1 COMPONENT 4 Feasibility studies Municipality of Almada The Mobility House of Almada Almada, March 12 th - 13 th 2013

2 SUMMARY Study Area Analysis Methodology Approach New PTA Characteristics

3 SUMMARY Study Area Analysis Methodology Approach New PTA Characteristics

4 Almada

5 Lisboa Almada Almada Lisbon Metropolitan Area Area 72 km 2 13 km of Atlantic beachfront

6 STUDY AREA ANALYSIS Almada s demography South bank of Tagus river across Lisbon urban pressure inhabitants in 72 km 2 (Census 2011) in Lisbon Metropolitan Area Fluctuating population of inhabitants Almost visitors per year!

7 STUDY AREA ANALYSIS Almada s demography 11 Parishes (freguesias): Cacilhas: Almada: Pragal: Cova da Piedade: Laranjeiro: Feijó: Caparica: Sobreda: Charneca da Caparica: Trafaria: Costa de Caparica:

8 STUDY AREA ANALYSIS Almada s local economy Based primarily on Tourism, Services and Public Administration agriculture in pre-1960 s era until late 1990 s, intense industrial port activities, mainly shipbuilding industry Example: Lisnave shipyard workers additional 40,000 indirect jobs remaining port activities (North river front) tourism sector and ICT industries becoming economically more important

9 STUDY AREA ANALYSIS Mobility Services in Almada

10 STUDY AREA ANALYSIS Almada s Modal Split (2006) Almada s Mobility Survey 2013: will allow the updating of these figures (in the framework of Almada s SUMP)

11 STUDY AREA ANALYSIS Almada s Modal Split (2006) Almada s Mobility Survey 2013: will allow the updating of these figures (in the framework of Almada s SUMP)

12

13 STUDY AREA ANALYSIS Almada s PT Modes 2 boat connections between Almada and Lisbon (8 and 20 min) A bus network with 60 lines in Almada and links to Lisbon and the southern regions 1train connection to Lisbon (11 min) and Setúbal (42min), that started it s operation in 2009 A Light Rail (tram) system (MST) with 3 lines (total of 19 stops, 17 of which within Almada)

14 STUDY AREA ANALYSIS Almada s PT Management Public Transport Mainly a central Government competence Local authorities with very few responsibilities (e.g.: Traffic management) All PT modes in Almada are concessions from the central government: Bus (private operator), Tram (private), Train (private), Boat (public operator) Problems: no metropolitan coordination and management, despite recent Metropolitan Transport Authorities; still work to be done in terms of improving intermodality

15 STUDY AREA ANALYSIS Almada s PT Management Public Transport Mainly a central Government competence Local authorities with very few responsibilities (e.g.: Traffic management) All PT modes in Almada are concessions from the central government: Bus (private operator), Tram (private), Train (private), Boat (public operator) Problems: no metropolitan coordination and management, despite recent Metropolitan Transport Authorities; still work to be done in terms of improving intermodality

16 STUDY AREA ANALYSIS Almada s PT Management The Mobility House of Almada will be an answer to the municipal lack of competence in public transport... will congregate all actors involved in urban mobility... will be a forum to discuss difficulties, share ideas and solutions to make Almada s mobility more efficient (energy, environment, economical perspectives)... will enable local mobility stakeholders, to be better prepared for the expected changes in the legal and financial framework for the tendering, awarding and regulation of PT services in Portugal... will be open to the public and integrate other transport modes (e.g. soft modes) and provide information and help

17 SUMMARY Study Area Analysis Methodology Approach New PTA Characteristics

18 ALMADA FS OBJECTIVES The Municipality will study the feasibility of adopting some Public Transport Authority (PTA) functions, in accordance with the mobility and transport strategies designed for Almada and the legal framework of this sector in Portugal, considering future developments. This PTA role will be adopted along with the creation of the Mobility House of Almada, that congregates all local mobility stakeholders, aiming at a better governance of the mobility in Almada.

19 METHODOLOGY and APPROACH Almada s Feasibility Study will have 2 main components: Definition of the competences and mission of the Municipality as a PTA, establishing the links between EU and national transport strategies, local mobility policies, the interests and roles of the operators, the needs of the population and the 7 EPTA functions Conceptualization and organization of the Mobility House of Almada, as a local forum for sustainable urban mobility, which will integrate the PTA functions of the Municipality.

20 METHODOLOGY and APPROACH Almada s Feasibility Study is being developed according to the following structure: Overview of the current state of development/implementation of the Public Transport Authorities in Portugal/Lisbon Metropolitan Area (legal and operational aspects) and state of development of the activities and local competences of the Municipality of Almada in the different 7 EPTA Pillars Description of the current transport/mobility in Almada and foreseen evolution of the technical, legal and financial framework of the mobility aspects

21 METHODOLOGY and APPROACH Almada s Feasibility Study is being made according to the following structure: Development of the PTA concept for Almada, bearing in mind its actuation according to the 7 EPTA functions, with special detail on the functions of tendering and awarding Definition of the level of intervention in the planning of the transport system and in the coordination of the transport operation, in an intermodal perspective, and of the mobility management in Almada

22 METHODOLOGY and APPROACH Almada s Feasibility Study is being made according to the following structure: Definition of the Mobility House of Almada as a local mobility forum: Main objectives to be achieved with the Mobility House of Almada; Definition of the competence and scope of intervention of the Mobility House of Almada; Approach to include the EPTA Pillars addressed; Partners to involve; Operational needs and resources (human, financial, material) to allocate to the development and maintenance of the Mobility House of Almada, as a Local Public Transport Authority; Schedule for implementation of the Mobility House of Almada

23 DATA COLLECTION and ANALYSIS DETAIL KEY DATA COLLECTED; Demography, mobility and transports, O/D matrix, EU and Portuguese legislation Current competences of sector s entities

24 SUMMARY Study Area Analysis Methodology Approach New PTA Characteristics

25 Management Monitoring Information Planning Participation Mediation Communication

26 idea To create a multifuncional space integrating several dimensions of urban mobility management + planning + information + mediation + monitoring + communication + participation + Tendering/Awarding?

27 articulation Key-words... intermodality complementarity eficiency Mobility House of Almada sharing

28 COST FACTORS On-going/planned work: Scenarios for the business model of the Mobility House Identification of the financing needed for the implementation of the Mobility House, based on its competences and structure Funding sources: local and EU (if applicable)

29 INVOLVEMENT OF LOCAL STAKEHOLDERS Main stakeholders involved in the creation of the Mobility House of Almada: Municipality of Almada PT operators Municipal Company for Parking and Circulation Local Energy Agency Taxi companies Police Other (eg. water, electricity, gas distributors, etc.)

30 GOOD PRACTICES APPLIED Good practices chosen: R1 A Vision for Integrated Urban Mobility: Setting up your Transport Authority (?) R3 PTA example Bologna R5 PTA example - Thessaloniki R11 National Transport Authority (Ireland) P12 "PTA example Barcelona planning of infrastructures and services" I9 PTA example - Helsinki I10 PTA Example - Toulouse I11 PTA Example - Goteborg

31 OUTPUTS PRODUCED SO FAR TANGIBLE OUTPUTS REALIZED SO FAR: 4 meetings with stakeholders/transport authorities

32 PROBLEMS TO BE FACED and SOLUTIONS IDENTIFIED One difficulty may arise: Mobility House of Almada: Ensure the compatibility between the role of authority and the role of mediator in the same structure FUNCTIONS Public and Shared Transport Authority EPTA Mobility House of Almada 1 REGULATE X (X) 2 PLAN X (X) 3 TENDER/AWARD XX - 4 INTEGRATE X (X) 5 PROMOTE X XXX 6 MANAGE X (X) 7 CONTROL X (X)

33 ACTIONS IMPLEMENTED SO FAR Checklist ACTIVITY DONE YES Analysis of the local context X Definition of study methodology X Definition of specific study tools X Data collection X Analysis of data X X Design of the new service/pta Costs/benefits analysis Involvement of local stakeholders X Draft study report X X X NO

34 Thank you for your attention!

PUBLIC TRANSPORT TRIP GENERATION PARAMETERS FOR SOUTH AFRICA

PUBLIC TRANSPORT TRIP GENERATION PARAMETERS FOR SOUTH AFRICA PUBLIC TRANSPORT TRIP GENERATION PARAMETERS FOR SOUTH AFRICA P Onderwater SMEC South Africa, 2 The Cresent, Westway office park, Westville 3629, Durban Tel: 031 277 6600; Email: pieter.onderwater@smec.com

More information

Regional Capacities and Needs for SUMP enabling

Regional Capacities and Needs for SUMP enabling Integrated REgional Action Plan For Innovative, Sustainable and LOw CaRbon Mobility Regional Capacities and Needs for enabling Katerina Chrysostomou Center for Research and Technology Hellas (CERTH) Hellenic

More information

Integrated Sustainable Urban Development Strategies

Integrated Sustainable Urban Development Strategies UDN Peer-review workshop Integrated Sustainable Urban Development Strategies URBAN DEVELOPMENT AND SOCIAL COHESION POLICY AT THE SERVICE OF THE METROPOLITAN PROJECT Toulon Provence Méditerranée Urban Community

More information

Fertagus Concession Contract

Fertagus Concession Contract Fertagus Concession Contract 2013 FERTAGUS is a company part of the BARRAQUEIRO GROUP that won the public international contest for the railway exploitation of the north/south passage launched by the portuguese

More information

SUSTAINABLE URBAN MOBILITY PLAN TRAINING WORKSHOP. Module 6 Implementation Plan

SUSTAINABLE URBAN MOBILITY PLAN TRAINING WORKSHOP. Module 6 Implementation Plan SUSTAINABLE URBAN MOBILITY PLAN TRAINING WORKSHOP Module 6 Implementation Plan Sustainable Urban Mobility Plans: Delivery & Implementation Plans Identifying phased approach to delivery and programming

More information

SUMP: getting organised to fund SUMP activities

SUMP: getting organised to fund SUMP activities SUMP: getting organised to fund SUMP activities Tallinn, 26 March Ivo Cré, Polis In this presentation Presenting SUMPS The question! Needs of different actors in the process EU examples UK France Flanders

More information

Sustainable Urban Mobility Plans: Concept, process, content & benefits. Koprivnica 11 th of June 2015

Sustainable Urban Mobility Plans: Concept, process, content & benefits.   Koprivnica 11 th of June 2015 Sustainable Urban Mobility Plans: Concept, process, content & benefits /mobility-plans Koprivnica 11 th of June 2015 Is the increase of car traffic a natural law? Like a sunrise or a sunset Or like an

More information

Contribution of the EU Cohesion Policy to the Ports and Maritime Transport

Contribution of the EU Cohesion Policy to the Ports and Maritime Transport Contribution of the EU Cohesion Policy to the Ports and Maritime Transport Patrick Bernard-Brunet European Commission Directorate-General for Regional Policy CPMR Seminar Ports and Maritime Transport Gijón

More information

Programme Manual

Programme Manual 1.1.1. 25 October 2010 Table of contents 0. Introduction... 1 1. General programme information... 2 1.1. Main objectives of the programme...2 1.2. Programme area...2 1.3. Programme funding...2 1.4. Programme

More information

Proposal for a COUNCIL REGULATION

Proposal for a COUNCIL REGULATION EUROPEAN COMMISSION Brussels, 30.1.2019 COM(2019) 64 final 2019/0031 (APP) Proposal for a COUNCIL REGULATION on measures concerning the implementation and financing of the general budget of the Union in

More information

Action Plan for Pons Danubii EGTC

Action Plan for Pons Danubii EGTC Action Plan for Pons Danubii EGTC August 2018 Sharing solutions for better regional policies The SWARE project has been funded with support from the European Commission. This publication reflects the views

More information

ITALIAN PUBLIC TRANSPORT FUNDING. General manager ASSTRA Emanuele Proia

ITALIAN PUBLIC TRANSPORT FUNDING. General manager ASSTRA Emanuele Proia ITALIAN PUBLIC TRANSPORT FUNDING General manager ASSTRA Emanuele Proia Paris, 16 June 2016 1 PT AT A GLANCE (2014) about 1,013 companies about 50,000 vehicles 5.3 billion passengers (Boardings) 110,000

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 29-Jan-2013

More information

Cross country analysis of PPP: The case of urban rail

Cross country analysis of PPP: The case of urban rail Cross country analysis of PPP: The case of urban rail Joana Ribeiro, Rui Couchinho, Rosário Macário IST, Universidade de Lisboa, Portugal Champika Liyanage, Christopher Boles UCLAN, UK Contents Introduction

More information

Presentation at Civitas Forum

Presentation at Civitas Forum 12/10/2017 1 Presentation at Civitas Forum Kim Kreilgaard Head of EIB Group Office in Portugal 28th September at Torres Vedras European Investment Bank Group 12/10/2017 2 Largest multilateral lender and

More information

Plotting a new course for public transportation in South East Europe

Plotting a new course for public transportation in South East Europe Dear READER, Welcome to the first electronic newsletter of the ATTAC Attractive... Project supported under the South East Europe Programme. Through this communication, the project partners intend to disseminate

More information

Corporate Profile. Forum Economique Maroc/Portugal, 20 avril 2015 Lisbonne

Corporate Profile. Forum Economique Maroc/Portugal, 20 avril 2015 Lisbonne Corporate Profile Forum Economique Maroc/Portugal, 20 avril 2015 Lisbonne Brisa Overview Strategic Vision Brisa Overview Strategic Vision Credentials Leading European Motorway Company Pioneer in electronic

More information

Workshop on Implementing the Urban Agenda for the EU: A Smart City Approach

Workshop on Implementing the Urban Agenda for the EU: A Smart City Approach Workshop on Implementing the Urban Agenda for the EU: A Smart City Approach Brussels, 1 st December 2016 Session III Living the Smart City (Smart) Urban Mobility: Approach & Examples Neri di Volo / Katarina

More information

Terms of Reference for Senior Non-Key Short-Term Expert: e- Commerce Regulatory Issues

Terms of Reference for Senior Non-Key Short-Term Expert: e- Commerce Regulatory Issues Terms of Reference for Senior Non-Key Short-Term Expert: e- Commerce Regulatory Issues 1 CONTRACT OBJECTIVES & EXPECTED RESULTS 2 1.1 Background to the Project 2 1.2 Background to the Assignment 3 1.3

More information

Enhancing legal conditions for infrastructure investment in the Mediterranean raising awareness of risk mitigation instruments

Enhancing legal conditions for infrastructure investment in the Mediterranean raising awareness of risk mitigation instruments Enhancing legal conditions for infrastructure investment in the Mediterranean raising awareness of risk mitigation instruments the investment security in the mediterranean support programme The Organisation

More information

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL EUROPEAN COMMISSION Brussels, 30.1.2019 COM(2019) 65 final 2019/0030 (COD) Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL laying down provisions for the continuation of ongoing

More information

1. PROCEDURE EUROPEAN COMMISSION. Brussels, SUBJECT: STATE AID NO. SA (2014/N) PORTUGAL REGIONAL AID MAP

1. PROCEDURE EUROPEAN COMMISSION. Brussels, SUBJECT: STATE AID NO. SA (2014/N) PORTUGAL REGIONAL AID MAP EUROPEAN COMMISSION Brussels, 11.06.2014 C(2014) 3576 PUBLIC VERSION This document is made available for information purposes only. SUBJECT: STATE AID NO. SA.38571 (2014/N) PORTUGAL REGIONAL AID MAP 2014-2020

More information

NEGOTIATION OF THE ECONOMIC PARTENERSHIP AGREEMENT BETWEEN WEST AFRICA REGION AND THE EUROPEAN UNION

NEGOTIATION OF THE ECONOMIC PARTENERSHIP AGREEMENT BETWEEN WEST AFRICA REGION AND THE EUROPEAN UNION NEGOTIATION OF THE ECONOMIC PARTENERSHIP AGREEMENT BETWEEN WEST AFRICA REGION AND THE EUROPEAN UNION Background and justification TECHNICAL WORKING GROUP ON SERVICES Terms of reference The Cotonou Agreement,

More information

FINANCING PPPS INTRANSPORT

FINANCING PPPS INTRANSPORT FOSTERING SUSTAINABILITY AND INNOVATION THROUGH PUBLIC PRIVATE PARTNERSHIPS Barcelona, November 17 th 2015 FINANCING PPPS INTRANSPORT AND URBAN PROJECTS José Manuel Vassallo Associate Professor Universidad

More information

Marche Region. Ex Ante Evaluation report. Executive summary. Roma, June 2015

Marche Region. Ex Ante Evaluation report. Executive summary. Roma, June 2015 Marche Region 2014-2020 COMMITTENTE RDP for Marche Ex Ante Evaluation report Roma, June 2015 Executive summary EXECUTIVE SUMMARY Introduction The Ex Ante Evaluation (EAE) of the Rural Development Programme

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Amended proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

COMMISSION OF THE EUROPEAN COMMUNITIES. Amended proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL COMMISSION OF THE EUROPEAN COMMUNITIES Amended proposal for a Brussels, 24.5.2006 COM(2005) 119 final/2 2005/0043 (COD) 2005/0044 (CNS) DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL concerning

More information

Danube Transnational Programme

Danube Transnational Programme Summary Danube Transnational Programme 2014-2020 Summary of the Cooperation Programme Version 2.3, 20 th October 2014 Danube Transnational Programme 2014-2020 (INTERREG V-B DANUBE) Page 1 Mission of the

More information

COMMISSION REGULATION (EU) / of XXX

COMMISSION REGULATION (EU) / of XXX EUROPEAN COMMISSION Brussels, XXX [ ](2015) XXX draft COMMISSION REGULATION (EU) / of XXX amending Regulation (EU) No 651/2014 declaring certain categories of aid compatible with the internal market in

More information

Swords/ Airport to City Centre BRT Consultation Submission For Coach Tourism and Transport Council of Ireland (CTTC)

Swords/ Airport to City Centre BRT Consultation Submission For Coach Tourism and Transport Council of Ireland (CTTC) - Swords/ Airport to City Centre BRT Consultation Submission For Coach Tourism and Transport Council of Ireland (CTTC) Final Submission November 2014 Email:- info@transportinsights.com Telephone:- + 353

More information

COMMISSION OF THE EUROPEAN COMMUNITIES

COMMISSION OF THE EUROPEAN COMMUNITIES EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 23.2.2009 COM(2009) 82 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE

More information

Planeamento e Gestão da Mobilidade Urbana. Sessão 3:

Planeamento e Gestão da Mobilidade Urbana. Sessão 3: Mestrado em Ordenamento do Território e Urbanismo Planeamento e Gestão da Mobilidade Urbana João de Abreu e Silva Sessão 3: - Organização e Custos do Sistema de Transportes (agradecimentos: Prof Rosário

More information

Evaluation, Monitoring and Incentives Mechanisms for Sub-national Capacity Building: Regional Policy in Italy

Evaluation, Monitoring and Incentives Mechanisms for Sub-national Capacity Building: Regional Policy in Italy Mechanisms for enhancing multi-level governance effectiveness Evaluation, Monitoring and Incentives Mechanisms for Sub-national Capacity Building: Regional Policy in Italy Flavia Terribile Ministry of

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION. of

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION. of COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 30.3.2009 C(2009) 2178 final COMMISSION DECISION of 30.3.2009 establishing the multi-annual work programme 2009 for grants in the field of trans- European

More information

Case study 1 Water distribution and sanitation in Casablanca (Morocco)

Case study 1 Water distribution and sanitation in Casablanca (Morocco) Case study 1 Water distribution and sanitation in Casablanca (Morocco) Contract type: Water distribution and sanitation for Grand Casablanca Contract award Date: 1997 Private partner: Lyonnaise des Eaux

More information

Minimum Elements of a Local Comprehensive Plan

Minimum Elements of a Local Comprehensive Plan Minimum Elements of a Local Comprehensive Plan Background OKI is an association of local governments, business organizations and community groups serving more than 180 cities, villages, and townships in

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 11 DIVISION: Communications BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Presentation and discussion regarding the Fiscal Year (FY) 2013 SFMTA

More information

Treatment of deep-discounted bonds and index-linked bonds Financing and exploiting of "public infrastructure" by the enterprises sector.

Treatment of deep-discounted bonds and index-linked bonds Financing and exploiting of public infrastructure by the enterprises sector. Following the decisions of 3 and 21 February 1997,, has once more decided on two complementary accounting issues setting the guidelines to ensure a better comparability for the deficit and debt procedure

More information

SEETO priority projects rating methodology. July, SEETO Priority Projects rating methodology 13/07/2012 Page 1

SEETO priority projects rating methodology. July, SEETO Priority Projects rating methodology 13/07/2012 Page 1 SEETO priority projects rating methodology July, 2012 13/07/2012 Page 1 Table of content 1 Introduction... 3 1.1 Purpose of the Rating methodology... 3 1.2 Rationale for the Rating methodology... 3 1.3

More information

Funding and financing solutions for urban rail systems

Funding and financing solutions for urban rail systems Funding and financing solutions for urban rail systems Arturs Alksnis Public Affairs Manager 5 th European Conference on Sustainable Urban Mobility Plans 15 May 2018, Nicosia, Cyprus UNIFE is the European

More information

DANUBE DANUBE Transnational Programme and CENTRAL EUROPE 2020 Richárd GÖNCZI National Contact Point, Hungary Széchenyi Programme Office

DANUBE DANUBE Transnational Programme and CENTRAL EUROPE 2020 Richárd GÖNCZI National Contact Point, Hungary Széchenyi Programme Office preparation of a transnational cooperation programme 2014- Transnational Programme and CENTRAL EUROPE Richárd GÖNCZI National Contact Point, Hungary Széchenyi Programme Office 22. April 2015 Content (0)

More information

Summary Project Fiche

Summary Project Fiche Summary Project Fiche 1. Basic Information 1.1. Désirée number 1.2. Title: Rehabilitation of Nicosia - Phase 2 1.3. Sector: Bi-communal 1 projects 1.4. Location: Cyprus / Nicosia 2. Objectives 2.1. Overall

More information

Executive summary of Statistics Portugal and ONA Annual Activities Report 2016

Executive summary of Statistics Portugal and ONA Annual Activities Report 2016 Executive summary of Statistics Portugal and ONA Annual Activities Report 2016 1. Overview 2. Some Statistical activities and Surveys developed in 2016 by the SP and ONA 2.1. Concerning the statistical

More information

Information Session on the Calls for Expression of Interest in the fields of municipal infrastructure and socio-economic support.

Information Session on the Calls for Expression of Interest in the fields of municipal infrastructure and socio-economic support. EUROPEAN COMMISSION Neighbourhood and Enlargement Negotiations A - STRATEGY AND TURKEY A.5 TURKEY Secretariat of the EU Facility for Refugees In Turkey Information Session on the Calls for Expression of

More information

Terms of Reference for Junior Non-Key Expert on e-invoicing, e-ordering and the respective framework

Terms of Reference for Junior Non-Key Expert on e-invoicing, e-ordering and the respective framework Terms of Reference for Junior Non-Key Expert on e-invoicing, e-ordering and the respective framework 1 CONTRACT OBJECTIVES & EXPECTED RESULTS 2 1.1 Background to the Project 2 1.2 Background to the Assignment

More information

Circulation Draft Created on 12/8/2009 2:58:00 PM

Circulation Draft Created on 12/8/2009 2:58:00 PM Circulation Draft Notes: This document is a draft document. It is not to be construed as a final product as it will change (i.e. items may be added or deleted). Please feel free to send comments at any

More information

The Uber Case in Portugal. European Seminar on Competition Law Valeria Bianco Autoridade da Concorrência 20 November 2015

The Uber Case in Portugal. European Seminar on Competition Law Valeria Bianco Autoridade da Concorrência 20 November 2015 The Uber Case in Portugal European Seminar on Competition Law Valeria Bianco Autoridade da Concorrência 20 November 2015 Contents I. Uber in Portugal II. The April 2015 Court Injunction and the June 2015

More information

Mobility / Other Modes Roger Nober Executive Vice President Law and Secretary BNSF Railway

Mobility / Other Modes Roger Nober Executive Vice President Law and Secretary BNSF Railway Mobility / Other Modes Roger Nober Executive Vice President Law and Secretary BNSF Railway Today s Discussion Urban Mobility Rural Mobility and Safety Other Modes: Mass Transportation Freight and Intercity

More information

Dear Cities, Counties, Transit Agencies, and CMAs:

Dear Cities, Counties, Transit Agencies, and CMAs: June 18, 2007 Bay Area Public Agencies San Francisco Bay Area Subject: Call for Projects for MTC s 2007 Traffic Engineering Technical Assistance Program Dear Cities, Counties, Transit Agencies, and CMAs:

More information

Greater Cleveland Regional Transit Authority

Greater Cleveland Regional Transit Authority Greater Cleveland Regional Transit Authority STRATEGIC PLAN UPDATE 2020-2030 Presented to: Operational Planning & Infrastructure Committee February 5, 2019 Review of Current/Planned Studies Strategic Plan:

More information

Transportation Theory and Applications

Transportation Theory and Applications Fall 2017 - MTAT.08.043 Transportation Theory and Applications Lecture V: Modal split A. Hadachi General Overview Idea After trip generation process and creating the new OD-matrix we slice it into number

More information

CE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE

CE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE CE TEXTE N'EST DISPONIBLE QU' VERSION ANGLAISE ANNEX 1 1. IDTIFICATION Title/Number Support Services to the National Authorising Officer CRIS NO: FED/2009/021-496 Total cost Total: 315,800 (EC Contribution:

More information

Cohesion policy: European solidarity in practice

Cohesion policy: European solidarity in practice SPEECH/04/290 Peter Balázs Member of the European Commission Cohesion policy: European solidarity in practice Economic and Social Committee Brussels, 8th June 2004 Ladies and Gentlemen, It is a real pleasure

More information

12 th Global Program of Work and Program Budget 2014/15. Imre Hollo Director Administration and Finance

12 th Global Program of Work and Program Budget 2014/15. Imre Hollo Director Administration and Finance 12 th Global Program of Work and Program Budget 2014/15 Imre Hollo Director Administration and Finance What is the GPW? A 6 year vision and mission for WHO Framework for priority setting and accountability

More information

The evaluation of transport public policies on commuters travels environmental consequences

The evaluation of transport public policies on commuters travels environmental consequences The evaluation of transport public policies on commuters travels environmental consequences 2 nd EEEN forum Stockholm, 9 th -10 th April 2013 Mihaï TIVADAR (IRSTEA), Odile HEDDEBAUT (IFSTTAR) 9th April

More information

Guidance for Member States on Integrated Sustainable Urban Development (Article 7 ERDF Regulation)

Guidance for Member States on Integrated Sustainable Urban Development (Article 7 ERDF Regulation) EUROPEAN COMMISSION European Structural and Investment Funds Guidance for Member States on Integrated Sustainable Urban Development (Article 7 ERDF Regulation) p10 addition of 3 bullet points for specific

More information

Metropolitan Planning Organizations in North Carolina. Chris Lukasina NCAMPO

Metropolitan Planning Organizations in North Carolina. Chris Lukasina NCAMPO Metropolitan Planning Organizations in North Carolina Chris Lukasina NCAMPO February 1, 2016 Items to Discuss What is an MPO/RPO? Why were they established? How are they structured? What areas do they

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Project Name Region Sector Project ID Borrower Report No. PIC4620 Senegal-Urban Transport Reform and... Capacity Building Project Africa Urban Transport SNPA44383 Republic

More information

Funding opportunities

Funding opportunities Funding opportunities Herbert Haubold, Environment Agency Austria 5th partner meeting Follow- Up Nr. 1 logo After the project! Ideas Funding constraints Projects 5th partner meeting Funding Opportunities

More information

Urban Transport Institutional and Financial Issues. International best practices

Urban Transport Institutional and Financial Issues. International best practices Urban Transport Institutional and Financial Issues International best practices Contents 2 I N T R O D U C T I O N S E L E C T E D F O R E I G N E X A M P L E S C O N C L U S I O N Introduction : Key issues

More information

Transport & Environment Does the money match the targets? Aligning EU investments in transport infrastructure with EU climate targets

Transport & Environment Does the money match the targets? Aligning EU investments in transport infrastructure with EU climate targets Transport & Environment Does the money match the targets? Aligning EU investments in transport infrastructure with EU climate targets Pia Nieminen 7.12.2016 EIB: The EU Bank Independent institution founded

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC China Transport Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 6.0 ARCHIVED on 21-Nov-2014 ISR16536 Implementing Agencies: Wuhan Urban

More information

DRAFT REVISED GUIDANCE NOTE ON MAJOR PROJECTS IN THE PROGRAMMING PERIOD : THRESHOLD AND CONTENTS OF COMMISSION DECISIONS

DRAFT REVISED GUIDANCE NOTE ON MAJOR PROJECTS IN THE PROGRAMMING PERIOD : THRESHOLD AND CONTENTS OF COMMISSION DECISIONS COCOF 08/0006/04-EN EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY DRAFT REVISED GUIDANCE NOTE ON MAJOR PROJECTS IN THE PROGRAMMING PERIOD 2007-2013: THRESHOLD AND CONTENTS OF COMMISSION DECISIONS!WARNING!

More information

Place based intervention in Pomurje. Jurij Kobal, Slovenia

Place based intervention in Pomurje. Jurij Kobal, Slovenia Place based intervention in Pomurje Jurij Kobal, Slovenia Jurij Kobal Oikos, company working in Pomurje region on Government s Place Based Intervention. Working in Slovenia, Croatia, Montenegro, Serbia,

More information

Port governance in Europe

Port governance in Europe Port governance in Europe Patrick Verhoeven AAPA ESPO Trans-Atlantic Seminar on Ports and Logistics Washington, The Willard, 23 March 2011 1 Summary 1. Conceptual background 2. ESPO Fact Finding Report

More information

GOLDEN VISA ARI. Authorization of Residency for Investment Autorização de Residência para Investimento

GOLDEN VISA ARI. Authorization of Residency for Investment Autorização de Residência para Investimento WWW.VALADASCORIEL.COM GOLDEN VISA ARI Authorization of Residency for Investment Autorização de Residência para Investimento 1 GOLDEN VISA ARI Authorization of residency for investment Autorização de Residência

More information

CBA of transport infrastructure projects in Germany

CBA of transport infrastructure projects in Germany CBA of transport infrastructure projects in Germany Dr. Catharina Horn Federal Transport Infrastructure Planning, Investment Policy Paris, 27th of February 2014 www.bmvi.de 1. The Federal Transport Infrastructure

More information

Transportation Improvement Program and Incentives for Local Planning

Transportation Improvement Program and Incentives for Local Planning Capital District November 9, 2004 Transportation Committee Transportation Improvement Program and Incentives for Local Planning CDTC has been successful in funding 36 Linkage Program planning studies since

More information

Urban Mobility within Sustainable Urban Development supported by the European Structural and Investment Funds

Urban Mobility within Sustainable Urban Development supported by the European Structural and Investment Funds Urban Mobility within Sustainable Urban Development supported by the European Structural and Investment Funds 2014-2020 1 st European Conference on Sustainable Urban Mobility Plans 12-13 June 2014, Sopot,

More information

Strengthening Vermont s Economy by Integrating Transportation and Smart Growth Policy

Strengthening Vermont s Economy by Integrating Transportation and Smart Growth Policy Strengthening Vermont s Economy by Integrating Transportation and Smart Growth Policy Technical Memorandum #4: Short List of Recommended Alternatives May 21, 2013 Tech Memo #4: Short List of Recommended

More information

Gautrain Rapid Rail Link - A Public Private Partnership Development Model

Gautrain Rapid Rail Link - A Public Private Partnership Development Model Gautrain Rapid Rail Link - A Public Private Partnership Development Model T E R R Y R A M A B U L A N A M. C O M ; A G A ( S A ) ; D I P ( F A ) ; M I S T D E X E C U T I V E D I R E C T O R T I S H O

More information

Note on the Development of the Global Fund s Strategy

Note on the Development of the Global Fund s Strategy Note on the Development of the Global Fund s Strategy The Global Fund Voluntary Replenishment 2005 Note on the Development of the Global Fund s Strategy The Global Fund to Fight AIDS, Tuberculosis and

More information

4.5/ Almada s Climate Fund

4.5/ Almada s Climate Fund Águeda koprivnica Zagreb CROATIA Lisbon PORTUGAL 4.5/ Almada s Climate Fund 4.5.1/ Almada s Internal Contracting scheme at a glance Key Figures City surface: 76 km² Inhabitants: 169,700 Municipal building

More information

Overview. Origins. EU Austerity Economic Causes Economic Consequences 04/03/ Single European Act Neo-liberal Assumptions National Objectives

Overview. Origins. EU Austerity Economic Causes Economic Consequences 04/03/ Single European Act Neo-liberal Assumptions National Objectives EU Austerity Economic Causes Economic Consequences IER Conference 9 March 2016 Overview CAUSES the neo-liberal assumptions of the 1986 Single Europe Act and subsequent treaties the contradictions between

More information

FAQ ON EX ANTE CONDITIONALITIES RELATING TO TRANSPORT

FAQ ON EX ANTE CONDITIONALITIES RELATING TO TRANSPORT FAQ ON EX ANTE CONDITIONALITIES RELATING TO TRANSPORT This list of frequently asked questions is based on comments received from Member States (MS) on Part II of the Guidance on ex ante conditionalities

More information

Purpose. 2 Third Crossing Business Plan

Purpose. 2 Third Crossing Business Plan Business Plan April 18, 2017 Purpose This is the third of three information sheets on critical pieces of work related to the preliminary design and business plan development for the Third Crossing. This

More information

Prioritisation Methodology

Prioritisation Methodology Prioritisation Methodology March 2014 PRIORITISATION METHODOLOGY Table of contents 1 Introduction... 5 2 The Projects Prioritisation Process... 7 3 The Methodological Assumptions... 8 3.1 Background...

More information

URBACT II PROGRAMME MANUAL. (Technical Working Document)

URBACT II PROGRAMME MANUAL. (Technical Working Document) European Regional Development Fund 2007-2013 Objective 3: European Territorial Cooperation URBACT II PROGRAMME MANUAL (Technical Working Document) Approved by the Monitoring Committee on 21/11/2007 Modified

More information

Implementation of the EU strategy for the Danube region

Implementation of the EU strategy for the Danube region C 188 E/30 Official Journal of the European Union 28.6.2012 Implementation of the EU strategy for the Danube region P7_TA(2011)0065 European Parliament resolution of 17 February 2011 on the implementation

More information

URBACT II PROGRAMME MANUAL

URBACT II PROGRAMME MANUAL European Regional Development Fund 2007-2013 Objective 3: European Territorial Cooperation URBACT II PROGRAMME MANUAL (Technical Working Document) Approved by the Monitoring Committee on 21/11/2007 Modified

More information

Alternative ways of Financing Urban Development

Alternative ways of Financing Urban Development External Support for Decentralization Reforms & Local Governance Systems in the Asia Pacific: Better Performance, Higher Impact? Cities Development Initiative for Asia Alternative ways of Financing Urban

More information

Westshore Circulator Study. Westshore Alliance Transportation Committee Meeting

Westshore Circulator Study. Westshore Alliance Transportation Committee Meeting Westshore Circulator Study Westshore Alliance Transportation Committee Meeting November 14, 2012 Agenda Study Purpose Existing Conditions Analysis Needs Assessment Implementation Plan Study Purpose Explore

More information

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT A. Sector Road Map Road Improvement and Institutional Development Project (RRP PHI 41076) SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT 1. Sector Performance, Problems and Opportunities 1. Roads provide

More information

CIVINET ACTIVITY FUND CALL For New CIVITAS National Networks

CIVINET ACTIVITY FUND CALL For New CIVITAS National Networks CIVINET ACTIVITY FUND CALL For New CIVITAS National Networks CIVINET WEBINAR, 11 September 2017 Jerome Simpson Regional Environmental Center for CEE Contents What are the CIVINETs? An Activity Fund Extra

More information

Implementation Status & Results China China Wuhan Second Urban Transport (P112838)

Implementation Status & Results China China Wuhan Second Urban Transport (P112838) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results China China Wuhan Second Urban Transport (P112838) Operation Name: China Wuhan Second Urban Transport (P112838)

More information

ANNEX V. Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures

ANNEX V. Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures EN ANNEX V Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures 1. Title/basic act/ CRIS number 2. Zone benefiting from the action/location CRIS number: 2018/41357

More information

CHAPTER 2 BACKGROUND. Update of Previous Planning Work. Plan Development Process. Public Involvement and Review Process

CHAPTER 2 BACKGROUND. Update of Previous Planning Work. Plan Development Process. Public Involvement and Review Process CHAPTER 2 BACKGROUND What Is the 2030 TSP? Update of Previous Planning Work Plan Development Process Public Involvement and Review Process Hennepin County Transportation Systems Plan (HC-TSP) Chapter 2

More information

GCF Readiness Programme Fiji

GCF Readiness Programme Fiji GCF Readiness Programme Fiji In Fiji, The Programme will target two important aspects of the GCF approach, access to funds and private sector engagement. In this context the Programme focuses on a range

More information

SPAIN Zaragoza Tramway SUMMARY OVERVIEW ZARAGOZA TRAMWAY. Location Zaragoza, Aragón, Spain

SPAIN Zaragoza Tramway SUMMARY OVERVIEW ZARAGOZA TRAMWAY. Location Zaragoza, Aragón, Spain SPAIN Zaragoza Tramway Image: Tramway through Plaza Lanuza in Zaragoza by Thierry Llansades / CC BY-NC-ND 2.0 OVERVIEW Location Zaragoza, Aragón, Spain Sector Transport Rail Procuring Authority Municipality

More information

EPTA presentation WS6 - Worskhop. «The Service Contract management: policy in action»

EPTA presentation WS6 - Worskhop. «The Service Contract management: policy in action» EPTA presentation WS6 - Worskhop «The Service Contract management: policy in action» Control procedures, performance indicators, etc. : keep a simple approach Fabio Formentin, Adrea Normanno Razlog, 29th

More information

EVALUATION REPORT ON IMPLEMENTATION OF ACTIONS

EVALUATION REPORT ON IMPLEMENTATION OF ACTIONS EVALUATION REPORT ON IMPLEMENTATION OF ACTIONS CO-FINANCED BY THE EXTERNAL BORDERS FUND Ref. No. A-089-711/10 Prepared by the responsible authority of the EBF in Sweden The National Criminal Police 1 EVALUATION

More information

RAILWAY SECURITY: RESPONSIBILITY DISTRIBUTION WHO SHOULD REGULATE? HOW?

RAILWAY SECURITY: RESPONSIBILITY DISTRIBUTION WHO SHOULD REGULATE? HOW? RAILWAY SECURITY: RESPONSIBILITY DISTRIBUTION WHO SHOULD REGULATE? HOW? 13th FLORENCE RAIL FORUM 25 NOVEMBER 2016 TABLE OF CONTENTS 01. RAILWAYS ARE COMMITTED TO ENSURE THE HIGHEST POSSIBLE LEVEL OF SECURITY

More information

National Agriculture and Rural Development Plan

National Agriculture and Rural Development Plan MEASURE 2.3. DEVELOPMENT AND IMPROVEMENT OF THE RURAL INFRASTRUCTURE Rationale The development of the private economic activities and the improvement of the living conditions for the population in the

More information

ENDOWMENT FUND PREPARATION CHECKLIST

ENDOWMENT FUND PREPARATION CHECKLIST LCMS Foundation 1333 S. Kirkwood Road St. Louis, MO 63122-7295 800.325.7912 lcmsfoundation.org There are a number of decisions for a congregation or ministry organization to make when establishing an endowment

More information

Development Planning in Uganda Patrick Birungi, PhD

Development Planning in Uganda Patrick Birungi, PhD Development Planning in Uganda Patrick Birungi, PhD Director Development Planning National Planning Authority Delivered to Rotary Club, Kampala 25 th July, 2016 Outline Introduction Functions of the National

More information

Christmas Webinar. Residency Permit for Investment in Portugal

Christmas Webinar. Residency Permit for Investment in Portugal Christmas Webinar Residency Permit for Investment in Portugal December 2018 Contents Residency Permit for Investment in Portugal What? 3 How? 6 Types of investment 6 Procedure 16 Benefits 18 Our experience

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Amended proposal for a COUNCIL DECISION

COMMISSION OF THE EUROPEAN COMMUNITIES. Amended proposal for a COUNCIL DECISION COMMISSION OF THE EUROPEAN COMMUNITIES Amended proposal for a COUNCIL DECISION Brussels, 24.5.2006 COM(2005) 442 final/2 2005/0187 (CNS) concerning the specific programme People implementing the 7 th Framework

More information

Maribor, Slovenia, 7 and 8 April 2008

Maribor, Slovenia, 7 and 8 April 2008 CONFERENCE ON THE FUTURE OF COHESION POLICY Maribor, Slovenia, 7 and 8 April 2008 PRESIDENCY CONCLUSIONS In September 2007, at the Fourth European Forum on Cohesion, the European Commission officially

More information

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL EUROPEAN COMMISSION Brussels, 19.12.2018 COM(2018) 892 final 2018/0432 (COD) Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL in order to allow for the continuation of the territorial

More information

Portugal Norte Region View

Portugal Norte Region View Cohesion Policy post 2020: Portugal Norte Region View Ester Silva Norte Regional Coordination and Development Commission 11 October2017 1 CCDR-Norte is a decentralised body of central government Intervention

More information