1 PNPM SUPPORT FACILITY (PSF) Project Proposal Project Title: Objective: Executing Agency: Estimated Duration: Estimated Budget: Geographic Coverage: Implementation Arrangements: PNPM Mandiri Revolving Loan Fund (RLF) Capacity-Building and Sustainability Project The objective of the five year Project is to support the capacity building, restructuring and institutionalization of the PNPM RLF scheme and strengthen linkages between the PNPM RLFs and the commercial microfinance sector so as to help ensure growth and sustainability in the provision of financial services to the poor. World Bank Entire duration of the Project: (5 years). Funding is being requested for activities covering August 2011-December A total of US$ 31,000,000 has been tentatively committed for the five year Project. A first allocation of US$4,211,000 was approved by the JMC on 15 January This proposal is seeking JMC approval for a second allocation of US$ 4,679,866. Four provinces (3,300 RLFs): Central Java and D.I.Yogyakarta West Sumatra and East Nusa Tenggara (NTT) To implement activities presented in this Project Proposal, the World Bank will use funding from the PSF Trust Fund to issue grants/sub-contracts to qualified service providers. I. Background 1. PNPM Mandiri and its predecessor projects (KDP and UPP), have provided financing for community-managed revolving loan funds (RLFs) since their inception over a decade ago. PNPM s provision of RLFs has been focused on facilitating access to credit for the poor, especially women, to overcome market failure. Access to credit from commercial banks, including banks which specialize in microfinance provision such as BRI, is indeed still very low in Indonesia, particularly in rural villages and low-income urban neighborhoods. Research conducted under this Project (2009) 1 shows that less than 18% of Indonesians have access to credit from the banking sector, while only 20% of poor households have access to banking services. The original of the Government of Indonesia (GoI) for the PNPM RLFs was that loan provision under PNPM would help poor people start-up and grow businesses, thus becoming more bankable, which would encourage the commercial banks to become more active in servicing the productive poor. 2. These RLFs have become a significant national, community-based revolving fund operation reaching poor people who typically have no or limited access to other sources of credit. Over the past 10 years, the revolving loan programs under PNPM have continued to grow and reached a significant volume, scale and outreach. The volume of RLFs under PNPM is much larger than originally estimated. According to latest data and estimates, the RLF capital in both PNPM Rural and Urban has reached more than US$600 million and about 700,000 groups (many of them women groups), with an estimated outreach of nearly 5 million individual borrowers. Client surveys suggest that RLFs have had positive impacts on household income, business development, job creation and children s education. 2 1 The World Bank (2009), Improving Access to Financial Services in Indonesia 2 See MICRA Microcredit Strategy Formulation Mission for PNPM, November 2008, page 39 Program Impact.

2 3. Yet, there is little evidence that the original GoI objective of supporting the uptake of RLF borrowers by commercial banks has been achieved. The sheer volume of funds currently revolving in PNPM communities reinforces the need to put the RLFs on a clear path towards sustainability. RLFs present an inherently high potential risk of misuse of fund and corruption, as well as a potentially high incidence of non-performing loans. A number of measures have been taken to reinforce formal and social controls on RLFs operation, resulting in improvements in redress processes and repayment rates on new loans, which now exceed 80%. Phasing-out the GoI s direct support of RLFs by supporting the transition of the RLFs from being a government-backed scheme to becoming operationally and financially independent microfinance institutions has been defined by GoI as a strategic objective. Addressing systemic issues faced by current RLFs operations under PNPM (e.g. improve oversight and capacity building, data accuracy and reporting etc.) also requires attention during a transition period. 4. In its meeting on January meeting, the JMC approved a concept for a five year, US$ 31 million PNPM Mandiri Revolving Loan Fund (RLF) Capacity-Building and Sustainability Project. The overall goal of the Project is to contribute to poverty reduction initiatives within the target communities by scaling-up sustainable access to finance to support the larger underserved population and the development and expansion of microenterprises. US$ 4.2 million for were allocated for start-up activities. With this proposal, the Project team seeks approval for a second allocation for activities to be implemented from August 2011 to December II. Project Description & Progress to Date 5. The Project acts as a bridge between Cluster 2 (community empowerment) and Cluster 3 (access to finance for the poor and for private sector development) of the GoI s overall national poverty reduction strategy. The Project s strategic value lies in its potential to leverage debt from commercial banks for the benefit of Indonesia s poorer communities. This will induce client level social and economic improvements such as increases in business sales, household income, employment, assets, spending on education and health, financial literacy, increased self-esteem. 6. The Project s development objective is to support the capacity building, restructuring and institutionalization of the PNPM RLF scheme and strengthen linkages between the PNPM RLFs and the commercial microfinance sector so as to help ensure growth and sustainability in the provision of financial services to the poor. Specifically, the Project has four key components: a) Develop and implement a strategy to support the capacity building and institutionalization of the PNPM RLFs. b) Strengthen linkages between the RLFs and the commercial financial sector so as to help ensure growth and sustainability in the provision of financial services to the poor. c) Develop and establish a monitoring and supervision system to provide fiduciary oversight of the microfinance operations and to track the institutional development and performance of the RLFs. d) Develop a clear policy and strategy for the phasing-out of Government s direct support of RLFs by supporting the transition of the RLFs from being a government-backed scheme to becoming operationally and financially independent microfinance institutions. Page 2 of 10

3 Towards RLFs self-sustainability Component 4 (Policy and Strategy) Component 3 (Monitoring and Supervision System) Component 2 (Bank Linkage) Component 1 (Capacity Building and Institutionalization) Sub-Component 1-A: RLF s needs Assessment Sub-Component 1-B: Legal Review & TA Sub-Component 1-c: Capacity Building Sub-Component 1-D: Support for MIS The World Bank Executed Period ( ) GoI Executed (2014) 7. Overall implementation progress to date. The first US $ 4.2 million allocation has supported project start-up activities, which are well underway. Milestones reached to date include: project locations selected; UPKs mapped; project concept socialized to key stakeholders at central, regional and provincial levels, as well as to a number of UPKs; and assessments of PNPM Mandiri RLFs nearly completed for Rural and well underway for Urban. Procurement of core technical assistance packages is in the final stages. Detailed information on progress to date under each component is provided in Annex 2. III. New Activities under Each Component 8. Component 1. Capacity Building and Institutionalization. This component will support the restructuration and improved performance of current PNPM RLF operations through the provision of technical assistance and training which take into account variances in human capital, operating procedures and future legal structure of the RLFs. An in-depth assessment of a representative sample of RLFs (15% or 507), which will foster a better understanding of RLFs current performance on core indicators (e.g. Governance, Management and Financial Performance), development potential and capacity building needs, will be completed by September Funding is being requested to start preparations and launch the following activities: a. A Legal Review, which will a) clarify the ownership of the RLFs capital and b) determine the appropriate legal structure for RLFs based on a menu of institutional options, which will take into account the institutional capacity of RLFs as well as their local context. An international expert on legal issues associated with micro-finance schemes has already been hired to support the replication of international best practice, and a local legal firm expected to start working in July The Legal Review should be completed by the end of b. Consulting Services for Capacity Building: This activity will be conducted after the completion of the aforementioned RLFs assessment, drawing on its findings. The Project will develop and conduct a customized capacity building program in two provinces in Java to restructure and improve performance of current RLF operations. In a second stage, capacity building will be rolled out to off- Java and to PNPM Urban RLFs, for a total of over 3,000 RLFs. A firm will be contracted to oversee implementation. Work is expected to start in July 2011 and should be completed by the end of Page 3 of 10

4 c. Implementation Support for RLF MIS: This activity will also start upon completion of the RLF assessment. The Project will develop a robust data recording and information system that captures transactional data of the groups and UPKs to help improve the efficiency and effectiveness of RLF operations and ensure that RLF data fed into PNPM s MIS is reliable. This is a critical activity, as the ongoing RLF assessments suggest that RLF data is unreliable. Accurate and transparent data will improve governance and increase opportunities for bank linkages. Implementation is expected to start in July 2011 and to be completed by the end of Component 2. Bank Linkages. Activities under this component will support the establishment of actual linkages between RLFs and the commercial financial sector, building on the activities conducted under Component 1 and based on a graduating institution concept. RLFs whose performance is rated as excellent and good under component 1, will receive support to develop relationships with banks as soon as they can be registered as a suitable legal entity. For other RLFs, alternative and/or gradual linkage options will be explored. Ways to accelerate linkages between PNPM RLFs borrowers themselves will also be explored. The feasibility and cost of creating commercial bank linkages including an effective incentive scheme (e.g. providing loan funds for on-lending to RLFs) will be finally determined after the ongoing assessment of the financial soundness of the RLFs and further dialogue with commercial banks. Funding is being requested to start preparations and launch the following activities: a) Revision of Current Standard Operating Procedures: The activity will assist GoI in reviewing, updating and upgrading current SOPs for PNPM RLFs to ensure that RLFs accounting follows international best practice and support RLF borrowers with good track records in accessing to formal financial services. The on-going needs assessment conducted by M-Cril includes a review of SOPs. It findings will be utilized by the Project team to provide technical assistance to GoI for the revision of SOPs. b) Product Design: This activity will support the upgrading of RLFs as a financial product (e.g. adjustment of loan size and repayment schedule) to respond to the needs expressed by borrowers and RLFs staff during the aforementioned assessments and explore the feasibility of developing new products (e.g. micro-insurance, savings etc.). Upgraded product design (e.g. aligning RLF ceiling with the government s partial guarantee program - KUR) will support the graduation of RLFs and their linkages with commercial institutions. 10. Component 3. Monitoring and Supervision System: A project logical framework was developed as part of start-up activities to support Project monitoring and evaluation (M&E). The Project involves inherent challenges as over 3,000 RLFs, with high variance as regards capacity and incentives (especially between rural and urban UPKs), will need to be supervised and monitored on an ongoing basis. Ensuring that appropriate monitoring and supervision systems based on internationally accepted performance indicators and standards are put in place is therefore important. a) Design of Impact Assessments: In collaboration with the PSF M&E team, the Project team will design a mixed-methods evaluation to assess the Project impacts on borrowers welfare (inc. sustainability of their businesses) and access to financial services. 11. Component 4. Policy and Strategy: The aforementioned activities under Component 1 to 3 will provide a solid foundation for the development of a long-term strategy to phase out the Government s direct support to the RLFs and establish sustainable RLF operations. The Project team will provide technical assistance to GoI in the form of policy briefings and discussion notes summarizing the findings of ongoing and planned assessments and laying-out options for consideration by decision-makers. Page 4 of 10

5 IV. Estimated Budget 12. A total of US$ 31 million has been committed by the JMC for the Project over the five year period. An initial budget of US$ million was allocated for start-up activities by the JMC meeting on January , and has been released accordingly. 13. The Project team is seeking approval of an additional allocation of US$ 4,679,866 for new activities to be conducted between August 2011 and December A breakdown of the budget is provided in the table below. Reallocations across expense categories may be needed during the course of implementation. Category Aug Dec 2012 (US$) Component 1 Legal and Regulatory Advisory Services 785,000 Training and Capacity-Building Support 1,984,000 Improving Monitoring and Information System (MIS) for RLFs operations 1,100,000 Component 2 Bank Linkage Scheme 1,000,000 Component 3&4 Monitoring & Evaluations / Strategy & Policy recommendations 300,000 Implementation costs of above all (Component 1-4) Operating Costs (inc. costs for travel/field trips, workshops etc.) 346,000 WB staff 402,500 Consultants 315,000 SUB TOTAL 6,232,500 Contingency (approx 5% of total budget) 311,625 TOTAL 6,544,125 Start-up ( Phase 1 ) activities Balance on 1 st JMC allocation 2,058,366 TOTAL FOR NEW ALLOCATION 4,679,866 V. Implementation Arrangements 14. The Task Team Leader for this Project is based within the Finance and Private Sector Development (FPD) Unit of the World Bank Office in Jakarta, and cooperates closely with the PNPM Support Facility (PSF) and the World Bank task teams for both PNPM Rural and Urban. 15. Project activities will be World Bank executed. The GoI expressed its preference for this modality, which makes it easier to test out different approaches while a parallel dialogue is being conducted between different government agencies on longer-term strategy for the RLF scheme and the Bank team coordinates with the National Team of Poverty Reduction (TNP2K). A gradual handing over of project components will take place once adequate arrangements have been agreed upon with concerned government stakeholders. The project will be fully handed over to GoI at the beginning of Year 5, at the latest. 16. GoI oversight and strategic guidance. In light of the large stake the GoI has in the PNPM Mandiri program, ensuring broad ownership over the Project among regional and national stakeholders is of crucial importance. The Bank team coordinates with key stakeholders at national and regional level, including Bappnas, Coordinating Ministry of People s Welfare, Ministry of Home Affairs, Ministry of Page 5 of 10

6 Public Works, National Team of Poverty Reduction (TNP2K) etc. To this end, a working group comprising relevant ministries (i.e. the Ministry of Home Affairs, the Ministry of Public Work and Bappenas) has been established, ensuring adequate institutional representation of oversight agencies for both PNPM Rural and Urban. The Project team is also assisting GoI in establishing working groups at the regional level. The Project will support the GoI in ensuring that regular information shared and discussed with key stakeholders through existing structures such as the TNP2K and Pokja Pengendali. VI. Key Performance Indicators 17. The indicators presented below are for the entire, five year program. Early results for the indicators highlighted in italic will materialize after the completion of proposed new activities in December Objectives and Outcomes Overall Goal Achieve poverty reduction in PNPM target communities by scaling up of sustainable access to financial services by Indonesia s poorer communities Project Development Objective(PDO) Sustainable provision of financial services by RLF in four selected provinces through restructuring and improving the performance of RLF operations ( Building a bridge between cluster 2 and cluster 3 ) Component 1 : Eligible RLF have the capacity to manage the funds in a professional way and based on good practice MF principles Component 2: Linkages between the RLFs and the commercial financial sector are established Component 3: Effective and timely monitoring and supervision system for RLF is in place Component 4: Clear policy and strategy for sustainable RLF operations is developed and agreed (including a phasing-out of the Government s direct support to RLFs) Result Indicators Impact assessment indicators (tbd) 1. Increase in no. and amount of loans to groups and their members. 2. Improvements in the types and quality of products and services offered (e.g. savings services)* 3. No of RLF that cover the full operating cost from their interest spread* 4. No. or % of RLFs that have received high quality microfinance technical assistance and training. 5. No. or % of RLFs that have improved in their rating based on key performance indicators. 6. No. or % of RLFs that have institutionalized in a legal form that is appropriate to the local context.* 7. No. or % of RLFs with linkages with commercial banks 8. Increased access to sustainable sources of financing: (i) bank loan amounts (ii) leverage ratio 9. No. or % of RLFs that receive less/no block grants and achieve financial self-sufficiency (for good performing RLFs) or are liquidated (for poor performing RLFs)* 10. No. or % of RLFs for which regular, complete and timely performance rating results are available 11. No. or % of RLFs under supervision of a qualified financial supervisory agency* 12. Key stakeholders have agreed on initial strategy before implementation 13. No. of good practice inputs provided to and adopted by PNPM Mandiri Page 6 of 10

7 14. By end of year 5, key stakeholders agree on longterm strategy and phasing-out of direct government support* ANNEX 1: LIST OF PROJECT ACTIVITIES (FIVE YEAR PROGRAM) Component 1 - Capacity Building of RLFs 1.1 Assessment of RLF capacity and capacity building needs in both rural and urban PNPM 1.2 Develop and clearly define good microfinance principles adapted to RLF 1.3 Assessment of support provided by the PNPM facilitators to (i) the RLF for a) establishment and b) on-going operations, (ii) formation and guidance of SPP (groups) a. Can this function be integrated in the UPK system? e.g. TPK b. If a. cannot: Can the UPK hire outside technical assistance? 1.4 Legal assessment and options for RLF legal status 1.5 Design capacity building measures based on institutional development strategies (Ref. Component 4 Policy and Strategy) 1.6 Develop eligibility criteria (based on graduation philosophy) for RLF capacity building 1.7 Implement capacity building and training for eligible RLFs Component 2 Bank Linkages: 2.1 Identify early potential RLF candidates for bank linkage 2.2 Identify potential banks and initiate discussions on feasibility and type of linkages 2.3 Develop linkage models, incl. potential role as agents for banks: Bank UPK Bank SPP Bank individual 2.4 Establish eligibility criteria for a. RLFs and b. banks 2.5 Initiate first demonstration and show cases of pilot linkages 2.6 Evaluate pilot linkages and refine linkage models 2.7 Conduct regional linkage workshops to socialize and disseminate the concept 2.8 Develop and implement a linkage training program for RLFs how to deal with a bank 2.9 Conduct short exposure programs for banks to gain a direct insight into RLF operations 2.10 Develop a cadre of linkage facilitators (e.g. twinning FK with a bank officer) 2.11 Implement bank linkages 2.12 Monitor and evaluate bank linkages Component 3 Monitoring and Supervision System 3.1 Develop a project monitoring system based on PDO, outcomes, indicators and activities 3.2 Develop a RLF rating system (governance, management and financial performance) Page 7 of 10

8 3.3 Develop an institutional performance monitoring system based on RLF rating system and up to date financial reporting standards 3.4 Develop institutional performance monitoring system into a supervisory rating system 3.5 Determine an appropriate supervisory agency (or agencies: non-prudential vs prudential) 3.6 Conduct capacity building of supervisors Component 4 Policy and Strategy 4.1 Develop initial strategy for restructuring and improving rural RLF operations based on 100 RLFs in CJ/Yog (year 2) - Institutional development strategies and options (as basis for capacity building Component 1) - Transition from grant (BLM) to loans phasing-out of BLM, phasing-in of bank loan - Potential legalization of RLFs 4.2 Develop initial strategy for restructuring and improving urban RLF operations 4.3 Develop refined strategy for rural and urban RLFs in four pilot provinces (year 3) 4.4 Provide lessons learned and good practice inputs to PNPM Mandiri on an incremental basis 4.5 Develop long-term policy and strategy for sustainable RLF operations and nationwide replication by the government, including exit strategy for the government s direct support for RLFs (year 5) ANNEX 2. DETAILED DESCRIPTION OF PROGRESS TO DATE 18. Overall implementation progress. Implementation is well underway, with project locations selected; UPKs mapped; project concept socialized to key stakeholders at central, regional and provincial levels, as well as to a number of UPKs; and assessments of PNPM Mandiri Revolving Loan Funds (RLFs) nearly completed for Rural and well underway for Urban. Procurement of core technical assistance packages is in the final stages. General progress and progress by component is detailed below. More information about the components is included in Annex Project preparation. Following project approval by the JMC in January 2010, the core project team was established; a Child Trust Fund was created and JMC-approved budget of US$4.211 million transferred to the TF account. A series of meetings were held with national level counterparts, the Ministry of Home Affairs, Bappenas, Coordinating Ministry for People s Welfare (Menko Kesra), NMC, donors and the Social Development team in the World Bank Indonesia s PSF Office. 20. A working group of relevant stakeholders from the Government has been established. A first meeting, chaired by Bappenas, was held on 5 November On that occasion, the working group endorsed the selection of the two off-java provinces (i.e., West Sumatra and East Nusa Tenggara (NTT)). Working group meetings at both national and regional level are expected to be held on a regular basis in due course. 21. The Project concept note has also been subjected to the World Bank internal peer review and was approved on 11 November Specifically, the World Bank management approved implementation of the Project by the Bank and the allocation of staff and management resources. The peer review also included external microfinance specialists from CGAP. 22. Inventory and mapping of RLFs. An inventory and mapping of all existing Revolving Loan Funds (RLFs) in the four provinces in both rural and urban areas was conducted (see table below). The project will broadly target approximately 3,300 RLFs, with the majority (75%) in Java. Furthermore, the RLFs in PNPM Page 8 of 10

9 Urban are larger in number but much smaller in size as they are located at the village (kelurahan) level as opposed to RLFs under PNPM Rural which are operating at the sub-district (kecamatan). Pilot Province Rural RLFs Urban RLFs Total RLFs 1 Central Java 444 1,795 2,239 68% 2 Yogyakarta (DIY) % 3 West Sumatra % 4 East Nusa Tenggara (NTT) % Total 886 2,414 3, % RLF sample for assessment % Note: Number of RLFs is as of December Numbers will fluctuate with formation of new groups. Component 1: Capacity Building and Institutionalization 23. This component is largely on track. Socialization of the new pilot program began in May 2010 with regional and local governments and local stakeholders in both Central Java and Yogyakarta for PNPM Rural. In a series of field workshops, initial inputs on the project concept were obtained from more than 1,000 UPK representatives and Kecamatan facilitators. This also included field visits to RLF operations in Central Java, Yogyakarta, and some other provinces. Following agreement to start expansion of the program to PNPM Urban RLFs from early 2011, the program has now been socialized to nearly 300 PNPM Urban Economic Facilitators, City Coordinators and Assistant City Coordinators in Central Java and Yogyakarta, and received support from Bappeda in both locations. The project has placed one core team member with the PNPM Urban team in the World Bank to support project preparation and implementation. 24. Sub-component 1-A: Revolving Loan Fund Assessments. One of the first major project activities is the in-depth assessment of a sufficiently large number of RLFs to gain a better understanding of the operations, the development potential and the capacity building needs of RLFs. Given the large number of RLFs in the pilot provinces, a representative sample of 507 RLFs approx. 15% of the total - has been chosen for the in-depth assessment. In line with the initial proposal, the assessment is being conducted in four stages: (i) a first batch of 100 rural RLFs in Central Java and Yogyakarta was completed in March 2011; (ii) 50 remaining rural RLFs in the same area have been completed in May 2011; (iii) 197 urban RLFs in Central Java and Yogyakarta will be completed by end-july 2011; and (iv) 116 rural RLFs and 44 urban RLFs in West Sumatra and NTT are planned to be finalized by October The consulting firm to carry out the assessments of the RLFs was contracted in October 2010 following a six-month procurement process under World Bank guidelines. The following steps have been conducted regarding the RLF assessment: November 2010 Initial assessment (pre-test) of 14 rural RLFs conducted December 2010 Assessment methodology reviewed in a technical workshop and fine-tuned for rollout March 2011: - Assessment of 100 rural RLFs completed - Mid-term review of rural assessments shared in workshop with key central, regional and provincial stakeholders April Initial assessment (pre-test) of 10 urban RLFs conducted May 2011: - Assessment of additional 50 rural RLFs completed - Assessment methodology for urban RLFs reviewed in a technical workshop and fine-tuned for rollout Page 9 of 10

10 - Assessment of additional 187 urban RLFs begin (to be completed end-july) 26. Sub-component 1-B: Legal Review. A second major assessment has been launched to clarify the ownership of the RLF capital and to determine the appropriate legal structure for RLFs based on a menu of institutional options. The procurement process to select a legal firm to support this activity is in the final stages. A part time international legal expert has been hired to support this activity. 27. Sub-component 1-C: Consulting Services for Capacity Building. Following the initial assessment, the Project will develop and conduct a customized program of capacity building in the two provinces in Java in order to restructure and improve performance of current RLF operations. In a second stage, capacity building will be rolled out to off-java and to PNPM Urban RLFs. Terms of Reference (TOR) were developed for the assignment, RFP issued and procurement is in the final stages. Implementation is expected to start in July Sub-component 1-D: Implementation Support for RLF MIS. The Project will develop a robust data recording and information system that captures transactional data of the groups and UPKs to help improve the efficiency and effectiveness of RLF operations and provide data to PNPM stakeholders. This is a critical activity, as the assessments underway now reveal that the RLF data is weak. Accurate and transparent data will improve governance and increase opportunities for bank linkages with and sustainability of the RLFs. TORs for the assignment were developed, RFP issued and procurement is in the final stages. Implementation is expected to start in July Page 10 of 10

REVOLVING LOAN FUND CAPACITY BUILDING AND SUSTAINABILITY PROJECT

REVOLVING LOAN FUND CAPACITY BUILDING AND SUSTAINABILITY PROJECT REVOLVING LOAN FUND CAPACITY BUILDING AND SUSTAINABILITY PROJECT World Bank PNPM Support Facility (PSF) Gedung Bursa Efek Indonesia Tower 1, lantai 9 Jl. Jenderal Sudirman Kav. 52-53, Jakarta 12190 Ph:

More information

Kecamatan Development Program M a y 2002

Kecamatan Development Program M a y 2002 Kecamatan Development Program Brief Overview M a y 2002 Introduction The Kecamatan Development Program (KDP) is a Government of Indonesia effort to alleviate poverty in rural communities and improve local

More information

Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810)

Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810) Operation

More information

INEY IPF Component. Strengthening National and Subnational Capacity

INEY IPF Component. Strengthening National and Subnational Capacity TERMS OF REFERENCE INEY IPF Component Strengthening National and Subnational Capacity to Implement the National Strategy to Accelerate Stunting Reduction (StratNas Stunting) Background Stunting is a condition

More information

The Urban Poverty Project - Indonesia: Lessons from the first Seven Years

The Urban Poverty Project - Indonesia: Lessons from the first Seven Years The Urban Poverty Project - Indonesia: Lessons from the first Seven Years George Soraya and Ani Dasgupta May 10, 2007, New Delhi, Jakarta and Washington DC UPP starts as a response to the crisis Starts

More information

BACKGROUND PAPER ON COUNTRY STRATEGIC PLANS

BACKGROUND PAPER ON COUNTRY STRATEGIC PLANS BACKGROUND PAPER ON COUNTRY STRATEGIC PLANS Informal Consultation 7 December 2015 World Food Programme Rome, Italy PURPOSE 1. This update of the country strategic planning approach summarizes the process

More information

Republic of Indonesia Indonesia. [ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) Category Date PID Prepared December 4, 2006

Republic of Indonesia Indonesia. [ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) Category Date PID Prepared December 4, 2006 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No. PID6725 Project Name Indonesia-Urban Poverty Project (+) Region Sector Project

More information

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection Technical Assistance Report Project Number: 47042-001 Policy and Advisory Technical Assistance (PATA) October 2013 People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

More information

PROJECT DOCUMENT. Capacity Building for the Management of Road Assets at District Level in Aceh

PROJECT DOCUMENT. Capacity Building for the Management of Road Assets at District Level in Aceh 2 o o PROJECT DOCUMENT Creating Jobs: Capacity Building for Local Resourcebased Road Works in Selected Districts in NAD UNDP/ILO Project INS/51/071 Phase III Capacity Building for the Management of Road

More information

Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For (P125405)

Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For (P125405) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For 2012-2015 (P125405) Operation

More information

Section 3.07 is deleted and the following is substituted therefor:

Section 3.07 is deleted and the following is substituted therefor: 2 outstanding Loan and the Fixed Spread that will be applied to new Loans (expressed as a percentage per annum), by (ii) the principal amount of the outstanding Loan on which the Borrower shall pay interest

More information

Sentot Satria 14 May 2008 to 31 December 2013 (68 months)

Sentot Satria 14 May 2008 to 31 December 2013 (68 months) PNPM Rural Implementation Support Quarterly Progress Report: July to September Summary Information Status Activity Number Task Team Leader(s) Executg Agency(ies) Start date to Closg Date Geographic Coverage

More information

NATIONAL TEAM FOR THE ACCELERATION OF POVERTY REDUCTION (TNP2K)

NATIONAL TEAM FOR THE ACCELERATION OF POVERTY REDUCTION (TNP2K) OFFICE OF THE VICE PRESIDENT THE REPUBLIC OF INDONESIA NATIONAL TEAM FOR THE ACCELERATION OF POVERTY REDUCTION (TNP2K) Bambang Widianto Deputy for Social Welfare and Poverty Alleviation/ Excecutive Secretary

More information

Project Name KIAT GURU: KINERJA DAN AKUNTABILITAS GURU - IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY

Project Name KIAT GURU: KINERJA DAN AKUNTABILITAS GURU - IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC56822

More information

Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810)

Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810) Operation

More information

to ensure that the urban poor in participating Kelurahans benefit from improved socio -economic and local governance conditions.

to ensure that the urban poor in participating Kelurahans benefit from improved socio -economic and local governance conditions. Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number: ICRR14905 1. Project Data: Date Posted: 06/02/2016 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Independent Progress Review. PNPM Program Support Facility (PSF) Final Report

Independent Progress Review. PNPM Program Support Facility (PSF) Final Report Independent Progress Review PNPM Program Support Facility (PSF) October 2012 Acknowledgements The review team would like to thank all those who participated in the review. We understand how difficult it

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: INO 34115 TECHNICAL ASSISTANCE TO THE REPUBLIC OF INDONESIA FOR FISCAL DECENTRALIZATION November 2001 CURRENCY EQUIVALENTS (as of 31 October 2001) Currency Unit Rupiah (Rp)

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: INO 34149 TECHNICAL ASSISTANCE (Financed from the Japan Special Fund) TO THE REPUBLIC OF INDONESIA FOR PREPARING THE SECOND DECENTRALIZED HEALTH SERVICES PROJECT November 2001

More information

PRESENTATION TO WORLD BANK-DSF GOVERNMENT COMMUNITY DEVELOPMENT OPERATIONS: MICROFINANCE / MICROCREDIT PROJECTS

PRESENTATION TO WORLD BANK-DSF GOVERNMENT COMMUNITY DEVELOPMENT OPERATIONS: MICROFINANCE / MICROCREDIT PROJECTS 1 PRESENTATION TO WORLD BANK-DSF GOVERNMENT COMMUNITY DEVELOPMENT OPERATIONS: MICROFINANCE / MICROCREDIT PROJECTS July 20, 2007 2 Introduction and Background 3 Background: 14 large government community

More information

REQUIRED DOCUMENT FROM HIRING UNIT

REQUIRED DOCUMENT FROM HIRING UNIT Terms of reference GENERAL INFORMATION Title: Public Financial Management Expert (Indonesian National) Project Name : Environment Unit/ Sustainable Development Financing (SDF) & BIOFIN Reports to: UNDP

More information

September Preparing a Government Debt Management Reform Plan

September Preparing a Government Debt Management Reform Plan September 2012 Preparing a Government Debt Management Reform Plan Introduction Preparing a Government Debt Management Reform Plan The World Bank supports the strengthening of government debt management

More information

Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For (P125405)

Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For (P125405) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For 2012-2015 (P125405) Operation

More information

Duration of Assignment: Approx. 150 working days from January to September 2015

Duration of Assignment: Approx. 150 working days from January to September 2015 Terms of reference GENERAL INFORMATION Title: Gender Poverty Expert _CPEIR Bangka Belitung (Indonesian National) Project Name : Environment Unit/ Sustainable Development Financing (SDF) SIDA Funding Reports

More information

PNPM Support Facility (PSF) Technical Committee May 30, 2013 Meeting Meeting Minutes

PNPM Support Facility (PSF) Technical Committee May 30, 2013 Meeting Meeting Minutes PNPM Support Facility (PSF) Technical Committee May 30, 2013 Meeting Meeting Minutes ----------------------------- Chairman: Dr. Rudy Soeprihadi Prawiradinata MCRP, Ph.D, Director for Poverty Reduction,

More information

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones Technical Assistance Report Project Number: 50004-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Study on Natural Resource Asset Appraisal and Management System

More information

Duration of Assignment: Apprx. 150 working days from January to September 2015

Duration of Assignment: Apprx. 150 working days from January to September 2015 Terms of reference GENERAL INFORMATION Title: Governance and Institutional Expert _CPEIR Bangka Belitung (Indonesian National) Project Name : Environment Unit/ Sustainable Development Financing (SDF) SIDA

More information

Self-Reliance through Mutual Accountability Framework (SMAF)

Self-Reliance through Mutual Accountability Framework (SMAF) Self-Reliance through Mutual Accountability Framework (SMAF) Realizing the need for deepening mutual accountability between the government of Afghanistan and the international community to face the challenges

More information

OFFICIAL DOCUMENTS. 2. The Donor and the Bank agree to the following amendments to the Administration Arrangement: (a)

OFFICIAL DOCUMENTS. 2. The Donor and the Bank agree to the following amendments to the Administration Arrangement: (a) Public Disclosure Authorized OFFICIAL DOCUMENTS Amendment No. 2 to the Administration Arrangement between the Swiss State Secretariat for Economic Affairs SECO, Federal Department of Economic Affairs,

More information

Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2

Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2 Technical Assistance Report Project Number: 40345 April 2008 Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2 The views expressed herein are those

More information

WSSCC, Global Sanitation Fund (GSF)

WSSCC, Global Sanitation Fund (GSF) Annex I WSSCC, Global Sanitation Fund (GSF) Terms of Reference Country Programme Monitor (CPM) BURKINA FASO 1 Background The Water Supply and Sanitation Collaborative Council (WSSCC) was established in

More information

Al-Amal Microfinance Bank

Al-Amal Microfinance Bank Impact Brief Series, Issue 1 Al-Amal Microfinance Bank Yemen The Taqeem ( evaluation in Arabic) Initiative is a technical cooperation programme of the International Labour Organization and regional partners

More information

Responsive Local Government. Accountability, and LG Capacity

Responsive Local Government. Accountability, and LG Capacity Responsive Local Government Operations, Downwards Accountability, and LG Capacity Presentation at the National Workshop, Local Governance Capacity Development tproject Jakarta, August 18, 2011 1 The Objective

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Social Protection & Labor Global Practice IBRD/IDA Investment Project Financing FY 2011 Seq No: 14 ARCHIVED on 21-Dec-2017 ISR30624 Implementing

More information

Republic of Indonesia: Promoting Innovative Financial Inclusion (Financed by ADB Technical Assistance Special Fund)

Republic of Indonesia: Promoting Innovative Financial Inclusion (Financed by ADB Technical Assistance Special Fund) Technical Assistance Report Program Number: 48207-003 Transaction Technical Assistance (TRTA) June 2017 Republic of Indonesia: Promoting Innovative Financial Inclusion (Financed by ADB Technical Assistance

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 40280 September 2007 Islamic Republic of Afghanistan: Technical Assistance for Support for Economic Policy Management (Cofinanced by the Government of Australia

More information

BANKS IN MICROFINANCE Guidelines for Successful Partnerships

BANKS IN MICROFINANCE Guidelines for Successful Partnerships BANKS IN MICROFINANCE Guidelines for Successful Partnerships This micronote is written primarily for USAID staff and others who may consider approaching banks to develop microfinance programs. It is intended

More information

SECTOR ASSESSMENT (SUMMARY): FINANCE

SECTOR ASSESSMENT (SUMMARY): FINANCE Inclusive Financial Sector Development Program, Subprogram 1 (RRP CAM 44263 013) SECTOR ASSESSMENT (SUMMARY): FINANCE 1. Sector Performance, Problems, and Opportunities a. Sector Context and Performance

More information

Terms of Reference (ToR)

Terms of Reference (ToR) Terms of Reference (ToR) Mid -Term Evaluations of the Two Programmes: UNDP Support to Deepening Democracy and Accountable Governance in Rwanda (DDAG) and Promoting Access to Justice, Human Rights and Peace

More information

Policy, Regulatory and Supervisory Environment for Microfinance in Tanzania

Policy, Regulatory and Supervisory Environment for Microfinance in Tanzania ESSAYS ON REGULATION AND SUPERVISION Policy, Regulatory and Supervisory Environment for Microfinance in Tanzania G.C. RUBAMBEY BANK OF TANZANIA December 2005 ESSAYS ON REGULATION AND SUPERVISION No.15

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Lebanon Social Protection & Labor Global Practice Recipient Executed Activities Investment Project Financing FY 2014 Seq No: 5 ARCHIVED on 09-Jan-2017

More information

Planning, Budgeting and Financing

Planning, Budgeting and Financing English Version Planning, Budgeting and Financing Post-Disaster Recovery and Reconstruction Activities in Khammouane Province, Lao PDR Developed under the Khammouane Development Project (KDP), Implemented

More information

75 working days spread over 4 months with possibility of extension 1. BACKGROUND

75 working days spread over 4 months with possibility of extension 1. BACKGROUND TERMS OF REFERENCE 1. Environmental Finance Expert Contracting Agency: Coordinating Agency: Place: Expected duration: United Nations Development Programme (UNDP) Bhutan UNDP Country Office Thimphu, Bhutan.

More information

FINAL REPORT EXECUTIVE SUMMARY

FINAL REPORT EXECUTIVE SUMMARY No. 2 Japan International Cooperation Agency (JICA) National Development Planning Agency (BAPPENAS) THE SUPPORT PROGRAM FOR AGRICULTURE AND FISHERIES DEVELOPMENT IN THE REPUBLIC OF INDONESIA FINAL REPORT

More information

THE ROAD TO ECONOMIC GROWTH

THE ROAD TO ECONOMIC GROWTH THE ROAD TO ECONOMIC GROWTH Introduction 1. As in many countries, the road sector accounts for the major share of domestic freight and inter-urban passenger land travel in Indonesia, playing a crucial

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities Country Partnership Strategy: Indonesia, 2012 2014 SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Fiscal decentralization.

More information

Internal Audit of the Republic of Albania Country Office January Office of Internal Audit and Investigations (OIAI) Report 2017/24

Internal Audit of the Republic of Albania Country Office January Office of Internal Audit and Investigations (OIAI) Report 2017/24 Internal Audit of the Republic of Albania Country Office January 2018 Office of Internal Audit and Investigations (OIAI) Report 2017/24 Internal Audit of the Albania Country Office (2017/24) 2 Summary

More information

Summary. I. Outline of the Project

Summary. I. Outline of the Project Summary I. Outline of the Project Country:Republic of Indonesia Issue / Sector:Environmental Management Environmental Administration Division in charge: JICA Indonesia Office Period of March 2009 to Cooperation

More information

SUPPLEMENTARY DOCUMENT 3: THE PROPOSED NATIONAL COMMUNITY-DRIVEN DEVELOPMENT PROGRAM 1

SUPPLEMENTARY DOCUMENT 3: THE PROPOSED NATIONAL COMMUNITY-DRIVEN DEVELOPMENT PROGRAM 1 KALAHI CIDSS National Community-Driven Development Project (RRP PHI 46420) SUPPLEMENTARY DOCUMENT 3: THE PROPOSED NATIONAL COMMUNITY-DRIVEN DEVELOPMENT PROGRAM 1 A. Program Objective and Outcomes 1. The

More information

Session 8 Case Study: PHI: Development Policy Support Program Kelly Bird Southeast Asia Regional Department

Session 8 Case Study: PHI: Development Policy Support Program Kelly Bird Southeast Asia Regional Department Session 8 Case Study: PHI: Development Policy Support Program Kelly Bird Southeast Asia Regional Department Introductory Course on Economic Analysis of Policy-Based Lending Operations 7 June 2007 ADB-Philippines

More information

Supplementary budget for the implementation of the medium-term strategic and institutional plan

Supplementary budget for the implementation of the medium-term strategic and institutional plan UNITED NATIONS HSP UN-Habitat Governing Council of the United Nations Human Settlements Programme Distr. General 10 April 2007 Original: English Twenty-first session Nairobi, 16-20 April 2007 Item 7 of

More information

Letter No. SK-519/PSF/XII/2010 December 6, 2010

Letter No. SK-519/PSF/XII/2010 December 6, 2010 Public Disclosure Authorized Address: INTBAFRAD CONFORMED COPYO NAL DEVELOPMENT ASSOCIATION U.S.A. Cable Address: INDEVAS Stefan G. Koeberle Country Director, Indonesia Letter No. SK-519/PSF/XII/2010 December

More information

TERMS OF REFERENCE. Technical Working Group on the extension of social security to the informal economy

TERMS OF REFERENCE. Technical Working Group on the extension of social security to the informal economy TERMS OF REFERENCE Technical Working Group on the extension of social security to the informal economy Financing social security coverage to informal construction workers in Zambia: design of a social

More information

Mauritania s Poverty Reduction Strategy Paper (PRSP) was adopted in. Mauritania. History and Context

Mauritania s Poverty Reduction Strategy Paper (PRSP) was adopted in. Mauritania. History and Context 8 Mauritania ACRONYM AND ABBREVIATION PRLP Programme Regional de Lutte contre la Pauvreté (Regional Program for Poverty Reduction) History and Context Mauritania s Poverty Reduction Strategy Paper (PRSP)

More information

Financial Inclusion: Using Financial Education to Reach Out to Undeserved Groups and the Informal Sector

Financial Inclusion: Using Financial Education to Reach Out to Undeserved Groups and the Informal Sector Financial Inclusion: Using Financial Education to Reach Out to Undeserved Groups and the Informal Sector Conference on Financial Literacy: Financial education For All Cape Town, South Africa 27-28 October

More information

Global Environment Facility

Global Environment Facility Global Environment Facility GEF Council June 3-8, 2005 GEF/ME/C.25/3 May 6, 2004 Agenda Item 5 FOUR YEAR WORK PROGRAM AND BUDGET OF THE OFFICE OF MONITORING AND EVALUATION FY06-09 AND RESULTS IN FY05 (Prepared

More information

Actual Project Name : Mn - Sustainable Livelihoods Country: Mongolia US$M): Project Costs (US$M

Actual Project Name : Mn - Sustainable Livelihoods Country: Mongolia US$M): Project Costs (US$M IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 10/29/2008 Report Number : ICRR12989 PROJ ID : P067770 Appraisal Actual Project Name : Mn - Sustainable Project Costs (US$M US$M):

More information

Annex 1. Action Fiche for Solomon Islands

Annex 1. Action Fiche for Solomon Islands Annex 1 Action Fiche for Solomon Islands 1. IDENTIFICATION Title/Number FED/2012/023-802 Second Solomon Islands Technical Cooperation Facility (TCF II) Total cost EUR 1,157,000 Aid method / Method of implementation

More information

Terms of Reference for an Individual National Consultant to conduct the testing of the TrackFin Methodology in Uganda.

Terms of Reference for an Individual National Consultant to conduct the testing of the TrackFin Methodology in Uganda. Terms of Reference for an Individual National Consultant to conduct the testing of the TrackFin Methodology in Uganda 21 July, 2017 Introduction: The Ministry of Water and Environment (MWE) is implementing

More information

OCUMENTS. April 24, 2013

OCUMENTS. April 24, 2013 Public Disclosure Authorized Public Disclosure Authorized THE WORLD BANK I BANK DUNIA OFFICIAL 1-r 0 o 4 7 Sharing Development Solutions for an Emerging Indonesia Mr. Lukita Dinarsyah Tuwo Vice Minister

More information

MATRIX OF STRATEGIC VISION AND ACTIONS TO SUPPORT SUSTAINABLE CITIES

MATRIX OF STRATEGIC VISION AND ACTIONS TO SUPPORT SUSTAINABLE CITIES Urban mission and overall strategy objectives: To promote sustainable cities and towns that fulfill the promise of development for their inhabitants in particular, by improving the lives of the poor and

More information

TERMS OF REFERENCE FEASIBILITY STUDY FOR ENVIRONMENTAL TRUST FUND

TERMS OF REFERENCE FEASIBILITY STUDY FOR ENVIRONMENTAL TRUST FUND TERMS OF REFERENCE FEASIBILITY STUDY FOR ENVIRONMENTAL TRUST FUND Type of Position: Local consultant Sustainable finance expert Location: Ulaanbaatar, Mongolia Type of Contract: Individual contract Expected

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening. (1st January 31st March 2013) First-Quarter Report

Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening. (1st January 31st March 2013) First-Quarter Report Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening (1st January 31st March 2013) First-Quarter Report Contents 1. BACKGROUND OF PROJECT... 3 2. PROJECT OVERVIEW...

More information

Supervision and Regulation of Microfinance Institutions in Indonesia. OJK International Seminar on Microfinance & Financial Inclusion, March 2016

Supervision and Regulation of Microfinance Institutions in Indonesia. OJK International Seminar on Microfinance & Financial Inclusion, March 2016 Supervision and Regulation of Microfinance Institutions in Indonesia OJK International Seminar on Microfinance & Financial Inclusion, March 2016 Contents FSA Indonesia (OJK) MFIs in Indonesia MFIs Regulations

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: VIE 38561 TECHNICAL ASSISTANCE (Financed by the Poverty Reduction Cooperation Fund) TO THE SOCIALIST REPUBLIC OF VIET NAM FOR DEVELOPING AGRICULTURAL INSURANCE December 2004

More information

DOCUMENTS) A Y Letter of Dev. pment Policy. No. S- 108.A /M.EKON/04/2014 Jakarta,April 25, 2014 No. S- 255/MK.08/2014. Dear Mr.

DOCUMENTS) A Y Letter of Dev. pment Policy. No. S- 108.A /M.EKON/04/2014 Jakarta,April 25, 2014 No. S- 255/MK.08/2014. Dear Mr. Letter of Dev pment Policy MENTERI KEUANGAN REPUBLIK INDONESIA DOCUMENTS) No. S- 108.A /M.EKON/04/2014 Jakarta,April 25, 2014 No. S- 255/MK.08/2014 Mr. Jim Yong Kim President The World Bank Washington,

More information

Additional Modalities that Further Enhance Direct Access: Terms of Reference for a Pilot Phase

Additional Modalities that Further Enhance Direct Access: Terms of Reference for a Pilot Phase Additional Modalities that Further Enhance Direct Access: Terms of Reference for a Pilot Phase GCF/B.10/05 21 June 2015 Meeting of the Board 6-9 July 2015 Songdo, Republic of Korea Provisional Agenda item

More information

Microfinance Credit Reporting. Colin Raymond - IFC CB Regional Specialist - Asia Rabat September, 2014 Session 11

Microfinance Credit Reporting. Colin Raymond - IFC CB Regional Specialist - Asia Rabat September, 2014 Session 11 Microfinance Credit Reporting Colin Raymond - IFC CB Regional Specialist - Asia Rabat - 22-25 September, 2014 Session 11 Case Study of MicroMicro Read description of the case study provided Discuss the

More information

Socialist Republic of Vietnam. Reporting Period: From 08/20/2017 to 04/03/2018 Report Date: 04/03/2018 Ministry of Natural Resources and Environment

Socialist Republic of Vietnam. Reporting Period: From 08/20/2017 to 04/03/2018 Report Date: 04/03/2018 Ministry of Natural Resources and Environment PMR Project Implementation Status Report (ISR) 1. SUMMARY INFORMATION Implementing Country/Technical Partner: Socialist Republic of Vietnam Reporting Period: From 08/20/2017 to 04/03/2018 Report Date:

More information

M2i s Experience in Microfinance

M2i s Experience in Microfinance M2i s Experience in Microfinance Title Duration Client Page Implementation of Risk Management International Finance June 2012-May 2015 Framework in 5 MFIs Corporation 3 Adaptation of Global Risk International

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council Distr.: Limited 1 December 2015 Original: English For decision United Nations Children s Fund Executive Board First regular session 2016 2-4 February 2016 Item

More information

Developing Anti-Money Laundering and Combating the Financing of Terrorism Approaches, Methodologies, and Controls

Developing Anti-Money Laundering and Combating the Financing of Terrorism Approaches, Methodologies, and Controls Technical Assistance Report Project Number: 50258-001 Cluster Regional Capacity Development Technical Assistance (C-R-CDTA) December 2016 Developing Anti-Money Laundering and Combating the Financing of

More information

Mongolia: Development of State Audit Capacity

Mongolia: Development of State Audit Capacity Technical Assistance Report Project Number: 47198-001 Capacity Development Technical Assistance (CDTA) November 2013 Mongolia: Development of State Audit Capacity The views expressed herein are those of

More information

INDONESIA RISING. Policy Priorities for 2010 and Beyond

INDONESIA RISING. Policy Priorities for 2010 and Beyond INDONESIA RISING. Policy Priorities for 2010 and Beyond Towards a Stable, Efficient, and Accessible Financial Sector Key Messages 1. The government s focus on maintaining and strengthening the stability

More information

Improving Financial Literacy of SMEs Through National Movement for Financial Transaction Records

Improving Financial Literacy of SMEs Through National Movement for Financial Transaction Records 2014/SMEWG39/015 Agenda Item: 11.2.2 Improving Financial Literacy of SMEs Through National Movement for Financial Transaction Records Purpose: Information Submitted by: Indonesia 39 th Small and Medium

More information

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN Terms of Reference for Consultants 1. BACKGROUND INFORMATION Government of Vanuatu has requested TA support in the formulation and preparation of a national infrastructure

More information

REQUIRED DOCUMENT FROM HIRING UNIT

REQUIRED DOCUMENT FROM HIRING UNIT Terms of Reference GENERAL INFORMATION Title: Event Management Consultant Project Name : Environment Unit/ Sustainable Development Financing (SDF) SIDA Funding Reports to: National Programme Manager Duty

More information

Mongolia: Social Security Sector Development Program

Mongolia: Social Security Sector Development Program Validation Report Reference Number: PVR196 Project Number: 33335 Loan Numbers: 1836 and 1837(SF) November 2012 Mongolia: Social Security Sector Development Program Independent Evaluation Department ABBREVIATIONS

More information

Title: Rabobank in developing countries Toon Bullens Number: 22

Title: Rabobank in developing countries Toon Bullens Number: 22 Title: Rabobank in developing countries Toon Bullens Number: 22 Rabobank was founded in the Netherlands more than a hundred years ago as a co-operative bank providing access to financial services for small

More information

METRICS FOR IMPLEMENTING COUNTRY OWNERSHIP

METRICS FOR IMPLEMENTING COUNTRY OWNERSHIP METRICS FOR IMPLEMENTING COUNTRY OWNERSHIP The 2014 policy paper of the Modernizing Foreign Assistance Network (MFAN), The Way Forward, outlines two powerful and mutually reinforcing pillars of aid reform

More information

Indonesia Financial Services Authority Brahma Setyowibowo

Indonesia Financial Services Authority Brahma Setyowibowo Indonesia Financial Services Authority Brahma Setyowibowo Any views, expressed in this presentation are those of the author, and are not the official views of the Indonesian FSA 1 Scheme of Presentation

More information

Cofinancing (US$M): c. Policy Areas: The policy areas included into the Program Document of the FIRM DPL were the following:

Cofinancing (US$M): c. Policy Areas: The policy areas included into the Program Document of the FIRM DPL were the following: Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted: 03/25/2015 Report Number: ICRR14675 Public Disclosure Authorized Public Disclosure Authorized Public

More information

ARIES. FINCA Program Brief No. 4 AFGHANISTAN. Agriculture, Rural Investment and Enterprise Strengthening Program in Afghanistan

ARIES. FINCA Program Brief No. 4 AFGHANISTAN. Agriculture, Rural Investment and Enterprise Strengthening Program in Afghanistan ARIES Agriculture, Rural Investment and Enterprise Strengthening Program in Afghanistan FINCA Program Brief No. 4 AFGHANISTAN The Financial Integration, Economic Leveraging, Broad-Based Dissemination Leader

More information

(1) PROJECT COORDINATOR (2) SENIOR EXPERT RESILIENCE

(1) PROJECT COORDINATOR (2) SENIOR EXPERT RESILIENCE TERMS OF REFERENCE bx (1) PROJECT COORDINATOR (2) SENIOR EXPERT RESILIENCE INCEPTION PHASE OF UNICEF RESILIENCE PROJECT IN SOMALIA This TOR is to support the process of hiring a consultant for the project

More information

Proposed Luxembourg-WHO collaboration: Supporting policy dialogue on national health policies, strategies and plans in West Africa

Proposed Luxembourg-WHO collaboration: Supporting policy dialogue on national health policies, strategies and plans in West Africa Proposed Luxembourg-WHO collaboration: Supporting policy dialogue on national health policies, strategies and plans in West Africa I. INTRODUCTION Effective national health systems require national health

More information

HLCM Procurement Network Procurement Process and Practice Harmonization in Support of Field Operations, Phase II

HLCM Procurement Network Procurement Process and Practice Harmonization in Support of Field Operations, Phase II HLCM Procurement Network Procurement Process and Practice Harmonization in Support of Field Operations, Phase II Introduction This Project proposal has been prepared by the HLCM Procurement Network (PN)

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857 Project

More information

Benchmarking Microfinance in Romania

Benchmarking Microfinance in Romania Benchmarking Microfinance in Romania 2006-2007 A report from Eurom Consultancy and Studies SRL for European Microfinance Network s Micro finance Conference Nice, France 2008 Bucharest Romania www.eurom-consultancy.ro

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: PHI 36419 TECHNICAL ASSISTANCE (Financed by the Japan Special Fund) TO THE REPUBLIC OF THE PHILIPPINES FOR PREPARING THE PROGRAM TO ACCELERATE SMALL AND MEDIUM ENTERPRISE FINANCING

More information

Fund for Gender Equality Monitoring and Evaluation Framework Executive Summary

Fund for Gender Equality Monitoring and Evaluation Framework Executive Summary Fund for Gender Equality Monitoring and Framework Executive Summary Primary Goal of the Monitoring and Framework The overall aim of this Monitoring and (M&E) Framework is to ensure that the Fund for Gender

More information

TERMS OF REFERENCE FOR INTERNATIONAL CONSULTANT

TERMS OF REFERENCE FOR INTERNATIONAL CONSULTANT TERMS OF REFERENCE FOR INTERNATIONAL CONSULTANT Title: Countries: Duration: Analysis and Advocacy for Child-Centred Budgeting Botswana, Lesotho, Namibia, South Africa and Swaziland 40 working days, spread

More information

Terms of Reference. Adviser (Health Spending Policy)

Terms of Reference. Adviser (Health Spending Policy) Terms of Reference Adviser (Health Spending Policy) DFAT Remuneration Framework: 1 Counterparts: Work Location: Reports to: Duration of inputs: Budget Source (AP# & Description): Spending Review (AP 9)

More information

Introduction. The Assessment consists of: A checklist of best, good and leading practices A rating system to rank your company s current practices.

Introduction. The Assessment consists of: A checklist of best, good and leading practices A rating system to rank your company s current practices. ESG / CSR / Sustainability Governance and Management Assessment By Coro Strandberg President, Strandberg Consulting www.corostrandberg.com September 2017 Introduction This ESG / CSR / Sustainability Governance

More information

May 8, 2006 INTRODUCTION

May 8, 2006 INTRODUCTION THE INDEPENDENT EVALUATION OFFICE OF THE INTERNATIONAL MONETARY FUND POSSIBLE TOPICS FOR EVALUATION OVER THE MEDIUM TERM May 8, 2006 INTRODUCTION This note identifies possible topics for evaluation by

More information

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE TOR - CONSULTANCY IC/2012/026. Date: 16 April 2012

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE TOR - CONSULTANCY IC/2012/026. Date: 16 April 2012 INDIVIDUAL CONSULTANT PROCUREMENT NOTICE IC/2012/026 TOR - CONSULTANCY Date: 16 April 2012 Position: Consultant - RESOURCE MOBILISATION STRATEGY 2012-2015 for UNCT ETHIOPIA Duty Station: Addis Ababa, Ethiopia

More information

FINANCE CONSULTANT FOR ASEAN COOPERATIVE PROJECT ON FINANCING MECHANISMS DESIGN FOR ENERGY EFFICIENCY AND CONSERVATION (EE&C) PROJECT IMPLEMENTATION

FINANCE CONSULTANT FOR ASEAN COOPERATIVE PROJECT ON FINANCING MECHANISMS DESIGN FOR ENERGY EFFICIENCY AND CONSERVATION (EE&C) PROJECT IMPLEMENTATION Call for Expert ASEAN Centre for FINANCE CONSULTANT FOR ASEAN COOPERATIVE PROJECT ON FINANCING MECHANISMS DESIGN EFFICIENCY AND CONSERVATION (EE&C) PROJECT IMPLEMENTATION About ACE Established on 1 January

More information

III. modus operandi of Tier 2

III. modus operandi of Tier 2 III. modus operandi of Tier 2 Objective, country and project eligibility 70 Budget and timing 71 Project preparation: formulation of proposals 71 Project appraisal 72 Project approval 73 Agreements and

More information

Action 3: Development of extension materials of rights and duties on land and forest resources at village level

Action 3: Development of extension materials of rights and duties on land and forest resources at village level Annex 5 Outline of Work Plan for Inception Phase (draft) During the inception phase the project will mostly focus on three important works as follows; 1) Preparation of MAF 5 year and Annual FS 2020 Implementation

More information