FOREWORD. There are five sections to this document:

Size: px
Start display at page:

Download "FOREWORD. There are five sections to this document:"

Transcription

1 1

2 FOREWORD * This document contains candidate projects which have been identified by districts as ready for letting or obligation of funds in fiscal year 2018 by TxDOT. There are five sections to this document: 1. Projects that are scheduled to let through the statewide letting process at Austin headquarters 2. Projects that are approved by the TxDOT administration to let by a local entity such as a city or county 3. Other financial obligations that do not go through a letting process 4. Project selected as Comprehensive Development Agreement 5. Projects selected as Design Build Projects and other financial obligations are funded by various funding sources, the details of which are provided on the following page. The State Highway is TxDOT s traditional method of project funding and in recent years the department has received additional financial tools from the Legislature to advance projects. The projects and financial obligations in this schedule are based on the current estimated construction costs of the projects and the current forecast of available funds for fiscal year Changing conditions may result in projects being removed or added to this Letting Schedule. These changes could include financial issues such as receiving more or less revenues than forecasted, adjustments to fit within obligation limits, the execution of funding agreements, bids on projects being higher or lower than the project estimates, and increasing or decreasing cost on existing contracts through change orders or quantity overruns. Likewise, some projects and financial obligations may move out of or into the Letting Schedule due to project development issues associated with receiving environmental clearance or required right of way, changes in project priorities at the local or statewide level, or conflicts with other ongoing construction or maintenance work. *The following list includes projects known at the time of publication based on input from the districts. The current letting schedule will be reflected each week according to district requested project scheduling changes. 2

3 FISCAL YEAR 2018 PLANNED STATEWIDE SUMMARY INCLUDES STATEWIDE LETTINGS, LOCAL LETTINGS AND OTHER OBLIGATIONS (In Millions) ALL S BASED ON CURRENT District State Highway SIB Pass Toll SH 130 Rail Local Texas 1 14 Through Rev Conc Mobility Prog 1 Bond Finance Prog 2 Total 5 ABILENE $85.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $85.59 AMARILLO $ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.03 $0.00 $ ATLANTA $48.37 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.38 $0.00 $48.75 AUSTIN $ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $ $0.00 $ BEAUMONT $ $0.00 $0.00 $0.00 $0.00 $0.00 $20.13 $0.00 $0.00 $0.00 $0.00 $0.00 $ BROWNWOOD $23.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $23.49 BRYAN $52.76 $0.38 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $53.14 CHILDRESS $25.16 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $25.16 CORPUS CHRISTI $ $10.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1.50 $0.00 $ DALLAS $ $43.20 $0.00 $0.00 $0.00 $0.00 $0.00 $20.27 $0.00 $0.00 $8.97 $0.00 $ EL PASO $ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $15.74 $0.00 $ FORT WORTH $ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $20.00 $0.00 $0.00 $18.84 $0.00 $ HOUSTON $ $7.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $ $10.89 $1, LAREDO $77.58 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3.62 $0.00 $81.20 LUBBOCK $ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.32 $0.00 $ LUFKIN $ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $ ODESSA $ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1.65 $0.00 $ PARIS $ $2.35 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $40.18 $0.00 $ PHARR $ $5.47 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $14.30 $0.00 $ SAN ANGELO $85.03 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $85.03 SAN ANTONIO $ $9.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $17.76 $0.00 $ TYLER $ $0.11 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $ WACO $ $21.71 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3.89 $0.00 $ WICHITA FALLS $34.61 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $34.61 YOAKUM $ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $ DESIGN DIVISION $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TRAFFIC DIVISION $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 District Total: $4, $ $0.00 $0.00 $0.00 $0.00 $20.13 $40.27 $0.00 $0.00 $ $10.89 $5, * Actual totals may include local letting and other obligations remaining to be obligated and/or concurrence of award. 1 2 State Highway consists of federal, state and local funds. State Highway Revenue Bonds (osition and ostion 14) allow for the advancement of projects payable from future deposits to the State Highway. 3 State Infrastructure Bank Loans. 3

4 FISCAL YEAR 2018 PLANNED STATEWIDE LETTING SUMMARY (In Millions) BASED ON CURRENT District State 2 2 SIB Pass Toll SH 130 Rail Local Texas Highway 1 14 Through Rev Conc Mobility Prog 1 Prog 2 Bond Finance Total ABILENE $85.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $85.59 AMARILLO $ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.03 $0.00 $ ATLANTA $48.37 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.38 $0.00 $48.75 AUSTIN $ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $ $0.00 $ BEAUMONT $ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $ BROWNWOOD $23.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $23.49 BRYAN $52.76 $0.38 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $53.14 CHILDRESS $25.16 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $25.16 CORPUS CHRISTI $ $10.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1.50 $0.00 $ DALLAS $ $43.20 $0.00 $0.00 $0.00 $0.00 $0.00 $20.10 $0.00 $0.00 $1.19 $0.00 $ EL PASO $109. $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $15.50 $0.00 $4.62 FORT WORTH $ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $13.08 $0.00 $ HOUSTON $ $7.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $36.45 $0.69 $ LAREDO $56.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $56.00 LUBBOCK $ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.32 $0.00 $ LUFKIN $ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $ ODESSA $ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1.65 $0.00 $ PARIS $ $2.35 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $ PHARR $ $5.47 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $5.65 $0.00 $ SAN ANGELO $85.03 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $85.03 SAN ANTONIO $ $9.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $13.68 $0.00 $ TYLER $ $0.11 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $ WACO $92.45 $21.71 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $ WICHITA FALLS $34.61 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $34.61 YOAKUM $ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $ DESIGN DIVISION $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TRAFFIC DIVISION $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 District Total: $4, $ $0.00 $0.00 $0.00 $0.00 $0.00 $20.10 $0.00 $0.00 $ $0.69 $4, State Highway consists of federal, state and local funds. State Highway Revenue Bonds (osition and ostion 14) allow for the advancement of projects payable from future deposits to the State Highway. 3 State Infrastructure Bank Loans. 4

5 ABILENE DISTRICT FISCAL YEAR 2018 PLANNED STATEWIDE LETTING SUMMARY (In Millions) BASED ON CURRENT Month State Highway 1 Prog 1 Prog 2 14 SIB Pass Through Finance Toll Rev SH 130 Conc Rail Local Texas Mobility Total SEPTEMBER $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 OCTOBER $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 NOVEMBER $6.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $6.80 DECEMBER $22.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $22.96 JANUARY $10.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $10.22 FEBRUARY $11.58 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $11.58 MARCH $9.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $9.19 APRIL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 MAY $1.76 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1.76 JUNE $5.07 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $5.07 JULY $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 AUGUST $18.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $18.00 District Total: $85.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $

6 ABILENE DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING ABILENE HOWARD IH NOV 2017 INSTALL INTERSECTION FLASHING BEACON, ADVANCE WARNININGSIGNALS AND SIGNS, INSTALL PAVEMENT MARKINGS LIMITS FROM: AT FM 700 LIMITS TO: FRONTAGE ROADS ONLY ABILENE CALLAHAN IH NOV 2017 INSTALL INTERSECTION FLASHING BEACON, ADVANCE WARNININGSIGNALS AND SIGNS, INSTALL PAVEMENT MARKINGS LIMITS FROM: AT FM 1707 LIMITS TO: FRONTAGE ROADS ONLY ABILENE JONES US NOV 2017 INSTALL INTERSECTION FLASHING BEACON,ADVANCE WARNING SIGNALSINTERSECTION-EXISTING SIGNAL,FLASHING BEACON OR STOP SIGNS LIMITS FROM: AT FM 707 ABILENE SCURRY US NOV 2017 INSTALL INTERSECTION FLASHING BEACON, ADVANCE WARNININGSIGNALS AND SIGNS, SAFETY LIGHTING LIMITS FROM: AT FM 1673(INT WITH N.FRONT RD) ABILENE CALLAHAN SH NOV 2017 SAFETY LIGHTING AT INTERSECTION LIMITS FM 604 LIMITS FM 604 ABILENE BORDEN US NOV 2017 INSTALL INTERSECTION FLASHING BEACON, INSTALL ADVANCEINTERSECTION WARNING SIGNALS AND SIGNS, SAFETY LIGHTING LIMITS FM 1054 LIMITS FM 1054 ABILENE HOWARD FM NOV 2017 IMPROVE TRAFFIC SGNLS, INSTL ADV INT WARNING SIG & SIGNS,SAFETY LT INTERSECTION, INSTL TRANSVERS RUMBLE STRIPS LIMITS FROM: AT BIRDWELL LANE ABILENE HOWARD FM NOV 2017 INSTALL INTERSECTION FLASHING BEACON LIMITS FROM: FM 700 & 11TH LIMITS TO: FM 700 & 11TH ABILENE TAYLOR FM NOV 2017 IMPROVE TRAFFIC SIGNALS, INSTALL FLASHING YELLOW ARROW,SAFETY LIGHTING AT INTERSECTION LIMITS FROM: AT FM 707 ABILENE TAYLOR FM NOV 2017 INSTALL ADVANCE CURVE WARNING SIGNALS LIMITS FROM: MI S OF FM 1085 LIMITS TO: 2.3 MI S OF FM 1085 ABILENE TAYLOR FM NOV 2017 INSTALL ADVANCE CURVE WARNING SIGNALS LIMITS FROM: MI S OF FM 1085 LIMITS TO: MI S OF FM 1085 ABILENE SCURRY FM NOV 2017 INSTALL ADVANCE CURVE WARNING SIGNALS - EXISTING WARNINGSIGNS LIMITS FROM: MI NW OF FM 2085 LIMITS TO: 0.3 MI E OF FM 2085 ABILENE SCURRY FM NOV 2017 INSTALL ADVANCE CURVE WARNING SIGNALS - EXISTING WARNING SIGSIGNS, INSTALL CHEVRONS ON CURVE LIMITS FROM: GARZA CO LINE LIMITS TO: 1.18 MI S OF GARZA CO LINE $ 137,371 HES $ 72,4 HES $ 58,793 HES $ 100,576 HES $ 50,355 HES $ 56,408 HES $ 179,981 HES $ 37,784 HES $ 161,630 HES $ 31,547 HES $ 31,271 HES $ 31,7 HES $ 54,455 HES LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 6

7 ABILENE DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING LIMITS FROM: GARZA CO LINE LIMITS TO: 1.18 MI S OF GARZA CO LINE PROJ NUM: STP ( )HES CONTRACT CSJ: NOV Projects $ 1,004,295 ABILENE NOLAN BI 20-M NOV 2017 REPLACE BRIDGE & APPROACHES LIMITS FROM: AT THE UPRR LIMITS TO: IN SWEETWATER (PSN 044) CONTRACT CSJ: NOV 2017 $ 5,800,000 PROJ NUM:BR 1702(521) $ 5,800,000 NOV 2017 TOTAL: 14 Projects 2 Contracts $ 6,804,295 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 7

8 ABILENE DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING ABILENE HOWARD IH DEC 2017 ROADWAY REHABILITATION / ARMORING LIMITS FROM: MARTIN COUNTY LINE LIMITS TO: NEAR US 87 (WB LANES ONLY) CONTRACT CSJ: DEC 2017 $ 8,005,015 $ 8,005,015 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 8

9 ABILENE DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING ABILENE JONES US DEC 2017 MAINLANES AND FRONTAGE ROADSEXCEPT OUT SOUTHBOUND MAINLANES ANSON TO HAWLEY( ) LIMITS FROM: 13TH ST IN ANSON LIMITS TO: TAYLOR COUNTY LINE ABILENE STONEWALL US DEC 2017 LIMITS FROM: US 83 IN ASPERMONT LIMITS TO: SH 283 ABILENE SHACKELFORD US DEC 2017 LIMITS FROM: THROCKMORTON COUNTY LIMITS TO: US 180 IN ALBANY ABILENE HASKELL US DEC 2017 LIMITS FROM: BU 277 NORTH INTERSECTION LIMITS TO: BU 277 SOUTH INTERSECTION ABILENE KENT LIMITS FROM: US 380 SH DEC 2017 LIMITS TO: FISHER COUNTY LINE ABILENE FISHER SH DEC 2017 LIMITS FROM: 0. MILES SOUTH OF FISHER CR 303 LIMITS TO: NORTH ROBY CITY LIMITS ABILENE FISHER SH DEC 2017 LIMITS FROM: NORTH ROBY CITY LIMITS LIMITS TO: NOLAN COUNTY LINE ABILENE JONES SH DEC 2017 LIMITS FROM: US 83 LIMITS TO: US 277 ABILENE HASKELL US DEC 2017 LIMITS FROM: STONEWALL COUNTY LINE LIMITS TO: SH 6 IN ABILENE HASKELL LIMITS FROM: SH 6 US DEC 2017 LIMITS TO: US 277 EAST FRONTAGE ROAD ABILENE NOLAN FM DEC 2017 LIMITS FROM: IH 20 NORTH FRONTAGE RD LIMITS TO: SH 70 INTERSECTION ABILENE BORDEN FM DEC 2017 LIMITS FROM: GARZA COUNTY LINE LIMITS TO: US 180 ABILENE BORDEN LIMITS FROM: US 180 ABILENE HOWARD LIMITS FROM: US 87 FM DEC 2017 LIMITS TO: HOWARD COUNTY LINE RM DEC 2017 LIMITS TO: GLASSCOCK COUNTY LINE $ 2,442,000 $ 372,000 $ 650,000 $ 439,000 $ 866,000 $ 35,000 $ 794,000 $ 865,000 $ 283,000 $ 524,000 $ 258,000 $ 610,000 $ 633,000 $ 256,000 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 9

10 ABILENE DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING ABILENE HOWARD LIMITS FROM: FM 820 SH DEC 2017 LIMITS TO: MITCHELL COUNTY LINE ABILENE SCURRY SH DEC 2017 LIMITS FROM: MITCHELL COUNTY LINE LIMITS TO: US 180 ABILENE NOLAN FM DEC 2017 LIMITS FROM: FISHER COUNTY LINE LIMITS TO: BI 20-M ABILENE HOWARD FM DEC 2017 LIMITS FROM: BORDEN COUNTY LINE LIMITS TO: US 87 ABILENE SCURRY FM DEC 2017 LIMITS FROM: FM 1609 S OF US 180 LIMITS TO: US 180 ABILENE HOWARD FM DEC 2017 LIMITS FROM: GLASSCOCK COUNTY LINE LIMITS TO: US 87 ABILENE HOWARD FM DEC 2017 LIMITS FROM: US 87 LIMITS TO: FM 699 ABILENE JONES FM DEC 2017 LIMITS FROM: US 83 LIMITS TO: FM 26 CONTRACT CSJ: DEC Projects $ 1,301,000 $ 864,000 $ 166,000 $ 359,000 $ 165,000 $ 70,000 $ 133,000 $ 209,000 $,294,000 ABILENE CALLAHAN REHABILITATION US DEC 2017 LIMITS FROM: IH 20 LIMITS TO: APPROX.25 MILES NORTH OF IH 20 ABILENE CALLAHAN REHABILITATION US DEC 2017 LIMITS FROM: BAIRD SOUTH CITY LIMITS LIMITS TO: EAST 6TH STREET IN BAIRD CONTRACT CSJ: DEC Projects $ 1,247,989 $ 1,408,495 $ 2,656,484 DEC 2017 TOTAL: 25 Projects 3 Contracts $ 22,955,499 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 10

11 ABILENE DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING ABILENE TAYLOR SH JAN 2018 MILL,SPOT REPAIR,LEVEL-UP & OVERLAY LIMITS FROM: BU 83-D (TREADAWAY ST) LIMITS TO: RAINY CREEK CONTRACT CSJ: JAN 2018 ABILENE JONES US JAN 2018 SPOT BASE REPAIR,MILL & FILL DRIVING LANES,1-COURSE SURFACETREATMENT,1" SP D OVER ENTIRE ROADBED LIMITS FROM: HASKELL COUNTY LINE LIMITS TO: FM 1636 (EAST) CONTRACT CSJ: JAN 2018 ABILENE TAYLOR MINOR BRIDGE REPAIR VA JAN 2018 LIMITS FROM: VARRIOUS LOCATIONS ON IH 20 LIMITS TO: IN ABILENE DISTRICT CONTRACT CSJ: JAN 2018 $ 2,4,342 $ 2,4,342 $ 7,562,080 $ 7,562,080 $ 536,801 $ 536,801 JAN 2018 TOTAL: 3 Projects 3 Contracts $ 10,223,223 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 11

12 ABILENE DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING ABILENE CALLAHAN FM FEB 2018 PROFILE EDGELINE MARKINGS LIMITS FROM: TAYLOR C/L LIMITS TO: BI 20T ABILENE TAYLOR IH FEB 2018 MILLED EDGELINE RUMBLE STRIPS LIMITS FROM: MI E OF FM 3438 LIMITS TO: NEAR OLD ANSON RD ABILENE TAYLOR IH FEB 2018 MILLED EDGELINE RUMBLE STRIPS LIMITS FROM: OLD ANSON RD LIMITS TO: MI W OF CALLAHAN CO LINE ABILENE CALLAHAN BI 20-T FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: FM 2047 LIMITS TO: IH 20 ABILENE SHACKELFORD SH FEB 2018 PROFILE CENTERLINE-EDGELINE MARKINGS LIMITS FROM: FM 604 LIMITS TO: US 180 ABILENE SHACKELFORD US FEB 2018 PROFILE CENTERLINE-EDGELINE MARKINGS LIMITS FROM: MI E OF US 283 LIMITS TO: MI W OF STEPHENS C/L ABILENE STONEWALL US FEB 2018 TEXTURIZE SHOULDERS AND CENTER LINEROLLED-IN OR MILLED-IN LIMITS FROM: FM 63 LIMITS TO: US 380 ABILENE STONEWALL US FEB 2018 TEXTURIZE SHOULDERS AND CENTER LINEROLLED-IN OR MILLED-IN LIMITS FROM: MI S OF FM 610 LIMITS TO: FISHER COUNTY LINE ABILENE FISHER US FEB 2018 TEXTURIZE SHOULDERS AND CENTER LINEROLLED-IN OR MILLED-IN LIMITS FROM: STONEWALL COUNTY LINE LIMITS TO: JONES COUNTY LINE ABILENE JONES US FEB 2018 TEXTURIZE SHOULDERS AND CENTER LINEROLLED-IN OR MILLED-IN LIMITS FROM: FISHER COUNTY LINE LIMITS TO: FM 540 ABILENE JONES US FEB 2018 PROFILE EDGELINE MARKINGS LIMITS FROM: 0.9 MI S OF SH 92 LIMITS TO: US 277 ABILENE SCURRY BU 84-H FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: US 84 (N) LIMITS TO: US 84 (S) ABILENE STONEWALL US FEB 2018 TEXTURIZE SHOULDERS AND CENTER LINEROLLED-IN OR MILLED-IN LIMITS FROM: US 380 LIMITS TO: 2 MI S OF US 380 ABILENE SHACKELFORD US FEB 2018 PROFILE CENTERLINE-EDGELINE MARKINGS LIMITS FROM: SH 6 LIMITS TO: MI W OF SH 351 $ 175,703 HES $ 18,019 HES $ 55,894 HES $ 83,428 HES $ 205,378 HES $ 167,645 HES $ 174,325 HES $ 176,319 HES $ 23,059 HES $ 10,498 HES $ 209,915 HES $ 79,002 HES $ 27,832 HES $ 156,661 HES LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD

13 ABILENE DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING ABILENE SHACKELFORD US FEB 2018 PROFILE EDGELINE MARKINGS LIMITS FROM: THROCKMORTON COUNTY LINE LIMITS TO: MI S OF FM 2482 ABILENE TAYLOR SH FEB 2018 TEXTURIZE SHOULDERS AND CENTER LINEROLLED-IN OR MILLED-IN LIMITS FROM: 1.61 MI S OF FM 18 LIMITS TO: CALLAHAN COUNTY LINE ABILENE BORDEN US FEB 2018 TEXTURIZE SHOULDERS-ROLLED-IN OR MILLED-IN LIMITS FROM: FM 669 LIMITS TO: SCURRY COUNTY LINE ABILENE BORDEN US FEB 2018 MILLED CENTERLINE RUMBLE STRIPS LIMITS FROM: FM 669 LIMITS TO: SCURRY CO LINE ABILENE SCURRY US FEB 2018 TEXTURIZE SHOULDERS-ROLLED-IN OR MILLED-IN LIMITS FROM: BORDEN COUNTY LINE LIMITS TO: FM 1609 ABILENE FISHER US FEB 2018 PROFILE EDGELINE MARKINGS LIMITS FROM: SH 70 LIMITS TO: JONES COUNTY LINE ABILENE TAYLOR US FEB 2018 MILLED EDGELINE AND CENTERLINE RUMBLE STRIPS LIMITS FROM: MI N OF FM 35 LIMITS TO: 5 MI N OF FM 89 ABILENE MITCHELL SH FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: IH 20 LIMITS TO: FM 644 ABILENE HOWARD RM FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: GLASSCOCK COUNTY LINE LIMITS TO: FM 818 ABILENE TAYLOR FM FEB 2018 PROFILE EDGELINE MARKINGS LIMITS FROM: US 277 LIMITS TO: FM 89 ABILENE HASKELL FM FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: FM 600 LIMITS TO: US 277 ABILENE HOWARD FM FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: FM 461 LIMITS TO: RM 33 ABILENE HOWARD FM FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: MARTIN COUNTY LINE LIMITS TO: US 87 ABILENE KENT SH FEB 2018 TEXTURIZE SHOULDERS-ROLLED-IN OR MILLED-IN LIMITS FROM: DICKENS COUNTY LINE LIMITS TO: US 380 $ 52,852 HES $ 86,467 HES $ 220,968 HES $ 148,951 HES $ 139,941 HES $ 188,718 HES $ 58,928 HES $ 255,717 HES $ 172,557 HES $ 76,031 HES $ 2,652 HES $ 166,320 HES $ 166,320 HES $ 229,549 HES LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 13

14 ABILENE DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING ABILENE KENT SH FEB 2018 MILLED CENTERLINE RUMBLE STRIPS LIMITS FROM: DICKENS CO LINE LIMITS TO: US 380 ABILENE JONES FM FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: US 180 LIMITS TO: FM 1082 ABILENE JONES FM FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: FM 1082 LIMITS TO: TAYLOR COUNTY LINE ABILENE TAYLOR FM FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: JONES COUNTY LINE LIMITS TO: IH 20 ABILENE JONES FM FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: FM 6 LIMITS TO: FM 707 ABILENE HASKELL FM FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: FM 618 LIMITS TO: MI E OF FM 618 ABILENE TAYLOR SL FEB 2018 TEXTURIZE SHOULDERS-ROFILE PAVEMENT MARKERS LIMITS FROM: IH 20 FR LIMITS TO: MI E OF BU 83-D ABILENE CALLAHAN FM FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: 3.8 MI N OF IH 20 LIMITS TO: IH 20 ABILENE JONES FM FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: FM 1082 LIMITS TO: TAYLOR COUNTY LINE ABILENE TAYLOR FM FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: JONES COUNTY LINE LIMITS TO: SH 351 CONTRACT CSJ: FEB Projects $ 154,341 HES $ 257,635 HES $ 145,769 HES $ 51,006 HES $ 150,638 HES $ 65,934 HES $ 188,781 HES $ 97,726 HES $ 119,542 HES $ 42,736 HES $ 5,013,757 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 14

15 ABILENE DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING ABILENE NOLAN US FEB 2018 TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: MI NW OF IH 20 LIMITS TO: MI NW OF IH 20 ABILENE JONES FM FEB 2018 HIGH FRICTION SURFACE TREATMENT-CURVE,TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: 3.3 MI S OF FM 2746 LIMITS TO: 3.7 MI S OF FM 2746 ABILENE JONES FM FEB 2018 HIGH FRICTION SURFACE TREATMENT-CURVE, TEXTURIZE SHOULDERSPROFILE PAVEMENT MARKERS LIMITS FROM: MI S OF US 83 LIMITS TO: MI S OF US 83 ABILENE SHACKELFORD FM FEB 2018 HIGH FRICTION SURFACE TREATMENT-CURVE, TEXTURIZE SHOULDERSPROFILE PAVEMENT MARKERS LIMITS FROM: MI E OF JONES C/L LIMITS TO: MI E OF JONES C/L ABILENE SHACKELFORD FM FEB 2018 HIGH FRICTION SURFACE TREATMENT-CURVE, TEXTURIZE SHOULDERSPROFILE PAVEMENT MARKERS LIMITS FROM: MI E OF FM 23 LIMITS TO: MI E OF FM 23 ABILENE TAYLOR FM FEB 2018 HIGH FRICTION SURFACE TREATMENT-CURVE, TEXTURIZE SHOULDERSPROFILE PAVEMENT MARKERS LIMITS FROM: 1.9 MI S OF FM 614 LIMITS TO: 2.3 MI S OF FM 614 ABILENE FISHER FM FEB 2018 HIGH FRICTION SURFACE TREATMENT-CURVE,TEXTURIZE SHOULDERS-PROFILE PAVEMENT MARKERS LIMITS FROM: MI S FO FM 57 LIMITS TO: MI S FO FM 57 ABILENE SCURRY FM FEB 2018 HIGH FRICTION SURFACE TREATMENT-CURVE, TEXTURIZE SHOULDERSPROFILE PAVEMENT MARKERS LIMITS FROM: 0.4 MI W OF FM 1606 LIMITS TO: FM 1606 CONTRACT CSJ: FEB Projects $ 3,6 HES $ 214,055 HES $ 187,683 HES $ 214,055 HES $ 258,550 HES $ 228,628 HES $ 149,6 HES $ 190,457 HES $ 1,566,166 ABILENE NOLAN US FEB 2018 ROADWAY REHABILITATION / ARMORING LIMITS FROM: MITCHELL COUNTY LINE (EBL ONLY) LIMITS TO: 5 MI EAST OF MITCHELL COUNTY LINE CONTRACT CSJ: FEB 2018 $ 3,000,000 $ 3,000,000 ABILENE TAYLOR VA FEB 2018 FY 2018 TRAFFIC CONTROL DEVICES PLACE HOLDER CSJ LIMITS FROM: VARIOUS LOCATIONS IN THE LIMITS TO: ABILENE DISTRICT CONTRACT CSJ: LS PROJ NUM: $ 2,000,000 $ 2,000,000 FEB 2018 TOTAL: 48 Projects 4 Contracts $ 11,579,923 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 15

16 ABILENE DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING ABILENE NOLAN IH MAR 2018 REHABILITATE ROADWAY, AND INSTALL LIMITED CURB & GUTTER LIMITS FROM: BS 70-G_(NORTH FRONTAGE ROAD ONLY) LIMITS TO: EAST ARIZONA AVENUE (IN SWEETWATER) CONTRACT CSJ: MAR 2018 ABILENE JONES US MAR 2018 SPOT BASE REPAIR, MILL & FILL DRIVING LANES WITH 1-CST AND1" THIN OVERLAY MIX LIMITS FROM: ANSON SOUTH CITY LIMITS LIMITS TO: HAWLEY (SOUTHBOUND MAINLANES ONLY) CONTRACT CSJ: MAR 2018 $ 1,700,000 $ 1,700,000 $ 6,188,719 $ 6,188,719 ABILENE TAYLOR OVERLAY LIMITS FROM: IH 20 FM MAR 2018 LIMITS TO: MERKEL SOUTH CITY LIMIT CONTRACT CSJ: MAR 2018 $ 1,299,745 $ 1,299,745 MAR 2018 TOTAL: 3 Projects 3 Contracts $ 9,188,464 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 16

17 ABILENE DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING ABILENE HOWARD IH MAY 2018 INSTALL MEDIAN BARRIER LIMITS FROM: MARTIN CO LINE LIMITS TO: FM 818 CONTRACT CSJ: MAY 2018 ABILENE TAYLOR IH MAY 2018 REPLACE BRIDGE AND APPROACH RAILING ORADD SAFETY END TREATMENT OR REPLACE GUARDFENCE LIMITS FROM: AT NOODLE CREEK (IH 20 & NFR & SFR) LIMITS TO: 0.10 MI E OF FM 1085 ABILENE TAYLOR IH MAY 2018 REPLACE BRIDGE AND APPROACH RAILING ORADD SAFETY END TREATMENT OR REPLACE GUARDFENCE LIMITS FROM: AT BITTER CREEK (IH 20 & NFR & SFR) LIMITS TO: 2.50 MI E OF FM 1085 ABILENE TAYLOR IH MAY 2018 REPLACE BRIDGE AND APPROACH RAILING ORADD SAFETY END TREATMENT OR REPLACE GUARDFENCE LIMITS FROM: AT LITTLE BITTER CK (IH 20 & N FTG) LIMITS TO: 3.10 MI W OF FM 6 ABILENE TAYLOR IH MAY 2018 REPLACE BRIDGE AND APPROACH RAILING ORADD SAFETY END TREATMENT OR REPLACE GUARDFENCE LIMITS FROM: AT MULBERRY CREEK BRANCH (ML & FTG) LIMITS TO: 4.55 MI E OF FM 6 ABILENE TAYLOR IH MAY 2018 REPLACE BRIDGE AND APPROACH RAILING ORADD SAFETY END TREATMENT OR REPLACE GUARDFENCE LIMITS FROM: AT DRAW (IH 20 ML & N FRTG) LIMITS TO: 1.05 MI W OF FM 6 ABILENE TAYLOR IH MAY 2018 REPLACE BRIDGE AND APPROACH RAILING ORADD SAFETY END TREATMENT OR REPLACE GUARDFENCE LIMITS FROM: AT E FORK BITTER CREEK (IH 20 & FR) LIMITS TO: 0.35 MI E OF FM 6 ABILENE TAYLOR IH MAY 2018 REPLACE BRIDGE AND APPROACH RAILING ORADD SAFETY END TREATMENT OR REPLACE GUARDFENCE LIMITS FROM: AT DRAW (IH 20 ML & FRTG RD) LIMITS TO: 1.95 MI E OF FM 6 ABILENE TAYLOR IH MAY 2018 REPLACE BRIDGE AND APPROACH RAILING ORADD SAFETY END TREATMENT OR REPLACE GUARDFENCE LIMITS FROM: AT INDIAN CREEK (IH 20 & N FRTG RD) LIMITS TO: 0.35 MI W OF FM 707 ABILENE TAYLOR IH MAY 2018 REPLACE BRIDGE AND APPROACH RAILING ORADD SAFETY END TREATMENT OR REPLACE GUARDFENCE LIMITS FROM: AT DRAW (IH 20 WB) LIMITS TO: 0.20 MI E OF US 83 CONTRACT CSJ: MAY 2018 ABILENE LIMITS FROM: NORTH 10 TH TAYLOR ILLUMINATION UPGRADE US MAY 2018 LIMITS TO: SOUTH 1ST CONTRACT CSJ: MAY Projects $ 408,707 HES $ 408,707 $ 73,876 PROJ NUM:BR ( ) $ 47,672 PROJ NUM:BR ( ) $ 20,601 PROJ NUM:BR ( ) $ 35,738 PROJ NUM:BR ( ) $ 53,822 PROJ NUM:BR ( ) $ 56,690 PROJ NUM:BR ( ) $ 33,118 PROJ NUM:BR ( ) $ 403,062 PROJ NUM:BR ( ) $ 131,400 PROJ NUM:BR ( ) $ 855,979 $ 500,000 $ 500,000 MAY 2018 TOTAL: 1s 3 Contracts $ 1,764,686 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 17

18 ABILENE DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING ABILENE FISHER BRIDGE REPLACEMENT US JUN 2018 LIMITS FROM: ALKALI CREEK CONTRACT CSJ: JUN 2018 $ 3,700,000 PROJ NUM:BR ( ) $ 3,700,000 ABILENE FISHER CR JUN 2018 REMOVE AND REPLACE EXISTING BRIDGE AND APPROACHES LIMITS FROM: ON CR 198 (SIGNED CR 436) LIMITS TO: AT LIVE OAK CREEK TRIB (PSN 1) ABILENE SCURRY CR JUN 2018 REMOVE AND REPLACE EXISTING BRIDGE AND APPROACHES LIMITS FROM: ON CR 134 (SIGNED CR 398) LIMITS TO: AT CANYON CREEK TRIBUTARY (PSN 1) ABILENE FISHER CR JUN 2018 REMOVE AND REPLACE EXISTING BRIDGE AND APPROACHES LIMITS FROM: ON CR 287 (SIGNED CR 251) LIMITS TO: AT DRAW (PSN 2) ABILENE FISHER CR JUN 2018 REMOVE AND REPLACE EXISTING BRIDGE AND APPROACHES LIMITS FROM: ON CR 198 (SIGNED CR 436) LIMITS TO: AT LIVE OAK CREEK (PSN 2) ABILENE FISHER CR JUN 2018 REMOVE AND REPLACE EXISTING BRIDGE AND APPROACHES LIMITS FROM: ON CR 252(SIGNED CR 1) LIMITS TO: AT SWEETWATER CREEK (PSN 1) CONTRACT CSJ: JUN Projects $ 291,720 PROJ NUM:BR ( ) $ 320,892 PROJ NUM:BR ( ) $ 350,064 PROJ NUM:BR ( ) $ 262,548 PROJ NUM:BR ( ) $ 146,465 PROJ NUM:BR ( ) $ 1,371,689 JUN 2018 TOTAL: 6 Projects 2 Contracts $ 5,071,689 ABILENE TAYLOR US AUG 2018 CONSTRUCT OVERPASS AND RELOCATE RAMPS LIMITS FROM: S OF FM 204(CLARK/REMINGTON RD) LIMITS TO: FM CONTRACT CSJ: AUG 2018 ABILENE TAYLOR US AUG 2018 REGRADE VERTICAL CURVE TO ELIMINATE SIGHT DISTANCE ISSUES,ELIMINATE CROSS- OVERS AND ADD ACCEL AND DECEL LANES LIMITS FROM: JUST SOUTH OF FM 204 LIMITS TO: US 83 -US 84 SPLIT CONTRACT CSJ: AUG 2018 $ 10,000,000 $ 10,000,000 $ 8,000,000 $ 8,000,000 AUG 2018 TOTAL: 3 Projects 2 Contracts $ 18,000,000 ABILENE 113 Projects 22 Contracts $ 85,587,779 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 18

19 AMARILLO DISTRICT FISCAL YEAR 2018 PLANNED STATEWIDE LETTING SUMMARY (In Millions) BASED ON CURRENT Month State Highway 1 Prog 1 Prog 2 14 SIB Pass Through Finance Toll Rev SH 130 Conc Rail Local Texas Mobility Total SEPTEMBER $1.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1.23 OCTOBER $16.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.03 $0.00 $16.58 NOVEMBER $18.28 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $18.28 DECEMBER $64.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $64.00 JANUARY $25.61 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $25.61 FEBRUARY $2.53 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2.53 MARCH $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 APRIL $5.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $5.00 MAY $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 JUNE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 JULY $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 AUGUST $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 District Total: $ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.03 $0.00 $

20 AMARILLO DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING AMARILLO POTTER CRACK SEAL VA SEP 2017 LIMITS FROM: VARIOUS LOCATIONS DISTRICTWIDE AMARILLO POTTER CRACK SEAL VA SEP 2017 LIMITS FROM: VARIOUS LOCATIONS DISTRICTWIDE CONTRACT CSJ: SEP Projects $ 1,037,018 PROJ NUM:STP 2018(003) $ 194,031 PROJ NUM:C $ 1,231,049 SEP 2017 TOTAL: 2 Projects 1 Contract $ 1,231,049 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 20

21 AMARILLO DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING AMARILLO OCHILTREE US OCT 2017 MILLED EDGELINE RUMBLE STRIPS LIMITS FROM: OKLAHOMA STATE LINE LIMITS TO: SH 15 AMARILLO OCHILTREE US OCT 2017 PROFILE EDGELINE MARKINGS LIMITS FROM: SL 143 LIMITS TO: MILES SE OF SH 70 AMARILLO HARTLEY US OCT 2017 MILLED EDGELINE RUMBLE STRIPS LIMITS FROM: US 87 LIMITS TO: CHANNING AMARILLO DALLAM US OCT 2017 MILLED EDGELINE RUMBLE STRIPS LIMITS FROM: OKLAHOMA STATE LINE LIMITS TO: SHERMAN COUNTY LINE AMARILLO SHERMAN US OCT 2017 MULLED EDGELINE RUMBLE STRIPS LIMITS FROM: DALLAM COUNTY LINE LIMITS TO: US 54 AMARILLO DALLAM US OCT 2017 MILLED EDGELINE RUMBLE STRIPS LIMITS FROM: OKLAHOMA STATE LINE LIMITS TO: MILES NORTH OF DALHART AMARILLO DALLAM US OCT 2017 MILLED EDGELINE RUMBLE STRIPS LIMITS FROM: MILES NORTH OF DALHART LIMITS TO: SS 17 AMARILLO HARTLEY US OCT 2017 MILLED EDGELINE RUMBLE STRIPS LIMITS FROM: CHANNING LIMITS TO: OLDHAM COUNTY LINE AMARILLO OLDHAM US OCT 2017 MILLED EDGELINE RUMBLE STRIPS LIMITS FROM: HARTLEY COUNTY LINE LIMITS TO: CANADIAN RIVER AMARILLO OLDHAM US OCT 2017 MILLED EDGELINE RUMBLE STRIPS LIMITS FROM: CANADIAN RIVER LIMITS TO: DEAF SMITH COUNTY LINE AMARILLO DEAF SMITH US OCT 2017 MILLED EDGELINE RUMBLE STRIPS LIMITS FROM: OLDHAM COUNTY LINE LIMITS TO: SOUTH OF FM 1062 AMARILLO DEAF SMITH US OCT 2017 MILLED EDGELINE RUMBLE STRIPS LIMITS FROM: SOUTH OF FM 1062 LIMITS TO: MILES NORTH OF FM 1058 AMARILLO HARTLEY US OCT 2017 MILLED EDGELINE RUMBLE STRIPS LIMITS FROM: MILES SE OF FM 807 LIMITS TO: MOORE COUNTY LINE AMARILLO MOORE US OCT 2017 MILLED EDGELINE RUMBLE STRIPS LIMITS FROM: HARTLEY COUNTY LINE LIMITS TO: MILES WEST OF US 287 CONTRACT CSJ: OCT Projects $ 168,653 PROJ NUM:STP 2018(160)HESG $ 49,714 PROJ NUM:STP 2018(161)HESG $ 78,883 PROJ NUM:STP 2018(162)HESG $ 48,204 PROJ NUM:STP 2018(163)HESG $ 57,837 PROJ NUM:STP 2018(165)HESG $ 88,641 PROJ NUM:STP 2018(165)HESG $ 107,191 PROJ NUM:STP 2018(166)HESG $ 31,277 PROJ NUM:STP 2018(167)HESG $ 56,911 PROJ NUM:STP 2018(168)HESG $ 164,592 PROJ NUM:STP 2018(169)HESG $ 84,315 PROJ NUM:STP 2018(170)HESG $ 51,538 PROJ NUM:STP 2018(171)HESG $ 103,817 PROJ NUM:STP 2018(172)HESG $ 98,513 PROJ NUM:STP 2018(173)HESG $ 1,190,086 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 21

22 AMARILLO DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING AMARILLO CARSON US OCT 2017 PRESERVATION AND SAFETY IMPROVEMENTS ON A FREIGHT CORRIDOR LIMITS FROM: 0.71 MI W OF SH 207 LIMITS TO: 3.86 MI EAST OF PANHANDLE CL AMARILLO CARSON US OCT 2017 PRESERVATION AND SAFETY IMPROVEMENTS ON A FREIGHT CORRIDOR LIMITS FROM: 3.86 MI EAST OF PAHANDLE CL LIMITS TO: CR S EAST OF PANHANDLE AMARILLO GRAY REHAB ROADWAY US OCT 2017 LIMITS FROM: FM 750 WEST OF PAMPA LIMITS TO: SH 70 AMARILLO GRAY US OCT 2017 PRESERVATION AND SAFETY IMPROVEMENTS ON A FREIGHT CORRIDOR LIMITS FROM: SH 70 LIMITS TO: SH 152 CONTRACT CSJ: OCT Projects $ 8,220,588 PROJ NUM:NH 2013(611) $ 992,749 PROJ NUM:NH 2013(611) $ 1,009,438 PROJ NUM:NH 2013(611) $ 5,168,445 PROJ NUM:NH 2013(611) $ 15,391,220 OCT 2017 TOTAL: 18 Projects 2 Contracts $ 16,581,306 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 22

23 AMARILLO DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING AMARILLO HEMPHILL SEALCOAT LIMITS FROM: FM 277 US NOV 2017 LIMITS TO: WHEELER COUNTY LINE AMARILLO RANDALL SEALCOAT SBL US NOV 2017 LIMITS FROM: SOUTH OF CANYON (DIVIDED SECTION) LIMITS TO: SWISHER COUNTY LINE AMARILLO RANDALL SEALCOAT NBL US NOV 2017 LIMITS FROM: SOUTH OF CANYON (DIVIDED SECTION) LIMITS TO: SWISHER COUNTY LINE AMARILLO RANDALL SEALCOAT IH NOV 2017 LIMITS FROM: SWISHER COUNTY LINE (WEST FRT RD) LIMITS TO: FM 3331 (WEST FRT RD) AMARILLO POTTER SEALCOAT BI 40-D NOV 2017 LIMITS FROM: IH 40 LIMITS TO: RM 1061 AMARILLO DEAF SMITH SEALCOAT US NOV 2017 LIMITS FROM: HEREFORD EAST DIVIDED 4 LANE (EBL) LIMITS TO: RANDALL COUNTY LINE AMARILLO RANDALL SEALCOAT LIMITS FROM: SL 335 (FRT RDS) IH NOV 2017 LIMITS TO: POTTER COUNTY LINE AMARILLO POTTER SEALCOAT IH NOV 2017 LIMITS FROM: RANDALL COUNTY LINE (FRT RDS) LIMITS TO: IH 40 (FRT RDS) AMARILLO LIPSCOMB SEALCOAT LIMITS FROM: OKLAHOMA STATE LINE US NOV 2017 LIMITS TO: HEMPHILL COUNTY LINE AMARILLO GRAY SEALCOAT IH NOV 2017 LIMITS FROM: FM 291 SOUTH (S FRT RD) LIMITS TO: BI40-H WEST OF MCLEAN (S FTR RD) AMARILLO OCHILTREE SEALCOAT FM NOV 2017 LIMITS FROM: HANSFORD COUNTY LINE LIMITS TO: SH 70 AMARILLO GRAY SEALCOAT SH NOV 2017 LIMITS FROM: US 60 LIMITS TO: LP171/FM 749 AMARILLO HANSFORD SEALCOAT LIMITS FROM: FM 759 SH NOV 2017 LIMITS TO: OCHILTREE COUNTY LINE AMARILLO HUTCHINSON SEALCOAT SH NOV 2017 LIMITS FROM: BORGER TRAFFIC CIRCLE LIMITS TO: SH 152 STINNETT $ 1,000 $ 629,900 $ 630,600 $ 546,100 $ 491,200 $ 458,400 $ 281,700 $ 61,700 $ 435,800 $ 229,200 $ 486,600 $ 0,400 $ 320,300 $ 839,100 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 23

24 AMARILLO DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING AMARILLO CARSON SEALCOAT SH NOV 2017 LIMITS FROM: US 60 LIMITS TO: IH 40 AMARILLO HUTCHINSON SEALCOAT SS NOV 2017 LIMITS FROM: SH 207 LIMITS TO: SP 119 AMARILLO HUTCHINSON SEALCOAT LIMITS FROM: SH 207 SH NOV 2017 LIMITS TO: MOORE COUNTY LINE AMARILLO MOORE SEALCOAT SH NOV 2017 LIMITS FROM: HUTCHINSON COUNTY LINE LIMITS TO: POTTER COUNTY LINE AMARILLO RANDALL SEALCOAT SH NOV 2017 LIMITS FROM: IH 27 LIMITS TO: PR 5 AMARILLO RANDALL SEALCOAT LIMITS FROM: SH 217 PR NOV 2017 LIMITS TO: END AMARILLO HUTCHINSON SEALCOAT SH NOV 2017 LIMITS FROM: MOORE COUNTY LINE LIMITS TO: SH 207/SH 136 AMARILLO GRAY SEALCOAT LIMITS FROM: LP 171/FM 749 AMARILLO GRAY SEALCOAT LIMITS FROM: BI 40 IN MCLEAN SH NOV 2017 LIMITS TO: NORTH FORK RED RIVER BRIDGE SH NOV 2017 LIMITS TO: NORTH FORK RED RIVER BRIDGE AMARILLO GRAY SEALCOAT SH NOV 2017 LIMITS FROM: DONLEY COUNTY LINE LIMITS TO: BI 40 AMARILLO SHERMAN SEALCOAT SH NOV 2017 LIMITS FROM: CR 7 LIMITS TO: FM 119 AMARILLO MOORE SEALCOAT LIMITS FROM: FM 119 FM NOV 2017 LIMITS TO: HUTCHINSON COUNTY LINE AMARILLO OLDHAM SEALCOAT FM NOV 2017 LIMITS FROM: DEAF SMITH COUNTY LINE LIMITS TO: IH 40 AMARILLO DEAF SMITH SEALCOAT LIMITS FROM: US 60 FM NOV 2017 LIMITS TO: OLDHAM COUNTY LINE $ 435,700 $ 270,000 $ 1,570,500 $ 7,300 $ 592,300 $ 313,100 $ 561,600 $ 586,800 $ 936,500 $ 117,600 $ 538,100 $ 422,800 $ 5,200 $ 1,200,200 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 24

25 AMARILLO DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING AMARILLO DALLAM SEALCOAT LIMITS FROM: US 87 AMARILLO OLDHAM SEALCOAT LIMITS FROM: US 385 SH NOV 2017 LIMITS TO: NEW MEXICO STATE LINE RM NOV 2017 LIMITS TO: POTTER COUNTY LINE AMARILLO POTTER SEALCOAT RM NOV 2017 LIMITS FROM: FM 2381 LIMITS TO: BI 40 AMARILLO LIPSCOMB SEALCOAT SH NOV 2017 LIMITS FROM: OKLAHOMA STATE LINE LIMITS TO: FM 377 AMARILLO GRAY SEALCOAT RM NOV 2017 LIMITS FROM: SH 273 LIMITS TO: FM 749 AMARILLO RANDALL SEALCOAT LIMITS FROM: 373' SOUTH OF SW 45TH SL NOV 2017 LIMITS TO: POTTER COUNTY LINE AMARILLO POTTER SEALCOAT SL NOV 2017 LIMITS FROM: RANDALL COUNTY LINE LIMITS TO: IH 40 AMARILLO LIPSCOMB SEALCOAT RM NOV 2017 LIMITS FROM: SH 23 LIMITS TO: FM 1920 CONTRACT CSJ: NOV 2017 AMARILLO POTTER IH NOV 2017 INTERSECTION IMPROVEMENTS AT RM 2381 (BUSHLAND)AND FRT ROAD IMPROVEMENTS LIMITS FROM: 2000 WEST OF FM 2381 LIMITS TO: 2000 EAST OF FM 2381 AMARILLO OLDHAM FM NOV 2017 SAFETY IMPROVEMENTS BY ADDING TURN LANES AT WILDORADO HIGH LIMITS FROM: 0.57 MI N OF DEAF SMITH COUNTY LINE LIMITS TO: DEAF SMITH COUNTY LINE AMARILLO DEAF SMITH FM NOV 2017 SAFETY IMPROVEMENTS BY ADDING TURN LANES AT WILDORADO HIGH LIMITS FROM: OLDHAM COUNTY LINE 47 MI S OF OLDHAM COUNTY LINE CONTRACT CSJ: NOV Projects 3 Projects $ 853,300 $ 231,500 $ 6,600 $ 249,900 $ 176,000 $ 174,500 $ 33,000 $ 243,900 $ 15,784,400 $ 1,500,000 $ 700,000 $ 300,000 $ 2,500,000 NOV 2017 TOTAL: 39 Projects 2 Contracts $ 18,284,400 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 25

26 AMARILLO DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING AMARILLO POTTER OVERLAY LIMITS FROM: LP 335 US DEC 2017 LIMITS TO: CARSON COUNTY LINE $ 5,200,000 AMARILLO POTTER OVERLAY LIMITS FROM: US 287 INTERCHANGE IH DEC 2017 LIMITS TO: CARSON COUNTY LINE CONTRACT CSJ: DEC Projects $ 3,500,000 PROJ NUM:IM ( ) $ 8,700,000 AMARILLO POTTER IH DEC 2017 REPLACE EXISTING BRIDGE AND APPROACHES WB LANES LIMITS FROM: AT WHITAKER STREET AMARILLO POTTER IH DEC 2017 REPLACE EXISTING BRIDGE AND APPROACHES EB LANES LIMITS FROM: AT WHITAKER STREET AMARILLO POTTER IH DEC 2017 REPLACE EXISTING BRIDGE AND APPROACHES WB LANES LIMITS FROM: AT SL 335 (LAKESIDE DR) AMARILLO POTTER IH DEC 2017 REPLACE EXISTING BRIDGE AND APPROACHES EB LANES LIMITS FROM: AT SL 335 (LAKESIDE DR) AMARILLO POTTER IH DEC 2017 REPLACE EXISTING BRIDGE AND APPROACHES WB LANES LIMITS FROM: AT FM 58 AMARILLO POTTER IH DEC 2017 REPLACE EXISTING BRIDGE AND APPROACHES EB LANES LIMITS FROM: AT FM 58 AMARILLO POTTER IH DEC 2017 RAMPS AND MISCELLANEOUS IMPROVEMENTS LIMITS FROM:.3 MILES EAST OF EASTERN STREET LIMITS TO: US 287 SPLIT CONTRACT CSJ: DEC Projects $,600,000 PROJ NUM:BR ( ) $ 7,500,000 PROJ NUM:BR ( ) $ 9,300,000 PROJ NUM:BR ( ) $ 8,500,000 PROJ NUM:BR ( ) $ 6,000,000 PROJ NUM:BR ( ) $ 6,300,000 PROJ NUM:BR ( ) $ 5,100,001 $ 55,300,001 DEC 2017 TOTAL: 9 Projects 2 Contracts $ 64,000,001 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 26

27 AMARILLO DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING AMARILLO POTTER US JAN 2018 PRESERVATION AND SAFETY IMPROVEMENTS ON A FREIGHT CORRIDOR LIMITS FROM: AMARILO CREEK LIMITS TO: MOORE COUNTY LINE AMARILLO POTTER OVERLAY LIMITS FROM: IH 40 AMARILLO CARSON OVERLAY LIMITS FROM: CARSON COUNTY LINE US JAN 2018 LIMITS TO: CARSON COUNTY LINE US JAN 2018 LIMITS TO: ARMSTRONG COUNTY LINE CONTRACT CSJ: JAN 2018 AMARILLO RANDALL US JAN 2018 IMPROVE TRAFFIC SIGNALS LIMITS FROM: AT FM 2590 AMARILLO DEAF SMITH US JAN 2018 IMPROVE TRAFFIC SIGNALS LIMITS FROM: AT MOREMAN ROAD AMARILLO HUTCHINSON SH JAN 2018 IMPROVE TRAFFIC SIGNALS LIMITS FROM: AT SS 246 AMARILLO GRAY SH JAN 2018 IMPROVE TRAFFIC SIGNALS LIMITS FROM: AT KENTUCKY AMARILLO GRAY SH JAN 2018 IMPROVE TRAFFIC SIGNALA LIMITS FROM: AT SH 152 CONTRACT CSJ: JAN 2018 AMARILLO HARTLEY FM JAN 2018 REPLACE EXISTING BRIDGE LIMITS FROM: AT PUNTA DE AGUA CREEK CONTRACT CSJ: JAN Projects 5 Projects $ 15,300,000 $ 3,150,000 $ 400,000 $ 18,850,000 $ 76,080 HES $ 82,800 HES $ 82,800 HES $ 82,800 $ 82,800 $ 407,280 $ 6,350,000 PROJ NUM:BR ( ) $ 6,350,000 JAN 2018 TOTAL: 9 Projects 3 Contracts $ 25,607,280 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 27

28 AMARILLO DISTRICT FISCAL YEAR 2018 PLANNED DETAIL FOR STATEWIDE LETTING AMARILLO GRAY CR FEB 2018 REPLACE BRIDGE AND APPROACHES LIMITS FROM: ON CR 17 LIMITS TO: AT GRAPEVINE CRK AMARILLO ARMSTRONG CR FEB 2018 REPLACE BRIDGE AND APPROACHES LIMITS FROM: ON CR 25 LIMITS TO: AT WEST FORK COTTONWOOD CREEK AMARILLO GRAY CR FEB 2018 REPLACE BRIDGE AND APPROACHES LIMITS FROM: ON HOG FARM ROAD LIMITS TO: AT TURKEY CREEK BR AMARILLO GRAY REPLACE BRIDGE LIMITS FROM: ON WEST LINE ROAD CR FEB 2018 LIMITS TO: AT MCCLELLAN CREEK CONTRACT CSJ: FEB Projects $ 1,037,615 PROJ NUM:BR 1702(577) $ 186,654 PROJ NUM:BR 1702(575) $ 575,000 PROJ NUM:BR 1702(574) $ 734,050 PROJ NUM:BR 1702(576) $ 2,533,319 FEB 2018 TOTAL: 4 Projects 1 Contract $ 2,533,319 AMARILLO DEAF SMITH IH APR 2018 INSTALL CRASHWALLS AT VARIOUS LOCATIONS ON IH 40 LIMITS FROM: VARIOUS LOCATIONS ON IH 40 CONTRACT CSJ: AMARILLO RANDALL IH APR 2018 INSTALL CRASHWALLS AT VARIOUS LOCATIONS ON IH 40 LIMITS FROM: VARIOUS LOCATIONS ON IH 27 CONTRACT CSJ: $ 4,000,000 PROJ NUM:BR ( ) $ 4,000,000 $ 1,000,000 PROJ NUM:BR ( ) $ 1,000,000 APR 2018 TOTAL: 2 Projects 2 Contracts $ 5,000,000 AMARILLO 83 Projects 13 Contracts $ 133,237,355 LBS = LOCAL BOND SALES PV1 = PROPOSITION BOND PROCEEDS Pv2 = PROPOSITION BOND PROCEEDS VERSION 2 P1 = PROPOSITION 1 BOND PROCEEDS RTR = REGIONAL TOLL REVENUE DB = DESIGN BUILD 28

29 ATLANTA DISTRICT FISCAL YEAR 2018 PLANNED STATEWIDE LETTING SUMMARY (In Millions) BASED ON CURRENT Month State Highway 1 Prog 1 Prog 2 14 SIB Pass Through Finance Toll Rev SH 130 Conc Rail Local Texas Mobility Total SEPTEMBER $3.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.19 $0.00 $3.40 OCTOBER $4.72 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $4.72 NOVEMBER $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 DECEMBER $6.15 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.20 $0.00 $6.35 JANUARY $5.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $5.75 FEBRUARY $6.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $6.51 MARCH $9.54 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $9.54 APRIL $7.69 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $7.69 MAY $3.28 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3.28 JUNE $0.95 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.95 JULY $0.57 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.57 AUGUST $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 District Total: $48.37 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.38 $0.00 $

FOREWORD. There are five sections to this document:

FOREWORD. There are five sections to this document: 9/2/2016 @ 2:38:38 PM FOREWORD * This document contains candidate projects which have been identified by districts as ready for letting or obligation of funds in fiscal year 2017 by TxDOT. There are five

More information

FOREWORD. There are five sections to this document:

FOREWORD. There are five sections to this document: 4/1/2019 @ 4:41:41 PM FOREWORD * This document contains candidate projects which have been identified by districts as ready for letting or obligation of funds in fiscal year 2019 by TxDOT. There are five

More information

TEXAS DEPARTMENT OF TRANSPORTATION

TEXAS DEPARTMENT OF TRANSPORTATION TEXAS DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM STIP 2015-2018 STATEWIDE FINANCIALS May 2015 Quarterly Revision HIGHWAY MAY 2015 FY 2015-2018 STIP Analysis Estimated s by

More information

RAS PROJECTS THE GOOD, THE BAD, AND THE UGLY. Ryan Barborak, P.E. CST Flexible Pavements Branch

RAS PROJECTS THE GOOD, THE BAD, AND THE UGLY. Ryan Barborak, P.E. CST Flexible Pavements Branch RAS PROJECTS THE GOOD, THE BAD, AND THE UGLY Ryan Barborak, P.E. CST Flexible Pavements Branch The Good, The Bad and The Ugly Every gun makes its own tune. http://www.ranker.com/list/the-good-the-bad-and-the-ugly-movie-quotes/movie-and-tv-quotes?page=2

More information

CONSTRUCTION STAFFING. Mario R. Jorge, P.E. District Engineer San Antonio District

CONSTRUCTION STAFFING. Mario R. Jorge, P.E. District Engineer San Antonio District CONSTRUCTION STAFFING Mario R. Jorge, P.E. District Engineer San Antonio District October 11 th, 2017 Previous Work Load Staffing Analysis District Workload/Workforce Analysis report prepared internally

More information

DRAFT UTP November Update - Funding Adjustments Summary EXHIBIT A REVISION DATE 11/7/14. (Amounts in millions) Sum $0

DRAFT UTP November Update - Funding Adjustments Summary EXHIBIT A REVISION DATE 11/7/14. (Amounts in millions) Sum $0 UTP November Update - Funding Adjustments Summary (Amounts in millions) District/Division//TMA Fiscal Year Adjusted Amount Post Public Meeting Adjustments Austin 3 SH 130 Concession FY $6,500,000 3 SH

More information

15,790. Bryan Waco Region. Do you own or lease a personal vehicle? What is your primary means of transportation?

15,790. Bryan Waco Region. Do you own or lease a personal vehicle? What is your primary means of transportation? Bryan Waco Region 1 Houston 2 Dallas 3 Fort Worth 4 San Antonio 5 Austin 6 Laredo Pharr 7 Corpus Christi Yoakum 8 Bryan Waco 9 Atlanta Beaumont Lufkin Paris Tyler 10 Amarillo Childress Lubbock Wichita

More information

TEXAS TRANSPORTATION COMMISSION MEETING ATTACHED LISTS February 26, 2015 HIGHWAY MAINTENANCE AND BUILDING CONSTRUCTION CONTRACTS-STATE LET

TEXAS TRANSPORTATION COMMISSION MEETING ATTACHED LISTS February 26, 2015 HIGHWAY MAINTENANCE AND BUILDING CONSTRUCTION CONTRACTS-STATE LET TEXAS TRANSPORTATION COMMISSION MEETING ATTACHED LISTS February 26, 2015 HIGHWAY MAINTENANCE AND BUILDING CONSTRUCTION CONTRACTS-STATE LET DIST COUNTY NAME HIGHWAY NUMBER CONTROLLING PROJECT NO. LOW BID

More information

TEXAS TRANSPORTATION FUNDING, INCLUDING TEXAS CLEAR LANES AND CONGESTION RELIEF UPDATE

TEXAS TRANSPORTATION FUNDING, INCLUDING TEXAS CLEAR LANES AND CONGESTION RELIEF UPDATE TEXAS TRANSPORTATION FUNDING, INCLUDING TEXAS CLEAR LANES AND CONGESTION RELIEF UPDATE Presentation for Texas Transportation Commission March 28, 2018 Purposes of the Workshop The Texas Transportation

More information

17,321 13,351. Overall Statewide Results. How was the survey taken? Do you own or lease a personal vehicle?

17,321 13,351. Overall Statewide Results. How was the survey taken? Do you own or lease a personal vehicle? 10 Overall Statewide Results 3 2 How was the survey taken? 1 Houston 2 Dallas 3 Fort Worth 4 San Antonio 5 Austin 6 Laredo / Pharr 7 Corpus Christi / Yoakum 12 11 5 4 7 8 1 9 Internet Mail Phone 35% 61%

More information

EXHIBIT A DONATIONS Cullen Blvd, An Individual Series of Forefunders Partners, LLC. Houston District

EXHIBIT A DONATIONS Cullen Blvd, An Individual Series of Forefunders Partners, LLC. Houston District EXHIBIT A DONATIONS NO. DONOR D/D/O COUNTY DESCRIPTION 1 9607 Cullen Blvd, An Individual Series of Forefunders Partners, LLC 2 Apache Corporation Houston District Harris The donor is donating the design

More information

2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION

2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION 2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION Texas Transportation Commission Workshop 06/29/16 Commission Workshop Outline Introduction of performance-based planning and programming processes.

More information

How to Read the Project Modification Listings Roadway Section

How to Read the Project Modification Listings Roadway Section How to Read the Project Modification Listings Roadway Section The project listing includes all projects for which Regional Transportation Council action will be requested during this Transportation Improvement

More information

Amarillo Metropolitan Transportation Plan October 18, 2007 Revision Use Of Year-Of-Expenditure Cost Estimates

Amarillo Metropolitan Transportation Plan October 18, 2007 Revision Use Of Year-Of-Expenditure Cost Estimates 2005-30 Amarillo Metropolitan Transportation Plan October 18, 2007 Revision Use Of Year-Of-Expenditure Cost Estimates The Federal Transportation bill, the Safe Accountable, Flexible, Efficient Transportation

More information

UNIFIED TRANSPORTATION PROGRAM

UNIFIED TRANSPORTATION PROGRAM 2002 UNIFIED TRANSPORTATION PROGRAM Blank Page SUMMARY OF CATEGORIES CATEGORIES NUMBER, NAME AND YEAR ESTABLISHED PROGRAMMING AUTHORITY FUNDING BANK BALANCE (Yes/) RESPONSIBLE ENTITY RANKING INDEX OR ALLOCATION

More information

December Update of 2018 UTP Category 2 and Category 10 CBI. Requested Amount

December Update of 2018 UTP Category 2 and Category 10 CBI. Requested Amount Exhibit A December Update of 2018 UTP Category 2 and Category 10 CBI Produced on: 12/13/2017 CSJ District County Hwy Dist Let FY Project Length Category Requested Amount Estimated Construction Cost Description

More information

TEXAS DEPARTMENT OF TRANSPORTATION BRYAN DISTRICT T I P

TEXAS DEPARTMENT OF TRANSPORTATION BRYAN DISTRICT T I P TEXAS DEPARTMENT OF TRANSPORTATION S T A T E W I D E T R A N S P O R T A T I O N I M P R O V E M E N T P R O G R A M S T I P 2 015201 8 BRYAN DISTRICT 2 0 1 5 2 0 1 8 T I P H I G H W AY I n i t i a l 2015

More information

EXHIBIT A DONATIONS April 26, 2018

EXHIBIT A DONATIONS April 26, 2018 EXHIBIT A DONATIONS April 26, 2018 1 830 Investors, Ltd. 2 AASA Holdings Humble The donor is donating the design and construction of a traffic signal from SH 99 at Imperial Promenade/Townsen Blvd into

More information

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM TIP FY 2006-2008 METROPOLITAN PLANNING ORGANIZATIONS - FY 2006 FEDERAL STATE LOCAL OTHER PART TOTAL FUNDING ESTIMATED COST BROWNSVILLE HARLINGEN-SAN BENITO

More information

Overview of the Homestead Exemption Increase (SJR 1 and SB 1, 84 th Legislature)

Overview of the Homestead Exemption Increase (SJR 1 and SB 1, 84 th Legislature) Overview of the Homestead Exemption Increase (SJR 1 and SB 1, 84 th Legislature) PRESENTED TO THE HOUSE COMMITTEE ON WAYS AND MEANS LEGISLATIVE BUDGET BOARD STAFF SEPTEMBER 2016 WAM Interim Charge #8 House

More information

Transportation Improvement Program Page 39

Transportation Improvement Program Page 39 Fiscal Year CSJ Project # Facility From To 1 - Preventive Maintenance 2019 2022 Transportation Improvement Program Page 39 2U - Urban Mobility 3LC - Local Contribution 4 - Congestion, Connectivity, Corridor

More information

BEXAR COUNTY MPO CATEGORY 7 RECAP FY 2013

BEXAR COUNTY MPO CATEGORY 7 RECAP FY 2013 BEXAR COUNTY MPO CATEGORY 7 RECAP FY 2013 Total Uncommitted Funds FY 2013 A + B = C C + D = E E - F = G A B C D E F G Balance Carryover from FY 12 FY (includes all adjustments) Total Available Total Obligations

More information

$ Monthly Rent Affordable to Selected Income Levels Compared with Two-Bedroom FMR. Gap between Rent Affordable and FMR $66

$ Monthly Rent Affordable to Selected Income Levels Compared with Two-Bedroom FMR. Gap between Rent Affordable and FMR $66 In Texas, the Fair Market () for a two-bedroom apartment is $868. In order this level of rent and utilities without paying more than of income on housing a household must earn $2,894 monthly or $34,724

More information

FY STIP. Lufkin District. February 2012 Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FY STIP. Lufkin District. February 2012 Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Lufkin District February 2012 Quarterly Revisions February 2012 FRIDAY, JANUARY 06, 2012 9:37:23 AM STATEWIDE TRANSPORTATION IMPROVEMENT

More information

$ FACTS ABOUT TEXAS: WAGE STATE FACTS HOUSING MOST EXPENSIVE AREAS WAGE RANKING

$ FACTS ABOUT TEXAS: WAGE STATE FACTS HOUSING MOST EXPENSIVE AREAS WAGE RANKING STATE #21 * RANKING In Texas, the Fair Market Rent () for a two-bedroom apartment is $1,005. In order this level of and utilities without paying more than 30% of income on housing a household must earn

More information

How to Read the Project Modification Listings - Roadway Section

How to Read the Project Modification Listings - Roadway Section How to Read the Project Modification Listings - Roadway Section Sa m pl e The project listing includes all projects for which Regional Transportation Council action will be requested during this Transportation

More information

L.zu? V fl1i. VARIOUS Counties MINUTE ORDER Page 1 of 1. VARIOUS Districts

L.zu? V fl1i. VARIOUS Counties MINUTE ORDER Page 1 of 1. VARIOUS Districts Transportation Code, 201.206, authorizes the Texas Department of Transportation VARIOUS Counties MINUTE ORDER Page 1 of 1 VARIOUS s Number Passed Submitted and reviewed by: Recommended by: Minute Date

More information

EXHIBIT A DONATIONS December 13, 2018

EXHIBIT A DONATIONS December 13, 2018 EXHIBIT A DONATIONS December 13, 2018 1. 59 Fuel Inc Houston 2. Community Health 1st Realty, LLC 3. D.R. Horton - Texas, Ltd. 4. HRS Operating, LLC Houston Houston Montgomery Harris Fort Bend The donor

More information

Construction Spending, Labor & Materials Outlook

Construction Spending, Labor & Materials Outlook Construction Spending, Labor & Materials Outlook San Antonio Chapter-AGC June 17, 2016 Ken Simonson Chief Economist, AGC of America simonsonk@agc.org Construction spending & employment, 2006-16 $1,250

More information

TEXAS CLEAR LANES AND CONGESTION RELIEF TASK FORCE COMMITTEE ACTIVITY

TEXAS CLEAR LANES AND CONGESTION RELIEF TASK FORCE COMMITTEE ACTIVITY TEXAS CLEAR LANES AND CONGESTION RELIEF TASK FORCE COMMITTEE ACTIVITY Texas Transportation Commission September 26, 2018 Governor s Charge for Congestion Relief Initiative The State of Texas is spurring

More information

TXDOT CONGESTION RELIEF INITIATIVE, INCLUDING

TXDOT CONGESTION RELIEF INITIATIVE, INCLUDING TXDOT CONGESTION RELIEF INITIATIVE, INCLUDING TEXASCLEARLANES Commissioner J. Bruce Bugg, Jr. February 6, 2017 Highway transportation in Texas: Today and our future 2 Highway transportation in Texas: Today

More information

Region 5 Upcoming Projects for Summer/Fall 2018

Region 5 Upcoming Projects for Summer/Fall 2018 Region 5 Upcoming Projects for Summer/Fall 2018 The budget amount provided does not reflect the construction costs for projects. The amounts may include ROW, engineering, design, and utility costs. The

More information

Appendix D Total Project Cost and Year of Expenditure Breakdown

Appendix D Total Project Cost and Year of Expenditure Breakdown Total Project Cost and Year of Expenditure Breakdown p. D -1 Total Project Cost and Year of Expenditure Breakdown Financial Constraint Methodology using Total Project Cost and Year of Expenditure Dollars

More information

New York state medical malpractice coverage premiums

New York state medical malpractice coverage premiums T H E F A C T S A B O U T New York state medical malpractice coverage premiums 2015-2016 standard medical malpractice premium rates Rochester area counties Internal medicine $ 6,782 General surgeon $ 25,356

More information

6 MCF REPORT RESIDENTIAL GAS BILL ANALYSIS TEXAS DISTRIBUTION UTILITIES. Second Quarter Published by:

6 MCF REPORT RESIDENTIAL GAS BILL ANALYSIS TEXAS DISTRIBUTION UTILITIES. Second Quarter Published by: Chairman Christi Craddick Commissioner Ryan Sitton Commissioner Wayne Christian 6 MCF REPORT RESIDENTIAL GAS BILL ANALYSIS TEXAS DISTRIBUTION UTILITIES Second Quarter - 2017 Published by: Gas s Department,

More information

U.S. Economic Outlook

U.S. Economic Outlook MIT Enterprise Forum of Texas Kim Chase Senior Economist BBVA Research, Houston TX January 13, 216 Global Outlook Balance of risks tilted to the downside Global Real GDP growth % change 7. 6. 5.7 5.4 5.

More information

CASH MANAGEMENT & CONTRACT AWARDS

CASH MANAGEMENT & CONTRACT AWARDS CASH MANAGEMENT & CONTRACT AWARDS Brian Ragland, Chief Financial Officer Bill Hale, Chief Engineer Randy Hopmann, Director of District Operations Footer Text Date I. Cash Management Practices 2 FY 2018-2019

More information

TEXAS METROPOLITAN MOBILITY PLAN: FUNDING NEW OPPORTUNITIES

TEXAS METROPOLITAN MOBILITY PLAN: FUNDING NEW OPPORTUNITIES TEXAS METROPOLITAN MOBILITY PLAN: FUNDING NEW OPPORTUNITIES Public Meetings June 12 and 13, 2006 Michael Morris, P.E. Director of Transportation Michael Burbank, AICP Principal Transportation Planner FOCUS

More information

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates. , Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create

More information

Table of Contents. Study Overview. Corridor Needs Analysis. Financial Strategies. Legislative Review

Table of Contents. Study Overview. Corridor Needs Analysis. Financial Strategies. Legislative Review Table of Contents Study Overview Corridor Needs Analysis Climbing Lanes Additional Lane I-25/I-80 Cost Estimate ITS Truck Parking Financial Strategies Legislative Review 02 Study Overview The overall goal

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create

More information

SPECIAL PROVISION Legal Relations and Responsibilities to the Public

SPECIAL PROVISION Legal Relations and Responsibilities to the Public 1993 Specifications CSJ 0914-00-196 SPECIAL PROVISION 007--1157 Legal Relations and Responsibilities to the Public For this project, Item 007, Legal Relations and Responsibilities to the Public, of the

More information

FY February Quarterly Revision. Bryan DISTRICT

FY February Quarterly Revision. Bryan DISTRICT FY 20132016 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM February Quarterly Revision Bryan DISTRICT TRANSIT Administrative Amendment February 2013 BCSMPO, Final FY 20132016 TIP, FY 2013 2016 Transportation

More information

Selected Economic Data for Texas Cooperative Extension, Central Texas District (8)

Selected Economic Data for Texas Cooperative Extension, Central Texas District (8) Panhandle (1) Selected Economic Data for Texas Cooperative Extension, Central Texas District (8) Dennis U. Fisher February 14, 2002 South Plains (2) Rolling Plains (3) North Texas (4) West Central (7)

More information

STATE BAR OF TEXAS Department of Research and Analysis

STATE BAR OF TEXAS Department of Research and Analysis STATE BAR OF TEXAS Department of Research and Analysis 2010 Paralegal Division Compensation Survey This is the salary survey results report on paralegals in Texas in 2010: their work, compensation, and

More information

Texas Nonagricultural Wage and Salary Employment (Seasonally Adjusted)

Texas Nonagricultural Wage and Salary Employment (Seasonally Adjusted) IN THIS ISSUE A Mo n t h l y Ne w s l e t t e r of th e Te x a s Workforce Co m m i s s i o n TEXAS L A B O R M A R K E T R E V I E W J u n e Texas Nonagricultural Wage & Salary Employment (Seasonally

More information

Salvador Contreras University of Texas Rio Grande Valley January 27, Research Assistants: Jacob Almaguer Ruth Cano Ivan Vazquez

Salvador Contreras University of Texas Rio Grande Valley January 27, Research Assistants: Jacob Almaguer Ruth Cano Ivan Vazquez Salvador Contreras University of Texas Rio Grande Valley January 27, 2017 Research Assistants: Jacob Almaguer Ruth Cano Ivan Vazquez Outline of presentation Rio Grande Valley The big numbers Where we are

More information

How to Read the Project Modification Listings Roadway Section

How to Read the Project Modification Listings Roadway Section How to Read the Project Modification Listings Roadway Section The project listing includes all projects for which Regional Transportation Council action will be requested during this Transportation Improvement

More information

Contribution and Benefit Decision-Making for Texas Public Retirement Systems

Contribution and Benefit Decision-Making for Texas Public Retirement Systems Statewide Constitutional Protection (Article 66) s of Texas Title 8, Subtitle B Chapters 811-815 Legislature, with a constitutional minimum of six percent and a maximum of 10 percent of the aggregate compensation

More information

The widening gap between home price and household

The widening gap between home price and household Still Affordable James P. Gaines and Clare Losey August 17, 2017 Publication 2176 The widening gap between home price and household income has recently sparked concerns over housing affordability. The

More information

Approved STIP Formal Amendments for the Period of 11/01/2018-3/15/2019

Approved STIP Formal Amendments for the Period of 11/01/2018-3/15/2019 3116-151 Hwy 169 from Taconite to Pengilly, Safety Improvements 5409-32 Concrete resurface, raise grade at levee's, install lighting, improve drainage and pedestrian accessibility on Hwy 75 in Halstad

More information

IN THIS ISSUE A MONTHLY NEWSLETTER OF THE TEXAS WORKFORCE COMMISSION. Texas Nonagricultural Wage and Salary Employment (Seasonally Adjusted) 4.

IN THIS ISSUE A MONTHLY NEWSLETTER OF THE TEXAS WORKFORCE COMMISSION. Texas Nonagricultural Wage and Salary Employment (Seasonally Adjusted) 4. IN THIS ISSUE A MONTHLY NEWSLETTER OF THE TEXAS L A B O R M A R K E T R E V I E W O CTOBER Texas Nonagricultural Wage & Salary Employment (Seasonally Adjusted).......... 1 Texas & U.S. Unemployment Rates.........

More information

30C VARIOUS Counties MINUTE ORDER Page 1 of 1. VARIOUS Districts

30C VARIOUS Counties MINUTE ORDER Page 1 of 1. VARIOUS Districts d TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 1 VARIOUS s Transportation Code, 201.206, authorizes the Texas Department of Transportation (department) to accept a donation in

More information

Public Hearing Tarrant County. April 14, 2009

Public Hearing Tarrant County. April 14, 2009 Public Hearing Tarrant County April 14, 2009 Public Hearing Agenda Welcome and Project Overview Ms. Maribel P. Chavez, P.E. District Engineer Texas Department of Transportation Fort Worth District 2 Public

More information

ABILENE MPO TRANSPORTATION POLICY BOARD MEETING

ABILENE MPO TRANSPORTATION POLICY BOARD MEETING ABILENE MPO TRANSPORTATION POLICY BOARD MEETING Tuesday, October 16, 2018 at 1:30 pm City Council Chambers Abilene City Hall 555 Walnut Street, Abilene, Texas 1. Call to Order. Public comment may be taken

More information

IN THIS ISSUE A MONTHLY NEWSLETTER OF THE TEXAS WORKFORCE COMMISSION. Texas Nonagricultural Wage and Salary Employment (Seasonally Adjusted) 6.

IN THIS ISSUE A MONTHLY NEWSLETTER OF THE TEXAS WORKFORCE COMMISSION. Texas Nonagricultural Wage and Salary Employment (Seasonally Adjusted) 6. IN THIS ISSUE A MONTHLY NEWSLETTER OF THE TEXAS L A B O R M A R K E T R E V I E W S EPTEMBER Texas Nonagricultural Wage & Salary Employment (Seasonally Adjusted).......... 1 Texas & U.S. Unemployment Rates.........

More information

Texas: Sources of Children s Coverage by County,

Texas: Sources of Children s Coverage by County, Texas: Sources of Children s Coverage by County, 2011-2015 Percent of with Medicaid/CHIP Percent of with ESI Percent of with direct purchase Percent of with other coverage Percent of who are uninsured

More information

Fiscal Year nd Quarter Report Quarterly Report of Actual Traffic and Toll Revenue For period ending February 28, 2018

Fiscal Year nd Quarter Report Quarterly Report of Actual Traffic and Toll Revenue For period ending February 28, 2018 Fiscal Year 2018 2 nd Quarter Report Quarterly Report of Actual Traffic and Toll Revenue For period ending February 28, 2018 Footer Text Date Table of Contents Section Page Number Disclaimer 3 Notes and

More information

FY STIP. Amarillo District May Quarterly Revisions STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY

FY STIP. Amarillo District May Quarterly Revisions STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Amarillo District May Quarterly Revisions May 2011 MINUTES AMARILLO METROPOLITAN PLANNING ORGANIZATION POLICY COMMITTEE MEETING The

More information

A PROCEDURAL DOCUMENT DESCRIBING THE PROCESS OF DEVELOPING THE 4-YEAR PLAN

A PROCEDURAL DOCUMENT DESCRIBING THE PROCESS OF DEVELOPING THE 4-YEAR PLAN 5-9035-01-P8 A PROCEDURAL DOCUMENT DESCRIBING THE PROCESS OF DEVELOPING THE 4-YEAR PLAN Authors: Zhanmin Zhang Michael R. Murphy TxDOT Project 5-9035-01: Pilot Implementation of a Web-based GIS System

More information

10-Year Capital Highway Investment Plan DRAFT

10-Year Capital Highway Investment Plan DRAFT This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp 10-Year Capital Highway

More information

125 EAST 11 TH STREET AUSTIN, TEXAS 78701-2483 (512) 463-8588 WWW.TXDOT.GOV Mrs. Barbara C. Maley, AICP Env/Tranp Plan Coord & Air Quality Specialist Barbara.Maley@dot.gov December 27, 2016 Transmitted

More information

SPECIAL PROVISION Legal Relations and Responsibilities to the Public

SPECIAL PROVISION Legal Relations and Responsibilities to the Public 1995 Metric San Antonio District SPECIAL PROVISION 007---382 Legal Relations and Responsibilities to the Public For this project, Item 007, Legal Relations and Responsibilities to the Public, of the Standard

More information

RECOMMENDATIONS REPORT WITH COMMENTS AND RESPONSES. October Submitted for Review to TxDOT Executive Management

RECOMMENDATIONS REPORT WITH COMMENTS AND RESPONSES. October Submitted for Review to TxDOT Executive Management LUMP SUM DISTRIBUTION OF TXDOT S UNIFIED TRANSPORTATION PROGRAM CATEGORIES 2 AND 3 FUNDS FOR CONSULTANT-BASED PRELIMINARY ENGINEERING, RIGHT-OF-WAY ACQUISITION, AND CONSTRUCTION RECOMMENDATIONS REPORT

More information

FY TRANSPORTATION IMPROVEMENT PROGRAM

FY TRANSPORTATION IMPROVEMENT PROGRAM FY 2019 2022 TRANSPORTATION IMPROVEMENT PROGRAM Approved for Public Review and Comment: April 16, 2018 Approved by the Policy Board: May 21, 2018 Table of Contents Permian Basin MPO Membership and Structure...

More information

These tariff sheets have an effective date of July 2, 2013.

These tariff sheets have an effective date of July 2, 2013. Texas Regulatory AT&T Texas Congress Avenue Suite 00 Austin, TX 0- Tariff Control No: July 0, 0 Filing Clerk Public Utility Commission of Texas 0 N. Congress Austin, TX - Dear Filing Clerk: Re: Tariff

More information

85 th Legislature: Impact on Funding and UTP

85 th Legislature: Impact on Funding and UTP 85 th Legislature: Impact on Funding and UTP Brian Ragland, Chief Financial Officer Peter Smith, Director, Transportation Planning and Programming Division TxDOT Budget FY -2019 Use of Funds 2 Proposition

More information

A A MONTHLY NEWSLETTER OF OF THE THE TEXAS WORKFORCE COMMISSION TEXAS

A A MONTHLY NEWSLETTER OF OF THE THE TEXAS WORKFORCE COMMISSION TEXAS IN THIS ISSUE Texas Nonagricultural Wage & Salary Employment (Seasonally Adjusted).......... 1 Texas & U.S. Unemployment Rates.......... 2 Texas Nonagricultural Wage & Salary Employment (Not Seasonally

More information

... TEXPERS. The Texas Association of Public Employee Retirement Systems

... TEXPERS. The Texas Association of Public Employee Retirement Systems . TEXPERS TEXPERS One Riverway, Suite 1401 Houston, TX 77056-1904 Phone (713) 622-8018 Fax (713) 622-7022 Report on the Asset Allocation and Investment Performance of Texas Public Employee Retirement Systems..........

More information

Texas Nonagricultural Wage and Salary Employment (Seasonally Adjusted) Growth in Total Nonagricultural Employment in Texas topped

Texas Nonagricultural Wage and Salary Employment (Seasonally Adjusted) Growth in Total Nonagricultural Employment in Texas topped IN THIS ISSUE Texas Nonagricultural Wage & Salary Employment (Seasonally Adjusted).......... 1 Texas & U.S. Unemployment Rates.......... 2 Texas Nonagricultural Wage & Salary Employment (Not Seasonally

More information

MINUTES OF THE ABILENE METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION POLICY BOARD. May 19, 2015

MINUTES OF THE ABILENE METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION POLICY BOARD. May 19, 2015 MINUTES OF THE ABILENE METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION POLICY BOARD May 19, 2015 The Abilene MPO Transportation Policy Board met at 1:30 p.m., Tuesday, May 19, 2015, in the Abilene City

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create

More information

Funding Update. House Transportation Subcommittee on Long-Term Infrastructure Planning September 10, 2015, 9:00 A.M. Capitol Extension E2.

Funding Update. House Transportation Subcommittee on Long-Term Infrastructure Planning September 10, 2015, 9:00 A.M. Capitol Extension E2. Funding Update House Transportation Subcommittee on Long-Term Infrastructure Planning September 10, 2015, 9:00 A.M. Capitol Extension E2.012 Transportation Funding Sources for the FY 2016-2017 Biennium

More information

Map the Meal Gap 2018: Overall Food Insecurity in Texas by County in

Map the Meal Gap 2018: Overall Food Insecurity in Texas by County in Map the Meal Gap 2018: Overall Insecurity in Texas by in 2016 1 and 185% Anderson 57,772 19.3% 11,160 58% 4% 38% Andrews 17,215 8.5% 1,470 61% 8% 31% Angelina 87,657 19.9% 17,480 67% 4% 29% Aransas 24,729

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Committee of the Whole November 28, 2016 City Council December 5, 2016 Agenda Item: Federal Transportation Funding Request Urban Roads Program Submitted by: Engineering

More information

Texas Nonagricultural Wage and Salary Employment (Seasonally Adjusted) Total Nonagricultural Employment in Texas slid by 1,300 jobs in

Texas Nonagricultural Wage and Salary Employment (Seasonally Adjusted) Total Nonagricultural Employment in Texas slid by 1,300 jobs in IN THIS ISSUE Texas Nonagricultural Wage & Salary Employment (Seasonally Adjusted).......... 1 Texas & U.S. Unemployment Rates.......... 2 Texas Nonagricultural Wage & Salary Employment (Not Seasonally

More information

2016 Texas Economic Outlook: Riding the Energy Roller Coaster Keith Phillips Assistant Vice President and Senior Economist

2016 Texas Economic Outlook: Riding the Energy Roller Coaster Keith Phillips Assistant Vice President and Senior Economist 216 Texas Economic Outlook: Riding the Energy Roller Coaster Keith Phillips Assistant Vice President and Senior Economist The views expressed in this presentation are strictly those of the presenter and

More information

DRAFT C APITAL I MPROVEMENT P LAN C ITY OF G EORGETOWN, TEXAS S TREETS/ DRAINAGE/AIRPORT F ISCAL Y EAR 201 6

DRAFT C APITAL I MPROVEMENT P LAN C ITY OF G EORGETOWN, TEXAS S TREETS/ DRAINAGE/AIRPORT F ISCAL Y EAR 201 6 C ITY OF G EORGETOWN, TEXAS C APITAL I MPROVEMENT P LAN S TREETS/ DRAINAGE/AIRPORT F ISCAL Y EAR 201 6 Georgetown Transportation Advisory Board April 10, 2015 Table of Contents Introduction... 1 Transportation

More information

... TEXPERS. The Texas Association of Public Employee Retirement Systems

... TEXPERS. The Texas Association of Public Employee Retirement Systems . TEXPERS TEXPERS One Riverway, Suite 1401 Houston, TX 77056-1904 Phone (713) 622-8018 Fax (713) 622-7022 Report on the Asset Allocation and Investment Performance of Texas Public Employee Retirement Systems..........

More information

Statewide Transportation Improvement Program INTRODUCTION

Statewide Transportation Improvement Program INTRODUCTION 2019-2022 Statewide Transportation Improvement Program INTRODUCTION TABLE OF CONTENTS STIP Self-Certification... Introduction... Transportation Planning Process Overview... Transportation Conformity Process...

More information

METRO INVESTMENT REPORT ALL FUNDS

METRO INVESTMENT REPORT ALL FUNDS METRO INVESTMENT REPORT ALL FUNDS DECEMBER 2012 Metropolitan Transit Authority of Harris County Investment Report Portfolio Summary Management Report The following is a summary of METRO's Investment Portfolios:

More information

Texas Mid-Year Economic Outlook: The Skies are Beginning to Clear Keith Phillips Assistant Vice President and Senior Economist

Texas Mid-Year Economic Outlook: The Skies are Beginning to Clear Keith Phillips Assistant Vice President and Senior Economist Texas Mid-Year Economic Outlook: The Skies are Beginning to Clear Keith Phillips Assistant Vice President and Senior Economist The views expressed in this presentation are strictly those of the presenter

More information

Wednesday, June 6, 2018

Wednesday, June 6, 2018 Wednesday, June 6, 2018 Excellence in Program Administration Award 2018 AASHTO Civil Rights Training Symposium Excellence in Program Administration Award Joanna McFadden EEO/DBE Section Head APRIL 2017-2018

More information

Section C Forms

Section C Forms 2010-2011 Section C Forms Texas Hotel Occupancy Tax Exemption Certificate C - 1 Tax Exemption C - 2 Texas Sales and Use Tax Exemption Certificate C - 3 Motor Vehicle Rental Exemption C - 4 Motor Vehicle

More information

The tariff sheets have an effective date of July 3, 2012.

The tariff sheets have an effective date of July 3, 2012. Texas Regulatory AT&T Texas Congress Avenue Suite 00 Austin, TX 0- Tariff Control No: 0 July 0, 0 Filing Clerk Public Utility Commission of Texas 0 N. Congress Austin, TX - Dear Filing Clerk: Re: Tariff

More information

SOLUTIONS FOR SAVING LIVES ON TEXAS ROADS

SOLUTIONS FOR SAVING LIVES ON TEXAS ROADS SOLUTIONS FOR SAVING LIVES ON TEXAS ROADS Darren McDaniel Texas Department of Transportation December 2016 Texas Traffic Safety Task Force Texas Traffic Safety Task Force was created in August 2015 with

More information

2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION

2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION 2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION TEMPO Meeting July 21, 2016 Current Initiatives On-going efforts to address performance-based planning and programming processes as required

More information

2015 INCOME FACT SHEET. Published August 2016 Analysis by Invariance Dynamics Consulting Nils Greger Olsson, PhD

2015 INCOME FACT SHEET. Published August 2016 Analysis by Invariance Dynamics Consulting Nils Greger Olsson, PhD STATE BAR OF TEXAS DEPARTMENT OF RESEARCH & ANALYSIS 2015 INCOME FACT SHEET Published August 2016 Analysis by Invariance Dynamics Consulting Nils Greger Olsson, PhD P.O. Box 12487, Austin, TX 78711 (800)

More information

Regional Toll Revenue Annual Financial Report

Regional Toll Revenue Annual Financial Report Regional Toll Revenue Annual Financial Report North Central As of September 30, 2011 Texas Council of Governments NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS REGIONAL TOLL REVENUE FINANCIAL REPORT As of

More information

BHJTS TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL, STATE & LOCAL PROJECTS 2016 THROUGH 2019 FOUR-YEAR SHORT RANGE PROGRAM

BHJTS TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL, STATE & LOCAL PROJECTS 2016 THROUGH 2019 FOUR-YEAR SHORT RANGE PROGRAM TOTAL PROJECT ESTIMATE ($) STATE ALLOCATION CODE (SAC) FUND TYPE ENCUMBERED FROM BEFORE FY 2011 PE/RW PRIOR TO FY 2016 LOCAL MATCH LOCAL LABOR STATE LABOR FED LABOR & TSKF LINE ITEM # ST. LINE ITEM

More information

STATE BAR OF TEXAS DEPARTMENT OF RESEARCH & ANALYSIS

STATE BAR OF TEXAS DEPARTMENT OF RESEARCH & ANALYSIS STATE BAR OF TEXAS DEPARTMENT OF RESEARCH & ANALYSIS CORPORATE/IN-HOUSE COUNSEL 2005 INCOME REPORT PUBLISHED SEPTEMBER 21, 2006 P.O. Box 12487, Austin, TX 78711 (800) 204-2222, ext. 1724 or (512) 427-1724

More information

Fiscal Year th Quarter Report Quarterly Report of Actual Traffic and Toll Revenue For period ending August 31, 2018

Fiscal Year th Quarter Report Quarterly Report of Actual Traffic and Toll Revenue For period ending August 31, 2018 Fiscal Year 2018 4 th Quarter Report Quarterly Report of Actual Traffic and Toll Revenue For period ending August 31, 2018 Footer Text Date Table of Contents Section Page Number Disclaimer 3 Notes and

More information

Programed Totals $39,761 $35,676 $75,437 $73,111 $2,326 $0 $17,109 $17,109 $17,109 $0 $0 $14,580 $14,580 $14,580 $0

Programed Totals $39,761 $35,676 $75,437 $73,111 $2,326 $0 $17,109 $17,109 $17,109 $0 $0 $14,580 $14,580 $14,580 $0 WCOG Managed WHATCOM COUNCIL OF GOVERNMENTS 2014 Transportation Improvement Program Amendment #1 (1401) MPO Financial Feasibility Summary Anticipated Federal Funding* & Programmed Expenditures (in Thousands)

More information

Capital Improvements Program. City Council October 14, 2014

Capital Improvements Program. City Council October 14, 2014 Capital Improvements Program City Council October 14, 2014 Neighborhood Attendees ~15 (Paul Kaspar) Presentation Today CIP Advantages/Process Approved CIP Program (FY14 - FY18 CIP) Financial Forecast Projects

More information

CDFI. Community Development Financial Institutions. By: Holly R. Logue IBAT Annual Convention September 21, 2015

CDFI. Community Development Financial Institutions. By: Holly R. Logue IBAT Annual Convention September 21, 2015 CDFI Community Development Financial Institutions By: Holly R. Logue IBAT Annual Convention September 21, 2015 Introduction Holly R. Logue Financial Institution Strategies Group, LLC CDFI Banks in Mississippi,

More information

Big Country Electric Cooperative Trust Operation Round Up Program

Big Country Electric Cooperative Trust Operation Round Up Program Big Country Electric Cooperative Trust Operation Round Up Program Individual/Family Application for Assistance For assistance completing this application, please contact Sarah McLen at (325) 776-3803.

More information

BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION

BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION Amendment # 2 FY 2017-2020 Transportation Improvement Program Amendment Summary: The Transportation Improvement Program (TIP)

More information

Undergraduate Admissions

Undergraduate Admissions Undergraduate Admissions The UTSA Fact Book Office of Institutional Research Fall 217 First Time Undergraduate Student Applications The,, and information comes from the Coordinating Board Admissions file

More information

Pavement Preservation

Pavement Preservation Road Foreman Meeting West Windsor, Vermont March 24, 2015 Dan Patenaude, P.E. Hometown: Chester, VT Pavement Preservation Your Key to Pavement Management Success Since 1957 Corporate Headquarters Braintree,

More information