ELECTRONIC PACKET MARCH 13, 2017 OPERATIONS COMMITTEE MEETING. RELEASED: Monday, March 6, 2017

Size: px
Start display at page:

Download "ELECTRONIC PACKET MARCH 13, 2017 OPERATIONS COMMITTEE MEETING. RELEASED: Monday, March 6, 2017"

Transcription

1 ELECTRONIC PACKET MARCH 13, 2017 OPERATIONS COMMITTEE MEETING RELEASED: Monday, March 6, 2017

2

3

4

5

6 OPERATIONS COMMITTEE MEETING March 13, 2017 EXECUTIVE DIRECTOR S REPORT A. Monthly Reports B. Green Luminaries (Lisa Sasso)

7 Item 1 COMMISSION FILE NO: DATE INTRODUCED: March 13, 2017 INTRODUCED BY: REFERRED BY COMMISSION CHAIRPERSON TO: Executive Director (Signature on File in the Office of the Commission) Operations Committee RELATING TO: Award of Contract J04039C01, Jones Island Water Reclamation Facility Pressure Relief Panel Replacement SUMMARY: The Commission is requested to award and to direct the Executive Director to execute on behalf of the District Contract J04039C01, Jones Island Water Reclamation Facility Pressure Relief Panel Replacement, to W.L. Hall Company in the amount of $2,229,390. W.L. Hall Company was the lowest responsible, responsive bidder with one bid received. The Milorganite Storage/Rail Loadout and Dewatering and Drying (D&D) Facilities at the Jones Island Water Reclamation Facility (JIWRF) have been in operation since the early 1990 s. These facilities primary functions are to produce, process, and convey Milorganite. These operations can create significant amounts of dust. The presence of dust in the atmosphere can result in some risk of explosions or fires. These facilities were originally constructed with significant safeguards to reduce the risk of dust-related fires and explosions or reduce the impact of fires/explosions, if they should occur. These safeguards are driven by building and fire protection codes, along with recommendations from insurance companies. One of the safeguards originally constructed with these facilities was pressure relief panels. A pressure relief panel intentionally opens quickly after an explosion, allowing the rapidly expanding heated gases to be released to the outside. By doing so, the internal walls, floor, and ceiling are spared from damaging overpressure experienced during an explosion. There are approximately 275 panels of varying sizes and configurations located throughout these buildings. ATTACHMENTS: BACKGROUND KEY ISSUES RESOLUTION FISCAL NOTE S/W/MBE OTHER OP_AWJ04039_JIWRF_PresRel_legislative_file.docx COMMITTEE ACTION: COMMISSION ACTION: DATE: DATE:

8 SUMMARY (Cont d) Award of Contract J04039C01, Jones Island Water Reclamation Facility Pressure Relief Panel Replacement The existing pressure relief panels were installed on the facades of both buildings during the original construction and have reached the end of their service life. They are experiencing significant delamination and general deterioration and, on at least one occasion, have fallen off the building during a wind storm. The panels do not have a restraint system, so, if a panel falls out, it simply falls to the ground. The purpose of the project is to provide new panels with at least 20-year service lives and include a panel restraint system for the panels. The work includes the removal and replacement of approximately 20,850 square feet of pressure relief panels at the D&D Facility and the Milorganite Storage/Rail Loadout Facility. These panels are an engineered system and require National Fire Protection Association 68 compliance. The duration for this contract is 305 days. Consistent with the Agreement for Management, Operations, and Maintenance Services between the District and Veolia Water Milwaukee, LLC, (VWM), VWM will make a $20,000 contribution to the District for this project. 2

9 RESOLUTION Award of Contract J04039C01, Jones Island Water Reclamation Facility Pressure Relief Panel Replacement RESOLVED, by the Milwaukee Metropolitan Sewerage Commission, that Contract J04039C01, Jones Island Water Reclamation Facility Pressure Relief Panel Replacement, is awarded to W.L. Hall Company in the amount of $2,229,390, and that the Executive Director is directed to execute a contract on behalf of the District. 3

10 Capital Budget Fiscal Note Total Project Cost RELATING TO: Award of Contract J04039C01, Jones Island Water Reclamation Facility Pressure Relief Panel Replacement Capital Project Number(s) Impact of Requested Action on Total Project Cost: J04039 Increase Decrease New Project X No Change Total Project Cost Analysis Project Costs Adopted 2017 Total Project Cost $2,947,272 Previously Approved Changes $0 Approved Total Project Cost $2,947,272 Requested Total Project Cost n/a Requested (Increase)/Decrease $0 Action to be taken to Long-Range Financing Plan to address Total Project Cost change Transfer from Allowance for Cost and Schedule Changes Transfer from another project (specify in comments) Delay Project(s) (specify in comments) Delete Project(s) (specify in comments) Other Transfer to Allowance for Cost and Schedule Changes Comments The VW contribution for this contract is $20,000. Budget Review by: Date: Theresa Zwieg 2/2/2017

11 Bid & S/W/MBE Information Award of Contract J04039C01, Jones Island Water Reclamation Facility Pressure Relief Panel Replacement Cost Center: 41 Bid Opening Date: February 1, 2017 Total S/W/MBE Local No. of Bids No. of Responsive Bids Bids (listed low to high) (Name/City/State/Zip) Price Responsive/ Non-Responsive/ Not Reviewed % Subcontractor % S/W/MBE W.L. Hall Co. Hopkins, MN $2,229, Responsive 48.5% 48.5% Low Bid Information Subcontractor MBE/WBE/SBE/VBE Firms Type of Work % Amount MBE: Allcon Construction Butler, WI Dust Proof 13.4% $300, WBE: SBE: VBE: CMB Erectors, Inc. Somers, WI Demo/Install 35.1% $782, /01/17 J04039C01-1 -

12 Non- MBE/WBE/SBE/VBE Subcontractors Type of Work % Amount List reason(s) if no MBE/WBE/SBE Involvement: Local Workforce Participation Requirement: A. Sanitary Sewer Service Area Employment: 45% B. Target Area Employment: 20% Apprentice Utilization As Bid: 2 Bids Non-Responsive: Comments: S/W/MBE Planholders: B&D Contractors, Inc., Ward Welding & Fabrication, JRT Top Notch Roofs Media Ads: Yes No Name of Publication: Daily Reporter 03/01/17 J04039C01-2 -

13 Information for Low Bid (Over $10,000) Company Name: W.L. Hall Company Contact Person: Bob Daniel Phone: EEO DATA: a) Total Number of Employees: 110 Total Percentage Total Percentage b) Minorities % c) Female % Hispanic 6 5.4% Hispanic 1 0.1% African American 3 2.7% African American 0 0.0% Native American 1 0.9% Native American 0 0.0% Asian 0 0.0% Asian 0 0.0% d) Labor Market Availability: Minorities: 16.2% Females: 48% 03/01/17 J04039C01-3 -

14 Item 2 COMMISSION FILE NO: DATE INTRODUCED: March 13, 2017 INTRODUCED BY: REFERRED BY COMMISSION CHAIRPERSON TO: Executive Director (Signature on File in the Office of the Commission) Operations Committee RELATING TO: Amendment Number Five, Contract W40002D05, Kinnickinnic River Reach 2 Phase 1 Project, and Restore the Executive Director s Original Delegated Authority SUMMARY: The Commission is requested to authorize the Executive Director to execute Amendment Number Five to Contract W40002D05, Kinnickinnic (KK) River Reach 2 Phase 1 Project, with Graef-USA, Inc., (Graef), in an amount not to exceed $281,100, and to restore the Executive Director s original delegated authority. The KK River Watercourse Management Plan (KKRWMP) identifies the number of structures in the floodplain and further identifies projects planned for implementation within the watershed. One of the key stream reaches of KKRWMP is the KK River Mainstem. Within the KK River Mainstem are 330 structures in the floodplain. Staff has divided the KK River Mainstem into individual reaches, including KK River Reach 2. Reach 2 limits are from S. 6 th Street to S. 27 th Street. (See KK River Mainstem Map.) The KKRWMP includes the following recommendations for the KK River Reach 2 project: Increase the channel width from 60 feet to 200 feet to allow passage of flood flows. Increase flow capacity at five City of Milwaukee vehicular bridges and four pedestrian bridges. Replace existing concrete-lined channel with a rock-lined main channel and an expanded vegetated floodplain. Acquire or floodproof seven additional structures that are expected to remain in the floodplain following the implementation of the other project recommendations. ATTACHMENTS: BACKGROUND KEY ISSUES RESOLUTION FISCAL NOTE S/W/MBE OTHER Kinnickinnic River Mainstem Map OP_Amdt5_W40002_KK_River_legislative_file.docx COMMITTEE ACTION: COMMISSION ACTION: DATE: DATE:

15 SUMMARY (Cont d) Amendment Number Five, Contract W40002D05, Kinnickinnic River Reach 2 Phase 1 Project, and Restore the Executive Director s Original Delegated Authority To implement these recommendations, the District is in the process of acquiring and removing 83 structures between S. 6 th and S. 16 th Streets to allow for the increased channel width. In addition, staff will incorporate green infrastructure into the KK River projects. In July 2014, the District awarded Contract W40002D05, KK River Reach 2 Phase 1 Project, to Graef in an amount not to exceed $2,576,042. The scope of the contract originally consisted of: Updating the KKRWMP. Preparing Park Plans for Milwaukee County Park areas affected by the updated KKRWMP. Performing preliminary engineering for the KK River Reach 2 recommendations. Preparing final design and bid documents for the Reach 2 segment between S. 20 th and S. 27 th Streets. Providing engineering services during construction (ESDC). As preliminary engineering progressed, staff identified that constructing the segment between S. 20 th and S. 27 th Streets would result in a temporary increase in flood risk to structures located upstream of the project area, including St. Luke s Hospital. This is not allowed by the Wisconsin Department of Natural Resources (WDNR) and the United States Federal Emergency Management Agency, and the District would be unable to obtain the necessary permits to construct the project. The flood risks would reduce after implementing other upstream elements. To obtain the required floodplain permits, the District must construct KKRWMP projects in a certain order to ensure that flood risks do not temporarily increase on structures. With completion of additional engineering, the District has now identified an acceptable project implementation plan on the KK River, and this plan avoids temporary increases in flood risk. For Reach 2, instead of proceeding with design and construction of the segment between S. 20 th and S. 27 th Streets, it is now necessary to proceed with design and construction of the segment within Pulaski Park between S. 16 th Street and the Union Pacific Railroad. Following this project, the District will need to construct upstream flood storage in Jackson Park prior to implementation of the remaining sections of the KK River Reach 2. 2

16 SUMMARY (Cont d) Amendment Number Five, Contract W40002D05, Kinnickinnic River Reach 2 Phase 1 Project, and Restore the Executive Director s Original Delegated Authority Under contract amendments four (already executed) and five, District staff proposes to amend Graef s contract as follows: Remove design and ESDC of the Reach 2 segment between S. 20 th and S. 27 th Streets. Add design and ESDC of Reach 2 segment between S. 16 th Street and the Union Pacific Railroad, including all work within Pulaski Park. Provide additional public involvement, including public meetings, additional outreach/involvement events, and generate website information. Perform additional soil sampling and analysis and develop a soils management plan (construction phase). This project phase will generate approximately 24,000 cubic yards of material that will need to be excavated and disposed of properly. The soils management plan is required by the WDNR and was not included in the original contract. Within Pulaski Park, proposed concrete channel lining removal and expansion of the channel will affect several County Park facilities and open space areas. The impacted park facilities include a playground, basketball courts, pedestrian bridge, and park trails. As part of Graef s contract, the District has worked with the County to develop a draft updated park plan for Pulaski Park. The District and County have also developed a draft agreement to implement the KK River Reach 2 project within Pulaski Park that will restore the impacted park facilities and areas consistent with the draft Pulaski Park plan. This agreement is currently being considered for approval by the Commission. The proposed park modifications are in the scope of this contract amendment. The Commission has delegated to the Executive Director the authority to make changes to engineering service contracts up to $200,000 or 10 percent of the original contract price, whichever is less. For this contract, a limit of $200,000 prevails. To date, the Executive Director has utilized $197,569 of this authority, leaving a balance of $2,431. The request to restore the Executive Director s authority is in case any other additional services of a minor nature are needed. 3

17 SUMMARY (Cont d) Amendment Number Five, Contract W40002D05, Kinnickinnic River Reach 2 Phase 1 Project, and Restore the Executive Director s Original Delegated Authority SUMMARY OF CONTRACT COST CHANGES CONTRACT AMOUNT PERCENTAGE INCREASE OVER ORIGINAL AUTHORIZED BY CONTRACT Original $ 2,576, Commission Amendment No. 1 $ 57, % Executive Director Amendment No. 2 $ 98, % Executive Director Amendment No. 3 $ 7, % Executive Director Amendment No. 4 $ 33, % Executive Director Amendment No. 5 $ 281, % Request of Commission Total Amendments $ 478, % TOTAL $ 3,054,

18 RESOLUTION Amendment Number Five, Contract W40002D05, Kinnickinnic River Reach 2 Phase 1 Project, and Restore the Executive Director s Original Delegated Authority RESOLVED, by the Milwaukee Metropolitan Sewerage Commission, that the Executive Director is authorized to execute Amendment Number Five to Contract W40002D05, Kinnickinnic River Reach 2 Phase 1 Project, with Graef-USA, Inc., in an amount not to exceed $281,100, and that the Executive Director s original delegated authority is restored. 5

19 Capital Budget Fiscal Note Total Project Cost RELATING TO: Amendment Number Five, Contract W40002D05, Kinnickinnic River Reach 2 Phase 1 Project, and Restore the Executive Director s Original Delegated Authority Capital Project Number(s) W40002-KK River Flood Management-Mainstem Work Impact of Requested Action on Total Project Cost: Increase Decrease New Project X No Change Total Project Cost Analysis Project Costs Adopted 2017 Total Project Cost $78,868,782 Previously Approved Changes $0 Approved Total Project Cost $78,868,782 Requested Total Project Cost n/a Requested (Increase)/Decrease $0 Action to be taken to Long-Range Financing Plan to address Total Project Cost change Transfer from Allowance for Cost and Schedule Changes Transfer from another project (specify in comments) Delay Project(s) (specify in comments) Delete Project(s) (specify in comments) Other Transfer to Allowance for Cost and Schedule Changes Comments In addition to approval for amendment 5 to contract W40002D05, the Division requests the restoration of the Executive Director's authority. Budget Review by: Date: Theresa Zwieg 2/2/2017

20 Kinnickinnic (KK) River Mainstem Projects ± Jackson Park KK River Reach 3 Revised Reach 2 Phase 1 Design Original Reach 2 Phase 1 Design Pulaski Park Union Pacific Railroad St. Luke's Hospital KK River Reach 2 S. 6th Street S. 27th Street S. 20th Street S. 16th Street 0 1,000 2,000 4,000 Feet Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), MapmyIndia, OpenStreetMap contributors, and the GIS User Community

21 Item 3 COMMISSION FILE NO: DATE INTRODUCED: March 13, 2017 INTRODUCED BY: REFERRED BY COMMISSION CHAIRPERSON TO: Executive Director (Signature on File in the Office of the Commission) Operations Committee RELATING TO: Authorizing the Executive Director to Execute a Purchase Order for Five Jones Island Solar Turbine Fuel Injectors SUMMARY: The Commission is requested to authorize the Executive Director to execute a purchase order with Solar Turbines, Inc., (Solar ) for five fuel injectors in an amount not to exceed $220,000. Solar manufactured the turbines, and the District can only procure injectors from Solar ; therefore, this is a sole source procurement. At the Jones Island Water Reclamation Facility, the District owns three Solar turbines, hereinafter called landfill gas turbines. The landfill gas turbines are capable of being fueled by landfill gas, natural gas, or a combination of both. The turbines supply power to the plant electrical grid for plant operations. Exhaust heat from the turbines is also used in the dewatering and drying facility in the drying of sludge to produce Milorganite. Reliably producing electric power with the landfill gas turbines is critical to maintaining the treatment process and minimizing the total cost of operations. Within each of the three turbines are eight injectors that inject a stream of natural gas, landfill gas, or a combination of both into a combustion chamber. The injectors are exposed to high temperatures and degrade over time. Currently, five of the 24 injectors have degraded to the point where they need to be replaced. With five injectors inoperable, the District is limited as to the number of turbines that can be operated. ATTACHMENTS: BACKGROUND KEY ISSUES RESOLUTION FISCAL NOTE S/W/MBE OTHER OP_Award_JI_Solar_Turbine_Fuel_Injectors_legislative_file.docx COMMITTEE ACTION: COMMISSION ACTION: DATE: DATE:

22 SUMMARY (Cont d) Authorizing the Executive Director to Execute a Purchase Order for Five Jones Island Solar Turbine Fuel Injectors When the landfill gas turbines are not available and operating, the District is not utilizing all available landfill gas, is not maximizing the amount of exhaust heat utilized in Milorganite production, and is purchasing additional power from We Energies, all of which increase the cost of operations. In the interest of minimizing the cost of operations while the District reviews the available information, District staff recommends that the District purchase fuel injectors now, so that they can be installed in April. April is the same time that repair work will be completed on the gas compressors that provide the fuel mixture to the landfill gas turbines. When this work is complete, the District can utilize all three landfill gas turbines. Solar provided the landfill gas turbines to the District and is the sole supplier of parts for the landfill gas turbines; therefore, this purchase is considered a sole source procurement and the purchase order must be executed with Solar. The fuel injectors will be installed by Solar under the extended service agreement (ESA) between the District and Solar. District staff are exploring the possibility that some of or all the cost of the purchase of these injectors may be recovered under the ESA. 2

23 RESOLUTION Authorizing the Executive Director to Execute a Purchase Order for Five Jones Island Solar Turbine Fuel Injectors RESOLVED, by the Milwaukee Metropolitan Sewerage Commission, that the Executive Director is authorized and directed to execute a purchase order with Solar Turbines, Inc., for five Jones Island Solar turbine fuel injectors in an amount not to exceed $220,000. 3

24 O&M Budget Fiscal Note RELATING TO: Authorizing the Executive Director to Execute a Purchase Order for Five Jones Island Solar Turbine Fuel Injectors Cost Center: Line Item: Office of Contract Compliance 671 Line Item Impact 2017 Original Budget Carryovers or Transfers Adjusted Budget Estimated Annual Expenditure including Request Anticipated Year End Balance Actual Year to Date Expenditures Through 2/15 $2,015,626 $0 $2,015,626 $2,015,626 $0 $0 For unfavorable Year End Balance, identify funding source: Absorbed within the Division Other Division Unallocated Reserve Anticipated Expenditure Timing Current Year (2017) Subsequent Total Cost Requested Expenditures $220,000 $0 $220,000 Anticipated Savings/Revenues $0 $0 $0 Net Fiscal Impact $220,000 $0 $220,000 Comments: Budget Review by: Date Christine Durkin 2/15/2017

25 Proposal & S/W/MBE Information Authorizing the Executive Director to Execute a Purchase Order for Five Jones Island Solar Turbine Fuel Injectors Cost Center: 41 Proposal Submittal Date: February 22, 2017 Total S/W/MBE Local No. of Bids No. of Proposals Sole Source No. of Responsive Bids Bids (listed low to high) (Name/City/State/Zip) Solar Turbines Incorporated San Diego, CA Price Responsive/ Non-Responsive/ Not Reviewed % Subcontractor % S/W/MBE $220, Responsive 0.0% 0.0% Low Bid Information Subcontractor MBE/WBE/SBE/VBE Firms MBE: Type of Work % Amount WBE: SBE: VBE: 03/01/17-1 -

26 Non- MBE/WBE/SBE/VBE Subcontractors Type of Work % Amount List reason(s) if no MBE/WBE/SBE Involvement: Local Workforce Participation Requirement: A. Sanitary Sewer Service Area Employment: B. Target Area Employment: Apprentice Utilization As Bid: Bids Non-Responsive: Proposal Comments: Staff followed the District s procurement process as outlined in Administrative Policies and , and through this process determined that this is a Sole Source Procurement. S/W/MBE Planholders: None Media Ads: Yes No Name of Publication: Daily Reporter 03/01/17-2 -

27 Information for Low Bid (Over $10,000) Company Name: Solar Turbines Incorporated Contact Person: Rene Derringer Phone: EEO DATA: a) Total Number of Employees: 4,266 Total Percentage Total Percentage b) Minorities 1, % c) Female % Hispanic % Hispanic % African American % African American % Native American % Native American 4 0.1% Asian % Asian % d) Labor Market Availability: Minorities: 16.2% Females: 48% 03/01/17-3 -

28 Item 4 COMMISSION FILE NO: DATE INTRODUCED: March 13, 2017 INTRODUCED BY: REFERRED BY COMMISSION CHAIRPERSON TO: Executive Director (Signature on File in the Office of the Commission) Operations Committee RELATING TO: Approval of Funding Agreement WA05 under Project M03044, 2017 City of Wauwatosa Private Property Inflow and Infiltration Reduction Project SUMMARY: The Commission is requested to authorize and to direct the Executive Director to execute on behalf of the District Funding Agreement WA05 in the amount of $982,586 for work outlined in Work Plan WA05 as submitted by the City of Wauwatosa under project M03044, Private Property Inflow and Infiltration (PPI/I) Reduction Program. Including this Work Plan WA05, the City of Wauwatosa (City) has obligated 100% of the funding available to the City through 2017 under the PPI/I program. The City has invested significant municipal and District funds in sewersheds within the City that are not in compliance with peak flow performance standards codified in District Rules. The City is proposing pressure grout sealing of 1,038 laterals within noncompliant metershed MS0448 as the next stage of work in the City lateral rehabilitation program. The total project cost is estimated to be $3.1 million with the City share for public work estimated to be $2 million and the private property scope estimated to be $1.1 million. The City s share exceeds the current available balance by approximately $160,000. The City intends to submit an amendment request to Work Plan WA05 for additional project funding, contingent on Commission approval of subsequent annual budgets. The City proposes to begin work on the project in 2017 with work extending through ATTACHMENTS: BACKGROUND KEY ISSUES RESOLUTION FISCAL NOTE S/W/MBE OTHER OP_Wauwatosa_WA05_II_Reduction_Project_legislative_file.docx COMMITTEE ACTION: COMMISSION ACTION: DATE: DATE:

29 BACKGROUND Approval of Funding Agreement WA05 under Project M03044, 2017 City of Wauwatosa Private Property Inflow and Infiltration Reduction Project MMSD metershed MS0448 is shared by the City and the City of Milwaukee and has been identified as noncompliant with District Chapter 3 rules for peak wet weather flow management. Within metershed MS0448, submetershed MS0417 contains City sewersheds WA4010 and WA4016 and includes 1,038 laterals. In 2015, the City funded extensive dye water testing of the sanitary sewer within MS0417 and found similar results to previous investigative work in other sewersheds. The majority of major defects attributed to PPI/I appear to be near the intersection of the storm sewers and the sanitary laterals. Based on flow reduction results in metershed MS0411, the City proposes to continue the lateral grouting approach taken in previous PPI/I projects. With this project, 100% of the City laterals within MS0417 will be addressed. The City intends to contract the rehabilitation of the public sewers through cured-in-place-pipe (CIPP) lining as one project with the private property work. Since the entire metershed will be rehabilitated through the grouting and CIPP methods, the City will rely on District meter data to monitor flow reduction results. There is no cost-match requirement by the homeowner. The project is proposed to be funded by the City (estimated $2,000,000) and the District through the PPI/I program (estimated $1,142,000 contingent on subsequent annual budget allocations). The tentative project schedule is as follows: Bidding: second quarter 2017 Notice to Proceed: third quarter 2017 Substantial Completion: third quarter 2018 Final Reimbursement Request: first quarter 2019 This request is funded through accumulated annual allocations to the PPI/I project M03044 and does not represent an increase in total project cost. Including this Work Plan WA05, the City has obligated 100% of the available funding to the City through 2017 in the PPI/I program. 2

30 RESOLUTION Approval of Funding Agreement WA05 under Project M03044, 2017 City of Wauwatosa Private Property Inflow and Infiltration Reduction Project RESOLVED, by the Milwaukee Metropolitan Sewerage Commission, that the Executive Director is authorized and directed to execute on behalf of the District Funding Agreement WA05 in the amount of $982,586 for work outlined in Work Plan WA05 as submitted by the City of Wauwatosa under Project M03044, Private Property Inflow and Infiltration Program. 3

31 Capital Budget Fiscal Note Total Project Cost RELATING TO: Approval of Funding Agreement WA05 under Project M03044, 2017 City of Wauwatosa Private Property Inflow and Infiltration Reduction Project Capital Project Number(s) Impact of Requested Action on Total Project Cost: M03044 Increase Decrease New Project X No Change Total Project Cost Analysis Project Costs Adopted 2017 Total Project Cost * Previously Approved Changes $0 Approved Total Project Cost * Requested Total Project Cost n/a Requested (Increase)/Decrease $0 Action to be taken to Long-Range Financing Plan to address Total Project Cost change Transfer from Allowance for Cost and Schedule Changes Transfer from another project (specify in comments) Delay Project(s) (specify in comments) Delete Project(s) (specify in comments) Other Transfer to Allowance for Cost and Schedule Changes Comments *The PP I/I program does not have a total project cost because it is a capital program. The 2017 Capital Budget includes $5 million for 2017, and the long-range financing plan includes $30 million. The adopted 2017 Capital Budget and the longrange financing plan have sufficient funding for the current request of $982,586. Budget Review by: Date: Christine Durkin 2/13/2017

32 March 2017 Sun Mon Tue Wed Thu Fri Sat Operations Committee-9:00 a.m. PF&P Committee- 9:05 a.m ST. PATRICK S DAY Commission-9:00 a.m

ELECTRONIC PACKET. December 18, 2017 Commission Meeting. RELEASED: Monday, December 11, 2017

ELECTRONIC PACKET. December 18, 2017 Commission Meeting. RELEASED: Monday, December 11, 2017 ELECTRONIC PACKET December 18, 2017 Commission Meeting RELEASED: Monday, December 11, 2017 Item 11 COMMISSION FILE NO: 17-129-12 DATE INTRODUCED: December 18, 2017 INTRODUCED BY: REFERRED BY

More information

ELECTRONIC PACKET. January 22, 2018 Commission Meeting. RELEASED: Tuesday, January 16, 2018

ELECTRONIC PACKET. January 22, 2018 Commission Meeting. RELEASED: Tuesday, January 16, 2018 ELECTRONIC PACKET January 22, 2018 Commission Meeting RELEASED: Tuesday, January 16, 2018 COMMISSION MEETING January 22, 2018 OPERATIONS AND MAINTENANCE REPORT FOR DECEMBER 2017 PAT OBENAUF &

More information

ELECTRONIC PACKET. January 14, 2019 OPERATIONS COMMITTEE MEETING. RELEASED: Monday, January 7, 2019

ELECTRONIC PACKET. January 14, 2019 OPERATIONS COMMITTEE MEETING. RELEASED: Monday, January 7, 2019 ELECTRONIC PACKET January 14, 2019 OPERATIONS COMMITTEE MEETING RELEASED: Monday, January 7, 2019 Item 1 COMMISSION FILE NO: 19-005-1 DATE INTRODUCED: January 14, 2019 INTRODUCED BY: REFERRED BY COMMISSION

More information

Statement of Policy. Milwaukee Metropolitan Sewerage District s Private Property Inflow and Infiltration Reduction Program.

Statement of Policy. Milwaukee Metropolitan Sewerage District s Private Property Inflow and Infiltration Reduction Program. Milwaukee Metropolitan Sewerage District s 2011-2020 Private Property Inflow and Infiltration Reduction Program Introduction Infiltration is the quantity of water entering a sewer system through such sources

More information

ELECTRONIC PACKET. November 5, 2018 POLICY, FINANCE, & PERSONNEL COMMITTEE MEETING. RELEASED: Monday, October 29, 2018

ELECTRONIC PACKET. November 5, 2018 POLICY, FINANCE, & PERSONNEL COMMITTEE MEETING. RELEASED: Monday, October 29, 2018 ELECTRONIC PACKET November 5, 2018 POLICY, FINANCE, & PERSONNEL COMMITTEE MEETING RELEASED: Monday, October 29, 2018 Item 4 COMMISSION FILE NO: 18-114-11 DATE INTRODUCED: November 5, 2018 INTRODUCED

More information

ELECTRONIC PACKET. October 8, 2018 POLICY, FINANCE, & PERSONNEL COMMITTEE MEETING. RELEASED: Monday, October 1, 2018

ELECTRONIC PACKET. October 8, 2018 POLICY, FINANCE, & PERSONNEL COMMITTEE MEETING. RELEASED: Monday, October 1, 2018 ELECTRONIC PACKET October 8, 2018 POLICY, FINANCE, & PERSONNEL COMMITTEE MEETING RELEASED: Monday, October 1, 2018 Item 2 COMMISSION FILE NO: 18-105-10 DATE INTRODUCED: October 8, 2018 INTRODUCED

More information

APPENDIX A TECHNICAL SPECIFICATIONS Solicitation # Forest Trail pay as cut, per ton timber sale agreement

APPENDIX A TECHNICAL SPECIFICATIONS Solicitation # Forest Trail pay as cut, per ton timber sale agreement APPENDIX A TECHNICAL SPECIFICATIONS Solicitation # 96749 Forest Trail pay as cut, per ton timber sale agreement The following Technical Specifications are provided to the Bidder: Successful Bidder shall

More information

METROPOLITAN ST. LOUIS SEWER DISTRICT BUSINESS DIVERSITY. MWBE Utilization and Workforce Program Construction Projects with Federal Funding

METROPOLITAN ST. LOUIS SEWER DISTRICT BUSINESS DIVERSITY. MWBE Utilization and Workforce Program Construction Projects with Federal Funding METROPOLITAN ST. LOUIS SEWER DISTRICT BUSINESS DIVERSITY MWBE Utilization and Workforce Program Construction Projects with Federal Funding Effective October 1, 2014 PURPOSE The Metropolitan St. Louis Sewer

More information

Targeted Business Certification Program Application

Targeted Business Certification Program Application Targeted Business Certification Program Application 1. Check all that apply: Minority Business Enterprise Small Business Enterprise Women Business Enterprise Section 3 (Dane County & City of Madison) Return

More information

CHAPTER 15: FLOODPLAIN OVERLAY DISTRICT "FP"

CHAPTER 15: FLOODPLAIN OVERLAY DISTRICT FP CHAPTER 15: FLOODPLAIN OVERLAY DISTRICT "FP" SECTION 15.1 STATUTORY AUTHORIZATION The legislature of the State of Minnesota in Minnesota Statutes, Chapter 103F and Chapter 394 has delegated the responsibility

More information

Solano Local Agency Formation Commission 675 Texas St. Ste Fairfield, California (707) FAX: (707)

Solano Local Agency Formation Commission 675 Texas St. Ste Fairfield, California (707) FAX: (707) Solano Local Agency Formation Commission 675 Texas St. Ste. 6700 Fairfield, California 94533 (707) 439-3897 FAX: (707) 438-1788 Staff Report DATE: May 8, 2017 TO: FROM: SUBJECT: Local Agency Formation

More information

Request for Proposals 2018 Erosion Control Project. Madison, Wisconsin

Request for Proposals 2018 Erosion Control Project. Madison, Wisconsin Request for Proposals 2018 Erosion Control Project Madison, Wisconsin November, 2018 SECTION TABLE OF CONTENTS PAGE ADVERTISEMENT... A 1 PROPOSAL... P 1 CONTRACT..... C 1 REQUEST FOR PROPOSAL...... 1 6

More information

APPLICATION FOR CERTIFICATE OF QUALIFICATIONS TO PROPOSE FOR PROFESSIONAL SERVICES

APPLICATION FOR CERTIFICATE OF QUALIFICATIONS TO PROPOSE FOR PROFESSIONAL SERVICES THE METROPOLITAN ST. LOUIS SEWER DISTRICT 2350 MARKET STREET ST. LOUIS, MO 63103 (USED IN PREQUALIFYING CONSULTANTS ON ARCHITECTURAL, ENGINEERING, AND SURVEYING SERVICES) January 1, 2014 through December

More information

TABLE OF CONTENTS ARTICLE NUMBER DESCRIPTION PAGE. I Application 1. II Minority Business Enterprise Goals 1. III Subcontractor Payment Requirements 2

TABLE OF CONTENTS ARTICLE NUMBER DESCRIPTION PAGE. I Application 1. II Minority Business Enterprise Goals 1. III Subcontractor Payment Requirements 2 TABLE OF CONTENTS ARTICLE NUMBER DESCRIPTION PAGE I Application 1 II Minority Business Enterprise Goals 1 III Subcontractor Payment Requirements 2 IV Program Compliance Requirements 3 V Checklist for Review

More information

ELECTRONIC PACKET NOVEMBER 13, 2017 POLICY, FINANCE, & PERSONNEL COMMITTEE MEETING. RELEASED: Monday, November 6, 2017

ELECTRONIC PACKET NOVEMBER 13, 2017 POLICY, FINANCE, & PERSONNEL COMMITTEE MEETING. RELEASED: Monday, November 6, 2017 ELECTRONIC PACKET NOVEMBER 13, 2017 POLICY, FINANCE, & PERSONNEL COMMITTEE MEETING RELEASED: Monday, November 6, 2017 Item 4 COMMISSION FILE NO: 17-110-11 DATE INTRODUCED: November 13, 2017 INTRODUCED

More information

Upper Joachim Creek Public Survey on Potential Flood Risk Reduction

Upper Joachim Creek Public Survey on Potential Flood Risk Reduction Upper Joachim Creek Public Survey on Potential Flood Risk Reduction This survey is intended to help the interagency planning committee to receive public feedback on specific flood risk reduction techniques,

More information

FLOODPLAIN DEVELOPMENT VARIANCE APPLICATION PACKET

FLOODPLAIN DEVELOPMENT VARIANCE APPLICATION PACKET FLOODPLAIN DEVELOPMENT VARIANCE APPLICATION PACKET Sutter County Water Resources Department 1130 Civic Center Boulevard Yuba City, California, 95993 (530) 822-7400 Floodplain management regulations cannot

More information

2013 METER REPLACEMENT PROGRAM REQUEST FOR COMPETITIVE SEALED PROPOSALS Solicitation Number: B DD Job No.:

2013 METER REPLACEMENT PROGRAM REQUEST FOR COMPETITIVE SEALED PROPOSALS Solicitation Number: B DD Job No.: 2013 METER REPLACEMENT PROGRAM REQUEST FOR COMPETITIVE SEALED PROPOSALS Solicitation Number: B-13-015-DD Job No.: 13-4003 ADDENDUM #1 March 18, 2013 This addendum, applicable to work referenced above,

More information

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality WHAT IS A FLOOD? The National Flood Insurance Program defines a flood as a general and temporary condition of partial

More information

COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO

COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO CECELIA H. STOWE, CPPO, C.P.M. PURCHASING DIRECTOR DEPARTMENT OF FINANCE ADDENDUM NO. 1 TO: Prospective Bidders and Others Concerned FROM: County of Henrico/URS

More information

Situation: the need for non-structural flood risk reduction measures

Situation: the need for non-structural flood risk reduction measures Evaluating benefits of non-structural measures in flood risk management feasibility studies At left: Example of a house on an open foundation Source Asheville, NC (undated) By Steve Cowdin, CFM; Natalie

More information

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES DEPARTMENT OF ENVIRONMENTAL SERVICES Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

METROPOLITAN ST. LOUIS SEWER DISTRICT BUSINESS DIVERSITY. MBE Utilization and Workforce Program Building Construction Projects

METROPOLITAN ST. LOUIS SEWER DISTRICT BUSINESS DIVERSITY. MBE Utilization and Workforce Program Building Construction Projects METROPOLITAN ST. LOUIS SEWER DISTRICT BUSINESS DIVERSITY MBE Utilization and Workforce Program Building Construction Projects Effective February, 2014 PURPOSE The Metropolitan St. Louis Sewer District

More information

Wetzel County Floodplain Ordinance

Wetzel County Floodplain Ordinance Wetzel County Floodplain Ordinance AUTHORITY AND PURPOSE: THE PROVISIONS OF THIS ORDINANCE HAVE BEEN PREPARED WITH THE INTENTION OF MEETING THE REQUIREMENTS OF SECTION 60.3 (D) OF THE NATIONAL FLOOD INSURANCE

More information

SAN DIEGO CONVENTION CENTER CORPORATION

SAN DIEGO CONVENTION CENTER CORPORATION SAN DIEGO CONVENTION CENTER CORPORATION REQUEST FOR PROPOSALS FOR CONSTRUCTION PROJECT MANAGEMENT RFP # 19-1159 Issue Date: Friday, October 5, 2018 Pre-Bid Conference: Pre-Bid Question Deadline: Bid Deadline:

More information

Montour Area Recreation Commission (MARC) North Branch Canal Trail Construction Invitation to Bid. Application Terms and Conditions

Montour Area Recreation Commission (MARC) North Branch Canal Trail Construction Invitation to Bid. Application Terms and Conditions (MARC) North Branch Canal Trail Construction Invitation to Bid Application Terms and Conditions Sealed bids for North Branch Canal Trail construction will be received by MARC at any time until Monday,

More information

Chapter 6 - Floodplains

Chapter 6 - Floodplains Chapter 6 - Floodplains 6.1 Overview The goal of floodplain management is to reduce the potential risks to both existing and future developments, and infrastructure, in the 100-year floodplain. Over the

More information

Does this change apply to all projects for any tax exempt entities?

Does this change apply to all projects for any tax exempt entities? for Certain Tax Exempt Entities 1 What has changed? Effective January 1, 2016, contractors will be able to directly purchase construction materials on behalf of many of their tax exempt and local government

More information

BASE BID and ALTERNATES WORK ITEM PROPOSAL 2017 Parking Structure #2 Renovations WSU #

BASE BID and ALTERNATES WORK ITEM PROPOSAL 2017 Parking Structure #2 Renovations WSU # VENDOR NAME GENERAL CONTRACT - PROPOSAL FORM (revised 4-2017) Please Note Vendors must Pre-qualify themselves when responding to this bid opportunity. Our Prequalification questions can be found on page

More information

ELECTRONIC PACKET. June 11, 2018 POLICY, FINANCE, & PERSONNEL COMMITTEE MEETING. RELEASED: Monday, June 4, REVISED: Tuesday, June 5, 2018

ELECTRONIC PACKET. June 11, 2018 POLICY, FINANCE, & PERSONNEL COMMITTEE MEETING. RELEASED: Monday, June 4, REVISED: Tuesday, June 5, 2018 ELECTRONIC PACKET June 11, 2018 POLICY, FINANCE, & PERSONNEL COMMITTEE MEETING RELEASED: Monday, June 4, 2018 REVISED: Tuesday, June 5, 2018 The following items have been added to the packet: 1. Agenda

More information

Water Resources Engineering Division Public Works City of Colorado Springs

Water Resources Engineering Division Public Works City of Colorado Springs Water Resources Engineering Division Public Works City of Colorado Springs Richard Mulledy, P.E. Division Manager City of Colorado Springs/Pueblo County IGA City of Colorado Springs/Pueblo County IGA $460

More information

City of St. Augustine. Floodplain Management Higher Standards Information

City of St. Augustine. Floodplain Management Higher Standards Information City of St. Augustine Floodplain Management Higher Standards Information There are different regulations that communities can use to help protect existing and future development and natural floodplain

More information

Lake Region Electric Cooperative, Inc Annual Report

Lake Region Electric Cooperative, Inc Annual Report Lake Region Electric Cooperative, Inc. 2016 Annual Report Message from the CEO and Board President To our Members, LREC wrapped up fiscal year 2016 (FY 2016) maintaining a healthy financial position despite

More information

Milwaukee Metropolitan Sewerage District 2010 Annual Budget

Milwaukee Metropolitan Sewerage District 2010 Annual Budget Milwaukee Metropolitan Sewerage District 2010 Annual Budget Dale J. Richards Chair Commissioners Wallace White Vice Chair Lyle A. Balistreri Pedro Colón David Cullen Michal Ann Dawson Ben Gramling Ronald

More information

City of Coralville Invitation to Quote Snow/Ice Removal and Parking Space Sweeping 5 th Street On Street Angle Parking

City of Coralville Invitation to Quote Snow/Ice Removal and Parking Space Sweeping 5 th Street On Street Angle Parking City of Coralville Invitation to Quote Snow/Ice Removal and Parking Space Sweeping 5 th Street On Street Angle Parking The City of Coralville is accepting bids for the snow and ice removal and one time,

More information

Denver Public Schools Facility Management / Purchasing S. Acoma St. Denver, Colorado S. Acoma St. Denver, Colorado 80223

Denver Public Schools Facility Management / Purchasing S. Acoma St. Denver, Colorado S. Acoma St. Denver, Colorado 80223 Denver Public Schools Facility Management / Purchasing 1617 S. Acoma St. Denver, Colorado 80223 Date: March 4, 2014 RFQ Number: RFQ Title: RFQ will be received: 2014 DPS Contractor RFQ RFQ Construction

More information

Floodplain Development Permit Application

Floodplain Development Permit Application Floodplain Development Permit Application **All construction will also require a building permit** This is an application packet for a Floodplain Development Permit. Certain sections are to be completed

More information

Impacts from the July 8, 2013 Storm Event on the City of Toronto

Impacts from the July 8, 2013 Storm Event on the City of Toronto STAFF REPORT ACTION REQUIRED Impacts from the July 8, 2013 Storm Event on the City of Toronto Date: September 10, 2013 To: From: Wards: Executive Committee City Manager All Reference Number: SUMMARY The

More information

Project Information. SHARS Number: (Name and Title) Tarrytown, NY Telephone:

Project Information. SHARS Number: (Name and Title) Tarrytown, NY Telephone: Environmental Review for Activity/Project that is Exempt or Categorically Excluded Not Subject to Section 58.5 Pursuant to 24 CFR Part 58.34(a) and 58.35(b) Project Information Program Name: Opening Doors

More information

2017 Operations & Maintenance and Capital Budgets

2017 Operations & Maintenance and Capital Budgets 2017 Operations & Maintenance and Capital Budgets Milwaukee Metropolitan Sewerage District Milwaukee, Wisconsin Milwaukee Metropolitan Sewerage District 2017 Budget Commissioners John R. Hermes Chair Kris

More information

STORMWATER MANAGEMENT FUND Department of Environmental Services

STORMWATER MANAGEMENT FUND Department of Environmental Services Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

PIERCE COUNTY INVITATION TO BID SURPLUS PROPERTY SALE NUMBER 1606 FOR SALE OF SURPLUS GRAVEL

PIERCE COUNTY INVITATION TO BID SURPLUS PROPERTY SALE NUMBER 1606 FOR SALE OF SURPLUS GRAVEL PIERCE COUNTY INVITATION TO BID SURPLUS PROPERTY SALE NUMBER 1606 FOR SALE OF SURPLUS GRAVEL BIDS MUST BE SUBMITTED TO: CLERK OF THE COUNCIL 930 TACOMA AVE S RM 1046 TACOMA WA 98402-2176 AND WILL BE RECEIVED

More information

APPLICATION FOR STATE CERTIFICATION

APPLICATION FOR STATE CERTIFICATION APPLICATION FOR STATE CERTIFICATION Thank you for your interest in applying for state certification. We ask that you carefully complete each question. If a question is not applicable, simply answer that

More information

TOWN OF KENT, CT PLANNING AND ZONING COMMISSION

TOWN OF KENT, CT PLANNING AND ZONING COMMISSION TOWN OF KENT, CT PLANNING AND ZONING COMMISSION FLOOD PLAIN MANAGEMENT REGULATIONS Whereas, Congress has determined that a National Flood Insurance Program would alleviate personal hardships and economic

More information

Request for Proposal For Design Engineering Services. Northwest Lansing Relief Sewer Project

Request for Proposal For Design Engineering Services. Northwest Lansing Relief Sewer Project Request for Proposal For Design Engineering Services City of Lansing, Kansas Wastewater Utility Department 800 First Terrace Lansing, Kansas 66043 February 14, 2018 Page 1 of 14 A. INTRODUCTION The City

More information

Approved in Open Session 6/12/18 Board of County Commissioners Manatee County Government Administrative Center Commission Chambers, First Floor 9:00 a

Approved in Open Session 6/12/18 Board of County Commissioners Manatee County Government Administrative Center Commission Chambers, First Floor 9:00 a Approved in Open Session 6/12/18 Board of County Commissioners Manatee County Government Administrative Center Commission Chambers, First Floor 9:00 a.m. - June 12, 2018 June 12, 2018 - Regular Meeting

More information

Header Tile ATTACHMENT 2. City of Saskatoon

Header Tile ATTACHMENT 2. City of Saskatoon Header Tile ATTACHMENT 2 2 Building Better Infrastructure The Administration evaluates the condition of the City s assets in order to develop annual programs to maintain the assets at a minimum cost. Where

More information

Oakland Park Transportation Improvement Program (TIP) Projects. Mobility. Oakland Park Blvd. Total Funding Amounts ($):

Oakland Park Transportation Improvement Program (TIP) Projects. Mobility. Oakland Park Blvd. Total Funding Amounts ($): Oakland Park 2016-2020 Transportation Improvement Program (TIP) Projects 4358081 4346971 4359251 4360971 4366851 4331651 4368751 4316721 4316721 4260161 4387321 Legend Projects Interstates Roadway Mobility

More information

Special Conditions, Regulations and Instructions for Right of Way Permit Applications

Special Conditions, Regulations and Instructions for Right of Way Permit Applications Special Conditions, Regulations and Instructions for Right of Way Permit Applications The Department of Environmental Services (DES) issues public right of way (PROW) permits to contractors with a valid

More information

THE FLOOD HAZARD AREA Valda Opara New Jersey Department of Environmental Protection June 8, 2012

THE FLOOD HAZARD AREA Valda Opara New Jersey Department of Environmental Protection June 8, 2012 THE FLOOD HAZARD AREA Valda Opara New Jersey Department of Environmental Protection June 8, 2012 Individual Permits Building Requirements 0% Net-fill Standards JET SKIING DURING A FLOOD ESCAPING THE FLOOD

More information

Subcontractor Qualification Statement

Subcontractor Qualification Statement Subcontractor Qualification Statement Trade: Legal Name of Firm: Address: No. & Street City State Zip Mailing Address: If different from above address E-mail address: Telephone #: Fax #: Website: Type

More information

PW25. REPORT FOR ACTION

PW25. REPORT FOR ACTION PW25. REPORT FOR ACTION Contract Award for Tender Call 265-2017, Contract No. 17ECS-MI-03WA for the Rehabilitation of the Rosehill Reservoir and Amendment to Purchase Order No. 6045909 for Professional

More information

CHAPTER 57 ARTICLES II & III

CHAPTER 57 ARTICLES II & III CHAPTER 57 ARTICLES II & III ARTICLE II. MINORITY BUSINESS ENTERPRISE Sec. 57.15. Definitions. (1) For the purposes of this Chapter, Minority Business Enterprise is defined as a business firm which is

More information

QUONSET DEVELOPMENT CORPORATION (QDC) INVITATION TO BID

QUONSET DEVELOPMENT CORPORATION (QDC) INVITATION TO BID QUONSET DEVELOPMENT CORPORATION (QDC) A BID is solicited for the following work: INVITATION TO BID Name of Project: Background & Description of Work: Pavement Repairs: Utility Connections: On-Call Pavement

More information

SOUTH DAKOTA BOARD OF REGENTS. Policy Manual

SOUTH DAKOTA BOARD OF REGENTS. Policy Manual SOUTH DAKOTA BOARD OF REGENTS Policy Manual SUBJECT: NUMBER: A. PURPOSE To provide guidance on what constitutes maintenance and repair and the process used to document and approve projects. B. DEFINITIONS

More information

Solicitation No. B RA 2010 Concrete Placement Work Order Construction Contract Package No. 2 PROPOSAL. PROPOSAL OF, a corporation a

Solicitation No. B RA 2010 Concrete Placement Work Order Construction Contract Package No. 2 PROPOSAL. PROPOSAL OF, a corporation a Solicitation No. B-09-071-RA 2010 Concrete Placement Work Order Construction Contract Package No. 2 PROPOSAL PROPOSAL OF, a corporation a partnership consisting of and an individual doing business as TO

More information

2015 Comprehensive Annual Financial Report

2015 Comprehensive Annual Financial Report 2015 Comprehensive Annual Financial Report For the Years Ended December 31, 2015 and 2014 Milwaukee Metropolitan Sewerage District Milwaukee, Wisconsin Jones Island Water Reclamation Facility 2015 Comprehensive

More information

Neighborhood Housing Services of Queens, CDC. Heather Spitzberg, Director, Environmental Analysis Unit

Neighborhood Housing Services of Queens, CDC. Heather Spitzberg, Director, Environmental Analysis Unit Environmental Review for Activity/Project that is Exempt or Categorically Excluded Not Subject to Section 58.5 Pursuant to 24 CFR Part 58.34(a) and 58.35(b) Project Information Program Name: NHSQ CDC HOME

More information

Lake Region Electric Cooperative, Inc. Annual Report

Lake Region Electric Cooperative, Inc. Annual Report 2015 Lake Region Electric Cooperative, Inc. Annual Report Message from the CEO and President 1 Lake Region Electric Cooperative s mission, adopted by the board of directors, charges the cooperative to

More information

GENERAL CONTRACT - PROPOSAL FORM (revised )

GENERAL CONTRACT - PROPOSAL FORM (revised ) VENDOR NAME GENERAL CONTRACT - PROPOSAL FORM (revised 4-2017) Sealed proposals for lump-sum General Contract will be received at the office of the Procurement & Strategic Sourcing by electronic submission

More information

A. All Responses to Request for Statements shall be sent to:

A. All Responses to Request for Statements shall be sent to: CITY OF FEDERAL WAY REQUEST FOR STATEMENT OF QUALIFICATIONS ARCHITECTURAL AND ENGINEERING SERVICES Surface Water Management ( SWM ) Comprehensive Plan Capital Improvements Program Update and Rate Study

More information

MONTEREY REGIONAL WATER POLLUTION CONTROL AGENCY NOTICE REQUEST FOR PROPOSALS FOR: WASTEWATER BIOSOLIDS HAULING SERVICES

MONTEREY REGIONAL WATER POLLUTION CONTROL AGENCY NOTICE REQUEST FOR PROPOSALS FOR: WASTEWATER BIOSOLIDS HAULING SERVICES MONTEREY REGIONAL WATER POLLUTION CONTROL AGENCY NOTICE REQUEST FOR PROPOSALS FOR: WASTEWATER BIOSOLIDS HAULING SERVICES Notice is hereby given that sealed proposals will be received at the Finance Department,

More information

CITY OF SACRAMENTO CALIFORNIA. April 27, 2012

CITY OF SACRAMENTO CALIFORNIA. April 27, 2012 OFFICE OF THE CITY MANAGER CALIFORNIA April 27, 2012 CITY HALL 5 th FLOOR 915 I STREET SACRAMENTO, CA 95814-2684 PH 916-808-5704 FAX 916-808-7618 Honorable Mayor and City Council Sacramento, California

More information

Mecklenburg County Minority, Women, and Small Business Enterprise Provisions

Mecklenburg County Minority, Women, and Small Business Enterprise Provisions Mecklenburg County Minority, Women, and Small Business Enterprise Provisions Revised January 1, 2014 M/W/SBE TABLE OF CONTENTS CONTENTS PAGE NUMBER Policy Statement...1 Introduction...2 M/W/SBE Table of

More information

Storm Water Mitigation Services ITB SEMINOLE TRIBE OF FLORIDA INVITATION TO BID

Storm Water Mitigation Services ITB SEMINOLE TRIBE OF FLORIDA INVITATION TO BID SEMINOLE TRIBE OF FLORIDA INVITATION TO BID Solicitation #: ITB 58-2018 Title: Description: Storm Water Mitigation Services The Seminole Tribe of Florida ( Tribe or STOF ) is requesting proposals from

More information

Finance Committee Meeting

Finance Committee Meeting Finance Committee Meeting FY18 Strategic Business and Operating Plan and Preliminary Budget Review April 04, 2017 1 Finance Committee Meeting FY18 Strategic Business Operating Plan and Preliminary Budget

More information

Enclosed are copies of the following revised tariff sheets for the utility's files TARIFF SCHEDULES APPLICABLE TO WATER SERVICE

Enclosed are copies of the following revised tariff sheets for the utility's files TARIFF SCHEDULES APPLICABLE TO WATER SERVICE STATE OF CALIFORNIA EDMUND G. BROWN JR., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 May 12, 2017 Jeffrey T. Linam Director -Rates & Regulation California-American

More information

Cover section: Buildings

Cover section: Buildings Buildings easy Index 1. Definitions that apply to your building section 2 2. Conditions for cover 2 3. What we cover 2 4. Main cover 3 5. Additional benefits 3 6. Optional benefits 5 7. Specific exclusions

More information

ORDINANCE ESTABLISHING STANDARDS FOR REDUCTION OF INFLOW AND INFILTRATION. January, Western Lake Superior Sanitary District Duluth, Minnesota

ORDINANCE ESTABLISHING STANDARDS FOR REDUCTION OF INFLOW AND INFILTRATION. January, Western Lake Superior Sanitary District Duluth, Minnesota ORDINANCE ESTABLISHING STANDARDS FOR REDUCTION OF INFLOW AND INFILTRATION January, 2009 Western Lake Superior Sanitary District Duluth, Minnesota WESTERN LAKE SUPERIOR SANITARY DISTRICT ORDINANCE ESTABLISHING

More information

Elizabeth River Crossings OpCo, LLC Midtown Tunnel Project Monthly Report Owners and Holders Pursuant to Continuing Disclosure Agreement

Elizabeth River Crossings OpCo, LLC Midtown Tunnel Project Monthly Report Owners and Holders Pursuant to Continuing Disclosure Agreement Elizabeth River Crossings OpCo, LLC Midtown Tunnel Project Monthly Report Owners and Holders Pursuant to Continuing Disclosure Agreement December 2012 From: Greg Woodsmall, Chief Executive Officer, Elizabeth

More information

Small Business Enterprise Program

Small Business Enterprise Program Small Business Enterprise Program Registration & Roster Enrollment Registration Does NOT Pre-Approve You (The City may use this information to develop bid lists, contract lists and reports. Prime contractors

More information

Finance Committee Meeting

Finance Committee Meeting Finance Committee Meeting FY16 Strategic Business and Operating Plan and Preliminary Budget Review April 8, 2015 Finance Committee Meeting FY16 Strategic Business Operating Plan and Preliminary Budget

More information

WATER, ELECTRIC, OR JOINT UTILITY ANNUAL REPORT

WATER, ELECTRIC, OR JOINT UTILITY ANNUAL REPORT UTILITY NO. 5370 Class AB WATER, ELECTRIC, OR JOINT UTILITY ANNUAL REPORT OF SHEBOYGAN WATER UTILITY 72 PARK AVE SHEBOYGAN, WI 53081-2958 For the Year Ended: DECEMBER 31, 2016 TO PUBLIC SERVICE COMMISSION

More information

Backlog Reduction Plan

Backlog Reduction Plan 2003-2013 Executive Summary proposes to achieve reductions in our facilities maintenance backlog by documenting and completing backlog projects on a priority basis and by minimizing or eliminating future

More information

Procurement of Works

Procurement of Works AFRICAN UNION UNION AFRICAINE UNIÃO AFRICANA African Union Commission Standard Bidding Documents Procurement of Works Provision of Minor Maintenance Works Under Framework Contract Procurement Number: AUC/AFMD/ST/W-017/2016

More information

Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study

Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study U.S. Army Corps of Engineers, New York District New Jersey Department of Environmental Protection 11 &

More information

Con Edison Performance-Based Gas Demand Response Pilot Guidelines

Con Edison Performance-Based Gas Demand Response Pilot Guidelines Con Edison Performance-Based Gas Demand Response Pilot Guidelines 2018/19 Capability Period Last updated: 09/10/2018 Performance-Based Gas DR Pilot Guidelines Consolidated Edison Contents Acronyms and

More information

ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL

ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL II. ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL ITEM NO. 1: Page P-1, Proposal DELETE the Proposal (pages P-1 through P-9) in its entirety and REPLACE with the attached Proposal (pages P-1R

More information

BID PROPOSAL. In compliance with your NOTICE TO BIDDERS, dated the Undersigned proposes and agrees as follows:

BID PROPOSAL. In compliance with your NOTICE TO BIDDERS, dated the Undersigned proposes and agrees as follows: BID PROPOSAL To: Township of Somers Highway Department DATE: FIRM NAME: In compliance with your NOTICE TO BIDDERS, dated the Undersigned proposes and agrees as follows: (1) That having a principal place

More information

Wildfire and Flood Hazards, Using GIS Tools to Assess Risk

Wildfire and Flood Hazards, Using GIS Tools to Assess Risk Wildfire and Flood Hazards, Using GIS Tools to Assess Risk Floodplain Management Association Conference, Rancho Mirage, CA September 2015 Thoughts To Keep In Mind What advantages are there in looking at

More information

REQUEST FOR BID (RFB) Number: FY2013/042

REQUEST FOR BID (RFB) Number: FY2013/042 1 May 16, 2013 REQUEST FOR BID (RFB) Number: FY2013/042 OPEN: May 16, 2013 CLOSES: May 28, 2013 12:00 PM (noon) Description On behalf of the Spokane Tribe of Indians we hereby request Sealed, firm-fixed

More information

Stephanie Smith, Project EngineerW

Stephanie Smith, Project EngineerW MEMORANDUM v TO: Paul Oehme, Director of Public Works/ City Engineer o FROM: Stephanie Smith, Project EngineerW 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 9522271100 Fax

More information

2018 BUDGET AND FINANCIAL PLAN

2018 BUDGET AND FINANCIAL PLAN Questionnaire 2018 BUDGET AND FINANCIAL PLAN January 1, 2018 - January 23, 2018 The Township of Langley is reviewing the Draft 2018 2022 Five-Year Financial Plan with emphasis on the 2018 Budget. Your

More information

Floodplain Development Permit Application

Floodplain Development Permit Application Floodplain Development Permit Application City of Jonesboro, AR This is an application packet for a Floodplain Development Permit. Certain sections are to be completed by the Applicant, and certain sections

More information

City of Madison 2018 Capital Improvement Plan Agency Request Summary

City of Madison 2018 Capital Improvement Plan Agency Request Summary City of Madison 2018 Capital Improvement Plan Agency Request Summary Agency : Agency Request by Project (All Funds) Project 2230 Broadway ## Citywide Flood Mitigation 350,000 875,000 550,000 575,000 675,000

More information

Floodplain Management 101: UNIT II. Maps & Flood Insurance Studies

Floodplain Management 101: UNIT II. Maps & Flood Insurance Studies Floodplain Management 101: UNIT II Maps & Flood Insurance Studies Who is ASFPM? ASFPM stands for the Association of State Floodplain Managers A national organization of floodplain management professionals

More information

OWNER/PROFESSIONAL SERVICES CONSULTANT AGREEMENT PROJECT TITLE UNIVERSITY OF ILLINOIS

OWNER/PROFESSIONAL SERVICES CONSULTANT AGREEMENT PROJECT TITLE UNIVERSITY OF ILLINOIS PROJECT TITLE UNIVERSITY OF ILLINOIS THIS AGREEMENT, made and entered into in the City of, State of Illinois, as of the date of the last signature of the parties hereto by and between THE BOARD OF TRUSTEES

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: December 21, 2017 TO: FROM ACTION TRANSMITTAL No. 2018-07 Technical Advisory Committee TAC Funding and Programming Committee

More information

Floodplain Development Permits A Technical Guidance Document

Floodplain Development Permits A Technical Guidance Document Floodplain Development Permits A Technical Guidance Document To Prevent Loss of Life, Reduce Property Damage and to Protect and Enhance the Natural and Beneficial Functions of Floodplains Iredell County

More information

microfit RULES Version 1.6 December 8, 2010

microfit RULES Version 1.6 December 8, 2010 microfit RULES Version 1.6 December 8, 2010 Ontario Power Authority, 2010 RULE CHANGE (May 19, 2010) IN-SERIES METERING IS NO LONGER PERMITTED UNDER THE microfit RULES. In-series metering is no longer

More information

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES DEPARTMENT OF ENVIRONMENTAL SERVICES Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

City Council Agenda Report October 16, 2018

City Council Agenda Report October 16, 2018 City Council Agenda Report October 16, 2018 TO: FROM: BY: Honorable City Council Jesus M. Gomez, City Manager Gary DiCorpo, Deputy City Manager James C. Parker, Executive Director of Regional Transportation

More information

PERMIT APPLICATION PLEASE PRINT CLEARLY AND FILL IN ALL APPLICABLE SECTIONS

PERMIT APPLICATION PLEASE PRINT CLEARLY AND FILL IN ALL APPLICABLE SECTIONS CONTRACTOR OWNER/ AGENT APPLICANT CITY OF DALY CITY DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION 333 90 th Street, 1 st Floor, Daly City, CA 94015 Tel: (650) 991-8064 Fax: (650) 991-8243 ENGINEERING

More information

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL Phone: (561) Fax: (561)

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL Phone: (561) Fax: (561) OFFICE USE ONLY: TOWN OF JUNO BEACH 340 Ocean Drive Phone: (561) 656-0302 Fax: (561) 775-0812 Date: Permit #: Tracking #: Application for Building Permit & Certificate of Occupancy Job Address: Property

More information

SERVICE CONNECTION CONSTRUCTION PERMIT WSSC Permit Services Unit APPLICANT/OWNER: PROPERTY DESCRIPTION: ADDRESS: CONTACT PERSON: ADDRESS:

SERVICE CONNECTION CONSTRUCTION PERMIT WSSC Permit Services Unit APPLICANT/OWNER: PROPERTY DESCRIPTION: ADDRESS: CONTACT PERSON:  ADDRESS: SERVICE CONNECTION CONSTRUCTION PERMIT WSSC Permit Services Unit PERMIT NUMBER: APPLICANT/OWNER: PROPERTY DESCRIPTION: ADDRESS: CONTACT PERSON: TELEPHONE NUMBER: FAX NUMBER: E-MAIL ADDRESS: 1. The Applicant

More information

** completed qualification form to City: State: Zip: Telephone: Fax:

** completed qualification form to City: State: Zip: Telephone: Fax: **Email completed qualification form to subs@hammondconstruction.com Company Name: : Address: City: State: Zip: : Fax: Federal ID#: Email Address: Type of work qualified to perform: (masonry, steel, etc.)

More information

As Introduced. 128th General Assembly Regular Session H. B. No A B I L L

As Introduced. 128th General Assembly Regular Session H. B. No A B I L L 128th General Assembly Regular Session H. B. No. 464 2009-2010 Representatives Winburn, Phillips Cosponsors: Representatives Letson, Murray, Mallory, Domenick, Fende, Lundy, Yuko, Williams, S., Garland,

More information

PIERCE COUNTY INVITATION TO BID SURPLUS PROPERTY SALE NUMBER 1022 FOR SALE OF SURPLUS GRAVEL

PIERCE COUNTY INVITATION TO BID SURPLUS PROPERTY SALE NUMBER 1022 FOR SALE OF SURPLUS GRAVEL PIERCE COUNTY INVITATION TO BID SURPLUS PROPERTY SALE NUMBER 1022 FOR SALE OF SURPLUS GRAVEL BIDS MUST BE SUBMITTED TO: CLERK OF THE COUNCIL 930 TACOMA AVE S RM 1046 TACOMA WA 98402-2176 AND WILL BE RECEIVED

More information

Request for Bids/Proposals for City-Wide Stump Grinding Project

Request for Bids/Proposals for City-Wide Stump Grinding Project Request for Bids/Proposals for City-Wide Stump Grinding Project The City of West Branch is seeking competitive bids/proposals for City Wide Stump Grinding. Such services shall include the following: 1.

More information

Decommissioning Regulatory Process

Decommissioning Regulatory Process Decommissioning Regulatory Process Deanna Toy Diablo Canyon Decommissioning Engagement June 27, 2018 Panel 1055 Monterey St. San Luis Obispo County Government Building July 25, 2018 1 Safety Moment AED

More information