1 Sustainable Recovery and Reconstruction Framework (SURRF) Saroj Kumar Jha Program Manager Global Facility for Disaster Reduction and Recovery The World Bank Group, Washington DC 1
2 The definitional challenge ISDR defines Recovery as Decisions and actions taken after a disaster with a view to restoring or improving the pre-disaster living conditions of the stricken community, while encouraging and facilitating necessary adjustments to reduce disaster risk. Recovery (rehabilitation and reconstruction) affords an opportunity to develop and apply disaster risk reduction measures. -Source: UN ISDR 2
3 Phases of earthquake disaster response One month after Wenchuan earthquake 3
4 The recovery that we should avoid.. In 1954, an earthquake caused massive damage in then-orleansville, Algeria. A building boom followed but with indications of negligence and lax controls. Then, just 26 years later in October 1980, the same town, but now called El Asnam following Algerian independence, was again devastated by an earthquake. In 1970, after the catastrophic cyclone in Bangladesh(then East Pakistan), a number of cyclone shelters were built in areas adjacent to Bay of Bengal. These porly designed, ill-sited and often located beyond a reasonable distance had to be abandoned. Following the cyclone in 1991, cyclone shelters had to redesigned, enlarged, and relocated closer to the population centers. In 1984, after a major landlside in Venezuela, several thousands of people were settled on steep and degraded slopes. Though considered safe and viable then, unplanned and uncontrolled local development made the slopes unstable and as a result, more than people died in a massive mudslide and floods in
5 Sustainable Recovery and Reconstruction Framework (SURRF) Vision Well functioning society and economy Elements Damage and Needs Assessment Stategic Planning Resource Mobilization Revival of Economy SURFF Recovery continuum Pre-disaster planning Relief Reconstruction Development Cross-Cutting Issues Gender Empowerment Social protection Stakeholders Evaluation Environment Guiding principles Good practices Government led Local participation Capcity and institution building Risk reduction 5
6 Recovery & Reconstruction: Opportunity for Sustainable Development Creating a Vision What do we want to have when we are finished? (More than just stronger buildings) What are the objectives at household, community, and national level? People living, working, and investing with confidence Well-designed infrastructure, social and health services Growth-oriented economy Reduced vulnerability Example: Kobe Hyogo Phoenix Plan Target completion: pillars: welfare society, rich culture, growing industry, disaster-resistance, multi-centered urban development Kobe Destruction 6
7 Guiding Principles for Recovery Transfer of Lessons Each disaster is unique no blueprint for effective recovery But lessons from good practice can be drawn Importance of sharing information South south cooperation Government led with int l support Combination of national and international expertise Local Participation Example Pakistan, Gujarat: Owner-driven reconstruction using local materials Government provided training to match demand and financial assistance (e.g. tax exemptions, tranche payments) and materials Reconstruction Construction Material Hut in Pakistan 7
8 Guiding Principles for Recovery Capacity and institution building, policy making Focal point institutions Turkey Emergency Management General Directorate National Disaster Management Authority in Pakistan Tasks: Policies, coordination, standards, monitoring, capacity building Policies: Japan: Seismic Retrofitting Act; Gujarat: Earthquake Rehabilitation Plan; Turkey: Compulsory insurance for residential buildings Integration of risk reduction Gujarat: Ensuring code standards through third party quality control (National Council for Cement and Building Materials) Paradigm shift in Turkey: In the past Fate Reactive Recovery Wait and see Ex-post Crisis management Ad-hoc efforts Development at risk New strategic approach Choice Proactive Mitigation Anticipate and prevent Ex-ante Risk management Comprehensive approach Sustainable development 8
9 Elements of a Recovery Process Joint Damage and Needs Assessment Estimates of the damages and needs in all social and economic sectors Base for a comprehensive recovery and reconstruction strategy Strategic planning Design of framework and plans Gujarat: Atlas with maps for preparation of development plans and public awareness Assessment of Damages and Losses by Sector Traditional markets on specific streets Traffic congestion Large central market area Market streets for pedestrians Gujarat Planning Maps Green spaces No hierarchy of streets Existing Plots have no proper access Well planned street network Proposed Proper access for all plots 9
10 Elements of a Recovery Process Resource Mobilization: Finances Funds typically diverted from longterm development Multi-Donor Fund (Indonesia) Risk transfer (Turkey Catastrophe Insurance Pool) Clearly distinguished roles of different players (Pakistan) Private Sector Participation Human capacity: Gujarat: training of engineering students to inspect buildings, schooling of masons to match demand Risk assessment and reduction experts Logistical capacity Speed: Restoring decades of development in a short time period Flexibility Transportation Disaster Community Management Participation Others Urban Infrastructure, Health Rural & Cottage Industry Rural Water Supply Education Public Buildings Agriculture Project Management Dams & Irrigation Shares of Recovery Finances Spent in Gujarat by Sector 10 Housing Mobilizing Human Capacity: Training after Pakistan earthquake
11 Elements of a Recovery Process Basic Services and Social Protection Cash transfer schemes, grants in kind, start-up grants Restoring health, education and other basic services Infrastructure reconstruction and development Creation of intermedidate job opportunities Economic recovery and development Re-establishing livelihoods and reduce poverty Strengthening institutional capacities Local institutions, decentralize management Strengthening information and coordination mechanisms Efficiency of the interventions, phasing of recovery operations Building disaster prevention in recovery and reconstruction Reduce vulnerability to future hazards Quake-proof hospital reconstruction in Pakistan Drainage work in Gujarat 11
12 Cross-Cutting Issues in Recovery Empowering individuals and communities To reflect concerns and needs of the affected Reduces social tensions and leads to more sustainable development Gender mainstreaming Gujarat: Joint ownership of house by husband and wife Protection of the vulnerable Livelihood program Cash Grants for vulnerable households: Managed by central Gov. and executed by local Gov. Social rehabilitation and protection Quick recovery of schools, hospitals and other social services Environment Resourceful: Use of rubble for recycling Water, greenery, and public spaces: part of urban planning Community Participation 12 Gov. High School Rebuilding in Pakistan
13 Cross-Cutting Issues in Recovery Multiple stakeholder coordination Partnerships are crucial Key stakeholders: Local and nations Government, Private Sector, Civil Society, NGOs, UN agencies, International Organizations, Donors All parties need to be able to track progress (who is doing what where) Internet, good communications (Indonesia: regular newspaper) Evaluation Monitoring Impact Evaluation Internal and international validation Communication 13 Code compliance evaluation
14 Disaster Recovery and Reconstruction is a core expertise of the World Bank Experience in Disaster Response More than 600 World Bank financed disaster responses For instance: 60 Earthquakes, 243 Floods, 76 Storms More than 60 damage and needs assessments Total Lending Amount Non-meteorological disasters (earthquakes, volcanoes): $ 8.1 billion Meteorological disasters (floods, storms, others): $ 8.9 billion Types of Assistance Damage and needs assessments Recovery and reconstruction Risk Financing and Insurance Analytical and Advisory Activities Training and Capacity building Disaster Prevention Emergency Preparedness 14
15 World Bank offers global knowledge and innovative finance -Rapid Response Policy for flexible and innovative financing of emergency operations -The Global Facility for Disaster Reduction and Recovery(GFDRR) Post-Disaster Emergency Recovery Loans Asset restoration, reconstruction of economic, social, and physical systems Additional Financing The Bank can provide Additional Financing in the context of ongoing projects Technical Assistance Damage and needs assessments, recovery and reconstruction planning Global Knowledge and Good Practices Build back good enough 15
16 Packaging Global knowledge and Innovative Finance Disaster Response to Disaster Prevention: Investment Loans Turkey Marmara Earthquake Reconstruction (2000): $ 505 Million Istanbul Seismic Risk Mitigation (2005): $ 400 Million Property Catastrophe Insurance Program Public-private sector partnerships to establish efficiently priced insurance for homeowners; In Turkey, 2.7 million of such policies sold in 2007 Contingency Loans Offering immediate liquidity after a disaster with Catastrophe Risk Deferred Drawdown Option (CatDDO), for instance in Turkey Catastrophe Risk Insurance Accessing the international catastrophe reinsurance markets on competitive terms Advisory Services Technical guidance for government to mainstream risk reduction Peer to peer learning through South-South Cooperation Support in developing a long-term plan of action and institutional frameworks The World Bank assists borrowers in designing their disaster risk management programs and works with them in defining a risk financing solution most adapted to their needs 16
Global Facility for Disaster Reduction and Recovery. of the Hyogo Framework for Action. Kobe, January 15, 2007
Global Facility for Disaster Reduction and Recovery New Initiative to Enable / Accelerate the Implementation of the Hyogo Framework for Action Kobe, January 15, 2007 Maryvonne Plessis-Fraissard Senior
More informationSECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) 1. Sector Performance, Problems, and Opportunities
National Disaster Risk Management Fund (RRP PAK 50316) SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) A. Sector Road Map 1. Sector Performance, Problems, and Opportunities a. Performance
More informationSkardu, Pakistan. Local progress report on the implementation of the Hyogo Framework for Action (First Cycle)
Skardu, Pakistan Local progress report on the implementation of the Hyogo Framework for Action (First Cycle) Name of focal point: Habib Mughal Organization: UN-HABITAT - Pakistan Title/Position: Manager
More informationSendai Cooperation Initiative for Disaster Risk Reduction
Sendai Cooperation Initiative for Disaster Risk Reduction March 14, 2015 Disasters are a threat to which human being has long been exposed. A disaster deprives people of their lives instantly and afflicts
More informationGUJARAT EARTHQUAKE 2001?
WHAT HAS CHANGED AFTER GUJARAT EARTHQUAKE 2001? Presented by V. Thiruppugazh Joint Chief Executive Officer Gujarat State Disaster Management Authority Government of Gujarat HAVOC AND DEVASTATION 26 January
More informationDisaster Risk Reduction
Disaster Risk Reduction AHI M2 Extreme Environement Risk and vulnerability UPEC Universityof Creteil-Paris XII Aloysius John March 2012 Introduction There is growing international concern at the present
More informationEAP DRM KnowledgeNotes Disaster Risk Management in East Asia and the Pacific
Public Disclosure Authorized EAP DRM KnowledgeNotes Disaster Risk Management in East Asia and the Pacific Working Paper Series No. 13 Disaster risk reduction Public Disclosure Authorized Photos.com Public
More informationEarthquake 2005 Recovery and Reconstruction
Earthquake 2005 Recovery and Reconstruction 2 Earthquake 8 Oct 2005 Nine Districts 1. MANSHERA 2. BATAGRAM 3. SHANGLA 4. ABBOTTABAD 5. KOHISTAN Epicentre 6. MUZAFFARABAD 7. NELUM 8. BAGH 9. RAWALAKOT Depth:
More informationSkardu, Pakistan. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (First Cycle)
Skardu, Pakistan Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (First Cycle) Name of focal point: Habib Mughal Organization: UN-HABITAT - Pakistan Title/Position:
More informationPalu, Indonesia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )
Palu, Indonesia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical
More informationpartnership charter I. Background II. Mission
Partnership Charter GLOBAL FACILITY FOR DISASTER REDUCTION AND RECOVERY 1 partnership charter I. Background 1. The Global Facility for Disaster Reduction and Recovery (GFDRR) is a global partnership program
More informationDISASTER RISK REDUCTION AND CLIMATE CHANGE ADAPTATION PROGRAMME FOR THE GAMBIA. Presentation
DISASTER RISK REDUCTION AND CLIMATE CHANGE ADAPTATION PROGRAMME FOR THE GAMBIA Presentation THE NATIONAL DISASTER AND CLIMATE CHANGE ADAPTATION PROGRAMME The programme as outlined in Chapter 5 of the document
More informationReducing vulnerability to disasters is an integral part of the fight against
IDA at Work Managing Natural Hazards, Reducing Risks to Development Reducing vulnerability to disasters is an integral part of the fight against poverty. A natural disaster can destroy decades of development
More informationDisasters are a development issue and one of growing importance
Abstract of speech by Ms Maryvonne Plessis-Fraissard Director, Transport, Urban and Hazard Management At the Public Forum Winning Against Disasters Role of Education, Development and Community Action For
More informationPalu, Indonesia. Local progress report on the implementation of the Hyogo Framework for Action ( )
Palu, Indonesia Local progress report on the implementation of the Hyogo Framework for Action (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical Support Consultant
More informationBinjai, Indonesia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )
Binjai, Indonesia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical
More informationMournag, Tunisia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )
Mournag, Tunisia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Kamal Alelwy Organization: La ville de Mournag Title/Position:
More informationBone Bolango, Indonesia
Bone Bolango, Indonesia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical
More informationBeirut, Lebanon. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )
Beirut, Lebanon Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Bilal Hamad Organization: - Title/Position: - E-mail address:
More informationSri Lanka: Preliminary Damage and Needs Assessment Page 25 of 29
Sri Lanka: Preliminary Damage and Needs Assessment Page 25 of 29 F. IMMEDIATE AND MEDIUM TERM RECOVERY STRATEGY Implementation Approach 75. One of the main challenges of developing a comprehensive, as
More informationCayman Islands. National progress report on the implementation of the Hyogo Framework for Action ( ) - interim
Cayman Islands National progress report on the implementation of the Hyogo Framework for Action (2009-2011) - interim Name of focal point : McCleary Frederick Organization : Hazard Management Cayman Islands
More informationBirgunj Sub metropolitan City, Nepal
Birgunj Sub metropolitan City, Nepal Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: - - Organization: - Title/Position: -
More informationPatika, Pakistan. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (First Cycle)
Patika, Pakistan Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (First Cycle) Name of focal point: Habib Mughal Organization: UN-HABITAT - Pakistan Title/Position:
More informationEx Ante Financing for Disaster Risk Management and Adaptation
Ex Ante Financing for Disaster Risk Management and Adaptation A Public Policy Perspective Dr. Jerry Skees H.B. Price Professor, University of Kentucky, and President, GlobalAgRisk, Inc. Piura, Peru November
More informationPadang Lawas, Indonesia
Padang Lawas, Indonesia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical
More informationREDUCING DISASTER RISK a challenge for development
Reducing Disaster Risk: a challenge for development REDUCING DISASTER RISK a challenge for development A Global Report from : United Nations Development Programme Bureau for Crisis Prevention and Recovery
More informationBarito Kuala, Indonesia
Barito Kuala, Indonesia Local progress report on the implementation of the Hyogo Framework for Action (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical Support
More informationIntroduction to the Disaster Risk Profile of Chittagong
Introduction to the Disaster Risk Profile of Chittagong subir Das Focal Person Youth Issue Young Power in Social Action (YPSA) Cell: +01716692292 Email: subir18bd@yahoo.com Chittagong at a Glance 2nd largest
More informationDISASTER RISK FINANCING AND INSURANCE PROGRAM
DISASTER RISK FINANCING AND INSURANCE PROGRAM Strengthening Financial Resilience to Disasters What We Do DRFIP helps developing countries manage the cost of disaster and climate shocks. The initiative
More informationPROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6188 Operation Name
More informationDisaster Risk Management & Mitigation
Disaster Risk Management & Mitigation 1 The concept of DRM accepts that some hazard events may occur But tries to lessen the impact by improving the community s ability to absorb the impact with minimum
More informationSouth Eastern Europe
Disaster Risk Mitigation and Adaptation Programme At a glance THE WORLD BANK GFDRR Global Facility for Disaster Reduction and Recovery International Strategy for Disaster Reduction This publication was
More informationHousing Finance, Risk Mitigation And Post-disaster Reconstruction
Housing Finance, Risk Mitigation And Post-disaster Reconstruction Marja C Hoek-Smit Wharton School, University of Pennsylvania 5 th World Bank Housing Finance Conference May 30-31, 2012 Framing the Issue
More informationPublic Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Project Information Document Report No. PID8416 Turkey-Marmara Earthquake
More informationOFFICIAL -1 L(-L DOCUMENTS. Between. and
Public Disclosure Authorized OFFICIAL -1 L(-L DOCUMENTS ADDENDUM No 2 TO ADMINISTRATION AGREEMENT Between Public Disclosure Authorized Public Disclosure Authorized the EUROPEAN UNION (represented by the
More informationOFFICIAL DOCUMENTS. The World Bank. Public Disclosure Authorized. Public Disclosure Authorized
Public Disclosure Authorized OFFICIAL DOCUMENTS The World Bank 1818 H Street N.W. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL
More informationKathmandu, Nepal. Local progress report on the implementation of the Hyogo Framework for Action (First Cycle)
Kathmandu, Nepal Local progress report on the implementation of the Hyogo Framework for Action (First Cycle) Name of focal point: Devendra Dongol Organization: Kathmandu Metropolitan City Title/Position:
More informationPidie Jaya, Indonesia
Pidie Jaya, Indonesia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical
More informationTowards a Post-2015 Framework for Disaster Risk Reduction
Towards a Post-2015 Framework for Disaster Risk Reduction Introduction 1. The Hyogo Framework for Action 2005-2015 (HFA) Building the Resilience of Nations and Communities to Disasters, is the inspiration
More informationEARTHQUAKE RISK Mustafa Erdik
EARTHQUAKE RISK Mustafa Erdik EARTHQUAKE RISK/LOSS Loss is the reduction in value of an asset due to damage.. Risk is the uncertainty of loss. Risk or Loss estimation is the quantification of the earthquake
More informationIMPLEMENTATION OF THE IDNDR-RADIUS PROJECT IN LATIN AMERICA
IMPLEMENTATION OF THE IDNDR-RADIUS PROJECT IN LATIN AMERICA Carlos A VILLACIS 1 And Cynthia N CARDONA 2 SUMMARY In 1996, the Secretariat of the International Decade for Natural Disaster Reduction (IDNDR),
More informationFINAL CONSULTATION DOCUMENT May CONCEPT NOTE Shaping the InsuResilience Global Partnership
FINAL CONSULTATION DOCUMENT May 2018 CONCEPT NOTE Shaping the InsuResilience Global Partnership 1 Contents Executive Summary... 3 1. The case for the InsuResilience Global Partnership... 5 2. Vision and
More informationGlobal Facility. for Disaster Reduction and Recovery. A partnership for mainstreaming disaster mitigation in poverty reduction strategies.
Global Facility for Disaster Reduction and Recovery A partnership for mainstreaming disaster mitigation in poverty reduction strategies 1,2 g- Z AXIS 0,0 g- -0,2 g- 1,2 g- X AXIS 0,0 g- -0,2 g- World Bank
More informationInvesting in Business Continuity Planning (BCP) for Coastal Community
Advancing Business Continuity in a Challenging Environment Investing in Business Continuity Planning (BCP) for Coastal Community Dr. Khairul Hisyam Kamarudin May 2018 INTRODUCTION Malaysia has a tropical
More informationOVERVIEW. Linking disaster risk reduction and climate change adaptation. Disaster reduction - trends Trends in economic impact of disasters
Linking disaster risk reduction and climate change adaptation Inter-Agency Secretariat for the International Strategy for Disaster Reduction (UNISDR) A. Trends OVERVIEW B. Disaster reduction a tool for
More informationPadang Lawas, Indonesia
Padang Lawas, Indonesia Local progress report on the implementation of the Hyogo Framework for Action (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical Support
More informationNational Disaster Risk Management Strategy For Republic of Tajikistan
National Disaster Risk Management Strategy For 2010 2015 Republic of Tajikistan President speech Page 1 Government of the Republic of Tajikistan DECREE March 30, 2010 # 164 Dushanbe About approval of the
More informationMainstreaming Disaster Risk Reduction into National Development Planning and Financing in Asia-Pacific
Mainstreaming Disaster Risk Reduction into National Development Planning and Financing in Asia-Pacific Outline 1. Development, sustainable development and disaster 2. Guidelines for mainstreaming Disaster
More informationMainstreaming Disaster Risk Reduction into Development Policy, Planning and Implementation
International Perspectives: Mainstreaming Disaster Risk Reduction into Development Policy, Planning and Implementation Loy Rego Arghya Sinha Roy The views expressed in this paper are the views of the authors
More informationEffective Disaster Risk Management for Sustainable Development
Effective Disaster Risk Management for Sustainable Development Catastrophe Risk Insurance: Key Challenges and Opportunities - Project Dissemination Workshop Sofia, Bulgaria, May 27, 2008 Margaret Arnold,
More informationBriefing on the Reconstruction Progress of Lushan Earthquake-Affected Area
2014/SOM1/EPWG/031 Agenda Item: 9.6 Briefing on the Reconstruction Progress of Lushan Earthquake-Affected Area Purpose: Information Submitted by: China 6 th Emergency Preparedness Working Group Meeting
More informationFinancing Options and Issues Session 6: Access to Financing Options and Instruments
IMF Workshop on Building Resilience to Natural Disasters and Climate Change DISASTER RISK FINANCING AND INSURANCE PROGRAM (DRFIP) April 4-6 2017 Financing Options and Issues Session 6: Access to Financing
More informationBatam, Indonesia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )
Batam, Indonesia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical
More informationCASE STUDY 4 The Experience of SEWA
CASE STUDY 4 The Experience of SEWA This paper explores the Self Employed Women s Association s (SEWA) experience using microfinance and safety nets to increase disaster resilience among the rural poor
More informationActual Project Name : Marmara Earthquake Emergency Reconstruction Project Country: Turkey US$M): Project Costs (US$M
Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 09/06/2007 Report Number : ICRR12684 Public Disclosure Authorized Public Disclosure Authorized Public
More informationDisaster Risk Reduction and Financing in the Pacific A Catastrophe Risk Information Platform Improves Planning and Preparedness
Disaster Risk Reduction and Financing in the Pacific A Catastrophe Risk Information Platform Improves Planning and Preparedness Synopsis The Pacific Islands Countries (PICs) 1, with a combined population
More informationCatastrophe Risk Financing Instruments. Abhas K. Jha Regional Coordinator, Disaster Risk Management East Asia and the Pacific
Catastrophe Risk Financing Instruments Abhas K. Jha Regional Coordinator, Disaster Risk Management East Asia and the Pacific Structure of Presentation Impact of Disasters in developing Countries The Need
More informationResponding to the Earthquake in Nepal. Avani Dixit, Disaster Risk Management Specialist Jyoti Pandey, Social Protection Analyst
Responding to the Earthquake in Nepal Avani Dixit, Disaster Risk Management Specialist Jyoti Pandey, Social Protection Analyst Earthquake and the response needs Housing reconstruction project: Grant &
More informationDisaster Risk Management
Disaster Risk Management Managing The Impacts of Extreme Weather and Climate Events Workshop on Climate Change and Disaster Risk Management in Planning and Investment Projects Session 8: Climate Change
More informationDisasters and Climate Change: Hazards of Nature or Risks from Development
Disasters and Climate Change: Hazards of Nature or Risks from Development Ajay Chhibber Director, Independent Evaluation Group World Bank Fourth Disasters and Development Seminar Tuesday, November 28,
More informationDr. Joseph A. Weinstock Asian Development Bank
New Directions of Asian Development Bank in Reducing Disaster Risk Dr. Joseph A. Weinstock Asian Development Bank January 20, 2005 Kobe, Japan Global Disasters 1974 2003: People Affected Region Mean Annual
More informationBuilding Regulation for Resilience In Low and Middle-Income Countries
Building Regulation for Resilience In Low and Middle-Income Countries The Contribution of Experience Fred Krimgold Virginia Tech ICC Global Forum Long Beach, September 28, 2015 Challenges Urbanization
More informationREDUCING DISASTER RISK a challenge for development
REDUCING DISASTER RISK a challenge for development A Global Report from : United Nations Development Programme Bureau for Crisis Prevention and Recovery Why a global UNDP Report on Disaster Risk Economic
More informationExperiences, Gaps and Needs in Disaster Risk Reduction and Climate Change Adaptation Planning and Financing
Experiences, Gaps and Needs in Disaster Risk Reduction and Climate Change Adaptation Planning and Financing Mr. Win Htut U Director Relief and Resettlement Department Republic of the Union of Myanmar 1
More informationJamaica. October 24, Remarks Dr. Warren Smith WFCP Page 1
Remarks by Dr. W m. Warren Smith President Caribbean Development Bank at the Opening Ceremony of the Sixth Meeting of the World Forum of Catastrophe Programmes Montego Bay Jamaica October 24, 2011 Remarks
More informationPreliminary Damage and Loss Assessment
The 15th Meeting of The Consultative Group on Indonesia Jakarta, June 14, 2006 Yogyakarta and Central Java Natural Disaster A Joint Report from BAPPENAS, the Provincial and Local Governments of D.I.Yogyakarta,
More informationDisaster Risk Management in the Caribbean Case Study: Rapid Damage and Loss Assessment following the 2013 Disaster
Belize benefits from knowledge and experiences from the PPCR Disaster Risk Management in the Caribbean Case Study: Rapid Damage and Loss Assessment following the 2013 Disaster Photo Credit: http://gov.vc
More informationSoutheast Asia Disaster Risk Insurance Facility
Southeast Asia Disaster Risk Insurance Facility PROTECT THE GREATEST HOME OF ALL: OUR COUNTRIES SEADRIF is a regional platform to provide ASEAN countries with financial solutions and technical advice to
More informationDraft Terms of Reference. Mozambique Climate Change Technical Assistance Project
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1. Background Context Draft Terms of Reference Mozambique Climate Change Technical Assistance
More informationDisaster Risk Reduction : The Hyogo Framework For Action
Disaster Risk Reduction : The Hyogo Framework For Action 2005-2015 Manoj Kumar Mishra Introduction Every year, more than 200 million people are affected by droughts, floods, cyclones, earth quake, wild
More informationPDNA. Post Disaster Damage and Needs Assessment, methodologies and toolkit
PDNA Post Disaster Damage and Needs Assessment, methodologies and toolkit The PDNA 1. A process 2. ECLAC s s past experience 3. A systemic, integrated approach 4. An cooperative effort that encompasses
More informationSuggested elements for the post-2015 framework for disaster risk reduction
United Nations General Assembly Distr.: General 16 June 2014 A/CONF.224/PC(I)/6 Original: English Third United Nations World Conference on Disaster Risk Reduction Preparatory Committee First session Geneva,
More informationWORLD FORUM OF CATASTROPHE PROGRAMMES 2011
WORLD FORUM OF CATASTROPHE PROGRAMMES 2011 THE CARIBBEAN CATASTROPHE RISK INSURANCE FACILITY (CCRIF) Natural Catastrophes 2010 2011, Recovery Efforts, Lessons Learned 1 2 0 1 0 EART H Q UA K E I N H A
More informationDISASTER RISK FINANCING ADB Operational Innovations in South Asia
DISASTER RISK FINANCING ADB Operational Innovations in South Asia Erik Kjaergaard, Disaster Risk Management Specialist South Asia Department with input from Mayumi Ozaki, Senior Portfolio Management Specialist
More informationMICRO-INSURANCE FOR NATURAL DISASTERS CONCEPTS, PRESENT AND FUTURE OUTLOOK
MICRO-INSURANCE FOR NATURAL DISASTERS CONCEPTS, PRESENT AND FUTURE OUTLOOK Haresh C. Shah 1, Tso-Chien Pan 2, Bing Li 3 and Suruchi S. Wagh 4 1 Obayashi Professor of Engineering Emeritus, Stanford University,
More informationClosing the Protection Gap Issues and Initiatives
Issues and Initiatives Be mindful of the future despite the blissful ignorance of the present. Today is the good old times of tomorrow. Karl Valentin (German actor, writer and comedian, 1882-1948) 2 The
More informationCATASTROPHE RISK MODELLING AND INSURANCE PENETRATION IN DEVELOPING COUNTRIES
CATASTROPHE RISK MODELLING AND INSURANCE PENETRATION IN DEVELOPING COUNTRIES M.R. Zolfaghari 1 1 Assistant Professor, Civil Engineering Department, KNT University, Tehran, Iran mzolfaghari@kntu.ac.ir ABSTRACT:
More informationCatastrophe Risks and their Financing in India including Regulatory Landscape
Catastrophe Risks and their Financing in India including Regulatory Landscape -YogeshLohiya Natural Catastrophe Exposure in India India is vulnerable to natural disasters & prone to Earthquakes, Floods,
More informationes ork h strop l Net ata bad na C Division r o ati cal Hyde e-s g 07, CD Inte y 20 E f Lart o uar Administrat
ENHANCING RISK AWARENESS AND CAPABILITY Flore-Anne Messy Administrator OECD Financial Affairs Division Conference of the OECD International Network on the Management of Large-Scale Catastrophes 26-27 February
More informationKarlstad, Sweden. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )
Karlstad, Sweden Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Mayor: Ulf Nyqvist Name of focal point: -Anna -Sjödin Organization: -Karlstad Municipality
More informationStatus of World Bank Assistance in the Reconstruction of Aceh and North Sumatra, Indonesia. Janelle Plummer, WSP-EAP Bill Paterson, EASTR
Status of World Bank Assistance in the Reconstruction of Aceh and North Sumatra, Indonesia Janelle Plummer, WSP-EAP Bill Paterson, EASTR 2 3 4 5 6 7 In Aceh The disaster was caused by a tsunami and an
More informationTHE FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA NATIONAL POLICY AND STRATEGY ON DISASTER RISK MANAGEMENT. July 2013 Addis Ababa
THE FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA NATIONAL POLICY AND STRATEGY ON DISASTER RISK MANAGEMENT July 2013 Addis Ababa 1 Content 1. Introduction... 3 2. Policy Vision,Mission and Objectives... 4 3.Policy
More informationPROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Second Disaster Risk Management Development Policy Loan with a CAT-DDO Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Operation Name Second Disaster
More informationBusiness for Resilience
Business for Resilience ARISE is the private sector initiative of the UN Office for Disaster Risk Reduction (UNISDR). Its main role is to mobilize business in support of the goals of the 2015 Sendai Framework.
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1.Name of the Project Country: Federal Democratic Republic of Nepal Project: Emergency Housing Reconstruction Project Loan Agreement: December
More informationQuestionnaire on Financial Schemes for Disaster Risk Reduction
Questionnaire on Financial Schemes for Disaster Risk Reduction 1 Objectives of Questionnaire Survey the current financial schemes related to disaster risk reduction in each country Review current approaches
More informationImproving Korea s Disaster Risk Reduction Policy using the Sendai Framework
, pp.185-189 http://dx.doi.org/10.14257/astl.2016.129.37 Improving Korea s Disaster Risk Reduction Policy using the Sendai Framework 2015-2030 Younhee Kim National Civil Defense and Disaster Management
More informationTaking stock of the existing financial instruments that address the risks of loss & damage across different levels & sectors 5 September 2016
CURRENT SPECTRUM & STRUCTURE OF FINANCIAL INSTRUMENTS TO ADDRESS THE RISKS OF LOSS & DAMAGE Taking stock of the existing financial instruments that address the risks of loss & damage across different levels
More informationREPUBLIC OF BULGARIA
REPUBLIC OF BULGARIA DISASTER RISK REDUCTION STRATEGY INTRUDUCTION Republic of Bulgaria often has been affected by natural or man-made disasters, whose social and economic consequences cause significant
More informationSOVEREIGN CATASTROPHE RISK POOLS A Brief for Policy Makers 1
SOVEREIGN CATASTROPHE RISK POOLS A Brief for Policy Makers 1 More than 1 billion people have lifted themselves out of poverty in the past 15 years, but climate and disaster risks threaten these achievements.
More informationFinancing ASP Fiji s Case TC Winston in 2016
Financing ASP Fiji s Case TC Winston in 2016 Financial Tools and Approaches for Shock-responsive Safety Nets Rupeni Fatiaki Director of the Department of Social Welfare Ministry of Social Welfare, Women
More informationSECTION 1. SHORT TITLE AND TABLE OF CONTENTS.
1-17-2011 Draft A BILL To strengthen America s financial infrastructure, by requiring pre-funding for catastrophe losses using private insurance premium dollars to protect taxpayers from massive bailouts,
More informationBackground and context of DRR and GIS
Mainstreaming DRR into National Plan, Policies and Programmes in Nepal Present to: Regional Workshop on Geo-referenced Disaster Risk Management information System in South and South West Asia and Central
More informationREPUBLIC OF KENYA THE NATIONAL TREASURY AND MINISTRY OF PLANNING
REPUBLIC OF KENYA THE NATIONAL TREASURY AND MINISTRY OF PLANNING DISASTER RISK FINANCIAL INSTRUMENTS IN KENYA EXECUTIVE SEMINAR ON INDEX BASED LIVESTOCK INSURANCE SAROVA WHITESANDS HOTEL 19 TH -20 TH APRIL,
More informationChapter 10 Mitigation
44.213 Emergency Management Fall 2015 Chapter 10 Mitigation School of Criminology and Justice Studies University of Massachusetts Lowell Understand the general concepts and purposes behind mitigation Know
More informationLoss and Damage Associated with Climate Change Impacts The (possible) role of Disaster Risk Financing and Insurance
UNFCC regional expert meeting on loss and damage August 27 29, 2012 Bangkok, Thailand Loss and Damage Associated with Climate Change Impacts The (possible) role of Disaster Risk Financing and Insurance
More informationHydro-Meteorological Disasters and their Impact on Sustainable Development : Asian Perspective
Hydro-Meteorological Disasters and their Impact on Sustainable Development : Asian Perspective -A Holistic Approach to Disaster Reduction & Response for Sustainable Development Water Resource Management-
More informationEvaluation Approach Project Performance Evaluation Report for Loan 2167 and Grant 0006-SRI: Tsunami-Affected Areas Rebuilding Project September 2015
Asian Development Bank 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2163; evaluation@adb.org www.adb.org/evaluation Evaluation Approach Project Performance
More informationThe Lessons of 2017 Perspective from the World Bank Group
The Lessons of 2017 Perspective from the World Bank Group Barbuda Dominica Hurricane Irma Hurricane Maria Rebuild, Rethink, Resilience: Lessons for economic and security partnerships following after the
More informationSwitzerland. National progress report on the implementation of the Hyogo Framework for Action ( ) - interim
Switzerland National progress report on the implementation of the Hyogo Framework for Action (2009-2011) - interim Name of focal point : Secretaire Executif PLANAT Organization : Swiss National Platform
More information