1 ;STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION SAN FRANCISCO, CA Edmund G. Brown Jr., Governor November 13, 2015 Advice Letter 3219-E and 3219-E-A Russell G. Worden Director, Regulatory Operations Southern California Edison Company 8631 Rush Street Rosemead, CA Subject: Green Tariff Shared Renewables Program Customer-Side Implementation Advice Letter and Supplemental Filing Dear Mr. Worden: Advice Letter 3219-E and 3219-E-A are effective November 20h, Sincerely, Edward Randolph Director, Energy Division

2 Russell G. Worden Managing Director, State Regulatory Operations October 21, 2015 ADVICE 3219-E-A (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Supplement to Advice 3219-E, Southern California Edison Company s Green Tariff Shared Renewables Program Customer-Side Implementation Advice Letter I. PURPOSE In compliance with Ordering Paragraph (OP) 2 of Resolution E-4734 (the Resolution), this advice filing makes changes to information originally contained within Southern California Edison Company s (SCE) Green Tariff Shared Renewables Program (GTSR) Customer-Side Implementation Advice Letter (CSIAL) and to the tariff sheets originally container therein. This advice letter (AL) supplements AL 3219-E in part. II. BACKGROUND On September 28, 2013, Governor Brown signed Senate Bill (SB) 43 (Wolk) into law. 1 SB 43 enacted the GTSR Program, a 600 megawatt (MW) statewide program that allows participating utilities 2 customers including local governments, businesses, schools, homeowners, municipal customers and renters to meet up to 100% of their energy usage with generation from eligible renewable energy resources. As required by SB 43, 3 on January 10, 2014, SCE filed Application (A.) , its Application for Approval of Optional Green Rate (Application), 4 which focused on the Green Rate 1 SB 43 was codified in California Public Utilities (PU) Code Section 2831 et seq. 2 Participating utility means an electrical corporation with 100,000 or more customer accounts in California. PU Code Section (b)(2). SCE is a participating utility. 3 See PU Code Section 2832(a). 4 SCE s Application was subsequently consolidated with San Diego Gas & Electric Company s (SDG&E) A and Pacific Gas and Electric Company s (PG&E) A P.O. Box Rush Street Rosemead, California (626) Fax (626)

3 ADVICE 3219-E-A (U 338-E) October 21, 2015 component of the GTSR Program. On March 21, 2014, SCE served testimony proposing an additional Community Renewables Program. 5 On January 29, 2015, the California Public Utilities Commission (Commission or CPUC) adopted Decision (D.) (the Decision), implementing a GTSR Program framework and approving the investor-owned utilities (IOUs) 6 applications with modifications. Among other things, the Commission divided the GTSR Program s statewide limitation of 600 MW of customer participation among the IOUs. Specifically, the Commission allocated 269 MW of total GTSR Program capacity to SCE (GTSR Program Cap). 7 The GTSR Program structure approved by the Commission consists of two elements: (1) a Green Tariff option 8 allowing customers to purchase energy with a greater share of renewables (i.e., the Green Rate option for SCE), and (2) an Enhanced Community Renewables (ECR) option 9 allowing customers to subscribe to renewable energy from community-based projects (i.e., the Community Renewables option for SCE). 10 Each IOU s GTSR Program Cap is inclusive of both the Green Tariff and ECR Programs. 11 The Decision does not establish individual program caps for the Green Tariff and ECR Programs. The Decision ordered the IOUs to file three Tier 3 ALs to implement the GTSR Program within 100 days of the issuance of the Decision. 12 On May 13, 2015, SCE submitted the ALs, referred to as the CSIAL (Advice 3219-E), the Marketing Implementation Advice Letter (MIAL) (Advice 3220-E), and the Joint Procurement Implementation Advice Letter (JPIAL) (Advice 3218-E), which was a joint filing by the three IOUs. On October 1, 2015, the Commission adopted the Resolution, which approves the CSIAL and JPIAL as modified by the Resolution. Specifically, the Resolution orders SCE to file supplements to its CSIAL and JPIAL to modify certain issues, addressed 5 SCE subsequently served amended testimony on both its proposed Green Rate and Community Renewables Program on April 11, The IOUs are SCE, PG&E, and SDG&E. 7 See the Decision at OP 7. 8 SCE s Green Tariff option is called the Green Rate or the Green Rate Program. Throughout this document, the terms Green Tariff and Green Rate are used interchangeably. 9 SCE s ECR option is called Community Renewables or the Community Renewables Program. Throughout this document, the terms Enhanced Community Renewables, ECR, and Community Renewables are used interchangeably. 10 See the Decision at pp See id. at p. 4, OP See id. at OP 2.

4 ADVICE 3219-E-A (U 338-E) October 21, 2015 below. The Resolution also approves the MIAL, as previously supplemented in Advice 3220-E-A. 13 III. MODIFICATIONS TO SCE S GTSR PROGRAM PURSUANT TO THE RESOLUTION A. Display and Definition of the GTSR Indifference Adjustment In its CSIAL, SCE proposed to aggregate all GTSR billing sub-components into two line items, one representing charges and one representing credits, that would display under the Generation charges section of the customer s bill. 14 OP 4 of the Resolution orders SCE to separately display the GTSR Indifference Adjustment portion of a GTSR customer s bill. OP 4 also orders SCE to ensure that its bill describes the Indifference Adjustment in an easily understandable way. As such, SCE has modified the billing statements that will be sent to GTSR customers to comply with these requirements. Sample versions of these billing statements are included as Attachments B, C, D and E to this filing. Online bills will incorporate these same modifications. All other GTSR Program bill information will display as filed in the original CSIAL for both Green Rate and ECR customers. B. Indifference Adjustment Vintage In its CSIAL, SCE described its plan to charge GTSR customers an Indifference Adjustment comprised of the sum of the Power Charge Indifference Adjustment (PCIA) and Competition Transition Charge (CTC). SCE also explained that it would assign GTSR customers a PCIA vintage consistent with the direction adopted by the Commission in D ; namely, that a customer will receive the PCIA vintage based on the year in which they subscribe to the program, except that a customer that begins to receive GTSR service in the first half of a calendar year will be assigned the prior year s vintage. 15 SCE clarifies that it will continue to use the same PCIA vintaging method described above, in its CSIAL, and in the Resolution. SCE further clarifies that a GTSR customer will maintain the same PCIA vintage should the customer relocate within SCE s service territory; that is, should the customer close the service account taking service under the GTSR Program and open a new service account taking service under the GTSR Program in SCE s service territory, the closed account s PCIA vintage will be applied to the new service account. 13 In its MIAL, SCE proposed that it be allowed to require ECR developers to include language on their marketing materials informing customers that if they believe that the developer has been false or misleading in their communications, the customer is entitled to file a complaint with the CPUC. The Resolution, at pp , declined to adopt this proposal. SCE affirms that, although its MIAL has been approved as supplemented, SCE will not require the developer to provide the language in question on its marketing materials. 14 See Advice 3219-E, at p. 8 and p. 14, and Attachments B, C, D, and E. 15 See Advice 3219-E, at p. 17.

5 ADVICE 3219-E-A (U 338-E) October 21, 2015 C. GTSR Program Website OP 6 of the Resolution orders SCE to maintain a GTSR Program webpage, and to provide on the face of the webpage a breakdown of all individual GTSR Program charges and credits, their components, and, to the extent they are available, historical trends dating back 10 years. SCE has begun the process of gathering and displaying this information, and will comply with this requirement within 60 days of the adoption of the Resolution. SCE will also update this portion of the webpage annually. OP 11 of the Resolution orders SCE to post detailed criteria for assessment of thirdparty marketing materials in the ECR program no later than 60 days after adoption of the Resolution. SCE will comply with this requirement within 60 days of the adoption of the Resolution, which is November 30, D. GTSR Re-enrollment Exception for Customers Defaulted to Community Choice Aggregation (CCA) Service SCE, in its CSIAL, proposed that Green Rate customers may de-enroll from the program at any time; however, customers that de-enroll from the Green Rate may not re-enroll for 12 months. 16 In the Resolution, the Commission accepted this position with the additional provision that a GTSR customer that de-enrolled by virtue of being defaulted to CCA Service may re-enroll in the GTSR Program within 60 days of being defaulted to CCA Service. The Resolution also directs SCE to specify that its customer service representatives will be authorized to override the one year re-enrollment waiting period in these cases. SCE has begun preparations for implementing this change, and affirms that it will allow GTSR customers defaulted to CCA Service to re-enroll in the GTSR Program within 60 days of the customer s default provided the customer also chooses to return to Bundled Service since CCA Service customers are not eligible for service under the GTSR Programs. SCE also affirms that its customer service representatives will be authorized to override the one year re-enrollment waiting period for customers in this scenario. E. CDA Information One of the key documents necessary for renewables developers and end-use customers to participate in the Community Renewables portion of the GTSR Program is the Customer Developer Agreement (CDA). 17 The CDA is an agreement between the customer and developer; SCE is not a party to it. SCE does not need to receive the completed CDA for any Community Renewables project or customer. The only information SCE needs to receive are the name, service address, and SCE account number of the subscribed customer, as well as the specific subscription information for each customer that is necessary for SCE to accurately bill the customer under the 16 See Advice 3219-E, at pp. 4 and 13, and Schedule GTSR-GR, Special Condition See Advice 3219-E at p. 8, and Schedule GTSR-CR, Special Conditions 1 and 10.

6 ADVICE 3219-E-A (U 338-E) October 21, 2015 GTSR-CR tariff. 18 SCE does not need to receive details of the financial agreement between the customer and developer, and did not require this information in its CSIAL. Nevertheless, pursuant to OP 10 of the Resolution, SCE affirms that it will not require any pricing information of the CDA from either the customer or the developer. F. Community Choice Aggregator Code of Conduct The Resolution requires SCE to ensure that third-party marketing for the Community Renewables Program does not circumvent the Community Choice Aggregator Code of Conduct. To ensure this, SCE is ordered to provide Attachment 1 of the Commission s Community Choice Aggregator Code of Conduct Decision (D ) to third-party marketers, and to obtain an attestation from those marketers that they have received and read the attachment and have committed to not circumventing it. 19 SCE acknowledges this requirement, and will distribute this attachment upon notification that a third-party intends to market the Community Renewables Program to its customers. SCE will also keep record of the required attestations from third-party marketers as part of the ECR Program Participation Requests submitted by developers pursuant to Schedule GTSR-CR-PDT. G. Location of GTSR Program Subscribers In its CSIAL and the JPIAL, SCE proposed that all ECR customers must be located within either ten miles of, or the same county as, the ECR project, whether subscribing to the program before or after development of the Community Renewables project. 20 The only proposed exception was for customers who, after enrolling in the Community Renewables Program, move to another location within the same IOU s service territory. Such customers were allowed to transfer their subscription to their new location. The Resolution, in OP 14, orders SCE to allow Community Renewables customers to come from anywhere in its service territory once initial community interest is demonstrated and a Power Purchase Agreement (PPA) is signed for a given Community Renewables project. That is, initial community interest for the project must come from customers located within 10 miles or the same county as the project, but, after a PPA is executed, subsequent customers may come from anywhere in the service territory. SCE acknowledges this requirement and hereby revises its CSIAL and tariff schedules to comply with this change. The JPIAL, including the ECR Project Development Tariff and associated ECR PPA Rider, will also be revised to comply with this requirement in a separate supplemental filing. 18 See Advice 3218-E, Attachment C, Appendix O. 19 See Resolution E-4734, OP 13, at p See for example Advice 3219-E, at p. 11, Schedule GTSR-CR, Special Condition 7.e, and Advice 3218-E, at p. 12.

7 ADVICE 3219-E-A (U 338-E) October 21, 2015 H. Ongoing Minimum Subscription Requirements In its CSIAL and the JPIAL, SCE proposed that Community Renewables projects be required to reach a subscription level of 51% of the project s capacity at the pre- Commercial Operation Date phase. 21 Those projects that do not meet this rolling six month average subscription level would be subject to cancellation of the project s PPA. 22 The Commission, in OP 16 of the Resolution, determined that this is a requirement not supported by the Decision and ordered that once initial community interest is demonstrated, and a PPA is signed for a given ECR project in an IOU s territory, there is no ongoing subscription requirement for an ECR project for any purpose other than to determine whether the Unsubscribed Energy Price should be paid. SCE acknowledges this requirement and hereby revises its CSIAL to comply with this change. The JPIAL, including the ECR Project Development Tariff and ECR PPA Rider, will also be revised to comply with this requirement in a separate supplemental filing. IV. Proposed Tariff Modifications Pursuant to the discussion above, SCE proposes modifications herein to the tariff sheets originally filed in Advice 3219-E, as follows: A. Schedule GTSR-CR The second paragraph of the Applicability section is modified to specify that the pricing component of the CDA between the developer and the GTSR customer is not required to be provided to SCE since such information is not required for SCE to accurately bill the customer. A minor typo is also corrected in the Applicability section by including the word not in the last sentence of the first paragraph. The preamble to the Rates section is modified to inform customers that a breakdown of all individual credits and charges and the historical trends for each to the extent they are available can be found on SCE s GTSR Program webpage. Section 2 of the Rates section is modified to specify that the GTSR Indifference Adjustment will be displayed separately on the customer s bill. Special Condition 7.e is modified to reflect the Community Interest requirements after a PPA is executed as discussed above. This Special Condition also addresses the relocation and GTSR Indifference Adjustment vintage provisions discussed above. Special Condition 8.c is modified to specify that the GTSR Indifference Adjustment will be displayed separately on the customer s bill. 21 See for example Advice 3219-E, at p. 11, Advice 3218-E, Attachment C, at p See Advice 3218-E, Attachment C, at p. 13.

8 ADVICE 3219-E-A (U 338-E) October 21, 2015 B. Schedule GTSR-GR The preamble to the Rates section is modified to inform customers that a breakdown of all individual credits and charges and the historical trends for each to the extent they are available can be found on SCE s GTSR Program webpage. Section 2 of the Rates section is modified to specify that the GTSR Indifference Adjustment will be displayed separately on the customer s bill. Special Condition 3 is modified to include the exception to the 12- month re-enrollment restriction for customers who are defaulted to CCA Service and who then elect to return to Bundled Service and wish to continue to be served on the Green Rate. A new Special Condition 4.c is added to specify that customers with existing subscriptions who relocate elsewhere within SCE s service territory can retain their subscriptions at their new service address and will retain their existing GTSR Indifference Adjustment vintage at the new location. The remaining subcomponents of Special Condition 4 are renumbered as a result. Special Condition 6 is modified to specify that the GTSR Indifference Adjustment will be displayed separately on the customer s bill. A minor typo is corrected in the Applicability section by including the word not in the last sentence of the first paragraph. LIST OF ATTACHMENTS Attachment A: Attachment B: Attachment C: Attachment D: Attachment E: Supplemented Tariff Sheets Residential Green Rate Bill Mockup Commercial Green Rate Bill Mockup Residential Community Renewables Bill Mockup Commercial Community Renewables Bill Mockup TIER DESIGNATION As directed by the Commission s Energy Division, this advice filing is submitted with a Tier 2 designation. EFFECTIVE DATE This advice letter will become effective on November 20, 2015, the 30 th calendar day after the date filed.

9 ADVICE 3219-E-A (U 338-E) October 21, 2015 PROTESTS SCE asks that the Commission maintain the original protest and comment period designated in Advice 3219-E and not reopen the protest period as the updates in this advice letter reflect the direction of the Commission in Resolution E NOTICE In accordance with General Rule 4 of GO 96-B, SCE is serving copies of this advice filing to the interested parties shown on the attached GO 96-B and A et al. service lists. Address change requests to the GO 96-B service list should be directed by electronic mail to AdviceTariffManager@sce.com or at (626) For changes to all other service lists, please contact the Commission s Process Office at (415) or by electronic mail at Process_Office@cpuc.ca.gov. Further, in accordance with Public Utilities Code Section 491, notice to the public is hereby given by filing and keeping the advice filing at SCE s corporate headquarters. To view other SCE advice letters filed with the Commission, log on to SCE s web site at For questions, please contact Nathanael Gonzalez at (626) or by electronic mail at Nathanael.Gonzalez@sce.com. Southern California Edison Company RGW:ng:cm Enclosures /s/ Russell G. Worden Russell G. Worden

10 CALIFORNIA PUBLIC UTILITIES COMMISSION ADVICE LETTER FILING SUMMARY ENERGY UTILITY MUST BE COMPLETED BY UTILITY (Attach additional pages as needed) Company name/cpuc Utility No.: Southern California Edison Company (U 338-E) Utility type: Contact Person: Darrah Morgan ELC GAS Phone #: (626) PLC HEAT WATER Disposition Notice to: EXPLANATION OF UTILITY TYPE ELC = Electric GAS = Gas PLC = Pipeline HEAT = Heat WATER = Water (Date Filed/ Received Stamp by CPUC) Advice Letter (AL) #: 3219-E-A Tier Designation: 2 Subject of AL: Supplement to Advice 3219-E, Southern California Edison Company s Green Tariff Shared Renewables Program Customer-Side Implementation Advice Letter Keywords (choose from CPUC listing): Compliance AL filing type: Monthly Quarterly Annual One-Time Other If AL filed in compliance with a Commission order, indicate relevant Decision/Resolution #: Resolution E-4734 Does AL replace a withdrawn or rejected AL? If so, identify the prior AL: Summarize differences between the AL and the prior withdrawn or rejected AL: Confidential treatment requested? Yes No If yes, specification of confidential information: Confidential information will be made available to appropriate parties who execute a nondisclosure agreement. Name and contact information to request nondisclosure agreement/access to confidential information: Resolution Required? Yes No Requested effective date: 11/20/15 No. of tariff sheets: -11- Estimated system annual revenue effect: (%): Estimated system average rate effect (%): When rates are affected by AL, include attachment in AL showing average rate effects on customer classes (residential, small commercial, large C/I, agricultural, lighting). Tariff schedules affected: Service affected and changes proposed 1 : See Attachment A Pending advice letters that revise the same tariff sheets: 3219-E 1 Discuss in AL if more space is needed.

11 All correspondence regarding this AL, unless otherwise authorized by the Commission, and shall be sent to: CPUC, Energy Division Attention: Tariff Unit 505 Van Ness Avenue San Francisco, California Russell G. Worden Managing Director, State Regulatory Operations Southern California Edison Company 8631 Rush Street Rosemead, California Facsimile: (626) Michael R. Hoover Director, State Regulatory Affairs c/o Karyn Gansecki Southern California Edison Company 601 Van Ness Avenue, Suite 2030 San Francisco, California Facsimile: (415)

12 Public Utilities Commission 3219-E-A Attachment A Cal. P.U.C. Sheet No. Original E Original E Original E Original E Original E Original E Original E Original E Original E Original E Original E Title of Sheet Schedule GTSR-CR Schedule GTSR-CR Schedule GTSR-CR Schedule GTSR-CR Schedule GTSR-CR Schedule GTSR-GR Schedule GTSR-GR Schedule GTSR-GR Schedule GTSR-GR Schedule GTSR-GR Schedule GTSR-GR Cancelling Cal. P.U.C. Sheet No. 1

13 Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No. Schedule GTSR-CR Sheet 1 GREEN TARIFF SHARED RENEWABLES COMMUNITY RENEWABLES APPLICABILITY This Schedule is applicable to Bundled Service customers (Customers) who elect to participate in one of two optional Green Tariff Shared Renewables (GTSR) programs (GTSR Program) pursuant to California Public Utilities Code (PUC) Sections and California Public Utilities Commission (Commission) Decision (D.) for the purposes of receiving a bill credit from SCE to reflect the Customer s Subscription in a Community Renewables (CR) Facility (Community Renewables Program). This Schedule is available to Customers on a first-come, first-served basis until the earlier of (i) the date that Customer Subscriptions served under this Schedule and under Schedule GTSR-GR (Green Rate Program) reach 269 megawatts (MW-AC) (GTSR Program Cap), which is SCE s allocated share of the total statewide GTSR Program cap of 600 MW; or (ii) January 1, Once SCE reaches its GTSR Program Cap or January 1, 2019, whichever is earlier, Customers served under this Schedule at that time may continue receiving service under this Schedule, subject to the termination provisions outlined below, unless and/or until the Community Renewables Program is terminated, but Customers not served under this Schedule as of the date SCE reaches its GTSR Program Cap or January 1, 2019, whichever is earlier, are not allowed to receive service under this Schedule. Customers served under this Schedule must enter into a Customer Developer Agreement (CDA) with the Developer of the CR Facility to which the Customer wishes to subscribe and consent to the Developer providing information about the Customer s Subscription to SCE on a regular basis in order for SCE to accurately bill the Customer pursuant to the terms of this Schedule (the pricing component of the CDA between the Developer and the Customer is not required to be provided to SCE since such information is not required for SCE to accurately bill the Customer). Refer to Special Condition 10 below for more information. TERRITORY Within the entire territory served. (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 3219-E-A R.O. Nichols Date Filed Oct 21, 2015 Decision Senior Vice President Effective Nov 20, H12 Resolution E-4734

14 Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No. RATES Schedule GTSR-CR Sheet 2 GREEN TARIFF SHARED RENEWABLES COMMUNITY RENEWABLES All charges and provisions of the Customer s Otherwise Applicable Tariff (OAT) apply, except that the total amount billed to the Customer by SCE shall be adjusted by applying the following additional credits and charges on a dollar per kilowatt-hour ($/kwh) basis to the Customer s Subscription, as defined below. A breakdown of individual credits and charges and the historical trends for each to the extent they are available can be found on SCE s GTSR Program webpage. Component Community Renewables Credit Class Average Generation Credit Residential TOU-GS-1 TOU-GS-2 TOU-GS-3 TOU-8-Sec TOU-8-Pri TOU-8-Sub TOU-PA-2 TOU-PA-3 TOD Adjustment ($/kwh) CR Facility Specific Community Renewables Charge RPR GTSR Indifference Adjustment See Schedule DA-CRS CAISO Grid & WREGIS Charges RA Adjustment CR Facility Specific Program Administration Charge RIC Charge Credits. All of the following components appear in aggregate as the Community Renewables Credit under the Generation section of the Customer s regular billing statement from SCE and are updated annually as part of SCE s Energy Resource Recovery Account (ERRA) proceeding. a. Class Average Generation Credit: Based on the class average retail generation rate as established in SCE s Commission-approved tariffs for the class to which the Customer s OAT belongs. In addition to the ERRA proceeding, this component will be updated whenever there is a substantial change to the generation revenue requirement, such as the implementation of Phase 1 of a General Rate Case. (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 3219-E-A R.O. Nichols Date Filed Oct 21, 2015 Decision Senior Vice President Effective Nov 20, H11 Resolution E-4734

15 Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No. Schedule GTSR-CR Sheet 3 GREEN TARIFF SHARED RENEWABLES COMMUNITY RENEWABLES RATES (continued) 1. Credits. (continued) b. Time of Delivery (TOD) Adjustment: Reflects the difference in value, if any, between the TOD profile of the CR Facility and the TOD consumption profile of the class. If the value is negative (i.e., the value of the output from the CR Facility exceeds the cost to serve the Customer s class), the TOD Adjustment will increase the CR Credit. If the value is positive (i.e., the cost to serve the Customer s class exceeds the value of the output from the CR Facility), the TOD Adjustment will decrease the CR Credit. 2. Charges. All of the following components appear in aggregate, with the exception of the GTSR Indifference Adjustment which is displayed as an additional separate line item, as the Community Renewables Charge under the Generation section of the Customer s regular billing statement from SCE and are updated annually as part of SCE s ERRA proceeding, with the exception of the RPR. a. Renewable Power Rate (RPR): CR Contract Price included in the PPA for a specific CR Facility. This charge is always offset to $0.00 since the PPA requires that the Developer allow the CR Contract Price payment for energy related to subscribed capacity to be assigned to the Customer based on the Customer s Subscription. b. GTSR Indifference Adjustment: Includes both the Power Charge Indifference Amount (PCIA) and the Competition Transition Charge (CTC) as found in Schedule DA-CRS by customer class and vintage, and is based on the above market costs of resources already procured by SCE to serve customers and an adjustment to maintain customer indifference. A Customer served under this Schedule receives a specific GTSR Indifference Adjustment vintage based on the date that the Customer began service under this Schedule. If a Customer begins receiving service under this Schedule in the first half of the calendar year (i.e., prior to July 1), the Customer is assigned the prior year s vintage. For example, if a residential Customer begins receiving service under this Schedule in March 2016, the Customer will be billed pursuant to the 2015 Vintage Non-Continuous ($/kwh) PCIA and CTC factors found in Schedule DA-CRS for the Domestic rate group; if that same Customer began receiving service instead in July 2016, the Customer would be assigned the 2016 vintage. The Customer s vintage remains constant for as long as the Customer continually receives service under this Schedule, but the actual amount of the GTSR Indifference Adjustment for each vintage is updated annually. (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 3219-E-A R.O. Nichols Date Filed Oct 21, 2015 Decision Senior Vice President Effective Nov 20, H11 Resolution E-4734

16 Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No. Schedule GTSR-CR Sheet 8 GREEN TARIFF SHARED RENEWABLES COMMUNITY RENEWABLES SPECIAL CONDITIONS (continued) 7. Customer Subscription Provisions. The following provisions apply to Customer Subscriptions served under this Schedule: a. Customers are not permitted to subscribe to more than 100 percent (100%) of their energy demand, whereby 120% of the Customer s reasonably anticipated annual load (in kwh), as determined by SCE, is used as a proxy to determine 100% of the Customer s energy demand in this context. b. A Customer s Subscription cannot be less than the equivalent of an annual average of either (i) 100 kwh per month or (ii) 25% of the Customer s load (in kwh) per month. c. The maximum Customer Subscription served under this Schedule cannot exceed an amount equivalent to more than 2 MW of nameplate rated generating capacity from a CR Facility. This limitation does not apply to a federal, state, or local government, school or school district, county office of education, the California Community Colleges, the California State University, or the University of California. d. A single Customer cannot subscribe to more than 20% of any single calendar year s total available cumulative nameplate rated generating capacity available as part of the GTSR Program. e. Prior to the execution of the PPA for a CR Facility, Customers can only subscribe to a CR Facility if they are physically located within the same municipality or county as that CR Facility or if their service address is within ten miles of that CR Facility. However, any time after a PPA is entered into between SCE and the Developer for a CR Facility, new Customers subscribing to that CR Facility may come from anywhere within SCE s service territory and Customers with existing Subscriptions to that CR Facility who relocate elsewhere within SCE s service territory can retain their Subscription at their new service address. Existing Customers who relocate within SCE s service territory will be considered as having continuously received service under this Schedule for the purposes of determining the GTSR Indifference Adjustment vintage, meaning that the closed account s GTSR Indifference Adjustment vintage will apply to the new service account, unless the Customer elects to no longer receive service under this Schedule at the time the new service account is established. f. Customers can only have a single Subscription to one CR Facility at a time. Customers cannot be subscribed to more than one CR Facility at any time. g. 45 MW of capacity is reserved for residential customer participation on the GTSR Program. SCE reserves the right to not allow additional non-residential Customer participation on this Schedule if non-residential customer participation on the GTSR Program reaches the equivalent of 224 MW. (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 3219-E-A R.O. Nichols Date Filed Oct 21, 2015 Decision Senior Vice President Effective Nov 20, C11 Resolution E-4734

17 Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No. SPECIAL CONDITIONS (continued) Schedule GTSR-CR Sheet 9 GREEN TARIFF SHARED RENEWABLES COMMUNITY RENEWABLES 8. Billing. All charges and credits of a Customer s OAT are calculated prior to the addition of the charges and credits shown in the Rates section above. Additional billing provisions apply, as follows: a. The regular billing period for Customers served under this Schedule is from the 1st to the 1st of each Calendar month. b. SCE will allocate kwh to each Customer based on the instructions received from the Developer, which must be provided to SCE as required in the PPA. If SCE does not receive instructions from the Developer as required in the PPA, SCE shall bill Customers pursuant to their OAT only. c. For billing periods where SCE does receive billing instructions from the Developer pursuant to Special Condition 8.b above, the amount of kwh allocated to the Customer s bill will be multiplied by the charges and credits shown in the Rates section above (on a $/kwh basis) to determine the aggregate Community Renewables Credit, aggregate Community Renewables Charge and the GTSR Indifference Adjustment that will appear on the Customer s regular billing statement from SCE. d. There may be a difference in the time period when kwh are generated by a CR Facility and applied to a Customer s bill. The credits and charges in the Rates section above that are effective as of the date that the kwh are generated by the CR Facility will be used to determine the Customer s Community Renewables Credit and Charge regardless of when the kwh are applied to the Customer s bill. For example, kwh may be generated by the CR Facility during the period of May 1 to May 31, but may not appear on a Customer s regular billing statement until August 1. The August 1 billing statement will include OAT charges based on the OAT rates in effect for the July 1 to August 1 billing period, but will include a Community Renewables Charge and Credit based on the Schedule GTSR-CR rates in effect for the May 1 to June 1 billing period. e. When a Customer elects to close the service account served under this Schedule prior to the end of the Customer s regular billing period, the credits and charges shown in the Rates section above will continue to apply until the end of the calendar month. This also applies when a customer elects to transfer the Subscription to a new service account. The Customer may also experience a delay in receiving the closing bill for the closed account due to the difference in the time periods for when kwh are generated by a CR Facility and applied to a Customer s bill. (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 3219-E-A R.O. Nichols Date Filed Oct 21, 2015 Decision Senior Vice President Effective Nov 20, C10 Resolution E-4734

18 Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No. Schedule GTSR-GR Sheet 1 GREEN TARIFF SHARED RENEWABLES GREEN RATE APPLICABILITY This Schedule is applicable to Bundled Service customers (Customers) who elect to participate in one of two optional Green Tariff Shared Renewables (GTSR) programs (GTSR Program) pursuant to California Public Utilities Code (PUC) Sections and California Public Utility Commission (Commission) Decision (D.) for the purposes of having SCE procure additional renewable resources from GTSR Facilities to meet Customer Subscriptions hereunder (Green Rate Program). This Schedule is available to Customers on a first-come, first-served basis until the earlier of (i) the date that Customer Subscriptions served under this Schedule and under Schedule GTSR-CR (Community Renewables Program) reach 269 megawatts (MW-AC) (GTSR Program Cap), which is SCE s allocated share of the total statewide GTSR Program cap of 600 MW; or (ii) January 1, Once SCE reaches its GTSR Program Cap or January 1, 2019, whichever is earlier, Customers served under this Schedule at that time may continue receiving service under this Schedule on a month-to-month basis unless and/or until the Green Rate Program is terminated, but Customers not served under this Schedule as of the date SCE reaches its GTSR Program Cap or January 1, 2019, whichever is earlier, are not allowed to receive service under this Schedule. TERRITORY Within the entire territory served. (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 3219-E-A R.O. Nichols Date Filed Oct 21, 2015 Decision Senior Vice President Effective Nov 20, H10 Resolution E-4734

19 Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No. Schedule GTSR-GR Sheet 2 GREEN TARIFF SHARED RENEWABLES GREEN RATE RATES All charges and provisions of the Customer s Otherwise Applicable Tariff (OAT) apply, except that the total amount billed to the Customer shall be adjusted by applying the following additional credits and charges on a dollar per kilowatt-hour ($/kwh) basis to the Customer s Subscription, as defined below. A breakdown of all individual credits and charges and the historical trends for each to the extent they are available can be found on SCE s GTSR Program webpage. Component Green Rate Credit Class Average Generation Credit Residential TOU-GS-1 TOU-GS-2 TOU-GS-3 TOU-8-Sec TOU-8-Pri TOU-8-Sub TOU-PA-2 TOU-PA-3 TOD Adjustment Residential TOU-GS-1 TOU-GS-2 TOU-GS-3 TOU-8-Sec TOU-8-Pri TOU-8-Sub TOU-PA-2 TOU-PA-3 ($/kwh) Green Rate Charge RPR GTSR Indifference Adjustment See Schedule DA-CRS CAISO Grid & WREGIS Charges RA Adjustment Program Administration Charge RIC Charge (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 3219-E-A R.O. Nichols Date Filed Oct 21, 2015 Decision Senior Vice President Effective Nov 20, H10 Resolution E-4734

20 Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No. Schedule GTSR-GR Sheet 3 GREEN TARIFF SHARED RENEWABLES GREEN RATE RATES (continued) 1. Credits. All of the following components appear in aggregate as the Green Rate Credit under the Generation section of the Customer s regular billing statement and are updated annually as part of SCE s Energy Resource Recovery Account (ERRA) proceeding. a. Class Average Generation Credit: Based on the class average retail generation rate as established in SCE s Commission-approved tariffs for the class to which the Customer s OAT belongs. In addition to the ERRA proceeding, this component will be updated whenever there is a substantial change to the generation revenue requirement, such as the implementation of Phase 1 of a General Rate Case. b. Time of Delivery (TOD) Adjustment: Reflects the difference in value, if any, between the TOD profile of the GTSR Facilities (and/or Interim Green Rate Pool) and TOD consumption profile of the class. If the value is negative (i.e., the value of the output from the GTSR Facilities (and/or the Interim Green Rate Pool) exceeds the cost to serve the Customer s class), the TOD Adjustment will increase the Green Rate Credit. If the value is positive (i.e., the cost to serve the Customer s class exceeds the value of the output from the GTSR Facilities (and/or the Interim Green Rate Pool)), the TOD Adjustment will decrease the Green Rate Credit. 2. Charges. All of the following components appear in aggregate, with the exception of the GTSR Indifference Adjustment which is displayed as an additional separate line item, as the Green Rate Charge under the Generation section of the Customer s regular billing statement and are updated annually as part of SCE s ERRA proceeding. a. Renewable Power Rate (RPR): Commodity rate for the GTSR Facilities that is calculated by taking the weighted average, TOD-adjusted contract costs of all GTSR Facilities (averaged with contract costs of projects from the Interim Green Rate Pool on a weighted average basis, if necessary). During the period of time when the Interim Green Rate Pool is used to meet Customer Subscriptions, the RPR is calculated as the weighted average, TODadjusted contract costs of all projects in the Interim Green Rate Pool. (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 3219-E-A R.O. Nichols Date Filed Oct 21, 2015 Decision Senior Vice President Effective Nov 20, H10 Resolution E-4734

21 Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No. Schedule GTSR-GR Sheet 5 GREEN TARIFF SHARED RENEWABLES GREEN RATE SPECIAL CONDITIONS 1. Definitions. The following definitions are applicable to Customers served under this Schedule: a. GTSR Program: Comprised of both the Green Rate Program (Schedule GTSR-GR) and the Community Renewables Program (Schedules GTSR-CR and GTSR-CR-PDT) that are administered by SCE. b. GTSR Facility(ies): New solar generating facility(ies) with a nameplate rated generating capacity between 0.5 MW and 20 MW that is located within SCE s service territory and that supplies energy to SCE via a Commission-approved GTSR Program procurement mechanism for the purposes of meeting Customer Subscriptions under this Schedule. SCE shall retire the RECs associated with the energy produced by GTSR Facility(ies) on behalf of participating Customers, except for the RECs associated with energy not needed to serve Green Rate Program Subscriptions. SCE shall also retire any California-eligible greenhouse gas (GHG) allowances associated with energy procurement from GTSR Facilities on behalf of participating Customers, except for the GHG allowances associated with energy not needed to serve Green Rate Program Subscriptions. c. Interim Green Rate Pool: Comprised of existing RPS-eligible solar projects that are located within SCE s service territory with a nameplate rated generating capacity between 0.5 MW and 20 MW with actual or expected online dates of January 1, 2014 or later that are used to meet Customer Subscriptions hereunder while GTSR Facilities are initially procured and constructed. d. Subscription: The percentage of registered load (kwh) served by SCE during each billing period that the Customer elects to have participate on this Schedule pursuant to Special Condition 4 below. 2. Customer Eligibility. Only Bundled Service customers whose OATs are billed based on metered consumption are eligible to receive service under this Schedule. Direct Access customers, Community Choice Aggregation (CCA) Service customers, Community Aggregation customers, and Transitional Bundled Service customers are not eligible to receive service under this Schedule. 3. Customer Enrollment and Term. Service under this Schedule shall become effective at the start of the next billing period after SCE receives a request from a Customer to take service hereunder; such request must include the Customer s elected Subscription option. There is no minimum length of time that a Customer must take service under this Schedule. There is also no termination fee associated with de-enrolling from the Green Rate Program. In the event a Customer elects to no longer receive service under this Schedule, the change will become effective at the start of the next billing period after the date that SCE receives the Customer s request to de-enroll from the Green Rate Program. The Customer is then ineligible to receive service under this Schedule for a period of 12 months from the date of the change. This 12- month restriction does not apply to Customers who are defaulted onto CCA Service and off of this Schedule provided the Customer elects to return to Bundled Service and requests to be served under this Schedule again within 60 days of having been originally defaulted onto CCA Service. (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 3219-E-A R.O. Nichols Date Filed Oct 21, 2015 Decision Senior Vice President Effective Nov 20, H13 Resolution E-4734

22 Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No. SPECIAL CONDITIONS (continued) Schedule GTSR-GR Sheet 6 GREEN TARIFF SHARED RENEWABLES GREEN RATE 4. Customer Subscriptions. Prior to receiving service under this Schedule, Customers must elect a Subscription option of either 50 percent (50%) or 100% of their registered load (kwh). For example, if the Customer s service account registers 700 kwh for a given billing period and the Customer elected the 50% Subscription option, 350 kwh would be subject to the additional charges and credits under the Rates section above. If the Customer elected the 100% Subscription option, 700 kwh would be subject to the additional charges and credits under the Rates section above. Customers may change their Subscription option once in any given 12- month period (e.g., change from the 50% option to the 100% option and vice versa), and such change shall become effective at the start of the next billing period after the Customer notifies SCE of the change. However, once SCE reaches its GTSR Program Cap or January 1, 2019, whichever is earlier, Customers can no longer change their Subscription option. The following Customer Subscription provisions also apply: a. A single Customer cannot elect a Subscription option that results in the Customer having load served under this Schedule in an amount equivalent to more than 2 MW. This limitation does not apply to a federal, state, or local government, school or school district, county office of education, the California Community Colleges, the California State University, or the University of California. b. A single Customer cannot elect a Subscription option that results in the Customer being subscribed (i.e., having an equivalent amount of load served under this Schedule) to more than 20% of any single calendar year s total available cumulative nameplate rated generating capacity under the GTSR Program. c. Customers with existing Subscriptions who relocate elsewhere within SCE s service territory can retain their Subscription at their new service address. The Customer will be considered as having continuously received service under this Schedule for the purpose of determining the GTSR Indifference Adjustment vintage, meaning that the closed account s GTSR Indifference Adjustment vintage will apply to the new service account, unless the Customer elects to no longer receive service under this Schedule at the time the new service account is established. d. 45 MW of capacity is reserved for residential Customer participation in the GTSR Program. SCE reserves the right to stop offering Subscriptions under this Schedule to non-residential Customers, and to no longer allow non-residential Customers served under this Schedule to increase their Subscription option, if non-residential Customer participation on the GTSR Program reaches the equivalent of 224 MW. (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 3219-E-A R.O. Nichols Date Filed Oct 21, 2015 Decision Senior Vice President Effective Nov 20, C9 Resolution E-4734

23 Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No. Special Conditions (continued) Schedule GTSR-GR Sheet 8 GREEN TARIFF SHARED RENEWABLES GREEN RATE 6. Billing. For each billing period, either 50% or 100% of the Customer s registered load (kwh) (i.e., the Customer s Subscription) is multiplied on a $/kwh basis by the charges and credits shown in the Rates section above. An aggregated Green Rate Charge, aggregated Green Rate Credit and GTSR Indifference Adjustment are applied to the Customer s regular billing statement, after and in addition to all other charges and credits of the Customer s OAT. 7. Metering. All Customers must be metered according to the requirements of their OAT. (To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 3219-E-A R.O. Nichols Date Filed Oct 21, 2015 Decision Senior Vice President Effective Nov 20, C9 Resolution E-4734

24 Attachment B Residential Green Rate Bill Mockup

25 P.O. Box 600 Rosemead, CA Your electricity bill VALUED CUSTOMER / Page 1 of 3 For billing and service inquiries call Customer account Date bill prepared: Mmm dd yy Service account STREET ADDRESS MONTEREY PARK, CA Rotating outage Group A123 Your account summary Previous balance $ Payment received Mmm dd yy -$ Balance forward $0.00 Your new charges $ Total amount you owe by Mmm dd yy $ Compare the electricity you are using For meter from Mmm dd yy to Mmm dd yy Total electricity you used this month in kwh 1,500 Your next billing cycle will end on or about Mmm dd yy. Your daily average electricity usage (kwh) 2 years ago: Last year: This year: Sep '08 Sep '09 Oct '09 Nov '09 Dec '09 Jan '10 Feb '10 Mar '10 Apr '10 May '10 Jun '10 Jul '10 Aug '10 Sep '10 Your monthly usage may be higher than usual Based on your historical usage pattern, your monthly usage is trending higher than normal. As a result, you may notice an increase in your bill. If you would like information on tips and programs that can help you lower your energy usage and your bill, please visit (14-574) (Tear here) Please return the payment stub below with your payment and make your check payable to Southern California Edison. If you want to pay in person, call for locations, or you can pay online at (Tear here) Customer account Please write this number on your check. Make your check payable to Southern California Edison. Amount due by Mmm dd yy $ Amount enclosed $ VALUED CUSTOMER MAILING ADDRESS MONTEREY PARK, CA P.O. BOX 600 ROSEMEAD, CA

Schedule GTSR-GR Sheet 1 GREEN TARIFF SHARED RENEWABLES GREEN RATE

Schedule GTSR-GR Sheet 1 GREEN TARIFF SHARED RENEWABLES GREEN RATE Southern California Edison Revised Cal. PUC Sheet No. 59547-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 56750-E Schedule GTSR-GR Sheet 1 APPLICABILITY This Schedule is applicable

More information

Schedule GTSR-CR Sheet 1 GREEN TARIFF SHARED RENEWABLES COMMUNITY RENEWABLES

Schedule GTSR-CR Sheet 1 GREEN TARIFF SHARED RENEWABLES COMMUNITY RENEWABLES Southern California Edison Revised Cal. PUC Sheet No. 59541-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 56740-E Schedule GTSR-CR Sheet 1 APPLICABILITY This Schedule is applicable

More information

January 26, Advice Letter 3721-E

January 26, Advice Letter 3721-E STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 January 26, 2018 Advice Letter 3721-E Russell G. Worden Director, State Regulatory

More information

SUBJECT: Establishment of the Avoided Cost Calculator Memorandum Account in Compliance with Decision

SUBJECT: Establishment of the Avoided Cost Calculator Memorandum Account in Compliance with Decision STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 June 13, 2017 Advice Letter 3566-E Russell G. Worden Director, State Regulatory

More information

SUBJECT: Establishment of Demand Response Load Shift Working Group Memorandum Account in Compliance with Decision

SUBJECT: Establishment of Demand Response Load Shift Working Group Memorandum Account in Compliance with Decision STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 February 23, 2018 Advice Letter 3729-E Russell G. Worden Director, State Regulatory

More information

SUBJECT: Modification of the Distribution Resources Plan Memorandum Account Pursuant to Decision

SUBJECT: Modification of the Distribution Resources Plan Memorandum Account Pursuant to Decision STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 April 13, 2018 Advice Letter 3764-E Russell G. Worden Director, State Regulatory

More information

SUBJECT: Establishment of the Distribution Resources Plan Demonstration Balancing Account (DRPDBA) Pursuant to Decision

SUBJECT: Establishment of the Distribution Resources Plan Demonstration Balancing Account (DRPDBA) Pursuant to Decision STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 June 2, 2017 Advice Letter 3579-E Russell G. Worden Director, State Regulatory

More information

Akbar Jazayeri Vice President, Regulatory Operations Southern California Edison Company P O Box 800 Rosemead, CA 91770

Akbar Jazayeri Vice President, Regulatory Operations Southern California Edison Company P O Box 800 Rosemead, CA 91770 STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr. Governor February 1, 2012 Advice Letter 2677-E Akbar Jazayeri Vice President, Regulatory Operations Southern

More information

September 22, Advice Letter 3033-E

September 22, Advice Letter 3033-E STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr., Governor September 22, 2014 Advice Letter 3033-E Megan Scott-Kakures Vice President,

More information

March 15, Advice Letter 3543-E

March 15, Advice Letter 3543-E STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 March 15, 2017 Advice Letter 3543-E Director, State Regulatory Operations

More information

October 26, 2017 Advice Letter 3665-E

October 26, 2017 Advice Letter 3665-E STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr., Governor October 26, 2017 Advice Letter 3665-E Russell G. Worden Director, Regulatory Operations Southern

More information

SUBJECT: Establishment of the Aliso Canyon Energy Savings Assistance Program Memorandum Account in Response to the Aliso Canyon Emergency

SUBJECT: Establishment of the Aliso Canyon Energy Savings Assistance Program Memorandum Account in Response to the Aliso Canyon Emergency STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 June 20, 2016 Advice Letter: 3413-E Russell G. Worden Managing Director, State

More information

June 11, 2018 Advice Letter 3803-E. SUBJECT: Qualified Nuclear Trust Investment Management Agreement with NISA Investment Advisors, LLC

June 11, 2018 Advice Letter 3803-E. SUBJECT: Qualified Nuclear Trust Investment Management Agreement with NISA Investment Advisors, LLC STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 June 11, 2018 Advice Letter 3803-E Russell G. Worden Director, State Regulatory

More information

Advice Letters 3072-E and 3072-E-A

Advice Letters 3072-E and 3072-E-A STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr., Governor August 19, 2014 Advice Letters 3072-E and 3072-E-A Megan Scott-Kakures Vice President, Regulatory

More information

SUBJECT: SCEs Request for Cancellation of Plug Load and Appliances (PLA) Subprogram - Appliance Recycling Program (ARP)

SUBJECT: SCEs Request for Cancellation of Plug Load and Appliances (PLA) Subprogram - Appliance Recycling Program (ARP) STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 March 8, 2016 Advice Letter 3365-E Russell G. Worden Director, State Regulatory

More information

SUBJECT: Establishment of the Transportation Electrification Portfolio Balancing Account Pursuant to D

SUBJECT: Establishment of the Transportation Electrification Portfolio Balancing Account Pursuant to D STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 February 26, 2018 Advice Letter 3734-E Russell G. Worden Director, State Regulatory

More information

ADVICE LETTER (AL) SUSPENSION NOTICE ENERGY DIVISION

ADVICE LETTER (AL) SUSPENSION NOTICE ENERGY DIVISION ADVICE LETTER (AL) SUSPENSION NOTICE ENERGY DIVISION Utility Name: Southern California Edison Utility Number/Type: U 338-E AL Number(s):3620-E/3620-E-A/3620-E-B Date AL(s) Filed: 6/16/17, 7/28/17, 9/11/17

More information

ADVICE LETTER (AL) SUSPENSION NOTICE ENERGY DIVISION

ADVICE LETTER (AL) SUSPENSION NOTICE ENERGY DIVISION ADVICE LETTER (AL) SUSPENSION NOTICE ENERGY DIVISION Utility Name: SCE Utility Number/Type: U338-E Advice Letter Number(s) 3214-E Date AL(s) Filed) 5/1/15 Utility Contact Person: Darrah Morgan Utility

More information

SUBJECT: Request for an Amendment to SCE's Bundled Procurement Plan Appendix D.

SUBJECT: Request for an Amendment to SCE's Bundled Procurement Plan Appendix D. STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 November 14, 2017 Advice Letter 3673-E Russell G. Worden Director, State Regulatory

More information

Akbar Jazayeri Vice President, Regulatory Operations Southern California Edison Company P O Box 800 Rosemead, CA 91770

Akbar Jazayeri Vice President, Regulatory Operations Southern California Edison Company P O Box 800 Rosemead, CA 91770 STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr. Governor March 5, 2012 Advice Letter 2692-E Akbar Jazayeri Vice President, Regulatory Operations P O Box

More information

March 17, 2008 Advice Letter 2211-E

March 17, 2008 Advice Letter 2211-E STATE OF CALIFORNIA ARNOLD SCHWARZENEGGER, Governor PUBLIC UTILITIES COMMISSION SAN FRANCISCO, CA 94102-3298 March 17, 2008 Advice Letter 2211-E Akbar Jazayeri Vice President, Regulatory Operations Southern

More information

ADVICE LETTER (AL) SUSPENSION NOTICE ENERGY DIVISION

ADVICE LETTER (AL) SUSPENSION NOTICE ENERGY DIVISION ADVICE LETTER (AL) SUSPENSION NOTICE ENERGY DIVISION Utility Name: SCE Utility Number/Type: U 338-E Advice Letter Number(s): 3660-E Date AL(s) Filed: September 25, 2017 Utility Contact Person: Darrah Morgan

More information

Akbar Jazayeri Vice President, Regulatory Operations Southern California Edison Company P O Box 800 Rosemead, CA 91770

Akbar Jazayeri Vice President, Regulatory Operations Southern California Edison Company P O Box 800 Rosemead, CA 91770 STATE OF CALIFORNIA ARNOLD SCHWARZENEGGER, Governor PUBLIC UTILITIES COMMISSION SAN FRANCISCO, CA 94102-3298 December 27, 2010 Advice Letter 2427-E Akbar Jazayeri Vice President, Regulatory Operations

More information

January 31, 2006 ADVICE 1960-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

January 31, 2006 ADVICE 1960-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Akbar Jazayeri Director of Revenue and Tariffs January 31, 2006 ADVICE 1960-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Statewide Pricing Pilot Advanced

More information

January 22, Establishment of Smart Energy Program and Modification of Summer Discount Plan in Compliance with Decision

January 22, Establishment of Smart Energy Program and Modification of Summer Discount Plan in Compliance with Decision Russell G. Worden Managing Director, State Regulatory Operations January 22, 2018 ADVICE 3731-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Establishment of

More information

November 14, 2005 ADVICE 1929-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

November 14, 2005 ADVICE 1929-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Akbar Jazayeri Director of Revenue and Tariffs November 14, 2005 ADVICE 1929-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Disconnection Notice, Past Due Utility

More information

June 30, 2015 ADVICE 3241-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

June 30, 2015 ADVICE 3241-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Russell G. Worden Managing Director, State Regulatory Operations June 30, 2015 ADVICE 3241-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Establishment of New

More information

ADVICE LETTER (AL) SUSPENSION NOTICE ENERGY DIVISION

ADVICE LETTER (AL) SUSPENSION NOTICE ENERGY DIVISION ADVICE LETTER (AL) SUSPENSION NOTICE ENERGY DIVISION Utility Name: Southern California Edison Utility No./Type: U 338-E Advice Letter No.: 3743-E Date Utility Notified: March 9, 2018 via: email [X] E-Mailto:

More information

May 30, Advice Letter 3444-E

May 30, Advice Letter 3444-E STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 May 30, 2017 Advice Letter 3444-E Russell G. Worden Director, State Regulatory

More information

February 26, 2018 Advice Letter 3926-G/5214-E

February 26, 2018 Advice Letter 3926-G/5214-E STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 EDMUND G. BROWN JR., Governor February 26, 2018 Advice Letter 3926-G/5214-E Erik Jacobson Director, Regulatory

More information

January 29, 2018 Advice Letter 5133-G

January 29, 2018 Advice Letter 5133-G STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 January 29, 2018 Advice Letter 5133-G Ronald van der Leeden Director, Regulatory

More information

July 9, Advice Letters: 3050-E

July 9, Advice Letters: 3050-E STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 July 9, 2014 Advice Letters: 3050-E Megan Scott-Kakures Vice President, Regulatory

More information

January 12, 2017 Advice Letter 5070

January 12, 2017 Advice Letter 5070 lstate OF CALIFORNIA PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr., Governor January 12, 2017 Advice Letter 5070 Ronald van der Leeden Director, Regulatory

More information

May 25, Revisions to Southern California Edison s Critical Peak Pricing Programs for Large Customers with Demands Above 200 kw

May 25, Revisions to Southern California Edison s Critical Peak Pricing Programs for Large Customers with Demands Above 200 kw Akbar Jazayeri Director of Revenue and Tariffs May 25, 2005 ADVICE 1895-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Revisions to Southern California Edison

More information

October 5, 2017 Advice Letter 3488-E

October 5, 2017 Advice Letter 3488-E STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION SAN FRANCISCO, CA 94102-3298 REVISED Edmund G. Brown Jr., Governor October 5, 2017 Advice Letter 3488-E Russell G. Worden Director, Regulatory Operations

More information

Your electricity bill

Your electricity bill P.O. Box 300 Rosemead, CA 91772-0001 www.sce.com Your electricity bill DOM DA NON-CON / Page 1 of 6 15 For billing and service inquiries call 1-800-799-4723, 24 hrs a day, 7 days a week Date bill prepared:

More information

March 13, Advice Letter 218-G/3730-E

March 13, Advice Letter 218-G/3730-E STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 March 13, 2018 Advice Letter 218-G/3730-E Russell G. Worden Director, State

More information

December 5, 2016 Advice Letter 3501-E

December 5, 2016 Advice Letter 3501-E STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr., Governor December 5, 2016 Advice Letter 3501-E Russell G. Worden Director, Regulatory Operations Southern

More information

June 10, 2005 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

June 10, 2005 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Akbar Jazayeri Director of Revenue and Tariffs June 10, 2005 ADVICE 1896-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Establishment of Application for California

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 59483-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 51843-E APPLICABILITY Schedule RES-BCT Sheet 1 This Schedule is optional

More information

April 29, Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, CA Dear Ms. Megan Scott-Kakures,

April 29, Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, CA Dear Ms. Megan Scott-Kakures, STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 EDMUND G. BROWN JR., Governor April 29, 2014 Southern California Edison Company 2244 Walnut Grove Avenue

More information

September 16, 2015 Advice Letter 4845

September 16, 2015 Advice Letter 4845 STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr., Governor September 16, 2015 Advice Letter 4845 Ronald van der Leeden Director, Regulatory

More information

April 4, 2014 Advice Letter 4616-G

April 4, 2014 Advice Letter 4616-G STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr., Governor April 4, 2014 Advice Letter 4616-G Rasha Prince, Director Regulatory Affairs

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 64409-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 58722-E Schedule NEM Sheet 1 APPLICABILITY Applicable to Eligible Customer-Generators

More information

Enclosed are copies of the following revised tariff sheets for the utility s files:

Enclosed are copies of the following revised tariff sheets for the utility s files: STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 EDMUND G. BROWN JR., Governor May 11, 2018 Gary A. Stern, Ph.D. Managing Director, State Regulatory Operations

More information

November 16, Advice Letter 5178-A

November 16, Advice Letter 5178-A STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 November 16, 2017 Ronald van der Leeden Director, Regulatory Affairs Southern California Gas 555 W. Fifth

More information

May 15, 2013 ADVICE 88-W (U 338-W) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

May 15, 2013 ADVICE 88-W (U 338-W) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Megan Scott-Kakures Vice President, Regulatory Operations May 15, 2013 ADVICE 88-W (U 338-W) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Modifications to Southern California

More information

March 1, 2013 Advice Letter 2841-E

March 1, 2013 Advice Letter 2841-E STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr. Governor March 1, 2013 Advice Letter 2841-E Akbar Jazayeri Vice President, Regulatory Operations Southern

More information

December 11, 2006 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

December 11, 2006 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Akbar Jazayeri Vice President, Revenue and Tariffs December 11, 2006 ADVICE 2072-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Revision to the Base Revenue

More information

April 3, Megan Scott-Kakures Vice President, Regulatory Operations Southern California Edison Company 8631 Rush Street Rosemead, CA 91770

April 3, Megan Scott-Kakures Vice President, Regulatory Operations Southern California Edison Company 8631 Rush Street Rosemead, CA 91770 STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 EDMUND G. BROWN JR., Governor April 3, 2015 Megan Scott-Kakures Vice President, Regulatory Operations Southern

More information

Revised Cal. P.U.C. Sheet No E Cancelling Original Cal. P.U.C. Sheet No E. ELECTRIC SCHEDULE E-GT Sheet 1 GREEN TARIFF PROGRAM

Revised Cal. P.U.C. Sheet No E Cancelling Original Cal. P.U.C. Sheet No E. ELECTRIC SCHEDULE E-GT Sheet 1 GREEN TARIFF PROGRAM Revised Cal. P.U.C. Sheet No. 40858-E Cancelling Original Cal. P.U.C. Sheet No. 35744-E ELECTRC SCHEDULE E-GT Sheet 1 GREEN TARFF PROGRAM APPLCABLTY: TERRTORY: The Green Tariff (GT) is one of two voluntary

More information

Subject: Core Pricing Flexibility and Noncore Competitive Load Growth Opportunities Programs

Subject: Core Pricing Flexibility and Noncore Competitive Load Growth Opportunities Programs Ronald van der Leeden Director Regulatory Affairs 555 W. Fifth Street, GT14D6 Los Angeles, CA 90013-1011 Tel: 213.244.2009 Fax: 213.244.4957 RvanderLeeden@semprautilities April 29, 2016 Advice No. 4961

More information

SUBJECT: System-wide Curtailment Effective February 20, 2018 through March 6, 2018.

SUBJECT: System-wide Curtailment Effective February 20, 2018 through March 6, 2018. STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 June 15, 2018 Advice Letter 5267-G Ronald van der Leeden Director, Regulatory

More information

July 1, 2015 Advice Letter: 4814-G. Advice Letter 4814-G is effective as of June 29, 2015 with corresponding Tariffs effective as of July 1, 2015.

July 1, 2015 Advice Letter: 4814-G. Advice Letter 4814-G is effective as of June 29, 2015 with corresponding Tariffs effective as of July 1, 2015. STATE OF CALIFORNIA EDMUND G. BROWN JR., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 July 1, 2015 Advice Letter: 4814-G Southern California Gas Company Attention:

More information

November 14, 2014 Advice Letters: 4582-G 4582-G-A. SUBJECT: Establishment of Rule No. 43, OBR Tariff in Compliance with D.

November 14, 2014 Advice Letters: 4582-G 4582-G-A. SUBJECT: Establishment of Rule No. 43, OBR Tariff in Compliance with D. STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 November 14, 2014 Advice Letters: 4582-G 4582-G-A Rasha Prince, Director Regulatory

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 64407-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 43778-E Schedule NMDL Sheet 1 APPLICABILITY This Schedule is applicable

More information

SUBJECT: Deviation to SCE's Added Facilities Agreement - Applicant Financed (Form ) for Fort Irwin

SUBJECT: Deviation to SCE's Added Facilities Agreement - Applicant Financed (Form ) for Fort Irwin STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 October 9, 2014 Advice Letter 3100-E Megan Scott-Kakures Vice President, Regulatory

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 58755-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 55676-E APPLICABILITY Schedule NEM-V Sheet 1 Applicable to Qualified Customers

More information

Schedule NEM-V Sheet 1 VIRTUAL NET ENERGY METERING FOR MULTI-TENANT AND MULTI-METER PROPERTIES

Schedule NEM-V Sheet 1 VIRTUAL NET ENERGY METERING FOR MULTI-TENANT AND MULTI-METER PROPERTIES Southern California Edison Revised Cal. PUC Sheet No. 55676-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 54511-E* APPLICABILITY Schedule NEM-V Sheet 1 Applicable to Qualified

More information

December 14, 2016 Advice Letter 5053

December 14, 2016 Advice Letter 5053 lstate OF CALIFORNIA PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr., Governor December 14, 2016 Advice Letter 5053 Ronald van der Leeden Director, Regulatory

More information

August 15, 2017 Advice Letter 5167-G

August 15, 2017 Advice Letter 5167-G STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 August 15, 2017 Advice Letter 5167-G Ronald van der Leeden Director, Regulatory

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 60721-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 53887-E Schedule FC-NEM Sheet 1 APPLICABILITY Applicable to Bundled Service

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 57626-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 46689-E Schedule TMDL Sheet 1 APPLICABILITY This Schedule is applicable

More information

December 14, Modifications to Regulatory Mechanisms Established in Accordance with Decision and Decision

December 14, Modifications to Regulatory Mechanisms Established in Accordance with Decision and Decision Akbar Jazayeri Director of Revenue and Tariffs December 14, 2005 ADVICE 1940-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Modifications to Regulatory Mechanisms

More information

July 17, 2013 Advice Letter 4504

July 17, 2013 Advice Letter 4504 STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 July 17, 2013 Advice Letter 4504 Rasha Prince, Director Regulatory Affairs

More information

Akbar Jazayeri Vice President, Regulatory Operations Southern California Edison Company P O Box 800 Rosemead, CA 91770

Akbar Jazayeri Vice President, Regulatory Operations Southern California Edison Company P O Box 800 Rosemead, CA 91770 STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr. Governor May 31, 2011 Advice Letter 2550-E Akbar Jazayeri Vice President, Regulatory Operations Southern

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 64404-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 58701-E Schedule MASH-VNM Sheet 1 APPLICABILITY Applicable to Qualified

More information

SUBJECT: PG&E, SCE, and SDG&E's Proposed Modifications to Rule 24 and Related Documents

SUBJECT: PG&E, SCE, and SDG&E's Proposed Modifications to Rule 24 and Related Documents STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 February 9, 2016 Advice Letters 3313-E, 3313-E-A, 3313-E-B and 3313-E-C Russell

More information

SUBJECT: Submission of Contract for Procurement of Renewable Energy from SCE's 2013 Renewables Portfolio Standard Solicitation

SUBJECT: Submission of Contract for Procurement of Renewable Energy from SCE's 2013 Renewables Portfolio Standard Solicitation STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 April 28, 2015 Advice Letter 3119-E Russell G. Worden Director, State Regulatory

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 62547-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 57088-E APPLICABILITY Schedule CCA-INFO Sheet 1 Applicable to Community

More information

May 16, Newly Designed Bill Format and Establishment of an Optional Simplified Bill Format

May 16, Newly Designed Bill Format and Establishment of an Optional Simplified Bill Format Akbar Jazayeri Vice President, Revenue and Tariffs May 16, 2007 ADVICE 139-G (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Newly Designed Bill Format and Establishment

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 57616-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 53885-E Schedule CPP Sheet 1 APPLICABILITY This Schedule is optional for

More information

Southern California Edison IEC (Corp ID 6096) Status of Advice Letter 128 As of January 21, Disposition: Effective Date: Accepted

Southern California Edison IEC (Corp ID 6096) Status of Advice Letter 128 As of January 21, Disposition: Effective Date: Accepted STATE OF CALIFORNIA EDMUND G. BROWN JR., Governor PUBLIC UTILITIES COMMISSION 505 Van Ness Avenue San Francisco CA 94102-3298 Southern California Edison IEC (Corp ID 6096) Status of Advice Letter 128 As

More information

December 11, 2003 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

December 11, 2003 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Akbar Jazayeri Director of Revenue and Tariffs December 11, 2003 ADVICE 1717-E-A (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Tariff Modifications Associated

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 52806-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 51618-E Rule 22.1 Sheet 1 The following terms and conditions apply to

More information

SUBJECT: Submission of Contract for Procurement of Renewable Energy from SCE's 2013 Renewables Portfolio Standard Solicitation

SUBJECT: Submission of Contract for Procurement of Renewable Energy from SCE's 2013 Renewables Portfolio Standard Solicitation STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 March 19, 2015 Advice Letters: 3124-E Russell G. Worden Director, State Regulatory

More information

request for approval of Telecommunication leases between SCEC and MCImetro access transmission services LLC pursuant to GO 173 Accepted

request for approval of Telecommunication leases between SCEC and MCImetro access transmission services LLC pursuant to GO 173 Accepted STATE OF CALIFORNIA EDMUND G. BROWN JR., Governor PUBLIC UTILITIES COMMISSION 505 Van Ness Avenue San Francisco CA 94102-3298 Southern California Edison IEC (Corp ID 6096) Status of Advice Letter 130 As

More information

September 13, Advice Letter 3452-E

September 13, Advice Letter 3452-E STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 September 13, 2016 Advice Letter 3452-E Russell G. Worden Director, State

More information

December 5, Advice No (U 904 G) Public Utilities Commission of the State of California

December 5, Advice No (U 904 G) Public Utilities Commission of the State of California Ronald van der Leeden Director Regulatory Affairs 555 W. Fifth Street, GT14D6 Los Angeles, CA 90013-1011 Tel: 213.244.2009 Fax: 213.244.4957 RvanderLeeden@semprautilities.com December 5, 2017 Advice No.

More information

March 7, 2018 Advice Letter 5234-G. SUBJECT: Modification of the New Environmental Regulation Balancing Account (NERBA).

March 7, 2018 Advice Letter 5234-G. SUBJECT: Modification of the New Environmental Regulation Balancing Account (NERBA). STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 March 7, 2018 Advice Letter 5234-G Ray B. Ortiz Southern California Gas Company

More information

June 5, Advice No (U 904 G) Public Utilities Commission of the State of California. Subject: Schedule No. G-CPS May 2018 Cash-Out Rates

June 5, Advice No (U 904 G) Public Utilities Commission of the State of California. Subject: Schedule No. G-CPS May 2018 Cash-Out Rates Ronald van der Leeden Director Regulatory Affairs 555 W. Fifth Street, GT14D6 Los Angeles, CA 90013-1011 Tel: 213.244.2009 Fax: 213.244.4957 RvanderLeeden@semprautilities.com June 5, 2018 Advice No. 5305

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 57517-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 55662-E Schedule NEM Sheet 1 APPLICABILITY Applicable to Eligible Customer-Generators

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 62425-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 57044-E Schedule DBP Sheet 1 APPLICABILITY This Schedule is optional for

More information

Schedule NEM-ST Sheet 1 NET ENERGY METERING SUCCESSOR TARIFF

Schedule NEM-ST Sheet 1 NET ENERGY METERING SUCCESSOR TARIFF Southern California Edison Revised Cal. PUC Sheet No. 60463-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 58728-E Schedule NEM-ST Sheet 1 APPLICABILITY This Schedule is applicable

More information

July 20, 2018 Advice Letter 3681-E/3681-E-A

July 20, 2018 Advice Letter 3681-E/3681-E-A STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 July 20, 2018 Advice Letter 3681-E/3681-E-A Russell G. Worden Director, State

More information

Schedule NEM-ST Sheet 1 NET ENERGY METERING SUCCESSOR TARIFF

Schedule NEM-ST Sheet 1 NET ENERGY METERING SUCCESSOR TARIFF Southern California Edison Revised Cal. PUC Sheet No. 60463-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 58728-E Schedule NEM-ST Sheet 1 APPLICABILITY This Schedule is applicable

More information

ADVICE LETTER (AL) SUSPENSION NOTICE ENERGY DIVISION

ADVICE LETTER (AL) SUSPENSION NOTICE ENERGY DIVISION ADVICE LETTER (AL) SUSPENSION NOTICE ENERGY DIVISION Utility Name: Southern California Edison Co. Utility Number/Type: U 338-E Advice Letter Number(s): 3695-E Date AL(s) Filed: Nov. 16, 2017 Utility Contact

More information

April 8, 2005 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Revision to the Energy Resource Recovery Account

April 8, 2005 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Revision to the Energy Resource Recovery Account Akbar Jazayeri Director of Revenue and Tariffs April 8, 2005 ADVICE 1884-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Revision to the Energy Resource Recovery

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 58812-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 55706-E Sheet 1 NET ENERGY METERING Form 14-935 (To be inserted by utility)

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 59484-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 52461-E RATES (continued) Schedule RES-BCT Sheet 2 All costs associated

More information

Schedule NEM-V-ST Sheet 1 VIRTUAL NET METERING FOR MULTI-TENANT AND MULTI-METER PROPERTIES SUCCESSOR TARIFF

Schedule NEM-V-ST Sheet 1 VIRTUAL NET METERING FOR MULTI-TENANT AND MULTI-METER PROPERTIES SUCCESSOR TARIFF Southern California Edison Revised Cal. PUC Sheet No. 60503-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 58758-E Schedule NEM-V-ST Sheet 1 APPLICABILITY This Schedule is applicable

More information

SUBJECT: Submission of Contract for Procurement of Renewable Energy from SCE's 2013 Renewables Portfolio Standard Solicitation

SUBJECT: Submission of Contract for Procurement of Renewable Energy from SCE's 2013 Renewables Portfolio Standard Solicitation STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 August 21, 2015 Advice Letter 3120-E Russell G. Worden Director, State Regulatory

More information

February 19, Revisions to SCE s 2008 Santa Catalina Island Water Revenue Requirement

February 19, Revisions to SCE s 2008 Santa Catalina Island Water Revenue Requirement Akbar Jazayeri Vice President of Regulatory Operations February 19, 2008 ADVICE 62-W (U 338-W) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA WATER DIVISION SUBJECT: Revisions to SCE s 2008 Santa

More information

August 25, Advice Letter 4677-E

August 25, Advice Letter 4677-E STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr., Governor August 25, 2015 Erik Jacobson Director, Regulatory Relations Pacific Gas and

More information

April 3, Advice 4085-G/5517-E (Pacific Gas and Electric Company ID U 39 M) Public Utilities Commission of the State of California

April 3, Advice 4085-G/5517-E (Pacific Gas and Electric Company ID U 39 M) Public Utilities Commission of the State of California Erik Jacobson Director Regulatory Relations Pacific Gas and Electric Company 77 Beale St., Mail Code B13U P.O. Box 770000 San Francisco, CA 94177 Fax: 415-973-3582 April 3, 2019 Advice 4085-G/5517-E (Pacific

More information

SUBJECT: SCEs 2014 Assembly Bill 57 Bundled Procurement Plan Compliance Filing

SUBJECT: SCEs 2014 Assembly Bill 57 Bundled Procurement Plan Compliance Filing STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 February 16, 2016 Advice Letter: 3349-E Russell G. Worden Managing Director,

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 62190-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 61458-E Sheet 1 DISCONNECTION NOTICE, PAST DUE UTILITY SERVICE AND OTHER

More information

September 5, 2006 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

September 5, 2006 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Akbar Jazayeri Vice President, Revenue and Tariffs September 5, 2006 ADVICE 2039-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Request for an Amendment to

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 58914-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 57616-E Schedule CPP Sheet 1 APPLICABILITY This Schedule is optional for

More information

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E Revised Cal. P.U.C. Sheet No. 41685-E Cancelling Revised Cal. P.U.C. Sheet No. 40901-E ELECTRIC SCHEDULE ETL Sheet 1 APPLICABILITY: TERRITORY: RATES: This schedule is applicable to residential single-phase