1 Title Reference 1 Aggregate Revenue Requirement - Summary Sheet Form 1 2 Normative Operation and Maintenance Expenses Form 2 3 Operations and Maintenance Expenses Form Transmission Network Details Form Employee Expenses Form A&G Expenses Form R&M Expenses Form Summary of Capital Expenditure & Capitalisation Form 3 9 Assets & Depreciation Form 4 10 Interest Expenses Form 5 11 Interest on Working Capital Form 6 12 Return on Regulatory Equity Form 7 13 Non-tariff Income Form 8 14 Contribution to contingency reserves Form 9 15 Transmission Losses Form Transmission Availability Form Truing Up Summary Form Break-up of Revenue Form 12.1 NOTE: (1) Electronic copy in the form of CD containing excel sheets of the Forms shall also be furnished. (2) Figures in (-ve) must be shwon in Brackets- (... ) and figures in (+ve) must be shown without Bracket. Page 65
2 Form 1: Aggregate Revenue Requirement - Summary Sheet True-Up Year (FY ) April - March Reference Tariff Order (Audited) Deviation (a) (b) (c)=(b)-(a) 1 Operation & Maintenance Expenses Form 2 1, , Depreciation Form Interest and Finance Charges Form (72.91) 4 Interest on Working Capital and deposits from TSUs Form Contribution to Contingency reserves Form Total Revenue Expenditure 2, , (37.91) 7 Return on Equity Capital Form Incentive Tax (24.88) 8 Aggregate Revenue Requirement 3, , (31.72) 9 Less: Non Tariff Income Form (18.85) 10 Less: Income from Other Business Less: Revenue from short-term transmission charges Less: Expenses Capitalized Aggregate Revenue Requirement from Transmission Tariff 3, , (28.50) Page 66 Remarks
3 Form 2: Normative Operation and Maintenance Expenses Previous Year Particular FY Opening Closing Average 1 Ckt. Km. Basis a Ckt km length Above 400 kv -400 kv -220 kv -132 kv -66 kv and below Total b Applicable O&M cost Norm for ckt-km :- Rs Lakh / ckt-km 0.64 c O&M Expenses (ckt-km), Rs Crore A Sub-total Remarks 2 Bay basis d Number of Bays Above 400 kv -400 kv -220 kv -132 kv -66 kv and below Total e f B C Lakh per feeder bay O&M Expense (Bays), Rs Crore Sub-total Total (A+B) , Page 67
4 Form 2.1: Operations and Maintenance Expenses Approved in Tariff Order True-Up Year (FY ) Normative Actual As per Audited Accounts (Net of O&M Expenses Capitalised) 1 O&M Expenses 1, , , Remarks Page 68
5 Network details GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED Form 2.2: Transmission Network Details Previous Year Remarks FY A B C No of Substations (Addition) Above 400 kv 400 KV KV KV KV and less Transformation Capacity (in MVA) Above 400 kv 400 KV 14, KV 31, KV 8, KV and less 46, Transmission Capacity (in MW) Page 69
6 Form 2.3: Employee Expenses Expenditure details True-Up Year (FY ) April-March (Audited) Regulated Business Non-regulated Business Total (Audited) 1 Basic Salary Dearness Allowance (DA) - 3 House Rent Allowance 4 Conveyance Allowance 5 Leave Travel Allowance - 6 Earned Leave Encashment - 7 Other Allowances - 8 Medical Reimbursement - 9 Overtime Payment 10 Bonus/Ex-Gratia Payments - 11 Interim Relief / Wage Revision - 12 Staff welfare expenses VRS Expenses/Retrenchment Compensation 14 Commission to Directors 15 Death & Accident Compensation - 16 Training Expenses 17 Payment under Workmen's Compensation Act - 18 Net Employee Costs 19 Terminal Benefits Provident Fund Contribution Provision for PF Fund 19.3 Pension Payments 19.4 Gratuity Payment - 20 Re-measurement of the defined benefit plans Gross Employee Expenses * Less: Expenses Capitalised** - 23 Net Employee Expenses Note: Employee expenses shown is excluding SLDC charges Expenses capitalized have been shown under separate head in F1 sheet Page 70
7 Form 2.4: Administration & General Expenses True-Up Year (FY ) April-March (Audited) Non-regulated Regulated Business Total (Audited) Business 1 Rent Rates & Taxes Insurance Telephone & Postage, etc Legal charges & Audit fee (Break-up as per separate Table in Form 2.4.1) Professional, Consultancy, Technical fee Conveyance & Travel Electricity charges Water charges Security arrangements 10 Fees & subscription Books & periodicals 12 Computer Stationery Printing & Stationery Advertisements Purchase Related Advertisement Expenses Contribution/Donations - 17 License Fee and other related fee 18 Vehicle Running Expenses Truck / Delivery Van 19 Vehicle Hiring Expenses Truck / Delivery Van 20 Cost of services procured 21 Outsourcing of metering and billing system 22 Freight On Capital Equipments V-sat, Internet and related charges 24 Training Bank Charges 26 Miscellaneous Expenses Office Expenses CSR Expenses - 29 Others (Pls. specify) Gross A&G Expenses Less: Expenses Capitalised - 32 Net A&G Expenses Note: A&G expenses shown is excluding SLDC charges Expenses capitalized have been shown under separate head in F1 sheet Page 71
8 GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED Form 2.5: Repair and Maintenance Expenses True-up Year (FY ) (Audited) 1 Plant & Machinery Buildings Civil Works - 4 Hydraulic Works - 5 Lines & Cable Networks Vehicles - 7 Furniture & Fixtures - 8 Office Equipment Others (Pls. specify) 10 Gross R&M Expenses Less: Expenses Capitalised - 12 Net R&M Expenses Note: R&M expenses shown is excluding SLDC charges Expenses capitalized have been shown under separate head in F1 sheet Page 72
9 Form 3: Summary of Capital Expenditure and Capitalisation True-up Year (FY ) April-March Tariff Order (Audited ) Deviation (a) (b) (c ) = (b) - (a) 1 Capital Expenditure 2, , (159.16) Remarks 2 Capitalisation 2, , IDC Capitalisation + IDC 2, , Note: Detail Justification shall be provided for variation in approved capital expenditure and capitalisation vis-a-vis actual capital expenditure and capitalisation Page 73
10 Form 4: Assets & Depreciation Fixed Assets and Depreciation For True Up year and each Year of MYT Control Period * Land Buildings Hydraulic works Other Civil Works Plant & Machinery Lines & Cables Vehicles Furniture & Fixtures Office Equipments Capital Expenditure on Assets not belonging to utility Spare Units Capital Spares Leasehold land Intangible Assets As at the beginning of the Financial Year Additions Gross Block Deductions As at the end of the Financial Year As at the beginning of the Financial Year Additions Depreciation Deductions As at the end of the Financial Year Applicable rate of Depreciation (%) * As at the beginning of the Financial Year Net Block As at the end of the Financial Year TOTAL Total as per Audited Account (for 18, , , % True up year only) * The particular of asset and rate of depreciation should match with those provided in the applicable Tariff Regulations Page 74
11 Form 5: Interest & Finance Charges / Interest Expenses (1 of 2) A. Normative Loan True-Up Year (FY ) Source of Loan Tariff Order April-March (Audited) Deviation (a) (b) (c ) = (b) - (a) 1 Opening Balance of Normative Loan 5, , (53.25) 2 Less: Reduction of Normative Loan due to retirement or replacement of assets Addition of Normative Loan due to capitalisation during the year 1, , Repayment of Normative loan during the year Closing Balance of Normative Loan 5, , Average Balance of Normative Loan 5, , Weighted average Rate of Interest on actual Loans (%) 10.11% 8.79% 8 Interest Expenses Finance Charges Total Interest & Finance Charges Remarks Page 75
12 Form 6: Interest on Working Capital A. True up Year (FY ) True up Year (FY ) Norm Tariff Order Audited True-Up Petition 1 O&M expenses 1 Month Maintenance Spares 1% of the historical cost escalated at 6% yearly Receivables 1 Month Less: Amount of Security Deposit from Transmission System Users 0-5 Total Working Capital requirement Computation of working capital interest 7 Interest Rate (%) 11.70% 11.79% 8 Interest on Working Capital Actual Working Capital Interest Not Applicable Notes: 1 Petitioner should submit documentary evidence for actual interest on working capital incurred Page 76
13 Form 7: Return on Regulatory Equity True up Year (FY ) Legend Claimed in Norm Tariff Order Petition 1 Regulatory Equity at the beginning of the year A 4, , Capitalisation during the year B 3 Equity portion of capitalisation during the year C Reduction in Equity Capital on account of retirement / replacement of assets D Regulatory Equity at the end of the year E=A+C-D 5, , Return on Equity Computation 6 Return on Regulatory Equity at the beginning of the year F 7 Return on Regulatory Equity addition during the year G=(C-D)/2 8 Total Return on Equity Page 77
14 Form 8: Non-Tariff Income True up Year (FY ) Reference MYT Order April-March (Audited ) Deviation Remarks (a) (b) (c ) = (b) - (a) 1 Income from Rents of land or buildings 2 Income from Sale of Scrap 3 Income from Scheduling and system operating charges 4 Income from interest on investments etc. 5 Interest income on advances to suppliers/contractors 6 Income from Rental from staff quarters 7 Income from Rental from contractors 8 Income from hire charges from contractors and others 9 Income from advertisements, etc. 10 Prior Period Income etc. 11 Parallel Operation Charges Miscellaneous Receipts Miscellaneous charges from consumers Penalties received from suppliers & consumers Others 17 Total Page 78
15 Form 9: Contribution to Contingency Reserves True up Year (FY ) MYT Order April-March (Audited ) Deviation (a) (b) (c ) = (b) - (a) 1 Opening Balance of Contingency Reserves 2 Opening Gross Fixed Assets 3 Opening Balance of Contingency Reserves as % of Opening GFA 0.00% 4 Contribution to Contingency Reserves during the year Utilisation of Contingency Reserves during the year Closing Balance of Contingency Reserves Closing Balance of Contingency Reserves as % of Opening GFA 0.00% Remarks Note: Documentary evidence towards investment of amounts under Contingency Reserve should be submitted Page 79
16 Form 10: Transmission Losses True-Up Year (FY ) Energy Input Energy Output Loss in % KV KV KV 4 66 KV 5 Below 66 KV 6 Transmission System as a Whole % Page 80
17 Form 11: Transmission Availability True-Up Year (FY ) Tariff Order Actual 1 Transmission Availability (in %) % Note:As certified by SLDC. Page 81
18 Form 12: Truing-up Summary True-up Year (FY ) Approved Actual Deviation Reason for Deviation Controllable Uncontrollable 1 Operation & Maintenance Expenses 1, , (14.04) (4.76) (9.28) 2 Depreciation (20.88) (20.88) 3 Interest on Long-term Loan Capital Interest on Working Capital and deposit of TSUs (0.07) (0.07) 5 Contribution to Contingency reserves Total Revenue Expenditure 2, , (4.76) Return on Equity Capital (3.64) (3.64) 8 Incentive (27.43) (27.43) 9 Tax Aggregate Revenue Requirement 3, , (4.76) Less: Non Tariff Income Less: Income from Other Business Less: Expenses Capitalized (15.62) (15.62) 14 Aggregate Revenue Requirement fromtransmission Tariff 3, , (4.76) Revenue from transmission tariff 16 Long-term TSUs incl Distribution Licensees (Break-up must be provided as per separate Table in Form 12.1) Medium Term Users (Break-up must be provided as per separate Table in Form 12.1) Short-term Users (Break-up must be provided as per separate Table in Form 12.1) Short-term collective transactions Others (Pls. specify) - 21 Revenue Gap/(Surplus) Page 82
19 Form 12.1: Break-up of Revenue A. True-Up Year (FY ) Long & Medium Term TSUs Month Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total Transmission Capacity utilisied in MW Revenue in Rs. Crore Short Term TSUs Month Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total Transmission Capacity utilisied in MW Revenue in Rs. Crore Total Month Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total (A) Projected in the Tariff Order (B) Transmission Capacity utilisied in MW Revenue in Rs. Crore Page 83 Deviation (C) = (B)- (A)
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED MYT Petition, True-up Petition Formats - Transmission
Title Reference 1 Aggregate Revenue Requirement - Summary Sheet Form 1 2 Normative Operation and Maintenance Expenses Form 2 3 Operations and Maintenance Expenses Form 2.1 4 Transmission Network Details
More informationGujarat State Electricity Corporation Ltd. MYT Petition, True-up Petition Formats - Generation Dhuvaran CCPP 2 Sr. Title Reference No.
Title Reference 1 Aggregate Revenue Requirement - Summary Sheet Form 1 2 Summary of Tariff Proposal Form 1.1 3 Operational Parameters - Thermal Generation Form 2.1 4 Energy Charges - Thermal Generation
More informationUTTAR GUJARAT VIJ COMPANY LIMITED MEHSANA MYT Petition, True-up Petition Formats - Distribution & Retail Supply
Title Reference 1 Aggregate Revenue Requirement - Summary Sheet ARR-Summary 2 Customer Sales Forecast Form 1 3 Power Purchase Expenses Form 2 4 Summary of Operations and Maintenance Expenses Form 3 5 Normative
More informationUttar Gujarat Vij Company Limited 67
Title Reference 1 Aggregate Revenue Requirement - Summary Sheet ARR-Summary 2 Customer Sales Forecast Form 1 3 Power Purchase Expenses Form 2 4 Summary of Operations and Maintenance Expenses Form 3 5 Normative
More informationMaharashtra Electricity Regulatory Commission (Uniform Recording, Maintenance and Reporting of Information) Regulations, 2009
Maharashtra Electricity Regulatory Commission (Uniform Recording, Maintenance and Reporting of Information) Regulations, 2009 1 TABLE OF CONTENTS 1. Short Title, Extent and Commencement 4 2. Definitions
More information3.1 In FY , the transmission loss is 4.08% as compared to last year loss
ASSAM ELECTRICITY GRID CORPORATION LIMITED Truing Up for FY 2013-14, Annual Performance Review for FY 2014-15 & Revised ARR for FY 2015-16 and Transmission Tariff for FY 2015-16 1 Truing up for FY 2013-14
More informationSmallBizU WORKSHEET 1: REQUIRED START-UP FUNDS. Online elearning Classroom. Item Required Amount ($) Fixed Assets. 1 -Buildings $ 2 -Land $
WORKSHEET 1: REQUIRED START-UP FUNDS Item Required Amount () Fixed Assets 1 -Buildings 2 -Land 3 -Initial Inventory 4 -Equipment 5 -Furniture and Fixtures 6 -Vehicles 7 Total Fixed Assets Working Capital
More informationBEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL)
BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL) REVISED PETITION FOR APPROVAL OF TRUE UP OF FY 2015-16 & FY 2016 17 AND PROVISIONAL TRUE UP of FY 2017-18
More informationKERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM
KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM Application No : OA 12/2017 In the matter of : Applicant Application for the approval of revised ARR & ERC for the year 2017-18 filed by
More informationCPA Australia Plan Your Own Enterprise Competition
Financial Plan Your financial plan should include: 1. A list of Start-Up Costs and how these will be paid for (eg from savings, bank loan or family loan) 2. A Breakeven Analysis, which includes: a list
More informationOrder on. Petition No. 21/2014
MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 4 th and 5 th Floor, Metro Plaza, Bittan Market, Bhopal - 462 016 Order on ARR & Retail Power Supply Tariff for Electricity Distribution Business of Special
More informationCOMPONENTS OF REVENUE REQUIREMENT
COMPONENTS OF REVENUE REQUIREMENT A typical Tariff Application of Discom has to include Demand Forecast Annual Revenue Requireme nt to meet the Cost of Supply to cater to the demand Power Procurement (Self+Purchase)
More informationTARIFF ORDER. Petition No. 250/2017. For. Electricity Department, UT of Dadra and Nagar Haveli (Transmission Division)
TARIFF ORDER True-up of FY 2014-15, FY 2015-16 and FY 2016-17, Annual Performance Review of FY 2017-18 and Approval of Aggregate Revenue Requirement (ARR) and determination of tariff for FY 2018-19 Petition
More informationCost Estimation of a Manufacturing Company
Cost Estimation of a Manufacturing Company Name: Business: Date: Economics of One Unit: Manufacturing Company (Only complete if you are making a product, such as a bracelet or beauty product) Economics
More informationPASCHIM GUJARAT VIJ COMPANY LIMITED
SOURCES OF FUNDS SHAREHOLDERS FUND PASCHIM GUJARAT VIJ COMPANY LIMITED Share Capital 1 42290.39 5.01 Share Capital Suspense 1A 0 86963.53 Share Application Money 2 4000.00 0 Reserves & Surplus 3 69875.83
More informationMERC Order on TPC-T s Petition for Truing up of ARR for FY and FY , and MTR for 3 rd Control Period. Before the
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION 13th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai- 400 005 Tel: 022-22163964/65/69 Fax: 022-22163976 E-mail: mercindia@merc.gov.in
More informationBefore the MP Electricity Regulatory Commission 5 TH Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market : BHOPAL.
In the Matter of - Before the MP Electricity Regulatory Commission 5 TH Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market : BHOPAL. Petition 53 of 2013 Filing of application for True-up of the Transmission
More informationBIHAR ELECTRICITY REGULATORY COMMISSION. Case No. 54 of for BIHAR STATE POWER TRANSMISSION COMPANY LIMITED (BSPTCL)
BIHAR ELECTRICITY REGULATORY COMMISSION Case 54 of 2015 Tariff Order Truing-up for FY 2014-15, Annual Performance Review (APR) for FY 2015-16, Annual Revenue Requirement (ARR) for FY 2016-17 to FY 2018-19
More informationBoard of Directors October 2018 and YTD Financial Report
Board of Directors October 2018 and YTD Financial Report Consolidated Financial Results Operating Margin October ($30,262) $129,301 ($159,563) Year-to-date $292,283 $931,358 ($639,076) Excess of Revenue
More information1. Summary E&S is in the process of completing the internal compliance reviews for Q1 through Q3 of FY17.
NAHAC FINANCE SUMMARY Prepared By: Chantell Legacy Date Prepared: 11/21/2017 1. Summary E&S is in the process of completing the internal compliance reviews for Q1 through Q3 of FY17. 2. Finance Report
More informationMAHARASHTRA ELECTRICITY REGULATORY COMMISSION (LEVY AND COLLECTION OF FEES AND CHARGES BY STATE LOAD DESPATCH CENTRE) REGULATIONS,
Approach Paper for MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (LEVY AND COLLECTION OF FEES AND CHARGES BY STATE LOAD DESPATCH CENTRE) REGULATIONS, 2014 Issued By: Maharashtra Electricity Regulatory
More informationVidarbha Industries Power Limited - Transmission
Vidarbha Industries Power Limited - Transmission Revised Petition towards: Approval of Capital Cost and Determination of Aggregate Revenue Requirement ( ARR ) for the period FY 14-15 to FY 15-16 Filed
More informationMitchell Electric Charitable Fund PO Box 409 Camilla, GA (229) or FAX:
Mitchell Electric Charitable Fund PO Box 409 Camilla, GA 31730 (229) 336-5221 or 1-800-479-6034 FAX: 229-336-7088 For Office use only: Agency / Organization Application All attached sheets, including financial
More informationUnrestricted Cash / Board Designated Cash & Investments December 2014
Unrestricted Cash / Board Designated Cash & Investments December 2014 25.0 20.0 21.0 20.8 18.9 19.9 15.0 10.0 11.5 12.8 11.6 9.1 10.4 9.8 11.1 10.2 9.8 17.0 16.8 15.4 14.7 14.2 14.1 13.6 13.0 12.0 10.2
More informationThe Chief Engineer Maharashtra State Load Despatch Center Phone Fax Executive Summary MSLDC s Budget
Office of The Chief Engineer Maharashtra State Load Despatch Center Thane Belapur Road, Airoli, Navi Mumbai 400 708 (INDIA) (ISO 9001 2000 certified unit of Mahatransco) Phone (022) (O) 2760 1931 (P) 2760
More informationFINANCIAL HIGHLIGHTS
FINANCIAL HIGHLIGHTS HIGHLIGHTS 22.75 23.03 1% up Profit after Tax 23.03 Total Assets 2,370 Profit after Tax Profit & Loss Account Net Interest Income 54.3 NonInterest Income 31.1 2,369.9 1,975.7 20% up
More informationAs at. As at 31-Mar-17
Balance Sheet as at Notes 31-Mar-17 31-Mar-16 1-Apr-15 ASSETS Non-current assets Property, plant and equipment 1(a) 73,473,714 4,764,770 75,732,710 5,017,292 76,033,917 4,752,120 Capital work-in-progress
More informationRegulatory formats for Multi Year Annual Revenue Requirement for the Control Period from FY to FY and determination of retail tariff
Regulatory formats for Multi Year Annual Revenue Requirement for the Control Period from FY 2016-17 to FY 2020-21 and determination of retail tariff for FY 2018-19 along with trueup of the FY 2012-13,
More informationSummary of Tariff Petition for BECL 2 x 250 MW Lignite based Thermal Power Plant at Bhavnagar
Summary of Tariff Petition for BECL 2 x 250 MW Lignite based Thermal Power Plant at Bhavnagar In terms of sections 61, 62, 64 and 86 of the Electricity Act, 2003, the tariff for the generation and sale
More informationExecutive Summary. Annual Performance Review towards: Truing up of ARR of FY09, APR of FY10 and Determination of ARR and Tariff for FY11
RInfra-Distribution (RInfra-D) Wire and Retail Annual Performance Review towards: Truing up of ARR of FY09, APR of FY10 and Determination of ARR and Tariff for FY11 Executive Summary Filed with Maharashtra
More informationNORTH KARANPURA TRANSMISSION COMPANY LIMITED ANNUAL ACCOUNTS FOR THE FY
NORTH KARANPURA TRANSMISSION COMPANY LIMITED ANNUAL ACCOUNTS FOR THE FY 2014-15 Vishal D Shah Partner Membership No. 119303 Place: Mumbai Date: Vishal D Shah Partner Membership No. 119303 Place: Mumbai
More informationCase No. 170 of Coram. Shri. Anand B. Kulkarni, Chairperson Shri. I.M. Bohari, Member Shri Mukesh Khullar, Member ORDER
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre No. 1, 13 th Floor, Cuffe Parade, Mumbai 400 005 Tel. No. 022 22163964/65/69 Fax 022 22163976 E mail: mercindia@merc.gov.in Website:
More informationBig Walnut Local School District
Big Walnut Local School District Monthly Financial Report for the month ended September 30, 2012 Prepared By: Felicia Drummey Treasurer BIG WALNUT LOCAL SCHOOL DISTRICT SUMMARY OF YEAR-TO-DATE FINANCIAL
More informationBusiness & Financial Services December 2017
Business & Financial Services December 217 Completed Procurement Transactions by Month 2 4 175 15 125 1 75 5 2 1 Business Days to Complete 25 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 217 Procurement
More informationNATIONAL PTA. FINANCIAL STATEMENTS September (Unaudited)
NATIONAL PTA FINANCIAL STATEMENTS September 2016 TABLE OF CONTENTS Executive Summary 1 National PTA Statement of Financial Position A 1 Statement of Net Assets A 4 Statement of Activities Actual vs. Budget
More informationArrow Pharma Pte Limited BALANCE SHEET AS AT Mar 31, 2016
BALANCE SHEET AS AT Mar 31, 2016 Schedule Mar16 A. EQUITY AND LIABILITIES 1. Shareholders' funds a) Share capital 1 72,625 b) Reserves and Surplus 2 (360,205) (287,580) 2. Share application money pending
More informationQUARTERLY FINANCIAL REPORT March 31, 2018
California Independent System Operator QUARTERLY FINANCIAL REPORT March 31, 2018 250 Outcropping Way Folsom, CA 95630 (916) 351-4000 CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION QUARTERLY FINANCIAL
More informationXML Publisher Balance Sheet Vision Operations (USA) Feb-02
Page:1 Apr-01 May-01 Jun-01 Jul-01 ASSETS Current Assets Cash and Short Term Investments 15,862,304 51,998,607 9,198,226 Accounts Receivable - Net of Allowance 2,560,786
More informationQUARTERLY FINANCIAL REPORT June 30, 2017
California Independent System Operator QUARTERLY FINANCIAL REPORT June 30, 2017 250 Outcropping Way Folsom, CA 95630 (916) 351-4000 CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION QUARTERLY FINANCIAL
More informationGujarat Energy Transmission Corporation Limited (GETCO)
GUJARAT ELECTRICITY REGULATORY COMMISSION Tariff Order Truing up for FY 2011-12 and For Gujarat Energy Transmission Corporation Limited (GETCO) Case No. 1262 of 2012 28 th 1st Floor, Neptune Tower, Opp.:
More informationKERALA STATE ELECTRICITY REGULATORY COMMISSION
KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM OA 7/2017 In the matter of Applicant : Application for the approval of revised ARR & ERC for the year 2017-18 filed by M/s KINESCO Power
More informationElgi Compressors Italy S.r.l. Balance Sheet As At 31st March 2017
Balance Sheet As At 31st March 2017 Particulars Note March 31, 2017 March 31, 2016 Non Current Assets Property, Plant and Equipment 3 127,486,695 145,048,621 Capital work-in-progress 3 - Investment Property
More informationSCHEDULE and 2019 Budget Assumptions
SCHEDULE 3.4 2018 and 2019 Budget Assumptions 1 2018-19 Budgets Assumptions 2 3 The following assumptions were used by EGNB in the development of its 2018 and 2019 Budgets: 4 5 Budget Item Assumption 6
More informationExecutive Summary of Tata Power Generation True up Petition for FY as well as MYT Petition for FY to FY
Executive Summary of Tata Power Generation True up Petition for FY 2011-12 as well as MYT Petition for FY 2012-13 to FY 2015-16 Tata Power G Page 1 TABLE OF CONTENTS TABLE OF CONTENTS... 2 LIST OF TABLES...
More informationPARTNERS' CAPITAL ACCOUNTS 1 Torrent Pharmaceuticals Ltd 5, Torrent Pharma Employee Welfare Trust
TORRENT PHARMACEUTICALS (DAHEJ) BALANCE SHEET SCHEDULE (Rs. in lacs) As at 31Mar2011 SOURCES OF FUNDS PARTNERS' CAPITAL ACCOUNTS 1 Torrent Pharmaceuticals Ltd 5,928.47 Torrent Pharma Employee Welfare Trust
More informationCOMPREHENSIVE ASSIGNMENT MANAC Course: MANAGEMENT ACCOUNTING / PGCBM 21. Name of the faculty: Prof. Ram Kumar Kakani. Subject :..Management Accounting
COMPREHENSIVE ASSIGNMENT MANAC Course: MANAGEMENT ACCOUNTING / PGCBM 21 Name of the faculty: Prof. Ram Kumar Kakani Subject :..Management Accounting RB1225 Name of center:- NOIDA (NEW DELHI) KUMAR HOME
More information2 EXECUTIVE SUMMARY. 1. This Licence may be called the Distribution Licence for The Tata Power Company Ltd. (Distribution Licence No.
2 EXECUTIVE SUMMARY The Tata Power Company Limited ( Tata Power ) is a company established in 1919. On April 1, 2000, The Tata Hydro-Electric Power Supply Company Limited (established in 1910) and The
More informationStart the cashflow in the month you expect to receive theloan, regardless whether you have started
Cashflow Guidelines Please email to obtain a Excel format if needed. Please ensure the Start Up Cost sheet is filled out. State how much money you need for each item and specify the sources of financing:,
More informationPimaCountyCommunityCollegeDistrict Board of Governors 4905C East Broadway/Tucson, Arizona INFORMATION REPORT
PimaCountyCommunityCollegeDistrict Board of Governors 4905C East Broadway/Tucson, Arizona 85709-1010 INFORMATION REPORT Meeting Date: 9/14/16 Item Number: 2.1 Item Title Financial Report July 2016 Financial
More informationCase No. 30 of In the matter of Petition filed by MSETCL for approval of SLDC Budget for FY and FY
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th floor, Cuffe Parade, Mumbai 400 005. Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail mercindia@mercindia.org.in
More informationANNUAL REVENUE REQUIREMENT & FY
ANNUAL REVENUE REQUIREMENT & TARIFF APPLICATION FY 2009-10 Uttar Pradesh Power Transmission Corporation Limited LUCKNOW Table of Contents 1. Introduction... 1-1 1.1. U P Power Transmission Corporation
More information4. PROFIT OR LOSS PRIOR TO INCORPORATION
4. PROFIT OR LOSS PRIOR TO INCORPORATION SOLUTIONS TO ASSIGNMENT PROBLEMS Problem No. 1 Trading A/c and Profit and loss a/c for the year ending 31.3.2002 post post To cost of goods sold (WN 2) 2,10,000
More informationConstructing a Cash Flow Forecast
Constructing a Cash Flow Forecast Method and Worked Example A cash flow forecast shows the estimates of the timing and amounts of cash inflows and outflows over a period of time. The sections of a cash
More informationACTUAL * COR ADMINISTRATION TARGETS * 2017 Target vs 2016 Target a) Number of New COR Registrations % Year (a)
23-Jun-16 Date Prepared Section 1(a): BUDGET - COR ACTIVITIES ACTUAL * COR ADMINISTRATION TARGETS * # Variance (b-a) % Variance (b/a) (12 months) 2016 YTD (6 months) Year 1 Year 2 2016 (a) Year 3 2017
More informationSpheria Australian Smaller Companies Fund
29-Jun-18 $ 2.7686 $ 2.7603 $ 2.7520 28-Jun-18 $ 2.7764 $ 2.7681 $ 2.7598 27-Jun-18 $ 2.7804 $ 2.7721 $ 2.7638 26-Jun-18 $ 2.7857 $ 2.7774 $ 2.7690 25-Jun-18 $ 2.7931 $ 2.7848 $ 2.7764 22-Jun-18 $ 2.7771
More informationFPSBI/M-VI/03-01/10/WN-23 (1+0.09/4)^4-1 ( )/( )-1
Solutions-Irawati Senna 1) B) 2) A) Nominal interest rate Effective rate Inflation Real rate of return 9.00% p.a. 9.31% p.a. 5.50% p.a. 3.61% p.a. (1+0.09/4)^4-1 (1+0.0931)/(1+0.055)-1 3) D) Amount of
More informationFinancial & Business Highlights For the Year Ended June 30, 2017
Financial & Business Highlights For the Year Ended June, 17 17 16 15 14 13 12 Profit and Loss Account Operating Revenue 858 590 648 415 172 174 Investment gains net 5 162 909 825 322 516 Other 262 146
More informationBig Walnut Local School District
Big Walnut Local School District Monthly Financial Report for the month ended September 30, 2013 Prepared By: Felicia Drummey Treasurer BIG WALNUT LOCAL SCHOOL DISTRICT SUMMARY OF YEAR TO DATE FINANCIAL
More informationSuzlon Wind Eberji Sanayi ve Ticaret Limited Sirketi. IND AS Financial Statements for the year ended March 31, 2018
IND AS Financial Statements for the year ended March 31, 2018 Balance sheet as at March 31, 2018 All amounts in TRY, unless otherwise stated Particulars Assets Notes - - (0) As at As at As at March 31,
More informationRInfra-G Multi Year Tariff Petition for FY to FY Executive Summary 1
TABLE OF CONTENTS 1. BACKGROUND... 4 1.1. Introduction... 4 1.2. Objective of the present MYT Petition... 4 2. TRUING UP OF FY 2014-15... 4 2.1. Operational Performance for FY 2014-15... 5 2.2. Fuel Cost
More informationCity of Monticello, Minnesota Telecommunications Revenue Bonds (Fibernet Monticello Project)
City of Monticello, Minnesota Telecommunications Revenue Bonds (Fibernet Monticello Project) Quarterly Report as of December 31, 2012 CUSIP #: 614491 Telecommunications Revenue Dated Date Maturity Date
More informationFiscal Year 2018 Project 1 Annual Budget
Fiscal Year 2018 Project 1 Annual Budget Table of Contents Table Page Summary 3 Summary of Costs Table 1 4 Treasury Related Expenses Table 2 5 Summary of Full Time Equivalent Table 3 6 Positions Cost-to-Cash
More informationQUARTERLY FINANCIAL REPORT December 31, 2017
California Independent System Operator QUARTERLY FINANCIAL REPORT December 31, 2017 Preliminary and Unaudited 250 Outcropping Way Folsom, CA 95630 (916) 351-4000 CALIFORNIA INDEPENDENT SYSTEM OPERATOR
More informationMPERC TARIFF FILING FORMS UNIT -1 (TRUE UP PETITION) (For Financial Years: & )
MPERC TARIFF FILING FORMS UNIT -1 (TRUE UP PETITION) (For Financial Years: 2017-18 & 2018-19) FORM-TPS-1 SUMMARY SHEET Place Anuppur, Madhya Pradesh S. No. Particulars Remarks 2017-18 2018-19 (1) (2) (3)
More informationCASE No. 105 of Coram Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Transmission Co. Ltd.
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th Floor, Cuffe Parade, Mumbai 400 005 Tel. No. 022 22163964/ 65/ 69 Fax No. 022 22163976 Email: mercindia@merc.gov.in
More informationSection 2. ARR and Tariff proposal submitted by the JSEB
Page 1 of 10 Section 2 ARR and Tariff proposal submitted by the JSEB The petition filed by the Board for approval of its Annual Revenue Requirement (ARR) and tariff for FY 2003-04 has been summarized in
More informationBHARAT SANCHAR NIGAM LIMITED PROFIT AND LOSS ACCOUNT FOR THE YEAR ENDED 31 ST MARCH 2009
PROFIT AND LOSS ACCOUNT FOR THE YEAR ENDED 31 ST MARCH 2009 SCHEDULE For the Year ended For the Year ended INCOME Service Revenue and Other Operating Income N 3,026,857 3,284,230 Other Income O 554,335
More informationFDD FIRM STORAGE SERVICE NORTHERN NATURAL GAS COMPANY
FDD FIRM STORAGE SERVICE NORTHERN NATURAL GAS COMPANY FIRM STORAGE SERVICE OPTIONS Northern s firm storage service is provided pursuant to the FDD Rate Schedule located in Northern s FERC Gas Tariff. The
More informationFPSBI/M-VI/06-01/09/WN-14
Solutions - Rahul 1) C) Present age of Aditi = 43 years Age of Aditi when Rahul Retires = 57 years Life expectancy of Aditi = 77 years Annuity needed = 77-57 = 20 years 2) B) Current Market Value of House
More informationPaschim Gujarat Vij Company Ltd.
BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR CASE NO. Filing of the Petition for True Up of FY 2015-16 & Determination of Multi-Year ARR for FY 2016-17 to FY 2020-21 & Determination
More information2 EXECUTIVE SUMMARY. 2.1 Distribution Business in Mumbai Area
2 EXECUTIVE SUMMARY The Tata Power Company Limited ( Tata Power ) is a company established in 1919. On April 1, 2000, The Tata Hydro-Electric Power Supply Company Limited (established in 1910) and The
More informationMAHARASHTRA ELECTRICITY REGULATORY COMMISSION
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 22163964/ 65/ 69 Fax 22163976 Email: mercindia@merc.gov.in Website:
More informationMulti Year Tariff Order For Himachal Pradesh State Load Dispatch Society (HPSLDS) For the period FY 15 to FY 19
Multi Year Tariff Order For Himachal Pradesh State Load Dispatch Society (HPSLDS) For the period FY 15 to FY 19 Himachal Pradesh Electricity Regulatory Commission 10 th June, 2014 Himachal Pradesh Electricity
More informationI. EQUITY AND LIABILITIES EQUITY Equity Share Capital , ,000 Other Equity 19 1,492,255 26,719
ERGO DESIGN PRIVATE LIMITED Balance Sheet as at 31.03.2018 Non Current Assets Property, Plant and Equipment 3 639,731 58,912 Capital work-in-progress 3 Investment Property 4 Goodwill 5 Other Intangible
More informationTERMS OF REFERENCE FOR THE INVESTMENT COMMITTEE
I. PURPOSE The purpose of the Investment Committee (the Committee ) is to recommend to the Board the investment policy, including the asset mix policy and the appropriate benchmark for both ICBC and any
More information1: Product Profitability Analysis - Exercise
1: Product Profitability Analysis - Exercise PRODUCT TOTAL Filter Bolt Drum PRICE ( ) 12 6 15 COST ( ) 8 3 12 ANNUAL SALES ( ) 1,440k 1,800k 2,500k 5,740k AVERAGE STOCK ( ) 210k 850k 240k 1,300k 1 Typical
More informationGuideline Answers for Accounting Group I
Guideline Answers for Accounting Group I Question 1(a): 5 Marks Heramba Ltd gives you the following information for the year ended 31 st March 20X2: ` Sales for the year ` 48,00,000 (The Company sold goods
More informationFinance Report for DCEO Steering Group. Financial Year 2017/18, June Executive Summary
Finance Report for DCEO Steering Group Financial Year 2017/18, June 2017 Executive Summary The Qtr 1 budget review has been included as an appendix to this report with commentary and a draft budget for
More informationFORM L-1-A : Revenue Account. FORM L-1-A : Revenue Account UP TO THE QUARTER ENDED ON JUNE Non Participating. (Linked) Individual
Insurer : DHFL Pramerica Insurance Company Limited Registration No. 140 ; Date of Registration with the IRDAI: June 27, 2008 Revenue Account For the quarter Ended March 31, 2018 FORM L-1-A : Revenue Account
More informationCUSC - SECTION 14 CHARGING METHODOLOGIES CONTENTS
CUSC - SECTION 14 CHARGING METHODOLOGIES CONTENTS 14.1 Introduction Part I -The Statement of the Connection Charging Methodology 14.2 Principles 14.3 The Calculation of the Basic Annual Connection Charge
More informationFire Marine Miscellaneous Total Fire Marine Miscellaneous Total 3,37,441 23,19,275 2,14,17,685 2,40,74,401 2,67,675 22,58,259 1,81,45,741 2,06,71,675
FORM NL-1-B-RA Name of the Insurer: TATA AIG GENERAL INSURANCE COMPANY IRDA Registration No. 108, dated January 22, 2001 REVENUE ACCOUNT FOR THE YEAR ENDED Particulars Schedule For the YEAR ENDED For the
More informationFinance Report for DCEO Steering Group. Financial Year 2017/18, August Executive Summary
Finance Report for DCEO Steering Group Financial Year 2017/18, August 2017 Executive Summary Partially through quarter 2, forecast and costs remain within our accepted variance level. There are no material
More informationOF ARR & TARIFF FILING FORMATS FOR DISTRIBUTION AND RETAIL SUPPLY LICENSEES
ANNEXURE - I Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited, Indore INDEX OF ARR & TARIFF FILING FORMATS FOR DISTRIBUTION AND RETAIL SUPPLY LICENSEES Financial Formats 1 Sheet S1 Profit
More informationFlorence Marina State Park Business Plan. Table of Contents
Florence Marina State Park Business Plan Table of Contents 2 Georgia State Parks and Historic Sites Executive Summary 3 Florence Marina State Park Business Plan 0 Target Visitation Growth from FY-2010
More informationState Load Dispatch Centre (SLDC)
GUJARAT ELECTRICITY REGULATORY COMMISSION Tariff Order Truing up for, Approval of Provisional ARR for FY 2016-17 For State Load Dispatch Centre (SLDC) Case No. 1546 of 2015 31 st March, 2016 6 th Floor,
More informationKERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM O.A No.15/2016
KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM O.A No.15/2016 In the matter of : Amendment to the Order on truing up of accounts for financial year 2009-10 of M/s KPUPL Applicant : M/s
More informationDevelopment of Economy and Financial Markets of Kazakhstan
Development of Economy and Financial Markets of Kazakhstan National Bank of Kazakhstan Macroeconomic development GDP, real growth, % 116 112 18 14 1 113,5 11,7 216,7223,8226,5 19,8 19,8 19,3 19,619,7 199,
More informationMEGHALAYA STATE ELECTRICITY REGULATORY COMMISSION
MEGHALAYA STATE ELECTRICITY REGULATORY COMMISSION Tariff Order For True up for FY 2014-15 And Annual Revenue Requirement & Transmission Tariff For FY 2017-18 MEGHALAYA POWER TRANSMISSION CORPORATION LIMITED
More informationAs at 31st March 2014
Balance Sheet as at March 31, 2014 Note 31st March 2014 31st March 2013 R R I.EQUITY AND LIABILITIES (1) Shareholders' Funds (a) Share Capital 2 43,20,00,000 43,20,00,000 (b) Reserves and Surplus 3 411,49,68,815
More informationFORM L-1-A : Revenue Account. FORM L-1-A : Revenue Account UP TO THE QUARTER ENDED ON JUNE Non Participating (Linked) Total
Insurer : DHFL Pramerica Insurance Company Limited Registration No. 140 ; Date of Registration with the IRDAI: June 27, 2008 Revenue Account For the quarter Ended June 30, 2017 FORM L-1-A : Revenue Account
More informationIRDA Public Disclosures
IRDA Public Disclosures QUARTER ENDED 31ST MARCH 2015 Aviva Life Insurance Company India Limited S. No. Form No. Description Page No. 1 L-1 REVENUE ACCOUNT 1-2 2 L-2 PROFIT & LOSS ACCOUNT 3 3 L-3 BALANCE
More informationELGI GULF FZE BALANCE SHEET AS AT 31ST MARCH, 2016
I. EQUITY AND LIABILITIES ELGI GULF FZE BALANCE SHEET AS AT 31ST MARCH, 2016 Particulars Note No 31-03-2016 31-03-2015 (1) SHAREHOLDERS' FUNDS (a) Share Capital 2 1777500 1777500 (b) Reserves and Surplus
More informationCalcom Vision Limited. FY18-19 Q2 (July-Sept 18) Investors Release 29 th October, 2018
Vision Limited FY18-19 Q2 (July-Sept 18) Investors Release 29 th October, 2018 Index FY2018-19 Q2 Performance - Review FY2018-19 Sales Review Key Focus Area of the Past Quarter: Materials Requirement Planning
More informationNotified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009
Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009 No. 2734/MPERC/2009. In exercise of powers conferred under Section 181(2) (zd) read with Section 45 and 61 of the Electricity Act, 2003
More informationPRESS RELEASE. Securities issued by Hungarian residents and breakdown by holding sectors. January 2019
7 March 2019 PRESS RELEASE Securities issued by Hungarian residents and breakdown by holding sectors January 2019 According to securities statistics, the amount outstanding of equity securities and debt
More informationBRIHANMUMBAI ELECTRIC SUPPLY and TRANSPORT UNDERTAKING (BEST)
BRIHANMUMBAI ELECTRIC SUPPLY and TRANSPORT UNDERTAKING (BEST) EXECUTIVE SUMMARY OF Annual Performance Review for FY 2008-09 & ARR for FY 2009-10 along with Truing Up of Accounts for FY 2007-08 TO Maharashtra
More informationTGC-1 9M 2016 IFRS Results. November 21, 2016 Saint Petersburg
TGC-1 9M 2016 IFRS Results November 21, 2016 Saint Petersburg Disclaimer The information contained herein has been prepared using information available to Public Joint Stock Company Territorial generating
More informationACCT-112 Final Exam Practice Solutions
ACCT-112 Final Exam Practice Solutions Question 1 Jan 1 Cash 200,000 H. Happee, Capital 200,000 Jan 2 Prepaid Insurance 10,000 Cash 10,000 Jan 15 Equipment 15,000 Cash 5,000 Notes Payable 10,000 Jan 30
More informationBalance Sheet as at 31st March 2015 Particulars Note March 31, 2015 March 31, 2014 I. EQUITY AND LIABILITIES Shareholders' Funds Share capital 2.1 44,770,000 44,770,000 Reserves and surplus 2.2 202,297,322
More informationBEFORE THE HONOURABLE KERALA STATE ELECTRICITY REGULATORY COMMISSION
BEFORE THE HONOURABLE KERALA STATE ELECTRICITY REGULATORY COMMISSION In the Matter of: Petitioner : Review Petition against KSERC order dated 14 August 2014 on Petition OP No. 9 of 2014 on ARR & ERC of
More information