IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-44950) ON A CREDIT IN THE AMOUNT OF SDR 2.8 MILLION (US$4.5 MILLION EQUIVALENT) TO THE

Size: px
Start display at page:

Download "IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-44950) ON A CREDIT IN THE AMOUNT OF SDR 2.8 MILLION (US$4.5 MILLION EQUIVALENT) TO THE"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-44950) ON A CREDIT IN THE AMOUNT OF SDR 2.8 MILLION (US$4.5 MILLION EQUIVALENT) TO THE ISLAMIC REPUBLIC OF MAURITANIA FOR A Report No: ICR2528 TRANSPORT SECTOR INSTITUTIONAL DEVELOPMENT AND TECHNICAL ASSISTANCE PROJECT Transport Sector Country Department AFCF1 Africa Regional Office March 14, 2013

2 CURRENCY EQUIVALENTS (Exchange Rate Effective September 30, 2012) Currency Unit = Mauritanian Ouguiya (MRO) MRO = US$1 US$1.54 = SDR 1 FISCAL YEAR January 1 December 31 ABBREVIATIONS AND ACRONYMS ANAC APL ARTR ASECNA BAAC CAS CECAM CETUD CPS CUN DEPC DGTT DMM DSR EDF ESW EU FA FMR GDP GIRM GNI IBRD ICAO IDA IFR IMO ISPS KPI LSP Agence Nationale de l Aviation Civile (National Civil Aviation Authority) Adaptative Program Lending Autorité de Régulation des Transports Routiers (Road transport Regulation Authority) Agency for Air Navigation Safety in Africa and Madagascar (Agence pour la Sécurité de la Navigation Aérienne en Afrique et à Madagascar) Bulletin d 'Analyse des Accidents de la Circulation (Road Traffic Accidents Analysis Report) Country Assistance Strategy Cellule d'etudes et de Coordination des Affaires Maritimes (Maritime Affairs Studies and Coordination Unit) Conseil Exécutif des Transports Urbain de Dakar (Dakar Urban Transport ExecutiveCouncil) Country Partnership Strategy Communauté Urbaine de Nouakchott (Nouakchott Metropolitan Area) Direction des Etudes, de la Programmation et de la Coopération (Directorate of Studies, Planning and Cooperation) Direction Générale des Transports Terrestres (General Directorate of Land Transport) Direction de la Marine Marchande (Merchant Shipping Directorate) Direction de la Sécurité Routière (Road Safety Directorate) European Development Fund Economic and Sector Work European Union Financing Agreement Financial Management Report Gross Domestic Product Government of the Islamic Republic of Mauritania Gross National Income International Bank for Reconstruction and Development International Civil Aviation Organization International Development Association Interim Unaudited Financial Report International Maritime Organization International Shipping and port facility Security Key Performance Indicator Letter of Sector Policy

3 M&E MARPOL ME MET MIO MRO MTR NGO NRSS NTP PAD PAN PANPA PDO PNDP PPF PRSP-3 SAM STP TA TAL TSIDTAP TSS TTL WCAATSSP Monitoring and Evaluation International Convention for the Prevention of Pollution from Ships Ministry of Education Ministry of Equipment and Transport Maritime Investigation Office Mauritanian Ouguiya Mid-term Review Nongovernmental Organization National Road Safety Strategy National Transport Plan Project Appraisal Document Port Autonome de Nouadhibou (Port of Nouadhibou) Port Autonome de Nouakchott-Port de l Amitié (Port of Nouakchott) Project Development Objective Port of Nouakchott Development Project Project Preparation Facility Third Poverty Reduction Strategy Paper (Cadre Stratégique de Lutte contre la Pauvreté - CSLP-3) Société des Aéroports de Mauritanie (Mauritanian Airports Company) Société des Transports Publics (Public Transport Company) Technical Assistance Technical Assistance Loan Transport Sector Institutional Development and Technical Assistance Project Transport Sector Strategy Task Team Leader West and Central Africa Air Transport Safety and Security Project Vice President: Makhtar Diop Country Director: Vera Songwe Sector Director Jamal Saghir Sector Manager: Supee Teravaninthorn Project Team Leader: Ibou Diouf ICR Team Leader: Papa Mamadou Fall

4 MAURITANIA TRANSPORT SECTOR INSTITUTIONAL DEVELOPMENT AND TECHNICAL ASSISTANCE PROJECT CONTENTS Data Sheet A. Basic Information B. Key Dates C. Ratings Summary D. Sector and Theme Codes E. Bank Staff F. Results Framework Analysis G. Ratings of Project Performance in ISRs H. Restructuring I. Disbursement Graph 1. Project Context, Development Objectives and Design Key Factors Affecting Implementation and Outcomes Assessment of Outcomes Assessment of Risk to Development Outcome Assessment of Bank and Borrower Performance Lessons Learned Comments on Issues Raised by Borrower/Implementing Agencies/Partners Annex 1. Project Costs and Financing Annex 2. Outputs by Component Annex 3. Economic and Financial Analysis Annex 4. Bank Lending and Implementation Support/Supervision Processes Annex 5. Beneficiary Survey Results Annex 6. Stakeholder Workshop Report and Results Annex 7. Summary of Borrower's ICR and/or Comments on Draft ICR Annex 8. Comments of Cofinanciers and Other Partners/Stakeholders Annex 9. List of Supporting Documents MAP

5 A. Basic Information DATASHEET Country: Mauritania Project Name: MAURITANIA: TRANSPORT SECTOR INSTITUTIONAL DEVELOPMENT AND TECHNICAL ASSISTANCE PROJECT Project ID: P L/C/TF Number(s): IDA ICR Date: 01/23/2013 ICR Type: Core ICR Lending Instrument: TAL Borrower: ISLAMIC REPUBLIC OF MAURITANIA Original Total Commitment: XDR 2.80M Disbursed Amount: XDR 2.28M Revised Amount: XDR 2.80M Environmental Category: C Implementing Agencies: Directorate of Studies, Planning and Cooperation - Ministry of Transport Cofinanciers and Other External Partners: Mauritania B. Key Dates Process Date Process Original Date Revised / Actual Date(s) Concept Review: 11/27/2007 Effectiveness: 01/15/ /29/2009 Appraisal: 04/14/2008 Restructuring(s): Approval: 07/31/2008 Mid-term Review: 06/05/ /15/2011 Closing: 09/30/ /30/2012 C. Ratings Summary C.1 Performance Rating by ICR Outcomes: Risk to Development Outcome: Bank Performance: Borrower Performance: Satisfactory Moderate Satisfactory Satisfactory i

6 C.2 Detailed Ratings of Bank and Borrower Performance (by ICR) Bank Ratings Borrower Ratings Quality at Entry: Satisfactory Government: Satisfactory Quality of Supervision: Satisfactory Implementing Agency/Agencies: Satisfactory Overall Bank Performance: Satisfactory Overall Borrower Performance: Satisfactory C.3 Quality at Entry and Implementation Performance Indicators Implementation QAG Assessments Indicators Performance (if any) Potential Problem Project No at any time (Yes/No): Problem Project at any time (Yes/No): DO rating before Closing/Inactive status: Yes Satisfactory Quality at Entry (QEA): Quality of Supervision (QSA): None None Rating D. Sector and Theme Codes Original Actual Sector Code (as % of total Bank financing) Public administration- Transportation Theme Code (as % of total Bank financing) Infrastructure services for private sector development Other public sector governance E. Bank Staff Positions At ICR At Approval Vice President: Makhtar Diop Obiageli Katryn Ezekwesili Country Director: Vera Songwe Madani M. Tall Sector Manager: Supee Teravaninthorn C. Sanjivi Rajasingham Project Team Leader: Ibou Diouf Ibou Diouf ICR Team Leader: Papa Mamadou Fall ICR Primary Author: Papa Mamadou Fall F. Results Framework Analysis Project Development Objectives (from Project Appraisal Document) The Project Development Objective is to: Improve land, maritime, and air transport sector management. ii

7 Revised Project Development Objectives (as approved by original approving authority) The Project Development Objective was not revised. (a) PDO Indicator(s) Indicator Baseline Value Original Target Values (from approval documents) iii Formally Revised Target Values Actual Value Achieved at Completion or Target Years Indicator 1 : Letter of sector policy. Value Preliminary study quantitative or completed. Qualitative) Letter approved. Letter approved. Date achieved 06/30/ /15/ /30/2012 Comments 100% achievement. The letter of sector policy was approved by the council of (incl. % ministers on September 13, achievement) Indicator 2 : Road safety strategy. Scattered responsibilities Value Strategy is defined among several agencies Strategy is defined quantitative or and adopted by the without a coordinated and adopted. Qualitative) Government. framework. Date achieved 06/30/ /30/ /30/2012 Comments (incl. % achievement) 100% achievement. The strategy has been defined by the Government further to a broad consultation process. The strategy has been approved by the council of ministers on August 04, Indicator 3 : Road safety prevention curriculum implemented by the Ministry of Education in pilot schools. Value quantitative or Qualitative) Lack of road safety sensitization in primary education curriculum. Launch of curriculum in pilot schools. Road safety prevention curriculum is launched in pilot schools. Date achieved 06/30/ /30/ /30/2012 Comments (incl. % achievement) 100% achievement. As a result of a broad consultative process, a road safety manual was developed and introduced in pilot schools for the school year. Indicator 4 : Merchant shipping code and regulations, including ISPS code provisions. Value quantitative or Qualitative) Code is outdated. Code is revised. Code is revised. Date achieved 06/30/ /30/ /30/2012 Comments (incl. % achievement) Indicator 5 : 100% achievement. Revision is consistent with the IMO conventions ratified by the Recipient, and the relevant IMO standards, including the provisions of the ISPS Code. The code was approved by the council of ministers on September 27, Civil aviation code.

8 Value quantitative or Qualitative) Code outdated, preliminary update already carried out. Code is revised, compliant with ICAO standard, and adopted by the Government. Code is revised in compliance with ICAO standard, and adopted by the Government. Date achieved 06/30/ /30/ /30/2012 Comments (incl. % 100% achievement. The code is in force with highly satisfactory results. achievement) (b) Intermediate Outcome Indicator(s) Indicator Indicator 1 : Value (quantitative or Qualitative) Baseline Value Original Target Values (from approval documents) Formally Revised Target Values Actual Value Achieved at Completion or Target Years Database producing the number of accidents in Nouakchott per 100,000 inhabitants. ToRs available. Database available. Achieved. Date achieved 06/30/ /30/ /30/2012 Comments (incl. % 100% achievement. Database is available and functional. achievement) Indicator 2 : Action plan for road safety strategy in Nouakchott. Action plan Action plan drafted, Value drafted, adopted, adopted, and (quantitative Lack of plan. and implementation or Qualitative) implementation started. started. Date achieved 06/30/ /30/ /30/2012 Comments (incl. % 100% achievement. Awareness campaign completed on June 30, achievement) Indicator 3 : Merchant Shipping Directorate (Direction de la Marine Marchande - DMM) staffing. Value (quantitative or Qualitative) Recruitment of 16 staff. Key high level staff in place and trained. Staff are in place and have been trained. Date achieved 06/30/ /30/ /30/2012 Comments (incl. % achievement) 100% achievement. Training received in Merchant marine operations, ISPS and Port state control completed. Thanks to the project, two DMM staff received a master s degree in Port Administration. Indicator 4 : ISPS and MARPOL conventions compliance monitoring by DMM. Value (quantitative or Qualitative) ISPS convention monitoring started. M&E system available (yearly reports produced). Achieved. iv

9 Date achieved 06/30/ /30/ /30/2012 Comments 100% achievement. DMM is monitoring ISPS on a regular basis. The project has (incl. % financed new equipment, including electronic navigational chart. achievement) Indicator 5 : Airport investment plan. Airport Investment Value Plan approved and (quantitative ToRs of the study drafted. implementation or Qualitative) started. Achieved. Date achieved 06/30/ /30/ /30/2012 Comments (incl. % 100% achievement. achievement) Indicator 6 : Procurement schedule. Value Procurement plan Annual (quantitative established adjustment. or Qualitative) Achieved. Date achieved 06/30/ /30/ /30/2012 Comments (incl. % 100% achievement. Procurement plan updated on a regular basis, as needed. achievement) Indicator 7 : Financial management reports (FMRs) and audits. Value (quantitative or Qualitative) FMR format agreed upon between IDA and Government. Annual audit. v Achieved. Date achieved 06/30/ /30/ /30/2012 Comments 100% achievement. Annual audits were completed and FMR were submitted to (incl. % IDA on a quarterly basis. achievement) G. Ratings of Project Performance in ISRs No. Date ISR Archived DO IP Actual Disbursements (USD millions) 1 12/22/2008 Moderately Moderately Unsatisfactory Unsatisfactory /21/2009 Moderately Moderately Unsatisfactory Unsatisfactory /27/2009 Moderately Satisfactory Moderately Unsatisfactory /30/2009 Moderately Satisfactory Moderately Satisfactory /09/2010 Moderately Satisfactory Moderately Satisfactory /25/2010 Moderately Satisfactory Moderately Satisfactory /10/2011 Satisfactory Satisfactory /12/2012 Satisfactory Satisfactory /27/2012 Satisfactory Satisfactory 2.96

10 10 10/02/2012 Satisfactory Satisfactory 3.40 H. Restructuring (if any) Not Applicable I. Disbursement Profile vi

11 1. Project Context, Development Objectives and Design 1.1 Context at Appraisal 1. Economic situation at appraisal. At the time of appraisal in 2008 Mauritania had a population of 3.2 million and a gross national income (GNI) per capita of US$840. Overall gross domestic product (GDP) growth decreased from 11.4 percent in 2006 to 1.0 percent in The country went through a period of political instability with the overthrow of elected governments twice, in 2005 and After three years of sustained dialogue between the government and development partners, the political crisis in the second half of 2008 led the international community to put most of its activities on hold, except humanitarian aid. The World Bank curtailed its operations in Mauritania from August 2008 until September Transport sector. The road transport network consisted of 10,927 km of classified roads of which about 7,873 km were rural earth roads. Mauritania had three international airports (Nouakchott, Nouadhibou, and Atar), seven regional airfields and one national airline. Mauritania had two ports: the main port of Nouakchott and the secondary port of Nouadhibou. 3. Land transport sub-sector. The road sub-sector was characterized by a persistent imbalance between construction, rehabilitation and maintenance funds. As a result, more than half of the country s core road network was in poor or bad condition. At the same time, the Ministry did not have a Transport Sector Strategy that indicated a clear roadmap for the development and more effective management of the sub-sector. 4. At the time of appraisal, the status of road safety was worrisome. Indeed, in 2007, National reports showed that an estimated 138 people a year were killed in accidents on national roads, including about 50 people a year in Nouakchott. Between 2002 and 2007, the occurrence of accidents mirrored the 15 to 20 percent annual growth of the transport fleet, while the number of casualties increased from 25 to 30 percent. 5. Maritime sub-sector. The maritime sector was characterized by fragmented ownership: management of the two main ports at Nouakchott and Nouadhibou were under different ministries, while operations at the mineral quay in Nouadhibou were overseen by a third ministry. Also, the agencies involved in the management and coordination of the maritime sector suffered significant capacity issues linked with the lack of training and adequate staffing. Furthermore, the legal and institutional frameworks of the maritime sub-sector were outdated and were not in compliance with International Maritime Organization (IMO) standards. 6. Air sub-sector. At the time of appraisal, the institutional framework of the air transport sub-sector was unclear and was characterized by weak administrative and financial capacity. The newly created Civil Aviation Agency (ANAC) operated in an ambiguous legal environment and lacked the capacity to fulfill its mission of ensuring 1

12 operators compliance with international safety and security standards. Overall, security measures at all airports were inadequate with regard to the minimum requirements of International Civil Aviation Organization (ICAO) standard security measures (obsolete security equipment, lack of comprehensive training and security plan). Runways, taxiways, and apron surfaces at Nouakchott and Nouadhibou Airports were in a badly deteriorating state and required immediate intervention. A new airline company (Mauritania Airways) had emerged, in replacement of liquidated former carrier (Air Mauritanie). 7. Sector policies and plans. The Government of the Islamic Republic of Mauritania (GIRM) with the support of the World Bank and the European Union (EU) undertook a comprehensive analytical review of the sector on the basis of the National Transport Plan (NTP) and the 2004 Bank financed economic and sector work 1 (ESW). As a result, the GIRM outlined a coherent roadmap which consisted of: (a) the liberalization of the road transport industry which was enacted by a 2005 decree; (b) the creation in 2004 of an autonomous Civil Aviation Agency (ANAC) in replacement of the Civil Aviation Directorate; (c) the completion and adoption in 2007 of sectoral studies (road transport strategy and multimodal transport strategy); and (d) the creation in 2004 of a Directorate of Studies, Planning, and Cooperation (DEPC) within the Ministry of Equipment and Transport (MET), tasked with the coordination, formulation and implementation of sector policies and strategies. 8. The Project. The Transport Sector Institutional Development and Technical Assistance Project (TSIDTAP) was primarily designed to support the above-mentioned reforms by improving the management capacities of the GIRM in the land, maritime, and transport subsectors. It was also designed to improve overall sector coherence and coordination, and provide for a clear vision of the transport sector. The total estimated cost of the project at appraisal was about US$5.5 million of which US$4.5 million would be funded by IDA while the balance would be funded by GIRM. 1.2 Original Project Development Objectives (PDO) and Key Indicators 9. The PDO. The Project Development Objective as stated in the Project Appraisal Document (PAD) was to improve land, maritime, and air transport sector management. The project also sought to strengthen the sector coordination capacity of the MET in order to achieve greater efficiency and effectiveness of Mauritanian transport sector. 10. The PDO was consistent with the Country Assistance Strategy (CAS) dated June, 2007 (IDA/Report No ), which identified governance and public sector capacity as key priorities. 11. Key Indicators of Performance. The key performance indicators are summarized in the table below. 1 Islamic Republic of Mauritania, Transport Sector Overview, Report No dated September

13 Table 1: Key Performance Indicators Land transport sub-sector PDO Indicators: The definition and adoption of road safety strategy; and The introduction of a road safety curriculum in pilot primary schools. Intermediate Outcome Indicators: Database producing number of accidents in Nouakchott per 100,000 inhabitants Action plan for road safety strategy in Nouakchott. Maritime transport sub-sector PDO Indicator: The update of the Merchant Shipping Code and Regulations, including International Shipping and Port facility Security (ISPS 2 ) code provisions. Intermediate Outcome Indicators: Merchant Shipping Directorate (DMM) staffing; ISPS and Marine Pollution (MARPOL) conventions compliance monitoring by DMM Air transport sub-sector PDO Indicator: The update of the civil aviation code. Intermediate Outcome Indicators: Airport investment plan Transport sector coordination PDO Indicator: The adoption of a letter of sector policy (LSP) Intermediate Outcome Indicators: Procurement schedule Financial management reports and audits 1.3 Revised PDO (as approved by original approving authority) and Key Indicators, and reasons/justification 12. The objectives of the project were not revised. 1.4 Main Beneficiaries 13. The Project Appraisal Document (PAD) did not explicitly identify project beneficiaries. However, it is clear that the population at large was expected to benefit from the outcome of institutional strengthening activities supported by the project. More specifically: (i) institutional strengthening under the project would result in the more efficient management of the sector; (ii) improvement in road safety management would have a benefit in terms of the costs of avoided accidents; (iii) the updated maritime code 2 ISPS Code is implemented through chapter XI-2 Special measures to enhance maritime security in the International Convention for the Safety of Life at Sea (SOLAS), 1974 and enforced since

14 would improve security and safety of ports operations; and (iv) the updated civil aviation regulatory and legal framework would improve security and safety of airport operations. 1.5 Original Components 14. The project consisted of four components, which were clearly linked to the PDO and key indicators. These components were: 15. Component 1: Institutional Support and Capacity-Building for Land Transport Sub-sector. Support to the newly created Directorate General of Land Transport (DGTT) through: (i) institutional capacity-building (with support to road safety directorate); (ii) road safety situation assessment and implementation of a pilot monitoring and evaluation (M&E) system in Nouakchott; (iii) launch of a sensitization campaign; (iv) development of a road safety introduction book for primary education; (v) purchase of equipment for an experimental road safety education base; and (vi) definition of a national road safety strategy. 16. Component 2: Support to Institutional and Technical Capacity-Building for the Maritime Transport Sub-sector. Support to GIRM s efforts in reorganizing the maritime sub-sector, through: (i) capacity building for the newly created Merchant Shipping Directorate (Direction de la Marine Marchande - DMM) and Maritime Affairs Studies and Coordination Unit (CECAM); (ii) development and implementation of an information system for the port of Nouadhibou (PAN); and (iii) improvement of the legal and regulatory framework of the sub-sector through the update of the Merchant Shipping Code and Regulations. 17. Component 3: Support to Air Transport System Reorganization and Technical Capacity-Building. (i) Support to GIRM s efforts to set up a development program for Mauritanian airports by funding a master plan for the development of airports, including a detailed development plan and an investment plan for Nouakchott Airport; and (ii) support the update of the outdated civil aviation code. 18. Component 4: Support to the Ministry s Coordination Role and Project Activities Coordination. (i) Support to the DEPC through staff training, technical assistance (fiduciary support, and monitoring and evaluation), and purchase of equipment and vehicles to ensure close coordination of the different sub-sector units involved in the project; and (ii) definition of a letter of sector policy (LSP) designed to address policy, institutional and legal issues for the efficient operation of the transport sector. 1.6 Revised Components 19. The components of the project were not revised. 4

15 2. Key Factors Affecting Implementation and Outcomes 2.1 Project Preparation, Design and Quality at Entry 20. The project was fully consistent with the CAS and supported the CAS objective of promoting economic governance and public sector capacity. The project design was based on sound dialogue supported by the 2004 World Bank-financed ESW, the 2007 EU-financed Road Sector Study and the 2007 World Bank-financed 3 Multimodal Transport Sector Study. 21. TSIDTAP was prepared in a collaborative manner and GIRM took the lead role. Information sharing and consultations also took place with the donor community. 22. Although not explicitly mentioned in the PAD, the project design adopted a number of relevant lessons learned from previous World Bank experience in the reform of the transport sector such as: (i) comprehensive sector-wide institutional reforms yield more sustainable benefits compared to a piecemeal approach of tackling reforms; (ii) the benefit of carrying out focused sub-sectoral analysis prior to engaging in comprehensive sector-wide reforms; and (iii) the importance of transport sector donor coordination and alignment in ensuring government s commitment to the reform agenda. 23. At an early stage of preparation, the project sought to finance physical investments to improve Mauritanian transport infrastructures, as well as capacity strengthening activities. However, given the drop in the country s IDA allocation, financing for the investment part of the project was no longer available. After discussing the matter with the World Bank, GIRM decided to scale down the project scope and maintain only the technical assistance activities. This strategic choice was sound in light of critical capacity building needs which remained substantial regardless of infrastructure needs. 24. At the time of appraisal, the second phase (APL 2-B) of the West and Central Africa Air transport Safety and Security Project (WCAATSSP) was under preparation with Mauritania as one of the three potential recipient countries. In light of limited available financing for the TSIDTAP, all proposed activities of the civil aviation component of TSIDTAP dealing with security and safety equipment and training were transferred to the then proposed Mauritanian component of WCAATSSP. 25. At project preparation, a risk analysis was carried out and the mitigation measures were correctly identified. The capacity of Directorates/public agencies to implement the project was allocated high risk rating and this was adequately mitigated through close supervision by the Bank, and through quarterly portfolio monitoring and review. The technical risk linked with the sensitive nature of the reforms which required a comprehensive understanding of sector issues, was managed through the provision of specialized training, especially in the maritime sector. The other risk stemming from the 3 Financed under the Urban Development Project (Credit MAU). 5

16 option to mainstream project management within the MET was managed through agreeing on a series of key actions as follows: (i) appointment of a project coordinator who is familiar with Bank procurement guidelines; (ii) preparation of an adequate administrative, accounting, and financial management manual; and (iii) recruitment of an accountant and a procurement specialist prior to effectiveness. 26. The risk linked with the reversal in government commitment to reforms due to the limited funding offered by the project was mitigated by the fact that the GIRM had committed to the same reforms with the EU which offered substantial investment financing of the sector. Hence, through the project, the World Bank reinforced the joint EU/IDA dialogue with the GIRM. 27. The project is rated as satisfactory in terms of quality at entry. The rating is based on the following criteria: (i) consistency of the project s objectives with GIRM priorities, and the CAS; (ii) the project design which was sound and simple; and (iii) the risk identification and mitigation which was candid, relevant and robust. 2.2 Implementation 28. Implementation was initially delayed by more than a year as a direct consequence of the August 6, 2008 coup after which the Bank curtailed its operations in Mauritania until September This meant that although the project was approved on July 31, 2008, it only became effective seventeen months later on December 29, However, in light of the good implementation performance, the project closing date was not extended to make up for the initial force majeure delay in project implementation. 29. Shortly after the lifting of suspension of Bank operations in Mauritania, the project team carried out a reengagement mission, which allowed the signing of the project s financing agreement (FA) and the subsequent declaration of project effectiveness on December 29, The delay in the start of the project was partly mitigated by the fact that, during the long hiatus, the Directorate of Studies, Planning and Cooperation (Direction des Etudes, de la Programmation et de la Coopération - DEPC) made significant progress in the preparation of the procurement activities in anticipation of project effectiveness. 31. In 2008, shortly after TSIDTAP s approval, Mauritania was dropped from Phase 2-B of WCAATSSP because of the suspension of World Bank activities in the country. Following the lifting of suspension of World Bank operations in September 2009, IDA resources from the Regional Integration Department were no longer available for Mauritania to join the WCAATSSP. As a result, the expected IDA parallel financing in equipment and training to benefit the country s civil aviation (cf. paragraph 24) did not materialize. In light of this, the GIRM decided to take the lead and provide the funding given the importance of the activities in improving the ICAO compliance of the country s civil aviation sub sector. 6

17 32. In 2010, the GIRM took the unexpected decision to create a new Public Transport Company (Société des Transports Publics - STP) and an Authority for the Regulation of Road Transport (Autorité de Régulation des Transports Routiers - ARTR). While the project implementation arrangements were not directly impacted by this decision, the World Bank and the EU undertook with the GIRM a thorough review of the mandates of the new institutions to ensure that sector policy and reforms agreed with the GIRM were not at risk and that there were no overlapping of mandates and backtracking regarding sector liberalization. 33. DMM which at the time of appraisal was housed within the MET was transferred for project effectiveness to the Ministry in charge of Fishing and Maritime Economy. This change had a negative impact on the coordination and follow-up of project activities. As a result, the preparation and validation process of the new maritime code was delayed by almost one year. 34. The World Bank conducted a Mid Term Review (MTR) of the project in May Implementation and progress toward achievement of PDOs were noted as satisfactory. By MTR, initial lag in project implementation had been substantially absorbed, and the disbursement rate stood at 49 percent. The project indicators were deemed fully achievable by project closing and no restructuring was envisaged. 2.3 Monitoring and Evaluation (M&E) Design, Implementation and Utilization 35. M&E Design and Implementation: The M&E design was simple and included five key performance indicators (KPIs) which were easy to measure and directly attributable to the achievements of the project. 36. M&E Utilization: DEPC has been equipped with a sector-wide M&E tool which is updated and utilized on a regular basis (cf. paragraph 66). The Directorate of Road Safety (DSR) is now staffed and equipped to monitor accidents and a pilot M&E system is available and functional for the city of Nouakchott (cf. paragraph 53). 2.4 Safeguard and Fiduciary Compliance 37. Safeguard. As the project did not involve physical investments, it was rated category C. Therefore, no safeguard policy was triggered. 38. Financial Management. Financial management by the coordinating unit was efficient. The quarterly Financial Monitoring Reports (FMRs) were received regularly and were fully compliant with the agreed format. Audits were done annually and on-time and were unqualified. 39. Procurement. Procurement under the project was satisfactory. All procurement activities and post-reviews were satisfactory. Procurement Plans were updated on a regular basis (at least once a year) and all procurement activities were executed efficiently and in a timely manner. 7

18 2.5 Post-completion Operation/Next Phase 40. The 2012 Country Partnership Strategy (CPS) did not identify any operation in the transport sector. Nevertheless, consolidation of the project s result is foreseen in the continued joint dialogue and coordination with the EU. The World Bank will continue to work with the GIRM through the donor coordination mechanism to ensure that the project outcomes are sustained and that sufficient funding is provided to the sector. 41. The proposed IBRD enclave for the Port of Nouakchott Development Project (PNDP) which builds on the achievements of the maritime transport component of TSIDTAP was finally dropped by the GIRM in December 2012, after two years of preparation. Nevertheless, the GIRM envisages pursuing the development of a container terminal for the port of Nouakchott, although it is not clear to what extent private sector participation in port operations will materialize in the near future, which was the initial plan. On the positive side, both the TSIDTAP and the aborted PNDP helped in providing a better assessment of the type and scope of activities, commercial risks, and all prerequisite conditions that international operators usually require. 3. Assessment of Outcomes 3.1 Relevance of Objectives, Design and Implementation 42. The PDO remains relevant. The overall objective of improving management of land, maritime, and air transport sectors remains a priority for the GIRM. Indeed, the GIRM in its Poverty Reduction Strategy Paper (PRSP-3) emphasizes the need to promote the capacity strengthening and development of transport to foster economic growth and poverty reduction. 3.2 Achievement of Project Development Objectives 43. The PDO rating is satisfactory for the following reasons. 44. First, the PDO of improving the country s management of the land, maritime, and air transport sub-sectors, has been largely achieved. 45. Secondly, the transfer of knowledge between the various consultants and concerned directorates, and agencies involved in project implementation has largely been achieved through good collaboration. 46. Thirdly, a number of institutional tools for more rational sector planning and management have been put in place. These include but are not limited to: (i) the transport letter of sector policy (LSP); (ii) the sector-wide monitoring and evaluation tool housed at DEPC; (iii) the National Road Safety Strategy; (iv) the revised maritime code; and (v) the revised civil aviation code. 8

19 47. Fourthly, the participatory process introduced by the project with regards to road safety, has created a dynamic collaboration between the MET, NGOs, and civil society that never existed in the past and a high-level political support with regards to road safety issues. 48. What follows is a detailed assessment of the project s achievements against its specific objectives. (i) Objective 1: Strengthen institutional capacity and management of the land transport sub-sector. 49. The rating is satisfactory for the following reasons. 50. First, the project helped set up a framework conducive to addressing road safety issues in a cohesive manner. A modern National Road Safety Strategy (NRSS), consistent with international standards and best practices 4 was further defined following broad consultations with all relevant stakeholders. The strategy was approved by the National transportation Commission on May 30, 2012 and adopted by the council of ministers on August 04, Implementation of the strategy s action plan started with a road safety awareness campaign held in Nouakchott between April and June 2012, under the leadership of the Directorate of Road Safety (DSR) and with the support of an international consultant, and NGOs. 51. Secondly, thanks to the project, the mainstreaming of road safety in primary school curricula is likely to be achieved. An illustrated road safety manual for children was produced and 10,000 copies were printed. The manual has been introduced as a pilot initiative of the Ministry of Education (ME) in 8 primary schools in Nouakchott and 3 schools in Nouadhibou for the academic year. 52. Furthermore, in support of mainstreaming of road safety in primary education, the GIRM has invested US$526,000 in the construction of a Road Safety Education Track for primary school students in the Nouakchott area. It is expected that the facility will be operational by the upcoming academic year ( ). 53. Thirdly, the project has equipped DSR with a road accident database which is already producing statistics to feed into the existing Road Traffic Accidents Analysis Report (BAAC). Furthermore, the project exposed seven DSR staff to international bestpractice in road safety through a training session held in Senegal with the participation of world class road safety experts from Senegal, France and Belgium. Finally, as a result of the information being generated by the road accident database, a monthly report on road safety statistics is presented during the council of ministers on a monthly basis, ensuring continued high-level ownership of road safety issues. 4 The strategy was reviewed by the Global Road Safety Partnership (GRSP). 9

20 Box 1. Introduction of a road safety curriculum in pilot primary schools. On November 19, 2012, the Minister of Transport and the Minister of Education jointly launched the introduction of a road safety manual in pilot elementary schools in Mauritania. This initiative is highly appreciated at the Government level. Indeed, the GIRM intends to gradually extend the manual to every school in the country the upcoming academic years. The Manual, which was jointly prepared by a group of experts from the two ministries, features a simplified illustrative explanation of road safety issues. It evokes in a simplified style, the issues of road safety, and raises awareness of the risks in the use of the telephone, the risks of driving when tired or sleepy, the importance of fastening seatbelts, etc. The manual teaches children how to cross a road in a safe manner, and puts an emphasis on the risks associated with children playing in the streets and public places. (ii) Objective 2: Strengthen institutional capacity and management of the maritime transport sub-sector. 54. The rating is satisfactory for the following reasons. 55. Thanks to the project, the legal and regulatory framework of the maritime subsector was revised and is now consistent with the IMO conventions ratified by the GIRM and the relevant IMO standards, including the provisions of the International Shipping and Port Facility Security (ISPS) Code. The revised maritime code was adopted by the council of ministers on November 29,

21 56. Furthermore, the project has significantly contributed to the reorganization and strengthening of the DMM in the following manner: the maritime investigation office (MIO) which is a key element of the institutional chain of the maritime sub-sector has been equipped and made functional by the project. the project has financed the training of 16 DMM staff in key specialized areas such as the enforcement of IMO and ISPS codes and standards. 53. Thanks to the project, two DMM staff where awarded a master s degree in Management of Maritime Affairs. Finally, the project has equipped DMM s Accident Investigation Unit with state of the art technology. (iii) Objective 3: Strengthen institutional capacity and management of the aviation sub-sector. 57. The rating is highly satisfactory for the following reasons. 58. First, the project introduced modern best-practice legislation and regulation in the Mauritanian aviation sector with the revision of the outdated civil aviation code. The legislative part of the revised code was adopted on February 27, 2011 by law n o while the regulatory part was adopted by the council of ministers on March 31, 2011 by decree n o The revised code has enabled ANAC to take corrective measures regarding the deficiencies identified in previous International Civil Aviation Organization (ICAO) safety audits. In terms of aviation security, the Government implemented a plan of action for the improvement of ICAO compliance which consisted in: the adoption of a National Security Plan, the acquisition of security equipment, and the capacity building of security actors. As a result, further to an ICAO audit held in April 2012, Mauritania civil aviation safety compliance rate improved from 33 percent in 2008 to 70 percent in Furthermore, thanks to the new code, ANAC was finally able to certify the national airline company, which was not feasible in the past because of the outdated civil aviation code. 60. As a result, Mauritania now ranks number seven among African countries and first in the African Air Navigation Safety Agency (ASECNA) group regarding civil aviation safety compliance. 61. Secondly, thanks to a study financed by the project, the MET has a Master plan for the development of Mauritanian Airports, including a detailed development plan for the Nouakchott international airport. These are key planning tools that are enabling the MET to better prioritize and sequence investments within the sub-sector. For instance, recent investments by GIRM in the regional airport in Atar were planned and designed as per the new Master plan. 11

22 (iv) Objective 4: Strengthen the sector coordination capacity of the Ministry of Equipment and Transport (MET). 62. The rating is satisfactory for the following reasons. 63. Thanks to support from the project, the MET was able to prepare and endorse a Transport Sector Strategy (TSS) and a Letter of Sector Policy (LSP). The LSP was approved by the council of Ministers on September 13, The TSS and the LSP have set the stage for ensuring improvement and sustained efficiency in the provision of transport infrastructure and services. This is likely to help reinforce the sector s impact on the national economy and its support to key growth enabling sectors. 64. MET s overall knowledge of the transport sector has been improved thanks to key studies conducted under the project. MET is now cognizant of the externalities of urban transport in Nouakchott and the related costs to the economy (see box 2 for more details). Furthermore, the study on unit cost of civil works will help ensure better planning and appraisal of transport related works. Box 2. Externalities of Nouakchott Urban Transport Thanks to a study financed by the project, the GIRM and the Nouakchott Metropolitan Area (CUN) are now cognizant of the externalities costs of the city s urban transport system in terms of economic cost of: traffic accidents; air pollution; noise pollution; traffic congestion; and internal dysfunctions of mass transport in Nouakchott. The study revealed that overall transport sector costs was MRO 167 billion in 2012 (US$560 million) and represented 17 percent of GDP, and that economic cost of externalities of Nouakchott urban transport was estimated at MRO 40 billion (US$130 million) which represents 4 percent of GDP. The most costly item was vehicle operating costs which accounted for about 56 percent of the total. This is mainly because of the ageing urban transport fleet (82 percent of the fleet has more than 10 years). The study has defined a detailed action plan to mitigate the identified externalities. 3.3 Efficiency 65. The project contributed to achieving efficiency gains in the following areas: (i) efficiency improvements in the legal and regulatory frameworks of civil aviation and maritime subsectors seen in modern civil aviation and maritime codes; (ii) improvement in the monitoring and evaluation of road safety with the availability of a computerized road accident database at DGTT; and (iii) improvement in overall knowledge of the sector: knowledge of the externalities of urban transport and its costs to the economy, and better grasp on costs of civil works thanks to a comprehensive study on unit prices of civil works. 66. Furthermore, with the capacity building of DEPC, efficiency increases have been achieved in the overall coordination of the transport sector. MET now has a 12

23 comprehensive sector-wide computer-based monitoring and evaluation framework which provides real time information on project status and thus facilitates decision-making. 3.4 Justification of Overall Outcome Rating 67. The rating is satisfactory for the following reasons 68. The project has laid a strong foundation for the management and sustainability of the transport sector. It has strengthened the capacity of the transport sector directorates and agencies, and improved prospects for greater accountability and transparency. The project outcome is still fully relevant to current World Bank and GIRM strategy and sector efficiency has been sustainably improved. 3.5 Overarching Themes, Other Outcomes and Impacts (a) Poverty Impacts, Gender Aspects, and Social Development Not Applicable. (b) Institutional Change/Strengthening 69. The long-term capacity improvement of the transport directorates and structures strengthened under the project, particularly the recently created DEPC, is likely to be sustained. The legislative framework that has been created for the aviation and maritime subsectors is unlikely to change in the near future. (c) Other Unintended Outcomes and Impacts (positive or negative) 70. First, the project helped prevent the blacklisting of Nouakchott International Airport by the EU in 2007, on the grounds of poor condition of its runway. Funds from the Project s Preparation Advance (PPA) to the tune of US$200,000 were mobilized to finance preliminary and detailed engineering study for the rehabilitation of the runway of Nouakchott International Airport. This has allowed the GIRM to fund the civil works (estimated at US$8.5 million) for the rehabilitation of the runway and thus avoided blacklisting of its main airport. 71. Secondly, subsequent to the establishment of the STP by the GIRM in 2010, (cf. paragraph 32), the project facilitated a sharing of experience between the new company, and the existing public bus companies in Senegal and Cote d Ivoire. This has eased the operationalization of the newly created STP, positive impacts of which are already being felt by the public transport users in the cities of Nouakchott and Nouadhibou. 72. Finally, thanks to a study financed by the project, Nouadhibou Port has improved its information system. Furthermore, the ports of Nouakchott and Nouadhibou have now 13

24 harmonized their information systems for basic data, under the coordination and technical oversight of Maritime Affairs Studies and Coordination Unit (CECAM). 3.6 Summary of Findings of Beneficiary Survey and/or Stakeholder Workshops 73. This is a core ICR which does not require a beneficiary survey/stakeholder workshop. 4. Assessment of Risk to Development Outcome 66. The rating is moderate for the following reasons. 74. The project has put in place the right elements of reform: a relevant transport LSP coupled with a transport sector strategy, a National Road Safety Strategy, a modern civil aviation code, a road safety strategy at par with international standards, and a revised maritime code consistent with the latest IMO requirements. 75. The institutional reforms supported by the project have been enacted by decrees and are likely to be sustained. Improved working conditions at the transport agencies particularly the acquisition of computer equipment, modernized administration, and rehabilitated office facilities will help to retain the staff that has been trained under the project. 76. The GIRM is taking the appropriate measures towards the sustainability of institutional gains in the civil aviation sector. More specifically, the GIRM adopted a decree in 2011 to scale up the resources of ANAC which are now estimated at US$5.1 million compared to US$2.5 million in About 80 percent 5 of ANAC s budget comes from aviation related taxes. The fact that 10 percent of that budget is earmarked for security will enable ANAC to maintain and renew airport security equipment in view of sustaining gains in ICAO compliance. 77. With regards to road safety, although a strong partnership was establish between the GIRM, NGOs and other actors of road safety, continuation of sensitization activities will not be sustainable unless its financing is borne by the private sector, in particular the insurance companies which have a vested interest in improved road safety. For instance, the monthly live road safety show on National Television funded for one year by DGTT (featuring all actors of road safety including police officers, drivers, etc.) will need to be sustained in order to maintain the public s interest in road safety issues. 5 There is a 20 percent subsidy from the National budget which will gradually decrease. 14

25 78. The main risk to the sustainability of capacity gains in the maritime sub-sector is the diffused institutional setting with actors from two separate ministries. In such a context, effective coordination of maritime activities and full enforcement of the new maritime code will be difficult to maintain. 79. Finally, it would be unrealistic to assume that the new tools and ways of doing things, as brought about by the reforms, will be fully assimilated at once. Although the GIRM has expressed its firm commitment to sustaining such reforms, it will actually depend on the effective assimilation of sectoral planning tools by the DEPC, and the subsectoral agencies and directorates involved in transport. 5. Assessment of Bank and Borrower Performance 5.1 Bank Performance (a) Bank Performance in Ensuring Quality at Entry 80. Rating is satisfactory for the following reasons. 81. As mentioned above, the project design was relevant, appropriate and responsive to the client s needs. Furthermore, the World Bank was proactive in working with the GIRM to first prepare a Technical Assistance project with a specific focus on strengthening management capacity, reviewing sector priorities, and implementing policy and institutional reforms, which were critical prior to considering any major investment in the transport sector. (b) Quality of Supervision 82. Rating is satisfactory for the following reasons. 83. First, despite the delay in making the project effective, all project activities were more or less completed by the scheduled project completion date. 84. Second, the World Bank allocated adequate resources to support the implementation of this technical assistance project. The proximity of task-team members (based in Senegal and Ivory Coast) allowed for the participation and input by the World Bank in the presentation of key studies and capacity building activities. Furthermore, the GIRM was appreciative of the continuous technical advice provided by the World Bank throughout project implementation in complex areas of reform in the transport sector. Finally, the World Bank s ability to convene worldwide expertise on transport sector reform/institutional issues was key to ensure the implementation of all project activities. 85. Project implementation progress was adequately reported and legal covenants were monitored and enforced. Furthermore, key implementation issues were identified, assessed and resolved in a timely manner. The MTR was a positive milestone, as it gave a 15

Project Name. Region. Date of Board Approval July 29, 2008

Project Name. Region. Date of Board Approval July 29, 2008 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No: AB3458.: MAURITANIA:

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT APPRAISAL DOCUMENT ON A PROPOSED

More information

Mauritania s Poverty Reduction Strategy Paper (PRSP) was adopted in. Mauritania. History and Context

Mauritania s Poverty Reduction Strategy Paper (PRSP) was adopted in. Mauritania. History and Context 8 Mauritania ACRONYM AND ABBREVIATION PRLP Programme Regional de Lutte contre la Pauvreté (Regional Program for Poverty Reduction) History and Context Mauritania s Poverty Reduction Strategy Paper (PRSP)

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011 Public Disclosure Authorized Document of The World Bank Report No: 65071-CM Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA IDA-3574A IDA TF-26223) ON A CREDIT

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA IDA-3574A IDA TF-26223) ON A CREDIT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-35740 IDA-3574A

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF056601) ON A MULTI DONOR TRUST FUND TF IN THE AMOUNT OF US$ MILLION EQUIVALENT TO THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF056601) ON A MULTI DONOR TRUST FUND TF IN THE AMOUNT OF US$ MILLION EQUIVALENT TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF056601) ON

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Project Name Region Sector Project ID Borrower Report No. PIC4620 Senegal-Urban Transport Reform and... Capacity Building Project Africa Urban Transport SNPA44383 Republic

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-44690, IDA-H1910, IDA-H4050)

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-44690, IDA-H1910, IDA-H4050) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-44690, IDA-H1910,

More information

Document of The World Bank FOR OFFICIAL USE ONLY IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H4630 TF TF-96083) ON AN

Document of The World Bank FOR OFFICIAL USE ONLY IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H4630 TF TF-96083) ON AN Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: ICR00003680 Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H4630 TF-92396 TF-96083)

More information

US$M): Sector Board : Social Development Cofinancing (US$M (US$M US$M): US$M):

US$M): Sector Board : Social Development Cofinancing (US$M (US$M US$M): US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR14437 1. Project Data: Date Posted : 09/22/2014 Public Disclosure Authorized Public Disclosure Authorized Country:

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (4410-NE) ON A CREDIT IN THE AMOUNT OF SDR 14.4 MILLION (US$23.7 MILLION EQUIVALENT) TO THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (4410-NE) ON A CREDIT IN THE AMOUNT OF SDR 14.4 MILLION (US$23.7 MILLION EQUIVALENT) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (4410-NE) ON

More information

ANNEX. DAC code Sector Economic and Development Planning

ANNEX. DAC code Sector Economic and Development Planning ANNEX 1. IDTIFICATION Title Total cost Aid method management mode Technical Cooperation Facility 1.5M (2.4% of NIP) Project approach partially decentralised management DAC code 15010 Sector Economic and

More information

Institutional Strengthening for Aviation Regulation

Institutional Strengthening for Aviation Regulation Technical Assistance Report Project Number: 43429 Regional capacity development technical assistance (R-CDTA) December 2010 Institutional Strengthening for Aviation Regulation The views expressed herein

More information

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780

Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Department of Fisheries Ministry of Natural Resources Teone, Funafuti TUVALU Email: proptuv@gmail.com / proptuv@tuvalufisheries.tv

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 104604 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA TF-92459) ON A CREDIT IN THE AMOUNT OF SDR MILLION (US$30.00 MILLION EQUIVALENT) TO THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA TF-92459) ON A CREDIT IN THE AMOUNT OF SDR MILLION (US$30.00 MILLION EQUIVALENT) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-42570 TF-92459)

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020366 Public Disclosure Authorized Public Disclosure Authorized Project ID P107666 Country Peru Project

More information

Document of The World Bank

Document of The World Bank Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-35380 IDA-35381)

More information

Project Costs (US$M):

Project Costs (US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted: 10/05/2015 Report Number: ICRR14849 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Implementation Status & Results Senegal SENEGAL: TRANSPORT & URBAN MOBILITY PROJECT (P101415)

Implementation Status & Results Senegal SENEGAL: TRANSPORT & URBAN MOBILITY PROJECT (P101415) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Senegal SENEGAL: TRANSPORT & URBAN MOBILITY PROJECT (P101415) Operation Name: SENEGAL: TRANSPORT

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Transport Sector Unit Europe and Central Asia Region Document of The World Bank RESTRUCTURING

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-48650) ON A LOAN IN THE AMOUNT OF EURO 90.0 MILLION (US$ MILLION EQUIVALENT) TO THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-48650) ON A LOAN IN THE AMOUNT OF EURO 90.0 MILLION (US$ MILLION EQUIVALENT) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-48650)

More information

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN Terms of Reference for Consultants 1. BACKGROUND INFORMATION Government of Vanuatu has requested TA support in the formulation and preparation of a national infrastructure

More information

Table 1 the Road Network of Mozambique (in kilometers)

Table 1 the Road Network of Mozambique (in kilometers) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2867 Roads

More information

I Introduction 1. II Core Guiding Principles 2-3. III The APR Processes 3-9. Responsibilities of the Participating Countries 9-14

I Introduction 1. II Core Guiding Principles 2-3. III The APR Processes 3-9. Responsibilities of the Participating Countries 9-14 AFRICAN UNION GUIDELINES FOR COUNTRIES TO PREPARE FOR AND TO PARTICIPATE IN THE AFRICAN PEER REVIEW MECHANISM (APRM) Table of Contents I Introduction 1 II Core Guiding Principles 2-3 III The APR Processes

More information

Cofinancing (US$M): Monika Huppi Lourdes N. Pagaran IEGPS2

Cofinancing (US$M): Monika Huppi Lourdes N. Pagaran IEGPS2 Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number: ICRR14712 1. Project Data: Date Posted: 06/16/2015 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION

Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION Introduction Chapter 1, Page 1 of 9 1. INTRODUCTION 1.1 OVERVIEW Preamble 1.1.1 The African Development Bank is the premier financial development institution in Africa dedicated to combating poverty and

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA IDA IDA-47610) ON A CREDIT

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA IDA IDA-47610) ON A CREDIT Public Disclosure Authorized Document of The World Bank Report No: ICR2482 Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-0 IDA-1 IDA-47610) ON A CREDIT Public Disclosure

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H8510) ON A GRANT IN THE AMOUNT OF SDR 3.4 MILLION (US$5.0 MILLION EQUIVALENT) TO THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H8510) ON A GRANT IN THE AMOUNT OF SDR 3.4 MILLION (US$5.0 MILLION EQUIVALENT) TO THE Public Disclosure Authorized Document of The World Bank Report No: ICR00004097 Public Disclosure Authorized Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H8510) ON A GRANT

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Jun ,300, Original Commitment 30,400,

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Jun ,300, Original Commitment 30,400, Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020110 Public Disclosure Authorized Project ID P107311 Country Mozambique Project Name MZ-Nat'l Dec

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT PROGRAMMATIC CREDITS IN THE AMOUNT OF SDR 54.8 MILLION (US$80 MILLION EQUIVALENT) THE REPUBLIC OF SENEGAL

IMPLEMENTATION COMPLETION AND RESULTS REPORT PROGRAMMATIC CREDITS IN THE AMOUNT OF SDR 54.8 MILLION (US$80 MILLION EQUIVALENT) THE REPUBLIC OF SENEGAL Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT ON PROGRAMMATIC

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TRANSPARENCY AND ACCOUNTABILITY CAPACITY BUILDING PROJECT (CREDIT NO.

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TRANSPARENCY AND ACCOUNTABILITY CAPACITY BUILDING PROJECT (CREDIT NO. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

The World Bank Kenya Infrastructure Finance/PPP project (P121019)

The World Bank Kenya Infrastructure Finance/PPP project (P121019) Public Disclosure Authorized AFRICA Kenya Financial Systems Practice Global Practice IBRD/IDA Adaptable Program Loan FY 2013 Seq No: 4 ARCHIVED on 22-Dec-2014 ISR17114 Implementing Agencies: Public Private

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

Proposed grant to Solomon Islands for the. Solomon Islands Rural Development Programme

Proposed grant to Solomon Islands for the. Solomon Islands Rural Development Programme Document: Agenda: 14(c)(iii) Date: 15 December 2010 Distribution: Public Original: English E President s report Proposed grant to Solomon Islands for the Solomon Islands Rural Development Programme Note

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H6200) ON A GRANT

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H6200) ON A GRANT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00002334 IMPLEMENTATION COMPLETION AND RESULTS

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Transport Sector Country Department AFCF2 Africa Region Document of The World Bank FOR

More information

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No:

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ELECTRICITY SECTOR EFFICIENCY ENHANCEMENT PROJECT CR SE. April 25, 2005 TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ELECTRICITY SECTOR EFFICIENCY ENHANCEMENT PROJECT CR SE. April 25, 2005 TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H4540) ON A GRANT

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H4540) ON A GRANT Public Disclosure Authorized Document of The World Bank Report No: ICR00003979 Public Disclosure Authorized Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H4540) ON A GRANT

More information

GOVERNANCE FRAMEWORK FOR THE CLEAN TECHNOLOGY FUND. November, 2008

GOVERNANCE FRAMEWORK FOR THE CLEAN TECHNOLOGY FUND. November, 2008 GOVERNANCE FRAMEWORK FOR THE CLEAN TECHNOLOGY FUND November, 2008 Table of Contents A. Introduction B. Purpose and Objectives C. Types of Investment D. Financing under the CTF E. Country Access to the

More information

Implementation Status & Results Senegal SENEGAL: TRANSPORT & URBAN MOBILITY PROJECT (P101415)

Implementation Status & Results Senegal SENEGAL: TRANSPORT & URBAN MOBILITY PROJECT (P101415) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Senegal SENEGAL: TRANSPORT & URBAN MOBILITY PROJECT (P101415) Operation Name: SENEGAL: TRANSPORT

More information

Mongolia: Social Security Sector Development Program

Mongolia: Social Security Sector Development Program Validation Report Reference Number: PVR196 Project Number: 33335 Loan Numbers: 1836 and 1837(SF) November 2012 Mongolia: Social Security Sector Development Program Independent Evaluation Department ABBREVIATIONS

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jul ,330,316.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jul ,330,316.00 Public Disclosure Authorized 1. Project Data Report Number : ICRR0020321 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project ID P107840 Country Macedonia, former

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H2620) (IDA-4520) (IDA-46610) (IDA-47750) ON A GRANT AND THREE CREDITS

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H2620) (IDA-4520) (IDA-46610) (IDA-47750) ON A GRANT AND THREE CREDITS Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H2620) (IDA-4520)

More information

Actual Project Name : Social Insurance. US$9.7 US$9.4 Technical Assistance Project (SITAP) Country: Bosnia and US$M): Project Costs (US$M

Actual Project Name : Social Insurance. US$9.7 US$9.4 Technical Assistance Project (SITAP) Country: Bosnia and US$M): Project Costs (US$M IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 10/22/2008 Report Number : ICRR12969 PROJ ID : P071004 Appraisal Actual Project Name : Social Insurance Project Costs (US$M US$M):

More information

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA)

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) 2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) TECHNICAL SPECIFICATIONS 15 July 2016 1 1) Title of the contract The title of the contract is 2nd External

More information

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments Annex 1. Identification Title/Number Trinidad and Tobago Annual Action Programme 2010 on Accompanying Measures on Sugar; CRIS reference: DCI- SUCRE/2009/21900 Total cost EU contribution : EUR 16 551 000

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-47910) ON A LOAN

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-47910) ON A LOAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-47910)

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-48420) ON A LOAN IN THE AMOUNT OF US$ MILLION ROMANIA FOR A

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-48420) ON A LOAN IN THE AMOUNT OF US$ MILLION ROMANIA FOR A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00001476 IMPLEMENTATION COMPLETION AND RESULTS

More information

Implementation Status & Results Central African Republic Support to Vulnerable Groups Community Development Project (P111679)

Implementation Status & Results Central African Republic Support to Vulnerable Groups Community Development Project (P111679) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Central African Republic Support to Vulnerable Groups Community Development Project (P111679) Operation

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000, Original Commitment 400,000,

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000, Original Commitment 400,000, Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020001 Public Disclosure Authorized Project ID P100580 Country Ukraine Project Name ROADS & SAFETY IMPROVEMENT

More information

Republic of the Maldives: Preparing Business Strategy for Port Development

Republic of the Maldives: Preparing Business Strategy for Port Development Technical Assistance Report Project Number: 47283 Capacity Development Technical Assistance (CDTA) November 2013 Republic of the Maldives: Preparing Business Strategy for Port Development The views expressed

More information

Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening. (1st January 31st March 2013) First-Quarter Report

Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening. (1st January 31st March 2013) First-Quarter Report Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening (1st January 31st March 2013) First-Quarter Report Contents 1. BACKGROUND OF PROJECT... 3 2. PROJECT OVERVIEW...

More information

Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Executive Summary. An IDEV Country Strategy Evaluation

Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Executive Summary. An IDEV Country Strategy Evaluation Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program 2004 2015 Executive Summary An IDEV Country Strategy Evaluation March 2017 IDEV conducts different types of evaluations

More information

GOVERNANCE FRAMEWORK FOR

GOVERNANCE FRAMEWORK FOR December, 2011 GOVERNANCE FRAMEWORK FOR THE STRATEGIC CLIMATE FUND Adopted November 2008 and amended December 2011 Table of Contents A. Introduction B. Purpose and Objectives C. SCF Programs D. Governance

More information

CENTRAL AFRICAN REPUBLIC MINISTRY OF ECONOMY, PLANNING AND INTERNATIONAL COOPERATION OFFICE OF THE MINISTER

CENTRAL AFRICAN REPUBLIC MINISTRY OF ECONOMY, PLANNING AND INTERNATIONAL COOPERATION OFFICE OF THE MINISTER CENTRAL AFRICAN REPUBLIC MINISTRY OF ECONOMY, PLANNING AND INTERNATIONAL COOPERATION OFFICE OF THE MINISTER STEERING COMMITTEE ON THE POVERTY REDUCTION STRATEGY PAPER PERMANENT TECHNICAL SECRETARIAT OF

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT. A CREDIT (IDA-46110) and A GRANT (IDA-H6940)

IMPLEMENTATION COMPLETION AND RESULTS REPORT. A CREDIT (IDA-46110) and A GRANT (IDA-H6940) Public Disclosure Authorized Document of The World Bank Report No: ICR00003458 Public Disclosure Authorized Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT ON A CREDIT (IDA-46110)

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA P100785) ON A CREDIT IN THE AMOUNT OF SDR MILLION (US$46.65 MILLION EQUIVALENT) TO THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA P100785) ON A CREDIT IN THE AMOUNT OF SDR MILLION (US$46.65 MILLION EQUIVALENT) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-41640 P100785)

More information

GOVERNANCE FRAMEWORK FOR THE CLEAN TECHNOLOGY FUND

GOVERNANCE FRAMEWORK FOR THE CLEAN TECHNOLOGY FUND June 2014 GOVERNANCE FRAMEWORK FOR THE CLEAN TECHNOLOGY FUND Adopted November 2008 and amended June 2014 Table of Contents A. Introduction B. Purpose and Objectives C. Types of Investment D. Financing

More information

Background and Introduction

Background and Introduction EU-WHO Policy Dialogue Programme Inception report March 2012 1 Background and Introduction WHO entered into a collaborative agreement with the European Commission (EC) in October 2011 to 'support policy

More information

Liberia Reconstruction Trust Fund Implementation Manual

Liberia Reconstruction Trust Fund Implementation Manual Liberia Reconstruction Trust Fund Implementation Manual Updated November 2009 2011-02-28 LRTF Implementation Manual 1 I. Background... 3 II. Coverage... 3 III. General Principles... 4 IV. Project Development

More information

Country Practice Area(Lead) Additional Financing

Country Practice Area(Lead) Additional Financing Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021281 Public Disclosure Authorized Public Disclosure Authorized Project ID P149884 Project Name CF-

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H0680, CIDA-54421) ON A INTERNATIONAL DEVELOPMENT ASSOCIATION GRANT

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H0680, CIDA-54421) ON A INTERNATIONAL DEVELOPMENT ASSOCIATION GRANT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR0000656 IMPLEMENTATION COMPLETION AND RESULTS

More information

Cofinancing (US$M): c. Policy Areas: The policy areas included into the Program Document of the FIRM DPL were the following:

Cofinancing (US$M): c. Policy Areas: The policy areas included into the Program Document of the FIRM DPL were the following: Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted: 03/25/2015 Report Number: ICRR14675 Public Disclosure Authorized Public Disclosure Authorized Public

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF-94240) ON A GRANT. IN THE AMOUNT OF US$ Million TO THE SOCIALIST REPUBLIC OF VIETNAM FOR A

IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF-94240) ON A GRANT. IN THE AMOUNT OF US$ Million TO THE SOCIALIST REPUBLIC OF VIETNAM FOR A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00003046 IMPLEMENTATION COMPLETION AND RESULTS

More information

Document of The World Bank FOR OFFICIAL USE ONLY

Document of The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Haiti Energy & Extractives Global Practice IBRD/IDA Specific Investment Loan FY 2013 Seq No: 7 ARCHIVED on 28-Jun-2017 ISR27403 Implementing Agencies:

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-47320) ON A LOAN IN THE AMOUNT OF US$ 9.

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-47320) ON A LOAN IN THE AMOUNT OF US$ 9. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00002035 IMPLEMENTATION COMPLETION AND RESULTS

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-43710) ON A CREDIT IN THE AMOUNT OF SDR16.4 MILLION (US$25 MILLION EQUIVALENT)

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-43710) ON A CREDIT IN THE AMOUNT OF SDR16.4 MILLION (US$25 MILLION EQUIVALENT) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-43710) ON

More information

BENIN: COUNTRY FINANCING PARAMETERS

BENIN: COUNTRY FINANCING PARAMETERS BENIN: COUNTRY FINANCING PARAMETERS BENIN: COUNTRY FINANCING PARAMETERS May 5, 2005 Summary 1. This note provides the supporting analysis and background for the country financing parameters under the new

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H2770, IDA-H6880, IDA-49520) A GRANT IN THE AMOUNT OF SDR 10 MILLION (US$15.00 MILLION EQUIVALENT),

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H2770, IDA-H6880, IDA-49520) A GRANT IN THE AMOUNT OF SDR 10 MILLION (US$15.00 MILLION EQUIVALENT), Public Disclosure Authorized Document of The World Bank Report No: ICR00003583 Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H2770, IDA-H6880, IDA-49520) ON A GRANT IN

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD TF-57202) ON A LOAN IN THE AMOUNT OF 20.0 MILLION US$ EQUIVALENT)

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD TF-57202) ON A LOAN IN THE AMOUNT OF 20.0 MILLION US$ EQUIVALENT) Public Disclosure Authorized Document of The World Bank Report No: ICR00002536 Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-48200 TF-57202) ON A LOAN IN THE AMOUNT OF

More information

Implementation Status & Results Haiti Strengthening the Management of Agriculture Public Services (GFRP) (P113623)

Implementation Status & Results Haiti Strengthening the Management of Agriculture Public Services (GFRP) (P113623) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Haiti Strengthening the Management of Agriculture Public Services (GFRP) (P113623) Operation Name:

More information

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS EUROPEAN COMMISSION Brussels, 13.10.2011 COM(2011) 638 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF URBAN III - PHASE II PROJECT GRANT IDA-H3300 APPROVED ON JULY 9, 2007

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF URBAN III - PHASE II PROJECT GRANT IDA-H3300 APPROVED ON JULY 9, 2007 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

More information

INTEGRATED SAFEGUARDS DATA SHEET

INTEGRATED SAFEGUARDS DATA SHEET Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET IDENTIFICATION / CONCEPT STAGE Date ISDS Prepared/Updated:

More information

Mozambique has emerged from decades of war to become one

Mozambique has emerged from decades of war to become one IDA at Work Mozambique: From Post-Conflict Recovery to High Growth Mozambique has emerged from decades of war to become one of Africa s best-performing economies. One of the poorest countries in the world

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA TF-58152) ON A CREDIT IN THE AMOUNT OF SDR6.7 MILLION (US$ 10 MILLION EQUIVALENT) TO THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA TF-58152) ON A CREDIT IN THE AMOUNT OF SDR6.7 MILLION (US$ 10 MILLION EQUIVALENT) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized AFTHE AFCS1 Africa Region Document of The World Bank Report No: ICR00001497 IMPLEMENTATION

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H1880) ON A GRANT IN THE AMOUNT OF SDR 13.9 MILLION (US$20 MILLION EQUIVALENT) TO THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H1880) ON A GRANT IN THE AMOUNT OF SDR 13.9 MILLION (US$20 MILLION EQUIVALENT) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00001375 IMPLEMENTATION COMPLETION AND RESULTS

More information

Document of The World Bank RESTRUCTURING PAPER

Document of The World Bank RESTRUCTURING PAPER Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER Report No: 71429-IQ ON A PROPOSED PROJECT

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA IDA-3524A IDA TF-26222) ON A CREDIT

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA IDA-3524A IDA TF-26222) ON A CREDIT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-35240 IDA-3524A

More information

President s report. Proposed loan to the Republic of Mali for the. Rural Microfinance Programme

President s report. Proposed loan to the Republic of Mali for the. Rural Microfinance Programme Document: EB 2009/96/R.15/Rev.1 Agenda: 10(a)(v) Date: 30 April 2009 Distribution: Public Original: English E President s report Proposed loan to the Republic of Mali for the Rural Microfinance Programme

More information

Document of The World Bank

Document of The World Bank Document of The World Bank PROJECT COMPLETION NOTE OF A LEARNING AND INNOVATION LOAN IN THE AMOUNT OF SDR 2.7 MILLION (US$4 MILLION EQUIVALENT) TO THE REPUBLIC OF MALAWI FOR A DEVELOPMENT LEARNING CENTER

More information

Document of The World Bank

Document of The World Bank Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-44000, TF-99140)

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-37900) ON A CREDIT IN THE AMOUNT OF SDR 6.70 MILLION (US$ 9.12 MILLION EQUIVALENT) TO THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-37900) ON A CREDIT IN THE AMOUNT OF SDR 6.70 MILLION (US$ 9.12 MILLION EQUIVALENT) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00001435 IMPLEMENTATION COMPLETION AND RESULTS

More information

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Jun ,000,000.00

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Jun ,000,000.00 Public Disclosure Authorized 1. Project Data Report Number : ICRR0021272 Public Disclosure Authorized Public Disclosure Authorized Operation ID P159774 Country Fiji Operation Name Fiji Post-Cyclone Winston

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/15/2010 1. Basic Project Data Original

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA IDA-3279A) ON A CREDIT

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA IDA-3279A) ON A CREDIT Public Disclosure Authorized Document of The World Bank Report No: ICR0000505 Public Disclosure Authorized Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-32790 IDA-3279A)

More information

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) TF Dec ,580,000.00

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) TF Dec ,580,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020620 Public Disclosure Authorized Public Disclosure Authorized Operation ID P147166 Country Haiti

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF-92489) ON A GRANT IN THE AMOUNT OF US$ 21.0 MILLION PEOPLE S REPUBLIC OF CHINA FOR A

IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF-92489) ON A GRANT IN THE AMOUNT OF US$ 21.0 MILLION PEOPLE S REPUBLIC OF CHINA FOR A Public Disclosure Authorized Document of The World Bank Report No: ICR00002509 Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF-92489) ON A GRANT IN THE AMOUNT OF US$ 21.0

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-48270) ON A LOAN IN THE AMOUNT OF US$150 MILLION UKRAINE FOR THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-48270) ON A LOAN IN THE AMOUNT OF US$150 MILLION UKRAINE FOR THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00001407 IMPLEMENTATION COMPLETION AND RESULTS

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-71460) ON A LOAN IN THE AMOUNT OF US$ 15.

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-71460) ON A LOAN IN THE AMOUNT OF US$ 15. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR0000782 IMPLEMENTATION COMPLETION AND RESULTS

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Madagascar Urban Development Global Practice IBRD/IDA Specific Investment Loan FY 2006 Seq No: 21 ARCHIVED on 30-Dec-2014 ISR17647 Implementing Agencies: Public Disclosure

More information

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.:

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: 113653 Program

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Jun ,713,300.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Jun ,713,300.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020377 Public Disclosure Authorized Public Disclosure Authorized Project ID P118145 Country Middle East

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The PPTA will review and assess the performance of the secondary education subsector in Viet Nam and identify the challenges, which

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H3650 IDA-H7520 TF-16319) ON A GRANT IN THE AMOUNT OF XDR 73.6 MILLION

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-H3650 IDA-H7520 TF-16319) ON A GRANT IN THE AMOUNT OF XDR 73.6 MILLION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00003841 IMPLEMENTATION COMPLETION AND RESULTS

More information