1 Social Monitoring Report Final Report December 2016 VIE: Power Transmission Investment Program, Tranche 1 220kV Phu My 2 Industrial Zone Substation and Connection Lines Subproject Prepared by the Southern Vietnam Power Projects Management Board for the National Power Transmission Corporation and the Asian Development Bank. This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

2 Resettlement Final Report Completion Report Document Stage: final Project Number: December 2016 Multi-tranche Financing Facility Socialist Republic of Viet Nam: Power Transmission Investment Program Subproject The report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB s Board of Directors, Management, or staff, and may be preliminary in nature.

3 ABBREVIATIONS ADB AP AH CARB CPC DLFDC DMS DP DPC EVN GOV HH IOL LURC NPT PPC ROW RP SES SPMB SPS USD VND Asian Development Bank (project) Affected Person (project) Affected Household Compensation, Assistance and Resettlement Board Commune People s Committee District Land Fund Development Center Detailed Measurement Survey Displaced Persons District People s Committee Vietnam Electricity Government Household Inventory of Losses Land Use Rights Certificate National Power Transmission Corporation Provincial Peoples Committee Right-of-Way Resettlement Plan Socio-Economic Survey Southern Power Project Management Board Safeguard Policy Statement United States Dollars Viet Nam Dong 1

4 Table of Contents 1. GENERAL INFORMATION OF PROJECT... 3 a. Project objective... 3 b. Project component... 3 c. Project impacts... 5 d. Objectives of internal monitoring RESETTLEMENT IMPLEMENTATION PROGRESS... 7 a. DMS process... 7 b. Preparation and approval of compensation plans... 8 c. Process of compensation payment d. Assess degree of APs satisfaction of compensation and resettlement ASSESS THE STAKEHOLDER COOPERATION PENDING ISSUE CONCLUSION AND LESSON LEARNED a. Conclusion b. Lesson learned Annex 1 Entitlement Matrix Annex 2 New PPC s document on compensation and support Annex 3 Document and forms used for public consultation, information disclosure

5 1. GENERAL INFORMATION OF PROJECT a. Project objective 1. The National Power Transmission Corporation (NPT) of the Government of the Socialist Republic Viet Nam (GOV) has received a loan from the Asian Development Bank (ADB) to finance partly Master Plan VII of Power Development of Viet Nam. The Power Transmission Investment Program is an integral part of the National Power Development Master Plan VII and comprises of: (i) Transmission Network Expansion Component for expanding and upgrading 500 kv and 220 kv transmission lines and associated substations throughout Viet Nam; (ii) Operational Improvement Component for strengthening operational effectiveness and efficiency of the National Power Transmission Corporation; (iii) Project Implementation Support Component for detailed technical design, construction supervision, safeguard compliance, and preparing subsequent projects of the Investment Program. 2. The Power Transmission Investment Program, Tranche 1 includes 220kV Phu My 2 Industrial Zone subproject that managed by SPMB. b. Project component 3. The subproject includes: i. Construction of the 220kV substation and access road; ii. Construction of the 220kV connection line with a total length of 1,707 m; and; iii. Construction and installation of two parallel 110kV connection lines with a length of 831 m and 912 m respectively. 4. The subproject is composed of 220kV Substation, 220kV and 110kV connection lines. Details are summarized in Table 1. Table 1 Scope of Phu My 2 Industrial Zones and Connection Lines subproject No. Component Commune/District Started Date Completion Date Actual Cost 1 Substation Tan Phuoc commune, Tan Thanh district 2 Connection lines Tan Phuoc commune, Tan Thanh district $million Aug 2013 Nov Aug 2013 Nov

6 5. Construction phase of this subproject was 21 months from August 2013 to November Figure 1 Map of 6. The subproject is located in Tan Phuoc commune, Tan Thanh district, Ba Ria Vung Tau province. The location map of Subproject is presented in Figure 1 and the diagram of Subproject is illustrated in Figure 2. Figure 2 Diagram of Phu My 2 IZ Substation 4

7 c. Project impacts 7. The Detailed Measurement Survey has been implemented from August 2013 to May 2014 and being updated to the end of the subproject showed that about 126,172 m 2 of land affected by the project. Of which, 60,772.8 m 2 of Phu My 2 Industrial Zone and 1,514 m 2 of Tan Phuoc CPC, are permanently acquired for substation, access road, tower foundations and 58,528 m 2 of land affected within ROW. Productive land, such as rice paddies, fishpond, vegetable gardens, orchards, accounts for 83.3% of total affected land. According to the subproject survey, there are no relocated households and severely affected households. Table 2 Project affected area No. Component Starting point Ending point 1 220kV Phu My 2 Industrial zone substation 220kV connection line Length (m) Number of angle tower Location: Tan Phuoc commune, Tan Thanh district, Ba Ria - Vung Tau Area: 60,772.8 m 2 (included substation and access road) N242-66ĐN 220kV gate tower of the 220kV Phu My 2 1,808 8 Number of AH/Organ ization 06AHs and 01 Organizati on 80 AHs 110kV connection lines 1, Part 1: 110kV connection line 110kV gate tower of the 220kV Phu My 2 tower T15/8 of the 110kV Phu My - Thi Vai and Posco 778 Part 2: 110kV connection line 110kV gate tower of the 220kV Phu My 2 tower T15/8 of the 110kV Phu My - Thi Vai and Posco Total of 86 households and 01 organization (Phu My 2 Industrial Zone managed by IDICO) was affected by land acquisition, in which 26 households were affected by permanent land acquisition for constructing substation, access road, and tower foundations. Among HHs affected by ROW, there are 25 households with structures and houses that relocation under ROW. Types of houses and structures in ROW mostly are grade 4 and grade 5. In addition, 5

8 approximately 200 timber trees/industrial trees and more than 2,000 young plants are also affected. 9. Approximately 90% of permanently affected land (60,772.8 m 2 ) belongs to Phu My 2 Industrial Zone so land acquisition of subproject has not seriously affected to AHs. Category Permanently affected land Affected land within ROW Agricultural land (m 2 ) Table 3 Summary of project impacts Residential land (m 2 ) Aquaculture land (m 2 ) Other land (m 2 ) Subtotal (m 2 ) 9, ,491 49,079* 67,645 54,598 1, ,047 58,527 Total 63,622 1,933 9,491 51, ,172 Non land affected assets House under ROW (m 2 ) Affected enterprise (AHs) Affected crops (m 2 ) Affected trees (tree) Structure under ROW (m 2 ) 2, ,220 2, (*): Land acquired from Phu My 2 Industrial Zone 10. Among AHs, there is no HH considered as either severely affected or vulnerable household. Therefore, income restoration program is not essential. 11. Besides affected households, there is one organization affected, namely Phu My 2 Industrial Zone with total area of 60,772.8 m 2 permanently acquired to construct Phu My 2 substation and connection lines. 12. None of the public facilities, historical and cultural structures is affected by the project implementation. d. Objectives of internal monitoring 13. The SPMB conducted the internal monitoring of RP implementation to identify as early as possible the achieved activities and the cause(s) of occurred problems so that RP can be adjusted. Results of the internal monitoring are to be reported quarterly and semi-annually to NPT and ADB. 14. The general purpose of internal monitoring is to ensure that resettlement and land acquisition have been implemented in accordance with the policies and procedures of the RP. 6

9 15. To ensure the standard of DPs living being restored or improved, the main objectives of internal monitoring are to (i) monitor whether the schedule is being met; (ii) assess if compensation and support are sufficient; (iii) identify problems or potential problems; and (iv) identify methods of emergency respond to mitigate problems. 2. RESETTLEMENT IMPLEMENTATION PROGRESS a. DMS process 16. Detailed Measurement Survey had been conducted in September 2013 and completed in May The process of DMS was in compliance with policy. Table 4 The subproject s DMS progress End of 2013 End of 2014 End of 2015 End of 2016 Component (HHs) (HHs) (HHs) (HHs) 220kV Phu My 2 SS Connection lines Total Affected households filled declaration form as issued and guided by DLFDC. A declaration form has the principal contents including (i) Area and type of land, land origin, land use right certificate; (ii) Quantity of houses, types of houses, construction year, and other structures on the land; quantity, kinds and ages of perennial trees; land area of annual trees, their kinds, productivity and output; area of aquaculture land and salt paddies, productivity and output of aquatic products or salt paddies; (iii) number of household members, number of labourers affected by the land acquisition (for the agricultural sector, including persons directly engaged in agricultural production; aquaculture production on acquired land; for the non-agricultural sector, including contractual employees of registered employers); 18. DMS process was carried out with participation of CPC representative. DMS records were signed by AHs, representative of community, the DMS team, a commune-level cadastral officer, representatives of SPMB, DLFDC, LURC registration office, and the Natural Resources and Environment Division. One copy of DMS record was delivered to AHs to save. Noncomplaint was recorded on the result of DMS. 19. After DMS, AHs have been entitled depending on the type or/and scale of impacts as regulated in the project policy. Details of project policy for compensation and allowances are indicated in the entitlement matrix Annex Due to the typical of power project, for safe corridor, in some cases DMS of affected assets were carried out after civil work was implemented for supplementary of compensation plan. 7

10 21. Based on the final results of DMS, there was no AH considered as severely affected who lost 10% or more of their productive land or vulnerable group. Therefore, the subproject had not implemented an income restoration and rehabilitation program. b. Preparation and approval of compensation plans 22. Tan Thanh DLFDC is responsible for preparing compensation plans that includes the accuracy of DMS data, the value of assets to be compensated, and support. Compensation unit pricing and applying: 23. Households with affected land and assets in the construction area of substations and pole foundations, land and assets are permanently acquired. Affected lands are compensated in cash at the market price. Households with affected land and assets under ROW, affected assets are compensated in cash for the limitation of their uses. Affected structures and trees/crops are compensated according to the local compensation rate approved by the local authorities on the basis of structure/tree type. Temporarily affected assets during the construction and installation process are compensated by the construction contractor. The compensation rates are agreed between the construction contractor and all affected households. Details of policy are presented in Annex Compensation unit price for affected assets is summarized in the following table. Table 5 Compensation unit prices No. Item Unit Unit price (VND) 1 Land in Tan Phuoc commune, Tan Thanh district Residential land VND/m 2 768,000-2,905,000 Agricultural land VND/m 2 16, ,000 2 Structures Grade 4 (brick wall, wooden frame with titled roof) Grade 5 (bamboo and wooden frame with palm roof) 3 Tree and crops VND/m 2 1,537,000 VND/m 2 641,000 Paddy VND/m 2 3,500-4,400 Annual crops VND/m 2 8,400-20,000 Eucalyptus VND/tree 9,600-81,700 Cajuput VND/tree 3,800-81,700 Jackfruit VND/tree 51,000-1,130,000 8

11 No. Item Unit Unit price (VND) Longan VND/tree 37, ,500 Mango VND/tree 61,500-2,352,000 Custard apple VND/tree 51, ,000 Lemon VND/tree 39, ,500 Banana VND/tree 27,500-84,000 Approval of compensation plans progress: 25. After DMS completion, DLFDC prepared a draft compensation, support and resettlement plan including (i) Name and address of AH; (ii) Acquired land area, type, position, origin; and (iii) Valuation of the compensation or support; Table 6 The preparation and approval progress of the compensation plans for the subproject End of 2013 End of 2014 End of 2015 End of 2016 Component (HHs) (HHs) (HHs) (HHs) 220kV Phu My SS Connection lines Total The draft compensation plan had been disclosed at the office of CPC and public meeting in the project area for further comments and feedbacks. Detailed information was summarized and disseminated to all affected households for their review. Normally, it takes two months to get approval for compensation plan from its draft version. In the case of Phu My 2 subproject, some compensation plans were pending in few months while waiting for new policy issued by Ba Ria-Vung Tau PPC. 27. Consultation activities had been carried out to all affected households, local authorities, and village leaders since subproject preparation and design stages. That is an opportunity for AHs to express their comments and needs on the subproject. All of AH feedbacks was recorded and analysed as basics of compensation and support. In this stage, about 100% of affected households were consulted at least one time on the subproject land acquisition, compensation and support. 28. At the end of the period of posting and receiving opinions, DLFDC summarized the feedbacks of AHs, the numbers of opinions, comments against the draft compensation plan in writing, then finalized the plan and submitted it to DPC for approval. Total of 22 comments and 12 complaints was recorded. Detailed complaints are showed in Error! Reference source not found.. Most of comments were focused on the differences between the policy on compensation and support under Land Law 2003 and In the case of Phu My 2 subproject, Ba Ria-Vung 9

12 Tau PPC has promulgated a new document for households whose land is restricted to use apply Article 25 of Decree 47/2014/ND-CP dated May 15, 2014 of the government on support at 80% of the land price specified by PPC, referred Annex 2 for more details. DLFDC had to explain, review and adjust the plan before submitting it for approval. 29. After receiving the approved compensation, support and resettlement plan, DLFDC coordinates with CPC to disclose the approved compensation plan at the office of CPC and public meetings and directly send a detailed assets valuation to AHs, stating the compensation payment and commitment to hand-over for the acquired land. 30. All tasks in this step had been monitored by SPMB to ensure that AH feedbacks must be taken into account and they satisfy with the subproject policy. 31. Land acquisition for the project construction has been fully completed. Totally 12 (twelve) compensation plans had been prepared and approved for the subproject. Details of land acquisition are presented in Annex. c. Process of compensation payment 32. After sending a written notice on the approved compensation, support and resettlement plan to AHs, DLFDC carried out payment of compensation and support. Representatives of DCARB, SPMB, and CPC monitored the payment process. 33. Announcement of compensation schedule including time, place, and other relevant information were disclosed at the office of CPC, public meetings, and directly informed to AHs. 34. More than 17 billion VND were paid to the affected households for their lost and damaged assets during December 2013 to September Details are showed in table below. Table 7 Compensation and assistance for AHs under subproject Actual Compensation and assistance (VND) No Components AHs Relocated Compensation plans Paid amount Remaining 1 220kV Phu My ss ,337, ,337, Connection lines ,673,822,580 16,673,822,580 0 Total ,057,160,496 17,057,160, In case AH cannot receive compensation and support with any reasons, DLFDC have to transfer the money to State Treasure at district level and keep it until this case settled. There is no one refuse to get compensation payment. 10

13 36. Besides, for compensation payment to AHs, SPMB has to pay for IDICO who is in charge of compensation and resettlement for Phu My 2 Industrial Zone. However, Ba Ria-Vung Tau PPC has not had regulations on compensation amount. Progress of compensation for land occupied by Phu My 2 Industrial Zone is summarized in Box 1. Box 1 Progress of compensation payment for Phu My 2 Industrial Zone Since June 2015, SPMB has frequently requested Tan Thanh s DPC to prepare compensation plan for 60,772.8 m 3 of land belonging to Phu My 2 Industrial Zone that managed by IDICO in order to complete the subproject of Phu My 2 substation as planned. To response SPMB s requests, on December 25, 2015, Department of Industrial and Trade organized meeting with the representatives of Department of Environmental and Natural Resources, Industrial Parks Management Board, Tan Thanh s DPC, SPMB, and IDICO. The discussed issue is how to compensate for land acquisition implemented by IDICO during site clearance of Phu My 2 Industrial Zone. After the meeting, Department of Industrial and Trade issued Document No.27/SCT-QLNL dated 6 January 2016 on proposed solution for the cost of Phu My 2 substation s site clearance. It recommended that Ba Ria-Vung Tau PPC would allow Tan Thanh DPC to estimate the amount which was approximately 70% of investment for land (deduct depreciation) including compensation payment for AHs, cost for planning adjustment, cost for clearance of unexploded ordnances, and levelling (if any). Lately, Ba Ria-Vung Tau PPC stipulated Document No.816/UBND-VP dated February 3, 2016 on (1) Agree with the suggestions of Department of Industrial and Trade mentioned in Document No.27/SCT-QLNL; (2) Assign DoNRE in association with Department of Finance, Tan Thanh DPC working with IDICO as well as SPMB to solve the relevant procedures as prescribed. A Certificate of Valuation No.2441/2016/VLAND-HCM has been issued on June 30, 2016 on investment for land constructed Phu My 2 substation. The draft compensation plan has been submitted to DoNRE for verification. It proposed to compensate the amount of 64 million VND to Phu My 2 Industrial Zone. 37. SPMB has often requested Tan Thanh DPC as well as other stakeholders to finalize the compensation plan for Phu My 2 Industrial Zone. However, the process of dealing with these matters is totally controlled by many relevant organizations not SPMB. Tan Thanh DLFDC had submitted a draft compensation plan for approval. 11

14 d. Assess degree of APs satisfaction of compensation and resettlement 38. The grievance redress mechanism is set up to address questions and complaints on the land acquisition, compensation and resettlement in a timely manner. All affected persons had aware of their rights and complaint procedures. 39. Affected persons can lodge their complaints relating to any aspects of land acquisition and resettlement entitlement, prices, payment or procedures for resettlement etc. Their complaints can be made verbally or in writing. 40. An aggrieved AP can bring his/her complaint to DPC (the organization issued compensation plan) or sue as an administrative lawsuit at court in accordance with the Law on Administrative Procedures. 41. In case the complainant disagrees with the first-time complaint settlement decision or AP complaint remains unsettled which is past the prescribed time limit, AP may file a second-time complaint with the direct superior of the competent agency who in charge of the first-time complaint settlement or sue as an administrative lawsuit at court in accordance with the Law on Administrative Procedures. 42. In case the complainant disagrees with the second-time complaint settlement decision or AP complaint remains unsettled which is past the prescribed time limit, AP may sue as an administrative lawsuit at court in accordance with the Law on Administrative Procedures. 43. Generally, affected households are agreed with the compensation and assistance of the project. During implementation process of compensation and assistance, there were some minor inquiries on result of DMS and ownership of affected assets. DLFDC along with SPMB has immediately resolved those inquiries. There are 12-recorded complaints at DPC level on ownership of affected assets and compensation value. 44. All these complaints have been resolved in accordance with the project policy and government Law. AHs are satisfied with the grievance solutions then there is no outstanding complaint. Details are shown in table below. Table 8 Details of complaint settlement No. Name of AHs Content of complaint Grievance solution 1. Le Van Nguyen Request compensation for temporary affected assets caused by construction 2. Nguyen Van Tuong Compensation for land under ROW Decision No.1265/QD-UBND dated May 15, 2014 Decision No.1269/QD-UBND dated May 16, Nguyen Thi Tuyet Compensation for structures Decision No.1937/QD-UBND 12

15 No. Name of AHs Content of complaint Grievance solution under ROW dated July 16, Dinh Tu Hai Compensation for supporting structures 5. Nguyen Van Chuong Compensation and assistance for land and other structures under ROW 6. Nguyen Thi Tuyet Compensation for house under ROW 7. Nguyen Van Lon Compensation for affected assets under ROW 8. Tran Van Trung Compensation for temporary house under ROW 9. Tran Thi The Compensation for temporary structure under ROW 10. Nguyen Thi Ngoc Thuy Compensation for temporary structure under ROW 11. Pham Thi Nuong Additional compensation for temporary structure under ROW 12. Pham Van Hung Additional compensation for temporary structure under ROW 3. ASSESS THE STAKEHOLDER COOPERATION Decision No.1939/QD-UBND dated July 16, 2014 Decision No.2420/QD-UBND dated September 5, 2014 Decision No.3146/QD-UBND dated November 25, 2014 Decision No.3375/QD-UBND dated December 15, 2014 Decision No.3376/QD-UBND dated December 15, 2014 Decision No.3482/QD-UBND dated December 23, 2014 Decision No.3483/QD-UBND dated December 23, 2014 Decision No.1002/QD-UBND dated February 14, 2015 Decision No.1004/QD-UBND dated February 14, SPMB had signed the contract with DLFDC who are in charge of land acquisition and compensation. SPMB had smoothly coordinated with DLFDC and closely involved in process and progress of land acquisition and compensation. 46. During subproject implementation, SPMB had received much assistance from organizations such as Ba Ria-Vung Tau PPC, Phu My 2 Industrial Zone, etc. Without this cooperation, the subproject could not be timely completed. At the time of compensation preparation, Ba Ria-Vung Tau PPC issued Document No.6949/UBND-VP dated September 23, 2014 on support for households affected by Phu My 2 subproject. 13

16 4. PENDING ISSUE 47. The draft compensation plan for affected assets of Phu My 2 Industrial Zone has been submitted to Tan Thanh DoNRE for their review and verification. It is proposed to get approval in February 2017 and to pay compensation at the end of February CONCLUSION AND LESSON LEARNED a. Conclusion 48. The construction work of 220kV Phu My 2 Substation project has been completed and came into operation on November 30, Information dissemination, community consultations have been strictly conducted by SPMB and DLFDC in the project area resulting in no any serious complaint of affected people. 50. Due to the new Land Law, Ba Ria-Vung Tau PPC had to promulgate either a new policy or a procedure on compensation and assistance. It takes the project a long time to establish compensation plan. And also, it takes a lot of time to solve the differential regarding compensation and assistance between Land Law 2003 and Construction work was started before updating RP due to late mobilization of Consultant. However, construction activities were implemented in the land area of Phu My 2 Industrial Zone so they did not impact to AHs. b. Lesson learned 52. With the typical characteristics of power connection line, sometimes DMS results on affected assets under ROW must be adjusted when construction of power connection lines completed. 53. For the power network project, it only needs to acquire permanently small area of land for tower foundation but the process of compensation plan approval takes quite long time. Therefore, in some cases, compensation plans have been prepared at the same time with construction and payment has been delivered to AHs in advance. To avoid this situation, all activities must be strictly scheduled and followed as planned. 54. The subproject is mainly located in Industrial Zone, only small section of connection lines affected to assets of household, and then AHs livelihood was not affected. According to the project policy, AH received the compensation for agricultural land along with cash assistance. Thus, local people was willing to handover their land to the power network project. 55. However, the transferring of State land between two organizations as Phu My 2 Industrial Zone and SPMB has difficulty because of unavailable regulations issued by Ba Ria-Vung Tau PPC. It takes long time to complete the compensation for land to IDICO - representative of Phu My 2 Industrial Zone. 14

17 56. Consultant should be mobilized at the initial stage of the project implementation in order to carry out tasks and/or reports in accordance with ADB s safeguards policy. 15

18 Annex 1 Entitlement Matrix Entitled Persons A. AGRICULTURAL LAND Type & Level Of Impact A.1 Permanently affected agricultural land Owners with LURC, owners in process of acquiring LURC, owners eligible to acquire LURC AND public organizations More than 10 percent or more of total productive landholding affected Less than 10 percent of total productive landholding affected Compensation Policy a/ As a priority, allocation of replacement land: (i) equal in area to affected land up to a maximum of land quota in the locality; (ii) of same category (or productive capacity); (iii) at a location satisfactory to AP; (iv) with full title in the names of both the household head and his/her spouse; and (v) without charge for taxes, registration and land transfer charges; and b/ Economic rehabilitation package (see G, below); Or, if AP opts, a/ Cash compensation at replacement cost; and, b/ Economic rehabilitation package (see G, below). Cash compensation at replacement cost at current market prices for affected portion if remaining holding is viable; OR Cash compensation at replacement cost at current market prices for entire landholding, if remaining holding is not viable. Implementation AHs to be notified on reason of land acquisition schedule and plan, compensation plan on compensation, site clearance, resettlement at least 90 days prior to land acquisition (Land Law 2003, Article 39). Full payment for affected land to AHs at least 01 months before site clearance. Allowance for agricultural land acquisition accounts for 50% compensation rate for land. 16

19 Entitled Persons Type & Level Of Impact A.2 Impact on productive land in ROW All AHs have productive land in ROW Partially impact or totally impact Compensation Policy a/ No compensation for land b/ Compensation for fruit trees and others at market price. c/ Support for utilization of restricted land B. RESIDENTIAL AND/OR NON-AGRICULTURAL LAND (e.g., commercial) B.1 Impact on residential and/or non-agricultural land in ROW All AHs have residential and/or non-agricultural land in ROW Partially impact or totally impact a/ No compensation for land C. MAIN HOUSES AND OTHER STRUCTURES IN ROW C.1. Main house in ROW All AHs have house/structure and trees in ROW Partially impact on house or structures in ROW (affected area less than 50% of total land area without any impact to the remaining structures b/ Allowance for purchasing fireproof materials and lightning arrestors for the existing house/structure or cash compensation at replacement cost of affected house/structure c/ Support for utilization of restricted land a/ Retain their houses in ROW according to the conditions regulated by Article 13 of Decree No. 14/2014/NĐ-CP and cash compensation for directly affected parts of the houses at the replacement cost and cost for demolishing the affected part Implementation Allowance for limitation of land use is equal to 80% of compensation rate for land. AHs receive compensation for tree/crop without returning compensated tree/crop Allowance for limitation of land use is equal to 80% of compensation rate for land. Allowance for limitation of house/structure use is equal to 70% of its compensation rate. 17

20 Entitled Persons Type & Level Of Impact of the house/building) Demolishing partial or totally impact on house/structures (impact >50%, or less than 50%) Compensation Policy a/ AH could chose one of the following options: Retaining their houses or building in ROW according to the conditions regulated by Article 13 of Decree 14/2014/NĐ-CP. Allowance for purchasing fireproof materials and lightning arrestors for the existing house/building. Cash compensation at replacement cost for full areas of affected house/structure and cost for demolishing AHs houses in ROW. b/ Support for utilization of restricted house and impacts on daily-life activities C.2 Other Structures, e.g., kitchens, toilets, animal sheds, fences, foundations, etc. in ROW Other structures Structures affected due to location in ROW of the T/L Support for improvement of installing fireproof materials and lightning arrestors D. ANNUAL AND PERENNIAL CROPS, FRUIT AND TIMBER TREES AND TREE/PLANT FENCES Crops and/ or trees Loss of annual crops If standing crops are ripening and cannot be harvested, cash compensation of un-harvested crops Implementation For structure with improvement, allowance is paid at PPC s rate for rehabilitation of installing fireproof materials and lightning arrestors. For structure without improvement, allowance for limitation of house/structure use is equal to 70% of its compensation rate. AHs to be notified at least 2 months 18

21 Entitled Persons Type & Level Of Impact Loss of perennial trees, fruit and timber trees and tree fences G. REHABILITATION ASSISTANCE G.1 Economic Rehabilitation Package Severely affected persons, displaced from housing or losing 10 percent or more of their productive, income generating irrespective of tenure status. Assistance to restore livelihoods and incomes following acquisition of agricultural land or other productive assets Compensation Policy at market values based on the average production aver past 3 years. Cash compensation at current market prices given the type, age and productive value of the affected crops and/or trees. AHs directly cultivate on the affected land to be entitled: (i) Losing from 10 to 30% of agricultural land holding: Cash assistance equal to 30 kg of rice (valued at market price) per month per household member for 3 months, if not relocating; for 6 months if relocating; and for 12 months if relocating in a harsh living condition area; (ii) Losing more than 30% to 70% of total agriculture landholding. Cash assistance equal to 30 kg of rice (valued at market price) per month per household member for 6 months, if not relocating; for 12 months if relocating; and for 24 months if relocating in a harsh living condition area; (iii) Losing more than 70% of total agriculture Implementation for harvesting crops; Compensation is made depending on the species, age, and value of affected tree/crop. AHs receive compensation for tree/crop without returning compensated tree/crop. It is not necessary to implement IRP due to none severely affected house identified. 19

22 Entitled Persons Type & Level Of Impact G.2 Assistance for job changing and creation AHs agricultural permanently affected with land Assistance for job changing and creation. landholding Compensation Policy Cash assistance equal to 30 kg of rice (valued at market price) per month per household member for 12 months, if not relocating; for 24 months if relocating; and for 36 months if relocating in a harsh living condition area; AND (iv) In-kind assistance to be decided in consultation with eligible APs. Forms or assistance may include, but are not limited to, agricultural extension assistance, and training for non-agricultural occupations. And (v) Participating in income restoration programs (IRP). Cash assistance equal to 1.5 time of compensation value for affected for acquired land area but not exceed 5 (five) times of land quota in locality, according to PPC s regulation. If AP has demand for training, he/she will be entitled to a free training course G.3 Special allowance for social and economically vulnerable households Implementation Cash assistance is equal to 1.5 times of compensation value of acquired land areas. Vocational training card is given to all family members of labor force, equivalent to the amount of VND 6,000,000 per member. 20

23 Entitled Persons Type & Level Of Impact Compensation Policy Implementation Vulnerable APs (the poor, war invalid person, woman headed household, the elderly) Assistance to the poor and vulnerable households to improve their social and economic conditions. For the poor households, cash assistance equal to 30 kg of rice (at market price) per each family member per month for at least 6 months For other vulnerable APs, assistance of VND 2,000,000 per household to improve their social and economic conditions No one entitled as vulnerable AP. G.4 Assistance for houses in ROW AHs with house in ROW Assistance to improve house or install fireproof materials and lighting arrestors. And assistance to mitigate impacts due to restricted usability and impacts on daily activities. G.5 Assistance for other structures in ROW AHs with other structures in ROW G.6 Assistance for land in ROW Assistance to improve structure or install fireproof materials and lighting arrestors. With grade 4 houses, allowance for installing fireproof materials and lighting arrestors. With grade 5 houses, allowance for rehabilitation. Allowance due to restricted usability and impacts on daily activities (according to Decree 14/2014/ND-CP, it is 30% value of house). With grade 4 structure, allowance for installing fireproof materials and lighting arrestors. With grade 5 structure, allowance for rehabilitation. Allowance for limitation of house use is equal to 70% of its compensation rate. Allowance for limitation of structure use is equal to 70% of its compensation rate. 21

24 Entitled Persons Type & Level Of Impact Compensation Policy Implementation AHs with land in ROW Assistance to mitigate impacts due to restricted usability of land Allowance for agricultural land, residential land, production planted, production forest, nonagricultural land in ROW (according to GOV Decree No.14/2014/ND-CP) Allowance for limitation of land use is equal to 80% of compensation rate for land. 22

25 Annex 2 New PPC s document on compensation and support 23

26 Annex 3 Document and forms used for public consultation, information disclosure Announcement on Land acquisition 24

27 25

28 26

29 Decision on DCARB establishment 27

30 28

31 Public disclosure on Draft Compensation Plan 29

32 30

33 Completion report for Compensation Plan Disclosure 31

34 List of Compensation and Assistance plan No. Compensation plan 1. Decision No.6808/QD-UBND approved by Tan Thanh DPC dated 12/12/ Decision No.1376/QD-UBND approved by Tan Thanh DPC dated 28/03/2014 (additional payment for Decision No.6808) 3. Decision No.1090/QD-UBND approved by Tan Thanh DPC dated 17/03/ Decision No.6112/QD-UBND approved by Tan Thanh DPC dated 13/11/ Decision No.399/QD-UBND approved by Tan Thanh DPC dated 29/01/ Decision No.979/QD-UBND approved by Tan Thanh DPC dated 14/02/ Decision No.984/QD-UBND approved by Tan Thanh DPC dated 14/02/ Decision No.1002/QD-UBND approved by Tan Thanh DPC dated 14/02/ Decision No.1004/QD-UBND approved by Tan Thanh DPC dated 14/02/ Decision No.1396/QD-UBND approved by Tan Thanh DPC dated 08/04/ Decision No.2577/QD-UBND approved by Tan Thanh DPC dated 12/06/ Decision No.4588/QD-UBND approved by Tan Thanh DPC dated 11/09/

VIE: Power Transmission Investment Program, Tranche 1 220kV Phu My Industrial Zone Substation and 220kV Song May-Uyen Hung Transmission Line

VIE: Power Transmission Investment Program, Tranche 1 220kV Phu My Industrial Zone Substation and 220kV Song May-Uyen Hung Transmission Line Social Monitoring Report Semestral Report July to December 2014 VIE: Power Transmission Investment Program, Tranche 1 220kV Phu My Industrial Zone Substation and 220kV Song May-Uyen Hung Transmission Line

More information

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line Social Monitoring Report Semi Annual Report January June 2016 VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line Prepared by the Southern Vietnam Power

More information

VIE: Power Transmission Investment Program Tranche 3

VIE: Power Transmission Investment Program Tranche 3 Social Monitoring Report 2 nd Quarterly Report June 2017 VIE: Power Transmission Investment Program Tranche 3 Installation of a second transformer bank for 220 kv Duc Hoa substation Installation of a second

More information

VIE: Power Transmission Investment Program, Tranche 1 Song May-Uyen Hung Transmission Line

VIE: Power Transmission Investment Program, Tranche 1 Song May-Uyen Hung Transmission Line Social Monitoring Report 5 th Independent Monitoring Report January April 2016 VIE: Power Transmission Investment Program, Tranche 1 Song May-Uyen Hung Transmission Line Prepared by the Southern Vietnam

More information

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line Social Monitoring Report Semi-Annual Monitoring Report July December 2015 VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line Prepared by the Southern Vietnam Power

More information

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line Social Monitoring Report Quarterly Report April June 2016 VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line Prepared by the Southern Vietnam Power

More information

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line Social Monitoring Report Semi-Annual Monitoring Report January June 2015 VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line Prepared by the Southern Vietnam Power

More information

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Duc Hoa Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Duc Hoa Transmission Line Social Monitoring Report Semi-Annual Report Jun-Dec 2014 VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Duc Hoa Transmission Line Prepared by the Southern Power Projects Management

More information

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line Social Monitoring Report Quarterly Report July September 2015 VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line Prepared by the Southern Vietnam Power Projects Management

More information

COMPENSATION, ASSISTANCE AND RESETTLEMENT POLICY PROPOSED FOR

COMPENSATION, ASSISTANCE AND RESETTLEMENT POLICY PROPOSED FOR Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DIRECTORATE FOR ROADS OF VIETNAM PROJECT MANAGEMENT UNIT 3 ================= COMPENSATION,

More information

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line Social Monitoring Report Quarterly Report April June 2015 VIE: Power Transmission Investment Program, Tranche 2 Cau Bong-Duc Hoa Transmission Line Prepared by the Southern Vietnam Power Projects Management

More information

VIE: Power Transmission Investment Program, Tranche 3

VIE: Power Transmission Investment Program, Tranche 3 Social Monitoring Report 1st Semi-annual Report July 2017 VIE: Power Transmission Investment Program, Tranche 3 Prepared by Le Duc Huy for the National Power Transmission Corporation and the Asian Development

More information

VIE: Power Transmission Investment Program, Tranche 2 500kV Pleiku-My Phuoc-Cau Bong Transmission Line (Binh Duong Province)

VIE: Power Transmission Investment Program, Tranche 2 500kV Pleiku-My Phuoc-Cau Bong Transmission Line (Binh Duong Province) Social Monitoring Report July 2014 VIE: Power Transmission Investment Program, Tranche 2 500kV Pleiku-My Phuoc-Cau Bong Transmission Line (Binh Duong Province) Prepared by Central Vietnam Power Projects

More information

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line Social Monitoring Report Semi-Annual Report Jun-Dec 2014 VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line Prepared by the Southern Power Projects

More information

NORTH POWER CORPORATION Electric Network Project Management Board RESETTLEMENT PLAN (RP) SUBPROJECT:

NORTH POWER CORPORATION Electric Network Project Management Board RESETTLEMENT PLAN (RP) SUBPROJECT: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Subproject : Rural Energy - Additional Financing (Phase 4) Subproject in Ha Nam NORTH

More information

Cam My and Thong Nhat Districts DONG NAI PROVINCE Stage 3

Cam My and Thong Nhat Districts DONG NAI PROVINCE Stage 3 THE SOCIALIST REPUBLIC OF VIETNAM MINISTRY OF TRANSPORT VIETNAM EXPRESSWAY CORPORATION (VEC) SOUTHERN EXPRESSWAY PROJECT MANAGEMENT UNIT (SEPMU) The Updated Resettlement Plan Cam My and Thong Nhat Districts

More information

Da Nang - Quang Ngai Expressway Development Project

Da Nang - Quang Ngai Expressway Development Project Public Disclosure Authorized Public Disclosure Authorized DA NANG-QUANG NGAI EXPRESSWAY PROJECT Due Dilligence report, Phu Ninh district, Quang Nam province MINISTRY OF TRANSPORT VIETNAM EXPRESSWAY CORPORATION

More information

VIE: Renewable Energy Development and Network Expansion and Rehabilitation for Remote Communes Sector Project. Sub-project: So Vin Hydropower Project

VIE: Renewable Energy Development and Network Expansion and Rehabilitation for Remote Communes Sector Project. Sub-project: So Vin Hydropower Project Final Resettlement Monitoring Report Document stage: Final Project number: Loan 2517 May, 2017 VIE: Renewable Energy Development and Network Expansion and Rehabilitation for Remote s Sector Project Sub-project:

More information

Safeguards Monitoring Report

Safeguards Monitoring Report Safeguards Monitoring Report Semiannual Report Covering July-Dec 2016 period February 2017 (ESDIP) Tranche-2 Chimtala- Arghandi 220 kv DC Transmission Line Subproject (DABS - 006/ICB) Prepared by Da Afghanistan

More information

Combined Resettlement Plan and Ethnic Minority Development Plan. VIE: GMS Kunming-Haiphong Transport Corridor Noi Bai-Lao Cai Highway Project

Combined Resettlement Plan and Ethnic Minority Development Plan. VIE: GMS Kunming-Haiphong Transport Corridor Noi Bai-Lao Cai Highway Project Combined Resettlement Plan and Ethnic Minority Development Plan December 2017 VIE: GMS Kunming-Haiphong Transport Corridor Noi Bai-Lao Cai Highway Project Prepared by Vietnam Expressway Corporation for

More information

PEOCS QUALITY MANAGEMENT SYSTEM ISO C6NG TY Ttl VAN XAY D/NG DION 3 R'P82 VO L t' RESETTLEMENT ACTION PLAN

PEOCS QUALITY MANAGEMENT SYSTEM ISO C6NG TY Ttl VAN XAY D/NG DION 3 R'P82 VO L t' RESETTLEMENT ACTION PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ELECTRICITY OF VIET NAM SOUTHERN POWER PROJECT MANAGEMENT BOARD R'P82 VO L. 14 LONG AN

More information

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line Social Monitoring Report 3 rd Independent Monitoring Report June 2016 VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Binh Tan Transmission Line Prepared by the Southern Vietnam

More information

Viet Nam: Secondary Cities Development Project - Ha Tinh Subproject

Viet Nam: Secondary Cities Development Project - Ha Tinh Subproject Resettlement Monitoring Report # First Periodic Report September 2016 Viet Nam: Secondary Cities Development Project - Ha Tinh Subproject Prepared by Nguyen Van Trung, External Resettlement Monitoring

More information

VIE: Ben Luc Long Thanh Expressway Project

VIE: Ben Luc Long Thanh Expressway Project Resettlement Plan TA 7155-VIE 19 July 2010 VIE: Ben Luc Long Thanh Expressway Project Vietnam Expressway Corporation ABBREVIATIONS ADB DP CPC DPC DCSCC DARD DOC DOF DONRE DPI DOT DMS EMA FS GoV HCMC HH

More information

VIE: O Mon IV Combined Cycle Power Plant

VIE: O Mon IV Combined Cycle Power Plant Resettlement Due Diligence Report February 2011 VIE: O Mon IV Combined Cycle Power Plant Prepared by Can Tho Thermal Power Company for the Asian Development Bank. 1 O MON IV THERMAL POWER PLANT RESETTLEMENT

More information

.~~~IO O12O RP82 OF VIT NAM ~~~ELECTRICITY. RESETTLIEMENT ACTION PlAsN (RAP) (FINAL REVISION) \} \ PECC4 POWER ENGINEERING CONSULTING COMPANY 4

.~~~IO O12O RP82 OF VIT NAM ~~~ELECTRICITY. RESETTLIEMENT ACTION PlAsN (RAP) (FINAL REVISION) \} \ PECC4 POWER ENGINEERING CONSULTING COMPANY 4 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized X RP82 VOL. 20 ~~~~~SOCIALIST REPUBLIC OF VIET NAM OF VIT NAM \} \ ~~~ELECTRICITY PECC4

More information

VIETNAM INDUSTRIAL POLLUTION MANAGEMENT PROJECT (P113151)

VIETNAM INDUSTRIAL POLLUTION MANAGEMENT PROJECT (P113151) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized VIETNAM INDUSTRIAL POLLUTION MANAGEMENT PROJECT (P113151) Due Diligence Review of Involuntary

More information

NATIONAL POWER TRANMISSION CORPORATION Northern Power Projects Management Board RESETTLEMENT PLAN (RP)

NATIONAL POWER TRANMISSION CORPORATION Northern Power Projects Management Board RESETTLEMENT PLAN (RP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NATIONAL POWER TRANMISSION CORPORATION Northern Power Projects Management Board -------------------------------

More information

Internal Resettlement Monitoring Report

Internal Resettlement Monitoring Report Internal Resettlement Monitoring Report Stage of document: Quarterly (Q4 2015) Project/Loan number: Loan 2789 Date: March 2016 VIE: TRANSPORT CONNECTIONS IN NORTHERN MOUNTAINOUSPROVINCES PROJECT Prepared

More information

Semi-Annual Social Safeguards Monitoring Report. SRI: Greater Colombo Wastewater Management Project

Semi-Annual Social Safeguards Monitoring Report. SRI: Greater Colombo Wastewater Management Project Semi-Annual Social Safeguards Monitoring Report Project No. 36173-013 Period Covering July to December 2013 April 2014 SRI: Greater Colombo Wastewater Management Project Prepared by the Ministry of Local

More information

REPORT ON Independent Resettlement Monitoring (Mission I)

REPORT ON Independent Resettlement Monitoring (Mission I) ELECTRICITY OF VIETNAM TRUNG SON HYDROPOWER PROJECT CONSTRUCTION OPERATION ROAD TRUNG SON HYDROPOWER PLANT REPORT ON Independent Resettlement Monitoring (Mission I) Monitored and reported by: Centre for

More information

THE PRIME MINISTER ------- No. 71/2010/QD-TTg SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom Happiness --------- Hanoi, November 09, 2010 DECISION PROMULGATING THE REGULATION ON PILOT INVESTMENT

More information

GEO: Sustainable Urban Transport Investment Program, Tranche 2 Tbilisi-Rustavi Urban Road Link (Section-1: km 0 to 4 Tbilisi Phonichala) (Addendum)

GEO: Sustainable Urban Transport Investment Program, Tranche 2 Tbilisi-Rustavi Urban Road Link (Section-1: km 0 to 4 Tbilisi Phonichala) (Addendum) Resettlement Plan December 2014 GEO: Sustainable Urban Transport Investment Program, Tranche 2 Tbilisi-Rustavi Urban Road Link (Section-1: km 0 to 4 Tbilisi Phonichala) (Addendum) Prepared by the Municipal

More information

Subproject: Cau Khai drainage system Yen Dinh district, Thanh Hoa province

Subproject: Cau Khai drainage system Yen Dinh district, Thanh Hoa province Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RP299 vol. 3 Ministry of Agriculture and Rural Development The World Bank Natural Disaster

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

DECREE No. 108/2006/ND-CP OF SEPTEMBER 22, 2006, DETAILING AND GUIDING THE IMPLEMENTATION OF A NUMBER OF ARTICLES OF THE INVESTMENT LAW THE

DECREE No. 108/2006/ND-CP OF SEPTEMBER 22, 2006, DETAILING AND GUIDING THE IMPLEMENTATION OF A NUMBER OF ARTICLES OF THE INVESTMENT LAW THE DECREE No. 108/2006/ND-CP OF SEPTEMBER 22, 2006, DETAILING AND GUIDING THE IMPLEMENTATION OF A NUMBER OF ARTICLES OF THE INVESTMENT LAW THE GOVERNMENT Pursuant to the December 25, 2001 Law on Organization

More information

VIE: Central Mekong Delta Region Connectivity Project

VIE: Central Mekong Delta Region Connectivity Project Social Monitoring Report Fifth Report August 2016 VIE: Central Mekong Delta Region Connectivity Project Prepared by Romeo Cleto, External Monitor, for the Ministry of Transport, Cuu Long Corporation for

More information

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness. General Provisions

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness. General Provisions GOVERNMENT No. -2006-ND-CP Draft 1653 SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness Hanoi, [ ] 2006 DECREE PROVIDING GUIDELINES FOR IMPLEMENTATION OF LAW ON INVESTMENT Pursuant to the

More information

PROJECT PREPARATION TECHNICAL ASSISTANCE

PROJECT PREPARATION TECHNICAL ASSISTANCE 12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility

More information

Initial Environmental Examination

Initial Environmental Examination Initial Environmental Examination June 2017 IND: Green Energy Corridor and Grid Strengthening Project (320 kv VSC-HVDC power transmission lines between Pugalur, Tamil Nadu and North Trichur, Kerala) Annexures

More information

Timor-Leste: Baucau to Viqueque Highway Project

Timor-Leste: Baucau to Viqueque Highway Project Resettlement Plan Project Number: 51115 June 2017 Timor-Leste: Baucau to Viqueque Highway Project Prepared by the Government of Timor-Leste for the Asian Development Bank. Table of Contents EXECUTIVE

More information

Nepal: Decentralized Rural Infrastructure and Livelihood Project- Additional Financing

Nepal: Decentralized Rural Infrastructure and Livelihood Project- Additional Financing Resettlement Planning Document Due Diligence Report Loan Number: 2796 and Grant Number: 0267 NEP June 2012 Nepal: Decentralized Rural Infrastructure and Livelihood Project- Additional Financing Ghupa-Sanghu

More information

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project Technical Assistance Project Number: 50098 Project Preparatory Technical Assistance (PPTA) November 2016 Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project This document is being

More information

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No. 15/2015/NĐ-CP Hanoi, February 14, 2015 DECREE

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No. 15/2015/NĐ-CP Hanoi, February 14, 2015 DECREE THE GOVERNMENT ------- SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness --------------- No. 15/2015/NĐ-CP Hanoi, February 14, 2015 DECREE ON INVESTMENT IN THE FORM OF PUBLIC-PRIVATE PARTNERSHIP

More information

LAND ACQUISITION AND RESETTLEMENT COMPENSATION POLICY FRAMEWORK AND IMPLEMENTING GUIDELINES

LAND ACQUISITION AND RESETTLEMENT COMPENSATION POLICY FRAMEWORK AND IMPLEMENTING GUIDELINES LAND ACQUISITION AND RESETTLEMENT COMPENSATION POLICY FRAMEWORK AND IMPLEMENTING GUIDELINES Supplementary Appendix to the Report Recommendation of the President to the Board of Directors on the HEALTH

More information

Resettlement Planning Document.

Resettlement Planning Document. Resettlement Planning Document. Document: Land Acquisition and Resettlement Plan Document Stage: Final Project Number: 40190 June 2012 GMS - Flood and Drought Risk Management and Mitigation Project (FDRMMP)

More information

COUNTRY REPORT (VIETNAM)

COUNTRY REPORT (VIETNAM) COUNTRY REPORT (VIETNAM) ------------------------------------------------------------------------------------- I. Current situation of Rail Links in Viet Nam: 1. Singapore Kunming Railways Project: - Section:

More information

Land Acquisition and Resettlement Plan Compliance Report. ARM: Sustainable Urban Development Investment Program Tranche 2

Land Acquisition and Resettlement Plan Compliance Report. ARM: Sustainable Urban Development Investment Program Tranche 2 Land Acquisition and Resettlement Plan Compliance Report May 2018 ARM: Sustainable Urban Development Investment Program Tranche 2 LARP Area (Babajanyan - Tichina Highway) Prepared by the AM Partners Consulting

More information

The Provincial People s Committees of Thanh Hóa, Quảng Bình, Thừa Thiên - Huế, Quảng Nam, and Quảng Ngãi Province. To:

The Provincial People s Committees of Thanh Hóa, Quảng Bình, Thừa Thiên - Huế, Quảng Nam, and Quảng Ngãi Province. To: MINISTRY OF CONSTRUCTION THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness No: /BXD-QLN Subject: Guidelines on the implementation of Project s Component 1 funded by Green Climate Fund (GCF):

More information

Legal news. Contents. Vision & Associates A TTORNEYS. PATENT & T RADEMARK A GENTS. I NVESTMENT & B USINESS C ONSULTANTS.

Legal news. Contents. Vision & Associates A TTORNEYS. PATENT & T RADEMARK A GENTS. I NVESTMENT & B USINESS C ONSULTANTS. A TTORNEYS. PATENT & T RADEMARK A GENTS. I NVESTMENT & B USINESS C ONSULTANTS Legal news Contents INVESTMENT LAW... 2 Other Sectors... 5 Finance... 5 Banking... 5 Taxation... 6 Trade... 6 Labour... 7 Health...

More information

Prepared by Nam Ngiep 1 Power Company Limited for the Asian Development Bank

Prepared by Nam Ngiep 1 Power Company Limited for the Asian Development Bank Social Monitoring Report Project Number: 41924-014 24 August 2018 (Lao People s Democratic Republic) Quarterly Monitoring Report 2018 Q1 Prepared by Nam Ngiep 1 Power Company Limited for the Asian Development

More information

Press Release. Press Release SAVILLS VIETNAM REPORT ON INDUSTRIAL SECTOR NATIONWIDE 1. OVERVIEW 24/09/2015

Press Release. Press Release SAVILLS VIETNAM REPORT ON INDUSTRIAL SECTOR NATIONWIDE 1. OVERVIEW 24/09/2015 24/09/2015 SAVILLS VIETNAM REPORT ON INDUSTRIAL SECTOR NATIONWIDE 1. OVERVIEW Co.,Ltd 18 th Floor, Continental Tower 81-85 Ham Nghi Street District 1, HCMC T: +84 8 3823 9205 savills.com.vn Large-scale

More information

NATIONAL ASSEMBLY SOCIALIST REPUBLIC OF VIETNAM XIth NATIONAL ASSEMBLY 7 th SESSION (from... to ) AMENDED AND SUPPLEMENTED CUSTOMS LAW

NATIONAL ASSEMBLY SOCIALIST REPUBLIC OF VIETNAM XIth NATIONAL ASSEMBLY 7 th SESSION (from... to ) AMENDED AND SUPPLEMENTED CUSTOMS LAW Draft NATIONAL ASSEMBLY Law No.../2005/QH 10 SOCIALIST REPUBLIC OF VIETNAM Independence Liberty Happiness NATIONAL ASSEMBLY SOCIALIST REPUBLIC OF VIETNAM XIth NATIONAL ASSEMBLY 7 th SESSION (from... to...

More information

AZERBAIJAN MOTORWAY IMPROVEMENT AND DEVELOPMENT Baku Shamakhi Road Widening

AZERBAIJAN MOTORWAY IMPROVEMENT AND DEVELOPMENT Baku Shamakhi Road Widening SFG1532 Public Disclosure Authorized AZERBAIJAN REPUBLIC Public Disclosure Authorized Public Disclosure Authorized MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY AZERBAIJAN MOTORWAY IMPROVEMENT

More information

VIE: Central Mekong Delta Connectivity Project Can Tho City

VIE: Central Mekong Delta Connectivity Project Can Tho City Income Restoration Program February 2015 VIE: Central Mekong Delta Connectivity Project Can Tho City Prepared by Ministry of Transport, Cuu Long Corporation for Investment, Development and Project Management

More information

Environmental Safeguard Monitoring Report. FIJ: Transport Infrastructure Investment Sector Project

Environmental Safeguard Monitoring Report. FIJ: Transport Infrastructure Investment Sector Project Environmental Safeguard Monitoring Report Semi Annual Report July 2016 ADB Project Number: 48141-001 ADB Loan Number: 3210 FIJ: Transport Infrastructure Investment Sector Project Prepared by Fiji Roads

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Country Partnership Strategy: Viet Nam, 2012 2015 SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Investment in the transport sector in Viet

More information

Updated Facility Administration Manual. Socialist Republic of Viet Nam: Greater Mekong Subregion Ben Luc Long Thanh Expressway Project

Updated Facility Administration Manual. Socialist Republic of Viet Nam: Greater Mekong Subregion Ben Luc Long Thanh Expressway Project Updated Facility Administration Manual Project Number: 41414 Loan Number: MFF 0053-VIE 23 March 2016 Socialist Republic of Viet Nam: Greater Mekong Subregion Ben Luc Long Thanh Expressway Project 1 Contents

More information

Vision & Associates ATTORNEYS. PATENT & TRADEMARK AGENTS. INVESTMENT & BUSINESS CONSULTANTS Legal news

Vision & Associates ATTORNEYS. PATENT & TRADEMARK AGENTS. INVESTMENT & BUSINESS CONSULTANTS Legal news ATTORNEYS. PATENT & TRADEMARK AGENTS. INVESTMENT & BUSINESS CONSULTANTS Legal news Contents Highlighted... 2 Other sectors... 8 Finance - Banking... 8 Trade... 8 Labour... 8 Health... 9 Education... 9

More information

Pham Quang Huy. University of Economics Ho Chi Minh City, Vietnam

Pham Quang Huy. University of Economics Ho Chi Minh City, Vietnam Journal of Modern Accounting and Auditing, June 2015, Vol. 11, No. 6, 322-327 doi: 10.17265/1548-6583/2015.06.004 D DAVID PUBLISHING Introduction of the 2015 Law on Public Investments and Its Effects on

More information

Viet Nam: Northern Power Transmission Expansion Sector Project

Viet Nam: Northern Power Transmission Expansion Sector Project Validation Report Reference Number: PVR-485 Project Number: 38196-013 Loan Number: 2225 December 2016 Viet Nam: Northern Power Transmission Expansion Sector Project Independent Evaluation Department ABBREVIATIONS

More information

Legal news. Contents. Vision & Associates A TTORNEYS. PATENT & T RADEMARK A GENTS. I NVESTMENT & M ANAGEMENT C ONSULTANTS.

Legal news. Contents. Vision & Associates A TTORNEYS. PATENT & T RADEMARK A GENTS. I NVESTMENT & M ANAGEMENT C ONSULTANTS. A TTORNEYS. PATENT & T RADEMARK A GENTS. I NVESTMENT & M ANAGEMENT C ONSULTANTS Legal news Contents REAL ESTATE BUSINESS LAW...2 Other Sectors...5 Finance... 5 Banking... 5 Taxation... 6 Insurance... 6

More information

INFORMATION DISCLOSURE ON THE WEBSITES OF THE STATE SECURITIES COMMISSION AND HO CHI MINH STOCK EXCHANGE

INFORMATION DISCLOSURE ON THE WEBSITES OF THE STATE SECURITIES COMMISSION AND HO CHI MINH STOCK EXCHANGE VINGROUP JOINT STOCK COMPANY ----------- ---------- No.:352/2013/CV-TGD-VINGROUP THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness ----------- ---------- Hanoi, 11 September 2013 INFORMATION

More information

DECREE DETAILING AND GUIDING A NUMBER OF ARTICLES OF THE LAW ON THE ELDERLY THE GOVERNMENT

DECREE DETAILING AND GUIDING A NUMBER OF ARTICLES OF THE LAW ON THE ELDERLY THE GOVERNMENT THE GOVERNMENT ------- No. 06/2011/ND-CP SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom Happiness --------- Hanoi, January 14, 2011 DECREE DETAILING AND GUIDING A NUMBER OF ARTICLES OF THE LAW ON

More information

FINAL EVALUATION VIE/033. Climate Adapted Local Development and Innovation Project

FINAL EVALUATION VIE/033. Climate Adapted Local Development and Innovation Project FINAL EVALUATION VIE/033 Climate Adapted Local Development and Innovation Project PROJECT SUMMARY DATA Country Long project title Short project title LuxDev Code Vietnam Climate Adapted Local Development

More information

I. SUBJECTS AND SCOPE OF APPLICATION. II. Compensation, allowance

I. SUBJECTS AND SCOPE OF APPLICATION. II. Compensation, allowance Circular N o 10/2003/TT- BLDTBXH dated 18 April 2003 of the MOLISA Instructing the implementation of compensation to the victims of occupational accidents and diseases Implementing the Government Decree

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE 8 Appendix 3 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The Government of the Republic of the Union of Myanmar has requested the Asian Development Bank (ADB) to provide a project preparatory

More information

Asian Development Bank Accountability Mechanism Compliance Review Panel

Asian Development Bank Accountability Mechanism Compliance Review Panel Asian Development Bank Accountability Mechanism Compliance Review Panel Terms of Reference for Monitoring under the Chashma Right Bank Irrigation Project (Stage III) Inspection Request I. Introduction

More information

RESETTLEMENT PLAN RURAL ENERGY II PROJECT - ADDITIONAL FINANCING PHASE 1 - YEN BAI PROVINCE. Lai Hop Quoc. ELECTRICITY OF VIETNAt\1 PREPARED BY

RESETTLEMENT PLAN RURAL ENERGY II PROJECT - ADDITIONAL FINANCING PHASE 1 - YEN BAI PROVINCE. Lai Hop Quoc. ELECTRICITY OF VIETNAt\1 PREPARED BY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ELECTRCTY OF VETNAt\1 NORTHERl~ POWER CORPORATON RURAL ENERGY PROJECT - ADDTONAL FNANCNG

More information

ACCESS TO CREDIT OF FARM HOUSEHOLDS IN HAI DUONG PROVINCE, VIETNAM. Abstract

ACCESS TO CREDIT OF FARM HOUSEHOLDS IN HAI DUONG PROVINCE, VIETNAM. Abstract ACCESS TO CREDIT OF FARM HOUSEHOLDS IN HAI DUONG PROVINCE, VIETNAM Le Thi Minh Chau0F1, Philippe Lebailly 1F 2, Nguyen Tuan Son 1 Paper presented at the third International Scientific Symposium Agrosym

More information

Viet Nam. UNCTAD Compendium of Investment Laws. Law on Investment (2014)

Viet Nam. UNCTAD Compendium of Investment Laws. Law on Investment (2014) UNCTAD Compendium of Investment Laws Viet Nam Law on Investment (2014) Note The Investment Laws Navigator is based upon sources believed to be accurate and reliable and is intended to be up-to-date at

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: VIE 38561 TECHNICAL ASSISTANCE (Financed by the Poverty Reduction Cooperation Fund) TO THE SOCIALIST REPUBLIC OF VIET NAM FOR DEVELOPING AGRICULTURAL INSURANCE December 2004

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA TF-94257) ON A CREDIT IN THE AMOUNT OF SDR 91.1 MILLION (US$ 150 MILLION EQUIVALENT) TO THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA TF-94257) ON A CREDIT IN THE AMOUNT OF SDR 91.1 MILLION (US$ 150 MILLION EQUIVALENT) TO THE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00002312 IMPLEMENTATION COMPLETION AND RESULTS

More information

PAK: MFF Power Distribution Enhancement Investment Program (Tranche 2)

PAK: MFF Power Distribution Enhancement Investment Program (Tranche 2) Social Monitoring Report Bi-annual Social Monitoring Report July 2014 PAK: MFF Power Distribution Enhancement Investment Program (Tranche 2) Prepared by Lahore Electric Supply Company, Punjab for the Asian

More information

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time);

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time); 2 (f) GAP or Gender Action Plan means the gender action plan for the Project, including any update thereto, prepared and agreed between the Borrower and ADB and further set out in the PAM; (g) Goods means

More information

Legal news. Contents. Vision & Associates A TTORNEYS. PATENT & T RADEMARK A GENTS. I NVESTMENT & M ANAGEMENT C ONSULTANTS.

Legal news. Contents. Vision & Associates A TTORNEYS. PATENT & T RADEMARK A GENTS. I NVESTMENT & M ANAGEMENT C ONSULTANTS. A TTORNEYS. PATENT & T RADEMARK A GENTS. I NVESTMENT & M ANAGEMENT C ONSULTANTS Legal news Contents HIGHLIGHTED NOTES... 2 Other Sectors... 10 Finance - Banking... 10 Securities... 10 Taxation... 10 Labour...

More information

Dated 15 January 2018 CONTENTS CHAPTER General Provisions... 1

Dated 15 January 2018 CONTENTS CHAPTER General Provisions... 1 DECREE 09 PROVIDING REGULATIONS ON THE COMMERCIAL LAW AND THE LAW ON MANAGEMENT OF FOEIGN TRADE REGARDING GOODS TRADING AND DIRECTLY RELATED ACTIVITIES [DISTRIBUTION] BY FOREIGN INVESTORS AND ECONOMIC

More information

No.: 01/2016/BB-ĐHĐCĐ Ho Chi Minh City, 21 April, 2016 MINUTES OF THE 2015 ANNUAL GENERAL MEETING (AGM) HO CHI MINH CITY SECURITIES CORPORATION (HSC)

No.: 01/2016/BB-ĐHĐCĐ Ho Chi Minh City, 21 April, 2016 MINUTES OF THE 2015 ANNUAL GENERAL MEETING (AGM) HO CHI MINH CITY SECURITIES CORPORATION (HSC) Hochiminh City Securities Corporation (HSC) HEAD OFFICE Level 5 & 6, AB Tower, 76 Le Lai St., Ben Thanh Ward, District 1, HCMC, Vietnam T: (+84 8) 3823 3299 F: (+84 8) 3823 3301 E: info@hsc.com.vn W: www.hsc.com.vn

More information

Decree No.15/2015/ND-CP dated 14/02/2015 on Public Private Partnership Investment (PPP) (Effective from 10/4/2015)

Decree No.15/2015/ND-CP dated 14/02/2015 on Public Private Partnership Investment (PPP) (Effective from 10/4/2015) Decree No.15/2015/ND-CP dated 14/02/2015 on Public Private Partnership Investment (PPP) (Effective from 10/4/2015) 1 Old legal framework on PPP Decision No. 71/2010/QD-TTg on pilot PPP Projects Decree

More information

LAW ON ENTERPRISE INCOME TAX. (No. 09/2003/QH11 of June 17, 2003)

LAW ON ENTERPRISE INCOME TAX. (No. 09/2003/QH11 of June 17, 2003) THE NATIONAL ASSEMBLY Số: 09/2003/QH11 CỘNG HOÀ XÃ HỘI CHỦ NGHĨA VIỆT NAM Độc lập - Tự do - Hạnh phúc ----- o0o ----- Hà Nội, Ngày 17 tháng 06 năm 2003 LAW ON ENTERPRISE INCOME TAX (No. 09/2003/QH11 of

More information

RESETTLEMENT POLICY FRAMEWORK

RESETTLEMENT POLICY FRAMEWORK Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RESETTLEMENT POLICY FRAMEWORK HURRICANE TOMAS EMERGENCY RECOVERY PROJECT Saint Lucia

More information

LAW ON INVESTMENT TABLE OF CONTENTS

LAW ON INVESTMENT TABLE OF CONTENTS LAW ON INVESTMENT TABLE OF CONTENTS CHAPTER I... 1 General Provisions... 1 Article 1 Governing scope... 1 Article 2 Applicable entities... 1 Article 3 Interpretation of terms... 1 Article 4 Policies on

More information

LAW ON INVESTMENT. National Assembly of the Socialist Republic of Vietnam Legislature XI, 8 th Session

LAW ON INVESTMENT. National Assembly of the Socialist Republic of Vietnam Legislature XI, 8 th Session NATIONAL ASSEMBLY No. 59-2005-QH11 SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness LAW ON INVESTMENT National Assembly of the Socialist Republic of Vietnam Legislature XI, 8 th Session

More information

SOCIALIST REPUBLIC OF VIETNAM CONSTRUCTION. Independence - Freedom - Happiness

SOCIALIST REPUBLIC OF VIETNAM CONSTRUCTION. Independence - Freedom - Happiness THE MINISTRY OF SOCIALIST REPUBLIC OF VIETNAM CONSTRUCTION Independence - Freedom - Happiness -------- --------------- No. 1/213/TT-BXD Hanoi, February 8 th 213 CIRCULAR GUIDING THE CALCULATION AND MANAGEMENT

More information

SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom Happiness No. 65/2013/ND-CP Hanoi, June 27, 2013 DECREE

SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom Happiness No. 65/2013/ND-CP Hanoi, June 27, 2013 DECREE THE GOVERNMENT ------- SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom Happiness --------- No. 65/2013/ND-CP Hanoi, June 27, 2013 DECREE DETAILING A NUMBER OF ARTICLES OF THE LAW ON PERSONAL INCOME

More information

Legal news. Contents. Vision & Associates A TTORNEYS. PATENT & T RADEMARK A GENTS. I NVESTMENT & BUSINESS C ONSULTANTS.

Legal news. Contents. Vision & Associates A TTORNEYS. PATENT & T RADEMARK A GENTS. I NVESTMENT & BUSINESS C ONSULTANTS. A TTORNEYS. PATENT & T RADEMARK A GENTS. I NVESTMENT & BUSINESS C ONSULTANTS Legal news Contents HIGHLIGHTED UPDATES... 2 Other Sectors... 6 Banking - Finance... 6 Taxation... 6 Trade... 6 Labour... 7

More information

THE NATIONAL ASSEMBLY

THE NATIONAL ASSEMBLY THE NATIONAL ASSEMBLY -------- SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness --------------- Law No. 67/2014/QH13 Hanoi, November 26, 2014 LAW ON INVESTMENT Pursuant to Constitution

More information

AFG: Transport Network Development Investment Program Proposed Tranche 2 (Paktika Economic Corridor: Sar Hawzar Orgun/ Rabat Shkin Roads Subproject)

AFG: Transport Network Development Investment Program Proposed Tranche 2 (Paktika Economic Corridor: Sar Hawzar Orgun/ Rabat Shkin Roads Subproject) Resettlement Plan November 2012 AFG: Transport Network Development Investment Program Proposed Tranche 2 (Paktika Economic Corridor: Sar Hawzar Orgun/ Rabat Shkin Roads Subproject) Prepared by Ministry

More information

Legal news. Contents. Vision & Associates A TTORNEYS. PATENT & TRADEMARK A GENTS. I NVESTMENT & MANAGEMENT C ONSULTANTS.

Legal news. Contents. Vision & Associates A TTORNEYS. PATENT & TRADEMARK A GENTS. I NVESTMENT & MANAGEMENT C ONSULTANTS. A TTORNEYS. PATENT & TRADEMARK A GENTS. I NVESTMENT & MANAGEMENT C ONSULTANTS Legal news Contents HIGH LIGHT... 2 Other Sectors... 7 Banking...7 Taxation...7 Trade...7 Transport...8 Construction...8 Interior

More information

THE PRIME MINISTER THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness. No. 504/QD-TTg Hanoi, 21 April 2010

THE PRIME MINISTER THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness. No. 504/QD-TTg Hanoi, 21 April 2010 THE PRIME MINISTER THE SOCIALIST REPUBLIC OF VIETNAM ----- Independence Freedom Happiness -------------------------------- No. 504/QD-TTg Hanoi, 21 April 2010 DECISION On Approval of the National Mine

More information

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT Himachal Pradesh Clean Energy Transmission Investment Program (RRP IND 43464) TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT A. INTRODUCTION 1. The

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

Legal news. Contents. Vision & Associates A TTORNEYS. PATENT & T RADEMARK A GENTS. I NVESTMENT & M ANAGEMENT C ONSULTANTS.

Legal news. Contents. Vision & Associates A TTORNEYS. PATENT & T RADEMARK A GENTS. I NVESTMENT & M ANAGEMENT C ONSULTANTS. A TTORNEYS. PATENT & T RADEMARK A GENTS. I NVESTMENT & M ANAGEMENT C ONSULTANTS Legal news Contents Investment Law...2 Other Sectors...5 Finance... 6 Banking... 6 Import Export... 6 Health care... 6 Labor...

More information

No.: 40/2018/ND-CP Hanoi, on March 12, DECREE on management of business activities under multi-level method

No.: 40/2018/ND-CP Hanoi, on March 12, DECREE on management of business activities under multi-level method THE GOVERNMENT SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No.: 40/2018/ND-CP Hanoi, on March 12, 2018 DECREE on management of business activities under multi-level method Pursuant

More information

Legal news. Contents. Vision & Associates A TTORNEYS. PATENT & T RADEMARK A GENTS. I NVESTMENT & B USINESS C ONSULTANTS.

Legal news. Contents. Vision & Associates A TTORNEYS. PATENT & T RADEMARK A GENTS. I NVESTMENT & B USINESS C ONSULTANTS. A TTORNEYS. PATENT & T RADEMARK A GENTS. I NVESTMENT & B USINESS C ONSULTANTS Legal news Contents HIGHLIGHTED... 2 Other Sectors... 6 Finance... 6 Taxation... 6 Trade... 7 Labour... 8 Education... 9 Health...

More information

Legal news. Contents. August 2007

Legal news. Contents. August 2007 A T T O R N E Y S. P A T E N T & T R A D E M A R K A G E N T S. I N V E S T M E N T & M A N A G E M E N T C O N S U L T A N T S Legal news Contents BANKING LAW... 2 ENTERPRISE LAW... 4 Other Sectors...

More information

MINISTRY OF PLANNING AND INVESMENT PUBLIC PROCUREMENT AGENCY OVERVIEW OF PPP IN VIET NAM

MINISTRY OF PLANNING AND INVESMENT PUBLIC PROCUREMENT AGENCY OVERVIEW OF PPP IN VIET NAM MINISTRY OF PLANNING AND INVESMENT PUBLIC PROCUREMENT AGENCY OVERVIEW OF PPP IN VIET NAM HCM city, 22 May 2018 1 Content 1. PPP decree and Investor selection decree 2. Overview of potential projects 2

More information

Socialist Republic of Viet Nam: Sustainable Rural Infrastructure Development Project in Northern Mountain Provinces

Socialist Republic of Viet Nam: Sustainable Rural Infrastructure Development Project in Northern Mountain Provinces Sustainable Rural Infrastructure Development Project in Northern Mountain Provinces (RRP VIE 41461) Project Administration Manual Project Number: 41461 Loan and/or Grant Number(s): 30 September 2010 Socialist

More information

Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project

Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project Validation Report Reference Number: PCV: PHI 2011-15 Project Number: 35379 Loan Number: 2012 July 2011 Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project Independent

More information

ORDINANCE ON MEASURES AGAINST SUBSIDIZED PRODUCTS IMPORTED INTO VIETNAM

ORDINANCE ON MEASURES AGAINST SUBSIDIZED PRODUCTS IMPORTED INTO VIETNAM STANDING COMMITTEE OF NATIONAL ASSEMBLY SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No. 22-2004-PL-UBTVQH11 ORDINANCE ON MEASURES AGAINST SUBSIDIZED PRODUCTS IMPORTED INTO VIETNAM

More information