PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2560 Project Name. Bahia Integrated Water Management Region

Size: px
Start display at page:

Download "PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2560 Project Name. Bahia Integrated Water Management Region"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2560 Project Name Bahia Integrated Water Management Region LATIN AMERICA AND CARIBBEAN Sector General water, sanitation and flood protection sector (45%); Health (40%); Sub-national government administration (15%) Project ID P Borrower(s) State of Bahia Implementing Agency SEPLAN (Secretary of Planning), will be the lead agency responsible for overall coordination of implementation of the proposed Project. Environment Category [ ] A [X] B [] C [ ] FI [ ] TBD (to be determined) Date PID Prepared September 25, 2009 Estimated Date of November 9, 2009 Appraisal Authorization Estimated Date of Board March 9, 2010 Approval 1. Key development issues and rationale for Bank involvement Bahia is Brazil s fifth largest state in terms of land size (564,692 km²), and fourth in terms of population with 14 million inhabitants, or 7.5 percent of the nation. According to the latest census, two-thirds of Bahia s inhabitants live in urban areas. Bahia occupies 36 percent of the Northeast Region the poorest region in the country with more than two-thirds of the state s land considered semi-arid. Bahia s GDP has grown at a faster pace than that of Brazil as a whole, but growth has been spatially skewed across the state. The state s 4 percent GDP growth in 2006 was ranked 6 th in Brazil 1, and its cumulative growth over the past four years was 21.6 percent, almost doubling the 14.4 percent growth rate for all of Brazil during the same time period. The majority of Bahia s 417 municipalities, however, especially the semi-arid ones, are not as prosperous: While 25 municipalities account for 75 percent of the state s GDP; the poorest 132 municipalities generate a combined 5 percent. In addition, 53 percent of the state s wealth is concentrated in the Salvador (the state capital) Metropolitan Region. Despite its economic growth, Bahia is still ranked 22 nd in Brazil s Human Development Index (HDI). The state s GDP growth has not translated into much improvement in the standard of living for the state s population as a whole 2. Although policies to stimulate economic growth (e.g. tax breaks for new businesses) contributed to Bahia s recent economic dynamism, these policies are proving to have limited effectiveness for the state s overall development, because many of these industries are concentrated in the chemical and metallurgical sectors which create relatively few employment opportunities, and because the foregone tax revenues that arise from tax incentives have 1 Bahia s GDP was 96.6 billion Reais (local currency), estimated for March One real is approximately equivalent to 2 USD. 2 Bahia s economic report 2007.

2 not necessarily translated into social development. As a result, the state s GDP growth has not translated into much improvement in the standard of living for the state s population as a whole 3. Bahia s territorial concentration of production and wealth has generated asymmetrical economic and social development, which is reflected in several social indicators: (i) 53.1 percent of the state s residents live in poverty, against a national figure of 45.3 percent 4 ; (ii) 24 percent of the population lives on less than R$ , compared to the national average of 12.3 percent; (iii) the illiteracy rate is 20.4 percent, much higher than the national average of 11.2 percent; (iv) maternal mortality is deaths per 100,000 live births, against a national average of ; and (v) only 31.7 percent of rural households have access to a safe water supply, compared to 53 percent nationwide 7. Health status in both Brazil and Bahia has significantly improved over the last ten years 8, but less so in Bahia than in the country as a whole. Federal programs such as the Family Health Program (Programa de Saude da Familia PSF), as well as the state-level health sector reform, have both contributed to expanding basic healthcare to Bahia s rural and poor populations. However, Bahia continues to face several important health challenges such as: Its infant mortality rate (IMR), despite a significant reduction from per 1,000 live births in 1997 to around 20 in , is the seventh highest in the country. The progress resulted primarily from a reduction in post-neonatal deaths (those between 28 days and one year of life, which is mostly affected by socio-economic conditions). Today the dominant component of IMR is neonatal mortality, which accounts for 69.2 percent of deaths of infants 28 days or younger 10. While post-neonatal mortality is primarily affected by hygiene behaviors and water supply, the neonatal mortality is affected mostly by obstetric and neonatal health care services. The maternal mortality ratio (MMR), at deaths per 100,000 live births (2006), has worsened in recent years, from the original 91.1 (in 2000), particularly affecting young women (25 percent of pregnancies from 1996 to 2007 were to mothers between ages of 10 and 19). The MMR is now recognized as one of the most serious public health challenges, especially since it is estimated that 90 percent of maternal deaths could be avoided through timely delivery of quality health care. Maternal health care is also key for the reduction of IMR, and especially early neonatal mortality. If the negative trend continues, by 2015 Bahia could reach an MMR of 148 deaths per 100,000 live births, far higher than its Millennium Development Goal (MDG) of Bahia received Bank assistance under the first phase of the APL I for the state s Health Sector Reform. The main strategy was to define ten health priorities and corresponding indicators to be achieved by at least 50 percent of Bahia s municipalities, expanding family health coverage to the 35 percent of the population. As a result of the first phase, Bahia surpassed the initial target, approaching the population coverage for almost 50 percent of its population, and with 61 percent of Bahia s municipalities meeting eight out of ten indicators. 3 Bahia s economic report Attacking Brazil s Poverty, World Bank 2001, and State s data Reference to State s data WHO: Center for classification of diseases (2006). 7 WHO/UNICEF 2001, and data from Bahia For example, infant mortality in Brazil fell 47 percent from 47.5 per 1,000 live births in 1990 to 24.1 per 1,000 live births in 2005; mortality rates from vaccine-preventable diseases in children are negligible; and less than 7 percent of deaths among children under five are attributed to diarrheal diseases. 9 Datasus, Brazil 2008 (last available year). 10 SESAB s administrative data

3 Three of the ten key indicators were not achieved by the State as a whole 11 : TB treatment, diarrhea, and low weight at birth. While in Bahia TB treatment with low cure rates is attributed to the many patients who abandon treatment, low weight at birth is mainly a consequence of increased youth pregnancies, and low quality maternal and neonatal health care. Low weight at birth affects neonatal mortality. Diarrhea is more correlated with socio-economic conditions, such as the lack of clean drinking water and sanitation services. While on average the rate of acute diarrhea in children is around eight per 1000, in rural areas its incidence is far more than nine. The most importance cause of infant post-neonatal mortality is diarrhea (40 percent). Water and sanitation are crucial for reducing morbidity and mortality due to diarrhea in children. All mentioned health indicators vary greatly across the state, with especially poor results in rural municipalities of the semi-arid region. The reduction of infant and maternal morbidity and mortality requires multi-sectoral interventions. Synergy between water and healthcare interventions represents one of the most powerful combinations in reducing morbidity and mortality. In the case of water, the importance of adequate water supply and sanitation in the prevention of diarrheal diseases has been recognized by the international community as key to reducing IMR. In the case of health, the quality of health care services is the most important condition for the reduction of neonatal mortality and advanced cases of dehydration in children due to diarrheal diseases. Others include better equipment, timely referrals from primary healthcare (health care regulation), better obstetric health care, and training. A strategy that combines interventions in both sectors (water and health), in Bahia s context has been recognized as the most cost-effective strategy in the reduction of diarrheal diseases and the ultimate reduction of the IMR regarding its post-neonatal component. A longitudinal study in Salvador, Bahia ( ) showed a reduction of 21 percent in diarrheal prevalence among children 0-36 months old (43 percent in the highest prevalence areas) as a result of the implementation of a sanitation program 12. In addressing infant morbidity and mortality due to diarrhea, the state of Bahia still requires to overcome significant challenges in the water sector. The State continues to build up its institutional capacity for addressing water resources management (WRM) to ensure adequate rules and organizational structures to allocate water across competing uses and protecting its quality. The passages of the new water law and establishment of new institutions have been a part of these efforts to consolidate Bahia s WRM system. While the State met targets initially established for the Water for All program providing water supply to 97 percent of the urban population, and 150,000 families in rural areas, the water indicators show that the State still faces significant challenges. In 2005, only 31.7 percent of rural households were connected to the state water supply network, while in the urban area, the proportion of households not connected was at 5.4 percent. The rural poorest populations are disproportionally affected by the lack of access to reliable water resources. Regarding the access to sanitation, the direst situation is in Bahia s rural areas, where only 5.7 percent of the population has access to adequate sewage systems even when pits are included. The Government of Bahia is implementing the Bahia s Strategic Plan for in order to improve the equity, quality and efficiency of its social development, in particular healthcare percent of Bahia s municipalities have achieved 8 out of 10 basic health indicators included in the Pacto pela Vida, signed between the municipalities and the state. 12 Barreto, M Effect of city-wide sanitation program on reduction in rate for childhood diarrhea in northeast Brazil: assessment by two cohort studies.

4 and water/sanitation services, including guaranteed access to quality health and the expansion of social infrastructure (housing, water, sanitation, and energy). In health, the objectives are to reduce maternal and neonatal mortality as well as morbidity and mortality due to diarrhea in all Bahia s municipalities. For water, the objective is to guarantee access to adequate and safe water supply, adequate sanitation and treatment through an integrated water resources management. The State Government is committed to managing public policies effectively, and to seek synergies between different sectors. The State has requested Bank assistance to finance a multisector operation focusing on the health and water sectors, based on the evidence of positive impact of synergies 13 between these two critical sectors in their effect on a multi-sector problem of health. In addition, the use of multi-sector-based indicators to track the results of government actions is the initial step for the implementation of a more comprehensive monitoring system for all public policies. Rationale for Bank Involvement. The Bank has partnered with Brazil on regional development policies and specifically with the State of Bahia since the late 1990s. In addition to benefitting from several Bank-supported federal programs implemented by Brazil s states and municipalities, Bahia has had direct Bank lending for both health and water sectors, recently including the Health Sector Reform APL, Phase I (Loan 7182-BR), and the Bahia Integrated Water Resources Management Project - PGRH Project (Loan 4232-BR). The proposed Project is closely aligned with Brazil s Country Partnership Strategy. The proposed Project addresses selected key areas in the Equitable Brazil Plan for the FY period: (i) extending health and education coverage and systems and improving the quality of these services; (ii) strengthening the accountability and the M&E performance of relevant institutions; (iii) increasing involvement in the areas of health and education at the State and Municipal levels; (iv) focusing urban development efforts in excluded communities; and (v) prioritizing investment in the Northeastern region. 2. Proposed objective(s) Higher Development Objective. In order to support Bahia s main health strategy of reducing the state s IMR, the Bahia Health and Water SWAp objectives are: i) the reduction of State s morbidity and mortality due to diarrhea in children under one year of age (to affect the post-neonatal component of the IMR), and (ii) the reduction of early neonatal mortality (less than seven days) in 45 selected reference hospitals (to affect the neonatal component of the IMR). The Project would support capacity building of the corresponding public institutions related to the mentioned objectives, in the context of the State Government s Strategic Plan for Specific Project Objectives: The Project would: (i) Reduce morbidity due to diarrhea in children under one years of age (ii) Reduce mortality due to diarrhea in children under one year of age (iii) Reduce early neonatal mortality in 45 selected reference hospitals (iv) Strengthen the state s WRM system, by supporting the implementation of WRM instruments to improve and monitor the state s water quality (v) Facilitate the access of WSS services in 30 selected municipalities affected by diarrhea (vi) Support the annual management performance agreements between EMBASA and the Ministry of Cities for improving the efficiency, effectiveness, and quality of 417 water systems. 13 Pan-American Health Organization data shows that water supply and sanitation services contribute to improve health conditions particularly in marginal areas.

5 3. Preliminary description The proposed $60 million loan would be a multi-sector Specific Investment Loan (SIL) following a SWAp approach. Building upon earlier Bank assistance to the state in the water and health sectors, the loan would finance selected state-level investment programs in water, health and public management (Eligible Expenditure Programs, or EEPs). The basic design of the SWAp would be similar to previously approved operations supporting state-level programs in Ceara, Minas Gerais, Pernambuco and the Distrito Federal. A SIL under a SWAp approach is preferred for several reasons. First, the State of Bahia has a defined program that should be supported in a multi-sectoral manner. Since a SWAp allows for combined sector support with a focus on specific programs, the model is the most conducive to Bahia s needs. Second, by supporting and contributing to improve the Government s ongoing programs, Bank assistance would be fully owned by and integrated within those programs, especially by pooling Government and Bank resources. Finally, Brazil, and specifically Bahia, has strong financial management systems that can be relied upon for the Bank s fiduciary requirements, allowing for transparent, robust disbursement processes. By adopting this approach, World Bank s disbursements would be heavily concentrated in a few programs to accelerate their implementation and the achievement of expected results. To maintain continuity, the state investment programs supported by the previous Bankfinanced health and water projects (Loan 7182-BR and Loan 4232-BR respectively), would continue to be supported under the proposed SWAp since they continue to be priority programs for the state. In addition to providing assistance for these and other water and health sectoral investments under EEPs, a technical assistance component would be included to support the assistance needed for implementing the project in the sectors, as well as for strengthening the public management monitoring system. The proposed Project would have two components: a SWAp component for the two project objectives; and an institutional modernization component for supporting the sectors in achieving the objectives. Component 1: SWAp component will have two sub-components. Sub - Component A: Reduce the State s morbidity and mortality due to diarrhea in children under one year of age. This sub component will include the EEPs: (i) Water for All (small scale water supply systems); (ii) Comprehensive Water Resources Management; (iii) Managing Water Resources for Sustainable Development; (iv) Bahia Health Sector Modernization; and (v) Comprehensive healthcare for strategic and vulnerable populations (rotavirus vaccination to children less one year of age). Sub Component B: The reduction of early neonatal mortality (less than 7 days) in 30 selected reference hospitals would include: Comprehensive Healthcare for Strategic and Vulnerable Populations. This subcomponent aims to support municipalities to expand and improve the quality of primary and secondary health services through the introduction of a Maternal and Neonatal Incentive Insurance System (MANIIS) to improve the quality of maternal and child health care services. Component 2: Institutional Modernization of health, water and planning sector The Component includes technical support for the water, health, and planning sectors and its institutions to improve the management, and the monitoring and evaluation capacities for implementing the selected interventions included in the project. Activities financed under this component would support: (i) identification of the programs to be monitored and evaluated in both Sectors; (ii) identification of an M&E system of WRM activities to be implemented by INGÁ, and for

6 programs to be implemented under SESAB; (iii) training on M&E and results based management for the sector-specific technical units implementing the Health and Water components of this SWAp; (iv) drafting a work plan for the implementation of M&E instruments in both Sectors and in SEPLAN; (v) supporting the development of M&E instruments for all three Sectors involved; (vi) defining M&E indicators; (vii) collecting data for program monitoring; (viii) data analysis, and (ix) drafting and consolidating monitoring narratives, as well as the dissemination of major results. 4. Safeguard policies that might apply In view of the nature of expenditures, capacity building, planning and management, as well as institutional development, with a focus on quality and efficiency areas to be triggered in both sectors and the fact that there are small scale rural supply systems, it is expected that the Environmental Assessment safeguard (OP/BP/GP 4.01) will apply. Background work to ensure compliance with the Bank s safeguard policies would benefit from prior and ongoing Bank-financed operations in Bahia, and to the extent possible, build upon work done in the context of preparation and implementation of earlier operations. Work has already begun on preparing an environmental assessment for Component 1. The Indigenous Peoples Safeguards (OP 4.10) will also apply. An IPP, building upon earlier work and tailored to the specific aspects of the proposed Project, has already begun. 5. Tentative Financing Source: ($m.) BORROWER 140 INTERNATIONAL BANK FOR RECONSTRUCTION AND 60 DEVELOPMENT Total Contact Point Contact: Fernando Lavadenz Title: Task Team Leader Tel: (202) Flavadenz@worldbank.org

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3313 Project Name. BO-Enhancing Human Capital of Children and Youth Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3313 Project Name. BO-Enhancing Human Capital of Children and Youth Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3313 Project Name BO-Enhancing Human Capital of Children and Youth Region LATIN AMERICA AND CARIBBEAN Sector Other social services (100%)

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Health Sector Support Project

More information

Document of. The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A OF AN INTEGRATED HEALTH AND WATER MANAGEMENT PROJECT LOAN NUMBER IBRD-7951

Document of. The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A OF AN INTEGRATED HEALTH AND WATER MANAGEMENT PROJECT LOAN NUMBER IBRD-7951 Public Disclosure Authorized Document of The World Bank Public Disclosure Authorized FOR OFFICIAL USE ONLY Report No: RES22987 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED 2 ND PROJECT

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Health Service Delivery Project (HSDP) Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Health Service Delivery Project (HSDP) Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Health Service Delivery Project (HSDP) Region AFRICA Sector Health (100%) Project ID P111840 Borrower(s) GOVERNMENT OF ANGOLA Implementing

More information

Health Sector Strategy. Khyber Pakhtunkhwa

Health Sector Strategy. Khyber Pakhtunkhwa Health Sector Strategy Khyber Pakhtunkhwa Health Sector Strategy-Khyber Pakhtunkhwa After devolution, Khyber Pakhtunkhwa is the first province to develop a Health Sector Strategy 2010-2017, entailing a

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Project Name Kosovo Health Project

More information

State Secretariat for Planning, Science and Technology (SEPLAN)

State Secretariat for Planning, Science and Technology (SEPLAN) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower Implementing Agency Report No. PID10306

More information

Tanzania Health Sector Development APL II Region

Tanzania Health Sector Development APL II Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5049 Project Name Tanzania Health Sector Development APL II Region Africa Sector Health (80%), Non-compulsory health finance (10%), Central

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country. Sector(s) Health (100%) Theme(s)

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country. Sector(s) Health (100%) Theme(s) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA61910 Project Name

More information

AFRICA. Investment Project Financing P Federal Ministry of Finance

AFRICA. Investment Project Financing P Federal Ministry of Finance Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA24330 Project Name

More information

Government of Peru Peru. PROVIAS Departamental Peru

Government of Peru Peru. PROVIAS Departamental Peru Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category Safeguard Classification PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB827 Regional Transport

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

Performance-Based Intergovernmental Transfers

Performance-Based Intergovernmental Transfers Performance-Based Intergovernmental Transfers Brazil s Family Health Program And Argentina s PLAN NACER Program Jerry La Forgia World Bank National Workshop for Results-Based Financing for Health Jaipur,

More information

Rwanda. UNICEF/Till Muellenmeister. Health Budget Brief

Rwanda. UNICEF/Till Muellenmeister. Health Budget Brief Rwanda UNICEF/Till Muellenmeister Health Budget Brief Investing in children s health in Rwanda 217/218 Health Budget Brief: Investing in children s health in Rwanda 217/218 United Nations Children s Fund

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Productive Initiatives For Solidarity Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Productive Initiatives For Solidarity Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5534 Project Name Productive

More information

Appendix 2 Basic Check List

Appendix 2 Basic Check List Below is a basic checklist of most of the representative indicators used for understanding the conditions and degree of poverty in a country. The concept of poverty and the approaches towards poverty vary

More information

COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) APPRAISAL STAGE

COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS)

More information

Sector-wide Health System and Social Development Support Project Region

Sector-wide Health System and Social Development Support Project Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1473 Country Mali Prpoject ID P093689 Project Name Sector-wide Health System and Social Development Support Project Region AFRICA Sector Health

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second School Access and Improvement

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second School Access and Improvement Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

Table 1 the Road Network of Mozambique (in kilometers)

Table 1 the Road Network of Mozambique (in kilometers) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2867 Roads

More information

STATUS REPORT ON MACROECONOMICS AND HEALTH NEPAL

STATUS REPORT ON MACROECONOMICS AND HEALTH NEPAL STATUS REPORT ON MACROECONOMICS AND HEALTH NEPAL 1. Introduction: Nepal has made a significant progress in health sector in terms of its geographical coverage by establishing at least one health care facility

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA32577 Project Name

More information

Making the case for Social Determinants of Health Through a Social Protection System The Chilean Case

Making the case for Social Determinants of Health Through a Social Protection System The Chilean Case Making the case for Social Determinants of Health Through a Social Protection System The Chilean Case I. Introduction Nowadays Chile faces favorable conditions to make the case for financing interventions

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social Welfare and Development Reform

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social Welfare and Development Reform Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social

More information

Project Information Document/ Identification/Concept Stage (PID)

Project Information Document/ Identification/Concept Stage (PID) Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated:

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5690 Project Name. STRENGTHENING THE PUBLIC HEALTH CARE SYSTEM PROJECT Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5690 Project Name. STRENGTHENING THE PUBLIC HEALTH CARE SYSTEM PROJECT Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5690 Project Name STRENGTHENING

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4270 Health Transformation and Social Security Reform Project.

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4270 Health Transformation and Social Security Reform Project. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4270 Health

More information

Cash transfers, impact evaluation & social policy: the case of El Salvador

Cash transfers, impact evaluation & social policy: the case of El Salvador September 8th, 2016 GPED Forum Vanderbilt University Cash transfers, impact evaluation & social policy: the case of El Salvador The talk aims to present the experience of El Salvador in the implementation

More information

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE <October 4, 2013> Report No.: 86550

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE <October 4, 2013> Report No.: 86550 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Operation Name PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report

More information

Working Towards a Harmonized Framework for Impact Reporting for Social Bonds

Working Towards a Harmonized Framework for Impact Reporting for Social Bonds Working Towards a Harmonized Framework for Impact Reporting for Social Bonds June 2018 Contents Introduction...2 Core Principles...4 Recommendations...5 Sample Summary Template for Reporting on Social

More information

Brazil. Poverty profile. Country profile. Country profile. November

Brazil. Poverty profile. Country profile.   Country profile. November Brazil Country profile Country profile 16 November www.devinit.org/pi This country profile is produced by Development Initiatives to support the National Dialogue on the 3 Agenda for Sustainable Development.

More information

Scaling up interventions in the Eastern Mediterranean Region. What does it take and how many lives can be saved?

Scaling up interventions in the Eastern Mediterranean Region. What does it take and how many lives can be saved? Scaling up interventions in the Eastern Mediterranean Region What does it take and how many lives can be saved? Introduction Many elements influence a country s ability to extend health service delivery

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2649. Date ISDS Prepared/Updated: 06/26/2009 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2649. Date ISDS Prepared/Updated: 06/26/2009 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 06/26/2009 I. BASIC INFORMATION A. Basic Project Data Country:

More information

THE WELFARE MONITORING SURVEY SUMMARY

THE WELFARE MONITORING SURVEY SUMMARY THE WELFARE MONITORING SURVEY SUMMARY 2015 United Nations Children s Fund (UNICEF) November, 2016 UNICEF 9, Eristavi str. 9, UN House 0179, Tbilisi, Georgia Tel: 995 32 2 23 23 88, 2 25 11 30 e-mail:

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3364 Project Name

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3364 Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3364 Project Name Minas

More information

Service Delivery and Fiscal Management DPL Region

Service Delivery and Fiscal Management DPL Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE December 4, 2014 Report No.: 93412 (The

More information

BROAD DEMOGRAPHIC TRENDS IN LDCs

BROAD DEMOGRAPHIC TRENDS IN LDCs BROAD DEMOGRAPHIC TRENDS IN LDCs DEMOGRAPHIC CHANGES are CHALLENGES and OPPORTUNITIES for DEVELOPMENT. DEMOGRAPHIC CHALLENGES are DEVELOPMENT CHALLENGES. This year, world population will reach 7 BILLION,

More information

EAST ASIA AND PACIFIC. Investment Project Financing P People's Republic of China

EAST ASIA AND PACIFIC. Investment Project Financing P People's Republic of China Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA31584 Project Name

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Social Protection & Labor Global Practice IBRD/IDA Investment Project Financing FY 2011 Seq No: 14 ARCHIVED on 21-Dec-2017 ISR30624 Implementing

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Social Protection Global Practice IBRD/IDA Adaptable Program Loan FY 2011 Seq No: 8 ARCHIVED on 18-Dec-2014 ISR16564 Implementing Agencies:

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1183 Project Name. Bahia Integrated Urban Development Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1183 Project Name. Bahia Integrated Urban Development Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1183 Project Name Bahia

More information

New Multidimensional Poverty Measurements and Economic Performance in Ethiopia

New Multidimensional Poverty Measurements and Economic Performance in Ethiopia New Multidimensional Poverty Measurements and Economic Performance in Ethiopia 1. Introduction By Teshome Adugna(PhD) 1 September 1, 2010 During the last five decades, different approaches have been used

More information

INVESTING IN FAMILY PLANNING FOR ACCELERATED ACHIEVEMENT OF MDGs. Dr. Wilfred Ochan Assistant Representative, UNFPA

INVESTING IN FAMILY PLANNING FOR ACCELERATED ACHIEVEMENT OF MDGs. Dr. Wilfred Ochan Assistant Representative, UNFPA Uganda United Nations Population Fund INVESTING IN FAMILY PLANNING FOR ACCELERATED ACHIEVEMENT OF MDGs. Dr. Wilfred Ochan Assistant Representative, UNFPA at SEAPACOH Workshop Speke Resort Munyonyo September

More information

Rwanda. Till Muellenmeister. Health Budget Brief

Rwanda. Till Muellenmeister. Health Budget Brief Rwanda Till Muellenmeister Health Budget Brief Investing in children s health in Rwanda 217/218 Health Budget Brief: Investing in children s health in Rwanda 217/218 United Nations Children s Fund (UNICEF)

More information

ONE WASH NATIONAL PROGRAMME (OWNP)

ONE WASH NATIONAL PROGRAMME (OWNP) ONE WASH NATIONAL PROGRAMME (OWNP) ONE Plan ONE Budget ONE Report planning with linked strategic and annual WASH plans at each level budgeting re ecting all WASH-related investments and expenditures financial

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3376 Project Name Jamaica

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5681 STRENGTHENING HEALTH ACTIVITY FOR THE RURAL POOR PROJECT Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5681 STRENGTHENING HEALTH ACTIVITY FOR THE RURAL POOR PROJECT Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5681 STRENGTHENING

More information

The Trend and Pattern of Health Expenditure in India and Its Impact on the Health Sector

The Trend and Pattern of Health Expenditure in India and Its Impact on the Health Sector EUROPEAN ACADEMIC RESEARCH Vol. III, Issue 9/ December 2015 ISSN 2286-4822 www.euacademic.org Impact Factor: 3.4546 (UIF) DRJI Value: 5.9 (B+) The Trend and Pattern of Health Expenditure in India and Its

More information

Public Disclosure Authorized. Report No.:AC634. Project ID: P Project: Health Transition Project. TTL: Enis Baris

Public Disclosure Authorized. Report No.:AC634. Project ID: P Project: Health Transition Project. TTL: Enis Baris Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (ISDS) Section I - Basic Information Date ISDS Prepared/Updated:

More information

1. Key development issues and rationale for Bank involvement

1. Key development issues and rationale for Bank involvement Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DRAFT PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5278 Project Name

More information

First Consolidated Annual Progress Report on Activities Implemented under the Lesotho One UN Fund

First Consolidated Annual Progress Report on Activities Implemented under the Lesotho One UN Fund First Consolidated Annual Progress Report on Activities Implemented under the Lesotho One UN Fund Report of the Administrative Agent of the Lesotho One UN Fund for the Period 1 January to 31 December 2011

More information

Project Name. Region Sector

Project Name. Region Sector Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Lending Instrument Project ID Borrower(s) Implementing

More information

Health Planning Cycle

Health Planning Cycle Health Planning Cycle Moazzam Ali Department of Reproductive Health and Research WHO In today's presentation Definitions Rationale for health planning Health planning cycle outline Step by step introduction

More information

The MPI as a governance tool to support the achievement of the SDGs

The MPI as a governance tool to support the achievement of the SDGs The MPI as a governance tool to support the achievement of the SDGs Revisiting socio-economic policies to address poverty in all its dimensions in Middle Income Countries, Beirut, May 2018 Diego Zavaleta

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE GUINEA: EDUCATION FOR

More information

Experience in Setting National Nutrition Targets and Commitments to Actions: The Case for Zambia

Experience in Setting National Nutrition Targets and Commitments to Actions: The Case for Zambia Experience in Setting National Nutrition Targets and Commitments to Actions: The Case for Zambia Methods of Establishing National Nutrition Targets Introduction Stakeholder consultation on nutrition priorities,

More information

Colombia REACHING THE POOR WITH HEALTH SERVICES. Using Proxy-Means Testing to Expand Health Insurance for the Poor. Public Disclosure Authorized

Colombia REACHING THE POOR WITH HEALTH SERVICES. Using Proxy-Means Testing to Expand Health Insurance for the Poor. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized REACHING THE POOR WITH HEALTH SERVICES Colombia s poor now stand a chance of holding

More information

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Second Disaster Risk Management Development Policy Loan with a CAT-DDO Region

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Second Disaster Risk Management Development Policy Loan with a CAT-DDO Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Operation Name Second Disaster

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

Financing strategies to achieve the MDGs in Latin America and the Caribbean

Financing strategies to achieve the MDGs in Latin America and the Caribbean UNDP UN-DESA UN-ESCAP Financing strategies to achieve the MDGs in Latin America and the Caribbean Rob Vos (UN-DESA/DPAD) Presentation prepared for the inception and training workshop of the project Assessing

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 14-Jul-2014

More information

FISCAL STRATEGY PAPER

FISCAL STRATEGY PAPER REPUBLIC OF KENYA MACHAKOS COUNTY GOVERNMENT THE COUNTY TREASURY MEDIUM TERM FISCAL STRATEGY PAPER ACHIEVING EQUITABLE SOCIAL AND ECONOMIC DEVELOPMENT IN MACHAKOS COUNTY FEBRUARY2014 Foreword This Fiscal

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857 Project

More information

Statement. H.E. Mr. Cheick Sidi Diarra

Statement. H.E. Mr. Cheick Sidi Diarra Please check against delivery Statement by H.E. Mr. Cheick Sidi Diarra Under-Secretary-General Special Adviser on Africa and High Representative for the Least Developed Countries, Landlocked Developing

More information

Implementation Status & Results India India: Reproductive & Child Health Second Phase (P075060)

Implementation Status & Results India India: Reproductive & Child Health Second Phase (P075060) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India India: Reproductive & Child Health Second Phase

More information

Framework for Monitoring Progress towards Universal Health Coverage in Bangladesh

Framework for Monitoring Progress towards Universal Health Coverage in Bangladesh Framework for Monitoring Progress towards Universal Health Coverage in Bangladesh Md. Ashadul Islam Director General Health Economics Unit Ministry of Health and Family Welfare National Commitment to UHC

More information

Improving Maternal and Child Health through Integrated Social Services (P123706)

Improving Maternal and Child Health through Integrated Social Services (P123706) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Haiti Health, Nutrition & Population Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 11 ARCHIVED on 31-Dec-2018 ISR35476 Implementing

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC695 Project Name DO

More information

CASH TRANSFERS, IMPACT EVALUATION & SOCIAL POLICY: THE CASE OF EL SALVADOR

CASH TRANSFERS, IMPACT EVALUATION & SOCIAL POLICY: THE CASE OF EL SALVADOR CASH TRANSFERS, IMPACT EVALUATION & SOCIAL POLICY: THE CASE OF EL SALVADOR By Carolina Avalos GPED Forum September 8th, 2016 Vanderbilt University Nashville, TN El Salvador El Salvador is the smallest

More information

Overview of Progress of Maternal Health in Nepal: A Case Study

Overview of Progress of Maternal Health in Nepal: A Case Study Overview of Progress of Maternal Health in Nepal: A Case Study Dr Babu Ram Marasini, MBBS,MPH Coordinator, Health Sector Reform Unit Ministry of Health & Population, Nepal Presented at 7 th Annual ODI-CAPE

More information

Parliament of the Republic of Macedonia. Law on Balanced Regional Development

Parliament of the Republic of Macedonia. Law on Balanced Regional Development Parliament of the Republic of Macedonia Law on Balanced Regional Development Skopje, May 2007 0 LAW ON BALANCED REGIONAL DEVELOPMENT I. GENERAL PROVISIONS Content of the Law Article 1 (1) This Law regulates

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Russia

More information

IEG. ICR Review Independent Evaluation Group. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

IEG. ICR Review Independent Evaluation Group. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted: 05/26/2015 Report Number: ICRR14633 Public Disclosure Authorized Public Disclosure Authorized Public

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING EXPANDING ACCESS TO REDUCE HEALTH INEQUITIES PROJECT (APL III)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING EXPANDING ACCESS TO REDUCE HEALTH INEQUITIES PROJECT (APL III) Public Disclosure Authorized Document of The World Bank Report No: 73337-BO Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF EXPAING ACCESS TO REDUCE HEALTH INEQUITIES

More information

Project Information Document/ Identification/Concept Stage (PID)

Project Information Document/ Identification/Concept Stage (PID) Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated:

More information

Tracking Government Investments for Nutrition at Country Level Patrizia Fracassi, Clara Picanyol, 03 rd July 2014

Tracking Government Investments for Nutrition at Country Level Patrizia Fracassi, Clara Picanyol, 03 rd July 2014 Tracking Government Investments for Nutrition at Country Level Patrizia Fracassi, Clara Picanyol, 03 rd July 2014 1. Introduction Having reliable data is essential to policy makers to prioritise, to plan,

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4543 Project Name. 1. Key development issues and rationale for Bank involvement

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4543 Project Name. 1. Key development issues and rationale for Bank involvement PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4543 Project Name Honduras State Modernization Region LATIN AMERICA AND CARIBBEAN Sector General public administration sector (100%) Project

More information

Country Presentation of Nepal

Country Presentation of Nepal Country Presentation of Nepal on Inclusion Presentation By: Ram Chandra Dhakal, Ph.D. Executive Director Centre for Economic Development and Administration(CEDA),Tribhuvan University, Nepal 1 ST ADB-Asia

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC23166 Project Name Strengthening

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE PY Energy Sector Strengthening

More information

Human Development Indices and Indicators: 2018 Statistical Update. Brazil

Human Development Indices and Indicators: 2018 Statistical Update. Brazil Human Development Indices and Indicators: 2018 Statistical Update Briefing note for countries on the 2018 Statistical Update Introduction Brazil This briefing note is organized into ten sections. The first

More information

RWANDA PERFORMANCE BASED SYSTEM: PUBLIC REFOMS. Dr Claude SEKABARAGA Ministry of health

RWANDA PERFORMANCE BASED SYSTEM: PUBLIC REFOMS. Dr Claude SEKABARAGA Ministry of health RWANDA PERFORMANCE BASED SYSTEM: PUBLIC REFOMS Dr Claude SEKABARAGA Ministry of health June 2008 Outline Background and vision; Rwanda is back on track for the health MDG s; Health sector reforms: Results

More information

UNICEF s equity approach: from the 2010 Narrowing the Gaps study via equity focused programming and monitoring to a Narrowing the Gaps+5 study &

UNICEF s equity approach: from the 2010 Narrowing the Gaps study via equity focused programming and monitoring to a Narrowing the Gaps+5 study & UNICEF s equity approach: from the 2010 Narrowing the Gaps study via equity focused programming and monitoring to a Narrowing the Gaps+5 study & EQUIST Narrowing the Gaps: Right in Principle, Right in

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 16-Mar-2012

More information

Operation Name Region Sector. Project ID Borrower(s) Implementing Agency

Operation Name Region Sector. Project ID Borrower(s) Implementing Agency Operation Name Region Sector Project ID Borrower(s) Implementing Agency PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3497 BR - RIO GRANDE DO SUL FISCAL SUSTAINABILITY LATIN AMERICA AND

More information

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.:

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: 113653 Program

More information

Reports of the Regional Directors

Reports of the Regional Directors ^^ 禱 ^^^^ World Health Organization Organisation mondiale de la Santé EXECUTIVE BOARD Provisional agenda item 4 EB99/DIV/8 Ninety-ninth Session 30 October 1996 Reports of the Regional Directors Report

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2062 Bono de Desarrollo Humano Adaptable Lending 1st Phase Project

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2062 Bono de Desarrollo Humano Adaptable Lending 1st Phase Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2062 Bono

More information

COUNTRY CASE STUDY UNIVERSAL HEALTH INSURANCE IN COSTA RICA. Prepared by: Di McIntyre Health Economics Unit, University of Cape Town

COUNTRY CASE STUDY UNIVERSAL HEALTH INSURANCE IN COSTA RICA. Prepared by: Di McIntyre Health Economics Unit, University of Cape Town COUNTRY CASE STUDY UNIVERSAL HEALTH INSURANCE IN COSTA RICA Prepared by: Di McIntyre Health Economics Unit, University of Cape Town Preparation of this material was funded through a grant from the Rockefeller

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA16636 Project Name

More information

Evaluation of Budget Support Operations in Morocco. Summary. July Development and Cooperation EuropeAid

Evaluation of Budget Support Operations in Morocco. Summary. July Development and Cooperation EuropeAid Evaluation of Budget Support Operations in Morocco Summary July 2014 Development and Cooperation EuropeAid A Consortium of ADE and COWI Lead Company: ADE s.a. Contact Person: Edwin Clerckx Edwin.Clerck@ade.eu

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project Region EUROPE AND CENTRAL ASIA Sector Roads and highways (70%);Railways

More information

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING

More information

Chapter - Chapter 02

Chapter - Chapter 02 Chapter - 02 Planning in India The need for planned, coordinated economic development under government guidance was recognized all along the freedom movement. In the 1930s, as the freedom struggle intensified,

More information

Human Development Indices and Indicators: 2018 Statistical Update. Peru

Human Development Indices and Indicators: 2018 Statistical Update. Peru Human Development Indices and Indicators: 2018 Statistical Update Briefing note for countries on the 2018 Statistical Update Introduction Peru This briefing note is organized into ten sections. The first

More information

PNG s national strategy and plan for the Health and Education Sectors

PNG s national strategy and plan for the Health and Education Sectors PNG s national strategy and plan for the Health and Education Sectors Presentation by: Department of National Planning and Monitoring, at CIMC New Guinea Islands Regional Forum, Kimbe, West New Britain

More information

The Impact of Community-Based Health Insurance on Access to Care and Equity in Rwanda

The Impact of Community-Based Health Insurance on Access to Care and Equity in Rwanda TECH N IC A L B R I E F MARCH 16 Photo by Todd Shapera The Impact of Community-Based Health Insurance on Access to Care and Equity in Rwanda W ith support from The Rockefeller Foundation s Transforming

More information

Beneficiary View. Cameroon - Total Net ODA as a Percentage of GNI 12. Cameroon - Total Net ODA Disbursements Per Capita 120

Beneficiary View. Cameroon - Total Net ODA as a Percentage of GNI 12. Cameroon - Total Net ODA Disbursements Per Capita 120 US$ % of GNI Beneficiary View Cameroon - Official Development Assistance (OECD/DAC Data) Source: OECD/DAC Database by Calendar Year (as of 2/2/213) unless noted. Cameroon - Total Net ODA as a Percentage

More information