1 This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact WRDS at wrds@uwyo.edu and include the phrase Digital Documents in your subject heading. To view other documents please visit the WRDS Library online at: Mailing Address: Water Resources Data System University of Wyoming, Dept E University Avenue Laramie, WY Physical Address: Wyoming Hall, Room 249 University of Wyoming Laramie, WY Phone: (307) Fax: (307) Funding for WRDS and the creation of this electronic document was provided by the Wyoming Water Development Commission (

2

3 PURPOSE Wyoming Water Development Commission contracted with Engineering Associates in 2008 to review the rehabilitation needs of the Cody Canal Irrigation District and update the existing GIS model. The scope of this study included updating the rehabilitation schedule for major improvements identified by Cody Canal Irrigation District (Cody Canal or CCID), updating construction costs, surveying and inventorying irrigation features, evaluating nine automation sites, creating a GIS search tool and providing updated map books. Cody Canal Irrigation District The Cody Canal Irrigation District (Cody Canal) is located near Cody, in Park County, Wyoming. The Cody Canal system diverts water directly from the South Fork of the Shoshone River approximately 2 miles upstream of the Buffalo Bill Reservoir. The lands that receive water through the Cody Canal extend from the location of the head gate, northeast to the City of Cody, and then east along Highway 14 until it bends north to the Shoshone River. The system spans 12,500 acres and has 24 miles of Main Canal and 116 miles of Laterals. Picture 1 Main Head Gate & Spill to River Cody Canal currently assesses 2,096 entities, including the City of Cody. The 11,433 acres within Cody Canal is broken into approximately 2,900 parcels of land. Approximately eighty-five (85) percent of the entities own parcels of land less than five acres in size. Parcels of land that have less than five acres of water rights are assessed five (5) units. Larger parcels of land have an assessment unit equal to the number of water right acreages. The summation of the assessment units within Cody Canal is 18,274 units. 1

4 Ninety-five percent of the water in Cody Canal have Priority Dates that extend back to The remaining five percent of water rights have Priority Dates that range between 1913 and Due to the close proximity to the City of Cody, Cody Canal has experienced a tremendous amount of change through the years as land has been subdivided and incorporated into the Cody city limits. During the study, the information presented in the Wyoming Water Development Commission & Cody Canal Irrigation District; Rehabilitation and Hydropower Level II Study submitted by Aqua Engineering, Inc., in May 2006 was utilized. Rehabilitation Needs Cody Canal identified nineteen structures in need of rehabilitation over the next nine years. The structures were previously surveyed and photographed in Construction costs were developed based on the current construction costs in the area. Mapping and GIS Survey information and photographs were inserted into the GIS along with aerial photos, Park County roads, and land ownership information. In addition, data available on water right maps were referenced into the GIS model. Cody Canal provided GIS data to identify the lands irrigated by the main headgates within their system. A search tool has been created to help Cody Canal easily update and utilize their GIS system. Automation Analysis Nine sites were identified by Cody Canal as possible automation sites. Currently, Cody Canal does not have a radio system or automation devices within their system. Cody Canal receives water directly from the river, and as river levels change throughout each day, the flows entering the Cody Canal system fluctuate. Automation would allow Cody Canal to minimize excess water and maximize water efficiency within their system. 2

5 FINDINGS Rehabilitation Needs A review of the Cody Canal System revealed nineteen (19) major structures that were in need of repair in the course of the following nine (9) years. It was determined each structure should be evaluated based on four criteria. The criteria have equal weight and were ranked on a scale of 1 to 5. The four criteria are not listed in any specific order of relevance. Table 1 Rehabilitation Priority shows the prioritization system. Newton Avenue Chute & 19th St. Headgate and Pipeline Glory Hole Drop Diamond Creek check Lower Sage Drop Beck Lake Headgate Musser Check Lewis Check Holm Lateral Sage Creek Spill & Ross Headgate Bluher Check & Drop (Ross ditch) Lower Sage Creek Spill (Dry Creek) Mann check Sage Creek Spill (Lower Sage Creek) City Check Wagler Check Buchanan Check Main Parshall Flume Sunburst Check Callen Check Effect on canal system if structure failed. Acres affected by failure. Overall Importance to System Performance Total Condition of structure Final Rank * Replacement Year Rate on a scale 1-5 Affect on system if structure failed: 1 - total system shutdown, 5 - system not impacted Acres Affected: 1 - many acres impacted, 5 - minimal amount of acres impacted Overall Importance to System Performance: 1 - important 5 - less important Condition of : 1-very poor condition with a high chance of failure, 5-in need of repair but lowest chance of failure * Replacement Schedule for structures that had the same total were given the assigned rank by CCID based on their knowledge of their system. Table 1 Rehabilitation Priority 3

6 Rehabilitation Cost Estimates The conceptual designs presented in the May 2006 report were appropriate for the structures. The structures identified for replacement need to be replaced due to failing concrete. The costs for the structures were updated to reflect the construction costs Cody Canal (CCID) has encountered since the May 2006 study. The costs are summarized in Table 2 WWDC Replacement Costs. Newton Avenue Chute & 19 th Street Headgate and Pipeline ,181 $ 200,900 Bid 33% $ 66,300 $ 134,600 Glory Hole Drop ,259 $ 190,000 Bid 33% $ 62,700 $ 127,300 Glory Hole Drop ,215 $ 190,000 District 59% $ 111,300 $ 78,700 Diamond Creek Check ,813 $ 69,400 District 51% $ 35,100 $ 34,300 Lower Sage Drop ,138 $ 64,100 Bid 33% $ 21,150 $ 42,950 Beck Lake Headgate ,881 $ 30,800 District 55% $ 16,800 $ 14,000 Musser Check ,673 $ 42,600 District 56% $ 23,900 $ 18,700 Lewis Check ,300 $ 69,900 District 56% $ 35,200 $ 34,700 Holm Lateral ,445 $ 100,100 District 49% $ 49,100 $ 51,000 Sage Creek Spill & Ross Headgate ,395 $ 259,400 Bid 33% $ 85,600 $ 173,800 Bluher Check & Drop (Ross ditch) ,533 $ 28,700 District 55% $ 15,800 $ 12,900 Lower Sage Creek Spill (Dry Creek) ,330 $ 78,300 Bid 33% $ 25,840 $ 52,460 Mann check ,813 $ 80,300 District 51% $ 40,600 $ 39,700 Sage Creek Spill (Lower Sage Creek) ,735 $ 117,600 District 53% $ 61,800 $ 55,800 City Check ,954 $ 76,400 District 52% $ 39,400 $ 37,000 Wagler Check ,813 $ 88,400 District 51% $ 44,700 $ 43,700 Buchanan Check ,275 $ 77,900 District 52% $ 40,600 $ 37,300 Main Parshall Flume ,061 $ 207,100 District 59% $ 121,200 $ 85,900 Sunburst Check ,813 $ 92,900 District 51% $ 47,000 $ 45,900 Callen Check ,813 $ 97,500 District 51% $ 49,300 $ 48,200 Replacement Year 2009 Project Cost Cost at Year of Construction District or Bid Percentage Table 2 WWDC Replacement Costs WWDC Assistance A loan analysis was performed on the projects Cody Canal could receive WWDC loan assistance. Cody Canal requested a 30-term be utilized at the 4% APR interest rate indicated by WWDC. To distribute the Operation and Maintenance expense of Cody Canal over the acreages within the district, the annual debt service per assessed unit was calculated. The summation of the assessment units is 18,274 units. The total acreage served by the assessment units is 11,433 acres. This will help Cody Canal to correlate the annual debt service to their billing procedure. 4

7 Table 3 WWDC Loan Funding Assistance found on the following page, summarizes the funding assistance available through WWDC on projects Cody Canal would like to bid to contractors for construction. Newton Avenue Drop & 19th Street Headgate and Pipeline ,181 $ 200,900 Bid 33% $ 66,300 $ 134,600 $ (3,834) $ (0.210) Glory Hole Drop ,259 $ 190,000 Bid 33% $ 62,700 $ 127,300 $ (3,626) $ (0.198) Lower Sage Drop ,138 $ 64,100 Bid 33% $ 21,150 $ 42,950 $ (1,223) $ (0.067) Sage Creek Spill & Ross Headgate ,395 $ 259,400 Bid 33% $ 85,600 $ 173,800 $ (4,950) $ (0.271) Lower Sage Creek Spill (Dry Creek) ,330 $ 78,300 Bid 33% $ 25,840 $ 52,460 $ (1,494) $ (0.082) Replacement Year 2009 Project Cost Cost at Year of Construction District or Bid *Captial Recovery Factor for 4% APR on a 30 year loan is **Annual Debt Service Per Acre Is Based On 18,274 Asessed Units. (11,433 Acres) Percentage CCID Loan Responsibility WWDC Grant Annual Debt Service* Annual Debt Service Per Assessed Unit** Table 3 WWDC Loan Funding Assistance Automation Nine sites were identified by Cody Canal as potential automation sites that would increase the operating efficiency of the district. To achieve automation of their system, two-way radio telemetry would be setup and a base station would be placed at the Cody Canal shop. Based on the radio frequency analysis, a repeater will need to be placed on the Cedar Mountain Tower. Prior to the implementation of the radio system, Cody Canal would need to receive the approval of a radio frequency band width by the Federal Communications Commission (FCC). To secure their approval, Cody Canal will require a federal sponsor such as the National Weather Service, Bureau of Reclamation or the U.S. Geological Survey. In addition, a field study should be performed to confirm the results of the study prior to implementation of the system. Implementation and Costs It is proposed to install automation at the Holm Lateral Headgate and the Sage Creek Spill at the time the structures are reconstructed and the construction costs for the structures reflect automation improvements. The remaining automation sites were grouped into three phases for WWDC funding applications. 5

8 Phase One consists of the automation components: Automation equipment and a gate in one bay of the Main Head Gate. Setup the Base Station at the CCID Shop Install a Repeater on Cedar Mountain Phase Two consists of automating the following sites: Diamond Creek Spill Sulphur Creek Spill Town Lateral Headgate Phase Three consists of automating the following sites: Kauffman Spill Lower Sage Headgate Lower Sage Spill Headgate As part of the grant match, Cody Canal would be responsible for the installation costs of the electronic components of the systems by qualified personnel. Table 4 Automation Cost Summary, briefly summarizes the automation costs for WWDC loans and grants. Automation Phase ,362 $ 123,200 Bid 33% $ 40,660 $ 82,540 Automation Phase ,677 $ 227,400 Bid 33% $ 75,040 $ 152,360 Automation Phase ,092 $ 303,200 Bid 33% $ 100,060 $ 203,140 Automation Phase ,597 $ 130,400 District 64% $ 83,460 $ 46,940 Automation Phase ,080 $ 236,000 District 60% $ 141,600 $ 94,400 Automation Phase ,495 $ 313,600 District 54% $ 169,340 $ 144,260 Installation Year 2009 Project Cost Cost at Year of Construction District or Bid Percentage WWDC Assistance Table 4 Automation Cost Summary Table 5 Automation Loan Recovery Costs, summaries the loan recovery costs based on a 30 year term at 4% interest for 18,274 assessed units. Automation Phase ,362 $ 123,200 Bid 33% $ 40,660 $ 82,540 $ (2,351) $ (0.129) Automation Phase ,677 $ 227,400 Bid 33% $ 75,040 $ 152,360 $ (4,340) $ (0.237) Automation Phase ,092 $ 303,200 Bid 33% $ 100,060 $ 203,140 $ (5,786) $ (0.317) Installation Year 2009 Project Cost Cost at Year of Construction District or Bid *Captial Recovery Factor for 4% APR on a 30 year loan is **Annual Debt Service Per Acre Is Based On 18,274 Asessed Units. (11,433 Acres) Percentage CCID Loan Responsibility WWDC Grant Annual Debt Service* Annual Debt Service Per Assessed Unit** 6

9 MAPPING & GIS GEOGRAPHIC INFORMATION SYSTEM The existing Geographical Information System (GIS) model developed in 2006 was enhanced to become a powerful tool for Cody Canal. The following items were incorporated into the existing model: additional system components, water right permit information, lands served by critical headgates, assessment role information, and a powerful search tool. All the structures within the GIS model were renamed based on a revised naming convention. The structure names now include a distance measurement along the canal or lateral. Pictures were taken of each structure and the photographs are accessible through the use of the GIS Search Tool. The most current water right maps created by Tom Flack, during the Big Horn River Adjudication for the Wyoming State Engineer s Office, were added to the GIS System. Through the efforts of Mr. Bales, Cody Canal Manager, the headgate service area feature class was created within the GIS model and incorporated into the Study. By using the headgate service area and water right information spatially, Cody Canal has a powerful tool to easily access the necessary information they need to regulate irrigation flows within their system. The 2009 Park County GIS Land Ownership feature class was purchased from Park County to incorporate into the GIS model and provided the spatial information necessary to link the Cody Canal assessment role to the land ownership. Cody Canal has a Microsoft Excel list of all the assessed water users within the district which is updated annually. Unfortunately, the Excel file did not have a specific connection to the Park County Assessor s tax payer identification number. To create a connection, a cross-analysis of the CCID assessment and the Park County Land Ownership information was completed. The Irrigation Geodatabase Tool (IGT) Version 2.2 is a suite of utilities developed by Anderson Consulting Engineers (ACE) to facilitate completion of complex tasks by even the novice user. These tools were enhanced with new features and functionality during the completion of this project. All tools customized and developed by ACE were created using Microsoft Visual Basic (Version 6.3) within the ArcView GIS environment. Consequently, they can only be accessed from within the project GIS. The search tool was customized during this study by ACE to allow Cody Canal to identify land ownership based on water right permit dates. The search tool s ease of use and functionality can make the difference between a GIS model being a simple and static snapshot in time of a district or a dynamic management tool serving the district manager into the future. To facilitate the ability of Cody Canal to update the GIS model, a draft Developer s Application was created. The Developer s Application requires developers to provide Cody Canal specific electronic information and pay for the costs encountered by CCID to maintain the GIS model. The proposed fee schedule requires a base fee and an additional cost per lot. The electronic information requested should readily be available from the engineer hired by the developer. In addition, the items are typically on the Water Distribution Map required by the State Engineer s Office or on the electronic file required by Park County Planning and Zoning. It was decided it was in the best interest of the developer to provide the electronic information at the time of development. Thus, Cody Canal would not need to hire an engineer to provide the information and back charge the developer at a later date. 7

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact

More information

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact

More information

Statement of Qualifications and Proposal

Statement of Qualifications and Proposal Statement of Qualifications and Proposal Date: February 24, 2016 Re: Solano Community College District Pavement Assessment Project (Fairfield Campus) 4000 Suisun Valley Road, Fairfield, CA Package includes

More information

For Information Contact: David Lasser, SIOR/CCIM

For Information Contact: David Lasser, SIOR/CCIM EXECUTIVE SUMMARY OFFERING SUMMARY Sale Price: $130,000 Price / SF: $0.74 Price / Acre: $32,178 Lot Size: 4.04 Acres Zoning: A-1 PROPERTY OVERVIEW 4.04 +/- acres, triangular shaped parcel, of partially

More information

Cedarbrook MHC Property Prospectus: The Offering

Cedarbrook MHC Property Prospectus: The Offering Property Prospectus: The Offering First Commercial Property Corporation is pleased to be the exclusive marketing agent of Cedarbrook MHC. Located in the rural South King County Washington town of Black

More information

PHASE 2 HAZARD IDENTIFICATION AND RISK ASSESSMENT

PHASE 2 HAZARD IDENTIFICATION AND RISK ASSESSMENT Prioritize Hazards PHASE 2 HAZARD IDENTIFICATION AND After you have developed a full list of potential hazards affecting your campus, prioritize them based on their likelihood of occurrence. This step

More information

BEAR CLAW RANCH. JOHN PIERCE, Associate Broker DAYTON, WYOMING. Property #

BEAR CLAW RANCH. JOHN PIERCE, Associate Broker DAYTON, WYOMING. Property # BEAR CLAW RANCH DAYTON, WYOMING Property #14-1458 brought to you by JOHN PIERCE, Associate Broker 307.690.1756-307.739.8003 - John.Pierce@jhsir.com JACKSON HOLE SOTHEBY S INTERNATIONAL REALTY 185 W. Broadway,

More information

Westwood Country Club Redevelopment

Westwood Country Club Redevelopment Westwood Country Club Redevelopment Economic and Fiscal Impact March, 2014 Prepared for: Mensch Capital Partners Prepared By: Kent Gardner, Ph.D. Project Director 1 South Washington Street Suite 400 Rochester,

More information

REQUEST FOR PROPOSAL Engineering Survey/Design Services Loecy Pond Dam Modification or Rehabilitation August 27, 2018

REQUEST FOR PROPOSAL Engineering Survey/Design Services Loecy Pond Dam Modification or Rehabilitation August 27, 2018 REQUEST FOR PROPOSAL Engineering Survey/Design Services Loecy Pond Dam Modification or Rehabilitation August 27, 2018 I. INTRODUCTION Chagrin River Watershed Partners, Inc. (CRWP), located at 38238 Glenn

More information

A4. Budget WBG LAC A4-1

A4. Budget WBG LAC A4-1 A4. Budget Attachment 4 identifies and discusses the overall Proposal budget as well as the individual budgets for each of the seven projects proposed for implementation in the Santa Barbara County Region

More information

Attachment B. King County Flood Control Zone District Work Program

Attachment B. King County Flood Control Zone District Work Program Attachment B King County Flood Control Zone District Work Program The King County Flood Control Zone District work program is comprised of two major categories: Programmatic Work Program o Flood Preparedness,

More information

Flood Risk Review (FRR) Meeting. Cumberland County, Pennsylvania Carlisle, Pennsylvania December 5, 2016

Flood Risk Review (FRR) Meeting. Cumberland County, Pennsylvania Carlisle, Pennsylvania December 5, 2016 Flood Risk Review (FRR) Meeting Cumberland County, Pennsylvania Carlisle, Pennsylvania December 5, 2016 Why are we here today? The Flood Insurance Study (FIS) report and Flood Insurance Rate Maps (FIRMs)

More information

THE SIMPSON COMPANY OF GEORGIA, INC.

THE SIMPSON COMPANY OF GEORGIA, INC. Land» For Sale Chicopee Industrial Park 1623 CALVARY CHURCH ROAD, GAINESVILLE, GA 30506 THE SIMPSON COMPANY OF GEORGIA, INC. 425 Spring Street, Suite 200 Gainesville, GA 30501 O: 770.532.9911 BRIAN HUGHS,

More information

Wetzel County Floodplain Ordinance

Wetzel County Floodplain Ordinance Wetzel County Floodplain Ordinance AUTHORITY AND PURPOSE: THE PROVISIONS OF THIS ORDINANCE HAVE BEEN PREPARED WITH THE INTENTION OF MEETING THE REQUIREMENTS OF SECTION 60.3 (D) OF THE NATIONAL FLOOD INSURANCE

More information

@wyo.gov. Contact: State of Wyoming. tempered. Wyoming. year. Wyoming Cost of. of Living Index. second in. Page 1 of 6

@wyo.gov. Contact: State of Wyoming. tempered. Wyoming. year. Wyoming Cost of. of Living Index. second in. Page 1 of 6 State of Wyoming Department of Administration and Information Economic Analysiss Division 2800 Central Avenue Cheyenne, WY 82002-0060 E-mail: ai-ead-info@ @wyo.gov http://eadiv.state.wy.us Ph. (307) 777-7504

More information

Challenges in the Allocation of Fryingpan-Arkansas Project Water and Project Water Return Flows. Allocation Committee January 7, 2014

Challenges in the Allocation of Fryingpan-Arkansas Project Water and Project Water Return Flows. Allocation Committee January 7, 2014 Challenges in the Allocation of Fryingpan-Arkansas Project Water and Project Water Return Flows Allocation Committee January 7, 2014 1 Project Water Allocation Project Water Allocation With NPANIW - 2014

More information

APPENDIX J. CIP Renewal and Replacement Process. Revision History

APPENDIX J. CIP Renewal and Replacement Process. Revision History APPENDIX J CIP Renewal and Replacement Process Revision History Revision Date Approval Reason 0 09/30/05 Original 1 05/25/11 2 09/27/12 3 03/26/14 4 11/14/16 E. Yong Updated Clearinghouse process and replaced

More information

REQUEST FOR PROPOSALS FOR CIVIL ENGINEERING SERVICES

REQUEST FOR PROPOSALS FOR CIVIL ENGINEERING SERVICES Saddle Creek Community Services District 1000 Saddle Creek Drive - Copperopolis, CA 95228 (209) 785-0100 saddlecreekcsd.org DIRECTORS Larry Hoffman, President Ken Albertson, Vice President Darlene, DeBaldo,

More information

STREETS & NEIGHBORHOOD REPAIR PLAN Kevin Faulconer s Vision for Improving San Diego Neighborhoods

STREETS & NEIGHBORHOOD REPAIR PLAN Kevin Faulconer s Vision for Improving San Diego Neighborhoods October 23, 2013 STREETS & NEIGHBORHOOD REPAIR PLAN Kevin Faulconer s Vision for Improving San Diego Neighborhoods As financial crises and unsustainable pension benefits took tax dollars away from San

More information

Village of Blue Mounds Annex

Village of Blue Mounds Annex Village of Blue Mounds Annex Community Profile The Village of Blue Mounds is located in the southwest quadrant of the County, north of the town of Perry, west of the town of Springdale, and south of the

More information

City of Centerville BMP Pages Table of Contents. Minimum Control Measure 1. Public Education and Outreach

City of Centerville BMP Pages Table of Contents. Minimum Control Measure 1. Public Education and Outreach i City of Centerville s Table of Contents Minimum Control Measure 1. Public Education and Outreach Best Management Practice Page 1-1: Outreach Publications...1 1-2: 30-day Public Notice for Annual Storm

More information

Replacement Reserve Study Report

Replacement Reserve Study Report Replacement Reserve Study Report for Landscaping and Lighting Assessment District (Zone 1: La Vigne) For the Napa County, California August 6, 2012 (Revised March 5, 2014) Page i August 6, 2012 (revised

More information

EXHIBIT 1. Salt Lake City

EXHIBIT 1. Salt Lake City EXHIBIT 1 Salt Lake City DRAFT Cost-Benefit and Financial Need Analysis Stadler Development March 5, 2018 COST-BENEFIT AND FINANCIAL NEED ANALYSIS STADLER DEVELOPMENT Zions Public Finance, Inc., has conducted

More information

G318 Local Mitigation Planning Workshop. Module 2: Risk Assessment. Visual 2.0

G318 Local Mitigation Planning Workshop. Module 2: Risk Assessment. Visual 2.0 G318 Local Mitigation Planning Workshop Module 2: Risk Assessment Visual 2.0 Unit 1 Risk Assessment Visual 2.1 Risk Assessment Process that collects information and assigns values to risks to: Identify

More information

Request for Proposals: Bond Underwriter

Request for Proposals: Bond Underwriter Request for Proposals: Bond Underwriter RFP Contact Inquiries regarding this RFP should be directed in writing to: Brittney Bateman Executive Envoy & Programs Manager Weber Basin Water Conservancy District

More information

Purpose The purpose of the Controller s Report is to provide summarized financial information on a monthly basis to the Board of Directors.

Purpose The purpose of the Controller s Report is to provide summarized financial information on a monthly basis to the Board of Directors. May 16, 2018 Attention: Administrative and Finance Committee Controller s Report on Monthly Financial Activity. (Information) Purpose The purpose of the Controller s Report is to provide summarized financial

More information

ANNEX B: TOWN OF BLUE RIVER

ANNEX B: TOWN OF BLUE RIVER ANNEX B: TOWN OF BLUE RIVER B.1 Community Profile Figure B.1 shows a map of the Town of Blue River and its location within Summit County. Figure B.1. Map of Blue River Summit County (Blue River) Annex

More information

COMMERCIAL LAND AVAILABLE ±10.19 ACRES (CAN BE SUBDIVIDED) CENTRAL ST E & 15TH AVE SE Lonsdale, MN 55046

COMMERCIAL LAND AVAILABLE ±10.19 ACRES (CAN BE SUBDIVIDED) CENTRAL ST E & 15TH AVE SE Lonsdale, MN 55046 -$400,000 (CAN BE SUBDIVIDED) CENTRAL ST E 5,700 VPD PROPERTY HIGHLIGHTS FAIRVIEW HEALTH MEDICAL CLINIC DOLLAR GENERAL + + Zoning: B2 - Highway & Business Service + + Tri-City United Public Schools ISD

More information

DIVISION OF WATER RESOURCES

DIVISION OF WATER RESOURCES DEPARTMENT OF NATURAL RESOURCES DIVISION OF WATER RESOURCES John W. Hickenlooper Governor Mike King Executive Director Dick Wolfe, P.E. Director/State Engineer Alan C. Martellaro, P.E. Division Engineer

More information

2011 MT Floods Damages and Recovery Options

2011 MT Floods Damages and Recovery Options MONTANA 2011 MT Floods Damages and Recovery Options Damage Estimates Public Works: Between $57.5 million Individual: id Housing Assistance $4,442,194 Small Business Assistance $1,634,100 Other Needs

More information

INTRODUCTION INTRODUCTION 1

INTRODUCTION INTRODUCTION 1 INTRODUCTION The provides a blueprint for the future growth and development of the City in the coming decade. The Comprehensive Plan is long-range in scope and represents a comprehensive update of the

More information

MPO Staff Report Technical Advisory Committee: April 8, 2015 MPO Executive Board: April 15, 2015

MPO Staff Report Technical Advisory Committee: April 8, 2015 MPO Executive Board: April 15, 2015 MPO Staff Report Technical Advisory Committee: April 8, 2015 MPO Executive Board: April 15, 2015 RECOMMENDED ACTION: Approve the Final. RECOMMENDED ACTION from TAC: Accept the Final and include the NDDOT

More information

King County Flood Control District Flood Risk Reduction Work Program and Accomplishments

King County Flood Control District Flood Risk Reduction Work Program and Accomplishments King County Flood Control District Flood Risk Reduction Work Program and Accomplishments Brian Murray Water and Land Resources Division April 26, 2016 Department of Natural Resources and Parks Water and

More information

FOR IMMEDIATE RELEASE April 15, 2019 Contact: Amy Bittner, Senior Economist. Wyoming Cost of Living Index for the Fourth Quarter of 2018

FOR IMMEDIATE RELEASE April 15, 2019 Contact: Amy Bittner, Senior Economist. Wyoming Cost of Living Index for the Fourth Quarter of 2018 FOR IMMEDIATE RELEASE April 15, 2019 Contact: Amy Bittner, Senior Economist Wyoming Cost of Living Index for the Fourth Quarter of 2018 CHEYENNE The State of Wyoming, Economic Analysis Division reported

More information

1.0 CITY OF HOLLYWOOD, FL

1.0 CITY OF HOLLYWOOD, FL 1.0 CITY OF HOLLYWOOD, FL PAVEMENT MANAGEMENT SYSTEM REPORT 1.1 PROJECT INTRODUCTION The nation's highways represent an investment of billions of dollars by local, state and federal governments. For the

More information

REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO OF THE CITY OF SAN JACINTO

REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO OF THE CITY OF SAN JACINTO REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO. 2003-1 OF THE CITY OF SAN JACINTO December 11, 2003 REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO. 2003-1 CITY OF SAN JACINTO Prepared for CITY OF SAN

More information

RATE STUDY. Town of Midland. HEMSON C o n s u l t i n g L t d.

RATE STUDY. Town of Midland. HEMSON C o n s u l t i n g L t d. WATER AND WASTEWATER RATE STUDY Town of Midland C o n s u l t i n g L t d. December 2010 TABLE OF CONTENTS EXECUTIVE SUMMARY.........1 I BACKGROUND AND STUDY OBJECTIVES.........9 ll ASSOCIATED LEGISLATION.........13

More information

Town of Montrose Annex

Town of Montrose Annex Town of Montrose Annex Community Profile The Town of Montrose is located in the Southwest quadrant of the County, east of the Town of Primrose, south of the Town of Verona, and west of the Town of Oregon.

More information

Wyoming Cost of Living Index

Wyoming Cost of Living Index Wyoming Cost of Living Index Overview and Uses of the WCLI Presented by: Justin Ballard, Senior Economist Economic Analysis Division, Wyoming State Government Friday, February 27, 2004 1 What is the WCLI?

More information

March 1, City of Painesville 2017 Grass Cutting and Trimming Proposal for Properties in Violation

March 1, City of Painesville 2017 Grass Cutting and Trimming Proposal for Properties in Violation March 1, 2017 Re: 2017 Grass Cutting and Trimming Proposal for Properties in Violation Dear Sir / Madam: Your company has been identified as an eligible grass cutting and trimming vendor for the. If you

More information

Port Jax Trade Center, Bldg 300

Port Jax Trade Center, Bldg 300 Port Jax Trade Center, Bldg 300 2629 PORT INDUSTRIAL DR, JACKSONVILLE, FL 32226 BUILD-TO-SUIT & LEASING OPPORTUNITIES Nominated 2014 NAIOP Developer of the Year! Designated Foreign Trade Zone #64 > > Bldg.

More information

DRAFT. Prioritizing the Implementation of Harris County Flood Control District 2018 Bond Projects

DRAFT. Prioritizing the Implementation of Harris County Flood Control District 2018 Bond Projects DRAFT Prioritizing the Implementation of Harris County Flood Control District 2018 Bond Projects February 27, 2019 Purpose This document provides the draft documentation for the Harris County Flood Control

More information

RESOLUTION NO

RESOLUTION NO RESOLUTION NO. 2016- A RESOLUTION OF THE BOARD OF DIRECTORS OF THE SADDLE CREEK COMMUNITY SERVICES DISTRICT ADOPTING INTENDED BALLOT LANGUAGE, AND CALLING AND PROVIDING FOR A SPECIAL MAILED BALLOT ELECTION

More information

1 INTRODUCTION 1.1 PURPOSE

1 INTRODUCTION 1.1 PURPOSE 1 INTRODUCTION 1.1 PURPOSE The County of Mariposa Board of Supervisors proposes to adopt the Mariposa County General Plan. This General Plan will replace the County s current General Plan, which was prepared

More information

Garfield County NHMP:

Garfield County NHMP: Garfield County NHMP: Introduction and Summary Hazard Identification and Risk Assessment DRAFT AUG2010 Risk assessments provide information about the geographic areas where the hazards may occur, the value

More information

Request for Qualifications

Request for Qualifications Request for Qualifications Needs Assessment and Feasibility Study For New El Centro Public Library Facility Release Date: January 22, 2015 Contact Information: City of El Centro Community Services Department

More information

Vision to Action: Creating and Using a Flood Risk Assessment for Identifying Mitigation Options

Vision to Action: Creating and Using a Flood Risk Assessment for Identifying Mitigation Options Vision to Action: Creating and Using a Flood Risk Assessment for Identifying Mitigation Options Lisa Graff, CFM, GISP Clayton Ballerine, CFM Brad McVay, CFM, GISP University of Illinois Prairie Research

More information

EAST CONTRA COSTA COUNTY HCP / NCCP MITIGATION FEE AUDIT DRAFT REPORT AND NEXUS STUDY. Prepared For: Prepared By:

EAST CONTRA COSTA COUNTY HCP / NCCP MITIGATION FEE AUDIT DRAFT REPORT AND NEXUS STUDY. Prepared For: Prepared By: EAST CONTRA COSTA COUNTY HCP / NCCP MITIGATION FEE AUDIT AND NEXUS STUDY DRAFT REPORT Prepared For: East Contra Costa County Habitat Conservancy Prepared By: Robert D. Spencer, Urban Economics Sally E.

More information

Wyoming. the Second. quarter of the second. the. extraction. sector the year. with. Comparative Cost of. Page 1 of 6

Wyoming. the Second. quarter of the second. the. extraction. sector the year. with. Comparative Cost of. Page 1 of 6 FOR IMMEDIATE RELEASE October 12, 2017 Contact: Amy Bittner, Senior Economist Wyoming Cost of Living Index for the Second Quarter of 2017 CHEYENNE The State of Wyoming, Economic Analysis Division reported

More information

EXECUTIVE SUMMARY. Greater Greenburgh Planning Area Planning Process

EXECUTIVE SUMMARY. Greater Greenburgh Planning Area Planning Process EXECUTIVE SUMMARY The Greater Greenburgh Planning Area All-Hazards Mitigation Plan was prepared in response to the Disaster Mitigation Act of 2000 (DMA 2000). DMA 2000 requires states and local governments

More information

PARK COUNTY, WYOMING AND INCORPORATED AREAS

PARK COUNTY, WYOMING AND INCORPORATED AREAS PARK COUNTY, WYOMING AND INCORPORATED AREAS Community Name Community Number CODY, CITY OF 560038 MEETEETSE, TOWN OF 560039 PARK COUNTY UNINCORPORATED AREAS 560085 POWELL, CITY OF 560040 June 18, 2010 Federal

More information

Wilder Research Information. Insight. Impact. Executive summary. Summary of key findings

Wilder Research Information. Insight. Impact. Executive summary. Summary of key findings Executive summary The goals of the State of the Infrastructure survey are: 1) to learn to what degree city, county, and state agencies are using asset management practices in Minnesota, and 2) to share

More information

REQUEST FOR QUALIFICATIONS Engineering Services for Aerial Sewer Line Construction Project SOUTH GRANVILLE WATER AND SEWER AUTHORITY October 31, 2018

REQUEST FOR QUALIFICATIONS Engineering Services for Aerial Sewer Line Construction Project SOUTH GRANVILLE WATER AND SEWER AUTHORITY October 31, 2018 Engineering Services for Aerial Sewer Line Construction Project SOUTH GRANVILLE WATER AND SEWER AUTHORITY October 31, 2018 I. PURPOSE/BACKGROUND The South Granville Water and Sewer Authority () is a water

More information

CHAPTER 11: Economic Development and Sustainability

CHAPTER 11: Economic Development and Sustainability AGLE AREA COMMUNITY Plan CHAPTER 11 CHAPTER 11: Economic Development and Sustainability Economic Development and Sustainability The overall economy of the Town and the Town government s finances are inextricably

More information

City of La Habra Heights. Benefit Assessment Districts. June 6, Presented by Pablo Perez, Director

City of La Habra Heights. Benefit Assessment Districts. June 6, Presented by Pablo Perez, Director City of La Habra Heights Benefit Assessment Districts June 6, 2016 Presented by Pablo Perez, Director 1 BENEFIT ASSESSMENT DISTRICTS Proposition 218 Defines Special Benefit as Particular and distinct benefit

More information

APPRAISAL/BROKERAGE QUESTIONNAIRE FOR CEMETERY

APPRAISAL/BROKERAGE QUESTIONNAIRE FOR CEMETERY www.acmcconsultants.com 1-800-888-8602 APPRAISAL/BROKERAGE QUESTIONNAIRE FOR CEMETERY I. GENERAL INFORMATION Contact Person: Contact Phone: Cemetery Name: Address: City: State: Zip: Form of Organization:

More information

Herkimer County, New York Flood Hazard Mapping Status Report for Property Owners

Herkimer County, New York Flood Hazard Mapping Status Report for Property Owners Herkimer County, New York Flood Hazard Mapping Status Report for Property Owners Herkimer County, New York Flood Hazard Mapping Status Report for Property Owners FLOOD INSURANCE Who Should Purchase Flood

More information

Guildford Borough Level 1 Strategic Flood Risk Assessment Summary Report. January 2016

Guildford Borough Level 1 Strategic Flood Risk Assessment Summary Report. January 2016 Guildford Borough Level 1 Strategic Flood Risk Assessment Summary Report January 2016 What is this document? This document provides a summary of Guildford Borough Strategic Flood Risk Assessment (SFRA,

More information

REQUEST FOR WRITTEN BIDS

REQUEST FOR WRITTEN BIDS Parks & Recreation Department 9355 E, Stockton Blvd., Suite 185 Elk Grove, CA 95624 REQUEST FOR WRITTEN BIDS TO: ALL PROSPECTIVE CONTRACTORS DATE: December 14, 2017 AMENDED 1/4/18 Bid Manager: Pamela Dawson,

More information

Innovation & Technology Budget Unit Program 2019 Proposed Budget Innovation & Technology $ 405, Innovation & Technology Administration

Innovation & Technology Budget Unit Program 2019 Proposed Budget Innovation & Technology $ 405, Innovation & Technology Administration Innovation & Technology Budget Unit Program 2019 Proposed Budget Innovation & Technology $ 405,034 100-30-300 Innovation & Technology Administration - 610-30-300 Innovation & Technology Administration

More information

FOR IMMEDIATE RELEASE October 16, 2018 Contact: Amy Bittner, Senior Economist. Wyoming Cost of Living Index for the Second Quarter of 2018

FOR IMMEDIATE RELEASE October 16, 2018 Contact: Amy Bittner, Senior Economist. Wyoming Cost of Living Index for the Second Quarter of 2018 FOR IMMEDIATE RELEASE October 16, 2018 Contact: Amy Bittner, Senior Economist Wyoming Cost of Living Index for the Second Quarter of 2018 CHEYENNE The State of Wyoming, Economic Analysis Division reported

More information

TERMS OF REFERENCE FOR CONSULTING SERVICES FOR A STORMWATER FUNDING STUDY

TERMS OF REFERENCE FOR CONSULTING SERVICES FOR A STORMWATER FUNDING STUDY TERMS OF REFERENCE FOR CONSULTING SERVICES FOR A STORMWATER FUNDING STUDY PROJECT OVERVIEW The City of Guelph (City) wishes to retain a consulting engineering firm to complete a Stormwater Funding Study.

More information

REQUEST FOR PROPOSALS. Planning in Water s Way: Flood Resilient Economic Development Strategy for the I-86 Innovation Corridor

REQUEST FOR PROPOSALS. Planning in Water s Way: Flood Resilient Economic Development Strategy for the I-86 Innovation Corridor REQUEST FOR PROPOSALS Planning in Water s Way: Flood Resilient Economic Development Strategy for the I-86 Innovation Corridor Southern Tier Central Regional Planning and Development Board (STC) is seeking

More information

Lower San Joaquin River Feasibility Report

Lower San Joaquin River Feasibility Report Sacramento District Planning Division Lower San Joaquin River Feasibility Report San Joaquin County, California APPENDIX A: ECONOMICS This page intentionally left blank RISK ANALYSIS OVERVIEW Risk is defined

More information

Valley Creek Trunk Sewer (VCTS) Evaluation Status. Tredyffrin Township Board of Supervisors Meeting

Valley Creek Trunk Sewer (VCTS) Evaluation Status. Tredyffrin Township Board of Supervisors Meeting Valley Creek Trunk Sewer (VCTS) Evaluation Status Tredyffrin Township Board of Supervisors Meeting June 16, 2014 Copyright 2011 by CH2M HILL, Inc. Company Confidential 2 2 Aerial View of VCTS Traverses

More information

CHAPTER 11. CAPITAL FACILITIES PLAN ELEMENT

CHAPTER 11. CAPITAL FACILITIES PLAN ELEMENT CHAPTER 11. CAPITAL FACILITIES PLAN ELEMENT 11.1 INTRODUCTION A is one of eight elements required by the Growth Management Act (GMA) to be included in Yakima County s comprehensive plan. The reason for

More information

Socrata Open Budget Capital Budget / CIP Schema

Socrata Open Budget Capital Budget / CIP Schema Socrata Open Budget Capital Budget / CIP Schema v2.3 Last Updated October 6th, 2015 Introduction Socrata s Open Budget allows you to visualize the revenues and expenses of your Operating Budget and Capital

More information

MINUTES CITY OF LONSDALE SPECIAL CITY COUNCIL MEETING APRIL 25, 2017

MINUTES CITY OF LONSDALE SPECIAL CITY COUNCIL MEETING APRIL 25, 2017 MINUTES CITY OF LONSDALE SPECIAL CITY COUNCIL MEETING APRIL 25, 2017 1. CALL TO ORDER Mayor Rud called a meeting of the Lonsdale City Council to order at 7:00 p.m. in the City Council Chambers, 415 Central

More information

Changes in Criteria and Scoring for CRS Outreach Projects

Changes in Criteria and Scoring for CRS Outreach Projects Changes in Criteria and Scoring for CRS Outreach Projects A Handout for the National Flood Insurance Program Community Rating System Many communities want to keep disseminating and obtaining CRS credit

More information

2016 End of Year Report

2016 End of Year Report 2016 End of Year Report Johnson County Weed and Pest Control District Mission and Policy The Johnson County Weed & Pest is committed to providing leadership and education for the long term management of

More information

Issued: October 3, 2016 Proposals Due: November 28, 2016

Issued: October 3, 2016 Proposals Due: November 28, 2016 REQUEST FOR QUALIFICATIONS PROFESSIONAL SERVICES For Boulder City Municipal Airport Issued: October 3, 2016 Proposals Due: November 28, 2016 Page 1 of 8 I. Introduction Request For Statements of Qualifications

More information

63-Farm & Ranch. Commercial, Farm & Ranch. Gr Schd Inc Vacancy Rt Gr Adj Inc. Total Exp. Net Opr Inc Cap Rate

63-Farm & Ranch. Commercial, Farm & Ranch. Gr Schd Inc Vacancy Rt Gr Adj Inc. Total Exp. Net Opr Inc Cap Rate Commercial/Indrl. Client Detail Report Listings as of 12/16/09 at 12:19am Lot: 8119 Frontage Rd Quincy 98848 Quincy Status Active Listing# 29166058 County Grant Area 292 Map 1 Grid: A-1 List Price 950,000

More information

American Council of Engineering Companies

American Council of Engineering Companies Summary of the 128 th Maine Legislature 2nd Regular Session Prepared for: American Council of Engineering Companies All laws have an effective date of August 1, 2018, unless otherwise noted. Bonds LD 139

More information

2019 ANNUAL BUDGET SALT LAKE CITY DEPARTMENT OF PUBLIC UTILITIES

2019 ANNUAL BUDGET SALT LAKE CITY DEPARTMENT OF PUBLIC UTILITIES 2019 ANNUAL BUDGET SALT LAKE CITY DEPARTMENT OF PUBLIC UTILITIES SEWER S E W E R STORM WATER S T O R M LIGHTING L I G H T S WATER W A T E R Serving Our Community and Protecting Our Environment FY2019 PUBLIC

More information

client user GUIDE 2011

client user GUIDE 2011 client user GUIDE 2011 STEP ACTION Accessing Risk Register 1. Type https://www.scm rms.ca/riskregister/login.aspx 2. Click in the Username field on the Risk Register home page. 3. Type your Username and

More information

Phase 1: Water Budget Based Rate Structure Feasibility Analysis

Phase 1: Water Budget Based Rate Structure Feasibility Analysis Attachment #1 SCOPE OF WORK NOTE: All references to meeting(s) will mean face-to-face meetings and not conference calls. Phase 1: Water Budget Based Rate Structure Feasibility Analysis Task 1: Kick-off

More information

Modernization, FEMA is Recognizing the connection between damage reduction and

Modernization, FEMA is Recognizing the connection between damage reduction and EXECUTIVE SUMMARY Every year, devastating floods impact the Nation by taking lives and damaging homes, businesses, public infrastructure, and other property. This damage could be reduced significantly

More information

FISCAL YEAR BUDGET Executive Summary

FISCAL YEAR BUDGET Executive Summary FISCAL YEAR 2014-15 BUDGET Executive Summary The requested budget of the Brevard County Property Appraiser addresses the obligations of the Office under the Constitution of the State of Florida and the

More information

Information Technology

Information Technology Mission Statement Information Technology The Department of Information Technology will ensure the citizens, Board of County Supervisors, County Executive and County agencies receive an excellent return

More information

Memorandum. From left to right as viewed from the audience or upon entering the main door of the chambers: Mayor Roger Perryn

Memorandum. From left to right as viewed from the audience or upon entering the main door of the chambers: Mayor Roger Perryn OFFICE OF THE CITY ADMINISTRATOR Memorandum Mayor Roger Perryn City Administrator Austin Gilley TO: Mayor and City Council From: Austin Gilley, City Administrator RE: Notes to accompany agenda packet for

More information

SAMPLE OFFICIAL BALLOT ANNUAL TOWN ELECTION RAYMOND, NEW HAMPSHIRE MARCH 12, 2019

SAMPLE OFFICIAL BALLOT ANNUAL TOWN ELECTION RAYMOND, NEW HAMPSHIRE MARCH 12, 2019 OFFICIAL BALLOT ANNUAL TOWN ELECTION RAYMOND, NEW HAMPSHIRE MARCH 12, 2019 BAllot 1 of 4 INSTRUCTIONS TO VOTERS A. to Vote, completely fill in the oval to the right of your choice(s) like this: B. Follow

More information

FLOODPLAIN DEVELOPMENT VARIANCE APPLICATION PACKET

FLOODPLAIN DEVELOPMENT VARIANCE APPLICATION PACKET FLOODPLAIN DEVELOPMENT VARIANCE APPLICATION PACKET Sutter County Water Resources Department 1130 Civic Center Boulevard Yuba City, California, 95993 (530) 822-7400 Floodplain management regulations cannot

More information

Proposed Omega Bay TIRZ. City of La Marque Public Hearing January 14, 2019

Proposed Omega Bay TIRZ. City of La Marque Public Hearing January 14, 2019 Proposed Omega Bay TIRZ City of La Marque Public Hearing January 14, 2019 Outline TIRZ Definition and How They Work TIRZ Creation Process Composition & Role of the Board of Directors Omega Bay TIRZ Concept

More information

Department of Transportation

Department of Transportation Department of Transportation Programs Primary Roads Local Roads County Roads Managing Director Office Management Permits, Traffic Services, and Safety Operations Project Management & Design Parma Crew

More information

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality WHAT IS A FLOOD? The National Flood Insurance Program defines a flood as a general and temporary condition of partial

More information

What Was Updated in 2004 in Hennepin Countywide Maps?

What Was Updated in 2004 in Hennepin Countywide Maps? What Was Updated in 2004 in Hennepin Countywide Maps? Combined the city and township maps into one countywide index Done by USACE Mainly digital capture of old floodplain boundaries; some spots with shifts

More information

CAPITAL OVERVIEW AND ALLOCATIONS

CAPITAL OVERVIEW AND ALLOCATIONS CAPITAL OVERVIEW AND ALLOCATIONS for BAR January 25, 2018 Cheryl Bivens (360) 704-4386 cbivens@sbctc.edu OWNED AND LEASED SQUARE FOOTAGE Square Feet 1,143,706 Leased 20,529,467 Owned 21,673,173 Total 2

More information

Mitigation Action Plan Alamance County

Mitigation Action Plan Alamance County Mitigation Action Plan Alamance County The Mitigation Action Plan for Alamance County is divided into two subsections: 7.1 Status of Previously Adopted Mitigation Actions 7.2 New 2015 Mitigation Actions

More information

Request for Qualifications Facilities Condition Assessment and Development Consulting Services City of Mobile Mobile, Alabama PL

Request for Qualifications Facilities Condition Assessment and Development Consulting Services City of Mobile Mobile, Alabama PL Request for Qualifications Facilities Condition Assessment and Development Consulting Services City of Mobile Mobile, Alabama PL-220-16 1.0 INTRODUCTION The City of Mobile is inviting qualified consultants

More information

Fort Bend County Levee Improvement District No. 2

Fort Bend County Levee Improvement District No. 2 FBCLID2.COM TABLE OF CONTENTS 2 What is a LID? Board of Directors Professional Services 3 District District Map and Levee Facts Fort Bend County Levee Improvement District No. 2 - Keeping Sugar Land Dry

More information

TOLEDO BEND PROJECT FERC NO FINAL LICENSE APPLICATION INITIAL STATEMENT

TOLEDO BEND PROJECT FERC NO FINAL LICENSE APPLICATION INITIAL STATEMENT TOLEDO BEND PROJECT FERC NO. 2305 FINAL LICENSE APPLICATION INITIAL STATEMENT September 2011 Copyright 2011. Sabine River Authority of Texas and Sabine River Authority, State of Louisiana. All Rights Reserved.

More information

Plan of Water Management

Plan of Water Management Plan of Water Management Special Improvement District No. 4 of the Rio Grande Water Conservation District Effective Date:, 20 DRAFT 056/306/2018 DRAFT 056/306/2018 Table of Contents 1.0 DEFINITIONS...

More information

CITY COUNCIL INFORMATION TRANSMITTAL September 3, Repair of Streets Damaged by RTA... 4

CITY COUNCIL INFORMATION TRANSMITTAL September 3, Repair of Streets Damaged by RTA... 4 CITY COUNCIL INFORMATION TRANSMITTAL September 3, 2015 The Following Council Action Requests Are Attached: Repair of Streets Damaged by RTA... 4 Memorandums Or Items Of Information Enclosed: Upcoming Public

More information

MARION COUNTY COMMISSION COUNTY COURT FEBRUARY 1, 2012

MARION COUNTY COMMISSION COUNTY COURT FEBRUARY 1, 2012 COUNTY COURT The Marion County Commission sat in regular session pursuant to its adjournment on Wednesday, Wednesday, January 25, 2012. Present were Commissioner Elliott, Commissioner Ward and President

More information

The Engineer has been requested to provide an estimate to complete Fontana 233 rd Avenue to 237 th Avenue.

The Engineer has been requested to provide an estimate to complete Fontana 233 rd Avenue to 237 th Avenue. January no Meeting LINWOOD TOWNSHIP ROAD & BRIDGE COMMITTEE February 2, 2016 7:00 p.m. Present: Chairman Bob Beckman, Craig Rylander, Tammie Lukkonen, Steve Strandland, Philip Osterhus - Township Supervisor

More information

THREE LAKES WATER AND SANITATION DISTRICT 2019 BUDGET DOCUMENTS

THREE LAKES WATER AND SANITATION DISTRICT 2019 BUDGET DOCUMENTS THREE LAKES WATER AND SANITATION DISTRICT 2019 BUDGET DOCUMENTS PO BOX 899 GRAND LAKE, CO 80447 970-627-3544 www.threelakesws.com THREE LAKES WATER AND SANITATION DISTRICT 1111 COUNTY ROAD 48 GRAND LAKE,

More information

TOWN OF GARDINER Page: 1 TRIAL BALANCE Date: 02/04/2016 Executed By: TOG-Darlene Time: 09:20:09

TOWN OF GARDINER Page: 1 TRIAL BALANCE Date: 02/04/2016 Executed By: TOG-Darlene Time: 09:20:09 1 TOWN OF GARDINER Page: 1 Date: 02/04/2016 Time: 09:20:09 YEAR 2016 FUND 00 GENERAL FUND CASH - DISBURSEMENTS 200 $ 14, 126.29 $ CASH - PAYROLL 202 $ 10, 882. 01 $ MONEY MARKET 204 $ 958, 549.59 $ CASH

More information

Quivira National Wildlife Refuge Impairment Complaint

Quivira National Wildlife Refuge Impairment Complaint Quivira National Wildlife Refuge Impairment Complaint Impairment Complaints in Kansas In Kansas, surface water and groundwater are all part of the same priority system and the administrative review must

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS FOR THE GENEVA ROAD AREA-WIDE PLAN Issued September 18, 2017 City of Orem 56 North State Street Orem Utah 84057 TABLE OF CONTENTS 1.0 Introduction... 2 1.2 The Successful Applicant...

More information

KETCHUM ESSENTIAL SERVICES FACILITIES TABLE OF CONTENTS

KETCHUM ESSENTIAL SERVICES FACILITIES TABLE OF CONTENTS TABLE OF CONTENTS TABLE OF CONTENTS 1 Introduction Existing Conditions Why New Facilities Locations Why A Central Location is Important Alternate Sites Why Now 2 City Hall Space Needs Purpose, Program,

More information