1 Public Procurement Office Jagiellonian University Ul. Gołębia 6/2, Kraków tel , fax lub ; The Public Procurement, as Project, is coo-financed by the European Union through the European Regional Development Fund and the state budget, under the Innovative Economy Operational Programme , Project No. POIG /09 /National Research Centre for Electromagnetic Radiation/ Priority 2. Infrastructure of area B+R Operation 2.1. Development of centres of high research potential Kraków, 17 th December 2013 SPECIFICATION OF ESSENTIAL TERMS AND CONDITIONS OF THE PUBLIC PROCUREMENT (hereinafter referred to as the SETCPP ) 1) Full name (company name) and address of the Purchaser. 1. Jagiellonian University, ul. Gołębia 24, Kraków. 2. Unit assigned to the Tender Procedure: 2.1 Public Procurement Office of the Jagiellonian University, ul. Gołębia 6/2, Kraków; tel ; fax lub ; bzp@uj.edu.pl website: place of publication of announcements and information: 2) Contract Award Procedure. 1. The procedure shall be carried out as an open tender, pursuant to the regulations under the Act of 29 January 2004 Public Procurement Law, hereinafter referred to as the PPL (consolidated text: Polish Journal of Laws of 2013, item 907, as amended), and the estimated value of this procurement is higher than so-called EU thresholds. 2. The Public Procurement procedure is conducted by the evaluation committee appointed to perform the procedure for the award of Public Procurement. 3. Provisions of the aforementioned Public Procurement Law (PPL) and regulations related thereto, enacted on the basis of the PPL, shall apply to actions undertaken by both the Purchaser and the prospective Contractors in connection with the procedure bzp@uj.edu.pl Page 1 of 55

2 aiming at awarding a Contract. With regard to issues not governed by that Law, the provisions of the Act of 23 April 1964, Civil Code (Polish Journal of Laws No. 16 item 93, as amended) shall apply. 3) Description of the Object of Public Procurement. 1. The Object of Public Procurement and of the prospective Contract is the selection of a Contractor for the delivery of three mirror chambers and one exit slit unit for the bending magnet beamline at National Synchrotron Radiation Center SOLARIS (hereinafter called: SOLARIS) in Krakow, together with installation of three mirror chambers (including installation of optical elements provided by the Purchaser) and performing of SAT. All actions related to the performance of the delivery on behalf of the Jagiellonian University, shall be performed by Synchrotron Radiation Center SOLARIS (hereinafter called SOLARIS). 1.1 The Public Procurement is coo-financed by the European Union through the European Regional Development Fund and the state budget, under the Innovative Economy Operational Programme , Project No. POIG /09 /National Research Centre for Electromagnetic Radiation Stage I/ Priority 2. Infrastructure of area B+R, Operation 2.1., Development of centres of high research potential. 2. The Contractor shall assure the performance of the contract within deadline indicated in point 4) of SETCP Before singing the contract the Contarctor shall submit the estimated time schedule with the phases: Final drawings, Manufacture, factory acceptance tests and delivery. 3. The Contractor shall offer the Object of the Public Procurement that is compliant with the requirements specified in the SETCPP especially according to technical and functional parameters defined in point 3)10. Bellow. 4. The Contractor shall assure the Object of the Public Procurement covered by a warranty valid for a period of at least 18 months from date of SAT, and not less than 24 months from the date of the delivery, depending on whichever comes first. The Contractor shall indicated the warranty period befor signing the contract. 5. The Contractor shall offer a lump sum price for delivery of the Object of the Public Procurement in the form of an individual calculation based on the provisions and requirements of the SETCPP. In particular, the Contractor shall indicate in his offer separate prices for different commercial items: a) vacuum chamber for collimating toroidal mirror with cooling, b) vacuum chamber for the focusing cylindrical mirror together with mirror s holding using in the future, c) vacuum chamber for refocusing toroidal mirror, d) exit slit unit, e) delivery of all chambers and installation and SAT of three mirrors (including installation of optical elements received from Purchaser). 6. In case the Contractor intends to employ subcontractors, the bid shall include a list with the scope of works assigned to those subcontractors (parts of the Object of the Contract). 7. The Contractor shall fill in and sign the bid form together with its appendixes, or submit an offer according to its content. Additionally the Contractor may sign and add to the offer the contract draft which constitutes an integral part of the SETCPP. 8. The Contractor shall add to the offer all documents, statements and appendixes required according to the SETCPP. 9. The description of the Object of Public Procurement consistent with the wording of bzp@uj.edu.pl Page 2 of 55

3 the Common Procurement Vocabulary (CPV) is CPV: Optical instruments. 10. The detailed description of the Object of Public Procurement along with the description of parameters and technical as well as functional requirements GENERAL INFORMATION The subject of the purchase is delivery of three mirror chambers and one exit slit unit for the bending magnet beamline at National Synchrotron Radiation Center SOLARIS (hereinafter called: SOLARIS), together with performing of SAT and installation of three mirror chambers together with supports (including installation of optical elements provided by the Purchaser) The mirror units must be delivered with dummy substrates for testing if they are required for performing of the SAT. The dimensions of the substrates specified below are approximate. The final dimensions and drawings will be provided by SOLARIS in four weeks from the date of contract signing. The Customer will not provide dummy substrates for FAT and for SAT and installation will provide final optic elements (mirrors) Solaris encourages the Contractor during the detailed technical design period to recommend alternate design methods or fabrication and assembly techniques that might improve the quality of the final product, improve performance, expedite schedules, etc. However such changes may only be implemented after prior written approval by Solaris during the design period and cannot have an influence on the contract value Part of the work will focus on spectroscopy at the carbon 1s edge, it is of great importance to minimize the carbon contamination on the optics Since all the reflecting optical elements of the beamline have been foreseen with the optical surface placed vertically and will reflect the synchrotron radiation in the horizontal plane, it appears convenient to use a common reference frame in which left and right will be defined as seen as from the source, the Z coordinate is perpendicular to the surface of each optical elements, oriented horizontally and pointing right, the Y coordinate is along the mirror pointing the experimental station and the X coordinate defines the vertical direction pointing the ground. In such a referent frame the rotation around X (pitch) will be defined by X, the rotation around Y (roll) will be defined by Y and the rotation around Z (yaw) will be defined by Z TECHNICAL REQUIREMENTS OF VACUUM VESSEL FOR THE COLLIMATING TOROIDAL MIRROR Beamline parameters The mirror will be manufactured by a third supplier, and will be denoted in the following as "Mirror 1". Detailed drawings of Mirror 1 will be supplied by SOLARIS in four weeks from the date of contract signing. Mirror 1 has a length of 480 mm, and will be positioned with the optical surface facing right. The mirror chamber will include the necessary mechanics to operate the alignment of Mirror 1 remotely. The incoming beam height at the middle-point of the mirror chamber will be 1300 mm above the nominal level of the ground floor. bzp@uj.edu.pl Page 3 of 55

4 Full energy range Source plane / Source distance Image plane (H) / Image distance Image plane (V) / Image distance Beam dimension at the collimting toroidal mirror Beam divergence upstream the toroidal mirror Beam divergence downstream the toroidal mirror Grazing incidence angle Plane of reflection / direction Height of the incoming beam Height of exiting beam 200 ev 2000 ev BENDING MAGNET / mm EXIT SLITS / mm Infinite / infinite 15 mm (H) x 10 mm (V) 1.5 mrad (H) - 1 mrad (V) 1.2 mrad (H) - collimated (V) 2 Horizontal / right 1300 mm 1300 mm Optics dimension toroidal mirror 430mm x 10mm footprint toroidal mirror blank 480mm (Length) x To be confirmed by the 40mm (Wide) x 30mm (Heigth) customer in four weeks from the date of contract signing Toroidal mirror weight 1.5 Kg To be confirmed by the customer in four weeks from the date of contract signing Mirror chamber mechanical requirements Mechanics will allow the mirror to operate with five degree of freedom (two translations and three rotations). A all in air solution is desirable and linear encoders have to guarantee the positions repeatability. The nominal working angular position for the mirror will be (topview) 2 clockwise respect to the beamline centerline. Goniometers, manipulators or kinematic systems are allowed for aligning the mirror. The Z and the X translations adjustment of the mirror must be motorized due to radiation critical environment. Mirror parasitic translations during rotations have to be negligible. Absolute encoder or encoder plus zero marker position has to be provided. Precise limit switches have to be foreseen to limit the angular travel. All stages without loads due to the gravity have to be equipped with retain springs to maintain the load and reduce backlash effects. Angles The angles alignment procedure for Pitch, Roll and Yaw has to be operated remotely and motorized systems are requested. Pitch control of the mirror X The mirror has to be rotated with a resolution 0.5 µrad with an accuracy 2.5 µrad and a repeatability 2.5 µrad. Absolute encoder or encoder plus zero marker position has to be provided. Precise limit switches have to be foreseen to limit the angular travel bzp@uj.edu.pl Page 4 of 55

5 Roll control of the mirror Y The mirror has to be rotated with a resolution 0.5 µrad with an accuracy 2.5 µrad and a repeatability 2.5 µrad. Absolute encoder or encoder plus zero marker position has to be provided. Precise limit switches have to be foreseen to limit the angular travel Yaw control of the mirror Z The mirror has to be rotated with a resolution 0.5 µrad with an accuracy 2.5 µrad and a repeatability 2.5 µrad. Absolute encoder or encoder plus zero marker position has to be provided. Precise limit switches have to be foreseen to limit the angular travel Translations Vertical (X direction) and transversal (Z direction) position of the mirror must be operated by means motorized stages. The vertical position of the toroidal mirror, X direction, should be regulated with a total linear travel of ± 10 mm with a resolution 10µm. The transversal position of the toroidal mirror, Z direction, should be regulated with a total linear travel of at least ± 10mm with a resolution 10µm. Resume table for range, accuracy and resolution: Range Accuracy Resolution Translation x ±10 mm 50 µm 10 µm z ±10 mm 50 µm 10 µm Rotation x (pitch) ± 10mRad 2.5 µrad 0.5 µrad y (roll) ± 10 mrad 2.5 µrad 0.5 µrad z (yaw) ± 10 mrad 2.5 µrad 0.5 µrad VACUUM VESSEL AND MIRROR HOLDING MODULE The mirror vacuum chamber will be designed as a cylinder with a full aperture flange (top or side is a free decision of the supplier) in order to install the mirror holder module easily in the correct position. The vacuum chamber would be connected to the chamber support by means three or four adjustable support feet. The support feet will allow the chamber to be adjusted vertically (X) within ± 10 mm with an accuracy 50 µm. The transversal and longitudinal (Z and Y respectively) ranges should be of ±10 mm, with an accuracy 50 µm. The support feet must also allow rotating the whole chamber around its vertical axis (X ) within at least ±1. The holding module is a frame that has to support Mirror 1 with the requested stiffness without introduce any elastic stress on the optical surface that could be compromise the mirror optical performances. Detailed drawings of Mirror 1 will be supplied by SOLARIS in four weeks from the date of contract signing. The Mirror 1 holding module will be driven by the mechanics of the vacuum vessel. Due to bzp@uj.edu.pl Page 5 of 55

6 the main flange large dimension, the mirror chamber should be equipped with OHFC custom CF-gasket or full annealed Copper wire to seal it. The use of Viton gasket is not allowed. Two or three lifting points will be necessary on the cover flange to remove it with a crane. Two setting pins will be foreseen to fit the right coupling position between flange and chamber. As per Fig.1, in the plane of reflection a DN100CF beam entrance flange and a DN100CFR (rotatable) beam exit flange will be positioned on axis on the main chamber body. The entrance flange will be reduced with nipple DN100/40CF while the correct beam exit direction of 4 will be insured by means a short custom inclined nipple DN100CF to DN40CFR both included in the supply. The vacuum chamber entrance and exit flanges axis will be aligned on a plane placed at 1300 mm from the nominal ground level. The total length of the chamber along the beam has to be 350 mm from entrance flange to the vacuum chamber centre (centre of the mirror), included the DN reduction, and 500 mm from the vacuum chamber centre and the exit flange, included the inclined nipple. The parameters related with external dimensions for the mirror chamber listed in the specification should be considered as a conceptual one. Fig.1 Schematic layout of the mirror chamber with the inclined nipple COOLING AND TEMPERATURE MONITORING The total power on the first optical element will be 13.5 W. Of this total power roughly 3 W will be absorbed on the mirror due to the mirror reflectivity. Nevertheless, it is recommendable that a soft mirror water cooling system should be adopted. Copper plates could be placed side way the mirror and forced on it elastically. 200/300µm thickness In-foil could be inserted between the Copper plates and the mirror to improve the thermal conductivity. Copper tubes for water circulation have to be brazed on the Copper plates. Water connections are admitted in vacuum only if enclosed in guard vacuum devices. In alternative a cooling system by means copper braids could be considered. The cooling media will be demineralized water delivered from the main cooling system of the beamline. The inlet pressure is 0.6 MPa but the design and the production must ensure no leakage between air and vacuum and between air and water with a water working pressure of bzp@uj.edu.pl Page 6 of 55

7 1 MPa and a flow rate of 0.1 kg/s. The Contractor is responsible for providing detail information about required water flow and pressure drop for toroidal mirror water cooling circuit. Mirror temperature has to be monitored by means K-type thermocouples VACUUM General vacuum requirements The materials, manufacturing processes, components and handling operations should be compatible with UHV procedure. A final base pressure 5 x mbar with a 500 l/s ion pump after baking with a temperature that not exceed 120 C and a total Helium leak rate 2 x mbar l/s are required. A water cooled Copper mask with the same mirror profile will be placed upstream the mirror at the height of the optical surface. The mask has to protect the profile of the optical element from the direct white radiation that could accidentally hit the mirror entrance edge. The protection mask water circuit can be independent or part of one of the two Copper plates foreseen sideway the mirror as well. A mask cooling system by means copper braids could be considered also. All procedures and manufacturing processes (choice of materials, welding, brazing, cleaning, pre-baking, assembly) have to be done according to the enclosed specifications Technologies and materials for SOLARIS UHV devices Vacuum ports for interfaces The list of the requested aperture is described following. One port DN100CF and one port DN100CFR along the beam direction. A nipple DN100/40CF flange has to be foreseen to reduce the entrance port and a 4 inclined nipple DN100CF to DN40CFR will reduce the exit port. Both the reduction will be included in the supply. One port DN150CFR flange at the bottom of the vessel for a 500l/s ion pump (supplied by Solaris) One port DN63CF viewport allowing the visual inspection of the mask from the side and mirror surface. One port DN63CF viewports allowing the visual inspection of the mirror surface from the side and ne port DN63CF viewports for inspection of the mirror surface from the top Two ports DN40CF for vacuum gauges (supplied by Solaris, penning and pirani gauges). A zero-length reduction DN40/16, for pirani vacuum gauge, has to be included in the supply. Two ports DN40CF for water circuit connection One port DN63CFR for a VAT CF-R54136-GE02 right angle valve (supplied by Solaris). This port must be positioned so to offer easy access for the connection of a roughing pump long hydro-formed bellow. One port DN40CF or appropriate for electrical connections of thermocouples One port DN40CF in front of the mirror plus one port DN63CF on the backside of the mirror to be used for mirror cleaning RF devices. Additional 2-3 ports DN40CF to be confirmed by the customer As mirror chamber will be placed in an optical hutch with Pb walls, view ports with Pb-glass bzp@uj.edu.pl Page 7 of 55

8 windows are not necessary. The final position of the flanges must be agreed with SOLARIS Additional requirements and equipments supplied by SOLARIS The pump, vacuum gauges and valves used in the unit are not part of the contract. If requested by the contractor, they will be provided by Solaris for the final assembly and tests but not earlier than 6 months from the contract signing. Solaris will provide: one ion pump Gamma Vacuum 500T. For dimensions refer to the Gamma Vacuum catalog, one Pfeiffer Pirani TPR 280 one Pfeiffer Penning IKR270 one VAT CF-R GE02 all metal right angle valve Solaris will deliver timely the definitive drawings for the toroidal mirror and will provide it for installation ones the mirror chamber has been delivered TECHNICAL REQUIREMENTS OF VACUUM VESSEL FOR THE FOCALIZING CYLINDRICAL MIRROR Beamline parameters The mirror will be manufactured by a third supplier, and will be denoted in the following as "Mirror 2". Detailed drawings of Mirror 2 will be supplied by SOLARIS in four weeks from the date of contract signing. Mirror 2 has a length of 320 mm, and will be positioned with the optical surface facing right. The mirror chamber will include the necessary mechanics to operate the alignment of Mirror 2 remotely and will include also mechanics and holder to operate in the future a second mirror. The incoming beam height at the middle-point of the mirror chamber will be 1320 mm above the nominal level of the ground floor (to be confirmed by Solaris in 4 weeks after contract signing). Full energy range Source plane (V) / Source distance Image plane (V) / Image distance Beam dimension at the focalizing cylindrical mirror Beam divergence upstream the cylindrical mirror Beam divergence downstream the cylindrical mirror Grazing angle Plane of reflection / direction Height of the incoming beam Height of exiting beam 200 ev 2000 ev Infinite / Infinite EXIT SLITS / 7500 mm 9 mm (H) x max 22.5 mm (V) 1.2 mrad (H) focused - collimated (V) 1.2 mrad (H) focused - max 3 mrad (V) 2 Horizontal / right 1320 mm (to be confirmed by Solaris in 4 weeks after contract signing) 1320 mm (to be confirmed by Solaris in 4 weeks after contract signing) bzp@uj.edu.pl Page 8 of 55

9 Optics dimension cylindrical mirror 258 mm x 22.5 mm footprint cylindrical mirror blank 320 mm (Length) x 50mm (Wide) x 30mm (Heigth) cylindrical mirror 1.1 Kg weight To be confirmed by the customer in four weeks from the date of contract signing To be confirmed by the customer in four weeks from the date of contract signing Mirror chamber mechanical requirements Mechanics will allow the mirror to operate with five degree of freedom (two translations and three rotations). A all in air solution is desirable and linear encoders have to guarantee the positions repeatability. The nominal working angular position for Mirror 2 will be (topview) 2 clockwise respect to the beamline centerline. Goniometers, manipulators or kinematic systems are allowed for aligning the mirror. The Z and the X translations adjustment must be motorized. Mirror parasitic translations during rotations have to be negligible. Absolute encoder or encoder plus zero marker position has to be provided. Precise limit switches have to be foreseen to limit the angular travel. All stages without loads due to the gravity have to be equipped with retain springs to maintain the load and reduce backlash effects. The mirror chamber has to be prepared to operate in the future a second symmetric mirror of the same characteristics of Mirror 2 that will reflect the SR horizontally but in the left direction. Due to that mechanics and holder for second mirror in this chamber has to be also delivered. The two mirror, when both in operation, will have to be switchable. Angles The angles alignment procedure of Pitch, Roll and Yaw have to be operated remotely and motorized systems are requested. Pitch control of the mirror X The mirror has to be rotated with a resolution 1 µrad with an accuracy 5 µrad and a repeatability 5 µrad. Absolute encoder or encoder plus zero marker position has to be provided. Precise limit switches have to be foreseen to limit the angular travel Roll control of the mirror Y The mirror has to be rotated with a resolution 1 µrad with an accuracy 5 µrad and a repeatability 5 µrad. Absolute encoder or encoder plus zero marker position has to be provided. Precise limit switches have to be foreseen to limit the angular travel Yaw control of the mirror Z The mirror has to be rotated with a resolution 1 µrad with an accuracy 5 µrad and a repeatability 5 µrad. bzp@uj.edu.pl Page 9 of 55

10 Absolute encoder or encoder plus zero marker position has to be provided. Precise limit switches have to be foreseen to limit the angular travel Translations Vertical (X direction) and transversal (Z direction) position of the mirror must be operated by means motorized stages. The vertical position of the cylindrical mirror and the future installed second mirror, X direction, should be regulated with a total linear travel of ± 10 mm with a resolution 10µm. The transversal position of the cylindrical mirror, Z direction, should be regulated with a total linear travel of at least ± 10mm with a resolution 10µm. The Mirror change lateral translation should be big enough for the purpose of the chamber, it means exchange two mirrors and alignment respect to the SR beam, and the resolution should be 10µm. Resume table for range, accuracy and resolution : Range Accuracy Resolution Translation x ±10 mm 50 µm 10 µm z ±10 mm (depends on the design) 50 µm 10 µm Rotation x (pitch) ± 10 mrad 5 µrad 1 µrad y (roll) ± 10 mrad 5 µrad 1 µrad z (yaw) ± 10 mrad 5 µrad 1 µrad VACUUM VESSEL AND MIRROR HOLDING MODULE The mirror vacuum chamber will be designed as a cylinder with a full aperture flange (top or side is a free decision of the supplier) in order to install the mirror holder module easily in the correct position. The vacuum chamber would be connected to the chamber support by means three or four adjustable support feet. The support feet will allow the chamber to be adjusted vertically (X) within ± 10 mm with an accuracy 50 µm. The transversal and longitudinal (Z and Y respectively) ranges should be of ±10 mm, with an accuracy 50 µm. The support feet must also allow rotating the whole chamber around its vertical axis (X ) within at least ±1.The holding module is a frame that has to support Mirror 2 with the requested stiffness without introduce any elastic stress on the optical surface that could be compromise the mirror optical performances. Detailed drawings of Mirror 2 will be supplied by SOLARIS. The Mirror 2 holding module will be driven by the mechanics of the vacuum vessel. Due to the main flange large dimension, the mirror chamber should be equipped with OHFC custom CF-gasket or full annealed Copper wire to seal it. The use of Viton gasket is not allowed. Two or three lifting points will be necessary on the cover flange to remove it with a crane. Two setting pins will be foreseen to fit the right coupling position between flange and chamber. As per Fig.2, in the plane of reflection a DN100CF beam entrance flange and a DN100CFR (rotatable) beam exit flange will be positioned on axis on the main chamber bzp@uj.edu.pl Page 10 of 55

11 body. The entrance flange will be reduced with a nipple DN100/40CF while the correct beam exit direction of ± 4 will be insured by means a short custom double inclined nipple DN100CF to 2 x DN40CFR both included in the supply. The vacuum chamber entrance and exit flanges axis will be aligned on a plane placed at 1320 mm from the nominal ground level (to be confirmed by Solaris in 4 weeks after contract signing). The total length of the chamber along the beam has to be 270 mm from entrance flange to the vacuum chamber centre (centre of the mirror), included the DN reduction, and 500 mm from the vacuum chamber centre and the exit flange (both direction), included the double inclined nipple. The parameters related with external dimensions for the mirror chamber listed in the specification should be considered as a conceptual one. Fig.2 Schematic layout of the mirror chamber with the double inclined nipple and the future second mirror COOLING AND TEMPERATURE MONITORING Since the mirrors will operate in monochromatic light, no cooling systems are requested VACUUM General vacuum requirements The materials, manufacturing processes, components and handling operations should be compatible with UHV procedure. A final base pressure 5 x mbar with a 400 l/s ion pump after baking with a temperature that not exceed 120 C and a total Helium leak rate 2 x mbar l/s are required. All procedures and manufacturing processes (choice of materials, welding, brazing, cleaning, pre-baking, assembly) have to be done according to the enclosed specifications Technologies and materials for SOLARIS UHV devices Vacuum ports for interfaces The list of the requested aperture is described following. bzp@uj.edu.pl Page 11 of 55

12 One port DN100CF and one port DN100CFR along the beam direction. A nipple DN100/40CF flange has to be foreseen to reduce the entrance port and a ± 4 double inclined nipple DN100CF to 2 x DN40CFR will reduce the exit port. Both the reduction will be included in the supply. One port DN150CFR flange at the bottom of the vessel for a 400 l/s ion pump (supplied by Solaris) Two ports DN63CF viewports for inspection of the mirrors surfaces (side and top of the chamber) Two ports DN40CF for vacuum gauges (supplied by Solaris, penning and pirani gauges). A zero-length reduction DN40/16, for pirani vacuum gauge, has to be included in the supply. One port DN40CFR for a VAT CF-R54132-GE02 right angle valve (supplied by Solaris). This port must be positioned so to offer easy access for the connection of a roughing pump long hydro-formed bellow. One port DN40CF and one port DN63CF on the backside of the mirror to be used for mirror cleaning RF devices. Additional 2-3 ports DN40CF to be confirmed by the customer All viewports have to be shielded by means lead glass covers. The final position of the flanges must be agreed with SOLARIS Additional requirements and equipments supplied by SOLARIS The pump, vacuum gauges and valves used in the unit are not part of the contract. If requested by the contractor, they will be provided by Solaris for the final assembly and tests but not earlier than 6 months from the contract signing. Solaris will provide: one ion pump Gamma Vacuum 400LX. For dimensions refer to the Gamma Vacuum catalog, one Pfeiffer Pirani TPR 280 one Pfeiffer Penning IKR270 one VAT CF-R54132-GE02 all metal right angle valve Solaris will deliver timely the definitive drawings for the cylindrical mirror and will provide it for installation ones the mirror chamber has been delivered TECHNICAL REQUIREMENTS OF VACUUM VESSEL FOR THE REFOCUSING TOROIDAL MIRROR Beamline parameters The mirror will be manufactured by a third supplier, and will be denoted in the following as "Mirror 3". Detailed drawings of Mirror 3 will be supplied by SOLARIS in four weeks from the date of contract signing. Mirror 3 has a length of 150 mm, and will be positioned with the optical surface facing right. The mirror chamber will include the necessary mechanics to operate the alignment of Mirror 3 remotely. The incoming beam height at the middle-point of the mirror chamber will be 1320 mm above bzp@uj.edu.pl Page 12 of 55

13 the nominal level of the ground floor (to be confirmed by Solaris in 4 weeks after contract signing). Full energy range 200 ev 2000 ev Source plane / Source distance EXIT SLITS / 2400 mm Image plane / Image distance PEEM EXP. / 1600 mm Beam dimension at the refocusing toroidal 3 mm (H) x 7.5 mm (V) mirror Beam divergence upstream the toroidal mirror 1.2 mrad (H) max 3 mrad (V) Beam divergence downstream the toroidal 1.8 mrad (H) max 4.5 mrad (V) mirror Grazing angle 1.5 Plane of reflection / direction Horizontal / right Height of the incoming beam 1320 mm (to be confirmed by Solaris in 4 weeks after contract signing) Height of exiting beam 1320 mm (to be confirmed by Solaris in 4 weeks after contract signing) Optics dimension toroidal mirror 110 mm x 7.5 mm footprint toroidal mirror blank 150 mm (Length) x 30 To be confirmed by the mm (Wide) x 30mm customer in four weeks from (Heigth) the date of contract signing Toroidal mirror weight 0.3 Kg To be confirmed by the customer in four weeks from the date of contract signing Mirror chamber mechanical requirements Mechanics will allow the mirror to operate with five degree of freedom (two translations and three rotations). A all in air solution is desirable and linear encoders have to guarantee the positions repeatability. The nominal working angular position for the mirror will be (topview) 1.5 clockwise respect to the beamline centerline. Goniometers, manipulators or kinematic systems are allowed for aligning the mirror. The Z and the X translations adjustment must be motorized. Mirror parasitic translations during rotations have to be negligible. Absolute encoder or encoder plus zero marker position has to be provided. Precise limit switches have to be foreseen to limit the angular travel. All stages without loads due to the gravity have to be equipped with retain springs to maintain the load and reduce backlash effects. Angles The angles alignment procedure for Pitch, Roll and Yaw has to be operated remotely and motorized systems are requested. Pitch control of the mirror X bzp@uj.edu.pl Page 13 of 55

14 The mirror has to be rotated with a resolution 10 µrad with an accuracy 10 µrad and a repeatability 10 µrad. Absolute encoder or encoder plus zero marker position has to be provided. Precise limit switches have to be foreseen to limit the angular travel Roll control of the mirror Y The mirror has to be rotated with a resolution 10 µrad with an accuracy 10 µrad and a repeatability 10 µrad. Absolute encoder or encoder plus zero marker position has to be provided. Precise limit switches have to be foreseen to limit the angular travel Yaw control of the mirror Z The mirror has to be rotated with a resolution 10 µrad with an accuracy 10 µrad and a repeatability 10 µrad. Absolute encoder or encoder plus zero marker position has to be provided. Precise limit switches have to be foreseen to limit the angular travel Translations Vertical (X direction) and transversal (Z direction) position of the mirror could be operated manually or by means motorized stages. The vertical position of the toroidal mirror, X direction, should be regulated with a total linear travel of ± 10 mm with a resolution 10µm. The transversal position of the toroidal mirror, Z direction, should be regulated with a total linear travel of at least ±10mm with a resolution 10µm. Resume table for range, accuracy and resolution: Range Accuracy Resolution Translation x ±10 mm 50 µm 10 µm z ±10 mm 50 µm 10 µm Rotation x (pitch) ± 10 mrad 10 µrad 10 µrad y (roll) ± 10 mrad 10 µrad 10 µrad z (yaw) ± 10 mrad 10 µrad 10 µrad VACUUM VESSEL AND MIRROR HOLDING MODULE The mirror vacuum chamber will be designed as a cylinder with a full aperture flange (top or side is a free decision of the supplier) in order to install the mirror holder module easily in the correct position. The vacuum chamber would be connected to the chamber support by means three or four adjustable support feet. The support feet will allow the chamber to be adjusted vertically (X) within ± 10 mm with an accuracy 50 µm. The transversal and longitudinal (Z and Y respectively) ranges should be of ±10 mm, with an accuracy 50 µm. The support feet must also allow rotating the whole chamber around its vertical axis (X ) within at least ±1. bzp@uj.edu.pl Page 14 of 55

15 The holding module is a frame that has to support Mirror 3 with the requested stiffness without introduce any elastic stress on the optical surface that could be compromise the mirror optical performances. Together with the mirror3 holder an electrical contacts together with isolated cable and electrical feedthrough should be provided. These contacts will be used to measure the photoemission current from the mirror surface. Detailed drawings of Mirror 3 will be supplied by SOLARIS in four weeks from the date of contract signing. The Mirror 3 holding module will be driven by the mechanics of the vacuum vessel. The main flange dimension should be a standard DN250CF. Otherwise, the mirror chamber should be equipped with OHFC custom CF-gasket or full annealed Copper wire to seal it. The use of Viton gasket is not allowed. Two or three lifting points will be necessary on the cover flange to remove it with a crane. Two setting pins will be foreseen to fit the right coupling position between flange and chamber. As per Fig.3 in the plane of reflection a DN100CF beam entrance flange and a DN100CFR (rotatable) beam exit flange will be positioned on axis on the main chamber body. The entrance flange will be reduced with a nipple DN100/40CF while the correct beam exit direction of 3 will be insured by means a short custom inclined nipple DN100CF to DN40CFR both included in the supply. The vacuum chamber entrance and exit flanges axis will be aligned on a plane placed at 1320 mm from the nominal ground level (to be confirmed by Solaris in 4 weeks after contract signing). The total length of the chamber along the beam has to be 250 mm from entrance flange to the vacuum chamber centre (centre of the mirror), included the DN reduction, and 380 mm from the vacuum chamber centre and the exit flange, included the inclined nipple. The parameters related with external dimensions for the mirror chamber listed in the specification should be considered as a conceptual one. Fig.3 Schematic layout of the mirror chamber with the inclined nipple COOLING AND TEMPERATURE MONITORING Since the mirrors will operate in monochromatic light, no cooling systems are requested VACUUM bzp@uj.edu.pl Page 15 of 55

16 General vacuum requirements The materials, manufacturing processes, components and handling operations should be compatible with UHV procedure. A final base pressure 5 x mbar with a 300 l/s ion pump after baking with a temperature that not exceed 120 C and a total Helium leak rate 2 x mbar l/s are required. All procedures and manufacturing processes (choice of materials, welding, brazing, cleaning, pre-baking, assembly) have to be done according to the enclosed specifications Technologies and materials for SOLARIS UHV devices Vacuum ports for interfaces The list of the requested aperture is described following. One port DN100CF and one port DN100CFR along the beam direction. A nipple DN100/40CF flange has to be foreseen to reduce the entrance port and a 3 inclined nipple DN100CF to DN40CFR will reduce the exit port. Both the reduction will be included in the supply. One port DN150CFR flange at the bottom of the vessel for a 300 l/s ion pump (supplied by Solaris) One port DN63CF viewport allowing the visual inspection of the mirror surface from the side and one DN63CF viewport for inspection of the mirror surface from the top Two ports DN40CF for vacuum gauges (supplied by Solaris, penning and pirani gauges). A zero-length reduction DN40/16, for pirani vacuum gauge, has to be included in the supply. One port DN40CFR for a VAT CF- R54132-GE02 right angle valve (supplied by Solaris). This port must be positioned so to offer easy access for the connection of a roughing pump long hydro-formed bellow. One or two CF ports with electrical feedthroughs (electrical contacts for measurement of photoemission current from the mirror surface) One port DN40CF in front of the mirror plus one port DN63CF on the backside of the mirror to be used for mirror cleaning RF devices. Additional 2-3 ports DN40CF to be confirmed by the customer The final position of the flanges must be agreed with SOLARIS Additional requirements and equipments supplied by SOLARIS The pump, vacuum gauges and valves used in the unit are not part of the contract. If requested by the contractor, they will be provided by Solaris for the final assembly and tests but not earlier than 6 months from the contract signing. Solaris will provide: one ion pump Gamma Vacuum 300TV. For dimensions refer to the Gamma Vacuum catalog, one Pfeiffer Pirani TPR 280 one Pfeiffer Penning IKR270 one VAT CF-R54132-GE02 all metal right angle valve Solaris will deliver timely the definitive drawings for the toroidal mirror and will provide it for installation ones the mirror chamber has been delivered. bzp@uj.edu.pl Page 16 of 55

17 10.5 MISCELLANEOUS Accessibility to the optics without disturbing the alignment, i.e. the design of vacuum vessels and holders must allow installation and changing the optical elements with minimal disassembling and without disturbing the alignment; sufficiently large flanges must be provided. Threads should comply to metric standard. All ion pumps shall be supported by support structures in a manner that allows the pumps to be removed without dismounting the chambers. All motor driven motions must be equipped with high duty limit switches and, where necessary, encoders. Use of carbon containing materials in vacuum should be reduced to minimum. The Contractor will mount and align mirrors in all three mirror units at Solaris after/during the Site Acceptance Tests. The installation and SAT of the three mirror chambers will be performed by the Contractor SUPPORT SYSTEM FOR MIRROR CHAMBERS To sustain the mirror vessels, a vibration-free and stiff supports must be provided. Stone, concrete or square steel welded tubes girder could be used for manufacturing the vacuum vessel support (support system is a free decision of the Supplier). 3D adjustment feet have to be provided with a lateral and vertical stroke of ± 15mm and a resolution of 0.2 mm. The adjustment feet have to be placed in such a way a pitch, roll and yaw regulation of ± 1 with a resolution 50 µrad could be achievable. Feet should be fixed to a leveled grouting on the floor to provide a rigid link for each leg. For the combined solution (concrete/granite block plus metal frame as a base for the chamber) the concrete/granite block has to be mounted on a fixed metal plate allowing horizontal lateral adjustment of the concrete/granite block ±15mm with an accuracy 0.2mm. The vertical adjustment in the range ±10mm should be possible in means that base metallic plate before of gluing to the floor should have possibility for vertical adjustment. The vacuum vessel support should also include a drawer for the ion pump insertion from the side without remove the frame or the vessel. For ion pumps dimension refer to the Gamma Vacuum catalog. Ion pumps will be supplied by SOLARIS. Easy access for the roughing pump port and handling points for the forklift or crane must be provided. In case of the support manufacturing will contain the steel welded square tubes, surfaces must be protected against corrosion with a coating that will satisfactorily withstand the chamber bake-out temperature of 100 C. Frame tubes should be filled with sand to reduce vibrations and increase thermal inertia EXIT SLITS Mechanical requirements The Exit Slits (ES) chamber will be placed at mm from the source and at that distance will be placed the first beamline focus. It has to contain the Vertical Exit Slits (VES) which have to define precisely the vertical beam dimension at the plane of the focus. Particular care has to be reserved to resolution, accuracy and parallelism of the two vertical blades movement. bzp@uj.edu.pl Page 17 of 55

18 Chamber will be equipped with two vertical Tungsten blades coated with UHV compatible fluorescent material YAG (e.g. P43) or YAG:Ce on the upstream side. All blades have to intercept completely the x-ray beam. The vertical slit mechanism have to be motorized and remote controlled. Mechanical characteristics as per table 4. Encoders with zero-marker position or micrometric switch, have to be provided for each axis to refer the movements. Limit-switches have to be foreseen also to limit the linear travels. Limit-switches have to be of the type normally closed. X-ray beam height 1320 mm (to be confirmed by Solaris in 4 weeks after contract signing) Focus dimension (FWHM) 100 µm (H) x 20 µm (V) Up (U) slit stroke / resolution / accuracy 1 mm / 0.2 µm / 0.5 µm Down (D) slit stroke / resolution / accuracy 1 mm / 0.2 µm / 0.5 µm Longitudinal stroke / resolution / accuracy 200 mm / 50 µm / 100µm Blades parallelism 2 µm/ 10mm Table 4 The Contractor may offer additional slit mechanism for Horizontal Exit Slit (HES) installed upstream VES in the same vacuum chamber. Assuming 140mm distance between Horizontal Exit Slit and VES, the HES device will be placed at mm from the source and the x-ray beam at that distance (the beam is focalizing approximately 140 mm downstream HES) is a rectangle of 0.17 mm (H) x max 0.42 mm (V). The vertical beam dimension depends on the C ff constant used on the monochromator. HES mechanism have to define the horizontal beam dimension at the plane of the vertical slits. HES unit will be equipped with two horizontal Tungsten blades coated with UHV compatible fluorescent material YAG (e.g. P43) or YAG:Ce on the upstream side. The blades should be electrically isolated to be able to measure drain/photoemission current. All blades have to intercept completely the x-ray beam. A possible collision of the horizontal blades must be excluded by the design. The two blades axes have to be motorized and remote controlled. Mechanical characteristics as per table 5. Encoders are not required for HES mechanism. Limit-switches have to be foreseen also to limit the blades linear travel. Limit-switches have to be of the type normally closed. X-ray beam height Incoming beam dimension Outgoing beam dimension Left (L) slit stroke / resolution (full step) / accuracy Right (R) slit stroke / resolution (full step) / accuracy Table mm (to be confirmed by Solaris in 4 weeks after contract signing) 170 µm (H) x max 420 µm (V) 170 µm (H) x max 420 µm (V) 12 mm (-3mm to 9mm distance from the beam axis to the blade edge) / 5 µm / 5 µm 12 mm (-3mm to 9mm distance from the beam axis to the blade edge) / 5 µm / 5 µm Vacuum vessel bzp@uj.edu.pl Page 18 of 55

19 A cylinder placed longitudinally with a DN63CF for x-ray entrance and a DN63CFR (rotatable) for the beam exit. The vacuum chamber entrance and exit flanges axes will be aligned on a plane placed at 1320 mm from the nominal ground level (to be confirmed by Solaris in 4 weeks after contract signing). The flange to flange overall length could be 400 mm. The parameters related with external dimensions for the vertical exit slit chamber listed in the specification as well flange size for the slit mechanism should be considered as a conceptual one. In the same chamber downstream vertical blades the DN40CF flange for diagnostic mounted on vertical or horizontal stage should be provided. The distance from VES blades to the exit flange of the chamber should be minimized and keep as short as possible and should not exceed 300mm. The vacuum chamber would be connected to a support table by means three or four adjustable support feet. The support feet will allow the chamber to be 3D adjusted within ±10 mm with an accuracy 50 µm. The support feet must also allow rotating the whole chamber around its vertical axis within at least ±1 with a resolution of 50 µrad. There must be a reference surface to align the slit with a water-level on the outside. This surface must be parallel to the slit within ±50 µrad. Survey points for the height and longitudinal positions are required. The table and the chamber will be mounted on a linear slide that will allow finding the real vertical focal plane changing its position along the beam. The requested stroke is ±100 mm from the nominal position and two long welded bellows have to compensate the longitudinal chamber movement. A free vibration and stable granite girder has to support the linear slide and the chamber. The chamber will not be pumped directly. To reduce pumping impedance the upstream and the downstream flanges will be DN63CF and DN63CFR respectively, and the welded bellows will be DN63CF / DN63CFR, according to the rule that for each component, downstream flanges are always rotatable. Both bellows should be delivered by Contractor Cooling and temperature monitoring VES blades do not need of cooling system nor thermocouples. HES blades do not need of cooling system nor thermocouples (if chamber equipped also with HES mechanism) VACUUM General vacuum requirements The materials, manufacturing processes, components and handling operations should be compatible with UHV procedure. A final base pressure 5 x mbar with a 300 l/s ion pump after baking with a temperature that not exceed 150 C and a total Helium leak rate 2 x mbar l/s are required. The chamber will be pumped indirectly by the pump installed upstream Exit Slit chamber. All procedures and manufacturing processes (choice of materials, welding, brazing, cleaning, pre-baking, assembly) have to be done according to the enclosed specifications Technologies and materials for SOLARIS UHV devices Vacuum ports for interfaces List of Vertical Exit Slits requested ports: bzp@uj.edu.pl Page 19 of 55

20 one DN63CF for x-ray inlet port one DN63CFR (rotatable) for x-ray exit port one DN40CF view port should be provided through which the incoming light can be inspected on the slit (VES or HES) one DN40CF view port pointing back side of the diagnostic and VES mechanism two DN40CF viewports with standard glass should be provided for observation of the vertical defining exit slits one vertical or horizontal DN40CF for diagnostic mounted on z-stage or y-stage downstream VES suitable CF port/ports for slit mechanism (depends on the design) If chamber equipped also with Horizontal Exit Slits suitable CF port/ports for slit mechanism one or two CF ports with electrical feedthroughs (electrical isolation, contact for measurement of photoemission current) The final position of the flanges must be agreed with SOLARIS Support system The incoming beam height at the middle-point of the VES chamber will be 1320 mm above the nominal level of the ground floor (to be confirmed by Solaris in 4 weeks after contract signing). To sustain the VES chamber, a vibration-free and stiff granite support must be provided. 3D adjustment feet have to be provided with a lateral and vertical stroke of ±15mm and a resolution of 0.1 mm. The adjustment feet have to be placed in such a way a pitch, roll and yaw regulation of ±1 could be achievable. Feet should be fixed to a levelled grouting on the floor to provide a rigid link for each leg. Other solution can contain concrete/granite block mounted on a fixed metal plate allowing horizontal lateral adjustment of the concrete/granite block ±15mm with an accuracy 0.2mm. The vertical adjustment in the range ±10mm should be possible in means that base metal plate before of gluing should have possibility for vertical adjustment MOTORIZATION The stepper motors must be approved by Solaris for compatibility with the control system Tango and motor controllers IcePAP adopted in the Solaris. The recommended motors and general description of the motor controllers and cables is available in enclosed file Solaris_standard_motion_control. Limit switches, home switches and encoders of a high duty type must be used. The contractor's choice on these components must be approved by the Solaris. The power supplies, motor controllers are not part of the contract SURVEYING For alignment and survey purposes all units must be equipped with reference surfaces and points accessible from outside. A suitable number of threaded holes and plane surfaces for surveying targets have to be foreseen on the chamber. Threaded holes should be M6. Nests will be supplied by SOLARIS. bzp@uj.edu.pl Page 20 of 55

scalpers and band saws Aluminium industry solutions

scalpers and band saws Aluminium industry solutions scalpers and band saws Aluminium industry solutions InGOT scalpers Wide product range for various demands The particularly rigid design of the ingot scalpers from SMS group allow plant owners to achieve

More information

SVL. 250 For full technical and ordering information visit

SVL. 250 For full technical and ordering information visit SVL Glassware l SVL glassware has screwthread joints which are easily connected together using purpose made couplings l Only glass and PTFE come into contact with the chemicals being used to provide a

More information

Lightstream Scroll kW ULTRACOMPACT II COMPACT AIR-COOLED CHILLERS WITH SCROLL COMPRESSORS

Lightstream Scroll kW ULTRACOMPACT II COMPACT AIR-COOLED CHILLERS WITH SCROLL COMPRESSORS Lightstream Scroll ULTRACOMPACT II COMPACT AIR-COOLED CHILLERS WITH SCROLL COMPRESSORS EXTREME EFFICIENCY WITH EER UP TO 3.29 OPTIONAL EVAPORATIVE PRE-COOLING MICROCHANNEL CONDENSING COILS COMPACT & LIGHTWEIGHT

More information

Ultra High Vacuum Met-Seal Flanges

Ultra High Vacuum Met-Seal Flanges Ultra High Vacuum Met-Seal Flanges Description KEY MET-SEL Flanges are manufactured to standards compatible with other Conflat style flanges to assure interchangeability and are available in sizes from

More information

Lightstream Scroll kW ULTRACOMPACT COMPACT AIR-COOLED CHILLERS WITH SCROLL COMPRESSORS

Lightstream Scroll kW ULTRACOMPACT COMPACT AIR-COOLED CHILLERS WITH SCROLL COMPRESSORS Lightstream ULTRACOMPACT COMPACT AIR-COOLED CHILLERS WITH SCROLL COMPRESSORS COMPACT & LIGHTWEIGHT DESIGN MICROCHANNEL CONDENSING COILS ALUMINIUM FRAME AND PANELING 50-285kW AVAILABLE IN 5 FRAME SIZES,

More information

Easystream kW PACKAGED SCROLL CHILLERS

Easystream kW PACKAGED SCROLL CHILLERS PACKAGED SCROLL CHILLERS COMPACT DESIGN FOR OUTDOOR AND INDOOR INSTALLATIONS AIR-COOLED AND WATER-COOLED DESIGNS LOWEST POSSIBLE NOISE POLLUTION 40-480kW 26 AIR-COOLED MODELS, 26 WATER-COOLED MODELS, 3

More information

March Process Industry Practices Piping. PIP PNDMV09N Needle Valve Data Sheet and Standard Terms

March Process Industry Practices Piping. PIP PNDMV09N Needle Valve Data Sheet and Standard Terms March 2013 Process Industry Practices Piping Needle Valve Data Sheet and Standard Terms PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this

More information

THERMOPILE DETECTORS FOR MEASUREMENT. TPD 1T 0224, TPD 1T 0524, TPD 1T 0624 General-Purpose Thermopile

THERMOPILE DETECTORS FOR MEASUREMENT. TPD 1T 0224, TPD 1T 0524, TPD 1T 0624 General-Purpose Thermopile THERMOPILE DETECTORS FOR MEASUREMENT THERMOPILE DETECTORS FOR MEASUREMENT TPD 1T 0224, TPD 1T 0524, TPD 1T 0624 General-Purpose Thermopile Applications This is our general-purpose range of thermopile detectors

More information

Technical Summary. Contract for Cooling Water Plant Installation Works in Building 61

Technical Summary. Contract for Cooling Water Plant Installation Works in Building 61 Contract for Cooling Water Plant Installation Works in Building 61 1 Purpose The purpose of this Call for Nomination is to establish a contract for early cooling water plant installation in the Site Services

More information

Lightstream Scroll kW ULTRACOMPACT II FREECOOL COMPACT FREE COOLING CHILLERS WITH SCROLL COMPRESSORS

Lightstream Scroll kW ULTRACOMPACT II FREECOOL COMPACT FREE COOLING CHILLERS WITH SCROLL COMPRESSORS Lightstream Scroll ULTRACOMPACT II FREECOOL COMPACT FREE COOLING CHILLERS WITH SCROLL COMPRESSORS EXTREME EFFICIENCY WITH EER UP TO 3.9 HIGH FREE COOLING PERFORMANCE MICROCHANNEL CONDENSING COILS COMPACT

More information

(Revised January 15, 2009) MODIFICATION PROPOSALS--PRICE BREAKDOWN (DEC 1991)

(Revised January 15, 2009) MODIFICATION PROPOSALS--PRICE BREAKDOWN (DEC 1991) (Revised January 15, 2009) 252.236-7000 Modification Proposals--Price Breakdown. As prescribed in 236.570(a), use the following clause: MODIFICATION PROPOSALS--PRICE BREAKDOWN (DEC 1991) (a) The Contractor

More information

High pressure centrifugal pumps

High pressure centrifugal pumps High pressure centrifugal pumps Wilo-Multivert MVI (North America) Series description H [ft] 3 1 MVI 1 1 1 MVI 1 MVI 3 MVI MVI 1 1 Q [m³/h] Wilo-Multivert-MVI Hz - North America Q [US gpm] H [m] 1 1 1

More information

Jawaharlal Nehru Govt. Engg.College, Sundernagar Distt.Mandi (H.P.) TENDER DOCUMENT FOR

Jawaharlal Nehru Govt. Engg.College, Sundernagar Distt.Mandi (H.P.) TENDER DOCUMENT FOR Jawaharlal Nehru Govt. Engg.College, Sundernagar Distt.Mandi (H.P.)-175018 TENDER DOCUMENT FOR Procurement of equipments for labs. under Civil Engg. Department Name of labs. 1. Hydro Power Lab 2. Concrete

More information

Ø mm. SYSTEM KAN-therm. High quality for reasonable price TECHNOLOGIA SUKCESU ISO 9001

Ø mm. SYSTEM KAN-therm. High quality for reasonable price TECHNOLOGIA SUKCESU ISO 9001 Ø 16 110 mm SYSTEM KAN-therm PP High quality for reasonable price TECHNOLOGIA SUKCESU System KAN-therm PP - assortment pipe PN10 (S5/SDR11) GROUP: L 20 1,9 1229 202002 04000120 4/200 m 25 2,3 1229 202004

More information

Insertion loss (db) TOP VIEW SIDE VIEW BOTTOM VIEW. 4x ± ± Orientation Marker Denotes Pin Location 4x 0.

Insertion loss (db) TOP VIEW SIDE VIEW BOTTOM VIEW. 4x ± ± Orientation Marker Denotes Pin Location 4x 0. Model DC4759J52AHF Ultra Low Profile 85 2dB Directional Coupler Description The DC4759J52AHF is a low cost, low profile sub-miniature high performance 2 db directional coupler in an easy to use RoH compliant,

More information

Model H-340. Tipping Bucket Rain Gauge. Owner's Manual Version 1.1

Model H-340. Tipping Bucket Rain Gauge. Owner's Manual Version 1.1 Model H-340 Tipping Bucket Rain Gauge Owner's Manual Version 1.1 Design Analysis Associates 75 West 100 South Logan, UT 84321 USA Phone: (435) 753-2212 Fax: (435) 753-7669 1. NATURE OF THE PRODUCT User

More information

Connecting Garage Door Jambs to Building Framing

Connecting Garage Door Jambs to Building Framing Connecting Garage Door Jambs to Building Framing Introduction The members of DASMA recognize that connecting garage doors to building framing is as important as the design of garage doors themselves. The

More information

QML35. Cover. Voltage A = 5V (+/- 5%) B = 3.3V (+/- 5%)

QML35. Cover. Voltage A = 5V (+/- 5%) B = 3.3V (+/- 5%) QML35 DESIGN FEATURES Bearingless modular design Low profile assembled height Resolutions up to 8192 lines per revolution 4, 6, 8 or 10 pole commutation Easy lock-n-twist assembly feature Through shaft

More information

Mounting possibilities 300 plus

Mounting possibilities 300 plus 300 plus Mounting possibilities 300 plus 345 plus 360 plus 375 plus 390 plus 8100, 8200, 8300, 8400, 8500 8100, 8200, 8300, 8400, 8500 8300, 8400, 8500 8400, 8500 8600, 8700, 8800 8600, 8700, 8800 8600,

More information

RST INSTRUMENTS LTD.

RST INSTRUMENTS LTD. RST INSTRUMENTS LTD. Borehole Pressure Cell Installation Instructions Ltd. 200 2050 Hartley Avenue Coquitlam, B.C. Canada V3K 6W5 Tel: (604) 540-1100 Fax: (604) 540-1005 e-mail: info@rstinstruments.com

More information

R-407C REFRIGERANT LORC, LNH, LNL, LNQ AND LNX SERIES OUTDOOR AIR-COOLED REMOTE CONDENSERS STANDARD FEATURES VERTICAL DISCHARGE

R-407C REFRIGERANT LORC, LNH, LNL, LNQ AND LNX SERIES OUTDOOR AIR-COOLED REMOTE CONDENSERS STANDARD FEATURES VERTICAL DISCHARGE R-407C REFRIGERANT OUTDOOR AIR-COOLED REMOTE CONDENSERS STANDARD FEATURES VERTICAL DISCHARGE WEATHER-TIGHT ELECTRICAL ENCLOSURE COMPUTER DESIGNED CONDENSER COILS FULL-FLOODING SYSTEM (-20 F CAPABILITY)

More information

DRC gross price list (end customers) EUROPE

DRC gross price list (end customers) EUROPE 1 End-customer price list, prices given exclude VAT AMK Solac Systems AG MAXIMUS General Services Maracineni DN2 / E85 Nr.134, Buzau, Romania Tel: +4(0) 745 021 755, +4(0) 745 047 317 www.maximusenergy.ro

More information

American Petroleum Institute Purchasing Guidelines Purchase API Spec 8C online at Table of Contents

American Petroleum Institute Purchasing Guidelines Purchase API Spec 8C online at   Table of Contents API Specification 8C 5th th Edition, April 2012 Specification for Drilling and Production Hoisting Table of Contents 1.0 Product 1.1 Products 1.2 Product Specification Level 2.0 Design Requirements 3.0

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MATERIALS & WORKMANSHIP PAVEMENT WARRANTY (NEW/RECONSTRUCTED HOT MIX ASPHALT PAVEMENT)

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MATERIALS & WORKMANSHIP PAVEMENT WARRANTY (NEW/RECONSTRUCTED HOT MIX ASPHALT PAVEMENT) MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MATERIALS & WORKMANSHIP PAVEMENT WARRANTY (NEW/RECONSTRUCTED HOT MIX ASPHALT PAVEMENT) C&T:SCB 1 of 10 C&T:APPR:JTL:JDC:09-29-03 FHWA:APPR:10-15-03

More information

THE PROXIMITY OF MICROVIAS TO PTHs AND ITS IMPACT ON THE RELIABILITY OF THESE MICROVIAS

THE PROXIMITY OF MICROVIAS TO PTHs AND ITS IMPACT ON THE RELIABILITY OF THESE MICROVIAS THE PROXIMITY OF MICROVIAS TO PTHs AND ITS IMPACT ON THE RELIABILITY OF THESE MICROVIAS Jaydutt Joshi Principle Program Manager RF Module Technology Development Skyworks Solutions, Inc. Irvine, California

More information

Mechanical Design of Process Equipments

Mechanical Design of Process Equipments CH2357 Process Equipment Design I Mechanical Design of Process Equipments Dr. M. Subramanian Associate Professor Department of Chemical Engineering Sri Sivasubramaniya Nadar College of Engineering Kalavakkam

More information

145 V PTC Thermistors For Overload Protection

145 V PTC Thermistors For Overload Protection FEATURES Wide range of trip and non-trip currents: From 47 ma up to A for the non-trip current Small ratio between trip and non-trip currents (I t /I nt =.5 at 25 C) High maximum inrush current (up to

More information

186. PROFILE ON THE PRODUCTION OF SHOCK ABSORBER (HYDRAULIC)

186. PROFILE ON THE PRODUCTION OF SHOCK ABSORBER (HYDRAULIC) 186. PROFILE ON THE PRODUCTION OF SHOCK ABSORBER (HYDRAULIC) 186-1 TABLE OF CONTENTS PAGE I. SUMMARY 186-2 II. PRODUCT DESCRIPTION & APPLICATION 186-3 III. MARKET STUDY AND PLANT CAPACITY 186-4 A. MARKET

More information

Item No. M2B/M2W/M2RW/M2MG Installation Guide. Computer Riser. Website: Tel:

Item No. M2B/M2W/M2RW/M2MG Installation Guide. Computer Riser. Website:  Tel: Item No. M2B/M2W/M2RW/M2MG Installation Guide Computer Riser Website: www.flexispot.com Tel: 1-855-421-2808 Specifications Step 1 The size of desktop work surface: 5.9"~ 19.7" (150 ~ 500mm) 35" (890mm)

More information

INSTALLATION & MAINTENANCE INSTRUCTIONS MASTER-EX MODELS DDP14 - DDP50

INSTALLATION & MAINTENANCE INSTRUCTIONS MASTER-EX MODELS DDP14 - DDP50 ACME ENGINEERING & MANUFACTURING CORP. P.O. BOX 978 Muskogee, Oklahoma 74402 Telephone 918/682-7791 Fax 918/682-0134 acmeag@thefanpeople.com www.acmeag.com FORM 610388 INSTALLATION & MAINTENANCE INSTRUCTIONS

More information

IHOL-8AR / IRA800 8 Gravity LED Adjustable

IHOL-8AR / IRA800 8 Gravity LED Adjustable IHO-AR / IRA00 Gravity E Adjustable EETRIA ATA E ight Engine elivered umens * System attage ** M1 M2 1 2 4 1000lm @ 000K / 2 RI 100lm @ 000K / 2 RI 0lm @ 000K / 2 RI 400lm @ 000K / 2 RI 0lm @ 000K / 2

More information

SPECIFICATION. Product Name : 4G/3G/2G Cellular Hinged SMA(M) Mount Monopole

SPECIFICATION. Product Name : 4G/3G/2G Cellular Hinged SMA(M) Mount Monopole SPECIFICATION Part No. : TG.9.113 Product Name : 4G/3G/2G Cellular Hinged SMA(M) Mount Monopole Feature : 7MHz to 38MHz LTE*/GSM/CDMA/HSPA/UMTS 7*/85/9/17/18/19/21/23/35/37 Rotatable hinge design for optimal

More information

193. PROFILE ON THE PRODUCTION OF STEEL PROFILES

193. PROFILE ON THE PRODUCTION OF STEEL PROFILES 193. PROFILE ON THE PRODUCTION OF STEEL PROFILES 193-1 TABLE OF CONTENTS PAGE I. SUMMARY 193-2 II. PRODUCT DESCRIPTION & APPLICATION 193-3 III. MARKET STUDY AND PLANT CAPACITY 193-3 A. MARKET STUDY 193-3

More information

SOT Package summary

SOT Package summary 1. Package summary Table 1. Package summary plastic, leadless thermal enhanced ultra thin small outline package; 6 terminals; 0.65 mm pitch; 2 mm x 2 mm x 0.65 mm body 8 June 2018 Package information Terminal

More information

QM35. Cover. Output. A = Line Driver B = Line Driver (ABZ) /Open Collector (UVW) C = Dual Votage Line Driver (ABZ)/ Open Collector (UVW)

QM35. Cover. Output. A = Line Driver B = Line Driver (ABZ) /Open Collector (UVW) C = Dual Votage Line Driver (ABZ)/ Open Collector (UVW) QM35 DESIGN FEATURES Bearingless modular design Low profile assembled height Resolutions up to 8192 lines per revolution 4, 6, 8 or 10 pole commutation Easy lock-n-twist assembly feature Through shaft

More information

SCALPERATOR GUIDE. 24 and 48 SCALPERATOR AGRIBUSINESS CAPACITIES 24 MODULAR SCALPERATOR

SCALPERATOR GUIDE. 24 and 48 SCALPERATOR AGRIBUSINESS CAPACITIES 24 MODULAR SCALPERATOR 24 and 48 SCALPERATOR AGRIBUSINESS CAPACITIES 24 MODULAR SCALPERATOR WIDTH 57" 1448 mm 85" 2159 mm 113" 2870 mm 141" 3581 mm LENGTH 103" 2616 mm 110" 2794 mm 117" 2972 mm 124.5" 3162 mm HEIGHT 98.5" 2502

More information

kW. Lightstream Screw V AIR-COOLED CHILLERS WITH SCREW COMPRESSORS

kW. Lightstream Screw V AIR-COOLED CHILLERS WITH SCREW COMPRESSORS AIR-COOED CHIERS WITH SCREW COMPRESSORS CASS A+ ENERGY EFFICIENCY AVAIABE WITH RZE AND RA OPTIONA FREE COOING SYSTEM OPTIONA HEAT RECOVERY 00-00 AVAIABE IN FRAME SIZES, TOTA 0 MODES WITH A BROAD SEECTION

More information

ADDENDUM #1 RFQ M1201M. 06/07/13 Please replace Chiller Maintenance Specifications with the attached Chiller Maintenance Specifications.

ADDENDUM #1 RFQ M1201M. 06/07/13 Please replace Chiller Maintenance Specifications with the attached Chiller Maintenance Specifications. ADDENDUM #1 RFQ M1201M 06/07/13 Please replace Chiller Maintenance Specifications with the attached Chiller Maintenance Specifications. Please replace M1201M Pricing Proposal with the attached M1201M Pricing

More information

SPECIFICATION PACKAGE. for BURDICK GENERATING STATION TORQUE CONVERTER GAS TURBINE 2 & 3

SPECIFICATION PACKAGE. for BURDICK GENERATING STATION TORQUE CONVERTER GAS TURBINE 2 & 3 Working Together for a Better Tomorrow. Today. SPECIFICATION PACKAGE for BURDICK GENERATING STATION TORQUE CONVERTER GAS TURBINE 2 & 3 Bid Opening Date/Time Tuesday, October 23, 2012 @ 2:00 p.m. (local

More information

THE PROXIMITY OF MICROVIAS TO PTHs AND ITS IMPACT ON THE RELIABILITY

THE PROXIMITY OF MICROVIAS TO PTHs AND ITS IMPACT ON THE RELIABILITY THE PROXIMITY OF MICROVIAS TO s AND ITS IMPACT ON THE RELIABILITY Anthony Primavera Manager - CSP Consortium Universal Instruments Corporation Binghamton, New York 13902-0825. Jaydutt Joshi Package Development

More information

#161. Connecting Garage Door Jambs to Building Framing. Introduction

#161. Connecting Garage Door Jambs to Building Framing. Introduction Connecting Garage Door Jambs to Building Framing Introduction The members of DASMA are equally as concerned about connecting garage doors to building framing as they are about the design of garage doors

More information

BAT54 series 1. Product profile 2. Pinning information Schottky barrier diodes 1.1 General description 1.2 Features and benefits

BAT54 series 1. Product profile 2. Pinning information Schottky barrier diodes 1.1 General description 1.2 Features and benefits SOT2 Rev. 5 5 October 2012 1. Product profile 1.1 General description Planar with an integrated guard ring for stress protection, encapsulated in a small SOT2 (TO-26AB) Surface-Mounted Device (SMD) plastic

More information

Installation Guide. Product Code: DLCEL. T: F: Page 1 of 5 PRODUCT #: DLCEL

Installation Guide. Product Code: DLCEL.   T: F: Page 1 of 5 PRODUCT #: DLCEL Installation Guide PRODUCT #: DLCEL ITEM: Locker Section from Celare SOURCE FOR PURCHASE: SpaEquip Inc. www.spaequip.com www.spaequipasia.com www.spaequipeurope.com Corporate Headquarters: 211 Wappo Ave

More information

INVITATION FOR QUOTATION. TEQIP-III/2017/nitr/Shopping/5 01/11/2017

INVITATION FOR QUOTATION. TEQIP-III/2017/nitr/Shopping/5 01/11/2017 INVITATION FOR QUOTATION TEQIP-III/2017/nitr/Shopping/5 01/11/2017 To, Sub: Invitation for Quotations for supply of Goods Dear Sir, 1. You are invited to submit your most competitive quotation for the

More information

Maintenance Instructions & Parts List

Maintenance Instructions & Parts List Maintenance Instructions Actuators Maintenance Instructions & Parts List Provide Model Number and Serial Number When Ordering Spare Parts. The PTR/LTR Series Actuators will provide superior performance

More information

DISCRETE SEMICONDUCTORS DATA SHEET

DISCRETE SEMICONDUCTORS DATA SHEET DISCRETE SEMICONDUCTORS DATA SHEET book, halfpage M3D252 BGY687 600 MHz, 21.5 db gain push-pull amplifier Supersedes data of 1995 Sep 11 2001 Nov 08 FEATURES Excellent linearity Extremely low noise Silicon

More information

Henderson Model HWS - 8' Patrol Wing. Wing Plow - Make and Model. Right hand front. Where mounted on truck

Henderson Model HWS - 8' Patrol Wing. Wing Plow - Make and Model. Right hand front. Where mounted on truck Vendor Name: Aspen Equipment Co Contact Person: Mark Lundeen Street Address: 9150 Pillsbury Ave. South P.O. Box: City, State, Zip: Bloomington, MN 55420 Phone #: 952-888-2525 Toll Free #: 800-888-7671

More information

Lightstream Scroll kW AIR-COOLED CHILLERS WITH SCROLL COMPRESSORS

Lightstream Scroll kW AIR-COOLED CHILLERS WITH SCROLL COMPRESSORS IR-COOLED CHILLERS WITH SCROLL COMPRESSORS CLSS ENERGY EFFICIENCY MICROCHNNEL CONDENSING COILS HET RECOVERY OPTIONS 190-0 VILBLE IN 7 FRME SIZES, TOTL MODELS WITH WIDE SELECTION OF OPTIONS ND CCESSORIES

More information

Maritime Rules Part 24E: Carriage of Cargoes Offshore Containers

Maritime Rules Part 24E: Carriage of Cargoes Offshore Containers Maritime Rules Part 24E: Carriage of Cargoes Offshore Containers ISBN 978-0-478-44735-4 Published by Maritime New Zealand, PO Box 25620, Wellington 6146, New Zealand Maritime New Zealand Copyright 2015

More information

THE NEW ANGLE GRINDERS WWB 200 PLUS / WWB 300 PLUS THE FIRST TO INCREASE OUTPUT ON THEIR OWN AND LOWER OPERATING COSTS. laska.at

THE NEW ANGLE GRINDERS WWB 200 PLUS / WWB 300 PLUS THE FIRST TO INCREASE OUTPUT ON THEIR OWN AND LOWER OPERATING COSTS. laska.at THE NEW ANGLE GRINDERS WWB 200 PLUS / WWB 300 PLUS THE FIRST TO INCREASE OUTPUT ON THEIR OWN AND LOWER OPERATING COSTS. laska.at GREATER PERFORMANCE, GREATER HYGIENE, GREATER FLEXIBILITY. THE NEW GRINDERS

More information

CONTENTS. Ergonomic Mats. Shadow Board. UT-Box Screw Material Picking. Manipulators for Screwdrivers

CONTENTS. Ergonomic Mats. Shadow Board. UT-Box Screw Material Picking. Manipulators for Screwdrivers 98 ERGONOMICS CONTENTS Ergonomic Mats Shadow Board 100 101 UT-Box Screw Material Picking 102 Manipulators for Screwdrivers 104 99 ERGONOMIC Ergonomic Mats DESCRIPTION AND VERSIONS 100 Ergonomic mats of

More information

UNIVERSITY OF CALIFORNIA College of Engineering Departments of Mechanical Engineering and Material Science & Engineering

UNIVERSITY OF CALIFORNIA College of Engineering Departments of Mechanical Engineering and Material Science & Engineering Fall 006 UNIVERSITY OF CALIFORNIA College of Engineering Departments of Mechanical Engineering and Material Science & Engineering MSEc113/MEc14 Mechanical Behavior of Materials Midterm #1 September 19

More information

NCR-80 NCR-80. IX C SD A H X A N A X X. Display. Connection. Housing. Version. Mounting. 1: Plastic 2: Thread 3: Metal

NCR-80 NCR-80. IX C SD A H X A N A X X. Display. Connection. Housing. Version. Mounting. 1: Plastic 2: Thread 3: Metal NCR-80 Display Mark if none Sample Sample NCR-80. I C SD A H A N A Display : - No Bindisc - No Window (1, 2, 3) A: A - Bindisc Top Mounted with Window (1, 2, 3) F: F - No Bindisc - With Window Top (2,

More information

Cinelabs Sanyo EZ-20 Flyback Installation Guide

Cinelabs Sanyo EZ-20 Flyback Installation Guide Cinelabs Sanyo EZ-20 Flyback Installation Guide WARNING: CRT display monitors can produce lethal voltages. Refer servicing to qualified service personnel. PLEASE NOTE: This product is intended to be installed

More information

ETN Evo. Plastic Lined Magnetic Drive Centrifugal Pumps. ETN Evo 50 ETFE. Pompe S.r.l. Comply to : 2006/42/CE. Design to : sub - ISO 2858

ETN Evo. Plastic Lined Magnetic Drive Centrifugal Pumps. ETN Evo 50 ETFE. Pompe S.r.l. Comply to : 2006/42/CE. Design to : sub - ISO 2858 ETN Evo Plastic Lined Magnetic Drive Centrifugal Pumps ETN Evo 50 ETFE Plastic and Fluoroplastic Lined Magnetic drive Horizontal - Single Stage - Centrifugal pumps Sub-ISO designed Lining: PP (Polypropylene),

More information

AEROSPACE PRODUCT LINE PACKAGE BROCHURE

AEROSPACE PRODUCT LINE PACKAGE BROCHURE AROSPAC PRODUCT LIN PACKAG BROCHUR For general information on Analog Devices Space Qualified products please visit the following address. http://www.analog.com/aerospace For technical inquiries on Aerospace

More information

SCALPERATOR GUIDE 24 MODULAR SCALPERATOR 24 AND 48 SCALPERATOR AGRIBUSINESS AND PLASTICS 24 AND 11 SCALPERATOR LOW PROFILE AGRIBUSINESS

SCALPERATOR GUIDE 24 MODULAR SCALPERATOR 24 AND 48 SCALPERATOR AGRIBUSINESS AND PLASTICS 24 AND 11 SCALPERATOR LOW PROFILE AGRIBUSINESS 24 and 48 SCALPERATOR AGRIBUSINESS CAPACITIES 24 MODULAR SCALPERATOR WIDTH 57" 1448 mm 85" 2159 mm 113" 2870 mm 141" 3581 mm LENGTH 103" 2616 mm 110" 2794 mm 117" 2972 mm 124.5" 3162 mm HEIGHT 98.5" 2502

More information

GT RETROFIT AND RE-DESIGN OF A FOUR-STAGE CENTRIFUGAL COMPRESSOR

GT RETROFIT AND RE-DESIGN OF A FOUR-STAGE CENTRIFUGAL COMPRESSOR Proceedings of ASME Turbo Expo 2015: Turbine Technical Conference and Exposition GT2015 June 15-19, 2015, Montreal GT2015-43760 RETROFIT AND RE-DESIGN OF A FOUR-STAGE CENTRIFUGAL COMPRESSOR Chao Chen SoftInWay,

More information

187. PROFILE ON THE PRODUCTION OF SHOCK ABSORBER (SPRING)

187. PROFILE ON THE PRODUCTION OF SHOCK ABSORBER (SPRING) 187. PROFILE ON THE PRODUCTION OF SHOCK ABSORBER (SPRING) 187-1 TABLE OF CONTENTS PAGE I. SUMMARY 187-2 II. PRODUCT DESCRIPTION & APPLICATION 187-2 III. MARKET STUDY AND PLANT CAPACITY 187-3 A. MARKET

More information

OMX Optical Distribution Frame

OMX Optical Distribution Frame OMX Optical Distribution Frame Introduction The OMX solution gives the capability to splice and patch fibers in a 600mm x 300mm (ETSI) footprint. It s a flexible optical distribution frame that enables

More information

The MICROS Bump Bar MBB-10 and MBB-20 User s Guide

The MICROS Bump Bar MBB-10 and MBB-20 User s Guide The MICROS Bump Bar MBB-10 and MBB-20 User s Guide This document describes the MBB features, shows how to adjust the speaker and LED from the keypad, as well as determine the firmware version and how to

More information

POWDER SYSTEMS LIMITED. simplefilter

POWDER SYSTEMS LIMITED. simplefilter POWDER SYSTEMS LIMITED simplefilter POWDER SYSTEMS LIMITED PSL BELIEVES IN WORLD CLASS PEOPLE WORKING TOGETHER TO PROVIDE WORLD CLASS SOLUTIONS. Our experienced engineering teams work closely with our

More information

Hydraulic Series Coupon Holders

Hydraulic Series Coupon Holders Hydraulic Series Coupon Holders for High Pressure Hydraulic Access Systems Flush Disc Strip Ladder Multiple Disc Figure 1. Various coupon holder styles on hydraulic access fittings. Hydraulic Series Coupon

More information

SUPERSTITION MOUNTAINS COMMUNITY FACILITIES DISTRICT NO S.

SUPERSTITION MOUNTAINS COMMUNITY FACILITIES DISTRICT NO S. SUPERSTITION MOUNTAINS COMMUNITY FACILITIES DISTRICT NO. 1 5661 S. Ironwood Drive Apache Junction Arizona 85120 Phone (480) 941-6754 Fax (480) 671-3180 www.smcfd.org BID PACKAGE PROJECT 18.C.18 Issue Date:

More information

New Roller Packer Motor Grader Attachment & New Retriever Motor Grader Attachment

New Roller Packer Motor Grader Attachment & New Retriever Motor Grader Attachment REQUEST FOR BIDS New Roller Packer Motor Grader Attachment & New Retriever Motor Grader Attachment Bid Due Date: Tuesday April 5, 2016 at 4:00 pm COLUMBIA COUNTY PUBLIC WORKS DEPARTMENT PO BOX 5 OR 415

More information

3M Serial Advanced Technology Attachment (SATA) Connector Host Receptacle, Vertical and Right Angle, Std Height, Surface Mount Receptacle 5622 Series

3M Serial Advanced Technology Attachment (SATA) Connector Host Receptacle, Vertical and Right Angle, Std Height, Surface Mount Receptacle 5622 Series M Serial Advanced Technology Attachment (SATA) Connector 22-position signal and power combination Input/ouput connector for backplane applications EMLB contacts for "hot swap" Blind mate polarization for

More information

Current Job Openings:

Current Job Openings: One Exodus Drive Superior, WI 54880 Current Job Openings: Job Descriptions are attached please have interested people apply at www.exodusmachines.com Project Engineer Field Service Technician CNC Machinist

More information

Rail Clamps Type BSZ. PINTSCH BUBENZER is certified according to DIN EN ISO 9001:2008. Safe Tried and Trusted High Performance Robust Easy Maintenance

Rail Clamps Type BSZ. PINTSCH BUBENZER is certified according to DIN EN ISO 9001:2008. Safe Tried and Trusted High Performance Robust Easy Maintenance Rail Clamps Type BSZ PINTSCH BUBENZER is certified according to DIN EN ISO 0:0 Safe Tried and Trusted High Performance Robust Easy Maintenance H Description BSZ Main Features Rail clamp spring applied

More information

TENDER NOTICE FOR SUPPLY OF DC MAGNETRON SPUTTERING UNIT (THROUGH E-PROCUREMENT MODE)

TENDER NOTICE FOR SUPPLY OF DC MAGNETRON SPUTTERING UNIT (THROUGH E-PROCUREMENT MODE) CENTRAL UNIVERSITY OF KARNATAKA (Established by an Act of the Parliament in 2009) KADAGANCHI, Gulbarga -585367, Karnataka State Phone (08477)-226702 Fax: (08477)-226703 Website: www.cuk.ac.in Email: purchases@cuk.ac.in

More information

ARTICLE I. Section 1. "City" shall mean the City of Marion, Linn County, Iowa.

ARTICLE I. Section 1. City shall mean the City of Marion, Linn County, Iowa. RULES AND REGULATIONS GOVERNING THE MUNICIPAL WATER WORKS IN THE CITY OF MARION, IOWA, AND ADOPTED BY THE BOARD OF TRUSTEES OF THE MUNICIPAL WATER WORKS OF THE CITY OF MARION, IOWA. The following rules

More information

BROKEN ARROW PUBLIC SCHOOLS 701 SOUTH MAIN BROKEN ARROW, OK PHONE (918) Request for Bid Ventilation System for Plant Operation #B12-23

BROKEN ARROW PUBLIC SCHOOLS 701 SOUTH MAIN BROKEN ARROW, OK PHONE (918) Request for Bid Ventilation System for Plant Operation #B12-23 BROKEN ARROW PUBLIC SCHOOLS 701 SOUTH MAIN BROKEN ARROW, OK 74012 PHONE (918) 259-5700 Request for Bid Ventilation System for Plant Operation #B12-23 Time and Date to be Returned: 11:00 AM on March 27,

More information

DISCONTINUED. 3M PC Card Header Single Slot, Low Profile, No Ejector, Standard Footprint. Physical. Electrical. Environmental. UL File No.

DISCONTINUED. 3M PC Card Header Single Slot, Low Profile, No Ejector, Standard Footprint. Physical. Electrical. Environmental. UL File No. PC Card Header Meets PCMCIA specifications Tapered header pins provide easy insertion High temperature plastic insulator Stand-off height options ESD clips and plastic pegs for secure hold-down See Regulatory

More information

Current Job Openings:

Current Job Openings: One Exodus Drive Superior, WI 54880 Current Job Openings: Job Descriptions are attached please have interested people apply at www.exodusmachines.com Administrative Assistant Field Service Technician CNC

More information

Request for Proposal

Request for Proposal TO: Clare Computer Systems Facility & Relocation Management Services 3170 Crow Canyon Place, Suite 210 San Ramon, CA 94583 925.242.4350 925.242.4355 Request for Proposal Computer Services and Structured

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE 0807 3502 SOUTH FIRST STREET CHAMPAIGN, ILLINOIS SYSTEM CONDITION INDEX.771 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 347,400 LABORATORY BUILDING GROSS SQUARE FEET 16,986

More information

Steel solutions provider to the global wind energy industry

Steel solutions provider to the global wind energy industry Steel solutions provider to the global wind energy industry What is your turbine s carbon footprint? ArcelorMittal thinks green. Sustainability mindset ArcelorMittal is constantly developing new technologies

More information

PIPELINE INVESTIGATION REPORT P07H0014 CRUDE OIL PIPELINE RUPTURE

PIPELINE INVESTIGATION REPORT P07H0014 CRUDE OIL PIPELINE RUPTURE PIPELINE INVESTIGATION REPORT P07H0014 CRUDE OIL PIPELINE RUPTURE ENBRIDGE PIPELINES INC. LINE 3, MILE POST 506.2217 NEAR GLENAVON, SASKATCHEWAN 15 APRIL 2007 The Transportation Safety Board of Canada

More information

SYLLABUS FOR BAR BENDING & STEEL FIXING TRADE

SYLLABUS FOR BAR BENDING & STEEL FIXING TRADE SYLLABUS FOR BAR BENDING & STEEL FIXING TRADE Duration at Skills Training Institute (Spread in three months) : 600 Hrs 1. Introduction to ITI : 3 Hrs 2. Introduction to the Trade : 3 Hrs 3. Introduction

More information

RDP-272+ DC to 2700 MHz (DC-950, MHz) The Big Deal Low insertion loss High isolation Miniature shielded package.

RDP-272+ DC to 2700 MHz (DC-950, MHz) The Big Deal Low insertion loss High isolation Miniature shielded package. Surface Mount Diplexer 5Ω DC to 27 MHz (DC-95, 17-27 MHz) The Big Deal Low insertion loss High isolation Miniature shielded package CASE STYLE: CK65 Product Overview is a low-pass + high-pass combination

More information

Warranty Certificate

Warranty Certificate GUARANTEE Joule Cyclone The JOULE Cyclone stainless steel vessel carries a fully transferable 25-year guarantee against faulty materials or manufacture provided that: It has been installed in the United

More information

ASTRO 2 CIRCULATORS. ASTRO 2 3-Speed Circulators (except Astro 286):

ASTRO 2 CIRCULATORS. ASTRO 2 3-Speed Circulators (except Astro 286): ASTRO 2 CIRCULATORS ASTRO 2 3-Speed Circulators (except Astro 286): IRON BODY CONSTRUCTION (Includes Check Valve) Model No. Part No. Connection List Price Wt.ea.lbs. Astro 210CI 110223-326 Flanged $ 307.00

More information

Ant Infrastructure Technologies Pty Ltd PRODUCT APPRAISAL REPORT 1615

Ant Infrastructure Technologies Pty Ltd PRODUCT APPRAISAL REPORT 1615 WSAA Product Appraisal 1615 1 Ant Infrastructure Technologies Pty Ltd PRODUCT APPRAISAL REPORT 1615 Valve Spindle Extensions AS/NZS 2638.1:2011 Gate valves for waterworks purposes - Metal seated AS/NZS

More information

SOT815 Footprint dimensions (mm) 3.5 x 5.5 Footprint area (mm²) 19.3

SOT815 Footprint dimensions (mm) 3.5 x 5.5 Footprint area (mm²) 19.3 plastic, leadless dual in-line compatible thermal enhanced very thin quad flat package; 24 terminals; 0.5 mm pitch; 3.5 mm x 5.5 mm x 0.85 mm body 18 October 2018 Package information 1. Package summary

More information

MODIFIED REQUEST FOR PROPOSALS. PROFESSIONAL SERVICES FOR FD Training & Logistics Facility Geothermal Test Well Activity ID

MODIFIED REQUEST FOR PROPOSALS. PROFESSIONAL SERVICES FOR FD Training & Logistics Facility Geothermal Test Well Activity ID CITY OF DES MOINES ENGINEERING DEPARTMENT MODIFIED REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR FD Training & Logistics Facility Geothermal Test Well Activity ID 21-2011-001 1. Purpose: The City of

More information

Hennepin County Transportation Department ADDENDUM

Hennepin County Transportation Department ADDENDUM Hennepin County Transportation Department ADDENDUM TO PLANS, SPECIFICATIONS AND SPECIAL PROVISIONS FOR ADVANCED TRAFFIC MANAGEMENT SYSTEM HENNEPIN COUNTY TRANSPORTATION DEPARTMENT (To be opened Tuesday,

More information

Current Job Openings:

Current Job Openings: One Exodus Drive Superior, WI 54880 Current Job Openings: Job Descriptions are attached please have interested people apply at www.exodusmachines.com Accounts Receivable/Tax Specialist Customer Service

More information

DIN ISO 9001 : 2000 QA-Nr.: Safe Tried and Trusted High Performance Robust Easy Maintenance

DIN ISO 9001 : 2000 QA-Nr.: Safe Tried and Trusted High Performance Robust Easy Maintenance Rail Clamps Type BSZ DIN ISO 0 : 00 QA-Nr.: 0400 924 BUBENZER BREMSEN is certified according to DIN EN ISO 0:00 Safe Tried and Trusted igh Performance Robust Easy Maintenance Description BSZ Main Features

More information

Current Job Openings:

Current Job Openings: One Exodus Drive Superior, WI 54880 Current Job Openings: Job Descriptions are attached please have interested people apply at www.exodusmachines.com Customer Service Purchasing-Inventory Specialist Field

More information

F Series Fluid Coils. Product Guide. Fluid Coolers Chilled Water Coils Hot Water Coils Special Fluids Gases.

F Series Fluid Coils. Product Guide. Fluid Coolers Chilled Water Coils Hot Water Coils Special Fluids Gases. F Series Fluid Coils www.alcoil.net For: Fluid Coolers Chilled Water Coils Hot Water Coils Special Fluids Gases Product Guide F Series FLUID Coils Alcoil Microchannel Features (F Series) Custom & Standard

More information

Invitation for Pre-Qualification of Bidders for 1X600 MT Mounded Pressurized Storage Vessel at Lucknow LPG Plant.

Invitation for Pre-Qualification of Bidders for 1X600 MT Mounded Pressurized Storage Vessel at Lucknow LPG Plant. Invitation for Pre-Qualification of Bidders for 1X600 MT Mounded Pressurized Storage Vessel at Lucknow LPG Plant. TENDER NO. : E&P:PQR:MSV/12-13/ 01 DATED 13-07-2012 Bharat Petroleum Corporation Ltd.,

More information

A C E. Answers Investigation 4. Applications. x y y

A C E. Answers Investigation 4. Applications. x y y Answers Applications 1. a. No; 2 5 = 0.4, which is less than 0.45. c. Answers will vary. Sample answer: 12. slope = 3; y-intercept can be found by counting back in the table: (0, 5); equation: y = 3x 5

More information

Stylos INSTALLATION INSTRUCTIONS

Stylos INSTALLATION INSTRUCTIONS R WHIRLPOOL BATH WHIRLPOOL R BATH Stylos INSTALLATION INSTRUCTIONS Important: Read complete instructions before beginning installation. Each unit arrives ready for installation, completely equipped with

More information

GENERAL CONDITIONS OF SALES and DELIVERY

GENERAL CONDITIONS OF SALES and DELIVERY GENERAL CONDITIONS OF SALES and DELIVERY I. Application, Offers These General Conditions of Sale and Delivery (Conditions) shall apply to all present and future contracts with commercial buyers, with public

More information

To request a full data sheet, please send an to:

To request a full data sheet, please send an  to: To request a full data sheet, please send an email to: display_contact@list.ti.com. PACKAGE OPTION ADDENDUM 11-Apr-2013 PACKAGING INFORMATION Orderable Device Status (1) Package Type Package Drawing Pins

More information

BY TYPE, ($ MILLIONS)... 5

BY TYPE, ($ MILLIONS)... 5 CHAPTER ONE: INTRODUCTION... 1 STUDY GOALS AND OBJECTIVES... 1 REASONS FOR DOING THE STUDY... 1 CONTRIBUTION OF THE STUDY... 2 SCOPE AND FORMAT... 2 INFORMATION SOURCES... 2 ANALYST S CREDENTIALS... 2

More information

List Price Sheet March 28, 2016

List Price Sheet March 28, 2016 List Price Sheet March 28, 2016 Welcome to Clear Water Manufacturing In this booklet you will find products for the water and wastewater treatment industry. Whether you re involved in building water or

More information

Use Scantron 882E to transfer the answers. MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.

Use Scantron 882E to transfer the answers. MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question. HW Date: Name Use Scantron 88E to transfer the answers. MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question. The graph shows sales in thousands of dollars

More information

3M D Sub EMI Junction Shell Shielded Flat Cable

3M D Sub EMI Junction Shell Shielded Flat Cable 3M D Sub EMI Junction Shell Shielded Flat Cable Stainless steel inserts in plastic shell provide EMI/ ESD protection for shielded flat cable Uses standard hardware Light weight, compact size Low profile

More information

Supplemental Material Optics formula and additional results

Supplemental Material Optics formula and additional results Supplemental Material Optics formula and additional results Fresnel equations We reproduce the Fresnel equations derived from Maxwell equations as given by Born and Wolf (Section 4.4.). They correspond

More information

INTERNATIONAL INVITATION FOR PREQUALIFICATION

INTERNATIONAL INVITATION FOR PREQUALIFICATION INTERNATIONAL INVITATION FOR PREQUALIFICATION CONSTRUCTION OF MOTORWAY ON CORRIDOR Vc, SECTION POPRIKUŠE-ZENICA NORTH (DONJA GRAČANICA), SUBSECTION PONIRAK-VRACA JPAC 851-B83-17 Public company Autoceste

More information