1 Government of Bihar (Energy Department) Proposed Annual Plan for The proposed outlay for the Annual Plan of the Energy Department is as follows. : (Rupees in lacs) Total proposed outlay for ,86.60 Total proposed Earmarked for (a) RIDF 263,57.00 (b) EAP (c) BRGF 525, ,57.00 Total proposed remaining out lay for (State Plan) Annual Plan ( ) (Rupees in lacs) For BREDA Particulars Proposed Annual plan Amount And for Sinchai shour karnti yojna for other Solar light schemes, For Street Light, Solar Lantern & Solar Home light Sub Total: For BSEB State Plan (a) Generation (b) Distribution (c) Transmission (d) R-APDRP/APDRP Head wise Proposed Annual plan Amount Sub Total: Total: JNP JS Plan

2 STATE PLAN A) Generation : (Rupees in lacs) sl.no. Particulars Proposed Annual plan for SCHEME : 1 Nabinagar TPS (3x660 MW) BTPS Extension (2x250 MW) Including Ganga water scheme MTPS Extension (2x195 MW) Total ( Scheme ) B) Distribution : (Rupees in lacs) sl.no Particulars Proposed Annual plan for Replacement of Old & Damaged Conductor (Continuing Scheme) Scheme for Capacity Augmentation and installation of additional Power transformers in P.S.S. of distribution System (Continuing Scheme) 3 Replacement of burnt / damaged distribution transformers (Continuing Scheme) 4 Scheme for Capacity Augmentation and installation of additional distribution transformers. (Continuing Scheme) 5 Replacement of burnt / damaged Power Transformers (Continuing Scheme) 6 Scheme for transfer of electrical connection given on Bansballa system to Pole, conductor etc. 7 Installation of A.B. Switch in P.S.S. and D.S.S in distribution system 8 Construction of PSS at Narayanpur, Dist.Madhubani (continuing Scheme) 9 Construction of PSS at Telhara Bazar, Bairgania, Saidpur, (continuing Scheme) 10 Construction of PSS at Chaksarwar.(continuing Scheme) Construction of PSS at Jale,Dist. Dharbhanga (continuing Scheme) Total : JNP JS Plan

3 C) Transmission : (Rupees in lacs) sl.no Particulars Proposed Annual plan for Shifting of 132/33 KV Mithapur G.S.S. and R.K. Nagar /11 KV P.S.S. from its existing place to Karbigahiya (on going Scheme) 2 Construction of transmission system for evacuation of power from KBUNL, Muzaffarpur 3 Construction of 132/33 Kv G.S.S. at following places with associated 132 KV lines at Jandaha, with associated line (On going Scheme) 4 Construction of 132/33 Kv G.S.S. at following places with associated 132 KV lines at Tehta & Imamganj (On going Scheme) 5 Construction of 132/33 Kv G.S.S. at following places with associated 132 KV lines at Ekma (On going Scheme) 6 Construction of 2x100 MVA, 220/132 KV Bihta G.S.S Construction of 5 Nos. of 132 KV Bays at G.S.S. at Sitamarhi, Bihta, Khagaul, Ara & Nawada 8 Construction of 10 Nos. of 33 KV Bays at Sitamarhi, Bihta, Kaghaul, Ara, Nawada, and five other places. Total D) APDRP/RAPDRP : 1 Release of APDRP & R-APDRP part A funds (Ongoing scheme) 2 Release of R-APDRP part B funds Total JNP JS Plan

4 JNP JS Plan

5 BIHAR STATE ELECTRICITY BOARD, PATNA Proposed Annual Plan for GENERATION Bihar has only two Thermal Power Stations in the State Sector namely Barauni Thermal Power Station ( 2x110 MW) with the Bihar State Electricity Board and Muzaffarpur Thermal Power Station (2x110 MW) with the Kanti Bijlee Utpadan Nigam Ltd., joint venture of Bihar State Electricity Board and NTPC Ltd. All the units at these power stations had been under long shut down due to various defects/problems and financial crunch. However, based on decisions taken by the State Govt. and the Central Govt., restoration works of one unit at each was taken up and presently the generation obtainable from the Barauni Thermal Power Station Unit No- 6 is MW and from Muzaffarpur Thermal Power Station Unit No - 2 is MW. The demand of power in the state is around 2000 MW. The demand of power is met mainly from the Central Sector allocation which is presently MW. In the light of the meager installed generation capacity and to meet the ever growing requirement, several steps have been taken to enhance power generation capacity both in the public sector and private sector. Under Backward Region Grants fund (BRGF) : (i) Generation : The scope of remaining works of R&M of 2x110 MW units at BTPS (Mechanical, Electrical & Civil Works) which were not included in 11th Five Year Plan has been included under BRGF and is proposed for 12th Five Year Plan amounting to Rs. 158 crores. A provision. of Rs crs. has been made under BRGF in Annual Plan (ii) Transmission :- An estimated amount of Rs crores will be required during 12 th Plan for expansion of G rids, Lines and Transmission sub-systems to meet the requirements of increased power flow which has been proposed under BRGF scheme. A provision. of Rs crs. has been made under BRGF in Annual Plan

6 (iii) Distribution :- Development of infrastructure development in distribution sector as well as separation of agriculture feeder has been proposed in 12th Five year Plan tots up to Rs crores A provision. of Rs crs. has been made under BRGF in Annual Plan Under State Plan :- (i) Nabinagar Super Thermal Power Project (3x660 MW) The Govt. of Bihar has set up a Joint Venture Company on 50:50 equity basis between Bihar State Electricity Board and N.T.P.C. Ltd., named as M/s Nabinagar Power Generating Co. Pvt. Ltd. The proposal is to set up 3x660 MW Thermal Power plant at Nabinagar in district Aurangabad, Bihar at an estimated cost of Rs Crores. Provision of Rs Crs. has been made under State Plan to NPGCPL towards B.S.E.B. equity in the joint venture company under Annual Plan (ii) Barauni T.P.S. Extension (2x250 MW) The expansion of BTPS (2x250 MW) has been sanctioned by State Govt. under State Plan at a total project Cost is Rs crs. The work is being done by M/s BHEL on turn-key basis and project activity consultant is M/s STEAG. Ganga water scheme is under progress for BTPS Extension at an estimated cost of Rs crores. A provision. of Rs crs. has been made for BTPS extension alongwith Ganga water scheme under Annual Plan (iii) Muzaffarpur T.P.S. Extension (2 x 195 MW) The Muzaffarpur Thermal Power Station is now under a joint venture company of Bihar State Electricity Board and N.T.P.C. Ltd., named as M/s Kanti Bijlee Utpadan Nigam Ltd. (KBUNL). The proposal for extension of Muzaffarpur T.P.S. was initially for 2x250 MW. However, on account of the aviation clearance accorded, the proposal is now for 2x195 MW. The Project cost is Rs crore and BTG Package work is being executed by BHEL. Provision of Rs Crs. has been made under State Plan to KBUNL towards B.S.E.B. equity in the joint venture company under Annual Plan

7 Transmission:- (i) Karbigahiya G.S.S. 132/33 KV Mithapur G.S.S. and 33/11 KV R.K.Nagar PSS has to shift from its existing place and & new 132/33 KV GSS and 33/11 KV PSS is being constructed at Karbigahiya premises. So, for above wok an amount of Rs crores is proposed in Annual Plan (ii) MTPS Extension Project (2x195 MW) under which two unit of 195 MW each is being executed. So, for evacuation of power from new units is not possible unless transmission system is being constructed. A scheme for construction of transmission system amounting to Rs Crore to be executed for evacuation of power from KBUNL, Muzaffarapur and the accordingly same has been proposed in Annual Plan (iii) Construction of New G.S.S. Construction work of 4 nos. of new 132/33 KV G.S.S. at Jandaha, Tehta, Imamganj & Ekma with associated 132 KV lines is going under State Plan. A provision of Rs crores has been made towards this in Annual Plan (Sr. no. 3,4 & 5) (iv) Capacity Augmentation of 132/33 KV Bihta GSS and a new 2x100 MVA, 220/132/33 KV GSS at Bihta has to be constructed in & So, for executing the project an amount of Rs crores is proposed in Annual Plan (v) 5 Nos. of 132 KV Bays at GSS at Sitamarhi, Bihta, Khagaul, Ara & Nawada and 10 Nos. of 33 KV Bays at 10 different places has to be constructed for evacuation of power from new upcoming G.S.S. A Provision of total 5.00 Crore has been made under State Plan in Annual Plan (Sr. no. 6 & 7) 3

8 DISTRIBUTION : (i) Replacement of old/damaged conductors of Distribution lines : BSEB has estimated that for the replacement of old and damaged conductors during three years for which an amount of Rs.221 crs. is required. Of this amount, a sum of Rs crs. is required in Annual Plan as budget provision. (Sr. no. 1) (ii) Augmentation of Power Transformer and installation of additional D/S/S to meet the growing loads of the State :- It is seen that a nos. of Power transformers and distribution transformers in the state are heavily loaded/overloaded presently due to growth of loads. With the improvements in power availability and strengthening of transmission and distribution system, the capacity of existing running transformers are to be augmented and corresponding additional D/S/S have to be installed also to meet the requirement of increasing demand. For this, two scheme for augmentation of some existing running Power transformers and another for installation of D/S/S has been formulated respectively at a cost of Rs crores and Rs crores. provision has been made for Rs crores and Rs crores under Annual plan (Sr. no. 2 & 4) (iii)replacement of burnt/damaged Power & Distribution Transformers: In order to provide uninterrupted power supply to consumer, burnt power & distribution transformers have to be replaced in definite time. So, for this two schemes, one for replacement of burnt/damaged Power transformers has been made for three years amounting to Rs Crores and Rs Crores respectively. Provisions of Rs Crore and Rs Crores have been made on this account in Annual Plan (Sr. no. 3 & 5) (iv) Removal of Bans Balla connection :- A new scheme has been proposed for removal of existing 'Bans Balla' coonections in urban as well as rural areas, which are causing frequent break down of supply, burning of distribution transformer and occurrences of electrical accidents. The scheme provides extension of L.T. lines with overhead lines on PSC poles at the cost of Rs crore only. Provision of this amount has been made in Annual Plan (Sr. no. 6) 4

9 (v) Installation of A.B. switches in PSS and DSS :- There are few P.S.S. & D.S.S. in distribution system where A.B. switch is either not installed or damaged causing interruption in power supply and electrical accidents sometimes. In this respect a scheme for installation of A.B. switch has been prepared amounting to Rs crores and accordingly budget provision of the same has been made in Annual Pan (Sr. no.7) (vi) Construction of new P.S.S. :- At six different places namely (i) Narayanpur, Block- Jhanjharpur, distt.- Madhubani (ii) Telhara Bazar, Block- Ekangarsarai, Distt.- Nalanda (iii) Bairgania, Distt.- Sitamarhi. (iv) Saidpur, Block-Ben, distt- Nalanda. (v) Jamaalpur Chaksarvar, block- Athmalgola, Patna. (vi) Jaale, Distt. - Darbhanga new PSS has to be constructed in order to facilitate power supply and strengthening of distribution system. A sum of Rs crores is required in Annual Plan as budget provision. (Sr. no. 8,9,10 & 11) (D) R-APDRP Project Part-A & Part-B For covering 71 Towns having population of more than thirty thousand, fund to be provided by BSEB / Bihar Govt. is Rs Crores against total project cost of Rs Crs. proposed for R-APDRP, Part-A Strengthening of Distribution system is being done under R-APDRP Part-B scheme for 64 towns. Provisions of Rs Crores for APDRP and 4.07 crores for RAPDRP Part-A and Rs Crores for Part-B have been made in Annual Plan (E) Externally Aided Project (EAP) : EAP consists of targeted investments in strengthening of electrical distribution system of 7 towns in the state and Transmission system improvement. The total cost of the project is about Rs Crs., out of which Crs has to be funded by BSEB/GOB and remaining by Asian Development Bank (ADB). The provision. of Rs Crs has been made under EAP in Annual Plan

10 Annual Plan for Renewable Energy. Bihar Renewable Energy Development Agency. For Promotion and implementation of Non- Conventional-Sources of Energy program and schemes the provision of Rs Crs. under State Plan has been made for Annula Plan In this program Solar lantern, solar Streat light, Solar Charging Station, Solar water pumping, Tharuhat Solar lantern distribution program schemes are to be taken. Out of total out-lay for Energy sector and amount of Rs Crs. is being proposed for New and Renewable Energy Schemes during which are as follows :- Sl. no Name of the Schemes No Fund required in Solar lantern Solar street light Solar charging station Solar water pumping Tharhut solar lantern distribution Mushhar development program street light Total Crs Annual Plan for Hydro - Energy. Bihar State Hydroelectric Power-corporation Preparation of Annual Plan is to be taken up at a time when we are moving towards the 12 th five - year plan period, in the year total out-lay of Rs lacs has been year-worked for RIDF loan to be given to Bihar State Hydro-electric Power Corporation for the following sanctioned schemes :- Sl. no Name of the Schemes Capacity Trench Location Project Cost Fund required in Katanya 2x1000 K.W RIDF-XIII W. Champaran Barbal 2x800 KW RIDF-XIII W. Champaran Mathauli 2x400 KW RIDF-XIII W. Champaran Bathnaha 8.00 MW RIDF-XV Araria Nirmali 7.00 MW RIDF-XVI Supaul Dihari 3.3 MW RIDF-XVI Rohtas Dehra 1.00 MW RIDF-XVII Rohatas Sipha 1.00 MW RIDF-XVII Rohatas Ararghat 7.00 MW RIDF-XVIII Madhepura Total

11 7

Annual Financial results

Annual Financial results Annual Financial results 2011-2012 STATEMENT OF AUDITED FINANCIAL RESULTS FOR THE YEAR ENDED 31 MARCH 2012 Part I ST Sl. No. Particu 1 2 1 Income from operations (c) Net sales (net of electricity duty)

More information

Revenue- Linked Supply Scheme (RLSS)

Revenue- Linked Supply Scheme (RLSS) Revenue- Linked Supply Scheme (RLSS) Sarur Chaudhary, JPAL SA Robin Burgess, LSE and IGC Michael Greenstone, UChicago and IGC Nicholas Ryan, Yale and IGC Anant Sudarshan, UChicago 01 November, 2014 BSPHCL

More information

BIHAR ELECTRICITY REGULATORY COMMISSION

BIHAR ELECTRICITY REGULATORY COMMISSION BIHAR ELECTRICITY REGULATORY COMMISSION Case No. TP- 41 of 2012 Order on Truing up for FY 2011-12 & Review for FY 2012-13 of erstwhile BSEB And Determination of Multi Year Aggregate Revenue Requirement

More information

BIHAR ELECTRICITY REGULATORY COMMISSION Ground Floor, Vidyut Bhavan-II Jawahar Lal Nehru Marg Patna TARIFF ORDER

BIHAR ELECTRICITY REGULATORY COMMISSION Ground Floor, Vidyut Bhavan-II Jawahar Lal Nehru Marg Patna TARIFF ORDER BIHAR ELECTRICITY REGULATORY COMMISSION Ground Floor, Vidyut Bhavan-II Jawahar Lal Nehru Marg Patna 800 021 TARIFF ORDER Passed in Case No.TP-3 of 2010 on 6 th December, 2010 In the matter of : Determination

More information

(a) For HLCs empanelled at Branches linked to Retail Loan Factories: About 5 proposals worth Rs. 1 Crore a month.

(a) For HLCs empanelled at Branches linked to Retail Loan Factories: About 5 proposals worth Rs. 1 Crore a month. Empanelment of Home Loan Counselors (HLCs):- Bank of Baroda, Bihar, Orissa and Jharkhand Zone (BOJZ) invite applications for empanelment as Home Loan Counselors (HLCs) for sourcing Home Loan proposals

More information

BIHAR ELECTRICITY REGULATORY COMMISSION. Case No. 54 of for BIHAR STATE POWER TRANSMISSION COMPANY LIMITED (BSPTCL)

BIHAR ELECTRICITY REGULATORY COMMISSION. Case No. 54 of for BIHAR STATE POWER TRANSMISSION COMPANY LIMITED (BSPTCL) BIHAR ELECTRICITY REGULATORY COMMISSION Case 54 of 2015 Tariff Order Truing-up for FY 2014-15, Annual Performance Review (APR) for FY 2015-16, Annual Revenue Requirement (ARR) for FY 2016-17 to FY 2018-19

More information

Presentation. Bihar s s Annual Plan

Presentation. Bihar s s Annual Plan Presentation on Bihar s s Annual Plan 2008-09 09. Aspirations Format : Commitment Processes Set in Motion Basic Data Sl.No. Indicators Bihar India 1 2 3 4 1 Population (Rural) (%) 89.6 72.2 2 Birth rate

More information

Annual Plan Discussions - Bihar. Planning Commission

Annual Plan Discussions - Bihar. Planning Commission Annual Plan Discussions - Bihar Planning Commission 15.02.2011 1 Overview: Plan Performance & GSDP Annual Plan 2010-11 achievement ` 11,003 cr (till Jan) vs BE of ` 20,000 cr (despite 3 months loss due

More information

Section 2. ARR and Tariff proposal submitted by the JSEB

Section 2. ARR and Tariff proposal submitted by the JSEB Page 1 of 10 Section 2 ARR and Tariff proposal submitted by the JSEB The petition filed by the Board for approval of its Annual Revenue Requirement (ARR) and tariff for FY 2003-04 has been summarized in

More information

(Rahul Singh, IAS) State Project Director

(Rahul Singh, IAS) State Project Director Shiksha Bhawan, Campus of Rastrabhasha Parishad, Saidpur, Rajendra Nagar, Patna-800004 Ph.: 0612 2667152, Fax: 0612 2667190 Website : www.bepcssa.in Notice Inviting Tender for Appointment of Concurrent

More information

BIHAR STATE ELECTRICITY BOARD

BIHAR STATE ELECTRICITY BOARD BEFORE THE BIHAR ELECTRICITY REGULATORY COMMISSION PATNA CASE NO: Filing of the Review Petition for FY 2011-12 and Aggregate Revenue from Charges or Aggregate Revenue Requirement (ARR) & Tariff Petition

More information

(On behalf of Aravali Power Company Pvt. Ltd.)

(On behalf of Aravali Power Company Pvt. Ltd.) (On behalf of Aravali Power Company Pvt. Ltd.) I N V O I C E S U M M A R Y Send To: Superintending Engineer(Billing) Copy To: Rajasthan Urja Vikas Nigam Limited 132 KV GSS Sub Station Building, Calgiri

More information

POWER GENERATION. Public Enterprises Survey : Vol-II 295

POWER GENERATION. Public Enterprises Survey : Vol-II 295 POWER GENERATION Public Enterprises Survey 2015-2016 : Vol-II 295 14. As on 31.03.2016, there were 11 Central Public Sector Enterprises in the group. The names of these enterprises along with their year

More information

BOON TO RURAL GUJARAT

BOON TO RURAL GUJARAT BOON TO RURAL GUJARAT :: P R E A M B L E :: All DISCOMs have mainly four categories of 11/22 KV feeders viz. Urban, Industrial, GIDC, Rural. Out of which, Rural feeders having mixed load of Agricultural

More information

Government of Bihar welcomes. Sri M.S. Ahluwalia Deputy Chairman Planning Commission 18 th November 2009

Government of Bihar welcomes. Sri M.S. Ahluwalia Deputy Chairman Planning Commission 18 th November 2009 Government of Bihar welcomes Sri M.S. Ahluwalia Deputy Chairman Planning Commission 18 th November 2009 Presentation Format Plan Expenditure Per Capita Development Expenditure Annual Plan 2009-10 Brief

More information

Q4 FY Presentation 26 th May 2016

Q4 FY Presentation 26 th May 2016 Q4 FY 2016- Presentation 26 th May 2016 1 Disclaimer This presentation and the discussion that follows may contain certain words or phrases that are forward - looking statements, based on current expectations

More information

STANDING COMMITTEE ON ENERGY MINISTRY OF POWER

STANDING COMMITTEE ON ENERGY MINISTRY OF POWER STANDING COMMITTEE ON ENERGY (211) SIXTEENTH LOK SABHA MINISTRY OF POWER DEMANDS FOR GRANTS 211 REPORT LOK SABHA SECRETARIAT NEW DELHI March 21Phalguna 1 (Saka) DRAFT REPORT STANDING COMMITTEE ON ENERGY

More information

meeting. Cooperative Department, Government of Bihar. Bid Document

meeting. Cooperative Department, Government of Bihar. Bid Document Cooperative Department, Government of Bihar. Bid Document Invitation of bids for selection of Insurance Companies as lmplementing Agencies (la) for "Pradhan Mantri Fasal Bima Yojana (PMFBY)" in BIHAR State

More information

Order on Truing up of FY

Order on Truing up of FY BIHAR ELECTRICITY REGULATORY COMMISSION Order on Truing up of FY 2012-13 For BIHAR STATE POWER HOLDING COMPANY LIMITED (BSPHCL) Case No. 21 of 2013 28 th February, 2014 CONTENTS ORDER... 1 1. Introduction...

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Order on Approval of Business Plan And ARR for MYT Control Period FY 2016-17 to FY 2020-21 And Transmission and SLDC Tariff for FY 2016-17 for Jharkhand Urja Sancharan Nigam Ltd (JUSNL) Ranchi February

More information

Uttar Bihar Gramin Bank

Uttar Bihar Gramin Bank Uttar Bihar Gramin Bank Head Office, Kalambagh Chowk, Muzaffarpur Tender reference No.HO:GAD:2017-18/806 dt.14.11.17 TENDER FOR MAINTENANCE OF CCTV SYSTEM AT BRANCHES/OFFICES OF UTTAR BIHAR GRAMIN BANK

More information

STATE LEVEL BANKERS COMMITTEE, BIHAR 66TH REVIEW MEETING FOR THE QUARTER ENDED

STATE LEVEL BANKERS COMMITTEE, BIHAR 66TH REVIEW MEETING FOR THE QUARTER ENDED STATE LEVEL BANKERS COMMITTEE, BIHAR 66 TH REVIEW MEETING FOR THE QUARTER ENDED 30 th SEPTEMBER, 2018 VENUE: HOTEL CHANKYA, PATNA DATE: 1 ST DECEMBER 2018 TIME: 11.00 AM STATE BANK OF INDIA SLBC DEPARTMENT

More information

ANALYSIS OF AGGREGATE TECHNICAL AND COMMERCIAL LOSSES OF APCPDCL

ANALYSIS OF AGGREGATE TECHNICAL AND COMMERCIAL LOSSES OF APCPDCL ANALYSIS OF AGGREGATE TECHNICAL AND COMMERCIAL LOSSES OF APCPDCL Mohsen Roshani Yasaghi, Depart of Management, Osmania Universiy, Hyderabad T Ravi Kumar Faculty Memebr, IBS- Hyderabad Abstract The Aggregate

More information

Government of Bihar. Particulars

Government of Bihar. Particulars Government of Bihar Main Features-Budget 2012-13 Rs. in Cr 2009-10 2010-11 2011-12 2012-13 % 2012-13 Increase Rece./Exp. over Actuals Actuals B.E. B.E. % of Rev/ 2011-12 Cap (B.E.) 1 2 3 4 5 6 7 Particulars

More information

BIHAR ELECTRICITY REGULATORY COMMISSION PATNA

BIHAR ELECTRICITY REGULATORY COMMISSION PATNA BIHAR ELECTRICITY REGULATORY COMMISSION PATNA NOTIFICATION 2 nd August, 2010 No. BERC-Regl/Solar-2/2010-03 In exercise of powers conferred under Section 61 read with Section 181(2)(zd) of the Electricity

More information

CONSTRUCTION OF 220/132 KV GIS SUBSTATION AT EGRA, DISTRICT-PURBA MEDINIPUR (Package-25)

CONSTRUCTION OF 220/132 KV GIS SUBSTATION AT EGRA, DISTRICT-PURBA MEDINIPUR (Package-25) DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED (A Govt of West Bengal Enterprise) CHIEF ENGINEER (PROCUREMENT), VIDYUT BHAVAN NOTICE INVITING TENDERS For CONSTRUCTION

More information

STATE BANK OF INDIA SLBC DEPARTMENT (5TH FLOOR) LOCAL HEAD OFFICE, WEST GANDHI MAIDAN P A T N A PH.NO / FAX-

STATE BANK OF INDIA SLBC DEPARTMENT (5TH FLOOR) LOCAL HEAD OFFICE, WEST GANDHI MAIDAN P A T N A PH.NO / FAX- STATE LEVEL BANKERS COMMITTEE, BIHAR 57TH REVIEW MEETING FOR THE QUARTER ENDED 30 TH JUNE, 2016 VENUE: HOTEL CHANAKYA, PATNA DATE: 31ST AUGUST 2016 TIME: 11.00 AM STATE BANK OF INDIA SLBC DEPARTMENT (5

More information

VOLUME I INSTRUCTION TO BIDDERS SELECTION OF ENROLMENT AGENCY. Request for Quotation (RFQ) Rural Development Department, Government of Bihar

VOLUME I INSTRUCTION TO BIDDERS SELECTION OF ENROLMENT AGENCY. Request for Quotation (RFQ) Rural Development Department, Government of Bihar Request for Quotation (RFQ) VOLUME I INSTRUCTION TO BIDDERS SELECTION OF ENROLMENT AGENCY Page 1 of 24 28/07/2014 Contents 1. INVITATION TO BID...3 2. INTRODUCTION...3 2.1 About Registrar s project...4

More information

Incorporating public transfers into the measurement of poverty

Incorporating public transfers into the measurement of poverty Incorporating public transfers into the measurement of poverty Anders Kjelsrud and Rohini Somanathan July, 2013 The Problem Poverty measures in India, and elsewhere, are based on private consumption data

More information

STATE BANK OF INDIA SLBC DEPARTMENT (5TH FLOOR) LOCAL HEAD OFFICE, WEST GANDHI MAIDAN P A T N A PH.NO / FAX-

STATE BANK OF INDIA SLBC DEPARTMENT (5TH FLOOR) LOCAL HEAD OFFICE, WEST GANDHI MAIDAN P A T N A PH.NO / FAX- STATE LEVEL BANKERS COMMITTEE, BIHAR 58TH REVIEW MEETING FOR THE QUARTER ENDED 30 TH SEPTEMBER, 2016 VENUE: HOTEL CHANAKYA, PATNA DATE: 16 TH NOVEMBER 2016 TIME: 11.00 AM STATE BANK OF INDIA SLBC DEPARTMENT

More information

Regulatory formats for Multi Year Annual Revenue Requirement for the Control Period from FY to FY and determination of retail tariff

Regulatory formats for Multi Year Annual Revenue Requirement for the Control Period from FY to FY and determination of retail tariff Regulatory formats for Multi Year Annual Revenue Requirement for the Control Period from FY 2016-17 to FY 2020-21 and determination of retail tariff for FY 2018-19 along with trueup of the FY 2012-13,

More information

41 st Annual Report MANAGEMENT DISCUSSION AND ANALYSIS. Management Discussion and Analysis Annexure - I to Directors Report

41 st Annual Report MANAGEMENT DISCUSSION AND ANALYSIS. Management Discussion and Analysis Annexure - I to Directors Report ECONOMIC AND SECTOR OUTLOOK MANAGEMENT DISCUSSION AND ANALYSIS A Maharatna Company Annexure-I to Directors Report Existing Installed Capacity Total Capacity (MW) % share 32 24 44 Total* 326848.54 100 INDUSTRY

More information

SOUTH BIHAR POWER DISTRIBUTION COMPANY LIMITED

SOUTH BIHAR POWER DISTRIBUTION COMPANY LIMITED SOUTH BIHAR POWER DISTRIBUTION COMPANY LIMITED Vidyut Bhawan-I, Jawahar Lal Nehru Marg, Patna 800021 ----------------------------------------------------------------------------------------------------------------------------------------------

More information

A. Typical Cost Data Sheet for preparation of estimates on LABOUR CONTRACT

A. Typical Cost Data Sheet for preparation of estimates on LABOUR CONTRACT A. Typical Cost Data Sheet for preparation of estimates on LABOUR CONTRACT Amount (in Rs.) 1 Materials Cost 2 Labour Charges 3 Special Locality Allowance @..% on on Sl. 2 above (applicable for areas mentioned

More information

EXTRA ORDINARY 13 SHRAVANA (S) BIHAR ELECTRICITY REGULATORY COMMISSION

EXTRA ORDINARY 13 SHRAVANA (S) BIHAR ELECTRICITY REGULATORY COMMISSION REGISTERED NO. PT.-40 The B Bihar Gazett te EXTRA ORDINARY PUBLISHED BY AUTHORITY 13 SHRAVANA (S) (NO.PATNA 541) PATNA, WEDNESDAY, 4TH AUGUST 2010 BIHAR ELECTRICITY REGULATORY COMMISSION NOTIFICATION The

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market, Bhopal - 462016 Petition 06/2013 PRESENT: Rakesh Sahni, Chairman A. B. Bajpai, Member Alok

More information

Monthly Review Meeting with Districts MGNREGA 19 th August, 2016

Monthly Review Meeting with Districts MGNREGA 19 th August, 2016 1 Monthly Review Meeting with Districts MGNREGA 19 th August, 2016 PDs Generation (Till July: Performance against LB) % PDs Generated w.r.to Target of LB till July 16 2 PDs Generation (Till July: Performance

More information

TIME AND DATE OF OPENING OF TECHNICAL BIDS : Nov. 27, 2017, Hrs TIME AND DATE OF OPENING OF FINANCIAL BIDS : Dec. 05, 2017, 14.

TIME AND DATE OF OPENING OF TECHNICAL BIDS : Nov. 27, 2017, Hrs TIME AND DATE OF OPENING OF FINANCIAL BIDS : Dec. 05, 2017, 14. GOVERNMENT OF BIHAR, RURAL DEVELOPMENT DEPARTMENT (RDD) NATIONAL COMPETITIVE BIDDING: INVITATION FOR TENDER FOR PRINTING & SUPPLY OF BOOKLET FOR BIHAR RURAL DEVELOPMENT SOCIETY(BRDS), PATNA& DRDAs OF THE

More information

Preface. The Bihar Electricity Regulatory Commission (BERC) in exercise of the

Preface. The Bihar Electricity Regulatory Commission (BERC) in exercise of the Preface The Bihar Electricity Regulatory Commission (BERC) in exercise of the powers vested under section 62(1) (d) read with section 63(3) and section 64(3)(a) of the Electricity Act 2003 and other enabling

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Maharashtra Electricity Regulatory Commission (Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination of Compensation)

More information

STATE LEVEL BANKERS COMMITTEE, BIHAR

STATE LEVEL BANKERS COMMITTEE, BIHAR STATE LEVEL BANKERS COMMITTEE, BIHAR 48 TH REVIEW MEETING FOR THE QUARTER ENDED 31 ST MARCH, 2014 VENUE: HOTEL CHANAKYA, PATNA DATE: 27.05.2014 TIME: 10.30 AM STATE BANK OF INDIA SLBC DEPARTMENT (5 TH

More information

STATE LEVEL BANKERS COMMITTEE, BIHAR VENUE: HOTEL CHANAKYA, PATNA DATE: TIME: AM

STATE LEVEL BANKERS COMMITTEE, BIHAR VENUE: HOTEL CHANAKYA, PATNA DATE: TIME: AM STATE LEVEL BANKERS COMMITTEE, BIHAR 39 TH REVIEW MEETING FOR THE QUARTER ENDED 31 ST DECEMBER 2011 VENUE: HOTEL CHANAKYA, PATNA DATE: 10.02.2012 TIME: 10.30 AM CONVENOR: STATE BANK OF INDIA SLBC DEPARTMENT

More information

STATE LEVEL BANKERS COMMITTEE, BIHAR 65TH REVIEW MEETING FOR THE QUARTER ENDED

STATE LEVEL BANKERS COMMITTEE, BIHAR 65TH REVIEW MEETING FOR THE QUARTER ENDED STATE LEVEL BANKERS COMMITTEE, BIHAR 65 TH REVIEW MEETING FOR THE QUARTER ENDED 30 th JUNE, 2018 VENUE: HOTEL CHANKYA, PATNA DATE: 25 TH AUGUST 2018 TIME: 11.00 AM STATE BANK OF INDIA SLBC DEPARTMENT (5

More information

Karnataka Electricity Regulatory Commission Tariff Order 2018 BESCOM CHAPTER 5 REVISED ANNUAL REVENUE REQUIREMENT FOR FY19

Karnataka Electricity Regulatory Commission Tariff Order 2018 BESCOM CHAPTER 5 REVISED ANNUAL REVENUE REQUIREMENT FOR FY19 CHAPTER 5 REVISED ANNUAL REVENUE REQUIREMENT FOR FY19 5.0 Revised Annual Revenue Requirement (ARR) for FY19 BESCOM s Application: BESCOM in its application dated 30 th November, 2017, has sought the approval

More information

Analysis of R-APDRP Implementation in Improving the Distribution Efficiency 2

Analysis of R-APDRP Implementation in Improving the Distribution Efficiency 2 P P five P International Journal of Scientific Engineering and Applied Science (IJSEAS) - Volume-1, Issue-3, June 2015 Analysis of R-APDRP Implementation in Improving e Distribution Efficiency 2 1 Priyanka

More information

Order on. Petition No. 21/2014

Order on. Petition No. 21/2014 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 4 th and 5 th Floor, Metro Plaza, Bittan Market, Bhopal - 462 016 Order on ARR & Retail Power Supply Tariff for Electricity Distribution Business of Special

More information

TAMIL NADU ELECTRICITY REGULATORY COMMISSION. Tariff Order No 1 of 2010 dated

TAMIL NADU ELECTRICITY REGULATORY COMMISSION. Tariff Order No 1 of 2010 dated TAMIL NADU ELECTRICITY REGULATORY COMMISSION Tariff Order No 1 of 2010 dated 27.05.2010 Sl.No Description Summary of Regulations 1 Title Tariff order for projects covered by Jawaharlal Nehru National Solar

More information

No.25/1/2014-APDRP Government of India Ministry of Power (Distribution Division) EFC MEMORANDUM. Proposal for Deendayal Upadhyaya Gram Jyoti Yojana

No.25/1/2014-APDRP Government of India Ministry of Power (Distribution Division) EFC MEMORANDUM. Proposal for Deendayal Upadhyaya Gram Jyoti Yojana No.25/1/2014-APDRP Government of India Ministry of Power (Distribution Division) EFC MEMORANDUM Date: 7th August 2014 1. Proposal identification 1.1 Title of the proposal. Proposal for Deendayal Upadhyaya

More information

SUBJECT. CONFIRMATION OF THE MINUTES OF THE 46th SLBC MEETING HELD ON THE 20 th NOVEMBER 2013

SUBJECT. CONFIRMATION OF THE MINUTES OF THE 46th SLBC MEETING HELD ON THE 20 th NOVEMBER 2013 [1] A G E N D A I T E M S ITEM I II III SUBJECT PAGE NO. CONFIRMATION OF THE MINUTES OF THE 46th SLBC MEETING HELD ON THE 20 th NOVEMBER 2013 2 ACTION TAKEN REPORT ON THE 46 TH SLBC MEETING 3-6 KEY INDICATORS

More information

Rs Billion Short Term Debt Programme. (Series IX & X)

Rs Billion Short Term Debt Programme. (Series IX & X) CRISIL Limited CRISIL s RatingRationale Power Grid Corporation of India Limited OCTOBER 2005 Rs. 20 Billion Bonds Programme Rs. 6.50 Billion Short Term Debt Programme (Enhanced from Rs. 6 Billion) Rs.

More information

1200kV AC Sub-station at Bina. Delivering Smart Grid/ Distribution Solutions `

1200kV AC Sub-station at Bina. Delivering Smart Grid/ Distribution Solutions ` 1200kV AC Sub-station at Bina Delivering Smart Grid/ Distribution Solutions ` Press Meet 12 th February, 2013 Disclaimer By attending the meeting where this presentation is made, or by reading the presentation

More information

STATE LEVEL BANKERS COMMITTEE, BIHAR 50TH REVIEW MEETING FOR THE QUARTER ENDED 30TH SEPTEMBER, 2014 VENUE: HOTEL CHANAKYA, PATNA DATE:

STATE LEVEL BANKERS COMMITTEE, BIHAR 50TH REVIEW MEETING FOR THE QUARTER ENDED 30TH SEPTEMBER, 2014 VENUE: HOTEL CHANAKYA, PATNA DATE: STATE LEVEL BANKERS COMMITTEE, BIHAR 50 TH REVIEW MEETING FOR THE QUARTER ENDED 30 TH SEPTEMBER, 2014 VENUE: HOTEL CHANAKYA, PATNA DATE: 21.11.2014 TIME: 10.30 AM STATE BANK OF INDIA SLBC DEPARTMENT (5

More information

SUBJECT. CONFIRMATION OF THE MINUTES OF THE 45th SLBC MEETING HELD ON THE 21 ST AUGUST 2013

SUBJECT. CONFIRMATION OF THE MINUTES OF THE 45th SLBC MEETING HELD ON THE 21 ST AUGUST 2013 [1] A G E N D A I T E M S ITEM I II SUBJECT CONFIRMATION OF THE MINUTES OF THE 45th SLBC MEETING HELD ON THE 21 ST AUGUST 2013 PAGE NO. ACTION TAKEN REPORT ON THE 45 TH SLBC MEETING 3-7 KEY INDICATORS

More information

Business Plan for MYT Control Period FY to FY Jharkhand Bijli Vitran Nigam Ltd (JBVNL)

Business Plan for MYT Control Period FY to FY Jharkhand Bijli Vitran Nigam Ltd (JBVNL) Business Plan for MYT Control Period FY 2016-17 to FY 2020-21 Jharkhand Bijli Vitran Nigam Ltd (JBVNL) Contents List of Figures... 1 List of Tables... 1 1. Background & Introduction... 3 2. Jharkhand Power

More information

I N V O I C E S U M M A R Y

I N V O I C E S U M M A R Y I N V O I C E S U M M A R Y Send To: SE(RDPPC) Copy To: 220 KV substation Heerapura Ajmer Road Jaipur 302005 (On behalf of Aravali Power Company Pvt. Ltd.) Beneficiary: Bill Date 9-Mar-2017 Sl. No. Bill

More information

Bihar School Examination Board

Bihar School Examination Board Bihar School Examination Board Sinha Library Road, Patna-800017 NOTICE INVITIG e-tender (Through e-procurement mode only over (https://www.eproc.bihar.gov.in) e-tender Notice No. PR 85/2017 Bihar School

More information

Q4 FY Presentation 26 th April, 2013

Q4 FY Presentation 26 th April, 2013 Q4 FY 2013- Presentation 26 th April, 2013 DISCLAIMER This presentation and the discussion that follows may contain certain words or phrases that are forward - looking statements, based on current expectations

More information

STATE BANK OF INDIA SLBC DEPARTMENT (5TH FLOOR) LOCAL HEAD OFFICE, WEST GANDHI MAIDAN P A T N A PH.NO / FAX-

STATE BANK OF INDIA SLBC DEPARTMENT (5TH FLOOR) LOCAL HEAD OFFICE, WEST GANDHI MAIDAN P A T N A PH.NO / FAX- STATE LEVEL BANKERS COMMITTEE, BIHAR 59TH REVIEW MEETING FOR THE QUARTER ENDED 31 ST DECEMBER, 2016 VENUE: HOTEL CHANAKYA, PATNA DATE: 17 TH FEBRUARY 2017 TIME: 11.00 AM STATE BANK OF INDIA SLBC DEPARTMENT

More information

RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR

RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR Petition Nos. RERC 1284/17 and 1309/17 In the matter of approval of: (i) (ii) Investment Plan of Rajasthan Rajya Vidyut Prasaran Nigam Limited for FY

More information

STATE LEVEL BANKERS COMMITTEE, BIHAR. AS ON 31st DECEMBER 2008 VENUE: HOTEL CHANAKYA, PATNA DATE: TIME: 11 A.M.

STATE LEVEL BANKERS COMMITTEE, BIHAR. AS ON 31st DECEMBER 2008 VENUE: HOTEL CHANAKYA, PATNA DATE: TIME: 11 A.M. 1 STATE LEVEL BANKERS COMMITTEE, BIHAR 27 TH REVIEW MEETING AS ON 31st DECEMBER 2008 VENUE: HOTEL CHANAKYA, PATNA DATE: 26.03.2009 TIME: 11 A.M. CONVENOR: STATE BANK OF INDIA LOCAL HEAD OFFICE P A T N

More information

Karnataka Electricity Regulatory Commission Tariff Order 2018 HESCOM CHAPTER 5 REVISED ANNUAL REVENUE REQUIREMENT FOR FY19

Karnataka Electricity Regulatory Commission Tariff Order 2018 HESCOM CHAPTER 5 REVISED ANNUAL REVENUE REQUIREMENT FOR FY19 CHAPTER 5 REVISED ANNUAL REVENUE REQUIREMENT FOR FY19 5.0 Revised Annual Revenue Requirement (ARR) for FY19 HESCOM s Application: HESCOM in its application dated 30 th November, 2017, has sought approval

More information

Tenughat Vidyut Nigam Limited (TVNL) Annual Revenue Requirement FY

Tenughat Vidyut Nigam Limited (TVNL) Annual Revenue Requirement FY POWERING JHARKHAND Tenughat Vidyut Nigam Limited (TVNL) (A Government of Jharkhand Undertaking) Hinoo, Doranda,Ranchi-834 002 Annual Revenue Requirement FY 2007-08 Submitted to Jharkhand State Electricity

More information

STATE BANK OF INDIA SLBC DEPARTMENT (5TH FLOOR) LOCAL HEAD OFFICE, WEST GANDHI MAIDAN P A T N A PH.NO / FAX-

STATE BANK OF INDIA SLBC DEPARTMENT (5TH FLOOR) LOCAL HEAD OFFICE, WEST GANDHI MAIDAN P A T N A PH.NO / FAX- STATE LEVEL BANKERS COMMITTEE, BIHAR 55 TH REVIEW MEETING FOR THE QUARTER ENDED 31 ST DECEMBER, 2015 VENUE: HOTEL CHANAKYA, PATNA DATE: 24 TH FEBRUARY 2016 TIME: 11.00 AM STATE BANK OF INDIA SLBC DEPARTMENT

More information

Bihar Electricity Regulatory Commission ANNUAL REPORT ( to )

Bihar Electricity Regulatory Commission ANNUAL REPORT ( to ) 1 Bihar Electricity Regulatory Commission Ground Floor, Vidyut Bhawan II Jawahar Lal Nehru Marg Patna 800 021 ANNUAL REPORT (20.05.2005 to 31.03.2007) 2 C O N T E N T S Sl. No. Page No. 1. Message.. 1

More information

3.1 In FY , the transmission loss is 4.08% as compared to last year loss

3.1 In FY , the transmission loss is 4.08% as compared to last year loss ASSAM ELECTRICITY GRID CORPORATION LIMITED Truing Up for FY 2013-14, Annual Performance Review for FY 2014-15 & Revised ARR for FY 2015-16 and Transmission Tariff for FY 2015-16 1 Truing up for FY 2013-14

More information

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED MYT Petition, True-up Petition Formats - Transmission

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED MYT Petition, True-up Petition Formats - Transmission Title Reference 1 Aggregate Revenue Requirement - Summary Sheet Form 1 2 Normative Operation and Maintenance Expenses Form 2 3 Operations and Maintenance Expenses Form 2.1 4 Transmission Network Details

More information

NORTH BIHAR POWER DISTRIBUTION COMPANY LIMITED PUBLIC NOTICE

NORTH BIHAR POWER DISTRIBUTION COMPANY LIMITED PUBLIC NOTICE NORTH BIHAR POWER DISTRIBUTION COMPANY LIMITED 4 th Floor, Vidyut Bhawan-I, Jawaharlal Nehru Marg, Patna 800021 PUBLIC NOTICE REQUEST FOR COMMENTS / SUGGESTIONS / OBJECTIONS FROM GENERAL PUBLIC AND STAKEHOLDERS

More information

Road Infrastructure - An Evolving Transformation

Road Infrastructure - An Evolving Transformation Government of Bihar Road Infrastructure - An Evolving Transformation Presentation Road Construction Department 18.11.09 The State has - 3734 Kms of National Highways - 3989 Kms of State Highways - 8156

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION

KERALA STATE ELECTRICITY REGULATORY COMMISSION KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM OA 7/2017 In the matter of Applicant : Application for the approval of revised ARR & ERC for the year 2017-18 filed by M/s KINESCO Power

More information

Before the MP Electricity Regulatory Commission 5 TH Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market : BHOPAL.

Before the MP Electricity Regulatory Commission 5 TH Floor, Metro Plaza, E-5, Arera Colony, Bittan Market : BHOPAL. In the Matter of - Before the MP Electricity Regulatory Commission 5 TH Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market : BHOPAL. Petition 53 of 2013 Filing of application for True-up of the Transmission

More information

Year Ended No. (Unaudited)

Year Ended No. (Unaudited) Regd. Office : Survey No. 344-350, Changodar, Sarkhej Bavla Highway, Ahmedabad-382213 UNAUDITED FINANCIAL RESULTS FOR THE QUARTER ENDED 30TH JUNE, 2012 (Rs. In Lacs) Particulars Standalone Sr. Quarter

More information

OVERVIEW Overview of Government companies and Statutory corporations (Paragraphs 1.1 and 1.30) (Paragraphs 1.2 and 1.15) (Paragraph 1.

OVERVIEW Overview of Government companies and Statutory corporations (Paragraphs 1.1 and 1.30) (Paragraphs 1.2 and 1.15) (Paragraph 1. PREFACE Government commercial concerns, the accounts of which are subject to audit by the Comptroller and Auditor General of India, fall under the following categories: (i) Government companies, (ii) Statutory

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MUMBAI

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MUMBAI MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MUMBAI MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (RENEWABLE PURCHASE OBLIGATION, ITS COMPLIANCE AND IMPLEMENTATION OF RENEWABLE ENERGY CERTIFICATE FRAMEWORK)

More information

mùkj fcgkj xzkeh.k csad

mùkj fcgkj xzkeh.k csad mùkj fcgkj xzkeh.k csad UTTAR BIHAR GRAMIN BANK Izzk/kku dk;kzy;] dyeckx pksd eqt Qjiqj]]fcgkj] 842 001 MUZAFFARPUR, BIHAR, 842 001 (Sponsored By :: Central Bank of India ) Website :: www.ubgb.in HEAD

More information

I N V O I C E S U M M A R Y

I N V O I C E S U M M A R Y I N V O I C E S U M M A R Y Send To: SE(RDPPC) Copy To: 220 KV substation Heerapura Ajmer Road Jaipur 302005 (On behalf of Aravali Power Company Pvt. Ltd.) Beneficiary: Bill Date 9-Mar-2017 Sl. No. Bill

More information

Annexure-3 to Circular No.: BESCOM/CGM(Op)/DGM(Op-4)/AGM-1(Op-4)/ 18-19/ cys-23

Annexure-3 to Circular No.: BESCOM/CGM(Op)/DGM(Op-4)/AGM-1(Op-4)/ 18-19/ cys-23 Annexure-3 to Circular No.: BESCOM/CGM(Op)/DGM(Op-4)/AGM-1(Op-4)/ 18-19/ cys-23 date:18-05-2018 Attributes required for creation of DTR/DTC master database in DTLMS Software 1. Agency shall collect the

More information

Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009

Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009 Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009 No. 2734/MPERC/2009. In exercise of powers conferred under Section 181(2) (zd) read with Section 45 and 61 of the Electricity Act, 2003

More information

Paschim Gujarat Vij Company Ltd.

Paschim Gujarat Vij Company Ltd. BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR CASE NO. Filing of the Petition for True Up of FY 2015-16 & Determination of Multi-Year ARR for FY 2016-17 to FY 2020-21 & Determination

More information

CONSTRUCTION OF 132/33 KV GIS SUB-STATION AT DINHATA, DISTRICT COOCHBEHAR. (Packge-38)

CONSTRUCTION OF 132/33 KV GIS SUB-STATION AT DINHATA, DISTRICT COOCHBEHAR. (Packge-38) DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED (A Govt of West Bengal Enterprise) CHIEF ENGINEER (PROCUREMENT), VIDYUT BHAVAN NOTICE INVITING TENDERS For CONSTRUCTION

More information

UNAUDITED FINANCIAL RESULTS (After Limited review) FOR THE THREE MONTHS ENDED 30TH SEPT 2004

UNAUDITED FINANCIAL RESULTS (After Limited review) FOR THE THREE MONTHS ENDED 30TH SEPT 2004 RS./Millions SL. PARTICULARS 3 Months Corresponding Year to date Year to date Previous NO. Ended 3 Months in figures for figures for Accounting 30.09.2004 the previous current period the previous year

More information

Power Finance Corporation Limited A Navratna PSU

Power Finance Corporation Limited A Navratna PSU Funding for a Brighter Tomorrow. Power Finance Corporation Limited A Navratna PSU Performance Highlights Quarter Ended (Standalone, Un-Audited) 30 th September, 2017 Disclaimers This presentation may contain

More information

Jammu and Kashmir State Electricity Regulatory Commission (J&K SERC) (Security Deposit) Regulation, 2008.

Jammu and Kashmir State Electricity Regulatory Commission (J&K SERC) (Security Deposit) Regulation, 2008. Jammu and Kashmir State Electricity Regulatory Commission (J&K SERC) (Security Deposit) Regulation, 2008. Notification No. 9 of 2008. In exercise of the power conferred under section 17(2) (f) of the J&K

More information

REGISTRATION OF AIR CONSOLIDATION AGENTS

REGISTRATION OF AIR CONSOLIDATION AGENTS BHARAT HEAVY ELECTRICALS LIMITED Regional Operations Division Mumbai REGISTRATION OF AIR CONSOLIDATION AGENTS BE A PARTNER IN OUR PROGRESS. RE/MUM/IMP/8T/5216 DATE: 31 st AUGUST, 2012 Page 1 of 12 Ref:

More information

BRIHANMUMBAI ELECTRIC SUPPLY and TRANSPORT UNDERTAKING (BEST)

BRIHANMUMBAI ELECTRIC SUPPLY and TRANSPORT UNDERTAKING (BEST) BRIHANMUMBAI ELECTRIC SUPPLY and TRANSPORT UNDERTAKING (BEST) EXECUTIVE SUMMARY OF Annual Performance Review for FY 2008-09 & ARR for FY 2009-10 along with Truing Up of Accounts for FY 2007-08 TO Maharashtra

More information

IMPLEMENTATION OF DDUGJY

IMPLEMENTATION OF DDUGJY IMPLEMENTATION OF DDUGJY The MOP has stated that the following are the priority to submit the proposals under DDUGJY scheme. 1) Electrification of colonies (already submitted through online) 2) HVDS 3)

More information

Himachal Pradesh Budget Analysis

Himachal Pradesh Budget Analysis -4.9% -3.2% 3.9% 9. 10.4% 7.2% 10.2% 10. 10.8% 7.5% 9.1% 6.9% Himachal Pradesh Budget Analysis The Finance Minister of Himachal Pradesh, Mr. Jai Ram Thakur, presented the Budget for financial year on March

More information

PROPOSAL FORM - my:asset Home Insurance: Super Home Insurance Plan

PROPOSAL FORM - my:asset Home Insurance: Super Home Insurance Plan PROPOSAL FORM - my:asset Home Insurance: Super Home Insurance Plan GUIDELINES TO FILL THE FORM 1. Please fill the form in BLOCK LETTERS. Please answer all questions fully and correctly. All details with*

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI Maharashtra Electricity Regulatory Commission (Fees and Charges) Regulations, 2017

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI Maharashtra Electricity Regulatory Commission (Fees and Charges) Regulations, 2017 MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI Maharashtra Electricity Regulatory Commission (Fees and Charges) Regulations, 2017 ELECTRICITY ACT, 2003 No. MERC/Legal/2017/1771 - In exercise of

More information

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED MYT Petition, True-up Petition Formats - Transmission

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED MYT Petition, True-up Petition Formats - Transmission Title Reference 1 Aggregate Revenue Requirement - Summary Sheet Form 1 2 Normative Operation and Maintenance Expenses Form 2 3 Operations and Maintenance Expenses Form 2.1 4 Transmission Network Details

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No. 70 of 2015 PRESENT: Dr. Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok Gupta, Member

More information

OF ARR & TARIFF FILING FORMATS FOR DISTRIBUTION AND RETAIL SUPPLY LICENSEES

OF ARR & TARIFF FILING FORMATS FOR DISTRIBUTION AND RETAIL SUPPLY LICENSEES ANNEXURE - I Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited, Indore INDEX OF ARR & TARIFF FILING FORMATS FOR DISTRIBUTION AND RETAIL SUPPLY LICENSEES Financial Formats 1 Sheet S1 Profit

More information

Maharashtra Electricity Regulatory Commission (Uniform Recording, Maintenance and Reporting of Information) Regulations, 2009

Maharashtra Electricity Regulatory Commission (Uniform Recording, Maintenance and Reporting of Information) Regulations, 2009 Maharashtra Electricity Regulatory Commission (Uniform Recording, Maintenance and Reporting of Information) Regulations, 2009 1 TABLE OF CONTENTS 1. Short Title, Extent and Commencement 4 2. Definitions

More information

Case No. 52 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Mahati Hydro Power Projects Pvt. Ltd.

Case No. 52 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Mahati Hydro Power Projects Pvt. Ltd. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

TAXATION OF CO-OPERATIVE SOCIETIES (BASIC PROVISIONS)

TAXATION OF CO-OPERATIVE SOCIETIES (BASIC PROVISIONS) TAXATION OF CO-OPERATIVE SOCIETIES (BASIC PROVISIONS) 1) Definition Meaning of Co-operative Society - Sec. 2 (19) Co-operative society means a society registered under the Cooperative Societies Act, 1912,

More information

Order ( date of hearing )

Order ( date of hearing ) BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of order : 16.09.2014 PRESENT: 1. Hon ble Sri Desh Deepak Verma, Chairman 2. Hon ble Smt. Meenakshi Singh, Member 3. Hon ble Sri

More information

Before the MP Electricity Regulatory Commission 5 TH Floor, "Metro Plaza", E-5, Arera Colony, BHOPAL.

Before the MP Electricity Regulatory Commission 5 TH Floor, Metro Plaza, E-5, Arera Colony, BHOPAL. Before the MP Electricity Regulatory Commission 5 TH Floor, "Metro Plaza", E-5, Arera Colony, BHOPAL. Petition of 2018 In the Matter of - Applicant - Filing of application for True-up of the Transmission

More information

POLICY ON DEVELOPMENT OF HYDRO POWER PROJECT. Energy Department Government of Bihar

POLICY ON DEVELOPMENT OF HYDRO POWER PROJECT. Energy Department Government of Bihar POLICY ON DEVELOPMENT OF HYDRO POWER PROJECT Energy Department Government of Bihar 2012 ( 1 ) Table of Content 1. Objective 2. Title and Enforcement 3. Scope and Coverage 4. Nodal Agency 5. Classification

More information

Q1 FY Presentation. 07 th Aug 2015

Q1 FY Presentation. 07 th Aug 2015 Q1 FY 2016- Presentation 07 th Aug 2015 DISCLAIMER This presentation and the discussion that follows may contain certain words or phrases that are forward - looking statements, based on current expectations

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market, Bhopal - 462016 Petition No75/2012 PRESENT: Rakesh Sahni, Chairman A. B. Bajpai, Member Alok

More information

State Bank of India. PREMISES AND ESTATE DEPARTMENT Local Head Office, Poojappura Thiruvananthapuram -12 Telephone: /

State Bank of India. PREMISES AND ESTATE DEPARTMENT Local Head Office, Poojappura Thiruvananthapuram -12 Telephone: / 1 State Bank of India PREMISES AND ESTATE DEPARTMENT Local Head Office, Poojappura Thiruvananthapuram -12 Telephone:0471-2192406/2192407 EMPANELMENT OF CONTRACTORS NIT no: 1/2018-19 Applications are invited

More information