UVA Presentation to Virginia SMPS Higher Ed Panel April 27, 2017
|
|
- Nelson Franklin
- 5 years ago
- Views:
Transcription
1 UVA Presentation to Virginia SMPS Higher Ed Panel April 27, 2017
2
3 IVY MOUNTAIN MASTER PLAN Master Plan Approved by BOV in March 2017 Returning to B&G Committee in June for Musculoskeletal Center/ Orthopedics Building Project Approval and A/E Selection ( for 1 st Building) 3
4 SITE CONTEXT AERIAL VIEW TO GROUNDS AND CHARLOTTESVILLE COCHRAN HOUSE LEWIS MOUNTAIN IVY MOUNTAIN SITE OLD IVY ROAD SITE 4
5 IVY MOUNTAIN VISION Ivy Road (Rt. 250) Future signalized intersection I-29 C E the grove A Rivanna Trail 3-4 STORY 200, ,000 GSF F A Service B C 2-3 STORY 50,000-60,000 GSF 55 PARKING SPACES 2-3 STORY 50,000-60,000 GSF 60 PARKING SPACES The Garden D D PARKING GARAGE 350 TO 360 SPACES E ON GRADE PARKING 20 SPACES B F BIO-REMEDIATION AREA Poplar Glen Cochran House Lewis Mountain 5
6 IVY MOUNTAIN VISION POTENTIAL MASSING 6
7 BRANDON AVENUE MASTER PLAN Master Plan Approved by BOV September 2016 Perkins & Will hired for design of Green Street Utility Infrastructure Goody Clancy hired for design of Upper Class Student Housing Schematic Design Approval June 2017 New Student Health Project BOV Approval June Financial Plan & A/E Approval September
8 Brandon Avenue Upper Class Student Housing Green Street Master Plan and Phasing Diagram A B C D E Academic Mixed-Use Academic Mixed-Use Residential Student Health Residential 8
9 Brandon Avenue Upper Class Student Housing 9
10 IVY CORRIDOR REDEVELOPMENT EFFORT Update on Phase I and Recommendation for Future of Cavalier Inn at June BOV B&G Meeting 10
11 Revisions to Capital Program Revised Capital Plan to be approved by BOV June 2017 includes new projects, removes projects that are no longer a priority, and aligns high priority projects across timeframes based on when project will be initiated: Near term currently in progress and/or expect to expend resources within next 18 months Mid term to be initiated during Long term to begin after June 30, 2020 Aligns with State required Six Year Capital Plan 11
12 UVA Capital Program Category (in millions) Academic Division Health System College at Wise Authorized projects under construction $ $ $ Authorized projects in planning $ $ 97.1 $ 0.5 Authorized projects not yet initiated $ $ 33.1 $ SUBTOTAL (Program Approved June 2016) $ $ $ Proposed new projects $ $ $ TOTAL (Revised Capital Program) $1, $1, $ GRAND TOTAL FOR UVA, HEALTH SYSTEM, COLLEGE AT WISE: $2.43+ BILLION 12
13 Academic Division Proposed Capital Projects Near Term Proposed Projects ( ) Project Budget Source Softball Facility Renovation $8.0M $10.0M TBD Brandon Avenue Upper Class Residence Hall $52.3M $58.3M Debt Brandon Avenue Green Street & Infrastructure $32.0M UIA, Debt Ivy Corridor Landscape and Infrastructure Phase I $27.7M Debt Main Heat Plant New Boiler $8.0M $11.0M UIA, Debt Ivy Mountain District Energy Development Zone $12.0M $16.0M UIA, Debt Low Temperature Hot Water Conversion, Phase 1 $14.0M $20.0M TBD TOTAL $154.0M 175.0M 13
14 Academic Division Proposed Capital Projects Mid Term Proposed Projects ( ) Project Budget Source Carr's Hill Renovation and Event Structure TBD TBD McIntire Academic Facility TBD Gifts Thornton Hall B Wing Renovation (SEAS) TBD TBD Student Activities Building TBD TBD Alderman Road Residence Area Buildings 7 & 8 TOTAL $60.0M $110.0M $60.0M+ $110.0M+ Debt Housing Funds GRAND TOTAL PROPOSED PROJECTS : $214.0M+ $285.0M+ 14
15 Health System Proposed Capital Projects Near Term Proposed Projects ( ) Project Budget Source Translational Research Building $150.0M $200.0M TBD Ivy Mountain Development $146.0M $164.0M Debt, Cash TOTAL $296.0M $364.0M Mid Term Proposed Projects ( ) Project Budget Source Pinn Hall Renovation, Phase II TBD TBD Consumer Based Ambulatory Clinic Building TBD TBD Long Term Proposed Projects (2020 and beyond) Project Budget Source Multi Disciplinary Ambulatory Clinic Building TBD TBD 15
16 Studies Likely to Result in Capital Projects Near Term ( ) North Grounds/Athletics Precinct * Darden Master Facility Plan & Roadmap * Ivy Mountain Redevelopment Planning * Fontaine Master Plan & Transportation Student Activities Building Architecture School Space Needs Curry School Space Needs Engineering School Space Needs Environmental Health & Safety Mid Term ( ) University Police Department/Public Safety Space Needs O'Hill Dining Hall Expansion UVA Technology Center * Study approved June 2016 and in progress 16
17 PROJECT POINT OF CONTACT Academic & Wise Projects Tim Roland Director Health System / Medical Center Projects George Southwell Director gss6d@eservices.virginia.edu 17
18 SELECTION COMMITTEE PARTICIPATION Clients / Users Associate V.P. & Chief Facilities Officer Architect for the University FP&C Department Directors (Academic, HS, & Contracts) University Project Managers / Construction Admin Managers A/E Advisor 18
19 DESIRED A/E/C FIRM PROJECT QUALITIES UVA Chemistry with On Site Team Members Recent Similar Team Experience Strong Past Performance by Key Team Members Team With Experience Working Together Project Safety Record & Proposed Plan SWaM Firm Plan & Past Utilization 19
20 SWAM GOALS MBE 6% WBE 7% SBE 30% Total = 43% 20
21 UVA CONTRACT ADMIN WEB PAGE 21
22
Board of Visitors Finance Committee and Full Board Meeting June 7, 2018
Board of Visitors Finance Committee and Full Board Meeting June 7, 2018 Agenda ACTION ITEMS 1. 2018-2019 Operating Budget 2. 2018 Major Capital Projects Financial Plans 3. Debt Issuance for Acquired Northridge
More informationBudget Submission Calendar
How to Submit the 2006-07 Budget University of Virginia Submissions, with prior vice presidential approval, must be received by the close of business on the dates listed. Each vice president, dean and
More informationThe University of Virginia
The University of Virginia Housing and Residence Life Update B o a r d o f V i s i t o r s M e e t i n g F e b r u a r y 1 9, 2 0 1 6 AGENDA B O A R D O F V I S I T O R S M E E T I N G This Presentation
More informationF 2 STANDING COMMITTEES. Finance and Asset Management Committee. Capital and Debt Update INFORMATION ITEM
STANDING COMMITTEES F 2 Finance and Asset Management Committee Capital and Debt Update INFORMATION ITEM This item is being presented for information only. BACKGROUND This is a standing agenda item. The
More informationCapital Project Approval Process Table of Contents
Table of Contents I. Preliminary Project Proposal 1 II. Final Project Proposal 2 III. Project Proposal Executive Review Committee 2 IV. Business Plan 2 V. Annual Renovation and Infrastructure Plan 3 VI.
More informationFY Operating Budget
FY 2014-15 Operating Budget Board of Regents Meeting June 26-27, 2014 FY 2014-15 Colorado Tuition Rate Increases Resident Undergraduate Tuition & Fee Rate Increases Institution FY14 to FY15 Percent Increase
More informationNotable highlights and changes compared to last month include:
STANDING COMMITTEES F 4 Finance and Asset Management Committee Capital and Debt Update INFORMATION ITEM This item is being presented for information only. BACKGROUND This is a standing agenda item. Notable
More informationGeorgia Institute of Technology Advanced Computing Technology Building. Draft Program. Mission Model Initial Program Development
Georgia Institute of Technology Advanced Computing Technology Building Draft Program Initial Program Development Issued April 2, 2001 Introduction Scope This document is a summary of the Session for the
More informationUniversity of Nebraska Quarterly Status of Capital Construction Projects As of March 31, 2016
Quarterly Status of Capital Projects KEARNEY Early Childhood Education Center 1/27/2017 1/30/2018 6/30/2019 : $5,126,500 $1,273,500 Total Project Cost: $6,400,000 % funds expended: 0% Revolving $4,400,000
More informationUniversity of Nebraska Quarterly Status of Capital Construction Projects As of June 30, 2017
Quarterly Status of Capital Projects KEARNEY Early Childhood Education Center (LB957) 1/27/2017 1/30/2018 6/30/2019 : $5,126,500 $1,273,500 Total Project Cost: $6,400,000 % funds expended: 0% State Appropriations
More informationChanges at UVA. David Boling Deputy Comptroller, UVA May 17 th, 2012
Changes at UVA David Boling Deputy Comptroller, UVA May 17 th, 2012 1 Changes at UVA New Leadership A New Financial Model Financial Reporting to the Board 2 New Leadership New President August 2010 New
More informationSpring Hill Zoning & Subdivision
Spring Hill Zoning & Subdivision AGENDA Introduction to Camiros Introduction to Zoning Overview of Project! Process! Current understandings! What we ve heard so far Public Comment Camiros Key Personnel
More informationDOCKET BOARD OF VISITORS. University of Virginia. Regular Meeting
DOCKET BOARD OF VISITORS University of Virginia Regular Meeting December 7, 2018 DOCKET BOARD OF VISITORS December 7, 2018 CONSENT ITEMS 1. AUTHORIZATION FOR THE MEDICAL CENTER TO MAKE AN ADDITIONAL CAPITAL
More informationREVISED June 5, 2018 UNIVERSITY OF VIRGINIA BOARD OF VISITORS. Meeting of the Finance Committee
REVISED June 5, 2018 UNIVERSITY OF VIRGINIA BOARD OF VISITORS Meeting of the Finance Committee June 7, 2018 FINANCE COMMITTEE Thursday, June 7, 2018 3:00 4:30 p.m. Board Room, The Rotunda Board Members:
More informationMinutes Capital Planning and Budget Committee Thursday, August 23, 2012
Minutes Capital Planning and Budget Committee Thursday, August 23, 2012 The meeting of the Capital Planning and Budget Committee was called to order at 1:00 pm by Committee Chair Regent Jeffrey Bartell
More informationCapital Project Approval Process Table of Contents
Capital Project Approval Process Table of Contents I. Preliminary Project Proposal 1 II. Final Project Proposal 2 III. Project Proposal Executive Review Committee 2 IV. Business Plan 2 V. Annual Renovation
More informationCapital Improvement Program Fund
Capital Improvement Program Fund Capital Improvement Program (CIP) Overview The Capital Improvement Program provides funding for streets, public buildings (both governmental and school facilities), land,
More informationADVANCING CAPITAL OUTLAY
ADVANCING CAPITAL OUTLAY Robert R. Broyden Assistant Vice President for Capital Assets and Financial Management 1 Major Topics Today: 1) Commitment to long-range planning processes 2) Update on 2012 General
More informationGUIDING PRINCIPLES UNIVERSITY OF VIRGINIA STRATEGIC INVESTMENT FUND
GUIDING PRINCIPLES UNIVERSITY OF VIRGINIA STRATEGIC INVESTMENT FUND 2017-2018 1. Purpose 2. Types of Investments 3. Limitations 4. Administration 5. Funding 6. Eligibility 7. Review Process 8. Review Guidelines
More informationTown Square Redevelopment. Phase I Contract Discussion
Town Square Redevelopment Phase I Contract Discussion Date: June 8, 2017 Current Estimated Schedule Draft RFQ Review September 20, 2016 Final RFQ Publication October 10, 2016 Part I Team Shortlist January
More informationThe William Paterson University of New Jersey
The William Paterson University of New Jersey (A Component Unit of the State of New Jersey) Financial Statements and Management s Discussion and Analysis Table of Contents Page Independent Auditors Report
More information27 September 2016 l WORK SESSION Board of Supervisors
27 September 2016 l WORK SESSION Board of Supervisors PRO JECT OPTIONS 1 2 3 OUTLINE THE PROBLEM ADDRESS SOLUTIONS ESTABLISH PLAN TO IMPLEMENT A S S E S S M E N T S T U D Y + L O N G - R A N G E V I S
More informationOC s preferred model includes the following recommendations:
To: CC: County Executive s Office Board of Supervisors, School Board, & Planning Commission From: Members of the CIP Oversight Committee (OC) Date: January 16, 2018 Re: Recommendation for FY 19 Capital
More informationCONSTRUCTION PROJECTS STATUS REPORT BOARD OF TRUSTEES MEETING March 25, 2015
Project Name by Phase Project # Current BOT Approved Budget Encumbrances (As of 3/10/15) Budget Phase Budgeted Funding Source(s) (s) Planning Budget Phase Academic and Research Facilities STEM 901802 $1,000,000
More informationUniversity of Colorado Capital Construction Project Status SUMMARY - Second Quarter 2016
of Colorado Capital Project Status SUMMARY - Second Quarter Legend On-Track Risks Approved - Adjustments Needed Awaiting $ Start-Up Design Phase In Bidding Phase In Closeout Project Completed or Withdrawn
More informationWHITE OAK PLACE. Brownfield Plan No East Grand River, Tax ID Spartan Ave, Tax ID
WHITE OAK PLACE 1301 East Grand River, Tax ID 33 20 02 18 415 009 1307 East Grand River, Tax ID 33 20 02 18 415 010 116-132 Spartan Ave, Tax ID 33 20 02 18 415 008 East Lansing, Michigan 48823 Brownfield
More informationNew Internal Financial Model Expenditure Decision Briefs December 2012
New Internal Financial Model Expenditure Decision Briefs December 2012 Introduction This work has been informed by the deliberations of the Core Work Group in summer 2011, the July 2012 report of the Cost
More informationOff to College? First Apartment? First House? Not So Fast!
Home Sweet Home Off to College? First Apartment? First House? Not So Fast! 1. Do you know how to open a bank account? Yes No 2. Do you know how to balance a checkbook? Yes No 3. Do you know how to get
More informationUniversity of Virginia Status Report on the Plan to Address Deferred Maintenance
Executive Summary University of Virginia Status Report on the Plan to Address Deferred Maintenance The University of Virginia s facilities portfolio includes 552 buildings and related infrastructure, encompassing
More informationBudgeting at the University of Virginia
There are four primary approaches to budgeting at UVa. I. Targeted budgeting II. Sales and services budgeting III. High-level summary budgeting IV. Sponsored program budgeting In addition, the University
More informationJuly 2011 Review Lander Schematic. Design. Presentation. Pre-design / Design / Construction
F 6 Phase, Reduce Project Budget and Reduce Debt Funding Regents Action and Information Timeline November 2009 HFS Master Plan Phase II & III Update Mercer Site 30W Project Concept March 2011 Mercer Presentation
More informationFY2013 Annual Capital Improvement Budget. Board of Regents Facilities Committee May 2012
FY2013 Annual Capital Improvement Budget Board of Regents Facilities Committee May 2012 Capital Plan Board of Regents Policy directs the administration to develop a capital budget with a 6-year time horizon,
More informationThe Ohio State University Board of Trustees. October 28, 2009
The Ohio State University Board of Trustees TOPIC: October 28, 2009 CONTEXT: Capital Recommendations At the September 17 th Fiscal Affairs Committee meeting, the University Administration promised to come
More informationKey Focus Area: Trinity River Project
Key Focus Area: Trinity River Project The Trinity River Corridor Project encompasses many of the elements needed to achieve an improvement to quality of life for the residents of Dallas. It is a multi-objective
More informationCONSTRUCTION PROJECTS STATUS REPORT BOARD OF TRUSTEES MEETING - October 31, 2018
Planning Academic & Research Facilities - Homer 300008 $1,850,000 $1,603,349 P UCONN 2000 Bond Funds 03/29/17 2022 Babbidge Library Renovations Northwest Science Quad Infrastucture- 3 300103 $700,000 P
More informationSTATE CENTER COMMUNITY COLLEGE DISTRICT
STATE CENTER COMMUNITY COLLEGE DISTRICT INDEPENDENT ACCOUNTANTS REPORT ON AGREED UPON PROCEDURES PERFORMED RELATED TO MEASURE E COMPLIANCE AND PERFORMANCE JUNE 30, 2009 Prepared by: Vavrinek, Trine, Day
More informationGENERAL ASSEMBLY OF NORTH CAROLINA Session 2017 Legislative Fiscal Note
GENERAL ASSEMBLY OF NORTH CAROLINA Session 2017 Legislative Fiscal Note BILL NUMBER: House Bill 620 (First Edition) SHORT TITLE: UNC Capital Projects. SPONSOR(S): Representatives Brawley, Saine, Szoka,
More informationFROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: SEPTEMBER 11, 2006 CMR: 346:06
21a TO: HONORABLE CITY COUNCIL FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: SEPTEMBER 11, 2006 CMR: 346:06 SUBJECT: 901 SAN ANTONIO ROAD [06PLN-00031, 06PLN-00050]: REQUEST BY
More information2018 Educational and Facilities Master Plan (EFMP) and Proposed Bond Projects. June 27, 2018 // Board of Trustees Meeting
2018 Educational and Facilities Master Plan (EFMP) and Proposed Bond Projects June 27, 2018 // Board of Trustees Meeting Proposed Bond Projects Overall Phasing Phase 1A Phase 1B Phase 2 Phase 3 Phase TBD
More informationPlease list all branch offices on a separate sheet and include a breakdown of the staff at each location.
ARCHITECTS & ENGINEERS PROFESSIONAL LIABILITY APPLICATION ITECTS & ENGINEERS PROFESSIONAL LIABILITY APPLICATION GENERAL INFORMATION 1. Company Name (Applicant): CH Street: City: State: Zip: Telephone:
More informationCONSTRUCTION PROJECTS STATUS REPORT BOARD OF TRUSTEES MEETING December 12, 2012
Project Name by Phase Project # Current BOT Approved Budget Encumbrances (As of 11/28/12) Budget Phase Budgeted Funding Source(s) (s) Planning Budget Phase Ecology and Evolutionary Biology (EEB) 201583
More informationPROJECT BUDGET PRESENTATION
PROJECT BUDGET PRESENTATION Monomoy Regional High School Building Committee Meeting June 19, 2012 Project Features Serves 700 Students Grades 8-12 8 th Grade Wing located near main entrance 168,000 GSF
More information2017/18 Annual Budget Report. Charlie Faas VP Administration & Finance/CFO
2017/18 Annual Budget Report Charlie Faas VP Administration & Finance/CFO Fiscal Year Budget Overview Increase in tuition and General Fund appropriation Tuition rate increase ($270, 4.9% increase) +240
More informationHOUSING SYSTEM FACILITIES
HOUSING SYSTEM FACILITIES General The System Facilities consist of student housing facilities, including all existing residence halls and apartments located on the Tampa campus of the University in Hillsborough
More informationUniversity of Nebraska Quarterly Status of Capital Construction Projects As of September 30, 2018
Quarterly Status of Capital Projects KEARNEY Nebraskan Student Union Remodel 3/31/2017 12/15/2017 8/1/2018 Otto Olsen Replacement Building (LB957) 1/27/2017 5/30/2018 10/31/2019 : $4,889,700 $1,110,300
More informationBOISE BENCH AREA URBAN RENEWAL DISTRICT
BOISE BENCH AREA URBAN RENEWAL DISTRICT Discussion Draft Prepared by CCDC 3/17/2016 DOCUMENT DELIVERABLES REQUIRED 1. Bench Area Master Plan 2. Bench Area Eligibility Study 3. Bench Area Specific Plan
More informationCharlottesville Virginia. Smart and Efficient Government Community Value of Services and Delivery
Charlottesville Virginia Community Value of Services and Delivery Charlottesville Virginia City Council Vision A leader in innovation, environmental sustainability, and social and economic justice Flexible
More informationPriority #1 Request for Construction FY Priority #2 Anticipated Request for Planning FY 2019
V. IMPLEMENTATION PLAN a) Prioritize major capital projects requested from the State, including a brief project description and estimated cost, in the format provided. (Adjust previously developed or prior
More informationBoard of Visitors Dashboard. September 24, 2015
Board of Visitors Dashboard September 24, 2015 Enrollment, Retention, and Graduation Rates Headcount By Level Total Enrollment Undergraduate Graduate 26,050 24,526 24,525 24,696 24,932 24,672 21,050 16,050
More informationCity of Sammamish Planning Commission November 17, Town Center Planning History Development Updates Implementation Strategies
City of Sammamish Planning Commission November 17, 2016 Town Center Planning History Development Updates Implementation Strategies Concept Visualized Task Force Formed Vision Statement Adopted Town Center
More informationSan Pedro Elementary School Community Town Hall Meeting #1 March 22, 2017 MINUTES
H Y HIBSER YAMAUCHI Architects, Inc. San Pedro Elementary School Community Town Hall Meeting #1 March 22, 2017 MINUTES Date: March 22, 2017 Chair(s): tbd Time: 6:00 7:00 PM Scribe: Tim Steele School Site:
More informationFor Yale Faculty, Staff, and Students only
For Yale Faculty, Staff, and Students only Budget Book Fiscal Year 2017 Cover photo: Brandon Boyer YC 15 Analyst, Office of Financial Planning & Analysis, Yale University FY17 Operating and Capital Budget
More informationUnderstanding the University of Virginia s Budget
Understanding the University of Virginia s Budget PRESENTATION TOPICS UVa s Sources and Uses of Funds All Divisions Academic Division UVa s Capital Plan UVa s Relationship with the State UVa s Current
More informationAlbemarle County FY17 19 Strategic Plan
Albemarle County FY17 19 Strategic Plan Strategic planning is used to set priorities and focus energy and resources to move an organization towards its vision. Albemarle County has used strategic planning
More information2/26/2015 1
1 2 3 4 5 Directed/Mandated: $3.88M Health Insurance Increase $2,191,902 Salary Increase (Half-Year) $1,282,820 Salary Increase (Additional Quarter-Year) $690,000 Transfer to Comprehensive Services Act
More informationI. ACTION ITEM PRESENTATION
M E M O R A N D U M TO: FROM: Members of the Administration and Finance Committee Robert M. Tata, Chair Larry R. Hill, Vice Chair Carlton F. Bennett (ex-officio) Lisa B. Smith (ex-officio) Yvonne T. Allmond
More informationFY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary
FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary The adopted FY 2017 FY 2021 CIP is $235.8 million (including prior year expenditures) and is $28 million higher than the previous CIP
More informationFISCAL YEAR RECOMMENDED BUDGET
FISCAL YEAR 2017-2018 RECOMMENDED BUDGET JUNE 6, 2017 AGENDA City Manager s Budget Status FY 2017-18 General Fund Recommended Budget FY 2017-18 Recommended Non-General Fund Budget FY 2017-18 Recommended
More informationRECOMMENDATION. c. Approve a total project cost of $3,300,000
1. U. T. Arlington - Intramural and Recreation Complex - Phase I: Request for Approval to Amend the FY 2002-2007 Capital Improvement Program and the FY 2002-2003 Capital Budget to Include Project; Authorization
More informationInfrastructure and Capital Projects Planning and Funding
Infrastructure and Capital Projects Planning and Funding September 6, 2018 Preview of FY 2020 2024 CIP process Why are we here? Overview Current Assets Overview and Highlights of Adopted FY 2019 2023 CIP
More informationPUBLIC NOTICE CITY OF HOBOKEN HUDSON COUNTY, NJ THIS RESOLUTION AUTHORIZES AMENDMENTS TO THE SFY 2006 BUDGET INTRODUCED ON 14 SEPTEMBER 2005.
PUBLIC NOTICE CITY OF HOBOKEN HUDSON COUNTY, NJ THIS RESOLUTION AUTHORIZES AMENDMENTS TO THE SFY 2006 BUDGET INTRODUCED ON 14 SEPTEMBER 2005. WHEREAS, the local municipal budget for the fiscal year 2006
More informationCITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA March 4, 2014 AGENDA ITEM HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
CITY OF SIGNAL HILL 2175 Cherry Avenue Signal Hill, CA 90755-3799 AGENDA ITEM TO: FROM: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL SCOTT CHARNEY DIRECTOR OF COMMUNITY DEVELOPMENT SUBJECT: 2013 GENERAL
More informationNew Jersey Institute of Technology
New Jersey Institute of Technology FY18 Budget Status Report and FY19 Budget Development Status Presented to the Joint Session of the Strategic Planning Steering Committee and Committee on Academic Strategic
More informationNotice of Request for Proposals For Ephesus Church Road/Fordham Boulevard Small Area Planning/Traffic Analysis
Notice of Request for Proposals For Ephesus Church Road/Fordham Boulevard Small Area Planning/Traffic Analysis BID: Q10-62 TO: FROM: SUBJECT: ALL PROSPECTIVE BIDDERS COCO HALL, PURCHASING & CONTRACTS MANAGER
More informationDate:July 30, 2003 Board Members - Parks and Recreation General Manager - Parks and Recreation CHAMPLAIN HEIGHTS COMMUNITY CENTRE ADDITION
Date:July 30, 2003 TO: FROM: SUBJECT: Board Members - Parks and Recreation General Manager - Parks and Recreation CHAMPLAIN HEIGHTS COMMUNITY CENTRE ADDITION RECOMMENDATION A) THAT the Board endorse a
More informationBOARD OF TRUSTEES Community College District No. 522 Belleville Campus Marsh Conference Room April 17, :00 p.m. AGENDA
BOARD OF TRUSTEES Community College District No. 522 Belleville Campus Marsh Conference Room April 17, 2019 6:00 p.m. AGENDA I. CALL TO ORDER BY CHAIRMAN II. III. IV. PLEDGE OF ALLEGIANCE ROLL CALL BY
More informationMaster Planning to Project Implementation
Master Planning to Project Implementation LeadingAge Washington Annual Conference June 12 15, 2017 Stevenson, WA Measure twice cut once GSI Research & Consulting Bellevue, WA (425) 559 6335 1 Operators
More informationPhysical Plant. Detailed Assessment Report
Physical Plant Detailed Assessment Report 2011-2012 Mission / Purpose The Physical Plant Department enhances the University of West Alabama's mission to provide opportunities for students to pursue a quality
More informationUH-Clear Lake Budget
FY2016 Total Budget $ Millions Operating Budget $ 131.5 Capital Facilities 23.1 Total $ 154.6 Operating Budget Source of Funds Other Operating, $2.0M 2% Tuition & Fees $71.1M 54% Contracts & Grants *,
More informationCITY OF SIGNAL HILL. California state law requires that each city adopt a General Plan. The General Plan must include:
CITY OF SIGNAL HILL 2175 Cherry Avenue Signal Hill, CA 90755-3799 AGENDA ITEM TO: FROM: HONORABLE CHAIR AND MEMBERS OF THE CITY COUNCIL SCOTT CHARNEY DIRECTOR OF COMMUNITY DEVELOPMENT SUBJECT: 2014 GENERAL
More information2010 CRA Annual Report. City of Holly Hill, Florida
2010 CRA Annual Report City of Office of Economic Development Holly Hill Community Redevelopment Area 1065 Ridgewood Avenue 32117 The City of Holly Hill Community Redevelopment Agency (Agency) was established
More informationAcademic Leadership Retreat. Financial and Facilities Update August 2016
Academic Leadership Retreat Financial and Facilities Update August 2016 Facilities Update August 2016 Major Construction Projects Projects being planned, programmed, under design or construction Fall 2016
More informationComplex Incentives & Financing Experience Portfolio. By: Frank A. Hoffman
Complex Incentives & Financing Experience Portfolio By: Frank A. Hoffman New Market Tax Credit & State Investment Tax Credit Equity Transaction Track Record Since 2005 Has closed 8 State Investment Tax
More informationVICE PRESIDENT, BUDGET AND CAPITAL RESOURCES, UNIVERSITY OF CALIFORNIA, OFFICE OF THE PRESIDENT
August 2014 VICE PRESIDENT, BUDGET AND CAPITAL RESOURCES, UNIVERSITY OF CALIFORNIA, OFFICE OF THE PRESIDENT AMENDMENT OF THE BUDGET, ENVIRONMENTAL HEALTH AND SAFETY EXPANSION, RIVERSIDE CAMPUS EXECUTIVE
More informationApprove a project to construct the Sports Performance Center
Facilities Committee Michael S. Molina Vice Chancellor - Facilities Planning & Construction December 10-11, 2015 Texas Tech University Item 1 Approve a project to construct the Sports Performance Center
More informationSIRF: Sustainability Initiatives Revolving Fund
SIRF: Sustainability Initiatives Revolving Fund FY 2012 Annual Report SIRF provides energy savings opportunities, makes good business sense February 1, 2013 We are pleased to present you with Arizona State
More informationRequest for Qualifications (RFQ) from Architectural/Engineering Firms
Town of Windham, CT Issue Date: April 18, 2018 Bid Number: WHS 482018 To: Re: ALL PROSPECTIVE RESPONDENTS Request for Qualifications (RFQ) from Architectural/Engineering Firms The Town of Windham, CT (hereafter
More informationM E M O R A N D U M. David F. Harnage Chief Operating Officer. DATE: September 9, SUBJECT: Meeting of the Committee, September 22, 2016
M E M O R A N D U M TO: FROM: Members of the Administration and Finance Committee Robert M. Tata, Chair Fred J. Whyte, Vice Chair Yvonne T. Allmond Alton J. Harris Larry R. Hill Ross A. Mugler Donna L.
More information38 th A n n u a l C o n f e r e n c e o n S c h o o l F a c i l i t i e s
MANAGING RISK v. REWARD HOW TO BALANCE CREATIVE DESIGN WITH THE REALITIES OF PROJECT BUDGETS, SCHEDULES & SCOPE 38 th A n n u a l C o n f e r e n c e o n S c h o o l F a c i l i t i e s Panel Moderator:
More informationOperating & Capital Budget Plan May 2017
2017-2018 Operating & Capital Budget Plan May 2017 Operating and Capital Budget Plan FY 2018 Operating Budget - Highlights Table 1: Composite Operating Budget 4 Table 2: Composite Operating Budget - by
More informationTIME PROJECT TEAM S LOCKER ROOM
NEW PARKLAND HOSPITAL HALF TIME VISITING THE PROJECT TEAM S LOCKER ROOM H A N K A D A M S, A I A, A C H A, E D A C V I C E P R E S I D E N T / D I R E C T O R H E A L T H C A R E, H D R D E S I G N M A
More informationFinancial Report
Financial Report 2017-18 TABLE OF CONTENTS 2 FROM THE EXECUTIVE VICE PRESIDENT AND CHIEF OPERATING OFFICER 5 MANAGEMENT S DISCUSSION AND ANALYSIS (UNAUDITED) 15 MANAGEMENT RESPONSIBILITY LETTER 16 INDEPENDENT
More informationglenmont sector plan S C O P E O F W O R K J AN U A R Y MONTGOMERY COUNTY PLANNING DEPARTMENT M-NCPPC MontgomeryPlanning.
glenmont sector plan S C O P E O F W O R K J AN U A R Y 2 0 1 2 MONTGOMERY COUNTY PLANNING DEPARTMENT M-NCPPC MontgomeryPlanning.org glenmont sector plan S C O P E O F W O R K 1 glenmont sector plan Scope
More informationFort Collins Strategic Planning & Budget Process
1 Fort Collins Strategic Planning & Budget Process Macro Planning Process 2013 2014 2015 2016 Elections On Board Planning Activity Strategic Plan 5 Yr View BFO 2015/2016 Execution Activity 2013 Budget
More information6.0 Support Facilities Element
6.0 PURPOSE The purpose of this element is to ensure the provision of support facilities to meet University needs during the planning period. (1) DATA REQUIREMENTS. This element shall be based on the following
More informationDeveloping the Capital Plan is only Half the Battle
Western Connecticut State University Western Oregon University Westfield State University Widener University Williams College Worcester Polytechnic Institute Worcester State University Xavier University
More informationHydroelectric Licensing Workshop. December 9, 2014
Hydroelectric Licensing Workshop December 9, 2014 River Falls Hydroelectric Project Junction Falls, Upper Hydro Concrete Gravity Dam 140 Long, 40 High Uncontrolled Overflow Spillway Generator rated at
More informationCity of Derby Board of Aldermen / Alderwomen
City of Derby Board of Aldermen / Alderwomen First Ward Second Ward Third Ward Barbara L. DeGennaro Joseph L. DiMartino Jim DiMartino Thomas J. Donofrio Evelyn Browning Louis Oliwa Bev Moran Ronald M.
More informationThe Ohio State University (A Component Unit of the State of Ohio) Financial Statements as of and for the Year Ended June 30, 2011 and 2010, and
The Ohio State University (A Component Unit of the State of Ohio) Financial Statements as of and for the Year Ended June 30, 2011 and 2010, and Report on Federal Awards in Accordance with OMB Circular
More information2 February 5-6, 2016
February 5-6, 2016 Our Priorities for the Community Fiscal Responsibility and Reducing the Tax Burden Education Infrastructure Economic Development Public Safety Service Excellence Annual Planning Meeting
More informationBoard of Visitors Finance Committee Meeting June 2016
Board of Visitors Finance Committee Meeting June 2016 Finance Committee Agenda Consent Agenda: 1. Virginia Blood Services Contract 2. Defined Contribution Retirement Plan 3. Revised In-State Undergraduate
More informationREGIONAL EVALUATION FRAMEWORK 1.0 INTRODUCTION 2.0 PURPOSE 3.0 DEFINITIONS. Edmonton Metropolitan Region Planning Toolkit
Edmonton Metropolitan Region Planning Toolkit Re-imagine. Plan. Build. Edmonton Metropolitan Region Growth Plan 1.0 INTRODUCTION On October 26, 2017, the Government of Alberta approved the Edmonton Metropolitan
More informationTHE UNIVERSITY OF NORTH CAROLINA AT CHAPEL HILL CAPITAL IMPROVEMENT PROJECT PROCESS
Rev. 08/01/07 THE UNIVERSITY OF NORTH CAROLINA AT CHAPEL HILL CAPITAL IMPROVEMENT PROJECT PROCESS This document describes the project development and approval process for Capital Improvement Projects,
More information1. Approve and accept the Comprehensive Park Design for the Orange County Great Park.
REQUEST FOR CITY COUNCIL ACTION COUNCIL MEETING DATE: TITLE: O~GE COUNTY GREAT PARK COMP~ PARK DESIGN City~ RECOMMENDED ACTION: 1. Approve and accept the Comprehensive Park Design for the Orange County
More informationBlock 31 in the Railway Lands: Development Agreement, Update and Next Steps
STAFF REPORT ACTION REQUIRED Block 31 in the Railway Lands: Development Agreement, Update and Next Steps Date: January 20, 2014 To: From: Wards: Executive Committee Brenda Patterson, Deputy City Manager,
More informationANNUAL REPORT. A. Description of the Type of Reportable Fees in the Account or Sub-Account(s) of the District:
THE PERRIS UNION HIGH SCHOOL DISTRICT ANNUAL AND FIVE-YEAR REPORTABLE FEES REPORT FOR FISCAL YEAR 2012-2013, IN COMPLIANCE WITH GOVERNMENT CODE SECTIONS 66006 AND 66001 Government Code Sections 66006 and
More informationVALENCIA COLLEGE FINANCIAL SUMMARY FISCAL YEAR As of March 31, 2016
VALENCIA COLLEGE FINANCIAL SUMMARY FISCAL YEAR 2015-16 As of March 31, 2016 Budgeted Annual Collected % Collected Revenue Year To Date Of Annual Enrollment Based 94,185,539 94,205,294 100% State Funding
More informationMT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT PROPOSITION 39, GENERAL OBLIGATION BONDS (MEASURE R, NOVEMBER 2001) PERFORMANCE AUDIT.
(MEASURE R, NOVEMBER 2001) (MEASURE R, NOVEMBER 2001) CONTENTS Page Independent Auditor s Report... 1 Objectives... 2 Scope of the Audit... 2 Background Information... 3 Procedures Performed... 3 Results
More informationTOWNSHIP OF UPPER ST. CLAIR LONG-TERM PLAN
FIVE YEAR PROJECTION FIVE YEAR PROJECTION OVERVIEW The Five Year Projection for all Township Funds is a tool in which the Board of Commissioners and Township Staff can monitor potential funding impacts
More informationAnnual Budget Report. Charlie Faas VP Administration & Finance/CFO
2018-19 Annual Budget Report Charlie Faas VP Administration & Finance/CFO Facilities Special Year Student Recreation & Aquatic Center (SRAC) Interdisciplinary Science Building (ISB) Mubadala Silicon Valley
More information