Road and Building Department

Size: px
Start display at page:

Download "Road and Building Department"

Transcription

1 Road and Building Department Road Sector Perspective The roads and building department owns road network of km. of plan road and non-plan road of km. In plan road 4.39% length of the road network is National Highway / Expressway, 24.81% length of road network is State Highway, 27.62% length of network is MDR while the rest comprises of Rural Roads (ODR and VR). Width wise, the state has only 3.62% roads as multilane roads while 11.94% roads as 2 lane roads. The rest roads fall below 2 lane width class. The existing network also suffers traffic disruptions due to frequent floods at some specific locations. All these shortfalls have to be removed by raising road level and through scientifically identified treatments and making adequate provisions in successive annual plans. Bypass & RoB gave priorities for less congestion traffic in cities and interrupted traffic. Program for the Annual Plan An outlay of Rs lakh is provided for Road and Bridges sub sector for the year Out of which provision of Rs lakh is provided for normal works, an outlay of Rs lakh is provided for Tribal Sub Plan (As per Government Of India norms 17.57% of plan allocation shall be provided for Tribal Area Sub Plan) and an outlay of Rs lakh is provided for Schedule Cast Sub Plan This outlay addresses needs for road improvements through various schemes as narrated below. 12 th Five Year s Plan The plan embodies last tranche of requirements of 12th Five year plan of Plan emphasizes more on capacity and level of service augmentation in comparison with expansion of network including improvement of rural roads. Greater emphasis is also laid on tribal and SCP development. Measures for HR 1

2 development, road safety and environmental impact mitigation are also introduced. 11th Five Year Plan ( ) Projected & Achieved Financial & Physical Target Financial Physical Projected outlay for the 11th Five Year Plan ( ) was Rs lakh while planned outlay is Rs lakh, anticipated expenditure for is Rs lakh, which is % of the Projected outlay & 104% of the Planned outlay. Target for the 11th Five Year Plan ( ) was Km. and 219 No. bridges. Actual achievement including anticipated achievement for is Km. and 295 No. bridges, which is % for roads and % for bridges. Item Unit Eleventh Plan Eleventh Plan Target Achievement Roads Strengthening/Resurfacing KM Widening to 2 Lanes KM Widening to 4 lanes KM meter widening ( 2 Lane + Paved KM Shoulders) Bypasses KM Black Topping, Others (Missing Link) KM Total Bridges Railway Over bridges On SH/MDR NOS Missing bridges/upgradation of existing deep & causeway on SH/MDR Rehabilitation of bridges Total outlay of Rs lakh is provided for the year An outlay shall cover Rs lakh for new services and Rs lakh for ongoing services. 2

3 An outlay of Rs lakh is earmarked for works to be financed from institutional / external finances. An outlay of Rs lakh is for GOG contribution towards privatization works. The rest portion of outlay is for meeting spills of ongoing works (Pragatipath, Vikaspath, Pravasipath, District to District, Taluka to Taluka) and works such as port / SEZ / industrial estate connectivity, all weather connectivity to villages getting marooned in monsoons and upgrading road network. The major work of Road and Building Department is under economic services; around 68.17% of budget outlay is for economic services in The total Budget of Road and Building Department is Rs crore for and total expenditure was Rs crore in The Budget outlay for social services (Revenue expenditure) under Road and Building department is Rs crore for , out of which Water supply and sanitation is Rs crore, Housing is Rs crore, and Urban development is Rs crore. Whereas capital out for soial and community development work is Rs crore, out of which capital outlay on public works for education is Rs crore, Housing is Rs crore, Capital outlay for urban development is Rs crore, capital outlay for welfare of schedule caste, schedule tribes and other is Rs crore and capita outlay for other social service sis Rs crore. The budget outlay for economic services is Rs crore and capital outlay on economic services is Rs crore in

4 Actual Expenditure Rs. In crore Revised Estimates Rs. In crore Budget Estimates Rs. In crore Major Heads 2049 Interest Payment Public works other administrative services Miscellaneous and General services Medical and public health Family welfare water supply and sanitation Housing Urban development Animal Husbandry Forestry and wild life Roads and Bridges Secretarial t economic services Capital outlay on public works Cap outlay on public works education and sports Cap outlay on Medical and Public Health Cap on Housing Cap on Urban Development Cap on information and Publicity Capital outlay on sc/st welfare Cap outlay on social security and welfare Capital outlay on other social services Cap on crop Husbandry

5 4403 Cap on Animal Husbandry Cap outlay on Village and small industries Cap on Non-ferrous mining and metallurgi Cap on Civil Aviation Cap On Road and Bridges Loans to Government servant Total Budget of Road and Building Dept Actual Expenditure Rs. In crore Revised Estimates Rs. In crore Budget Estimates Rs. In crore Total Budget of Road and Building Department, Gujarat % of General Services social Services Economic services The budget outlay of Road and Building Department is divided for construction work under General services, social services, and Economic services with percentage share of 17.01%, 14.82% and 68.17% respectively. 5

6 Program for the Annual Plan An outlay of Rs lakh is provided for Road and Bridges sub sector for the year Out of which provision of Rs lakh is provided for normal works, an outlay of Rs lakh is provided for Tribal Sub Plan (As per Government Of India norms 17.57% of plan allocation shall be provided for Tribal Area Sub Plan) and an outlay of Rs lakh is provided for Schedule Cast Sub Plan This outlay addresses needs for road improvements through various schemes as narrated below. National Highway Four lanning work of Bagodara-Rajkot was completed in the year Considering the need of strengthening of Bagodara-Rajkot Highway, work of strengthening is necessary, so an outlay of Rs.1500 lakh is provided for the year This includes works of State Highway for normal budgeted items. 6

7 Following new items are proposed for the year Land acquisition & upgradation the existing road & construction of new road for Development of "Gujarat International Finance Tech (GIFT) city at Gandhinagar. An outlay of Rs.500 lakh is provided for the year Payment of fees for consultancy services as an independent engineer for the works of State highway Development project (SHDP) to be taken up on DBFOt- Annuity basis. An outlay of Rs. 100 lakh is provided for the year Constructing and maintenance of Railway Over Bridge under Annuity Basis Construction of 5 ROB at level crossing having TVU more than 1.00 lakh will be beneficial to traffic. The work is required for payment of Annuity, Independent Engineer Fee, Utility, Forest Clearance and Land Acquisition. An outlay of Rs lakh is provided for the year Resurfacing of Vikaspath roads which not have been resurfaced for five years. An outlay of Rs lakh is provided for the year Pragatipath Yojana Considering the necessity of excellent road network for rapid development the state needs to invest heavily in road infrastructure. Keeping this in view and for achieving social integration of its people is taken up to upgrade nine long distance corridors connecting extremes of the state to high speed highways under Pragatipath Yojana in year Total length of 3710 km. has been taken under Pragatipath Yojana. Out of this 98.03% is upgraded under various schemes. Remaining is in progress. An outlay of Rs lakh is provided for the year Vikaspath Yojana 7

8 The state government had declared year 2005 as "Urban Development Year". State Highways passing through these urban areas are required to be upgraded considering all round development. The project to widen/strengthen roads, provide central-verge, footpath, gutter, street light and road furniture under Vikaspath Yojana taken up during Nagarpalikas are covered under this scheme. Under this scheme km. roads are approved to be upgraded at a cost of Rs lakh out of which work of 598 km. are completed, and km. are in progress. An outlay of Rs lakh is provided for the year Pravashi Path Year 2006 was declared as Tourism year. For this state has approved roads joining tourism places of km. road section costing Rs lakh. Out of these road length of km. are completed and Km. are in progress. After completion of this scheme roads joining 54 tourism places will be rectified. An outlay of Rs lakh is provided for the year Rising of Over Topped State Highway Section During last few years many sections of state highways are overtopped. This affected the communication and particularly of essential items adversely. For provide all weather roads by rising of overtopped section of State Highway. An outlay of Rs lakh is provided in year Facility of minimum one 10 Mt. wide roads connectivity to District to adjoining District It is planned to provide minimum one 10 meter width road connectivity to district to adjoining district. Total Km of road works are approved at the cost of 8

9 Rs lakh. All are in progress. An outlay of Rs lakh is provided for the year Port Connectivity Gujarat has the longest coast line of 1666 km in the country mentoring maritime activities since ages. Gujarat's maritime sector is considered to be the most proactive and well developed sectors of India. In response to the development of port activities Government of Gujarat has initiated a scheme to provide 10m wide connectivity to link minor ports to the nearest NH or SH already having 10m or above facility. An outlay of Rs lakh is provided for the year Taluka to Taluka Under this scheme to improve & strengthening existing roads which provide connectivity between Taluka to Taluka and Taluka to District place. Under this schemes 232 road works of 2706 km is approved of Rs lakh out of which 184 road works of 2147 km of Rs lakh are completed, 44 road works of 559 Km of Rs lakh are in progress, 4 road works of being start An outlay of Rs lakh is provided for the year Thus, total outlay of Rs lakh is provided which includes outlay Rs lakh for continuing schemes (Rs lakh for above schemes & Rs lakh for other various remaining continuous items) and Rs lakh is provided for new items in the year , to carry out of various works of state highway for normal plan. This includes works of State Highway for Tribal Area Sub Plan To uplift the tribal area by providing adequate rural infrastructure is planned. There are several works which are planned from other projects falling in tribal 9

10 area of the state. This fund in tribal area amounts to Rs lakh. The norms of provision are fully satisfied in proposed plan. An outlay of Rs lakh from Pragatipath Yojana, Rs lakh from Vikaspath Yojana, Rs lakh from Pravasipath Yojana are allocated to Tribal Area. Road joining taluka to taluka of Rs lakh, for standard two lane Rs lakh, and other on going works is proposed of Rs lakh for the year This scheme includes work on major district roads, other district roads and village Roads in normal area Following new items are proposed for the year Resurfacing of main district roads and other district roads which not have been resurfaced for more than seven years. An outlay of Rs lakh is provided for the year Resurfacing of main district roads and other district roads which not have been resurfaced for more than seven years. An outlay of Rs lakh is provided for the year Road joining to Salt Production unit: Provide better connectivity to salt production unit in entire state to develop salt industries. 4. Hence an outlay of Rs lakh is provided for the year Maroon Villages During last several monsoons, approximate 207 villages (300km) are found flooded & their connections to the main roads were cut-off. Hence Department has proposed to give these maroon villages roads to be made all weather roads by raising road level, including appropriate improvement of CD works & bridges. An outlay of Rs lakh is provided for the year

11 Strengthening and widening to 7M (two lanes) to Major District Road (MDR) An outlay of Rs lakh is provided for Strengthening and widening to 7M (two lanes) to Major District Road (MDR). Thus, total outlay of Rs lakh is provided which includes Rs lakh for continuing schemes (Rs lakh for above schemes & Rs lakh for other various remaining continuous items) and Rs lakh for new items for the year This scheme includes Tribal Area Sub Plan for work on major district roads, other district roads and village roads in Tribal areas Following new items are proposed for the year Resurfacing of Main District roads and other District roads which not have been resurfaced for more than seven years. An outlay of Rs lakh is provided for the year Resurfacing of Main District roads and other District roads which not have been resurfaced for more than seven years. A provision of Rs lakh is provided for the year Rs lakh is for Kisanpath Scheme, and Rs lakh for ongoing budget supported works. Thus, total outlay of Rs lakh is provided which includes Rs lakh for continuing schemes and Rs lakh for new items in the year for the propose. District Roads Schedules Caste Sub Plan (SCSP) The plan has been initiated as an integral part of the state plan for all-round development of Schedules Caste. An outlay of Rs lakh is provided under Schedules Caste Sub Plan in annual plan Out of this an outlay of Rs lakh provision is proposed for converting metal surface to BT surface, BT surface to BT surface Rs lakh. Road 11

12 infrastructure facilities will be provided to the villages having Schedule Caste population more than 250. Roads Works of Institutional Finance Special Project - World Bank aided Project Following new items are proposed for the year Various Consultancy Services for GSHP-II including consultancy services for Project coordination, Construction, Quality assurance & Technical audit, Road safety strategy action plan and institutional reforms etc. An outlay of Rs lakh is provided for the year Widening and strengthening of various roads under GSHP-II, an outlay of Rs lakh is provided for the year Road Safety works, an outlay of Rs lakh is provided for the year Thus, total outlay for W.B follow-on project is Rs out of which a outlay for continuing items for Rs lakh & Rs lakh for new items. NABARD NABARD Normal This includes roads and bridge works under institutional finance by NABARD for major district roads, and other district roads an outlay of Rs lakh, for those work an outlay of Rs lakh is provided for Panchayat R & BD and Rs. 10 lakh for State R and B.D. Hence total outlay proposed is Rs lakh for the year NABARD Tribal This includes roads and bridge works under institutional finance by NABARD for major district roads, an outlay of Rs lakh is provided for the year

13 This scheme includes village connectivity Villages connected as on in Tribal Area. Sr. No. Population group Total villages Villages Connected up to target Balance yet to be connected & above Less then Total Nos. of Villages yet to be connected, out of them 18 Nos. of Villages could not be connected because they are either submerged or falls in forest area or island or on hills etc. Following new items are proposed for the year Normal budget to Resurfacing of rural roads which not have been resurfaced for more than seven years. An outlay of Rs lakh is provided for the year Normal budget to Resurfacing of rural roads which not have been resurfaced for more than seven years. An outlay of Rs lakh is provided for the year Tribal budget to Resurfacing of rural roads which not have been resurfaced for more than seven years. An outlay of Rs lakh is provided for the year Tribal budget to Resurfacing of rural roads which not have been resurfaced for more than seven years. An outlay of Rs lakh is provided for the year Connectivity to villages/habitation Population less than

14 Normal budget to connect 1157 Villages/Habitation the Population less than 500. An outlay of Rs lakh is provided for the year Connectivity to villages/habitation Population less than 250 Tribal budget to connect 513 Villages/Habitation the Population less than 251. An outlay of Rs lakh is provided for the year Hence total outlay proposed is Rs lakh for the year Contribution in Privatization/Gujarat State Road Development Corporation (GSRDC) Following new items are proposed for the year Construction of Ahmedabad-Dholera Six Lane Expressway An outlay of Rs lakh is provided for the year An outlay of Rs lakh is provided for the privatization projects which have been undertaken and are being undertaken. Out of which outlay of Rs lakh (Total provision proposed Rs lakh for Privatization of Roads & Bridges including for continuing items Rs lakh & Rs lakh for new items & Rs lakh for Gujarat State Road Development Corporation) from budget and for 5 works Rs lakh from non-budgetary resources are proposed. Following four projects are in progress & will be completed in near future. Sr Name of Project Length Rs. in lakh No. Km 1 Halol-Godhra-Shamlaji Road (4 laning work) Rajkot-Jamnagar-Vadinar Road (4 laning work) Ahmedabad-Viramgam-Maliya Road (4 laning work) Deesa-Panthavada-Gundari Road (10 mt. widening) Following projects are under pipeline 14

15 1 Six laning of Bagodara-Wataman-Tarapur-Vasad Road Bhuj-Bhachau- Road 10 mt.wide Four laning of Bhavnagar-Vallabhipur-Dhandhuka Bagodara Road 4 Suigam Sidhada Road (10 mt. widening) All these projects being on PPP, BOT/VGF, Only small provision is required for preconstruction activities and consultancies. Following five projects are under taken from non-budgetary resources details of work is as under. Sr. Approved Roads Length Approved Status No. Km. Amount Rs. lakh 1 10mt. Widening & Strengthening to Acceptance sarkhej-dholaka-wataman-piplidholera-bhavanagar Road (Section-1) letter given to the Agency 2 10mt. Widening & Strengthening to dosarkhej-dholaka-wataman-piplidholera-bhavanagar Road (Section-2) 3 Widening to six lane of Bharuch-Dahej do- Road (SH-6) 4 10mt. widening & Strengthening of Tender Gandhinagar-Gojaria-Visnagar (Km.- Under 65) Approval. 5 Land Acquisition, Feasibility study & Feasibility Ancillary activities for the work of study Under Expressway from Ahmedabad to Approval. Dholera Total This scheme includes earmarked for Tribal Area Sub Plan. In Gujarat pattern an outlay of Rs lakh is provided for the year

16 An outlay of Rs lakh is provided for year for expanding connectivity to taluka level and also to intensify computerization processes. Training to staff is also envisaged through this provision. This includes Information Technology, For taluka level connectivity an outlay of Rs lakh is provided for ongoing scheme. Government of India 100 % Central Sponsor Schemes (C.S.S) Border Area Development Plan To facilitate the duty of Border Security Force, GOI, Ministry of Home Affairs planned to develop Ghaduli-Santalpur road of 508 Km. length situated on Indian- Pakistan Border exist in Gujarat, 100% assistance is provided by GOI and will be released during financial year to This scheme includes Border Area Development Plan for the year with proposed total outlay of Rs lakh. Inter State Connectivity This scheme includes developing roads which is connected with adjoin other state roads. For this total outlay of Rs lakh is provided for ongoing works for the year Central Road Fund (CRF) For Strengthening and Widening of State Highway, Major District Road, Other District Road and Bridges for those work outlay proposed is Rs lakh for Panchayat R & BD and Rs lakh for State R & BD. Hence, total outlay proposed is Rs lakh in the year Railway Safety 16

17 Railway crossing carrying in the various roads of Roads & Building Department for providing safety work,.an outlay of Rs lakh is provided for the year For purchase of Motor Vehicle, Machinery, Testing Equipment for GERI & QC, Training and PIU. Total outlay of Rs lakh is provided for the year which include Rs lakh for continuing items and Rs lakh for new items. Thus, total outlay of Rs lakh is provided for the year , to carry out various works of road, highways and schemes performing to Road & Building Department. Sr. No. Scheme No. Name of the Scheme Annual Plan Proposed Outlay OLD / NEW Total Continuing New Schemes schemes RBD-1 National Highway RBD-2/RBD- 2(A) State Highway RBD-3/RBD- State Highway TASP/ 100(24A) SCP RBD-4 District Roads RBD-5/RBD- 101 District Roads TASP RBD-6/RBD- 4(24b) District Roads SCP Roads Works if 7 RBD-7/RBD- Institutional Finance (1) World Bank TASP RBD-7 HUDCO RBD-7/ RBD- 4(24b) RBD-8/RBD- 102 NABARD TASP SCP Village Connectivity Village Connectivity (TASP)

18 11 RBD-9/RBD- Privatization of Roads 10(22) & Bridges Gujarat State Road Development Corporation RBD-10 Gujarat State Road Development Corporation NBR 13 RBD-11 Earmarked for TASP RBD-12 Earthquake RBD-13 Information Technology/Training BADP RBD-14 Inter State Connectivity Central Road Fund Railway Safety R&D/Purchase of 17 RBD-/RBD- 103 inspection vehicles/ Plant & PIU machinery/ Total Purchase of New Machineries It has been decided to purchase following new Machineries against Old ones. (1.)Excavator cum Loader, Nos-05 for Rs /- (2.) Mechanical paver,nos-02 for Rs /- (3.) Sensor paver,nos-02 for Rs /- (4.) 16MT Dumpers,Nos-10 for Rs /-;(5.) 10MT Dumpers, Nos-10 for Rs ; (6.) Drum Mix Plant,Nos- 01 for Rs /-; (7.)Trucks,Nos-04 for Rs /-;(8.) Water Tanker, Nos-04 for Rs /-. For this purpose an amount of `7,53,00,000/- is required during the year Accordingly, it is proposed to provide an amount of `7,53,00,000/- in the Budget Estimates for the year , for which, this new item is presented. Purchase of New Vehicles Government is proposed to purchase 80 (eighty) new vehicles against condemned vehicles. For this purpose Rs.4,42,50,000/-is required during the year

19 Accordingly, it is proposed to provide an amount of Rs.4,42,50,000/- in the Budget Estimates for the year , for which, this new item is presented. 19

Welcome to Presentation of Twelfth Five Year Plan and Annual Plan Proposal Madhya Pradesh. May 11, 2012

Welcome to Presentation of Twelfth Five Year Plan and Annual Plan Proposal Madhya Pradesh. May 11, 2012 Welcome to Presentation of Twelfth Five Year Plan and Annual Plan Proposal Madhya Pradesh May 11, 2012 1 ACHIEVEMENTS OF ELEVENTH PLAN (ECONOMY) Targets and Achievement Sector Target for Growth Expected

More information

CIVIL ACCOUNT FOR THE GOVERNMENT OF GENERAL STATEMENT OF ACCOUNT 15,93,62,78,38, ,66,89,50,78, ,78,38,22,24,000.

CIVIL ACCOUNT FOR THE GOVERNMENT OF GENERAL STATEMENT OF ACCOUNT 15,93,62,78,38, ,66,89,50,78, ,78,38,22,24,000. REPORT ID: PRINTED BY: PRINTED ON: CIVIL ACCOUNT FOR THE GOVERNMENT OF FOR THE MONTH OF APR/217 GENERAL STATEMENT OF ACCOUNT TAMILNADU

More information

SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR. 1. Sector Performance, Problems, and Opportunities Chhattisgarh State Road Sector Project (RRP IND 44427) Sector Road Map SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR 1. Sector Performance, Problems, and Opportunities 1. The state of Chhattisgarh

More information

Mahender Jethmalani.

Mahender Jethmalani. 12 th Five Year Plan: Concerns for the Tribal Development in Gujarat Organized by Tribal Research and Training Institute, Gujarat Vidyapith, Ahmedabad & Pathey Budget Center. 7 th October, 2011. Mahender

More information

CIVIL ACCOUNT FOR THE GOVERNMENT OF GENERAL STATEMENT OF ACCOUNT 17,62,51,48,07, ,54,51,43,51, ,87,67,92,03,000.

CIVIL ACCOUNT FOR THE GOVERNMENT OF GENERAL STATEMENT OF ACCOUNT 17,62,51,48,07, ,54,51,43,51, ,87,67,92,03,000. REPORT ID: PRINTED BY: PRINTED ON: CIVIL ACCOUNT FOR THE GOVERNMENT OF FOR THE MONTH OF NOV/218 GENERAL STATEMENT OF ACCOUNT TAMILNADU

More information

CIVIL ACCOUNT FOR THE GOVERNMENT OF GENERAL STATEMENT OF ACCOUNT 17,62,51,48,07, ,14,37,60,32, ,34,23,85,29,000.

CIVIL ACCOUNT FOR THE GOVERNMENT OF GENERAL STATEMENT OF ACCOUNT 17,62,51,48,07, ,14,37,60,32, ,34,23,85,29,000. REPORT ID: PRINTED BY: PRINTED ON: CIVIL ACCOUNT FOR THE GOVERNMENT OF FOR THE MONTH OF FEB/219 GENERAL STATEMENT OF ACCOUNT TAMILNADU

More information

CIVIL ACCOUNT FOR THE GOVERNMENT OF GENERAL STATEMENT OF ACCOUNT 14,94,51,85,03, ,04,94,96,12, ,12,49,12,000.

CIVIL ACCOUNT FOR THE GOVERNMENT OF GENERAL STATEMENT OF ACCOUNT 14,94,51,85,03, ,04,94,96,12, ,12,49,12,000. REPORT ID: PRINTED BY: PRINTED ON: CIVIL ACCOUNT FOR THE GOVERNMENT OF FOR THE MONTH OF SEP/216 GENERAL STATEMENT OF ACCOUNT TAMILNADU

More information

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN)

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN) Second Jharkhand State Road Project (RRP IND 49125) SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN) A. Sector Performance, Problems, and Opportunities 1. State context. The state of Jharkhand was

More information

CIVIL ACCOUNT FOR THE GOVERNMENT OF GENERAL STATEMENT OF ACCOUNT ,08,36,09,79, ,39,20,14, ,25,98,73,000.

CIVIL ACCOUNT FOR THE GOVERNMENT OF GENERAL STATEMENT OF ACCOUNT ,08,36,09,79, ,39,20,14, ,25,98,73,000. REPORT ID: PRINTED BY: PRINTED ON: CIVIL ACCOUNT FOR THE GOVERNMENT OF FOR THE MONTH OF APR/216 GENERAL STATEMENT OF ACCOUNT TAMILNADU

More information

CIVIL ACCOUNT FOR THE GOVERNMENT OF GENERAL STATEMENT OF ACCOUNT 9,69,71,98,06, ,08,36,09,79, ,39,20,14,000.00

CIVIL ACCOUNT FOR THE GOVERNMENT OF GENERAL STATEMENT OF ACCOUNT 9,69,71,98,06, ,08,36,09,79, ,39,20,14,000.00 REPORT ID: PRINTED BY: PRINTED ON: CIVIL ACCOUNT FOR THE GOVERNMENT OF FOR THE MONTH OF JUN/216 GENERAL STATEMENT OF ACCOUNT TAMILNADU

More information

Report of the Comptroller and Auditor General of India on Economic Sector for the year ended 31 March 2014

Report of the Comptroller and Auditor General of India on Economic Sector for the year ended 31 March 2014 Report of the Comptroller and Auditor General of India on Economic Sector for the year ended 31 March 2014 Government of Gujarat Report No. 1 of the year 2015 Report of the Comptroller and Auditor General

More information

(17 th March, 2016)

(17 th March, 2016) GOVERNMENT OF MIZORAM ANNUAL FINANCIAL STATEMENT () 2016-2017 (17 th March, 2016) [The Recommendation of His Excellency the Governor required under Article 202(1) of the Constitution of India has been

More information

India: Public Private Partnerships in Highways Sector

India: Public Private Partnerships in Highways Sector India: Public Private Partnerships in Highways Sector Prepared by World Bank as input for IDA paper, 2008 (provided by Tarun Sankar, PPIAF office, South Asia) India s transport program is one of the most

More information

ROAD DEVELOPMENT IN INDIA

ROAD DEVELOPMENT IN INDIA ROAD DEVELOPMENT IN INDIA - 2010 This report is the most up-to-date and comprehensive review of the Indian road sector. The report provides: The latest status of projects, programmes and policies (as on

More information

GOVERNMENT OF MADHYA PRADESH APPROPRIATION ACCOUNTS

GOVERNMENT OF MADHYA PRADESH APPROPRIATION ACCOUNTS 1 GOVERNMENT OF MADHYA PRADESH APPROPRIATION ACCOUNTS 2004-2005 2 APPROPRIATION ACCOUNTS 2004-2005 GOVERNMENT OF MADHYA PRADESH TABLE OF CONTENTS Pages Introductory vii Summary of Appropriation Accounts

More information

Republic of India. Gujarat Rural Roads (MMGSY) Project

Republic of India. Gujarat Rural Roads (MMGSY) Project PD 0025-IND May 31, 2017 PROJECT DOCUMENT OF THE ASIAN INFRASTRUCTURE INVESTMENT BANK Republic of India Gujarat Rural Roads (MMGSY) Project This document has a restricted distribution and may be used by

More information

Government of Bihar. Particulars

Government of Bihar. Particulars Government of Bihar Main Features-Budget 2012-13 Rs. in Cr 2009-10 2010-11 2011-12 2012-13 % 2012-13 Increase Rece./Exp. over Actuals Actuals B.E. B.E. % of Rev/ 2011-12 Cap (B.E.) 1 2 3 4 5 6 7 Particulars

More information

Gender Budgeting and women Empowerment Budget for women in Gujarat

Gender Budgeting and women Empowerment Budget for women in Gujarat Gender Budgeting and women Empowerment Budget for women in Gujarat A case study of Gujarat state budget by Mahender N. Jethmalani Patheya Budget Center Budgeting for Women s Essential Question: What does

More information

Road and Transport : Registered Motor Vehicles per 1000 Population and % Share of Registered Motor

Road and Transport : Registered Motor Vehicles per 1000 Population and % Share of Registered Motor and Transport 13.1: Surfaced & Length s in Arunachal Pradesh (A.P.) 13.2: Length of National Highways 13.3: Lane-wise Length of National Highways 13.4: and Surfaced Length of other PWD s 13.5: Length of

More information

International Journal of Academic Research ISSN: ; Vol.4, Issue-1(1), January, 2017 Impact Factor: 4.535;

International Journal of Academic Research ISSN: ; Vol.4, Issue-1(1), January, 2017 Impact Factor: 4.535; Compositional changes of public expenditure in Andhra Pradesh Dr.B.Lilly Grace Eunice, Assistant Professor, Dept. of Economics, Andhra University Visakhapatnam Mr.D.Narayana Rao, Lecturer, Girraj Govt.

More information

Dr. Pramod Kumar Anand JS (RC) & DG, NRRDA : : : D.O. # P-10021/1/2010/P-III August 4, 2010

Dr. Pramod Kumar Anand JS (RC) & DG, NRRDA : : : D.O. # P-10021/1/2010/P-III August 4, 2010 Dr. Pramod Kumar Anand JS (RC) & DG, NRRDA : 23383553 : 23388207 : anandpk@nic.in D.O. # P-10021/1/2010/P-III August 4, 2010 Dear Shri As you are aware, Government of India launched the Pradhan Mantri

More information

Honourable Prime Minister and Members of the National Development Council, It gives me immense pleasure to. attend the National Development Council

Honourable Prime Minister and Members of the National Development Council, It gives me immense pleasure to. attend the National Development Council Honourable Prime Minister and Members of the National Development Council, It gives me immense pleasure to attend the National Development Council meeting convened to discuss the Mid-term Appraisal of

More information

No. M-13048/35/(PY)/2009-SP-S Government of India Planning Commission (State Plans Division)

No. M-13048/35/(PY)/2009-SP-S Government of India Planning Commission (State Plans Division) / No. M-13048/35/(PY)/2009-SP-S Government of India Planning Commission (State Plans Division) Yojana Bhawan, Sansad Marg, New Delhi-II 0 001 Dated i h July,,2010 To The Chief Secretary, Government of

More information

EXPLANATORY NOTES ON DATA SOURCE AND METHODOLOGY

EXPLANATORY NOTES ON DATA SOURCE AND METHODOLOGY EXPLANATORY NOTES ON DATA SOURCE AND METHODOLOGY Data Sources The data on State Government Finances are based on the receipts and expenditure data presented in the Budget documents of the State Governments

More information

DLI/BDD/EOI/

DLI/BDD/EOI/ DLI/BDD/EOI/073 24.01.2018 Expression of Interest to act as a lead member in a joint venture for participation in upgradation to 2 lane with paved shoulder/4 lane of Gagaria-Baori Kalan- Serwa-Bakhasar

More information

Social Security Provisioning in Bihar: A Case for Universal Old Age Pension

Social Security Provisioning in Bihar: A Case for Universal Old Age Pension Social Security Provisioning in Bihar: A Case for Universal Old Age Pension First Author: Dr. Manjur Ali (Research Officer) Second Author: Nilachala Acharya Authors Organisation: Centre for Budget and

More information

Projections of Investment in Infrastructure during the Eleventh Plan

Projections of Investment in Infrastructure during the Eleventh Plan Government of India Projections of Investment in Infrastructure during the Eleventh Plan Published by The Secretariat for the Committee on Infrastructure Planning Commission, Government of India Yojana

More information

Finance Accounts (Volume- I) Government of Haryana

Finance Accounts (Volume- I) Government of Haryana Finance Accounts (Volume- I) 2015-16 Government of Haryana Subject (i) TABLE OF CONTENTS VOLUME-I Page(s) Certificate of the Comptroller and Auditor General of India (iii)-(v) Guide to Finance Accounts

More information

FINANCIAL RESULTS The key financial parameters for the year ended March 31, 2011 are: Amount (Rupees Lakhs)

FINANCIAL RESULTS The key financial parameters for the year ended March 31, 2011 are: Amount (Rupees Lakhs) DIRECTORS REPORT The Directors have pleasure in presenting their report and Accounts for the year ended March 31, 2011. FINANCIAL RESULTS The key financial parameters for the year ended March 31, 2011

More information

STATE FINANCES for the year ended 31 March 2015

STATE FINANCES for the year ended 31 March 2015 Report of the Comptroller and Auditor General of India On STATE FINANCES for the year ended 31 March 2015 GOVERNMENT OF UTTAR PRADESH TABLE OF CONTENTS Preface Particulars Reference to Paragraph Page

More information

Rural Road Connectivity in India

Rural Road Connectivity in India www.swaniti.in Rural Road Connectivity in India The 12th Five Year Plan (2012-17) identifies rural connectivity as one of the key priorities to achieve rural poverty alleviation and development. With over

More information

FINANCE ACCOUNTS (VOLUME I)

FINANCE ACCOUNTS (VOLUME I) FINANCE ACCOUNTS (VOLUME I) 2013-2014 GOVERNMENT OF MADHYA PRADESH Finance Accounts (VOLUME - I) 2013-14 Government of Madhya Pradesh TABLE OF CONTENTS SUBJECT PAGES VOLUME - I Table of contents i-ii Certificate

More information

vlk/kkj.k Hkkx II [k.m 1 izkf/kdkj ls izdkf'kr PUBLISHED BY AUTHORITY MINISTRY OF LAW AND JUSTICE (Legislative Department)

vlk/kkj.k Hkkx II [k.m 1 izkf/kdkj ls izdkf'kr PUBLISHED BY AUTHORITY MINISTRY OF LAW AND JUSTICE (Legislative Department) jftlvªh lañ Mhñ,yñ (,u)04@0007@2003 14 REGISTERED NO. DL (N)04/0007/2003 14 vlk/kkj.k EXTRAORDINARY Hkkx II [k.m 1 PART II Section 1 izkf/kdkj ls izdkf'kr PUBLISHED BY AUTHORITY lañ 13] ubz fnyyh] cq/kokj]

More information

Government of Gujarat Budget Press Note-1

Government of Gujarat Budget Press Note-1 Government of Gujarat Budget 2015-16. Press Note-1 Important Schemes. The size for the Annual Development Plan for the year 2015-16 has been fixed at Rs.79,295.11 crore. The social sector has been accorded

More information

UTTAR PRADESH BUDGET MANUAL CHAPTER I

UTTAR PRADESH BUDGET MANUAL CHAPTER I UTTAR PRADESH BUDGET MANUAL CHAPTER I INTRODUCTORY This Manual contains rules framed by the Finance Department for the guidance of estimating officers and departments of the Secretariat in regard to the

More information

HIGHWAY ENGINEERING MODULE-IV

HIGHWAY ENGINEERING MODULE-IV HIGHWAY ENGINEERING MODULE-IV 1 HIGHWAY DRAINAGE. 2 HILL ROAD 3 ROADSIDE DEVELOPMENT. 4 ROAD ADMINISTRATION AND FINANCE Prof. Ujjval J. Solanki DEPARTMENT OF CIVIL ENGINEERING, DARSHAN INSTITUTE OF ENGINEERING

More information

Experience of Implementing Transportation PPPs in India. Abhijit Bhaumik August 6, 2015

Experience of Implementing Transportation PPPs in India. Abhijit Bhaumik August 6, 2015 Experience of Implementing Transportation PPPs in India Abhijit Bhaumik August 6, 2015 Experience of Implementing PPPs in India India has witnessed successful PPPs across several infrastructure sectors

More information

Annual Plan Planning Commission.

Annual Plan Planning Commission. Annual Plan 2013 14 Planning Commission http://planningcommission.nic.in Contents Introduction... 2 Annual Plan 2013-14... 3 Budgetary Allocation: An Overview... 5 Central Plan Outlay... 6 Central Plan

More information

West Bengal Budget Analysis

West Bengal Budget Analysis 0.3% 3. 2.3% 6.4% 5.9% 8.8% 8. 8. 11.4% 10.2% 11. 15. West Bengal Budget Analysis The Finance Minister of West Bengal, Dr. Amit Mitra presented the Budget for financial year on January 31, 2018. Budget

More information

CORK COUNTY COUNCIL. Graduate Resident Engineer Road Construction Supervision

CORK COUNTY COUNCIL. Graduate Resident Engineer Road Construction Supervision CORK COUNTY COUNCIL Graduate Resident Engineer Road Construction Supervision QUALIFICATIONS 1. Character Candidates shall be of good character. 2. Health Candidates shall be in a state of health such as

More information

Investment in Infrastructure

Investment in Infrastructure 14 Investment in Infrastructure INTRODUCTION 14.1 The Eleventh Plan emphasized the importance of investment in infrastructure for achieving a sustainable and inclusive growth of 9 to 10 per cent in GDP

More information

FINANCE ACCOUNTS

FINANCE ACCOUNTS FINANCE ACCOUNTS 2011-2012 Volume 1 GOVERNMENT OF ASSAM Placed before the State Legislative Assembly on 10 th December 2012. FINANCE ACCOUNTS 2011-2012 Volume 1 GOVERNMENT OF ASSAM TABLE OF CONTENTS Subject

More information

HIGHLIGHTS OF KARNATAKA S BUDGET

HIGHLIGHTS OF KARNATAKA S BUDGET HIGHLIGHTS OF KARNATAKA S BUDGET 2008-09 OVERVIEW OF THE BUDGET! The Budget of Government of Karnataka for 2008-09 with an outlay of Rs.56542.15 crores from the State Consolidated fund has been presented

More information

Government of Bihar welcomes. Sri M.S. Ahluwalia Deputy Chairman Planning Commission 18 th November 2009

Government of Bihar welcomes. Sri M.S. Ahluwalia Deputy Chairman Planning Commission 18 th November 2009 Government of Bihar welcomes Sri M.S. Ahluwalia Deputy Chairman Planning Commission 18 th November 2009 Presentation Format Plan Expenditure Per Capita Development Expenditure Annual Plan 2009-10 Brief

More information

CHAPTER-IV REFORMS IN THE CSS

CHAPTER-IV REFORMS IN THE CSS CHAPTER-IV REFORMS IN THE CSS 6. The analysis of the CSS in the previous Chapter has indicated the need for reforms. Suggestions on this are being mentioned in the following paragraphs: 6.1 6.1.1 It has

More information

48081 v1. India: Andhra Pradesh Road Sector Project. Environmental and. Social Management Framework. For. Maintenance Road. (approx.

48081 v1. India: Andhra Pradesh Road Sector Project. Environmental and. Social Management Framework. For. Maintenance Road. (approx. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 48081 v1 India: Andhra Pradesh Road Sector Project Environmental and Social Management

More information

Restructuring of Government Departments-Karnataka Experience

Restructuring of Government Departments-Karnataka Experience Restructuring of Government Departments-Karnataka Experience T V Ramanayya, V.Nagadevara & Shyamal Roy Indian Institute of Management Bangalore Abstract Public expenditure in India has played a key role

More information

Model Concession Agreement for Highways: An Overview

Model Concession Agreement for Highways: An Overview Model Concession Agreement for Highways: An Overview - Gajendra Haldea The highways sector in India is witnessing significant interest from both domestic as well as foreign investors following the policy

More information

BUDGET: TABLE 1: BUDGET AT A GLANCE (Actuals) A. Revenue Receipts

BUDGET: TABLE 1: BUDGET AT A GLANCE (Actuals) A. Revenue Receipts BUDGET: 2018-19 TABLE 1: BUDGET AT A GLANCE (Rs. in crore) Items 2016-17 (Actuals) (RE) 2018-19 A. Revenue Receipts 41978 58168 55307 64269 B. Revenue Expenditure 39812 48819 43882 51185 Revenue Surplus

More information

Technical Appendix. FDOT 2040 Revenue Forecast

Technical Appendix. FDOT 2040 Revenue Forecast Technical Appendix FDOT 040 Revenue Forecast This page was left blank intentionally. APPENDIX FOR THE METROPOLITAN LONG RANGE PLAN 040 Forecast of State and Federal Revenues for Statewide and Metropolitan

More information

ECONOMIC AND FINANCIAL ANALYSES FOR TRANCHE 2

ECONOMIC AND FINANCIAL ANALYSES FOR TRANCHE 2 Appendix 6 ECONOMIC AND FINANCIAL ANALYSES FOR TRANCHE 2 1. Background. The Second Rural Connectivity Investment Program will support the Government of India in improving rural connectivity through the

More information

Presentation at Asian Highways Investment Forum. Performance based Maintenance Contracts for Highways

Presentation at Asian Highways Investment Forum. Performance based Maintenance Contracts for Highways Presentation at Asian Highways Investment Forum Bangkok, 8-9, October 2013 United Nations Economic & Social Commission For Asia & The Pacific Performance based Maintenance Contracts for Highways By Atul

More information

No.M.13048/23 (Sikkim)/2008/SP. Planning Commission (State Plans Division)

No.M.13048/23 (Sikkim)/2008/SP. Planning Commission (State Plans Division) , ' No.M.13048/23 (Sikkim)/2008/SP. Planning Commission (State Plans Division) To The Chief Secretary, Government of Sikkim, Gangtok Yojana Bhawan, Sansad Marg, New Delhi 110001 Dated 24.8 2009 Subject:

More information

Seminar on Strengthening Panchayati Raj Institutions in Gujarat: Issues before the 3 rd State Finance Commission 21 st July, 2012 at

Seminar on Strengthening Panchayati Raj Institutions in Gujarat: Issues before the 3 rd State Finance Commission 21 st July, 2012 at Seminar on Strengthening Panchayati Raj Institutions in Gujarat: Issues before the 3 rd State Finance Commission 21 st July, 2012 at Institute t of Rural lmanagement tanand d(irma) Status of Financial

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Bihar New Ganga Bridge Project (RRP IND 48373) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The proposed project is to build a new six-lane bridge across the Ganges River near Patna in the state

More information

CONSTRUCTION OF THE BYPASS OF 3 VILLAGES ALONG THE M3 NATIONAL ROAD CHISINAU- GIURGIULESTI

CONSTRUCTION OF THE BYPASS OF 3 VILLAGES ALONG THE M3 NATIONAL ROAD CHISINAU- GIURGIULESTI TRACECA PROJECT FICHE CONSTRUCTION OF THE BYPASS OF 3 VILLAGES ALONG THE M3 NATIONAL ROAD CHISINAU- GIURGIULESTI 1. BASIC INFORMATION TITLE: Construction of the bypass of 3 villages along the M3 National

More information

GOVERNMENT OF MADHYA PRADESH

GOVERNMENT OF MADHYA PRADESH GOVERNMENT OF MADHYA PRADESH ACCOUNTANT GENERAL (ACCOUNTS AND ENTITLEMENTS) MADHYA PRADESH, GWALIOR 2 Preface The Annual Accounts of the State Government are prepared and examined under the directions

More information

Markets Cheer Government Roadmap for Economic Revival:

Markets Cheer Government Roadmap for Economic Revival: Markets Cheer Government Roadmap for Economic Revival: Should You Revise Your Portfolio Now? Author: ifast Research Team November 9, 217 The Government of India (GOI) decided to celebrate Diwali on October

More information

Farmers and rural population

Farmers and rural population MARCH YOJANA Budget Union Budget, this year, was presented amidst a host of uncertainties. Demonetisation drive and imminent GST drive, new administration in U.S etc. made the whole exercise very challenging.

More information

CORK COUNTY COUNCIL. Resident Executive Engineer Road Construction Supervision QUALIFICATIONS

CORK COUNTY COUNCIL. Resident Executive Engineer Road Construction Supervision QUALIFICATIONS 1. Character CORK COUNTY COUNCIL Resident Executive Engineer Road Construction Supervision Candidates must be of good character. 2. Health QUALIFICATIONS Candidates shall be in a state of health such as

More information

CORK COUNTY COUNCIL. Senior Resident Engineer Road Construction Supervision

CORK COUNTY COUNCIL. Senior Resident Engineer Road Construction Supervision CORK COUNTY COUNCIL Senior Resident Engineer Road Construction Supervision QUALIFICATIONS 1. Character Candidates shall be of good character. 2. Health Canidates shall be in a state of health such as would

More information

Public Private Partnership in Highway Sector in Punjab, India

Public Private Partnership in Highway Sector in Punjab, India Public Private Partnership in Highway Sector in Punjab, India Infrastructure Governance Roundtable March 24 th, 2006 Kulwinder Singh Rao Deputy Project Director Punjab Roads & Bridges Development Board

More information

COST BENEFIT ANALYSIS OF CHENNAI PERIPHERAL ROAD

COST BENEFIT ANALYSIS OF CHENNAI PERIPHERAL ROAD COST BENEFIT ANALYSIS OF CHENNAI PERIPHERAL ROAD 1 Introduction The objective of the cost benefit economic analysis is to identify and quantify the benefits and costs associated with the project. This

More information

FUNCTIONS AND STRUCTURE OF THE PLANNING COMMISSION ( IN BRIEF )

FUNCTIONS AND STRUCTURE OF THE PLANNING COMMISSION ( IN BRIEF ) FUNCTIONS AND STRUCTURE OF THE PLANNING COMMISSION ( IN BRIEF ) Planning Commission was set up in March, 1950. A copy of the Resolution of Government of India has been given in Unit I of this document.

More information

Development, Govt. of India, and 40% funded by Govt. Madhya Pradesh.

Development, Govt. of India, and 40% funded by Govt. Madhya Pradesh. MADHYA PRADESH RURAL ROAD DEVELOPMENT AUTHORITY (AN AGENCY OF PANCHYAT & RURAL DEVELOPMENT DEPARTMENT, GOVT. OF M.P.) 5 th Floor, Block-II, Paryavas Bhawan, BHOPAL M.P. 462 011 PRADHANMANTRI GRAM SADAK

More information

Kelso (Potentially Vulnerable Area 13/09) Local Plan District Local authority Main catchment Tweed Scottish Borders Council River Tweed Background Thi

Kelso (Potentially Vulnerable Area 13/09) Local Plan District Local authority Main catchment Tweed Scottish Borders Council River Tweed Background Thi Kelso (Potentially Vulnerable Area 13/09) Local Plan District Tweed Local authority Scottish Borders Council Main catchment River Tweed Summary of flooding impacts At risk of flooding 90 residential properties

More information

BOON TO RURAL GUJARAT

BOON TO RURAL GUJARAT BOON TO RURAL GUJARAT :: P R E A M B L E :: All DISCOMs have mainly four categories of 11/22 KV feeders viz. Urban, Industrial, GIDC, Rural. Out of which, Rural feeders having mixed load of Agricultural

More information

TABLE OF CONTENTS VOLUME-I

TABLE OF CONTENTS VOLUME-I TABLE OF CONTENTS SUBJECT PAGES VOLUME-I Table of Contents i-ii Certificate of the Comptroller and Auditor General of India iii-v Guide to Finance Accounts vii-xi 1. Statement of Financial Position 1-2

More information

ALL Counties. ALL Districts

ALL Counties. ALL Districts TEXAS TRANSPORTATION COMMISSION ALL Counties rhnute ORDER Page of ALL Districts The Texas Transportation Commission (commission) finds it necessary to propose amendments to. and., relating to Transportation

More information

Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1)

Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1) Validation Report Reference Number: PVR-326 Project Number: 37066 Loan Number: 2248 October 2014 Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1) Independent Evaluation

More information

ORDER. Subject: Constitution of a Committee for revision of the List of Major and Minor Heads of Accounts.

ORDER. Subject: Constitution of a Committee for revision of the List of Major and Minor Heads of Accounts. 73 Annexure A No. T- 14018/1/2009-Codes/178-187 Government of India Ministry of Finance Department of Expenditure Controller General of Accounts Lok Nayak Bhawan, Khan Market New Delhi ORDER Subject: Constitution

More information

M /Guj/2007-SP (West) Government of India Planning Commission (State Plans Division) Approval of Annual Plan ( ) of Gujarat.

M /Guj/2007-SP (West) Government of India Planning Commission (State Plans Division) Approval of Annual Plan ( ) of Gujarat. M-1304817/Guj/2007-SP (West) Government of India Planning Commission (State Plans Division) To The Chief Secretary, Government of Gujarat, Ahmadabad Yojana Bhawan, Sansad Marg, New Delhi-110 001 3 th Feb.,

More information

HPEC (Ahluwalia) Report 2011

HPEC (Ahluwalia) Report 2011 HPEC (Ahluwalia) Report 2011 Highlights and Recommendations October 11, 2012 Goa First Regional Knowledge Dissemination Workshop Bhopal, Madhya Pradesh Urban Share of Total Population in 2011 (per cent)

More information

Chapter 6: Financial Resources

Chapter 6: Financial Resources Chapter 6: Financial Resources Introduction This chapter presents the project cost estimates, revenue assumptions and projected revenues for the Lake~Sumter MPO. The analysis reflects a multi-modal transportation

More information

Toll Supported Finance for Highway Development in India

Toll Supported Finance for Highway Development in India Toll Supported Finance for Highway Development in India Prof. Nagarjuna P. 1 and Dr. Pradeepta Kumar Samanta 2 1,2, Assistance Professor, National Institute of Construction Management and Research (NICMAR),

More information

Schemes Launched in Budget Overview of such schemes

Schemes Launched in Budget Overview of such schemes Schemes Launched in Budget 2018-19 Overview of such schemes List of Schemes 1. National Health Protection Scheme 2. Operation Green 3. Eklavya School 4. Revitalising Infrastructure and Systems in Education

More information

Regulators' Budget. May Regulators Budget: More for Homeland Security, Less for Environmental Regulation

Regulators' Budget. May Regulators Budget: More for Homeland Security, Less for Environmental Regulation May 2018 40 Regulators' Budget Regulators Budget: More for Homeland Security, Less for Environmental Regulation An Analysis of the U.S. Budget for Fiscal Years 1960 through 2019 by Susan Dudley & Melinda

More information

APPENDIX FOR THE METROPOLITAN LONG RANGE TRANSPORTATION PLAN Forecast of State and Federal Revenues for Statewide and Metropolitan Plans

APPENDIX FOR THE METROPOLITAN LONG RANGE TRANSPORTATION PLAN Forecast of State and Federal Revenues for Statewide and Metropolitan Plans APPENDIX FOR THE METROPOLITAN LONG RANGE TRANSPORTATION PLAN 2035 Forecast of State and Federal Revenues for Statewide and Metropolitan Plans Overview This appendix documents the current Florida Department

More information

ACCOUNTS AT A GLANCE GOVERNMENT OF MADHYA PRADESH

ACCOUNTS AT A GLANCE GOVERNMENT OF MADHYA PRADESH ACCOUNTS AT A GLANCE 2016-2017 GOVERNMENT OF MADHYA PRADESH i ii PREFACE This is the Nineteenth issue of our annual publication "Accounts at a Glance". The Annual Accounts of the State Government are prepared

More information

Investment Opportunities in Infrastructure Exciting Times to be in India

Investment Opportunities in Infrastructure Exciting Times to be in India Creation of world class infrastructure, a prerequisite & foundation for growth, has finally caught the imagination of India and the country is on the move. This is apparent in the rapid growth of wide

More information

Press Information Bureau Government of India Ministry of Finance 01-February :06 IST Highlights of Budget

Press Information Bureau Government of India Ministry of Finance 01-February :06 IST Highlights of Budget Press Information Bureau Government of India Ministry of Finance 01-February-2018 14:06 IST Highlights of Budget 2018-19 Finance Minister Shri Arun Jaitley presents general Budget 2018-19 in Parliament.

More information

Analysis of Expenditure on Healthcare Schemes in Kinwat Taluka

Analysis of Expenditure on Healthcare Schemes in Kinwat Taluka Serials Publications Analysis of Expenditure on Healthcare Schemes in Kinwat Taluka National Academy of Agricultural Science (NAAS) Rating : 3. 03 Analysis of Expenditure on Healthcare Schemes in Kinwat

More information

Roading and Footpaths Group

Roading and Footpaths Group Roading and Footpaths Group Roading Council maintains and manages the local roading network including roads, street lighting and signage. Community Outcome A Safe and Healthy District Roading contributes

More information

ECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million)

ECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million) Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) ECONOMIC ANALYSIS A. Project Costs 1. This chapter outlines the methodology and results of the economic analysis for the project, comprising

More information

THE ROAD TO ECONOMIC GROWTH

THE ROAD TO ECONOMIC GROWTH THE ROAD TO ECONOMIC GROWTH Introduction 1. As in many countries, the road sector accounts for the major share of domestic freight and inter-urban passenger land travel in Indonesia, playing a crucial

More information

Balanced Regional Development in India Issues and Policies

Balanced Regional Development in India Issues and Policies Balanced Regional Development in India Issues and Policies Incorporating An Introduction to Balanced Regional Development in India Plan-wise Documentation of Policies and Programmes for Balanced Regional

More information

Overview of the framework

Overview of the framework Overview of the framework Need for a framework The highways sector in India is witnessing a significant interest from both domestic as well as foreign investors following the policy initiatives taken by

More information

Food Processing Fund Operational Guidelines

Food Processing Fund Operational Guidelines Food Processing Fund 2014-15 Operational Guidelines Government of India (GoI) has accorded top priority for the development of the food processing industry in the country and accordingly in reply to the

More information

GOVERNMENT OF MADHYA PRADESH

GOVERNMENT OF MADHYA PRADESH GOVERNMENT OF MADHYA PRADESH ACCOUNTANT GENERAL (ACCOUNTS AND ENTITLEMENTS) MADHYA PRADESH, GWALIOR 2 Preface The Annual Accounts of the State Government are prepared and examined under the directions

More information

ORISSA PUBLIC PRIVATE PARTNERSHIP POLICY-2007

ORISSA PUBLIC PRIVATE PARTNERSHIP POLICY-2007 ORISSA PUBLIC PRIVATE PARTNERSHIP POLICY-2007 PLANNING & CO-ORDINATION DEPARTMENT RESOLUTION No.12711 / PPP 38/2006 Dated 07 th August 2007 Sub: - ORISSA PUBLIC PRIVATE PARTNERSHIP (PPP) POLICY- 2007 1

More information

POS No.1 Fund released under 12 th & 13 th Finance Commission Observations.

POS No.1 Fund released under 12 th & 13 th Finance Commission Observations. POS No.1 Fund released under 12 th & 13 th Finance Commission Observations. 1 It may please be stated the criteria for Finance Department allocated Rs.157.80 allocation of fund under 12 th Finance crore

More information

PRASHANT MAVANI. Senior Faculty: StudyIQ

PRASHANT MAVANI. Senior Faculty: StudyIQ . P R O F I L E PRASHANT MAVANI MSc. in Management, University of Surrey (UK) Senior Faculty: StudyIQ Follow/Contact me: @PrashantTMavani Download PDF notes of this lecture is available West Bengal Budget..lets

More information

Companies Act, 2013 Tracker II. CNK & Associates

Companies Act, 2013 Tracker II. CNK & Associates Companies Act, 2013 Tracker II CNK & Associates Corporate Social Responsibility (CSR) Provisions As per Companies Act, 2013, CSR has become mandatory in India. The Ministry of Corporate Affairs (MCA) in

More information

PREFACE. This Report for the year ended 31 March 2007 has been prepared for submission to the Governor under Article 151(2) of the Constitution.

PREFACE. This Report for the year ended 31 March 2007 has been prepared for submission to the Governor under Article 151(2) of the Constitution. PREFACE This Report for the year ended 31 March 2007 has been prepared for submission to the Governor under Article 151(2) of the Constitution. The audit of revenue receipts of the State Government is

More information

BUDGET MCQ PART- I. Q.1 How much amount of Agricultural Credit to farmers has been proposed in the Union Budget ?

BUDGET MCQ PART- I. Q.1 How much amount of Agricultural Credit to farmers has been proposed in the Union Budget ? BUDGET MCQ PART- I Q.1 How much amount of Agricultural Credit to farmers has been proposed in the Union Budget 2017-18? 1. 40 lakh crores 2. 30 lakh crores 3. 10 lakh crores 4. 20 lakh crores 5. None of

More information

Validation Report. India: Rural Roads Sector I Project. Independent Evaluation Department

Validation Report. India: Rural Roads Sector I Project. Independent Evaluation Department Validation Report Reference Number: PVR-307 Project Number: 36320 Loan Number: 2018 May 2014 India: Rural Roads Sector I Project Independent Evaluation Department ABBREVIATIONS ADB Asian Development Bank

More information

Budget of the Village of Emerald Lake Village Form Due Date: 20 Days after the Meeting

Budget of the Village of Emerald Lake Village Form Due Date: 20 Days after the Meeting New Hampshire Department of Revenue Administration 2016 MS-636 Budget of the Village of Emerald Lake Village Form Due Date: 20 Days after the Meeting This form was posted with the warrant on: For Assistance

More information

PRESENTATION BEFORE THE PLANNING COMMISSION on ANNUAL PLAN ( ) AND TWELFTH FIVE YEAR PLAN. GOVT OF HIMACHAL PRADESH 23 rd March, 2012

PRESENTATION BEFORE THE PLANNING COMMISSION on ANNUAL PLAN ( ) AND TWELFTH FIVE YEAR PLAN. GOVT OF HIMACHAL PRADESH 23 rd March, 2012 PRESENTATION BEFORE THE PLANNING COMMISSION on ANNUAL PLAN (2012-13) AND TWELFTH FIVE YEAR PLAN GOVT OF HIMACHAL PRADESH 23 rd March, 2012 1 ADMINISTRATIVE UNITS Units Nos. Districts 12 Tehsils 82 Sub

More information

SECTOR-WISE HIGHLIGHTS OF UNION BUDGET,

SECTOR-WISE HIGHLIGHTS OF UNION BUDGET, 1 Available at: http://indianexpress.com/article/business/budget/union-budget-2018-live-updates-highlights-of-arunjaitleys-fifth-budget-5047188/ February 01, 2018 SECTOR-WISE HIGHLIGHTS OF UNION BUDGET,

More information

` APPENDIX (Reference: Paragraph 1.1; Page 1)

` APPENDIX (Reference: Paragraph 1.1; Page 1) ` APPENDIX - 1.1 (Reference: Paragraph 1.1; Page 1) Part A: Structure and Form of Government Accounts Structure of Government Accounts: The accounts of the State Government are kept in three parts (i)

More information