Attached we are sending you the JASPERS Independent Quality Review Report for the above mentioned project.

Size: px
Start display at page:

Download "Attached we are sending you the JASPERS Independent Quality Review Report for the above mentioned project."

Transcription

1 To the attention of Mr Jerzv Solecki Director of the ERDF Department Marshall Office of the Silesian Voivodeship ul. Ligonia Katowice Poland Luxembourg, 13 December 2016 SG/AS/JASPERS/ /AA/HG/mla Subject: JASPERS Independent Quality Review Report for the project Construction of the Regional Road Racibórz-Pszczyna on the section running through the City of Rybnik - stage I (JASPERS No PL IQR ROD) Dear Mr Solecki, We thank you for the good co-operation on the project Construction of the Regional Road Racibórz- Pszczyna on the section running through the City of Rybnik - stage I with our JASPERS team. Attached we are sending you the JASPERS Independent Quality Review Report for the above mentioned project. We thank you for your support and remain with best regards, A. A magro Director of JASPERS H. Goldsmith Acting Head of IQR Division Enclosure: IQR Report for PL IQR ROD Construction of the Regional Road Racibórz-Pszczyna on the section running through the City of Rybnik - stage I project JASPERS c/o European Investment Bank , boulevard Konrad A denauer L-2950 Luxem bourg V (+352) (+352) w w w.jaspers-europa-info.org c» jaspersiaeib.org

2 INDEPENDENT QUALITY REVIEW REPORT The independent experts declare that: 1. They have fulfilled the requirements o f Article 23(2)(b) o f Commission Delegated Regulation (EU) N o 480/ They have appraised the project in accordance with all the criteria set out in Annex II to that Regulation. Member State Republic o f Poland Region and project location Silesia, City o f Rybnik Project name C onstruction o f the Regional Road Racibórz-Pszczyna on the section running through the City o f Rybnik - stage I (Rybnik bypass road) Beneficiary City o f Rybnik Managing Authority Independent experts reference M arshal O ffice o f the Silesian V oivodeship PL IQ R R O D Task Manager: Signature and Date: Pawel Malinowski Head of IQR Division: Hugh Goldsmith Signature and Date: ll^ li In agreement with: A. Almagro f t\ Head o f JASPERS \ J ) J\Ato> D is c la im e r 'ITiis JASPERS Independent Quality Review Report has been prepared at the request o f the relevant Managing Authority in Ime with Articles 101 and o f the Regulation (KU) N o 1303/2013. It presents a quality review o f the major project based on inform ation made available to JASPERS. In case the inform ation used for the project notification has been changed after this review, the reader o f this report should be aware that som e o f th e statem ents and justifications expressed m ay no longer be valid. 1

3 Glossary: AADT BCR Birds Directive CBA CBA Methodology CC Annual Average Daily Traffic Benefit to Cost Ratio Council Directive 2009/147/EC on the conservation of wild birds Cost-benefit analysis The methodology for Cost-Benefit Analysis as defined in Annex III to the Implementing Regulation Climate Change CDR Commission Delegated Regulation (EU) 480/2014 CIR Commission Implementing Regulation (EU) 2015/207 CO 2e Carbon Dioxide Equivalent CPR Common Provision Regulation (EU) 1303/2013 DK DW EU EIA Directive EIB ERDF FIDIC GHG Habitats Directive ISPA MA MoE NUTS NTS O&M ROP PIU SEA Directive National Road Voivodeship (Regional) Road European Union Council Directive 2011/92/EU on Environmental Impact Assessment European Investment Bank European Regional Development Fund International Federation of Consulting Engineers Greenhouse gases Council Directive 92/43/EEC on the conservation of natural habitats and of wild fauna and flora Instrument for Structural Policies for Pre-Accession Managing Authority Ministry of Environment Nomenclature for Units of Territorial Statistics Non-Technical Summary of the EIA Report Operations & Maintenance Regional Operational Programme Project Implementation Unit Council Directive 2001/42/EC on Strategic Environmental Assessment This IQR Report is based on the following groups of documents that were received from the Managing authority (MA): Document Document date (final version) Information on major project, including Feasibility Study documents and Economic and Financial analysis spreadsheets prepared in PLN 07/11/2016 Environmental documentation 07/11/2016 Action Completion Note of JASPERS 27/10/2016 PART A of the Notification Form in draft 25/11/2016 In addition the MA supplied various written responses to requests for clarifications from JASPERS. The project has previously received assistance from JASPERS Advisory and a JASPERS Action Completion Note has been issued. 2

4 Please confirm that all of the following conditions are fulfilled: the operation is a major project within the meaning of Article 100 of Regulation (EU) No 1303/2013; the major project is not a completed operation within the meaning of Articles 2(14) and 65(6) of that Regulation; the major project is included within the relevant operational programme(s). Yes Put x where appropriate X Give details The project complies with the major project definition laid down in Art. 100 of Regulation (EU) No 1303/2013, as: The project is an indivisible task of a precise economic and technical nature, with clearly identified goals. This major project, named Stage I, forms the core of the Southern road bypass of Rybnik. A further extension of the road bypass, named Stage II, is planned to be completed in the current ( ) programming period as a non-major project. Stage I is not dependent on Stage II for its economic viability; and The project s total eligible cost is EUR 92,224, Eligible costs exceed the amount of EUR 75,000,000. The major project is not a completed operation within the meaning of Articles 2(14) and 65(6) of Regulation No 1303/2013, as the timetable for implementation envisages end of construction by June The project is included in the list of major projects to be implemented under the Regional Operational Programme of Silesia (CCI 2014PL16M2OP012, hereinafter ROP of Silesia ). This major project has been selected by the Managing Authority through a competitive process according to the principles defined in the ROP of Silesia No 1. THE BODY RESPONSIBLE FOR IMPLEMENTATION OF THE MAJOR PROJECT, AND ITS CAPACITY Summarise relevant information on the body responsible for implementation of the major project, and its capacity including technical, legal, financial and administrative capacity. The main beneficiary of the project is the City of Rybnik, which is a local government unit responsible for the provision of the regional road infrastructure on its territory. The city oversees the preparation, construction, operation and maintenance of regional roads within its borders. The neighbouring City of Żory is the partner of the City of Rybnik in this project, because part of the constructed road infrastructure will be located on the territory of the City of Żory. Technical capacity The Roads Department of Rybnik City Office is a specialised unit responsible for new road investments and maintenance of the road network within Rybnik, and will be responsible for project implementation in line with applicable national standards for roads of this capacity. The department has 22 suitably-qualified staff with considerable experience in implementing road projects; over the last decade, it oversaw the implementation of roads projects in the vicinity of Rybnik. Several of the staff working for the Roads Department has experience in overseeing large, complex construction projects. 3

5 In case of the maintenance of the section of DW935 road constructed on the territory of the City of Żory, a specialised road department of this city will oversee maintenance and any future rehabilitation of this road section. The construction supervision over the investment and the core construction works will be entrusted to external companies with adequate competence and experience. Legal capacity The City of Rybnik is a city with the rights of powiat (equivalent of a county). Based on Article 19 (5) of the Act on roads the President of the City is responsible for the management of all public roads, except for motorways and express roads. The constructed road section will be a voivodeship (regional) road, and therefore the relevant local government unit (a city with county rights) will be responsible for all investments. In view of the fact that a part of the investment will be implemented within the area of another city, i.e. Żory, both local government units concluded an agreement based on Article 74 of the Act on local self-government, in which the City of Żory delegated to the City of Rybnik the necessary rights to implement the project. Both cities will share the costs of the investment. The land for the voivodeship road, in accordance with the relevant provisions of the law, shall be purchased by the Beneficiary on behalf of the Silesian Voivodeship. The land associated with accompanying infrastructure shall be owned by the local government unit and in this case is already in the possession of the Beneficiary. Financial capacity To enable it to financially implement the project, since 2012 the City of Rybnik has been reducing its debt by running operational surpluses (meaning operating expenses have been significantly lower than income). In operational surplus ranged from PLN 69 million (EUR 16.4 million) to PLN 97.6 million (EUR 23.1 million), which placed Rybnik amongst the bestperforming cities in Poland. Fitch Ratings in July 2016 confirmed the City of Rybnik s rating of A+(pol) with a stable outlook. The City has sufficient debt capacity to draw and service the debt required for financing the investment. The City of Żory will participate financially in the investment and the maintenance of the road DW935 section on its territory (length of 425 m, approx. 4.2% of the length of entire project). Administrative capacity The beneficiary has significant experience in the implementation of infrastructure investments. Over the last 15 years, the City of Rybnik implemented over 90 investment projects co-financed by the external funds (including financed from the European Union structural funds). Almost 20 of these investments were related to the construction or reconstruction of public roads. The City of Rybnik has already successfully implemented investment projects of a similar scale. In the years the project "Construction of sanitary sewage in municipalities of Rybnik Gaszowice, Jejkowice, which loads the upgraded sewage treatment plant in Rybnik of total cost of EUR 122 million was implemented with the support of ISPA and later the Cohesion Fund. The Project Implementation Unit was formed in 2013 as a special interdepartmental team of specialists in the City administration appointed for the project implementation and management. The 1st Deputy of President of the City, supervising over inter alia the Roads Department, was previously employed on managerial positions in General Directorate for National Roads and Motorways and has significant experience in the preparation and implementation of large infrastructure projects. 4

6 Give a clear statement whether or not the project meets the relevant criteria for quality review set out in Annex II to Commission Delegated Regulation (EU) No 480/2014 and justify this statement. Put x where appropriate Give a statement and justification Yes X The project meets the relevant criteria for quality review set out in Annex II to Commission Delegated Regulation (CDR) EU No 480/2014. No There is sufficient evidence of the capacity of the beneficiary (City of Rybnik) to manage the project in the implementation and operational phases, considering that: The City of Rybnik has sufficient technical capacity and experience with the implementation and operation of road projects. The beneficiary has the necessary legal rights to implement and operate the project. Land plots necessary for the project implementation are already available to the Beneficiary. The beneficiary has sufficient financial capacity to implement and operate the project. The funds for project implementation have been allocated by the City of Rybnik in its multiannual budget in amount of PLN million (EUR million) in years Planned annual expenditure on O&M of the project amounts to about EUR 357 thousand and constitutes ca. 0.2% of the total City s budget and 24% of the resources available for maintenance of the road network (EUR 1.5 million in 2016), and therefore will lead to a significant increase in the total annual road maintenance budget of the City, but not a significant increase in the overall City budget. The planned capital expenditure for periodic rehabilitation, replacement or reconstruction of the road in 2031 and 2041(of EUR 3.3 million each) is expected to be allocated in future annual budgets. The City of Żory committed in form of agreement with the City of Rybnik to participate financially in the implementation of the project proportionally to its part of the road, and will provide budgetary funds for its maintenance. The investment and maintenance costs associated with this investment will not constitute a significant financial burden to the City of Żory. The beneficiary has sufficient administrative capacity to execute the project. The proposed organisation of the project implementation and the staffing structure is adequate to the scale of the investment. 2. DESCRIPTION OF THE INVESTMENT AND ITS LOCATION Summarise relevant information on the description of the investment and its location. Existing situation Rybnik is a city of about 140,000 people in the south-western part of the Silesian Voivodeship. About 6 km to the east of Rybnik lies the A1 Motorway, which is a main north-south corridor through Poland that links the main port of Gdansk in northern Poland to Slovakia, via Torun, Lodz, Czestochowa and Katowice. The existing link between Rybnik and the A1 the regional road DW935 is a highly-urbanized single carriageway (1x1) road, carrying some east-west traffic (e.g., from Rybnik to neighbouring Żory), as well as a substantial number of goods vehicles and personal cars wishing to access the A1 motorway. 5

7 During peak times the road is congested leading to low average speeds and long delays. The existing DW935 road has many at-grade junctions, pedestrian crossings and accesses (to houses and shops and public buildings), which negatively impact on safety, reliability and performance. The annual average daily traffic (AADT) varies by section but in 2015 reached a maximum of about 26,000 well above the design capacity of the existing road. Main project components The project involves the construction of about 10.2 km of dual carriageway (2x2) road with a total of 5 grade-separated interchanges. The project will link the A1 motorway with the DK78 to the southwest of Rybnik. An additional link from the DK78 to the DW935 to the west of Rybnik (section V, see map below) is scheduled to be completed before Together these links will form a complete east-west (DW935) bypass of Rybnik (see map below). Map 3. Voivodeship road DW935: planned section alignment (red); existing alignment (blue) Additional section V, not in this notification Planned sections I to IV forming this project Source: Feasibility Study The project will divert most of the medium-long distance traffic on the DW935 away from congested urban roads in Rybnik to a higher-speed but safer dual carriageway with median barriers separating opposing flows and with accesses limited to junctions which on average are spaced about 2km apart. The new road and its grade-separated interchanges will provide efficient access to Rybnik for local traffic, and avoid the need for travelling on the existing unsafe, congested DW935 road in Rybnik (see blue line on map above). The project will comprise: construction of km of dual carriageway road; construction of 5 grade separated interchanges; construction of auxiliary engineering structures (e.g., bridges and viaducts); (re)construction and realignment of nearby roads; relocation of utilities; additional associated infrastructure (e.g., drainage, road lighting, safety barriers, noise barriers); and road safety measures. The majority of the road will lie within the Rybnik municipality; however a small section of about km lies within Żory administration (see map above). The project is one of a series of improvements anticipated on the DW935 corridor between Raciborz and Pszczyna. 6

8 Eligibility The project will be funded by the European Regional Development Fund (ERDF) through the ROP of Silesia, The project is consistent with the objectives and purposes of Priority Axis VI of the OP and action 6.1 (i.e., Improved availability of Voivodeship roads ). The project is proposed under the thematic objective 07 Promoting Sustainable Transport and Removing Bottlenecks in Key Network Infrastructure, and is located in NUTS III location code PL227. The project has not yet been completed. Give a clear statement whether or not the project meets the relevant criteria for quality review set out in Annex II to Commission Delegated Regulation (EU) No 480/2014 and justify this statement. Put x where appropriate Give a statement and justification Yes X The project meets the relevant criteria for quality review set out in Annex II to CDR (EU) No 480/2014. No The project is located in the Silesian Region of Poland and is therefore within the area covered by the ROP of Silesia The area is eligible for ERDF Financing. A sufficient project description is provided accurately describing both the existing situation and the chosen technical solution. The project complies with the eligibility rules set down in Regulation (EU) No. 1303/2013 such as Art. 65 (Eligibility of Expenditure and Durability) and in the Cohesion Fund Regulation No. 1301/2013, mainly Art. 3 (Scope of Support from the ERDF). The project exceeds the total eligible costs (after taking into account revenue generation) threshold of EUR 75 m and is therefore correctly considered a major project. The Managing Authority has confirmed compliance of the project costs with national eligibility rules. 3. EXPLANATION AS TO HOW IT IS CONSISTENT WITH THE RELEVANT PRIORITY AXES OF THE OPERATIONAL PROGRAMME(S) CONCERNED, AND ITS EXPECTED CONTRIBUTION TO ACHIEVING THE SPECIFIC OBJECTIVES OF THOSE PRIORITY AXES AND THE EXPECTED CONTRIBUTION TO SOCIOECONOMIC DEVELOPMENT Summarise relevant information on project objectives and its consistency with the relevant priority axes of the operational programme or operational programmes concerned, and its expected contribution to achieving the specific objectives and results of those priority axes and the expected contribution to socioeconomic development of the area covered by the operational programme, and measures taken by the beneficiary to ensure optimal utilisation of the infrastructure in the operation phase. Project objectives The main project objectives are to: provide a fast and safe connection from Rybnik to the A1 motorway; remove traffic from the current congested and unsafe DW935 road through Rybnik; improve the attractiveness of Rybnik city for investment; 7

9 reduce the harmful impacts (e.g., emissions, noise, health impacts) of road traffic on occupants of Rybnik; and improve the safety of the road transport system. These objectives are consistent with the priorities of the ROP of Silesia , in particular Priority Axis VI (transport) which has as an investment priority to enhance regional mobility by connecting secondary and tertiary nodes to TEN-T infrastructure, including multimodal nodes. The project will contribute to the following Priority Axis result indicators: No Indicator Unit Target (2023) This project CO13 Total length of new roads km Contribution to socio-economic development of the area covered by the OP Once implemented, and in line with the overall objectives of the ROP of Silesia , the project is expected to contribute to the socio economic development of Rybnik city and surrounding areas by: reducing travel time and transport costs between Rybnik and the A1 motorway; directing cars and heavy goods vehicle traffic away from the existing congested DW935; reducing the number and severity of road accidents in Rybnik, and reducing the negative impacts of emissions of both non-greenhouse gases such as particulate matter (which negatively impact on local health), and greenhouse gases (GHG) on the residents of Rybnik. The project will also help attract new investments by improving the liveability and working conditions for the local population; and add jobs during construction and operational stages of the project Measures taken by the beneficiary to ensure optimal utilisation of the infrastructure in the operation phase The new link between Rybnik and the A1 motorway will become the main route for traffic going east-west through Rybnik and for residents of Rybnik connecting to the A1. Optimal utilization will be ensured through the provision of high-quality access for all motorized transport free of charge and on an equal and non-discriminatory basis. Convenient accesses to various districts of Rybnik will be provided through provision of grade-separated interchanges which will minimize delays and queueing at junctions. The demand model predicts 11,400-22,200 vehicles will transfer daily to the new road, thus substantially reducing delays on the existing road. Give a clear statement whether or not the project meets the relevant criteria for quality review set out in Annex II to Commission Delegated Regulation (EU) No 480/2014 and justify this statement. Put x where appropriate Give a statement and justification Yes X The project meets the relevant criteria for quality review set out in Annex II to CDR (EU) No 480/2014. No The project and its objectives are consistent with Priority Axis VI of the Operational Programme. The objectives are adequately defined for a project of this type. The proposed project will contribute to the objectives of the ROP of Silesia Once implemented, the project is expected to contribute to the socioeconomic development of the region by reducing: travel time and transport costs; and harm to the environment caused by both GHG and non-ghg emissions. Optimal utilization of the new link will be ensured by providing free access on a non-discriminatory basis to all motorized vehicles. 8

10 4. TOTAL COST AND TOTAL ELIGIBLE COST 4.1 Summarize relevant information on the total cost, calculation of costs both in terms of its overall cost to achieve the expected objectives and unit costs, and total eligible cost taking into account requirements of Article 61 of Regulation (EU) No 1303/2013. The estimated total cost of the project is EUR 102,646,028.59, of which EUR 92,224, represents the eligible cost. The only item presented as being ineligible is the part of land acquisition cost (EUR 10,421,597.40) that exceeds the limit of 10% of total eligible expenditure. VAT is considered eligible as VAT is non-recoverable by the City of Rybnik. Building and Construction Costs are estimated at EUR 67,163,800.01, of which EUR 44.45% is related to structures (10 viaducts, 2 bridges, 1 elevated road section). Presented costs are based on a pre-tender construction and supervision cost estimate of the Beneficiary. The construction cost per km for the entire project EUR 8.1 million per km incl. VAT reflects the high number of structures on a relatively short section of road (13 structures with a total length of 1291 metres on a 10.2 km section, including a 418.5m elevated section). The total project cost does not include any allowance for either contingency or price adjustment. Table: Summary cost estimate for the City of Rybnik stage I Cost Item Total Cost Ineligible Cost Eligible Cost 1. Planning / design fees Land purchase 19,644, ,421, ,222, Building and Construction 67,163, ,163, Demolition of buildings 689, , Road works, of which: 27,476, ,476, Earth works 4,532, ,532, Subgrade 11,405, ,405, Road surfacing/ top layer 7,369, ,369, Preparatory works 454, , Finishing works 4,785, ,785, Culverts 463, , Soil strengthening 2,955, ,955, Drainage 5,178, ,178, Lighting 17, , Energy networks 699, , Reconstruction of water supply networks 619, , Reconstruction of wastewater networks 417, , Reconstruction of gas networks 244, , Reconstruction of district heating networks 349, , Reconstruction of railway overhead lines 9, , Landscaping 419, , Traffic reorganisation/diversions 605, , Engineering structures (overpass, bridges, etc.) 29,394, ,394, Noise screens 1,041, ,041, Plant and machinery or equipment Contingency Price adjustment Publicity 9, , Supervision during constr. implementation 307, , Technical assistance Sub-TOTAL 87,125, ,421, ,703, (VAT) 15,520, ,520, TOTAL 102,646, ,421, ,224, The original cost estimate of the Beneficiary was prepared in Polish Zloty (PLN). The cost estimate was converted to EUR at the rate of PLN per 1 EUR. 9

11 Give a clear statement whether or not the project meets the relevant criteria for quality review set out in Annex II to Commission Delegated Regulation (EU) No 480/2014 and justify this statement. Put x where appropriate Give a statement and justification Yes X The project meets the relevant criteria for quality review set out in Annex II to CDR (EU) No 480/2014. No Total costs and eligible costs are provided and calculated correctly taking into account requirements of Article 61 of Regulation (EU) No 1303/2013. Planning and design fees (approx. EUR 395 thousand) were correctly excluded from the eligible project cost as they were already co-financed from public resources. Due to the small value of this cost (0.4% of total project cost) its exclusion from the total project cost has marginal impact on the results of financial and economic assessment of the project; Total land acquisition cost of EUR 19,644, represents 19.1% of total project cost. Of this only EUR 9,222, has been presented as being an eligible project cost in order to keep within the limit of 10% of total eligible expenditure for the operation in question defined in Article 69.3(b) of Regulation (EU) No 1303/2013. The relatively high land acquisition costs are in part due to the need for acquisition of some builtup plots of land within urbanised area. No contingencies are provided for in the project cost estimate. This approach in effect transfers the risk of financing of any unforeseen works and services to the Beneficiary s municipal budget and remains a key project risk. The sensitivity analysis shows that the project would remain economically efficient (ENPV>0) as long as cost increases do not exceed 92%. Additionally, the City of Rybnik has considerable borrowing capacity to finance any increases in project cost, although this may limit the city s potential to implement other planned projects. VAT is non-recoverable and therefore has been correctly deemed to be an eligible project cost; and The initial results of the ongoing tender for supervision services (see section 9 for further details) provide higher supervision costs than in the estimate. The offers range between EUR million incl. VAT (also including a separate task related to 0.86km of the local connecting road financed from own city funds out of this project) which in any case means a higher cost of supervision related to the project than the anticipated EUR 0.3 million incl. VAT. Cost of supervision from the received bids is in range of % of total project cost, which is a standard cost of such service and is justified in this case. The overall cost estimate, except the likely higher cost of supervision by ca. EUR 0.4 million, is sufficient to achieve the expected objectives of the project. The rationale for calculation of the total costs is sufficiently detailed in the feasibility study. At the stage before finalising the tender of the work contract the cost estimate is reasonable compared to the observed costs of similar roads in Poland. Unit values for construction costs remain in the usually observed range for similar (2x2-lane) road projects in Poland (between EUR 6.4 and 15.2 million per km incl. VAT) and are sufficiently explained by the fact that the road runs through a quite densely populated area. 10

12 4.2 Provide information on compliance with State aid rules and how State aid rules have been taken into account in the calculation of the total public contribution to the project Please inform whether the independent experts, in accordance with Article 23(1) of Commission Delegated Regulation (EU) No 480/2014 or the Member State, have consulted the Commission on relevant State aid issues. If the Commission has been consulted, please provide the date and reference of consultation and the date and reference of the reply and summarize the result of the consultation. The independent experts did not consult the Commission on State aid issues with regards to this project If the Commission has not been consulted, please provide the following information: Do you consider that this project involves the granting of State aid? Yes No If yes, please explain on what basis compliance with State aid rules is ensured. Please provide this information for all groups of potential State aid recipients, for example, in case of infrastructures, for the owner, the constructors, the operator and for the users of the infrastructure. Not applicable If no, please explain in detail why you consider that the support does not constitute State aid. Please provide this information for all groups of potential State aid recipients (for example, in case of infrastructures potential aid recipients are: the owner of the infrastructure, the constructor, the operator and the users of the infrastructure) ( 1 ). If applicable, please indicate whether the reason why you consider that the project does not involve State aid is that (i) the project does not concern any economic activity (including activities in the public remit) or that (ii) the recipient(s) of support enjoy a legal monopoly for the relevant activities and are not active in any other liberalised sector (or will keep separate accounts in case the recipient(s) are active in additional sectors). The public support to the project The project involves financing the construction of road infrastructure with use of public resources in form of a grant from the European Regional Development Fund provided to the City of Rybnik (acting as an investor also on behalf of the City of Żory) under the ROP of Silesia The beneficiaries of funds are the City of Rybnik and the City of Żory, both local government bodies. According to the law, such local governments are responsible for the investment and maintenance of all roads on its land, with the exception of motorways and express roads. The City of Rybnik and the City of Żory are therefore exclusive owners and managers (operators) of the regional road on their territories. The cost of operations and maintenance of the regional road will be financed entirely from the cities respective budgetary resources. The existence of state aid The project concerns the provision of regional road infrastructure, which by Polish law is made available free of charge to all users (non-tolled public road), and therefore will not be commercially exploited. At the level of the owner and operator (both roles played by the City of Rybnik and City of Żory that are public administration bodies) the construction, operation and maintenance is one of their basic tasks granted by the legislator to the public authority on the appropriate level. The state aid can be excluded as there will be no transfer of public resources to an undertaking and this task is not regarded an economic activity. At the level of contractors, there will be no distortion of the competition as all contractors of the studies, documentation, and the works were or will be selected in public tenders in accordance with Polish public procurement law. At the level of infrastructure users, there will be no distortion of competition as the road infrastructure build in this project will be available free of charge and on an equal and non-discriminatory basis to 11

13 all users. On the basis of the above, the project does not involve State Aid at the level of any of the stakeholders. Give a clear statement whether or not the project meets the relevant criteria for quality review set out in Annex II to Commission Delegated Regulation (EU) No 480/2014 and justify this statement. Put x where appropriate Give a statement and justification Yes X The project meets the relevant criteria for quality review set out in Annex II to CDR (EU) No 480/2014. No The process of identifying and addressing the state aid in the project was correctly carried out by the Beneficiary. The beneficiary provided sufficient evidence that public support to the project does not constitute State aid. The Beneficiaries (City of Rybnik and City of Żory) is a public body which holds public authority for the construction and management of regional roads available to all potential users. The State Aid has been correctly taken into account in the calculation of the total public contribution to the project. State Aid considerations did not affect the calculations of the public contribution to the project (Article 61.8 of the CPR does not apply). ( 1 ) The Commission services provided guidance to Member States to facilitate the assessment when infrastructure investments may involve State aid. In particular, the Commission services have prepared analytical grids. A Communication on the notion of aid is currently in preparation The Commission invites Member States to make use of the analytical grids and of the future communication for explaining why it is considered that the support does not involve the granting of State Aid. 5. FEASIBILITY STUDIES CARRIED OUT, INCLUDING OPTION ANALYSIS, AND THE RESULTS 5.1 Summarise relevant information on the feasibility studies carried out and the results under the following aspects: institutional, technical, environmental including climate change (if relevant) and other aspects. The Feasibility Study for The construction of the Regional Road Racibórz-Pszczyna on the section running through the City of Rybnik stage I was carried out by an external consultant (dated September 2016). Institutional aspects Under Polish law, the cities with powiat (county) rights are responsible for the provision and maintenance of regional roads on their territories. In this case the City of Rybnik is the only relevant public authority entitled to implement the project and to become an owner and an operator of the new road infrastructure. The same applies to the road section on the City of Żory territory (425 m long). There is no other practical institutional alternative to implement the project. Both cities established special partnership in order to prepare and implement the project jointly. The City of Żory delegated specific necessary powers to the City of Rybnik in line with the national law for the purpose of project preparation and implementation. In the operational phase the cities will maintain road sections on their territories separately. Both cities have dedicated specialist departments in charge of overseeing the road networks, however for the purpose of this project implementation the supervision will be contracted 12

14 externally. The construction works will be delivered by an external contractor selected in a competitive tender in line with Polish public procurement law. Technical aspects The feasibility study considered numerous technical aspects of the project, including its basic technical and functional parameters also considered in the options analysis. The process of designing of the roads in Poland considers obligatory standards, regulations and guidelines as well as technical specificities of the location of the investments (conditions of water-soil) and the possibility of occurrence of natural disasters characteristic for particular area of Poland. The investment shall be implemented in an area strongly transformed by human activity e.g. extractive industries. For this reason, when designing the road, it was necessary in this case to apply additional protection against the so-called mining damage and to provide grade separated crossings with dense roads network of lower category and railway lines. The selected alignment of the road was avoids dense aggregations of residential buildings and allows safe and quick access to the axis of A1 motorway - national road DK78. The project is not in an area prone to natural disasters. The constructed road will form a part of an important regional road corridor (from Racibórz to Pszczyna) and the future role of this road in the road network system of Silesia has been considered. The road will be connected to the existing road network without duplication of infrastructure. In order to adjust the road to the expected demand the road is planned to be built as a dual carriageway road with two lanes in each direction (2x2 with a separating strip) in line with the class GP road. Detailed technical parameters are presented in Section B.3 of the Part A of the notification form. Junction design was considered as part of options analysis and considered different solutions that were finally decided upon the basis of traffic fluidity considerations. For the design and implementation purposes, the road was divided into the following sections: Task (section) I - a road section in the City of Żory (from Raciborskie Roundabout to the border of the Cities of Żory and Rybnik); Task (section) II - a road section from the border of the Cities of Żory and Rybnik to Gotartowicki junction in Rybnik, including the Gotartowicki junction; Task (section) III - a section from Gotartowicki junction to Chwałowicki junction, including the Chwałowicki junction; Task (section) IV - a section from Chwałowicki junction to Wodzisławski junction, including Wodzisławski junction; Task (section) V - a section from Wodzisławski junction to the intersection with Sport Street, including the intersection. This section shall probably be redesigned to reduce the road in Rybnik and earlier inclusion to Raciborska Street, i.e. an exit section DW 935 in Rybnik towards Racibórz. Tasks (sections) I-IV under the name "Construction of the Regional Road Racibórz-Pszczyna on a section running through the City of Rybnik - stage I" (major part of the bypass of the city of Rybnik) is the investment, which is the subject of this application and was selected by the Managing Authority for ROP of Silesia in a competitive process. For this stage, an economic and financial analysis was executed, and investment expenditures were estimated (in the following sections of this document). Task (section) V under the name Construction of the Regional Road Racibórz-Pszczyna on a section running through the City of Rybnik stage II is planned also to apply for funds for under the measure 6.1 ROP of Silesia (project is also considered on the list of projects in the Plan of expansion of the voivodeship roads in the Silesian Voivodeship ). Routine and winter maintenance will be carried out on an annual basis as appropriate for the road 13

15 class. An important periodic rehabilitation is scheduled for 2031 (11 th year of operations) and 2041 (21 st year of operations). Environmental, climate change mitigation and adaptation aspects For the EIA aspects of the project see Section 7.1. For the climate change mitigation, GHG emissions and adaptation aspects please see Section 7.2. Give a clear statement whether or not the project meets the relevant criteria for quality review set out in Annex II to Commission Delegated Regulation (EU) No 480/2014 and justify this statement. Put x where appropriate Give a statement and justification Yes X The project meets the relevant criteria for quality review set out in Annex II to CDR (EU) No 480/2014. No The institutional setup for both the implementation and operational stages of the project, with the Beneficiary (City of Rybnik) and its partner in the project implementation (City of Żory) both operating the infrastructure on their territories, and being appropriate institutions to implement the project, follows a standard approach and is adequate and sufficient. Furthermore, City of Rybnik has successfully managed a large number of road projects and has adequate capacity to ensure project implementation and ongoing sustainability of project benefits. The facilities are designed using common international practice and adequate technology and reflect a solid engineering approach. The applied design criteria and engineering approach are therefore adequate to meet the project objectives. The investment does not create unnecessary excess capacity of the road network. The environmental and climate change aspects of this project are discussed in Section 7 of this report. 5.2 Summarise relevant information on the demand analysis (or business plan in case of productive investment). The demand analysis was based on modelling undertaken by the project consultants in 2015, using industry-standard and recognised traffic modelling software, PTV Visum. A total of 119 (internal and external) zones were used in the transport model, covering Rybnik municipality and adjacent areas. The demand model used is a typical four-stage transport model (with a 2015 base year), covering: trip attraction and generation; trip distribution; mode switch, and assignment. Traffic patterns data was sourced from available sources of information, including: available demographic data (e.g., population, employment, schools), traffic counts and origin-destination surveys. The demand modelling included separate consideration of: car travel; truck transport; public transport (buses, microbuses, and rail); and pedestrian transport. Demand was segmented according to trip purpose (e.g., commuting, school trips, non-home based trips). The supply network the representation of the physical transport network in the model was built taking advantage of available spatial datasets covering e.g., the road network (which included data on number of lanes and lane width, junction details), administrative boundaries, and the location of public transport stops. The public transport network in the transport model coded all public transport stops (bus stops, bus stations and train stations). The road network used in the 14

16 model included national roads, voivodeship roads and most of the county roads in the area, with each road link coded to include technical road type, speed limit (for cars, buses, and minibuses), capacity, and allowable vehicle types. The model was calibrated to ensure it adequately reflected the local situation, with changes to e.g., capacity and speeds on road links and speeds on rail network made to improve model s accuracy. After calibration the model provided a good fit, with coefficient of determination of The model assigned demand to modes of transport and paths according to travel time, using a standard mathematical logit function. Traffic forecasts were produced for six different years (2016, 2021, 2026, 2031, 2036, and 2041). The demand analysis was undertaken on the basis of the completion of the link between DK78 and A1 only (sections I-IV). Section V linking DW935 to DK78 west of Rybnik was not included in the demand and economic analysis, as it does not form part of the project. The table below shows forecasted development in AADT over the period for the with project scenario. The modelling predicts an initial traffic volume of 11,400-24,230 vehicles, rising over time to 13,660-27,050 vehicles. Traffic forecasts imply a modest growth rate of less than 1% per year over the reference period. Table: Traffic projections (AADT) on road DW935 in Rybnik in with project scenario, Year Scenario Żory roundabout city border 24,230 26,680 27,050 City border Gotartowicki interchange 21,420 23,850 24,110 Gotartowicki interchange Chwałowicki interchange 19,820 22,230 22,470 Chwałowicki interchange Śródmiejski interchange 20,000 22,440 22,740 Śródmiejski interchange Wodzisławski interchange 11,400 13,380 13,660 Source: project feasibility study Give a clear statement whether or not the project meets the relevant criteria for quality review set out in Annex II to Commission Delegated Regulation (EU) No 480/2014 and justify this statement. Put x where appropriate Give a statement and justification Yes X The project demand analysis meets the relevant criteria for quality review outlined in Annex II to CDR (EU) No 480/2014. No Demand modelling. The traffic modelling assessed the impact that completion of the Rybnik bypass would have on traffic flows and speeds on the main road network around Rybnik, using outputs from a 4-stage transport model. Model build, calibration and validation were undertaken in line with standard industry practice. Traffic forecasts are considered appropriate and are based on a conservative growth rate of less than 1% per year over the reference period. The demographic assumptions underlying the demand modelling are based on projections from the national statistical office. Dimensioning of facilities. The proposed capacity is appropriate to the projected demand, with 4-lanes considered reasonable given the projected traffic volume (which is expected to reach up to 27,000 vehicles per day within the reference period). The further extension of the DW935 to the west of the proposed project (planned to be completed before 2020) will add additional traffic and further strengthen the case for 4-lanes. 15

17 5.3 Summarise relevant information on the option analysis and selection of the best option. An option analysis has been undertaken for the project. A strategic option analysis was carried out in which two routes were studied (Options W1 in red and W2 in green, see map below); the option analysis covered a longer stretch of road than the current project s scope, the current project ends at the DK78 that runs South-Southwest from Rybnik (see also the map in Section 2 for the scope of the current project compared with the scope of the option analysis that was used in the current project.). Option W1 mostly follows the original alignment that had been defined in the zoning plan, whereas W2 would avoid built-up areas and forests more, and be bundled with railways lines no. 140 and 957 to reduce impact on the surrounding areas. Both options have an identical alignment on the section roughly from the Chwałowicki interchange until the viaduct over Ziemska street, as this alignment minimised the risk of mining subsidence caused by two adjacent active mine exploration areas (shown on the map as purple dashed lines above and below the road). The options were compared using multi-criteria analysis (considering socio-economic, environmental, geological and technical criteria), that showed Option W1 as the most favourable option mainly because it is less exposed to geological risks and uses less land than option W2 and that land had already been reserved for transport infrastructure in the zoning plan. Subsequently a technological option analysis was carried out for the five exits, where for each of them 3-4 exit layouts were analysed. The selected options were assessed to be the best of the analysed options, as they had the best overall score on the criteria of land occupancy, simplicity of solutions and subsequent minimisation of engineering structure required, traffic flow and (in the case of the Świerklański exit) a lower risk of mining subsidence. All selected options have adequate capacity for the expected demand. The climate risks of the different options were not specified; as most option analysis had been carried out in an early stage of project preparation, climate risk was not considered in the strategic option selection. 16

18 Give a clear statement whether or not the project meets the relevant criteria for quality review set out in Annex II to Commission Delegated Regulation (EU) No 480/2014 and justify this statement. Put x where appropriate Give a statement and justification Yes X The project meets the relevant criteria for quality review outlined in Annex II to CDR (EU) No 480/2014. No Strategic options have been compared for the Regional Road Racibórz Pszczyna on the section running through the City of Rybnik. Both options were compared using multi-criteria analysis (considering socioeconomic, environmental, geological and technical criteria), that showed Option W1 as the most favourable. Subsequently a technological option analysis was carried out for the five exit layouts, selecting the optimal layout for each of them. The project option analysis process started before 2014 and therefore climate change issues were not considered throughout all stages of its option analysis. Rather, the climate change adaptation vulnerability and risk assessment was carried out at the major projects application stage, which is adequate in this context. Overall it can be confirmed that the quality of the option analysis is adequate, the main alternatives have been analysed, and the analysis sufficiently justifies the technical solution to be implemented. The selected type of road best meets the project traffic demand. 6. A COST-BENEFIT ANALYSIS, INCLUDING A FINANCIAL AND AN ECONOMIC ANALYSIS, AND A RISK ASSESSMENT 6.1 Summarise relevant information on the financial analysis, including the main indicators of the financial analysis i.e. FRR and FNPV, calculation of net revenue and its result, tariff strategy and affordability (if applicable), and financial viability (sustainability). Approach to the financial analysis The financial analysis of the project (effectiveness, net revenue generation and sustainability) was done for the investment as defined for this application (from Racibórz roundabout in the city of Żory to Wodisławska Street in Rybnik, km long). No other section of the regional road DW 935 was included in the financial analysis. Main elements of the financial analysis The financial analysis was carried out from the point of view of the project owner and operator, City of Rybnik. The incremental method comparing the without project scenario and the with project scenario was used, but effectively the non-investment scenario for the financial analysis is a zero scenario, because the road is a new development (no pre-existing infrastructure). The financial analysis is undertaken in constant prices (2014) over 25-year reference period of including 4 years of implementation and 21 years of operations. Macroeconomic parameters used are based on official national data. 17

INFRASTRUCTURE INVESTMENT

INFRASTRUCTURE INVESTMENT ANNEX MAJOR PROJECT 1 NOTIFICATION TO THE COMMISSION OF THE SELECTED MAJOR PROJECT UNDER ARTICLE 92.1. OF COMMON PROVISIONS REGULATION (CPR) (EC) NO ( ) 2 EUROPEAN REGIONAL DEVELOPMENT FUND / COHESION

More information

FAQ ON EX ANTE CONDITIONALITIES RELATING TO TRANSPORT

FAQ ON EX ANTE CONDITIONALITIES RELATING TO TRANSPORT FAQ ON EX ANTE CONDITIONALITIES RELATING TO TRANSPORT This list of frequently asked questions is based on comments received from Member States (MS) on Part II of the Guidance on ex ante conditionalities

More information

ENVIRONMENT AND TRANSPORT

ENVIRONMENT AND TRANSPORT EUROPEAN COMMISSION REF Nº:... ANNEX D PROJECT TITLE:.. THE COHESION FUND - 000-006 APPLICATION FOR ASSISTANCE COUNCIL REGULATION (EC) N 64/94 of 6 May 994 COUNCIL REGULATION (EC) N º 64/99 of June 999

More information

ECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million)

ECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million) Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) ECONOMIC ANALYSIS A. Project Costs 1. This chapter outlines the methodology and results of the economic analysis for the project, comprising

More information

Cost-benefit analysis in the context of EU Cohesion funding - tools, methodology and available support

Cost-benefit analysis in the context of EU Cohesion funding - tools, methodology and available support Cost-benefit analysis in the context of EU Cohesion funding - tools, methodology and available support Massimo Marra JASPERS Networking and Competence Centre IPA Conference Impact Assessment What can we

More information

Major projects in the programming period

Major projects in the programming period Regional Major projects in the 2014-2020 programming period Major Project Team Unit G.1 Competence Centre: Smart and Sustainable Growth DG Regional and Urban Legal framework 2014-2020 Regional New Cohesion

More information

PL CBC PL/D Mieszka I Crossroads reconstruction

PL CBC PL/D Mieszka I Crossroads reconstruction PL01.08.11 CBC PL/D Mieszka I Crossroads reconstruction 1. Basic Information 1.1.Desiree Number: PL01.08.11 1.2. Title: Re-construction of crossroads: Mieszka I, Dabrowskiego, Piast?w, Boh. Warszawy, Powst.

More information

CBA of transport infrastructure projects in Germany

CBA of transport infrastructure projects in Germany CBA of transport infrastructure projects in Germany Dr. Catharina Horn Federal Transport Infrastructure Planning, Investment Policy Paris, 27th of February 2014 www.bmvi.de 1. The Federal Transport Infrastructure

More information

SEETO priority projects rating methodology. July, SEETO Priority Projects rating methodology 13/07/2012 Page 1

SEETO priority projects rating methodology. July, SEETO Priority Projects rating methodology 13/07/2012 Page 1 SEETO priority projects rating methodology July, 2012 13/07/2012 Page 1 Table of content 1 Introduction... 3 1.1 Purpose of the Rating methodology... 3 1.2 Rationale for the Rating methodology... 3 1.3

More information

JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT

JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT 17 April 2009 This document has been produced with the financial

More information

3 rd Call for Project Proposals

3 rd Call for Project Proposals IPA CROSS-BORDER PROGRAMME "GREECE THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA 2007-2013" 3 rd Call for Project Proposals Project Selection Criteria CCI: 2007 CB 16 I PO 009 The following Project Selection

More information

Guidance for Member States on Integrated Sustainable Urban Development (Article 7 ERDF Regulation)

Guidance for Member States on Integrated Sustainable Urban Development (Article 7 ERDF Regulation) EUROPEAN COMMISSION European Structural and Investment Funds Guidance for Member States on Integrated Sustainable Urban Development (Article 7 ERDF Regulation) p10 addition of 3 bullet points for specific

More information

JASPERS Advisory and capacity building support for projects and investment

JASPERS Advisory and capacity building support for projects and investment JASPERS Advisory and capacity building support for projects and investment Massimo Marra, Senior Officer JASPERS Networking and Competence Centre JASPERS-EPEC Seminar on Blending ESI Funds and PPPs Brussels,

More information

Greenlane East Interchange/Great South Road Improvements. Approved Organisation: NZTA (HNO) and Auckland Transport (Auckland City Council)

Greenlane East Interchange/Great South Road Improvements. Approved Organisation: NZTA (HNO) and Auckland Transport (Auckland City Council) Post implementation reviews completed in 2011/12 Reviews represent the views of independent consultants and are used by the NZTA to identify potential opportunities for improvements. Greenlane East Interchange/Great

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Additional Financing of National Motorway M-4 Gojra Shorkot Khanewal Section Project (RRP PAK 48402) ECONOMIC AND FINANCIAL ANALYSIS A. General 1. Roads are the main mode of transport in Pakistan, accounting

More information

TRANS-EUROPEAN NETWORKS GUIDELINES

TRANS-EUROPEAN NETWORKS GUIDELINES TRANS-EUROPEAN NETWORKS GUIDELINES The Treaty on the Functioning of the European Union (TFEU) retains the trans-european networks (TENs) in the areas of transport, energy and telecommunications, first

More information

PPP Projects in Finland Success or not Kari Ruohonen General Director, Investments Finnish Transport Agency

PPP Projects in Finland Success or not Kari Ruohonen General Director, Investments Finnish Transport Agency PPP Projects in Finland Success or not Kari Ruohonen General Director, Investments Finnish Transport Agency The Finnish Transport Agency is a multidisciplinary expert organisation specialising in transport.

More information

Project Appraisal Guidelines for National Roads Unit Minor Projects ( 0.5m to 5m)

Project Appraisal Guidelines for National Roads Unit Minor Projects ( 0.5m to 5m) Project Appraisal Guidelines for National Roads Unit 14.0 - Minor Projects ( 0.5m to 5m) February 2017 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII)

More information

The approved ESPON 2020 Cooperation Programme. ESPON ECP Meeting 9-10 December 2015 in Luxembourg

The approved ESPON 2020 Cooperation Programme. ESPON ECP Meeting 9-10 December 2015 in Luxembourg The approved ESPON 2020 Cooperation Programme ESPON ECP Meeting 9-10 December 2015 in Luxembourg The approved ESPON 2020 Cooperation Programme Guiding questions How is the third ESPON programme generation

More information

September 2014 Pagham Neighbourhood Plan

September 2014 Pagham Neighbourhood Plan September 2014 Pagham Neighbourhood Plan 2014-2029 Basic Conditions Statement Published by Pagham Parish Council for Consultation under the Neighbourhood Planning (General) Regulations 2012. 1 Pagham Neighbourhood

More information

Prioritisation Methodology

Prioritisation Methodology Prioritisation Methodology March 2014 PRIORITISATION METHODOLOGY Table of contents 1 Introduction... 5 2 The Projects Prioritisation Process... 7 3 The Methodological Assumptions... 8 3.1 Background...

More information

COMMISSION DECISION. C(2007)6376 on 18/12/2007

COMMISSION DECISION. C(2007)6376 on 18/12/2007 COMMISSION DECISION C(2007)6376 on 18/12/2007 adopting a horizontal programme on the Energy Efficiency Finance Facility for Albania, Bosnia and Herzegovina, Croatia, Montenegro, Serbia including Kosovo

More information

Draft Environmental Impact Statement. Appendix G Economic Analysis Report

Draft Environmental Impact Statement. Appendix G Economic Analysis Report Draft Environmental Impact Statement Appendix G Economic Analysis Report Appendix G Economic Analysis Report Economic Analyses in Support of Environmental Impact Statement Carolina Crossroads I-20/26/126

More information

Economic Analysis Concepts

Economic Analysis Concepts Economic Analysis Concepts Questions & Decisions (1) Is the project justified?- Are benefits greater than costs? Which is the best investment if we have a set of mutually exclusive alternatives? If funds

More information

FISHERIES MEASURES FOR MARINE NATURA 2000 SITES A consistent approach to requests for fisheries management measures under the Common Fisheries Policy

FISHERIES MEASURES FOR MARINE NATURA 2000 SITES A consistent approach to requests for fisheries management measures under the Common Fisheries Policy FISHERIES MEASURES FOR MARINE NATURA 2000 SITES A consistent approach to requests for fisheries management measures under the Common Fisheries Policy It is the responsibility of Member States to designate

More information

Guidance for Member States on Performance framework, review and reserve

Guidance for Member States on Performance framework, review and reserve EGESIF_18-0021-01 19/06/2018 Version 2.0 EUROPEAN COMMISSION European Structural and Investment Funds Guidance for Member States on Performance framework, review and reserve This version was updated further

More information

GUIDANCE NOTE ON MAJOR PROJECTS SPANNING OVER TWO PROGRAMMING PERIODS

GUIDANCE NOTE ON MAJOR PROJECTS SPANNING OVER TWO PROGRAMMING PERIODS 29/03/2012 COCOF_12-0047-02-EN EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY DIRECTORATE-GENERAL EMPLOYMENT, SOCIAL AFFAIRS and EQUAL OPPORTUNITIES GUIDANCE NOTE ON MAJOR PROJECTS SPANNING OVER

More information

Transfer of Federal Gas Tax Revenues Under the New Deal for Cities and Communities. Municipal Funding Agreement Guide.

Transfer of Federal Gas Tax Revenues Under the New Deal for Cities and Communities. Municipal Funding Agreement Guide. Transfer of Federal Gas Tax Revenues Under the New Deal for Cities and Communities Municipal Funding Agreement Guide January 2010 Administered by: Association of Municipalities of Ontario 200 University

More information

BUCHAREST BRASOV MOTORWAY COMARNIC-BRASOV (CRISTIAN) SECTION

BUCHAREST BRASOV MOTORWAY COMARNIC-BRASOV (CRISTIAN) SECTION GOVERNMENT OF ROMANIA DEPARTMENT FOR INFRASTRUCTURE PROJECTS AND FOREIGN INVESTMENT BUCHAREST BRASOV MOTORWAY COMARNIC-BRASOV (CRISTIAN) SECTION Concession Project Sheet 1 1. PROJECT NAME Bucharest Brasov

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3202 Project Name. Kenya Nairobi Urban Toll Road PRG Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3202 Project Name. Kenya Nairobi Urban Toll Road PRG Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3202 Project Name Kenya

More information

This update fully addresses the issues raised by DfT in its response to the February 2008 submission.

This update fully addresses the issues raised by DfT in its response to the February 2008 submission. Executive Summary Introduction 1. This document forms the Major Scheme Business Case (MSBC) submission to the Department for Transport (DfT), seeking Programme Entry for Croxley Rail Link. It is the culmination

More information

European Union Regional Policy Employment, Social Affairs and Inclusion. EU Cohesion Policy Proposals from the European Commission

European Union Regional Policy Employment, Social Affairs and Inclusion. EU Cohesion Policy Proposals from the European Commission EU Cohesion Policy 2014-2020 Proposals from the European Commission 1 Legislative package The General Regulation Common provisions for cohesion policy, the rural development policy and the maritime and

More information

An overview of the eligibility rules in the programming period

An overview of the eligibility rules in the programming period Rules and conditions applicable to actions co-financed from Structural Funds and Cohesion Fund An overview of the eligibility rules in the programming period 2007-2013 FEBRUARY 2009 1 Table of contents

More information

Government Policy Statement on land transport 2018 release for public engagement

Government Policy Statement on land transport 2018 release for public engagement In Confidence Office of the Minister of Transport Chair, Cabinet Economic Development Committee Government Policy Statement on land transport 2018 release for public engagement Proposal 1. This paper seeks

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Bihar New Ganga Bridge Project (RRP IND 48373) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The proposed project is to build a new six-lane bridge across the Ganges River near Patna in the state

More information

National Agriculture and Rural Development Plan

National Agriculture and Rural Development Plan MEASURE 2.3. DEVELOPMENT AND IMPROVEMENT OF THE RURAL INFRASTRUCTURE Rationale The development of the private economic activities and the improvement of the living conditions for the population in the

More information

Annual Implementation Report 2015

Annual Implementation Report 2015 Annual Implementation Report 215 of the INTERREG V-A SLOVAKIA-HUNGARY COOPERATION PROGRAMME Content 1. Identification of the annual implementation report... 4 2. Overview of the implementation... 4 3.

More information

TSHWANE BRT: Development of a Traffic Model for the BRT Corridor Phase 1A Lines 1 and 2

TSHWANE BRT: Development of a Traffic Model for the BRT Corridor Phase 1A Lines 1 and 2 TSHWANE BRT: Development of a Traffic Model for the BRT Corridor Phase 1A Lines 1 and 2 L RETIEF, B LORIO, C CAO* and H VAN DER MERWE** TECHSO, P O Box 35, Innovation Hub, 0087 *Mouchel Group, 307-317,

More information

Guidance document on. management verifications to be carried out by Member States on operations co-financed by

Guidance document on. management verifications to be carried out by Member States on operations co-financed by Final version of 05/06/2008 COCOF 08/0020/04-EN Guidance document on management verifications to be carried out by Member States on operations co-financed by the Structural Funds and the Cohesion Fund

More information

GOOD PRACTICE. Attracting FDIs and domestic investments by Katowice Special Economic Zone - systematic approach

GOOD PRACTICE. Attracting FDIs and domestic investments by Katowice Special Economic Zone - systematic approach GOOD PRACTICE Attracting FDIs and domestic investments by Katowice Special Economic Zone - systematic approach ORGANISATION: Katowice Special Economic Zone TOPIC: Attraction of investment DETAILED DESCRIPTION

More information

SUSTAINABLE URBAN MOBILITY PLAN TRAINING WORKSHOP. Module 6 Implementation Plan

SUSTAINABLE URBAN MOBILITY PLAN TRAINING WORKSHOP. Module 6 Implementation Plan SUSTAINABLE URBAN MOBILITY PLAN TRAINING WORKSHOP Module 6 Implementation Plan Sustainable Urban Mobility Plans: Delivery & Implementation Plans Identifying phased approach to delivery and programming

More information

NGO voting recommendations Connecting Europe Facility Regulation

NGO voting recommendations Connecting Europe Facility Regulation NGO voting recommendations Connecting Europe Facility Regulation 2014-2020 ITRE-TRAN committee (Co-rapporteurs: D. Riquet, I. Ayala Sender,A. Valean) Vote on Tuesday 18 December 2012, from 09:00 Environmental

More information

Rehabilitation and Partial Reconstruction of Road II-19 Razlog Bansko Gotse Delchev Sadovo

Rehabilitation and Partial Reconstruction of Road II-19 Razlog Bansko Gotse Delchev Sadovo STANDARD SUMMARY PROJECT FICHE Rehabilitation and Partial Reconstruction of Road II-19 Razlog Bansko Gotse Delchev Sadovo 1. Basic Information CRIS Number: 2002/000-624-01 Title: Rehabilitation and Partial

More information

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof,

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof, L 244/12 COMMISSION IMPLEMTING REGULATION (EU) No 897/2014 of 18 August 2014 laying down specific provisions for the implementation of cross-border cooperation programmes financed under Regulation (EU)

More information

Transport TASK 3 - MAJOR PROJECT CASE STUDIES WORK PACKAGE 5

Transport TASK 3 - MAJOR PROJECT CASE STUDIES WORK PACKAGE 5 Transport TASK 3 - MAJOR PROJECT CASE STUDIES WORK PACKAGE 5 Ex post evaluation of Cohesion Policy programmes 2007-2013, focusing on the European Regional Development Fund (ERDF) and the Cohesion Fund

More information

05.01 Strengthen environmental impact assessment

05.01 Strengthen environmental impact assessment 05.01 Strengthen environmental impact assessment 1. Basic Information 1.1.Desiree Number:PL0007.01 1.2 Title: Strengthen environmental impact assessment 1.3 Sector : Environment Twinning code: PL2000/IB/EN01

More information

DRAFT TEMPLATE AND GUIDELINES ON THE CONTENT PARTNERSHIP AGREEMENT OF THE

DRAFT TEMPLATE AND GUIDELINES ON THE CONTENT PARTNERSHIP AGREEMENT OF THE DRAFT TEMPLATE AND GUIDELINES ON THE CONTENT OF THE PARTNERSHIP AGREEMENT This is a draft document based on the new ESIF Regulations published in OJ 347 of 20 December 2013 and on the most recent version

More information

DRAFT TEMPLATE AND GUIDELINES FOR THE CONTENT

DRAFT TEMPLATE AND GUIDELINES FOR THE CONTENT DRAFT 21.05.2013 DRAFT TEMPLATE AND GUIDELINES FOR THE CONTENT OF THE OPERATIONAL PROGRAMME Version 3 21.05.2013 This document is based on the Presidency compromise text (from 19 December 2012), which

More information

Chapter 8: Lifecycle Planning

Chapter 8: Lifecycle Planning Chapter 8: Lifecycle Planning Objectives of lifecycle planning Identify long-term investment for highway infrastructure assets and develop an appropriate maintenance strategy Predict future performance

More information

Major projects CBA for transport sector Brussels, 30 September 2015

Major projects CBA for transport sector Brussels, 30 September 2015 Regional Major projects 2014-2020 - CBA for transport sector Brussels, 30 September 2015 Major projects 2007-2013 Witold Willak Head of Sector, Major Projects, Unit G1 for Smart and Sustainable growth,

More information

REPORT TO THE CAPITAL REGIONAL DISTRICT BOARD MEETING OF WEDNESDAY, SEPTEMBER 8, 2010

REPORT TO THE CAPITAL REGIONAL DISTRICT BOARD MEETING OF WEDNESDAY, SEPTEMBER 8, 2010 REPORT TO THE CAPITAL REGIONAL DISTRICT BOARD MEETING OF WEDNESDAY, SEPTEMBER 8, 2010 SUBJECT City of Victoria Request for General Strategic Priorities Funding Application Support Johnson Street Bridge

More information

CONSTRUCTION OF THE BYPASS OF 3 VILLAGES ALONG THE M3 NATIONAL ROAD CHISINAU- GIURGIULESTI

CONSTRUCTION OF THE BYPASS OF 3 VILLAGES ALONG THE M3 NATIONAL ROAD CHISINAU- GIURGIULESTI TRACECA PROJECT FICHE CONSTRUCTION OF THE BYPASS OF 3 VILLAGES ALONG THE M3 NATIONAL ROAD CHISINAU- GIURGIULESTI 1. BASIC INFORMATION TITLE: Construction of the bypass of 3 villages along the M3 National

More information

INDICATIVE TERM SHEET

INDICATIVE TERM SHEET INDICATIVE TERM SHEET Financial instrument Urban Development Fund Operational Programme Regions in Growth 2014-2020 March 2017 This comprises the following sections: Purpose of this Document. Disclaimer.

More information

Prioritising bridge replacements

Prioritising bridge replacements Prioritising bridge replacements Andrew Sonnenberg, National Bridge Engineering Manager, Pitt&Sherry ABSTRACT Road and Rail managers own a variety of assets which are aging and will need replacement. There

More information

Manual Cost Benefit Analysis

Manual Cost Benefit Analysis Republic of Serbia MINISTRY OF INFRASTRUCTURE Manual Cost Benefit Analysis Republic of Serbia Reference R20100299/31275000/ABU/EGR Version 6.0 Zoetermeer, December 2010 R20100299.doc Preface Serbia is

More information

DRAFT REVISED GUIDANCE NOTE ON MAJOR PROJECTS IN THE PROGRAMMING PERIOD : THRESHOLD AND CONTENTS OF COMMISSION DECISIONS

DRAFT REVISED GUIDANCE NOTE ON MAJOR PROJECTS IN THE PROGRAMMING PERIOD : THRESHOLD AND CONTENTS OF COMMISSION DECISIONS COCOF 08/0006/04-EN EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY DRAFT REVISED GUIDANCE NOTE ON MAJOR PROJECTS IN THE PROGRAMMING PERIOD 2007-2013: THRESHOLD AND CONTENTS OF COMMISSION DECISIONS!WARNING!

More information

Investing in the future

Investing in the future Investing in the future Using value creation and value capture to fund the infrastructure our cities need Submission responding to the Discussion Paper issued by Department of Infrastructure and Regional

More information

Danube Transnational Programme

Danube Transnational Programme Summary Danube Transnational Programme 2014-2020 Summary of the Cooperation Programme Version 2.3, 20 th October 2014 Danube Transnational Programme 2014-2020 (INTERREG V-B DANUBE) Page 1 Mission of the

More information

Transportation Investment Corporation Service Plan 2012/ /15

Transportation Investment Corporation Service Plan 2012/ /15 Service Plan 2012/13 2014/15 TABLE OF CONTENTS MESSAGE FROM THE CHAIR... 3 ORGANIZATIONAL OVERVIEW... 5 Mandate and Enabling Legislation... 5 Our Vision... 5 Our Values... 5 TI CORP LOCATIONS... 7 CORPORATE

More information

FAQ. Questions and answers relating to the 2014 call for proposals for NGO operating grants for funding in 2015 (Latest update September 2014)

FAQ. Questions and answers relating to the 2014 call for proposals for NGO operating grants for funding in 2015 (Latest update September 2014) FAQ Questions and answers relating to the 2014 call for proposals for NGO operating grants for funding in 2015 (Latest update September 2014) CORRIGENDUM: In the first version of the Application Guide,

More information

Guidance for Member States on Performance framework, review and reserve

Guidance for Member States on Performance framework, review and reserve EGESIF_18-0021-01 19/06/2018 Version 12.0 07/01/2015 EUROPEAN COMMISSION European Structural and Investment Funds Guidance for Member States on Performance framework, review and reserve This version was

More information

MINISTRY OF ECONOMY AND FINANCE Authority for Coordination of Structural Instruments

MINISTRY OF ECONOMY AND FINANCE Authority for Coordination of Structural Instruments MINISTRY OF ECONOMY AND FINANCE Authority for Coordination of Structural Instruments GENERAL GUIDELINES FOR COST BENEFIT ANALYSIS OF PROJECTS TO BE SUPPORTED BY THE The present guidelines were prepared

More information

SELECTION CRITERIA. for applications submitted to the INTERREG V-A Austria-Hungary Programme

SELECTION CRITERIA. for applications submitted to the INTERREG V-A Austria-Hungary Programme SELECTION CRITERIA for applications submitted to the INTERREG V-A Austria-Hungary Programme Version 2.0 19.04.2017 Project selection in the programme INTERREG V-A Austria-Hungary Project selection is based

More information

Setting Standards for Sustainable Development Update and Review of the World Bank s Safeguard Policies Case Studies in Indonesia

Setting Standards for Sustainable Development Update and Review of the World Bank s Safeguard Policies Case Studies in Indonesia Setting Standards for Sustainable Development Update and Review of the World Bank s Safeguard Policies Case Studies in Indonesia Phase 3 Consultation in Indonesia January 26-28, 2016 Objective Illustrate

More information

Appendix 1 In-Depth Checks

Appendix 1 In-Depth Checks Appendix 1 In-Depth Checks The following appendix sets out the In-Depth Checks undertaken by the Department for the 2016 Quality Assurance Report. The three projects/programmes selected for review are:

More information

Articles 42 to 44 - LEADER. Articles 58-66

Articles 42 to 44 - LEADER. Articles 58-66 DRAFT GUIDANCE FICHE FOR DESK OFFICERS ARRANGEMENTS ON TERRITORIAL DEVELOPMENT VERSION 2 22/01/2014 RELEVANT PROVISIONS IN THE LEGISLATION Regulation Common Provisions Regulation (N 1303/2013) ERDF Regulation

More information

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution.

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution. ANNEX ICELAND NATIONAL PROGRAMME 2012 1 IDENTIFICATION Beneficiary Iceland CRIS decision number 2012/023-648 Year 2012 EU contribution 11,997,400 EUR Implementing Authority European Commission Final date

More information

Programming Period. European Social Fund

Programming Period. European Social Fund 2014 2020 Programming Period European Social Fund f Legislative package 2014-2020 European Regional Development Fund (EC) 1301/2013 Cohesion Fund (EC) 1300/2013 European Social Fund (EC) 1304/2013 European

More information

Official Journal of the European Union

Official Journal of the European Union 13.5.2014 L 138/5 COMMISSION DELEGATED REGULATION (EU) No 480/2014 of 3 March 2014 supplementing Regulation (EU) No 1303/2013 of the European Parliament and of the Council laying down common provisions

More information

PE-CONS 3619/3/01 REV 3

PE-CONS 3619/3/01 REV 3 on the assessment of the effects of certain plans and programmes on the environment THE EUROPEAN PARLIAMENT AND THE COUNCIL OF THE EUROPEAN UNION, Having regard to the Treaty establishing the European

More information

Environmental Planning Statement

Environmental Planning Statement Operational Programmes for Malta Cohesion Policy 2007 2013 Investing in Our Future This Project is being considered for European Union part-financing Operational Programme I Cohesion Policy 2007-2013 Investing

More information

Review of preliminary flood risk assessments (Flood Risk Regulations 2009): guidance for lead local flood authorities in England

Review of preliminary flood risk assessments (Flood Risk Regulations 2009): guidance for lead local flood authorities in England Review of preliminary flood risk assessments (Flood Risk Regulations 2009): guidance for lead local flood authorities in England 25 January 2017 We are the Environment Agency. We protect and improve the

More information

Blending EU grants with PPPs in the next financial perspective ( ) François Gaudet 25 th October, Zagreb

Blending EU grants with PPPs in the next financial perspective ( ) François Gaudet 25 th October, Zagreb Blending EU grants with PPPs in the next financial perspective (2014-2020) François Gaudet 25 th October, Zagreb Structure of the presentation The principles and challenges of blending PPP with EU Funds

More information

(Non-legislative acts) REGULATIONS

(Non-legislative acts) REGULATIONS 12.7.2012 Official Journal of the European Union L 181/1 II (Non-legislative acts) REGULATIONS COMMISSION REGULATION (EU) No 600/2012 of 21 June 2012 on the verification of greenhouse gas emission reports

More information

THE ANALYSIS OF THE CONSTRUCTION COSTS OF TRANSPORT INFRASTRUCTURE PROJECTS

THE ANALYSIS OF THE CONSTRUCTION COSTS OF TRANSPORT INFRASTRUCTURE PROJECTS The 8 th International Conference RELIABILITY and STATISTICS in TRANSPORTATION and COMMUNICATION - 2008 THE ANALYSIS OF THE CONSTRUCTION COSTS OF TRANSPORT INFRASTRUCTURE PROJECTS Algirdas Griskevicius

More information

Response from the European Sea Ports Organisation. to the. Connecting Europe Facility II proposal

Response from the European Sea Ports Organisation. to the. Connecting Europe Facility II proposal Response from the European Sea Ports Organisation to the Connecting Europe Facility II proposal (COM) (2018)438 Introduction On 6 June 2018, the European Commission adopted its proposal for the Connecting

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

Greater Bristol Bus Network Major Scheme Business Case. Chapter 1. Developing the Full Approval Major Scheme Business Case

Greater Bristol Bus Network Major Scheme Business Case. Chapter 1. Developing the Full Approval Major Scheme Business Case Greater Bristol Bus Network Major Scheme Business Case Chapter 1 Developing the Full Approval Major Scheme Business Case i ii 1. The Case for Full Approval INTRODUCTION 1.1.1 Bath and North East Somerset,

More information

GUIDANCE FICHE PERFORMANCE FRAMEWORK REVIEW AND RESERVE IN VERSION 1 9 APRIL 2013 RELEVANT PROVISIONS IN THE DRAFT LEGISLATION

GUIDANCE FICHE PERFORMANCE FRAMEWORK REVIEW AND RESERVE IN VERSION 1 9 APRIL 2013 RELEVANT PROVISIONS IN THE DRAFT LEGISLATION GUIDANCE FICHE PERFORMANCE FRAMEWORK REVIEW AND RESERVE IN 2014-2020 VERSION 1 9 APRIL 2013 RELEVANT PROVISIONS IN THE DRAFT LEGISLATION Regulation Articles Article 18 Performance reserve Article 19 Performance

More information

Appendix J Western Corridor Regeneration Scheme. Benefits Realisation Plan & Monitoring and Evaluation Plan

Appendix J Western Corridor Regeneration Scheme. Benefits Realisation Plan & Monitoring and Evaluation Plan Appendix J Western Corridor Regeneration Scheme Benefits Realisation Plan & Monitoring and Evaluation Plan April 2014 [Final Report] Strategic Transportation Planning Torbay Council 2nd Floor Electric

More information

Table of contents. Introduction Regulatory requirements... 3

Table of contents. Introduction Regulatory requirements... 3 COCOF 08/0020/02-EN DRAFT Guidance document on management verifications to be carried out by Member States on projects co-financed by the Structural Funds and the Cohesion Fund for the 2007 2013 programming

More information

CATEGORIES OF INTERVENTION. Fiche no 6. Brussels, 14 November Commission Proposals

CATEGORIES OF INTERVENTION. Fiche no 6. Brussels, 14 November Commission Proposals CATEGORIES OF INTERVENTION Fiche no 6 Brussels, 14 November 2011 Articles Commission Proposals Articles 87 (2) (b) (iv) and 102 (2) Common Provisions Regulation [COM(2011) 615] This draft working paper

More information

EUROPEAN COMMISSION. Observations on the Partnership Agreement with the Netherlands

EUROPEAN COMMISSION. Observations on the Partnership Agreement with the Netherlands Ref. Ares(2014)1617982-19/05/2014 EUROPEAN COMMISSION Introduction Observations on the Partnership Agreement with the Netherlands The observations set out below have been made within the framework of the

More information

Marsh Barton Rail Station Draft Benefits Realisation Plan and Monitoring and Evaluation Plan

Marsh Barton Rail Station Draft Benefits Realisation Plan and Monitoring and Evaluation Plan Draft Benefits Realisation Plan and Monitoring and Evaluation Plan May 2014 Devon County Council County Hall Topsham Road Exeter Devon EX2 4QD Contents 1 Scheme Background and Context... 3 1.1 Description

More information

PUBLIC CONSULTATION Improving offshore safety in Europe

PUBLIC CONSULTATION Improving offshore safety in Europe PUBLIC CONSULTATION Improving offshore safety in Europe Waters off EU shores are in parts intensively exploited for the production of oil and gas. In 2009, oil production in the EU and Norway amounted

More information

Connecting Europe Facility. Czech Permanent Representation 7 December 2011

Connecting Europe Facility. Czech Permanent Representation 7 December 2011 Czech Permanent Representation 7 December 2011 The : EU added value Europe s economic future requires smart, sustainable and fully interconnected transport, energy and digital networks => key for the Europe

More information

Tracking climate expenditure

Tracking climate expenditure istockphoto Tracking climate expenditure The common methodology for tracking and monitoring climate expenditure under the European Structural and Investment Funds (2014-2020) Climate Action Introduction

More information

2 nd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes

2 nd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes 2 nd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes Reviewing and Approving TYNDP A Regulatory Perspective Evangelos Penglis Partner, VIS Economic & Energy Consultants 08/12/2017

More information

Project Selection Criteria Transnational Cooperation Programme Interreg Balkan Mediterranean

Project Selection Criteria Transnational Cooperation Programme Interreg Balkan Mediterranean Project Selection Criteria Transnational Cooperation Programme Interreg Balkan Mediterranean 2014 2020 CCI 2014TC16M4TN003 22/06/2015 Version 1.0 Balkan-Mediterranean is co-financed by European Union and

More information

SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS

SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS SCOTTISH FUNDING COUNCIL CAPITAL PROJECTS DECISION POINT PROCESS Incorporating amendments by Scottish Futures Trust (Proposals for Decision Points 2 5 Only) Executive summary... 1 Section 1: Introduction

More information

Cross-border Cooperation Action Programme Montenegro - Albania for the years

Cross-border Cooperation Action Programme Montenegro - Albania for the years ANNEX 1 Cross-border Cooperation Action Programme Montenegro - Albania for the years 2015-2017 1 IDENTIFICATION Beneficiaries CRIS/ABAC Commitment references Union Contribution Budget line Montenegro,

More information

Screening report Montenegro

Screening report Montenegro Screening report Montenegro Chapter 22 Regional policy and coordination of Structural Instruments Date of screening meetings: Explanatory meeting: 14-15 November 2012 Bilateral meeting: 18 December 2012

More information

SHIFT RAPID TRANSIT MASTER PLAN AND BUSINESS CASE RECOMMENDATION

SHIFT RAPID TRANSIT MASTER PLAN AND BUSINESS CASE RECOMMENDATION TO: FROM: SUBJECT: CHAIR AND MEMBERS STRATEGIC PRIORITIES AND POLICIES COMMITTEE MEETING ON JULY 24, 2017 KELLY SCHERR, P.ENG., MBA, FEC MANAGING DIRECTOR ENVIRONMENTAL & ENGINEERING SERVICES AND CITY

More information

SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR. 1. Sector Performance, Problems, and Opportunities Chhattisgarh State Road Sector Project (RRP IND 44427) Sector Road Map SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR 1. Sector Performance, Problems, and Opportunities 1. The state of Chhattisgarh

More information

Methodology for CBA preparation SOP Environment

Methodology for CBA preparation SOP Environment Methodology for CBA preparation SOP Environment Programming Meeting for water and wastewater projects in the period 2008-2009 Mamaia, 10-13 th July 2008 Massimo Marra JASPERS Regional Office for Romania

More information

Presentation at Civitas Forum

Presentation at Civitas Forum 12/10/2017 1 Presentation at Civitas Forum Kim Kreilgaard Head of EIB Group Office in Portugal 28th September at Torres Vedras European Investment Bank Group 12/10/2017 2 Largest multilateral lender and

More information

Public Works and Development Services

Public Works and Development Services City of Commerce Capital Improvement Program Prioritization Policy Public Works and Development Services SOP 101 Version No. 1.0 Effective 05/19/15 Purpose The City of Commerce s (City) Capital Improvement

More information

COMMISSION STAFF WORKING DOCUMENT Accompanying the document

COMMISSION STAFF WORKING DOCUMENT Accompanying the document EUROPEAN COMMISSION Brussels, 9.10.2017 SWD(2017) 330 final PART 9/13 COMMISSION STAFF WORKING DOCUMENT Accompanying the document REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE

More information

OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED

OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED 2014-2020 1. IDENTIFICATION (max. 200 characters) The purpose of this section is to identify only the programme concerned. It

More information

COMMISSION IMPLEMENTING DECISION. of adopting a

COMMISSION IMPLEMENTING DECISION. of adopting a EUROPEAN COMMISSION Brussels, 10.12.2014 C(2014) 9352 final COMMISSION IMPLEMENTING DECISION of 10.12.2014 adopting a Cross-border cooperation Programme Montenegro- Albania for the years 2014-2020 and

More information