Department of Defense Fiscal Year (FY) 2018 Budget Estimates

Size: px
Start display at page:

Download "Department of Defense Fiscal Year (FY) 2018 Budget Estimates"

Transcription

1 LSSIFID Department of Defense Fiscal Year (FY) 2018 Budget stimates ay 2017 rmy ustification Book of rocurement of W&TV, rmy LSSIFID

2

3 T F WS D TKD BT VHILS, Y ITI LGG For construction, procurement, production, and modification of weapons and tracked combat vehicles, equipment, including ordnance, spare parts, and accessories therefore; specialized equipment and training devices; expansion of public and private plants, including the land necessary therefore, for the foregoing purposes, and such lands and interests therein, may be acquired, and construction prosecuted thereon prior to approval of title; and procurement and installation of equipment, appliances, and machine tools in public and private plants; reserve plant and government and contractor-owned equipment, layaway; and other expenses necessary for the foregoing purposes, $3,614,747 to remain available for obligation until September 30, The following ustification Books were prepared at a cost of $250,916: ircraft (FT), issile (SLS), Weapons & Tracked ombat Vehicles (WTV), mmunition (), ther rocurement rmy () 1 - Tactical & Support Vehicles, ther rocurement rmy () 2 - ommunications & lectronics, ther rocurement rmy () 3 & 4 - ther Support quipment & Spares, esearch, Development, Test and valuation (DT) for: Budget ctivity 1, Budget ctivity 2, Budget ctivity 3, Budget ctivity 4, Budget ctivity 5, Budget ctivity 5B, Budget ctivity 6, and Budget ctivity 7.

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25 LSSIFID rmy Budget stimates rocurement Table of ontents Line Item Table of ontents (by ppropriation then Line umber)... ii Line Item Table of ontents (lphabetically by Line Item Title)... v xhibit -40s... 1 LSSIFID i

26 LSSIFID rmy Budget stimates rocurement Line Item Table of ontents (by ppropriation then Line umber) ppropriation 2033: rocurement of W&TV, rmy Line # B BS Line Item umber Line Item Title age G80718 BDLY G G80819 rmored ulti urpose Vehicle (V) G85100 Stryker Vehicle G0100 Stryker (od) G85200 Stryker pgrade GZ2400 Bradley rogram (D) G FV odifications GZ0410 aladin Integrated anagement (I) G0570 Improved ecovery Vehicle (882 HLS) GZ3250 ssault Bridge (od) G82925 ssault Breacher Vehicle G FV DS GZ3001 oint ssault Bridge G brams Tank (D) G0750 brams pgrade rogram G0050 roduction Support (TV-WTV) LSSIFID ii

27 LSSIFID rmy Budget stimates rocurement ppropriation 2033: rocurement of W&TV, rmy Line # B BS Line Item umber Line Item Title age G16101 Integrated ir Burst Weapon System Family G edium achine Gun (7.62mm) G13101 LTI-L TI- TI-SL W SYST G02200 ortar Systems G01501 X320 Grenade Launcher odule (GL) G01507 T SI-TTI SI SYST G13501 arbine G04700 ommon emotely perated Weapons Station G15325 Handgun GB3000 K-19 Grenade achine Gun DS GZ ods GB arbine ods GB al achine Gun DS GZ SW achine Gun DS GZ edium achine Gun DS GZ1500 Sniper ifles odifications LSSIFID iii

28 LSSIFID rmy Budget stimates rocurement ppropriation 2033: rocurement of W&TV, rmy Line # B BS Line Item umber Line Item Title age G odifications G02100 ortar odification G0925 odifications Less Than $5.0m (WV-WTV) GL3200 Items Less Than $5.0m (WV-WTV) G0050 roduction Support (WV-WTV) G0075 Industrial reparedness G0076 Small rms quipment (Soldier nh rog) G9500 LSD T DSTTS LSSIFID iv

29 LSSIFID rmy Budget stimates rocurement Line Item Table of ontents (lphabetically by Line Item Title) Line Item Title Line Item umber Line # B BS age brams pgrade rogram G rmored ulti urpose Vehicle (V) G ssault Breacher Vehicle G ssault Bridge (od) GZ BDLY G G Bradley rogram (D) GZ LSD T DSTTS G T SI-TTI SI SYST G arbine G ommon emotely perated Weapons Station G Handgun G Improved ecovery Vehicle (882 HLS) G Industrial reparedness G Integrated ir Burst Weapon System Family G Items Less Than $5.0m (WV-WTV) GL oint ssault Bridge GZ brams Tank (D) G LSSIFID v

30 LSSIFID rmy Budget stimates rocurement Line Item Title Line Item umber Line # B BS age 109 FV odifications G odifications G al achine Gun DS GB edium achine Gun (7.62mm) G edium achine Gun DS GZ SW achine Gun DS GZ arbine ods GB ods GZ FV DS G K-19 Grenade achine Gun DS GB LTI-L TI- TI-SL W SYST G odifications Less Than $5.0m (WV-WTV) G ortar odification G ortar Systems G aladin Integrated anagement (I) GZ roduction Support (TV-WTV) G roduction Support (WV-WTV) G Small rms quipment (Soldier nh rog) G Sniper ifles odifications GZ Stryker (od) G LSSIFID vi

31 LSSIFID rmy Budget stimates rocurement Line Item Title Line Item umber Line # B BS age Stryker pgrade G Stryker Vehicle G X320 Grenade Launcher odule (GL) G LSSIFID vii

32 LSSIFID xhibit -40, Budget Line Item ustification: rmy Date: ay 2017 ppropriation / Budget ctivity / Budget Sub ctivity: 2033: rocurement of W&TV, rmy / B 01: Tracked ombat Vehicles / BS 10: Tracked ombat Vehicles -1 Line Item umber / Title: G80718 / BDLY G ID ode (=Service eady, B=ot Service eady): rogram lements for ode B Items: / ther elated rogram lements: Line Item D/IS ode: / esource Summary rior Years FY 2016 FY 2017 FY 2019 FY 2020 FY 2021 FY 2022 To omplete rocurement Quantity (nits in ach) ontinuing ontinuing Gross/Weapon System ost ($ in illions) ontinuing ontinuing Less Y dvance rocurement ($ in illions) et rocurement (-1) ($ in illions) ontinuing ontinuing lus Y dvance rocurement ($ in illions) bligation uthority ($ in illions) ontinuing ontinuing (The following esource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in illions) Flyaway nit ost ($ in Thousands) Gross/Weapon System nit ost ($ in Thousands) , , ontinuing ontinuing Description: The Bradley rogram upgrades the existing Bradley 22 DS - Situational wareness (DS-S)/73 vehicle to the Bradley 24/74 configuration to support the requirement for unit equipment sets to deter potential adversaries and support the uropean eassurance Initiative (I). Improvements to the Bradley 22 DS-S vehicle include increasing lethality by installing a ommander s Independent Viewer (IV) providing a hunter-killer capability to the Bradley Gunner and Vehicle ommander, increasing survivability by incorporating improved suspension and track components, increasing mobility by integrating an upgraded engine and transmission improving vehicle acceleration, top speed, and braking capacity, and increasing vehicle electrical power generation and distribution by improving the system architecture and generation capabilities. urrent projections indicate that the 2/74 Bradley Fighting Vehicle will be critical for the BT formation until FY rmy : Secondary Distribution Secondary Distribution FY 2016 FY 2017 FY 2019 FY 2020 FY 2021 FY 2022 Quantity bligation uthority Quantity bligation uthority LI G BDLY G LSSIFID rmy age 1 of 8-1 Line #1 1

33 LSSIFID xhibit -40, Budget Line Item ustification: rmy Date: ay 2017 ppropriation / Budget ctivity / Budget Sub ctivity: 2033: rocurement of W&TV, rmy / B 01: Tracked ombat Vehicles / BS 10: Tracked ombat Vehicles -1 Line Item umber / Title: G80718 / BDLY G ID ode (=Service eady, B=ot Service eady): rogram lements for ode B Items: / ther elated rogram lements: Line Item D/IS ode: / xhibits Schedule rior Years FY 2016 FY 2017 xhibit Type Title* Subexhibits ID D D/ IS ode Quantity / ost (ach) / ($ ) Quantity / ost (ach) / ($ ) Quantity / ost (ach) / ($ ) Quantity / ost (ach) / ($ ) Quantity / ost (ach) / ($ ) Quantity / ost (ach) / ($ ) -5 G80723 / Bradley rogram (24) -5a, / - - / - - / - - / - 60 / / Gross/Weapon System ost - / - - / - - / - - / - 60 / / *Title represents 1) the umber / Title for Items; 2) the umber / Title [DDI] for mmunition; and/or 3) the umber / Title (odification Type) for odifications. ote: s in this xhibit -40 set may not be exact or sum exactly due to rounding. ustification: rocurement funding in the amount of $200,000 million funds the upgrade of sixty (60) 22 DS-S/73 vehicle to the 24/74 configuration to support the requirement for unit equipment sets to deter potential adversaries and support the uropean eassurance Initiative (I). Funding supports all aspects of the vehicle upgrade program as well as all of the Government and ontractor System ngineering/rogram anagement required for management of the program. Support the ctive rmy. In accordance with Section 1815 of the FY2008 ational Defense uthorization ct (.L ), this item is necessary for use by the active and reserve components of the rmed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI G BDLY G LSSIFID rmy age 2 of 8-1 Line #1 2

34 LSSIFID xhibit -5, ost nalysis: rmy Date: ay 2017 ppropriation / Budget ctivity / Budget Sub ctivity: 2033 / 01 / 10 ID ode (=Service eady, B=ot Service eady) : -1 Line Item umber / Title: G80718 / BDLY G D/IS ode: Item umber / Title [DDI]: G80723 / Bradley rogram (24) esource Summary rior Years FY 2016 FY 2017 rocurement Quantity (nits in ach) Gross/Weapon System ost ($ in illions) Less Y dvance rocurement ($ in illions) et rocurement (-1) ($ in illions) lus Y dvance rocurement ($ in illions) bligation uthority ($ in illions) (The following esource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in illions) Gross/Weapon System nit ost ($ in Thousands) , , ote: Subtotals or s in this xhibit -5 may not be exact or sum exactly due to rounding. ost lements Flyaway ost ecurring ost nit ost ($ K) rior Years FY 2016 FY 2017 Qty (ach) ost ($ ) nit ost ($ K) Qty (ach) ost ($ ) nit ost ($ K) Qty (ach) anufacturing ( ) , , TF (SL, BII, T, FT) ost ($ ) nit ost ($ K) Subtotal: ecurring ost Subtotal: Flyaway ost Support - Government Furnished aterials ost Government Furnished aterials Subtotal: Support - Government Furnished aterials ost Support - rogram anagement ost Government anagement ontractor anagement Subtotal: Support - rogram anagement ost Gross/Weapon System ost , , Qty (ach) ost ($ ) nit ost ($ K) Qty (ach) ost ($ ) nit ost ($ K) Qty (ach) ost ($ ) LI G BDLY G LSSIFID rmy age 3 of 8-1 Line #1 3

35 LSSIFID xhibit -5, ost nalysis: rmy Date: ay 2017 ppropriation / Budget ctivity / Budget Sub ctivity: 2033 / 01 / 10 ID ode (=Service eady, B=ot Service eady) : rmy : Secondary Distribution -1 Line Item umber / Title: G80718 / BDLY G D/IS ode: Secondary Distribution FY 2016 FY 2017 Item umber / Title [DDI]: G80723 / Bradley rogram (24) Quantity bligation uthority Quantity bligation uthority ( ) indicates the presence of a -5a LI G BDLY G LSSIFID rmy age 4 of 8-1 Line #1 4

36 LSSIFID xhibit -5a, rocurement History and lanning: rmy Date: ay 2017 ppropriation / Budget ctivity / Budget Sub ctivity: 2033 / 01 / 10 ost lements FY ontractor and Location -1 Line Item umber / Title: G80718 / BDLY G ethod/type or Funding Vehicle Location of ward Date Date of First Delivery Item umber / Title [DDI]: G80723 / Bradley rogram (24) Qty (ach) nit ost ($ K) anufacturing ( ) 2018 B / York, SS / FIF T, Warren, I ay 2018 an , Specs vail ow? Date evision vailable F Issue Date ( ) indicates the presence of a -21 LI G BDLY G LSSIFID rmy age 5 of 8-1 Line #1 5

37 LSSIFID LI G BDLY G LSSIFID rmy age 6 of 8-1 Line #1 xhibit -21, roduction Schedule: rmy Date: ay 2017 ppropriation / Budget ctivity / Budget Sub ctivity: 2033 / 01 / 10-1 Line Item umber / Title: G80718 / BDLY G Item umber / Title [DDI]: G80723 / Bradley rogram (24) ost lements (nits in ach) Fiscal Year 2018 Fiscal Year 2019 alendar Year 2018 alendar Year 2019 F # FY SVI QTY T I T 1 T 2017 BL D S F 1 T T V D F B Y L G S T V D F B Y L G S B L anufacturing Y T V D F B Y L G S T V D F B Y L G S 6

38 LSSIFID LI G BDLY G LSSIFID rmy age 7 of 8-1 Line #1 xhibit -21, roduction Schedule: rmy Date: ay 2017 ppropriation / Budget ctivity / Budget Sub ctivity: 2033 / 01 / 10-1 Line Item umber / Title: G80718 / BDLY G Item umber / Title [DDI]: G80723 / Bradley rogram (24) ost lements (nits in ach) Fiscal Year 2020 Fiscal Year 2021 alendar Year 2020 alendar Year 2021 F # FY SVI QTY T I T 1 T 2019 BL D S F 1 T T V D F B Y L G S T V D F B Y L G S B L anufacturing Y T V D F B Y L G S T V D F B Y L G S 7

39 LSSIFID xhibit -21, roduction Schedule: rmy Date: ay 2017 ppropriation / Budget ctivity / Budget Sub ctivity: 2033 / 01 / 10 F ef # roduction ates (ach / onth) anufacturer ame - Location S For For 2018 X For Line Item umber / Title: G80718 / BDLY G LT rior to ct 1 LT fter ct 1 Initial anufacturing LT rocurement Leadtime (onths) fter ct 1 LT rior to ct 1 Item umber / Title [DDI]: G80723 / Bradley rogram (24) LT fter ct 1 eorder anufacturing LT fter ct 1 1 B - York, "" in the Delivery Schedule indicates the ontract ward Date. ote: Due to space limitations, quantities in the xhibit -21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).if the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI G BDLY G LSSIFID rmy age 8 of 8-1 Line #1 8

40 LSSIFID xhibit -40, Budget Line Item ustification: rmy Date: ay 2017 ppropriation / Budget ctivity / Budget Sub ctivity: 2033: rocurement of W&TV, rmy / B 01: Tracked ombat Vehicles / BS 10: Tracked ombat Vehicles -1 Line Item umber / Title: G80819 / rmored ulti urpose Vehicle (V) ID ode (=Service eady, B=ot Service eady): rogram lements for ode B Items: / ther elated rogram lements: Line Item D/IS ode: / esource Summary rior Years FY 2016 FY 2017 FY 2019 FY 2020 FY 2021 FY 2022 To omplete rocurement Quantity (nits in ach) ,275 2,897 Gross/Weapon System ost ($ in illions) , , Less Y dvance rocurement ($ in illions) et rocurement (-1) ($ in illions) , , lus Y dvance rocurement ($ in illions) bligation uthority ($ in illions) , , (The following esource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in illions) Flyaway nit ost ($ in Thousands) Gross/Weapon System nit ost ($ in Thousands) , , , , , , , , , Description: The rmored ulti-urpose Vehicle (V) is the materiel solution for replacement of the rmy's rmored ersonnel arrier (113) Family of Vehicles (FoV) within the rmored Brigade ombat Team (BT). It will mitigate current and future capability gaps in force protection, mobility, reliability, and interoperability across the Spectrum of onflict. The V will replace five mission roles currently performed by the 113 FoV by transferring the current 113 ission quipment ackages () to a new ilitary Vehicle Derivative (VD) platform. In total, the V FV will account for approximately 30% of the BT's tracked fleet and consists of the following five variants: 1. ission ommand (md) Vehicle: This platform enables effective mission command planning and execution for both the Tactical perations enter (T) and Tactical ommand Vehicle (T) versions of the md. It will host current Battle ommand Systems, future replacements, and upgrades of hardware and software. 2. edical Treatment (T) Vehicle: This platform will provide a protected surgical environment, with adequate lighting and accessible medical equipment. It will provide a capability for immediate medical care for one patient by a medical crew of four. 3. edical vacuation () Vehicle: This platform will conduct ambulance type activities and provide casualty evacuation for up to four litter or six ambulatory patients, with a crew of three medical attendants. 4. General urpose (G) Vehicle: This platform will operate throughout the battle space by conducting re-supply, maintenance, casualty evacuation, and other tasks within the formation. 5. ortar arrier () Vehicle: This platform will provide immediate responsive fire support to conduct fast-paced offensive operations. rmy : Secondary Distribution Secondary Distribution FY 2016 FY 2017 FY 2019 FY 2020 FY 2021 FY 2022 Quantity bligation uthority Quantity bligation uthority LI G rmored ulti urpose Vehicle (V) LSSIFID rmy age 1 of 8-1 Line #2 9

41 LSSIFID xhibit -40, Budget Line Item ustification: rmy Date: ay 2017 ppropriation / Budget ctivity / Budget Sub ctivity: 2033: rocurement of W&TV, rmy / B 01: Tracked ombat Vehicles / BS 10: Tracked ombat Vehicles -1 Line Item umber / Title: G80819 / rmored ulti urpose Vehicle (V) ID ode (=Service eady, B=ot Service eady): rogram lements for ode B Items: / ther elated rogram lements: Line Item D/IS ode: / xhibits Schedule rior Years FY 2016 FY 2017 xhibit Type Title* Subexhibits ID D D/ IS ode Quantity / ost (ach) / ($ ) Quantity / ost (ach) / ($ ) Quantity / ost (ach) / ($ ) Quantity / ost (ach) / ($ ) Quantity / ost (ach) / ($ ) Quantity / ost (ach) / ($ ) -5 G80819 / rmored ulti urpose Vehicle (V) -5a, / - - / - - / - 42 / / / Gross/Weapon System ost - / - - / - - / - 42 / / / *Title represents 1) the umber / Title for Items; 2) the umber / Title [DDI] for mmunition; and/or 3) the umber / Title (odification Type) for odifications. ote: s in this xhibit -40 set may not be exact or sum exactly due to rounding. ustification: FY2018 rocurement dollars in the amount of $ million procures 42 rmored ulti-urpose Vehicles (Vs). This represents the first year of Low ate Initial roduction (LI-1). In total, the first LI base contract covers 52 vehicles, 10 of which will be funded by esearch, Development, Test, and valuation (DT& rogram lement ) to support Full-p System Level (FSL) live fire testing. The FY2018 base procurement dollars cover the remaining 42 vehicles in LI-1. In accordance with the Full Funding olicy, the entire procurement cost of the LI-1 assets is being budgeted in the fiscal year in which long lead time items are initially procured. ccordingly, the FY2018 procurement cost covers all contractor efforts related to recurring production and production support, government efforts related to award of the LI-1 contract, and testing/training/fielding support related to the 42 LI-1 vehicles. Since the 42 LI-1 vehicles will be utilized for Initial perational Test and valuation, much of the training and fielding type efforts are covered by the aforementioned DT& rogram lement. V is a new start in. FY2018 procurement dollars in the amount of $ million supports requirement for unit equipment sets to deter potential adversaries and support uropean eassurance Initiative (I). Funding will procure 65 Vs platforms, select ission quipment ackages, associated training and fielding support, and additional oversight/testing efforts not required for the base program. In accordance with Section 1815 of the FY 2008 ational Defense uthorization ct (.L ), this item is necessary for use by the active and reserve components of the rmed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. rmy cquisition bjective (): 2,897 vehicles. LI G rmored ulti urpose Vehicle (V) LSSIFID rmy age 2 of 8-1 Line #2 10

42 LSSIFID xhibit -5, ost nalysis: rmy Date: ay 2017 ppropriation / Budget ctivity / Budget Sub ctivity: 2033 / 01 / 10-1 Line Item umber / Title: G80819 / rmored ulti urpose Vehicle (V) ID ode (=Service eady, B=ot Service eady) : D/IS ode: 471 Item umber / Title [DDI]: G80819 / rmored ulti urpose Vehicle (V) esource Summary rior Years FY 2016 FY 2017 rocurement Quantity (nits in ach) Gross/Weapon System ost ($ in illions) Less Y dvance rocurement ($ in illions) et rocurement (-1) ($ in illions) lus Y dvance rocurement ($ in illions) bligation uthority ($ in illions) (The following esource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in illions) Gross/Weapon System nit ost ($ in Thousands) , , , ote: Subtotals or s in this xhibit -5 may not be exact or sum exactly due to rounding. ost lements Flyaway ost ecurring ost Vehicle anufacturing nit ost ($ K) rior Years FY 2016 FY 2017 Qty (ach) ost ($ ) nit ost ($ K) Qty (ach) ost ($ ) nit ost ($ K) Qty (ach) - ontractor ( ) , , , ngineering hange rders Sys ng / rog gmt (Government) Sys Test & valuation (Government) ost ($ ) nit ost ($ K) Training Devices ackage Fielding (TF) Subtotal: ecurring ost on ecurring ost roduction Facilitization Subtotal: on ecurring ost Subtotal: Flyaway ost Gross/Weapon System ost , , , Qty (ach) ost ($ ) nit ost ($ K) Qty (ach) ost ($ ) nit ost ($ K) Qty (ach) ost ($ ) LI G rmored ulti urpose Vehicle (V) LSSIFID rmy age 3 of 8-1 Line #2 11

43 LSSIFID xhibit -5, ost nalysis: rmy Date: ay 2017 ppropriation / Budget ctivity / Budget Sub ctivity: 2033 / 01 / 10-1 Line Item umber / Title: G80819 / rmored ulti urpose Vehicle (V) ID ode (=Service eady, B=ot Service eady) : D/IS ode: 471 rmy : Secondary Distribution Secondary Distribution FY 2016 FY 2017 Item umber / Title [DDI]: G80819 / rmored ulti urpose Vehicle (V) Quantity bligation uthority Quantity bligation uthority ( ) indicates the presence of a -5a LI G rmored ulti urpose Vehicle (V) LSSIFID rmy age 4 of 8-1 Line #2 12

44 LSSIFID xhibit -5a, rocurement History and lanning: rmy Date: ay 2017 ppropriation / Budget ctivity / Budget Sub ctivity: 2033 / 01 / 10 ost lements Vehicle anufacturing - FY ontractor and Location -1 Line Item umber / Title: G80819 / rmored ulti urpose Vehicle (V) ethod/type or Funding Vehicle Location of ward Date Date of First Delivery Item umber / Title [DDI]: G80819 / rmored ulti urpose Vehicle (V) Qty (ach) nit ost ($ K) ontractor ( ) 2018 B / York, ption / FIF Warren, I pr 2018 ug , Vehicle anufacturing - ontractor ( ) 2018 B / York, - / FIF Warren, I pr 2018 ay , Specs vail ow? Date evision vailable F Issue Date ( ) indicates the presence of a -21 LI G rmored ulti urpose Vehicle (V) LSSIFID rmy age 5 of 8-1 Line #2 13

45 LSSIFID LI G rmored ulti urpose Vehicle (V) LSSIFID rmy age 6 of 8-1 Line #2 xhibit -21, roduction Schedule: rmy Date: ay 2017 ppropriation / Budget ctivity / Budget Sub ctivity: 2033 / 01 / 10-1 Line Item umber / Title: G80819 / rmored ulti urpose Vehicle (V) Item umber / Title [DDI]: G80819 / rmored ulti urpose Vehicle (V) ost lements (nits in ach) Fiscal Year 2018 Fiscal Year 2019 alendar Year 2018 alendar Year 2019 F # FY SVI QTY T I T 1 T 2017 BL D S F 1 T T V D F B Y L G S T V D F B Y L G S B L Vehicle anufacturing - ontractor Y Y T V D F B Y L G S T V D F B Y L G S 14

46 LSSIFID LI G rmored ulti urpose Vehicle (V) LSSIFID rmy age 7 of 8-1 Line #2 xhibit -21, roduction Schedule: rmy Date: ay 2017 ppropriation / Budget ctivity / Budget Sub ctivity: 2033 / 01 / 10-1 Line Item umber / Title: G80819 / rmored ulti urpose Vehicle (V) Item umber / Title [DDI]: G80819 / rmored ulti urpose Vehicle (V) ost lements (nits in ach) Fiscal Year 2020 Fiscal Year 2021 alendar Year 2020 alendar Year 2021 F # FY SVI QTY T I T 1 T 2019 BL D S F 1 T T V D F B Y L G S T V D F B Y L G S B L Vehicle anufacturing - ontractor Y Y T V D F B Y L G S T V D F B Y L G S 15

47 LSSIFID xhibit -21, roduction Schedule: rmy Date: ay 2017 ppropriation / Budget ctivity / Budget Sub ctivity: 2033 / 01 / 10 F ef # roduction ates (ach / onth) anufacturer ame - Location S For For 2018 X For Line Item umber / Title: G80819 / rmored ulti urpose Vehicle (V) LT rior to ct 1 LT fter ct 1 Initial anufacturing LT rocurement Leadtime (onths) fter ct 1 LT rior to ct 1 Item umber / Title [DDI]: G80819 / rmored ulti urpose Vehicle (V) LT fter ct 1 eorder anufacturing LT fter ct 1 1 B - York, B - York, "" in the Delivery Schedule indicates the ontract ward Date. ote: Due to space limitations, quantities in the xhibit -21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).if the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI G rmored ulti urpose Vehicle (V) LSSIFID rmy age 8 of 8-1 Line #2 16

48 LSSIFID xhibit -40, Budget Line Item ustification: rmy Date: ay 2017 ppropriation / Budget ctivity / Budget Sub ctivity: 2033: rocurement of W&TV, rmy / B 01: Tracked ombat Vehicles / BS 10: Tracked ombat Vehicles -1 Line Item umber / Title: G85100 / Stryker Vehicle ID ode (=Service eady, B=ot Service eady): rogram lements for ode B Items: / ther elated rogram lements: Line Item D/IS ode: / esource Summary rior Years FY 2016 FY 2017 FY 2019 FY 2020 FY 2021 FY 2022 To omplete rocurement Quantity (nits in ach) Gross/Weapon System ost ($ in illions) 14, , Less Y dvance rocurement ($ in illions) et rocurement (-1) ($ in illions) 14, , lus Y dvance rocurement ($ in illions) bligation uthority ($ in illions) 14, , (The following esource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in illions) Flyaway nit ost ($ in Thousands) Gross/Weapon System nit ost ($ in Thousands) Description: dynamic asymmetric threat and operational environment demands full spectrum, strategically responsive, agile and dominant land forces. Immediate response by a lethal, versatile, tactically agile joint force capable of operational maneuver is essential to fulfilling the rmy's Warfighting needs. The Stryker-equipped Brigade ombat Team (BT) is this force. The use of a common platform/common chassis design reduces requirements for repair parts and logistics support in the area of operations. The Stryker Brigade ombat Team (SBT), equipped with Stryker Vehicles, can be used across the full spectrum of military operations. The SBT deploys rapidly and conducts effective combat operations immediately on arrival to prevent, contain, stabilize, or resolve a conflict through shaping and decisive operations. onfigurations of Stryker Vehicles are: Infantry arrier: The Infantry arrier Vehicle (IV) carries an infantry squad with individual equipment. The IV also provides protected transport and supporting fires for the infantry squad during dismounted assault. econnaissance Vehicle: The econnaissance Vehicle (V) provides force situational awareness, gathering and transmitting real time intelligence while moving throughout the battlefield in close, complex, and urban terrain. obile Gun System: The obile Gun System (GS) supports dismounted infantry and engages the enemy in close combat in order to clear opposition and permit rapid movement, allowing the force to maintain the initiative, occupy and/or secure key objectives, and defeat strong points. ortar arrier: The ortar arrier () supports infantry units with screening obscurants, suppressive forces and on-call supporting fires. 120mm, 81mm, and 60mm mortars provide complementary capabilities with responsive, accurate and lethal indirect fire support to the dismounted infantry assault. ommander's Vehicle: The ommander's Vehicle (V) provides the brigade commanders and infantry battalion commanders with the means to receive data, analyze, prepare and transmit data, and control the forces/functions carrying out combat missions. Fire Support Vehicle: The Fire Support Vehicle (FSV) provides automated enhanced surveillance, target acquisition, target identification, target tracking, target designation, position location, and communications functionality. Targets will be transmitted instantly to the fire support system and shooter. ngineer Squad Vehicle: The ngineer Squad Vehicle (SV) provides maneuver/mobility support capabilities which include obstacle clearing, in-stride breaching of surface mines, proofing of subsurface mines, and smoke generation for local protection. edical vacuation Vehicle: The edical vacuation Vehicle (V) is the Battalion id Station for brigade units, providing treatment for serious injury and advanced trauma cases. ntitank Guided issile Vehicle: The ntitank Guided issile Vehicle (TG) is the brigade's primary tank killing system. The TG reinforces the brigade's infantry battalion, reinforces the brigade reconnaissance squadron, and provides long-range direct fire. uclear, Biological, hemical econnaissance Vehicle: The uclear, Biological, hemical econnaissance Vehicle (BV) provides on the move and remote near-real-time nuclear, biological and chemical detection and surveillance to supply battlefield visualization of B hazards. LI G Stryker Vehicle LSSIFID rmy age 1 of 2-1 Line #3 17

49 LSSIFID xhibit -40, Budget Line Item ustification: rmy Date: ay 2017 ppropriation / Budget ctivity / Budget Sub ctivity: 2033: rocurement of W&TV, rmy / B 01: Tracked ombat Vehicles / BS 10: Tracked ombat Vehicles -1 Line Item umber / Title: G85100 / Stryker Vehicle ID ode (=Service eady, B=ot Service eady): rogram lements for ode B Items: / ther elated rogram lements: Line Item D/IS ode: / rmy : Secondary Distribution Secondary Distribution FY 2016 FY 2017 FY 2019 FY 2020 FY 2021 FY 2022 Quantity bligation uthority Quantity bligation uthority ustification: procurement dollars are in the amount of $.000 millions. DVH exchange vehicles procured in FY 2016 and prior did not increase the Stryker Family of Vehicles rmy cquisition bjective () of 3,788. In accordance with Section 1815 of the FY 2008 ational Defense uthorization ct (.L ), this item is necessary for use by the active and reserve components of the rmed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI G Stryker Vehicle LSSIFID rmy age 2 of 2-1 Line #3 18

50 LSSIFID xhibit -40, Budget Line Item ustification: rmy Date: ay 2017 ppropriation / Budget ctivity / Budget Sub ctivity: 2033: rocurement of W&TV, rmy / B 01: Tracked ombat Vehicles / BS 20: odification of Tracked ombat Vehicles -1 Line Item umber / Title: G0100 / Stryker (od) ID ode (=Service eady, B=ot Service eady): rogram lements for ode B Items: / ther elated rogram lements: Line Item D/IS ode: / esource Summary rior Years FY 2016 FY 2017 FY 2019 FY 2020 FY 2021 FY 2022 To omplete rocurement Quantity (nits in ach) Gross/Weapon System ost ($ in illions) ontinuing ontinuing Less Y dvance rocurement ($ in illions) et rocurement (-1) ($ in illions) ontinuing ontinuing lus Y dvance rocurement ($ in illions) bligation uthority ($ in illions) ontinuing ontinuing (The following esource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in illions) Flyaway nit ost ($ in Thousands) Gross/Weapon System nit ost ($ in Thousands) Description: odifications to the Stryker Family of Vehicles (FV) to resolve reliability, lethality, safety, operational, performance degradation, and chemical detection and ommand, ontrol, ommunications, omputers, Intelligence, Surveillance, and econnaissance (4IS) obsolescence issues. rimary efforts involve the incorporation of a 30mm-equipped weapon system onto the Stryker Infantry arrier Vehicle (IV), application of ngineering hange roposal 1 ( 1) engine, alternator, suspension, and in-vehicle network upgrades into the Stryker Double V Hull (DVH) fleet, and the retrofit of 2 lethality upgrades to enhance the suppressive fire and armored vehicle engagement capabilities of the rmy's Stryker Brigade ombat Teams (SBTs). LI G Stryker (od) LSSIFID rmy age 1 of 20-1 Line #4 19

51 LSSIFID xhibit -40, Budget Line Item ustification: rmy Date: ay 2017 ppropriation / Budget ctivity / Budget Sub ctivity: 2033: rocurement of W&TV, rmy / B 01: Tracked ombat Vehicles / BS 20: odification of Tracked ombat Vehicles -1 Line Item umber / Title: G0100 / Stryker (od) ID ode (=Service eady, B=ot Service eady): rogram lements for ode B Items: / ther elated rogram lements: Line Item D/IS ode: / xhibits Schedule rior Years FY 2016 FY 2017 xhibit Type Title* Subexhibits ID D D/ IS ode Quantity / ost (ach) / ($ ) Quantity / ost (ach) / ($ ) Quantity / ost (ach) / ($ ) Quantity / ost (ach) / ($ ) Quantity / ost (ach) / ($ ) Quantity / ost (ach) / ($ ) -3a G0100 / STYK DIFITI (Increase erformance) - / / / / / - - / Gross/Weapon System ost - / / / / / - - / xhibits Schedule FY 2019 FY 2020 FY 2021 FY 2022 To omplete xhibit Type Title* Subexhibits ID D D/ IS ode Quantity / ost (ach) / ($ ) Quantity / ost (ach) / ($ ) Quantity / ost (ach) / ($ ) Quantity / ost (ach) / ($ ) Quantity / ost (ach) / ($ ) Quantity / ost (ach) / ($ ) -3a G0100 / STYK DIFITI (Increase erformance) - / - - / - - / - - / - - / - - / Gross/Weapon System ost - / / / / ontinuing ontinuing *Title represents 1) the umber / Title for Items; 2) the umber / Title [DDI] for mmunition; and/or 3) the umber / Title (odification Type) for odifications. ote: s in this xhibit -40 set may not be exact or sum exactly due to rounding. ustification: procurement dollars in the amount $ million supports the application of multiple fleet-wide modifications to address Stryker chemical detection and ommand, ontrol, ommunications, omputers, Intelligence (4I) obsolescence; resolves reliability, capability and performance degradation, safety, and operational-related issues; provides for maintenance of the Stryker test fleet to ensure test assets are positioned to provide accurate, verifiable test results; continues retrofit planning and site management efforts to ensure procured modification kits are applied in an efficient and effective fashion; designs, modifies, and procures Stryker Training ids, Devices, Simulators, and Simulations (TDSS) to ensure Stryker soldiers train with equipment that reflects the configuration and behavior of the current fielded vehicles; and provides for the fielding of a 30mm weapon system to address a arch 2015 nited States rmy urope (S) rgent perational eeds Statement (S), and other activities supporting 2 Lethality across the Stryker Family of Vehicles. Support the ctive rmy. In accordance with Section 1815 of the FY2008 ational Defense uthorization ct (.L ), this item is necessary for use by the active and reserve components of the rmed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI G Stryker (od) LSSIFID rmy age 2 of 20-1 Line #4 20

52 LSSIFID xhibit -3a, Individual odification: rmy Date: ay 2017 ppropriation / Budget ctivity / Budget Sub ctivity: 2033 / 01 / 20 ID ode (=Service eady, B=ot Service eady) : esource Summary rior Years FY 2016 FY Line Item umber / Title: G0100 / Stryker (od) D/IS ode: FY 2019 FY 2020 FY 2021 FY 2022 odification umber / Title: G0100 / STYK DIFITI To omplete rocurement Quantity (nits in ach) Gross/Weapon System ost ($ in illions) Less Y dvance rocurement ($ in illions) et rocurement (-1) ($ in illions) lus Y dvance rocurement ($ in illions) bligation uthority ($ in illions) (The following esource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in illions) Gross/Weapon System nit ost ($ in Thousands) Description: odifications are needed to address safety and operational-related, and chassis, chemical detection, and ommand, ontrol, ommunications, omputer, and Intelligence (4I) obsolescence issues within the Stryker fleet. odifications to the Stryker Family of Vehicles (FoV) are also required to address mid and long-term deficiencies needed to achieve obile Gun System (GS) Full ateriel elease (F) and increase direct and suppressive firepower of nited States rmy urope (S) assets to satisfy an urgent operational need. dditionally, to ensure Stryker soldiers continue to receive maintenance training consistent with rmy prescribed Stryker training programs, the procurement of system-specific training devices is required to support the emerging 91S Stryker Vehicle aintainer training course. obile Gun System (GS) Full ateriel elease (F): The GS variant has been granted onditional ateriel elease () and efforts to correct deficiencies required to obtain F are ongoing. odifications to correct GS deficiencies include: ain Gun improvements (Turret system lectronic nit (TS)-13 and coax low ammo chute), generation II air conditioning system, Stryker eactive rmor Tiles II (ST II) rear door improvement, commanders display with shock mounts and color situational awareness, xtended Low ate Initial roduction (LI) lectronic Handle lectronic Trigger (HT), hydraulic circuit check valve, engine cold start warm-up circuit, carousel improvement, rammer improvement, and open protected hatches. Installation of hardware is conducted by field modification teams, subject to vehicle/hardware availability. Fleet odifications: Fleet modifications address changes to the vehicle configurations resulting from identified safety issues, performance degradation issues, obsolescence issues, odified Table of rganization & quipment (T&) changes, or perational eed Statements (S). lanned modifications include: oint hemical gent Detector (D), V-103 for the ommander's Vehicle (V) variant, nergy ttenuating seats for Flat Bottom Hull (FBH) vehicles, ortar arrier Fire ontrol omputer, S6-L 2 ecuperator gauge, Improved Battery Box, troop heater improvements, Short ange ir Defense, and refresh of the Fire Support Vehicle (FSV) ission quipment package (). odifications will be conducted by field modification teams, subject to vehicle/hardware availability. 4I bsolescence and ext Generation Items: odifications are needed to address obsolescence issues with ommand, ontrol, ommunications, omputer, and Intelligence (4I) components of the Stryker Family of Vehicles (FoV). fforts include id-tier etworking Vehicular adio (V), enhanced Vehicular Intercom System (VI-5), Blue-Force Tracking 2 (BFT-2), Warfighter Information etwork-tactical (WI-T) re-stowage, improved embedded training, niversal Software Loader (SL), and the Stryker In-Vehicle etwork 2 (IV2). Test Fleet aintenance: aintains the Stryker test fleet, to include contractor repair labor and operation of Stryker repair parts warehouses located at the rmy's test centers (berdeen roving Grounds, Yuma roving Grounds, and lectronic roving Grounds). aintenance is required to ensure the test fleet is positioned to support testing needs and is in the appropriate condition to ensure accurate and verifiable test results. etrofit lanning and Site anagement: etrofit planning, kit material handling, and retrofit site management to support fleet-wide retrofits of the Stryker FoV. LI G Stryker (od) LSSIFID rmy age 3 of 20-1 Line #4 21

53 LSSIFID xhibit -3a, Individual odification: rmy Date: ay 2017 ppropriation / Budget ctivity / Budget Sub ctivity: 2033 / 01 / 20-1 Line Item umber / Title: G0100 / Stryker (od) odification umber / Title: G0100 / STYK DIFITI ID ode (=Service eady, B=ot Service eady) : D/IS ode: Training ids, Devices, Simulators, and Simulations (TDSS): Funding provides for the integration of the Vehicle Tactical ngagement Simulation System (V-TSS) and supports the nited States rmy ombined rms Support ommand (S) validated the requirement for the Stryker Vehicle aintainer Training ourse to support establishment of the Stryker-unique 91S ilitary ccupational Series (S). The 91S training course requires purchase of the following training devices: Diagnostic Troubleshooting Trainers (DTTs), nti-tank Guided issile Vehicle art Task Trainers (TTs), Full-p ower ack art Task Trainers (F TTs), ortar arrier art Task Trainers ( TTs) obile Gun System Hands-n Trainers (HTs) and emote Weapon Station (WS) Hands-on Trainers. ngineering hange roposal 1 ( 1): (FY 2019 Start) 1 incorporates a 910 amp alternator, in-vehicle network, 450 H engine, and upgraded suspension that will restore vehicle space, weight, and power margin lost due to the addition of numerous kits integrated during prior deployment operations, and allow for the integration of the future rmy etwork. 1 retrofit will be executed by a joint contractor and depot team in a production-like environment. ngineering hange roposal 2 ( 2): 2 will integrate a medium caliber weapon, under armor avelin fire capability, improved optics and targeting systems, and other capabilities into the Stryker fleet. These improvements will provide for increased under armor fire capability, target identification range, provide overmatch against peer threats and supporting infantry assault, and address obsolescence within the targeting and reconnaissance systems utilized on the Stryker Family of Vehicle (FoV). Double V Hull (DVH) Survivability and Safety ods: DVH survivability and safety modifications address changes to the DVH vehicle configuration driven by T& and perational eeds Statements. fforts included are Driver's Station nhancement 2 (DS2), rear ramp gap plate, and integration of Stryker eactive rmor Tiles (ST) II. odifications will be conducted by field modification teams at unit location, subject to vehicle/hardware availability. Stryker S Lethality: ddresses a lethality capability gap identified by 2nd avalry egiment (2) in a arch 2015 rgent perational eeds Statement (S). The S Lethality upgrade incorporates a 30mm weapon system onto the Flat Bottom Hull (FBH) Infantry arrier Vehicle (IV). rogram anagement Support: rogram management, engineering, and logistics support necessary to execute Stryker modifications to include Fleet odifications, 4I bsolescence and ext Generation items, DVH Survivability and Safety odifications, S Lethality, 1 (beginning FY 2019), and 2. LI G Stryker (od) LSSIFID rmy age 4 of 20-1 Line #4 22

54 LSSIFID xhibit -3a, Individual odification: rmy Date: ay 2017 ppropriation / Budget ctivity / Budget Sub ctivity: 2033 / 01 / 20 ID ode (=Service eady, B=ot Service eady) : -1 Line Item umber / Title: G0100 / Stryker (od) D/IS ode: odels of Systems ffected: VIS odification Type: Increase erformance elated DT& s: rocurement Financial lan odification Item 1 of 12: obile Gun System (GS) Full ateriel elease(f) Kits ecurring rior Years FY 2016 FY 2017 odification umber / Title: G0100 / STYK DIFITI FY 2019 FY 2020 FY 2021 FY 2022 To omplete Hardware 712 / / / / / / / - - / - - / - - / - - / - - / - Subtotal: ecurring - / / / / / / / - - / - - / - - / - - / - - / - on-ecurring Fielding 0 / / / / / / / - - / - - / - - / - - / - - / - ngineer Support 0 / / / / / / / - - / - - / - - / - - / - - / - Test 0 / / / / / / / - - / - - / - - / - - / - - / - Subtotal: on-ecurring - / / / / / / / - - / - - / - - / - - / - - / - Subtotal: obile Gun System (GS) Full ateriel elease(f) odification Item 2 of 12: Fleet odifications Kits ecurring 712 / / / / / / / - - / - - / - - / - - / - - / - Fielding 0 / / / / / / / - - / - - / - - / - - / - - / - Hardware 2,962 / / ,271 / / / / / - - / - - / - - / - - / - - / - Subtotal: ecurring - / / / / / / / - - / - - / - - / - - / - - / - on-ecurring ngineer Support 0 / / / / / / / - - / - - / - - / - - / - - / - Test 0 / / / / / / / - - / - - / - - / - - / - - / - Subtotal: on-ecurring - / / / / / / / - - / - - / - - / - - / - - / - Subtotal: Fleet odifications 2,962 / / ,271 / / / / / - - / - - / - - / - - / - - / - odification Item 3 of 12: Video Display lectronic Terminal (VDT) Kits ecurring Hardware 664 / / / / / / / - - / - - / - - / - - / - - / - Subtotal: ecurring - / / / / / / / - - / - - / - - / - - / - - / - on-ecurring ngineer Support 0 / / / / / / / - - / - - / - - / - - / - - / - LI G Stryker (od) LSSIFID rmy age 5 of 20-1 Line #4 23

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO SSIID xhibit -40, udget ine Item ustification: 2017 rmy Date: ebruary 2016 ppropriation / udget ctivity / udget Sub ctivity: 2035: ther rocurement, rmy / 03: ther Support quipment / S 50: onstruction quipment

More information

Department of Defense Fiscal Year (FY) 2013 President's Budget Submission

Department of Defense Fiscal Year (FY) 2013 President's Budget Submission LSSIFID Department of Defense Fiscal Year (FY) 2013 resident's Budget Submission February 2012 rmy ustification Book issile rocurement, rmy LSSIFID ISSIL T, Y ppropriation Language For construction, procurement,

More information

Department of Defense Fiscal Year (FY) 2019 Budget Estimates

Department of Defense Fiscal Year (FY) 2019 Budget Estimates LSSIFID Department of Defense Fiscal Year (FY) 2019 Budget stimates February 2018 rmy ustification Book of ircraft rocurement, rmy LSSIFID LSSIFID rmy Budget stimates rocurement Table of ontents Introduction

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base II xhibit -40, udget ine Item ustification: 2017 rmy ate: ebruary 2016 ppropriation / udget ctivity / udget ub ctivity: 2032: issile rocurement, rmy / 02: ther issiles / 20: ir-o-urface issile ystem -1

More information

Department of Defense Fiscal Year (FY) 2017 President's Budget Submission

Department of Defense Fiscal Year (FY) 2017 President's Budget Submission LSSIFID Department of Defense Fiscal Year (FY) 2017 resident's Budget Submission February 2016 avy ustification Book Volume 4 of 5 ther rocurement, avy B 4 LSSIFID The estimated cost for this report for

More information

Department of Defense Fiscal Year (FY) 2017 President's Budget Submission

Department of Defense Fiscal Year (FY) 2017 President's Budget Submission LSSIFID Department of Defense Fiscal Year (FY) 2017 President's Budget Submission February 2016 ir Force ustification Book Volume 1 of 1 Space Procurement, ir Force LSSIFID LSSIFID THIS PG ITTILLY LFT

More information

Committee Staff Procurement Backup Book FY 2008/2009 Budget Estimates. February 2007 MISSILE PROCUREMENT, AIR FORCE OPR: SAF/FMB

Committee Staff Procurement Backup Book FY 2008/2009 Budget Estimates. February 2007 MISSILE PROCUREMENT, AIR FORCE OPR: SAF/FMB ommittee taff rocurement Backup Book FY 2008/2009 Budget stimates February 2007 II, I F : F/FB B F FY 2008/2009 Budget stimates II, I F (3020) I 1 ~ Y I xhibit -1 issile rocurement, ir Force 3 I 2 ~ BD

More information

Committee Staff Procurement Backup Book FY 2007 Budget Estimates. February 2006 MISSILE PROCUREMENT, AIR FORCE OPR: SAF/FMB

Committee Staff Procurement Backup Book FY 2007 Budget Estimates. February 2006 MISSILE PROCUREMENT, AIR FORCE OPR: SAF/FMB ommittee taff rocurement Backup Book FY 2007 Budget stimates February 2006 II, I F : F/FB IFID B F FY 2007 Budget stimates II, I F (3020) I 1 ~ Y I xhibit -1 issile rocurement, ir Force 3 I 2 ~ BD DIX

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 6 P-1 Line #1

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 6 P-1 Line #1 UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB 2017 ir Force Date: February 2016 ppropriation / Budget ctivity / Budget Sub ctivity: 3080F: Other Procurement, ir Force / B 02: Vehicular Equipment

More information

Committee Staff Procurement Backup Book FY 2005 Budget Estimates. February 2004 AIRCRAFT PROCUREMENT, AIR FORCE VOLUME I OPR: SAF/FMB

Committee Staff Procurement Backup Book FY 2005 Budget Estimates. February 2004 AIRCRAFT PROCUREMENT, AIR FORCE VOLUME I OPR: SAF/FMB ommittee taff rocurement Backup Book FY 2005 Budget stimates February 2004 IF, I F I : F/FB IFID olume 1 B F FY 2005 Budget stimates IF, I F (3010) I 1 ~ II................................... 3 I 2 ~

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB 2017 ir Force Date: February 2016 ppropriation / Budget ctivity / Budget Sub ctivity: 3080F: Other Procurement, ir Force / B 02: Vehicular Equipment

More information

Committee Staff Procurement Backup Book FY 2001 Amended Budget Request. February 2000 AIRCRAFT PROCUREMENT, AIR FORCE VOLUME I OPR: SAF/FMB

Committee Staff Procurement Backup Book FY 2001 Amended Budget Request. February 2000 AIRCRAFT PROCUREMENT, AIR FORCE VOLUME I OPR: SAF/FMB ommittee taff rocurement Backup Book FY 2001 mended Budget equest February 2000 IF, I F VL I : F/FB LIFID Volume 1 BL F FY2001 mended Budget equest IF, I F (3010) I 1 ~ II LGG...................................

More information

O UNIT 6. Risk Management Response. Risk Management, Response, and Recovery for IT Systems

O UNIT 6. Risk Management Response. Risk Management, Response, and Recovery for IT Systems 6 isk anagement esponse isk anagement, esponse, and ecovery for ystems opics for this nit Quantitative and qualitative risk assessment approaches Business impact analysis (B) Business continuity plan (BP)

More information

DEPARTMENT OF THE ARMY

DEPARTMENT OF THE ARMY DEPARTMENT OF THE ARMY Procurement Programs Committee Staff Procurement Backup Book FY 2003 Budget Submission PROCUREMENT OF AMMUNITION, ARMY February 2002 APPROPRIATION PROCUREMENT OF AMMUNITION, ARMY

More information

General Dynamics Reports Fourth-Quarter, Full-Year 2018 Results

General Dynamics Reports Fourth-Quarter, Full-Year 2018 Results 2941 Fairview Park Drive, Suite 100 Falls Church, VA 22042-4513 www.generaldynamics.com News Contact: Jeff A. Davis Tel: 703 876 3483 press@generaldynamics.com January 30, 2019 General Dynamics Reports

More information

Principals, Business Managers and Special Education Staff. Purchasing Equipment, Supplies, and Contracted Services for Students with Disabilities

Principals, Business Managers and Special Education Staff. Purchasing Equipment, Supplies, and Contracted Services for Students with Disabilities o: From: e: rincipals, Business anagers and pecial ducation taff Kim Gibbons urchasing quipment, upplies, and ontracted ervices for tudents with isabilities ate: eptember 2014 B 9 he following administrative

More information

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 977 Date: October 27, 2011

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 977 Date: October 27, 2011 anual ystem Pub 100-20 One-Time Notification Department of ealth & uman ervices (D) enters for edicare & edicaid ervices () Transmittal 977 Date: October 27, 2011 hange equest 7601 UBJT: nhancements to

More information

SECTION 7 WARRANTY REQUIREMENTS

SECTION 7 WARRANTY REQUIREMENTS SECTION 7 WARRANTY REQUIREMENTS Initial Issue SECTION 7: WARRANTY REQUIREMENTS... 1 WR 1. Warranty Provisions... 1 WR 1.1 Basic Provisions... 1 WR 1.1.1 Warranty Requirements...1 WR 1.1.1.1 Contractor

More information

Annual Report 2009 GENERAL DYNAMICS

Annual Report 2009 GENERAL DYNAMICS Annual Report 2009 GENERAL DYNAMICS Contents 1 2009 Financial Highlights 3 Letter to Shareholders 8 Company Overview 10 Aerospace 12 Combat Systems 14 Marine Systems 16 Information Systems and Technology

More information

L-3 Announces Second Quarter 2013 Results

L-3 Announces Second Quarter 2013 Results Contact: L-3 Communications Holdings, Inc. Corporate Communications 212-697-1111 For Immediate Release L-3 Announces Second Quarter Results Diluted earnings per share of $2.03 Net sales increased 2% to

More information

GENERAL DYNAMICS CORPORATION (Exact Name of Registrant as Specified in Its Charter)

GENERAL DYNAMICS CORPORATION (Exact Name of Registrant as Specified in Its Charter) UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 Form 8-K CURRENT REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 Date of Report (Date of earliest event

More information

SUBPART ACQUISITION PLANS (Revised February 24, 2010)

SUBPART ACQUISITION PLANS (Revised February 24, 2010) SUBPART 207.1--ACQUISITION PLANS (Revised February 24, 2010) 207.102 Policy. (a)(1) See 212.102 regarding requirements for a written determination that the commercial item definition has been met when

More information

Joint Small Arms Capability Assessment Analytical Procedure

Joint Small Arms Capability Assessment Analytical Procedure Joint Small rms Capability ssessment nalytical Procedure 2006 National Defense Industrial ssociation s Joint Services Small rms Systems nnual Symposium John Edwards ay 16, 2006 Presentation Outline 1.

More information

Baird s 2018 Global Industrial Conference

Baird s 2018 Global Industrial Conference Baird s 2018 Global Industrial Conference NOVEMBER 6, 2018 Wilson Jones President and CEO Dave Sagehorn Executive Vice President & CFO Pat Davidson Sr. Vice President, Investor Relations (NYSE: OSK) Forward-Looking

More information

P roficy* M aintenance G ateway

P roficy* M aintenance G ateway P roficy* M aintenance G ateway Implementing an agile maintenance solution. B arry Lynch G lobal Product Manag er G E Fanuc Intellig ent Platforms Dr Ananth S es han C EO Automatika LTD. How do you.? Introduce

More information

Department of Defense Fiscal Year (FY) 2013 President's Budget Submission

Department of Defense Fiscal Year (FY) 2013 President's Budget Submission Department of Defense Fiscal Year (FY) 2013 President's Budget Submission February 2012 Department of Defense Education Activity Justification Book Procurement, Defense-Wide UNCLASSIFIED THIS PAGE INTENTIONALLY

More information

Streamline and integrate your claims processing

Streamline and integrate your claims processing Increase flexibility Reduce costs Expedite claims Streamline and integrate your claims processing DXC Insurance RISKMASTERTM For corporate claims and self-insured organizations DXC Insurance RISKMASTER

More information

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 876 Date: April 22, 2011

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 876 Date: April 22, 2011 anual ystem Pub 100-20 One-Time Notification epartment of ealth & uman ervices () enters for edicare & edicaid ervices () Transmittal 876 ate: pril 22, 2011 hange equest 7347 UBJT: Upgrade of Optical haracter

More information

GENERAL DYNAMICS CORPORATION (Exact Name of Registrant as Specified in Its Charter)

GENERAL DYNAMICS CORPORATION (Exact Name of Registrant as Specified in Its Charter) UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 Form 8-K CURRENT REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 Date of Report (Date of earliest event

More information

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 296 Date: OCTOBER 19, 2007

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 296 Date: OCTOBER 19, 2007 anual ystem Pub 100-20 One-Time Notification epartment of ealth & uman ervices () enters for edicare & edicaid ervices () Transmittal 296 ate: OTO 19, 2007 hange equest 5651 ubject: New Numbers for ll

More information

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 81 Date: FEBRUARY 7, 2008

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 81 Date: FEBRUARY 7, 2008 anual ystem Pub 100-02 edicare Benefit Policy Department of Health & Human ervices (DHH) enters for edicare & edicaid ervices () Transmittal 81 Date: BUY 7, 2008 hange equest 5870 ubject: Process for mending

More information

Finally, the Department determined that modernizing 47 C-5B aircraft and 2 C-5C aircraft best meets the essentiality criteria set forth by the JROC.

Finally, the Department determined that modernizing 47 C-5B aircraft and 2 C-5C aircraft best meets the essentiality criteria set forth by the JROC. "Such acquisition program is essential to the national security" The Joint Requirements Oversight Council (JROC) 1 conducted an assessment of the C-5 Reliability Enhancement and Re-engining Program (RERP)

More information

The Underfunded Pentagon

The Underfunded Pentagon march / april 2oo7 The Underfunded Pentagon Martin Feldstein Volume 86 Number 2 The contents of Foreign Affairs are copyrighted. 2007 Council on Foreign Relations, Inc. All rights reserved. Reproduction

More information

(Revised October 21, 2016) PROTECTION AGAINST COMPROMISING EMANATIONS (JUN 2004)

(Revised October 21, 2016) PROTECTION AGAINST COMPROMISING EMANATIONS (JUN 2004) (Revised October 21, 2016) 252.239-7000 Protection Against Compromising Emanations. As prescribed in 239.7103(a), use the following clause: PROTECTION AGAINST COMPROMISING EMANATIONS (JUN 2004) (a) The

More information

L-3 Announces Fourth Quarter 2013 Results

L-3 Announces Fourth Quarter 2013 Results Contact: L-3 Communications Holdings, Inc. Corporate Communications 212-697-1111 For Immediate Release L-3 Announces Fourth Quarter 2013 Results Diluted earnings per share from continuing operations of

More information

ROOF CONTRACTORS LIABILITY QUESTIONNAIRE

ROOF CONTRACTORS LIABILITY QUESTIONNAIRE ROOF ONTRATORS LIABILITY QUESTIONNAIRE INSTRUTIONS A. Please answer all the questions and return to Fenn & Fenn Insurance Practice Inc at the address under D below. If you have questions please contact

More information

Annual Report 2007 GENERAL DYNAMICS

Annual Report 2007 GENERAL DYNAMICS GENERAL DYNAMICSDGD Annual Report 2007 GENERAL DYNAMICS GD07 Annual Report 2007 GD D Contents 1 3 6 8 10 12 14 inside back cover inside back cover 2007 Financial Highlights Letter to Shareholders Company

More information

LOGISTICS ASSISTANCE REPRESENTATIVES

LOGISTICS ASSISTANCE REPRESENTATIVES CECOM Directorate of Safety Risk Management Risk Management CECOM LOGISTICS ASSISTANCE REPRESENTATIVES Training Risk Management Why Safety? Battle and Non-battle Casualties Army W.W.II Korea Vietnam DS/S

More information

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 883 Date: April 22, 2011

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 883 Date: April 22, 2011 anual ystem Pub 100-20 One-Time Notification Department of ealth & uman ervices (D) enters for edicare & edicaid ervices () Transmittal 883 Date: pril 22, 2011 hange equest 7327 UBJT: T Overpayment Data

More information

"Manufacturing and Cold Test" Contract (MFR) Questions / Answers

Manufacturing and Cold Test Contract (MFR) Questions / Answers Questions from companies Should potential tenderers (s) responses to all for ender be fully compliant but with a list of issues raised, or can exclusions or nonconformities be raised in the response? Will

More information

Report Price: US$ 1250 (Single User) Future of the Kenyan Defense Industry Market Attractiveness, Competitive Landscape and Forecasts to 2020

Report Price: US$ 1250 (Single User) Future of the Kenyan Defense Industry Market Attractiveness, Competitive Landscape and Forecasts to 2020 Report Price: US$ 1250 (Single User) Future of the Kenyan Defense Industry Market Attractiveness, Competitive Landscape and Forecasts to 2020 Summary Future of the Kenyan Defense Industry Market Attractiveness,

More information

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 2769 Date: August 16, 2013

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 2769 Date: August 16, 2013 S anual System Pub 100-04 edicare laims Processing Department of ealth & uman Services (DS) enters for edicare & edicaid Services (S) Transmittal 2769 Date: ugust 16, 2013 hange equest 8326 SUBJT: npatient

More information

Town of Sellersburg EMPLOYMENT APPLICATION. Applicant Name

Town of Sellersburg EMPLOYMENT APPLICATION. Applicant Name wn of ellersburg Y II pplicant ame he wn of ellersburg considers applicants for all positions without regards to race, color, religion, sex, national origin, age, marital or veteran status, the presence

More information

EMERGENCY MANAGEMENT: CONCEPTUAL FRAMEWORK (Industrial Emergency Preparedness)

EMERGENCY MANAGEMENT: CONCEPTUAL FRAMEWORK (Industrial Emergency Preparedness) EMERGENCY MANAGEMENT: CONCEPTUAL FRAMEWORK (Industrial Emergency Preparedness) Dr.D.P.Tripathy, Professor & Head, Dept. of Mining Engg., NIT, Rourkela-769008. Emergency management Emergency management

More information

Dear Fellow Shareholder:

Dear Fellow Shareholder: Annual Report 2013 Dear Fellow Shareholder: At the beginning of 2013, your leadership team committed to improving operating performance and engaging in wise capital deployment. We delivered on our promise

More information

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 896 Date: May 6, 2011

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 896 Date: May 6, 2011 anual ystem Pub 100-20 One-Time Notification epartment of ealth & uman ervices () enters for edicare & edicaid ervices () Transmittal 896 ate: ay 6, 2011 hange equest 7389 UBJT: urable edical quipment

More information

Future of the Qatari Defense Industry Market Attractiveness, Competitive Landscape and Forecasts to 2020

Future of the Qatari Defense Industry Market Attractiveness, Competitive Landscape and Forecasts to 2020 Future of the Qatari Defense Industry Market Attractiveness, Competitive Landscape and Forecasts to 2020 Future of the Qatari Defense Industry Market Attractiveness, Competitive Landscape and Forecasts

More information

ry.i, m ftl " my a mn m ir, a aa n ai aa vt w11 tda -; 'J' Uv_^ A. mmrw Mayor

ry.i, m ftl  my a mn m ir, a aa n ai aa vt w11 tda -; 'J' Uv_^ A. mmrw Mayor ft ry.i, m fe>" li II I m ftl " ill fej a ir, a aa n my a mn m ai aa s vt w11 \*% 'J' tda -; is. fa! P mm IIP Ml Uv_^ A. mmrw Eric Garcetti Mayor Honorable Members of the City Council do City Clerk Room

More information

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 2836 Date: December 13.

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 2836 Date: December 13. anual ystem Pub 100-04 edicare laims Processing Department of ealth & uman ervices (D) enters for edicare & edicaid ervices () Transmittal 2836 Date: December 13. 2013 hange equest 8531 UBJT: Y 2014 Update

More information

ALLFINANZ Digital New Business & Underwriting

ALLFINANZ Digital New Business & Underwriting Digital New Business & Underwriting Transform underwriting into a sales enabler and profit driver Life Group Health Disability www.munichre.com/automation-solutions Digital New Business and Underwriting

More information

Future of the Kazakh Defense Industry Market Attractiveness, Competitive Landscape and Forecasts to 2018

Future of the Kazakh Defense Industry Market Attractiveness, Competitive Landscape and Forecasts to 2018 Future of the Kazakh Defense Industry Market Attractiveness, Competitive Landscape and Forecasts to 2018 TABLE OF CONTENTS 1. Introduction... 9 1.1. What is this Report About?... 9 1.2. Definitions...

More information

Oshkosh Corporation. Investor Presentation

Oshkosh Corporation. Investor Presentation Oshkosh Corporation Investor Presentation MARCH 2018 Forward-Looking Statements This presentation contains statements that the Company believes to be forward-looking statements within the meaning of the

More information

DOWNLOAD PDF IMPROVEMENTS NEEDED IN ARMY SUPPLY MANAGEMENT AND STOCK FUND ACTIVITIES IN KOREA

DOWNLOAD PDF IMPROVEMENTS NEEDED IN ARMY SUPPLY MANAGEMENT AND STOCK FUND ACTIVITIES IN KOREA Chapter 1 : Anticipatory Logistics: The Army's Answer to Supply Chain Management Improvements Needed In Army Supply Management And Stock Fund Activities In Korea B Published: Jun 30, Publicly Released:

More information

Bill Pay User Terms and Agreements

Bill Pay User Terms and Agreements Bill Pay User Terms and Agreements First Community Bank hereby publishes the following terms and conditions for User's use of bill payment services via telephone, personal computer or any other device

More information

GENERAL DYNAMICS CORPORATION (Exact Name of Registrant as Specified in Its Charter)

GENERAL DYNAMICS CORPORATION (Exact Name of Registrant as Specified in Its Charter) UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 Form 8-K CURRENT REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 Date of Report (Date of earliest event

More information

DISASTER MANAGEMENT. The Complete Package

DISASTER MANAGEMENT. The Complete Package DISASTER MANAGEMENT The Complete Package Introduction Vince Yeager Darden Restaurants FM 30yr US Naval Officer Participated and led numerous disaster response and recovery operations around the world.

More information

IBM Agreement for Services Acquired from an IBM Business Partner

IBM Agreement for Services Acquired from an IBM Business Partner IBM Agreement for Services Acquired from an IBM Business Partner This IBM Agreement for Services Acquired from an IBM Business Partner ( Agreement ) governs IBM s delivery of certain IBM Services and Product

More information

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C FORM 10-K

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C FORM 10-K UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM 10-K (Mark One) [X] ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 For the fiscal year

More information

L-3 Announces First Quarter 2014 Results

L-3 Announces First Quarter 2014 Results Contact: L-3 Communications Holdings, Inc. Corporate Communications 212-697-1111 For Immediate Release L-3 Announces First Quarter Results Diluted earnings per share of $2.01 Net sales of $3.0 billion

More information

UNDERWRITING GUIDELINES FOR TECHNOLOGY MANUFACTURERS SEGMENT

UNDERWRITING GUIDELINES FOR TECHNOLOGY MANUFACTURERS SEGMENT UNDERWRITING GUIDELINES FOR TECHNOLOGY MANUFACTURERS SEGMENT Local exceptions to these underwriting guidelines may apply. Please consult with your underwriter or sales executive for details and to discuss

More information

compatible with the Global Roaming Service. Terms of Use of FUSION GOL Services (Terms and Conditions for End-Users) Fusion Communications Corp.

compatible with the Global Roaming Service. Terms of Use of FUSION GOL Services (Terms and Conditions for End-Users) Fusion Communications Corp. Terms of Use of FUSION GOL Services (Terms and Conditions for End-Users) Fusion Communications Corp. The English version of this document (and all FUSION GOL Policies) is provided solely for the convenience

More information

SOFTWARE LICENSE AND SERVICES AGREEMENT

SOFTWARE LICENSE AND SERVICES AGREEMENT SOFTWARE LICENSE AND SERVICES AGREEMENT ACCEPTANCE OF TERMS By clicking AGREE, Customer agrees to license the Field Collection System software ( FCS Software ) and to purchase the FCS Software maintenance

More information

MOVING THE WORLD AT WORK

MOVING THE WORLD AT WORK MOVING THE WORLD AT WORK Oshkosh Corporation (NYSE:OSK) Third Quarter Fiscal 2018 Wilson R. Jones President and Chief Executive Officer David M. Sagehorn Executive Vice President and Chief Financial Officer

More information

Business Interruption Coverage for Vehicles and Mobile Equipment

Business Interruption Coverage for Vehicles and Mobile Equipment Business Interruption Coverage for Vehicles and Mobile Equipment Loss Exposures Covered Business income (BI) Extra expense (EE) Extended business income (EBI) Basic Requirements for Coverage to Apply Loss

More information

City Commission Agenda Cover Memorandum

City Commission Agenda Cover Memorandum City Commission Agenda Cover Memorandum Originating Department: Finance (FIN) Meeting Type: Regular Agenda Date: 08/01/2016 Advertised: Required?: Yes No ACM#: 20967 Subject: Resolution No. 251-16(F) amending

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Financial Management Information Systems (FMIS)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Financial Management Information Systems (FMIS) Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 53.972 49.816 101.317-101.317 98.673

More information

MOVING THE WORLD AT WORK

MOVING THE WORLD AT WORK MOVING THE WORLD AT WORK Oshkosh Corporation (NYSE:OSK) Second Quarter Fiscal 2018 Wilson R. Jones President and Chief Executive Officer David M. Sagehorn Executive Vice President and Chief Financial Officer

More information

Maintenance Service Agreement

Maintenance Service Agreement ServicePac Maintenance Service Agreement NOTICE: PLEASE CAREFULLY READ THE FOLLOWING TERMS UNDER WHICH INTERNATIONAL BUSINESS MACHINES CORPORATION ( IBM ) WILL PROVIDE THIS SERVICE TO YOU. IBM WILL PROVIDE

More information

Develop Project Management Plan

Develop Project Management Plan H PBK GUD - 47 P, PU, n & UPU Process Group Knowledge rea G Develop Project harter (24) Develop Project anagement Plan XU (8) Direct & anage Project Work & (11) onitor & ontrol Project Work Perform ntegrated

More information

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 1021 Date: January 26, 2012

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 1021 Date: January 26, 2012 anual ystem Pub 100-20 One-Time Notification Department of ealth & uman ervices (D) enters for edicare & edicaid ervices () Transmittal 1021 Date: January 26, 2012 hange equest 7604 Transmittal 1002, dated

More information

U NITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C Delaware Stateorotherjurisdictionofincorporationor

U NITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C Delaware Stateorotherjurisdictionofincorporationor U NITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM 10-K (Mark One) [X] ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 For the fiscal year

More information

PHOTO DIODE NR6800 Series

PHOTO DIODE NR6800 Series PHOTO DIODE NR6800 Series 80 m InGaAs AVALANCHE PHOTO DIODE FOR OTDR APPLICATIONS DESCRIPTION The NR6800 Series is an InGaAs avalanche photo diode, and can be used in OTDR systems. FEATURES Small dark

More information

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 1008 Date: December 23, 2011

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 1008 Date: December 23, 2011 anual ystem Pub 100-20 One-Time Notification epartment of ealth & uman ervices () enters for edicare & edicaid ervices () Transmittal 1008 ate: ecember 23, 2011 hange equest 7498 NOT: Transmittal 1007,

More information

Surface Navy Association Symposium January 16, 2019

Surface Navy Association Symposium January 16, 2019 PMS 385 Strategic and Theater Sealift Program Office Surface Navy Association Symposium January 16, 2019 CAPT Scot Searles, USN Program Manager DISTRIBUTION STATEMENT A: Approved for Public Release; Distribution

More information

Annual Shareholder Meeting. May 6, 2009

Annual Shareholder Meeting. May 6, 2009 Annual Shareholder Meeting May 6, 2009 Safe Harbor Statement This presentation contains forward-looking statements that involve risks and uncertainties. Forward-looking statements in this document and

More information

INFORMATION SUPPORT FOR EFFECTIVE RESOURCE MANAGEMENT

INFORMATION SUPPORT FOR EFFECTIVE RESOURCE MANAGEMENT I&S INFORMATION SUPPORT FOR EFFECTIVE RESOURCE MANAGEMENT Dobromir TOTEV and Bisserka BOUDINOVA Background Bulgaria started a radical defense reform aimed at adapting the role of the military factor in

More information

MOVING THE WORLD AT WORK

MOVING THE WORLD AT WORK MOVING THE WORLD AT WORK Oshkosh Corporation (NYSE:OSK) Fourth Quarter Fiscal 2018 Wilson R. Jones President and Chief Executive Officer David M. Sagehorn Executive Vice President and Chief Financial Officer

More information

S Pandemic and All-Hazards Preparedness and Advancing Innovation Act of 2018

S Pandemic and All-Hazards Preparedness and Advancing Innovation Act of 2018 CONGRESSIONAL BUDGET OFFICE COST ESTIMATE August 3, 2018 S. 2852 Pandemic and All-Hazards Preparedness and Advancing Innovation Act of 2018 As reported by the Senate Committee on Health, Education, Labor,

More information

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 1237 Date: May 17, 2013

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 1237 Date: May 17, 2013 anual ystem Pub 100-20 One-Time Notification epartment of ealth & uman ervices () enters for edicare & edicaid ervices () Transmittal 1237 ate: ay 17, 2013 hange equest 8310 UBJT: nalysis and esign of

More information

REALIZE DIGITAL EVOLUTION WI TH SAP SOLUTIONS

REALIZE DIGITAL EVOLUTION WI TH SAP SOLUTIONS REALIZE DIGITAL EVOLUTION WI TH SAP SOLUTIONS A n S A P i s t h e h e a r t o f an e nte rpris e, w ith al l bus ine ss fu n c ti o n s r e l y i ng h e av i l y on th e e ffe ctive impl em e ntati o n

More information

Client Risk Solutions Going beyond insurance. Risk solutions for Real Estate. Start

Client Risk Solutions Going beyond insurance. Risk solutions for Real Estate. Start Client Risk Solutions Going beyond insurance Risk solutions for Real Estate Start Partnering to Reduce Risk Real estate owners, operators, managers and developers act vigorously to maintain profitability

More information

If the claims are not submitted within the above timeframes, payment may be withheld in accordance with CMS guidelines.

If the claims are not submitted within the above timeframes, payment may be withheld in accordance with CMS guidelines. Dear Physicians and Practitioners, Per LN article 6960 titled ystems hanges Necessary to mplement the Patient Protection and ffordable are ct (PP) ection 6404 - aximum Period for ubmission of edicare laims

More information

Selected Acquisition Report (SAR)

Selected Acquisition Report (SAR) Selected Acquisition Report (SAR) RCS: DD-A&T(Q&A)823-437 AB3B NEW BUILD As of December 31, 2011 Defense Acquisition Management Information Retrieval (DAMIR) UNCLASSIFIED Table of Contents Program Information

More information

SAMSUNG ELECTRONICS AMERICA, INC. ONLINE REMOTE MANAGEMENT SERVICES ONLINE REMOTE MANAGEMENT SERVICE TERMS AND CONDITIONS 1.

SAMSUNG ELECTRONICS AMERICA, INC. ONLINE REMOTE MANAGEMENT SERVICES ONLINE REMOTE MANAGEMENT SERVICE TERMS AND CONDITIONS 1. SAMSUNG ELECTRONICS AMERICA, INC. ONLINE REMOTE MANAGEMENT SERVICES ONLINE REMOTE MANAGEMENT SERVICE TERMS AND CONDITIONS 1. LEGAL NOTICE 1.1 This legal notice (these Terms ) applies to the Online Remote

More information

Risk versus Reward. Responsibilities

Risk versus Reward. Responsibilities Slide 1 Risk versus Reward "Dynamic Risk Assessment" (DRA) National Fallen Fire Fighters Foundation Sean DeCrane, Battalion Chief Cleveland (OH) Fire Department During the funeral ceremony, Charleston,

More information

L-3 Announces Third Quarter 2014 Results

L-3 Announces Third Quarter 2014 Results Contact: L-3 Communications Holdings, Inc. Corporate Communications 212-697-1111 For Immediate Release L-3 Announces Third Quarter Results Diluted earnings per share of $1.78 Net sales of $2.9 billion

More information

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 1418 Date: JANUARY 18, 2008

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 1418 Date: JANUARY 18, 2008 anual ystem Pub 100-04 edicare laims Processing Department of ealth & uman ervices (D) enters for edicare & edicaid ervices () Transmittal 1418 Date: JNUY 18, 2008 hange equest 5805 UBJT: New P odifiers

More information

SOT23 3. Part Number Compliance Marking Reel Size(inches) Tape Width(mm) Quantity Per Reel DESDA5V3LQ-7 Automotive RD ,000/Tape & Reel

SOT23 3. Part Number Compliance Marking Reel Size(inches) Tape Width(mm) Quantity Per Reel DESDA5V3LQ-7 Automotive RD ,000/Tape & Reel YM YW 5V3Q F M V Y roduct ummary V BMin) Max) Max) 5.3V 2 22pF escription his new generation V is designed to protect sensitive electronics from the damage due to. he combination of small size and high

More information

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 1544 Date: June 26, 2008

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 1544 Date: June 26, 2008 S anual System Pub 100-04 edicare laims Processing Department of Health & Human Services (DHHS) enters for edicare & edicaid Services (S) Transmittal 1544 Date: June 26, 2008 hange equest 6007 SUBJET:

More information

Bid Chevrolet Silverado 2500HD 4WD Crew Cab 167.7" Work Truck INVITATION TO BID

Bid Chevrolet Silverado 2500HD 4WD Crew Cab 167.7 Work Truck INVITATION TO BID City of Portsmouth Portsmouth, New Hampshire Fire Department Bid 23-14 2014 Chevrolet Silverado 2500HD 4WD Crew Cab 167.7" Work Truck INVITATION TO BID Sealed bid proposals, plainly marked City of Portsmouth

More information

U NITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C (Exact name of registrant as specified in its charter)

U NITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C (Exact name of registrant as specified in its charter) U NITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM 10-K (Mark One) [X] ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 For the fiscal year

More information

Westmount Place Renovations Policy

Westmount Place Renovations Policy Conditions Precedent to the Implementation of Renovations 1. Condominium Bylaws and Regulations No renovations or modifications shall be implemented without authorization of the Board of Directors. All

More information

CSRA Announces First Quarter Fiscal Year 2018 Financial Results

CSRA Announces First Quarter Fiscal Year 2018 Financial Results CSRA Announces First Quarter Fiscal Year 2018 Financial Results FALLS CHURCH, Va., Aug 9, 2017 - CSRA Inc. (NYSE:CSRA), a leading provider of next-generation IT solutions and professional services to government

More information

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 2236 Date: June 3, 2011

Department of Health & Human Services (DHHS) Centers for Medicare & Medicaid Services (CMS) Transmittal 2236 Date: June 3, 2011 anual ystem Pub 100-04 edicare laims Processing Department of ealth & uman ervices (D) enters for edicare & edicaid ervices () Transmittal 2236 Date: June 3, 2011 hange equest 7416 UBJET: July Quarterly

More information

DS-2019 Form Data Field Description

DS-2019 Form Data Field Description Overview This document provides an overview of the S-2019 panel in M-Pathways. The information entered in this panel is sent to SVIS in order to create the xchange Visitor (V) SVIS record and generate

More information

Patterson-UTI Energy, Inc. (Exact name of registrant as specified in its charter)

Patterson-UTI Energy, Inc. (Exact name of registrant as specified in its charter) UNITED STATES SECURITIES AND EXCHANGE COMMISSION WASHINGTON, D.C. 20549 FORM 8-K CURRENT REPORT Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934 Date of Report (Date of Earliest Event

More information

ProSIS-FSE. SIL Calculator V1.6 User Guide

ProSIS-FSE. SIL Calculator V1.6 User Guide SIL Calculator V1.6 User Guide Page 1 of 12 ProSIS-FSE SIL Calculator V1.6 User Guide 1 of 12 Table of Contents ProSIS-FSE... 1 SIL Calculator V1.6 User Guide... 1 1 OBJECTIVES... 3 2 REFERENCES... 4 2.1

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO.: 13 SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY DIVISION: Finance and Information Technology BRIEF DESCRIPTION: Authorizing the Director of Transportation to submit

More information

FY09 President s Budget America s Edge: Global Vigilance, Reach and Power

FY09 President s Budget America s Edge: Global Vigilance, Reach and Power Headquarters U.S. Air Force I n t e g r i t y - S e r v i c e - E x c e l l e n c e FY09 President s Budget America s Edge: Global Vigilance, Reach and Power Maj Gen Larry Spencer Director, Air Force Budget

More information

LIFE CYCLE ASSET MANAGEMENT. Project Management Overview. Good Practice Guide GPG-FM-001. March 1996

LIFE CYCLE ASSET MANAGEMENT. Project Management Overview. Good Practice Guide GPG-FM-001. March 1996 LIFE YLE Good Practice Guide ASSET MANAGEMENT Project Management Overview March 1996 Department of Energy Office of Field Management Office of Project and Fixed Asset Management ontents 1. INTRODUTION...1

More information