Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Size: px
Start display at page:

Download "Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No. PID6725 Project Name Indonesia-Urban Poverty Project (+) Region Sector Project ID Implementing Agency East Asia and Pacific Urban IDPE55821 Date PID Prepared August 11, 1998 Projected Appraisal September 7, 1998 Projected Board Approval Date October 5, 1998 Background BAPPENAS (National Development Planning Agency) and PMDs (Directorate General of Community Development) at kecamatan level 1. Country and Sector Background The banking sector in Indonesia collapsed following the July 1997 collapse of the Thailand financial system. Enterprises that relied on credit can no longer obtain it to finance their working capital, and this has led to a vicious circle of lay offs and loss of purchasing power both by employeesconsumers and by enterprises. In addition, severe drought in many places affected rural livelihoods. Thus, many urban residents returned to their rural roots, and rural migration to cities increased - when both urban and rural areas were hard placed to sustain additional people, let alone the standard numbers. The foreign exchange crisis exacerbated the problem, and more recently, the social unrest made it even worse. The pre-crisis unemployment estimates were very low, less than 2% - though there was substantial underemployment. Earlier in 1998, from a 91 million labor force, the potential for open urban unemployment was estimated at some 14 million (15%), and the potential for under-employment was estimated at 45% by the Indonesian Federation of Workers. The pre-crisis number of urban "absolute" poor was estimated at 7 million, at a 10% incidence (and 15 million in rural areas, 12%). To this now should be added perhaps another 7 million who hovered over the poverty line but are now under it, and an unknown number of people-- maybe another 7 million - who had higher incomes but lost. The larger cities are the most affected, in terms of concentration of lost jobs, but it is possible that overall the unemployed are dispersed and their numbers are also high in the many smaller cities and towns. The Government strategy to cope with the crisis included assistance first to the rural areas with new income opportunities and encourage temporary urban residents who lost their job to leave. In particular, the Government provided some new credit programs and continued with other rural programs. The Bank's Village Infrastructure Project coverage was doubled to 3000 villages in 1998/9 (taking over financing of the government's share). The Kecamatan (subdistrict) Development Project was approved by the Board June 2 and is expected to assist 250 kecamatans in FY99, fitting current needs. Two Bank

2 financed agricultural projects are being restructured to allow more participatory, small infrastructure construction and income generating activities. In the urban areas, the Government implemented quickly with its own resources: a) a labor intensive program (padat karya) to undertake small works that were already in the municipal plans; from December 1997 to May 1998 it spent some Rp7O billion on this program and is estimated to have employed some 4 million persons at Rp7,500 per day in the first 2 months. b) subsidy programs for necessities. The subsidy ensured that a food distribution program (operasi pasar) provide rice, sugar and cooking oil at pre-crisis prices, and food coupons for free meals. It also subsidized medicines and ensured supplies. The Government avoided fuel price increases at a time of income loss. More recently, school fees have been waived. To provide relief to the urban areas, the Bank a) amended on-going urban loans to assist with further labor intensive works, to be managed by the Directorate General of Urban Settlements. b) proposed this new urban poverty project; In March 1998 a project concept note was sent to Bappenas, which has endorsed the concept. 2. Objectives. The objective of the proposed urban poverty project is to improve poor urban neighborhoods and to provide income to poor urban residents who a) have lost their jobs or sources of income in the economic crisis, b) have income eroded by high inflation; or c) are "long term" poor. 3. Description. The proposed project will provide funding for small public infrastructure works as well as economic activities in urban areas, by demand from community groups. The menu will be open except for a negative list (e.g., arms, harmful drugs, depositing project funds in banks to earn interest, land acquisition). Activities such as urban agriculture and group training in communities are encouraged. Funds for small public infrastructure works will be on a grant basis. Funds for economic activities have to be repaid within a year, with a 2t per monthly interest rate and a repayment schedule reflecting the cash flow of the financed activity. 4. Financing. The proposed loan is US$ 100 million. GOI will provide US$ 10 million as counterpart financing. 5. Implementation. The project will begin in the 40 districts in the northern half of Java, where most of the dense urban areas and urban poor are located. Starting in year 2, funds will also be available to other areas. Provincial governments will select the poorest kecamatans and local governments will select the poorest kelurahans in selected kacamatans. A Kelurahan Forum (KF) will be established consisting of representatives of the communities. Community groups will prepare subproject proposals, which will be evaluated and approved by the KF. Grants to the kelurahans would be authorized by the local treasury office with presentation of the project implementation agreement. The agreement has to be signed by the representatives of the community group and the KF, the project manager from -2 -

3 PMD, and the oversight consultant, who is to ensure quality and compliance with project guidelines. Overall coordination, management, budgeting and monitoring responsibilities will be carried out by a Secretariat in Bappenas, under the regional development deputy. An interministerial coordination committee, chaired by Bappenas, would resolve coordination problems. The PMDs at kecamatan level will be the implementation agencies. They will preselect poor kelurahans and poor RWs, and provide information and fliers on the project at the neighborhood level. Three levels of TA for implementation are anticipated: a) The Secretariat at Bappenas will be strengthened by a team of management consultant to assist with the management, organization, monitoring, etc. b) a consultant firm will be selected for each of West, Central and East Java and Jakarta for the first project year, to establish an oversight consultant team in each of the 6 municipalities in each province. This team is to approve, and help design if necessary, the proposals made by the community groups, and supervise implementation progress to certify payment requests. c) facilitators will be selected and trained for 6 months by the oversight consultants in the first year. The facilitators should come from nearby the districts that they are to assist. They will first disseminate information about the project, then help identified groups prepare proposals, and after approval of proposals, assist with implementation as may be needed. After 6 months, the facilitators would be selected by each group making a proposal for development of its concept. 6. Sustainability. Unlike the VIPs and KDP, which were designed with a long term approach, the proposed project has important but limited term objectives: provide people with immediate relief, with purchasing power in a better way than simply distributing cash. It may be that lessons are learnt that can be used to deal more permanently with urban poverty reduction: for instance, in the promotion of urban agriculture, assistance to improve housing, credits in the absence of a functioning banking system, etc. 7. Lessons Learned from Past Operations in the Country/Sector. The various social funds and similar projects undertaken in the Bank have been reviewed and their lessons taken into account. Furthermore, the characteristics of the Indonesian society have been taken into account in designing the project - their spatial and social structures, customs such as gotong royong (community work), informal safety nets and cooperative systems; the available skills; the current bleak situation. The government structure also has been taken into account: it has a hierarchy that facilitates dissemination of information, so that a "model" can quickly be replicated across many cities. This allows a relatively large project to be implemented through small parallel, independent and varied subprojects - by establishing standard criteria, allowing demand driven solutions at each location, proceeding through relatively small assistance "units". For this to work, the basic organization needs to be relatively centralized, as does the monitoring. 8. Poverty Category. This project is considered part of the Program of -3 -

4 Targeted Interventions. 9. Environmental and Social Aspects. Environment Category B is proposed. Works under the project are expected to be small-scale and should enhance the environment. The environmental guidelines developed for the Municipal Innovations Project will be used. Urban renewal and upgrading will be encouraged, rather than moving people out of their neighborhoods, and little involuntary resettlement is expected. Standard guidelines have been prepared. 10. Program Objective Categories. The categories that this project supports are poverty alleviation and environmentally sustainable development. 11. Benefits. The benefits would be provision of some purchasing power and creation of jobs from community improvements (small public works and improvements tend to have high economic returns), food production, and creation of small businesses and of skills through training. Returns from these activities by the poor are normally good and have shown high repayment rates. The target group may comprise some 15 million poor people. 12. Risks. Major risks consist of improper use of funds, lack of market for economic activities, inconsistent incentives among various poverty programs, and lack of counterpart funds. Risk minimization measures include penalties for misuse of funds, wide public disclosure about availability and uses of funds, outside reviews and audits, assistance to poor to focus on marketable products, assistance to Bappenas to monitor all on-gong poverty programs and ensure consistency among them. 13.Contact Point: The InfoShop The World Bank 1818 H Street, N.W. Washington, D.C Telephone No. (202) Fax No. (202) Note: This is information on an evolving project. Certain activities and/or components may not be included in the final project. Processed by the InfoShop week ending August 14,

5 Annex Because this is a Category B project, it may be required that the borrower prepare a separate EA report. If a separate EA report is required, once it is prepared and submitted to the Bank, in accordance with OP 4.01, Environmental Assessment, it will be filed as an annex to the Public Information Document (PID). If no separate EA report is required, the PID will not contain an EA annex; the findings and recommendations of the EA will be reflected in the body of the PID.

REVOLVING LOAN FUND CAPACITY BUILDING AND SUSTAINABILITY PROJECT

REVOLVING LOAN FUND CAPACITY BUILDING AND SUSTAINABILITY PROJECT REVOLVING LOAN FUND CAPACITY BUILDING AND SUSTAINABILITY PROJECT World Bank PNPM Support Facility (PSF) Gedung Bursa Efek Indonesia Tower 1, lantai 9 Jl. Jenderal Sudirman Kav. 52-53, Jakarta 12190 Ph:

More information

PNPM SUPPORT FACILITY (PSF) Project Proposal

PNPM SUPPORT FACILITY (PSF) Project Proposal PNPM SUPPORT FACILITY (PSF) Project Proposal Project Title: Objective: Executing Agency: Estimated Duration: Estimated Budget: Geographic Coverage: Implementation Arrangements: PNPM Mandiri Revolving Loan

More information

PROJECT APPRAISAL DOCUMENT ONA PROPOSED CREDIT (US$100 MILLION EQUIVALENT) TO THE REPUBLIC OF INDONESIA FOR AN URBAN POVERTY PROJECT.

PROJECT APPRAISAL DOCUMENT ONA PROPOSED CREDIT (US$100 MILLION EQUIVALENT) TO THE REPUBLIC OF INDONESIA FOR AN URBAN POVERTY PROJECT. Public Disclosure Authorized Document of The World Bank ReportNo: 18359-IND Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT APPRAISAL DOCUMENT ONA PROPOSED

More information

Development Credit Agreement. (Urban Poverty Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL DEVELOPMENT ASSOCIATION. Dated May 28, 1999

Development Credit Agreement. (Urban Poverty Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL DEVELOPMENT ASSOCIATION. Dated May 28, 1999 Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 3210 IND Public Disclosure Authorized Development Credit Agreement (Urban Poverty Project) between REPUBLIC OF INDONESIA and Public Disclosure

More information

State Secretariat for Planning, Science and Technology (SEPLAN)

State Secretariat for Planning, Science and Technology (SEPLAN) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower Implementing Agency Report No. PID10306

More information

Republic of Indonesia Indonesia. [ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) Category Date PID Prepared December 4, 2006

Republic of Indonesia Indonesia. [ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) Category Date PID Prepared December 4, 2006 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE (SCL-4198; WBTF28362) LOAN/GEF GRANT

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE (SCL-4198; WBTF28362) LOAN/GEF GRANT Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 30244 Public Disclosure Authorized PROJECT COMPLETION NOTE (SCL-4198; WBTF28362) ON A LOAN/GEF GRANT Public Disclosure

More information

Fisheries & Food (SAGPyA)

Fisheries & Food (SAGPyA) Report No. PID7776 Project Name Argentina-Sustainable Fisheries (+) Management Project Region Sector Project ID Latin America and the Caribbean AF, SE ARLL57459 Estimated Project Cost: $6.5 million Expected

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857 Project

More information

Kecamatan Development Program M a y 2002

Kecamatan Development Program M a y 2002 Kecamatan Development Program Brief Overview M a y 2002 Introduction The Kecamatan Development Program (KDP) is a Government of Indonesia effort to alleviate poverty in rural communities and improve local

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Project Name Region Sector Project ID Implementing Agency Report No. PIC908 West Bank and Gaza-Emergency Rehabilitation Project (& Middle East and North Africa Non-Sectoral XOPA34112 Date prepared May

More information

Project Name KIAT GURU: KINERJA DAN AKUNTABILITAS GURU - IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY

Project Name KIAT GURU: KINERJA DAN AKUNTABILITAS GURU - IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC56822

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6515 Afghanistan New Market Development Project

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6515 Afghanistan New Market Development Project Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report.: AB6515 Afghanistan New Market Development Project Region SOUTH ASIA Sector General industry and trade sector (100%) Project ID P118053

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Report No. PID6809 Project Pakistan-Punjab Municipal Development (+) Fund Project Region Sector Project ID Borrower Implementing Agencies South Asia Urban PKPE55293 Government of Pakistan (GOP) Date PID

More information

to ensure that the urban poor in participating Kelurahans benefit from improved socio -economic and local governance conditions.

to ensure that the urban poor in participating Kelurahans benefit from improved socio -economic and local governance conditions. Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number: ICRR14905 1. Project Data: Date Posted: 06/02/2016 Public Disclosure Authorized Public Disclosure Authorized Public

More information

AFRICA. Investment Project Financing P Federal Ministry of Finance

AFRICA. Investment Project Financing P Federal Ministry of Finance Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA24330 Project Name

More information

Project Name Philippines-Local Government Finance & Development Project (LOGOFIND)

Project Name Philippines-Local Government Finance & Development Project (LOGOFIND) Public Disclosure Authorized Report No. PID4841 Project Name Philippines-Local Government Finance (@+)... & Development Project (LOGOFIND) Region East Asia and Pacific Region Sector UY - Other Urban Development

More information

Initial Project Information Document (PID) Report No: AB484. INDONESIA - Domestic Gas Sector Restructuring Region. Project Name

Initial Project Information Document (PID) Report No: AB484. INDONESIA - Domestic Gas Sector Restructuring Region. Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Initial Project Information Document () Report No: AB484 Project Name INDONESIA - Domestic

More information

Table 1 the Road Network of Mozambique (in kilometers)

Table 1 the Road Network of Mozambique (in kilometers) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2867 Roads

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name. Wenchuan Earthquake Recovery Project Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name. Wenchuan Earthquake Recovery Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name Wenchuan

More information

[ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) [ ] S 1 [X ] S 2 [ ] S 3 [ ] S F [ ] TBD (to be determined)

[ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) [ ] S 1 [X ] S 2 [ ] S 3 [ ] S F [ ] TBD (to be determined) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PUBLIC DISTRIBUTION PROJECT INFORMATION DOCUMENT (PID) Project Name Iraq: Emergency School

More information

6-8 September 2011, Manila, Philippines. Jointly organized by UNESCAP and BANGKO SENTRAL NG PILIPINAS. Country Experiences 3: Net Energy Exporters

6-8 September 2011, Manila, Philippines. Jointly organized by UNESCAP and BANGKO SENTRAL NG PILIPINAS. Country Experiences 3: Net Energy Exporters High-level Regional Policy Dialogue on "Asia-Pacific economies after the global financial crisis: Lessons learnt, challenges for building resilience, and issues for global reform" 6-8 September 2011, Manila,

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Health Sector Support Project

More information

EAST ASIA AND PACIFIC. Investment Project Financing P People's Republic of China

EAST ASIA AND PACIFIC. Investment Project Financing P People's Republic of China Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA31584 Project Name

More information

PROJECT INFORMATION DOCUMENT

PROJECT INFORMATION DOCUMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name: Region: Sector: Task Manager: Project ID Number: Borrower: Guarantor: Implementing

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social Welfare and Development Reform

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social Welfare and Development Reform Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Project Name Region Sector Project ID Borrower Report No. PIC2827 Latvia-Welfare Reform Project (@) Europe and Central Asia Social Sector Adjustment LVPA35807 Republic of Latvia

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/27/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

CIA. Loan Agreement. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

CIA. Loan Agreement. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized CIA LOAN NUMBER 3888-IND Public Disclosure Authorized Loan Agreement Public Disclosure Authorized (Village Infrastructure Project for Java) between REPUBLIC OF INDONESIA and

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No. PID8347 Project Name Indonesia-Western Java Environmental (@) Management Project

More information

Planning, Budgeting and Financing

Planning, Budgeting and Financing English Version Planning, Budgeting and Financing Post-Disaster Recovery and Reconstruction Activities in Khammouane Province, Lao PDR Developed under the Khammouane Development Project (KDP), Implemented

More information

Money Matters: Designing Effective CDD Disbursement Mechanisms

Money Matters: Designing Effective CDD Disbursement Mechanisms Money Matters: Designing Effective CDD Disbursement Mechanisms One of the key challenges associated with Community Driven Development (CDD) approaches is how to disburse funds to communities in an efficient

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

More information

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE July 21, 2017 Report No.: MG Public Finance Sustainability and Investment II DPO

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE July 21, 2017 Report No.: MG Public Finance Sustainability and Investment II DPO Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE July 21, 2017 Report No.: 120763 Operation

More information

Indonesia s Kecamatan Development Program: A Large-Scale Use of Community Development to Reduce Poverty

Indonesia s Kecamatan Development Program: A Large-Scale Use of Community Development to Reduce Poverty Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized A case study from Reducing Poverty, Sustaining Growth What Works, What Doesn t, and Why

More information

Updated Project Information Document (PID) Report No: AB894

Updated Project Information Document (PID) Report No: AB894 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Theme Project Borrower(s) Implementing Agency(ies) Environment

More information

SUPPLEMENTARY DOCUMENT 3: THE PROPOSED NATIONAL COMMUNITY-DRIVEN DEVELOPMENT PROGRAM 1

SUPPLEMENTARY DOCUMENT 3: THE PROPOSED NATIONAL COMMUNITY-DRIVEN DEVELOPMENT PROGRAM 1 KALAHI CIDSS National Community-Driven Development Project (RRP PHI 46420) SUPPLEMENTARY DOCUMENT 3: THE PROPOSED NATIONAL COMMUNITY-DRIVEN DEVELOPMENT PROGRAM 1 A. Program Objective and Outcomes 1. The

More information

Development Credit Agreement

Development Credit Agreement Public Disclosure Authorized NEGOTIATED TEXT June 2, 2003 CREDIT NUMBER -IND Public Disclosure Authorized Development Credit Agreement (Third Kecamatan Development Project) between Public Disclosure Authorized

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Russia

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA5305. Project Name. Parent Project Name. Region Country Sector(s) Theme(s)

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA5305. Project Name. Parent Project Name. Region Country Sector(s) Theme(s) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Parent Project Name Region Country Sector(s) Theme(s) Lending Instrument

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project Region EUROPE AND CENTRAL ASIA Sector Roads and highways (70%);Railways

More information

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Project Information Document Report No. PID8416 Turkey-Marmara Earthquake

More information

Project Information Document/ Identification/Concept Stage (PID)

Project Information Document/ Identification/Concept Stage (PID) Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated:

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB1710 Leader

More information

Draft Terms of Reference. Mozambique Climate Change Technical Assistance Project

Draft Terms of Reference. Mozambique Climate Change Technical Assistance Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1. Background Context Draft Terms of Reference Mozambique Climate Change Technical Assistance

More information

Money Matters: Designing Effective CDD Disbursement Mechanisms

Money Matters: Designing Effective CDD Disbursement Mechanisms Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOCIAL DEVELOPMENT HOW TO SERIES vol. 4 February 2008 Money Matters: Designing Effective

More information

MANAGING THE CRISIS. Establishing a Vulnerability Monitoring and Social Assistance Response System in Indonesia.

MANAGING THE CRISIS. Establishing a Vulnerability Monitoring and Social Assistance Response System in Indonesia. MANAGING THE CRISIS Establishing a Vulnerability Monitoring and Social Assistance Response System in Indonesia Viviyulaswati@bappenas.go.id Ministry of National Development Planning/BAPPENAS The Republic

More information

CONFORMED COPY LOAN NUMBER 4100 IND LOAN NUNMBER 4100 IND

CONFORMED COPY LOAN NUMBER 4100 IND LOAN NUNMBER 4100 IND Public Disclosure Authorized Loan Agreement CONFORMED COPY LOAN NUMBER 4100 IND Public Disclosure Authorized (Second Village Infrastructure Project) between REPUBLIC OF INDONESIA and INTERNATIONAL BANK

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4152 Second Madhya Pradesh District Poverty Initiatives Project Project Name

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4152 Second Madhya Pradesh District Poverty Initiatives Project Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4152 Second Madhya Pradesh

More information

The Urban Poverty Project - Indonesia: Lessons from the first Seven Years

The Urban Poverty Project - Indonesia: Lessons from the first Seven Years The Urban Poverty Project - Indonesia: Lessons from the first Seven Years George Soraya and Ani Dasgupta May 10, 2007, New Delhi, Jakarta and Washington DC UPP starts as a response to the crisis Starts

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/15/2010 1. Basic Project Data Original

More information

Loan Agreement. (Bengkulu Regional Development Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Loan Agreement. (Bengkulu Regional Development Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 4290 IND Public Disclosure Authorized Loan Agreement (Bengkulu Regional Development Project) between REPUBLIC OF INDONESIA and INTERNATIONAL BANK

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Report No. PID8369 Tanzania-Social Action Fund Project Africa Regional Office Social Funds & Social Assistance TZPE65372 GOT

More information

11TH BEST PRACTICE IN CITIZENS PARTICIPATION Award

11TH BEST PRACTICE IN CITIZENS PARTICIPATION Award A. BASIC INFORMATION: Title of the experience : OPTIMIZING E-MUSRENBANG TO SUPPORT PARTICIPATORY-BASED DEVELOPMENT PLANNING Name of city/region : SURABAYA Promoting entity: Country: INDONESIA Starting

More information

Providing Social Protection and Livelihood Support During Post Earthquake Recovery 1

Providing Social Protection and Livelihood Support During Post Earthquake Recovery 1 Providing Social Protection and Livelihood Support During Post Earthquake Recovery 1 A Introduction 1. Providing basic income and employment support is an essential component of the government efforts

More information

Preliminary Damage and Loss Assessment

Preliminary Damage and Loss Assessment The 15th Meeting of The Consultative Group on Indonesia Jakarta, June 14, 2006 Yogyakarta and Central Java Natural Disaster A Joint Report from BAPPENAS, the Provincial and Local Governments of D.I.Yogyakarta,

More information

INDEPENDENT EVALUATION GROUP UKRAINE COUNTRY ASSISTANCE EVALUATION (CAE) APPROACH PAPER

INDEPENDENT EVALUATION GROUP UKRAINE COUNTRY ASSISTANCE EVALUATION (CAE) APPROACH PAPER Country Background INDEPENDENT EVALUATION GROUP UKRAINE COUNTRY ASSISTANCE EVALUATION (CAE) APPROACH PAPER April 26, 2006 1. Ukraine re-established its independence in 1991, after more than 70 years of

More information

Loan Agreement. (Third National Program for Community Empowerment in Urban Areas) between REPUBLIC OF INDONESIA. and

Loan Agreement. (Third National Program for Community Empowerment in Urban Areas) between REPUBLIC OF INDONESIA. and Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7866-ID Public Disclosure Authorized Loan Agreement (Third National Program for Community Empowerment in Urban Areas) between Public Disclosure Authorized

More information

Nicaragua-Pension and Financial Market Reform Technical Assistance Credit

Nicaragua-Pension and Financial Market Reform Technical Assistance Credit Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category Report No. PID8081 Nicaragua-Pension and Financial Market (@) Reform Technical Assistance Credit Latin America

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second Additional Financing to Road Rehabilitation & Maintenance Project Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second Additional Financing to Road Rehabilitation & Maintenance Project Region Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Second Additional Financing to Road Rehabilitation & Maintenance Project Region AFRICA Sector Roads and highways (100%) Project ID P120723

More information

EAST ASIA AND PACIFIC. Indonesia

EAST ASIA AND PACIFIC. Indonesia Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA853 Project Name HCFC

More information

Decision The decision review meeting, held on November 26, 2012 authorized the team to continue with appraisal and negotiation.

Decision The decision review meeting, held on November 26, 2012 authorized the team to continue with appraisal and negotiation. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA798 Project Name TURKEY

More information

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE November 16, 2016 Report No:

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE November 16, 2016 Report No: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE November 16, 2016 Report No: 111025

More information

Primary Health; Including Reproductive Health; Chi

Primary Health; Including Reproductive Health; Chi Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency Report No. PID9659 China-Tuberculosis Control Project East Asia and Pacific

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Report No. PID11533 WEST BANK AND GAZA-Emergency Municipal... Services

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4270 Health Transformation and Social Security Reform Project.

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4270 Health Transformation and Social Security Reform Project. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4270 Health

More information

Loan Agreement. (Third National Program for Community Empowerment in Rural Areas) between REPUBLIC OF INDONESIA. and

Loan Agreement. (Third National Program for Community Empowerment in Rural Areas) between REPUBLIC OF INDONESIA. and Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7867-ID Public Disclosure Authorized Loan Agreement (Third National Program for Community Empowerment in Rural Areas) between Public Disclosure Authorized

More information

RESTRUCTURING PAPER ON A

RESTRUCTURING PAPER ON A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: 63424-AR PROPOSED PROJECT

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Productive Initiatives For Solidarity Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Productive Initiatives For Solidarity Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5534 Project Name Productive

More information

OFFICIAL DOCUMENTS. The World Bank. Public Disclosure Authorized. Public Disclosure Authorized

OFFICIAL DOCUMENTS. The World Bank. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized OFFICIAL DOCUMENTS The World Bank 1818 H Street N.W. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL

More information

REPORT OF THE SELECT COMMITTEE ON FINANCE ON THE PROVINCIAL TREASURIES EXPENDITURE REVIEW FOR THE 2014/15 FINANCIAL YEAR, DATED 14 OCTOBER 2015

REPORT OF THE SELECT COMMITTEE ON FINANCE ON THE PROVINCIAL TREASURIES EXPENDITURE REVIEW FOR THE 2014/15 FINANCIAL YEAR, DATED 14 OCTOBER 2015 REPORT OF THE SELECT COMMITTEE ON FINANCE ON THE PROVINCIAL TREASURIES EXPENDITURE REVIEW FOR THE 2014/15 FINANCIAL YEAR, DATED 14 OCTOBER 2015 1. Introduction and Background The Select Committee on Finance

More information

PRESENTATION TO WORLD BANK-DSF GOVERNMENT COMMUNITY DEVELOPMENT OPERATIONS: MICROFINANCE / MICROCREDIT PROJECTS

PRESENTATION TO WORLD BANK-DSF GOVERNMENT COMMUNITY DEVELOPMENT OPERATIONS: MICROFINANCE / MICROCREDIT PROJECTS 1 PRESENTATION TO WORLD BANK-DSF GOVERNMENT COMMUNITY DEVELOPMENT OPERATIONS: MICROFINANCE / MICROCREDIT PROJECTS July 20, 2007 2 Introduction and Background 3 Background: 14 large government community

More information

Development Credit Agreement

Development Credit Agreement Public Disclosure Authorized CONFORMED COPY Public Disclosure Authorized Public Disclosure Authorized CREDIT NUMBER 4063-IND Development Credit Agreement (Third Urban Poverty Project) between REPUBLIC

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: INO 34149 TECHNICAL ASSISTANCE (Financed from the Japan Special Fund) TO THE REPUBLIC OF INDONESIA FOR PREPARING THE SECOND DECENTRALIZED HEALTH SERVICES PROJECT November 2001

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: Health Sector Enhancement Project Additional Financing

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: Health Sector Enhancement Project Additional Financing Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 59729 Health

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Bhutan Second Rural Access

More information

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE September 30, 2017 Report No.:

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE September 30, 2017 Report No.: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE September 30, 2017 Report No.: 120338

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/24/2007 INTEGRATED SAFEGUARDS DATASHEET

More information

DRAFT FOR CONSULTATION OCTOBER 7, 2014

DRAFT FOR CONSULTATION OCTOBER 7, 2014 DRAFT FOR CONSULTATION OCTOBER 7, 2014 Information Note 1: Environmental and Social Risk Classification The Board has requested the release of this document for consultation purposes to seek feedback on

More information

Project Name Comoros-Health Project... (Previously Second Human Resources Project)

Project Name Comoros-Health Project... (Previously Second Human Resources Project) Report No. PID5951 Project Name Comoros-Health Project... (Previously Second Human Resources Project) Region Sector Project ID Borrower Implementing Agency Africa Basic Health KMPE52887 Government of Comoros

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No. PID7125 Project Name Argentina-Special Structural Adjustment... Loan (SSAL)

More information

COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) APPRAISAL STAGE

COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS)

More information

ON A PROPOSED LOAN TO THE REPTJBLIC OF INDONESIA FORA APRIL 21, 1998

ON A PROPOSED LOAN TO THE REPTJBLIC OF INDONESIA FORA APRIL 21, 1998 Public Disclosure Authorized Document of The World Bank Report No.: 17397 IND Public Disclosure Authorized PROJECT APPRAISAL DOCUMENT ON A PROPOSED LOAN Public Disclosure Authorized IN THE AMOUNTT OF US$225

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/26/2009 INTEGRATED SAFEGUARDS DATASHEET

More information

Design and Implementation of Public Works Programs through Social Funds

Design and Implementation of Public Works Programs through Social Funds Design and Implementation of Public Works Programs through Social Funds BY CECILIA V. COSTELLA AND IDA MANJOLO * Social funds (SFs) aim to alleviate poverty by creating and upgrading social and economic

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC695 Project Name DO

More information

1. Key development issues and rationale for Bank involvement

1. Key development issues and rationale for Bank involvement Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DRAFT PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5278 Project Name

More information

Mainstreaming climate change adaptation in development: JICA Project in Indonesia as a case

Mainstreaming climate change adaptation in development: JICA Project in Indonesia as a case Mainstreaming climate change adaptation in development: JICA Project in Indonesia as a case Asia-Pacific Climate Change Adaptation Forum 2014 Masato Kawanishi Senior Advisor, JICA 1 Project of Capacity

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC10930 Project Name Financial

More information

Japanese ODA Loan. Ex-ante evaluation

Japanese ODA Loan. Ex-ante evaluation Japanese ODA Loan Ex-ante evaluation 1. Name of the Program Country: The Republic of Indonesia Project name: Connectivity Development Policy Loan Loan Agreement December 2, 2013 Loan Amount: 19,848 million

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Project Name Region Sector Project ID Borrower(s) Report No. PID5794 Lebanon-Municipal Infrastructure Project (@+) Middle East and North Africa Region Other Urban Development LBPE50544 Lebanese Republic

More information

Fiscal Transparency and Public Contingent Liabilities

Fiscal Transparency and Public Contingent Liabilities Fiscal Transparency and Public Contingent Liabilities Lessons from Cross-Country Experiences Sudarshan Gooptu Lead Economist Poverty Reduction and Economic Management Sector Unit East Asia and Pacific

More information

FINAL EVALUATION VIE/033. Climate Adapted Local Development and Innovation Project

FINAL EVALUATION VIE/033. Climate Adapted Local Development and Innovation Project FINAL EVALUATION VIE/033 Climate Adapted Local Development and Innovation Project PROJECT SUMMARY DATA Country Long project title Short project title LuxDev Code Vietnam Climate Adapted Local Development

More information

INDONESIA EMPLOYMENT POLICIES: PROBLEMS AND CHALLENGES

INDONESIA EMPLOYMENT POLICIES: PROBLEMS AND CHALLENGES INDONESIA EMPLOYMENT POLICIES: PROBLEMS AND CHALLENGES Rahma Iryanti Deputy Minister for Poverty, Labor, and SMEs National Development Planning Agency 24 February 2015 BACKGROUND From 2005 to 2014, Indonesia

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE. I. Basic Information Date prepared/updated: 12/13/2006

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE. I. Basic Information Date prepared/updated: 12/13/2006 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 12/13/2006 INTEGRATED SAFEGUARDS DATASHEET

More information

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Strengthening DAK Transfers To Local Governments Region

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Strengthening DAK Transfers To Local Governments Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Program Name

More information

PROJECT DOCUMENT. Capacity Building for the Management of Road Assets at District Level in Aceh

PROJECT DOCUMENT. Capacity Building for the Management of Road Assets at District Level in Aceh 2 o o PROJECT DOCUMENT Creating Jobs: Capacity Building for Local Resourcebased Road Works in Selected Districts in NAD UNDP/ILO Project INS/51/071 Phase III Capacity Building for the Management of Road

More information