1 National Highways Authority of India, PIU-Patna Project: 4- laining of Patna Buxar section of NH-30 & 84 from Km to in the state of Bihar under NHDP Phase-III in 3 packages on EPC mode. 01. Name of the Project Four Lanning of Patna - Buxar stretch of NH 30 from Km to Km (Existing Chainage Km to Km ofnh 30 & Ara Bypass from km of NH-30to Km 6.00 of NH 84 & Km to Km of NH 84 in the state of Bihar under NHDP Phase- III in 3 packages on EPC Mode: Package I: Patna to Koilwar ( Design Chainage Km to Km Total Length = Km.) Package II: Koilwar to Bhojpur (Design Chainage Km to Km Total Length = Km.) Package III: Bhojpur to Buxar (Design Chainage Km to Km Total Length = Km.) 02. a) Name of the Concessionaire b) Name of EPC Contractor 01. a) Name of the Independent Consultant/IC Name of the Project Management Consultant/PMC Patna Buxar Highway limited terminated due to non compliance of financial close within stipulated time. Not Finalized-Restructured 3 packages estimates has been sent to HQ vide letter no. NHAI/RO/PAT/PAT- BUX/IE/2012/1887 dated Bloom Companies, LLC Not Applicable 02. Contract Price/TPC Rs Cr. (BOT Package) Restructured with total civil cost Cr on EPC. Package I Rs Cr. Package II Rs Cr. Package III Rs Cr. 04A Concession period NA 03. Date of commencement/appointed date/financial close date Contract terminated vide NHAI, HQ letter no. NHAI/BH/11012/26/2004/Imp/56066 dated and project is to be implemented under EPC mode in three packages. 04. Stipulated date of completion Not Applicable

2 05. Likely date of completion Not Applicable 06. Extension of time granted upto Not Applicable 07. Progress Not Applicable 08. Brief scope of work (give nos/name/location/length/span arrangement) (a) Length of section Kms. (b) Major Bridges 09 no. Package I 1.Sikandarpur ( 5x21.5+1x10.75) 2. Local Stream (1x18.9+2x x18.9) 3. Local Stream (1 x x x18.9) 4. Lekhantola (1 x x x18.9) Package II 1.Sone River (30 x x 23.00) 2.Nagri Nadi x Gangi Nadi x 20 4.Bhitauli Nadi x x x Package III 1.Ganga River x x x (c) Minor Bridges 19 nos. Package I 1.Narayan chakk x13 2. Nawado x21 3.Patna Main Canal x x10 5. Ahiya pur x Maner Ditr x20 Package II 7.Giddha x6 8. Danapur Dist x18 9. Sobhi Dumra x Banas x14

3 11. Banas Nadu x Gangi Nadi x Gangi Nadi x34 Package III 14. Shahpur x26 15.LS x LS x6 17. Koan Nadi x LS x Bhainshi Nadi x7.38+3x6.5 (d) Rigid pavement 125 Km (e) Flexible pavement 0.00 (f) Bypass and /or realignments Package I : (g) Flyovers Nil 1. Patna Bypass = Km. 2. Realignmnet: (i) Jagdispur 1.6 Km (ii) Ahiyapur 1.6 Km. (iii) Kanhauli 1.6 Km. (iv) Srirampur Km. (v) Bihta Chowk 1.3 Km. Total Length of Realignment = Km. Package II : 1. Ara Bypass = Km 2. Realignment: (i) Sone Bridge Km. (ii) Bibigunj 1.1 Km. (iii) Gajrajgunj 2.4 Km. (iv) Bihiya 2.00 Km. (v) Sariya/Bilouty 1.9 Km. Total Length of Realignment = Km. Package III: 1. Shahpur/Ranisagar Bypass = Km 2. Realignment : (i) Barhampur 1.9 Km. (ii) Naya Bhojpur 1.9 Km. (iii) Purana Bhojpur 2.9 Km Total Length of Realignment = 6.7 Km

4 (i) Culverts Package I: 58 Package II: 63 Package III: 73 (j) Service roads 2.25x2 kms ( 7 mtr wide - Flexible) (k) VUP/PUP Package I: 2 VUP & 2 Utility Passage Package II: 10 PUP Package III: 2 VUP & 11 PUP (l) ROB 1 Nos at km in Package I (m) Truck Lay Bye Two locations 1) Km (Gidha) in Package - II 2) Km (Dalsagar) in Package - III (n) Toll Plaza Two Locations 1) Km , ( 5+5) Lanes in Package - II 2) Km ,( 5+5) Lanes in Package - III (o) Bus Bays/ Bus Shelter 33 Nos Package I : 6 Package II : 13 Package III : 14 (11) Status of pre construction activities and steps taken so far: Details of Land Acquisition: Annexure-I Total Land required for project = 750 Ha Available ROW = 168 Ha LA proposed to be done = 582 Ha 3A completed = Ha = Ha.(96.86%) 3D completed = Ha = Ha.(96.86 %) 3G Completed = Ha = Ha.(95.27 %) Possession = Ha +168 Ha= Ha ( 84.26%) (12) Details of Environmental clearance: Obtained vide letter no5-10/2009-ia-iii dated (13) Details of Forest clearance:

5 Stage I forest clearance of 44.5 Km out of 125 km approved vide MoEF letter no 8-38/2010-FC dated Stage II forest clearance has been forwarded to Govt. of India by State Govt. vide letter no Forest land -09/ (E) dated Observation from MoEF regarding the certificate of FRA-2006 from DM-Bhojpur and Buxar which are pending with DM s. However, work may be executed even Stage II clearance is not obtained as per MoEF Letter no. F.No /2014-FC dated 8 th Aug (14) Details of utility shifting:- Estimate sanctioned on (15) Details of permission from Railways: GAD approved on for ROB at Km (16) Current status of the Project:- Concession Agreement has been terminated due to failure of timely financial closure vide letter no. NHAI/BH/11012/26/2004/Imp/56066 dated Restructured estimates in 3 packages have been submitted to the NHAI, HQ for further approval vide letter no. NHAI/RO/PAT/PAT-BUX/IE/I/2012/1887 dated

India: Public Private Partnerships in Highways Sector

India: Public Private Partnerships in Highways Sector India: Public Private Partnerships in Highways Sector Prepared by World Bank as input for IDA paper, 2008 (provided by Tarun Sankar, PPIAF office, South Asia) India s transport program is one of the most

More information

Presentation at Asian Highways Investment Forum. Performance based Maintenance Contracts for Highways

Presentation at Asian Highways Investment Forum. Performance based Maintenance Contracts for Highways Presentation at Asian Highways Investment Forum Bangkok, 8-9, October 2013 United Nations Economic & Social Commission For Asia & The Pacific Performance based Maintenance Contracts for Highways By Atul

More information

Experience of Implementing Transportation PPPs in India. Abhijit Bhaumik August 6, 2015

Experience of Implementing Transportation PPPs in India. Abhijit Bhaumik August 6, 2015 Experience of Implementing Transportation PPPs in India Abhijit Bhaumik August 6, 2015 Experience of Implementing PPPs in India India has witnessed successful PPPs across several infrastructure sectors

More information

Road Infrastructure - An Evolving Transformation

Road Infrastructure - An Evolving Transformation Government of Bihar Road Infrastructure - An Evolving Transformation Presentation Road Construction Department 18.11.09 The State has - 3734 Kms of National Highways - 3989 Kms of State Highways - 8156

More information

NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVT.OF INDIA) Plot No. G-5 & 6, Sector 10, Dwarka New Delhi

NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVT.OF INDIA) Plot No. G-5 & 6, Sector 10, Dwarka New Delhi NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVT.OF INDIA) Plot No. G-5 & 6, Sector 10, Dwarka New Delhi 110 075 Independent Engineer services for 4 Laning of Goa / Karnataka

More information

ROAD DEVELOPMENT IN INDIA

ROAD DEVELOPMENT IN INDIA ROAD DEVELOPMENT IN INDIA - 2010 This report is the most up-to-date and comprehensive review of the Indian road sector. The report provides: The latest status of projects, programmes and policies (as on

More information

Public Private Partnership in Highway Sector in Punjab, India

Public Private Partnership in Highway Sector in Punjab, India Public Private Partnership in Highway Sector in Punjab, India Infrastructure Governance Roundtable March 24 th, 2006 Kulwinder Singh Rao Deputy Project Director Punjab Roads & Bridges Development Board

More information

AMENDMENT - 2 SECTION 2 INSTRUCTION TO CONSLTANTS, 2.1 Scope of the proposal, Page-13 of Revised RFP document stands amended as follows:-

AMENDMENT - 2 SECTION 2 INSTRUCTION TO CONSLTANTS, 2.1 Scope of the proposal, Page-13 of Revised RFP document stands amended as follows:- Bihar State Road Development Corporation Limited (A Government of Bihar Undertaking) Regd. Office: RCD Central Mechanical Workshop Campus, Near Patna Airport, Sheikhpura, Patna-800014 Tel: 0612-2226711,

More information

CA Anoop Kumar Jairath, Partner (Membership # )

CA Anoop Kumar Jairath, Partner (Membership # ) CA Anoop Kumar Jairath, Partner (Membership # 0 8 6 5 1 5) ACADEMIA of CA Anoop Kumar Jairath B.Com from Delhi University Fellow Chartered Accountant (F.C.A) SAS (COMMERCIAL) from Comptroller & Auditor

More information

DLI/BDD/EOI/

DLI/BDD/EOI/ DLI/BDD/EOI/073 24.01.2018 Expression of Interest to act as a lead member in a joint venture for participation in upgradation to 2 lane with paved shoulder/4 lane of Gagaria-Baori Kalan- Serwa-Bakhasar

More information

NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVT.OF INDIA) Plot No. G-5 & 6, Sector 10, Dwarka New Delhi

NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVT.OF INDIA) Plot No. G-5 & 6, Sector 10, Dwarka New Delhi NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVT.OF INDIA) Plot No. G-5 & 6, Sector 10, Dwarka New Delhi 110 075 Independent Engineer services for development and construction

More information

HIGHWAY ENGINEERING MODULE-IV

HIGHWAY ENGINEERING MODULE-IV HIGHWAY ENGINEERING MODULE-IV 1 HIGHWAY DRAINAGE. 2 HILL ROAD 3 ROADSIDE DEVELOPMENT. 4 ROAD ADMINISTRATION AND FINANCE Prof. Ujjval J. Solanki DEPARTMENT OF CIVIL ENGINEERING, DARSHAN INSTITUTE OF ENGINEERING

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Bihar New Ganga Bridge Project (RRP IND 48373) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The proposed project is to build a new six-lane bridge across the Ganges River near Patna in the state

More information

Dr. Pramod Kumar Anand JS (RC) & DG, NRRDA : : : D.O. # P-10021/1/2010/P-III August 4, 2010

Dr. Pramod Kumar Anand JS (RC) & DG, NRRDA : : : D.O. # P-10021/1/2010/P-III August 4, 2010 Dr. Pramod Kumar Anand JS (RC) & DG, NRRDA : 23383553 : 23388207 : anandpk@nic.in D.O. # P-10021/1/2010/P-III August 4, 2010 Dear Shri As you are aware, Government of India launched the Pradhan Mantri

More information

Infrastructure Development Finance Company Limited

Infrastructure Development Finance Company Limited Infrastructure Development Finance Company Limited Presentation on Road Sector Financing Our four sector focus: Energy. Telecom. Transport Industrial & Commercial Infrastructure Agenda 1 Road Sector Overview

More information

November 15, 2017 I Ratings. Hybrid Annuity Model The journey so far. Introduction:

November 15, 2017 I Ratings. Hybrid Annuity Model The journey so far. Introduction: Hybrid Annuity Model The journey so far Contact: Maulesh Desai Associate Director Maulesh.desai@careratings.com 91-79- 4026 5605 91-8511190079 Ravina Deopura Analyst Ravina.deopura@careratings.com 91-79-4026

More information

Road and Transport : Registered Motor Vehicles per 1000 Population and % Share of Registered Motor

Road and Transport : Registered Motor Vehicles per 1000 Population and % Share of Registered Motor and Transport 13.1: Surfaced & Length s in Arunachal Pradesh (A.P.) 13.2: Length of National Highways 13.3: Lane-wise Length of National Highways 13.4: and Surfaced Length of other PWD s 13.5: Length of

More information

WELCOME SHAREHOLDERS. 25 th Annual General Meeting September 19, 2018

WELCOME SHAREHOLDERS. 25 th Annual General Meeting September 19, 2018 WELCOME SHAREHOLDERS 25 th Annual General Meeting September 19, 2018 WELCOME SHAREHOLDERS TO 25 TH ANNUAL GENERAL MEETING SEPTEMBER 19, 2018 3 Disclaimer This presentation and the accompanying slides (the

More information

GUIDELINES FOR FORMULATION, APPRAISAL AND APPROVAL OF PUBLIC PRIVATE PARTNERSHIP (PPP) PROJECTS

GUIDELINES FOR FORMULATION, APPRAISAL AND APPROVAL OF PUBLIC PRIVATE PARTNERSHIP (PPP) PROJECTS GUIDELINES FOR FORMULATION, APPRAISAL AND APPROVAL OF PUBLIC PRIVATE PARTNERSHIP (PPP) PROJECTS (i) (ii) OF ALL SECTORS COSTING MORE THAN RS.100 CRORE AND LESS THAN RS.250 CRORE UNDER NHDP COSTING RS.250

More information

COST BENEFIT ANALYSIS OF CHENNAI PERIPHERAL ROAD

COST BENEFIT ANALYSIS OF CHENNAI PERIPHERAL ROAD COST BENEFIT ANALYSIS OF CHENNAI PERIPHERAL ROAD 1 Introduction The objective of the cost benefit economic analysis is to identify and quantify the benefits and costs associated with the project. This

More information

SBI Capital Markets Ltd, AK capital Services Ltd, ICICI Securities, Kotak Invest Banking

SBI Capital Markets Ltd, AK capital Services Ltd, ICICI Securities, Kotak Invest Banking Issuer Issue Recommendation Acceptance Public Issue of tax free NCDs aggregating to Rs.5000 crs with an option to retain oversubscription upto Rs.5000 crs for issuance of additional NCDs. SUBSCRIBE ON

More information

Toll Supported Finance for Highway Development in India

Toll Supported Finance for Highway Development in India Toll Supported Finance for Highway Development in India Prof. Nagarjuna P. 1 and Dr. Pradeepta Kumar Samanta 2 1,2, Assistance Professor, National Institute of Construction Management and Research (NICMAR),

More information

Development, Govt. of India, and 40% funded by Govt. Madhya Pradesh.

Development, Govt. of India, and 40% funded by Govt. Madhya Pradesh. MADHYA PRADESH RURAL ROAD DEVELOPMENT AUTHORITY (AN AGENCY OF PANCHYAT & RURAL DEVELOPMENT DEPARTMENT, GOVT. OF M.P.) 5 th Floor, Block-II, Paryavas Bhawan, BHOPAL M.P. 462 011 PRADHANMANTRI GRAM SADAK

More information

ECONOMIC SENSITIVITY ANALYSIS OF WALAYAR - VADAKKANCHERRY B.O.T. CONTRACT ROAD PROJECT A CASE STUDY

ECONOMIC SENSITIVITY ANALYSIS OF WALAYAR - VADAKKANCHERRY B.O.T. CONTRACT ROAD PROJECT A CASE STUDY ECONOMIC SENSITIVITY ANALYSIS OF WALAYAR - VADAKKANCHERRY B.O.T. CONTRACT ROAD PROJECT A CASE STUDY R. R. Kshatriya 1, Monika B. Murkute 2,Sonia G. Upadhyay 3 1 Assistant Professor, Department of Civil

More information

To, Deputy Project Manager (PJ), Mis Indian Oil Corporation Ltd., Vill. Jhimani, Paradip, Dist. Jagatsinghpur, Orissa

To, Deputy Project Manager (PJ), Mis Indian Oil Corporation Ltd., Vill. Jhimani, Paradip, Dist. Jagatsinghpur, Orissa F.No. 11-33/2013-IA III Government of India Ministry of Environment & Forests (IA Division) Paryavaran Bhawan, CGO Complex, Lodhi Road, New Delhi - 110 003. To, Deputy Project Manager (PJ), Mis Indian

More information

15 th International Road Federation World Meeting

15 th International Road Federation World Meeting 15 th International Road Federation World Meeting Bangkok, June 2005 Guang Z. Chen Sector Manager, Transport South Asia Region The World Bank Today s Presentation Principles of Road User Charges Objectives

More information

RESPONSE TO QUERIES (To Form Part of the Bid Document)

RESPONSE TO QUERIES (To Form Part of the Bid Document) Widening of East Coast Road (ECR) from Double Lane into Four Lane from KM 22/300 to KM 55/800, Including Improvement to Curved Stretches 13 Nos & Junctions-7 Nos from KM 55/800 to KM 135/500 in Chennai,

More information

EARNINGS PRESENTATION H1-FY18 / Q2-FY18

EARNINGS PRESENTATION H1-FY18 / Q2-FY18 EARNINGS PRESENTATION H1-FY18 / Q2-FY18 1 Robust Sector Outlook The total length of the National highways is expected to cross ~200,000 Kms in next 5 years a) A total 83,677 Kms of roads will be built

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District One

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District One DISTRICT ONE PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make project investments in District One. In FY 2017 and FY 2018, current Turnpike projects total over $105 million within Okeechobee

More information

June 2, 2017 I Ratings

June 2, 2017 I Ratings Rating Methodology for ratings of road projects based on Hybrid Annuity Model (HAM) June 2, 2017 I Ratings Introduction: The Government of India has approved the hybrid annuity model (HAM) to increase

More information

ROAD DEVELOPMENT IN INDIA 2016

ROAD DEVELOPMENT IN INDIA 2016 Now Available ROAD DEVELOPMENT IN INDIA 2016 Research report with weekly newsletters and monthly updates Research Report Data-set (Excel) 52 Weekly Newsletters 11 Monthly Updates India Infrastructure Research

More information

Development, Govt. of India, and 40% funded by Govt. Madhya Pradesh.

Development, Govt. of India, and 40% funded by Govt. Madhya Pradesh. MADHYA PRADESH RURAL ROAD DEVELOPMENT AUTHORITY (AN AGENCY OF PANCHYAT & RURAL DEVELOPMENT DEPARTMENT, GOVT. OF M.P.) 5 th Floor, Block-II, Paryavas Bhawan, BHOPAL M.P. 462 011 PRADHANMANTRI GRAM SADAK

More information

Uttar Pradesh Shasan Audhyogik Vikas Anubhag-3 No. 615 / , dated 19 February, 2010.

Uttar Pradesh Shasan Audhyogik Vikas Anubhag-3 No. 615 / , dated 19 February, 2010. In pursuance of the provisions of clause(3) of Article 348 of the Constitution, the Governor is pleased to order the publication of following English Translation of notification. Uttar Pradesh Shasan Audhyogik

More information

India: National Highway Sector II Project

India: National Highway Sector II Project Validation Report October 2017 India: National Highway Sector II Project Reference Number: PVR-517 Project Number: 35335-013 Loan Number: 2154 ABBREVIATIONS ADB Asian Development Bank CSC construction

More information

BARWA ADDA EXPRESSWAY LIMITED ANNUAL REPORT

BARWA ADDA EXPRESSWAY LIMITED ANNUAL REPORT BARWA ADDA EXPRESSWAY LIMITED ANNUAL REPORT 2013-14 DIRECTORS REPORT The Shareholders BARWA ADDA EXPRESSWAY LIMITED Your Directors have pleasure in presenting the First Annual Report along with the Audited

More information

ANNUAL REPORT PAVING THE PATHWAY TO PROGRESS

ANNUAL REPORT PAVING THE PATHWAY TO PROGRESS ANNUAL REPORT 2013-14 PAVING THE PATHWAY TO PROGRESS Contents 2 3 4 1 CORPORATE OVERVIEW 2 IRB at a Glance 4 Recently Awarded Projects 6 Milestones 8 Pan-India Presence 9 BOT Projects 10 Key Performance

More information

Annual Plan Discussions - Bihar. Planning Commission

Annual Plan Discussions - Bihar. Planning Commission Annual Plan Discussions - Bihar Planning Commission 15.02.2011 1 Overview: Plan Performance & GSDP Annual Plan 2010-11 achievement ` 11,003 cr (till Jan) vs BE of ` 20,000 cr (despite 3 months loss due

More information

Investor Presentation February 2017

Investor Presentation February 2017 Investor Presentation February 2017 Disclaimer This presentation and the accompanying slides (the Presentation ), which have been prepared by Ashoka Buildcon Limited (the Company ), have been prepared

More information

PNC Infratech Limited Q3 FY2018 Earnings Conference Call. February 15, 2018

PNC Infratech Limited Q3 FY2018 Earnings Conference Call. February 15, 2018 PNC Infratech Limited Q3 FY2018 Earnings Conference Call ANALYST: MR. PREM KHURANA ANAND RATHI SHARE & STOCK BROKERS MANAGEMENT: MR. YOGESH JAIN- MANAGING DIRECTOR MR. T. R. RAO -EXECUTIVE VICE PRESIDENT(INFRA)

More information

NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINISTRY OF ROAD TRANSPORT & HIGHWAYS) GOVERNMENT OF INDIA

NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINISTRY OF ROAD TRANSPORT & HIGHWAYS) GOVERNMENT OF INDIA NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINISTRY OF ROAD TRANSPORT & HIGHWAYS) GOVERNMENT OF INDIA Plot No. G-5 & 6, Sector-10, Dwarka New Delhi - 110 075 Independent Engineer Services for construction of

More information

Directors Report. As per Consolidated Accounts:

Directors Report. As per Consolidated Accounts: 31 To The Shareholders of Your Directors have pleasure in submitting their fifteenth Annual together with the Audited Accounts of the Company, for the eighteen months period from 1st October, 2014 to 31st

More information

Guidelines for Formulation, Appraisal and Approval of

Guidelines for Formulation, Appraisal and Approval of Government of India Ministry of Finance Department of Economic Affairs Guidelines for Formulation, Appraisal and Approval of Central Sector Public Private Partnership Projects INFRASTRUCTURE Building for

More information

IL&FS Transportation Networks Ltd. Analyst Meet June 1, 2015 CIN - L45203MH2000PLC129790

IL&FS Transportation Networks Ltd. Analyst Meet June 1, 2015 CIN - L45203MH2000PLC129790 IL&FS Transportation Networks Ltd Analyst Meet June 1, 2015 CIN - L45203MH2000PLC129790 1 IL&FS Transportation - Overview 2 ITNL Footprint - At a Glance China: 49% stake of Chongqing Yuhe Expressway Company

More information

GAMMON INFRASTRUCTURE PROJECTS LIMITED. September 2011

GAMMON INFRASTRUCTURE PROJECTS LIMITED. September 2011 GAMMON INFRASTRUCTURE PROJECTS LIMITED September 2011 R Gammon Infrastructure Projects - An Overview Established Incorporated in 2001 as Gammon Group s vehicle for undertaking infrastructure projects on

More information

RAJYA SABHA List of Questions for ORAL ANSWERS

RAJYA SABHA List of Questions for ORAL ANSWERS RAJYA SABHA List of Questions for ORAL ANSWERS to be asked at a sitting of the Rajya Sabha to be held on Monday, July 30, 2018/Shravana 8, 1940 (Saka) (Ministries: Defence; Drinking Water Sanitation; Earth

More information

Evolution of Model Concession Agreement for National Highways in India

Evolution of Model Concession Agreement for National Highways in India See discussions, stats, and author profiles for this publication at: https://www.researchgate.net/publication/254423729 Evolution of Model Concession Agreement for National Highways in India Article CITATIONS

More information

Document of The World Bank FOR OFFICIAL USE ONLY IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-45590) ON A LOAN IN THE AMOUNT OF US$516.

Document of The World Bank FOR OFFICIAL USE ONLY IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-45590) ON A LOAN IN THE AMOUNT OF US$516. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: ICR0000807 IMPLEMENTATION

More information

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN)

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN) Second Jharkhand State Road Project (RRP IND 49125) SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN) A. Sector Performance, Problems, and Opportunities 1. State context. The state of Jharkhand was

More information

India s PPP Program Progress, Key Takeaways & Emerging Challenges

India s PPP Program Progress, Key Takeaways & Emerging Challenges India s PPP Program Progress, Key Takeaways & Emerging Challenges South Asia Sustainable Development Department The World Bank LAC Study Tour April 2009 1 A quick regional snapshot In SAR, efforts to attract

More information

NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways) Government of India

NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways) Government of India I NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways) Government of India SIX LANING OF DELHI - AGRA SECTION OF NH-2 FROM KM 20.500 TO KM 200.000 (LENGTH - KM 179.500) IN THE STATE

More information

PNC Infratech Q2 FY2018 Earnings Conference Call. November 16, 2017

PNC Infratech Q2 FY2018 Earnings Conference Call. November 16, 2017 PNC Infratech Q2 FY2018 Earnings Conference Call ANALYST: MR. DEBASHISH MAZUMDAR EDELWEISS INVESTMENT RESEARCH MANAGEMENT: MR. YOGESH JAIN MANAGING DIRECTOR PNC INFRATECH LIMITED MR. D.K. MAHESHWARI ASST.

More information

DA TOLL ROAD PRIVATE LIMITED. Financial Statements for

DA TOLL ROAD PRIVATE LIMITED. Financial Statements for DA TOLL ROAD PRIVATE LIMITED Financial Statements for YEAR ENDED MARCH 2015 Balance Sheet as at 31st March 2015 Particulars Note As at March 31, 2015 As at March 31, 2014 I. EQUITY AND LIABILITIES

More information

PNC Infratech Limited. Result Update Presentation Q3 & 9M FY

PNC Infratech Limited. Result Update Presentation Q3 & 9M FY PNC Infratech Limited Result Update Presentation Q3 & 9M FY 2017-18 Safe Harbour This presentation and the accompanying slides (the Presentation ), which have been prepared by PNC Infratech Limited (the

More information

IN THE SUPREME COURT OF INDIA CIVIL ORIGINAL JURISDICTION

IN THE SUPREME COURT OF INDIA CIVIL ORIGINAL JURISDICTION REPORTABLE IN THE SUPREME COURT OF INDIA CIVIL ORIGINAL JURISDICTION I.A. Nos.363-364, I.A NO.425 IN I.A. NO.364 IN I.A. NOS.344, 355, 362 IN WRIT PETITION (CIVIL) No.13029/1985 M.C.MEHTA...Appellant Versus

More information

Pak. J. Biotechnol. Vol. 14 (3) (2017) ISSN Print: ISSN Online:

Pak. J. Biotechnol. Vol. 14 (3) (2017) ISSN Print: ISSN Online: Pak. J. Biotechnol. Vol. 14 (3) 317-321 (217) ISSN Print: 1812-1837 www.pjbt.org ISSN Online: 2312-7791 RISK MANAGEMENT ON BOT SCHEME ON POST CONSTRUCTED TOLL ROADS P. ARAVIND 1, V. P. GOLDA PERCY 2, V.

More information

Balance Sheet as at 31st March 2015 Particulars Note March 31, 2015 March 31, 2014 I. EQUITY AND LIABILITIES Shareholders' Funds Share capital 2.1 44,770,000 44,770,000 Reserves and surplus 2.2 202,297,322

More information

Support Loan Concept for the Viability of a BOT Road Project

Support Loan Concept for the Viability of a BOT Road Project Support Loan Concept for the Viability of a BOT Road Project Swapan Kumar Bagui 1) and Ambarish Ghosh 2) 1) PhD Student, Dept. of Civil Engrg., Bengal Engrg. and Science University, Shibpur, Howrah 711

More information

MEP Infrastructure Developers Limited Q1 FY16 Earnings Conference Call. August 17, 2015

MEP Infrastructure Developers Limited Q1 FY16 Earnings Conference Call. August 17, 2015 MEP Infrastructure Developers Limited Q1 FY16 Earnings Conference Call MANAGEMENT: MR. JAYANT MHAISKAR VICE CHAIRMAN & MANAGING DIRECTOR, MEP INFRASTRUCTURE DEVELOPERS LIMITED MR. MURZASH MANEKSHANA EXECUTIVE

More information

Rating Methodology Hybrid Annuity Road Projects

Rating Methodology Hybrid Annuity Road Projects RATING METHODOLOGY INFRASTRUCTURE SECTOR COMPANIES Rating Methodology Hybrid Annuity Road Projects Introduction: The Government of India has approved the hybrid annuity model (HAM) to increase the pace

More information

Resettlement Plan. India: National Capital Region Urban Infrastructure Financing Facility Project 1 - Bahadurgarh-Badli Road

Resettlement Plan. India: National Capital Region Urban Infrastructure Financing Facility Project 1 - Bahadurgarh-Badli Road Resettlement Plan Document Stage: Draft Project Number: 41598 September 2013 India: National Capital Region Urban Infrastructure Financing Facility Project 1 - Bahadurgarh-Badli Road Prepared by the Haryana

More information

Pre-Budget proposal of construction sector for

Pre-Budget proposal of construction sector for Pre-Budget proposal of construction sector for 0-7 8 9 0 7 Direct Taxes Income Tax Introduction of Transfer Pricing provisions to domestic transaction Applicability of alternate minimum tax on persons

More information

BOON TO RURAL GUJARAT

BOON TO RURAL GUJARAT BOON TO RURAL GUJARAT :: P R E A M B L E :: All DISCOMs have mainly four categories of 11/22 KV feeders viz. Urban, Industrial, GIDC, Rural. Out of which, Rural feeders having mixed load of Agricultural

More information

ASIAN DEVELOPMENT BANK RRP: IND 34420

ASIAN DEVELOPMENT BANK RRP: IND 34420 ASIAN DEVELOPMENT BANK RRP: IND 34420 REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE BOARD OF DIRECTORS ON A PROPOSED LOAN TO INDIA FOR THE NATIONAL HIGHWAY CORRIDOR (SECTOR) I PROJECT November 2003

More information

NHAI Public Issue of Tax Free Bonds

NHAI Public Issue of Tax Free Bonds 17 2015 December, 31 2015 HIGHLIGHTS OF TAX BENEFITS NATIONAL HIGHWAYS AUTHORITY OF INDIA (An Autonomous Body under the Ministry of Road Transport & Highways, Government of India) Interest from these Bonds

More information

FAQs on IRB InvIT Fund

FAQs on IRB InvIT Fund Valuation Summary Enterprise Valuation Net External debt from Banks & FI s (A) Net Sponsor loans (B) Sponsor lock-in @15% of EV Issue Expenses (C) Fresh Issue size (A+B+C) OFS Size Total Issue Size (including

More information

WELSPUN ENTERPRISES LTD

WELSPUN ENTERPRISES LTD WELSPUN ENTERPRISES LTD INVESTOR PRESENTATION November 2017 INFRASTRUCTURE OIL & GAS FINANCIAL SERVICES 1 SAFE HARBOR The information contained in this presentation is provided by Welspun Enterprises Limited

More information

Project Finance in PPP. Presented by Chaitanya Talwalkar Vice President, Axis Bank Ltd.

Project Finance in PPP. Presented by Chaitanya Talwalkar Vice President, Axis Bank Ltd. Project Finance in PPP Presented by Chaitanya Talwalkar Vice President, Axis Bank Ltd. 1 What is PPP? PPP (Public Private Partnership) involves a contract between a public sector authority and a private

More information

GPT Infraprojects Limited Q3 FY 2016 Earnings Conference Call

GPT Infraprojects Limited Q3 FY 2016 Earnings Conference Call Q3 FY 2016 Earnings Conference Call Management: Mr. Atul Tantia Executive Director, GPT Infraprojects Limited Mr. A. K. Dokania Chief Financial Officer, GPT Infraprojects Limited Page 1 of 5 Ladies and

More information

TRANSMISSION LICENCE NO. 2 OF 2009 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA

TRANSMISSION LICENCE NO. 2 OF 2009 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai - 400 005 Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail mercindia@mercindia.org.in

More information

48081 v1. India: Andhra Pradesh Road Sector Project. Environmental and. Social Management Framework. For. Maintenance Road. (approx.

48081 v1. India: Andhra Pradesh Road Sector Project. Environmental and. Social Management Framework. For. Maintenance Road. (approx. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 48081 v1 India: Andhra Pradesh Road Sector Project Environmental and Social Management

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3202 Project Name. Kenya Nairobi Urban Toll Road PRG Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3202 Project Name. Kenya Nairobi Urban Toll Road PRG Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3202 Project Name Kenya

More information

Allahabad Bank, Head Office, 2 N.S. Road, Kolkata DIVIDEND DISTRIBUTION POLICY

Allahabad Bank, Head Office, 2 N.S. Road, Kolkata DIVIDEND DISTRIBUTION POLICY DIVIDEND DISTRIBUTION POLICY 1. NEED AND OBJECTIVE OF THE POLICY: Securities and Exchange Board of India (SEBI) has, on July 08, 2016, notified the SEBI (Listing Obligations and Disclosure Requirements)

More information

IL & FS TRANSPORTATION NETWORKS LIMITED. 1 Type of Issue (IPO/FPO) IPO. 2 Issue Size (Rs. Cr) 700* * this includes Offer for Sale of Rs.110.

IL & FS TRANSPORTATION NETWORKS LIMITED. 1 Type of Issue (IPO/FPO) IPO. 2 Issue Size (Rs. Cr) 700* * this includes Offer for Sale of Rs.110. Name of the Issue: IL & FS TRANSPORTATION NETWORKS LIMITED 1 Type of Issue (IPO/FPO) IPO 2 Issue Size (Rs. Cr) 700* * this includes Offer for Sale of Rs.110.39 crs 3 Grade of issue alongwith name of the

More information

Public Issue of Tax Free Secured Redeemable Non-Convertible Bonds issued by

Public Issue of Tax Free Secured Redeemable Non-Convertible Bonds issued by Public Issue of Tax Free Secured Redeemable Non-Convertible Bonds issued by HIGHLIGHTS OF TAX BENEFITS In exercise of the powers conferred by item (h) of sub-clause (iv) of clause (15) of Section 10 of

More information

PNC Infratech Limited. Result Update Presentation Q1 FY

PNC Infratech Limited. Result Update Presentation Q1 FY PNC Infratech Limited Result Update Presentation Q1 FY 2018-19 Safe Harbour This presentation and the accompanying slides (the Presentation ), which have been prepared by PNC Infratech Limited (the Company

More information

MINUTES OF THE MEETING OF EMPOWERED COMMITTEE FOR PMGSY HELD ON 02 nd Nov, 2012

MINUTES OF THE MEETING OF EMPOWERED COMMITTEE FOR PMGSY HELD ON 02 nd Nov, 2012 MINUTES OF THE MEETING OF EMPOWERED COMMITTEE FOR PMGSY HELD ON 02 nd Nov, 2012 STATE: WEST BENGAL Phase X (2012-13) A Meeting of the Empowered Committee (EC) for PMGSY was held on 2 nd November, 2012

More information

Accounting issues in Infrastructure Industry By Amyn Jassani

Accounting issues in Infrastructure Industry By Amyn Jassani Accounting issues in Infrastructure Industry By Amyn Jassani Infrastructure Activities Page 2 Agenda Accounting Definition of operating cycle Service Concession Arrangements Accounting for revenue during

More information

Implementation Status & Results India Tamil Nadu Road Sector Project (P050649)

Implementation Status & Results India Tamil Nadu Road Sector Project (P050649) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Tamil Nadu Road Sector Project (P050649) Operation Name: Tamil Nadu Road Sector Project (P050649)

More information

DEWAN HOUSING. PNC Infratech Ltd. Hold. Growing business at cheap valuation

DEWAN HOUSING. PNC Infratech Ltd. Hold. Growing business at cheap valuation DEWAN HOUSING PNC Infratech Ltd. Hold Growing business at cheap valuation 31000 34000 55000 54000 48350 20-Dec-16 20-Jan-17 20-Feb-17 20-Mar-17 20-Apr-17 20-May-17 20-Jun-17 20-Jul-17 20-Aug-17 20-Sep-17

More information

CRISIL s criteria for rating annuity road projects. January 2017

CRISIL s criteria for rating annuity road projects. January 2017 CRISIL s criteria for rating annuity road projects January 2017 Criteria contacts Pawan Agrawal Chief Analytical Officer CRISIL Ratings Email: pawan.agrawal@crisil.com Sameer Charania Director Rating Criteria

More information

NHAI Public Issue of Tax Free Bonds Tranche II

NHAI Public Issue of Tax Free Bonds Tranche II NHAI Public Issue of Tax Free Bonds Tranche II HIGHLIGHTS OF TAX BENEFITS NATIONAL HIGHWAYS AUTHORITY OF INDIA (An Autonomous Body under the Ministry of Road Transport & Highways, Government of India)

More information

NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINIS TRY OF ROAD TRANSPORT & HIGHWAYS, GOVT.OF INDIA) Plot No. G-5 & 6, Sector 10, Dwarka New Delhi

NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINIS TRY OF ROAD TRANSPORT & HIGHWAYS, GOVT.OF INDIA) Plot No. G-5 & 6, Sector 10, Dwarka New Delhi 04.07.October March 2012 Date: 25 th 21st NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINIS TRY OF ROAD TRANSPORT & HIGHWAYS, GOVT.OF INDIA) Plot No. G-5 & 6, Sector 10, Dwarka New Delhi 110 075 INDEPENDENT

More information

Date of Approval by GoI. Project Component Housing Municipality

Date of Approval by GoI. Project Component Housing Municipality S. No ANNEXURE I : PROJECT INFORMATION (FINANCIAL) State /UT Code 19 State/UT Name West Bengal SLNA KMDA City Implementing Agency Code Title Bank Account No. Component Date of Approval by GoI Cost (Rs.

More information

NIT No 2/ OFFICE OF THE CHIEF ENGINEER(Roads), PWD, RAJASTHAN, JAIPUR.

NIT No 2/ OFFICE OF THE CHIEF ENGINEER(Roads), PWD, RAJASTHAN, JAIPUR. NIT No 2/2014-15 OFFICE OF THE CHIEF ENGINEER(Roads), PWD, RAJASTHAN, JAIPUR. Invitation of proposals for Expression of interest (EOI) for Statutory Auditor for development & implementation and operation

More information

BIDDING DOCUMENTS. for. Procurement of. Eastern Peripheral Expressway ITS Installation Project. Invitation for Bids PART 1 - Bidding Procedures

BIDDING DOCUMENTS. for. Procurement of. Eastern Peripheral Expressway ITS Installation Project. Invitation for Bids PART 1 - Bidding Procedures BIDDING DOCUMENTS for Procurement of Eastern Peripheral Expressway ITS Installation Project Invitation for Bids PART 1 - Bidding Procedures June 2017 Employer : National Highways Authority of India Country

More information

REPORT OF THE B K CHATURVEDI COMMITTEE ON NHDP

REPORT OF THE B K CHATURVEDI COMMITTEE ON NHDP REPORT OF THE B K CHATURVEDI COMMITTEE ON NHDP SUB: REVISED STRATEGY FOR IMPLEMENTATION OF THE NATIONAL HIGHWAYS DEVELOPMENT PROJECT (NHDP) FRAMEWORK AND FINANCING 1. Background A meeting was held by Hon

More information

1. RATE OF INTEREST IN CASE OF RUPEE EXPORT CREDIT. % age per annum 1. Pre-Shipment Credit a) Upto 180 days OBC 1 to 3: BR+0.50% OBC 4 to 6: BR+0.

1. RATE OF INTEREST IN CASE OF RUPEE EXPORT CREDIT. % age per annum 1. Pre-Shipment Credit a) Upto 180 days OBC 1 to 3: BR+0.50% OBC 4 to 6: BR+0. 1. RATE OF INTEREST IN CASE OF RUPEE EXPORT CREDIT Annexure IV Category of Export Credit Rate of Interest on advances % age per annum 1. Pre-Shipment Credit a) Upto 180 days OBC 1 to 3: BR+0.50% OBC 4

More information

Pradhan Mantri Gram Sadak Yojana

Pradhan Mantri Gram Sadak Yojana Pradhan Mantri Gram Sadak Yojana Review Meeting for Bihar, Jharkhand, Odisha and West Bengal at Patna on 29th & 3th September, 214 1 Eligible Habitations, Habitations Cleared and Connected (Since commencement

More information

FINANCIAL RESULTS The key financial parameters for the year ended March 31, 2011 are: Amount (Rupees Lakhs)

FINANCIAL RESULTS The key financial parameters for the year ended March 31, 2011 are: Amount (Rupees Lakhs) DIRECTORS REPORT The Directors have pleasure in presenting their report and Accounts for the year ended March 31, 2011. FINANCIAL RESULTS The key financial parameters for the year ended March 31, 2011

More information

The Directors have pleasure in presenting their Report and the Accounts for the period ending March 31, 2009.

The Directors have pleasure in presenting their Report and the Accounts for the period ending March 31, 2009. DIRECTORS REPORT The Directors have pleasure in presenting their Report and the Accounts for the period ending March 31, 2009. FINANCIAL RESULTS Your Company has not commenced commercial operations and

More information

Restructuring of Government Departments-Karnataka Experience

Restructuring of Government Departments-Karnataka Experience Restructuring of Government Departments-Karnataka Experience T V Ramanayya, V.Nagadevara & Shyamal Roy Indian Institute of Management Bangalore Abstract Public expenditure in India has played a key role

More information

MEP Infrastructure Developers Ltd.

MEP Infrastructure Developers Ltd. Strong play in Road OMT segment!! We MEP is one of the few established players in the road tolling and operations and maintenance (OMT) segment. The asset light business model has allowed MEP to achieve

More information

Overview of the framework

Overview of the framework Overview of the framework Need for a framework The highways sector in India is witnessing a significant interest from both domestic as well as foreign investors following the policy initiatives taken by

More information

Joint Fact Finding Committee (JFC) :: Recommendations

Joint Fact Finding Committee (JFC) :: Recommendations Joint Fact Finding Committee (JFC) :: Recommendations 1.Giving Special Category Status to Andhra Pradesh Inspite of the then Prime minister Dr.Manmohan Singh s assurance on the floor of the Rajya Sabha

More information

Initial Environmental Examination

Initial Environmental Examination Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kv VSC-HVDC power transmission lines between Pugalur, Tamil Nadu and North Trichur, Kerala) Annexures

More information

October 30, 2018 WEI./SEQ To, BSE Limited 1st Floor, Rotunda Bldg. Dalal Street, Fort, Mumbai Scrip Code:

October 30, 2018 WEI./SEQ To, BSE Limited 1st Floor, Rotunda Bldg. Dalal Street, Fort, Mumbai Scrip Code: -tç%rwelspun ENTERPRISES INFRASTRUCTURE AND ENERGY WEI./SEQ 2018 To, BSE Limited 1st Floor, Rotunda Bldg. Dalal Street, Fort, Mumbai - 400 001. Scrip Code: 532553 October 30, 2018 National Stock Exchange

More information

PNC Infratech Limited. Result Update Presentation Q2 & H1 FY

PNC Infratech Limited. Result Update Presentation Q2 & H1 FY PNC Infratech Limited Result Update Presentation Q2 & H1 FY 2018-19 Safe Harbour This presentation and the accompanying slides (the Presentation ), which have been prepared by PNC Infratech Limited (the

More information

Government of Bihar (Energy Department) Proposed Annual Plan for

Government of Bihar (Energy Department) Proposed Annual Plan for Government of Bihar (Energy Department) Proposed Annual Plan for 2012-13 The proposed outlay for the Annual Plan 2012-13 of the Energy Department is as follows. : (Rupees in lacs) Total proposed outlay

More information

KENYA NATIONAL HIGHWAYS AUTHORITY ROADS 10,000 PROGRAMME

KENYA NATIONAL HIGHWAYS AUTHORITY ROADS 10,000 PROGRAMME KENYA NATIONAL HIGHWAYS AUTHORITY ROADS 10,000 PROGRAMME DEVELOPMENT OF 10,000 KM OF ROADS SUPPORTING PRIMARY GROWTH SECTORS THROUGH CONTRACTOR FACILITATED FINANCING MECHANISM (Phase 1) TENDER NO. KeNHA/1291/2016.

More information

Ashoka Buildcon Limited Welcomes Shareholders for 24 th Annual General Meeting February 2016

Ashoka Buildcon Limited Welcomes Shareholders for 24 th Annual General Meeting February 2016 Ashoka Buildcon Limited Welcomes Shareholders for 24 th Annual General Meeting 30.09.2017 February 2016 Disclaimer This presentation and the accompanying slides (the Presentation ), which have been prepared

More information