1 Environmental Assessment Framework and Guidelines: Experience from the Philippines Presented by: Joe B. Tuyor Bishkek, Kyrgyz Republic March 26-28, 2008 Tbilisi, Georgia April 1-3,
2 Outline of the Presentation Background of the Philippines and its Portfolio Why Use EA Framework and Guidelines Contents of EA Framework & Guidelines Processes and Procedures for Using the Framework Institutional Arrangements for using the Framework Capacity Building Implementation Experience Challenges 2
3 Background of the Philippines Located in Southeast Asia Lower middle income country Archipelagic country with 7,107 islands Presidential system of government Decentralized system of administration local governments playing a key role in delivery of basic social services 3
4 Background of the Philippine Portfolio 22 active Projects, total net commitment of $1.13 billion >50% of Projects have subprojects that are decentralized and demand-driven in nature Subprojects are implemented by local governments and communities on demand-driven basis Subprojects are small to medium scale Diverse subproject types: small infrastructure, communitybased NRM, agriculture, health centers, eco-tourism, alternative livelihoods, solid waste mgt. facilities, wastewater treatment facilities, sanitation, etc. 4
5 Why Use Framework and Guidelines Types of subprojects not known at appraisal; only identified at implementation Majority of the subprojects are small-scale, mostly not covered by the national EIA law Subproject proponents have inadequate capacity Thousands of subprojects scattered nationwide 5
6 Contents of EA Framework* General provisions Scope and coverage Procedures and processes Monitoring and evaluation Institutional arrangements * Took into account World Bank and Government EA policies and requirements 6
7 Contents of EA Framework General provisions policy and legal bases definition of terms Scope and coverage use of the project thresholds to determine coverage with EA (mainly extent of civil works and types activities that would have adverse impacts) covered projects category A (requirement: full EA) & B (requirement: IEE) projects non-covered projects category C (requirement: screening for impact, if any, only or simple EMP) 7
8 Contents of EA Framework Procedures details the procedures for environmental screening of subprojects for coverage/non-coverage, type of EA required, review, processing and approval of the EA Monitoring and evaluation details compliance monitoring and evaluation Institutional arrangements details the responsibilities of the proponent, PMOs/ PIUs, govt. EA regulatory agency, World Bank 8
9 Contents of Environmental Guidelines Environmental standards and sustainability measures for each type of subproject to address impacts and enhance sustainability of subprojects Measures for consideration and/or mainstreaming in subproject design, site selection, EMP formulation and implementation Apply to both covered and non-covered subprojects 9
10 Processes and Procedures Involved in using the Framework and Guidelines Step 1: Environmental screening of subprojects use of project thresholds to determine coverage or non-coverage with the EIA requirements conducted by the subproject proponent with guidance from the PMO/PIU Step 2: Determine EA requirement non-covered subprojects - impact screening only using a checklist or prepare a simple EMP using the environmental guidelines 10
11 Processes and Procedures Involved in using the Framework and Guidelines Step 2 (continued) covered subprojects - screening for environment category (A or B) and determine type of EA (full EA or IEE) Step 3: Review of safeguard non-covered: review done by the PMO/PIU covered: review done by the govt. regulatory agency (and the Bank) 11
12 Processes and Procedures Involved in using the Framework and Guidelines Approval non-covered: no formal approval covered: approval by govt. regulatory agency Supervision and monitoring PMO/PIU Government Regulatory Agency World Bank 12
13 Safeguard Institutional Arrangements Subproject proponents: local govt. and communities conduct screening using the project threshold prepare the EA and implement the EMP PMOs/PIUs approve subproject, provide oversight, TA, guidance, coordination, monitoring Government Regulatory Agency reviews EA, issues EA permit and conducts monitoring World Bank 13 monitors compliance by PMOs/PIUs and proponents to agreed frameworks
14 Capacity Building Project orientation and briefing Training of the PMO/PIU who then trains the local governments and communities Specialized trainings on demand basis Annual safeguards forum to share lessons learned & experiences, discuss issues and agree on solutions 14
15 Capacity Building Annual safeguards forum started in 2003 objectives: (i) to increase awareness and understanding on Bank safeguard policies; (ii) to share experiences & lessons learned; (iii) to discuss and agree on resolution of safeguard issues & implementation challenges; (iv) to improve project compliance to safeguard policies & frameworks participants: PMOs/PIUs, sector agencies, government oversight agencies, safeguard agencies, government-financing institutions, local government units, congress, donor agencies, safeguard practitioners, civil society organizations, private sector, contractors last forum was co-financed by ADB with support from CIDA 15
16 Implementation Experience Simple and practical framework and guidelines work Subproject design is enhanced by the use of guidelines Sustainability measures incorporated in the design Increase awareness of local governments and communities Need to build capacity at all levels Buy in of proponents on the added value of safeguards beyond compliance is critical Costing for mitigating measures is always an issue, hence mainstreaming in the design ensures incorporation 16
17 Challenges Building capacity of local governments and communities Enhancing the capacity of PMOs/PIUs Incorporating cost of EMP/mitigating measures in subproject cost Improving environmental screening Intensifying supervision and monitoring 17
18 Thank you! 18
REPUBLIC OF TURKEY FOURTH EXPORT FINANCE INTERMEDIARY LOAN (EFIL IV) (LOAN NUMBER )
REPUBLIC OF TURKEY FOURTH EXPORT FINANCE INTERMEDIARY LOAN (EFIL IV) (LOAN NUMBER ) ENVIRONMENTAL FRAMEWORK FOR PARTICIPATING FINANCIAL INSTITUTIONS JANUARY, 2011 III. ENVIRONMENTAL REVIEW PROCEDURES Background
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 24-Feb-2015
More informationPROJECT PREPARATION TECHNICAL ASSISTANCE
12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility
More informationEnvironmental Assessment and Review Framework. Mongolia: Western Regional Road Corridor Investment Program
Western Regional Road Corridor Investment Program (RRP MON 41193) Environmental Assessment and Review Framework September 2011 Mongolia: Western Regional Road Corridor Investment Program Prepared by the
More informationOPERATIONS MANUAL BANK POLICIES (BP)
BANK POLICIES (BP) OM Section F1/BP Page 1 of 2 These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. SAFEGUARD POLICY STATEMENT 1. The Asian Development
More informationOPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.
OM Section F1/BP Page 1 of 3 OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction ENVIRONMENTAL
More informationMFF - Bihar Urban Development Investment Program (Facility Concept)
India: MFF - Bihar Urban Development Investment Program (Facility Concept) Project Name Project Number 41603-013 Country Project Status Project Type / Modality of Assistance Source of Funding / Amount
More informationSemi-Annual Social Safeguards Monitoring Report. SRI: Greater Colombo Wastewater Management Project
Semi-Annual Social Safeguards Monitoring Report Project No. 36173-013 Period Covering July to December 2013 April 2014 SRI: Greater Colombo Wastewater Management Project Prepared by the Ministry of Local
More informationCambodia: Rural Credit and Savings Project
Project Validation Report Reference Number: CAM 2008-06 Project Number: 30327 Loan Number: 1741 July 2008 Cambodia: Rural Credit and Savings Project Operations Evaluation Department ABBREVIATIONS ADB Asian
More informationProject Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2168 Support for Strategic Local Development and Investment Project
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2168 Support
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:
More informationIndigenous Peoples Development Planning Document. PHI : Support for the Sustainable Health Care Project
Indigenous Peoples Development Planning Document Indigenous Peoples Development Framework Document Stage: Draft Project Number: 41664 August 2008 PHI : Support for the Sustainable Health Care Project The
More informationLOAN AGREEMENT (Special Operations) (Municipal Services Development Project - Phase II) between GEORGIA. and ASIAN DEVELOPMENT BANK
LOAN NUMBER 2534-GEO(SF) LOAN AGREEMENT (Special Operations) (Municipal Services Development Project - Phase II) between GEORGIA and ASIAN DEVELOPMENT BANK DATED 20 AUGUST 2009 LAS:GEO 43171 LOAN AGREEMENT
More informationRepublic of Uzbekistan: Solid Waste Management Improvement Project
Project Administration Manual Project Number: 45366 Loan Number: {LXXXX-UZB} November 2013 Republic of Uzbekistan: Solid Waste Management Improvement Project CONTENTS ABBREVIATIONS I. PROJECT DESCRIPTION
More informationEnvironmental Safeguard Monitoring Report. FIJ: Transport Infrastructure Investment Sector Project
Environmental Safeguard Monitoring Report Semi Annual Report July 2016 ADB Project Number: 48141-001 ADB Loan Number: 3210 FIJ: Transport Infrastructure Investment Sector Project Prepared by Fiji Roads
More informationProject Name Philippines-Local Government Finance & Development Project (LOGOFIND)
Public Disclosure Authorized Report No. PID4841 Project Name Philippines-Local Government Finance (@+)... & Development Project (LOGOFIND) Region East Asia and Pacific Region Sector UY - Other Urban Development
More informationPublic Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.
Project Name Region Sector Project ID Borrower(s) Report No. PID5794 Lebanon-Municipal Infrastructure Project (@+) Middle East and North Africa Region Other Urban Development LBPE50544 Lebanese Republic
More informationFILE COPY. E494 Volume 2. Republic of Yemen. Urban Water & Sanitation Project. Terms of Reference for a Pro-Forma Environmental Assessment
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 0a/22/2002 08:26 203240 EXECB PMU SWSSP PAGE 02 Project Background Republic of Yemen
More informationRepublic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance
Technical Assistance Report Project Number: 47287-001 Capacity Development Technical Assistance (CDTA) December 2013 Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved
More informationPROJECT AGREEMENT. (Hebei Energy Efficiency Improvement and Emission Reduction Project) between ASIAN DEVELOPMENT BANK. and
LOAN NUMBER 2835-PRC PROJECT AGREEMENT (Hebei Energy Efficiency Improvement and Emission Reduction Project) between ASIAN DEVELOPMENT BANK and HEBEI PROVINCIAL GOVERNMENT DATED 6 MARCH 2012 PRC 44012 PROJECT
More informationA Tale of Two Sisters: Bangladesh and Philippine PPP Programs 26 November 2014
A Tale of Two Sisters: Bangladesh and Philippine PPP Programs 26 November 2014 Presented at the UNESCAP PPP Workshop on Public-Private Partnerships for Infrastructure Development in Myanmar Background
More informationPART A: THE PALESTINIAN ENVIRONMENTAL ASSESSMENT POLICY. A policy to establish an environmental assessment process in Palestine
PART A: THE PALESTINIAN ENVIRONMENTAL ASSESSMENT POLICY A policy to establish an environmental assessment process in Palestine WHEREAS the Palestinian National Authority seeks to achieve sustainable development
More informationNGO Concerns on the Use of National Safeguard Systems in World Bank Projects
NGO Concerns on the Use of National Safeguard Systems in World Bank Projects A Critique of the World Bank Paper, Issues in Using Country Systems in Bank Operations, August 23, 2004 By Peter Bosshard, Policy
More informationStephanie Fried March 2015 Adapted from article forthcoming in BankWatch, NGO Forum on ADB
Lessons Learned? The Implications of the ADB s Review of Safeguard Policy Implementation for the World Bank and the Asian Infrastructure Investment Bank Stephanie Fried March 2015 Adapted from article
More informationARM: Sustainable Urban Development Investment Program, Tranche 1
Environmental Monitoring Report Bi-annual Report July-December 2011 ARM: Sustainable Urban Development Investment Program, Tranche 1 Project Number: 42417 Loan Number: L2752 May 2013 Prepared by the Yerevan
More informationPeople s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones
Technical Assistance Report Project Number: 50004-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Study on Natural Resource Asset Appraisal and Management System
More informationPublic-Private Partnership Monitor Key Trends and Findings
Office of Public Private Partnership Public-Private Partnership Monitor Key Trends and Findings 23 November 2017 PPP Monitor Benefits and Key Findings PPP Monitor The PPP Monitor tracks the development
More informationReport No.: ISDSA13978
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 0 o Date ISDS Prepared/Updated: 29-Jul-2015 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL
More informationTERMS OF REFERANCE FOR PROJECT MANAGEMENT CONSULTANTS [PMC]
TERMS OF REFERANCE FOR PROJECT MANAGEMENT CONSULTANTS [PMC] I. Overview 1. National Capital Region (NCR) is 33,578 square kilometer area covering Delhi and sub-regions of the states of Haryana, Rajasthan
More informationARM: Sustainable Urban Development Investment Program, Tranche 1
Environmental Monitoring Report Bi-annual Report July-December 2012 ARM: Sustainable Urban Development Investment Program, Tranche 1 Project Number: 42417 Loan Number: L2752 May 2013 Prepared by the Yerevan
More informationStakeholder Engagement in Livelihood Restoration
Stakeholder Engagement in Livelihood Restoration Development Bank Half-Day : Joint ADB-IAIA Special Symposium on Resettlement and Livelihoods Michaela S Bergman Chief Counsellor for Social Issues, EBRD
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/10/2007 INTEGRATED SAFEGUARDS DATASHEET
More informationYen Loan Ex-ante project evaluation report
Yen Loan Ex-ante project evaluation report 1. Name of Project Country: Republic of the Philippines Project title: Agricultural Credit Support Project L/A signed on: November 25, 2009 Loan amount approved:
More informationLOAN AGREEMENT (Special Operations) (Climate Resilient Rice Commercialization Sector Development Project) between KINGDOM OF CAMBODIA.
LOAN NUMBER 3007-CAM (SF) LOAN AGREEMENT (Special Operations) (Climate Resilient Rice Commercialization Sector Development Project) between KINGDOM OF CAMBODIA and ASIAN DEVELOPMENT BANK DATED 26 AUGUST
More informationMultitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1)
Validation Report Reference Number: PVR-326 Project Number: 37066 Loan Number: 2248 October 2014 Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1) Independent Evaluation
More informationPublic Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.
Report No. PID6809 Project Pakistan-Punjab Municipal Development (+) Fund Project Region Sector Project ID Borrower Implementing Agencies South Asia Urban PKPE55293 Government of Pakistan (GOP) Date PID
More informationXII. CGIF Environmental and Social Safeguards Policy and Framework 1
A. Policy XII. CGIF Environmental and Social Safeguards Policy and Framework 1 1. Credit Guarantee and Investment Facility (CGIF), a trust fund of the Asian Development Bank (ADB) was established to promote
More informationSafeguard Policies: A Quick View Tbilisi. The World Bank Europe & Central Asia Region
Safeguard Policies: A Quick View Tbilisi April 1-3, 1 2008 The World Bank Europe & Central Asia Region 1 Why do we have the World Bank Safeguard Policies? Do no harm: protect people and environment from
More informationPROJECT AGREEMENT. (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF SINDH
LOAN NUMBER 2499-PAK (SF) PROJECT AGREEMENT (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK and PROVINCE OF SINDH NORTH SINDH URBAN SERVICES CORPORATION LIMITED DATED
More informationAloysius M. Kamperewera [PhD] Ministry of Environment and Climate Change Managment Director for Environmental Affairs
Session 6: Element D: Reporting, Monitoring And Review: Experiences And Lessons Learnt From National Climate Change Programme And NAPA Implementation In Malawi Aloysius M. Kamperewera [PhD] Ministry of
More informationLoan Agreement. (Additional Financing for Laguna de Bay Institutional Strengthening and Community Participation Project) between
Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 8035-PH Public Disclosure Authorized Loan Agreement Public Disclosure Authorized (Additional Financing for Laguna de Bay Institutional Strengthening
More information(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time);
2 (f) Goods means equipment and materials to be financed out of the proceeds of the Loan, including related services such as transportation, insurance, installation, commissioning, training, and initial
More informationReport and Recommendation of the President to the Board of Directors. Proposed Loan Republic of Uzbekistan: Solid Waste Management Improvement Project
Report and Recommendation of the President to the Board of Directors Project Number: 45366 October 2013 Proposed Loan Republic of Uzbekistan: Solid Waste Management Improvement Project CURRENCY EQUIVALENTS
More informationPROJECT PREPARATORY TECHNICAL ASSISTANCE
Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/15/2010 1. Basic Project Data Original
More informationSecondary Towns and Rural Community Based Water Supply and Sanitation Project Loan No SRI (SF) LOAN COVENANTS COMPLIANCE AS AT 31 March 2011
Secondary Towns and Rural Community Based Water Supply and Sanitation Project Loan No. 1993 SRI (SF) LOAN COVENANTS COMPLIANCE AS AT 31 March 2011 Reference in Loan Agreement paras 2 and 3 Covenant A.
More informationPublic Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.
Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Report No. PID8369 Tanzania-Social Action Fund Project Africa Regional Office Social Funds & Social Assistance TZPE65372 GOT
More informationClimate Funds AfDB Mobilizing Concessional Finance for NDC Implementation
Climate Funds AfDB Mobilizing Concessional Finance for NDC Implementation Davinah Milenge Uwella Senior Climate Change Officer Climate Change and Green Growth Department Presentation Outline Preamble Climate
More informationSECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1
Accelerating Infrastructure Delivery through Better Engineering Services Project (RRP INO 49141) Sector Road Map SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1 1. Sector Performance, Problems, and Opportunities
More informationSECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) 1. Sector Performance, Problems, and Opportunities
National Disaster Risk Management Fund (RRP PAK 50316) SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) A. Sector Road Map 1. Sector Performance, Problems, and Opportunities a. Performance
More informationTERMS OF REFERENCES FOR CONSULTANTS I. OBJECTIVE AND PURPOSE OF THE ASSIGNMENT
23 TERMS OF REFERENCES FOR CONSULTANTS I. OBJECTIVE AND PURPOSE OF THE ASSIGNMENT 1. The Asian Development Bank (ADB) is providing technical assistance to the Government of the Philippines (the government)
More informationIslamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project
Technical Assistance Report Project Number: 51039-001 Transaction Technical Assistance (TRTA) September 2017 Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 26-Jun-2014
More informationEx-ante Evaluation. Country: Republic of the Philippines Program: Development Policy Support Program (III) and Emergency Budget Support
Japanese ODA Loan Ex-ante Evaluation 1. Name of the Program Country: Republic of the Philippines Program: Development Policy Support Program (III) and Emergency Budget Support Japanese ODA Loan Loan Agreement:
More informationEnvironmental Monitoring Report
Environmental Monitoring Report Bi-annual Report January-June 2013 ARM: Sustainable Urban Development Investment Program, Tranche 1 Project Number: 42417 Loan Number: L2752 July 2013 Prepared by the Yerevan
More informationINTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Report No.: ISDSA Date ISDS Prepared/Updated: 12-Jan-2016
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 0 o ci Date ISDS Prepared/Updated: 12-Jan-2016 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name. Wenchuan Earthquake Recovery Project Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name Wenchuan
More informationPacific Islands Regional Oceanscape Program (PROP) Project Number: P151780
Pacific Islands Regional Oceanscape Program (PROP) Project Number: P151780 Department of Fisheries Ministry of Natural Resources Teone, Funafuti TUVALU Email: proptuv@gmail.com / proptuv@tuvalufisheries.tv
More informationb) if the sub-project is in the Annex B list of this Operational Manual;
Environmental Review Procedures 1. Background The Environmental Category of the project is FI, since Ziraat Bank (as an FI) will on-lend the World Bank funds to private commercial banks and leasing companies
More informationLao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization
Completion Report Project Number: 46-01 Technical Assistance Number: 7857 April 016 Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization This document is being disclosed
More informationSUPPLEMENTARY DOCUMENT 3: THE PROPOSED NATIONAL COMMUNITY-DRIVEN DEVELOPMENT PROGRAM 1
KALAHI CIDSS National Community-Driven Development Project (RRP PHI 46420) SUPPLEMENTARY DOCUMENT 3: THE PROPOSED NATIONAL COMMUNITY-DRIVEN DEVELOPMENT PROGRAM 1 A. Program Objective and Outcomes 1. The
More informationSAFEGUARD AND SUSTAINABILITY POLICIES IN A CHANGING WORLD: AN INDEPENDENT EVALUATION OF WORLD BANK GROUP EXPERIENCE
SAFEGUARD AND SUSTAINABILITY POLICIES IN A CHANGING WORLD: AN INDEPENDENT EVALUATION OF WORLD BANK GROUP EXPERIENCE WBG-CSO Forum October 7, 2010 1. Objective and Methodology First comprehensive evaluation
More informationSUMMARY FINANCIAL MANAGEMENT ASSESSMENT
A. Introduction Emergency Assistance for Relief and Recovery from Typhoon Yolanda (RRP PHI 47337) UMMARY FINANCIAL MANAGEMENT AEMENT 1. This financial management assessment was prepared in accordance with
More informationSection 3.06 is deleted and the following is substituted therefor:
2 (c) Section 3.03 is deleted and the following is substituted therefor: Commitment Charge; Credit; Maturity Premium. (a) The Borrower shall pay a commitment charge on the unwithdrawn amount of the Loan
More informationSAICM/ICCM.4/INF/9. Note by the secretariat. Distr.: General 11 August 2015 English only
SAICM/ICCM.4/INF/9 Distr.: General 11 August 2015 English only International Conference on Chemicals Management Fourth session Geneva, 28 September 2 October 2015 Item 5 (a) of the provisional agenda Implementation
More informationState Secretariat for Planning, Science and Technology (SEPLAN)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower Implementing Agency Report No. PID10306
More informationGLOBAL INFRASTRUCTURE FACILITY. A partnership platform for greater investment in the infrastructure of emerging markets and developing economies
GLOBAL INFRASTRUCTURE FACILITY A partnership platform for greater investment in the infrastructure of emerging markets and developing economies COLLABORATION FINANCE LEVERAGE IMPACT The Global Infrastructure
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB1710 Leader
More informationLessons learned from implementing Microfinance in a post-tsunami environment SRI LANKA. Dr. Dirk Steinwand
Lessons learned from implementing Microfinance in a post-tsunami environment SRI LANKA Dr. Dirk Steinwand Microfinance in South Asia Today and Tomorrow December 5-7, 2005, New Dehli Pre-Tsunami MF landscape
More informationREPORT 2014/107 INTERNAL AUDIT DIVISION. Audit of quick-impact projects in the African Union-United Nations Hybrid Operation in Darfur
INTERNAL AUDIT DIVISION REPORT 2014/107 Audit of quick-impact projects in the African Union-United Nations Hybrid Operation in Darfur Overall results relating to the management of quick-impact projects
More informationEarth is our Business
Earth is our Business changing the rules of the game POLLY HIGGINS SHEPHEARD-WALWYN (PUBLISHERS) LTD 2012 Polly Higgins Some rights reserved. [license_3.0] This work is licensed under a Creative Commons
More informationPeople s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project
Validation Report Reference Number: PVR-462 Project Number: 42496-013 Loan Number: 2508 December 2016 People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project Independent
More informationFinancing initiatives for reducing vulnerability and increasing resilience to impact of climate change. IMACC GIZ PAKLIM
Financing initiatives for reducing vulnerability and increasing resilience to impact of climate change. IMACC 29.07.2013 Adaptation Finance for : Central Government Local Government Private Sector Households
More informationINTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 13-Jan-2014 INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING
More informationEvaluation and future development of the EIA system in Jordan
MEDITERRANEAN ENVIRONMENTAL TECHNICAL ASSISTANCE PROGRAM Evaluation and future development of the EIA system in Jordan A report prepared under the METAP EIA Institutional Strengthening Project December
More informationBi-annual Environmental Monitoring Report
Bi-annual Environmental Monitoring Report Project Number: 42145 January-June 2011 Armenia: North-South Road Corridor Investment Program, Tranches 1 and 2 (Financed by the ADB) Prepared by the Organization
More informationCC is a development issue - not just an environmental concern CC impacts on human development, economic growth, poverty alleviation and the
CC is a development issue - not just an environmental concern CC impacts on human development, economic growth, poverty alleviation and the achievement of MDGs Long term: human lives and livelihoods are
More informationLOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).
LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). WHEREAS (A) the Borrower has applied to ADB for a loan
More informationPublic Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.
Project Name Region Sector Project ID Implementing Agency Report No. PIC908 West Bank and Gaza-Emergency Rehabilitation Project (& Middle East and North Africa Non-Sectoral XOPA34112 Date prepared May
More informationDocument of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE ON A LOAN IN THE AMOUNT OF US$32.8 MILLION TO THE REPUBLIC OF GUATEMALA
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE ON A LOAN IN
More informationCountry Operations Business Plan. Myanmar September 2015
Country Operations Business Plan September 2015 Myanmar 2016 2018 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of
More informationMultitranche Financing Facility Republic of Uzbekistan: Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program
Facility Administration Manual Project Number: 42107 MFF Number: 0042-UZB Loan Numbers: 2635-UZB (Project 1), 2746-UZB (Project 2), and 2868-UZB (Project 3) 21 August 2013 Multitranche Financing Facility
More informationCountry Operations Business Plan. Kazakhstan September 2017
Country Operations Business Plan September 2017 Kazakhstan 2018 2020 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as
More informationTHE COUNTY GOVERNMENT OF MACHAKOS THE COUNTY TREASURY PROGRAMMME BASED BUDGET FY 2015/2016
REPUBLIC OF KENYA THE COUNTY GOVERNMENT OF MACHAKOS THE COUNTY TREASURY PROGRAMMME BASED BUDGET FY JUNE 2015 0 Table of contents Table of contents... 1 Revenue Estimates FY 2015/16-2017-18... 2 Summary
More informationAlternative ways of Financing Urban Development
External Support for Decentralization Reforms & Local Governance Systems in the Asia Pacific: Better Performance, Higher Impact? Cities Development Initiative for Asia Alternative ways of Financing Urban
More information4. Outline of EIA for Development Assistance
4. Outline of EIA for Development Assistance 4.1 EIA and Development EIA has an important role to play resolving these environmental problems through its ability to contribute to environmentally sound
More informationFinancing Sustainable Infrastructure In Asia. Fei Yu Deputy Representative Asian Development Bank North American Representative Office
Financing Sustainable Infrastructure In Asia Fei Yu Deputy Representative Asian Development Bank North American Representative Office Agenda The Asia Scene The sustainable infrastructure gap The current
More informationDemocratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program Executive Summary. An IDEV Country Strategy Evaluation
Democratic Republic of Congo: Evaluation of the Bank s Country Strategy and Program 2004 2015 Executive Summary An IDEV Country Strategy Evaluation March 2017 IDEV conducts different types of evaluations
More informationIndonesia: Earthquake and Tsunami Emergency Support Project
Validation Report Reference Number: PVR 237 Project Number: 39127 Grant Number: 0002-SF December 2012 Indonesia: Earthquake and Tsunami Emergency Support Project Independent Evaluation Department ABBREVIATIONS
More informationPhilippines: Mindanao Basic Urban Services Sector Project
Validation Report Reference Number: PCV: PHI 2011-25 Project Number: 30551 Loan Number: 1843 September 2011 Philippines: Mindanao Basic Urban Services Sector Project Independent Evaluation Department ABBREVIATIONS
More informationSession 2. Discussion: The MDGs Localization in the Philippines
Session 2. Discussion: The MDGs Localization in the Philippines National Economic and Development Authority Philippines 23 June 2014 Sub-regional Advocacy Workshop on MDGs for South East Asia Lao Plaza
More informationIntegrated Safeguards Data Sheet Identification / Concept Stage (ISDS)
Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet Identification / Concept Stage (ISDS) Concept Stage Date ISDS Prepared/Updated:
More informationEvaluation Approach Project Performance Evaluation Report for Loan 2167 and Grant 0006-SRI: Tsunami-Affected Areas Rebuilding Project September 2015
Asian Development Bank 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2163; evaluation@adb.org www.adb.org/evaluation Evaluation Approach Project Performance
More informationUPDATE. Financial Intermediary Lending and Environmental Assessment. Environmental Assessment
Environmental Assessment S o u r c e b o o k UPDATE Environment Department June 2002 The World Bank Number 27 Financial Intermediary Lending and Environmental Assessment The World Bank supports economic
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 14-Jul-2014
More information(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time);
2 (f) GAP or Gender Action Plan means the gender action plan for the Project, including any update thereto, prepared and agreed between the Borrower and ADB and further set out in the PAM; (g) Goods means
More informationTechnical Assistance Republic of the Philippines: Harmonization and Managing for Results
Technical Assistance Report Project Number: 35166 November 2005 Technical Assistance Republic of the Philippines: Harmonization and Managing for Results The views expressed herein are those of the consultant
More informationINTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized o INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE te: This ISDS will be considered
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 02-Sep-2014
More information(c) Section 3.07 is deleted and the following is substituted therefor:
2 outstanding Loan on which a higher Fixed Spread is applicable. The amount of the Rebate shall be determined by multiplying (i) the difference between the Fixed Spread applicable to the outstanding Loan