LIFE CYCLE MANAGEMENT OF ROAD ASSETS (Emphasis on Long Life Pavements)
|
|
- Percival Barton
- 5 years ago
- Views:
Transcription
1 14 th INTERNATIONAL FLEXIBLE PAVEMENTS CONFERENCE LIFE CYCLE MANAGEMENT OF ROAD ASSETS (Emphasis on Long Life Pavements) Prepared for Master Class / Workshops In Sydney, Melbourne and Brisbane September and October, 2011 Ralph Haas University of Waterloo Canada
2 LIFE CYCLE MANAGEMENT OF ROAD ASSETS (WITH EMPHASIS ON LONG LIFE PAVEMENTS) Background Notes Master Class/Workshops Sydney, Melbourne and Brisbane October, 2011 Dr. Ralph Haas, CM, FRSC, FCAE The Norman W. McLeod Engineering Professor and Distinguished Professor Emeritus University of Waterloo, Canada
3 TOPICS Assessing road assets Fundamentals of life cycle analysis Example of LCA for long life pavement design Performance indicators Sustainability and Green Roads User costs, noise, emissions Recommendations
4 Category ROAD ASSETS Type Long Term Perf. Based Contract Fixed and Within ROW Unfixed and Fixed Outside ROW Other Assets Pavements Bridges. WIMS Buildings. Veh./Equipment People. Software, etc. Most types included Some may be sold or leased Mainly contractor responsibility
5 ASSESSING ROAD INFRASTRUCTURE Physical Condition (smoothness, structural distress, level of service, etc.) Asset value (depending on accounting base and method) Other (litter control, vegetation, lighting, etc.) and Environmental impacts, sustainability, user costs, noise, energy consumption, emissions
6 ASSESSMENT OF A LARGE INTERURBAN ROAD NETWORK Interurban Percent of km 40.00% 35.00% 30.00% 25.00% 20.00% 15.00% 10.00% 5.00% 0.00% IRI <=1 1>IRI <= >IRI<=2 IRI>2 V.Good Good Fair Poor
7 ESSENTIAL TECHNICAL REQUIREMENTS LONG LIFE / PERPETUAL PAVEMENTS Include: Good materials and their characterization, good design, construction and maintenance, and. Very Importantly Structural analysis methodology and Performance prediction methodology For M-E Design
8 FUNDAMENTALS E 1,h 1 P (4) (5) (1) (4) (2) (3) AC Layer P, Wheel load (1) Radius of loaded area (2) Tire pressure (may not be uniform) E 2,h 2 E 3,h 3 (6) Base Layer (3) Surface tensile stress or strain (4) Lateral shear strain or deformation (5) Tensile strain or stress at bottom of AC layer MECHANISTIC PART E S,h 4 Subgrade (6) Vertical stress, strain or deflection at surface of subgrade Relation / Correlation Between Fundamental Pavement Response(s) and Pavement Performance Measure of Serviceability or Deterioration Minimum Acceptable Life-Cycle Period EMPIRICAL PART Age and/or Accumulated Loads
9 FACTORS AFFECTING PERFORMANCE ENVIRONMENT Moisture Temperature (Min., Max, º Radiation Days, etc.) Freeze-thaw Cycles Layer Thicknesses Layer Types & Properties STRUCTURE Subgrade Type & Properties Variations in Thickness & Properties Measure of Serviceability or Deterioration Minimum Acceptable Life-Cycle Period Timing Methods CONSTRUCTION As-Built Quality Variance Axle Group Loads Tire Types & Pressures TRAFFIC Axle Spacing, Speed, Repetitions Age and/or Accumulated Loads Treatments Timing MAINTENANCE Methods Quality
10 LIFE CYCLE ANALYSIS Require: LOS vs Age (Performance) Model Cost / Cash Flow Calculation (eg. PW) Asset Value vs Age Calculation Risk Analysis Life-Cycle Period Level of Service (LOS) Minimum Acceptable Age
11 METHODS OF LCCA 1. Benefits / Cost Ratio * 2. Internal Rate of Return 3. Equivalent Uniform Annual Costs 4. Cost-Effectiveness 5. Present Worth Which Method is Best for Infrastructure? (applicability, understanding, consistency)
12 APPLICABILITY OF LCCA METHODS: HIGHWAYS Arterials Expressways Public Private Public Private Short Term C/E PWC AC IRR IRR C/E PWC IRR IRR Medium Term C/E PWC AC IRR IRR C/E IRR IRR Long Term IRR IRR
13 INTERNAL RATE OF RETURN METHOD 0 n LC Discount rate at which costs and benefits of an investment are equal (NPV x1 = PWB x2,n - PWC x1,n = 0)
14
15 RATE OF RETURN EXAMPLE Multi-lane urban bypass 50 year life cycle See Transp. Assoc. of Canada Proc Financial Feasibility of an ETR? Two long-life (50 year) pavement designs: A. Heavy duty flexible pavement B. Plain jointed PCCP Cost estimates, traffic estimates, toll charge scheme, rehabilitation and maintenance interventions schedule, etc. in TAC Proc.
16 RATE OF RETURN EXAMPLE NPV ($ x 10 6 ) / lane - km for i = Altern. 5% 12% 20% A (Flex.) B (PCC) NPV = 0 at IRR ~ 16%
17 PERFORMANCE INDICATORS FOR PROPERLY FUNCTIONING ASSET MANAGEMENT SYSTEMS Excerpts From: Ralph Haas Susan Tighe Lynne Cowe Falls ARRB Conference Cairns May, 2003
18 OBJECTIVES OF PERFORMANCE INDICATORS Assessing condition, function and safety, (smoothness, structural distress, level of service, mobility, etc.) Asset value (depending on accounting base and method) Monitoring effectiveness of policies Providing information to users Resource allocation tool Diagnostic tool and more...
19 EXAMPLES Policy Objective Quality of Service to Users Safety Goals Preservation of Investment Performance Indicator Network smoothness (% good, fair or poor) Annual user costs ($/km) Provision of mobility (ave. speed by road class) Accident reductions (%) Asset value of road network ($) Implementation Target 90% + fair or better Increase CPI > 50% speed limit Fatalities and injuries by 1% annually Increase of 0.5% annually
20 What is Sustainable Transportation... A balance between transportation s economic and social benefits vs. the need to protect the environment.. Simply put - Do things today that don t Screw up the Future Short Term (10 to 30 Years) Medium Term (30 to 70 Years) Long Term (70 to 100 Years+)
21
22 USER COSTS Delays due to maintenance and rehabilitation Vehicle operating costs Accidents Discomfort, etc.
23 USER DELAY COST FACTORS: Delay time and value(s) of time Traffic volume Types and percent of vehicles Speed Road capacity Traffic control plan Length of work zone Geometric characteristics
24 EXAMPLE (Pavement) Sh. Sh. 7 m 3 m 3 m 1.5 m Plan 1: Stop and go (flag person) Plan 2: Divert to shoulder 4 days Paving AADT Plan 1 UDC Plan 2 UDC 5,000 $40,000 $420 10,000 $550,000 $190,000
25 May 2004 POSITION PAPER The European Union Road Federation
26
27
28 RECOMMENDATIONS: LONG LIFE/PERPETUAL PAVEMENTS First and foremost, the right engineering for materials, structural design, construction and ongoing maintenance and Long life performance models
29 RECOMMENDATIONS Continued Specifically adapted life cycle analysis model Specifically adapted performance indicators Specifically adapted Green Roads rating system Comprehensive energy consumption and emissions model
TECHNICAL AND ECONOMIC BASE REQUIREMENTS FOR EFFECTIVE ASSET MANAGEMENT
14 th INTERNATIONAL FLEXIBLE PAVEMENTS CONFERENCE SYDNEY 25-28 September, 201 1 TECHNICAL AND ECONOMIC BASE REQUIREMENTS FOR EFFECTIVE ASSET MANAGEMENT Ralph Haas University of Waterloo Canada u Introduction
More informationBEYOND CONVENTIONAL LCCA: LONG TERM RETURN ON PAVEMENT INVESTMENTS
BEYOND CONVENTIONAL LCCA: LONG TERM RETURN ON PAVEMENT INVESTMENTS Ralph Haas, The Norman W. McLeod Engineering Professor and Distinguished Professor Emeritus University of Waterloo haas@uwaterloo.ca Susan
More informationIncluding Maintenance & Rehabilitation Schedules
Final Report Methodology for the Development of Equivalent Structural Design Matrix for Municipal Roadways- Montréal and Québec City Including Maintenance & Rehabilitation Schedules and Life Cycle Analysis
More informationLong-Term Monitoring of Low-Volume Road Performance in Ontario
Long-Term Monitoring of Low-Volume Road Performance in Ontario Li Ningyuan, P. Eng. Tom Kazmierowski, P.Eng. Becca Lane, P. Eng. Ministry of Transportation of Ontario 121 Wilson Avenue Downsview, Ontario
More informationIncluding Maintenance & Rehabilitation Schedules
Final Report Methodology for the Development of Equivalent Structural Design Matrix for Municipal Roadways- Including Maintenance & Rehabilitation Schedules and Life Cycle Analysis Prepared for: Cement
More informationHighway Engineering-II
Highway Engineering-II Chapter 7 Pavement Management System (PMS) Contents What is Pavement Management System (PMS)? Use of PMS Components of a PMS Economic Analysis of Pavement Project Alternative 2 Learning
More informationIncluding Maintenance & Rehabilitation Schedules
Final Report Methodology for the Development of Equivalent Structural Design Matrix for Municipal Roadways- Ontario Including Maintenance & Rehabilitation Schedules and Life Cycle Analysis Prepared for:
More informationOPTIMIZATION OF ROAD MAINTENANCE AND REHABILITATION ON SERBIAN TOLL ROADS
Paper Nº ICMP123 8th International Conference on Managing Pavement Assets OPTIMIZATION OF ROAD MAINTENANCE AND REHABILITATION ON SERBIAN TOLL ROADS Goran Mladenovic 1*, Jelena Cirilovic 2 and Cesar Queiroz
More informationIncorporating Variability into Life Cycle Cost Analysis and Pay Factors for Performance-Based Specifications
Incorporating Variability into Life Cycle Cost Analysis and Pay Factors for Performance-Based Specifications Leanne Whiteley, BASc. MASc Candidate Susan Tighe, Ph.D., P.Eng. Canada Research Chair in Pavement
More informationLife-Cycle Cost Analysis: A Practitioner s Approach
Life-Cycle Cost Analysis: A Practitioner s Approach FHWA Office of Performance Management 1 Topics Fundamentals of Economic Analysis Tools and resources What to do now 2 Learning Objectives By the end
More informationHDM-4 Applications. Project Appraisal. Project Formulation. Maintenance Policy Optimization. Road Works Programming. Network Strategic Analysis
HDM-4 Applications HDM-4 Applications Project Appraisal Project Formulation Maintenance Policy Optimization Road Works Programming Network Strategic Analysis Standards & Policies 2 Project Appraisal Concerned
More informationImplementing the MTO s Priority Economic Analysis Tool
Implementing the MTO s Priority Economic Analysis Tool presented at 6th National Conference on Transportation Asset Management presented by Alison Bradbury Ontario Ministry of Transportation November 2,
More informationDevelopment Practices for Municipal Pavement Management Systems Application
Development Practices for Municipal Pavement Management Systems Application Mehran Kafi Farashah, MASc., EIT, University of Waterloo Dr. Susan L. Tighe, PhD, PEng, University of Waterloo Paper prepared
More informationEconomic Analysis Concepts
Economic Analysis Concepts Questions & Decisions (1) Is the project justified?- Are benefits greater than costs? Which is the best investment if we have a set of mutually exclusive alternatives? If funds
More informationEVALUATION OF EXPENDITURES ON RURAL INTERSTATE PAVEMENTS IN KANSAS
EXECUTIVE SUMMARY EVALUATION OF EXPENDITURES ON RURAL INTERSTATE PAVEMENTS IN KANSAS by Stephen A. Cross, P.E. Associate Professor University of Kansas Lawrence, Kansas and Robert L. Parsons, P.E. Assistant
More informationRoads Economic Decision Model (RED)
Roads Economic Decision Model (RED) March 2006 Rodrigo Archondo-Callao The World Bank RED Objectives Simplify the economic evaluation of unpaved roads Better capture the economic benefits of a project
More informationin Pavement Design In Search of Better Investment Decisions Northwest Pavement Management Association 2016 Conference Jim Powell, P.E.
Life Cycle Cost Analysis in Pavement Design In Search of Better Investment Decisions Northwest Pavement Management Association 2016 Conference Jim Powell, P.E. What is it? Economic procedure That uses
More informationCBA of transport infrastructure projects in Germany
CBA of transport infrastructure projects in Germany Dr. Catharina Horn Federal Transport Infrastructure Planning, Investment Policy Paris, 27th of February 2014 www.bmvi.de 1. The Federal Transport Infrastructure
More informationTHE ROAD TO ECONOMIC GROWTH
THE ROAD TO ECONOMIC GROWTH Introduction 1. As in many countries, the road sector accounts for the major share of domestic freight and inter-urban passenger land travel in Indonesia, playing a crucial
More informationA guide on the basic principles of Life-Cycle Cost Analysis (LCCA) of pavements
EUROPEAN CONCRETE PAVING ASSOCIATION A guide on the basic principles of Life-Cycle Cost Analysis (LCCA) of pavements EUROPEAN CONCRETE PAVING ASSOCIATION CONTENTS Preface 3 1 - Scope 4 2 - Introduction
More informationNorfolk County Asset Management Plan Roads
Norfolk County Asset Management Plan Roads An overview of the County s Asset Management Practices based on the Ontario Ministry of Infrastructure s Building Together Initiative Prepared for: Norfolk County
More informationInteMat4PMS. Integration of material-science based performance models into life-cycleanalysis processed in the frame of pavement management systems
InteMat4PMS Integration of material-science based performance models into life-cycleanalysis processed in the frame of pavement management systems Technische Universität Braunschweig PMS-Consult GmbH Vienna
More informationTransportation Economics and Decision Making. Lecture-11
Transportation Economics and Decision Making Lecture- Multicriteria Decision Making Decision criteria can have multiple dimensions Dollars Number of crashes Acres of land, etc. All criteria are not of
More informationDraft Environmental Impact Statement. Appendix G Economic Analysis Report
Draft Environmental Impact Statement Appendix G Economic Analysis Report Appendix G Economic Analysis Report Economic Analyses in Support of Environmental Impact Statement Carolina Crossroads I-20/26/126
More informationHazim M Abdulwahid, MSC, MBA Hazim Consulting
Road Map for Establishing Pavement Maintenance Management System on the Strategic Level 13 th International O&M Conference in the Arab Countries,17-19 Nov 2015 Hazim M Abdulwahid, MSC, MBA Hazim Consulting
More informationEffective Use of Pavement Management Programs. Roger E. Smith, P.E., Ph.D. Zachry Department of Civil Engineering Texas A&M University
Effective Use of Pavement Management Programs Roger E. Smith, P.E., Ph.D. Zachry Department of Civil Engineering Texas A&M University 1 Pavement Management Is A Decision Making Process Effective Pavement
More informationAsset Management. Linking Levels of Service and Lifecycle Management Strategies Andrew Grunda Peter Simcisko
Asset Management Linking Levels of Service and Lifecycle Management Strategies Andrew Grunda Peter Simcisko 1 Introduction Topics that we will address today Review of Ontario Regulation 588/17 Defining
More informationBANTAY LANSANGAN: ROAD SECTOR REPORT CARD (09 Nov 06)
BANTAY LANSANGAN: ROAD SECTOR REPORT CARD (09 Nov 06) CLUSTER / INDICATOR A. SYSTEM/NETWORK DESCRIPTION 1. Overall Philippine Road Network (For information): National Roads 28,805 km Provincial Roads 27,076
More informationProject 06-06, Phase 2 June 2011
ASSESSING AND INTERPRETING THE BENEFITS DERIVED FROM IMPLEMENTING AND USING ASSET MANAGEMENT SYSTEMS Project 06-06, Phase 2 June 2011 Midwest Regional University Transportation Center College of Engineering
More informationThe Cost of Pavement Ownership (Not Your Father s LCCA!)
The Cost of Pavement Ownership (Not Your Father s LCCA!) Mark B. Snyder, Ph.D., P.E. President and Manager Pavement Engineering and Research Consultants, LLC 57 th Annual Concrete Paving Workshop Arrowwood
More informationECONOMIC ANALYSIS. A. Introduction
Bridge Replacement for Improved Rural Access Sector Project (RRP PNG 43200) ECONOMIC ANALYSIS A. Introduction 1. The economic analysis of the proposed project has been carried out in accordance with ADB
More informationGlossary Candidate Roadway Project Evaluation Form Project Scoring Sheet... 17
Kitsap County Public Works Transportation Project Evaluation System 2017 Table of Contents Introduction... 1 Four-Tier system... 4 Tier 1 - Transportation Improvement Program (TIP)... 4 Tier 2 Prioritized
More informationA PROCEDURAL DOCUMENT DESCRIBING THE PROCESS OF DEVELOPING THE 4-YEAR PLAN
5-9035-01-P8 A PROCEDURAL DOCUMENT DESCRIBING THE PROCESS OF DEVELOPING THE 4-YEAR PLAN Authors: Zhanmin Zhang Michael R. Murphy TxDOT Project 5-9035-01: Pilot Implementation of a Web-based GIS System
More informationFOR HISTORICAL REFERENCE ONLY
To: Distribution 57, 612, 618, 650 From: Subject: MINNESOTA DEPARTMENT OF TRANSPORTATION Policy, Safety, and Strategic Initiatives Division Technical Memorandum No. 10-04-MAT-01 Khani Sahebjam Deputy Commissioner
More informationPrioritising bridge replacements
Prioritising bridge replacements Andrew Sonnenberg, National Bridge Engineering Manager, Pitt&Sherry ABSTRACT Road and Rail managers own a variety of assets which are aging and will need replacement. There
More informationCOST BENEFIT ANALYSIS OF CHENNAI PERIPHERAL ROAD
COST BENEFIT ANALYSIS OF CHENNAI PERIPHERAL ROAD 1 Introduction The objective of the cost benefit economic analysis is to identify and quantify the benefits and costs associated with the project. This
More informationTransition from Manual to Automated Pavement Distress Data Collection and Performance Modelling in the Pavement Management System
Transition from Manual to Automated Pavement Distress Data Collection and Performance Modelling in the Pavement Management System Susanne Chan Pavement Design Engineer, M.A.Sc, P.Eng. Ministry of Transportation
More informationEffective Infrastructure Management Solutions Using the Analytic Hierarchy Process and Municipal DataWorks (MDW)
Effective Infrastructure Management Solutions Using the Analytic Hierarchy Process and Municipal DataWorks (MDW) James Smith, Ph.D., E.I.T Member Services/Infrastructure Coordinator Ontario Good Roads
More informationResidential Street Improvement Plan
Residential Street Improvement Plan Introduction Aging infrastructure, including streets, is a nationwide problem and it is one of the biggest challenges facing many cities and counties throughout the
More informationState of the Industry
Florida Department of TRANSPORTATION State of the Industry Howie Moseley State Bituminous Materials Engineer State Highway System 43,920 lane miles of roadway 8,242 interstate lane miles 33,465 arterial
More informationStrategy for the Development of Investment Decision-Making Framework for Road Asset Management for Queensland Department of Main Roads
Strategy for the Development of Investment Decision-Making Framework for Road Asset Management for Queensland Department of Main Roads By: Noppadol Piyatrapoomi, Arun Kumar, Neil Robertson and Justin Weligamage
More informationIn light of tougher current economic realities, public
Long-Term Cost-Benefit Analysis of Pavement Management System Implementation Lynne Cowe Falls, Pavement Management Systems, Canada S. Khalil, Alberta Department of Transportation and Utilities, Canada
More informationAPPENDIX E: ATM MODEL TECH MEMORANDUM. Metropolitan Council Parsons Brinckerhoff
APPENDIX E: ATM MODEL TECH MEMORANDUM Metropolitan Council Parsons Brinckerhoff Metropolitan Highway System Investment Study Evaluation of Active Traffic Management Strategies Prepared by: Parsons Brinckerhoff
More informationSTUDY OF METHODS OF ROAD CAPITAL COST ESTIMATION AND ALLOCATION BY CLASS OF USER IN AUSTRIA, GERMANY AND SWITZERLAND
TP 14494 STUDY OF METHODS OF ROAD CAPITAL COST ESTIMATION AND ALLOCATION BY CLASS OF USER IN AUSTRIA, GERMANY AND SWITZERLAND FINAL REPORT March 24, 2005 by FRANZISKA BORER BLINDENBACHER Economist - Transport
More informationMulti-Objective Optimization Model using Constraint-Based Genetic Algorithms for Thailand Pavement Management
Multi-Objective Optimization Model using Constraint-Based Genetic Algorithms for Thailand Pavement Management Pannapa HERABAT Assistant Professor School of Civil Engineering Asian Institute of Technology
More informationECONOMIC AND FINANCIAL ANALYSIS
Bihar New Ganga Bridge Project (RRP IND 48373) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The proposed project is to build a new six-lane bridge across the Ganges River near Patna in the state
More informationLCCA Design and Maintenance
LCCA Design and Maintenance John Cunningham Iowa Concrete Paving Association ASCE Conference November 6, 2013 www.iowaconcretepaving.org Life Cycle Cost Analysis Life cycle cost analysis (LCCA) is an economic
More informationNCHRP Consequences of Delayed Maintenance
NCHRP 14-20 Consequences of Delayed Maintenance Recommended Process for Bridges and Pavements prepared for NCHRP prepared by Cambridge Systematics, Inc. with Applied Research Associates, Inc. Spy Pond
More informationMaster Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.
, Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...
More informationMoDOT Dashboard. Measurements of Performance
MoDOT Dashboard Measurements of Performance 1997 1998 1999 2000 2001 2002 MoDOT Dashboard Executive Summary Performance measurement is not new to MoDOT. In July 2001, MoDOT staff began completing quarterly
More informationAN INNOVATIVE APPROACH TO MECHANISTIC EMPIRICAL PAVEMENT DESIGN
University of Kentucky UKnowledge Theses and Dissertations--Civil Engineering Civil Engineering 2012 AN INNOVATIVE APPROACH TO MECHANISTIC EMPIRICAL PAVEMENT DESIGN Ronnie Clark Graves II University of
More informationJune 2006 Technical Memorandum: UCPRC-TM Authors: Venkata Kannekanti and John Harvey
June 2006 Technical Memorandum: Sample Rigid Pavement Design Tables Based on Version 0.8 of the Mechanistic Empirical Pavement Design Guide Authors: Venkata Kannekanti and John Harvey Partnered Pavement
More informationMinnesota Department of Transportation Report to Legislature on Life-Cycle Cost Analyses. January 2013
This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp Minnesota Department
More informationECONOMIC AND FINANCIAL ANALYSIS
Additional Financing of National Motorway M-4 Gojra Shorkot Khanewal Section Project (RRP PAK 48402) ECONOMIC AND FINANCIAL ANALYSIS A. General 1. Roads are the main mode of transport in Pakistan, accounting
More informationCONSTRUCTION OF THE BYPASS OF 3 VILLAGES ALONG THE M3 NATIONAL ROAD CHISINAU- GIURGIULESTI
TRACECA PROJECT FICHE CONSTRUCTION OF THE BYPASS OF 3 VILLAGES ALONG THE M3 NATIONAL ROAD CHISINAU- GIURGIULESTI 1. BASIC INFORMATION TITLE: Construction of the bypass of 3 villages along the M3 National
More informationCity of Glendale, Arizona Pavement Management Program
City of Glendale, Arizona Pavement Management Program Current Year Plan (FY 2014) and Five-Year Plan (FY 2015-2019) EXECUTIVE SUMMARY REPORT December 2013 TABLE OF CONTENTS TABLE OF CONTENTS I BACKGROUND
More informationTransfer of Federal Gas Tax Revenues Under the New Deal for Cities and Communities. Municipal Funding Agreement Guide.
Transfer of Federal Gas Tax Revenues Under the New Deal for Cities and Communities Municipal Funding Agreement Guide January 2010 Administered by: Association of Municipalities of Ontario 200 University
More informationTechnical Assistance Consultant s Report
Technical Assistance Consultant s Report Project Number: 46370-001 November 2015 Republic of the Union of Myanmar: Developing the Asset Management Program for Myanmar Roads (Financed by the Japan Fund
More informationHIGHWAY PROGRAMING, INFORMATION MANAGEMENT EVALUATION METHODS
HIGHWAY PROGRAMING, INFORMATION MANAGEMENT EVALUATION METHODS Kumares C. Sinha, Purdue University Cf. Enhancing Highway Safety Through Engineering Management, Transportation Research Board, Final Report
More informationSECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT
A. Sector Road Map Road Improvement and Institutional Development Project (RRP PHI 41076) SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT 1. Sector Performance, Problems and Opportunities 1. Roads provide
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT PERFORMANCE WARRANTY. CFS:EMC 1 of 7 APPR:KPK:DBP: FHWA:APPR:
MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT PERFORMANCE WARRANTY CFS:EMC 1 of 7 APPR:KPK:DBP:12-07-12 FHWA:APPR:12-18-12 a. Description. The pavement performance warranty consists
More informationSECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN)
Second Jharkhand State Road Project (RRP IND 49125) SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN) A. Sector Performance, Problems, and Opportunities 1. State context. The state of Jharkhand was
More informationSection 4c. Our services: Land transport
Section 4c Our services: Land transport Land transport LAND TRANSPORT Local roads and footpaths Bridges Road safety Amenities Contribution to public transport Cycle ways Our land transport activity is
More informationSMEC PAVEMENT MANAGEMENT AND ROAD INVENTORY SYSTEM. Frequently Asked Questions
SMEC PAVEMENT MANAGEMENT AND ROAD INVENTORY SYSTEM Frequently Asked Questions SMEC COMPANY DETAILS SMEC Australia Pty Ltd Sun Microsystems Building Suite 2, Level 1, 243 Northbourne Avenue, Lyneham ACT
More informationDMP (Decision Making Process)
DMP (Decision Making Process) Office of Systems Analysis Planning Road School March 7, 2007 Driving Indiana s Economic Growth *** Please note: This is derived from the United States Military Decision Making
More informationUNIFIED TRANSPORTATION PROGRAM
2002 UNIFIED TRANSPORTATION PROGRAM Blank Page SUMMARY OF CATEGORIES CATEGORIES NUMBER, NAME AND YEAR ESTABLISHED PROGRAMMING AUTHORITY FUNDING BANK BALANCE (Yes/) RESPONSIBLE ENTITY RANKING INDEX OR ALLOCATION
More informationGLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade.
Glossary GLOSSARY Advanced Construction (AC): Authorization of Advanced Construction (AC) is a procedure that allows the State to designate a project as eligible for future federal funds while proceeding
More informationPOLICIES AND PROCEDURES FOR THE ISSUANCE OF SPECIAL HAULING PERMITS ON COUNTY MAINTAINED HIGHWAYS ASHLAND COUNTY, OHIO
POLICIES AND PROCEDURES FOR THE ISSUANCE OF SPECIAL HAULING PERMITS ON COUNTY MAINTAINED HIGHWAYS ASHLAND COUNTY, OHIO Adopted: Ashland County Commissioners 10/15/96 Ashland County Engineer 11/08/96 POLICIES
More informationMPO Staff Report Technical Advisory Committee: April 8, 2015 MPO Executive Board: April 15, 2015
MPO Staff Report Technical Advisory Committee: April 8, 2015 MPO Executive Board: April 15, 2015 RECOMMENDED ACTION: Approve the Final. RECOMMENDED ACTION from TAC: Accept the Final and include the NDDOT
More informationImproving Management Presentations
Southeastern States Equipment Managers Conference EMTSP Improving Management Presentations 2016 National Conference June 29, 2016 John F. White, PE 803 737 6675 Challenge You have a story to tell. The
More informationHarden Contributions Plan for Heavy Haulage Developments. Adopted by Council Resolution No. 277/11/11 16 th November, Prepared by.
Harden Contributions Plan for Heavy Haulage Developments Adopted by Council Resolution No. 277/11/11 16 th November, 2011 Prepared by newplan Urban Planning Solutions ABN 16 113 272 705 Member of the Planning
More informationFreight Rail Improvements Oklahoma City to Shawnee TIGER Grant Application Benefit Cost Analysis Technical Memo October 2009
Freight Rail Improvements Oklahoma City to Shawnee TIGER Grant Application Benefit Cost Analysis Technical Memo October 2009 Introduction The formal benefit cost analysis has been conducted using best
More informationTools & Methods for Monitoring Performance Results
Tools & Methods for Monitoring Performance Results Craig B. Newell Bureau of Transportation Planning Manager Michigan Department of Transportation Overview of MDOT s Tools & Methods for Monitoring Performance
More informationTable of Contents. Study Overview. Corridor Needs Analysis. Financial Strategies. Legislative Review
Table of Contents Study Overview Corridor Needs Analysis Climbing Lanes Additional Lane I-25/I-80 Cost Estimate ITS Truck Parking Financial Strategies Legislative Review 02 Study Overview The overall goal
More informationApplication in LIBERIA ROAD ASSET MANAGEMENT PROJECT
Application in LIBERIA ROAD ASSET MANAGEMENT PROJECT Kulwinder S Rao ESMAP RBF Conference Task Team Leader, AFTTR May 7, 2012 Washington DC 1 Content Introduction to Output & Performance Based Contracting
More informationPOLICIES AND PROCEDURES FOR TOLL COLLECTION AND ROADWAY OPERATIONS ON CCRMA FACILITIES
POLICIES AND PROCEDURES FOR TOLL COLLECTION AND ROADWAY OPERATIONS ON CCRMA FACILITIES Revised _9-8-2016 TABLE OF CONTENTS ARTICLE I TOLL COLLECTION OPERATIONS POLICY... 1 SECTION 1.1 PURPOSE... 1 SECTION
More informationMichigan s Roads Crisis: How Much Will It Cost to Maintain Our Roads and Bridges? 2014 Update
Michigan s Roads Crisis: How Much Will It Cost to Maintain Our Roads and Bridges? 2014 Update By Rick Olson, former State Representative Reporting analytical work performed by Gil Chesbro and Jim Ashman,
More informationCity of Mississauga Municipal Performance Measurements Program (MPMP) Results. For the period ending December 31, 2013
City of Mississauga Municipal Performance Measurements Program (MPMP) For the period ending December 31, Prepared by: Finance Division, Corporate Services Department City of Mississauga CITY OF MISSISSAUGA
More informationExamples of Decision Support Using Pavement Management Data
Examples of Decision Support Using Pavement Management Data John Coplantz, PE Pavement Management Engineer Oregon Department of Transportation October 27, 2016 Strategic Network (Tactical) Project (Operational)
More informationPMS: PUTTING THE DATA TO WORK. Judith Corley-Lay May 16, 2016
PMS: PUTTING THE DATA TO WORK Judith Corley-Lay May 16, 2016 Outline of Presentation Use of Open graded friction course in NC Data available in PMS Individual performance curves Overall performance of
More informationN O T I C E O F M E E T I N G
N O T I C E O F M E E T I N G T R A N S P O R T A N D I N F R A S T R U C T U R E A D V I S O R Y C O M M I T T E E M E E T I N G A Transport and Infrastructure Advisory Committee Meeting of Byron Shire
More information2016 PAVEMENT CONDITION ANNUAL REPORT
2016 PAVEMENT CONDITION ANNUAL REPORT January 2017 Office of Materials and Road Research Pavement Management Unit Table of Contents INTRODUCTION... 1 BACKGROUND... 1 DATA COLLECTION... 1 INDICES AND MEASURES...
More informationChapter 8: Lifecycle Planning
Chapter 8: Lifecycle Planning Objectives of lifecycle planning Identify long-term investment for highway infrastructure assets and develop an appropriate maintenance strategy Predict future performance
More informationHot Springs Bypass Extension TIGER 2017 Application. Benefit-Cost Analysis Methodology Summary
TIGER 2017 Application Overview This project proposes to extend the Hot Springs Bypass (US 70/US 270) from US 70 to State Highway 7 in Garland County, Arkansas. The 5.5 mile facility will initially consist
More informationLOCAL MAJOR BRIDGE PROGRAM
LOCAL MAJOR BRIDGE PROGRAM The Local Major Bridge Program provides federal funds to counties and municipal corporations for bridge replacement or bridge major rehabilitation projects. A Local Major Bridge
More informationGUNDAGAI SHIRE COUNCIL
GUNDAGAI SHIRE COUNCIL Contributions Plan in accordance with Section 94 of the Environmental Planning & Assessment Act 1979 Development generating heavy vehicle usage of local roads June 2015 Date of Adoption:
More informationA Report Prepared for the Highway 3 Twinning Development Association
A Report Prepared for the Highway 3 Twinning Development Association by Kien C. Tran, Ph.D. Professor Department of Economics University of Lethbridge Revised: April 22, 2017 I would like to take this
More informationPublic Disclosure Authorized CONFORMED COPY LOAN NUMBER 1236 IND. Public Disclosure Authorized LOAN AGREEMENT. (Fourth Highway Project)
Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1236 IND Public Disclosure Authorized Public Disclosure Authorized LOAN AGREEMENT (Fourth Highway Project) between REPUBLIC OF INDONESIA and INTERNATIONAL
More informationPUBLIC PRIVATE PARTNERSHIP IN THAILAND HIGHWAYS A CASE STUDY ON AN EXTENSION OF DONMUANG TOLLWAY PROJECT
PUBLIC PRIVATE PARTNERSHIP IN THAILAND HIGHWAYS A CASE STUDY ON AN EXTENSION OF DONMUANG TOLLWAY PROJECT Pruethipong Singhatiraj 1, Chatchai Chuangching 1 and Boonkua Janbanjong 1 1 Department of Highways,
More informationGOLDEN EARS BRIDGE. Alternative Transportation Financing ITE Quad Conference - May Fred Cummings Vice-President, Major Construction Projects
GOLDEN EARS BRIDGE Alternative Transportation Financing ITE Quad Conference - May 2009 Fred Cummings Vice-President, Major Construction Projects Golden Ears Bridge Project Context/Project Overview Project
More informationCity of La Habra Heights. Benefit Assessment Districts. June 6, Presented by Pablo Perez, Director
City of La Habra Heights Benefit Assessment Districts June 6, 2016 Presented by Pablo Perez, Director 1 BENEFIT ASSESSMENT DISTRICTS Proposition 218 Defines Special Benefit as Particular and distinct benefit
More informationTexas Department of Transportation Corpus Christi District
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens Advisory Committee Meeting January 11, 2012 Welcome
More informationCOUNTY OF LAMBTON ASSET MANAGEMENT PLAN 2013
COUNTY OF LAMBTON ASSET MANAGEMENT PLAN 2013 Pictures Key Front Cover Top Row 1) Administration Building Second Row, left to right 2) Brigden EMS Station 3) Judith & Norman Alix Art Gallery Third row,
More informationTESTIMONY. The Texas Transportation Challenge. Testimony Before the Study Commission on Transportation Financing
TESTIMONY The Texas Transportation Challenge Testimony Before the Study Commission on Transportation Financing Ric Williamson Chairman Texas Transportation Commission April 19, 2006 Texas Department of
More informationFlorida Department of Transportation INITIAL TRANSPORTATION ASSET MANAGEMENT PLAN
Florida Department of Transportation INITIAL TRANSPORTATION ASSET MANAGEMENT PLAN April 30, 2018 (This page intentionally left blank) Table of Contents Chapter 1 Introduction... 1-1 Chapter 2 Asset Management
More informationState of New York Office of the State Comptroller Division of Management Audit
State of New York Office of the State Comptroller Division of Management Audit NEW YORK STATE THRUWAY AUTHORITY IMPLEMENTATION OF THE 1988 CAPITAL PLAN REPORT 95-S-109 H. Carl McCall Comptroller State
More informationEconomic Implications of Selection of Long-Life versus Conventional Caltrans Rehabilitation Strategies for High-Volume Highways
Economic Implications of Selection of Long-Life versus Conventional Caltrans Rehabilitation Strategies for High-Volume Highways Draft report prepared for the CALIFORNIA DEPARTMENT OF TRANSPORTATION Division
More informationPerformance Measures for Making Pavement Preservation Decisions. David Luhr Pavement Management Engineer Washington State DOT
Performance Measures for Making Pavement Preservation Decisions David Luhr Pavement Management Engineer Washington State DOT 1 Performance Measures as Tools Project Decision Support - Where, When, and
More informationTHE HYBRID PERFORMANCE BASED PAVEMENT MANAGEMENT STRATEGY
THE HYBRID PERFORMANCE BASED PAVEMENT MANAGEMENT STRATEGY Travis Gilbertson, Opus International Consultants Ltd, Christchurch, NZ ABSTRACT Hybrid performance based road management and maintenance contracts
More informationProbabilistic comparison of seismic design response spectra
Special Workshop on Risk Acceptance and Risk Communication March 26-27, 27, Stanford University Probabilistic comparison of seismic design response spectra Sei ichiro Fukushima Senior researcher, Electric
More information