Secondary Towns and Rural Community Based Water Supply and Sanitation Project Loan No SRI (SF) LOAN COVENANTS COMPLIANCE AS AT 31 March 2011

Size: px
Start display at page:

Download "Secondary Towns and Rural Community Based Water Supply and Sanitation Project Loan No SRI (SF) LOAN COVENANTS COMPLIANCE AS AT 31 March 2011"

Transcription

1 Secondary Towns and Rural Community Based Water Supply and Sanitation Project Loan No SRI (SF) LOAN COVENANTS COMPLIANCE AS AT 31 March 2011 Reference in Loan Agreement paras 2 and 3 Covenant A. Execution Arrangements NWSDB shall establish a PMU headed by an experienced Project Director supported by a core team of NWSDB employees comprising a DPD, Chief Engineer and Chief Sociologist selected not later than one month after the effectiveness. Status of Compliance PMU Established. para 8 para 3 para 7 para 9 For urban component PIUs shall be established at the five districts not later than six months after the Design and Construction Supervision Consultants are fielded. Project Managers / Engineers shall head the PIUs. A separate PIU shall be established under the Irrigation Department (ID) for the implementation of the Unnichchai tank bund raising sub component. A Resident Engineer from ID shall head this ID PIU. The PIU at Anuradhapura for Loan L-1575-SRI shall be converted into a District TSU and a District TSU shall be established at Polonnaruwa, no later that 6 months after the design consultants are fielded. PSIUs shall be established in participating Pradeshiya Sabha (PS) prior to the implementation of any sub project in that Pradeshiya Sabha. B. Coordinating Arrangements The borrower shall establish the National Steering Committee with responsibility for overall coordination of project implementation including policy matters, coordinating with other Ministries and Agencies. NSC shall meet at least every three months or as often necessary. The borrower shall call for water sector donor coordination meetings to occur at least once per year. The PPCC shall be established in the North Central Provincial Council immediately after the effective date for monitoring of the PSIUs and coordination with the other agencies. Complied with PIUs Established in 5 Project towns ID PIU Established Complied with for Batch 1 & Batch 2. PSIU Established. Establishment of National Steering Committee Complied with. Quarterly meetings on going. Meetings on going Meetings on going.

2 paras 19,20 C. Social Covenants The Government and NWSDB will ensure (and NWSDB will obtain Government assurance from the Land Acquisition Section) that all land, land rights, rights-of way, and other land-related rights, and all water and water-related rights for the Project be acquired in accordance with (a) the Government s National Involuntary Resettlement Policy (b) ADB s Policy on Involuntary Resettlement : and (c) the Short Resettlement Plan (RP) for Land Acquisition for the Project submitted by the Government to ADB on 15th September 2002, by the earlier of one year after Effective Date or mobilization of construction contractors. Land acquisition Completed and transfers of Government lands in process. paras 19,20 The Government shall submit an acceptable RP after the detail technical design of the Unnichchai tank subcomponent has been completed, prior to award of civil work contracts and such resettlement plan shall be implemented to the satisfaction of the bank. PMU/PIU (ID) confirmed with contractor in the revised plan schedule for implementation. Affected persons informed & compensation payments completed as approved by the compensation plan. para 19 para 24 The Government shall ensure that compliance with Borrower s and ADB policy on Involuntary Resettlement is covered in the Quarterly reports. (i) Within one month of the Effective Date, NWSDB shall submit to the Bank a strategy to ensure that at least 25% of professional and technical staff working in the PMU, the PIUs, PSIUs and counterpart NGO s shall be women. (ii) Within three months of the fielding of the Project Management Consultant, a strategy to ensure that women comprise 50% of participating CBO s and CBO executive committees. (iii) Within three months of the fielding of the Project Management Consultant, a strategy to ensure that at least 20% of the NWSDB employees receiving training shall be women. Complied with Complied with Under implementation. para 23 D. Environmental Covenants The Borrower and NWSDB shall ensure that the Project is carried out in accordance with existing environmental laws and regulations of Sri Lanka and Bank environmental guidelines. The project shall carry out as per the monitoring and mitigation measures indicated in the IEE and CEA approval documents and consult the local communities on Environmental issues. Environmental Officers recruited under the project for monitoring of construction activities and catchment s protection.

3 para 23 NWSBD shall obtain Environmental clearance from CEA for Matara subcomponent before any withdrawals are to be made from the loan account except as the bank may otherwise agree. Sub project is discontinued. Environmental clearance no longer required. para 8 E. Urban component The Borrower shall ensure that local authority shall be engaged by the PMU in the implementation of the drainage sub component and drainage shall be undertaken in GNDs selected based on population density and state of existing facilities. Complied with para 21 para 12 The ID shall enter into and agreement with NWSDB regarding the implementation arrangement for the Unnichchai tank bund raising subcomponent and allowing the NWSDB to audit the ID project s accounts. The Borrower shall ensure that the Unnichachai Tank Feasibility study shall be provide to ADB F. The Rural Component Implementation The borrower shall ensure registration of CBOs as a legal entity: (i) Approval of the by laws and resolutions related to management of RWS for CBO by the relevant authority. (ii) CBOs have been duly constituted MOU signed on 24 October A copy has been provided to ADB, complied with (i) Registration of CBOs with RWS section of NWSDB is complete for batch 1 and batch 2. NSC concurrence obtained as well as comments of the Gov t Legal Advisor and PS. Final Draft document approved. PS council concurrence is in the process. (ii) (iii) Approval of the relevant authorities for the water supply management manuals prepared for the use of PS and CBO under the third water supply and sanitation project. (iv) PSIUs of the project select sub projects that meet selection criteria satisfactory to the bank. (vi) CBOs and PSs enter into agreements relating to management regulations and distribution of water. (iii) Selection according to approved criteria. (iv) Satisfactorily Completed. (v) On going. 1st batch 98% completed and 2nd batch in progress.

4 para 13 Selection of subprojects shall follow criteria agreed between NWSDB and the Bank. para 14 para 15 G. Financial Management NWSDB shall prepare strategy to improve its financial management operations with a detailed schedule and financial plan, to be submitted to the Bank for approval within three months of the Effective Date. The performance of NWSDB shall be measured by operational performance indicators and targets set out in Appendix 2 of the RRP Strategy agreed with the NWSDB. Implementation is in progress indicators indicate variable levels of performance. On going para 17 para 30 The Borrower shall ensure that water tariffs are set by NWSDB prior to the Water Services industry Act coming in to legal effect. (i) NWSDB to implement a corporate strategy to improve the financial planning and resource allocation within 2 years of the effective date. (ii) NWSDB shall implement within one year of the effective date an action plan to address audit findings and KPMG Accounting and Financial Management Recommendations attached to the 13 Sept MOU between the Borrower and ADB. Not yet due. (i) Corporate strategy under implementation. (ii) Implementation on-going Progress report attached as at

5 (iii) NWSDB shall implement the strategy to reduce O&M cost by reducing electricity cost and non revenue water within two years of effective date. (iv) Completion of assets registry in all regions for water supply schemes having more than 10,000 connections within two years of the effective date. (v) NWSDB shall identify water schemes less than 1,000 connections for rehabilitation and mutual transfer to Local Government Institutions, private sector entities and / or CBO s within four years of the effective date. (iii) Strategy under Implementation. Overall funds allocated under this loan insufficient to achieve Corporate Strategy targets. (iv) Asset registry completed and submitted to the Valuation department for asset valuation purposes to preparation of asset register in future. Clarifying of land ownership is taking place. Land and building valuation is Continuing. (v) Board undertaking this activity on a pilot basis prior to establishing the transfer of all schemes. ADB s agreement obtained. para 16 H. Training NWSDB shall submit for the Bank concurrence a strategic five year training plan which shall specify in the training institutions methodologies and expected training outputs within three months of the effective date and annual training plan prior to 31st October of each year. Complied with 2004/2005, 2005/2006 & 2006/ /2008 Submitted to ADB. I. Reporting NWSDB shall submit quarterly progress reports on project implementation following the Bank standards procedures. NWSDB shall submit to the Bank the project completion report (PCR) within three months from the physical completion of the project On going Not yet due.

6 para 28 para 31 para 26 para 32 The PIUs and PSIUs shall maintain separate project accounts. The Audited project subaccounts and financial statements shall be submitted through the PMU within 09 months of the close of the related financial years. The audited Annual report of NWSDB shall be submitted to the Bank not later than 9 months after the close of each financial year. The Borrower and local Governments shall prepare by 31 December of each year and operation plan of the next fiscal year. J. Counterpart funding The Borrower shall ensure that counterpart funds shall be released by 31st December of each year. K. Project Performance Monitoring The PMU shall develop comprehensive PPMS procedures and plans in accordance with ADB s standards within 6 months after effective date. Auditor General s final report of the project for the year 2009 has been received and submitted to ADB and Ministry of Water Supply and Drainage. Monitoring system and CPM developed by the PMU.

Project Administration Manual

Project Administration Manual Project Administration Manual Project Number: 31501 June 2011 Proposed Loan for Additional Financing Democratic Socialist Republic of Sri Lanka: Secondary Towns and Rural Community-Based Water Supply and

More information

Additional Cofinancing

Additional Cofinancing Additional Cofinancing Sri Lanka Sri Lanka Project Number: 45148 Loan Number: 3029/3030-SRI May 2014 Proposed Administration of Loan Democratic Socialist Republic of Sri Lanka: Greater Colombo Water and

More information

PROJECT AGREEMENT. (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF SINDH

PROJECT AGREEMENT. (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF SINDH LOAN NUMBER 2499-PAK (SF) PROJECT AGREEMENT (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK and PROVINCE OF SINDH NORTH SINDH URBAN SERVICES CORPORATION LIMITED DATED

More information

Semi-Annual Social Safeguards Monitoring Report. SRI: Greater Colombo Wastewater Management Project

Semi-Annual Social Safeguards Monitoring Report. SRI: Greater Colombo Wastewater Management Project Semi-Annual Social Safeguards Monitoring Report Project No. 36173-013 Period Covering July to December 2013 April 2014 SRI: Greater Colombo Wastewater Management Project Prepared by the Ministry of Local

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

Section 3.07 is deleted and the following is substituted therefor:

Section 3.07 is deleted and the following is substituted therefor: 2 outstanding Loan and the Fixed Spread that will be applied to new Loans (expressed as a percentage per annum), by (ii) the principal amount of the outstanding Loan on which the Borrower shall pay interest

More information

The World Bank LK GPOBA - Access to Sanitation Project (P111161)

The World Bank LK GPOBA - Access to Sanitation Project (P111161) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LK GPOBA - ACCESS TO SANITATION PROJECT APPROVED ON JUNE 8, 2011 TO DEMOCRATIC

More information

FRAMEWORK FINANCING AGREEMENT (SRI: Colombo Water and Wastewater Management Improvement Investment Program)

FRAMEWORK FINANCING AGREEMENT (SRI: Colombo Water and Wastewater Management Improvement Investment Program) FRAMEWORK FINANCING AGREEMENT (SRI: Colombo Water and Wastewater Management Improvement Investment Program) Parties MFF Investment Program This Framework Financing Agreement (FFA) dated 12 September 2012

More information

PROJECT PREPARATION TECHNICAL ASSISTANCE

PROJECT PREPARATION TECHNICAL ASSISTANCE 12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility

More information

LOAN AGREEMENT (Special Operations) (Climate Resilient Rice Commercialization Sector Development Project) between KINGDOM OF CAMBODIA.

LOAN AGREEMENT (Special Operations) (Climate Resilient Rice Commercialization Sector Development Project) between KINGDOM OF CAMBODIA. LOAN NUMBER 3007-CAM (SF) LOAN AGREEMENT (Special Operations) (Climate Resilient Rice Commercialization Sector Development Project) between KINGDOM OF CAMBODIA and ASIAN DEVELOPMENT BANK DATED 26 AUGUST

More information

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). WHEREAS (A) the Borrower has applied to ADB for a loan

More information

People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project

People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project Validation Report Reference Number: PVR-462 Project Number: 42496-013 Loan Number: 2508 December 2016 People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project Independent

More information

Project Administration Manual

Project Administration Manual Project Administration Manual Project Number:50102 Loan and/or Grant Number(s): {LXXXX; GXXXX} July 2018 Kingdom of Cambodia: Second Urban Environmental Management in the Tonle Sap Basin Project ABBREVIATIONS

More information

MFF - Bihar Urban Development Investment Program (Facility Concept)

MFF - Bihar Urban Development Investment Program (Facility Concept) India: MFF - Bihar Urban Development Investment Program (Facility Concept) Project Name Project Number 41603-013 Country Project Status Project Type / Modality of Assistance Source of Funding / Amount

More information

(c) Section 3.07 is deleted and the following is substituted therefor:

(c) Section 3.07 is deleted and the following is substituted therefor: 2 outstanding Loan on which a higher Fixed Spread is applicable. The amount of the Rebate shall be determined by multiplying (i) the difference between the Fixed Spread applicable to the outstanding Loan

More information

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time);

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time); 2 (f) Goods means equipment and materials to be financed out of the proceeds of the Loan, including related services such as transportation, insurance, installation, commissioning, training, and initial

More information

FINANCIAL MANAGEMENT ASSESSMENT

FINANCIAL MANAGEMENT ASSESSMENT Greater Malé Environmental Improvement and Waste Management Project (RRP MLD 51077) EXECUTIVE SUMMARY FINANCIAL MANAGEMENT ASSESSMENT 1. The financial management assessment (FMA) was conducted for the

More information

Indonesia: Metropolitan Medan Urban Development Project

Indonesia: Metropolitan Medan Urban Development Project Validation Report Reference Number: PCV:INO 2009-09 Project Number: 27358 Loan Number: 1587 May 2009 Indonesia: Metropolitan Medan Urban Development Project Independent Evaluation Department 2 ABBREVIATIONS

More information

India: Karnataka Urban Development and Coastal Environmental Management Project

India: Karnataka Urban Development and Coastal Environmental Management Project Validation Report Reference Number: PVR-334 Project Number: 30303 Loan Number: 1704 November 2014 India: Karnataka Urban Development and Coastal Environmental Management Project Independent Evaluation

More information

Indonesia: Capacity Building in Urban Infrastructure Management Project

Indonesia: Capacity Building in Urban Infrastructure Management Project Validation Report Reference Number: PCV: INO 2008-68 Project Number: 27289 Loan Number: 1572-INO May 2009 Indonesia: Capacity Building in Urban Infrastructure Management Project Independent Evaluation

More information

Bangladesh: Chittagong Hill Tracts Rural Development Project

Bangladesh: Chittagong Hill Tracts Rural Development Project Validation Report Reference Number: PVR-222 Project Number: 32467 Loan Number: 1771(SF) December 2012 Bangladesh: Chittagong Hill Tracts Rural Development Project Independent Evaluation Department ABBREVIATIONS

More information

Sri Lanka: National Highways Sector Project

Sri Lanka: National Highways Sector Project Completion Report Project Number: 38357-013 Loan Numbers: 2217, 2767 and 8252 Technical Assistance Number: 4736 August 2018 Sri Lanka: National Highways Sector Project This document is being disclosed

More information

OPERATIONS MANUAL BANK POLICIES (BP)

OPERATIONS MANUAL BANK POLICIES (BP) BANK POLICIES (BP) OM Section F1/BP Page 1 of 2 These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. SAFEGUARD POLICY STATEMENT 1. The Asian Development

More information

FINANCIAL ANALYSIS. A. Methodology and Assumptions

FINANCIAL ANALYSIS. A. Methodology and Assumptions Metropolitan Sanitation Management Investment Project (RRP INO 43251-025) FINANCIAL ANALYSIS 1. Financial analysis was prepared for the five subprojects in accordance with the Financial Management and

More information

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project Project Design Advance Project Number: 47279-003 September 2016 Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project This document is being disclosed to the public in accordance with ADB's Public

More information

LOAN AGREEMENT (Special Operations) (Road Network Upgrading Project) between DEMOCRATIC REPUBLIC OF TIMOR-LESTE. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Special Operations) (Road Network Upgrading Project) between DEMOCRATIC REPUBLIC OF TIMOR-LESTE. and ASIAN DEVELOPMENT BANK LOAN NUMBER 2858-TIM (SF) LOAN AGREEMENT (Special Operations) (Road Network Upgrading Project) between DEMOCRATIC REPUBLIC OF TIMOR-LESTE and ASIAN DEVELOPMENT BANK DATED 2 MAY 2012 TIM 45094 LOAN AGREEMENT

More information

Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1)

Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1) Validation Report Reference Number: PVR-326 Project Number: 37066 Loan Number: 2248 October 2014 Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1) Independent Evaluation

More information

Indonesia: Participatory Irrigation Sector Project

Indonesia: Participatory Irrigation Sector Project Validation Report Reference Number: PVR-393 Project Number: 32359 Loan/Grant Numbers: 2064, 2065, and 4229 February 2015 Indonesia: Participatory Irrigation Sector Project Independent Evaluation Department

More information

CURRENCY EQUIVALENCE (as of Dec 2011)

CURRENCY EQUIVALENCE (as of Dec 2011) CURRENCY EQUIVALENCE (as Dec 0) Currency Unit SLR.00 $.00 = = Sri Lanka Rupees (SLR) $ 0.0090909 SLR 0 ABBREVIATIONS ADB Asian Development Bank ACLG Assistant Commissioner Local Government CDTA Capacity

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). WHEREAS (A) by a loan agreement of even date herewith

More information

Project Completion Report

Project Completion Report Project Completion Report Project Number: 38074-013 Loan Number: 2208-UZB December 2011 Uzbekistan: Kashkadarya and Navoi Rural Water Supply and Sanitation Sector Project CURRENCY EQUIVALENTS Currency

More information

Republic of Uzbekistan: Solid Waste Management Improvement Project

Republic of Uzbekistan: Solid Waste Management Improvement Project Project Administration Manual Project Number: 45366 Loan Number: {LXXXX-UZB} November 2013 Republic of Uzbekistan: Solid Waste Management Improvement Project CONTENTS ABBREVIATIONS I. PROJECT DESCRIPTION

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program)

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program) PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program) 1. A project preparatory technical assistance (PPTA) for $700,000 in grant funds is

More information

Project Administration Memorandum. Democratic Socialist Republic of Sri Lanka: Eastern & North Central Provincial Road Project

Project Administration Memorandum. Democratic Socialist Republic of Sri Lanka: Eastern & North Central Provincial Road Project Project Administration Memorandum Project Number: 39619 Loan Number: 2546 December 2009 Democratic Socialist Republic of Sri Lanka: Eastern & North Central Provincial Road Project This Project administration

More information

Completion Report. Project Number: Loan Number: 1472 August Philippines: Small Towns Water Supply Sector Project

Completion Report. Project Number: Loan Number: 1472 August Philippines: Small Towns Water Supply Sector Project Completion Report Project Number: 27250 Loan Number: 1472 August 2006 Philippines: Small Towns Water Supply Sector Project CURRENCY EQUIVALENTS Currency Unit Philippine peso (P) At Appraisal At Project

More information

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT Himachal Pradesh Clean Energy Transmission Investment Program (RRP IND 43464) TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT A. INTRODUCTION 1. The

More information

Democratic Socialist Republic of Sri Lanka. Smallholder Agribusiness Partnerships (SAP) Programme. Negotiated financing agreement

Democratic Socialist Republic of Sri Lanka. Smallholder Agribusiness Partnerships (SAP) Programme. Negotiated financing agreement Document: EB 2017/120/R.13/Sup.1 Agenda: 9(b)(iii) Date: 8 April 2017 Distribution: Public Original: English E Democratic Socialist Republic of Sri Lanka Smallholder Agribusiness Partnerships (SAP) Programme

More information

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS Strengthening Public Financial Resource Management through Information and Communication Systems Technology Systems (TRTA MON 51084) OUTLINE TERMS OF REFERENCE FOR CONSULTANTS 1. The transaction technical

More information

PROJECT AGREEMENT. (Renewable Energy Development Sector Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF PUNJAB

PROJECT AGREEMENT. (Renewable Energy Development Sector Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF PUNJAB LOAN NUMBER 2286/2287(SF)-PAK PROJECT AGREEMENT (Renewable Energy Development Sector Investment Program Project 1) between ASIAN DEVELOPMENT BANK and PROVINCE OF PUNJAB DATED 5 October 2007 PAL:PAK 34339

More information

ARTICLE I. Loan Regulations; Definitions

ARTICLE I. Loan Regulations; Definitions 2 ARTICLE I Loan Regulations; Definitions Section 1.01. All provisions of the Special Operations Loan Regulations of ADB, dated 1 January 2006 (the Loan Regulations ), are hereby made applicable to this

More information

Section 3.06 is deleted and the following is substituted therefor:

Section 3.06 is deleted and the following is substituted therefor: 2 (c) Section 3.03 is deleted and the following is substituted therefor: Commitment Charge; Credit; Maturity Premium. (a) The Borrower shall pay a commitment charge on the unwithdrawn amount of the Loan

More information

Actual Project Name : Second Community. Project Costs (US$M US$M): Sector Board : Water Cofinancing (US$M US$M): US$M): ICR Review

Actual Project Name : Second Community. Project Costs (US$M US$M): Sector Board : Water Cofinancing (US$M US$M): US$M): ICR Review Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR13732 1. Project Data: Date Posted : 11/08/2013 Public Disclosure Authorized Public Disclosure Authorized Public

More information

LOAN AGREEMENT (Special Operations) (Municipal Services Development Project - Phase II) between GEORGIA. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Special Operations) (Municipal Services Development Project - Phase II) between GEORGIA. and ASIAN DEVELOPMENT BANK LOAN NUMBER 2534-GEO(SF) LOAN AGREEMENT (Special Operations) (Municipal Services Development Project - Phase II) between GEORGIA and ASIAN DEVELOPMENT BANK DATED 20 AUGUST 2009 LAS:GEO 43171 LOAN AGREEMENT

More information

Bangladesh: Urban Governance and Infrastructure Improvement (Sector) Project

Bangladesh: Urban Governance and Infrastructure Improvement (Sector) Project f Validation Report Reference Number: PVR-370 Project Number: 29041 Loan Number: 1947 December 2014 Bangladesh: Urban Governance and Infrastructure Improvement (Sector) Project Independent Evaluation Department

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. OM Section F1/BP Page 1 of 3 OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction ENVIRONMENTAL

More information

FINANCIAL MANAGEMENT ASSESSMENT REPORT (MICROFINANCE INSTITUTIONS)

FINANCIAL MANAGEMENT ASSESSMENT REPORT (MICROFINANCE INSTITUTIONS) Access to Green Finance Project (RRP TAJ 45229) Supplementary Document 17 FINANCIAL MANAGEMENT ASSESSMENT REPORT (MICROFINANCE INSTITUTIONS) A. Executive Summary 1. As of February 2013, there are 126 licensed

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI 6.02 Page 1 of 2 PROJECT ADMINISTRATION MISSIONS A. Introduction 1. ADB missions dispatched for loan and technical assistance (TA) project administration are classified

More information

The Democratic Socialist Republic of Sri Lanka. Smallholder Tea and Rubber Devitalization (STARR) Project. Negotiated financing agreement

The Democratic Socialist Republic of Sri Lanka. Smallholder Tea and Rubber Devitalization (STARR) Project. Negotiated financing agreement Document: EB 2015/116/R.20/Sup.1 Agenda: 9 (c ) (ii) Date: 4 December 2015 Distribution: Public Original: English E The Democratic Socialist Republic of Sri Lanka Smallholder Tea and Rubber Devitalization

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 44212 June 2014 Proposed Loan and Administration of Loan and Grants People s Republic of Bangladesh: Coastal Towns Environmental

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 24-Feb-2015

More information

Periodic Financing Request Report. Armenia: Sustainable Urban Development Investment Program Tranche 2

Periodic Financing Request Report. Armenia: Sustainable Urban Development Investment Program Tranche 2 Periodic Financing Request Report Project Number: 42417-033 MFF Number: 0056 September 2015 Armenia: Sustainable Urban Development Investment Program Tranche 2 This document is being disclosed to the public

More information

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance Technical Assistance Report Project Number: 47287-001 Capacity Development Technical Assistance (CDTA) December 2013 Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved

More information

Proposed Grants and Administration of Grants Independent State of Samoa: Renewable Energy Development and Power Sector Rehabilitation Project

Proposed Grants and Administration of Grants Independent State of Samoa: Renewable Energy Development and Power Sector Rehabilitation Project Project Administration Manual Project Number: 46044 October 2013 Proposed Grants and Administration of Grants Independent State of Samoa: Renewable Energy Development and Power Sector Rehabilitation Project

More information

Nepal: Kathmandu Sustainable Urban Transport Project

Nepal: Kathmandu Sustainable Urban Transport Project Project Administration Manual Project Number: 44058 Loan and/or Grant Number(s): LXXXX; GXXXX June 2010 Nepal: Kathmandu Sustainable Urban Transport Project CONTENTS I. PROJECT DESCRIPTION 1 II. IMPLEMENTATION

More information

Project Administration Manual. Project Number: November Cook Islands: Renewable Energy Sector Project

Project Administration Manual. Project Number: November Cook Islands: Renewable Energy Sector Project Project Administration Manual Project Number: 46453 November 2014 Cook Islands: Renewable Energy Sector Project Contents ABBREVIATIONS I. PROJECT DESCRIPTION 5 A. Impact and Outcome 5 B. Outputs 5 II.

More information

Validation Report. India: Rural Roads Sector I Project. Independent Evaluation Department

Validation Report. India: Rural Roads Sector I Project. Independent Evaluation Department Validation Report Reference Number: PVR-307 Project Number: 36320 Loan Number: 2018 May 2014 India: Rural Roads Sector I Project Independent Evaluation Department ABBREVIATIONS ADB Asian Development Bank

More information

Periodic Financing Request Report. India: Karnataka Integrated Urban Water Management Investment Program (Tranche 2)

Periodic Financing Request Report. India: Karnataka Integrated Urban Water Management Investment Program (Tranche 2) Periodic Financing Request Report Project Number: 43253-027 MFF Number: 0080-IND October 2018 India: Karnataka Integrated Urban Water Management Investment Program (Tranche 2) Distribution of this document

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK RRP: NEP 32249 REPORT AND RECOMMENDATION OF THE PRESIDENT TO THE BOARD OF DIRECTORS ON A PROPOSED LOAN TO THE KINGDOM OF NEPAL FOR THE COMMUNITY-BASED WATER SUPPLY AND SANITATION

More information

Project Agreement. OffICIAL OCUMENTS I LOAN NUMBER 8121-ID. Jakarta Urgent Flood Mitigation Project (Jakarta Emergency Dredging Initiative) between

Project Agreement. OffICIAL OCUMENTS I LOAN NUMBER 8121-ID. Jakarta Urgent Flood Mitigation Project (Jakarta Emergency Dredging Initiative) between OffICIAL OCUMENTS I LOAN NUMBER 8121-ID Project Agreement Jakarta Urgent Flood Mitigation Project (Jakarta Emergency Dredging Initiative) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT and

More information

Project Administration Manual. Project Number: Grant Number: GXXXX November Vanuatu: Cyclone Pam School Reconstruction Project

Project Administration Manual. Project Number: Grant Number: GXXXX November Vanuatu: Cyclone Pam School Reconstruction Project Project Administration Manual Project Number: 49320-001 Grant Number: GXXXX November 2015 Vanuatu: Cyclone Pam School Reconstruction Project Contents ABBREVIATIONS 4 I. PROJECT DESCRIPTION 1 II. IMPLEMENTATION

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/15/2010 1. Basic Project Data Original

More information

Philippines: Mindanao Basic Urban Services Sector Project

Philippines: Mindanao Basic Urban Services Sector Project Validation Report Reference Number: PCV: PHI 2011-25 Project Number: 30551 Loan Number: 1843 September 2011 Philippines: Mindanao Basic Urban Services Sector Project Independent Evaluation Department ABBREVIATIONS

More information

Section 3.07 is deleted and the following is substituted therefor:

Section 3.07 is deleted and the following is substituted therefor: 3 outstanding Loan on which a higher Fixed Spread is applicable. The amount of the Rebate shall be determined by multiplying (i) the difference between the Fixed Spread applicable to the outstanding Loan

More information

THE REPUBLIC OF UGANDA

THE REPUBLIC OF UGANDA THE REPUBLIC OF UGANDA REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF THE KAMPALA INSTITUTIONAL AND INFRASTRACTURE DEVELOPMENT PROJECT (KIIDP 2) IDA CREDIT NO. 53840 UG FOR THE FOURTEEN (14)

More information

Grant Assistance JFPR: SRI 39183

Grant Assistance JFPR: SRI 39183 Grant Assistance JFPR: SRI 39183 Proposed Grant Assistance to Sri Lanka for the Public Works Restoration and Rehabilitation of Line Drainage Systems of Tsunami-Affected Local Government Roads (Financed

More information

Socialist Republic of Viet Nam: Sustainable Rural Infrastructure Development Project in Northern Mountain Provinces

Socialist Republic of Viet Nam: Sustainable Rural Infrastructure Development Project in Northern Mountain Provinces Sustainable Rural Infrastructure Development Project in Northern Mountain Provinces (RRP VIE 41461) Project Administration Manual Project Number: 41461 Loan and/or Grant Number(s): 30 September 2010 Socialist

More information

GAMAS means Mongolia Customs Automated Data Processing

GAMAS means Mongolia Customs Automated Data Processing 2 System; (c) GAMAS means Mongolia Customs Automated Data Processing (d) Grant Account means the account opened by ADB on its books in the name of Mongolia for the purposes of the Project and to which

More information

Validation Report. India: North Karnataka Urban Sector Investment Program, Tranche 1. Independent Evaluation Department

Validation Report. India: North Karnataka Urban Sector Investment Program, Tranche 1. Independent Evaluation Department Validation Report Reference Number: PVR-451 Project Number: 38254-033 Loan Number: 2312 August 2016 India: North Karnataka Urban Sector Investment Program, Tranche 1 Independent Evaluation Department ABBREVIATIONS

More information

Cook Islands: Renewable Energy Sector Project

Cook Islands: Renewable Energy Sector Project Project Administration Manual Project Number: 46453 October 2017 Cook Islands: Renewable Energy Sector Project (including Additional Financing I and II) ABBREVIATIONS CONTENTS I. PROJECT DESCRIPTION 1

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Sri Lanka Project Number: 48141-001 November 2014 Proposed Loan and Technical Assistance Grant Republic of Fiji: Transport Infrastructure

More information

Islamic Republic of Pakistan: Sindh Provincial Road Improvement Project

Islamic Republic of Pakistan: Sindh Provincial Road Improvement Project Sindh Provincial Road Improvement Project (RRP PAK 46377) Project Administration Manual Project Number: 46377 Loan Number: September 2015 Islamic Republic of Pakistan: Sindh Provincial Road Improvement

More information

PROJECT AGREEMENT. (Conflict-Affected Region Emergency Project) between ASIAN DEVELOPMENT BANK. and CEYLON ELECTRICITY BOARD

PROJECT AGREEMENT. (Conflict-Affected Region Emergency Project) between ASIAN DEVELOPMENT BANK. and CEYLON ELECTRICITY BOARD LOAN NUMBER 2626-SRI PROJECT AGREEMENT (Conflict-Affected Region Emergency Project) between ASIAN DEVELOPMENT BANK and CEYLON ELECTRICITY BOARD NATIONAL WATER SUPPLY AND DRAINAGE BOARD NORTH CENTRAL PROVINCIAL

More information

Nepal: Road Connectivity Sector I Project

Nepal: Road Connectivity Sector I Project Validation Report October 2017 Nepal: Road Connectivity Sector I Project Reference Number: PVR-523 Project Number: 37266-032 Grant Number: 0051 ABBREVIATIONS ADB Asian Development Bank DOR Department of

More information

IN December The attached report is circulated at the request of the Director General, Independent Evaluation Department.

IN December The attached report is circulated at the request of the Director General, Independent Evaluation Department. IN.464-17 20 December 2017 Performance Evaluation Report Municipal Services Development Project and Municipal Services Development Project Phase 2 (Georgia) (Loans 2441 and 2534) The attached report is

More information

Financing the One WASH program ETHIOPIA. By Abiy Girma National WASH Program Coordinator

Financing the One WASH program ETHIOPIA. By Abiy Girma National WASH Program Coordinator Financing the One WASH program ETHIOPIA By Abiy Girma National WASH Program Coordinator OWNP:- Road to sector wide approach Government led Instrument for achieving the goals set in achieving middle income

More information

Facility Administration Manual

Facility Administration Manual Green Power Development and Energy Efficiency Improvement Investment Program (RRP SRI 47037) Facility Administration Manual Project Number: 47037 Loan Numbers: {LXXXX; LXXXX} May 2014 Democratic Socialist

More information

Country Practice Area(Lead) Additional Financing Indonesia Water P161514

Country Practice Area(Lead) Additional Financing Indonesia Water P161514 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020651 Public Disclosure Authorized Public Disclosure Authorized Project ID P096532 Project Name ID:

More information

Completion Report. Project Number: Loan Number: 1950 June Pakistan: Punjab Community Water Supply and Sanitation Sector Project

Completion Report. Project Number: Loan Number: 1950 June Pakistan: Punjab Community Water Supply and Sanitation Sector Project Completion Report Project Number: 35314 Loan Number: 1950 June 2008 Pakistan: Punjab Community Water Supply and Sanitation Sector Project CURRENCY EQUIVALENTS Currency Unit Pakistan rupee/s (PRe/PRs) At

More information

FINANCIAL MANAGEMENT ASSESSMENT EXECUTIVE SUMMARY

FINANCIAL MANAGEMENT ASSESSMENT EXECUTIVE SUMMARY Earthquake Emergency Assistance Project (RRP NEP 49215) FINANCIAL MANAGEMENT ASSESSMENT EXECUTIVE SUMMARY 1. An updated financial management assessment (FMA) has been conducted for the four Implementing

More information

FINANCIAL MANAGEMENT ASSESSMENT EXECUTIVE SUMMARY

FINANCIAL MANAGEMENT ASSESSMENT EXECUTIVE SUMMARY Emergency Assistance Project (RRP BAN 52174-001) FINANCIAL ANAGEENT ASSESSENT EXECUTIVE SUARY I. Introduction 1. An updated financial management assessment (FA) has been conducted for the four implementing

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 42007-018 June 2016 Proposed Loan and Administration of Technical Assistance Grant Republic of Uzbekistan: Small Business

More information

India: Bihar State Highways Project

India: Bihar State Highways Project Completion Report Project Number: 41127-013 Loan Number: 2443 Technical Assistance Number: 7130 August 2018 India: Bihar State Highways Project This document is being disclosed to the public in accordance

More information

ONE WASH NATIONAL PROGRAMME (OWNP)

ONE WASH NATIONAL PROGRAMME (OWNP) ONE WASH NATIONAL PROGRAMME (OWNP) ONE Plan ONE Budget ONE Report planning with linked strategic and annual WASH plans at each level budgeting re ecting all WASH-related investments and expenditures financial

More information

PROJECT AGREEMENT. (Hebei Energy Efficiency Improvement and Emission Reduction Project) between ASIAN DEVELOPMENT BANK. and

PROJECT AGREEMENT. (Hebei Energy Efficiency Improvement and Emission Reduction Project) between ASIAN DEVELOPMENT BANK. and LOAN NUMBER 2835-PRC PROJECT AGREEMENT (Hebei Energy Efficiency Improvement and Emission Reduction Project) between ASIAN DEVELOPMENT BANK and HEBEI PROVINCIAL GOVERNMENT DATED 6 MARCH 2012 PRC 44012 PROJECT

More information

Bhutan: Urban Infrastructure Development Project

Bhutan: Urban Infrastructure Development Project Validation Report December 2018 Bhutan: Urban Infrastructure Development Project Reference Number: PVR-551 Project Number: 38049-013 Loan Number: 2258 ADB DMF DUDES EIRR FIRR km LAP m 3 MOWHS MT O&M PCC

More information

FINANCIAL ANALYSIS. Table 1: Project Outputs Output Subcomponents Type of Analysis Enshi Wastewater Enshi Hongmiao WWTP Enshi Dashaba WWTP

FINANCIAL ANALYSIS. Table 1: Project Outputs Output Subcomponents Type of Analysis Enshi Wastewater Enshi Hongmiao WWTP Enshi Dashaba WWTP Hubei Enshi Qing River Upstream Environment Rehabilitation Project (RRP PRC 47048) FINANCIAL ANALYSIS A. Introduction 1. The financial analysis of the project was carried out in accordance with the Asian

More information

Loan Agreement. (Eastern Indonesia Region Transport Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Loan Agreement. (Eastern Indonesia Region Transport Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT CONFORMED COPY LOAN NUMBER 4643 IND Loan Agreement (Eastern Indonesia Region Transport Project) between REPUBLIC OF INDONESIA and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated January 22,

More information

CIA. Loan Agreement. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

CIA. Loan Agreement. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized CIA LOAN NUMBER 3888-IND Public Disclosure Authorized Loan Agreement Public Disclosure Authorized (Village Infrastructure Project for Java) between REPUBLIC OF INDONESIA and

More information

People's Republic of Bangladesh: Dhaka Chittagong Expressway PPP Design

People's Republic of Bangladesh: Dhaka Chittagong Expressway PPP Design Dhaka Chittagong Expressway PPP Design (RRP BAN 45174) Project Administration Manual Project Number: 45174 Loan Number: October 2011 People's Republic of Bangladesh: Dhaka Chittagong Expressway PPP Design

More information

Solomon Islands: Transport Sector Development Project

Solomon Islands: Transport Sector Development Project Validation Report September 2018 Solomon Islands: Transport Sector Development Project Reference Number: PVR-582 Project Number: 41171-022 Grant Number: 0243 ABBREVIATIONS ADB Asian Development Bank ADF

More information

Section (a) ADB and Uzbekenergo shall cooperate fully to ensure that the purposes of the Loan will be accomplished.

Section (a) ADB and Uzbekenergo shall cooperate fully to ensure that the purposes of the Loan will be accomplished. 2 Section 2.03. (a) In the carrying out of the Project, Uzbekenergo shall employ competent and qualified consultants and contractors, acceptable to ADB, to an extent and upon terms and conditions satisfactory

More information

PERIODIC FINANCING REQUEST. RE: Higher Education in the Pacific Investment Program: Periodic Financing Request #1

PERIODIC FINANCING REQUEST. RE: Higher Education in the Pacific Investment Program: Periodic Financing Request #1 PERIODIC FINANCING REQUEST Date: April 2012 To: Asian Development Bank 6 ADB Avenue Mandaluyong City, Metro Manila ATTENTION: Director General, Pacific Department Fax No. +632-632-6318 Sir: RE: Higher

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The PPTA will review and assess the performance of the secondary education subsector in Viet Nam and identify the challenges, which

More information

PROJECT AGREEMENT. (Tianjin Integrated Gasification Combined Cycle Power Plant Project) between ASIAN DEVELOPMENT BANK. and

PROJECT AGREEMENT. (Tianjin Integrated Gasification Combined Cycle Power Plant Project) between ASIAN DEVELOPMENT BANK. and LOAN NUMBER 2616-PRC PROJECT AGREEMENT (Tianjin Integrated Gasification Combined Cycle Power Plant Project) between ASIAN DEVELOPMENT BANK and THE EXPORT-IMPORT BANK OF CHINA CHINA HUANENG GROUP GREENGEN

More information

Completion Report. People s Republic of China: Hunan Flood Management Sector Project. Project Number: Loan Number: 2244 August 2016

Completion Report. People s Republic of China: Hunan Flood Management Sector Project. Project Number: Loan Number: 2244 August 2016 Completion Report Project Number: 37641-013 Loan Number: 2244 August 2016 People s Republic of China: Hunan Flood Management Sector Project This document is being disclosed to the public in accordance

More information

LOAN AGREEMENT (Ordinary Operations) (Hebei Energy Efficiency Improvement and Emission Reduction Project) between ASIAN DEVELOPMENT BANK.

LOAN AGREEMENT (Ordinary Operations) (Hebei Energy Efficiency Improvement and Emission Reduction Project) between ASIAN DEVELOPMENT BANK. LOAN NUMBER 2835-PRC LOAN AGREEMENT (Ordinary Operations) (Hebei Energy Efficiency Improvement and Emission Reduction Project) between ASIAN DEVELOPMENT BANK and PEOPLE S REPUBLIC OF CHINA DATED 6 MARCH

More information

LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK LOAN NUMBER 2729-ARM LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA and ASIAN DEVELOPMENT BANK DATED 30 MAY 2011 ARM 42145 LOAN

More information

Cambodia: Small and Medium Enterprise Development Program

Cambodia: Small and Medium Enterprise Development Program Validation Report Reference Number: PCV: CAM 2010-73 Program Number: 36383 Loan Number: 2129(SF) December 2010 Cambodia: Small and Medium Enterprise Development Program Independent Evaluation Department

More information

Greater Mekong Subregion: Flood and Drought Risk Management and Mitigation Project - Socialist Republic of Viet Nam

Greater Mekong Subregion: Flood and Drought Risk Management and Mitigation Project - Socialist Republic of Viet Nam GMS Flood and Drought Risk Management and Mitigation Project (RRP REG 40190) Project Administration Manual Project Number: 40190 Loan Number: LXXXX October 2012 Greater Mekong Subregion: Flood and Drought

More information