VIE: Central Mekong Delta Connectivity Project Can Tho City

Size: px
Start display at page:

Download "VIE: Central Mekong Delta Connectivity Project Can Tho City"

Transcription

1 Income Restoration Program February 2015 VIE: Central Mekong Delta Connectivity Project Can Tho City Prepared by Ministry of Transport, Cuu Long Corporation for Investment, Development and Project Management of Infrastructure for the Asian Development Bank. This is an updated version of the draft originally posted in April 2013 available on

2 NOTE In this report, "$" refers to US dollars. This final detailed income restoration program is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the terms of use section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Some information have been removed as they fall within exceptions to disclosure specified in paragraph 97(x) of ADB s Public Communications Policy (2011).

3 MINISTRY OF TRANSPORT Cuu Long Corporation for Investment, Development and Project Management of Infrastructure (Cuulong CIPM) Central Mekong Delta Region Connectivity Project (CMDCP) Detailed Design, Procurement and Implementation Support Services TA 7822-VIE Contract No.: 720A/CIPM-HDKT FINAL DETAILED INCOME RESTORATION PROGRAM FOR CAN THO CITY Joint Venture: CDM Smith, Inc., WSP Finland Limited & Yooshin Engineering Corporation Group 5, Tan Tich Hamlet, Tinh Thoi commune, Cao Lanh City, Dong Thap province Tel: (84) ; Fax: (84) February 2015

4 Central Mekong Delta Region Connectivity Project (CMDCP) Detailed Design, Procurement and Implementation Support Services TA 7822-VIE Contract No.: 720A/CIPM-HDKT FINALDETAILED INCOME RESTORATION PROGRAM FOR CAN THO CITY February, 2015

5 CMDCP Final Detailed Income Restoration Program Can Tho City LIST OF ABBREVIATIONS ADB - Asian Development Bank AEC - Agricultural Extension Centre AP - Affected person CIPM - Corporation for Investment, Development and Project Management of Infrastructure CLFD - Centre for Land Fund Development CMDCP - Central Mekong Delta Connectivity Project DARD - Department of Agriculture and Rural Development DDIS - Detailed Design and Implementation Support DMS - Detailed Measurement Survey DOLISA - Department of Labour, Invalids and Social Assistance FU - Farmers Union GOV - Government of Vietnam HH - Households IRP - Income Restoration Program MOT - Ministry of Transport MOU - Memorandum of Understanding ROW - Right-of-way RP - Resettlement Plan SAVH - Severely Affected and Vulnerable Households SC - Steering Committee SCCP - Southern Coastal Corridor Project SES - Socio-economic survey USD - United States Dollar VND - Vietnamese dong VS - Veterinary Services VTC - Vocational Training Centre WU - Women s Union CURRENCY EQUIVALENTS For this report, the rate of $1 USD: VND 21,335 has been used. Page iof iv

6 CMDCP Final Detailed Income Restoration Program Can Tho City TABLE OF CONTENT 1. INTRODUCTION Central Mekong Delta Connectivity Project Scope of land acquisition and the impact level of the project The Objective and General Principles of the Income Restoration Program Eligible Households to the IRP Participatory Approach Gender Sensibility Combination with Existing Program Completed Preparatory Activities THE SUPPORT LEVEL AND THE SUPPORT ACTIVITIES UNDER THE IRP Support Level Income Restoration Activities Criteria for Income Restoration Activities Support from the Project Use of Remaining Support Amount INSTITUTIONAL ARRANGEMENTS FOR IRP IMPLEMENTATION Steering Committee Working Groups Office to Manage the IRP DETAILED NEEDS ASSESSMENT Preparation of DNA with Steering Committees and Working Groups Organization of Workshops Confirmation of Choices IMPLEMENTATION Funding of the IRP Signing Contracts for Implementation of Detailed IRP Transfer of Fund for Implementation of the Detailed IRP Training, Purchase and Delivery of Inputs Agriculture Activities Vocational Training Small Business Building Groups of Interest Follow-up Evaluation and Monitoring of the IRP Evaluation Workshops Internal Monitoring External Monitoring SCHEDULE FOR THE IRP COSTS ESTIMATES Costs for Income Restoration Activities Costs for Implementation Page iiof iv

7 CMDCP Final Detailed Income Restoration Program Can Tho City 7.3 Costs for DDIS Total Costs DISBURSEMENT & LIQUIDATION LIST OF TABLES Table 1: Scope of Land Acquisition... 1 Table 2: Determination of Eligible Households... 3 Table 3: HH Eligible to IRP (Losing Productive Land & Relocated Business)... 4 Table 4: HH Eligible to IRP (Vulnerable HH)... 4 Table 5: Summary of HH Eligible to IRP... 4 Table 6: Support Level Based on Impacts and Vulnerability for Can Tho City... 7 Table 7: Activity, Input Supported by the Project... 9 Table 8: Use of Remaining Support Amount Table 9: Tasks of Steering Committee during IRP Implementation Table 10: Tasks of the Stakeholders during IRP Implementation Table 11: Staff Involved for the IRP Implementation Table 12: Results of the Workshops Table 13: List of Different Income Restoration Activities Chosen Table 14: Activities Planned for Steering Committees and Working Groups during Implementation.. 26 Table 15: Monitoring Indicators of IRP Activities Table 16: Regulations Used to Prepare Costs Estimates Table 17: Costs for Income Restoration Activities Table 18: Salary and Allowance for Staff and Expenses for IRP Implementation Table 19: Total Costs for IRP Implementation in Can Tho City Table 20: Distribution of Costs for IRP Implementation by Semester LIST OF FIGURES Figure 1: Organization of IRP Figure 2: Roles and Responsibilities of Stakeholders in IRP Implementation Figure 3: Choice of Income Restoration Activities by Participants Figure 4: Schedule for the Implementation of the IRP Figure 5: Distribution of Budget for the IRP in Can Tho City Figure 6: Process of Disbursement & Liquidation LIST OF BOXES Box 1: Example of Use of Support Amount Page iiiof iv

8 CMDCP Final Detailed Income Restoration Program Can Tho City LIST OF ANNEXES Annex 1: List of Eligible HH who Choose Agriculture Activities... 1 Annex 2: List of Eligible HH who Choose Training... 5 Annex 3: List of Eligible HH who Choose Small Business... 8 Annex 4: List of Eligible HH who didn t Want to Join the Program Annex 5: Photos Taken during Workshops Annex 6: Template for Confirmation of the Households on the Support Received Annex 7: Action Plan by Commune/Ward Annex 8: Detailed Costs for Agriculture Activities Annex 9: Detailed Costs for Vocational Training Annex 10: Detailed Costs for Small Business Annex 11: Costs for Staff Involved in IRP Annex 12: Expenses for IRP Operation Annex 13: Approval of Costs for Activities by Can Tho City PC Annex 14: Approval of Implementation Costs by Can Tho City PC Page ivof iv

9 CMDCP 1. INTRODUCTION Final Detailed Income Restoration Program Can Tho City 1.1 Central Mekong Delta Connectivity Project 1. The Central Mekong Delta Connectivity Project (CMDCP) will improve connectivity in the Mekong Delta Region and provide efficient access from Ho Chi Minh City to the Southern Coastal Region through construction of two cable stayed bridges across the Mekong River and associated roads: Component 1 Cao Lanh Bridge (2.4 km) and approach roads (5.4 km); Component 2 Interconnecting Road (15.7 km); and Component 3 Vam Cong Bridge (2.97 km) and approach roads (4.08 km). 1.2 Scope of land acquisition and the impact level of the project 2. The project will affect ha of land (195 ha in Dong Thap province and 28.5 ha in Can Tho City. Mainly agriculture land will be affected.a total of 257 HHs will be affected by the project in Can Tho City. Table 1: Scope of Land Acquisition Commune/ward Affected Area (ha) Affected HH Thoi Thuan Vinh Trinh Total Can Tho City Income Restoration Program Prepared in An Income Restoration Program (IRP) was prepared as part of the Resettlement Plan for Can Tho City and approved by ADB/DFAT on 5 April In the first IRP a total of 171 AHs were considered as eligible to the IRP. Following changes in the land acquisition (i.e. reduction of construction yard) and extension of eligibility to new categories of HH (near-poor and new poor HH), the number of eligible HH was changed to New criteria for assistance were also determined in this detailed IRP. In the first IRP HHs losing more than 50% of land were entitled to additional assistance. In the detailed IRP, following discussion with Steering Committees and Working Groups, it was agreed to base the support on the extent of losses. HH losing from 30 to 50%, from 50% to 70% and more than 70% of their productive land will receive additional support (up to 2.5 times the amount received by HH losing less than 30%). 1.4 The Objective and General Principles of the Income Restoration Program 6. The Income Restoration Program (IRP) is part of the Resettlement Plan prepared for Can Tho City. The IRP is additional to compensation and support already received by AHs under the Resettlement Plan for the CMDCP. The objective of the IRP is to stabilize, if not improve, the livelihood and income of severely affected and vulnerable households entitled to the Program. This objective will be achieved through a number of programs and activities: Improving the productivity of the remaining land through provision of agricultural/husbandry training courses for affected households. Developing household economies through provision of support for inputs to establish small businesses, agricultural or husbandry activities. Page 1 of 34

10 CMDCP Final Detailed Income Restoration Program Can Tho City Improving skills and employment opportunities through provision of vocational training courses and vocational support. 7. The general principles of the IRP planning and implementation are as follows: Transparency: information that relates to IRP planning and implementation (eligibility, entitlements, level of supports, contributions of the households, etc.) shall be properly disseminated to the IRP participants. Participatory planning and implementation: IRP eligible households are facilitated to participate in all the IRP processes (planning, implementation, monitoring). Gender sensibility: IRP planning, implementation and monitoring activities shall be with participation of women. Combinations with existing and planned programs/projects in the local: The IRP shall combine with but shall not overlap with the existing and planned governmental and non-governmental financed programs/projects. Suitable income restoration activities: the income restoration activities shall be doable, affordable and suitable with the needs of the eligible households, particularly the vulnerable households. Risks assessment and mitigation measures shall be developed for each income restoration activities. Compliant with Government Regulations on Financial Management. Cost estimations, disbursement and liquidation shall be compliant with Government s regulations on financial management. Flexibility: the programs shall have some flexibility since it is known that there are many variables that can influence the effectiveness of IRP during design and implementation. Such flexibility shall ensure that risks and needed resources and improvements are identified and adjustments are made to respond to feedbacks from various groups and due to changing conditions. 8. Other characteristics of the program are presented below: IRP is based on voluntary adherence from participants. HH not willing to participate will sign a form confirming they non-participation; No Cash Support to AH. IRP support are through provision of farm inputs (animals, materials), training, and not provision of cash to AHs. No Return of Investment. AHs are not required to return the investment to the Project in accordance with the contract signed between AH and Project. IRP is non-transferable. AH cannot transfer to other HHs the IRP. AH also cannot sell the inputs received from the Project unless it comes to the end of the production cycles and they have to reinvest and practice the selected models during the duration of the IRP (2 years). 1.5 Eligible Households to the IRP 9. The list of HHs entitled to the Income Restoration Program are: Severely Affected HHs.These are: - HHs who are losing 10% or more of their productive land and their main source of income is from agriculture, and - Relocated business: building, where business take place, totally affected and needs to relocate at another location (stand alone business or business located in a house) Vulnerable Households: These are people on account of their position in society and/or Page 2 of 34

11 CMDCP Final Detailed Income Restoration Program Can Tho City their physical and economic situation are less capable of re-establishing themselves than the others and, therefore, face greater risks of hardship or impoverishment; they are: - Female-headed households with dependents; - Household heads with disabilities; - Poor HH registered at the commune level; - Landless households; - Social policy HH (Heroic Vietnam Mother, Hero of the people s armed force, Hero of labor, war invalids) 10. In addition to this list, it was agreed by ADB-DFAT(ADB s letter dated 25 August 2014)to include in the list of eligible HH, the near poor HH. We should note that at the time of the DMS, this category didn t exist. The HH with a certificate of near-poor HH issued in 2014 are eligible to the IRP. 11. HH who became poor in 2014 after the DMS and who have a certificate of poor HH at the time of the DNA were also included in the list. Table 2: Determination of Eligible Households Category of Entitled HH Source of Information Agency in Charge - Severely affected HH (loss of 10% or more of their productive land and their main source of income is from agriculture; - Relocated business (building, where business take place, totally affected and needs to relocate at another location, stand alone business or business located in a house) - Compensation Plan approved by the city People s Committee of Can Tho with reference to the % of loss; - Compensation Plan approved by the city People s Committee of Can Tho; - It includes registered and non registered business; - Poor households - Certificate of poor HH issued by district authorities (stamped and signed) at the time of DMS and AHs who became poor after DMS (having a certificate a poor HH at the time of DNA in 2014); - Near-Poor households - Certificate of near-poor HH issued by district authorities (stamped and signed) in 2014; - Female headed Households; - Disabled head of Households; - Landless HH - Social policy households: HH with specific social situation (headed by elderly, orphans, disabled); War heroes (heroic - Compensation Plan approved by the city People s Committee of Can Tho; - Compensation Plan approved by city People s Committee of Can Tho; Page 3 of 34 - Center for Land Fund Development (CLFD) of Can Tho City - CLFD of Can Tho City - CLFD of Can Tho City; - District People s Committee (who issue certificate) - CLFD of Can Tho City; - District People s Committee (who issue certificate) - CLFD of Can Tho City; - Women s Union; - CLFD of Can Tho City; - Commune/ward People s Committees;

12 CMDCP Final Detailed Income Restoration Program Can Tho City Category of Entitled HH Source of Information Agency in Charge Vietnamese mothers, wounded soldiers etc. ); 12. In Can Tho City, the number of HH entitled to the IRP is 157 which represent 61% of the total HH affected. We should note that in Can Tho around 50 HH are affected by loss of graves only and therefore are marginally affected. 13. Among the eligible HH, a total of 105 HHs are affected through loss of productive land, 15 HH have their business relocated and 52 HH are classified as vulnerable. 15 HH losing productive land are also vulnerable or have their business relocated. The total number of eligible HH in Can Tho City is 157 (See Table 5). Table 3: HH Eligible to IRP (Losing Productive Land & Relocated Business) Loss of Productive Land 10-30% 31-50% 51-70% > 71% Sub-Total Relocated Business Thoi Thuan Vinh Trinh TOTAL Poor HH Land -less Table 4: HH Eligible to IRP (Vulnerable HH) Landless + WHHH Woman HHH Vulnerable HHs Landless+ Disabled HHH Landless + near poor HH Near 1 poor HH Disabled HHH Social Policy HH Sub- Total Thoi Thuan Vinh Trinh TOTAL Table 5: Summary of HH Eligible to IRP HH Losing Relocated Vulnerable TOTAL Productive Land Business HH Thoi Thuan Vinh Trinh TOTAL Participatory Approach 14. As indicated in the general principles, the project is participatory. The following actions have been taken to ensure participation of HH: Prior to the workshops, WG met all HH individually to explain IRP principles and assess their preliminary choices; therefore HH could start to discuss with their family before workshops; 1 5 near poor HH have been identified in Thoi Thuan ward an 0 in Vinh Trinh commune; the 5HH were already eligible to the IRP (4 are landless and 1 lost 30% of his productive land); 2 15 HH, affected by loss of productive land, are also vulnerable or have their business affected. Total of eligible HH is 157. Page 4 of 34

13 CMDCP Final Detailed Income Restoration Program Can Tho City 2 workshops were organized to explain in more details the IRP and to answer to questions and concerns of HH; a letter of invitation was sent to all HH. HH made a choice for an income restoration activity; however, this choice was not definitive and HH could change their mind; The list of HH with their choice was approved by Can Tho PC on 11 August 2014 (Decision 2176/QD-UBND). This listed will be posted at commune and ward PC office. HH will be informed that they have 3 weeks at the date of the posting to make a final choice; For HH who choose agriculture and small business activities, groups of interest (i.e. HH who choose cow raising, pig breeding, small business etc.) will be organized at the village level. The groups will provide peer support and cooperate with each other for better market prices. A leader for each group will be identified. The leader will have experience in the activity and will act as resource person for the group to liaise with extension workers. The leader will also be the representative of HH to participate in monitoring and evaluation process. Evaluation workshops are planned after 1 year and at the end of the project. After 1 year, following results of the evaluation workshop, a new work plan will be prepared. 1.7 Gender Sensibility 15. Gender sensibility is a component of the Project. The following actions have been taken to ensure participation of women and to take into account their needs and concerns: Women were specifically invited to participate to workshops in the invitation letters. Women joined the workshops and express their needs; during workshops individual cases involving women were discussed (i.e. elderly women); WU organized focus-groups in April 2014 with women and vulnerable HH on various issues (including IRP) and assess their needs and concerns regarding in particular the choice of an income restoration activity; Many HH choose small business and these businesses will be mainly managed by woman; as it is convenient for women to operate small business within their house. WU will manage the small business activities. They will givetraining course on business management skills, on HH budget management andwill provide follow-up support to help women in this group to set up businesses; Women s Union at the village level will coordinate with extension workers, vocational training centres to organize training courses taking into account the specific needs of women. They will also counsel on management of the family budget. 1.8 Combination with Existing Program 16. Can Tho City implements existing training programs such as the Program 1956 targeting rural workers implemented by the Vocational Training Center under DOLISA. There are similarities between the proposed training program and Program The main differences between the existing national and city training programs and the proposed IRP are: - City training programs cover farmers only. - Existing national and city training programs proposes training or allowance only; - No input (animals, equipment, material) is provided to trainees by the National and City Programs; 18. Combination with existing programs is desirable to avoid duplication of budget and Page 5 of 34

14 CMDCP Final Detailed Income Restoration Program Can Tho City activities. Combination could take the following forms: - HH who have already been trained under a similar City s training program, will not be entitled to training under the IRP; they could however use the total support amount to buy equipment/tools related to the training program followed; - HH who have been trained under the City s program but who couldn t find a job will be eligible to refresh training; refresh training will be a more advanced training; - Agencies will continue follow-up after the 2 years duration of the program, they will continue to follow-up with trainees; 1.9 Completed Preparatory Activities 19. Up to February 2015, the following preparatory activities have been completed in Can Tho City. Income Restoration Programs(IRP) has been approved by ADB/DFAT on 5 April ToR & budget for Detailed Needs Assessment (DNA) were approved by ADB/DFAT on 22 July 2013 and by MOT on 2 October 2013; additional budget was approved by MOT on 10 December Steering Committeewas established on 24 December 2013 (Decision No. 4554/QD-UBND). Working Groups established on 20 January 2014 (Decision No. 198/QD-UBND). Workshops with HH eligible to the IRP conducted on 6 March in Thoi Thuan ward and on 17 March in Vinh Trinh commune. Costs of IRP implementation have been approved by Can Tho City PC in August 2014 and February 2015; Page 6 of 34

15 CMDCP Final Detailed Income Restoration Program Can Tho City 2. THE SUPPORT LEVEL AND THE SUPPORT ACTIVITIES UNDER THE IRP 2.1 Support Level 20. In Can Tho City, the basis to determine the support amounts were: - Support amounts already agreed for the Southern Coastal Corridor Project (SCCP1); - Cost of IRP activities for Can Tho City. Proposed lowest support level is 8 M VND based on the cost of training for car driving ( M VND); a large number of HH with the lowest support level chose this activity; numerous HH losing more than 50% of their productive land chose cow raising (15 M VND); - Unit costs/cost norms approved and applied in Can Tho city; - Additional support of 2 M for poor HH losing productive land; 21. The agreed support levels by SC & WG in Can Tho City are presented in the table below. Table 6: Support Level Based on Impacts and Vulnerability for Can Tho City Category of Eligible HH Number of cases Support Amount - 10% to 30% of total production land holding affected; 29 - Vulnerable households (including near-poor HH) 52 - Relocated Business 15 8 M VND/HH % to 50% of total production land holding affected; M VND/HH - 51% to 70% of total production land holding affected; M VND/HH - > 70% of total production land holding affected; M VND/HH - Poor HH losing more than 70% of total production land holding affected; 1 22 M VND/HH 22. If AH fell into several categories, AH was entitled to the highest level of support. 23. If AH chose an activity which is higher than the support AH is entitled to, AH will contribute to the difference. 2.2 Income Restoration Activities Criteria for Income RestorationActivities 24. Agriculture activities implemented under the IRP should meet the following criteria: - Few risk of disease; - Generating quick (within 6 months) and good income; - Suitable with local market conditions; - Compatible with support amounts agreed; - Activity which can be implemented by elderly and illiterate persons should also be proposed; 25. Proposed training/small business activities should meet the following criteria: - Training to be job oriented (suitable with local job market); 3 Percentage will be rounded up to the next unit number (i.e % to 31%) Page 7 of 34

16 CMDCP Final Detailed Income Restoration Program Can Tho City - Consistent with HH education background to ensure the best work opportunities; - Compatible withsupport amounts agreed; 26. Working groups identified income restoration activities based on above criteria. These activities were presented during workshops to participants by members of the WG (see Chapter 4). WG also presented during workshops: - Requirement to implement activities (i.e. basic skills, land requirement etc.); - Expected income (for agriculture activities); - Expenses to carry out activity (for agriculture activities); - Costs of the activity (in order for the AH to choose an activity corresponding to the support amount he/she will benefit); 27. If a household wants to perform other income restoration activity, the AH proposed this activity to the Working Group. Working Group discussed with the households to determine if this activity can be supported. Activities were supported if they met the following criteria: a) Activity is feasible: household meet conditions to perform the proposed activity: (enough remaining land, sufficient manpower ); b) Activity will bring quick income (within one year) to the household; c) Activity has little risk of failure; d) Activity complies with land use plans; and e) Activity is sustainable, the household will continue to perform/or to expand the activity after Income Restoration Program ending Support from the Project 28. Table 7 indicates what type of support is providedunder the CMDCP, what is included in the support amount, what additional support is provided and what contribution is requested from the participant. Activities/Items supported by the project and included in the support amount 29. For agriculture activities, activities/items supported by the project and included in the support amount are: animals/plants/equipment to perform the agriculture model. In some cases (eel) facilities will be under the support amount when it requires specific equipment (i.e. plastic lined tank for eels). Industrial food can also be included. 30. For training, provided by the Vocational Training Center, costs of training courses are included in the support amount. The cost of vocational training should follow existing vocational training programs being implemented locally. 31. For small business,equipment to operate the business is included in the support amount.training courses provided by WU on business management skills, HH business management, microfinance are not included in the support amount. Additional support (in addition to the support amount) 32. Additional support for agriculture activities: - Cost of training on agriculture activities; - Allowance for meals and travel during the training period; - Vaccine 33. Additional support for training and small business: - Allowance for meals and travel during the training period; Page 8 of 34

17 CMDCP Final Detailed Income Restoration Program Can Tho City - Refresh training; after being trained if trainees cannot find a job after one year, he/she will be eligible for another training session. Refresh training will be done only one time. Activities/Items not-supported by the project 34. Normal care of animals/plants, daily food for animals will not be supported by the project. 35. Construction of basic facilities for raising animals (chicken, ducks etc.) will be funded by the AH if the support amount istotally used to provide inputs (animals); Activity/Items Agriculture Activities a) Raising/breedin g animals (pigs, chickens, ducks, buffalo, cow, eels, shrimp, fish ); b) Planting (ornamental flowers, bonsai mushroom etc.) c) Agriculture extension activities d) Machinery for agricultural development Table 7: Activity, Input Supported by the Project Supported by the Project Included in the support Additional support amount (8M, 10 M etc.) - Animals (number according to support amount level); - Facilities in some case (i.e. plastic-lined tank for eel raising); - Industrial food in some case; - Other (see Table 8) - Plants (number according to support amount) - Partially support for fertilizer; - Seedling (rice, beans, fruit ); - Partially support for fertilizer. - Earth working machinery, machinery for processing food for domestic animals. Training & Small Business Vocational, - Cost of vocational training Training course; - Small business - Equipment to operate small business (i.e. for beauty shop, armchairs, mirror, shelves, hair dryer etc.) - Vaccine; - Training to enhance capacity for AH; - Training to enhance farming capacity for AH; - Training to enhance farming capacity for AH; - Training to enhance farming capacity for AH; - Refresh training - Travel and meal allowance for participants during the training period; - Travel and meal allowance for participants during the training period; - Training course on business management; Contribution of HH 4 - Facilities if support amount is used totally to provide animals; - Food in general; - Normal care of animals/equipment; - Normal care of plants - - Normal maintenance of equipment - Participation to training course; - Additional equipment if equipment bought with support amount is not sufficient; 36. Support from the project, use of support amount and use of remaining support amount were presented to participants during workshops. 4 If activity chosen is higher than support amount, HH will contribute for the difference; Page 9 of 34

18 CMDCP Final Detailed Income Restoration Program Can Tho City Box 1: Example of Use of Support Amount If a HH is entitled to a support level of 8 M VND and choose small business activities with training. The support level for equipment will be calculated as follow: - Cost of training course (i.e. body care) = 1 M VND; - Remaining budget ( 8M - 1 M = 7 M VND) will be used to buy equipment; If a HH is entitled to support of 20 M VND and choose cow breeding activity - Cost of a cow is 15 M VND; - Remaining amount(5 M) could be used to buy industrial food or materials to build facilities. If a HH is entitled to support of 10 M VND and choose cow breeding activity - Cost of a cow is 15 M VND; - He will have to contribute for 5 M VND; If a HH is entitled to support of 10 M VND and choose growing flowers or ornamental plants - The number of flower/plants to be provided will be calculated based on the unit rate of a flower/plant and the support amount; HH can also receive a lower number of flowers and the remaining could be to buy fertilizer Use of Remaining Support Amount 37. The activities proposed are generally lower than the support amount the HH is entitled. Use of the remaining amount will be discussed with each HH after approval of the detailed IRP at the start of implementation. Examples of use of remaining support amount are presented in the table below. Type of Activity Agriculture activities Table 8: Use of Remaining Support Amount Example Use of remaining support amount Cow Industrial food; Material to build facility; Pigs Number of pigs adjusted to support amount; Industrial food; Material to build facility; Chicken/ducks Number of units adjusted to support amount; Industrial food; Flowers Adjust packages of flowers to support amount; Fertilizer; Training Add some HH members in working age for another training course; HH can buy equipment related to his training (i.e. brick layer, electric equipment etc.); Small business Buy equipment Page 10 of 34

19 CMDCP Final Detailed Income Restoration Program Can Tho City 3. INSTITUTIONAL ARRANGEMENTS FOR IRP IMPLEMENTATION 3.1 Steering Committee 38. As indicated above, a Steering Committee (SC) has been set-up, to implement the IRP in Can Tho City. 39. The SC is responsible for the coordination with all agencies involved for the implementation of the IRP. The Swill help to solve any problems which may occur. 40. Members of the SC are: - Chairman is the Vice Chairman of Can Tho city PC s; - Representative of DOLISA; - Representative of DARD; - Representative of Farmer s Union; - Representative of Center for Land Fund Development; - Representative of Women s Union; - Vice chairman of affected districts (Thot Not and VinhThanh); 41. The main tasks of the SC regarding IRP activities are summarized in the Table below: ROLE Overall Management Table 9: Tasks of Steering Committee during IRP Implementation MAIN TASKS Direct CLFD &WG to implement IRP tasks; Chair quarterly meetings; Approve all documents issued for the IRP (working plans, contracts, costs and procedures) Review and endorse quarterly reports to City PC and CIPM. Monitoring and Evaluation 42. During IRP implementation, the SC of each province/city will held regular meetings (see section 5.9) with CIPM, DDIS and Working Groups to give instructions and to deal with various issues reported. 3.2 Working Groups 43. As indicated above, two Working Groups, one to manage agriculture activities and one to manage training and small business activities, have been set-up in Can Tho City. While Steering Committees have a management role, Working Groups have a more technical role. 44. Working Groups gathered representatives of various agencies as presented below: - Working Group for Agriculture Activities - Department of Agriculture and Rural Development (DARD); - Agriculture Extension Center (AEC) under DARD; - Farmer s Union (FU) - Women s Union (WU) - Center for Land Fund Development (CLFD); - Working Group for Training and Small Business Activities - DOLISA - Vocational Training Center Page 11 of 34

20 CMDCP Final Detailed Income Restoration Program Can Tho City - Women s Union - Center for Land Fund Development (CLFD); 45. The tasks of the Working Groups during IRP implementation are summarized in the Table below: Table 10: Tasks of the Stakeholders during IRP Implementation AGENCY ROLE MAIN TASKS Supervision Responsible for overall implementation and supervision of IRP; Review all IRP documents (reports, plans, costs, procedures etc.)before their submission to SC; Assists and monitor the IRP Contract Implementation CIPM/DDIS Funding/ Contract Transfer funds through bank account acceptable by ADB and MOF; Signs IRP Contract with SC (through CLFD) Support Assist CLFD to ensure accounting documents are in accordance with Vietnamese Law and ADB guidelines. Support to CLFD and WG to prepare working plan, technical advice especially to WU, monitoring plan, reports; CLFD (Resettlement Subproject Owner) Coordination and IRP secretary Funding/subcontracts Accounting, auditing& liquidation Data collection Group of interest Monitoring &Evaluation Reporting Proper filing & archiving of documents Organize IRP meetings, issue invitations to the meeting participants, prepare minutes of meeting; Submits plans, cost estimates and procedures to SC and PC for review and approval; Coordinate study tours to visit other livelihood models within or outside Can Tho City; Prepare drafts of subcontracts with relevant agencies and input providers and submit to SC for approval; On behalf of SC the CLFD signs Sub-contracts and transfer money in accordance with approved subcontracts Responsible for maintaining accounting documents; Management of IRP financial system, regularly reports to SC and WGs about the financial issues of IRP Comply with inspection, auditing and liquidation procedures etc. Maintain database on participants and disbursement; Collect socioeconomic information on participants (income generated by activity etc.) Supervise establishment of groups of interest; Organize evaluation workshops; Monitor, evaluate IRP and report to SC; Review monthly reports prepared by WG; Prepare quarterly reports and submit reports to SC for review and approval; Keep and maintain all documents related to the IRP; Make documents available for CIPM/DDIS and external monitor; Page 12 of 34

21 CMDCP Working Groups Final Detailed Income Restoration Program Can Tho City AGENCY ROLE MAIN TASKS Assistance/ support Women s Union Groups of interest Training Follow-up Reporting Training for small business Follow-up, support & assistance to women and vulnerable Groups of interest Reporting Confirm choices of participants; Assist HH to decide the use of the remaining support amount; Check how the HH plan to implement the activity (i.e. adequate location and equipment etc.) and propose adjustment if needed; Purchase inputs in collaboration with participants (i.e. seedlings, breeds, tools for agriculture extension, equipment for small business etc.) and deliver these inputs to participants; Contact with businesses and enterprises to get information on the job vacancy and assist trainees to find a job; Organize study tours to visit other livelihood models within or outside Can Tho City Establish and manage groups of interest for agriculture activities; Conduct technical training; preparation of training courses, organization of class, selection of trainer; Conduct refresh training after 1 year if AH cannot find a job; Prepare monitoring plan; Conduct regular field visit to meet households participating in the IRP to ensure the IRP is implemented effectively and as planned and to provide technical support and advices. Cooperate with the SC, CIPM and DDIS to solve outstanding issues in the community during IRP implementation. Prepare monthly report on activities conducted; Send monthly reports to CHFLD (for their quarterly reports to the CIPM/DDIS) and provide relevant data, report outstanding issues, report on progress implementation, etc. Conduct technical training on small business (basis tools for developing feasible small enterprise) Support woman and vulnerable to confirm choice and to choose remaining support (i.e. equipment for small business); Conduct regular field visit with women and vulnerable to ensure the IRP is implemented effectively and as planned and to provide support and advices Manage small business activities Follow-up HH who implement small business activities; Counsel HH on family budget planning; Part time of follow-up; Coordinate with agriculture extension workers and VTC to organize training courses taking into account women needs; Establish and manage groups of interest for small business where appropriate; Send monthly reports to SC (for their quarterly reports to the CIPM/DDIS) and provide relevant data, report outstanding Page 13 of 34

22 CMDCP Final Detailed Income Restoration Program Can Tho City AGENCY ROLE MAIN TASKS issues, report on progress implementation, etc. 46. The figures below present the organization of the IRP and the roles and responsibilities of agencies involved in the implementation of the IRP. Page 14 of 34

23 CMDCP Final Detailed Income Restoration Program Can Tho City Figure 1: Organization of IRP STEERING COMMITTEE Management CIPM/DDIS Management Funding Supervision Contracts CENTER FOR LAND FUND & DEVELOPMENT Coordination; Funding & Subcontracts; Accounting, Auditing & Liquidation; Evaluation & Reporting WORKING GROUP ON AGRICULTURE Training; Technical Support & Consultation, Follow-up & Reporting WORKING GROUP ON TRAINING & SMALL BUSINESS Vocational & Refresh Training; Technical Support & Consultation, Follow-up, Assistance to find jobs & Reporting WOMEN'S UNION Follow-up and assistance to women and vulnerable WOMEN'S UNION Management of Small-Business, Training on small business; Follow-up and assistance to women and vulnerable Page 15 of 34

24 CMDCP Final Detailed Income Restoration Program Can Tho City Figure 2: Roles and Responsibilities of Stakeholders in IRP Implementation Management Steering Committee Management CLFD Working Groups for Agriculture Coordination Funding Accounting Contract Solve issues Technical training Technical support & Assistance Follow-up Purchase farm-inputs Manage groups of interest for agriculture HH eligible to IRP Manage small business activities Support & Assistance to women & vulnerable Training on small business and on HH finance management Manage groups of interest for small business Women's Union Working Groups for Training & Small Business Technical training Technical support & Assistance Follow-up Assistance to find job Purchase non-farm inputs Page 16 of 34

25 CMDCP Final Detailed Income Restoration Program Can Tho City 47. The staffs involved in the IRP implementation have been identified by the Steering Committee of Can Tho City and are presented in the table below. A total of 19 persons will be involved; most of them part-time. They are currently permanent staff of their respective organization. 48. Each position has been assessed in terms of time required to perform the listed tasks identified in Table 10. Most of the staff will be part time; only 2 staff from CLFD will be full time(see Annex 11). 49. The IRP will be managed mainly by the Center for Land Fund Development (CLFDwho is the Resettlement Sub-Project Owner)of Can Tho City. CLFD already leaded the implementation of the Detailed Needs Assessment (DNA). 3.3 Office to Manage the IRP 50. An office will be set-up in Thoi Thuan ward, (Thot Not District) to implement the IRP. All permanent staff mobilized (3) for the implementation of the IRP will be located at this office. 51. Can Tho city is far from Thot Not districtand the head office of CLFD in Can Tho city has limited space; therefore SC & WG prefer to have an office in Thoi Thuan ward (Thot Not district) close to the affected HH to facilitate follow-up of the IRP. Due to the duration of the IRP (2 years) it is necessary to have a specific office; AH,representatives of various departments, agencies, input providers etc. may come to the Office for resolving IR issues. Thus, it is necessary to set up a small office with a small meeting room to implement the IRPin Thoi Thuan ward. 52. All documents related to the IRP will also be gathered at the same place. This will ensure a better efficiency and coordination for the implementation of the IRP. IRP meetings can be held here. CIPM and DDIS can also come to work with SC and WG there. 53. Efforts will be made to rent an office within an IRP partner office. The office will be managed by the IRP Team of the CLFD. 54. All IRP documents can be kept in this office until full completion of IRP program and handed over to CLFD of Can Thocity 55. Costs of renting office and expenses for operation are included in the budget (see Annex 12). Page 17 of 34

26 CMDCP Final Detailed Income Restoration Program Can Tho City Table 11: Staff Involved for the IRP Implementation Name Organization Main Tasks Status WG for agriculture - Responsible for WG on agriculture; - Training preparation; 1 Director Agriculture extension Center - Reporting; - Supervision of follow-up; Part time - Organization of study tours; - Organization of evaluation workshops; 2 Huznh Anh Tuấn Agriculture extension Center Thot Not - Training and assistance in Thot Not District; District - Follow-up in Thot Not District Part time 3 Trần Văn Trắt Agriculture extension Center Thot Not - Training and assistance in Vinh Thanh District; District - Follow-up in Vinh Thanh District Part time 4 Phan Phước Sang Farmer s Union Thoi Thuan ward - Follow-up and assistance in Thot Not District Part time 5 Nguyễn Văn Tươi Farmer s Union Vinh Trinh Commune - Follow-up and assistance in Vinh Thanh District Part time WG for training and small business - Responsible for WG on training & small business; - Training preparation; 1 Trần Quang Khải DOLISA Can Tho - Supervision of follow-up; - Reporting; Part time - Organization of evaluation workshops; 2 Lê Thanh Nghị Vocational Training Center Thot Not - Training follow-up and assistance in Thot Not District District; Part time 3 Lê Thị Bạch Tuyết Vocational Training Center Vinh Thanh - Training follow-up and assistance in Vinh Thanh District District; Part time Women s Union 1 Lưu Thị Hòa Women s Union Thoi Thuan Ward - Training and assistance in Thot Not District; Part time - Follow-up in Thot Not District 2 Trần Thị Thơi Women s Union Vinh Trinh Commune - Training and assistance in Vinh Thanh District; Part time - Follow-up in Vinh Thanh District 3 To be named (5 persons) Women s Union at Village level - Daily follow-up and assistance; Part time Page 18 of 34

27 CMDCP Final Detailed Income Restoration Program Can Tho City Name Organization Main Tasks Status Center for Land Fund and Development - Responsible for coordination and supervision of Part time 1 Hồ Văn Mẫn Vice Director IRP; - Responsible for contract, disbursement, accounting, liquidation and auditing; - Responsible for reporting 2 Nguyen Thi Thanh Van Chief Accountant - Supervision for contract, disbursement, Part time accounting, liquidation and auditing 3 Nguyen Huu Phuc CLFD staff Daily coordination and supervision of IRP; - Reporting and database; Part time 4 Phan Thanh Tung CLFD staff - Daily coordination and supervision of IRP; - Reporting and database; Full time 5 Lê Tuấn Vũ Accountant - Preparation of contract, disbursement, accounting, liquidation and auditing documents; - Check all bills and prepare invoices; Full time - Assist WG for all financial documents; Page 19 of 34

28 CMDCP Final Detailed Income Restoration Program Can Tho City 4. DETAILED NEEDS ASSESSMENT 4.1 Preparation of DNA with Steering Committees and Working Groups 56. A first meeting was conducted, in Can Tho City on 12 February 2014, with both SC and WG in order to: - Explain DNA and IRP objectives, principles and characteristics; - Explain support amount principle; - Explain role of SC & WG; - Discuss on income restoration activities to be proposed; - Schedule DNA activities; 57. A second meeting was then conducted on 28 February 2014 with each of the working groups in order to: - Agree on support level; - Agree on proposed income restoration activities; - Discuss process of workshops; - Agree on proposed schedule (workshops etc.); 58. For DNA, the Working Groups prepared the following activities: - Identify income restoration activities to be proposed to beneficiaries as presented in section Prepare writing or visual material to be presented to beneficiaries during the workshops, in order for HH to make a choice; costs of activities will also be presented; - Present the proposed activities during the workshops; - Assist beneficiaries in their choice based on education and skills background; - Make recommendations to each beneficiary s choice and confirm this choice; 59. As indicated in Section HH could also propose their own activity. The questionnaire has a row for HH to identify his own activity. Working groups assessed and confirmed the proposed activity based on criteria identified. 4.2 Organization of Workshops 60. A pilot workshop was conducted in Thoi Thuan ward on 6 March 2014 and a second workshop was held in Vinh Trinh commune on 17 March Households were informed at least 1 week in advance through written invitation. Invitation letters were addressed to both husbands and wives. A statement was included stating that women members of the HH are encouraged to attend and to participate in the IRP. 62. During these workshops, the types of activities proposed were explained by the Working Groups. Working Groups presented a limited choice for agriculture activities and training to minimize the risks. Some specific demands of HH, regarding the type of activity to be implemented, were considered based on criteria identified in section Eligibility, entitlements, level of support, contribution of HH, and responsibilities of HH were clearly explained to participants. Page 20 of 34

29 CMDCP Final Detailed Income Restoration Program Can Tho City 64. Participants filled a questionnaire during the workshop to choose an activity. They received assistance, to fill the questionnaire, from DDIS, women s union and other stakeholders. 65. HH entitled to the IRP who didn t join the workshop were contacted by the Working Groups to identify the reason why they couldn t join (i.e. Interested to join but couldn t join due to any reason; not interested to join the program; other). 66. If an eligible HH wanted to join the workshop but couldn t be present, Working Groups contacted him/her, explain the proposed activities and filled thequestionnaire with him/her. 67. If an eligible HH didn t join the workshop because he didn t want to participate to the IRP, he/she was met to sign a document confirming he doesn t want to join. 68. The following tables and figure summarize the results of the DNA. Among the 157 HH eligible to the IRP, 52 choose agriculture activities, 48 training and 37 small business activities. 20 HH didn t want to join the IRP. 69. The final list of participants with the activity chosen was prepared and is presented in Annex 1, 2 and 3 for respectively HH who choose agriculture activities, training and small business. The list of HH who didn t want to join the IRP is presented in Annex 4. Photos of the workshops are presented in Annex 5. Agriculture Activities Table 12: Results of the Workshops Training Small Business Total participants HH didn t want to join the IRP Total Eligible HH Thoi Thuan Vinh Trinh Total Figure 3: Choice of Income Restoration Activities by Participants Small Business 27% Agriculture Activities 38% Training 35% Page 21 of 34

30 CMDCP Final Detailed Income Restoration Program Can Tho City 70. The final lists of participants with the activity chosen are presented in Annex 1, 2 and 3 for respectively HH who choose agriculture activities, training and small business. 71. Regarding the activities chosen by participants, for agriculture activities, 34 HH among 52 chose breeding cows; for training, 27 HH among 43 chose car or truck driving. Table 13: List of Different Income Restoration Activities Chosen Thoi Thuan Vinh Trinh Total Agriculture Activities Breeding cow Raising pigs Raising chicken Flowers cultivation Planting high quality rice Support for equipment Planting guava Training Driving license B Driving license C Body care Sewing Masonry Small business Support for equipment Lottery shop Repair shop Other TOTAL Confirmation of Choices 72. The choice of an income restoration activity is an important decision and HH need time and consultation with relatives and stakeholder for this choice. 73. The following steps are in place in order for HH to take an informed decision: Prior to the workshops, working groups met HH individually all HH to assess their preliminary choices; therefore when they came to the workshops, preliminary family discussions already took place; During workshops, HH who were not able to make a choice and wanted to discuss more with their families were met individually later; 20 HH were in this case and were met by representatives of WU &CLFD to assess their choice after further discussion; Some HH who made a first choice during workshop, contacted WG to make a new choice; these new choices, when found suitable, have been accepted; SC will post the list of HH with their choice at the People s Committee office of Thoi Thuan ward and Vinh Trinh commune. HH will be informed that they will have 3 weeks to respond after the posting to make a final choice; Page 22 of 34

31 CMDCP Final Detailed Income Restoration Program Can Tho City 5. IMPLEMENTATION 5.1 Funding of the IRP 74. As confirmed during the November 2014 ADB/DFAT review mission, funds for the IRP will be sourced from the ADB loan proceeds. 75. Costs for consulting services of DDIS for assistance to implement the IRP for 2 years, will be funded through a variation order of the DDIS Contract for Part B it directly related to consulting services. These costs will be taken from Contingency or the remainder of Provisional Sum for SAP of DDIS Contract. 76. Budget under the ADB Loan will be disbursed to Cuu Long CIPM Imprest Account Signing Contracts for Implementation of Detailed IRP 77. CIPM will sign IRP Contract with the Center for Land Fund Development (CLFD) based on the costs approved by PC and ADB. Can Tho City People s Committee is the Sub-project Owner and delegated responsibility for resettlement and IRP to respectively Center for Land Fund and Development (CLFD). CLFDis also member of the Steering Committees and Working Groups. 78. CLFD will open a sub-account at the Can Tho City State Treasury specifically for the IRP as soon as the IRP is acceptable to ADB. 79. If necessary and with agreement of PCs &SCs, CLFDwill sign Sub-contracts with various agencies in charge of implementation (DOLISA, AEC, FU, WU etc.), and with other services providers for IRP implementation Transfer of Fund for Implementation of the Detailed IRP 80. As indicated above, for IRP implementation the budget will come from the ADB Loan (except for DDIS consulting services). ADB will transfer the money to the Imprest Account established by Cuu Long CIPM. 81. CLFD will open a separate sub-account for IRP; this sub-account has not yet been set up (Can Tho city-component 3 of CMDCP does not receive ADB Loan funds for resettlement so they don t have a sub-account). This Sub-account will be opened once IRP approved by ADB/DFAT. 82. The IRP contract between CIPM and CLFD will include: - Costs for non-consulting services (i.e. costs for inputs for livelihood assistance, trainings and other expenses to be directly received by the beneficiaries); - Costs for implementation and management for local agencies in charge of the implementation (PC, SCs, WGs, DOLISA, DARD/AEC, FU, WU, CLFD), and costs for appraisal, auditing etc.) 83. After the contracts for implementation of the IRP signed, the Working Groups and CLFD, with the assistance of the SC and CIPM/DDIS, will prepare a financial plan for each affected commune/ward. 84. The plan shall identify the activities planned and the budget needed for each participant in each commune/ward. Page 23 of 34

32 CMDCP Final Detailed Income Restoration Program Can Tho City 85. Based on the plan for each commune/ward, Working Groups and CLFD will estimate the cost for implementation based on the template prepared (see Annex 7). 86. Working Groups and CLFD will send the plan and the implementation cost estimate to SC, CIPM and DDIS. 87. SC, CIPM and DDIS will review the plan and discuss the problems (if any) directly with the Working Groups and CLFD. After agreement on the plan and cost estimate, CIPM will transfer the fund to CLFD/CHFLD sub-account. 5.2 Training, Purchase and Delivery of Inputs Agriculture Activities 88. Members of the Working Groups from the Agriculture Extension Center will carry out training for participants who choose agriculture activities. Participants will be informed in advance of the duration and location of the training course for the activity chosen. The project will pay allowance for meals and travels as per province/city regulations. 89. Once the training completed, Working Groups for agriculture activities will check how the HH plan to implement the activity (i.e. area, facilities etc.) to ensure the requirements for the implementation of the activity are met. The Working Group will reinform the households on their contribution (labor, food and in-situ materials). 90. Members of WG will first get information on where farm inputs can be purchased and at what cost. Members of WGs will then go with participants to purchase farm inputs. 91. The households will sign and confirm they received the assistance by filling and signing the receipt presented in Annex 6. Once the receipt signed, the WG will hand over the inputs (animal, equipment, seedlings etc.) to the households Vocational Training 92. For vocational training and small business, the vocational training center will be in charge of the vocational training. Participants will be informed in advance of the duration and location of the training course chosen. 93. During training courses, the Working Groups will also conduct the following tasks: - Establish and maintain linkages with the management of construction projects; commercial, industrial and institutional establishments within the Province with the intention of identifying their manpower requirements (i.e. number, qualification, schedule of deployment, etc.) and securing agreements (quota for hiring) for deployment of qualified SAH members to fill job vacancies. - Establish a program to provide information to the affected communes/wards on the availability of jobs through posting of job vacancies in the commune/ward offices and through commune s local radio. - Close coordination and establish linkages with the project contractors and consultants to recruit local labors, especially the affected households, on a priority basis. Labor standards will be maintained and will incorporate applicable workplace occupational safety norms. - During job fairs,provide specific assistance to participants to find a job. Page 24 of 34

33 CMDCP Final Detailed Income Restoration Program Can Tho City 94. If the beneficiaries cannot find a job within six months after the training course, one refresh training session will be provided to them by the Vocational Training Centers Small Business 95. For small business, the Women s Union will be in charge of the training (small business skills, HH budget management, saving and credit etc.). Participants will be informed in advance of the duration and location of the training course chosen. 96. If a HH who have already followed a training course related to the small business or has enough experience, it will not be necessary for this participant to follow the training course. The participant could use the entire supportamount he is entitled, to buy equipment. 97. The HH with the assistance of members of the Working Groups will select the equipment needed from the list of equipment the province with official costs. Once chosen the Working Groups will purchase and provide the equipment to the households. 98. The households will sign and confirm their receipt of equipment as presented in Annex 5. Once the receipt signed, the WG will hand over the inputs (equipment, etc.) to the households. 5.3 Building Groups of Interest 99. For agriculture and small business activities, group of interest will be established. These groups of interest will gather, at the village level, participants which implement the same activity (i.e. cow raising, pig breeding etc.) or HH involved in small business Each group of interest will be led by an experienced member. The purpose of these groups is to provide peer support, share experience, success and to improve skills. The group members can coordinate with each other and between groups for between market prices. Groups of interest also provide strong support which increases the success of the implementation of the activity 101. Women s Union will be in charge to establish such groups for small business and the AEC the one for agriculture activities. 5.4 Follow-up 102. Working Groups for Agriculture and for Training and Small Business will prepare and carry out a monitoring plan in order to provide technical support to the households and identify any problem which may occur During the first 6 months of implementation, follow-up should be at least every month. For every site visit a short report will be prepared by the WG to record the results of the follow-up visit (i.e. difficulties met if any, capacity of the HH to implement activity, additional training needed etc.) Women s Union, at village level, will be in charge of day to day follow-up for small business but also for HH who are involved in agriculture activities with special focus on the vulnerable HH. They will report any problems needing attention to the WG The following table summarizes the activities to be undertaken once the budget will be approved by ADB/DFAT and Can Tho City PC. Page 25 of 34

34 CMDCP Final Detailed Income Restoration Program Can Tho City Table 14: Activities Planned for Steering Committees and Working Groups during Implementation Timeline for activities Weeks 1-4 Week 5-6 Weeks 7-11 Week Weeks Start of activity Weeks 18 Weeks 19- (intermitte Steering Committee Working Groups Agriculture Working groups for Training & Small Business - Meeting of SC and WG with DDIS/CIPM to start implementation and to identify all steps; - Prepare and sign contract between CIPM & SC/WG through Can Tho CLFD - CLFD to open its Sub-account 5. - Advance payment to CLFD in accordance with Vietnamese regulations; - In collaboration with CIPM/DDIS, complete organization arrangements and task assignment for each Member of SC and WG. - Prepare work plan for implementation of IRP in Thoi Thuan and Vinh Trinh commune in coordination with CIPM/DDIS. - Confirm costs of inputs - Confirmation of choices of AHs - Identify costs of inputs in the market (i.e. cow, pigs) based on Vietnamese regulation - - Preparation of training course; - Organization of class, selection of trainer; - Training on agriculture activities - - Check how the HH plan to implement the activity (i.e. sufficient area, adequate facilities etc.) and propose adjustment if needed - - Meet every HH to determine use of remaining support amount (i.e. facilities for animal, industrial food etc.) - Review signed form and approve contract with HH; - Approve working plan - Buy input/equipment with HH and handover input/equipment to HH; sign attached form - Build groups of interest - Prepare working plan by commune/ward - Confirmation of choices of AHs - Get list of prices of equipment materials from PPC (i.e. armchairs, dryer etc.) - Preparation of training courses; - Organization of class, selection of trainer; - Training on small business - - Check how the HH plan to implement the activity (i.e. adequate location and equipment etc.)and propose adjustment if needed; - Start of vocational training courses (following existing programs) - Meet every HH to determine use of remaining support amount (i.e. type of equipment for small business etc.) - Buy equipment with HH and handover equipment to HH; sign attached form; - Build groups of interest - Prepare working plan by commune/ward 5 DDIS will inform SC, WG and CLFD about the applied accounting procedures and will provide necessary forms for accounting procedures; Page 26 of 34

35 CMDCP Final Detailed Income Restoration Program Can Tho City Timeline for activities nt) Steering Committee Working Groups Agriculture Working groups for Training & Small Business Follow-up Week 20 to the end Reporting - Confirm HH can start activity Prepare monitoring plan in collaboration with CIPM/DDIS - - Every month for every HH for the first year; - Every 2 months for every HH for the second year; year - Prepare quarterly report Meetings - Meeting every 3 months with CIPM/DDIS (8 meetings) Workshops - Participation to the 2 workshops - Prepare monthly report on activities conducted (i.e. difficulties met if any, capacity of the HH to implement activity, additional training needed, disbursement conducted etc.). - Meeting with CIPM/DDIS every 2 months for the first year (12 meetings); every 3 months the second year (8 meetings) with CIPM/DDIS for review and discuss issues - Prepare monitoring plan in collaboration with CIPM/DDIS - Every month for every HH for the first year; - Every 2 months for every HH for the second year; year - Prepare monthly report on activities conducted (i.e. difficulties met if any, capacity of the HH to implement activity, additional training needed, disbursement conducted etc.). - Meeting every 2 months for the first year (12 meetings); every 3 months the second year (8 meetings) with CIPM/DDIS for review and discuss issues - Organize 1 workshop at the end of the first year in Thoi Thuan commune to assess difficulties and problems met during the first year; to share information and lessons learnt; and to identify any additional assistance needed to meet project objectives; some representatives of participants will also be invited - Organize 1 workshop at the end of the second year in Thoi Thuan to make a final valuation; - Assist HH to find a job Assist HH to find a job through contact with companies (especially with Thoi Thuan Industrial Zone) to identify their job requirement Job fair Prepare job fair every year and Liquidation Final Report - Review and approve liquidation documents - Prepare liquidation document with assistance of CIPM/DDIS - Final Report to be submitted to PC, MOT, ADB/DFAT provide consultation to AHs; - Prepare liquidation document with assistance of CIPM/DDIS Page 27 of 34

36 CMDCP Final Detailed Income Restoration Program Can Tho City 5.5 Evaluation and Monitoring of the IRP Evaluation Workshops 106. An evaluation workshop will be organized at the end of the first year of implementationin Thoi Thuan ward The purpose of the workshop is to assess difficulties and problems met during the first year; to share information and lessons learnt; and to identify any additional assistance needed to meet project objectives. Representatives of participants (i.e. leader of groups of interest) Based on the results of the first year evaluation workshop, a second year work plan will be prepared. This second work plan will identify all the changes to the IRP with a reevaluation of the staffing and budget Final workshop will take place after the two years of implementation. As per first workshops the workshop will be organized in Thoi Thuan ward The purpose of the final workshops will be to make a final evaluation of the IRP program Internal Monitoring 111. CIPM/DDIS consultant will develop a set of monitoring indicators at the beginning of the IRP implementation. Monitoring forms will be developed accordingly. The SC will prepare quarterly progress report on IRP implementation based on their respective coverage areas Issues identified for immediate action will be referred to the Steering Committee and CIPM/DDIS. Modifications in the program based on the progress and lessons learned in the course of IRP implementation and additional funds to cover additional activities and support to vulnerable households will be provided as and when necessary The monitoring and evaluation will continue for each activity of the IRP. Monitoring indicators are presented in Table 15. When possible these indicators will be disaggregated by gender External Monitoring 114. IRP will be also subject to external monitoring. All data, reports will be made available for the external monitor. Page 28 of 34

37 CMDCP Final Detailed Income Restoration Program Can Tho City Table 15: Monitoring Indicators of IRP Activities No. Activity Description Indicator Verification (Monitoring tools) 1 Agriculture - Survey, interview with participants Extension Models 2 Technical trainings and outputs of agricultural models - Providing a sustainable livelihood alternative to HHs who have sufficient conditions and motivation for conducting the models; - Improving income of the agriculture-based HHs who have viable land; - Creating immediate works to agriculture-based HHs; - Providing HHs with technical trainings to conduct agriculture extension models successfully; - Supporting HHs to find outputs for agricultural products 3 Vocational trainings - Improve knowledge and skills - Support to find new alternative job 4 Consultations: Job creating and introduction 5 Small business/service 6 Support to women and vulnerable HH - Affected persons are expected to find a new job or have orientation of their future career. - Providing a sustainable livelihood alternative to SAVHs who have sufficient conditions and motivation for conducting this model - Other SAVHs will be benefited thanks to the replication of the model. - Women and vulnerable HH are supported in selection and implementation of IRP activities - Organization of training activities take into account specific needs of women. - Economic efficiency: added income per remained land, profit/cost, - Income/month; save cost (in cases of finding other job) - No. of HH s member involved, - Successfulness of the model (increased income, implementation skills and lessons-learned) - No. of trainings, workshops/meetings, No. of participants; - Skills of participated HHs - Number and/or quantity of outputs sold by the HHs - No. of participants - Skills after training and capability in finding job - No. of trainees who found new job - Income generating from the new job; - No. of consultations and no. of trainees participating - No. of participants who are introduced new job - Economic efficiency: added income per remained land, Profit/cost, - No. of HH s member involve - Successfulness of the model (increased income, implementation skills & experience) - No. of women involved in IRP activities - Women and vulnerable HH increase income as a result of the IRP Page 29 of 34 - Survey, interview with participants - Workshops and HHs surveys; - Review by Working Group for agriculture activities and Minutes of meetings, - Participating training courses as observer and interview the HHs; - List of participants - Report from Working Groups for training & Small Business and discuss with trainees - Work contract with recruiting companies - Interview with trainees - List of participants - Report from WG on Training & Small Business - Interview APs - Survey, interview with participants; - Workshops and HHs surveys; - Survey, interview with participants;

38 CMDCP City Final Detailed Income Restoration Program Can Tho 6. SCHEDULE FOR THE IRP 115. The IRP will be implemented for a period of 2 years. The schedule provided below is designed for one production cycle to be implemented within 2 years. The DDIS Consultants will assist in the continuous implementation of the IRP and will provide back-stop support as and when necessary The proposed schedule for both agriculture activities and vocational training operating small business is presented in the Figure below. The IRP is expected to start in March Figure 4: Schedule for the Implementation of the IRP 1 Approval of budget by Can Tho City PC 2 Approval of detailed IRP by ADB/DFAT 3 Sign Contract with CFLD 4 Transfer of fund to CFLD 5 Identify costs of inputs 6 Prepare working plan Meet every HH and determine use of 7 remaining support 8 Sign contract with participants 9 Build groups of interest 10 Training 11 Purchase inputs 12 Start of activity 13 Follow-up 14 Mid term workshop 15 Prepare new work plan 16 Final workshop 17 Quarterly Report 18 Quarterly meetings 19 Liquidation Page 30 of 34

39 CMDCP City Final Detailed Income Restoration Program Can Tho 7. COSTS ESTIMATES 117. Preparation of costs estimates are based on the regulations presented in Table 16 and existing cost norm approved by the Government of Vietnam. Cost estimates are divided into: Cost of activities (include inputs and training course to be provided to participants); Cost of implementation by local agencies; Cost of implementation of DDIS; 118. Costs have been prepared in collaboration with Steering Committee of Can Tho City. Table 16: Regulations Used to Prepare Costs Estimates Regulation applied Content Issuance date Issued by 1 Circular 219/2009/TT-BTC Limit of expenditure applying for 19/11/2009 Ministry of Finance ODA projects and programs 2 Circular 192/2011/TT-BTC Amendments of some articles of Circular /12/2011 Ministry of Finance 3 Decree 66/2013/NĐ-CP Minimum wage level for 27/06/2013 Prime Minister government staff; 4 Decree 204/ND-CP Salary and wage coefficient and 14/12/2004 Prime Minister wage level for government staff 5 Decision 1111/2009/QD- BHXH Social, health and unemployment insurance to be included in salary 25/10/2011 General Director of Vietnam Social 6 Decision 40/2010/QD- UBND Security Per diem for staff 31/12/2010 Dong Thap Province Costs for Income Restoration Activities 119. The costs of activities include the support amount to each participant and the additional support (cost of training for agriculture activities, allowances for training vaccine etc.) as presented in Table The costs of activities are 1,820,032,000 VND equivalents to 85,665 USD. Table 17 summarized the costs of activities. Detailed costs of activities are presented in Annex 8, 9 and Costs of activities have been first approved by Can Tho City PC on 11 August 2014 (Decision No. 2176/QD-UBND). Can Tho City PC also approved an additional budget of 32,782,000 VND on 7 October 2014 (Decision No. 2901/QD-UBND) to cover the costs of training for small business. These costs were not included in the first budget. An adjustment of (-19,000,000) was also approved by Can Tho City PC on 7 October 2014 (Decision No. 2902/QD-UBND) Decisions on approval of costs of activities by Can Tho City PC are presented in Annex In DNA budget, MOT approved use of Dong Thap regulation on per diem for Can Tho City. Page 31 of 34

40 CMDCP City Final Detailed Income Restoration Program Can Tho Table 17: Costs for Income Restoration Activities Agriculture Activities Training Small Business Total Support amount Additional Support Sub-Total Decrease adjustment of allowance level Training for small business TOTAL VND Total USD Approval Decision Decision 2176/QD- UBND of Can Tho City (Annex 13) Decision 2902/QD- UBND of Can Tho City PC (Annex 13) Decision 2901/QD- UBND of Can Tho City PC (Annex 13) 7.2 Costs for Implementation 123. Steering Committees of Can Tho City has identified specific persons to implement the IRP (see Table 11). The staffs to implement the IRP are permanent staff of the various agencies and will mostly be involved part time in the IRP implementation.payment for staff involved in the implementation of IRP will be made on the actual mobilization.total costs for staff involved in IRP implementation, expenses and contingencies 1,288,253,242 VND equivalents to 60,382 USD Costs of implementation have been approved by Can Tho City PC on 14 February 2015 (Decision No. 588/QD-UBND).This decision is presented in Annex 14. Table 18: Salary and Allowance for Staff and Expenses for IRP Implementation items VND USD WG for Agriculture WG for Training & Small business Women s Union CLFD Allowances for Steering Committee Other Allowances (including WU at village level) Contingencies Sub-Total Salary & Allowances Approval Decision Decision 588/QD- UBND of Can Tho City (Annex 14) 7 Exchange rate of Vietcombank issued on 24/02/2015 is 21,335 VND/1USD Page 32 of 34

41 CMDCP Final Detailed Income Restoration Program Can Tho City Expenses for agriculture activities Office renting, stationary, equipment Contingencies 5% Sub-Total Expenses GRAND-TOTAL Costs for DDIS 125. The implementation costs (Consultant s fees and expenses) are not included in these costs. DDIS implementation costs will need a variation order and will be submitted to MOT and ADB for approval in a separate document. The variation order will be submitted to MOT and ADB in March Implementation costs for DDIS will also include costs for organizing mid-term and final evaluation workshops. 7.4 Total Costs 127. The total cost estimate for the Income Restoration Program in Can Tho City is VNDequivalents to USD as presented in the Table below. Detailed costs are presented in Annexes 11, 12 & 13. These costs are significantly lower than the costs estimates prepared for the IRP for Can Tho City in April 2013 (7. 3 billion VND and 350,000 USD). Table 19: Total Costs for IRP Implementation in Can Tho City No contents Amount in VND Equivalent to USD 1 Cost for Activities Cost for IRP implementation Cost for local staffs Expenses for agriculture activities Office renting Grand total ( 1+2) As indicated in section 5.1.1, costs and staff requirement will be reviewed after year 1, following the mid-term evaluation workshop. Figure 5: Distribution of Budget for the IRP in Can Tho City Page 33 of 34

42 CMDCP City Expenses 1% Final Detailed Income Restoration Program Can Tho Office renting 7% Cost for staff 33% Costs for activities 59% 129. Table 20 presents the distribution of the budget by semester; 70% of the budget will be needed during the first 6 months mainly to purchase the inputs and for the costs of training. Table 20: Distribution of Costs for IRP Implementation by Semester Total Half 1 Half 2 Half 1 Half 2 VND USD Costs for Activities Costs for staff Expenses for agriculture activities Office& contingencies Total % 70% 10% 10% 10% 100% 8. DISBURSEMENT& LIQUIDATION 130. The budget disbursement for the IRP implementation phase will be carried out based on the following basis: Remuneration/Allowance of the members of the Steering Committees and Working Groups. Payment should be based on the following basis: a) the approved Detailed Plan, Cost Estimate and time sheet; (b) payment confirmation of members of Steering Committees and Working Groups, (c) reporting from Steering Committees and Working Groups in compliance with the Vietnamese and ADB provisions. Page 34 of 34

43 CMDCP Final Detailed Income Restoration Program Can Tho City Payment of training courses: The payment of the expenses related to the training courses will need: (a) training program has been agreed with CIPM/DDIS (content, the number of households to be trained, trainers, training location...), ( b) a list of signature of households involved in the training program, (c) stationery bills and training aids (in accordance with the items to buy has been agreed with the CIPM) in accordance with Vietnam Provisions, and (d) report on the results of the training organization of the Working Groups or Certificates. Payment of expenses for animals seed, fertilizer, tools for starting jobs to support families...will need the following supporting documents: (a) the detailed IRP was approved by ADB/DFAT/PCs (b) a contract to supply goods/services signed between Working Groups/CLFD and providers of goods/services (c) the VAT invoice, (d) a list of households who received inputs, and (e) report on the implementation of providing support by Working Groups/CLFD. Payment of other expenses: The expenses such as stationery, fuel, food expenses and accommodation will be supported by receipts according to Vietnam Provisions and based on the implementation plan which has been agreed with CIPM CLFD will provide a professional accountant for the IRP; this accountant will be supported by Experienced National IRP Specialist/Accountant of DDIS. DDIS Consultant is well aware of Vietnamese and ADB procedures.ddis will assist the CLFD s accountant to prepare Contract and Subcontracts,check bills, vouchers, invoices etc The liquidation for IRP will be carried out periodically (i.e. liquidation for training; liquidation for providing breeds, seedlings and tools for carrying out a job; liquidation for IRP by commune/ward). Process for liquidation will be indicated in the contract between CIPM and CLFD/CHFLD Documents requested for liquidation include: (i) a summary of management expenses;(ii) a summary of costs for training and (iii) a summary costs for inputs provided top HH to implement IR activities in compliance with ADB and Vietnamese procedures Forms for each of these activities will be prepared by DDIS in collaboration with SC & WG during preparation of the detailed IRP. In addition to these forms, SC and Working Groups also need to include documents and forms as described in Section 6.2 (disbursement) and other documents in compliance with Vietnamese provisions Disbursement and liquidation are subject to external monitoring. \ Page 35 of 34

44 CMDCP City Final Detailed Income Restoration Program Can Tho Figure 6: Process of Disbursement & Liquidation Page 36 of 34

45 CMDCP Annex 1 Annex 1: List of Eligible HH who Choose Agriculture Activities Name 1 NGUYỄN VĂN NHU 2 PHAN NGỌC TRINH Address KV Thới Bình, phường, quận Thốt Nốt, thành phố Cần Thơ. KV. Thới Bình, P., Q. Thốt Nốt, TP. Cần Thơ. Commune/ ward Eligibility loss productive land: 52% land: 63,05% Support level Income restoration activity chosen Breeding cow Breeding cow 3 NGUYỄN THỊ LIẾN 4 NGUYỄN VĂN BO 5 NGUYỄN VĂN NHÀN 6 NGUYỄN VĂN TRIỆU 7 HỘ: TRẦN VĂN KHÁNG KV. Thới Bình, P., Q. Thốt Nốt, TP. Cần Thơ. KV. Thới Bình, P., Q. Thốt Nốt, TP. Cần Thơ. KV Thới Hòa 2, phường, quận Thốt Nốt, thành phố Cần Thơ. KV. Thới Thạnh 1, P., Q. Thốt Nốt, TP. Cần Thơ. KV. Thới Bình, P., Q. Thốt Nốt, TP. Cần Thơ. land: 83,99% land: 45,05% Breeding cow Breeding cow Landless Breeding cow 8 PHẠM VĂN HẬU P., Q. Thốt Nốt, TPCT. 9 LƯƠNG THỊ LAN CHI LÊ VĂN KẺN 10 NGUYỄN THANH PHIM 11 HỘ NGUYỄN VĂN BẢY 12 NGUYỄN VĂN SÁU NGUYỄN THỊ NẾT 13 HỘ NGUYỄN VĂN HUẾ KV Thới Hòa 2, phường, quận Thốt Nốt, thành phố Cần Thơ. KV Thới Thạnh 1, phường, quận Thốt Nốt, thành phố Cần Thơ. KV. Thới Thạnh 1, P., Q. Thốt Nốt, TP. Cần Thơ. Số 1392, KV Thới Thạnh 1, phường Thới Thuận, Q. Thốt Nốt, TP. Cần Thơ. Số 1402, KV Thới Thạnh 1, P. Thới Thuận, Q. Thốt Nốt, TP. Cần Thơ. land: 24,3% land: 65,15% + Relocated business. Relocated business. Landless land: 33% land: 9,73% land: 61,59% land: 64,66% + Relocated business. land: 50,88% Breeding cow Breeding cow Breeding cow Breeding cow Breeding cow Breeding cow Breeding cow Breeding cow Page 1 of 38

46 CMDCP Annex 1 Commune/ Income restoration activity Name Address Eligibility Support level ward chosen 14 HỘ: NGUYỄN VĂN VÂN 15 NGUYỄN VĂN ĐƯỢC 16 NGÔ THỊ THUẦN 17 VĂN HƯNG LÊ THỊ DIỄM THU 343/12 KV. Thới Bình, P., Q. Thốt Nốt, TP. Cần Thơ. KV Thới Thạnh 1, phường, Q. Thốt Nốt, TP. Cần Thơ. KV. Thới Thạnh 1, P., Q. Thốt Nốt, TP. Cần Thơ. 3A, đường Lê Thị Nhiên, phường Mỹ Long, thành phố Long Xuyên. land: 25,46% Breeding cow Landless Breeding cow land: 36,56% land: 36,52% Breeding cow Breeding cow 18 HỘ: NGUYỄN VĂN TRẠNG 344/12, KV. Thới Bình, P., Q. Thốt Nốt, TP. Cần Thơ. land: 21,47% Breeding cow 19 NGUYỄN VĂN LẸ 346/12, KV. Thới Bình, P., Q. Thốt Nốt, TP. Cần Thơ. land: 27,62% Breeding cow 20 NGUYỄN VĂN CHÂU 347/12, KV. Thới Bình, P., Q. Thốt Nốt, TP. Cần Thơ. land: 100% Breeding cow 21 DƯƠNG THỊ DUYÊN 22 MAI PHÚ LỢI NGUYỄN THỊ KIM CHI 23 MAI THỊ THỦY KV. Thới Thạnh 1, P., Q. Thốt Nốt, TP. Cần Thơ. KV. Thới Thạnh 1, P., Q. Thốt Nốt, TP. Cần Thơ. 131, Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh land: 76,16% land: 76,28% Breeding cow Breeding cow Vĩnh Trinh Landless Breeding cow 24 TRẦN VĂN DIỆN NGUYỄN THỊ PHƯỚC Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh Vĩnh Trinh land: 90,02% Breeding cow 25 TẠ THỊ TƯỞNG 26 TRẦN VĂN THANH 27 TRƯƠNG KIM PHƯỢNG Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh, TP. Cần Thơ. 129, Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh Vĩnh Trinh land: 100% Breeding cow Vĩnh Trinh Landless Breeding cow Vĩnh Trinh land: 48,04% + Woman head of HH Breeding cow Page 2 of 38

47 CMDCP Annex 1 Commune/ Income restoration activity Name Address Eligibility Support level ward chosen 28 TRƯƠNG NHỰT SƠN 120, Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh, thành phố Cần Thơ. Vĩnh Trinh land: 81,11% Breeding cow 29 TRƯƠNG HÒA NAM (LÊ PHƯỚC THỤY) Ấp Vĩnh Tiến, thị trấn Vĩnh Thạnh, huyện Vĩnh Thạnh, TPCT Vĩnh Trinh land: 17,9% Breeding cow 30 L[ THỊ KHUYÊN (LÊ PHƯỚC THỤY) 63/1 Thoại Ngọc Hầu, Khóm 6, Mỹ Long, TPLX Vĩnh Trinh land: 40,45% Breeding cow 31 NGUYÊN VĂN PHƯỚC 32 LƯƠNG VĂN TÁM 33 LÊ VĂN QUANG 34 PHẠM VĂN RI 35 NGUYỄN THỊ NHIỄN Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh, TP. Cần Thơ. Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh, thành phố Cần Thơ. KV Thới Hòa 2, phường, quận Thốt Nốt, thành phố Cần Thơ. Ấp Long Thạnh A, P. Long Thạnh, TX. Tân Châu, T. An Giang Vĩnh Trinh land: 99,62% Breeding cow Vĩnh Trinh Relocated business Breeding cow Vĩnh Trinh land: 39,45% land: 60,89% land: 47,86% Breeding cow Breeding cow Cultivation of ornamental flowers 36 TRẦN THỊ BÉ KV Thới Hòa 2, phường, quận Thốt Nốt, thành phố Cần Thơ. land: 11,73% Cultivation of ornamental flowers 37 NGUYỄN VĂN MẾT 38 TRẦN THỊ NHI 39 HỘ NGUYỄN THỊ YẾN 40 HỘ: PHAN THÁI THỐC 41 NGUYỄN THỊ MINH NGUYỆT KV Thới Hòa 2, phường, quận Thốt Nốt, thành phố Cần Thơ. KV. Thới Bình, P., Q. Thốt Nốt, TP. Cần Thơ. Số 1122, KV Thới Thạnh 1, P. Thới Thuận, Q. Thốt Nốt, TP. Cần Thơ. KV. Thới Thạnh 1, P., Q. Thốt Nốt, TP. Cần Thơ. land: 12,98% land: 85,48% Relocated business land: 42,4% P., Q. Thốt Nốt, TPCT. Landless Cultivation of ornamental flowers Cultivation of ornamental flowers Cultivation of ornamental flowers Cultivation of ornamental flowers Cultivation of ornamental flowers 42 DƯƠNG THỊ NIÊM LÊ THỊ NGỌC LAN Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh, thành phố Cần Thơ. Vĩnh Trinh land: 36,99% Cultivation of ornamental flowers Page 3 of 38

48 CMDCP Annex 1 Commune/ Income restoration activity Name Address Eligibility Support level ward chosen 43 ĐOÀN VĂN SANG 44 LÂM THỊ NGA 45 NGUYỄN TRƯỜNG AN 46 NGÔ THỊ RÍT 47 LƯƠNG HỒNG PHÁT 48 NGUYỄN HỒNG ĐÀO 196, ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh Số 376, KV Thới Bình, phường Thới Thuận, quận Thốt Nốt. số 1166,KV Thới Hòa 2, phường Thới Thuận, quận Thốt Nốt, thành phố Cần Thơ. 1148, KV Thới Hòa 2, P., Q. Thốt Nốt. Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh Ấp Vĩnh Lợi, xã Vĩnh Trinh, huyện Vĩnh Thạnh, TP. Cần Thơ. Vĩnh Trinh land: 18,24% Cultivation of ornamental flowers Landless Raising pigs Vĩnh Trinh Vĩnh Trinh land: 30,24% land: 18,45% land: 100% land: 72,79% Raising pigs Raising pigs Raising pigs Raising pigs 49 HỘ NGUYỄN VĂN GÀN KV. Thới Thạnh 1, P., Q. Thốt Nốt, TP. Cần Thơ. land: 30,2% Raising chicken 50 NGUYỄN THỊ THE Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh Vĩnh Trinh land: 11,94% Guava cultivation 51 NGUYỄN VĂN EM Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh Vĩnh Trinh land: 9,75% Support for agriculture production 52 LÊ THỊ BÊ Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh Vĩnh Trinh land: 21% High quality rice production Page 4 of 38

49 CMDCP Annex 2 Name 1 PHAN THÁI NHÂN 2 CAO THỊ NĂM 3 HỘ CHÂU NGỌC THẢO 4 LÊ THỊ NHIỂN 5 LÊ TẤN TÀI 6 NGUYỄN THỊ MAI 7 HUZNH HỬU SIÊU 8 TRẦN VĂN DŨNG 9 TRƯƠNG THỊ LUYẾN 10 NGUYỄN VĂN CHÍNH 11 PHẠM VĂN MINH 12 NGUYỄN QUỐC TRUNG Address KV Thới Thạnh 1, phường, Q. Thốt Nốt, TP. Cần Thơ. KV Thới Thạnh 1, phường, Q. Thốt Nốt, TP. Cần Thơ. 1250, KV. Thới Thạnh 1, P., Q. Thốt Nốt, TP. Cần Thơ. KV Thới Hòa 2, phường, quận Thốt Nốt, thành phố Cần Thơ. KV Thới Hòa 2, phường, quận Thốt Nốt, thành phố Cần Thơ. KV Thới Hòa 2, phường, quận Thốt Nốt, thành phố Cần Thơ. KV. Thới Bình, P., Q. Thốt Nốt, TP. Cần Thơ. 1391,Tổ 47, KV. Thới Thạnh 1, P. Thới Thuận, Q. Thốt Nốt, TP. Cần Thơ. KV Thới Thạnh 1, phường, quận Thốt Nốt, thành phố Cần Thơ. KV. Thới Bình, P., Q. Thốt Nốt, TP. Cần Thơ. 162, KV. Thới Bình, P., Q. Thốt Nốt, TP. Cần Thơ. Số 1249, KV Thới Thạnh 1, phường Thới Thuận, Q. Thốt Nốt, TP. Cần Thơ. Annex 2: List of Eligible HH who Choose Training Commune/ ward Page 5 of 38 Eligibility Support level Income restoration activity chosen Landless Driving car - License B2 Landless Driving car - License B2 land: 100% land: 100% land: 21% Driving car - License B Driving car - License B Driving car - License B2 Landless Driving car - License B2 land: 87,37% land: 100% land: 11,93% land: 19,95% land: 38,7% Driving car - License B Driving car - License B Driving car - License B Driving car - License B Driving car - License B2 Landless Driving car - License B2 13 LÊ HOÀI NGUYỄN KV Thới Thạnh 1, phường, Q. Thốt Nốt, TP. Cần Thơ. Landless Driving car - License B2 14 VÕ VĂN CẤP KV. Thới Bình, P., Q. Thốt Nốt, TP. Cần Thơ. land: 100% Driving car - License B2 15 NGUYỄN NGỌC TRAI KV. Thới Thạnh 1, P., Q. Thốt Nốt, TP. Cần Thơ. land: 99,16% Driving car - License B2 16 PHẠM THỊ LỆ THỦY KV Thới Hòa 2, phường, quận Thốt Nốt, thành phố Cần Thơ. land: 43,31% Driving car - License B2 17 PHAN VĂN THÂM KV. Thới Thạnh 1, P., Q. Thốt Driving car - License B2

50 CMDCP Annex 2 Name Address Commune/ Income restoration Eligibility Support level ward activity chosen Nốt, TP. Cần Thơ. land: 47,39% 18 ĐẶNG THỊ BÍCH NGỌC LÂM THÁI HÒA 19 NGUYỄN PHÚ NHUẬN KV. Thới Thạnh 1, P., Q. Thốt Nốt, TP. Cần Thơ. KV. Thới Bình, P., Q. Thốt Nốt, TP. Cần Thơ. 20 NGUYỄN THỊ BẢY P., Q. Thốt Nốt, TPCT. 21 TRẦN VĂN TOÀN 22 HỘ: NGUYỄN THANH BIÊN 23 LÊ BẰNG PHI 24 PHẠM THANH TÙNG 25 PHAN KIẾN ĐỨC 26 ĐỖ VĂN MINH 27 ĐOÀN CHÍ LINH 28 NGUYÊ N VĂN CHÂU 29 NGUYỄN THANH SƠN 30 TRẦN THANH TRÍ 31 HỘ TRẦN VĂN CHÍNH 32 NGUYỄN VĂN THÀNH NGUYỄN THỊ NGOÀI KV Thới Bình, P., Q. Thốt Nốt, TPCT KV. Thới Thạnh 1, P., Q. Thốt Nốt, TP. Cần Thơ. Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh, thành phố Cần Thơ. Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh KV Thới Hòa 2, phường, quận Thốt Nốt, thành phố Cần Thơ. Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh, thành phố Cần Thơ. ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh KV Thới Thạnh 1, P., Q. Thốt Nốt, TPCT. KV Thới Thạnh 1, phường, Q. Thốt Nốt, TP. Cần Thơ. 1174, KV Thới Hòa 2, phường, quận Thốt Nốt, thành phố Cần Thơ. KV. Thới Thạnh 1, P., Q. Thốt Nốt, TP. Cần Thơ. 1379, KV Thới Thạnh, P., Q. Thốt Nốt, TPCT. Vĩnh Trinh Vĩnh Trinh Vĩnh Trinh Vĩnh Trinh Page 6 of 38 land: 100% + Relocated business land: 100% + poor HH land: 12,5% Landless. Relocated business land: 100% land: 86,73% land: 22,87% land: 53,92% land: 38,52% land: 16,76% Driving car - License B Driving car - License C Driving car - License C Driving car - License C Driving car - License C Driving car - License B Driving car - License B Driving car - License B Driving car - License C Driving car - License C Landless Body care Landless Body care land: 56,12% land: 76,56% land: 67,38% Body care Body care Body care 33 NGUYỄN VĂN TƯ Huyện Tân phú, tỉnh Đồng Nai. Relocated business Body care 34 LÊ THANH TÙNG KV Thới Hòa 1, phường, quận Thốt Nốt, thành phố Cần Thơ. Landless Body care

51 CMDCP Annex 2 Commune/ Income restoration Name Address Eligibility Support level ward activity chosen 35 TRẦN VĂN DU 36 TRẦN CHÍ HIẾU 37 NGUYỄN THỊ TUYẾT LOAN 38 VÕ THÀNH DƯƠNG 39 PHẠM NGỌC MƠ 40 ĐOÀN MINH TÙNG HẢI ĐOÀN MINH TRÍ ĐOÀN MINH KIÊN TRINH ĐOÀN MINH TRƯỜNG TRINH 41 NGUYỄN NHỰT RI 42 HUZNH CÔNG BE 43 HUZNH CÔNG HIẾU 44 NGUYỄN THỊ GÁI 45 NGUYỄN VĂN LIÊM 46 LÊ TRUNG TÍN 47 NGUYỄN THANH DỰ 48 NGUYỄN VĂN KHÊ Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh, thành phố Cần Thơ. 126 Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh KV Thới Hòa 2, phường, quận Thốt Nốt, thành phố Cần Thơ. KV Thới Thạnh 1, phường, Q. Thốt Nốt, TP. Cần Thơ. KV Thới Thạnh 1, P., Q. Thốt Nốt, TPCT. Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh, TP. Cần Thơ. KV. Thới Bình, P., Q. Thốt Nốt, TP. Cần Thơ. KV. Thới Bình, P., Q. Thốt Nốt, TP. Cần Thơ. 378 KV Thới Bình, P., Q. Thốt Nốt, TPCT. KV Thới Thạnh 1, P., Q. Thốt Nốt, TPCT. Vĩnh Tiến, thị trấn Vĩnh Thạnh, huyện Vĩnh Thạnh Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh. KV Thới Hòa 2, phường, quận Thốt Nốt, thành phố Cần Thơ. KV Thới Hòa 2, phường, quận Thốt Nốt, thành phố Cần Thơ. Vĩnh Trinh land: 13,31% Body care Vĩnh Trinh Landless Beauty salon Landless Vĩnh Trinh Landless. Relocated business. Landless and close to poor land: 10,34% land: 56,35% land: 100% Industrial and domestic sewing. Industrial and domestic sewing Industrial and domestic sewing. Industrial and domestic sewing Masonry Masonry Landless Masonry Vĩnh Trinh Vĩnh Trinh Landless and close to poor land: 100% Landless. Relocated business Equipment for masonry Repair auto - opening garage Repair autos and machine Landless Support 1 motorbike Landless Support 1 motorbike Page 7 of 38

52 CMDCP Annex 3 Annex 3: List of Eligible HH who Choose Small Business Name Address Commune/ ward Eligibility Support level Income restoration activity chosen 1 NGUYỄN NHỰT NHƠN 2 NGUYỄN TRUNG DŨNG 3 NGUYỄN THỊ THU HƯƠNG 4 NGUYỄN VĂN DŨNG 5 NGUYỄN PHƯỚC HẢI 6 TRƯƠNG THỊ CHI 7 HUZNH LONG HẢI 8 HUZNH THỊ NGỌC NGA KV. Thới Bình, P., Q. Thốt Nốt, TP. Cần Thơ. KV. Thới Bình, P., Q. Thốt Nốt, TP. Cần Thơ. Tổ 47, KV Thới Thạnh 1, phường Thới Thuận, Q. Thốt Nốt, TP. Cần Thơ. Số 1401, KV Thới Thạnh 1, phường Thới Thuận, Q. Thốt Nốt, TP. Cần Thơ. KV Thới Hòa 2, phường, quận Thốt Nốt, thành phố Cần Thơ. KV Thới Hòa 2, phường, quận Thốt Nốt, thành phố Cần Thơ. 379 KV Thới Bình, P., Q. Thốt Nốt, TPCT. KV Thới Hòa 2, phường, quận Thốt Nốt, thành phố Cần Thơ. land: 96,7% land: 11,6% Small business Small business Landless HH Small business Landless HH Small business Landless HH Small business Landless HH Small business Landless HH Small business 9 NGUYỄN THỊ ÚT Kv Thới Bình, Q. Thốt Nốt, TP CT 10 LÊ THỊ THANH THU[ NGUYỄN ĐỨC THẮNG KV. Thới Thạnh 1, P., Q. Thốt Nốt, TP. Cần Thơ. land: 40,06% land: 100% land: 100% Small business Small business Small business 11 NGUYỄN KINH LUÂN P., Q. Thốt Nốt, TPCT. Landless HH Small business 12 NGUYỄN VĂN HÙNG 13 LÊ THỊ NĂM 14 HỘ NGUYỄN THỊ L[ 15 HỘ HUZNH THỊ HUỆ KV Thới Hòa 2, phường, quận Thốt Nốt, thành phố Cần Thơ. KV Thới Hòa 2, phường, quận Thốt Nốt, thành phố Cần Thơ. Số 1248, KV Thới Thạnh 1, P., Q. Thốt Nốt, TP. Cần Thơ. KV. Thới Thạnh 1, P., Q. Thốt Nốt, TP. Cần Thơ. land: 11,71% Small business Landless HH Small business land: 100% land: 100% Small business Small business Page 8 of 38

53 CMDCP Annex 3 Name Address Commune/ ward Eligibility Support level Income restoration activity chosen 16 NGUYỄN QUỐC THÁI Tổ 42, KV Thới Thạnh 1, phường Thới Thuận, Q. Thốt Nốt, TP. Cần Thơ. Landless HH Small business 17 TRƯƠNG THỊ THANH KV Thới Hòa 2, phường, quận Thốt Nốt, thành phố Cần Thơ. Landless HH, Woman Head of HH Small business 18 PHẠM VĂN HOÀNG 1484 KV Thới Thạnh 1, P., Q. Thốt Nốt, TPCT. 19 CAO THỊ HOA P., Q. Thốt Nốt, TP. Cần Thơ. 20 NGUYỄN THỊ MINH CHI KV Thới Bình, P., Q. Thốt Nốt, TPCT Landless HH and close to poor land: 100% +Relocated business land: 40,96% Small business Small business Small business 21 LÊ THỊ BÃNH KV Thới Hòa 2, phường, quận Thốt Nốt, thành phố Cần Thơ. land: 90,56% Small business 22 NGUYỄN THỊ HẠNH KV Thới Thạnh 1, P., Q. Thốt Nốt, TPCT. land: 100% Small business 23 ĐOÀN NGỌC ĐIỀM KV Thới Thạnh 1, P., Q. Thốt Nốt, TPCT. Hộ mua bán kinh doanh Small business 24 NGUYỄN THỊ DỠ KV Thới Thạnh 1, P., Q. Thốt Nốt, TP. Cần Thơ. Landless HH and close to poor Support to sell cakes 25 LƯƠNG HOÀNG NAM TƯỚC 119, Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh Vĩnh Trinh Landless HH Small business 26 TRƯƠNG NHỰT VĂN NGUYỄN THỊ BẢNH 118, áp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh, TP. Cần Thơ. Vĩnh Trinh land: 23,05% Small business 27 LÊ VĂN HÁT Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh. Vĩnh Trinh Landless HH.Relocated business Small business 28 ĐOÀN VĂN THÔI LƯƠNG THỊ CHƠN 180, Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Thốt Nốt (cũ), thành phố Cần Thơ. Vĩnh Trinh land: 36,13% Small business 29 NGUYỄN THỊ NHƯ NGỌC Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh. Vĩnh Trinh Landless HH, phụ nữ đơn thân làm chủ hộ Small business Page 9 of 38

54 CMDCP Annex 3 Name Address Commune/ ward Eligibility Support level Income restoration activity chosen 30 NGUYỄN VĂN RI NGUYỄN THỊ THÔI Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh. Vĩnh Trinh land: 49,8% Small business 31 LÊ VĂN MƯỜI Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh. Vĩnh Trinh land: 18,3% Small business 32 PHẠM VĂN LẠC 33 VÕ ANH DUY 34 NGUYỄN HỒNG SƠN 35 LƯƠNG TRỌNG THÁI 36 TRẦN THỊ BÉ EM Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh. Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh. 122A hẻm 3, Trần Hưng Đạo, Mỹ Xuyên, TP. Long Xuyên Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh. 127, áp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh, TP. Cần Thơ. Vĩnh Trinh Vĩnh Trinh Vĩnh Trinh land: 16,52% land: 34,74% land: 15,36% Small business Small business Small business Vĩnh Trinh Landless HH Lotery shop Vĩnh Trinh Hộ mua bán kinh doanh Support to sell fish 37 LƯƠNG BÁ TƯỚC 109, ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Thạnh Vĩnh Trinh land: 29,25% Repair shop (electricity, water) Page 10 of 38

55 CMDCP Annex 4 Annex 4: List of Eligible HH who didn twant to Join the Program Name Adress Location Eligibility Support amount Reason why HH didn t want to join 1 HỘ: NGUYỄN VĂN TIẾN KV. Thới Thạnh 1, P., Q. 100% productive Thốt Nốt, TP. Cần Thơ. land affected Not interested to join theprogram 2 HỒ THỊ TUYẾT HẠNH KV. Quy Thạnh 2, P. Trung Kiên, Q. Thốt 46,47% productive Not interested to join the program Nốt, TP. Cần Thơ. land affected 3 PHÙNG NAM HƯNG KV. Thới Thạnh 1, P., Q. 61,53% productive Not interested to join the program Thốt Nốt, TP. Cần Thơ. land affected 4 NGUYỄN MINH KIỆN KV. Thới Thạnh 2, P., Q. 89,63% productive Not interested to join the program Thốt Nốt, TP. Cần Thơ. land affected 5 MAI THỊ XUÂN PHƯƠNG 1148, KV Thới Hòa 2, P., Q. 100% productive Thốt Nốt. land affected Don t need training 6 NGUYỄN THỊ DUYÊN KV. Thới Bình, P., Q. Thốt 24,63% productive Nốt, TP. Cần Thơ. land affected Not interested to join the program 7 NGUYỄN VĂN MINH KV Thới Hòa 2, phường, 100% productive quận Thốt Nốt, thành phố Cần Thơ. land affected Not interested to join the program 8 PHAN THẾ LỘC KV. Thới Bình, P., Q. Thốt 81,28% productive Nốt, TP. Cần Thơ. land affected Want support for children 9 NGUYỄN VĂN SỬA KV Thới Thạnh 1, P., Q. Thốt 60,74% productive Not interested to join the program Nốt land affected 10 NGUYỄN VĂN BIẾT KV Thới Thạnh 1, phường, Not interested to join the program Landless HH Q. Thốt Nốt, TP. Cần Thơ. 11 LÊ HOÀI THANH KV Thới Thạnh 1, phường, Not interested to join the program Landless HH Q. Thốt Nốt, TP. Cần Thơ. 12 PHẠM TẤN SĨ NGHĨA P., Q. Thốt Nốt, TPCT. Landless HH Not interested to join the program 13 PHẠM THỊ TUYẾT VÂN KV Thới Thạnh 1, P., Q. Thốt Landless HH Not interested to join the program Nốt, TP. Cần Thơ. 14 HUZNH THỊ KIM MÃNH 677/34 Bình Khánh 1, P Bình Khánh, 60,03% productive TPLX land affected Family has stable source of income 15 NGUYỄN QUANG LUÂN KV Thới Thạnh 1, phường, 100% productive Not interested to join the program quận Thốt Nốt, thành phố Cần Thơ. land affected 16 HỘ NGUYỄN HỮU SƠ 636/42 KV Thới Thạnh 1, P., Cắt xén lớn hơn trên Not interested to join the program Q. Thốt Nốt, TPCT. GCN 17 HỘ: TRẦN THỊ KIM XUÂN KV. Thới Thạnh 1, P., Q. 41,6% productive Thốt Nốt, TP. Cần Thơ. land affected ,0 No time to participate in IRP 18 NGUYỄN THỊ LỆ HÀ 204, Ấp Vĩnh Long, xã Vĩnh Trinh, huyện 42,56% productive Vĩnh Trinh Vĩnh Thạnh land affected Family don t need agriculture training 19 TRẦN THỊ THU Ấp Vĩnh Long, xã Vĩnh Trinh, huyện Vĩnh Vĩnh Trinh Landless HH Not interested to join the program Page 11 of 38

56 CMDCP Annex 4 Thạnh, thành phố Cần Thơ. Relocated business 56/4 Ấp Vĩnh Long, xã Vĩnh Trinh, huyện 11,69% productive 20 LÊ BỬU VINH Vĩnh Trinh Older children have stable jobs Vĩnh Thạnh land affected Page 12 of 38

57 CMDCP Annex 5 Annex 5: Photos Taken during Workshops Participants to the Workshop in Thoi Thua ward Presentation of activities during workshop in Thoi Thuan ward Participants to the Workshop in Vinh Trinh Commune Participants are filling questionnaire in Vinh Trinh Commune Page 13 of 38

58 CMDCP Annex 6 Annex 6: Template for Confirmation of the Households on the Support Received Socialist Republic of Vietnam Independence - Freedom Happiness Central Mekong Delta Connectivity Project I. Affected households: Household name : Address : Household I.D card: Family book No. (If available) II. Supporting items received TT/ No. Items (Households clearly identify what kind of support he received) Unit Quantity 1 Example: Ornamental plants (type of flower/plant) Pcs Fertilizer SH Huminrich Package (25 1 kg/package) 3 III. Confirmation Date/Month/Year Affected households (Sign & full name ).. Confirmation of Working Group Support given by (Sign & full name) Page 14 of 38

59 CMDCP Annex 7 Annex 7: Action Plan by Commune/Ward Example: Training course for cow breeding/ raising in Vinh Trinh Commune Activity Training course for cow raising/breeding Duration for Trainers implementation 3 days 1 expert of Working Group Agriculture Extension Centre) Checking stables 2 days 3 members of Working Groups v.v, Place for training Vinh Trinh Commune Vinh Long Hamlet Start/End Date for Output of activity training 12/6 14/6 Participants understand thefollowing information: (i)... (ii)... (iii), (iv)... Each household receives a summary document onraising/breeding cow (feeding, technical requirements) Each household received a document regarding common illnesses of cows... 14/6-15/6 Check the preparation of stables of xx households Page 15 of 38

60 CMDCP Annex 8 Name Commune/ ward Annex 8: Detailed Costs for Agriculture Activities Support level Income restoration activity chosen Days of training Cost of training Vaccine Additional Support (VND) Meals Allowance Transport allowance Total additional support 11= ( )) TOTAL COSTS 12= NGUYỄN VĂN NHU Breeding cow PHAN NGỌC TRINH Breeding cow NGUYỄN THỊ LIẾN Breeding cow NGUYỄN VĂN BO Breeding cow NGUYỄN VĂN NHÀN Breeding cow NGUYỄN VĂN TRIỆU Breeding cow HỘ: TRẦN VĂN KHÁNG Breeding cow PHẠM VĂN HẬU Breeding cow LƯƠNG THỊ LAN CHI LÊ VĂN KẺN Breeding cow NGUYỄN THANH PHIM Breeding cow HỘ NGUYỄN VĂN BẢY Breeding cow NGUYỄN VĂN SÁU NGUYỄN THỊ NẾT Breeding cow HỘ NGUYỄN VĂN HUẾ Breeding cow HỘ: NGUYỄN VĂN VÂN Breeding cow NGUYỄN VĂN ĐƯỢC Breeding cow NGÔ THỊ THUẦN Breeding cow VĂN HƯNG LÊ THỊ DIỄM THU Breeding cow HỘ: NGUYỄN VĂN TRẠNG Breeding cow NGUYỄN VĂN LẸ Breeding cow NGUYỄN VĂN CHÂU Breeding cow DƯƠNG THỊ DUYÊN Breeding cow Page 16 of 38

61 CMDCP Annex 8 Name Commune/ ward Support level Income restoration activity chosen Days of training Cost of training Vaccine Additional Support (VND) Meals Allowance Transport allowance MAI PHÚ LỢI NGUYỄN THỊ KIM CHI Total additional support 11= ( )) TOTAL COSTS 12= Breeding cow MAI THỊ THỦY Vĩnh Trinh Breeding cow TRẦN VĂN DIỆN NGUYỄN THỊ PHƯỚC Vĩnh Trinh Breeding cow TẠ THỊ TƯỞNG Vĩnh Trinh Breeding cow TRẦN VĂN THANH Vĩnh Trinh Breeding cow TRƯƠNG KIM PHƯỢNG Vĩnh Trinh Breeding cow TRƯƠNG NHỰT SƠN Vĩnh Trinh Breeding cow TRƯƠNG HÒA NAM (LÊ PHƯỚC THỤY) Vĩnh Trinh Breeding cow L[ THỊ KHUYÊN (LÊ PHƯỚC THỤY) Vĩnh Trinh Breeding cow NGUYÊN VĂN PHƯỚC Vĩnh Trinh Breeding cow LƯƠNG VĂN TÁM Vĩnh Trinh Breeding cow LÊ VĂN QUANG Vĩnh Trinh Breeding cow PHẠM VĂN RI Breeding cow NGUYỄN THỊ NHIỄN Ornamental flowers TRẦN THỊ BÉ Ornamental flowers NGUYỄN VĂN MẾT TRẦN THỊ NHI HỘ NGUYỄN THỊ YẾN Ornamental flowers Ornamental flowers Ornamental flowers Page 17 of

62 CMDCP Annex 8 Name Commune/ ward Support level Income restoration activity chosen Days of training Cost of training Vaccine Additional Support (VND) Meals Allowance Transport allowance HỘ: PHAN THÁI THỐC NGUYỄN THỊ MINH NGUYỆT DƯƠNG THỊ NIÊM LÊ THỊ NGỌC LAN Vĩnh Trinh Ornamental flowers Ornamental flowers Ornamental flowers Total additional support 11= ( )) TOTAL COSTS 12= ĐOÀN VĂN SANG Vĩnh Trinh Ornamental flowers LÂM THỊ NGA Raising pigs NGUYỄN TRƯỜNG AN Raising pigs NGÔ THỊ RÍT Raising pigs LƯƠNG HỒNG PHÁT Vĩnh Trinh Raising pigs NGUYỄN HỒNG ĐÀO Vĩnh Trinh Raising pigs HỘ NGUYỄN VĂN GÀN Raising chicken NGUYỄN THỊ THE Vĩnh Trinh Guava cultivation NGUYỄN VĂN EM Vĩnh Trinh Support for agriculture 0, production 52 LÊ THỊ BÊ Vĩnh Trinh High quality rice production 0, TOTAL Page 18 of 38

63 CMDCP Annex 9 Name Commune/ ward Annex 9: Detailed Costs for Vocational Training Support level Income restoration activity chosen Page 19 of 38 Cost for training Days of training Meals Allowance Additional Support Transport allowance Total additional support =(8+9)) 11=(4+10) 1 PHAN THÁI NHÂN Driving car - License B CAO THỊ NĂM Driving car - License B HỘ CHÂU NGỌC THẢO Driving car - License B LÊ THỊ NHIỂN Driving car - License B LÊ TẤN TÀI Driving car - License B NGUYỄN THỊ MAI Driving car - License B HUZNH HỬU SIÊU Driving car - License B TRẦN VĂN DŨNG Driving car - License B TRƯƠNG THỊ LUYẾN Driving car - License B NGUYỄN VĂN CHÍNH Driving car - License B PHẠM VĂN MINH Driving car - License B NGUYỄN QUỐC TRUNG Driving car - License B LÊ HOÀI NGUYỄN Driving car - License B VÕ VĂN CẤP Driving car - License B NGUYỄN NGỌC TRAI Driving car - License B PHẠM THỊ LỆ THỦY Driving car - License B PHAN VĂN THÂM Driving car - License B ĐẶNG THỊ BÍCH NGỌC Driving car - License B2 LÂM THÁI HÒA NGUYỄN PHÚ NHUẬN Driving car - License C NGUYỄN THỊ BẢY Driving car - License C TRẦN VĂN TOÀN Driving car - License C NGUYỄN THANH BIÊN Driving car - License C LÊ BẰNG PHI Vĩnh Trinh Driving car - License B PHẠM THANH TÙNG Vĩnh Trinh Driving car - License B PHAN KIẾN ĐỨC Driving car - License B ĐỖ VĂN MINH Vĩnh Trinh Driving car - License C TOTAL COSTS

64 CMDCP Annex 9 Name Commune/ ward Support level Income restoration activity chosen Page 20 of 38 Cost for training Days of training Meals Allowance Additional Support Transport allowance Total additional support 27 ĐOÀN CHÍ LINH Vĩnh Trinh Driving car - License C NGUYÊ N VĂN CHÂU Body care NGUYỄN THANH SƠN Body care TRẦN THANH TRÍ Body care HỘ TRẦN VĂN CHÍNH Body care NGUYỄN VĂN THÀNH Body care NGUYỄN THỊ NGOÀI NGUYỄN VĂN TƯ Body care LÊ THANH TÙNG Body care TRẦN VĂN DU Vĩnh Trinh Body care TRẦN CHÍ HIẾU Vĩnh Trinh Beauty salon NGUYỄN THỊ TUYẾT LOAN VÕ THÀNH DƯƠNG PHẠM NGỌC MƠ ĐOÀN MINH TÙNG HẢI ĐOÀN MINH TRÍ ĐOÀN MINH KIÊN TRINH ĐOÀN MINH TRƯỜNG TRINH Vĩnh Trinh Industrial and domestic sewing. Industrial and domestic sewing Industrial and domestic sewing. Industrial and domestic sewing TOTAL COSTS NGUYỄN NHỰT RI Masonry HUZNH CÔNG BE Masonry HUZNH CÔNG HIẾU Masonry NGUYỄN THỊ GÁI Yêu cầu hộ trợ máy trộn NGUYỄN VĂN LIÊM Vĩnh Trinh Repair auto LÊ TRUNG TÍN Vĩnh Trinh Repair autos & machine NGUYỄN THANH DỰ Yêu cầu hộ trợ 01 chiếc NGUYỄN VĂN KHÊ Yêu cầu hộ trợ 01 chiếc

65 CMDCP Annex 10 Annex 10: Detailed Costs for Small Business Name Commune/ ward Support level Type of small business Page 21 of 38 Cost of training Days of training Meal allowance Additional Support (VND) Transport Allowance Total Additional Support TOTAL COSTS =(8+9) 11= (4+6+10) 1 NGUYỄN NHỰT NHƠN Small business NGUYỄN TRUNG DŨNG Small business NGUYỄN THỊ THU HƯƠNG Small business NGUYỄN VĂN DŨNG Small business NGUYỄN PHƯỚC HẢI Small business TRƯƠNG THỊ CHI Small business HUZNH LONG HẢI Small business HUZNH THỊ NGỌC NGA Small business NGUYỄN THỊ ÚT Small business LÊ THỊ THANH THU[ NGUYỄN ĐỨC THẮNG Small business NGUYỄN KINH LUÂN Small business NGUYỄN VĂN HÙNG Small business LÊ THỊ NĂM Small business HỘ NGUYỄN THỊ L[ Small business HỘ HUZNH THỊ HUỆ Small business NGUYỄN QUỐC THÁI Small business TRƯƠNG THỊ THANH Small business PHẠM VĂN HOÀNG Small business CAO THỊ HOA Small business NGUYỄN THỊ MINH CHI Small business LÊ THỊ BÃNH Small business NGUYỄN THỊ HẠNH Small business ĐOÀN NGỌC ĐIỀM Small business NGUYỄN THỊ DỠ Selling cakes

66 CMDCP Annex Name LƯƠNG HOÀNG NAM TƯỚC TRƯƠNG NHỰT VĂN NGUYỄN THỊ BẢNH Commune/ ward Support level Type of small business Cost of training Days of training Meal allowance Additional Support (VND) Transport Allowance Total Additional Support TOTAL COSTS Vĩnh Trinh Small business Vĩnh Trinh Small business LÊ VĂN HÁT Vĩnh Trinh Small business ĐOÀN VĂN THÔI LƯƠNG THỊ CHƠN NGUYỄN THỊ NHƯ NGỌC NGUYỄN VĂN RI NGUYỄN THỊ THÔI Vĩnh Trinh Small business Vĩnh Trinh Small business Vĩnh Trinh Small business LÊ VĂN MƯỜI Vĩnh Trinh Small business PHẠM VĂN LẠC Vĩnh Trinh Small business VÕ ANH DUY Vĩnh Trinh Small business NGUYỄN HỒNG SƠN Vĩnh Trinh Small business LƯƠNG TRỌNG THÁI Vĩnh Trinh Lotery shop TRẦN THỊ BÉ EM Vĩnh Trinh Capital LƯƠNG BÁ TƯỚC Vĩnh Trinh Repair shop (electricity, water) Page 22 of 38

67 CMDCP Annex 12 Annex 11: Costs for Staff Involved in IRP No. Full Name Agency Salary coefficient Basic salary (VND) Working time coefficient Responsibility additional payment (VND) Per diem (VND) Socialhealthinsurance 22% (VND) Total payment/ month (VND) No. of months Total (VND) Note I. Cost estimate (for working group on agriculture) 171,078,648 1 Nguyễn Hiền Trung 2 Huznh Anh Tuấn 3 Trần Văn Trắt 4 Phan Phước Sang 5 Nguyễn Văn Tươi Can Tho City AEC Thot AEC Vinh AEC Not Thanh Thoi Thuan Ward Farmer Union Vinh FU Trinh ,150, ,504, ,000-1,954, ,900,800 Part time ,150, ,283, ,000-1,733, ,592,768 Part time ,150, ,214, ,000-1,664, ,945,600 Part time ,2 451, , , ,627,480 Part time ,150, , , , ,012,000 Part time II. Cost Estimate (for working groups: training Vocation and small business) 90,764,064 1 Trần Quang Khải DOLISA ,150, ,248, ,000-1,698, ,763,664 Part time 2 Lê Thanh Nghị 3 Lê Thị Bạch Tuyết Thot Not Vocational Training Center Vinh Thanh Vocational Training Center ,150, , , , ,853,800 Part time ,150, , ,000-1,172, ,146,600 Part time III. Cost estimate (for Women's Union) 43,743,480 1 Lưu Thị Hoa Thoi Thuan WU ,150, , , , ,731,480 Part time Page 23 of 38

68 CMDCP Annex 12 No. Full Name Agency 2 Trần Thị Thơi Vinh Trinh WU Salary coefficient Basic salary (VND) Working time coefficient Responsibility additional payment (VND) Per diem (VND) Socialhealthinsurance 22% (VND) Total payment/ month (VND) No. of months Total (VND) ,150, , , , ,012,000 Part time IV. Cost Estimate (for CoLFD of Can Tho city ) 630,229,320 1 Hồ Văn Mẫn 2 Nguyen Thi Thanh Van 3 Nguyen Huu Phuc 4 Phan Thanh Tung CoLFD of Can Tho city ,150, ,408,715 1,650,000-5,058, ,409,160 Part time CoLFD of Can Tho city 2,67 1,150, ,228,200 1,650,000-2,878, ,076,800 Part time CoLFD of Can Tho city 5,38 1,150, ,474,800 1,650,000-4,124, ,995,200 Part time CoLFD of Can Tho city ,150, ,382, , ,920 7,098, ,374,080 Full time Note 5 Lê Tuấn Vũ SC of IRP Mobilized during 2 yeras ,150, ,382, , ,920 7,098, ,375,080 Full time V. Allowance for Steering Committee (VND) 30,000, Đào Anh Dũng - Vice- Chairman of People s Committee of Can Tho City Nguyễn Hữu Thắng - Vice-chairman of People s Committee of Thot Not District Trần Ngọc Hải - Vicechairman of People s Committee of Vinh Thanh District 500, ,000, , ,000, , ,000,000 Page 24 of 38

69 CMDCP Annex 12 No. Full Name Agency Nguyễn Anh Thùy - Vice-Director of Department of Agriculture and Rural Development Châu Hồng Thái - DOLISA Võ Kim Thoa - Vice Chairwomen of Women s Union of Can Tho City Salary coefficient Basic salary (VND) Working time coefficient Responsibility additional payment (VND) Per diem (VND) Socialhealthinsurance 22% (VND) Total payment/ month (VND) No. of months Total (VND) 500, ,000, , ,000, , ,000,000 VI Allowance for hamlet staffs ( including: Women s Union of hamlet, hamlet staffs, hamlet heads participation ) 15,000,000 Contingencies 40,000,000 Note 50,000 đ/ 1day/ pers Total 1,020,815,512 Page 25 of 38

70 CMDCP Annex 12 Sub-Total Summary of Implementation items VND USD WG for Agriculture WG for Training & Small business Women s Union CLFD Allowances for Steering Committee Other Allowances (including WU at village level) Contingencies Sub-Total Salary & Allowances Page 26 of 38

71 CMDCP Annex 13 Annex 12: Expenses for IRP Operation I. BUDGET FOR AGRICULTURAL ACTIVITIES II. 1. Field visit to cow farming models in Tra Vinh, Ben Tre 10,800,000 Legal basis 1 Rental for 14-seat car: 3,000,000 VND x 01 car 3,000,000 2 Rental for 29-seat car: 4,000,000 VND x 01 car 4,000,000 3 Meal: 100,000 VND x 38 people 3,800,000 Circular 219/2009/TT-BTC 2. Survey to identify price of cows 13,800,000 1 Rental for 7-seat car: 2,000,000 VND x 4 days 8,000,000 2 Meal: 100,000 VND x 4 people x 4 days 1,600,000 Circular 219/2009/TT-BTC 3 Hotel: 350,000 VND x 3 nights x 4 rooms 4,200,000 Circular 97/2010/TT-BTC 3. Organize AHHs to go Places in order to choice cow 18,400,000 1 Rental for 29-seat car: 4,000,000 VND x 01 car 4,000,000 2 Rental for 14-seat car: 3,000,000 VND x 01 car 3,000,000 3 Meal: 100,000 VND x 38 people 3,800,000 Circular 219/2009/TT-BTC 4 Rental car for cow transport cows to Thot Not: 200,000 VND x 38 cows 7,600, Organization to hand-over cows to AHHs 2,130, Rental meeting hall: 1,000,000 VND x 01 day 1,000,000 Banner: 250,000 VND x 01 banner 250,000 3 Drinking water: 20,000 VND x 44 people x 01 day 880,000 Circular 219/2009/TT-BTC Sum 45,130,000 Reference to market price and payment based on actual expenditure Reference to market price and payment based on actual expenditure Reference to market price and payment based on actual expenditure Reference to market price and payment based on actual expenditure Reference to market price and payment based on actual expenditure Reference to market price and payment based on actual expenditure Provisional sum - payment based on actual expenditure Provisional sum - payment based on actual expenditure Page 27 of 38

72 CMDCP Annex 13 II BUDGET FOR OFFICE RENTING & OFFICE FACILITY PURCHASE Description Quantity Unit price(vnd) Unit Amount (VND) Legal basis 1 Laser printer canon ,990,000 item 2,990,000 Price Quotation 2 Laptop Lenovo G G50G 2 12,490,000 item 12,490,000 Price Quotation 3 Telephone Panasonic KX TG1102 Fax Panasonic KX-FP ,490,000 item 2,490,000 Price Quotation 4 Electric fan Asia D ,400,000 item 1,400,000 Price Quotation 5 Wall/ceiling fan Lifan TE ,000 item 519,000 Price Quotation 6 Refrigerator Fanasomic Mini 1 4,090,000 item 4,090,000 Price Quotation 9 Meeting table 1,2m x 2,4m 1 1,980,000 item 1,980,000 Price Quotation 10 Foldable chair GG ,000 item 4,488,000 Price Quotation 11 Desk 1,4m x 0,7m 2 1,485,000 item 2,970,000 Price Quotation 12 Chair G216H 2 905,000 item 1,810,000 Price Quotation 13 Steel filing cabinet with 4 doors 1 2,420,000 item 2,420,000 Price Quotation 14 Fire extinguisher 5 kg 2 580,000 item 1,160,000 Price Quotation 15 Tea pot & cups 1 765,600 item 765,600 Price Quotation 16 Office renting cost 24 4,000,000 month 96,000, Water fee ,000 month 4,800, Power fee 24 1,000,000 month 24,000, Information Panel 1 2,000,000 month 2,000, Internet + Telephone fee ,000 month 19,200, Stationary + office maintenance 24 1,000,000 month 24,000,000 Sub-Total 209,572,600 Contingency 5% 12,735,130 Sum (B+C) 267,437,730 Reference to market price and payment based on actual expenditure Reference to market price and payment based on actual expenditure Reference to market price and payment based on actual expenditure Reference to market price and payment based on actual expenditure Reference to market price and payment based on actual expenditure Reference to market price and payment based on actual expenditure Page 28 of 38

73 CMDCP Annex 13 Annex 13: Approval of Costs for Activities by Can Tho City PC Page 29 of 38

74 CMDCP Annex 13 Page 30 of 38

75 CMDCP Annex 13 PEOPLE S COMMITTEE OF CAN THO CITY SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No: 2176/QD-UBND Can Tho, dated on August 11, 2014 DECISION Ref: Approval cost for Income Restoration Activities to affected households by Component 3 Project - Vam Cong Bridge Construction and additional road sections 1.5 Km PEOPLE S COMMITTEE OF CAN THO CITY Based on the Law on Organization of People's Council and People's Committee dated on November 26, 2003; Based on Land Law dated on November 29, 2013; Based on Decree No.47/2014/ND-CP dated on May 15, 2014 issued by Government on compensation, support, resettlement upon land recovery by the State; According to proposal of Appraisal Committee of Can Tho City at the document No.1732/TTr-HDTD dated on August 04, 2014, DECISION Article 1. Approval cost for Income Restoration Activities to affected households by Component 3 Project - Vam Cong Bridge Construction and additional road sections 1.5 Km with amount of 1,806,250,000 VND (One billion, eight hundred and six million, two hundred and fifty thousand VND), as follows: - Cost for activities: 1,616,000,000 VND. - Cost for training: 44,300,000 VND. - Cost for vaccine and antiseptic chemicals: 3,950,000 VND. - Cost for meal: 117,000,000 VND. - Cost for traveling: 25,000,000 VND (Attached the detailed cost for Income Restoration Activities to affected households by Component 3 Project - Vam Cong Bridge Construction and additional road sections 1.5 Km). Article 2. Assign Compensation, Support and Resettlement Committee to incorporate Center for Land Fund Development of Can Tho City, People s Committee of Thot Not district and Investor to implement support cost for above households accordance with regulations. Article 3. Office Manager of People s Committee of Can Tho City, Director of Department of Natural Resources and Environment, Director of Finance Department, Director of State Treasury of Can Tho City, Chairman of People s Committee of Thot Not district, Director of Center for Land Fund Development of Can Tho City, Investor and households mentioned in Article 1 are responsible for implementation of this decision from the date of signing. Recipients: - As Article 3; - Office of People's Committee of Can Tho City (3D); - Filed at VT, BN. ON BEHALF OF PEOPLE S COMMITTEE KT.CHAIRMAN VICE-CHAIRMAN (Signed) Dao Anh Dung Page 31 of 38

76 CMDCP Annex 13 Page 32 of 38

77 CMDCP Annex 13 PEOPLE S COMMITTEE OF CAN THO CITY SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No: 2901/QD-UBND Can Tho, dated on October 07, 2014 DECISION Ref: Approval additional cost for training courses of 37 households chose small business activities in the Income Restoration Program (IRP) of Component 3 Project - Vam Cong Bridge Construction and additional road sections 1.5 Km PEOPLE S COMMITTEE OF CAN THO CITY Based on the Law on Organization of People's Council and People's Committee dated on November 26, 2003; Based on Land Law dated on November 29, 2013; Based on Decree No.47/2014/ND-CP dated on May 15, 2014 issued by Government on compensation, support, resettlement upon land recovery by the State; According to proposal of Appraisal Committee of Can Tho City at the document No.2359/TTr-HDTD dated on September 30, 2014, DECISION Article 1. Approval additional cost for training courses of 37 households chose small business activities in the Income Restoration Program (IRP) of Component 3 Project - Vam Cong Bridge Construction and additional road sections 1.5 Km with amount of 32,782,000 VND (Thirtytwo million, seven hundred and eighty-two thousand VND). (Attached list of households approved additional cost for training courses in small business activities in IRP of Component 3 Project - Vam Cong Bridge Construction and additional road sections 1.5 Km) Article 2. Assign People s Committee of Thot Not district, People s Committee of Vinh Thanh district, Steering Committee of IRP to incorporate Center for Land Fund Development of Can Tho City, Cuu Long Corporation for Investment, Development and Project Management of Infrastructure (Cuu Long CIPM - the Investor) to implement accordance with regulations. Article 3. Office Manager of People s Committee of Can Tho City, Director of Department of Natural Resources and Environment, Director of Finance Department, Director of State Treasury of Can Tho City, Chairman of People s Committee of Thot Not district, Chairman of People s Committee of Vinh Thanh district, Head of Steering Committee of IRP, Investor, Director of Center for Land Fund Development of Can Tho City, Head of related agencies and households mentioned in Article 1 are responsible for implementation of this decision from the date of signing. Recipients: - As Article 3; - Office of People's Committee of Can Tho City (1AD); - Filed at VT, DTM. ON BEHALF OF PEOPLE S COMMITTEE KT.CHAIRMAN VICE-CHAIRMAN (Signed) Dao Anh Dung Page 33 of 43

78 CMDCP Annex 13 Page 34 of 38

79 CMDCP Annex 13 Page 35 of 38

80 CMDCP Annex 13 PEOPLE S COMMITTEE OF CAN THO CITY No: 2902/QĐ-UBND SOCIALIST REPUBLIC OF VIET NAM Independent freedom- Happiness Can tho city,date 07/October/2014 DECISION For: adjustment approval of allowance budget for 2 households in income restoration program (IRP) belong component 3 project- Vam Cong bridge construction project and additional section of 1,5 km PEOPLE S COMMITTEE OF CAN THO CITY Based on law of people council organization and people s committee dated 26/November/2003; Based on land law dated 29/November/2013; Based on Decree No 47/2014/ND-CP dated 15/May/2014 of Government :of Regulations on compensation, support and resettlement when Government acquires land According to proposal by assessment council of city in statement No 2360/TTr-HDTD dated 30/September/2014 DECISION Article Adjustment budget of allowance to 2 households as after: a- Household: Nguyen Van Trieu (Sequence No: 06. Agricultural activities ):adjusted from đ to decrease đ ( decreased level: đ) b- Household: Nguyen Thi Yen. (Sequence No:39. Agricultural activities ):adjusted from đ to decrease đ ( decreased level: đ) 2. Concurrently adjustment of allowance budget to Households of income restoration program belong component 3 project Vam cong Bridge construction project and additional section of 1,5 km approved by People s Committee of Can Tho city at Decision No 2176/QD-UBND dated 11/Agust/2014 from to decrease đ ( decrease : đ) Article 2. Assignment to People s committee of Thot Not district and People s committee of Vinh Thanh district, Steering committee of income restoration program co-operates with Centre of land fund development of Can tho city, Cuu Long CIPM ( Owner of project investment) organizes to implement as regulation Article 3. Office manager of People s committee of can tho city, director of DONRE, Director of DOF, Director of Treasury of can tho city, Chairman of Thot Not PC, Chairman of Vinh Thanh PC, Chairman of steering committee of income restoration program ( IRP); Director of Co LFD. Owner of project investment, Leader of related agencies and the 2 households written as in the article 1 having responsibility to execute this decision mentioned from signed time Recipient : PEOPLE S COMMITTEE OF CAN THO CITY As at article 3 CHAIRMAN OF CITY Chairman and vice chairman of city VICE CHAIRMAN ( Signed ) File DAO ANH DUNG Page 36 of 38

81 CMDCP Annex 14 Annex 14: Approval of Implementation Costs by Can Tho City PC Page 37 of 38

VIE: Central Mekong Delta Region Connectivity Project

VIE: Central Mekong Delta Region Connectivity Project Social Monitoring Report Fifth Report August 2016 VIE: Central Mekong Delta Region Connectivity Project Prepared by Romeo Cleto, External Monitor, for the Ministry of Transport, Cuu Long Corporation for

More information

VIE: Power Transmission Investment Program Tranche 3

VIE: Power Transmission Investment Program Tranche 3 Social Monitoring Report 2 nd Quarterly Report June 2017 VIE: Power Transmission Investment Program Tranche 3 Installation of a second transformer bank for 220 kv Duc Hoa substation Installation of a second

More information

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line Social Monitoring Report Quarterly Report April June 2016 VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line Prepared by the Southern Vietnam Power

More information

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line Social Monitoring Report Semi-Annual Monitoring Report July December 2015 VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line Prepared by the Southern Vietnam Power

More information

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line Social Monitoring Report Semi-Annual Monitoring Report January June 2015 VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line Prepared by the Southern Vietnam Power

More information

The Provincial People s Committees of Thanh Hóa, Quảng Bình, Thừa Thiên - Huế, Quảng Nam, and Quảng Ngãi Province. To:

The Provincial People s Committees of Thanh Hóa, Quảng Bình, Thừa Thiên - Huế, Quảng Nam, and Quảng Ngãi Province. To: MINISTRY OF CONSTRUCTION THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness No: /BXD-QLN Subject: Guidelines on the implementation of Project s Component 1 funded by Green Climate Fund (GCF):

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: VIE 38561 TECHNICAL ASSISTANCE (Financed by the Poverty Reduction Cooperation Fund) TO THE SOCIALIST REPUBLIC OF VIET NAM FOR DEVELOPING AGRICULTURAL INSURANCE December 2004

More information

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line Social Monitoring Report Semi Annual Report January June 2016 VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line Prepared by the Southern Vietnam Power

More information

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line Social Monitoring Report Quarterly Report April June 2015 VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line Prepared by the Southern Vietnam Power Projects Management

More information

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Duc Hoa Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Duc Hoa Transmission Line Social Monitoring Report Semi-Annual Report Jun-Dec 2014 VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Duc Hoa Transmission Line Prepared by the Southern Power Projects Management

More information

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line Social Monitoring Report Quarterly Report July September 2015 VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line Prepared by the Southern Vietnam Power Projects Management

More information

VIE: Power Transmission Investment Program, Tranche 1 220kV Phu My Industrial Zone Substation and 220kV Song May-Uyen Hung Transmission Line

VIE: Power Transmission Investment Program, Tranche 1 220kV Phu My Industrial Zone Substation and 220kV Song May-Uyen Hung Transmission Line Social Monitoring Report Semestral Report July to December 2014 VIE: Power Transmission Investment Program, Tranche 1 220kV Phu My Industrial Zone Substation and 220kV Song May-Uyen Hung Transmission Line

More information

Better poultry value chain development through microfinance in Vietnam

Better poultry value chain development through microfinance in Vietnam Better poultry value chain development through microfinance in Vietnam 6th University Meets Microfinance Workshop on Savings and Rural Finance 17 & 18 June 2011 University of Groningen, Groningen. Netherlands

More information

MICROFINANCE LOAN PROGRAMME Annual Report 2014

MICROFINANCE LOAN PROGRAMME Annual Report 2014 MICROFINANCE LOAN PROGRAMME Annual Report 2014 Beneficiary with her livestock Christina Noble Children s Foundation - Vietnam Programme Description Established: 1997 Reporting Period: January to December

More information

DECISION on approval of the National Target Program to respond to climate change THE PRIME MINISTER DECIDES:

DECISION on approval of the National Target Program to respond to climate change THE PRIME MINISTER DECIDES: THE PRIME MINISTER No: 158/2008/QD-TTg THE SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness Hanoi, 2 December 2008 DECISION on approval of the National Target Program to respond to climate

More information

VIE: Power Transmission Investment Program, Tranche 1 Song May-Uyen Hung Transmission Line

VIE: Power Transmission Investment Program, Tranche 1 Song May-Uyen Hung Transmission Line Social Monitoring Report 5 th Independent Monitoring Report January April 2016 VIE: Power Transmission Investment Program, Tranche 1 Song May-Uyen Hung Transmission Line Prepared by the Southern Vietnam

More information

COMPENSATION, ASSISTANCE AND RESETTLEMENT POLICY PROPOSED FOR

COMPENSATION, ASSISTANCE AND RESETTLEMENT POLICY PROPOSED FOR Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DIRECTORATE FOR ROADS OF VIETNAM PROJECT MANAGEMENT UNIT 3 ================= COMPENSATION,

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line Social Monitoring Report Semi-Annual Report Jun-Dec 2014 VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line Prepared by the Southern Power Projects

More information

FINAL EVALUATION VIE/033. Climate Adapted Local Development and Innovation Project

FINAL EVALUATION VIE/033. Climate Adapted Local Development and Innovation Project FINAL EVALUATION VIE/033 Climate Adapted Local Development and Innovation Project PROJECT SUMMARY DATA Country Long project title Short project title LuxDev Code Vietnam Climate Adapted Local Development

More information

MINUTES OF THE 2016 ANNUAL GENERAL SHAREHOLDERS MEETING

MINUTES OF THE 2016 ANNUAL GENERAL SHAREHOLDERS MEETING HAI AN TRANSPORT AND STEVEDORING JSC ===***=== SOCIAL REPUBLIC OF VIETNAM Independence - Freedom - Happiness ===***=== No.: 0304-2016/BB-DHDCD Haiphong, 25 April 2016 MINUTES OF THE 2016 ANNUAL GENERAL

More information

VIE: Power Transmission Investment Program, Tranche 1 220kV Phu My 2 Industrial Zone Substation and Connection Lines Subproject

VIE: Power Transmission Investment Program, Tranche 1 220kV Phu My 2 Industrial Zone Substation and Connection Lines Subproject Social Monitoring Report Final Report December 2016 VIE: Power Transmission Investment Program, Tranche 1 220kV Phu My 2 Industrial Zone Substation and Connection Lines Subproject Prepared by the Southern

More information

Policy Brief. Reforming commune-level planning, investment decision making and community empowerment for sustainable poverty reduction 1

Policy Brief. Reforming commune-level planning, investment decision making and community empowerment for sustainable poverty reduction 1 Policy Brief Reforming commune-level planning, investment decision making and community empowerment for sustainable poverty reduction 1 December 2014 Key messages Reforming commune-level planning, decentralization

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/24/2007 INTEGRATED SAFEGUARDS DATASHEET

More information

VIE: Power Transmission Investment Program, Tranche 2 500kV Pleiku-My Phuoc-Cau Bong Transmission Line (Binh Duong Province)

VIE: Power Transmission Investment Program, Tranche 2 500kV Pleiku-My Phuoc-Cau Bong Transmission Line (Binh Duong Province) Social Monitoring Report July 2014 VIE: Power Transmission Investment Program, Tranche 2 500kV Pleiku-My Phuoc-Cau Bong Transmission Line (Binh Duong Province) Prepared by Central Vietnam Power Projects

More information

THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom - Happiness

THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom - Happiness THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom - Happiness VIETNAM JSC BANK FOR PRIVATE ENTERPRISES Business registration No. 055689 issued by Hanoi Department of Planning and Investment on September

More information

THE PRIME MINISTER THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness. No. 504/QD-TTg Hanoi, 21 April 2010

THE PRIME MINISTER THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness. No. 504/QD-TTg Hanoi, 21 April 2010 THE PRIME MINISTER THE SOCIALIST REPUBLIC OF VIETNAM ----- Independence Freedom Happiness -------------------------------- No. 504/QD-TTg Hanoi, 21 April 2010 DECISION On Approval of the National Mine

More information

Cam My and Thong Nhat Districts DONG NAI PROVINCE Stage 3

Cam My and Thong Nhat Districts DONG NAI PROVINCE Stage 3 THE SOCIALIST REPUBLIC OF VIETNAM MINISTRY OF TRANSPORT VIETNAM EXPRESSWAY CORPORATION (VEC) SOUTHERN EXPRESSWAY PROJECT MANAGEMENT UNIT (SEPMU) The Updated Resettlement Plan Cam My and Thong Nhat Districts

More information

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project Technical Assistance Project Number: 50098 Project Preparatory Technical Assistance (PPTA) November 2016 Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project This document is being

More information

VIE: Power Transmission Investment Program, Tranche 3

VIE: Power Transmission Investment Program, Tranche 3 Social Monitoring Report 1st Semi-annual Report July 2017 VIE: Power Transmission Investment Program, Tranche 3 Prepared by Le Duc Huy for the National Power Transmission Corporation and the Asian Development

More information

RURAL COMMUNITY DEVELOPMENT CENTER Hanoi, Vietnam

RURAL COMMUNITY DEVELOPMENT CENTER Hanoi, Vietnam RURAL COMMUNITY DEVELOPMENT CENTER Hanoi, Vietnam Rural Community Development Center About us The Rural Community Development Center (RCDC) is a division of National Institute of Agricultural Planning

More information

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection Technical Assistance Report Project Number: 47042-001 Policy and Advisory Technical Assistance (PATA) October 2013 People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

More information

Viet Nam: Secondary Cities Development Project - Ha Tinh Subproject

Viet Nam: Secondary Cities Development Project - Ha Tinh Subproject Resettlement Monitoring Report # First Periodic Report September 2016 Viet Nam: Secondary Cities Development Project - Ha Tinh Subproject Prepared by Nguyen Van Trung, External Resettlement Monitoring

More information

Impact Monitoring Report

Impact Monitoring Report Impact Monitoring Report Status of poor households from 2007-2009 In 7 pilot communes of Tuyen Hoa and Minh Hoa districts Implemented by: Trương Quốc Đạt Dong Hoi, dated 15-01-2010 Impact monitoring towards

More information

VIE: O Mon IV Combined Cycle Power Plant

VIE: O Mon IV Combined Cycle Power Plant Resettlement Due Diligence Report February 2011 VIE: O Mon IV Combined Cycle Power Plant Prepared by Can Tho Thermal Power Company for the Asian Development Bank. 1 O MON IV THERMAL POWER PLANT RESETTLEMENT

More information

Da Nang - Quang Ngai Expressway Development Project

Da Nang - Quang Ngai Expressway Development Project Public Disclosure Authorized Public Disclosure Authorized DA NANG-QUANG NGAI EXPRESSWAY PROJECT Due Dilligence report, Phu Ninh district, Quang Nam province MINISTRY OF TRANSPORT VIETNAM EXPRESSWAY CORPORATION

More information

Managing Risk for the Present and the Future IDRM Planning in Thua Thien Hue province

Managing Risk for the Present and the Future IDRM Planning in Thua Thien Hue province Managing Risk for the Present and the Future IDRM Planning in Thua Thien Hue province Natural Disaster Risk Management Project Presenter: Trần Hoàng Yến for Symposium on Disaster Impact and Assessment

More information

Luu Quang Tuan Institute of Labour Science and Social Affairs

Luu Quang Tuan Institute of Labour Science and Social Affairs UNEMPLOYMENT INSURANCE IN VIETNAM: REFORM AND IMPLEMENTATION Luu Quang Tuan Institute of Labour Science and Social Affairs Manila, 18-20, Aug. 2015 CONTENTS 1. History of Unemployment Insurance in Vietnam

More information

VIE: Renewable Energy Development and Network Expansion and Rehabilitation for Remote Communes Sector Project. Sub-project: So Vin Hydropower Project

VIE: Renewable Energy Development and Network Expansion and Rehabilitation for Remote Communes Sector Project. Sub-project: So Vin Hydropower Project Final Resettlement Monitoring Report Document stage: Final Project number: Loan 2517 May, 2017 VIE: Renewable Energy Development and Network Expansion and Rehabilitation for Remote s Sector Project Sub-project:

More information

Combined Resettlement Plan and Ethnic Minority Development Plan. VIE: GMS Kunming-Haiphong Transport Corridor Noi Bai-Lao Cai Highway Project

Combined Resettlement Plan and Ethnic Minority Development Plan. VIE: GMS Kunming-Haiphong Transport Corridor Noi Bai-Lao Cai Highway Project Combined Resettlement Plan and Ethnic Minority Development Plan December 2017 VIE: GMS Kunming-Haiphong Transport Corridor Noi Bai-Lao Cai Highway Project Prepared by Vietnam Expressway Corporation for

More information

Community Hygiene and Water Women-led Output based Aid Project (WOBA) in Vietnam. Introduction & Overview

Community Hygiene and Water Women-led Output based Aid Project (WOBA) in Vietnam. Introduction & Overview Community Hygiene and Water Women-led Output based Aid Project (WOBA) in Vietnam Introduction & Overview What is the difference between Equity and Equality? What is GESI? Gender equality is about transforming

More information

VIE: Ben Luc Long Thanh Expressway Project

VIE: Ben Luc Long Thanh Expressway Project Resettlement Plan TA 7155-VIE 19 July 2010 VIE: Ben Luc Long Thanh Expressway Project Vietnam Expressway Corporation ABBREVIATIONS ADB DP CPC DPC DCSCC DARD DOC DOF DONRE DPI DOT DMS EMA FS GoV HCMC HH

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

Project Proposal Parcipate in Viet Nam Innovation Day 2009 MORE ACCOUNTABILITY AND TRANSPARENCY AND LESS CORRUPTION

Project Proposal Parcipate in Viet Nam Innovation Day 2009 MORE ACCOUNTABILITY AND TRANSPARENCY AND LESS CORRUPTION For O rganization Board No: 56 Date of reception: Project Proposal Parcipate in Viet Nam Innovation Day 2009 MORE ACCOUNTABILITY AND TRANSPARENCY AND LESS CORRUPTION I. PROJECT GENERAL INFORMATION 1. Project

More information

III. modus operandi of Tier 2

III. modus operandi of Tier 2 III. modus operandi of Tier 2 Objective, country and project eligibility 70 Budget and timing 71 Project preparation: formulation of proposals 71 Project appraisal 72 Project approval 73 Agreements and

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program)

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program) PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program) 1. A project preparatory technical assistance (PPTA) for $700,000 in grant funds is

More information

MISSION REPORT POST DISTRIBUTION MONITORING OF THE EMERGENCY CASH TRANSFER PROGRAMME IN THREE FLOOD-HIT PROVINCES

MISSION REPORT POST DISTRIBUTION MONITORING OF THE EMERGENCY CASH TRANSFER PROGRAMME IN THREE FLOOD-HIT PROVINCES International Federation of Red Cross and Red Crescent Societies MISSION REPORT on POST DISTRIBUTION MONITORING OF THE EMERGENCY CASH TRANSFER PROGRAMME IN THREE FLOOD-HIT PROVINCES Monitoring sites Reported

More information

CEP. Capital Aid for Employment of the Poor Microfinance Institution. Annual Report 2017

CEP. Capital Aid for Employment of the Poor Microfinance Institution. Annual Report 2017 CEP Capital Aid for Employment of the Poor Microfinance Institution Annual Report 2017 Contents 2 Message from the Director A comment on CEP s performance and the key activities undertaken by CEP during

More information

CEP. Capital Aid Fund for Employment of the Poor. Annual Report 2016

CEP. Capital Aid Fund for Employment of the Poor. Annual Report 2016 CEP Capital Aid Fund for Employment of the Poor Annual Report 2016 Contents 2 Message from the Director A comment on CEP s performance and the key activities undertaken by CEP during 2016 3 CEP Overview

More information

OFFICIAL -1 L(-L DOCUMENTS. Between. and

OFFICIAL -1 L(-L DOCUMENTS. Between. and Public Disclosure Authorized OFFICIAL -1 L(-L DOCUMENTS ADDENDUM No 2 TO ADMINISTRATION AGREEMENT Between Public Disclosure Authorized Public Disclosure Authorized the EUROPEAN UNION (represented by the

More information

MINUTES THE 2018 ANNUAL GENERAL MEETING OF SHAREHOLDERS PHU NHUAN JEWELRY JOINT-STOCK COMPANY

MINUTES THE 2018 ANNUAL GENERAL MEETING OF SHAREHOLDERS PHU NHUAN JEWELRY JOINT-STOCK COMPANY Socialist Republic of Vietnam Independence Freedom Happiness No.: 377/2018/BB-ĐHĐCĐ-CTY Ho Chi Minh City, 21 st April, 2018 MINUTES THE 2018 ANNUAL GENERAL MEETING OF SHAREHOLDERS PHU NHUAN JEWELRY JOINT-STOCK

More information

Evaluation Approach Project Performance Evaluation Report for Loan 2167 and Grant 0006-SRI: Tsunami-Affected Areas Rebuilding Project September 2015

Evaluation Approach Project Performance Evaluation Report for Loan 2167 and Grant 0006-SRI: Tsunami-Affected Areas Rebuilding Project September 2015 Asian Development Bank 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2163; evaluation@adb.org www.adb.org/evaluation Evaluation Approach Project Performance

More information

Section I GENERAL PROVISIONS

Section I GENERAL PROVISIONS The English translation provided by the Website of the State Bank of Vietnam (SBV) may only be used for reference. In case a different interpretation of the translated information contained in this website

More information

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No. 15/2015/NĐ-CP Hanoi, February 14, 2015 DECREE

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No. 15/2015/NĐ-CP Hanoi, February 14, 2015 DECREE THE GOVERNMENT ------- SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness --------------- No. 15/2015/NĐ-CP Hanoi, February 14, 2015 DECREE ON INVESTMENT IN THE FORM OF PUBLIC-PRIVATE PARTNERSHIP

More information

STRATEGIC LOCATION. Vinh

STRATEGIC LOCATION. Vinh STRATEGIC LOCATION CHINA LAOS THAILAND HANOI CAMBODIA NGHE AN Vinh Located in the center of the North Central Coast region of Vietnam. Connect North East Thailand, Laos to the South China Sea. It is a

More information

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT Himachal Pradesh Clean Energy Transmission Investment Program (RRP IND 43464) TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT A. INTRODUCTION 1. The

More information

The Commodity-oriented Poverty Reduction Programme in Ha Giang Province

The Commodity-oriented Poverty Reduction Programme in Ha Giang Province The Commodity-oriented Poverty Reduction Programme in Ha Giang Province Supervision report Main report and appendices Mission Dates: 18-29 Jan 2016 Document Date: 29-Jan 2016 Project No. 1663 Report No:

More information

The World Bank Social Assistance System Strengthening Project (P123960)

The World Bank Social Assistance System Strengthening Project (P123960) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SOCIAL ASSISTANCE SYSTEM STRENGTHENING PROJECT APPROVED ON JANUARY 22,

More information

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line Social Monitoring Report 3 rd Independent Monitoring Report June 2016 VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line Prepared by the Southern Vietnam

More information

South Sudan Common Humanitarian Fund Allocation Process Guidelines

South Sudan Common Humanitarian Fund Allocation Process Guidelines South Sudan Common Humanitarian Fund Allocation Process Guidelines 27 January 2012 ACRONYMS AB CAP CERF CHF HC HCT HFU ISWG NCE NGO OCHA OPS PPA PRT PUNO TOR UN UNDP Advisory Board Consolidated Appeal

More information

WP1 Administration, coordination and reporting

WP1 Administration, coordination and reporting ECGFA NET II Work Plan WP1 Administration, coordination and reporting Content 1. Work package objectives... 1 2. Project Management of the ECGFA NET II Project... 1 2.1 Organization and Decision Making

More information

OFFICIAL DOCUMENTS. The World Bank. Public Disclosure Authorized. Public Disclosure Authorized

OFFICIAL DOCUMENTS. The World Bank. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized OFFICIAL DOCUMENTS The World Bank 1818 H Street N.W. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL

More information

THE PRIME MINISTER ------- No. 71/2010/QD-TTg SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom Happiness --------- Hanoi, November 09, 2010 DECISION PROMULGATING THE REGULATION ON PILOT INVESTMENT

More information

PROJECT PREPARATION TECHNICAL ASSISTANCE

PROJECT PREPARATION TECHNICAL ASSISTANCE 12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility

More information

FUNDING STRATEGY FOR THE IMPLEMENTATION OF THE GLOBAL PLAN OF ACTION FOR ANIMAL GENETIC RESOURCES

FUNDING STRATEGY FOR THE IMPLEMENTATION OF THE GLOBAL PLAN OF ACTION FOR ANIMAL GENETIC RESOURCES Revised edition: http://www.fao.org/3/a-i3975e.pdf FUNDING STRATEGY FOR THE IMPLEMENTATION OF THE GLOBAL PLAN OF ACTION FOR ANIMAL GENETIC RESOURCES COMMISSION ON GENETIC RESOURCES FOR FOOD AND AGRICULTURE

More information

Vietnam: Key Changes under the New Law on Investment

Vietnam: Key Changes under the New Law on Investment August 2015 www.indochinecounsel.com Vietnam: Key Changes under the New Law on Investment Dear All, On 26 November 2014 the National Assembly of Vietnam adopted two new laws of great importance to investors:

More information

MINUTES OF VPBANK S GENERAL SHAREHOLDERS MEETING (GSM) 2011

MINUTES OF VPBANK S GENERAL SHAREHOLDERS MEETING (GSM) 2011 Vietnam Prosperity Joint Stock Commercial Bank (VPBank) Business registration as per certificate of joint stock company registration, tax code 0100233583 issued for the first time by Department of Planning

More information

OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED

OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED 2014-2020 1. IDENTIFICATION (max. 200 characters) The purpose of this section is to identify only the programme concerned. It

More information

EXECUTIVE SUMMARY - A STUDY ON "FORMALIZATION" OF HOUSEHOLD BUSINESS IN VIETNAM

EXECUTIVE SUMMARY - A STUDY ON FORMALIZATION OF HOUSEHOLD BUSINESS IN VIETNAM EXECUTIVE SUMMARY - A STUDY ON "FORMALIZATION" OF HOUSEHOLD BUSINESS IN VIETNAM Central Institute for Economic Management would like to thank the Mekong Business Initiative for supporting the preparation

More information

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:PID Results-Based Operation for Local Road Asset Management Region

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:PID Results-Based Operation for Local Road Asset Management Region Public Disclosure Authorized Public Disclosure Authorized PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:PID0023493 Program Name Results-Based Operation for Local Road Asset

More information

EXTERNAL END OF PROJECT PERFORMANCE EVALUATION

EXTERNAL END OF PROJECT PERFORMANCE EVALUATION EXTERNAL END OF PROJECT PERFORMANCE EVALUATION 1. Background TERMS OF REFERENCE PT. Rainforest Alliance (RA) is leading a consortium group in implementing the Cocoa Revolution: High-Yielding Climate Smart

More information

APPLICATION FOR VIETNAM INNOVATION DAY COMPETITION MORE ACCOUNTABILITY AND TRANSPARENCY AND LESS CORRUPTION 2009

APPLICATION FOR VIETNAM INNOVATION DAY COMPETITION MORE ACCOUNTABILITY AND TRANSPARENCY AND LESS CORRUPTION 2009 APPLICATION FOR VIETNAM INNOVATION DAY COMPETITION MORE ACCOUNTABILITY AND TRANSPARENCY AND LESS CORRUPTION 2009 No. 48 Date of reception: March 6, 2009 PROJECT UPGRADE QUALITY OF SOCIO-ECONOMIC DEVELOPMENT

More information

Mongolia: Social Security Sector Development Program

Mongolia: Social Security Sector Development Program Validation Report Reference Number: PVR196 Project Number: 33335 Loan Numbers: 1836 and 1837(SF) November 2012 Mongolia: Social Security Sector Development Program Independent Evaluation Department ABBREVIATIONS

More information

Agriculture, Farmers and Rural Areas Support Project (TNSP) in Ninh Thuan Province

Agriculture, Farmers and Rural Areas Support Project (TNSP) in Ninh Thuan Province Agriculture, Farmers and Rural Areas Support Project (TNSP) in Ninh Thuan Province Supervision report Main report and appendices Mission Dates: 22 June - 2 July 2015 Document Date: 8-Sep 2015 Project No.

More information

VIETNAM: 1997 MEKONG DELTA FLOODS

VIETNAM: 1997 MEKONG DELTA FLOODS VIETNAM: 1997 MEKONG DELTA FLOODS 17 June appeal no. 15/96 situation report no. 2 (FINAL) period covered: October 1996 - April 1997 Background In early October 1996 unusually heavy monsoon rains caused

More information

Information Session on the Calls for Expression of Interest in the fields of municipal infrastructure and socio-economic support.

Information Session on the Calls for Expression of Interest in the fields of municipal infrastructure and socio-economic support. EUROPEAN COMMISSION Neighbourhood and Enlargement Negotiations A - STRATEGY AND TURKEY A.5 TURKEY Secretariat of the EU Facility for Refugees In Turkey Information Session on the Calls for Expression of

More information

1. Key provisions of the Law on social integration of the disabled

1. Key provisions of the Law on social integration of the disabled Social integration of the disabled in Lithuania Teodoras Medaiskis Vilnius University Eglė Čaplikienė Ministry of Social Security and Labour I. Key information 1. Key provisions of the Law on social integration

More information

GEO: Sustainable Urban Transport Investment Program, Tranche 2 Tbilisi-Rustavi Urban Road Link (Section-1: km 0 to 4 Tbilisi Phonichala) (Addendum)

GEO: Sustainable Urban Transport Investment Program, Tranche 2 Tbilisi-Rustavi Urban Road Link (Section-1: km 0 to 4 Tbilisi Phonichala) (Addendum) Resettlement Plan December 2014 GEO: Sustainable Urban Transport Investment Program, Tranche 2 Tbilisi-Rustavi Urban Road Link (Section-1: km 0 to 4 Tbilisi Phonichala) (Addendum) Prepared by the Municipal

More information

Loan Agreement. (Institutional Development and Agriculture Strengthening Project) between MONTENEGRO. and

Loan Agreement. (Institutional Development and Agriculture Strengthening Project) between MONTENEGRO. and CONFORMED COPY LOAN NUMBER 7716-ME Loan Agreement (Institutional Development and Agriculture Strengthening Project) between MONTENEGRO and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated May

More information

NORTH POWER CORPORATION Electric Network Project Management Board RESETTLEMENT PLAN (RP) SUBPROJECT:

NORTH POWER CORPORATION Electric Network Project Management Board RESETTLEMENT PLAN (RP) SUBPROJECT: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam NORTH

More information

Mongolia: Developing an Information System for Development Policy and Planning

Mongolia: Developing an Information System for Development Policy and Planning Technical Assistance Report Project Number: 51136-001 Knowledge and Support Technical Assistance (KSTA) September 2017 Mongolia: Developing an Information System for Development Policy and Planning This

More information

LESSONS LEARNT FROM EX-POST EVALUATION AND A JOINT-EVALUATION FRAMEWORK BETWEEN JICA VIETNAM OFFICE AND MINISTRY OF PLANNING AND INVESTMENT

LESSONS LEARNT FROM EX-POST EVALUATION AND A JOINT-EVALUATION FRAMEWORK BETWEEN JICA VIETNAM OFFICE AND MINISTRY OF PLANNING AND INVESTMENT 1 LESSONS LEARNT FROM EX-POST EVALUATION AND A JOINT-EVALUATION FRAMEWORK BETWEEN JICA VIETNAM OFFICE AND MINISTRY OF PLANNING AND INVESTMENT JICA VIETNAM OFFICE Tran Mai Anh November 23 rd 2016 2 Contents

More information

Mongolia: Development of State Audit Capacity

Mongolia: Development of State Audit Capacity Technical Assistance Report Project Number: 47198-001 Capacity Development Technical Assistance (CDTA) November 2013 Mongolia: Development of State Audit Capacity The views expressed herein are those of

More information

INTERNAL AUDIT DIVISION REPORT 2018/014. Audit of quick-impact projects in the African Union-United Nation Hybrid Operation in Darfur

INTERNAL AUDIT DIVISION REPORT 2018/014. Audit of quick-impact projects in the African Union-United Nation Hybrid Operation in Darfur INTERNAL AUDIT DIVISION REPORT 2018/014 Audit of quick-impact projects in the African Union-United Nation Hybrid Operation in Darfur The Mission needed to ensure that completed projects are used, field

More information

No.: 01/2016/BB-ĐHĐCĐ Ho Chi Minh City, 21 April, 2016 MINUTES OF THE 2015 ANNUAL GENERAL MEETING (AGM) HO CHI MINH CITY SECURITIES CORPORATION (HSC)

No.: 01/2016/BB-ĐHĐCĐ Ho Chi Minh City, 21 April, 2016 MINUTES OF THE 2015 ANNUAL GENERAL MEETING (AGM) HO CHI MINH CITY SECURITIES CORPORATION (HSC) Hochiminh City Securities Corporation (HSC) HEAD OFFICE Level 5 & 6, AB Tower, 76 Le Lai St., Ben Thanh Ward, District 1, HCMC, Vietnam T: (+84 8) 3823 3299 F: (+84 8) 3823 3301 E: info@hsc.com.vn W: www.hsc.com.vn

More information

FACTSHEET ON MINIMUM WAGE LEGISLATION AROUND THE WORLD

FACTSHEET ON MINIMUM WAGE LEGISLATION AROUND THE WORLD FACTSHEET ON MINIMUM WAGE LEGISLATION AROUND THE WORLD According to the International Labour Office in Geneva in Switzerland, about 90% of the countries in the world have legislation in favour of minimum

More information

Socialist Republic of Vietnam. Reporting Period: From 08/20/2017 to 04/03/2018 Report Date: 04/03/2018 Ministry of Natural Resources and Environment

Socialist Republic of Vietnam. Reporting Period: From 08/20/2017 to 04/03/2018 Report Date: 04/03/2018 Ministry of Natural Resources and Environment PMR Project Implementation Status Report (ISR) 1. SUMMARY INFORMATION Implementing Country/Technical Partner: Socialist Republic of Vietnam Reporting Period: From 08/20/2017 to 04/03/2018 Report Date:

More information

BIOSURF. (BIOmethane SUstainable and Renewable Fuel) Project Handbook (D1.1) Loriana PAOLUCCI & Stefano PROIETTI (ISIS)

BIOSURF. (BIOmethane SUstainable and Renewable Fuel) Project Handbook (D1.1) Loriana PAOLUCCI & Stefano PROIETTI (ISIS) (BIOmethane SUstainable and Renewable Fuel) Project Handbook (D1.1) Authors: Loriana PAOLUCCI & Stefano PROIETTI (ISIS) Version: Final Quality Review: Stefano PROIETTI Date: 28-02-2015 Grant Agreement

More information

PUBLIC ANNOUNCEMENT THE PAN GROUP JOINT STOCK COMPANY

PUBLIC ANNOUNCEMENT THE PAN GROUP JOINT STOCK COMPANY PUBLIC ANNOUNCEMENT THE PAN GROUP JOINT STOCK COMPANY (Business registration certificate No.0301472704, initially registered on 31 August 2005 and amended the 12th time on 25 August 2015 by the Department

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: NEP 37196 TECHNICAL ASSISTANCE TO THE KINGDOM OF NEPAL FOR RESTRUCTURING OF NEPAL ELECTRICITY AUTHORITY December 2004 CURRENCY EQUIVALENTS (as of 3 November 2004) Currency Unit

More information

CORPORATE GOVERNANCE REPORT 2015

CORPORATE GOVERNANCE REPORT 2015 DIGIWORLD CORPORATION SOCIALIST REPUBLIC OF VIETNAM Independence Freedom - Happiness ---o0o--- No.: 03/01-2016/HĐQT/ TP.HCM, January 25 th 2016 CORPORATE GOVERNANCE REPORT 2015 To : STATE SECURITIES COMMISSION

More information

Local Road Asset Management Program Region. East Asia and Pacific Country. Program-for-Results Program ID. Government of Vietnam Implementing Agency

Local Road Asset Management Program Region. East Asia and Pacific Country. Program-for-Results Program ID. Government of Vietnam Implementing Agency Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.:PID0023493 (The

More information

Law On Foreign Investment Promulgated

Law On Foreign Investment Promulgated Law On Foreign Investment Promulgated ["Full text" of the Revised Law on Foreign Investment in Vietnam, carried in two installments. Passed by the Ninth National Assembly on 12 November 1996 and promulgated

More information

Fiscal space for social protection policies in Viet Nam

Fiscal space for social protection policies in Viet Nam 3rd China ASEAN Forum on Social Development and Poverty Reduction, 4th ASEAN+3 High Level Seminar on Poverty Reduction, and Asia wide Regional High level Meeting on The Impact of the Global Economic Slowdown

More information

THE MINUTES OF ANNUAL GENERAL MEETING OF SHAREHOLDERS 2016 OF VIETNAM DAIRY PRODUCTS JOINT STOCK COMPANY (VINAMILK)

THE MINUTES OF ANNUAL GENERAL MEETING OF SHAREHOLDERS 2016 OF VIETNAM DAIRY PRODUCTS JOINT STOCK COMPANY (VINAMILK) VIETNAM DAIRY PRODUCTS JOINT STOCK COMPANY ------------------------------------ SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness -------------------- THE MINUTES OF ANNUAL GENERAL MEETING OF

More information

Q&A THE MALAWI SOCIAL CASH TRANSFER PILOT

Q&A THE MALAWI SOCIAL CASH TRANSFER PILOT Q&A THE MALAWI SOCIAL CASH TRANSFER PILOT 2> HOW DO YOU DEFINE SOCIAL PROTECTION? Social protection constitutes of policies and practices that protect and promote the livelihoods and welfare of the poorest

More information

Ebola Recovery and Reconstruction Trust Fund Grant Agreement

Ebola Recovery and Reconstruction Trust Fund Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS GRANT NUMBER: TFOA1023 Public Disclosure Authorized Ebola Recovery and Reconstruction Trust Fund Grant Agreement (LABOR-INTENSIVE PUBLIC WORKS TO MITIGATE

More information

Safeguards Monitoring Report

Safeguards Monitoring Report Safeguards Monitoring Report Semiannual Report Covering July-Dec 2016 period February 2017 (ESDIP) Tranche-2 Chimtala- Arghandi 220 kv DC Transmission Line Subproject (DABS - 006/ICB) Prepared by Da Afghanistan

More information

ACCESS TO CREDIT OF FARM HOUSEHOLDS IN HAI DUONG PROVINCE, VIETNAM. Abstract

ACCESS TO CREDIT OF FARM HOUSEHOLDS IN HAI DUONG PROVINCE, VIETNAM. Abstract ACCESS TO CREDIT OF FARM HOUSEHOLDS IN HAI DUONG PROVINCE, VIETNAM Le Thi Minh Chau0F1, Philippe Lebailly 1F 2, Nguyen Tuan Son 1 Paper presented at the third International Scientific Symposium Agrosym

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:INO 34147 TECHNICAL ASSISTANCE (Cofinanced by the Government of the United Kingdom) TO THE REPUBLIC OF INDONESIA FOR INTEGRATION OF POVERTY CONSIDERATIONS IN DECENTRALIZED EDUCATION

More information