1 GMARG Forum Thursday 15 March 2018 Minutes of teleconference Participants: Name Company Name Company Hilary Healy GNI MDS David Mulholland SSE Airtricity Colm Ó Duibhir GNI Regulatory Operations Eamonn Murtagh Panda Power Douglas O Brien GNI GPRO Sean Doolin (part) Electric Ireland Con O Donnell GNI Mark Phelan Electric Ireland Declan Mulvey GNI Krystle Chapman Energia Mark Clarke GNI Gillian Kinsella Bord Gais Energy Ken Galloway GNI KAM Mark Clarke Bord Gais Energy Grace Kingston GNI KAM Seán Mac An Bhaird CRU Aidan Hogan GNI RP Page 1 of 7

2 Minutes of Meeting Agenda Item 2 Review of minutes from the previous meeting and Actions Title ID Overview Update at Meeting Action/Next Steps G121 G175 G185 Determine whether the Eligibility List can be published on GNI s extranet. Details of the new processing arrangement to be presented to the GMARG GNI high level assessment of postcodes Impact assessment of introducing supplier locks on PAYG meters Data Processor Agreement GNI had issued the DPA technical schedule prior to the march call meeting, Shippers were asked to comment on the Schedule by the end of March. Discussion on whether Shipper use TLS for security protocol Shippers to clarify. No significant update. Electricity likely to bring Eircodes in early 2019, Suppliers requested that GNI co-ordinates with ESBN for Eircode rollout. High level impact assessment of introducing supplier locks on PAYG meters GNI to issue;- 2. BGES DR: GNI to clarify MPD update status. Action G121 open Shippers to comment on Schedule. All to check if TLS security standard in use in their organisations Action G175 Open GNI to maintain watching brief on Eircodes, co-ordinate future go-live project plan with ESBN. Action G185 Open GNI to clarify MPD update status. G190 MPD2 to be updated Change of Mind Workshop had been held, GNI developed Correction template and issued note to GMARG list re proposal to revert sites back without the other Shipper confirming if a set of principles had been met, DR had issued. Consider if either MPDs 2 and/or 5 needs to be updated. SSEAT suggested alignment with Electricity process G 202 Vulnerable and Priority reconciliation reports Vulnerable Customer issues were outlined by GNI. GNI to prepare DR to cease Priority flag removal after CoS by 22 nd March. G 203 PAYG Misdirected Payments Note detailed Section 6 below. PPM workshop to be convened 27/03/18 Action G190 Open: Shippers to comment on principles by 30/03 GNI to issue revised MPD 2/5 Action G202 Open: GNI to raise DR to cease Priority flag removal after CoS by 22 nd March. Action G203 Open: GNI to consider front office adjustment process G 206 GMARG Terms of Reference GMARG Terms of Reference (including CR/DDR timelines), CRU review underway for both Electricity and Gas. Process/Roadmap for Schemas Action G206 Open Page 2 of 7

3 to be detailed, Schema/non-Schema policy clarified. GMARG to be updated. To issue in first half of year. Former draft ToR had been recirculated. No major update G207 PAYG Tariff slot 1 Default PPM slot Tariff No supplier comments had bene received prior to call. Propose to close this action as GNI have not received an alternative proposal from Suppliers Default tariff process to remain as is. One supplier indicated they may submit a response within the next day. CRU to provide update in first half of year on final version of GMARG ToR including revised CR/DDR timelines. Suppliers, if they wish, to submit views to CRU by 29/03. Action G207 Propose : (subject to no material comment being received) G208 Long-term PPM solution Note detailed Section 3 below. Action G208 Open: GNI to host PPM workshop G 218 Proposal for June 2018 Schema Note detailed Section 5 below. Action G218 Open - Shippers to revert with final comments on date for Schema release GNI to set up industry conference call on 23/03 GNI to update former change matrix G 221 Warm transfers to call centre Call centre warm transfers: GNI had held conference call with shipper customer operations representatives, not all Shippers had participated. Other Shippers can contact Conor Seery in GNI as required. Action G221 Propose : GNI convened call with Shipper CSR reps G 223 Incident management Plan Retail Market Incident Management Plan. GNI to advise the forum Action G223 Propose : when finalised plan has been approved by CRU. GNI to advise forum when CRU final approval granted. G 225 GNI Complaints Process Note detailed Section 4 below Action G225 Open: Shippers had provided feedback on Draft MPD GNI to review comments and update MPD by next GMARG G 227 PPM User guides PPM User guides: GNI are engaging directly with a number of suppliers on developing a PPM User Guide Date for completion extended to Q Action G227 Open: GNI to develop guide by end of Q2 Page 3 of 7

4 G228 Use of Skype for future calls GNI had considered using Skype for future GMARG calls. GNI advised Action G228 Propose : that Skype account log-in secured, line test to take place. Shippers had been asked to review if Skype is available on their work networks. CRU advised the forum that they cannot use Skype, but do use Blue Jeans G229 Prepayment Meter Refunds Prepayment Meter Refunds: Note detailed Section 6 below Action G229 Open Shippers to provide feedback on GNI proposals. GNI to review comments and update MPD based on comments. G231 PPM Framework Note section 5 below. GNI had advised Suppliers of current terms. Three Suppliers submitted written responses. GNI will present to the CRU and Suppliers at the next GMARG. Action G231: Open: GNI to review responses and progress. G232 Shipper/Supplier survey Shipper/Supplier survey: no feedback was received from Suppliers Action G232 Propose : G233 PPM Market Scan PPM Market Scan: PPM workshop has now been organised. Action G233 Propose : G234 Storm Emma Incident Report See item under AOB Action G234 New GNI to issue Storm Emma Incident report Agenda Item 3 PPM Front Office Framework Refer G231 above. GNI presented slide and summarised Shipper feedback in relation to the PPM Front Office contractual arrangements. 2 Shipper responses had been received, 1 Shipper asked for a further day to respond. CRU to revert on contingency/fail-safe processes for Front Office. Agenda Item 4 GNI Complaints Process Refer G225 above. MPD number was previously updated to MPD42. Shipper question on escalation process, was it dependent on new information? Page 4 of 7

5 Action: 1.Suppliers to revert to GNI by 21st of March with final comments on MPD 42 Management of Supplier Complaints. 2. GNI to update the MPD, and circulate in advance of the April GMARG, on foot of the feedback received. Agenda Item 5 Schema Date 2018 Refer G218 above. GNI outlined the current details for Schema change and provided updates on Shipper submissions. Regarding the date BGES advised that they required 6-months from the final Schema spec being agreed. Energia advised they had a window only until mid-august. Actions: 1. GNI to set-up a conference call on Friday the 23rd to agree a date for Schema implementation. 2. Suppliers to revert to GNI by COB on Thursday the 22nd with a proposed date for Schema implementation Agenda Item 6 PPM Refunds Refer G229 above. GNI outlined Shipper feedback and detailed that MPD43 had circulated in early March, GNI had replied top Shipper comments received. Suppliers to revert to GNI by 29th of March with comments on MPD 43 Prepayment Meter Refunds Agenda Item 7 Revenue Protection Update CRU presented its decision re the implement model for RP Read at RP Workshop on 8 March. GNI reiterated that the RP Read implementation timeline is entirely independent of the schema release timeline and that RP Read should be implemented as soon as possible, citing late summer / early autumn as feasible. RP Code of Practice 2/3 developed, website MPD to be reviewed. Next RP workshop is 12/04. Agenda Item 8 GNI verbal updates Page 5 of 7

6 8. GNI updates 8.1 Storm Emma response It was a difficult situation with a lot of no gas and PR calls, all calls addressed as soon as was possible. There was a delay with CoS days due to IT systems being configured as weekend to remove appointments.. An incident report will issue. 8.2 Incident Management Plan See G202. Was useful during Emma, for raising issues and communications with Shippers. An incident report will issue. Ongoing action G PPM Solution Meeting to be convened on the 27 th, Shippers to confirm attendance 8.4 Eircode update See G175 Ongoing action G CRU updates/consultations No items raised Agenda Item 9 CRU updates - Update Agenda Item 10/11 Meeting dates and A.O.B. 10. Next Meeting The next GMARG meeting will take place at 10:30am on April 19 th 11. A.O.B. DOB raised the issue of the GMARG distribution list getting a lot of non-delivery reports, individual Shippers agreed to check with internal contacts if they still wanted to be on list MC confirmed that a Problem/Cause/Remedy process was now being applied and that the Recommendation 1 on the T21 recommendations could be closed. Page 6 of 7

7 List of Live Actions at end of Meeting: Action # Status Overview Responsible G121 Open Data Processing Agreement: revised DPA schedule, Shippers to comment on Schedule; GNI to write to CRU to clarify timeline for Eligibility List circulation. All to check if TLS security standard in use in their organisations GNI/CRU/ Shippers G 175 Open GNI to maintain watching brief on Eircodes, communicate go-live project plan, co-ordinate future go-live project GNI plan with ESBN. G 185 Open High level impact assessment of introducing supplier locks on PAYG meters GNI to clarify MPD update status. GNI G 190 Open Review MPD2 re reflect change of mind: Shippers to comment on Change of Mind principles. GNI to issue Shippers/GNI revised MPD 2/5 to reflect Change of Mind by 30/03 G 202 Open Vulnerable Customers: GNI to raise DR to cease Priority flag removal after CoS by 22/03. GNI G 203 Open Misdirected Payments GNI to consider front office adjustment process. GNI G 206 Open GMARG ToR including revised CR/DDR timelines. CRU to provide update in first half of year on final version of CRU/Shippers GMARG ToR. Suppliers, if they wish, to submit views to CRU by 29/03. G 207 Propose PPM Slots (subject to no material comment being received) Shippers G 208 Open Long-term PPM solution GNI to arrange a PPM workshop with suppliers GNI G 218 Open Shippers to revert with final date for Schema by 22/03. GNI to set up industry conference call on 23/03 to agree All/GNI date for Schema. GNI to update former change matrix by 22/03. G 221 Propose Call centre warm transfers: GNI had convened call with Shipper CSR reps GNI G 223 Propose Incident management Plan: GNI to advise forum when CRU final approval granted. GNI G 225 Open GNI Complaints Process: Shippers to provide feedback on Draft MPD by 21st of March. Shippers/GNI GNI to review feedback, update MPD and circulate in advance of April GMARG. G 227 Open PPM User guides: PPM User Guide to be developed by GNI by end of Q2 of GNI G 228 Propose All to consider if Skype can be utilised for future GMARG calls All G 229 Open Prepayment Meter Refunds: Shippers to provide feedback on DRAFT MPD by 29 th of March Shippers GNI to review feedback, update MPD and circulate in advance of April GMARG G 231 Open PPM Framework - GNI to review responses and progress GNI G 233 Propose PPM Market Scan: GNI had arranged PPM workshop GNI G 234 New GNI to issue Storm Emma Incident report GNI Page 7 of 7

GMARG Forum. Thursday 15 February Minutes of meeting. Participants:

GMARG Forum. Thursday 15 February Minutes of meeting. Participants: GMARG Forum Thursday 15 February 2018 Minutes of meeting Participants: Name Company Name Company Ciara Drinan GNI MDS Adrienne Costello SSE Airtricity Colm Ó Duibhir GNI Regulatory Operations Siobhan Melvin

More information

GMARG forum. Teleconference. Thursday 21 May Minutes of Meeting. Participants:

GMARG forum. Teleconference. Thursday 21 May Minutes of Meeting. Participants: GMARG forum Teleconference Thursday 21 May 2015 Minutes of Meeting Participants: Name Company Name Company Brian Mullins GNI (Market Operations) Alison Byrne Flogas Ken Galloway GNI (Shipper Services)

More information

GMARG forum. Ashling Hotel. Thursday 18 June Minutes of Meeting. Participants:

GMARG forum. Ashling Hotel. Thursday 18 June Minutes of Meeting. Participants: GMARG forum Ashling Hotel Thursday 18 June 2015 Minutes of Meeting Participants: Name Company Name Company Brian Mullins GNI (Market Operations) Jennie Dockrell Flogas Ken Galloway GNI (Shipper Services)

More information

GMARG Meeting. Tuesday 18 th October 2018

GMARG Meeting. Tuesday 18 th October 2018 GMARG Meeting Tuesday 18 th October 2018 Today s Agenda 2 Item Number Description Time Allotted 1 Introduction/confirmation of attendees 5 mins 2 Review of Previous Minutes and Actions 20 mins 3 Eircodes

More information

GMARG Meeting. Ashling Hotel, Thursday 20 th August 2015

GMARG Meeting. Ashling Hotel, Thursday 20 th August 2015 GMARG Meeting Ashling Hotel, Thursday 20 th August 2015 Today s Agenda 1. Introduction 2. Review of Previous Minutes and Actions 16 July 2015 3. SMART Metering Update 4. GNI Presentation on Site Specific

More information

GMARG Meeting. Ashling Hotel, Thursday 17 th December 2015

GMARG Meeting. Ashling Hotel, Thursday 17 th December 2015 GMARG Meeting Ashling Hotel, Thursday 17 th December 2015 Today s Agenda 1. Introduction 2. Presentation by An Post re Front Office PAYG solution 3. Review of Previous Minutes and Actions 18 November 2015

More information

Prepayment Metering in the Electricity and Gas Markets

Prepayment Metering in the Electricity and Gas Markets Prepayment Metering in the Electricity and Gas Markets DOCUMENT TYPE: REFERENCE: DATE PUBLISHED: CLOSING DATE: RESPONSES TO: Consultation Paper CER/11/166 25 th August 2011 15 th September 2011 efarrelly@cer.ie

More information

Customer Care Team Annual Report 2017

Customer Care Team Annual Report 2017 An Coimisiún um Rialáil Fóntas Commission for Regulation of Utilities Customer Care Team Annual Report 2017 Annual Report Reference: CRU18235 Date Published: 31/10/2018 Closing Date: N/A 0 www.cru.ie 1

More information

Assurance Approach Delivery assurance activities for Retail Market Release April 2019

Assurance Approach Delivery assurance activities for Retail Market Release April 2019 Assurance Approach Delivery assurance activities for Retail Market Release April 2019 Schema V12.00.00 23 August 2018 Version 0.8 Draft for Consultation Contents Change History... 3 Document Controls...

More information

Code of Practice on Customer Billing and Disconnection

Code of Practice on Customer Billing and Disconnection Code of Practice on Customer Billing and Disconnection Code of Practice on Customer Billing and Disconnection Energia will bill you every two months for the energy you use. Your bill is based on either

More information

Gas Networks Ireland Distribution Tariffs and Allowed Revenue 2018/19

Gas Networks Ireland Distribution Tariffs and Allowed Revenue 2018/19 An Coimisiún um Rialáil Fóntas Commission for Regulation of Utilities Gas Networks Ireland Distribution Tariffs and Allowed Revenue 2018/19 Information Note Reference: CRU/18/101 www.cru.ie Date Published:

More information

Code Modification Forum Meeting Minutes 31 st January 2018 Location: Ashling Hotel, Dublin. Attendees

Code Modification Forum Meeting Minutes 31 st January 2018 Location: Ashling Hotel, Dublin. Attendees Code Modification Forum Meeting Minutes 31 st January 2018 Location: Ashling Hotel, Dublin Attendees Name Representing 1 Andrew Kelly GNI 2 Kieran Quill GNI 3 Catherine Philpott GNI 4 Wayne Mullins GNI

More information

SSE Airtricity Deemed Contract Scheme:

SSE Airtricity Deemed Contract Scheme: SSE Airtricity Deemed Contract Scheme: 1. Any Customer being supplied with electricity by SSE Airtricity other than in pursuance of a contract shall be deemed to have contracted with SSE Airtricity for

More information

Dr. Ann Louise Gilligan

Dr. Ann Louise Gilligan QQI/N07 Quality and Qualifications Ireland Note of the seventh Meeting of the Authority (The Board) which took place on Monday, 9 September 2013 at 10.00 am in the Boardroom, QQI Office, 26/27 Denzille

More information

MCS Solar Thermal Working Group Final Minutes on 17 th March 2016

MCS Solar Thermal Working Group Final Minutes on 17 th March 2016 Meeting of: Date: 17 th March 2016 Venue: Teleconference Attendees: Name Patrick Davis (PD) Neil Sawers (NS) Stuart Elmes (SE) Mitchell Cogger (MC) Imogen Jamie (IJ) Louise Evans (LE) Paul Roberts (PR)

More information

Charging User Group (ChUG) - Action Log 3 rd September 2014

Charging User Group (ChUG) - Action Log 3 rd September 2014 Attendees Mo Sukumaran (SHET) Chair Donald Preston (SHET) Emma Clark (SHET) Technical Secretary Ian Fothergill (SHET) James Robb (SHET) Mary Owen (ET) Stuart Boyle (ET) Shinlei Schlaff (ET) Donald Smith

More information

Charging User Group (ChUG) - Action Log Open Actions

Charging User Group (ChUG) - Action Log Open Actions Open Actions Attendees Alan Kelly (SP), Tracy Joyce (SP) Donald Smith (Ofgem) Ajay Panday () Mary Owen () Emma Clark (SSE) Sean Kelly (Transmission Capital) (for offshore section) Apologies Mo Sukumaran

More information

Charging User Group (ChUG) - Action Log Open Actions

Charging User Group (ChUG) - Action Log Open Actions Open Actions Attendees Donald Preston (SSE) Alan Kelly (SP), Tracy Joyce (SP) Emma Clark (SSE) Ajay Panday () Dave Wagstaff () Liz Statham () Mary Owen () Stuart Boyle () Donald Smith (Ofgem) Sean Kelly

More information

Flogas Natural Gas. Codes of Practice

Flogas Natural Gas. Codes of Practice Flogas Natural Gas Codes of Practice Billing Content Of Bill Your bill will contain the information relevant to you: We will bill you bi-monthly. This bill will be based on the actual or estimated meter

More information

UNIVERSITY OF ST MARK & ST JOHN BOARD OF GOVERNORS - AUDIT COMMITTEE APPROVED MINUTES

UNIVERSITY OF ST MARK & ST JOHN BOARD OF GOVERNORS - AUDIT COMMITTEE APPROVED MINUTES UNIVERSITY OF ST MARK & ST JOHN BOARD OF GOVERNORS - AUDIT COMMITTEE Thursday 16 October 2015 AT 10.00 am IN THE BOARDROOM APPROVED MINUTES Present: Mr Michael Lincoln (Chair) Independent Governor ML Ms

More information

Ms. Caitríona Lawless (Recording Secretary) Mr. Eamonn Collins (Item 7) Ms. Barbara Kelly (Item 9)

Ms. Caitríona Lawless (Recording Secretary) Mr. Eamonn Collins (Item 7) Ms. Barbara Kelly (Item 9) QQI/N10 Quality and Qualifications Ireland Note of the tenth Meeting of the Authority (The Board) which took place on Friday, 14 February 2014 at 14.00 pm in the Boardroom, QQI Office, 26/27 Denzille Lane,

More information

Monthly Performance Meeting. Terms of Reference. Version No: xx June Version control

Monthly Performance Meeting. Terms of Reference. Version No: xx June Version control Monthly Performance Meeting Terms of Reference Version No: xx June 2018 Version control Version Changes 1 1. Context The Electricity System Operator (ESO) has certain accountabilities for ensuring the

More information

Local Pension Board (LPB)

Local Pension Board (LPB) Local Pension Board (LPB) Minutes of the meeting held on 29th June 2016, 10:00am Room G.04, 169 Union Street, London, SE1 0LL LPB Members William Bourne LPB Chairman Omolayo Sokoya Member representative

More information

UNC Workgroup 0565 Minutes Central Data Service Provider: General framework and obligations Tuesday 01 December Homer Road, Solihull, B91 3LT

UNC Workgroup 0565 Minutes Central Data Service Provider: General framework and obligations Tuesday 01 December Homer Road, Solihull, B91 3LT UNC Workgroup 0565 Minutes Central Data Service Provider: General framework and obligations Tuesday 01 December 2015 Attendees Bob Fletcher (Chair) (BF) Joint Office Helen Cuin (Secretary) (HCu) Joint

More information

Energy Coordination Act Draft Gas Last Resort Supply Arrangements: Guidelines and Template Plan

Energy Coordination Act Draft Gas Last Resort Supply Arrangements: Guidelines and Template Plan Energy Coordination Act 1994 Draft Gas Last Resort Supply Arrangements: Guidelines and Template Plan May 2008 A full copy of this document is available from the Economic Regulation Authority web site at

More information

Gas Networks Ireland Allowed Revenue and Distribution Tariffs 2016/17

Gas Networks Ireland Allowed Revenue and Distribution Tariffs 2016/17 Gas Networks Ireland Allowed Revenue and Distribution Tariffs 2016/17 Decision Paper Reference: CER/16/244 Date Published: 25 th August 2016 Queries to: Colm Ó Gormáin cogormain@cer.ie Executive Summary

More information

Ms. Caitríona Lawless (Recording Secretary) Dr. Anna Murphy (Item 6) Ms. Trish O Brien (Item 7) Mr. Ultan Tuite (Item 8)

Ms. Caitríona Lawless (Recording Secretary) Dr. Anna Murphy (Item 6) Ms. Trish O Brien (Item 7) Mr. Ultan Tuite (Item 8) QQI/N02 Quality and Qualifications Ireland Note of the second Meeting of the Authority (The Board) which took place on Friday, 1 March 2013 at 2.00 pm in the Alexander Hotel, Dublin 2. Present: Mr. Gordon

More information

Minutes of the HSE Directorate Meeting held on Tuesday 17 th and Tuesday 24 th January, 2017

Minutes of the HSE Directorate Meeting held on Tuesday 17 th and Tuesday 24 th January, 2017 Minutes of the HSE Directorate Meeting held on Tuesday 17 th and Tuesday 24 th January, 2017 Directorate Members Present: Members of Leadership Team present: T. O Brien (Chairman), S. Mulvany, A. O Connor,

More information

Our Code of Practice

Our Code of Practice Our Code of Practice on Services for Prepayment Meter Customers Your Guide 3 Foreward We would like to take this opportunity to present our Electricity Code of Practice on Services for Prepayment Meter

More information

Northern Ireland Water Ltd Board Meeting 31 March 2011 Westland House. Kevin Steele Non Executive Director

Northern Ireland Water Ltd Board Meeting 31 March 2011 Westland House. Kevin Steele Non Executive Director Title of Paper Minutes of the 25 February 2011 To be presented by Purpose of paper (approval/information) Significant Issues Chair For the Board to agree the minutes of its meeting for subsequent internet

More information

At the outset the Chair welcomed Kieran Donaghy to his first meeting of the A&R Assurance committee.

At the outset the Chair welcomed Kieran Donaghy to his first meeting of the A&R Assurance committee. Minutes of Audit & Risk Assurance Committee Meeting No. 23 held on Tuesday 10 February 2015 at 10.00 in the Charity Commission for Northern Ireland office in Lurgan Present: Philip McDonagh, Chair Norman

More information

Quality and Qualifications Ireland

Quality and Qualifications Ireland QQI/N17 Quality and Qualifications Ireland Note of the seventeenth Meeting of the Authority (The Board) which took place on Friday, 24 April 2015 at 10.00 a.m. in the Boardroom, QQI Offices, 4 th Floor,

More information

UK LINK Committee Minutes Thursday 10 May 2007

UK LINK Committee Minutes Thursday 10 May 2007 UK LINK Committee Minutes Thursday 10 May 2007 held by teleconference Attendees John Bradley (JB) Joint Office Mike Berrisford (MiB) Joint Office Alexandra Crump (AC) E.ON UK plc Andrew Keogh (AK) e=mc

More information

RHONDDA CYNON TAF COUNTY BOROUGH COUNCIL PENSION BOARD. Board Members In attendance:-

RHONDDA CYNON TAF COUNTY BOROUGH COUNCIL PENSION BOARD. Board Members In attendance:- RHONDDA CYNON TAF COUNTY BOROUGH COUNCIL PENSION BOARD Minutes of the RCTCBC Pension Board held on Thursday 5 th November, 2015, at Llantrisant Leisure Centre. Board Members In attendance:- Hugh Coombs

More information

ENGLISH LACROSSE ASSOCIATION Ltd.

ENGLISH LACROSSE ASSOCIATION Ltd. ENGLISH LACROSSE ASSOCIATION Ltd. Minutes of the ELA Board meeting held on Thursday 7 th December 2017 at the I2, Euston commencing at 2pm. Present: John Neal (JN) Chair, Mark Coups (MC), Sallie Barker

More information

Harmonisation of Electricity Retail Markets in Ireland &Northern Ireland

Harmonisation of Electricity Retail Markets in Ireland &Northern Ireland Harmonisation of Electricity Retail Markets in Ireland &Northern Ireland Seán mac an Bhaird, Commission for Energy Regulation, Ireland CEER Workshop Brussels, 10 th February 2011 Agenda 1. Introduction

More information

Review Group 0217 Minutes Thursday 13 November 2008 held at Elexon, 350, Euston Road, London

Review Group 0217 Minutes Thursday 13 November 2008 held at Elexon, 350, Euston Road, London Attendees Review Group 0217 Minutes Thursday 13 November 2008 held at Elexon, 350, Euston Road, London John Bradley (Chair) Mike Berrisford (Secretary) Chris Milne Chris Wright Claire Thorneywork Douglas

More information

Government are happy for us to build on and adapt existing processes we already have in place including the LTB assurance framework

Government are happy for us to build on and adapt existing processes we already have in place including the LTB assurance framework Growth Deal Implementation - update for the LTB board 18 th September Background The Growth Deal was published on 7th July 2014 and Government will be issuing a draft offer letter for the Deal shortly

More information

St Oliver Plunkett Primary School. C2k Contracts & Finance Manager, C2k Implementation and Communications Manager, C2k

St Oliver Plunkett Primary School. C2k Contracts & Finance Manager, C2k Implementation and Communications Manager, C2k MINUTES OF THE C2K PROJECT BOARD MEETING HELD AT C2K HEADQUARTERS TUESDAY 12 TH JANUARY 2010 Present: Mr B Mulholland Mr J Stewart Mr G Byrne Mr R Hanna Ms S Lawler Mr J Wilkinson Mr F Devenny Mr P Mackey

More information

CHARITY REGULATOR FORUM. 4 th JUNE 2008 DEPARTMENT OF COMMUNITY, RURAL AND GAELTACHT AFFAIRS MESPIL ROAD DUBLIN 4

CHARITY REGULATOR FORUM. 4 th JUNE 2008 DEPARTMENT OF COMMUNITY, RURAL AND GAELTACHT AFFAIRS MESPIL ROAD DUBLIN 4 CHARITY REGULATOR FORUM 4 th JUNE 2008 DEPARTMENT OF COMMUNITY, RURAL AND GAELTACHT AFFAIRS 43 49 MESPIL ROAD DUBLIN 4 List of Attendees Terry Dunne Department of Community, Rural and Gaeltacht Affairs

More information

VSS Officers in Attendance: Chief Executive & Accounting Officer

VSS Officers in Attendance: Chief Executive & Accounting Officer Minutes of Board Meeting No. 1 Monday 27 January 2014, 9.30am Millennium House, Belfast Board Members in Attendance: Peter Gay VSS Director (Chair) Bertha McDougall VSS Board Member Richard Solomon VSS

More information

Cboe Europe Regulatory Transaction Reporting Service Description

Cboe Europe Regulatory Transaction Reporting Service Description Cboe Europe Regulatory Transaction Reporting Service Description Version 1.4 23rd November, 2017 Cboe Europe Limited is a Recognised Investment Exchange regulated by the Financial Conduct Authority. Cboe

More information

Board assurance of our PR19 business plan resubmission. South Staffs Water (incorporating Cambridge Water)

Board assurance of our PR19 business plan resubmission. South Staffs Water (incorporating Cambridge Water) Board assurance of our PR19 business plan resubmission South Staffs Water (incorporating Cambridge Water) Board assurance statement The Board considers all the elements add up to a business plan that is

More information

Introduction. What is AAR?

Introduction. What is AAR? Introduction The HSE has developed a number of review methodologies which will assist in the provision of a graduated and proportionate response to the review of incidents 1 as identified in the HSE s

More information

Minutes of the Meeting of the Audit Committee held on Thursday 16 th July 2015 at King s Court, Chapel Street, King s Lynn

Minutes of the Meeting of the Audit Committee held on Thursday 16 th July 2015 at King s Court, Chapel Street, King s Lynn Minutes of the Meeting of the Audit Committee held on Thursday 16 th July 2015 at King s Court, Chapel Street, King s Lynn Present: Hilary De Lyon (HDL) Lay Member (Audit), Chair Tony Burgess (TB) GP Governing

More information

Debt Investor Presentation 2017 Results and Business Update. March 15th 2018

Debt Investor Presentation 2017 Results and Business Update. March 15th 2018 Debt Investor Presentation 2017 Results and Business Update March 15th 2018 Disclaimer Forward looking statements: This presentation contains certain forward-looking statements with respect to Electricity

More information

Quality and Qualifications Ireland

Quality and Qualifications Ireland QQI/N14 Quality and Qualifications Ireland Note of the fourteenth Meeting of the Authority (The Board) which took place on Friday, 5 December 2014 at 10.00 a.m. in the Boardroom, QQI Offices, 26/27 Denzille

More information

Parliamentary Affairs: A Working Guide For Staff. Parliamentary Affairs Division

Parliamentary Affairs: A Working Guide For Staff. Parliamentary Affairs Division Parliamentary Affairs: A Working Guide For Staff Foreword This document is intended to outline in Question and Answer format briefly what the work of the HSE ( PAD ) entails and to provide in particular

More information

Quality and Qualifications Ireland

Quality and Qualifications Ireland Quality and Qualifications Ireland QQI/N37 Note of the thirty seventh Meeting of the Authority (The Board) which took place on Friday, 21 September 2018 at 10.00 a.m. in the Boardroom, QQI Offices, 26/27

More information

Finance & Emergency Services Strategic Policy Committee. Minutes of Meeting Held On 15 th January 2015

Finance & Emergency Services Strategic Policy Committee. Minutes of Meeting Held On 15 th January 2015 Finance & Emergency Services Strategic Policy Committee Minutes of Meeting Held On 15 th January 2015 1. Welcome Cllr. McGinley asked if the minutes of the meeting of 20 th November 2014 were in order

More information

Children and Young People s Services Committee Thursday 4 October 2018

Children and Young People s Services Committee Thursday 4 October 2018 Children and Young People s Services Committee Thursday 4 October 2018 CYPS/11/18/3 Board Room, Education Authority (Antrim) 10.30 am Present In Attendance Apologies Mrs P Carville (Chair), Rev A Adams,

More information

To: All NHS trust and NHS foundation trust finance directors and finance teams

To: All NHS trust and NHS foundation trust finance directors and finance teams Wellington House 133-155 Waterloo Road London SE1 8UG 13 November 2018 T: 020 3747 0000 E: nhsi.enquiries@nhs.net W: improvement.nhs.uk To: All NHS trust and NHS foundation trust finance directors and

More information

RQIA Board Meeting. Min/May17/public. To share with Board members a record of the previous meeting of the RQIA Board.

RQIA Board Meeting. Min/May17/public. To share with Board members a record of the previous meeting of the RQIA Board. Date of Meeting 6 July RQIA Board Meeting Title of Paper Public Session Minutes Agenda Item 2 Reference Author Presented by Purpose Executive Summary FOI Exemptions Applied Equality Impact Assessment Recommendation/

More information

*via teleconference. Page 1 of 5

*via teleconference. Page 1 of 5 UNC Workgroup 0647 Minutes Opening Class 1 reads to Competition (including IGT Modification 119 Opening Class 1 read services on IGT Meter Supply Points to Competition) Monday 17 December 2018 at Elexon,

More information

Minutes of the 6th Meeting of the Northern Ireland Human Rights Commission Monday 14 June 1999 Temple Court, 1.00pm

Minutes of the 6th Meeting of the Northern Ireland Human Rights Commission Monday 14 June 1999 Temple Court, 1.00pm HRC 7.1 Minutes of the 6th Meeting of the Northern Ireland Human Rights Commission Monday 14 June 1999 Temple Court, 1.00pm Present: Brice Dickson (Chair) Christine Bell (1.40pm onwards) Margaret-Ann Dinsmore

More information

This week s update focuses on an update on the negotiations of the withdrawal agreement including publication of the latest draft withdrawal text.

This week s update focuses on an update on the negotiations of the withdrawal agreement including publication of the latest draft withdrawal text. ǀ This regular paper produced by SPICe sets out developments in the UK s negotiations to leave the European Union, the process for which has now formally begun following the Prime Minister s triggering

More information

Consultation Paper on Prepayment Metering in the Electricity and Gas Markets

Consultation Paper on Prepayment Metering in the Electricity and Gas Markets Vayu Limited 3rd Floor, Macken House, 39-40a Mayor Street, Dublin 1, Ireland Ms. Elizabeth Farrelly, Commission for Energy Regulation, The Exchange, Belgard Square North, Tallaght, Dublin 24. telephone:

More information

MPD30 Gas Debt on Prepayment Meter (PPM)

MPD30 Gas Debt on Prepayment Meter (PPM) MPD30 Gas Debt on Prepayment Meter (PPM) Version 0.2 Draft for Consultation 1 of 6 1. Table of Contents 1. Table of Contents... 2 2. Revision History... 2 1. Introduction... 3 1.1 Scope... 3 1.2 History

More information

Code of Practice on Disconnection for Domestic and Non-Domestic customer s

Code of Practice on Disconnection for Domestic and Non-Domestic customer s Code of Practice on Disconnection for Domestic and Non-Domestic customer s Code of Practice on Disconnection for Domestic and Non-Domestic customer s Our Commitment to you We at PrePayPower are committed

More information

Allocation Process Expert Group Closure Report

Allocation Process Expert Group Closure Report Prepayment. Allocation Process Expert Group Closure Report 28 July 2015 V1.0 Lauren Nicholls CHANGE HISTORY REVISION HISTORY Revision date Author Version Summary of Changes 09/03/2015 Lauren Nicholls 0.1

More information

Audit Committee Annual Report to the Board

Audit Committee Annual Report to the Board Audit Committee Annual Report to the Board Report to: Board Date: 2 October 2015 Report by: Report No: Mike Cairns, Convener of the Audit Committee Agenda Item: 8.5 PURPOSE OF REPORT This report represents

More information

3. Minutes of Governance and Audit Committee Meeting held on 16 April 2013 GAC 36/2013

3. Minutes of Governance and Audit Committee Meeting held on 16 April 2013 GAC 36/2013 NORTHERN IRELAND HEALTH AND SOCIAL CARE BUSINESS SERVICES ORGANISATION GOVERNANCE AND AUDIT COMMITTEE Minutes of the Governance and Audit Committee (GAC) which took place on Tuesday, 28 May 2013 at 2:00pm

More information

MILTON KEYNES PRIMARY CARE TRUST BOARD PUBLIC MEETING

MILTON KEYNES PRIMARY CARE TRUST BOARD PUBLIC MEETING MILTON KEYNES PRIMARY CARE TRUST BOARD PUBLIC MEETING Minutes of the Trust Board Meeting held on Thursday, 26 th May 2011, 2.00pm at Sherwood Place, Sherwood Drive Present: Board, Non Executive Directors

More information

Debt Investor Presentation 2017 Results and Business Update. March 15th 2018

Debt Investor Presentation 2017 Results and Business Update. March 15th 2018 Debt Investor Presentation 2017 Results and Business Update March 15th 2018 Disclaimer Forward looking statements: This presentation contains certain forward-looking statements with respect to Electricity

More information

Record'of'Determinations:''Panel'Meeting'19'September'2013''!!''

Record'of'Determinations:''Panel'Meeting'19'September'2013''!!'' Record'of'Determinations:''Panel'Meeting'19'September'2013''!!'' Modification Vote'Outcome Shipper'Voting'Members Transporter'Voting'Members Consumer' Representativ e Determination'Sought AB PB'for' AG

More information

Liquor Legislation Amendment (Statutory Review) Act Stakeholder Forum

Liquor Legislation Amendment (Statutory Review) Act Stakeholder Forum Liquor Legislation Amendment (Statutory Review) Act 2014 Stakeholder Forum 1 December 2014 Welcome and overview Samantha Torres Director, Policy & Strategy 2013 Liquor Act review Statutory five-year statutory

More information

Compressed Natural Gas Funding Request Decision Paper. Decision Paper

Compressed Natural Gas Funding Request Decision Paper. Decision Paper Compressed Natural Gas Funding Request Decision Paper Decision Paper Reference: CER/16/313 Date Published: 24/11/2016 Executive Summary The Commission for Energy Regulation (CER) is today, 24 November

More information

Together we can power the change to a greener Ireland. #PowerOfGreen

Together we can power the change to a greener Ireland. #PowerOfGreen Together we can power the change to a greener Ireland #PowerOfGreen Lifestyle Pay As You Go Free Installation * No Deposit Free 5 credit A smarter way to prepay See inside for key Terms & Conditions. Charged

More information

General Terms and Conditions for Domestic Customers

General Terms and Conditions for Domestic Customers General Terms and Conditions for Domestic Customers Applicable from 1 December 2017 Contents 1. About us... 1 2. Contacting us... 2 3. General... 4 4. Definitions... 4 5. Standards of service... 11 6.

More information

Plan Management Stakeholder Committee July 19, 2018

Plan Management Stakeholder Committee July 19, 2018 Plan Management Stakeholder Committee July 19, 2018 Standing Agenda Welcome and Introductions Meeting Minutes Approval PMSC 2018 Schedule March 1-Renewals Debrief and Direction and 1095-A Results May 3-PayNow

More information

CORK CITY COUNCIL. Procurement Approval Policy & Procedure VERSION 1 EFFECTIVE FROM

CORK CITY COUNCIL. Procurement Approval Policy & Procedure VERSION 1 EFFECTIVE FROM CORK CITY COUNCIL Procurement Approval Policy & Procedure VERSION 1 EFFECTIVE FROM 1 st May 2015 Pre Procurement Policy and Procedure 1.0 Purpose The purpose of this policy and procedure is to introduce

More information

PAYE Modernisation. PSDA meeting 18 December 2017

PAYE Modernisation. PSDA meeting 18 December 2017 PAYE Modernisation PSDA meeting 18 December 2017 Agenda 1 PSDA Scenario Walkthrough 2 RPN for new employees 3 Proposed schema change 4 AOB Recoupment of overpayment where still in same Employment Overpayment

More information

Board Meeting. CDT Office Drummond St, Comrie. MINUTE

Board Meeting. CDT Office Drummond St, Comrie. MINUTE Board Meeting Monday 8 th October 2012, 7:30pm CDT Office 32-34 Drummond St, Comrie. MINUTE 1) Welcome and apologies Present Directors: David McCall (Chair), Malcolm Allan, Alan Caldwell, Bob Hughes, Bill

More information

Tha Boord o Ulstèr-Scotch. Meeting No: 120. Date: 18 October Paper No: 03/120/ Agenda Item: Minutes of 27 September 2012.

Tha Boord o Ulstèr-Scotch. Meeting No: 120. Date: 18 October Paper No: 03/120/ Agenda Item: Minutes of 27 September 2012. Tha Boord o Ulstèr-Scotch Meeting No: 120 Date: 18 October 2012 Paper No: 03/120/18.10.12 Agenda Item: Minutes of 27 September 2012 Page 1 of 8 Tha Board O Ulster-Scotch 119 th Board Meeting 27 September

More information

Management Committee Meeting Sofia, Bulgaria 21 st September 2016

Management Committee Meeting Sofia, Bulgaria 21 st September 2016 COST Action IS1405 Action Title: Building Intrapartum Research Through Health - an interdisciplinary whole system approach to understanding and contextualising physiological labour and birth (BIRTH) Management

More information

APNIC EC Meeting Minutes

APNIC EC Meeting Minutes APNIC EC Meeting Minutes Teleconference Thursday 30 January 2003 Meeting Start: 11:05 am (UTC+10) Minutes Present: Che-Hoo Cheng Geoff Huston Kuo Wei Wu Qian Hualin Xing Li BK Kim Paul Wilson Irene Chan

More information

Tariff for Virtual Reverse Flow Product at Moffat

Tariff for Virtual Reverse Flow Product at Moffat Tariff for Virtual Reverse Flow Product at Moffat DOCUMENT TYPE: REFERENCE: DATE PUBLISHED: FURTHER INFORMATION: Decision Paper CER/11/190 11 th November 2011 cjohnston@cer.ie The Commission for Energy

More information

Capacity Reservation Policy

Capacity Reservation Policy Capacity Reservation Policy Abstract This document summarises the current Bord Gáis Transportation ( BGT ) process for calculating Reserved Capacity ( RC ) and Supply Point Capacity ( SPC ) reservations.

More information

Holmes Chapel Primary School Finance and Personnel Committee

Holmes Chapel Primary School Finance and Personnel Committee Minutes - Summer Term PART 1 Held: Friday 26 th May 2017 at 9.00 am Martin Elliott (Chair) Helen Scott (HS) Lauren Brown (LB) Present: Helen Parkinson-Sykes HPS) Joanna Longman (JL) Associates; Sue Jewell

More information

AGENDA PIPELINE CAPACITY TRADING

AGENDA PIPELINE CAPACITY TRADING AGENDA PIPELINE CAPACITY TRADING MEETING: REFERENCE GROUP MEETING DATE: Friday, 4 May 2018 TIME: 9:00 AM to 12:30 PM (AEST) LOCATION: AEMO OFFICES Melbourne, Sydney, Brisbane and Adelaide TELECONFERENCE:

More information

Apologies Name Initials Position Robert Longden RL Alternate Users Panel Member Adam Lattimore AL ELEXON

Apologies Name Initials Position Robert Longden RL Alternate Users Panel Member Adam Lattimore AL ELEXON Minutes Meeting name Meeting number 141 CUSC Modifications Panel Date of meeting 26 October 2012 Location National Grid House, Warwick Attendees Name Initials Position Mike Toms MT Panel Chair Emma Clark

More information

NHS WORCESTERSHIRE AUDIT COMMITTEE

NHS WORCESTERSHIRE AUDIT COMMITTEE NHS WORCESTERSHIRE AUDIT COMMITTEE Minutes of the meeting held on 7th June 2011 at 2.00 pm in Board Room 1, Turnpike House Medical Centre, Newtown Road, Worcester. PRESENT: Mr Robert Parker (Chair) Mr

More information

1. Apologies Actions 1.1 There were no apologies as all Governors were present.

1. Apologies Actions 1.1 There were no apologies as all Governors were present. 2 1 Part 1 Minutes Present: Mangement Committee members will be referred to as governors in the minutes Karen Reeve (Chair) Local Authority Governor Chrys Healy (Vice Chair) Community Governor Jacquie

More information

NSR By-Laws

NSR By-Laws NSR By-Laws 1 17.1.2015 Table of contents 1. The tasks to be fulfilled by MD page 4 2. Responsibilities page 4 2.1 The NSR Meeting page 4 2.2 Practical responsibility page 5 2.3 Economical responsibility

More information

Mr Alexander Coleman (Chairman) Mr Brian McMurray Mr Gerry Strong Mr Sean Mahon

Mr Alexander Coleman (Chairman) Mr Brian McMurray Mr Gerry Strong Mr Sean Mahon HSC BUSINESS SERVICES ORGANISATION Minutes of Proceedings The nineteenth meeting of the Regional Business Services Organisation (BSO) was held on Thursday 25 November 2010 at 2.00 pm in the Boardroom,

More information

National Federation of Voluntary Bodies Secretariat Service Plan

National Federation of Voluntary Bodies Secretariat Service Plan National Federation of Voluntary Bodies Secretariat Service Plan 2017 National Federation of Voluntary Bodies Secretariat Service Plan 2017 1 Cover Artwork by Maeve Connolly Maeve is a local artist in

More information

Elected Member Briefing (10 Year Plan) 28 November 2017 Commencing at 9.30am in Committee Room One

Elected Member Briefing (10 Year Plan) 28 November 2017 Commencing at 9.30am in Committee Room One Elected Member Briefing (10 Year Plan) 28 November 2017 Commencing at 9.30am in Committee Room One Topic HCC Contact / Presenter(s) Open / Closed Fees and Charges David Bryant / Stephen Halliwell Open

More information

Gas Networks Ireland Allowed Revenue and Transmission Tariffs 2017/18 Decision Paper

Gas Networks Ireland Allowed Revenue and Transmission Tariffs 2017/18 Decision Paper Gas Networks Ireland Allowed Revenue and Transmission Tariffs 2017/18 Decision Paper Reference: CER/17/275 Date Published: 30/08/2017 Queries to: Daniel Ward dward@cer.ie Public Impact Statement Gas Networks

More information

European Update. 1 st October 2015

European Update. 1 st October 2015 European Update Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. 1 st October 2015 1. General

More information

Ring Fencing Policy. Policy. June 2017 Version 9.0

Ring Fencing Policy. Policy. June 2017 Version 9.0 June 2017 Version 9.0 Document Number Document Owner Safety & Compliance Manager Due Date for Review 1/07/2019 Review Required by: Asset Network Operations Safety & Compliance CEO Commercial Applicable

More information

I-SEM Project Managers Group (PMG) 23 May 2018 Key Notes, Actions & Decisions

I-SEM Project Managers Group (PMG) 23 May 2018 Key Notes, Actions & Decisions I-SEM Project Managers Group (PMG) 23 May 2018 Key Notes, Actions & Decisions Meeting Details Meeting Purpose Location Chair Secretariat I-SEM Project Managers Group (PMG) EirGrid, Dublin - Conference

More information

NORTHERN IRELAND FIRE & RESCUE SERVICE BOARD MINUTES OF A MEETING 31 MARCH AM

NORTHERN IRELAND FIRE & RESCUE SERVICE BOARD MINUTES OF A MEETING 31 MARCH AM NORTHERN IRELAND FIRE & RESCUE SERVICE BOARD MINUTES OF A MEETING 31 MARCH 2015 10.00 AM PRESENT: Dr J McKee, Chairman presiding Mr C Kerr, Interim Chief Fire Officer Cllr D Barbour Mr J Barbour Cllr M

More information

Proposed Regulated Tariff Formula (RTF) for Eligible Customers 1 April March 2004

Proposed Regulated Tariff Formula (RTF) for Eligible Customers 1 April March 2004 Proposed Regulated Tariff Formula (RTF) for Eligible Customers 1 April 2003 31 March 2004 CER/03/031 24 th February 2003 Background The Gas (Interim) (Regulation) Act 2002 and a Ministerial Order issued

More information

The Ark Federation - Local Governing Body Minutes Part 1

The Ark Federation - Local Governing Body Minutes Part 1 Meeting: 3 -LGB Date / Time: 1 st February 2018 at 6pm Location: All Saints School Attendees: Initials Director Role & Portfolio: Attendees: Initials: Director Role & Portfolio: Gill McMenemy GM Vice Chair

More information

SCOTTISH QUALIFICATIONS AUTHORITY

SCOTTISH QUALIFICATIONS AUTHORITY SCOTTISH QUALIFICATIONS AUTHORITY B39/2 i BOARD OF MANAGEMENT 28 SEPTEMBER 2006 Minutes of the thirty-eighth meeting of the Board of Management held at 10 am on Wednesday 9 August 2006 in the Boardroom,

More information

NORTHERN IRELAND HUMAN RIGHTS COMMISSION. Held on Monday 13 August At 2.00 pm in the NIHRC Offices, Temple Court, 39 North Street, Belfast

NORTHERN IRELAND HUMAN RIGHTS COMMISSION. Held on Monday 13 August At 2.00 pm in the NIHRC Offices, Temple Court, 39 North Street, Belfast NORTHERN IRELAND HUMAN RIGHTS COMMISSION Minutes of the 32 nd Commission Meeting Held on Monday 13 August 2001 At 2.00 pm in the NIHRC Offices, Temple Court, 39 North Street, Belfast HRC Present: In Attendance:

More information

Gas Networks Ireland Allowed Revenues and Transmission Tariffs 2015/16. Decision Paper CER/15/ st August Colm Ó Gormáin

Gas Networks Ireland Allowed Revenues and Transmission Tariffs 2015/16. Decision Paper CER/15/ st August Colm Ó Gormáin Gas Networks Ireland Allowed Revenues and Transmission Tariffs 2015/16 DOCUMENT TYPE: REFERENCE: Decision Paper CER/15/214 DATE PUBLISHED: 31 st August 2015 QUERIES TO: Colm Ó Gormáin cogormain@cer.ie

More information

Integrated Trading and Clearing (ITaC) Client Forum

Integrated Trading and Clearing (ITaC) Client Forum Integrated Trading and Clearing (ITaC) Client Forum 23 January 2019 1 Agenda ITaC High Level Timeline and Key Dates 9 February Mandatory Market Dress Rehearsal Decommissioning Testing Conceptual Training

More information

Global HIV Vaccine Enterprise Board Meeting Minutes. 26 September :00 to 21:00 EDT. Omni Hotel at CNN Center 100 CNN Center Atlanta, GA 30303

Global HIV Vaccine Enterprise Board Meeting Minutes. 26 September :00 to 21:00 EDT. Omni Hotel at CNN Center 100 CNN Center Atlanta, GA 30303 Global HIV Vaccine Enterprise Board Meeting Minutes 26 September 2010 19:00 to 21:00 EDT Omni Hotel at CNN Center 100 CNN Center Atlanta, GA 30303 AGENDA Time Agenda Item Action Documents 19:00 19:30 Dinner

More information

Planning in the HSE. HSE Planning and Performance Cycle and Framework Corporate Plan National Service Plan Regional Service Plans Illustrative example

Planning in the HSE. HSE Planning and Performance Cycle and Framework Corporate Plan National Service Plan Regional Service Plans Illustrative example Planning in the HSE HSE Planning and Performance Cycle and Framework Corporate Plan National Service Plan Regional Service Plans Illustrative example HSE Planning and Performance Cycle INFORM / PLAN Corporate

More information