1 TERMS OF REFERENCE FOR CONSULTING SERVICES FOR A STORMWATER FUNDING STUDY PROJECT OVERVIEW The City of Guelph (City) wishes to retain a consulting engineering firm to complete a Stormwater Funding Study. The purpose of the study is to determine a sustainable funding mechanism for the City in order to support existing and future stormwater management and drainage needs as well as provide a secure funding source for the long term security and protection of the City s water resources. BACKGROUND In 2011, the City completed a Stormwater Management Master Plan which developed a long-term plan for the safe and effective management of stormwater runoff from urban areas while improving the ecosystem health and ecological sustainability of the Eramosa and Speed Rivers and their tributaries. The master plan integrated aspects of flood control, groundwater and surface water quality, natural environment and system drainage issues into a cohesive City-wide strategy. Due to the significant costs to implement drainage system upgrades recommended in the Master Plan, it was recommended that the City initiate a study to investigate alternative funding mechanisms including the potential for a Stormwater User Pay Rate or Utility Fee. Also in 2012, the City completed a study entitled Sustainable Infrastructure Report which quantified the full life cycle costs to sustain the City s water, wastewater, stormwater and transportation systems in perpetuity. The projected costs of operating, maintaining, and replacing the system components over the next 100 years were compared to the City s current budget in order to quantify the magnitude of the funding deficit or surplus. With respect to the stormwater system assets, the study concluded that the existing budget is significantly inadequate to sustainably maintain the system. The study recommended that the City conduct a formal review of its stormwater related funding sources and investigate the appropriateness of establishing a dedicated stormwater funding source. The City currently owns and operates an integrated stormwater system consisting of a conveyance system that includes pipes, maintenance holes and inlet structures. In addition, the City operates and maintains a variety of storm water facilities (channels, oil grit separators, and ponds). The construction of this system dates back to the early 1900s and consistently has been augmented over the years. 1

2 The City inventory includes information on approximately 457 km of city-owned storm sewers, 10 km of channels (concrete and natural), 7,250 city-owned maintenance holes, 9,565 city-owned single catch basins and 1,600 city-owned double catchbasins, 134 city-owned oil-grit separators and 110 storm water retention ponds. The total asset value of the stormwater system is approximately $506 million with an annual operation and maintenance expenditure of approximately $750,000. The current deferred capital backlog of needs for the linear portion of the stormwater system is approximately $25 Million. The estimated equivalent annual cost for the stormwater system is $6.4 Million. The 2012 budget for stormwater was $2.6 M for rehabilitation, replacement and upgrade / expansion projects. In order to cover the projected cost of $6.4 M for maintaining, repairing, replacing and upgrading / expanding the storm system, the budget would have to be increased by approximately 140%. The Stormwater Management Master Plan identified 25 priority projects to be completed in the first ten year for a total estimated cost of $15.6 million in order to bring the existing storm drainage system to design levels. The estimated total cost of remaining long term stormwater management projects for implementation beyond 2021 was $45.7 million. PROJECT GOALS & OBJECTIVES The purpose of the study is to determine a sustainable funding mechanism for the City in order to support existing and future stormwater management and drainage needs as well as provide a secure funding source for the long term security and protection of the City s water resources. SCOPE OF WORK The tasks associated with the completion of the Stormwater Funding Study are listed below. They have been grouped into main headings each representing decision points or areas of similar types of tasks. TASK 1 RESEARCH AND DATA COLLECTION 1. Assess the City s existing stormwater management programs, operations and maintenance practices, inventory, asset management, on-going monitoring, capital and operational budgeting and other related expenditures. 2

3 2. Utilize Geographic Information System (GIS) parcel fabric and aerial photography (existing and future land use, natural features and ecology, impervious and pervious surfaces), infrastructure inventory, master plans, studies and reports to facilitate assessment of the City s drainage and stormwater management needs. 3. Benchmark the City s stormwater management programs against those of other similar municipalities in Ontario, including levels of service, expenditures and funding mechanisms. TASK 2 LEVELS OF SERVICE AND FUNDING OPTIONS 1. Develop and evaluate various stormwater management program options the City could implement, based on increasing levels of service from current status to a full sustainable program that addresses current and future financial and regulatory demands. 2. Determine a preferred level of service and programs based on evaluation of level of service against a set of criteria which includes social acceptance, financial viability and defensibility. 3. Undertake a review of funding and revenue collection options that have been used to support similar municipal stormwater management programs and evaluate the advantages and disadvantages of each in relation to the City s needs and organizational structure based on established evaluation criteria and the levels of service previously determined. 4. Determine the appropriate funding sources and assess the potential impacts of each alternative funding source. TASK 3 RECOMMENDED PROGRAM AND FUNDING STRATEGY 1. Recommend a stormwater management program for the City to implement that will meet the desired levels of service, targets for compliance with regulations and guidelines, and other future pressures. 3

4 2. Present stormwater financing funding options and recommend the preferred option that offers a fair and equitable method for allocating the costs of the recommended stormwater management program. 3. Develop and evaluate several scenarios and preliminary financing structures for the preferred funding option. All available spatial information and data attributes, such as tax assessment data and GIS information, will be provided by the City for the purposes of this study in order to conduct statistical parcel analysis. 4. Develop a strategy to proceed with the implementation phase of the Stormwater Funding Study including specific tasks, schedule and goals that will inform decisions based on equity and fairness, full cost recovery, efficiency, practicality and environmental soundness. 5. Prepare an implementation plan based on the preferred funding source and rate structure including a discussion on the applicability and eligibility with respect to stormwater credits. TASK 4 COMMUNITY ENGAGEMENT AND REPORTING Community engagement and communication will be crucial to the success of this study. Parallel to the above activities, the consultant shall undertake the following in order to seek input and support the above tasks. It is expected that community engagement and communications activities will be completed in collaboration with the City s Corporate Communications department and Community Engagement department, as well as in accordance with the City s Community Engagement Framework, Corporate Identity Guidelines and House Style Guidelines. 1. Develop a Community Engagement and Communications Plan to identify and outline a framework and schedule for community engagement with City staff including Executive Team, Mayor and Councillors, Conservation Authority staff, Ministry staff, City Committees, private stakeholders, the business community, rate payers representatives and the general public in evaluating and developing stormwater programs, level of service and funding options. The City of Guelph Corporate Communications department will assist in the development of the communications approach in support of the Stormwater Funding Study, working closely with the successful 4

5 consultant and project lead. The communications component of the Community Engagement and Communications Plan will identify the communications goal, objectives, stakeholders, strategic approach, key messages, and tactics. The responsibility of implementing the required tactics of the community engagement and communications approach will be shared by the successful consultant and the designated City communications coordinator. A clear division of responsibilities will be identified once the Community Engagement and Communications Plan is finalized and approved. The City of Guelph Corporate Community Engagement team will assist in the development of the Community Engagement Plan in support of the Stormwater Funding Study, working closely with the successful consultant and project lead. The Community Engagement Plan will identify key processes and activities to obtain and use input from the community. The responsibility of implementing the required activities of the Community Engagement Plan will be shared by the successful consultant, the Project lead and the designated City community engagement coordinator. A clear division of responsibilities will be identified once the Community Engagement Plan is finalized and approved. 2. Lead and maintain contact with key internal City department throughout the course of the study through an Internal Steering Committee (ISC). It is expected that ISC will include Engineering Services, Public Works, Community Engagement and Finance staff. Other key City departments that may be included in the project are Corporate Communications, Water Services, Wastewater Services, Parks and Recreation, Information Technology and Legal and Realty Services. 3. Assist in the formation of a Stormwater Advisory Committee (SAC) with key stakeholders and ratepayers and facilitate a series of meetings with the committee to solicit feedback on the study components and provide support and advice to the ISC. The SAC would comprise of, but not be limited to, representatives from the community (business, industry, institutional development, etc.), agencies such as the Grand River Conservation Authority and Ministry of Environment, the environmental interest sector, residential rate payers/members of the public, the 5

6 Chamber of Commerce, School Boards, University of Guelph as well as Council members. As a minimum, the SAC will meet at least two times during the study. The consulting team will be responsible for facilitating SAC meetings, providing technical support and information for the committee and be required to document meeting minutes. Consulting team proposals are expected to include appropriate financial and staff resources for a total of two SAC meetings. The City may, within its sole discretion, increase the number of SAC meetings required and the consultant will be required to adjust their proposal work plan accordingly. 4. Make all arrangements for the required public notification and prepare all presentation drawings and materials for all public meetings. All paid advertising and promotional communications will need to be approved by Corporate Communications before implementation. The City will post the prepared notifications in the local newspaper and City website at its own cost. 5. Hold Public Information Centres (PIC) to seek feedback and input from the public on the project objective, preferred level of service, funding options, proposed evaluation criteria and preliminary recommended funding source. Consulting team proposals are expected to include appropriate financial and staff resources for a total of two PIC meetings. The City may, within its sole discretion, increase the number of PIC meetings required and the consultant will be required to adjust their proposal work plan accordingly. 6. Provide technical content and assistance for any print and broadcast media material in collaboration with the City s Corporate Communications Department. 7. Conduct education sessions with the Executive Team, the Mayor and Councillors. 8. In addition to the PIC and SAC meetings, the Consultant should budget for two half day project meetings with community stakeholder groups and affected agencies based on feedback received at the PIC and SAC meetings. 6

7 9. Prepare two interim reports for the ISC summarizing the work completed and documenting the evaluation process including feedback received in community engagement process and how input received was considered. The interim reports will outline how the recommended stormwater program and how the recommended funding option will meet the City s needs. 10. Provide a draft report to the City for review and comment. Based on all applicable input on the draft report, a final report will be provided upon completion of this assignment and Council approval. 11. Present report findings and recommendations to the City s Planning & Building, Engineering and Environment Committee and City Council. 12. Prepare a project charter and work plan consistent with the City s Corporate Strategic Project format and assist staff in updating the charter and work plan. In addition to the tasks listed above, consultant s are encouraged to propose additional communications and community engagement activities that would add value and be beneficial to the successful completion of the project. These optional activities should be clearly defined and costed separately. Evaluation criteria for Innovation will be taken into account when reviewing proposal submissions. SUMMARY OF DELIVERABLES The following deliverables will be required (all reports must be submitted in both Word and PDF electronic version in addition to the number of hardcopies indicated below): Interim Reports Nos. 1 and 2 (6 copies); Draft Report (6 copies); and Final Report (18 copies plus an original suitable for reproduction). The consultant shall be responsible for providing this list of deliverables and other deliverables mentioned in the Terms of Reference to the satisfaction of the City. 7

8 PROFESSIONAL SERVICES CONSULTANT SERVICES The successful firm will possess technical skills to deal with the complex matters to be addressed in the above-noted tasks and will be required to work directly with City staff, the public, agencies and stakeholders in a professional manner. To do this, we are interested in a firm, which in addition to technical qualifications exhibits such skills as timeliness, diplomacy, tact, strong communication ability (both written and verbal) and an understanding of the municipal culture. The successful consultant team must: have completed at least one similar study within the last five years in another municipality, preferably in Ontario and demonstrate an understanding of and insights in sustainable stormwater funding; have technical excellence and innovation in the field of municipal engineering including project management, stormwater management and regulations, operations and maintenance, mapping, geographic information systems and asset management; demonstrate public relations and mediation skills and expertise in community engagement. QUALITY CONTROL The consultant shall outline the measures that it has in place to ensure the quality of the deliverables and that they will meet the needs of the City. STUDY TIMETABLE The study is expected to commence in July, 2013 and be completed by February, The study schedule will be submitted in MS Project format. The schedule will be updated on a monthly basis to show project progress and submitted to the City with the consultant's monthly budget status report. The consultant shall allow two weeks for the review of draft interim deliverables and two weeks for the review and acceptance of final interim deliverables. The consultant shall allow two weeks for the review of the draft and final report. The draft report must be accepted by the City prior to presentation to the Planning & Building, Engineering, Environment Committee and City Council. 8

9 BACKGROUND INFORMATION The following reports are available for review from the City or on the City s website ( 1. Stormwater Management Master Plan City of Guelph, AMEC Environment and Infrastructure, City of Guelph Sustainable Infrastructure Report, AECOM, City of Guelph Official Plan, December 2012 Consolidation 4. City of Guelph Corporate Strategic Plan corporate-strategic-plan/ 5. City of Guelph Communications Plan 6. Various City of Guelph Plans and Strategies 7. City of Guelph 2013 Capital, Operating and Enterprise budgets The following reports are available for review on the City s website as per the instruction on page 2 of the proposal document Contract listing: 8. City of Guelph Stormwater Management Facility Inventory, Assessment and Maintenance Needs Plan, Totten Sims Hubicki, City of Guelph Community Engagement Framework, April City of Guelph Community Engagement Tools, April City of Guelph Community Engagement Worksheets, April 2013 Any findings and/or recommendations of any of the reports are intended only for reference and general guidance during the bidding process. It is the Bidders responsibility to review the findings and/or recommendations of these reports and to make their own determination of how these reports may affect the project and its submission. 9

10 SUBMISSION REQUIREMENTS PROPOSALS Proposals are to be limited to 25 pages, excluding forms, schedule, person-hours matrix, costs, transmittal letter, addendums and appendices. A page is defined as a single-sided sheet of 8.5" by 11" paper. The only exceptions to this will be the project schedules, flowcharts and/or person-hours matrix, which may be submitted on 11" by 17" paper. Provide one (1) original (clearly marked as Original ) and ten (10) copies of your submission. Proposals are to be typed using a font size no smaller than 11 pt (with the exception of footnotes and endnotes). Column format is not to be used. No project data sheets or company brochures are to be submitted. The proposal should contain the following sections: Transmittal Letter; Acknowledged Addendums; Introduction; Project Team identify prime consultant (with whom the City will enter into an agreement), brief description for each member firm and include an organizational structure chart; Key Personnel identify key personnel, provide a brief description of experience, their guaranteed availability and role in this assignment, include a reporting structure chart and reference name/phone number for three (3) recent assignments (less than 3 years old) completed by the proposed overall project manager or lead; Project Understanding and Approach description of the tasks in the proposed work plan to complete the assignment, critical path outline for study outlining the timing of meetings and provision of deliverables, project management approach, QA/QC program, approach to community engagement and seeking input from diverse group of stakeholders; Schedule provide a hardcopy of a proposed schedule in Microsoft Project format to complete the tasks in the proposed work plan as well as a person-hours matrix, outlining the hours each team member has allocated to each of the tasks in the proposed work plan; Relevant Experience list similar projects undertaken by each member firm of the Project Team including specific examples of community engagement and facilitation and specific examples of municipal stormwater funding study undertakings; 10

11 Commitment Letters appended, letters of commitment from member firms on their own letterhead and signed by an officer of the company reaffirming their commitment to this assignment; List of current projects and clients (municipal and private) within the City, and disclosures of any potential conflict of interest by any members of the consulting team. Resumes appended, 4 page maximum per person; Consultants are encouraged to identify and make recommendations about the efficiency and appropriateness of the tasks listed herein and the description of the time to complete each task group as described in the "Study Timetable" section that follows below. Consultants should also make any recommendations about measures/approaches that would make the most effective use of resources available for this study. As previously noted in Section 4.0, consultant s are encouraged to propose additional communications and community engagement activities that would add value and be beneficial to the successful completion of the project. These optional activities should be clearly defined and cost separately. Evaluation criteria for Innovation will be taken into account when reviewing proposal submissions. COST The consultant shall submit with their proposal a cost breakdown by major task and deliverables. Hourly rates for key personnel and support team members shall be provided. These hourly rates shall be effective for the duration of the project. The total budget for consultant fees and disbursements for this study, proposed by the consultant, should cover all the consultant's fees and disbursements to complete all the tasks and deliverables listed in these Terms of Reference. Prices are to include all materials, labour, equipment, delivery and handling, statutory expenses, overhead and profit, other related charges, mileage, travel time and expenses. The prices shall not include HST shall be considered extra. A matrix shall be provided including the outlining the hours and fees each team member has allocated to each of the tasks in the proposed work plan. The total estimated cost including disbursements presented for the work proposed shall be considered the upset limit. Fees should include time for preparation and attendance at all noted meetings, Public Information Centres, Committee and Council meetings. Meetings proposed beyond the project meetings are to be identified separately. 11

12 Consultant costs (fees and disbursements separately) will be monitored closely by City staff, with invoices paid on a time basis as tasks are completed and progress reports are received. A budget progress report must be submitted with every invoice identifying the status and expenditure of each individual task. If additional costs are to be incurred over the upset limit, written authority to proceed with these additional costs must be obtained prior to the additional charges being incurred. Further, no invoice will be honoured for any work whatsoever that was not authorized by purchase order. All invoices must have the purchase order number entered thereon. Any invoice received, which does not meet the above requirements, will be returned unpaid. All printed materials must be reproducible and available to the City in electronic format (Microsoft Word and Adobe PDF format). Costs of newspaper advertisements and rooms for public meetings will be the responsibility of the City. 12

Stormwater System Development Charges

Stormwater System Development Charges Methodology Report Stormwater System Development Charges Prepared For City of Springfield April 20, 2009 GALARDI CONSULTING, LLC PAGE 1 OF 9 SECTION 1 Introduction Oregon legislation establishes guidelines

More information

STORMWATER MANAGEMENT FUND Department of Environmental Services

STORMWATER MANAGEMENT FUND Department of Environmental Services Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

A loyal three made stronger in one. Loyalist Township Strategic Plan ( )

A loyal three made stronger in one. Loyalist Township Strategic Plan ( ) A loyal three made stronger in one Loyalist Township Strategic Plan (2012-2015) Adopted by Council on August 13, 2012 Loyalist Township Strategic Plan I. Community Profile As prescribed by the Ministry

More information

Strategic Asset Management Policy

Strategic Asset Management Policy Strategic Asset Management Policy Submission Date: 2018-04-24 Approved by: Council Approval Date: 2018-04-24 Effective Date: 2018-04-24 Resolution Number: Enter policy number. Next Revision Due: Enter

More information

Public Works & Infrastructure Committee. Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division

Public Works & Infrastructure Committee. Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division STAFF REPORT ACTION REQUIRED Contract Award Request for Proposals No. 9117-14-7110 Professional Engineering Services and Program Management Services for Basement Flooding Protection Program Date: June

More information

ASSET MANAGEMENT PLAN. HEMSON C o n s u l t i n g L t d. 30 Saint Patrick Street, Suite 1000 Toronto, ON, M5T 3A3

ASSET MANAGEMENT PLAN. HEMSON C o n s u l t i n g L t d. 30 Saint Patrick Street, Suite 1000 Toronto, ON, M5T 3A3 ASSET MANAGEMENT PLAN C o n s u l t i n g L t d. 30 Saint Patrick Street, Suite 1000 Toronto, ON, M5T 3A3 March 2017 TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 A. STATE OF THE LOCAL INFRASTRUCTURE... 1 B.

More information

Request for Proposals Drainage Master Plan

Request for Proposals Drainage Master Plan Request for Proposals 201-15 Drainage Master Plan The City of Dawson Creek invites proposals from qualified professionals or firms to undertake a drainage master plan. This master plan will include an

More information

The City of Owen Sound Asset Management Plan

The City of Owen Sound Asset Management Plan The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to

More information

Project Customization Guideline July, 2017

Project Customization Guideline July, 2017 Project Customization Guideline July, 2017 Check the Capital Project Delivery website to ensure this is the current version. Table of Contents Introduction... 1 Section I: Project Customization General

More information

Update on Municipal Asset Management Planning

Update on Municipal Asset Management Planning Update on Municipal Asset Management Planning Municipal Finance Officers Association Conference Ontario Ministry of Infrastructure September 20, 2017 Overview Municipal asset management planning in Ontario

More information

City of Arroyo Grande Department of Public Works REQUEST FOR PROPOSAL WATER AND WASTEWATER RATE STUDY UPDATE

City of Arroyo Grande Department of Public Works REQUEST FOR PROPOSAL WATER AND WASTEWATER RATE STUDY UPDATE I. INTRODUCTION City of Arroyo Grande Department of Public Works REQUEST FOR PROPOSAL WATER AND WASTEWATER RATE STUDY UPDATE The City of Arroyo Grande, California (the City ) was incorporated as a general

More information

CITY OF SACRAMENTO CALIFORNIA. April 27, 2012

CITY OF SACRAMENTO CALIFORNIA. April 27, 2012 OFFICE OF THE CITY MANAGER CALIFORNIA April 27, 2012 CITY HALL 5 th FLOOR 915 I STREET SACRAMENTO, CA 95814-2684 PH 916-808-5704 FAX 916-808-7618 Honorable Mayor and City Council Sacramento, California

More information

Implementation of an Asset Management Plan

Implementation of an Asset Management Plan Municipal Finance Officers Association of Ontario 2006 Annual Conference Implementation of an Asset Management Plan Chad McCleave, CA PricewaterhouseCoopers September 21, 2006 pwc Municipal Infrastructure

More information

SCOPE BACKGROUND PROJECT OBJECTIVE

SCOPE BACKGROUND PROJECT OBJECTIVE A SCOPE The TAC Environment Council is undertaking a project that will be carried out in two phases and will ultimately lead to the development of national-level guidance on compliance with the Migratory

More information

BUDGET DRAFT 1 November 19, 2019

BUDGET DRAFT 1 November 19, 2019 BUDGET 2019 DRAFT 1 November 19, 2019 Executive summary For the consideration of our Mayor and Council, City of Lloydminster Administration is pleased to provide a first draft of the 2019 Municipal Budget.

More information

City of Welland. Comprehensive Asset Management Plan. GMBP File: January 13, Prepared By:

City of Welland. Comprehensive Asset Management Plan. GMBP File: January 13, Prepared By: Prepared By: City of Welland Comprehensive Asset Management Plan GMBP File: 614013 January 13, 2015 GUELPH OWEN SOUND LISTOWEL KITCHENER EXETER HAMILTON GTA 650 WOODLAWN RD. W., BLOCK C, UNIT 2, GUELPH

More information

Ontario Energy Board

Ontario Energy Board Ontario Energy Board Commission de l énergie de l Ontario Ontario Energy Board Filing Requirements For Electricity Transmission Applications Chapter 2 Revenue Requirement Applications February 11, 2016

More information

A. All Responses to Request for Statements shall be sent to:

A. All Responses to Request for Statements shall be sent to: CITY OF FEDERAL WAY REQUEST FOR STATEMENT OF QUALIFICATIONS ARCHITECTURAL AND ENGINEERING SERVICES Surface Water Management ( SWM ) Comprehensive Plan Capital Improvements Program Update and Rate Study

More information

Stormwater Management Fee Policy Options and Recommendations

Stormwater Management Fee Policy Options and Recommendations Green Infrastructure Advisory Committee Report Stormwater Management Fee Policy Options and Recommendations Prepared for City of Lancaster, PA March 17, 2014 1717 Arch Street Suite 4400 Philadelphia, PA

More information

Winnipeg s Sewage Treatment Plant Upgrade and Expansion Program. Summary Document Of the Program Agreement Signed on April 20, 2011

Winnipeg s Sewage Treatment Plant Upgrade and Expansion Program. Summary Document Of the Program Agreement Signed on April 20, 2011 Winnipeg s Sewage Treatment Plant Upgrade and Expansion Program Summary Document Of the Program Agreement Signed on April 20, 2011 By the City of Winnipeg And Veolia 2 Executive Summary As directed by

More information

Infrastructure, Development and Enterprise Services. Clair-Maltby Secondary Plan Phase One Report and Recommended Vision and Guiding Principles

Infrastructure, Development and Enterprise Services. Clair-Maltby Secondary Plan Phase One Report and Recommended Vision and Guiding Principles Staff Report To Service Area Committee of the Whole Infrastructure, Development and Enterprise Services Date Tuesday, July 4, 2017 Subject Clair-Maltby Secondary Plan Phase One Report and Recommended Vision

More information

1. Work with the Stormwater Program to ensure robust participation in the process by an inclusive range of stakeholders.

1. Work with the Stormwater Program to ensure robust participation in the process by an inclusive range of stakeholders. Vermont Department of Environmental Conservation Watershed Management Division 1 National Life Drive [phone] 802-490-6169 Main 2 Montpelier, VT 05620-3522 www.watershedmanagement.vt.gov Agency of Natural

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL 2010-092204P CONSULTING SERVICES FLEET OPERATIONS ASSESSMENT Sealed proposals addressed to David Logan, Purchasing Agent, 2nd Floor, Municipal Operations Complex, 175 Rothesay Avenue,

More information

Asset Management Investment Plan

Asset Management Investment Plan Asset Management Plan Prepared for the City of Kimberley 304-1353 Ellis Street Kelowna, BC, V1Y 1Z9 T: 250.762.2517 F: 250.763.5266 June 2016 File: 1162.0014.01 A s s e t M a n a g e m e n t I n v e s

More information

August 22, Scott McLeod Water and Sewer Foreman Municipality of Arran-Elderslie P.O.Box 70, 1925 Bruce Rd 10 Chesley, ON N0G 1L0

August 22, Scott McLeod Water and Sewer Foreman Municipality of Arran-Elderslie P.O.Box 70, 1925 Bruce Rd 10 Chesley, ON N0G 1L0 101-16183-00 August 22, 2011 Scott McLeod Water and Sewer Foreman Municipality of Arran-Elderslie P.O.Box 70, 1925 Bruce Rd 10 Chesley, ON N0G 1L0 Re: Chesley Drinking Water System Financial Plan Dear

More information

CITY OF RAMSEY PRELIMINARY WORK PLAN FOR: 2040 COMPREHENSIVE PLAN UPDATE (DETAILED WORK PLANS TO BE DEVELOPED IN FUTURE STEPS)

CITY OF RAMSEY PRELIMINARY WORK PLAN FOR: 2040 COMPREHENSIVE PLAN UPDATE (DETAILED WORK PLANS TO BE DEVELOPED IN FUTURE STEPS) CITY OF RAMSEY PRELIMINARY WORK PLAN FOR: 2040 COMPREHENSIVE PLAN UPDATE (DETAILED WORK PLANS TO BE DEVELOPED IN FUTURE STEPS) PURPOSE: The intent of this document is to BEGIN discussions on developing

More information

Special City Council Meeting Agenda

Special City Council Meeting Agenda Special City Council Meeting Agenda Wednesday, November 8, 2017 2:00 p.m. Council Chambers, Guelph City Hall, 1 Carden Street Please turn off or place on non-audible all electronic devices during the meeting.

More information

ORDINANCE No. The City of Portland ordains: Section 1. The Council finds:

ORDINANCE No. The City of Portland ordains: Section 1. The Council finds: ORDINANCE No. Create Portland Utility Board to strengthen oversight functions for City s water, sewer and stormwater services (Ordinance; repeal and replace Code Chapter 3.123) The City of Portland ordains:

More information

Draft Transport Asset Management Plan

Draft Transport Asset Management Plan Agenda Item 9(i) Draft Transport Asset Management Plan Purpose To update the Auckland Transport Board on progress with respect to the Asset Management Plan (AMP). To seek approval to submit a draft of

More information

Stormwater Financing Feasibility Study for. Wrightsville Borough, Pennsylvania

Stormwater Financing Feasibility Study for. Wrightsville Borough, Pennsylvania 2015 Stormwater Financing Feasibility Study for Wrightsville Borough, Pennsylvania Prepared for Wrightsville Borough, Pennsylvania Prepared by University of Maryland Environmental Finance Center for the

More information

PW25. REPORT FOR ACTION

PW25. REPORT FOR ACTION PW25. REPORT FOR ACTION Contract Award for Tender Call 265-2017, Contract No. 17ECS-MI-03WA for the Rehabilitation of the Rosehill Reservoir and Amendment to Purchase Order No. 6045909 for Professional

More information

Water Resources Engineering Division Public Works City of Colorado Springs

Water Resources Engineering Division Public Works City of Colorado Springs Water Resources Engineering Division Public Works City of Colorado Springs Richard Mulledy, P.E. Division Manager City of Colorado Springs/Pueblo County IGA City of Colorado Springs/Pueblo County IGA $460

More information

Special City Council Meeting Agenda Consolidated as of February 1, 2019

Special City Council Meeting Agenda Consolidated as of February 1, 2019 Special City Council Meeting Agenda Consolidated as of February 1, 2019 Thursday, February 7, 2019 4:00 p.m. Council Chambers, Guelph City Hall, 1 Carden Street Please turn off or place on non-audible

More information

REQUEST FOR PROPOSALS FOR INVESTMENT ADVISORY SERVICES

REQUEST FOR PROPOSALS FOR INVESTMENT ADVISORY SERVICES REQUEST FOR PROPOSALS FOR INVESTMENT ADVISORY SERVICES CONTACT: Michelle Durgy, michelle.durgy@sfgov.org, (415) 554-5210 Background San Francisco is the fourth largest city in California and serves as

More information

City of Lewiston, Maine Advertisement for Request for Proposals Comprehensive Plan Update RFP #: Due Date: October 9, 2012

City of Lewiston, Maine Advertisement for Request for Proposals Comprehensive Plan Update RFP #: Due Date: October 9, 2012 City of Lewiston, Maine Advertisement for Request for Proposals Comprehensive Plan Update RFP #: 2012-051 Due Date: October 9, 2012 The City of Lewiston seeks the services of a qualified planning consultant

More information

Building a Better Tomorrow

Building a Better Tomorrow Building a Better Tomorrow Investing in Ontario s Infrastructure to Deliver Real, Positive Change A Discussion Paper on Infrastructure Financing and Procurement February 2004 2 BUILDING A BETTER TOMORROW

More information

CITY OF VAUGHAN FINANCE, ADMINISTRATION AND AUDIT COMMITTEE AGENDA

CITY OF VAUGHAN FINANCE, ADMINISTRATION AND AUDIT COMMITTEE AGENDA CITY OF VAUGHAN FINANCE, ADMINISTRATION AND AUDIT COMMITTEE AGENDA Monday, January 21, 2019 6:00 p.m. Council Chamber 2nd Floor, Vaughan City Hall 2141 Major Mackenzie Drive Vaughan, Ontario Pages 1. CONFIRMATION

More information

CITY OF GRAND RAPIDS

CITY OF GRAND RAPIDS OFFICE OF CITY ENGINEER CITY OF GRAND RAPIDS March 1, 2017 To: Prospective Professional Firms From: Office of the City Engineer City of Grand Rapids, Michigan RE: Request for Statement of Qualifications:

More information

Toronto Water Budget BU Recommended Operating Budget Recommended Capital Plan 2017 Recommended Water Rate

Toronto Water Budget BU Recommended Operating Budget Recommended Capital Plan 2017 Recommended Water Rate 2017 BU25.1 Toronto Water Budget 2017 Recommended Operating Budget 2017 2026 Recommended Capital Plan 2017 Recommended Water Rate Lou Di Gironimo, General Manager, Toronto Water Budget Committee, November

More information

OPERATING PLAN FOR CALENDAR YEAR 2016 BUSINESS IMPROVEMENT DISTRICT NO. 1 OF THE CITY OF WAUSAU, WISCONSIN

OPERATING PLAN FOR CALENDAR YEAR 2016 BUSINESS IMPROVEMENT DISTRICT NO. 1 OF THE CITY OF WAUSAU, WISCONSIN OPERATING PLAN FOR CALENDAR YEAR 2016 BUSINESS IMPROVEMENT DISTRICT NO. 1 OF THE CITY OF WAUSAU, WISCONSIN {00081496.DOC/1} OPERATING PLAN FOR CALENDAR YEAR 2016 BUSINESS IMPROVEMENT DISTRICT NO. 1 OF

More information

Village of Minburn Viability Review

Village of Minburn Viability Review Village of Minburn Viability Review Viability Plan February 2015 A report concerning the viability of the Village of Minburn by the Village of Minburn Viability Review Team Village of Minburn Viability

More information

DRAFT. Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY

DRAFT. Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY DRAFT Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY JANUARY 2019 Table of Contents Introduction 3 Definitions 3

More information

SCOPE OF SERVICES FOR ALTERNATIVE CORRIDOR EVALUATION

SCOPE OF SERVICES FOR ALTERNATIVE CORRIDOR EVALUATION EXHIBIT A SCOPE OF SERVICES FOR ALTERNATIVE CORRIDOR EVALUATION SR 56 EXTENSION FROM US 301/SR 41 TO US 98/SR 35/SR 700 District Seven Pasco County This Scope of Services is an Exhibit which is incorporated

More information

Special Meeting of Council. 1.1 Strategic Decision Making; Council Priorities, Core Service Review and 2013 Service-Based Budget Process

Special Meeting of Council. 1.1 Strategic Decision Making; Council Priorities, Core Service Review and 2013 Service-Based Budget Process City of Saint John Common Council Meeting Wednesday, July 18, 2012 Special Meeting of Council 1. Call to Order Prayer 9:30 a.m. Council Chamber 1.1 Strategic Decision Making; Council Priorities, Core Service

More information

As outlined in Memo #2, a number of alternatives are being considered for the development of the stormwater credit program and are listed below.

As outlined in Memo #2, a number of alternatives are being considered for the development of the stormwater credit program and are listed below. MEMORANDUM City of Kitchener City Hall, 200 King St. West P.O. Box 1118 Kitchener, ON N2G 4G7 Date: September 20, 2011 To: From: cc: Steering Committee Members Nick Gollan and Nancy Corbett Project Team

More information

JOB ADVERTISEMENT. I. Job Title : Urban Regional Planner and Geo-Spatial Analyst (National Only)

JOB ADVERTISEMENT. I. Job Title : Urban Regional Planner and Geo-Spatial Analyst (National Only) JOB ADVERTISEMENT I. Job Title : Urban Regional Planner and Geo-Spatial Analyst (National Only) II. Job Reference : RDTL-MPIE-MPS-2016-010 III. Terms of Reference : Attached IV. Application procedure Applications

More information

MUNICIPALITY OF ARRAN-ELDERSLIE CHESLEY DRINKING WATER SYSTEM FINANCIAL PLAN

MUNICIPALITY OF ARRAN-ELDERSLIE CHESLEY DRINKING WATER SYSTEM FINANCIAL PLAN MUNICIPALITY OF ARRAN-ELDERSLIE CHESLEY DRINKING WATER SYSTEM FINANCIAL PLAN 15-013 GSS Engineering Consultants Ltd. Unit 104D 1010 9 th Avenue West Owen Sound ON N4K 5R7 519.372.4828 TABLE OF CONTENTS

More information

Town of Aurora General Committee Report

Town of Aurora General Committee Report Town of Aurora General Committee Report No. PBS16-085 Subject: Town of Aurora Strategic Plan Update What We Heard Prepared by: Anthony Ierullo, Manager of Long Range and Strategic Planning Department:

More information

Please turn off or place on non-audible all cell phones, PDAs, Blackberrys and pagers during the meeting.

Please turn off or place on non-audible all cell phones, PDAs, Blackberrys and pagers during the meeting. CITY COUNCIL AGENDA Council Chambers, Guelph City Hall, 1 Carden Street DATE Tuesday, November 5, 2013 6:00 p.m. Please turn off or place on non-audible all cell phones, PDAs, Blackberrys and pagers during

More information

CITY OF DUNDAS, MINNESOTA CITY ENGINEER REQUEST FOR PROPOSALS (RFP)

CITY OF DUNDAS, MINNESOTA CITY ENGINEER REQUEST FOR PROPOSALS (RFP) CITY OF DUNDAS, MINNESOTA CITY ENGINEER REQUEST FOR PROPOSALS (RFP) The is requesting written proposals from professional engineering firms to provide consulting services as a City Engineer. The City expects

More information

Asset Management Plan 2016 Township of King

Asset Management Plan 2016 Township of King Asset Management Plan 206 Township of King GHD Allstate Parkway Suite 30 Markham Ontario L3R 9T8 T 905 752 4300 F 905 752 430 5432 Table of Contents. 2. 3. 4. 5. 6. Executive Summary. Introduction.2 State

More information

LAMBTON AREA WATER SUPPLY SYSTEM WATER ONTARIO REGULATION 453/07 FINANCIAL PLAN FINANCIAL PLAN #

LAMBTON AREA WATER SUPPLY SYSTEM WATER ONTARIO REGULATION 453/07 FINANCIAL PLAN FINANCIAL PLAN # LAMBTON AREA WATER SUPPLY SYSTEM WATER ONTARIO REGULATION 453/07 FINANCIAL PLAN FINANCIAL PLAN # 020-301 DECEMBER 17, 2014 CONTENTS Page 1. INTRODUCTION 1.1 Study Purpose 1-1 1.2 Background 1-1 1.2.1

More information

City of Barrie Water and Wastewater Ontario Regulation 453/07 Financial Plans. Financial Plan # A

City of Barrie Water and Wastewater Ontario Regulation 453/07 Financial Plans. Financial Plan # A City of Barrie Water and Wastewater Ontario Regulation 453/07 Financial Plans Financial Plan # 014-301A October 7, 2015 Contents Page 1. Introduction... 1-1 1.1 Study Purpose... 1-1 1.2 Background...

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL The City of Sachse is soliciting submittals for the herein described services and/or commodities for the purpose defined in this document. By responding to this request, the offeror

More information

FUTURE STORMWATER CONTROLS PROGRAM RULES (ARTICLE 5)

FUTURE STORMWATER CONTROLS PROGRAM RULES (ARTICLE 5) FUTURE STORMWATER CONTROLS PROGRAM RULES (ARTICLE 5) Catskill Watershed Corporation PO Box 569 Margaretville, NY 12455 (845) 586-1400 Approved by the Board of Directors June 23, 1998 Revised April 5, 2016

More information

Statement of Policy. Milwaukee Metropolitan Sewerage District s Private Property Inflow and Infiltration Reduction Program.

Statement of Policy. Milwaukee Metropolitan Sewerage District s Private Property Inflow and Infiltration Reduction Program. Milwaukee Metropolitan Sewerage District s 2011-2020 Private Property Inflow and Infiltration Reduction Program Introduction Infiltration is the quantity of water entering a sewer system through such sources

More information

The University of Western Ontario Department of Political Science Master of Public Administration, Local Government Program

The University of Western Ontario Department of Political Science Master of Public Administration, Local Government Program The University of Western Ontario Department of Political Science Master of Public Administration, Local Government Program Nigel Bellchamber 519-61-1189 E-mail: nbellcha@uwo.ca PA 9912b Financial Management

More information

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES DEPARTMENT OF ENVIRONMENTAL SERVICES Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

REQUEST FOR QUALIFICATIONS & PROPOSALS. Julie Wilkie Assistant City Manager:

REQUEST FOR QUALIFICATIONS & PROPOSALS. Julie Wilkie Assistant City Manager: REQUEST FOR QUALIFICATIONS & PROPOSALS PROJECT NAME: Continuing Professional Engineering Services DESCRIPTION: DATE ISSUED: 8/22/2018 The City of Greenwood is soliciting proposals from professional engineering

More information

TOWNSHIP OF UPPER ST. CLAIR LONG-TERM PLAN

TOWNSHIP OF UPPER ST. CLAIR LONG-TERM PLAN FIVE YEAR PROJECTION FIVE YEAR PROJECTION OVERVIEW The Five Year Projection for all Township Funds is a tool in which the Board of Commissioners and Township Staff can monitor potential funding impacts

More information

Scope of Work. Water Resource Management in Mendocino County: Situation Analysis for the Mendocino County Water Agency

Scope of Work. Water Resource Management in Mendocino County: Situation Analysis for the Mendocino County Water Agency Scope of Work Water Resource Management in Mendocino County: Situation Analysis for the Mendocino County Water Agency John M. Harper, UCCE County Director and Livestock & Natural Resources Advisor David

More information

THREE RIVERS AREA YOUTH SPORTS COMPLEX. Request for PROPOSALS. 333 West Michigan Ave. Three Rivers, Michigan,

THREE RIVERS AREA YOUTH SPORTS COMPLEX. Request for PROPOSALS. 333 West Michigan Ave. Three Rivers, Michigan, City of Three Rivers THREE RIVERS AREA YOUTH SPORTS COMPLEX Request for PROPOSALS 333 West Michigan Ave. Three Rivers, Michigan, 49093 269 273 1075 www.threeriversmi.org Engineering Services for the Youth

More information

Resident Strategic Plan Input Report

Resident Strategic Plan Input Report City of Warrenville, Illinois Strategic/Economic Development Plan DuPage Forest Preserve Warrenville Grove Bridge Report 1 Resident Strategic Plan Input Report Page Intentionally Left Blank for Double-Sided

More information

We are looking to keep the same Comp Plan format and just update the chapters.

We are looking to keep the same Comp Plan format and just update the chapters. RFP ADDENDUM A. Q&A 1. Are you expecting a similar format to the last round? We are looking to keep the same Comp Plan format and just update the chapters. 2. Are you envisioning a simpler update to incorporate

More information

IPP TRANSACTION ADVISOR TERMS OF REFERENCE

IPP TRANSACTION ADVISOR TERMS OF REFERENCE IPP TRANSACTION ADVISOR TERMS OF REFERENCE Terms of reference for transaction advisor services to the Government of [ ] for the [insert description of the project] (the Project ). Contents 1. Introduction

More information

SUDBURY EAST PLANNING BOARD

SUDBURY EAST PLANNING BOARD REQUEST FOR PROPOSALS Sealed Proposals For: FIVE (5) YEAR OFFICIAL PLAN REVIEW TO ADOPT A NEW OFFICIAL PLAN As Described Herein and Addressed: Matthew Dumont, Director of Planning 39 Lafontaine Street,

More information

Statement of Qualifications and Proposal

Statement of Qualifications and Proposal Statement of Qualifications and Proposal Date: February 24, 2016 Re: Solano Community College District Pavement Assessment Project (Fairfield Campus) 4000 Suisun Valley Road, Fairfield, CA Package includes

More information

MUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES

MUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES MUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES TO: FROM: Mayor and Members of Council Gerry Wolting, B. Math, CPA, CA General Manager, Corporate Services DATE: January 13, 2014 SUBJECT: 2013 Asset Management

More information

CHAPTER 11. CAPITAL FACILITIES PLAN ELEMENT

CHAPTER 11. CAPITAL FACILITIES PLAN ELEMENT CHAPTER 11. CAPITAL FACILITIES PLAN ELEMENT 11.1 INTRODUCTION A is one of eight elements required by the Growth Management Act (GMA) to be included in Yakima County s comprehensive plan. The reason for

More information

STORMWATER UTILITY FEE CREDIT MANUAL

STORMWATER UTILITY FEE CREDIT MANUAL Single-Family Residential Properties STORMWATER UTILITY FEE CREDIT MANUAL Department of Public Works Stormwater Management Program 941 Fir Street Waynesboro, Virginia 22980 (540) 942-6624 waynesboro.va.us/291/stormwateradministration

More information

Request for Proposals Tri-Town Sports Arena & Field House Feasibility Study

Request for Proposals Tri-Town Sports Arena & Field House Feasibility Study Request for Proposals Tri-Town Sports Arena & Field House Feasibility Study Tri-Town Recreation Committee & the Towns of Highgate, Swanton and Franklin 2012 I. Request for Proposal and Project Schedule:

More information

City of Terrace. Request for Proposals Pedestrian Overpass Concept Design & Feasibility Study. Issue Date: January 31, 2018

City of Terrace. Request for Proposals Pedestrian Overpass Concept Design & Feasibility Study. Issue Date: January 31, 2018 City of Terrace Request for Proposals Issue Date: January 31, 2018 Closing Date: March 2, 2018 City of Terrace 5003 Graham Avenue Terrace, BC V8G 1B3 Contact: David Block Director of Development Services

More information

A Quick Guide to Defining and Funding Your Municipal Stormwater Program Merrimack Valley Stormwater Collaborative

A Quick Guide to Defining and Funding Your Municipal Stormwater Program Merrimack Valley Stormwater Collaborative A Quick Guide to Defining and Funding Your Municipal Stormwater Program Merrimack Valley Stormwater Collaborative June 3, 2015 Ellie Baker Horsley Witten Group, Inc. What will we cover today? Introduction

More information

Project 2.9 Guidance on best practices in river basin planning

Project 2.9 Guidance on best practices in river basin planning Common Strategy for the Implementation of the Water Framework Directive Project 2.9 Guidance on best practices in river basin planning Information supply Consultation Active involvement Introduction Common

More information

Request for Qualifications

Request for Qualifications Request for Qualifications Needs Assessment and Feasibility Study For New El Centro Public Library Facility Release Date: January 22, 2015 Contact Information: City of El Centro Community Services Department

More information

Stormwater Management Utility Fee Reduction Credit Application

Stormwater Management Utility Fee Reduction Credit Application Stormwater Management Utility City of Dubuque, IA Winter 2003 Stormwater Management Utility Stormwater Management Utility Introduction The City of Dubuque established a Stormwater Management Utility on

More information

2019 CAPITAL BUDGET BRIEFING NOTE State of Good Repair (SOGR) Backlog

2019 CAPITAL BUDGET BRIEFING NOTE State of Good Repair (SOGR) Backlog BN#13 Feb 13 Josie La Vita Executive Director Heather Taylor Chief Financial Officer and Treasurer Financial Planning Division City Hall, 7 th Floor, East Tower 100 Queen Street West Toronto, Ontario,

More information

Consulting Services - Cable Television System Franchise Renewal CLOSING LOCATION: EXECUTIVE OFFICE CITY OF LONGVIEW 1525 BROADWAY LONGVIEW, WA 98632

Consulting Services - Cable Television System Franchise Renewal CLOSING LOCATION: EXECUTIVE OFFICE CITY OF LONGVIEW 1525 BROADWAY LONGVIEW, WA 98632 REQUEST FOR PROPOSAL Consulting Services - Cable Television System Franchise Renewal ISSUE DATE: October 1, 2014 CLOSING LOCATION: EXECUTIVE OFFICE CITY OF LONGVIEW 1525 BROADWAY LONGVIEW, WA 98632 CLOSING

More information

Proposed FY Storm Drainage Management Fund Budget. Presented to the Dallas City Council August 19, 2009

Proposed FY Storm Drainage Management Fund Budget. Presented to the Dallas City Council August 19, 2009 Proposed FY2009 10 Storm Drainage Management Fund Budget Presented to the Dallas City Council August 19, 2009 Purpose Storm Drainage Management (SDM) Fund background Current rate structure Proposed rates

More information

That the report from the Director of Finance regarding the Strategic Asset Management Policy, dated June 20, 2018, be received; and

That the report from the Director of Finance regarding the Strategic Asset Management Policy, dated June 20, 2018, be received; and Staff Report To: From: Mayor and Council Jeff Schmidt, Director of Finance Date: June 20, 2018 Subject: Strategic Asset Management Policy Report Highlights Provincial regulation (O.Reg. 588/17 - Asset

More information

Lake County Stormwater Utility Fee

Lake County Stormwater Utility Fee County of Lake Stormwater Management Department 550 Blackbrook Road Painesville, OH 44077 Phone: (440) 350-2770 Fax: (440) 352-8133 www.lakecountyohio.org/smd Lake County Stormwater Utility Fee Credit

More information

Environment and Climate Protection Committee. Tax Supported Programs

Environment and Climate Protection Committee. Tax Supported Programs Environment and Climate Protection Committee Tax Supported Programs Tabled November 8, 2017 Table of Contents Environment and Climate Protection Committe - Tax Supported Briefing Notes... 1 Infrastructure

More information

Capital and Debt. Capital Expenditures 2017 to 2021 Capital Plan. Capital Plan Introduction. PSAB Tangible Capital Asset Five year Capital Plan

Capital and Debt. Capital Expenditures 2017 to 2021 Capital Plan. Capital Plan Introduction. PSAB Tangible Capital Asset Five year Capital Plan Capital and Debt CAPITAL AND DEBT Capital Expenditures 2017 to 2021 Capital Plan Capital Plan Introduction Asset Management Plans Bringing it all Together The City of Regina is building an asset management

More information

Stormwater System Asset Management Plan. June 2018

Stormwater System Asset Management Plan. June 2018 Stormwater System Asset Management Plan June 2018 City Council Citizens, stakeholders Strategic Priorities Level of Service Goals Performance Measures What actions are needed to meet Level of Service Goals

More information

Request for Proposals Town of Florence Strategic Plan

Request for Proposals Town of Florence Strategic Plan Request for Proposals Strategic Plan P.O. Box 2670 775 North Main Street Florence, Arizona 85132 Issued: November 19, 2015 Table of Contents 1.0 Invitation/Public Notice 1 2.0 Introduction/Background 3

More information

Water Utility Disinfection Survey

Water Utility Disinfection Survey 6666 West Quincy Avenue Denver, CO 80235-3098 T 303.794.7711 www.awwa.org American Water Works Association Request for Proposal Water Utility Disinfection Survey Issued by: Technical and Education Council

More information

INTRODUCTION TABLE OF CONTENTS

INTRODUCTION TABLE OF CONTENTS INTRODUCTION TABLE OF CONTENTS PAGE Overview... 3 Capital Improvement Policy... 5 Relationship Between Capital Projects and Operating Budgets... 7 Art in Public Places Program... 8 Categorization of Capital

More information

DRAFT MULTI-YEAR Water and Wastewater & Treatment Budget December 17, ANNUAL UPDATE INVESTING IN OUR FUTURE. london.

DRAFT MULTI-YEAR Water and Wastewater & Treatment Budget December 17, ANNUAL UPDATE INVESTING IN OUR FUTURE. london. 6 MULTI-YEAR BUDGET FOR THE 2019 ANNUAL UPDATE INVESTING IN OUR FUTURE london.ca/budget DRAFT 2019 Water and Wastewater & Treatment Budget December 17, 2018 Table of Contents Recommendations... 1 WATER

More information

Table of Contents. Page Witness Background and Experience General Matters Major Wastewater Rate Changes Wastewater Revenue...

Table of Contents. Page Witness Background and Experience General Matters Major Wastewater Rate Changes Wastewater Revenue... MSD Exhibit No. MSD H 0 Rate Change Proceeding WILLIAM STANNARD Direct Testimony Metropolitan St. Louis Sewer District February, 0 Table of Contents Page Witness Background and Experience... General Matters...

More information

The Corporation of Haldimand County. Consolidated Financial Statements

The Corporation of Haldimand County. Consolidated Financial Statements Consolidated Financial Statements December 31, 2016 Index to Consolidated Financial Statements December 31, 2016 Page INDEPENDENT AUDITORS' REPORT 2 CONSOLIDATED FINANCIAL STATEMENTS Management's Responsibility

More information

THE CORPORATION OF THE CITY OF MISSISSAUGA STORMWATER FEES AND CHARGES BY-LAW (amended by , , )

THE CORPORATION OF THE CITY OF MISSISSAUGA STORMWATER FEES AND CHARGES BY-LAW (amended by , , ) THE CORPORATION OF THE CITY OF MISSISSAUGA STORMWATER FEES AND CHARGES BY-LAW 135-15 (amended by 292-15, 296-16, 219-17) WHEREAS sections 8, 9 and 11 of the Municipal Act, 2001, S.O. 2001, c. 25, authorize

More information

SCOPE OF SERVICES FOR ALTERNATIVE CORRIDOR EVALUATION

SCOPE OF SERVICES FOR ALTERNATIVE CORRIDOR EVALUATION EXHIBIT A SCOPE OF SERVICES FOR ALTERNATIVE CORRIDOR EVALUATION US 301/US 98/SR 35/SR 700/Clinton Avenue Intersection Realignment Study District Seven Pasco County This Scope of Services is an Exhibit

More information

Attachment B. King County Flood Control Zone District Work Program

Attachment B. King County Flood Control Zone District Work Program Attachment B King County Flood Control Zone District Work Program The King County Flood Control Zone District work program is comprised of two major categories: Programmatic Work Program o Flood Preparedness,

More information

REQUEST FOR QUALIFICATIONS FOR ON-CALL PROJECT MANAGEMENT AND TECHNICAL SUPPORT SERVICES

REQUEST FOR QUALIFICATIONS FOR ON-CALL PROJECT MANAGEMENT AND TECHNICAL SUPPORT SERVICES REQUEST FOR QUALIFICATIONS FOR ON-CALL PROJECT MANAGEMENT AND TECHNICAL SUPPORT SERVICES SEPTEMBER 2018 Submit proposal to: Tony Williams, Principal Civil Engineer Marin County Flood Control & Water Conservation

More information

Draft Strategic Asset Management Plan

Draft Strategic Asset Management Plan Draft Strategic Asset Management Plan 2016-2026 December 2015 Revised to include Special Rate Variation Scenarios The capital works programs included in this Strategic Asset Management Plan are subjected

More information

City of Kingston Report to Council Report Number

City of Kingston Report to Council Report Number To: From: Resource Staff: City of Kingston Report to Council Report Number 18-004 Mayor and Members of Council Date of Meeting: Subject: Lanie Hurdle, Commissioner, Community Services Paige Agnew, Director,

More information

PPP Regulation in Jordan

PPP Regulation in Jordan PPP Regulation in Jordan We, Abdullah the Second Bin Al-Hussein, King of the Hashemite Kingdom of Jordan, pursuant to Article (31) of the Constitution and what was decided by the Council of Ministers on

More information

Funding Methods and Revenue Generating Capacity

Funding Methods and Revenue Generating Capacity TOWNSHIP OF FERGUSON Funding Methods and Revenue Generating Capacity Executive Summary The purpose of this paper is to examine the funding mechanisms available to the Township to support a stormwater management

More information

Scope of Services. 0.3 Project Administration DRG will provide project administration and monthly invoicing.

Scope of Services. 0.3 Project Administration DRG will provide project administration and monthly invoicing. Scope of Services Summary Statement The City of Sammamish is seeking consultant assistance from Davey Resource Group (DRG), a division of The Davey Tree Expert Company to provide professional urban forestry

More information

Allen County Highway Engineering Department Problems and Progress

Allen County Highway Engineering Department Problems and Progress Allen County Highway Engineering Department Problems and Progress K a r l J o h n s o n Allen County Highway Engineer Fort Wayne, Indiana IN T R O D U C T IO N The present and future traffic demands and

More information