Project Delivery Manual Overview Introduction 2007
|
|
- Mariah Burns
- 6 years ago
- Views:
Transcription
1 Project Delivery Manual Overview Introduction 2007
2 Project Delivery Manual Introduction Where do projects come from? How do they get in the Highway Program? Once they are in the Program, what do we do with them?
3 Highway Needs Study It [the department] shall undertake a continuing study of needs of the various highways.. RS 8:228
4 Highway Needs Study DISTRIBUTION OF 2006 NEEDS BY CATEGORY PRESERVATION $2.914 BILLION 20.8% Total = BILLION TOTAL = $ BILLION SAFETY (GEOMETRICS) $3.249 BILLION 23.2% CAPACITY $7.837 BILLION 56.0%
5 Millions of Dollars Highway Needs Trend $16,000 $14,000 $12,000 $10,000 $8,000 $6,000 $4,000 $2,000 $ Preserv Safety Capacity
6 Millions of Dollars Highway Needs vs. Available Funding $14,000 $12,000 $10,000 $14,000 M Resources = 3% of Needs $8,000 $6,000 $4,000 $2,000 $0 Needs $400 M Resources
7 Qualitative-Based Needs Needs identified through customer input Public - State and Local Elected Officials Metropolitan Planning Organizations Regional/Local Planning Officials Business/Civic Organizations State Agencies -Federal Agencies Often based on qualitative considerations Economic growth -Connectivity Quality of Life -Evacuation
8 Demand for Resources Preservation, Safety, and Capacity Needs Operations Needs (assessment techniques under development) Qualitative-Based Needs (connectivity, economic growth, quality of life) Mega Projects (I-49 North, I-49 South, LA 1, LA 28, etc.)
9 Budget Partition In fixing priorities, the department shall consider primarily the condition of roads, streets, and structures making up the state highway system.. RS 8:229
10 SYSTEM PRESERVATION TOTAL CONSTRUCTION BUDGET ADDITIONAL CAPACITY/NEW INFRASTRUCTURE TRAFFIC SAFETY OPERATIONS/ MOTORIST SERVICES
11 Budget Partition FY Sys Preservation $ 273 M Ops/Motor. Serv $ 26 M Safety $ 29 M Add. Capacity - Discretionary $ 62 M - Corridors $ 10 M Total $ 400 M Enhancements $ 8 M TIMED $ 830 M Urban Areas $ 36 M High Priority / Bond / Misc. $ 130 M Grand Total $1,404 M
12 Budget Sub-Partition System Preservation Pavement Pres. (non-interstate) $112 M Pavement Pres. (non-interstate NFA) $ 28 M Pavement Pres. (Interstate) $ 45 M Bridge Pres. (on-system) $ 73 M Bridge Pres. (off-system) $ 15 M Total $273 M
13 Budget Sub-Partition Operations/Motorist Services ITS $ 9.9 M Traffic Control Devices $ 7.5 M Roadway Flooding $ 3.0 M Weigh Stations $ 1.5 M Rest Areas $ 0.0 M Ferries Operating Budget Movable Bridge Preventive Maintenance $ 0.5 M Interstate Lighting $ 1.0 M TSM $ 2.5 M Total $25.9 M
14 Overview of the DOTD Highway Project Selection Process How are projects prioritized and selected? DOTD District and MPO officials rank projects based on: Technical analyses -Customer input Project Selection Teams make the final selections based on: District Recommendations -Technical analyses Customer input -Available funding
15 Overview of the DOTD Highway Project Selection Process Who are on these Project Selection Teams? People with expertise in certain fields: - DOTD Headquarters Officials - Representatives from other state agencies - DOTD District Officials (in a few cases) - Representatives from Federal, local, & private-sector associations (in a few cases)
16 Overview of the DOTD Highway Project Selection Process Then What Happens?
17 Overview of the DOTD Highway Project Selection Process Recommended (selected) projects assembled into proposed Highway Program Proposed Highway Program submitted to House & Senate Transportation Committees Joint Transportation Committee holds public hearings throughout state Final decision on Highway Program rests with House & Senate Trans. Committees and ultimately full Legislature
18 Project Delivery System Highway Program approved by Legislature Must have orderly process to move each project through preconstruction, construction, and into post-construction PD System is intended to overcome historic problems maintaining scope, schedule, and budget Relies heavily on strong Project Manager (s) taking charge on individual projects Program Managers oversee the various project categories (safety, capacity, etc.) At a glance, people know where any given project is in the overall process
19 DOTD Project Delivery Process Elected Officials MPO Long Range Plan Districts Public Stage 0: Feasibility One Year Stage 1: Planning/Environmental Process One One to to Two Two Years Years Stage 2: Funding Stage 2: Funding & Project Prioritization Indefinite Period Feasibility Analysis of the Proposed Project REJECT Detailed Planning & Environmental Analysis Funding Allocation for Design & Construction Stage 3: Final Design Process One One to to Three Three Years Years Stage 4: 4: Letting One Year Stage 5: Construction One to Three Years Stage 6: 6: Operation Indefinite Period Development of Final Plans & Specifications Bid Letting Process Construction of Project On-going Monitoring of Operation & Maintenance
20 Comments Project Delivery System Stage 0 occurs prior to project selection Some projects will go through Stage 1 and then will be held in Stage 2 indefinitely We are working on an estimating procedure for each Stage Project Delivery Steering Committee in place to deal with problems that arise on projects and in programs Project Manager curriculum under development Project Management Unit is being staffed to oversee Mega projects and high risk projects
21 Project Delivery System Overview of the Project Delivery Manual 10 chapters posted on the DOTD website Begins with philosophy, principles & quick overview Elaboration on each stage Ends with appendices on project plan, estimating, Project Delivery Steering Committee, & team building Important that you have an understanding of overall process and where you fit in More detailed training on individual stages is coming
22 QUESTIONS?
23 Project Delivery Manual Overview Stage 0 Feasibility
24 DOTD Project Delivery Process Elected Officials MPO Long Range Plan Districts Public Stage 0: Feasibility One Year Stage 1: Planning/Environmental Process One One to to Two Two Years Years Stage 2: Funding Stage 2: Funding & Project Prioritization Indefinite Period Feasibility Analysis of the Proposed Project REJECT Detailed Planning & Environmental Analysis Funding Allocation for Design & Construction Stage 3: Final Design Process One One to to Three Three Years Years Stage 4: 4: Letting One Year Stage 5: Construction One to Three Years Stage 6: 6: Operation Indefinite Period Development of Final Plans & Specifications Bid Letting Process Construction of Project On-going Monitoring of Operation & Maintenance
25 Stage 0 Purpose Determine project feasibility - Technical (will it work and can we build it) - Environmental - Financial GO / NO-GO
26 Stage 0 Process Overview Addresses different project types - Typical (regular program and mega ) - Federal/State Earmark - Special Category (urban sys/cmaq, RR crossing, CM, Enhance) Complexity of project will determine extent of documentation Integrated with the Project Selection Process
27 Stage 0 Process Steps 1. Determine purpose and need 2. Identify the initial project concept 3. Screen for major environmental impacts 4. Develop preliminary scope and estimate 5. Identify expected funding source (s)
28 Stage 0 Checklist
29 Stage 0 Environmental Checklist
30 Stage 0 Checklists Stage 0 Study Checklist - Completed checklist is Stage 0 study for minor or routine projects - Checklist is outline of Stage 0 study for complex projects Stage 0 Environmental Checklist - Aids in preliminary review of potential impacts to natural and human environment - Includes a list of environmental database websites - Explanation of relevance of each item in checklist
31 Responsibility Responsibility Matrix Program Manager Check Completeness / Approve Stage 0 Advance to Stage 1
32 Stage 0 Benefits Will allow more informed decisions before any promises are made Will make it easier to determine type of environmental document needed (CE, EA, EIS) in Stage 1 Can reduce time required for Stage 1 Will allow better financial planning and a better public image
33 Stage 0 (Feasibility) Manual Training
34 QUESTIONS?
35 Project Delivery Manual Overview Stage 1 Planning and Environment
36 DOTD Project Delivery Process Elected Officials MPO Long Range Plan Districts Public Stage 0: Feasibility One Year Stage 1: Planning/Environmental Process One One to to Two Two Years Years Stage 2: Funding Stage 2: Funding & Project Prioritization Indefinite Period Feasibility Analysis of the Proposed Project REJECT Detailed Planning & Environmental Analysis Funding Allocation for Design & Construction Stage 3: Final Design Process One One to to Three Three Years Years Stage 4: 4: Letting One Year Stage 5: Construction One to Three Years Stage 6: 6: Operation Indefinite Period Development of Final Plans & Specifications Bid Letting Process Construction of Project On-going Monitoring of Operation & Maintenance
37 Stage 0: Feasibility Provides a Go/No Go Decision Preliminary Purpose and Need Initial Project Concept Preliminary Environmental Review Preliminary Project Estimate and Budget Expected Funding Sources Stage 0 Environmental Checklist completed and provided for Stage 1 Processing
38 National Environmental Policy Act NEPA says all agencies of the Federal Government shall utilize a systematic, interdisciplinary approach which will insure the integrated use of the natural and social sciences and the environmental design arts in planning and in decision making which may have an impact on man's environment; identify and develop methods and procedures which will insure that presently unquantified environmental amenities and values may be given appropriate consideration in decision making
39 National Environmental Policy Act Include in every recommendation or report on proposals for major Federal actions significantly affecting the quality of the human environment, a detailed statement on: the environmental impact of the proposed action, any adverse environmental effects which cannot be avoided should the proposal be implemented, alternatives to the proposed action,
40 Air Quality Farmlands All Applicable Federal Laws Environmental Justice Safety Community Impacts State and Local Laws Wetlands Parklands Civil Rights Endangered Species Cultural Resources NEPA NEPA acts as an umbrella under which all environmental laws, regulations, and Executive Orders are administered Results in the Best Overall Public Interest Decision
41 Stage 1: NEPA Process Federal-aid or Federal Action Lead Federal Agency Determination Cooperating Agency Determination Participating Agency Designation (SAFETEA-LU) Categorical Exclusion (CE) Environmental Assessment/Finding of No Significant Impact (EA/FONSI) Environmental Impact Statement/ Record of Decision (EIS/ROD)
42 Stage 1: NEPA-like Process State-Funded Only Environmental Engineer Administrator acts as surrogate for Lead Agency Environmental Exclusion (EE) Environmental Assessment/ Environmental Finding (EA/EF) Environmental Impact Statement/ Environmental Record (EIS/ER)
43 Stage 1: Project Management Project Managers Overall from Project Management Unit Dual Managers from Environmental Section and appropriate Design Section Project Team staffed by representatives of other Sections (Design, Geometrics, Hydraulics, Traffic, Real Estate, Utilities, District, Planners, Consultants)
44 Stage 1: CE/EE Project/Program Manager prepares budget from Stage 0 Environmental Coordinator coordinates analysis and prepares documentation in accordance with NEPA Completes CE/EE determination
45 Stage1:EA/FONSI/EF Or EIS/ROD/ER Project Manager (s) appointed Team Building Project Manager initiates environmental process FONSI/EF or ROD/ER issued Scope and Budget Memo prepared and approved
46 Stage 1: Team Building Overall or Environmental Project Manager assumes lead role Preliminary Project Plan established Project Team established Scope of Work finalized Consultant selected, if appropriate Development of project activity schedule (PPMS) Project Management Plan finalized Project initiation meeting held
47 Stage 1: EA or EIS Documentation of social, economic and environmental impacts List of Permits Location and Major Design Features Updated Cost Estimate (PE and FE, Cons, ROW, Utilities, Mitigation) Mitigation and Environmental Commitments
48 Stage1: Authority CE/EE Programmatic Environmental Engineer Administrator (EEA) has authority from FHWA to make CE determination, EEA has authority to make EE determination Documented FHWA has authority to make CE determination, EEA has authority to make EE determination
49 Stage 1: Authority: EA/FONSI/EF Lead Federal Agency determines need to prepare EA, issues FONSI for NEPA projects or requires preparation of EIS EEA determines need to prepare EA, issues EF for non-nepa projects or requires preparation of EIS
50 Stage 1: Authority EIS/ROD/ER Lead Federal Agency determines need to prepare EIS, issues ROD for NEPA projects EEA determines need to prepare EIS, issues ER for non-nepa projects
51 Stage 1: Deliverables Environmental Closure Documentation CE/EE EA/FONSI/EF EIS/ROD/ER Scope and Budget Memorandum Description of Project Estimates and Full-Implementation Funding Commitments, Agreements, and Permits Recommended by Project Manager (s) Signed by Chief Engineer
52 Stage 1 Manual of Standard Practice Stage 1 Planning/Environmental Manual of Standard Practice ENVIRONMENTALLY Louisiana Department of Transportation and Development and Federal Highway Administration Louisiana Division State Project No F.A.P. No. SPR-0010(025)
53 QUESTIONS?
54 Project Delivery Manual Overview Stage 2 Funding and Project Prioritization
55 DOTD Project Delivery Process Elected Officials MPO Long Range Plan Districts Public Stage 0: Feasibility One Year Stage 1: Planning/Environmental Process One One to to Two Two Years Years Stage 2: Funding Stage 2: Funding & Project Prioritization Indefinite Period Feasibility Analysis of the Proposed Project REJECT Detailed Planning & Environmental Analysis Funding Allocation for Design & Construction Stage 3: Final Design Process One One to to Three Three Years Years Stage 4: 4: Letting One Year Stage 5: Construction One to Three Years Stage 6: 6: Operation Indefinite Period Development of Final Plans & Specifications Bid Letting Process Construction of Project On-going Monitoring of Operation & Maintenance
56 Stage 2: Funding and Project Prioritization Purpose: To provide for a realistic project time line.
57 Stage 2: Funding and Project Objectives: Prioritization Update the Cost Estimate and Insure Funding Is Available to Proceed Develop the Project Plan and Project Delivery Date (PDD) Establish the Program Fiscal Year (for the Construction Letting) Determine the Funding Source Insure the Project Is Included in the STIP and Highway Program
58 Process
59 Identify Origin of Project Priority program Earmark project
60 Priority Program Task & Responsibility Check estimate & update Project Manager if necessary Establish project plan Project & Program Manager Establish tentative Highway Program Engr. source Enter milestones in Highway Program Engr. LETS system Enter project info. in Project Manager PPMS Changes in Project Section Head of Project Delivery date Manager
61 Demo, Bond, or Other Earmark Funds Task & Responsibility Check estimate & update Project Manager if necessary Review funding Program Manager status Identify activities which Project Manager can be accomplished Enter milestones for activities Highway Program Engr. that are funded in LETS system Enter project information in Project Manager PPMS system Inform Project sponsors & Program Manager legislators of funding needs
62 Deliverables: Updated Cost Estimate Project Plan Project Delivery Date (PDD) Program Fiscal Year for Engineering, ROW, Utilities, & Construction Funding Source Identified
63 Gatekeeper For Stage 2: Highway Program Engineer
64 QUESTIONS?
65 Project Delivery Manual Overview Stage 3 Final Design Process
66 DOTD Project Delivery Process Elected Officials MPO Long Range Plan Districts Public Stage 0: Feasibility One Year Stage 1: Planning/Environmental Process One One to to Two Two Years Years Stage 2: Funding Stage 2: Funding & Project Prioritization Indefinite Period Feasibility Analysis of the Proposed Project REJECT Detailed Planning & Environmental Analysis Funding Allocation for Design & Construction Stage 3: Final Design Process One One to to Three Three Years Years Stage 4: 4: Letting One Year Stage 5: Construction One to Three Years Stage 6: 6: Operation Indefinite Period Development of Final Plans & Specifications Bid Letting Process Construction of Project On-going Monitoring of Operation & Maintenance
67 Needed Input From Stage 2 Well-defined scope Preliminary schedule (PDD) Up to date budget Purpose: Is to execute the final plans & specifications within scope, on-schedule and within budget.
68 Major Tasks for Stage 3 Develop Topographical survey Prepare Preliminary Plans, Cost Estimate & Conduct Plan-in-Hand (Road and Bridge) Value engineering Prepare Right-of-Way Maps Determine Utility Conflicts Appraise and Acquire Right-of-Way Prepare Final Road & Bridge Plans (ACP s) Determine Permits or Agreements Needed Develop Construction Proposal (PS&E)
69 Output Of Stage 3 Signed final plans Specifications 95% construction proposal Signed cost estimate Right-of-way acquired All agreements secured (utility, RR, cooperative endeavor-city/parish, etc.) Environmental (scenic stream, COE-wetlands, coastal use) and Non-environmental permits (coast guard)
70 Completion Of Stage 3 Project delivery date (PDD) Goal: To have the PDD efforts complete prior to fiscal year (July 1 June 30). Will allow the department to be flexible with the letting dates.
71 Effectively Managing Project Delivery Endorsed scope, schedule and budget Project Manager assigned key contact Build team task managers assigned Frequently communicate to all team members to get status on all progress Manage any change Use PPMS System, update frequently Regular schedule & budget monitoring/evaluation with revisions to reflect actual progress Value Engineering (EDSM No: I ) - mandated for projects with total cost of $25 million or more ($20 million or more for bridge projects) Application of resources to meet schedule. Plan The Work & Work The Plan
72 Tools: Project Scheduling Software = PPMS + Primavera (CPM Software)
73 DOTD Construction Program (PPMS Templates)
74 PPMS Standard And Summary Templates Current templates: Standard DOTD approx. 125 activities or tasks Stage 1+3 CE Summary Stage 3 EA-EIS Summary Urban Projects Standard Pavement Preservation Standard Pavement Preservation Summary Templates to be developed: Stage 1 EA summary (Environmental) Stage 1 EIS Summary (Environmental) Stage 1+3 CE Standard Stage 3 EA-EIS Standard
75 STAGE 3 CE SUMMARY TEMPLATE SFD420 DUS Coordinate Required Utility Agreements SFD480 Develop 100% Final Design Plans and Estimates SFD499 Project Delivery Date SFD460 SFD455 SFD410 Obtain Required Permits/ Agreements SFD470 Approval of Utility Agreements SFD469 Develop Construction Proposals to 95% Final Plans Notice to Proceed Obtain Scenic Stream Permit SFD420 Develop 95% Final Road Design SFD430 Develop 95% Final Bridge Design SFD440 Appraise and Acquire Right of Way STAGE 1+3 CE SUMMARY TEMPLATE ADDS PRELIMINARY TASKS.
76 SPD200 Stage 3 Project Startup STAGE 3 EA OR EIS SUMMARY TEMPLATE SPD210I Topographical Surveying (In-house) SPD210C Topographical Surveying (Consultant) SPD260 Perform Property Survey Work SPD270 Develop Preliminary ROW Maps SPD250 District/Utilities Preliminary Design Coordination SPD220 Develop 100% Preliminary Road Design SPD230 Develop 100% Preliminary Bridge Design SPD280 Setup for Final Plan Work SFD210 Final Plans Notice to Proceed SPD290 Schedule and Conduct Joint Review Meeting SFD260 Obtain Required Permits/ Agreements SFD270 Obtain Scenic Stream Permit SFD250 DUS Coordinate Required Utility Agreements SPD292 Prepare, Review, and Transmit Final ROW Maps SPD296 Prepare HQ Utility Cost Estimate SPD294 Prepare ROW Cost Estimate SFD255 Approval of Utility Agreements SFD230 Develop 95% Final Bridge Design SFD220 Develop 95% Final Road Design SFD240 Appraise and Acquire Right of Way SFD280 Develop 100% Final Design Plans and Estimates SFD299 Project Delivery Date SFD289 Develop Construction Proposal to 95%
77 TYPICAL STAGE 3 MAJOR MILESTONE TIMELINES TRANSMIT 95% ACP For 3 MONTHS (MIN.) ACP COMPLETE 3 MONTHS (MIN.) Review PRELIMINARY PDD PLANS Environ (COMPLETE) CLR.(CE) UTILITY CLR. 3 MONTHS (MIN.) MONTHS R/W Map (COMPLETE) 12 MONTHS 3 SITES OR LESS 18 MONTHS 3 SITES, 2 RELOCATIONS 24 MONTHS COMPLEX URBAN R/W CLR. 2 MONTHS (MIN.)
78 A Project Task Is An Assignable Item Of Work That Has: A definable beginning and end A time planned duration A state of completion that can be estimated at any time A reviewable internal and external deliverable at task completion
79 Significant Milestones in Stage 3 Completion of topographic survey 60% preliminary design geometric review 60% preliminary design hydraulic review Develop preliminary pavement design Plan-in-hand meeting (major milestone) Joint plan review R/W (major milestone) Advance check prints (major milestone) Release letter (utilities) Certify R/W complete Finalize permit Develop construction proposal 95% Plans signed by Chief Engineer
80 Any Change In Scope, Schedule Or Budget Requires The Following Documentation: Project overview narrative Original project scope Change project scope Reasons for change Environmental requirement changes Project schedule changes Budget and funding changes Send change scope and budget memorandum approved by Chief engineer to program manager and project delivery steering committee.
81 Current And Future Project Management Stage 3 Current: All projects to be placed in PPMS System. Stage 3 PM s are located in major design units. Both Project Management and Design (Engr. & Plans). Future: New Project Management section being formed. PM s in new section responsible for management of high risk projects (DOTD Risk Matrix.) New section responsible for PPMS System management. Project not high-risk to be managed & designed by Major Design sections.
82 QUESTIONS?
83 Project Delivery Manual Overview Stage 4 Assignment of Optimized Letting Dates
84 Purpose and Scope Purpose: Provide an orderly, predictable mix and flow of projects. Scope: All headquarters let projects except contract maintenance projects.
85 Stage 4 Goals Reflective of DOTD s Budget Partitions. Optimized geographical mix of projects. Reflective of local and statewide priorities. Reducing socio-economic impacts. Level monthly letting schedule. Baseline for annual Dashboard measure. Re-level monthly schedule as necessary.
86 Stage 4 Benefits Greater confidence in letting schedule. Reduced adverse effects of construction. Improved planning horizon for contractors. Fewer last minutes changes. Increased public awareness. Reasonable adjustment of schedule.
87 Preliminary Work Starting in Mid-February. Determination of potential project list. Projects that will not be let this SFY Projects in the next SFY s capital outlay program
88 Baseline Letting Schedule The process contains eight steps starting in March of each year to prepare a letting schedule for a SFY that starts July 1 st of the same calendar year.
89 Step1-1 st week Sort all potential projects by program. Based on PDDs, determine the earliest possible letting dates.
90 Step 2-2 nd and 3 rd weeks Preliminary review by program managers: Preliminary letting order Budgeting issues Determination of potential conflicts District priorities
91 Step 3-4 th week Create the preliminary letting list. Applying level dollar value per letting. Mix of projects based on defined goals.
92 Step 4-5 th week Section 39 ( Project Finance) review Verification of Federal Funding availability: Projects scheduled from July thru October Determining alternative options if federal funding not available
93 Step 5-6 th week Review by District Administrators for: Conflicts Special Needs Specific requirements Adjustments will be made accordingly.
94 Step 6-7 th week Evaluation of all information received. Non-critical projects are moved to rebalance the monthly letting list.
95 Step 7-7 th and 8 th week Draft final project letting list. Project Delivery Steering Committee (PDSC) review: Specific project adjustment Legislative input Any special requirements or criteria Re-adjustment of the list
96 Step 8 - end of April Chief Engineer's approval of the final list. Must be completed by 1st of May. Annual baseline is established upon Chief Engineer s approval.
97 Letting Schedule Maintenance PDD changes No bids or all bids rejected Project postponement Project withdrawal Letting changes due to executive decision Changes to adjust for other projects
98 Processes Remaining the Same. Project authorization DBE issues Award process Contract administration
99 Concluding Remarks Stage 4 process is still evolving. Impact on business/civic interests must be determined by project managers and Districts. Project Control will work with all responsible parties to minimize conflict in the letting schedule.
100 QUESTIONS?
101 Project Delivery Manual Overview Stage 5 Construction
102 Purpose To administer a construction contract between the Department and a Contractor. To have the project completed On time In budget In scope
103 Additional Goals To minimize disruption to the traveling public To keep the public accurately informed about the project.
104 Duration Stage 5 begins with receipt of the Notice of Contract Execution (NOCE) from Project Control in Stage 4 and continues through the final acceptance at which time the project is delivered to the operations staff in Stage 6
105 Projects vary immensely. From turn lanes to major Interstate interchanges. Some things are common to all projects.
106 Process Project Schedule Notice of Contract Execution from Stage 4 Notice to Proceed Contractor Responsibility Project Inspection Sampling and Testing Preconstruction Conference Contract Administration Final Inspection Final Acceptance Partial Estimates Creating and Processing Change Order Environmental Mitigation Construction Public Information Plan Construction Impact Mitigation Final Audit Deliver to Stage 6 (System Operations and Performance)
107 Contract Administration Project Schedule Contractor Responsibility Project Inspection Sampling & Testing Partial Estimates Creating & Processing Change Orders Environmental Mitigation Construction Impact Mitigation Final Inspection Final Acceptance Final Audit
108 Contract Administration Manuel Provides guidelines for Project Engineers and Inspectors. Found on the DOTD Intranet
109 Construction Impact Mitigation Public Information Construction Time Milestones Traffic Delay Mitigation Construction Funding
110 Construction Public Information Plan Effective communication is essential to the overall success of any major construction project Our goal is to provide timely and accurate information to motorists, emergency services personnel, business owners, public officials, commercial truck operators, the media and all others that may be impacted by the construction Complaints usually drop if the stakeholders are informed
111 Construction Public Information Plan A written public information plan will be developed for each project The plan will be developed by the assigned public affairs officer, local district representative, the contractor & other DOTD personnel as needed Detail of the plan proportional to the project s impact Act 103 of the 2003 Legislature requires project notifications to sheriffs, parish presidents, fire chiefs & state legislators
112 Key Elements of the Plan Development of project fact sheet for all DOTD personnel to use in providing consistent message Development of media contact list Development & distribution of initial project notification to media, affected businesses & residents, emergency services, schools & school transportation, etc. Regular updates to media Possible periodic appearances by DOTD on local morning TV shows, radio interviews, etc.
113 Construction Time Projects are let with several different types of contract times: working day, calendar day & A+B calendar day A+B bidding with calendar day will be used whenever practical Exceptions are non-interstate pavement preservation projects, typical contract maintenance projects and enhancement projects which will be let as working day projects. Clearing & grubbing projects which will be let as calendar day projects
114 Construction Time (continued) As of the December 2003 letting, calendar day projects have a special provision allowing contract time extensions for adverse weather conditions. The contractor is required to include these adverse weather days in their B bid. At the conclusion of the contract, the contractor can request additional time if the actual adverse weather days exceed the anticipated days in the contract. In no case will the original B contract days be reduced
115 Milestones All calendar day projects will require a milestone schedule Schedule will include starting date, completion date, lane closure & re-openings & other pertinent events determined during the project development process These milestones will determine the status of a project
116 Traffic Delay Mitigation The lion s share of traffic mitigation will be addressed during Stage 3, Final Design Process Goal is to use real time traffic data (permanent and construction ITS) to notify the motoring public of unexpected delays Traffic mitigation will require a review of the traffic flow during the different phases of the project Adjustments will be made to the traffic control plan if warranted
117 Construction Funding Change orders are coded based on the reason for the change order 7 categories: plan error or omission, different site conditions, DOTD convenience, Third party accommodation, contractor convenience, untimely ROW/Utility Relocation & Design Error These codes will help us identify problem areas
118 Construction Funding (continued) Change orders that are caused by plan errors, different site conditions & untimely ROW/Utility Relocation will be noted to the Project Delivery Steering Committee (PDSC) since they normally increase the cost of the project Change orders that are caused by DOTD convenience, Third party accommodation and contractor convenience may not always be approved. The Project Delivery Steering Committee will be notified when the approved funding has been exceeded
119 Project Development Steering Committee Duties in Stage 5 The PDSC authorizes, monitors and tracks expenditures vs budget for Stage 5 work. The PDSC receives, from the Construction Division, and reviews large change order requests that exceed contingency limits and assesses impact to the budget The PDSC receives and reviews project closeout report from Construction Audit and Project Control and accounts for funds being restored to the program
120 Performance Indicators Percentage of projects completed within contract time Percentage of partial estimates processed on time Percentage of final estimates processed on time (30 calendar days for projects<$2 million & 60 calendar days for projects >$2 million Time to process plan changes
121 QUESTIONS?
122 Project Delivery Manual Overview Stage 6 After The Project Is Complete
123 DOTD Project Delivery Process Elected Officials MPO Long Range Plan Districts Public Stage 0: Feasibility One Year Stage 1: Planning/Environmental Process One One to to Two Two Years Years Stage 2: Funding Stage 2: Funding & Project Prioritization Indefinite Period Feasibility Analysis of the Proposed Project REJECT Detailed Planning & Environmental Analysis Funding Allocation for Design & Construction Stage 3: Final Design Process One One to to Three Three Years Years Stage 4: 4: Letting One Year Stage 5: Construction One to Three Years Stage 6: 6: Operation Indefinite Period Development of Final Plans & Specifications Bid Letting Process Construction of Project On-going Monitoring of Operation & Maintenance
124 Stage 6 Activities Disposal of excess right-of-way Documentation of additional Utilities permitted on the right-of-way Compliance with post-construction environmental commitments Materials durability and performance Identification of design features that complicate maintenance activities Identification of design features that impede efficient traffic operations
125 Disposal of excess right-of-way District Maintenance Engineer, District Design Engineer, and Real Estate Section Reduce Maintenance and Liability, and put property back into the tax base Un-economic remainder, temporary need for construction, change order, anticipation of future need, realignment
126 Disposal of excess right-of-way May be identified during the project Usually identified when someone makes an inquiry (such as a joint use) or when a problem develops (such as additional maintenance or a law suit).
127 Disposal of excess right-of-way Identify potential excess property Check against standards Check for future needs District Administrator agrees that the parcel should be disposed of Real Estate Section grants servitude to each utility Real Estate handles disposal through sale or transfer; may lease if no buyer is available (only excess property may be leased; required property is covered by joint use)
128 Documentation of additional Utilities permitted on the right-of-way District Utility Relocation Unit with assistance of District Right-of-way Permit Unit Right-of-way Permit Database Two Thirds of facilities are installed without permit
129 Compliance With Post-Construction Environmental Commitments District Maintenance Engineer, District Traffic Engineer, Environmental Section Erosion control, water quality monitoring, vegetation maintenance Notify the Environmental Section upon completion
130 Materials Durability and Performance District Maintenance Engineer, District Traffic Engineer Early failure of surface, shoulder, drainage, etc Project number and completion date, description of failure, corrective action and date of action Submit report to Chief Engineer, Assistant Secretary of Operations, District Administrator, Design Division, Maintenance Management, and any other effected parties
131 Identification of Design Features That Complicate Maintenance Activities District Maintenance Engineer List feature that make maintenance more difficult, reason, and correction Submit report to Chief Engineer, Assistant Secretary of Operations, District Administrator, Design Division, Maintenance Management, and any other effected parties
132 Identification of Design Features that Impede Efficient Traffic Operations District Traffic Engineer List feature that impedes traffic flow, reason, and correction Submit report to Chief Engineer, Assistant Secretary of Operations, District Administrator, Design Division, Traffic Division, and any other effected parties
133 QUESTIONS?
People Make Projects Happen. Sherri H. LeBas, P.E. Secretary, LADOTD January 10, 2011
People Make Projects Happen Sherri H. LeBas, P.E. Secretary, LADOTD January 10, 2011 Evolution of Project Management Building a Project Management Culture Project Management Section Expectations, Roles
More informationSOUTH CENTRAL PLANNING AND DEVELOPMENT COMMISSION. Scope of Services. Terrebonne Parish
SOUTH CENTRAL PLANNING AND DEVELOPMENT COMMISSION Scope of Services Terrebonne Parish Houma-Thibodaux Metropolitan Planning Organization Project Description This project will review the feasibility of
More informationMn/DOT Scoping Process Narrative
Table of Contents 1 Project Planning Phase...3 1.1 Identify Needs...4 1.2 Compile List of Needs = Needs List...4 1.3 Define Project Concept...5 1.4 Apply Fiscal/Other Constraints...5 1.5 Compile List of
More informationNCDOT. Local Programs Management Office. Locally Administered Projects OVERVIEW
NCDOT Local Programs Management Office Locally Administered Projects OVERVIEW Local Programs Management Office ------------------------------------------------------------------------------------------------------------------------
More informationProcedures for NEPA Consultant hired by the County or the City
Procedures for NEPA Consultant hired by the County or the City IMPORTANT: A NEPA REQUEST WITH A LOCAL GOVERNMENT CHECKLIST AND A FOOTPRINT NEEDS TO BE SUBMITTED TO ENVIRONMENTAL PROGRAMS DIVISION AND A
More informationA SUMMARY OF EMERGENCY RELIEF PROCEDURES. For FEDERAL-AID HIGHWAYS
A SUMMARY OF EMERGENCY RELIEF PROCEDURES For FEDERAL-AID HIGHWAYS Prepared By THE OREGON DEPARTMENT OF TRANSPORTATION Local Government Section A SUMMARY OF EMERGENCY RELIEF (ER) PROCEDURES FOR FEDERAL-AID
More informationHouse Bill 20 Implementation. House Select Committee on Transportation Planning Tuesday, August 30, 2016, 1:00 P.M. Capitol Extension E2.
House Bill 20 Implementation Tuesday,, 1:00 P.M. Capitol Extension E2.020 INTRODUCTION In response to House Bill 20 (HB 20), 84 th Legislature, Regular Session, 2015, and as part of the implementation
More informationProject Scoping Guidebook for Metropolitan Planning Organization Transportation Projects
Project Scoping Guidebook for Metropolitan Planning Organization Transportation Projects Product 0-6929-P1 Cooperative Research Program TEXAS A&M UNIVERSITY KINGSVILLE DEPARTMENT OF CIVIL AND ARCHITECTURAL
More informationMilitary Highway Continuous Flow Intersection (CFI) Initial Financial Plan
Military Highway Continuous Flow Intersection (CFI) Initial Financial Plan State Project Number(s): 0013-122-V03, 0165-122-V04, 0165-122-181 UPC(s): 9783, 1765, 84243 1 Table of Contents 1. Project Description...
More informationPROJECT DESCRIPTION SCOPE OF SERVICES
ENGINEERING AND RELATED SERVICES OCTOBER 29, 2013 CONTRACT NO. 4400004357 RETAINER CONTRACT FOR TRAFFIC ENGINEERING MANAGEMENT ROADWAY PROJECTS STATEWIDE **DBE/WBE GOAL = 6% Under Authority granted by
More informationPROJECT COST REPORTING
Approved: Effective: May 18, 2016 Review: April 1, 2016 Office: Comptroller Financial Management Topic No.: 360-050-005-h Department of Transportation PROJECT COST REPORTING PURPOSE: Project Cost Reporting
More informationSECTION I. BACKGROUND AND INTRODUCTION
STEWARDSHIP AND OVERSIGHT AGREEMENT ON PROJECT ASSUMPTION AND PROGRAM OVERSIGHT BY AND BETWEEN FEDERAL HIGHWAY ADMINISTRATION, FLORIDA DIVISION AND THE OF FLORIDA DEPARTMENT OF TRANSPORTATION SECTION I.
More informationNational Flood Insurance Program (NFIP)
National Flood Insurance Program (NFIP) Programmatic EIS (PEIS) Informing our Understanding of the NFIP and the Environment ASFPM June 12, 2013 Overview/Outline After this Seminar you should know: Who
More informationPrioritization and Programming Process. NCDOT Division of Planning and Programming November 16, 2016
Prioritization and Programming Process NCDOT Division of Planning and Programming November 16, 2016 Today s Roadmap 1. Planning and Programming Division Overview 2. Strategic Investments (STI) Law 3. Prioritization
More informationLOCAL MAJOR BRIDGE PROGRAM
LOCAL MAJOR BRIDGE PROGRAM The Local Major Bridge Program provides federal funds to counties and municipal corporations for bridge replacement or bridge major rehabilitation projects. A Local Major Bridge
More informationProject Development Process
Brought to you by: Project Development Process 89 th Annual Purdue Road School March 25, 2003 David Holtz INDOT Program Development (317) 232-7588 dholtz@indot.state.in.us Chris Baynes INDOT Project Management
More information2045 Long Range Transportation
The Jackson Area Comprehensive Transportation Study 2045 Long Range Transportation June 2018 Jackson Area Comprehensive Transportation Study 2045 Long Range Transportation Plan Jackson County, Michigan
More informationBREAKOUT SESSION GROUP 3 Track D Financial/Billing Thursday, September 26, :30am 12:00pm
BREAKOUT SESSION GROUP 3 Track D Financial/Billing Thursday, September 26, 2013 10:30am 12:00pm Federal Strategy September 26, 2013 Deborah A. Grant Federal Programs Manager VDOT Programming Division Federal
More informationGLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade.
Glossary GLOSSARY Advanced Construction (AC): Authorization of Advanced Construction (AC) is a procedure that allows the State to designate a project as eligible for future federal funds while proceeding
More informationSOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN. Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania
SOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania January 2013 Table of Contents... 1 Introduction... 2 Project
More informationUTILITIES INTERNAL POLICIES AND PROCEDURES MANUAL
UTILITIES INTERNAL POLICIES AND PROCEDURES MANUAL Arkansas State Highway and Transportation Department Right of Way Division September 2011 Table of Contents 1.00 GENERAL... 1 1.01 ORGANIZATION... 1 1.02
More informationConcept Development Activity Descriptions July, 2017
Concept Development Activity Descriptions July, 2017 Check the Capital Project Delivery website to ensure this is the current version. Table of Contents Concept Development... 1 Concept Development Initiated
More informationBINGHAMTON METROPOLITAN TRANSPORTATION STUDY CERTIFICATION NARRATIVE FY 2016
BINGHAMTON METROPOLITAN TRANSPORTATION STUDY CERTIFICATION NARRATIVE FY 2016 The Binghamton Metropolitan Transportation Study Policy Committee is designated by the Governor of New York as the Metropolitan
More informationMAINE TURNPIKE AUTHORITY. Project Development Process
MAINE TURNPIKE AUTHORITY Project Development Process A Milestone Guide for the MTA, Consultant, & Partners to Build a MTA Project 10/20/16 1 P a g e INTRODUCTION: BACKGROUND AND APPLICABILITY The intent
More informationEmergency Relief Program. Ammon Heier, FHWA ER Coordinator
Emergency Relief Program Ammon Heier, FHWA ER Coordinator What to Remember Time is of the Essence - Urgency Good documentation is crucial Early and Ongoing Communication If you don t know, ask. Emergency
More informationDraft. Amendment FY Unified Planning Work Program
FY 2018 FY Unified Planning Work Program Kalamazoo Area Transportation Study 5220 Lovers Lane, Suite 110 Portage, MI 49002 (269) 343-0766 www.katsmpo.org Page 1 of 75 [This page intentionally left blank.]
More informationPennDOT Rapid Bridge Replacement Project
PennDOT Rapid Bridge Replacement Project Ohio Transportation Engineering Conference October 27 28,2015 Agenda Project Overview Project Development and Scoping Procurement Process Technical Requirements
More informationHUD s Environmental Review Process. Disaster Assistance Training 2012 Jerimiah Sanders, Environmental Specialist
HUD s Environmental Review Process Disaster Assistance Training 2012 Jerimiah Sanders, Environmental Specialist Goals: Understand NEPA Overview of levels of environmental review Spot red flags New Tools
More information2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION
2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION TEMPO Meeting July 21, 2016 Current Initiatives On-going efforts to address performance-based planning and programming processes as required
More informationSCOPE OF SERVICES FOR ALTERNATIVE CORRIDOR EVALUATION
EXHIBIT A SCOPE OF SERVICES FOR ALTERNATIVE CORRIDOR EVALUATION US 301/US 98/SR 35/SR 700/Clinton Avenue Intersection Realignment Study District Seven Pasco County This Scope of Services is an Exhibit
More informationUnified Planning Work Program
Unified Planning Work Program New Orleans, Mandeville Covington, Slidell, and Tangipahoa Parish Urbanized Areas ADDENDA FY 2016 2 P a g e Unified Planning Work Program Fiscal Year 2016 Urbanized Areas
More informationJosué M. Yambó Senior Transportation Engineer & ER Program Coordinator Federal Highway Administration (FHWA)
Josué M. Yambó Senior Transportation Engineer & ER Program Coordinator Federal Highway Administration (FHWA) 2017 CEAC Spring Conference March 24, 2017 ER Program Provides funds for emergency repairs and
More informationTexas Department of Transportation Corpus Christi District
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens Advisory Committee Meeting January 11, 2012 Welcome
More informationALL Counties. ALL Districts
TEXAS TRANSPORTATION COMMISSION ALL Counties rhnute ORDER Page of ALL Districts The Texas Transportation Commission (commission) finds it necessary to propose amendments to. and., relating to Transportation
More informationChapter 6: Financial Resources
Chapter 6: Financial Resources Introduction This chapter presents the project cost estimates, revenue assumptions and projected revenues for the Lake~Sumter MPO. The analysis reflects a multi-modal transportation
More informationIn addition to embarking on a new dialogue on Ohio s transportation priorities,
Strategic Initiatives for 2008-2009 ODOT Action to Answer the Challenges of Today In addition to embarking on a new dialogue on Ohio s transportation priorities, the Strategic Initiatives set forth by
More information2017 Educational Series FUNDING
2017 Educational Series FUNDING TXDOT FUNDING INTRODUCTION Transportation projects take many years to develop and construct. In addition to the design, engineering, public involvement, right-of-way acquisition,
More informationDominion Boulevard Improvements with Toll System VDOT Initial Financial Plan February 1, 2012
VDOT February 1, 2012 Table of Contents Section 1 Summary.2 Project Description. 2 Project Background 2 Current Activities.3 Project Schedule.4 Section 2 Project Cost Estimate..4 Section 3 Project Financing..5
More informationDEPARTMENT OF TRANSPORTATION STATE OF GEORGIA TIA PROJECT CONCEPT REPORT
DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA TIA PROJECT CONCEPT REPORT Project Type: GDOT District: Federal Route Number: State Route Number: P.I. Number: County: MPO ID Number: Project Description (provide
More informationMassDOT Highway ACEC State Markets Conference April 5, Jonathan Gulliver, Highway Administrator John J. Bechard, P.E., Deputy Chief Engineer
MassDOT Highway ACEC State Markets Conference April 5, 2018 Jonathan Gulliver, Highway Administrator John J. Bechard, P.E., Deputy Chief Engineer About MassDOT Highway 9,561 Lane Miles of Interstate, Numbered
More informationPerformance Audit Action Plan
Performance Audit Action Plan Item #_1 : We recommend that VDOT explore other potential groupings that could ultimately make the federal obligation process more efficient. Assigned Chief: Busher Action
More informationProject Customization Guideline July, 2017
Project Customization Guideline July, 2017 Check the Capital Project Delivery website to ensure this is the current version. Table of Contents Introduction... 1 Section I: Project Customization General
More informationNC DOT s Planning & Mitigation Program with focus on Orange County
NC DOT s Planning & Mitigation Program with focus on Orange County By: Bruce O. Ellis, CLM, PWS Mitigation Implementation Unit Head Project Development and Environmental Analysis Branch Agenda I. TIP Overview
More informationGeorgia Department of Audits and Accounts Performance Audit Division
Special Examination Report No. 16-17 December 2016 Georgia Department of Audits and Accounts Performance Audit Division Greg S. Griffin, State Auditor Leslie McGuire, Director Why we did this review This
More informationOHIO MPO AND LARGE CITY CAPITAL PROGRAM SFY 2015 SUMMARY
OHIO MPO AND LARGE CITY CAPITAL PROGRAM SFY 2015 SUMMARY TABLE OF CONTENTS MPO AND LARGE CITY PROGRAM OVERVIEW.. 3 MPO AND LARGE CITY SFY 2015 STP BUDGET SUMMARY......... 4 MPO AND LARGE CITY SFY 2015
More informationWhereas, the FDOT is willing to reimburse the SHPO for the increased staff required to provide priority project review; and
FUNDING AGREEMENT between Florida State Historic Preservation Officer (SHPO) and STATE OF FLORIDA, Florida Department of Transportation (FDOT) and UNITED STATES DEPARTMENT OF TRANSPORTATION Federal Highway
More informationSCOPE OF SERVICES FOR ALTERNATIVE CORRIDOR EVALUATION
EXHIBIT A SCOPE OF SERVICES FOR ALTERNATIVE CORRIDOR EVALUATION SR 56 EXTENSION FROM US 301/SR 41 TO US 98/SR 35/SR 700 District Seven Pasco County This Scope of Services is an Exhibit which is incorporated
More informationTSM Limited Scope Project Customization Guideline. December, 2016
TSM Limited Scope Project Customization Guideline December, 2016 Table of Contents Introduction... 1 Section I: Project Customization General Overview and Examples... 2 Section II: Required Aspects of
More informationTri-State Montrose-Nucla-Cahone Transmission Line Improvement Project. Plan of Development
Tri-State Montrose-Nucla-Cahone Transmission Line Improvement Project Montrose, Ouray, San Miguel, and Dolores Counties, Colorado Environmental Monitoring and Compliance Plan G-1 Environmental Monitoring
More informationJoint Appropriations Subcommittee on Transportation
Joint Appropriations Subcommittee on Transportation Funding Overview February 21, 2013 H. Tasaico, PE 1 NCDOT Funding Overview - Agenda State Transportation Comparative Data Transportation Funding Sources
More informationManaging Project Risk DHY
Managing Project Risk DHY01 0407 Copyright ESI International April 2007 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or
More informationCity of Portsmouth Portsmouth, New Hampshire Department of Public Works
RFP# 10-07 City of Portsmouth Portsmouth, New Hampshire Department of Public Works MARKET STREET BICYCLE AND PEDESTRIAN PATH BETWEEN MICHAEL SUCCI DRIVE AND THE NH PORT AUTHORITY REQUEST FOR PROPOSAL Sealed
More informationPrepared by the South East Texas Regional Planning Commission-Metropolitan Planning Organization (SETRPC-MPO) December 6, 2013
FY 2013 Annual Performance and Expenditure Report for the Jefferson-Orange-Hardin Regional Transportation Study (JOHRTS) Area October 1, 2012 September 30, 2013 Prepared by the South East Texas Regional
More informationTransportation Improvement Program Project Priority Process White Paper
Transportation Improvement Program Project Priority Process White Paper Pierce County Public Works- Office of the County Engineer Division Introduction This paper will document the process used by the
More informationVIRGINIA S STATE OF THE STATE ADDRESS
VIRGINIA S STATE OF THE STATE ADDRESS TRB ADC40 Summer Session July 27, 2009 Paul M. Kohler Noise Abatement Program Manager AGENDA 1. Economic Status of Virginia 2. Reorganization of VDOT 3. Projects of
More informationCAPITAL BUDGET NUCLEAR
Updated: 00-0- EB-00-00 Tab Page of 0 0 CAPITAL BUDGET NUCLEAR.0 PURPOSE The purpose of this evidence is to present an overview description of the nuclear capital project budget for the historical year,
More informationAPPENDIX FOR THE METROPOLITAN LONG RANGE TRANSPORTATION PLAN Forecast of State and Federal Revenues for Statewide and Metropolitan Plans
APPENDIX FOR THE METROPOLITAN LONG RANGE TRANSPORTATION PLAN 2035 Forecast of State and Federal Revenues for Statewide and Metropolitan Plans Overview This appendix documents the current Florida Department
More informationCorridors of Commerce DRAFT Scoring and Prioritization Process. Patrick Weidemann Director of Capital Planning and Programming November 1, 2017
Corridors of Commerce DRAFT Scoring and Prioritization Process Patrick Weidemann Director of Capital Planning and Programming November 1, 2017 Project Purpose To develop and implement a scoring and project
More informationHRTPO TTAC RECOMMENDATIONS ON THE HB2 PRIORITIZATION PROCESS
HRTPO TTAC RECOMMENDATIONS ON THE HB2 PRIORITIZATION PROCESS February 4, 2015 BACKGROUND The Office of the Secretary of Transportation is coordinating stakeholder input during the development of the House
More informationCancelled. Final Action
RESOLUTION NO. R2018-16 Baseline Budget and Schedule for the Lynnwood Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 05/10/2018 05/24/2018 Cancelled
More informationImplementation Project Development and Review 255
Introduction 248 Implementation Principles 249 Public Agency Fiduciary Responsibilities 250 Project Development and Review Process 252 Project Development and Review 255 Maintenance 23 Implementation Implementation
More informationMetropolitan Planning Organizations in North Carolina. Chris Lukasina NCAMPO
Metropolitan Planning Organizations in North Carolina Chris Lukasina NCAMPO February 1, 2016 Items to Discuss What is an MPO/RPO? Why were they established? How are they structured? What areas do they
More informationSTATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1113 VALUE ENGINEERING IN CONSTRUCTION. October 19, 2012
STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1113 VALUE ENGINEERING IN CONSTRUCTION October 19, 2012 1113.01 Description 1113.02 References 1113.03 Definitions 1113.04 Value Engineering Change
More informationTracker. Fast Projects That Are of Great Value. Tangible Result Driver Dave Nichols, Chief Engineer
Fast Projects That Are of Great Value Tangible Result Driver Dave Nichols, Chief Engineer MoDOT customers expect that transportation projects be completed quickly and provide major improvements for travelers.
More informationINVESTMENT STRATEGIES
3 INVESTMENT STRATEGIES 70 INVESTMENT STRATEGIES 71 A key role of Mobilizing Tomorrow is to outline a strategy for how the region will invest in transportation infrastructure over the next 35 years. This
More informationTier 1 Environmental Impact Statement for the Chesapeake Bay Crossing Study, Anne
This document is scheduled to be published in the Federal Register on 10/11/2017 and available online at https://federalregister.gov/d/2017-21916, and on FDsys.gov DEPARTMENT OF TRANSPORTATION Federal
More informationI-64 Capacity Improvements Segment III Initial Financial Plan
I-64 Capacity Improvements Segment III Initial Financial Plan State Project # 0064-965-229/0064-099-229 P101, R201, C501, B638, B639, B640, B641, B642, B643, D609, D610, D611 Federal # NHPP-064-3(498)/
More informationAppendix E: Revenues and Cost Estimates
Appendix E: Revenues and Cost Estimates Photo Source: Mission Media Regional Financial Plan 2020-2040 Each metropolitan transportation plan must include a financial plan. In this financial plan, the region
More informationMoDOT Dashboard. Measurements of Performance
MoDOT Dashboard Measurements of Performance 1997 1998 1999 2000 2001 2002 MoDOT Dashboard Executive Summary Performance measurement is not new to MoDOT. In July 2001, MoDOT staff began completing quarterly
More informationPresented by: Christy A. Hall, P.E. Interim Secretary of Transportation. January 2016
Presented by: Christy A. Hall, P.E. Interim Secretary of Transportation January 2016 Overall Assessment of the System Pavements: Most South Carolinian s are riding on poor pavements. Bridges: Most bridges
More informationContents. Alamo Area Metropolitan Planning Organization. Introduction S. St. Mary s Street San Antonio, Texas 78205
Contents Introduction 1 Alamo Area Metropolitan Planning Organization Tel 210.227.8651 Fax 210.227.9321 825 S. St. Mary s Street San Antonio, Texas 78205 www.alamoareampo.org aampo@alamoareampo.org Pg.
More informationF = MA : CSG SLC WEBINAR DECEMBER 16, J. Douglas Koelemay, Director
F = MA : CSG SLC WEBINAR DECEMBER 16, 2014 J. Douglas Koelemay, Director VIRGINIA LEADERSHIP IN PUBLIC-PRIVATE PARTNERSHIPS PPTA enabling legislation adopted 1995; PPEA followed PPTA implementation guidelines
More informationTRANSPORTATION IMPROVEMENT PROGRAM REVISION 19 F E D E R A L F I S C A L Y E A R S Expedited Administrative Modifications
TRANSPORTATION IMPROVEMENT PROGRAM F E D E R A L F I S C A L Y E A R S 2 0 1 5 2 0 1 8 REVISION 19 Expedited Administrative Modifications TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL FISCAL YEARS 2015-2018
More informationJACKSONVILLE URBAN AREA METROPOLITAN PLANNING ORGANIZATION UNIFIED PLANNING WORK PROGRAM AMENDMENT 1 FISCAL YEAR 2018 TABLE OF CONTENTS
JACKSONVILLE URBAN AREA METROPOLITAN PLANNING ORGANIZATION UNIFIED PLANNING WORK PROGRAM AMENDMENT 1 FISCAL YEAR 2018 TABLE OF CONTENTS Introduction 1 Five Year Planning Calendar 3 Budget Summary 4 Unified
More informationWednesday, June 6, 2018
Wednesday, June 6, 2018 Excellence in Program Administration Award 2018 AASHTO Civil Rights Training Symposium Excellence in Program Administration Award Joanna McFadden EEO/DBE Section Head APRIL 2017-2018
More informationAnnual Listing of Obligated Projects Federal Fiscal Year 2013
Annual Listing of Obligated Projects Federal Fiscal Year 2013 Nashua Regional Planning Commission 9 Executive Park Drive Suite 201 Merrimack, NH 03054 (603) 424-2240 www.nashuarpc.org A N N U A L L I S
More informationCOUNTY ADMINISTRATOR PUBLIC WORKS
COUNTY ADMINISTRATOR PUBLIC WORKS Public Works is comprised of several Departments/Divisions that develop, improve, and maintain the County s basic infrastructure needs related to transportation, storm
More informationPENNSYLVANIA S 2017 TRANSPORTATION PROGRAM FINANCIAL GUIDANCE
November 20, 2015 Revised December 18, 2015 to reflect FAST Act PENNSYLVANIA S 2017 TRANSPORTATION PROGRAM FINANCIAL GUIDANCE This is a collaborative product jointly developed by the Pennsylvania Planning
More informationFlorida Department of Transportation INITIAL TRANSPORTATION ASSET MANAGEMENT PLAN
Florida Department of Transportation INITIAL TRANSPORTATION ASSET MANAGEMENT PLAN April 30, 2018 (This page intentionally left blank) Table of Contents Chapter 1 Introduction... 1-1 Chapter 2 Asset Management
More informationSCOPE OF SERVICES FOR PROJECT DEVELOPMENT AND ENVIRONMENT (PD&E) STUDIES I-4 (SR 400) FROM W OF SR 570 (POLK PARKWAY) TO W OF US 27 INTERCHANGE FDOT
EXHIBIT A SCOPE OF SERVICES FOR PROJECT DEVELOPMENT AND ENVIRONMENT (PD&E) STUDIES I-4 (SR 400) FROM W OF SR 570 (POLK PARKWAY) TO W OF US 27 INTERCHANGE FDOT District 1 Polk County This Scope of Services
More informationDEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON, D.C AUG 2339
DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON, D.C. 20314-1000 8 1 AUG 2339 CECW-PC MEMORANDUM FOR COMMANDERS, MAJOR SUBORDINATE COMMANDS SUBJECT: Implementation Guidance
More informationSOUTH DAKOTA DEPARTMENT OF TRANSPORTATION CONSULTANT SERVICES MANUAL
SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION CONSULTANT SERVICES MANUAL 2017 Approved by FHWA on March 1, 2017 THIS PAGE INTENTIONALLY LEFT BLANK INDEX Chapter Section Title PAGE ACRONYMS i DEFINITIONS ii
More informationREQUEST FOR INFORMATION
REQUEST FOR INFORMATION Regarding the Interstate 66 Corridor Improvements (From US Route 15 in Prince William County To Interstate 495 in Fairfax County RFI Issuance Date: June 27, 2013 RFI Closing Date:
More informationSTUDY SCHEDULE STUDY PURPOSE
STUDY SCHEDULE This Open House is the last of three public meetings for the Route Centennial Bridge Study. The material presented previously at the second Open House in July 2015 focused upon Corridor
More informationSTANDARD PROCEDURE FOR VALUE ENGINEERING IN CONSTRUCTION
Standard Procedure No.: 510-008(SP) Effective Date: September 14, 2011 Responsible Division: Construction Management Approved: Megan Blackford, P.E. Deputy Director, Division of Construction Management
More informationGeneral Discussion A&E Services Consultants
WSDOT Local Agency Guidelines M 36-63.01 Chapter 31 Chapter 31 General Discussion To be eligible for reimbursement of Federal Highway Administration (FHWA) funds for payments to a consultant, the procedures
More informationSUMMARY OF RECENT USACE PLANNING POLICY UPDATES: SEPTEMBER MARCH 2019
SUMMARY OF RECENT USACE PLANNING POLICY UPDATES: SEPTEMBER 2018 - MARCH 2019 SUMMARY OF RECENT USACE PLANNING POLICY UPDATES: SEPTEMBER 2018 - MARCH 2019 2 USACE policy and guidance continues to evolve
More informationTechnical Appendix. FDOT 2040 Revenue Forecast
Technical Appendix FDOT 040 Revenue Forecast This page was left blank intentionally. APPENDIX FOR THE METROPOLITAN LONG RANGE PLAN 040 Forecast of State and Federal Revenues for Statewide and Metropolitan
More informationSCOPE OF SERVICES FOR PROJECT DEVELOPMENT AND ENVIRONMENT (PD&E) STUDIES I-75 (SR 93) FROM E OF SR 951 TO SR
FEXHIBIT A SCOPE OF SERVICES FOR PROJECT DEVELOPMENT AND ENVIRONMENT (PD&E) STUDIES I-75 (SR 93) FROM E OF SR 951 TO SR 78 (Bayshore DR) FDOT District 1 Collier and Lee County This Scope of Services is
More informationRisk Management Plan for the <Project Name> Prepared by: Title: Address: Phone: Last revised:
for the Prepared by: Title: Address: Phone: E-mail: Last revised: Document Information Project Name: Prepared By: Title: Reviewed By: Document Version No: Document Version Date: Review Date:
More informationCRAVE. Cost Risk Assessment + Value Engineering. CSVA 2011 Conference Toronto, Ontario Nov 14-16, Ken L. Smith, PE, CVS
CRAVE Cost Risk Assessment + Value Engineering CSVA 2011 Conference Toronto, Ontario Nov 14-16, 2011 Ken L. Smith, PE, CVS 1 HDRINC all rights reserved Topic Overview marketing statement, what is in it
More informationAdministrative Modification #1 (as of 10/15/2015) to the Kansas FFY STIP
Administrative Modification #1 (as of 10/15/2015) to the Kansas FFY 2016-2019 STIP The attached administrative modification to the Kansas FFY 2016-2019 Statewide Improvement Program (STIP) updates the
More informationMonroe County Soil & Water Conservation District
Monroe County Soil & Water Conservation District Nature Based Shoreline Design Request for Qualifications (RFQ) Release Date: October 26, 2018 Response Deadline: 12/7/2018 Monroe County Soil & Water Conservation
More informationCity of Grand Forks Staff Report
City of Grand Forks Staff Report Committee of the Whole November 28, 2016 City Council December 5, 2016 Agenda Item: Federal Transportation Funding Request Urban Roads Program Submitted by: Engineering
More informationState of Nevada Department of Transportation
State of Nevada Department of Transportation 2011-2013 Biennial Budget Overview March 15, 2011 E - 1 The Nevada Department of Transportation Summary of Agency Operations: The Nevada Department of Transportation
More informationExhibit A DEFINITIONS AND ACRONYMS
Exhibit A DEFINITIONS AND ACRONYMS Addenda/Addendum means supplemental additions, deletions, and modifications to the provisions of the RFP after the release date of the RFP. Additional Scope Component
More informationSUPPLEMENTAL SPECIFICATION CRITICAL PATH METHOD CONSTRUCTION SCHEDULES
March 1, 2007 SUPPLEMENTAL SPECIFICATION CRITICAL PATH METHOD CONSTRUCTION SCHEDULES General This supplemental specification addresses the Critical Path Method (CPM) construction schedule requirements
More informationPLANNING DEPARTMENT ADMINISTRATION
PLANNING DEPARTMENT ADMINISTRATION Long-Range Planning Zoning and Land Development Land Use and Design Community Improvement and Transportation Rezoning and Development Regulations Development Review Transit
More informationProject Selection Risk
Project Selection Risk As explained above, the types of risk addressed by project planning and project execution are primarily cost risks, schedule risks, and risks related to achieving the deliverables
More informationNORTH CAROLINA EMERGENCY MANAGEMENT
NORTH CAROLINA EMERGENCY MANAGEMENT NC Association of Municipal Clerks Friday, August 18, 2017 Atlantic Beach, NC Presenters: Mary Glasscock & Brian Snell NCEM PA PUBLIC ASSISTANCE PROGRAM Emergency Work
More information