ICDS Systems Strengthening and Nutrition Improvement Project (ISSNIP)

Size: px
Start display at page:

Download "ICDS Systems Strengthening and Nutrition Improvement Project (ISSNIP)"

Transcription

1 ICDS Systems Strengthening and Nutrition Improvement Project (ISSNIP) A: Overall Comments State: Andhra Pradesh Comments of CPMU, MWCD on the Annual Action Plan (AAP) It is noted that the State Govt. of Andhra Pradesh has estimated a requirement of Rs lakh in the Annual Action Plan for for the undivided State. Activities have been proposed in the current year keeping in view of less expenditure in the first one and half years. The State has made three separate plans one for the undivided Andhra Pradesh (with all 10 districts), one for residuary Andhra Pradesh (with 3 districts) after the bifurcation in June 2014 and the rest one for the newly created State of Telangana (with 7 districts). It is observed that the AAP has not provided any details of the proposed activities in a separate section, except giving the budgets in a cost table. The narratives in Section 3 summarizing the activities under four components do not provide any insights and are seemed to be generic in nature. The AAP has also not included several key activities/pilots as approved in the Admn. Approval & Guidelines of GoI dated 10 January It is noted that the guidance provided by the CPMU to the State Team including the STL of the TA Team on how to prepare this year s AAP has mostly not been followed. It is strongly recommended that the SPMU Team may ensure getting all necessary support from the State TA Team in revising the AAP based on the comments below. In selection of specific interventions/pilots under the project, the State Govt. must ensure nonduplication of activities with the main ICDS General Scheme. Important Note-1: Vide GOI s letter dated 21 st July 2014, Govt. of Andhra Pradesh has been conveyed the following: Given the tight time schedule of Phase 1 of the project (ending on 31 December 2015) and the urgent requirement of achieving the Phase 1 triggers, it may not be possible to include both the States (AP and Telangana) under the project within the limited budget of Rs crore (for Phase 1, 3 years) and therefore, it is suggested that the IDA assisted ISSNIP may continue to be implemented in Andhra Pradesh only, with suitable replacement of districts that are now under Telangana. The State Govt. may take necessary actions accordingly with intimation to this Ministry. It may be noted that at the time of preparation of Phase 2 of ISSNIP, Telangana may be considered for inclusion in ISSNIP for large-scale implementation of successful models/pilots of Phase 1, with necessary preparatory requirement of developing the State level PIP. In view of the above, the comments below are meant for the Annual Action Plan of the State of Andhra Pradesh only. Important Note-2: In order to address some of the issues that have led to the Moderately unsatisfactory rating for the project during the last Mission of the World Bank held in January 2014, the MWCD and the World Bank Team had several discussions on potential means to accelerate project implementation, to enhance the impact of project planned activities and also to accelerate disbursements. As a result of these deliberations, it has been agreed to intensify and expand the project support in some of the areas of critical importance to achieving project results. These have been outlined below under different sections along with a brief technical rationale for each. With this in-principle approval, the State Govt. may plan to include these in the revised AAP duly assessing their needs for these activities and required finances for them within the overall allocation of Phase 1 of the project, as well as update the Procurement Plan to reflect the procurement related to these activities. Page 1 of 10

2 B: Specific Comments 1. Under Section-2 (Review of AAP ), it may be indicated whether activities mentioned at Sl. No. 7 to 13 have been carried out using funds under ISSNIP and if so, whether these were approved by GoI in the last year s Annual Action Plan. 2. Under 11c. (Section 2) it has been mentioned that the SPMU and Technical Agency team was involved in the training of CDPOs and Supervisors in the revised MIS developed by GoI. However, as per the GoI guidelines and approved Induction Training Plan for Andhra Pradesh, such training was expected to be conducted by the State level Master Trainers who were trained by the Central Team of GoI. There had been specific budgetary approval and funds available for such trainings. This may be clarified in the AAP. 3. Under Sl.No.11d, please confirm whether the impact assessment study on spot-feeding programme (IAH), entrusted with Home Science College, Acharya NG Ranga Agriculture University has been conducted using ISSNIP budgets and if so, whether it was included in the Procurement Plan of and no objection of the World Bank was obtained. 4. It is not clear under what project component (s), orientation of Instructresses of the Anganwadi Training Centres (AWTCs) was undertaken for improved quality of training with respect to ISSNIP activities, recent changes in the ICDS programme including revised food models. The write-up on this and other activities in Section 2 seem to suggest that the SPMU/TA Team has not given due diligence while taking up such activities and in the course, has diluted the project priorities. 5. Strengthening and expanding ICDS Monitoring Systems It is noted that the State has not followed the Admn. Guidelines while proposing activities under this sub-component. Actvity-1: Support to roll out of revised MIS In the cost sheet, the terminology used for roll-out of revised MIS in ICDS as roll out of Monthly Progress Reports (MPRs) developed by GOI is not correct and it seems that there is limited understanding of the SPMU Team on this important aspect of ICDS strengthening introduced by GoI in There seems to be also a mix up between the revised MIS being implemented country-wide across all AWCs and the State s own MIS developed for monitoring spot-feeding programme for P & L mothers. No details are provided on whether any attempt has been made in avoiding duplication of efforts on the part of AWWs/Supervisors /CDPOs to fill up the additional forms introduced by the State Govt. to monitor spot-feeding programme. Please note, one of the key rationales of the revised MIS has been to minimize the burden of paper-work by the front line workers and to devote their time on more critical aspects of counselling of mothers/pregnant women at the right time with the right advice. It is strongly suggested, that a rationale on introduction of State s own MIS for spot-feeding vis-à-vis the revised MIS introduced by GoI may first be provided before the same is included in the AAP. It is also not clear when the induction training on revised MIS has already been completed in the State (though no status is included in the AAP) using the budgets under regular ICDS Training Programme, why the budgets for development and printing of Facilitators Manual that is meant for induction training only, has now been proposed. Also, it is not clear why 26 batches of additional training of SLMT/DLMFs have been proposed without any justification. Has there been any gap analysis after the roll out is over? The State is suggested to re-work the proposal keeping in view of the above points and also the following: a) Budget for core induction training of ICDS functionaries on roll out of revised MIS at three levels (DLMF- level 3, Supervisor-level 2 and AW -level 1) have already been made available Page 2 of 10

3 under regular ICDS Training Programme. Hence, funds available under ISSNIP for supporting the MIS roll out may be used for: (i) additional training of Supervisors (only) as per the needs after the roll-out is complete and if it is found that some of the AWWs are still not able to fill up the registers/prepare MPRs/ASRs properly; (ii) general orientation (one-day duration) on the revised MIS for the ICDS functionaries (DPOs/CDPOs), instructresses of AWTCs/MLTCs and other stakeholders from the development partners/other departments, who are not part of the master trainers teams at the State/district level. Such orientation has to be conducted by the SLMTs with support of the State TA Team. (iii) organizing review meetings (preferably at the divisional level) on the status of roll-out with the master trainers (DLMFs/Supervisors) for getting their feedbacks and planning for taking corrective actions, as required. b) For monitoring and supervision of quality of MIS roll-out, the State TA Team has been entrusted with the work as per the agreed ToRs. The State/district/block level Consultants under ISSNIP will also undertake this activity once they are hired. So no specific budgets will be required for undertaking supervision of MIS roll-out. Activity - 2: Piloting mechanisms to ensure AWC services to migrants This activity is missing in the AAP. It may be noted that the project s key characteristics is to undertake such pilots on those areas in ICDS, which are hitherto not given much focus to ensure universalization of service delivery. Actvity-3: Support for computerization of MIS up to Block Level No activity has been proposed under this. It may be noted that the support to strengthening MIS under ISSNIP is meant for across all districts and blocks, and is not limited to only project districts/blocks. Suggestions: Given the current priority on e-governance and the increased focus on use of IT for programme monitoring, it is proposed for additional support to the States for expansion of computerization of MIS up to the block level by covering all ICDS blocks in the State. Accordingly, it is suggested that the State Govt. may plan for providing computers with latest peripherals (software/hardware, UPS, internet connectivity) at the district and block level to be procured under ISSNIP after assessing the current needs of the latest computer systems (desktop or laptop), and propose purchase of the same in the Procurement Plan for no objection of the World Bank/GoI. In the project districts and blocks, the computers (desktops or laptops) will additionally be critical to the optimum provision of implementation support by the District and Block Coordinators and Project Assistants hired under the project along with supporting the DPOs/CDPOs for their work under larger ICDS Programme. Activity-4: Training of ICDS functionaries (CDPOs/Supervisors) on using web based MIS and Data Analysis It may be noted the MWCD is in the process of finalizing the web-enabled MIS software through NIC for use by all States that will primarily facilitate data entry of MPRs at the Sector/Block level and collate/generate Block MPRs and other reports. The funds under this activity are meant for training of ICDS functionaries on use of the web-based MIS and also on data analysis. This training is meant for all districts and blocks across the State. Activity-5 (Additional Proposal of State Govt.): The State Govt. has proposed for (i) developing a software on supply chain management at CDPO level for the food supplied by AP Foods through the Centre for Good Governance (CGG) at a cost of Rs lakh and (ii) continuous updation of department website to disseminate guidelines etc. at a cost of Rs lakh. Page 3 of 10

4 Following may be noted: i) Funds under Activity-1 (support to roll-out of MIS) and Actvity-4 (training on web-based MIS) may be pooled together to undertake all MIS related activities including the specific software development as proposed in the AAP. ii) Since the software is to be developed by an external agency, it needs to be included under Consultancy Services of the Procurement Plan and the World Bank Procurement Guidelines have to be followed. It may be noted that engagement of any organization/agency (both government/private/non-government) for undertaking any specific assignment comes under procurement of Consultancy Services and the same must be included in the Procurement Plan for no objection of the World Bank/approval of the GoI. 6. Strengthening Training & Capacity Building a) Activity-2: Incremental learning system is to be implemented in all project districts from this year itself following the GoI guidelines (being issued). Budgets for this activity along with the action plan may be revised accordingly after working out the detailed proposal of monthly orientations of DRGs/BRGs and conducting IL sessions at each level as per the GoI guidelines. Note: The administrative and financial guidelines for ILS provide cost norms per day of training X 3 days; but budget here has been calculated on a per district basis. Please provide more details on the roll out plan and how the breakup of the district wise budget. Under Activity 2: Orientation of BRGs at block level, Rs is per orientation and not per day of orientation. Under task 3: three day training at sector level to AWW, Nutrition counsellors and link workers, it may be noted that budget provided in the Admn. Guidelines is per meeting but not per trainee. b) Under Actvity-3 - inter and intra-state exposure/learning exchange visits, allocation kept under Phase 1 is Rs. 20 lakh, but the State has included the whole amount in itself to make (i) visits of five persons to Maharashtra to understand the Sneh Shivirs implementation at an estimated cost of Rs lakh; (ii) visit of 8 persons to CPMU identified site at an estimated cost of Rs lakh and (iii) intra-district visits to pilot sites at an estimated cost of Rs lakh (@Rs. 50,000/- per visit for 10 visits). The proposal may be re-worked with details annexed for each type of visits as well as keeping in view the needs during also. c) Activity-4 (Leadership building and programme management training) is missing in the cost sheets. This activity is aimed at providing leadership building and programme management skills of the CDPOs/DPOs/State Officials through professional training at reputed institutes. 7. Convergence with health a) Activity-1: Strengthening/formation of State, district and block level convergence committees with NRHM for review and planning Under this activity, it has been proposed to strengthen state, district and block level MAARPU convergence committees on 20 key interventions and supervised feeding of SUW/SAM/MAM children and accordingly proposed conducting state level convergence committee meetings to review the progress of Village level Convergence Committee (VLCC) meetings, MAARPU Darshini and convergence activities as well as conducting similar meetings at district and mandal levels at an estimated cost of Rs lakh, against a total allocation available under this activity for Phase 1 as Rs lakh. It is noted that no details are provided in the AAP about the MAARPU initiative or its 20 interventions and whether these are aligned with the ISSNIP objectives. Norms used per meeting far exceed the norms (almost doubled) as indicated in the Admn. Guidelines of GoI, without giving any rationale. Page 4 of 10

5 It is strongly suggested that this activity along with the associated costs may be pooled together with the implementation of the incremental learning approach (ILA) both at the sector and health sub-centre (HSC) level (Ref. GoI Guidelines on ILA) wherein monthly orientations/reviews of DRGs/BRGs (Health Officials are also Members of these groups) at the district and block level are integral to the ILA process. b) Activity 2 Piloting sub centre level meetings of ASHA, AWW and ANM for joint planning and implementation: Please follow the GoI guidelines on ILA on this. As stated above, as part of ILS, the State may re-work the proposal for conducting HSC level meetings across all HSCs in all project districts instead of 50% HSCs, (i.e. 2,500) as proposed in the AAP, in consultation with the Health Department using the budgets available under Actvity-1 above and Actvity-2. The State may also suitably propose a revised cost norm for HSC level meeting since it is recognized that the cost of Rs. 100/- per HSC meeting for a group of about 8 persons (5-6 ASHA, 1 AWW and 1 ANM) as per the Admn. Approval of GoI may not be sufficient. The cost will include photocopying of learning materials for each month s themes, refreshment of the participants etc. c) Activity 3 Joint Training of Health and ICDS functionaries on common themes: The State has proposed one-day joint trainings of AWW, ASHA, Link Worker, Nutrition Counsellor, Cluster Coordinators CRP and ANM on 20 key points of MAARPU at an estimated cost of Rs lakh against a total allocation of Rs lakh for Phase 1. Keeping in view of the objectives of newly introduced incremental learning approach, it is proposed that the joint training activity may also be aligned with the ILA process since all related common themes between ICDS and health are also proposed to be covered under ILA. The State may accordingly re-work the budgets for all three activities together in order to build a strong convergence model using the ILS at the HSC platform. d) Activity 4 Engagement of PRIs for strengthening convergence: This is missing in the AAP. Orientations of PRI members to support community mobilization for effective service delivery at the AWCs may be taken up on six monthly basis (instead of annually) across all districts. e) Activity 5 Piloting successful models of convergence This is missing in the AAP. Based on central guidance, a pilot on an identified model of convergence with health may be implemented. 8. Institutional Support for Innovations and Pilots a) Activity 2 Piloting Stimulation and cognitive activities for preschool children at AWCs: Under this the State has proposed: Capacity building to AWW in 10% of projects in 10 districts to pilot this activity Revision of pre-school curriculum and provide age specific activity books to promote joyful learning, score card Capacity building or orientation on the use of the new activity books to be procured under the project is important. This could be made part of the IL sessions. Budgets for these activities need to be relooked at, to ensure that they are consistent with and do not exceed provided budgetary allocations. Suggestions: In order to strengthen the quality of preschool activities, it is proposed to expand project s support for development and provision of age-specific activity books for each child in the age group 3-6 years to promote early joyful learning. Earlier it was planned to supply these pre-school activity books to AWC children in 10% AWCs in project districts. This may be now expanded to cover all children in the 3-6 year age group attending AWCs in all AWCs in project as well as non-project districts of the State. However, the State Govt. may first Page 5 of 10

6 make an estimate of the cost for covering all AWCs in the State keeping in view of overall ceiling of Phase 1 allocation for the State. Note: This activity (printing of activity books) is to be included in the Procurement Plan under non-consulting service with a cross reference in the AAP. b) Activity 3 Untied Funds for High Burden Districts to undertake context specific innovations in ICDS: Under this, the State has proposed three interventions/pilots, without any details and the estimated cost is not consistent with the provision in the project, viz. Rs. 25 lakh per district per year. Pilot-1: Identification and management of SUW/SAM/MAM children in all 10 districts at an estimated cost of Rs lakh. It is noted that a provision of Rs per day per child has been provisioned for 40,000 children for 300 days under this pilot, which implies cost of additional food supplements. This activity is not approved since providing food supplements to children under ISSNIP is not an agreed activity, and it is covered under ICDS General Scheme. Pilot-2: Kitchen gardens in IAH projects in all 10 districts at cost of Rs lakh No details are given. This pilot may be proposed under Component 3 convergent nutrition actions. Pilot-3: Establish nutrition helpline at state level at accost of Rs lakh No details are given. It is suggested that details on the concept, implementation plan and budget for all proposed district based pilots may be worked out and include the same in the revised AAP. Please ensure that the budgetary allocations for pilots are not exceeded. As a start, the pilots can be initiated in 1 or 2 districts, and need not be implemented in all project districts. In this regard, the concept of mobile academy/mobile kunji (learning through use of mobile phones and using it as an aid to counselling), being implemented in Bihar under the Bill Gates and Melinda Gates Foundation (BMGF) support for health front-line workers, may be referred to, for developing an ICT pilot. Note: It is expected that the State would review the existing innovations/good practices (having potential to impact programme outcomes in respect of child under nutrition) that have been/are being implemented in the State or elsewhere with/without support of the Development Partners or by the Govt. themselves and accordingly propose specific district based pilots with necessary details. The State TA Team is required to support the SPMU on development of such pilots through a process of review/consultations with the relevant stakeholders. The draft AAP does not throw any light on whether any such process was followed or not. c) Activity 4 Piloting second worker model: It has not been proposed in the AAP. Since under the restructured ICDS provision for second worker has been made in the high burden districts, it is suggested that the allocation of Rs lakh under Phase 1 for this pilot may be utilized for any other pilots including the scaling up of age-specific activity books for pre-school children (Actvity-2) as above. 9. Implementation support at District and Block level Budgets under this sub-component (remuneration for all district and block level staff, all recurring administration costs) are to be made for a maximum of 6-9 months in this FY given the delays in hiring of the staff at the district/block level. Suggestions: Given the critical role of the District ICDS Office in strengthening the programme systems, e.g., training, monitoring, roll-out of interventions under ISSNIP as well as the restructured ICDS, it is proposed to provide the following additional hardware support at the district and block level under the project: Page 6 of 10

7 a) One photocopier to each of the DPO office - This is to facilitate smooth functioning of the district teams including those working under main ICDS programme b) One projector and LCD Screen to each of the DPO and CDPO Office This is to facilitate and systematically strengthen regular training/orientation of Supervisors/AWWs, monitoring and review of programme implementation and also support the roll-out of the new interventions under ISSNIP as well as the restructured ICDS. The State Govt. may consider using the resources available under ISSNIP for improving the existing infrastructure of the ICDS District/Block Offices by providing the above essential hardware with the latest configuration and associated updated software. The State may make estimates for procurement of the above items in addition to the available support to the District under project 1 lakh per district for non-recurring items) and include the same under Goods in the Procurement Plan for approval of the GoI/World Bank. 10. Component 2: Community Mobilization and BCC Sub-Component: Community Mobilization and participation Out of seven planned activities under this sub-component, the State has proposed only three activities. a) Activity 1 - Map and assess capacities of CSO/CBO to undertake community engagement and BCC activities. No details are provided. This activity may be undertaken with the help of State TA Team. b) Activity 2 Piloting models of community engagement. This is missing in the AAP. c) Activity 3 - Capacity building of CBOs for engaging in ICDS. Under this the State has proposed one day orientation to Village Organisation (VO) Chairperson and Cluster Coordinator/SHG members along with AWW at a cost of Rs lakh. Please note the norm for such orientation is Rs. 250 per AWC per orientation and two orientations per AWC per year. d) Activity 4 Implementation of social audit and other community monitoring pilots: This is missing in the AAP. e) Activity 5 Organization of Community based events for sensitization on key health and nutrition issues: No descriptions are available in the AAP. In the budget sheet, the State has included this activity twice a year (as against twice a quarter) at an estimated cost of Rs per AWC per event. GoI guidelines dated 30 July 2014 may be referred to for planning of this activity. Recognizing that cost of organizing different events may vary, it is suggested to restrict the same to Rs. 250 per event. Evidence from some of the States shows that if organized systematically, such events have potential to not only create awareness about the health and nutrition positive behaviours, but also to promote the same among the communities especially among the mothers of children under three years, through live demonstrations of weaning foods, high nutritive value snacks/recipes and dietary diversification. Keeping view of this, it has been agreed with the World Bank to expand and intensify the systematic organization of such community events by: a) scaling-up the conduct of such events across all AWCs in project districts with immediate effect; and b) revise the schedule from the existing two events every quarter to once every month. The State may accordingly re-work the cost estimates for this activity. f) Activity 6 Partnerships with NGOs/CSOs for supporting community mobilization and Behaviour Change Activities: This activity is missing in the AAP. g) Activity 7 Implementation of PPP pilot: This activity is missing in the AAP. Page 7 of 10

8 Sub-Component: Behaviour Change Communication (BCC) Against a total allocation of Rs lakh for Phase 1 under this sub-component, the State has proposed activities for an estimated amount of Rs lakh. This is due to non-adherence to the GoI norms for Activity 3, i.e. mid-media initiatives as highlighted below. a) Activity 2 Strengthening home contacts: Under this, the State has proposed Home visits and small group discussions on 20 key points (MAARPU) by trained community resource persons (CRP) at habitation level for 700 Gram Panchayats in each 3,200/- per Gram Panchayats in all 10 districts (total cost estimate: Rs lakh as against an allocation of Rs lakh). Please note that under this activity, the project provides for implementing a pilot (@ Rs. 25 lakh per State per year) on incentivising the ICDS field functionaries (AWWs/Supervisor) for carrying out home visits and counselling of mothers. Furthermore, it is found that though the cost norm is Rs 25 lakh per state, the cost allocated to this activity is 10 times the allocation. Please rationalize the same. It is also unclear what this money will be used for. Please provide details of the intervention along with breakup of costs. The State may re-work the proposal accordingly and may also align the budgets available under this with the ILS both at the sector and HSC level. b) Activity 3 Implementation of mid media initiative such as folk theatre and film shows: Five activities are proposed under this and steps and cost norms proposed in the Admn. Guidelines have not been followed: i) State level training to Kalajatha troupes (Rs lakh) ii) Implement another round of Kalajathas in Year 2 with expanded scope in all 147 projects in 10 districts (Rs lakh) Norm for performance of folk troupes is Rs lakh per district as per Admn. Guidelines and not Rs lakh per project as used in the AAP. Accordingly, cost may be re-worked. iii) Wall writings/paintings on key messages on nutrition, child development and SNP entitlements (Rs lakh) This does not come under the purview of mid-media activities and is not agreed to. May be proposed under district-based pilots (Component- 1E) iv) Develop Model Anganwadi Centres (Rs lakh) It is unclear what this entails and how it is linked to mid-media initiatives. As such, there is no provision enumerated in administrative and financial guidelines for development of model AWCs in Phase I in every block; hence, not agreed to. v) TV Spots on services and entitlements (Rs lakh) This does not come under the purview of BCC activities, hence, not agreed to. c) Activity 4 - Advocacy and knowledge sharing: This important activity is missing in the AAP. Please note this activity aims at building political and administrative commitment on nutrition issued in the State through organization of periodic conferences and meetings with the MPs, MLAs and District Collectors. Suggestions: To supplement the Behaviour Change Communication efforts through community events, inter-personal counselling and mid-media initiatives under ISSNIP, it is proposed to provide weaning bowls (Katoris of stainless steel with measure/markings) for all children 6 months to 2 years old children attending AWCs in project districts as an innovative activity. Evidence from Bangladesh shows that such small measure of providing a weaning bowl to the mothers/caregivers of children 6 months to 2 years has significantly improved the appropriate feeding practices of infants and young children at the household level with age-appropriate diets that are adequate in quality and quantity. Having such a bowl not only served as a constant reminder but helped mothers/caregivers give their young children the recommended amounts and types of food per the recommended number of times every day. Such an effort has also been Page 8 of 10

9 tried in a pilot in Bihar supported by a development partner. This is expected to assist the mothers in ensuring the practice of feeding their children with the right quantity and quality of food on a daily basis. Inappropriate feeding of infants and young children at the household level is often not maintained and is one of the main causes for growth-faltering in this age group. It is suggested that the State Govt. may consider this as an innovative activity and include in the AAP after making an assessment of the requirement of number of weaning bowls. The same may be included in the Procurement Plan under Goods. 11. Component 3: Piloting Convergent Nutrition Action The MAARPU of the State Govt., which is a multi-sectoral initiative, may be considered for piloting convergent nutrition actions in at least one district under ISSNIP. The State may identify the district (s) where the pilot will be taken up. 12. Component 4: Project Management, Technical Assistance, Monitoring and Evaluation Sub-Component: Project Management i) Please include actual salary of the JPC who is to be a Govt. Employee on deputation to the Project. ii) Ref. to 2 Sept 2013 order of GoI, position of one Data Entry Operator in lieu of two Peons/Office Messengers has been approved while in the AAP, the same has not been taken note of. iii) Norms for travel cost of Consultants may be made as per the prevailing practices under the WB assisted projects in the State. It is understood that the same may have been finalized by the State since the SPMU Consultants have been recruited in March A copy of the contract signed between the State Govt and individual Consultants in the SPMU may be shard with the CPMU, for reference. iv) Norms for all administrative/operating costs should not exceed the norms in the GoI s Admn. Approval and Guidelines dated 10 January 2013, unless specified in the AAP with reasoning. Sub Component: Project Monitoring and Evaluation a) Activity 2 District level rapid assessments (RAPs) and ongoing internal assessments at sector level using Lot Quality Assurance Sampling (LQAS) approach Please note that the LQAS will be implemented through ICDS Supervisors with support of the State TA Team (guidelines will be provided by CPMU/Central TA Team), but the district-based rapid assessments (RAPs) are to be conducted through external agencies across all project Rs. 5 lakh per districts (ant not Rs. 2 lakh as proposed in the AAP). (Note: the TA Team will provide the sample ToRs for this activity). This is also to be included in the Procurement Plan under consultancy services. b) Activity 3 Operations research (OR) and Evaluations of pilots: It may be noted that under this activity, allocation of Rs lakh has been kept for Phase 1 to primarily conduct evaluation/operations research of various pilots proposed under ISSNIP. The State has proposed following two studies, but without any details: i) Assessment of diet and nutritional status of children below 5, adolescent girls and pregnant/lactating women by National Institute of Nutrition at an estimated cost of Rs lakh The purpose of this nutritional survey by NIN is unclear. Funds under the project have been provided for Operations Research studies that support assessment of pilots under the project and not for a state wide nutrition survey. Furthermore, the budget allocated to each OR/evaluation of pilot etc is Rs 30 lakh. The cost enumerated for this activity is almost 2.5 times allocated budget. Page 9 of 10

10 During , the MWCD in collaboration with UNICEF has conducted a nation-wide survey (Rapid Survey on Children-RSOC) that inter-alia includes the above assessment, especially in respect of nutritional status of below-5 year children and AGs. The State Govt. is aware of this fact. Results of the survey are expected to be disseminated very shortly. Hence, the proposed study is not agreed to. ii) Impact of Spot Feeding programme on nutritional status of Pregnant/Lactating women and their newborns by National Institute of Nutrition at an estimated cost of Rs lakh The proposed activity seems to be an assessment of the recently introduced IAH programme of the GoAP wherein spot feeding was introduced by the government. Please note that ISSNIP seeks to promote evidence based decision making and interventions and therefore supports the design and implementation of evaluations being undertaken by the government. However, it is important to ensure that the robust evaluations are designed and CPMU inputs are taken while finalizing the same. Details of the study objectives and scope of work in the form of a ToR may be worked out first after including this in the Procurement Plan ( Consultancy Services) and shared with GoI/WB for approval/no objection. It may be noted that such studies are to be conducted through external agencies following World Bank Procurement Guidelines/Methods. The State cannot pre-decide on selection of the agency, like in this case, NIN, which is a Govt. Organization. c) Activity 4 Social Assessments/Ethnographic Studies in SC/ST minority areas to facilitate development of appropriate communication strategies and materials No study has been proposed under this. Please include at least one social assessment study during this year, to be conducted through an external agency. Page 10 of 10

IDA assisted ICDS Systems Strengthening and Nutrition Improvement Project (ISSNIP)

IDA assisted ICDS Systems Strengthening and Nutrition Improvement Project (ISSNIP) IDA assisted ICDS Systems Strengthening and Nutrition Improvement Project (ISSNIP) Background The World Bank had been supporting the Government of India to improve nutritional status of children through

More information

ISSNIP Bihar ( )

ISSNIP Bihar ( ) Annual Action Plan ISSNIP Bihar (2014-15) State Project Management Unit (SPMU) Directorate of ICDS Department of Social Welfare Government of Bihar 1 Contents Section 1: Introduction and overview... 3

More information

OFFICIAL DO CUMENTS INDIA

OFFICIAL DO CUMENTS INDIA Public Disclosure Authorized OFFICIAL DO CUMENTS INDIA Supplemental Letter May 7, 2018 Public Disclosure Authorized International Bank for Reconstruction and Development 1818 H Street, N.W. Washington,

More information

Overview. 15 th March 2018

Overview. 15 th March 2018 Overview 15 th March 2018 Background Setting up of National Nutrition Mission (NNM)- Approved on 30.11.2017. Budget of 9046.17 Crore [FY 2017-18 to FY 2019-2020] BE for 2017-18: Rs. 1100 Crore; RE: 550

More information

24,700 cr GoI allocations for Ministry of Women and Child Development (MWCD) in FY

24,700 cr GoI allocations for Ministry of Women and Child Development (MWCD) in FY BUDGET BRIEFS Vol 10/ Issue 7 Integrated Child Development Services (ICDS) GoI, 2018-19 HIGHLIGHTS The Integrated Child Development Services (ICDS) is Government of India's (GoI) flagship programme aimed

More information

22,095 cr GoI allocations for Ministry of Women and Child Development (MWCD) in FY

22,095 cr GoI allocations for Ministry of Women and Child Development (MWCD) in FY BUDGET BRIEFS Vol 10/ Issue 7 Integrated Child Development Services (ICDS) GoI, 2017-18 HIGHLIGHTS The Integrated Child Development Services (ICDS) is Government of India's (GoI) flagship programme. This

More information

ICDS-IV PROJECT (IDA-ASSISTED)

ICDS-IV PROJECT (IDA-ASSISTED) ICDS-IV PROJECT (IDA-ASSISTED) [2008-09 to 2012-2013] Guidelines and Processes to be followed for the preparation of State Project Implementation Plans and District Annual Plans 18 February 2008 CENTRAL

More information

INTEGRATED CHILD DEVELOPMENT SERVICES (ICDS) SCHEME

INTEGRATED CHILD DEVELOPMENT SERVICES (ICDS) SCHEME INTEGRATED CHILD DEVELOPMENT SERVICES (ICDS) SCHEME Framework for Development of the State Annual Programme Implementation Plans (APIPs) MINISTRY OF WOMEN AND CHILD DEVELOPMENT GOVERNMENT OF INDIA www.wcd.nic.in

More information

UNITED NATIONS CHILDREN S FUND TERMS OF REFERENCE MANAGEMENT OF FIELD STAFF IN UTTAR PRADESH

UNITED NATIONS CHILDREN S FUND TERMS OF REFERENCE MANAGEMENT OF FIELD STAFF IN UTTAR PRADESH UNITED NATIONS CHILDREN S FUND TERMS OF REFERENCE MANAGEMENT OF FIELD STAFF IN UTTAR PRADESH 1. PURPOSE OF ASSIGNMENT (Attach background documents if necessary): Background Established as a vast and complex

More information

Gram Panchayat Development Plan(GPDP) Ministry of Panchayati Raj

Gram Panchayat Development Plan(GPDP) Ministry of Panchayati Raj Gram Panchayat Development Plan(GPDP) Ministry of Panchayati Raj 1 Panchayat Statistics Avg. population per GP National Average population per GP: 3,416 No. of PRIs in the country : 2,56,103 No. of Gram

More information

Tracking Government Investments for Nutrition at Country Level Patrizia Fracassi, Clara Picanyol, 03 rd July 2014

Tracking Government Investments for Nutrition at Country Level Patrizia Fracassi, Clara Picanyol, 03 rd July 2014 Tracking Government Investments for Nutrition at Country Level Patrizia Fracassi, Clara Picanyol, 03 rd July 2014 1. Introduction Having reliable data is essential to policy makers to prioritise, to plan,

More information

PMMVY-CAS Training. Pradhan Mantri Matru Vandana Yojana (PMMVY) MINISTRY OF WOMEN & CHILD DEVELOPMENT GOVERNMENT OF INDIA 1

PMMVY-CAS Training. Pradhan Mantri Matru Vandana Yojana (PMMVY) MINISTRY OF WOMEN & CHILD DEVELOPMENT GOVERNMENT OF INDIA 1 PMMVY-CAS Training Pradhan Mantri Matru Vandana Yojana (PMMVY) MINISTRY OF WOMEN & CHILD DEVELOPMENT GOVERNMENT OF INDIA 1 Training Agenda S.No. Session Duration 1 PMMVY Scheme Overview 20 Min 2 PMMVY

More information

Lessons from the Bihar Child Support Programme (BCSP), an initiative to deliver cash transfers via the Integrated Child Development Services

Lessons from the Bihar Child Support Programme (BCSP), an initiative to deliver cash transfers via the Integrated Child Development Services Lessons from the Bihar Child Support Programme (BCSP), an initiative to deliver cash transfers via the Integrated Child Development Services 16 th October 2015 Contents 1. About the programme 2. Lessons

More information

Appraisal Note: Andaman & Nicobar Islands

Appraisal Note: Andaman & Nicobar Islands Govt. of India Ministry of Human Resource Development Dept. of School Education and Literacy Mid Day Meal Division PAB-MDM meeting to consider and approve AWP&B 2015-16 (Date of the meeting: 10.4.2015)

More information

PEO Study No.120 EVALUATION REPORT ON THE INTEGRATED CHILD DEVELOPMENT SERVICES PROJECT ( ) The Study

PEO Study No.120 EVALUATION REPORT ON THE INTEGRATED CHILD DEVELOPMENT SERVICES PROJECT ( ) The Study PEO Study No.120 EVALUATION REPORT ON THE INTEGRATED CHILD DEVELOPMENT SERVICES PROJECT (1976-78) - 1982 1. The Study The Ministry of Social Welfare, Government of India, launched in October, 1975 a total

More information

III. modus operandi of Tier 2

III. modus operandi of Tier 2 III. modus operandi of Tier 2 Objective, country and project eligibility 70 Budget and timing 71 Project preparation: formulation of proposals 71 Project appraisal 72 Project approval 73 Agreements and

More information

Rajya Sabha Today in Rajya Sabha Business Questions Debates Members Committees Procedures Secretariat Downloads Events Im New Recruitment

Rajya Sabha Today in Rajya Sabha Business Questions Debates Members Committees Procedures Secretariat Downloads Events Im New Recruitment Rajya Sabah Questions Search Result RTI FAQ Sitemap Hindi site Rajya Sabha Today in Rajya Sabha Business Questions Debates Members Committees Procedures Secretariat Downloads Events Im New Recruitment

More information

ANDHRA PRADESH RURAL WATER SUPPLY AND SANITATION PROJECT (APRWSSP) FINANCIAL MANAGEMENT MANUAL FOR DEPARTMENT OF RWSS, SWSM AND DWSM FINAL REPORT

ANDHRA PRADESH RURAL WATER SUPPLY AND SANITATION PROJECT (APRWSSP) FINANCIAL MANAGEMENT MANUAL FOR DEPARTMENT OF RWSS, SWSM AND DWSM FINAL REPORT Financial Management Manual for Department of RWSS May 2008 ANDHRA PRADESH RURAL WATER SUPPLY AND SANITATION PROJECT (APRWSSP) FINANCIAL MANAGEMENT MANUAL FOR DEPARTMENT OF RWSS, SWSM AND DWSM FINAL REPORT

More information

PAISA FOR PANCHAYATS POLICY BRIEF 2016

PAISA FOR PANCHAYATS POLICY BRIEF 2016 PAISA FOR PANCHAYATS POLICY BRIEF 2016 TRACKING FISCAL DEVOLUTION TO LOCAL GOVERNMENTS A case study from Kolar district, Karnataka Union Zilla Panchayat State Taluk Panchayat Line Departments Parastatals

More information

The Right to Information Act, 2005

The Right to Information Act, 2005 (i) The Right to Information Act, 2005 Information regarding World Bank assisted ICDS Project Section: 4.(1) (b) Particulars of its organization, functions and duties; The Central Project Management Unit

More information

National Workshop on POSHAN Abhiyaan. Understanding Disbursement Linked Indicators

National Workshop on POSHAN Abhiyaan. Understanding Disbursement Linked Indicators National Workshop on POSHAN Abhiyaan Understanding Disbursement Linked Indicators MOHINI KAK HEALTH SPECIALIST, WORLD BANK NEW DELHI - MARCH 20, 2018 Disbursement Linked Indicator (DLI): What does it mean

More information

(1) PROJECT COORDINATOR (2) SENIOR EXPERT RESILIENCE

(1) PROJECT COORDINATOR (2) SENIOR EXPERT RESILIENCE TERMS OF REFERENCE bx (1) PROJECT COORDINATOR (2) SENIOR EXPERT RESILIENCE INCEPTION PHASE OF UNICEF RESILIENCE PROJECT IN SOMALIA This TOR is to support the process of hiring a consultant for the project

More information

OFFICE MEMORANDUM. Subject:- Administrative Approval of Central Sector Scheme "National Dairy Plan Phase-1 (NDP-1)"

OFFICE MEMORANDUM. Subject:- Administrative Approval of Central Sector Scheme National Dairy Plan Phase-1 (NDP-1) F. No.22-23l2011-DP Government of lrdia Ministry of ft{jrirulture Department of Animal Husbandry, Dairying & Fisheries Krishi Bhawan, New Delhi-11 0001 Dated the 16th March, 2012 OFFICE MEMORANDUM Subject:-

More information

DESK REVIEW UNDP AFGHANISTAN OVERSIGHT OF THE MONITORING AGENT OF THE LAW AND ORDER TRUST FUND FOR AFGHANISTAN

DESK REVIEW UNDP AFGHANISTAN OVERSIGHT OF THE MONITORING AGENT OF THE LAW AND ORDER TRUST FUND FOR AFGHANISTAN UNITED NATIONS DEVELOPMENT PROGRAMME DESK REVIEW OF UNDP AFGHANISTAN OVERSIGHT OF THE MONITORING AGENT OF THE LAW AND ORDER TRUST FUND FOR AFGHANISTAN Report No. 1310 Issue Date: 9 October 2014 Table of

More information

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments Annex 1. Identification Title/Number Trinidad and Tobago Annual Action Programme 2010 on Accompanying Measures on Sugar; CRIS reference: DCI- SUCRE/2009/21900 Total cost EU contribution : EUR 16 551 000

More information

NEPAD/Spanish Fund for African Women s empowerment

NEPAD/Spanish Fund for African Women s empowerment NEPAD/Spanish Fund for African Women s empowerment Project Proposal Format Annex 0 1 P age Proposal Format Proposal Cover Page: PROPOSAL TO THE NEPAD- SPANISH FUND FOR AFRICAN WOMEN s EMPOWERMENT Organization

More information

Power to the States: New pathways to Intergovernmental fiscal transfers for health

Power to the States: New pathways to Intergovernmental fiscal transfers for health Power to the States: New pathways to Intergovernmental fiscal transfers for health What do government investment prioritize? Expenditure by type Expenditure by function 100% 90% 80% 2.4 10.1 13 100% 90%

More information

UNICEF s Strategic Planning Processes

UNICEF s Strategic Planning Processes UNICEF s Strategic Planning Processes Outline of the Presentation Overview The Strategic Plan: The (current) Strategic Plan 2014-2017 Findings from the Mid Term review of the Strategic Plan 2014-2017 Preparing

More information

ONE WASH NATIONAL PROGRAMME (OWNP)

ONE WASH NATIONAL PROGRAMME (OWNP) ONE WASH NATIONAL PROGRAMME (OWNP) ONE Plan ONE Budget ONE Report planning with linked strategic and annual WASH plans at each level budgeting re ecting all WASH-related investments and expenditures financial

More information

Changing how we think about cost-effectiveness of addressing childhood anemia

Changing how we think about cost-effectiveness of addressing childhood anemia Changing how we think about cost-effectiveness of addressing childhood anemia Findings from the Uganda Micronutrient Powders Pilot Emily Baker, Costing Consultant April 11, 2018 Webinar outline Introduction

More information

2018 Corporate Work Plan & Budget Narrative

2018 Corporate Work Plan & Budget Narrative 38 th Board Meeting 2018 Corporate Work Plan & Budget Narrative 14-15 November 2017, Geneva, Switzerland Board Decision Purpose of the paper: This document presents a corporate work plan and budget narrative

More information

Rwanda. UNICEF/Till Muellenmeister. Health Budget Brief

Rwanda. UNICEF/Till Muellenmeister. Health Budget Brief Rwanda UNICEF/Till Muellenmeister Health Budget Brief Investing in children s health in Rwanda 217/218 Health Budget Brief: Investing in children s health in Rwanda 217/218 United Nations Children s Fund

More information

October Hundred and Fortieth Session. Rome, October Measures to improve Implementation of the Organization's Support Cost Policy

October Hundred and Fortieth Session. Rome, October Measures to improve Implementation of the Organization's Support Cost Policy October 2011 FC 140/8 E FINANCE COMMITTEE Hundred and Fortieth Session Rome, 10-14 October 2011 Measures to improve Implementation of the Organization's Support Cost Policy Queries on the substantive content

More information

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE TOR - CONSULTANCY IC/2012/026. Date: 16 April 2012

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE TOR - CONSULTANCY IC/2012/026. Date: 16 April 2012 INDIVIDUAL CONSULTANT PROCUREMENT NOTICE IC/2012/026 TOR - CONSULTANCY Date: 16 April 2012 Position: Consultant - RESOURCE MOBILISATION STRATEGY 2012-2015 for UNCT ETHIOPIA Duty Station: Addis Ababa, Ethiopia

More information

Session C Ownership and Alignment. Gender responsive Budgets in Morocco: illustration of the Paris Declaration Alignment and Ownership principles

Session C Ownership and Alignment. Gender responsive Budgets in Morocco: illustration of the Paris Declaration Alignment and Ownership principles WORKSHOP ON DEVELOPMENT EFFECTIVENESS IN PRACTICE: APPLYING THE PARIS DECLARATION TO ADVANCING GENDER EQUALITY, ENVIRONMENTAL SUSTAINABILITY AND HUMAN RIGHTS DUBLIN, IRELAND 26-27 APRIL 2007 Session C

More information

E Distribution: GENERAL. Executive Board Second Regular Session. Rome, October September 2007 ORIGINAL: ENGLISH

E Distribution: GENERAL. Executive Board Second Regular Session. Rome, October September 2007 ORIGINAL: ENGLISH Executive Board Second Regular Session Rome, 22 26 October 2007! E Distribution: GENERAL 11 September 2007 ORIGINAL: ENGLISH Cost (United States dollars) Current budget Increase Revised budget WFP food

More information

TERMS OF REFERENCE FOR INTERNATIONAL CONSULTANT

TERMS OF REFERENCE FOR INTERNATIONAL CONSULTANT TERMS OF REFERENCE FOR INTERNATIONAL CONSULTANT Title: Countries: Duration: Analysis and Advocacy for Child-Centred Budgeting Botswana, Lesotho, Namibia, South Africa and Swaziland 40 working days, spread

More information

Annex 1: The One UN Programme in Ethiopia

Annex 1: The One UN Programme in Ethiopia Annex 1: The One UN Programme in Ethiopia Introduction. 1. This One Programme document sets out how the UN in Ethiopia will use a One UN Fund to support coordinated efforts in the second half of the current

More information

P. O. Box 3243, Addis Ababa, ETHIOPIA Tel.: (251-11) Fax: (251-11)

P. O. Box 3243, Addis Ababa, ETHIOPIA Tel.: (251-11) Fax: (251-11) AFRICAN UNION UNION AFRICAINE UNIÃO AFRICANA P. O. Box 3243, Addis Ababa, ETHIOPIA Tel.: (251-11) 5517700 Fax: (251-11) 5517844 www.au.int VACANCY ANNOUNCEMENT: FINANCE OFFICER TO WORLD BANK FUNDED PROJECTS

More information

Adolescents 360 Baseline Survey Request for Proposals (RFP)

Adolescents 360 Baseline Survey Request for Proposals (RFP) Adolescents 360 Baseline Survey Request for Proposals (RFP) Background This invitation to tender invites proposals from potential service providers for conducting a baseline survey for the Adolescent 360

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council Distr.: Limited 1 December 2015 Original: English For decision United Nations Children s Fund Executive Board First regular session 2016 2-4 February 2016 Item

More information

Internal Audit of the Republic of Albania Country Office January Office of Internal Audit and Investigations (OIAI) Report 2017/24

Internal Audit of the Republic of Albania Country Office January Office of Internal Audit and Investigations (OIAI) Report 2017/24 Internal Audit of the Republic of Albania Country Office January 2018 Office of Internal Audit and Investigations (OIAI) Report 2017/24 Internal Audit of the Albania Country Office (2017/24) 2 Summary

More information

Date of Issue: 25 August 2017 Closing Date: 31 August 2017 SSA Announcement No. UNWOMEN/MCO/2017/030

Date of Issue: 25 August 2017 Closing Date: 31 August 2017 SSA Announcement No. UNWOMEN/MCO/2017/030 Date of Issue: 25 August 2017 Closing Date: 31 August 2017 SSA Announcement No. UNWOMEN/MCO/2017/030 I. POSITION INFORMATION Title Duty Station Type of Contract Contract Duration No of Positions Contract

More information

UNFPA EXECUTIVE BOARD DECISION-TRACKING MECHANISM

UNFPA EXECUTIVE BOARD DECISION-TRACKING MECHANISM UNFPA EXECUTIVE BOARD DECISION-TRACKING MECHANISM Status as at: 15 October 2017 UNFPA, in consultation with UNDP and UNOPS, has elaborated a decision-tracking mechanism covering UNFPA-specific and joint

More information

Rwanda. Till Muellenmeister. Health Budget Brief

Rwanda. Till Muellenmeister. Health Budget Brief Rwanda Till Muellenmeister Health Budget Brief Investing in children s health in Rwanda 217/218 Health Budget Brief: Investing in children s health in Rwanda 217/218 United Nations Children s Fund (UNICEF)

More information

TOOL KIT FOR SUSTAINABLE SCHOOL FEEDING

TOOL KIT FOR SUSTAINABLE SCHOOL FEEDING TOOL KIT FOR SUSTAINABLE SCHOOL FEEDING LIFTING SCHOOL CHILDREN OUT OF THE HUNGER TRAP GCNF-PCD meeting on HGSF, Accra 1-5 June, 2010 45 years of experience in school feeding yielded 8 quality standards

More information

Workshop on Assessment of Bihar s ICDS Supplementary Nutrition Programme

Workshop on Assessment of Bihar s ICDS Supplementary Nutrition Programme Workshop on Assessment of Bihar s ICDS Supplementary Nutrition Programme March 9, ADRI, Patna 1. Welcome Note Anjan Mukherji, Country Director, IGC India-Bihar welcomed all the participants of the meeting.

More information

The shortlisting criteria are: The Chartered Accountant firms applying for the assignment should possess the following qualifications.

The shortlisting criteria are: The Chartered Accountant firms applying for the assignment should possess the following qualifications. STATE PROJECT MANAGEMENT UNIT RURAL WATER SUPPLY AND SANITATION PROJECT BIHAR STATE WATER AND SANITATION MISSION PUBLIC HEALTH ENGINEERING DEPARTMENT VISHVESHWARIYA BHAWAN, BAILEY ROAD, PATNA 800 015 GOVERNMENT

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council Distr.: Limited 26 May 2015 Original: English 2015 session 21 July 2014-22 July 2015 Agenda item 7 Operational activities of the United Nations for international

More information

Implementation Status & Results India India First Statistical Strengthening Project (P108489)

Implementation Status & Results India India First Statistical Strengthening Project (P108489) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India India First Statistical Strengthening Project (P108489) Project Name: India First Statistical

More information

Liberia Reconstruction Trust Fund Implementation Manual

Liberia Reconstruction Trust Fund Implementation Manual Liberia Reconstruction Trust Fund Implementation Manual Updated November 2009 2011-02-28 LRTF Implementation Manual 1 I. Background... 3 II. Coverage... 3 III. General Principles... 4 IV. Project Development

More information

united Nations agencies

united Nations agencies Chapter 5: Multilateral organizations and global health initiatives A variety of international organizations are involved in mobilizing resources from both public and private sources and using them to

More information

Institutional budget for

Institutional budget for Distr. Limited 24 June 2011 Original: English United Nations Children s Fund Executive Board 12-15 September 2011 Item 8 of the provisional agenda * For action Institutional budget for 2012-2013 Summary

More information

Fund for Gender Equality Monitoring and Evaluation Framework Executive Summary

Fund for Gender Equality Monitoring and Evaluation Framework Executive Summary Fund for Gender Equality Monitoring and Framework Executive Summary Primary Goal of the Monitoring and Framework The overall aim of this Monitoring and (M&E) Framework is to ensure that the Fund for Gender

More information

Terms of Reference. International Consultant to MTR of the 5 year implementation of the National Nutrition Strategy,

Terms of Reference. International Consultant to MTR of the 5 year implementation of the National Nutrition Strategy, Terms of Reference International Consultant to MTR of the 5 year implementation of the National Nutrition Strategy, 2011-2020 1. Summary Title Terms of Reference for an international consultant in Nutrition

More information

EXECUTIVE SUMMARY. Assessment of the Sustainability of the Tanzania National Vitamin A Supplementation Program

EXECUTIVE SUMMARY. Assessment of the Sustainability of the Tanzania National Vitamin A Supplementation Program EXECUTIVE SUMMARY Assessment of the Sustainability of the Tanzania National Vitamin A Supplementation Program This assessment was made possible by the generous support of the American people through the

More information

GOVERNMENT OF ANDHRA PRADESH ABSTRACT

GOVERNMENT OF ANDHRA PRADESH ABSTRACT GOVERNMENT OF ANDHRA PRADESH ABSTRACT ALLOWANCES - Dearness Allowance Dearness Allowance to the State Government Employees from 1st July, 2009 Sanctioned Orders Issued. FINANCE (PC-I) DEPARTMENT G.O.Ms.No.

More information

ATTACHED TECHNICAL ASSISTANCE

ATTACHED TECHNICAL ASSISTANCE Third Capital Market Development Program (RRP BAN 45253) ATTACHED TECHNICAL ASSISTANCE A. Introduction 1. The attached technical assistance (TA) of $700,000 will support implementation of the proposed

More information

Budget Analysis for Child Protection

Budget Analysis for Child Protection Budget Analysis for Child Protection Children under the age of 18 constitute 42 percent of India's population. They represent not just India's future, but are integral to securing India's present. Yet

More information

UNICEF Moldova. Terms of Reference

UNICEF Moldova. Terms of Reference UNICEF Moldova Terms of Reference Individual Consultancy on Public Finance for Development of the National Action Plan for Gradual Implementation of the Sanitary and Hygiene Norms for Preschools Duration

More information

79,686 cr GoI allocations for the Ministry of Human Resource Development (MHRD) in FY

79,686 cr GoI allocations for the Ministry of Human Resource Development (MHRD) in FY BUDGET BRIEFS Vol 10/ Issue 1 Sarva Shiksha Abhiyan (SSA) GoI, 2017-18 Sarva Shiksha Abhiyan (SSA) is the Government of India s (GoI) flagship elementary education programme. Launched in 2001, it aims

More information

PUDHU VAAZHVU The World Bank funded Project

PUDHU VAAZHVU The World Bank funded Project TAMIL NADU EMPOWERMENT AND POVERTY REDUCTION PROJECT PUDHU VAAZHVU The World Bank funded Project About the Project A key Project of World Bank in Tamil Nadu to address inequity and to promote inclusive

More information

Can RLP (Rural Livelihood Project) and WSP (Water & Sanitation Project) collaborate? Shouvik Mitra Consultant SASDL - WB

Can RLP (Rural Livelihood Project) and WSP (Water & Sanitation Project) collaborate? Shouvik Mitra Consultant SASDL - WB Can RLP (Rural Livelihood Project) and WSP (Water & Sanitation Project) collaborate? Shouvik Mitra Consultant SASDL - WB Understanding RLP Broad objectives Targeting the poor, poorest and most vulnerable

More information

HLCM Procurement Network Procurement Process and Practice Harmonization in Support of Field Operations, Phase II

HLCM Procurement Network Procurement Process and Practice Harmonization in Support of Field Operations, Phase II HLCM Procurement Network Procurement Process and Practice Harmonization in Support of Field Operations, Phase II Introduction This Project proposal has been prepared by the HLCM Procurement Network (PN)

More information

Maldives: Developing the Revenue Administration Management Information System

Maldives: Developing the Revenue Administration Management Information System Completion Report Project Number: 44414-012 Technical Assistance Number: 7946 July 2015 Maldives: Developing the Revenue Administration Management Information System This document is being disclosed to

More information

Impact of Multi Sector Development Plan on Muslims: A Case Study of Moradabad District

Impact of Multi Sector Development Plan on Muslims: A Case Study of Moradabad District Impact of Multi Sector Development Plan on Muslims: A Case Study of Moradabad District B. K. Bajpai Introduction At the national level, 90 Minority Concentrated districts were identified as backward ones

More information

VAT Information Computerization to Optimize Revenue Yields (VICTORY)

VAT Information Computerization to Optimize Revenue Yields (VICTORY) 100 Compendium of e-governance Initiatives CHAPTER in India 7 VAT Information Computerization to Optimize Revenue Yields (VICTORY) Saurbah Gupta SIO and Project Leader S.N. Behera Technical Director and

More information

Sponsorship Guidelines. Contents Sponsorship Guidelines Introduction Background ADSA Sponsorship Policy...

Sponsorship Guidelines. Contents Sponsorship Guidelines Introduction Background ADSA Sponsorship Policy... Sponsorship Guidelines Contents Sponsorship Guidelines... 1 1 Introduction... 2 2 Background... 2 3 ADSA Sponsorship Policy... 3 4 Guiding Principles for Partnerships... 5 5 Types of ADSA Partnerships...

More information

European Insurance and Occupational Pensions Authority (EIOPA) Budget for 2016 Adopted by EIOPA Board of Supervisors on 28 January 2016

European Insurance and Occupational Pensions Authority (EIOPA) Budget for 2016 Adopted by EIOPA Board of Supervisors on 28 January 2016 European Insurance and Occupational Pensions Authority (EIOPA) for 2016 Adopted by EIOPA Board of Supervisors on 28 January 2016 EIOPA ed Revenues 2016 line Title Heading ns amounts 1 Title I Contribution

More information

Thirty-Second Board Meeting Corporate KPIs Narrative

Thirty-Second Board Meeting Corporate KPIs Narrative Thirty-Second Board Meeting Corporate KPIs Narrative 00 Month 2014 Location, Country Page 1 The Global Fund Thirty-Second Board Meeting GF/B32/24.a Revision 2 Board Decision THE GLOBAL FUND CORPORATE KEY

More information

AUDIT UNDP COUNTRY OFFICE BANGLADESH. Report No Issue Date: 28 May 2015

AUDIT UNDP COUNTRY OFFICE BANGLADESH. Report No Issue Date: 28 May 2015 UNITED NATIONS DEVELOPMENT PROGRAMME AUDIT OF UNDP COUNTRY OFFICE IN BANGLADESH Report No. 1429 Issue Date: 28 May 2015 Table of Contents Executive Summary i I. About the Office 1 II. Good practice 1 III.

More information

Terms of Reference. Contract #: (to be provided by PSU)

Terms of Reference. Contract #: (to be provided by PSU) Independent Evaluation of the Accelerating the Implementation of the Investment Case for Maternal, Newborn and Child Health in Asia and the Pacific Programme Terms of Reference Contract #: (to be provided

More information

PNPM SUPPORT FACILITY (PSF) Project Proposal

PNPM SUPPORT FACILITY (PSF) Project Proposal PNPM SUPPORT FACILITY (PSF) Project Proposal Project Title: Objective: Executing Agency: Estimated Duration: Estimated Budget: Geographic Coverage: Implementation Arrangements: PNPM Mandiri Revolving Loan

More information

IMPROVING PUBLIC FINANCING FOR NUTRITION SECTOR IN TANZANIA

IMPROVING PUBLIC FINANCING FOR NUTRITION SECTOR IN TANZANIA INN VEX UNITED REPUBLIC OF TANZANIA MINISTRY OF FINANCE IMPROVING PUBLIC FINANCING FOR NUTRITION SECTOR IN TANZANIA Policy Brief APRIL 2014 1 Introduction and background Malnutrition in Tanzania remains

More information

Benin 27 August 2015

Benin 27 August 2015 Benin 27 August 2015 PAGE 1 OF 6 (Please submit completed form to countries@gcfund.org) Executive Summary(in one page) Country (or region) Benin Submission Date 27/08/2015 NDA or Focal Point Directorate

More information

PlanPlus ( A tool for Decentralized and Integrated District Planning

PlanPlus (  A tool for Decentralized and Integrated District Planning PlanPlus (http://planningonline.gov.in) A tool for Decentralized and Integrated District Planning 1 TFC BRGF Planning currently done in silos (scheme-based) Funding NREGS Gram Panchayat Own Funds May not

More information

Addendum. E/ICEF/2015/5/Add.1 18 May 2015 Original: English. For information

Addendum. E/ICEF/2015/5/Add.1 18 May 2015 Original: English. For information 18 May 2015 Original: English For information United Nations Children s Fund Executive Board Annual session 2015 16-19 June 2015 Item 3 of the provisional agenda* Addendum Annual report of the Executive

More information

STATUS OF PANCHAYATI RAJ STATE PROFILE CHHATTISGARH STATE

STATUS OF PANCHAYATI RAJ STATE PROFILE CHHATTISGARH STATE STATUS OF PANCHAYATI RAJ STATE PROFILE CHHATTISGARH STATE 1. Introduction: The State of Chhattisgarh came into being on 1 November 2000, when it was carved out of Madhya Pradesh. According to the 2001

More information

Internal Audit of the Lao People s Democratic Republic Country Office

Internal Audit of the Lao People s Democratic Republic Country Office Internal Audit of the Lao People s Democratic Republic Country Office March 2013 Office of Internal Audit and Investigations (OIAI) Report 2013/04 Audit of the Lao People s Democratic Republic Country

More information

Draft DRAFT. Bangladesh s Financing Strategy: What we can learn for the Asia-Pacific region? Goksu Aslan. Bangkok, November 15, 2018

Draft DRAFT. Bangladesh s Financing Strategy: What we can learn for the Asia-Pacific region? Goksu Aslan. Bangkok, November 15, 2018 Bangladesh s Financing Strategy: What we can learn for the Asia-Pacific region? DRAFT Goksu Aslan goksu.aslan@un.org Bangkok, November 15, 2018 Goksu Aslan EGM - SDG Costing Bangkok, November 15, 2018

More information

GOVERNMENT OF ANDHRA PRADESH ABSTRACT

GOVERNMENT OF ANDHRA PRADESH ABSTRACT GOVERNMENT OF ANDHRA PRADESH ABSTRACT ALLOWANCES - Dearness Allowance Dearness Allowance to the State Government Employees from 1 st July, 2009 Sanctioned Orders Issued. ----------------------------------------------------------------------------------------------------------------

More information

MANAGERIAL ACCOUNTABILITY AND RISK MANAGEMENT

MANAGERIAL ACCOUNTABILITY AND RISK MANAGEMENT MANAGERIAL ACCOUNTABILITY AND RISK MANAGEMENT concept and practical implementation Discussion paper I Introduction The objective of this discussion paper is to explain the concept of managerial accountability

More information

Economic and Social Council

Economic and Social Council United Nations E/ICEF/2013/AB/L.4 Economic and Social Council Distr.: Limited 11 July 2013 Original: English For action United Nations Children s Fund Executive Board Second regular session 2013 3-6 September

More information

ZIMBABWE_Reporting format for final scoring (Ref. 4)

ZIMBABWE_Reporting format for final scoring (Ref. 4) Process 1: Bringing people in the same space Score each step: 0 (not applicable); 1 (started); 2 (on-going); 3 (nearly completed); 4 (completed) STEP 1. Select/develop coordinating mechanisms at country

More information

DISBURSEMENT-LINKED INDICATORS (FY2014 FY2017)

DISBURSEMENT-LINKED INDICATORS (FY2014 FY2017) Secondary Education Sector Investment Program (RRP BAN 44213) DISBURSEMENT-LINKED INDICATORS (FY2014 FY2017) DLIs and Definition Baseline Results Area 1. Enhanced Quality and Relevance of Secondary Education

More information

1.2 Title: Project Preparation and Support Facility (PPF)

1.2 Title: Project Preparation and Support Facility (PPF) FINAL VERSION 1. Basic information 1.1 CRIS Number: 2009/021-665 1.2 Title: Project Preparation and Support Facility (PPF) 1.3 ELARG Statistical code: 4.40 1.4 Location: Skopje Implementing arrangements:

More information

Communication Program to Support Fiscal Reform and Decentralization in Mongolia. Stakeholder Mapping Analysis (Summary of the report)

Communication Program to Support Fiscal Reform and Decentralization in Mongolia. Stakeholder Mapping Analysis (Summary of the report) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. INTRODUCTION Background Communication Program to Support Fiscal Reform and Decentralization

More information

FRAMEWORK AND WORK PROGRAM FOR GEF S MONITORING, EVALUATION AND DISSEMINATION ACTIVITIES

FRAMEWORK AND WORK PROGRAM FOR GEF S MONITORING, EVALUATION AND DISSEMINATION ACTIVITIES GEF/C.8/4 GEF Council October 8-10, 1996 Agenda Item 6 FRAMEWORK AND WORK PROGRAM FOR GEF S MONITORING, EVALUATION AND DISSEMINATION ACTIVITIES RECOMMENDED DRAFT COUNCIL DECISION The Council reviewed document

More information

BACKGROUND PAPER ON COUNTRY STRATEGIC PLANS

BACKGROUND PAPER ON COUNTRY STRATEGIC PLANS BACKGROUND PAPER ON COUNTRY STRATEGIC PLANS Informal Consultation 7 December 2015 World Food Programme Rome, Italy PURPOSE 1. This update of the country strategic planning approach summarizes the process

More information

A Multi Sectoral Approach To Health (UNDP Aided) Project Management Unit (SWAJAL) Deptt. Of Rural Development, Govt.

A Multi Sectoral Approach To Health (UNDP Aided) Project Management Unit (SWAJAL) Deptt. Of Rural Development, Govt. A Multi Sectoral Approach To Health (UNDP Aided) Project Management Unit (SWAJAL) Deptt. Of Rural Development, Govt. Of Uttar Pradesh 2 Structure Background Study and findings Action Plan 3 Background

More information

Rural Road Connectivity in India

Rural Road Connectivity in India www.swaniti.in Rural Road Connectivity in India The 12th Five Year Plan (2012-17) identifies rural connectivity as one of the key priorities to achieve rural poverty alleviation and development. With over

More information

UC BERKELEY BENEFITS DECENTRALIZATION SUMMARY OF CAMPUS INPUT

UC BERKELEY BENEFITS DECENTRALIZATION SUMMARY OF CAMPUS INPUT UC BERKELEY BENEFITS DECENTRALIZATION SUMMARY OF CAMPUS INPUT Overview of feedback We consulted with many people across the Berkeley campus over the last few months to solicit feedback and review the draft

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The PPTA will review and assess the performance of the secondary education subsector in Viet Nam and identify the challenges, which

More information

Swiss-Polish Cooperation Program Financial Reporting Technical Assistance Project

Swiss-Polish Cooperation Program Financial Reporting Technical Assistance Project Swiss-Polish Cooperation Program Financial Reporting Technical Assistance Project David Cairns and John Hegarty World Bank Centre for Financial Reporting Reform Warsaw, 11 December 2009 Presentation Outline»

More information

Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening. (1st January 31st March 2013) First-Quarter Report

Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening. (1st January 31st March 2013) First-Quarter Report Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening (1st January 31st March 2013) First-Quarter Report Contents 1. BACKGROUND OF PROJECT... 3 2. PROJECT OVERVIEW...

More information

AUDIT UNDP COUNTRY OFFICE SOMALIA. Report No Issue Date: 20 June 2014

AUDIT UNDP COUNTRY OFFICE SOMALIA. Report No Issue Date: 20 June 2014 UNITED NATIONS DEVELOPMENT PROGRAMME AUDIT OF UNDP COUNTRY OFFICE IN SOMALIA Report No. 1299 Issue Date: 20 June 2014 Table of Contents Executive Summary ii I. About the Office 1 II. Audit results 1 A.

More information

REPORT 2015/115 INTERNAL AUDIT DIVISION

REPORT 2015/115 INTERNAL AUDIT DIVISION INTERNAL AUDIT DIVISION REPORT 2015/115 Audit of the statistics subprogramme and related technical cooperation projects in the Economic Commission for Africa Overall results relating to effective management

More information

Implementation Status & Results Samoa SAMOA HEALTH SECTOR MANAGEMENT PROGRAM SUPPORT PROJECT (P086313)

Implementation Status & Results Samoa SAMOA HEALTH SECTOR MANAGEMENT PROGRAM SUPPORT PROJECT (P086313) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Samoa SAMOA HEALTH SECTOR MANAGEMENT PROGRAM SUPPORT PROJECT (P086313) Operation Name: SAMOA HEALTH

More information

Program Officer - Nutrition

Program Officer - Nutrition Program Officer - Nutrition Location: [Africa] [Kenya] Town/City: Nairobi Category: Health To provide Programmatic and Technical support to field staffs implement Maternal Child Nutrition Program (MCNP)

More information