1 National Highways Authority of India, PIU-Patna Project: 4- laining of Patna Buxar section of NH-30 & 84 from Km to in the state of Bihar under NHDP Phase-III in 3 packages on EPC mode. 01. Name of the Project Four Lanning of Patna - Buxar stretch of NH 30 from Km to Km (Existing Chainage Km to Km ofnh 30 & Ara Bypass from km of NH-30to Km 6.00 of NH 84 & Km to Km of NH 84 in the state of Bihar under NHDP Phase- III in 3 packages on EPC Mode: Package I: Patna to Koilwar ( Design Chainage Km to Km Total Length = Km.) Package II: Koilwar to Bhojpur (Design Chainage Km to Km Total Length = Km.) Package III: Bhojpur to Buxar (Design Chainage Km to Km Total Length = Km.) 02. a) Name of the Concessionaire b) Name of EPC Contractor 01. a) Name of the Independent Consultant/IC Name of the Project Management Consultant/PMC Patna Buxar Highway limited terminated due to non compliance of financial close within stipulated time. Not Finalized-Restructured 3 packages estimates has been sent to HQ vide letter no. NHAI/RO/PAT/PAT- BUX/IE/2012/1887 dated Bloom Companies, LLC Not Applicable 02. Contract Price/TPC Rs Cr. (BOT Package) Restructured with total civil cost Cr on EPC. Package I Rs Cr. Package II Rs Cr. Package III Rs Cr. 04A Concession period NA 03. Date of commencement/appointed date/financial close date Contract terminated vide NHAI, HQ letter no. NHAI/BH/11012/26/2004/Imp/56066 dated and project is to be implemented under EPC mode in three packages. 04. Stipulated date of completion Not Applicable
2 05. Likely date of completion Not Applicable 06. Extension of time granted upto Not Applicable 07. Progress Not Applicable 08. Brief scope of work (give nos/name/location/length/span arrangement) (a) Length of section Kms. (b) Major Bridges 09 no. Package I 1.Sikandarpur ( 5x21.5+1x10.75) 2. Local Stream (1x18.9+2x x18.9) 3. Local Stream (1 x x x18.9) 4. Lekhantola (1 x x x18.9) Package II 1.Sone River (30 x x 23.00) 2.Nagri Nadi x Gangi Nadi x 20 4.Bhitauli Nadi x x x Package III 1.Ganga River x x x (c) Minor Bridges 19 nos. Package I 1.Narayan chakk x13 2. Nawado x21 3.Patna Main Canal x x10 5. Ahiya pur x Maner Ditr x20 Package II 7.Giddha x6 8. Danapur Dist x18 9. Sobhi Dumra x Banas x14
3 11. Banas Nadu x Gangi Nadi x Gangi Nadi x34 Package III 14. Shahpur x26 15.LS x LS x6 17. Koan Nadi x LS x Bhainshi Nadi x7.38+3x6.5 (d) Rigid pavement 125 Km (e) Flexible pavement 0.00 (f) Bypass and /or realignments Package I : (g) Flyovers Nil 1. Patna Bypass = Km. 2. Realignmnet: (i) Jagdispur 1.6 Km (ii) Ahiyapur 1.6 Km. (iii) Kanhauli 1.6 Km. (iv) Srirampur Km. (v) Bihta Chowk 1.3 Km. Total Length of Realignment = Km. Package II : 1. Ara Bypass = Km 2. Realignment: (i) Sone Bridge Km. (ii) Bibigunj 1.1 Km. (iii) Gajrajgunj 2.4 Km. (iv) Bihiya 2.00 Km. (v) Sariya/Bilouty 1.9 Km. Total Length of Realignment = Km. Package III: 1. Shahpur/Ranisagar Bypass = Km 2. Realignment : (i) Barhampur 1.9 Km. (ii) Naya Bhojpur 1.9 Km. (iii) Purana Bhojpur 2.9 Km Total Length of Realignment = 6.7 Km
4 (i) Culverts Package I: 58 Package II: 63 Package III: 73 (j) Service roads 2.25x2 kms ( 7 mtr wide - Flexible) (k) VUP/PUP Package I: 2 VUP & 2 Utility Passage Package II: 10 PUP Package III: 2 VUP & 11 PUP (l) ROB 1 Nos at km in Package I (m) Truck Lay Bye Two locations 1) Km (Gidha) in Package - II 2) Km (Dalsagar) in Package - III (n) Toll Plaza Two Locations 1) Km , ( 5+5) Lanes in Package - II 2) Km ,( 5+5) Lanes in Package - III (o) Bus Bays/ Bus Shelter 33 Nos Package I : 6 Package II : 13 Package III : 14 (11) Status of pre construction activities and steps taken so far: Details of Land Acquisition: Annexure-I Total Land required for project = 750 Ha Available ROW = 168 Ha LA proposed to be done = 582 Ha 3A completed = Ha = Ha.(96.86%) 3D completed = Ha = Ha.(96.86 %) 3G Completed = Ha = Ha.(95.27 %) Possession = Ha +168 Ha= Ha ( 84.26%) (12) Details of Environmental clearance: Obtained vide letter no5-10/2009-ia-iii dated (13) Details of Forest clearance:
5 Stage I forest clearance of 44.5 Km out of 125 km approved vide MoEF letter no 8-38/2010-FC dated Stage II forest clearance has been forwarded to Govt. of India by State Govt. vide letter no Forest land -09/ (E) dated Observation from MoEF regarding the certificate of FRA-2006 from DM-Bhojpur and Buxar which are pending with DM s. However, work may be executed even Stage II clearance is not obtained as per MoEF Letter no. F.No /2014-FC dated 8 th Aug (14) Details of utility shifting:- Estimate sanctioned on (15) Details of permission from Railways: GAD approved on for ROB at Km (16) Current status of the Project:- Concession Agreement has been terminated due to failure of timely financial closure vide letter no. NHAI/BH/11012/26/2004/Imp/56066 dated Restructured estimates in 3 packages have been submitted to the NHAI, HQ for further approval vide letter no. NHAI/RO/PAT/PAT-BUX/IE/I/2012/1887 dated
India: Public Private Partnerships in Highways Sector
India: Public Private Partnerships in Highways Sector Prepared by World Bank as input for IDA paper, 2008 (provided by Tarun Sankar, PPIAF office, South Asia) India s transport program is one of the most
More informationPresentation at Asian Highways Investment Forum. Performance based Maintenance Contracts for Highways
Presentation at Asian Highways Investment Forum Bangkok, 8-9, October 2013 United Nations Economic & Social Commission For Asia & The Pacific Performance based Maintenance Contracts for Highways By Atul
More informationExperience of Implementing Transportation PPPs in India. Abhijit Bhaumik August 6, 2015
Experience of Implementing Transportation PPPs in India Abhijit Bhaumik August 6, 2015 Experience of Implementing PPPs in India India has witnessed successful PPPs across several infrastructure sectors
More informationRoad Infrastructure - An Evolving Transformation
Government of Bihar Road Infrastructure - An Evolving Transformation Presentation Road Construction Department 18.11.09 The State has - 3734 Kms of National Highways - 3989 Kms of State Highways - 8156
More informationNATIONAL HIGHWAYS AUTHORITY OF INDIA (MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVT.OF INDIA) Plot No. G-5 & 6, Sector 10, Dwarka New Delhi
NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVT.OF INDIA) Plot No. G-5 & 6, Sector 10, Dwarka New Delhi 110 075 Independent Engineer services for 4 Laning of Goa / Karnataka
More informationROAD DEVELOPMENT IN INDIA
ROAD DEVELOPMENT IN INDIA - 2010 This report is the most up-to-date and comprehensive review of the Indian road sector. The report provides: The latest status of projects, programmes and policies (as on
More informationPublic Private Partnership in Highway Sector in Punjab, India
Public Private Partnership in Highway Sector in Punjab, India Infrastructure Governance Roundtable March 24 th, 2006 Kulwinder Singh Rao Deputy Project Director Punjab Roads & Bridges Development Board
More informationAMENDMENT - 2 SECTION 2 INSTRUCTION TO CONSLTANTS, 2.1 Scope of the proposal, Page-13 of Revised RFP document stands amended as follows:-
Bihar State Road Development Corporation Limited (A Government of Bihar Undertaking) Regd. Office: RCD Central Mechanical Workshop Campus, Near Patna Airport, Sheikhpura, Patna-800014 Tel: 0612-2226711,
More informationCA Anoop Kumar Jairath, Partner (Membership # )
CA Anoop Kumar Jairath, Partner (Membership # 0 8 6 5 1 5) ACADEMIA of CA Anoop Kumar Jairath B.Com from Delhi University Fellow Chartered Accountant (F.C.A) SAS (COMMERCIAL) from Comptroller & Auditor
More informationDLI/BDD/EOI/
DLI/BDD/EOI/073 24.01.2018 Expression of Interest to act as a lead member in a joint venture for participation in upgradation to 2 lane with paved shoulder/4 lane of Gagaria-Baori Kalan- Serwa-Bakhasar
More informationNATIONAL HIGHWAYS AUTHORITY OF INDIA (MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVT.OF INDIA) Plot No. G-5 & 6, Sector 10, Dwarka New Delhi
NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINISTRY OF ROAD TRANSPORT & HIGHWAYS, GOVT.OF INDIA) Plot No. G-5 & 6, Sector 10, Dwarka New Delhi 110 075 Independent Engineer services for development and construction
More informationHIGHWAY ENGINEERING MODULE-IV
HIGHWAY ENGINEERING MODULE-IV 1 HIGHWAY DRAINAGE. 2 HILL ROAD 3 ROADSIDE DEVELOPMENT. 4 ROAD ADMINISTRATION AND FINANCE Prof. Ujjval J. Solanki DEPARTMENT OF CIVIL ENGINEERING, DARSHAN INSTITUTE OF ENGINEERING
More informationECONOMIC AND FINANCIAL ANALYSIS
Bihar New Ganga Bridge Project (RRP IND 48373) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The proposed project is to build a new six-lane bridge across the Ganges River near Patna in the state
More informationDr. Pramod Kumar Anand JS (RC) & DG, NRRDA : : : D.O. # P-10021/1/2010/P-III August 4, 2010
Dr. Pramod Kumar Anand JS (RC) & DG, NRRDA : 23383553 : 23388207 : anandpk@nic.in D.O. # P-10021/1/2010/P-III August 4, 2010 Dear Shri As you are aware, Government of India launched the Pradhan Mantri
More informationInfrastructure Development Finance Company Limited
Infrastructure Development Finance Company Limited Presentation on Road Sector Financing Our four sector focus: Energy. Telecom. Transport Industrial & Commercial Infrastructure Agenda 1 Road Sector Overview
More informationNovember 15, 2017 I Ratings. Hybrid Annuity Model The journey so far. Introduction:
Hybrid Annuity Model The journey so far Contact: Maulesh Desai Associate Director Maulesh.desai@careratings.com 91-79- 4026 5605 91-8511190079 Ravina Deopura Analyst Ravina.deopura@careratings.com 91-79-4026
More informationRoad and Transport : Registered Motor Vehicles per 1000 Population and % Share of Registered Motor
and Transport 13.1: Surfaced & Length s in Arunachal Pradesh (A.P.) 13.2: Length of National Highways 13.3: Lane-wise Length of National Highways 13.4: and Surfaced Length of other PWD s 13.5: Length of
More informationWELCOME SHAREHOLDERS. 25 th Annual General Meeting September 19, 2018
WELCOME SHAREHOLDERS 25 th Annual General Meeting September 19, 2018 WELCOME SHAREHOLDERS TO 25 TH ANNUAL GENERAL MEETING SEPTEMBER 19, 2018 3 Disclaimer This presentation and the accompanying slides (the
More informationGUIDELINES FOR FORMULATION, APPRAISAL AND APPROVAL OF PUBLIC PRIVATE PARTNERSHIP (PPP) PROJECTS
GUIDELINES FOR FORMULATION, APPRAISAL AND APPROVAL OF PUBLIC PRIVATE PARTNERSHIP (PPP) PROJECTS (i) (ii) OF ALL SECTORS COSTING MORE THAN RS.100 CRORE AND LESS THAN RS.250 CRORE UNDER NHDP COSTING RS.250
More informationCOST BENEFIT ANALYSIS OF CHENNAI PERIPHERAL ROAD
COST BENEFIT ANALYSIS OF CHENNAI PERIPHERAL ROAD 1 Introduction The objective of the cost benefit economic analysis is to identify and quantify the benefits and costs associated with the project. This
More informationSBI Capital Markets Ltd, AK capital Services Ltd, ICICI Securities, Kotak Invest Banking
Issuer Issue Recommendation Acceptance Public Issue of tax free NCDs aggregating to Rs.5000 crs with an option to retain oversubscription upto Rs.5000 crs for issuance of additional NCDs. SUBSCRIBE ON
More informationToll Supported Finance for Highway Development in India
Toll Supported Finance for Highway Development in India Prof. Nagarjuna P. 1 and Dr. Pradeepta Kumar Samanta 2 1,2, Assistance Professor, National Institute of Construction Management and Research (NICMAR),
More informationDevelopment, Govt. of India, and 40% funded by Govt. Madhya Pradesh.
MADHYA PRADESH RURAL ROAD DEVELOPMENT AUTHORITY (AN AGENCY OF PANCHYAT & RURAL DEVELOPMENT DEPARTMENT, GOVT. OF M.P.) 5 th Floor, Block-II, Paryavas Bhawan, BHOPAL M.P. 462 011 PRADHANMANTRI GRAM SADAK
More informationECONOMIC SENSITIVITY ANALYSIS OF WALAYAR - VADAKKANCHERRY B.O.T. CONTRACT ROAD PROJECT A CASE STUDY
ECONOMIC SENSITIVITY ANALYSIS OF WALAYAR - VADAKKANCHERRY B.O.T. CONTRACT ROAD PROJECT A CASE STUDY R. R. Kshatriya 1, Monika B. Murkute 2,Sonia G. Upadhyay 3 1 Assistant Professor, Department of Civil
More informationTo, Deputy Project Manager (PJ), Mis Indian Oil Corporation Ltd., Vill. Jhimani, Paradip, Dist. Jagatsinghpur, Orissa
F.No. 11-33/2013-IA III Government of India Ministry of Environment & Forests (IA Division) Paryavaran Bhawan, CGO Complex, Lodhi Road, New Delhi - 110 003. To, Deputy Project Manager (PJ), Mis Indian
More information15 th International Road Federation World Meeting
15 th International Road Federation World Meeting Bangkok, June 2005 Guang Z. Chen Sector Manager, Transport South Asia Region The World Bank Today s Presentation Principles of Road User Charges Objectives
More informationRESPONSE TO QUERIES (To Form Part of the Bid Document)
Widening of East Coast Road (ECR) from Double Lane into Four Lane from KM 22/300 to KM 55/800, Including Improvement to Curved Stretches 13 Nos & Junctions-7 Nos from KM 55/800 to KM 135/500 in Chennai,
More informationEARNINGS PRESENTATION H1-FY18 / Q2-FY18
EARNINGS PRESENTATION H1-FY18 / Q2-FY18 1 Robust Sector Outlook The total length of the National highways is expected to cross ~200,000 Kms in next 5 years a) A total 83,677 Kms of roads will be built
More informationFlorida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District One
DISTRICT ONE PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make project investments in District One. In FY 2017 and FY 2018, current Turnpike projects total over $105 million within Okeechobee
More informationJune 2, 2017 I Ratings
Rating Methodology for ratings of road projects based on Hybrid Annuity Model (HAM) June 2, 2017 I Ratings Introduction: The Government of India has approved the hybrid annuity model (HAM) to increase
More informationROAD DEVELOPMENT IN INDIA 2016
Now Available ROAD DEVELOPMENT IN INDIA 2016 Research report with weekly newsletters and monthly updates Research Report Data-set (Excel) 52 Weekly Newsletters 11 Monthly Updates India Infrastructure Research
More informationDevelopment, Govt. of India, and 40% funded by Govt. Madhya Pradesh.
MADHYA PRADESH RURAL ROAD DEVELOPMENT AUTHORITY (AN AGENCY OF PANCHYAT & RURAL DEVELOPMENT DEPARTMENT, GOVT. OF M.P.) 5 th Floor, Block-II, Paryavas Bhawan, BHOPAL M.P. 462 011 PRADHANMANTRI GRAM SADAK
More informationUttar Pradesh Shasan Audhyogik Vikas Anubhag-3 No. 615 / , dated 19 February, 2010.
In pursuance of the provisions of clause(3) of Article 348 of the Constitution, the Governor is pleased to order the publication of following English Translation of notification. Uttar Pradesh Shasan Audhyogik
More informationIndia: National Highway Sector II Project
Validation Report October 2017 India: National Highway Sector II Project Reference Number: PVR-517 Project Number: 35335-013 Loan Number: 2154 ABBREVIATIONS ADB Asian Development Bank CSC construction
More informationBARWA ADDA EXPRESSWAY LIMITED ANNUAL REPORT
BARWA ADDA EXPRESSWAY LIMITED ANNUAL REPORT 2013-14 DIRECTORS REPORT The Shareholders BARWA ADDA EXPRESSWAY LIMITED Your Directors have pleasure in presenting the First Annual Report along with the Audited
More informationANNUAL REPORT PAVING THE PATHWAY TO PROGRESS
ANNUAL REPORT 2013-14 PAVING THE PATHWAY TO PROGRESS Contents 2 3 4 1 CORPORATE OVERVIEW 2 IRB at a Glance 4 Recently Awarded Projects 6 Milestones 8 Pan-India Presence 9 BOT Projects 10 Key Performance
More informationAnnual Plan Discussions - Bihar. Planning Commission
Annual Plan Discussions - Bihar Planning Commission 15.02.2011 1 Overview: Plan Performance & GSDP Annual Plan 2010-11 achievement ` 11,003 cr (till Jan) vs BE of ` 20,000 cr (despite 3 months loss due
More informationInvestor Presentation February 2017
Investor Presentation February 2017 Disclaimer This presentation and the accompanying slides (the Presentation ), which have been prepared by Ashoka Buildcon Limited (the Company ), have been prepared
More informationPNC Infratech Limited Q3 FY2018 Earnings Conference Call. February 15, 2018
PNC Infratech Limited Q3 FY2018 Earnings Conference Call ANALYST: MR. PREM KHURANA ANAND RATHI SHARE & STOCK BROKERS MANAGEMENT: MR. YOGESH JAIN- MANAGING DIRECTOR MR. T. R. RAO -EXECUTIVE VICE PRESIDENT(INFRA)
More informationNATIONAL HIGHWAYS AUTHORITY OF INDIA (MINISTRY OF ROAD TRANSPORT & HIGHWAYS) GOVERNMENT OF INDIA
NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINISTRY OF ROAD TRANSPORT & HIGHWAYS) GOVERNMENT OF INDIA Plot No. G-5 & 6, Sector-10, Dwarka New Delhi - 110 075 Independent Engineer Services for construction of
More informationDirectors Report. As per Consolidated Accounts:
31 To The Shareholders of Your Directors have pleasure in submitting their fifteenth Annual together with the Audited Accounts of the Company, for the eighteen months period from 1st October, 2014 to 31st
More informationGuidelines for Formulation, Appraisal and Approval of
Government of India Ministry of Finance Department of Economic Affairs Guidelines for Formulation, Appraisal and Approval of Central Sector Public Private Partnership Projects INFRASTRUCTURE Building for
More informationIL&FS Transportation Networks Ltd. Analyst Meet June 1, 2015 CIN - L45203MH2000PLC129790
IL&FS Transportation Networks Ltd Analyst Meet June 1, 2015 CIN - L45203MH2000PLC129790 1 IL&FS Transportation - Overview 2 ITNL Footprint - At a Glance China: 49% stake of Chongqing Yuhe Expressway Company
More informationGAMMON INFRASTRUCTURE PROJECTS LIMITED. September 2011
GAMMON INFRASTRUCTURE PROJECTS LIMITED September 2011 R Gammon Infrastructure Projects - An Overview Established Incorporated in 2001 as Gammon Group s vehicle for undertaking infrastructure projects on
More informationRAJYA SABHA List of Questions for ORAL ANSWERS
RAJYA SABHA List of Questions for ORAL ANSWERS to be asked at a sitting of the Rajya Sabha to be held on Monday, July 30, 2018/Shravana 8, 1940 (Saka) (Ministries: Defence; Drinking Water Sanitation; Earth
More informationEvolution of Model Concession Agreement for National Highways in India
See discussions, stats, and author profiles for this publication at: https://www.researchgate.net/publication/254423729 Evolution of Model Concession Agreement for National Highways in India Article CITATIONS
More informationDocument of The World Bank FOR OFFICIAL USE ONLY IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-45590) ON A LOAN IN THE AMOUNT OF US$516.
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: ICR0000807 IMPLEMENTATION
More informationSECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN)
Second Jharkhand State Road Project (RRP IND 49125) SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN) A. Sector Performance, Problems, and Opportunities 1. State context. The state of Jharkhand was
More informationIndia s PPP Program Progress, Key Takeaways & Emerging Challenges
India s PPP Program Progress, Key Takeaways & Emerging Challenges South Asia Sustainable Development Department The World Bank LAC Study Tour April 2009 1 A quick regional snapshot In SAR, efforts to attract
More informationNATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways) Government of India
I NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways) Government of India SIX LANING OF DELHI - AGRA SECTION OF NH-2 FROM KM 20.500 TO KM 200.000 (LENGTH - KM 179.500) IN THE STATE
More informationPNC Infratech Q2 FY2018 Earnings Conference Call. November 16, 2017
PNC Infratech Q2 FY2018 Earnings Conference Call ANALYST: MR. DEBASHISH MAZUMDAR EDELWEISS INVESTMENT RESEARCH MANAGEMENT: MR. YOGESH JAIN MANAGING DIRECTOR PNC INFRATECH LIMITED MR. D.K. MAHESHWARI ASST.
More informationDA TOLL ROAD PRIVATE LIMITED. Financial Statements for
DA TOLL ROAD PRIVATE LIMITED Financial Statements for YEAR ENDED MARCH 2015 Balance Sheet as at 31st March 2015 Particulars Note As at March 31, 2015 As at March 31, 2014 I. EQUITY AND LIABILITIES
More informationPNC Infratech Limited. Result Update Presentation Q3 & 9M FY
PNC Infratech Limited Result Update Presentation Q3 & 9M FY 2017-18 Safe Harbour This presentation and the accompanying slides (the Presentation ), which have been prepared by PNC Infratech Limited (the
More informationIN THE SUPREME COURT OF INDIA CIVIL ORIGINAL JURISDICTION
REPORTABLE IN THE SUPREME COURT OF INDIA CIVIL ORIGINAL JURISDICTION I.A. Nos.363-364, I.A NO.425 IN I.A. NO.364 IN I.A. NOS.344, 355, 362 IN WRIT PETITION (CIVIL) No.13029/1985 M.C.MEHTA...Appellant Versus
More informationPak. J. Biotechnol. Vol. 14 (3) (2017) ISSN Print: ISSN Online:
Pak. J. Biotechnol. Vol. 14 (3) 317-321 (217) ISSN Print: 1812-1837 www.pjbt.org ISSN Online: 2312-7791 RISK MANAGEMENT ON BOT SCHEME ON POST CONSTRUCTED TOLL ROADS P. ARAVIND 1, V. P. GOLDA PERCY 2, V.
More informationBalance Sheet as at 31st March 2015 Particulars Note March 31, 2015 March 31, 2014 I. EQUITY AND LIABILITIES Shareholders' Funds Share capital 2.1 44,770,000 44,770,000 Reserves and surplus 2.2 202,297,322
More informationSupport Loan Concept for the Viability of a BOT Road Project
Support Loan Concept for the Viability of a BOT Road Project Swapan Kumar Bagui 1) and Ambarish Ghosh 2) 1) PhD Student, Dept. of Civil Engrg., Bengal Engrg. and Science University, Shibpur, Howrah 711
More informationMEP Infrastructure Developers Limited Q1 FY16 Earnings Conference Call. August 17, 2015
MEP Infrastructure Developers Limited Q1 FY16 Earnings Conference Call MANAGEMENT: MR. JAYANT MHAISKAR VICE CHAIRMAN & MANAGING DIRECTOR, MEP INFRASTRUCTURE DEVELOPERS LIMITED MR. MURZASH MANEKSHANA EXECUTIVE
More informationRating Methodology Hybrid Annuity Road Projects
RATING METHODOLOGY INFRASTRUCTURE SECTOR COMPANIES Rating Methodology Hybrid Annuity Road Projects Introduction: The Government of India has approved the hybrid annuity model (HAM) to increase the pace
More informationResettlement Plan. India: National Capital Region Urban Infrastructure Financing Facility Project 1 - Bahadurgarh-Badli Road
Resettlement Plan Document Stage: Draft Project Number: 41598 September 2013 India: National Capital Region Urban Infrastructure Financing Facility Project 1 - Bahadurgarh-Badli Road Prepared by the Haryana
More informationPre-Budget proposal of construction sector for
Pre-Budget proposal of construction sector for 0-7 8 9 0 7 Direct Taxes Income Tax Introduction of Transfer Pricing provisions to domestic transaction Applicability of alternate minimum tax on persons
More informationBOON TO RURAL GUJARAT
BOON TO RURAL GUJARAT :: P R E A M B L E :: All DISCOMs have mainly four categories of 11/22 KV feeders viz. Urban, Industrial, GIDC, Rural. Out of which, Rural feeders having mixed load of Agricultural
More informationASIAN DEVELOPMENT BANK RRP: IND 34420
ASIAN DEVELOPMENT BANK RRP: IND 34420 REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE BOARD OF DIRECTORS ON A PROPOSED LOAN TO INDIA FOR THE NATIONAL HIGHWAY CORRIDOR (SECTOR) I PROJECT November 2003
More informationNHAI Public Issue of Tax Free Bonds
17 2015 December, 31 2015 HIGHLIGHTS OF TAX BENEFITS NATIONAL HIGHWAYS AUTHORITY OF INDIA (An Autonomous Body under the Ministry of Road Transport & Highways, Government of India) Interest from these Bonds
More informationFAQs on IRB InvIT Fund
Valuation Summary Enterprise Valuation Net External debt from Banks & FI s (A) Net Sponsor loans (B) Sponsor lock-in @15% of EV Issue Expenses (C) Fresh Issue size (A+B+C) OFS Size Total Issue Size (including
More informationWELSPUN ENTERPRISES LTD
WELSPUN ENTERPRISES LTD INVESTOR PRESENTATION November 2017 INFRASTRUCTURE OIL & GAS FINANCIAL SERVICES 1 SAFE HARBOR The information contained in this presentation is provided by Welspun Enterprises Limited
More informationProject Finance in PPP. Presented by Chaitanya Talwalkar Vice President, Axis Bank Ltd.
Project Finance in PPP Presented by Chaitanya Talwalkar Vice President, Axis Bank Ltd. 1 What is PPP? PPP (Public Private Partnership) involves a contract between a public sector authority and a private
More informationGPT Infraprojects Limited Q3 FY 2016 Earnings Conference Call
Q3 FY 2016 Earnings Conference Call Management: Mr. Atul Tantia Executive Director, GPT Infraprojects Limited Mr. A. K. Dokania Chief Financial Officer, GPT Infraprojects Limited Page 1 of 5 Ladies and
More informationTRANSMISSION LICENCE NO. 2 OF 2009 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA
MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai - 400 005 Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail mercindia@mercindia.org.in
More information48081 v1. India: Andhra Pradesh Road Sector Project. Environmental and. Social Management Framework. For. Maintenance Road. (approx.
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 48081 v1 India: Andhra Pradesh Road Sector Project Environmental and Social Management
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3202 Project Name. Kenya Nairobi Urban Toll Road PRG Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3202 Project Name Kenya
More informationAllahabad Bank, Head Office, 2 N.S. Road, Kolkata DIVIDEND DISTRIBUTION POLICY
DIVIDEND DISTRIBUTION POLICY 1. NEED AND OBJECTIVE OF THE POLICY: Securities and Exchange Board of India (SEBI) has, on July 08, 2016, notified the SEBI (Listing Obligations and Disclosure Requirements)
More informationIL & FS TRANSPORTATION NETWORKS LIMITED. 1 Type of Issue (IPO/FPO) IPO. 2 Issue Size (Rs. Cr) 700* * this includes Offer for Sale of Rs.110.
Name of the Issue: IL & FS TRANSPORTATION NETWORKS LIMITED 1 Type of Issue (IPO/FPO) IPO 2 Issue Size (Rs. Cr) 700* * this includes Offer for Sale of Rs.110.39 crs 3 Grade of issue alongwith name of the
More informationPublic Issue of Tax Free Secured Redeemable Non-Convertible Bonds issued by
Public Issue of Tax Free Secured Redeemable Non-Convertible Bonds issued by HIGHLIGHTS OF TAX BENEFITS In exercise of the powers conferred by item (h) of sub-clause (iv) of clause (15) of Section 10 of
More informationPNC Infratech Limited. Result Update Presentation Q1 FY
PNC Infratech Limited Result Update Presentation Q1 FY 2018-19 Safe Harbour This presentation and the accompanying slides (the Presentation ), which have been prepared by PNC Infratech Limited (the Company
More informationMINUTES OF THE MEETING OF EMPOWERED COMMITTEE FOR PMGSY HELD ON 02 nd Nov, 2012
MINUTES OF THE MEETING OF EMPOWERED COMMITTEE FOR PMGSY HELD ON 02 nd Nov, 2012 STATE: WEST BENGAL Phase X (2012-13) A Meeting of the Empowered Committee (EC) for PMGSY was held on 2 nd November, 2012
More informationAccounting issues in Infrastructure Industry By Amyn Jassani
Accounting issues in Infrastructure Industry By Amyn Jassani Infrastructure Activities Page 2 Agenda Accounting Definition of operating cycle Service Concession Arrangements Accounting for revenue during
More informationImplementation Status & Results India Tamil Nadu Road Sector Project (P050649)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Tamil Nadu Road Sector Project (P050649) Operation Name: Tamil Nadu Road Sector Project (P050649)
More informationDEWAN HOUSING. PNC Infratech Ltd. Hold. Growing business at cheap valuation
DEWAN HOUSING PNC Infratech Ltd. Hold Growing business at cheap valuation 31000 34000 55000 54000 48350 20-Dec-16 20-Jan-17 20-Feb-17 20-Mar-17 20-Apr-17 20-May-17 20-Jun-17 20-Jul-17 20-Aug-17 20-Sep-17
More informationCRISIL s criteria for rating annuity road projects. January 2017
CRISIL s criteria for rating annuity road projects January 2017 Criteria contacts Pawan Agrawal Chief Analytical Officer CRISIL Ratings Email: pawan.agrawal@crisil.com Sameer Charania Director Rating Criteria
More informationNHAI Public Issue of Tax Free Bonds Tranche II
NHAI Public Issue of Tax Free Bonds Tranche II HIGHLIGHTS OF TAX BENEFITS NATIONAL HIGHWAYS AUTHORITY OF INDIA (An Autonomous Body under the Ministry of Road Transport & Highways, Government of India)
More informationNATIONAL HIGHWAYS AUTHORITY OF INDIA (MINIS TRY OF ROAD TRANSPORT & HIGHWAYS, GOVT.OF INDIA) Plot No. G-5 & 6, Sector 10, Dwarka New Delhi
04.07.October March 2012 Date: 25 th 21st NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINIS TRY OF ROAD TRANSPORT & HIGHWAYS, GOVT.OF INDIA) Plot No. G-5 & 6, Sector 10, Dwarka New Delhi 110 075 INDEPENDENT
More informationDate of Approval by GoI. Project Component Housing Municipality
S. No ANNEXURE I : PROJECT INFORMATION (FINANCIAL) State /UT Code 19 State/UT Name West Bengal SLNA KMDA City Implementing Agency Code Title Bank Account No. Component Date of Approval by GoI Cost (Rs.
More informationNIT No 2/ OFFICE OF THE CHIEF ENGINEER(Roads), PWD, RAJASTHAN, JAIPUR.
NIT No 2/2014-15 OFFICE OF THE CHIEF ENGINEER(Roads), PWD, RAJASTHAN, JAIPUR. Invitation of proposals for Expression of interest (EOI) for Statutory Auditor for development & implementation and operation
More informationBIDDING DOCUMENTS. for. Procurement of. Eastern Peripheral Expressway ITS Installation Project. Invitation for Bids PART 1 - Bidding Procedures
BIDDING DOCUMENTS for Procurement of Eastern Peripheral Expressway ITS Installation Project Invitation for Bids PART 1 - Bidding Procedures June 2017 Employer : National Highways Authority of India Country
More informationREPORT OF THE B K CHATURVEDI COMMITTEE ON NHDP
REPORT OF THE B K CHATURVEDI COMMITTEE ON NHDP SUB: REVISED STRATEGY FOR IMPLEMENTATION OF THE NATIONAL HIGHWAYS DEVELOPMENT PROJECT (NHDP) FRAMEWORK AND FINANCING 1. Background A meeting was held by Hon
More information1. RATE OF INTEREST IN CASE OF RUPEE EXPORT CREDIT. % age per annum 1. Pre-Shipment Credit a) Upto 180 days OBC 1 to 3: BR+0.50% OBC 4 to 6: BR+0.
1. RATE OF INTEREST IN CASE OF RUPEE EXPORT CREDIT Annexure IV Category of Export Credit Rate of Interest on advances % age per annum 1. Pre-Shipment Credit a) Upto 180 days OBC 1 to 3: BR+0.50% OBC 4
More informationPradhan Mantri Gram Sadak Yojana
Pradhan Mantri Gram Sadak Yojana Review Meeting for Bihar, Jharkhand, Odisha and West Bengal at Patna on 29th & 3th September, 214 1 Eligible Habitations, Habitations Cleared and Connected (Since commencement
More informationFINANCIAL RESULTS The key financial parameters for the year ended March 31, 2011 are: Amount (Rupees Lakhs)
DIRECTORS REPORT The Directors have pleasure in presenting their report and Accounts for the year ended March 31, 2011. FINANCIAL RESULTS The key financial parameters for the year ended March 31, 2011
More informationThe Directors have pleasure in presenting their Report and the Accounts for the period ending March 31, 2009.
DIRECTORS REPORT The Directors have pleasure in presenting their Report and the Accounts for the period ending March 31, 2009. FINANCIAL RESULTS Your Company has not commenced commercial operations and
More informationRestructuring of Government Departments-Karnataka Experience
Restructuring of Government Departments-Karnataka Experience T V Ramanayya, V.Nagadevara & Shyamal Roy Indian Institute of Management Bangalore Abstract Public expenditure in India has played a key role
More informationMEP Infrastructure Developers Ltd.
Strong play in Road OMT segment!! We MEP is one of the few established players in the road tolling and operations and maintenance (OMT) segment. The asset light business model has allowed MEP to achieve
More informationOverview of the framework
Overview of the framework Need for a framework The highways sector in India is witnessing a significant interest from both domestic as well as foreign investors following the policy initiatives taken by
More informationJoint Fact Finding Committee (JFC) :: Recommendations
Joint Fact Finding Committee (JFC) :: Recommendations 1.Giving Special Category Status to Andhra Pradesh Inspite of the then Prime minister Dr.Manmohan Singh s assurance on the floor of the Rajya Sabha
More informationInitial Environmental Examination
Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kv VSC-HVDC power transmission lines between Pugalur, Tamil Nadu and North Trichur, Kerala) Annexures
More informationOctober 30, 2018 WEI./SEQ To, BSE Limited 1st Floor, Rotunda Bldg. Dalal Street, Fort, Mumbai Scrip Code:
-tç%rwelspun ENTERPRISES INFRASTRUCTURE AND ENERGY WEI./SEQ 2018 To, BSE Limited 1st Floor, Rotunda Bldg. Dalal Street, Fort, Mumbai - 400 001. Scrip Code: 532553 October 30, 2018 National Stock Exchange
More informationPNC Infratech Limited. Result Update Presentation Q2 & H1 FY
PNC Infratech Limited Result Update Presentation Q2 & H1 FY 2018-19 Safe Harbour This presentation and the accompanying slides (the Presentation ), which have been prepared by PNC Infratech Limited (the
More informationGovernment of Bihar (Energy Department) Proposed Annual Plan for
Government of Bihar (Energy Department) Proposed Annual Plan for 2012-13 The proposed outlay for the Annual Plan 2012-13 of the Energy Department is as follows. : (Rupees in lacs) Total proposed outlay
More informationKENYA NATIONAL HIGHWAYS AUTHORITY ROADS 10,000 PROGRAMME
KENYA NATIONAL HIGHWAYS AUTHORITY ROADS 10,000 PROGRAMME DEVELOPMENT OF 10,000 KM OF ROADS SUPPORTING PRIMARY GROWTH SECTORS THROUGH CONTRACTOR FACILITATED FINANCING MECHANISM (Phase 1) TENDER NO. KeNHA/1291/2016.
More informationAshoka Buildcon Limited Welcomes Shareholders for 24 th Annual General Meeting February 2016
Ashoka Buildcon Limited Welcomes Shareholders for 24 th Annual General Meeting 30.09.2017 February 2016 Disclaimer This presentation and the accompanying slides (the Presentation ), which have been prepared
More information