1 Dhaka Chittagong Expressway PPP Design (RRP BAN 45174) Project Administration Manual Project Number: Loan Number: October 2011 People's Republic of Bangladesh: Dhaka Chittagong Expressway PPP Design

2 Contents ABBREVIATIONS I. PROJECT DESCRIPTION 1 II. IMPLEMENTATION PLAN 1 A. Project Readiness Activities 1 B. Overall Project Implementation Plan 2 III. PROJECT MANAGEMENT ARRANGEMENTS 3 A. Project Implementation Organizations Roles and Responsibilities 3 B. Key Persons Involved in Implementation 3 C. Project Organization Structure 4 IV. COSTS AND FINANCING 4 A. Cost Estimates by Expenditure Category and by Financier 5 B. Allocation and Withdrawal of Loan Proceeds 6 C. Fund Flow Diagram 6 V. FINANCIAL MANAGEMENT 7 A. Financial Management Assessment 7 B. Disbursement 8 C. Accounting 9 D. Auditing 9 VI. PROCUREMENT AND CONSULTING SERVICES 9 A. Advance Contracting 9 B. Procurement of Goods, Works and Consulting Services 9 C. Procurement Plan 10 D. Consultant's Terms of Reference 10 VII. SAFEGUARDS AND SOCIAL DIMENSIONS 10 VIII. PERFORMANCE MONITORING, EVALUATION, REPORTING AND COMMUNICATION 11 A. Project Design and Monitoring Framework 11 B. Monitoring 14 C. Evaluation 14 D. Reporting 15 E. Stakeholder Communication Strategy 15 IX. ANTICORRUPTION POLICY 15 X. ACCOUNTABILITY MECHANISM 15 XI. RECORD OF PAM CHANGES 16 Attachment A: Procurement Plan Attachment B: TOR for Design Consultants Attachment C: TOR for Transaction Advisors Attachment D: Safeguard Implementation Support Consultants Attachment E: Detailed Cost Estimate for the Consulting Services

3 Project Administration Manual Purpose and Process 1. The Project Administration Manual (PAM) describes the essential administrative and management requirements to implement the project on time, within budget, and in accordance with Government and Asian Development Bank (ADB) policies and procedures. The PAM should include references to all available templates and instructions either through linkages to relevant URLs or directly incorporated in the PAM. 2. The Ministry of Communications (MOC) is wholly responsible for the implementation of ADB financed projects, as agreed jointly between the borrower and ADB, and in accordance with Government and ADB s policies and procedures. ADB staff is responsible to support implementation including compliance by MOC of their obligations and responsibilities for project implementation in accordance with ADB s policies and procedures. 3. At Loan Negotiations the borrower and ADB shall agree to the PAM and ensure consistency with the loan agreement. Such agreement shall be reflected in the minutes of the Loan Negotiations. In the event of any discrepancy or contradiction between the PAM and the loan agreement, the provisions of the loan agreement shall prevail. 4. After ADB Board approval of the project's report and recommendations of the President (RRP) changes in implementation arrangements are subject to agreement and approval pursuant to relevant Government and ADB administrative procedures (including the Project Administration Instructions) and upon such approval they will be subsequently incorporated in the PAM.

4 Abbreviations ADB = Asian Development Bank ADF = Asian Development Fund AFS = audited financial statements DMF = design and monitoring framework EIA = environmental impact assessment EMP = environmental management plan IEE = initial environmental examination IPP = indigenous people plan NGOs = nongovernment organizations PAI = project administration instructions PAM = project administration manual PIU = project implementation unit PPP = Public Private Partnership QCBS = quality- and cost based selection RRP = report and recommendation of the President to the Board SOE = statement of expenditure SPS = Safeguard Policy Statement SPRSS = summary poverty reduction and social strategy TOR = terms of reference

5 1 I. PROJECT DESCRIPTION 1. The proposed technical assistance loan (the TA Loan) will finance the preparation of the Dhaka Chittagong Expressway design for an ensuing investment project to be financed under a public private partnership (PPP) scheme readily available for implementation. 2. Impact and Outcome. The TA loan will facilitate project preparation for a follow-on investment project resulting in the Dhaka Chittagong Expressway being efficiently constructed, operated and managed under a PPP scheme. As outcome of the TA loan, an agreed design of the Dhaka Chittagong Expressway for implementation under a PPP-scheme will be prepared. 3. Outputs The project will provide (i) a feasibility study with assessment of route alignment options, (ii) the economic and financial analysis for the Follow-on Project, structuring of the PPP-scheme, establishing the financial model in support of the Follow-on Project, and recommendation of the PPP structure for the Follow-on Project, (iii) capacity development in the Executing Agency for PPP-Project implementation; (iv) prepare the detailed engineering design for the selected option including the finalization of all safeguard documentation, (v) Transaction Advisory Services for the preparation of the pre-qualification and bidding documents for the Concession Agreement, preparation of the Concession Agreement, and support for the Project Executing Agency during the bidding process, and (vi) Safeguard Implementation Services to support and assist in relation to safeguard implementation for the Follow-on Project. II. IMPLEMENTATION PLAN A. Project Readiness Activities Sep Oct Nov/ Dec Loan Processing Project Implementation (Consultants) ADB Actions Government Actions ADB Actions Government Actions Loan Fact-Finding Management Review Meeting, Loan negotiations ADB Board Approval Aide Memoire Confirmation, TAPP submission PEC recommendation on TAPP, Loan negotiations Advertisement RFP Finalization Shortlisting RFP Issuance Project coordinator assigned PIU Setup Jan TAPP Approval Technical Evaluation Feb Signing Financial Evaluation Mar/ April Effectiveness Contract Negotiations

6 B. Overall Project Implementation Plan Item JFMA M JJA SO N D JFMA M JJA S O N D JFMAMJJA S O ND JFM AM JJASO ND JFMA M JJASO N D A. Loan Processing and Approval by ADB Loan Effectiveness B. Recruitment of Consultants 1. Bidding 2. Consultant Contract Negotiations 3. Consulting Services Execution C. Feasibility Study 1. Inception Period 2. Feasibility Study 3. Consultation and approval of Final Report D. Preparation of Detailed Design 1. Preparation of Detailed Design 2. Approval of Detailed Design and DPP E. Land Acquisition/Resettlement Plan (RP) Impl.*) Support during Land Acquisition/RP implementation F. PPP-Scheme Design 1. Assessment of PPP Options and Viability 2. Recommendation of PPP-Scheme G. PPP-Contract Procurement 1. Pre-Qualification of Bidders 2. Preparation of PPP Contract and Bid Documents 3. Bidding Process 4. Support during Bid Evaluation 5. Contract Negotiations/Award of PPP-Contract Note: *) To enhance project readiness should the ensuing investment project be financed by ADB. Source: Asian Development Bank

7 3 III. PROJECT MANAGEMENT ARRANGEMENTS A. Project Implementation Organizations Roles and Responsibilities Project implementation organizations Executing agency Management Roles and Responsibilities Ministry of Communications Establish PIU and Project Director day-to-day project management consultant recruitment and management withdrawal applications project progress reports maintaining project accounts and complete loan financial records ADB monitor and review overall implementation of the project in consultation with the executing agency including: the project implementation schedule; actions required in terms of safeguard implementation if applicable; timeliness of budgetary allocations and counterpart funding; project expenditures; progress with disbursement; statement of expenditure when applicable; compliance with particular loan covenants; and the likelihood of attaining the project s immediate development objectives. B. Key Persons Involved in Implementation Executing Agency Ministry of Communications ADB Transport and Communications Division of South Asia Regional Department (SATC) Mission Leader Md. Mozammel Haque Khan, Secretary (Roads Division) Fax No Bangladesh Secretariat Dhaka, 1000 Sri Widowati Director, SATC Telephone No.: (63) address: swidowati@adb.org Markus Roesner Senior Transport Specialist, SATC Telephone No.: (63) address: hyamaguchi@adb.org

8 C. Project Organization Structure 4. The flow chart below shows the reporting lines in the internal structures of key organizations involved in implementation, including coordination by MOC as the executing agency and chair of the steering committee for intergovernmental coordination. Steering Committee Chai: Secretary MOC Ministry of Communications Roads Division Executing Agency Asian Development Bank Project Director Roads and Highway Department Project Implementation Unit IV. COSTS AND FINANCING 5. The TA loan is estimated to cost $12.5 million, including taxes and duties of about $1.25 million. The total cost includes physical and price contingencies, and interest and other charges during implementation. The investment plan is summarized in Table 1. Table 1: Project Investment Plan ($ million) Item Amount a A. Base Cost b 1. Consulting Services Project Management Taxes and duties 1.25 Subtotal (A) B. Contingencies c 1.00 C. Financing Charges During Implementation d 0.25 Total (A+B+C) a Includes taxes and duties of $1.25 million io be financed from Government resources. b In mid-2011 prices. c Physical contingencies computed at 10% for consulting services. Price contingencies computed at 5% on foreign exchange costs and 8% on local currency costs; includes provision for potential exchange rate fluctuation under the assumption of a purchasing power parity exchange rate. d Includes interest. Interest during implementation for ADB loan(s) has been computed at the rate of 1.0% per annum. Source: Asian Development Bank estimates. 6. The government of Bangladesh has requested a loan in various currencies equivalent to $10 million from ADB s Special Funds resources to help finance the project. The loan will have a 32-year term, including a grace period of 8 years, an interest rate of 1.0% per annum during the grace period and 1.5% per annum thereafter, and such other terms and conditions set forth in the draft loan agreement.

9 5 7. The Government will provide $2.5 million for local taxes and duties, and project administration. The ADB and the Government will finance 80% and 20% of total investment cost, respectively. The financing plan for the TA loan is in Table 2. Table 2: Financing Plan Source Amount ($ million) Share of Total (%) Asian Development Bank Government Total Source: Asian Development Bank estimates. A. Cost Estimates by Expenditure Category and by Financier 8. The detailed cost estimates for the consulting services is provided in Attachment E, the detailed cost estimate by expenditure category and detailed cost estimates by financier are presented as table 3 below. Table 3: Detailed cost estimate and financing plan ($ million) Total ADB Government Item Cost a Total [%] Total [%] A. Consulting services 1. Engineering Design Transaction Advisor Safeguard Implementation Subtotal (A) B. Project Management C. Taxes and duties D. Contingencies b E. Financing Charges during Implementation c Total (A+B+C+D+E) a In mid-2011 prices. b Physical contingencies computed at 10% for consulting services. Price contingencies computed at 5% on foreign exchange costs and 8% on local currency costs; includes provision for potential exchange rate fluctuation under the assumption of a purchasing power parity exchange rate. c Includes interest. Interest during implementation for ADB loan(s) has been computed at the rate of 1.0% per annum. Source: Asian Development Bank estimates.

10 B. Allocation and Withdrawal of Loan Proceeds Number Item CATEGORY Amount Allocated USD (million) 1 Consulting Services 8,75 2 Interest Charge 0.25 ADB FINANCING Percentage and Basis for Withdrawal From the Loan Account 100 percent of total expenditure claimed* 100 percent of amount due 3 Unallocated 1,00 Total *Exclusive of taxes and duties imposed within the territory of the Borrower. C. Fund Flow Diagram 9. The TA loan will adopt the direct payment procedure and the reimbursement payment procedure. 10. In case of reimbursement procedures adopted, the following diagram shows how the funds will flow from ADB and the Borrower to implement project activities. Confirms Consultant s claim Asian Development Bank Pays directly to consultant Project Director Submits claims To Project Director For certification Consultants Submits claims for work done Key Documents Funds Flow Flow

11 7 11. In case of reimbursement procedures adopted, the following diagram shows how the funds will flow from ADB and the Borrower to implement project activities. Requests Donor to reimburse for payments made by GoB Donor Releases funds to Bangladesh Bank (BB) Project Director Bangladesh Bank Maintains funds under PIU A/c No. Instructs BB to pay contractor from Bank Account GoB A/c No. for PIU in Bangladesh Bank Key Documents Funds Flow Flow Consultants Receives funds for work done V. FINANCIAL MANAGEMENT A. Financial Management Assessment 12. Financial management risks should be considered and updated throughout the life of the TA loan. Risk mitigation measures should also be updated accordingly. 13. The accounting function of RHD is performed by the Audit and Accounts Department under the Management Services Wing which reports to the Chief Engineer of RHD. The two accounts officers are deputed from the Comptroller and Auditor General s (C&AG) Office. RHD has the necessary accounting policies, procedures and chart of accounts for the proper recording of project financial transactions, including the allocation of expenditures in accordance with the respective disbursement categories and sources of funds. It has most of the controls in place for the preparation and proper approval of transactions. It also retains all accounting and supporting documents in a secure place. They are properly catalogued to allow authorized users easy access and retrieval of documents. 14. RHD submits monthly, quarterly and annual reports to the Controller General of Accounts (CGA) under the Comptroller and Auditor General. The reporting is on cash basis with report of the expenditures of each division submitted to CGA who collates the accounts for

12 RHD. RHD s Director, Audit and Accounts, also collates RHD s accounts and reconciles it with CGA s account so that the output is consistent. The reporting by the divisions is submitted on a disc which is entered into RHD s CMS system which helps to collate the data. Project accounts are done manually on Excel spreadsheets and are not part of the CMS. The financial reports for projects are prepared monthly, quarterly and annually with a comparison of actual expenditure against budget. 15. RHD has an internal audit function which is the responsibility of one of the Accounts Officers under the Director of Audit and Accounts. The establishment manning provides for 3 officers but currently there are only 2 officers. As mentioned earlier, due to the limited staff, hardly any internal audit is carried out on the operations or projects during or after implementation. 16. Project accounts are audited annually by the government s audit authority, Foreign Aided Project Audit Directorate (FAPAD). The audit is conducted in accordance with International Standards of Auditing. FAPAD has generally conducted the audit in time as required under the donors' loan agreements. This is usually performed 6 months after the end of the financial year. The audit is in effect mainly a financial (not technical) audit and the opinion is limited to funds received and expenditure incurred by the project authority. 17. RHD has significant experience in implementing externally financed projects and has the organization structure in place to implement these projects. RHD assigns well qualified and experienced accounts officers who are familiar with ADB procedures and would be able to support and train the accounts officers in the project implementation units. Areas for possible enhancement include streamlining cheque clearance mechanism and strengthening internal audit capacity. These are ongoing activities and will be enhanced during implementation of follow-on investment projects. B. Disbursement 18. The Loan proceeds will be disbursed in accordance with ADB s Loan Disbursement Handbook (2007, as amended from time to time), 1 and detailed arrangements agreed upon between the Government and ADB. 19. Pursuant to ADB's Safeguard Policy Statement (2009) (SPS), 2 ADB funds may not be applied to the activities described on the ADB Prohibited Investment Activities List set forth at Appendix 5 of the SPS. All financial institutions will ensure that their investments are in compliance with applicable national laws and regulations and will apply the prohibited investment activities list (Appendix 5 of SPS) to subprojects financed by ADB. 20. Direct payment procedure and reimbursement procedure will be adopted. Statement of expenditure (SOE) procedures will be used for reimbursing eligible expenditures for any individual payment transaction up to $100,000 equivalent. SOE records should be maintained and made readily available for review by ADB's disbursement and review mission or upon ADB's request for submission of supporting documents on a sampling basis, and for independent audit. 3 1 Available at: 2 Available at: 3 Checklist for SOE procedures and formats are available at:

13 9 21. The EA will be responsible for (i) preparing disbursement projections, (ii) requesting budgetary allocations for counterpart funds, (iii) collecting supporting documents, and (iv) preparing and sending withdrawal applications to ADB. 22. Before the submission of the first withdrawal application, the borrower should submit to ADB sufficient evidence of the authority of the person(s) who will sign the withdrawal applications on behalf of the borrower, together with the authenticated specimen signatures of each authorized person. The minimum value per withdrawal application is US$100,000, unless otherwise approved by ADB. The borrower is to consolidate claims to meet this limit for reimbursement and imprest account claims. Withdrawal applications and supporting documents will demonstrate, among other things that the goods, and/or services were produced in or from ADB members, and are eligible for ADB financing. C. Accounting 23. The EA will maintain separate project accounts and records by funding source for all expenditures incurred on the Project. Project accounts will follow international accounting principles and practices. D. Auditing 24. The EA will cause the detailed consolidated project accounts to be audited in accordance with International Standards on Auditing by an auditor acceptable to ADB. The audited accounts will be submitted in the English language to ADB within 6 months of the end of the fiscal year by the EA. The Government and the EA have been made aware of ADB s policy on delayed submission, and the requirements for satisfactory and acceptable quality of the audited accounts. ADB reserves the right to verify the project's financial accounts to confirm that the share of ADB s financing is used in accordance with ADB s policies and procedures. VI. PROCUREMENT AND CONSULTING SERVICES A. Advance Contracting 25. All advance contracting will be undertaken in conformity with ADB s Procurement Guidelines (April 2010, as amended from time to time) (ADB s Procurement Guidelines) 4 and ADB s Guidelines on the Use of Consultants (2010, as amended from time to time) (ADB s Guidelines on the Use of Consultants). 5 The issuance of invitations to bid under advance contracting will be subject to ADB approval. The borrower and the EA have been advised that approval of advance contracting does not commit ADB to finance the project. Advance contracting includes recruitment of consultants. B. Procurement of Goods, Works and Consulting Services 26. All procurement of goods and works will be undertaken in accordance with ADB s Procurement Guidelines. All consultants will be recruited according to ADB s Guidelines on the Available at: 5 Available at:

14 Use of Consultants. 6 The terms of reference for all consulting services are detailed in Section D. 27. Consulting firms will be engaged using the quality- and cost-based selection (QCBS) method with a quality to cost ratio of 90:10 for the Engineering Design Consultant Services and the Transaction Advisory Services. This higher ratio of quality is adopted due to the scope covering a large scale Expressway project, the first in the country with PPP as a new financing modality in the transport sector, requiring high-level project coordination and management. Capacity development also requires innovativeness in change management in the organization. For the safeguard implementation support advisory consulting services, the standard quality to cost ratio of 80:20 shall apply. C. Procurement Plan 28. The procurement plan is in Attachment A and describes all procurement of consulting services for the TA loan. D. Consultant's Terms of Reference 29. The consultant's terms of reference are provided in the following: Attachment B: TOR for Design Consultants Attachment C: TOR for Transaction Advisors Attachment D: Safeguard Implementation Support Consultants VII. SAFEGUARDS AND SOCIAL DIMENSIONS 30. The TA loan is expected to ensure development of environmentally and socially viable follow-on investment projects. Projects under follow-on loans will be prepared in compliance with ADB's Safeguard Policy Statement (2009) and government guidelines, regulations, and policies. The TA loan is not expected to have any adverse on social and environmental consequences due to the nature of project preparation. Social and environmental impacts relating to follow-on loans will be assessed and mitigated in accordance with ADB's Safeguard Policy Statement (2009) and government guidelines, regulations, and policies. 31. The TA loan is not expected to have any impact in gender and social dimensions. Projects under follow-on loans will be prepared in compliance with ADB's Guidelines for Incorporation of Social Dimensions in Bank Operations (1994), and ADB's Handbook on Social Analysis (2007). Gender, consultation and participation, labor, HIV/AIDs, and other social risks relating to follow-on loans will be assessed and mitigation plan will be prepared to address those issues. 6 Checklists for actions required to contract consultants by method available in e-handbook on Project Implementation at:

15 11 VIII. PERFORMANCE MONITORING, EVALUATION, REPORTING AND COMMUNICATION A. Project Design and Monitoring Framework Design Summary Impact Dhaka Chittagong Expressway efficiently constructed, operated and managed under a PPP scheme Outcome Agreed design of the Dhaka Chittagong Expressway for implementation under a PPP-scheme Outputs 1. Feasibility study with assessment of different route alignment options 2. Economic and financial analysis for the Follow-on Project, structuring of the PPP-scheme, establishing the financial model and recommendation of the PPP structure for the Follow-on Project Performance Targets and Indicators Dhaka Chittagong Expressway in operation under a PPP-scheme by 2020 Submission and approval of Feasibility Study including recommended PPPscheme in 2013 Submission and approval of Design and PPP contract documents in 2015 Option for detailed design selected and detailed design and tender documents completed by 2015 PPP-scheme selected by 2014 Data Sources and Reporting Mechanisms Reporting mechanism to be drafted under PPP concession agreement Project feasibility study and detailed design reports Draft PPP concession agreement Project feasibility study and detailed design reports Draft PPP concession agreement Assumptions and Risks Assumptions Willingness of private sector to invest in Bangladesh s transport infrastructure Positive investment climate in Bangladesh Assumption Active support from other Government agencies and other stakeholders to support selection of route alignment options Assumption Sufficiently qualified consulting firms participate Risk Delays in Government approvals 3. Capacity Development for PPP-Project implementation Training Program established by 2013 and training implemented by 2015 Training Program and Training Report 4. Detailed engineering design for the selected option including the finalization of all safeguard documents Detailed Design Report completed by 2015 Detailed design Report

16 Design Summary Performance Targets and Indicators Data Sources and Reporting Mechanisms Assumptions and Risks 5. Transaction Advisory Services for the preparation of the pre-qualification and bidding documents for the Concession Agreement, preparation of the Concession Agreement, and support for the Project Executing Agency during the bidding process Concessionaire under proposed PPPscheme selected by 2015 Concession Agreement 6. Support for safeguard implementation for follow-on project 7 Safeguard documents prepared by 2014 Safeguard documents Activities with Milestones 1. Feasibility Study 1.1 Consultant selection by March Feasibility Study including data collection, surveys, engineering feasibility study and evaluation of options, economic analysis, financial modeling and analysis, PPPstructuring, environmental, resettlement and indigenous people assessment completed by March Option for detailed design selected by September Institutional environment for PPP-Projects 2.1 Assess the institutional environment for PPP- Projects and identify the needs for industry restructuring for PPP by March Identify legal prerequisites for PPP-Projects by March Value for Money Analysis and identify options for PPP-structuring of the investment project by July Action plan for improvements for PPP-project implementation by July 2013 Inputs Loan ADB: $10 million Item Amount ($ million) Consulting Services 8.75 Financing Charges during implementation 0.25 Contingencies 1.00 Government: $2.5 million Item Amount ($ million) Project Management 1.25 Taxes and Duties Expected output if the follow-on project is financed by ADB.

17 13 Activities with Milestones 3. Capacity development for PPP-Project implementation 3.1 Training Program drafted by March Training completed and Training Report submitted by March Detailed Design 4.1 Commencement Detailed Design by October Detailed Design including detailed engineering design, support during PPP procurement, social assessment, resettlement and indigenous people assessment and environmental studies completed by September Approval of detailed design by March PPP Transaction Advisory Services 5.1 Consultant selection by September PPP-scheme selected by June Public Private Partnership agreements drafted by September Selection of contractor under proposed PPPscheme by March Support for Safeguard Implementation (to be carried out 2014/2015, if ensuing project is financed by ADB) 6.1 Provide advice on ADB s policies, procedures, and best practices, helping them implement plans as required 6.2 Help to establish units to implement plans relating to resettlement, social aspects, and environment 6.3 Provide training to government officials and NGOs 6.4 Facilitate coordination and lines of communication between ADB and government agencies, line departments, and organizations or individuals involved with resettlement aspects of projects 6.5 Monitor project management to ensure effective coordination and implementation of safeguard-related plans Source: ADB

18 14 B. Monitoring 32. Project performance monitoring The achievement of the project performance targets will be assessed following the design and monitoring framework. The EA will establish a project performance management system. Indicators to be monitored include (i) the number of traffic before and after the follow-on investment loans; (ii) project implementation period and (ii) the number of RCI transport projects before and after the Project; (iii) the amount of private sector investment realized, and (iv) the extent of due diligence of social and environmental safeguard measures completed at ensuing loan fact-finding mission stage, during the project implementation. Progress will be monitored and reported monthly by the consultants. These reports will provide information necessary to update ADB's project performance reporting system Compliance monitoring: Regular monitoring of TA Consultants' outputs to ensure policies compliance will be conducted through the Bangladesh Resident Mission and SATC. As necessary, special loan administration missions and a midterm review mission will be fielded to ensure policy compliance. The EA will monitor project implementation in accordance with the schedule and time-bound milestones, and keep ADB informed of any significant deviations that may result in not achieving the milestones. 34. Safeguards monitoring: Regular safeguards monitoring of TA Consultants' outputs to ensure that ADB's Safeguard Policy Statement (2009) are met will be conducted through the Bangladesh Resident Mission and SATC. As necessary, special loan administration missions and a midterm review mission will be fielded to ensure safeguard policy compliance. The EA will monitor project implementation in accordance with the schedule and time-bound milestones, and keep ADB informed of any significant deviations that may result in not achieving the milestones. 35. Gender and social dimensions monitoring: Regular gender and social dimensions monitoring of TA Consultants outputs to ensure ADB's Gender and other social related policies are met will be conducted through the Bangladesh Resident Mission and SATC. As necessary, special loan administration missions and a midterm review mission will be fielded to ensure compliance of Gender and other social related policies. The EA will monitor project implementation in accordance with the schedule and time-bound milestones, and keep ADB informed of any significant deviations that may result in not achieving the milestones. C. Evaluation 36. A project inception mission will be fielded soon after the legal agreements for the TA loan are declared effective; thereafter, regular reviews will follow at least annually. As necessary, special loan administration missions and a midterm review mission will be fielded, under which any changes in scope or implementation arrangement may be required to ensure achievement of project objectives. The EA will monitor project implementation in accordance with the schedule and time-bound milestones, and keep ADB informed of any significant deviations that may result in the milestones not being met. Within 6 months of physical completion of the TA loan, the EA will submit a project completion report to ADB. 9 8 ADB's project performance reporting system is available at: 9 Project completion report format available at: Sector-Landscape.rar

19 15 D. Reporting 37. The EA will provide ADB with (i) quarterly progress reports in a format consistent with ADB's project performance reporting system; (ii) consolidated annual reports including (a) progress achieved by output as measured through the indicator's performance targets, (b) key implementation issues and solutions; (c) updated procurement plan and (d) updated implementation plan for next 12 months; and (iii) a project completion report within 6 months of completion of the TA loan. To ensure projects continue to be both viable and sustainable, project accounts and the executing agency AFSs, together with the associated auditor's report, should be adequately reviewed. E. Stakeholder Communication Strategy 38. While conducting poverty and social assessment, the TA consultants will conduct field visits and direct consultations/interactions with stakeholders using participatory approaches at the local and line Ministry levels. If there are any gaps emerging from the communication needs assessment, the TA consultants will have to formulate, in discussion with internal stakeholders and key decision-makers, a communications strategy for the TA loan. IX. ANTICORRUPTION POLICY 39. ADB reserves the right to investigate, directly or through its agents, any violations of the Anticorruption Policy relating to the Project. 10 All contracts financed by ADB shall include provisions specifying the right of ADB to audit and examine the records and accounts of the executing agency and all Project contractors, suppliers, consultants and other service providers. Individuals/entities on ADB s anticorruption debarment list are ineligible to participate in ADBfinanced activity and may not be awarded any contracts under the Project. 11 To support these efforts, relevant provisions are included in the loan agreement, regulations and the bidding documents for the Project. In particular, all contracts financed by ADB in connection with the Project shall include provisions specifying the right of ADB to audit and examine the records and accounts of RHD and BR, and consultants and other service providers, as they relate to the Project. The Government will also allow and assist ADB representatives' carrying out random spot checks on the work in progress and the utilization of funds for the Project. A further transparency measure is establishment of a publicly accessible project website within the existing RHD website where the Borrower will disclose key project related information including on costs, safeguards, and procurement. X. ACCOUNTABILITY MECHANISM 40. People who are, or may in the future be, adversely affected by the project may submit complaints to ADB s Accountability Mechanism. The Accountability Mechanism provides an independent forum and process whereby people adversely affected by ADB-assisted projects can voice, and seek a resolution of their problems, as well as report alleged violations of ADB s operational policies and procedures. Before submitting a complaint to the Accountability Mechanism, affected people should make a good faith effort to solve their problems by working 10 Available at: 11 ADB's Integrity Office web site is available at:

20 16 with the concerned ADB operations department. Only after doing that, and if they are still dissatisfied, should they approach the Accountability Mechanism. 12 XI. RECORD OF PAM CHANGES 41. All revisions/updates during course of implementation should be recorded and retained under this Section to provide a chronological history of changes to implemented arrangements recorded in this PAM. 12 For further information see:

21 Attachment A 17 PROCUREMENT PLAN Basic Data Project Name: Dhaka Chittagong Expressway PPP Design Country: Bangladesh Executing Agency: Ministry of Communications Loan Amount: $10 million ADF loan Loan Number: Date of First Procurement Plan:15 September 2011 Date of this Procurement Plan: 15 September 2011 A. Process Thresholds, Review, and 18-Month Procurement Plan 1. Project Procurement Thresholds 1. Except as the Asian Development Bank (ADB) may otherwise agree, the following process thresholds shall apply to procurement of goods and works. Procurement of Goods and Works Method Threshold International Competitive Bidding (ICB) for Works Above $1 million International Competitive Bidding (ICB) for Goods Above $500,000 National Competitive Bidding (NCB) for Works Beneath that stated for ICB, Works National Competitive Bidding (NCB) for Goods Beneath that stated for ICB, Goods Shopping for Works Below $100,000 Shopping for Goods Below $100, ADB Prior or Post Review 2. Except as ADB may otherwise agree, the following prior or post review requirements apply to the various procurement and consultant recruitment methods used for the Project. Procurement Method Prior or Post Comments Procurement of Goods and Works ICB Works Prior ICB Goods Prior NCB Works and Good Post Shopping for Works Post Shopping for Goods Post Recruitment of Consulting Firms Quality- and Cost-Based Selection (QCBS) Prior ADB will select the consultants. EAs will negotiate and sign the contract. 3. Consulting Services Contracts Estimated to Cost More Than $100, The following table lists consulting services contracts for which procurement activity is either ongoing or expected to commence within the next 18 months. General Description Contract Value Recruitment Method Feasibility study and detailed design consultants, PPP preparation Transaction Advisor $8.0 million $0.5 million Quality and Cost Based Selection (90:10) Quality and Cost Based Selection (90:10) Advertisement Date (quarter/year) International or National Assignment Q4/2011 International firm Q4/2011 International firm Comments

22 18 Attachment A General Description Contract Value Recruitment Method Safeguard Implementation Support (two packages) $0.25 million Quality and Cost Based Selection (80:20) Advertisement Date (quarter/year) International or National Assignment Q1/2013 National firm Comments B. Indicative List of Packages Required Under the Project 4. The following table provides an indicative list of all procurement (goods, works and consulting services) over the life of the project. Contracts financed by the Borrower and others should also be indicated, with an appropriate notation in the comments section. General Description Estimated Value (cumulative) Estimated Number of Contracts Recruitment Method Type of Proposal Consulting Services $8.50 million 2 QCBS (90:10) Full, STP and BTP Consulting Services $0.25 million 1 QCBS (80:20) STP Comments ADB will select the consultants. EAs will negotiate and sign the contract. C. National Competitive Bidding 1. General 5. The procedures to be followed for national competitive bidding shall be those set forth for the National Open Tendering Method in the Government s Public Procurement Rules, 2008 (as updated and issued pursuant to the Bangladesh Public Procurement Act, 2006) with the clarifications and modifications described in the following paragraphs required for compliance with the provisions of the Procurement Guidelines. 2. Advertising 6. Bidding of NCB contracts estimated at $500,000 or more for goods and related services or $1,000,000 or more for civil works shall be advertised on ADB s website via the posting of the Procurement Plan. 3. Anti-Corruption 7. Definitions of corrupt, fraudulent, collusive and coercive practices shall reflect the latest ADB Board-approved Anti-Corruption Policy definitions of these terms and related additional provisions (such as conflict of interest, etc.). 4. Location of Bid Submission 8. Submission of bids to primary and secondary locations, or multiple droppings of bids, shall not be required or allowed. Advertisements and bidding documents shall specify only one location for delivery of bids.

23 Attachment A Rejection of All Bids and Rebidding 9. Bids shall not be rejected and new bids solicited without ADB s prior concurrence. 6. Member Country Restrictions 10. Bidders must be nationals of member countries of ADB, and offered goods must be produced in member countries of ADB. 7. Lottery 11. A lottery system shall not be used to determine a successful bidder, including for the purpose of resolving deadlocks. 8. Qualification Requirements 12. A successful bidder must be determined by an assessment process that shall include the application of qualification requirements to all bids. 9. Rejection of Bids 13. A bid shall not be rejected on the grounds that its bid price is not within a percentage range above or below the contract estimate.

24 20 Attachment B TERMS OF REFERENCE Engineering Consultant A. Introduction 1. The Government of Bangladesh (the Government) has received a loan from Asian Development Bank (ADB) for the Dhaka Chittagong Expressway PPP Design TA Loan (the Project) and intends to apply a portion of proceeds to engage firms of international consultants (the consultants) to prepare the feasibility studies and detailed engineering designs for a new access controlled expressway between Dhaka and Chittagong. 2. The main objective of the consulting services is to carry out (a) the necessary surveys for traffic forecast, to establish base maps for the design and safeguard documents related surveys, and (b) feasibility study and detailed engineering design for the expressway (including structures and bridges), which consist of: (i) appropriate condition surveys, (ii) engineering design and cost estimates for the improvements, (iii) economic and financial analysis, (iv) financial modeling and PPP-structuring, (v) social and environmental assessment in accordance with ADB's Safeguard Policy Statement 2009 (SPS) as well as government regulations and policies, (vi) establishing bidding documents and providing procurement assistance for the PPPconcession, and (vii) other assistance as may be required by ADB Mission for loan processing. 3. The Ministry of Communications (MOC) is the Executing Agency (EA). The EA will establish a Project Implementation Unit (PIU) in the Roads and Highways Department and appoint a senior official as the Project Director to implement the TA loan. The consultant will also coordinate with the government s Steering Committee, the concerned local authorities, with the assistance of the EA, for data collection, site visits, and other appropriate consultations. 4. A Steering Committee with representatives from related Ministries and Government agencies covering National Planning, Commerce, Trade, Finance, Energy, Agriculture, Shipping, the PPP-cell in the Prime Minister s Office, etc. and representation from the two municipalities as well as the concerned districts of Bangladesh will be establish for high-level policy decisions for the project, to agree on issues needing decisions beyond the level of the Ministry of Communications, such as the selection of the preferred route option or PPP-scheme. 5. The TA loan will be implemented for 3 years from April 2012 to September Advance contracting actions will be undertaken for consultants' recruitment to enhance project readiness. The consultants will be selected based on ADB s quality- and cost-based selection method using full technical proposals in accordance with ADB s Guidelines on the Use of Consultants (2010, as amended from time to time) and a quality to cost ration of 90: Two international consulting firms will be recruited for the (i) preparation of the engineering design and (ii) transaction advisory services. The preliminary outline terms of reference for consulting services for design services are listed under chapter B for the engineering design consultant and under chapter C for the transaction advisory services. It is estimated that about 115 person-months of international staff and about 390 person-months of national staff will be required for the engineering design services under chapter B and about 5 person-months of international staff and about 10 person-months of national staff will be required for the transaction advisory services under chapter C. A third consulting contract may be requested by the government for Social Safeguard Implementation for subprojects to be financed by ADB, if any. About 240 person-months of national staff will be required for this consulting service; the terms of reference for this consulting service are in Appendix 6.

25 Attachment B The consultants shall carry out regular workshops for private sector investors interested in the project to update them on the progress of project preparation and to collect feedback from potential investors on the project design, structuring of the PPP-scheme and other technical, financial and institutional terms of the project. The workshops shall be carried out at least twice annually with participation of the transaction advisor, one recruited, and shall be linked to major milestones of the consultancy contract, such as report finalization or sufficiently in advance of advertising of bidding processes etc. 8. Procurement of equipment needed to carry out the consulting services and to be financed from the ADB loan will be undertaken in accordance with ADB's Procurement Guidelines (2010, as amended from time to time). B. Outline Terms of Reference for the Engineering Consultant 1. Scope of the Assignment 9. Possible options to be appraised in the Feasibility Study include, but are not limited to the following: Option I At-grade alignment along a new right of way (ROW) Option II Elevated alignment within the ROW of the national highway Option III At-grade and elevated alignment along the national highway Option IV Elevated alignment in a new ROW 2. Feasibility Study 10. The purpose of this Feasibility Study is to examine the various alignment options from a technical, environmental, social, and financial perspective to assess the best option that can be carried into the Detailed Design Phase. The terms of reference for the consultants for feasibility study include, but are not limited to, the following: a. Studies, data collection and surveys 11. The consultants will have the following tasks: (i) (ii) (iii) (iv) Establish a national highway development plan for Bangladesh, linking the proposed Dhaka Chittagong Expressway with other planned Expressways, feeder roads, the national highway network and the trans-asian road network, major Air- and Sea Ports, etc. Establish a base-map as part of a graphic information system covering the entire corridor between Dhaka and Chittagong for all studies under the TA loan. Carry out zoning for the origin-destination Survey, collect the necessary socioeconomic data and carry out additional traffic surveys and interviews with households, vehicle owners, truck and bus operators, freight forwarders, etc. Review previous studies and map planned and ongoing infrastructure projects in the base map established above.

26 22 Attachment B (v) (vi) Establish an approval procedure within the Government of Bangladesh to select and freeze the selected route alignment option. Establish selection criteria for the selection of the alignment option for the detailed design after completion of the Feasibility Study. b. Engineering Study 12. The consultants will have the following tasks: (i) (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix) (x) Establish a design manual for the expressway project including design criteria and a catalogue of standard design solutions for the cross section, structures such as culverts, bridges, retaining walls etc. Survey conditions along the corridor, including the condition of the existing national highway and roads crossing the future alignment, including geometric features, type and condition of drainage structures, pavement strength, and other major features; determine residual life; and categorize the roads into homogeneous sections. Design auxiliary functions such as toll plazas, service and rest areas for travelers, service areas for operations and maintenance of the road, weight stations, police stations and traffic monitoring and supervision centers, etc. Investigate the suitability of local construction materials, and, where necessary, locate new quarries and borrow pits, and assess the quality and quantity of materials and hauling distances. Prepare cost estimates for the alternative route alignment options, separating foreign exchange, local currency, and tax and duty elements. Propose an approach to contract packaging consistent with ADB s Guidelines for Procurement. Prepare a report summarizing the findings and recommendations, and presenting the supporting data and analysis, for review by the Government and ADB. Based on the agreed selection criteria, recommend one option to be further studied in the detailed engineering design and facilitate the Government s and Steering Committee s approval process for the selected option. In cooperation with local road authorities, consult with stakeholders regarding project design, and ensure that the selected roads reflect the result of consultation. Conduct an independent road safety audits with use of ADB s Road Safety Audit for Road Project: An Operational Tool Kit and: The Federal Highway Administration (FHWA) of the United States Department of Transportation: FHWA Road Safety Audit Guidelines (2006).

Multitranche Financing Facility Republic of Uzbekistan: Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program

Multitranche Financing Facility Republic of Uzbekistan: Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program Facility Administration Manual Project Number: 42107 MFF Number: 0042-UZB Loan Numbers: 2635-UZB (Project 1), 2746-UZB (Project 2), and 2868-UZB (Project 3) 21 August 2013 Multitranche Financing Facility

More information

PROJECT PREPARATION TECHNICAL ASSISTANCE

PROJECT PREPARATION TECHNICAL ASSISTANCE 12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility

More information

People s Republic of Bangladesh: Rural Infrastructure Maintenance Program

People s Republic of Bangladesh: Rural Infrastructure Maintenance Program Project Design Advance Project Administration Manual Project Number: 47243-003 June 2016 People s Republic of Bangladesh: Rural Infrastructure Maintenance Program CONTENTS I. PROPOSED PROJECT DESCRIPTION

More information

People s Republic of Bangladesh: Railway Rolling Stock Project

People s Republic of Bangladesh: Railway Rolling Stock Project Railway Rolling Stock Project (RRP BAN 49094) Project Administration Manual Project Number: 49094-001 Loan Number: {LXXXX} September 2015 People s Republic of Bangladesh: Railway Rolling Stock Project

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). WHEREAS (A) by a loan agreement of even date herewith

More information

People's Republic of Bangladesh: Padma Multipurpose Bridge Project

People's Republic of Bangladesh: Padma Multipurpose Bridge Project 1 Project Administration Manual Project Number: 35049 Loan and/or Grant Number(s): {LXXXX (OCR); LXXXX (ADF) to be determined} 26 October 2010 People's Republic of Bangladesh: Padma Multipurpose Bridge

More information

Bangladesh: Greater Dhaka Sustainable Urban Transport Project

Bangladesh: Greater Dhaka Sustainable Urban Transport Project Project Administration Manual Project Number: 42169 Loan and/or Grant Number(s): LXXXX; LXXXX March 2012 Bangladesh: Greater Dhaka Sustainable Urban Transport Project Contents ABBREVIATIONS I. PROJECT

More information

Republic of Uzbekistan: Solid Waste Management Improvement Project

Republic of Uzbekistan: Solid Waste Management Improvement Project Project Administration Manual Project Number: 45366 Loan Number: {LXXXX-UZB} November 2013 Republic of Uzbekistan: Solid Waste Management Improvement Project CONTENTS ABBREVIATIONS I. PROJECT DESCRIPTION

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The PPTA will review and assess the performance of the secondary education subsector in Viet Nam and identify the challenges, which

More information

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS Strengthening Public Financial Resource Management through Information and Communication Systems Technology Systems (TRTA MON 51084) OUTLINE TERMS OF REFERENCE FOR CONSULTANTS 1. The transaction technical

More information

Section 3.07 is deleted and the following is substituted therefor:

Section 3.07 is deleted and the following is substituted therefor: 2 outstanding Loan and the Fixed Spread that will be applied to new Loans (expressed as a percentage per annum), by (ii) the principal amount of the outstanding Loan on which the Borrower shall pay interest

More information

LOAN AGREEMENT (Special Operations) (Road Network Upgrading Project) between DEMOCRATIC REPUBLIC OF TIMOR-LESTE. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Special Operations) (Road Network Upgrading Project) between DEMOCRATIC REPUBLIC OF TIMOR-LESTE. and ASIAN DEVELOPMENT BANK LOAN NUMBER 2858-TIM (SF) LOAN AGREEMENT (Special Operations) (Road Network Upgrading Project) between DEMOCRATIC REPUBLIC OF TIMOR-LESTE and ASIAN DEVELOPMENT BANK DATED 2 MAY 2012 TIM 45094 LOAN AGREEMENT

More information

Section 3.06 is deleted and the following is substituted therefor:

Section 3.06 is deleted and the following is substituted therefor: 2 (c) Section 3.03 is deleted and the following is substituted therefor: Commitment Charge; Credit; Maturity Premium. (a) The Borrower shall pay a commitment charge on the unwithdrawn amount of the Loan

More information

Project Administration Manual. Project Number: Grant Number: GXXXX November Vanuatu: Cyclone Pam School Reconstruction Project

Project Administration Manual. Project Number: Grant Number: GXXXX November Vanuatu: Cyclone Pam School Reconstruction Project Project Administration Manual Project Number: 49320-001 Grant Number: GXXXX November 2015 Vanuatu: Cyclone Pam School Reconstruction Project Contents ABBREVIATIONS 4 I. PROJECT DESCRIPTION 1 II. IMPLEMENTATION

More information

(c) Section 3.07 is deleted and the following is substituted therefor:

(c) Section 3.07 is deleted and the following is substituted therefor: 2 outstanding Loan on which a higher Fixed Spread is applicable. The amount of the Rebate shall be determined by multiplying (i) the difference between the Fixed Spread applicable to the outstanding Loan

More information

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). WHEREAS (A) the Borrower has applied to ADB for a loan

More information

Islamic Republic of Pakistan: Sindh Provincial Road Improvement Project

Islamic Republic of Pakistan: Sindh Provincial Road Improvement Project Sindh Provincial Road Improvement Project (RRP PAK 46377) Project Administration Manual Project Number: 46377 Loan Number: September 2015 Islamic Republic of Pakistan: Sindh Provincial Road Improvement

More information

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time);

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time); 2 (f) Goods means equipment and materials to be financed out of the proceeds of the Loan, including related services such as transportation, insurance, installation, commissioning, training, and initial

More information

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project Technical Assistance Project Number: 50098 Project Preparatory Technical Assistance (PPTA) November 2016 Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project This document is being

More information

Democratic Socialist Republic of Sri Lanka: Transport Project Preparatory Facility

Democratic Socialist Republic of Sri Lanka: Transport Project Preparatory Facility Transport Project Preparatory Facility (RRP SRI 44350) Project Administration Manual Project Number: 44350-013 Loan xxxx-sri September 2016 Democratic Socialist Republic of Sri Lanka: Transport Project

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI 6.02 Page 1 of 2 PROJECT ADMINISTRATION MISSIONS A. Introduction 1. ADB missions dispatched for loan and technical assistance (TA) project administration are classified

More information

Nepal: Kathmandu Sustainable Urban Transport Project

Nepal: Kathmandu Sustainable Urban Transport Project Project Administration Manual Project Number: 44058 Loan and/or Grant Number(s): LXXXX; GXXXX June 2010 Nepal: Kathmandu Sustainable Urban Transport Project CONTENTS I. PROJECT DESCRIPTION 1 II. IMPLEMENTATION

More information

Section 3.07 is deleted and the following is substituted therefor:

Section 3.07 is deleted and the following is substituted therefor: 3 outstanding Loan on which a higher Fixed Spread is applicable. The amount of the Rebate shall be determined by multiplying (i) the difference between the Fixed Spread applicable to the outstanding Loan

More information

GAMAS means Mongolia Customs Automated Data Processing

GAMAS means Mongolia Customs Automated Data Processing 2 System; (c) GAMAS means Mongolia Customs Automated Data Processing (d) Grant Account means the account opened by ADB on its books in the name of Mongolia for the purposes of the Project and to which

More information

Islamic Republic of Pakistan: Enhancing Public- Private Partnerships in Punjab Project

Islamic Republic of Pakistan: Enhancing Public- Private Partnerships in Punjab Project Enhancing Public Private Partnerships in Punjab Project (RRP PAK 49128) Project Administration Manual Project Number: 49128-002 Loan, Grant, and TA Numbers: LXXXX; GXXXX; TAXXXX November 2017 Islamic Republic

More information

Project Administration Manual. Project Number: November Republic of Palau: North Pacific Regional Connectivity Investment Project

Project Administration Manual. Project Number: November Republic of Palau: North Pacific Regional Connectivity Investment Project Project Administration Manual Project Number: 46382-001 November 2015 Republic of Palau: North Pacific Regional Connectivity Investment Project ABBREVIATIONS Contents I. PROJECT DESCRIPTION 1 A. Impact

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project Project Design Advance Project Number: 47279-003 September 2016 Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project This document is being disclosed to the public in accordance with ADB's Public

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program)

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program) PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program) 1. A project preparatory technical assistance (PPTA) for $700,000 in grant funds is

More information

LOAN AGREEMENT (Special Operations) (Higher Education Reform Project) between MONGOLIA. and ASIAN DEVELOPMENT BANK DATED 9 SEPTEMBER 2011

LOAN AGREEMENT (Special Operations) (Higher Education Reform Project) between MONGOLIA. and ASIAN DEVELOPMENT BANK DATED 9 SEPTEMBER 2011 LOAN NUMBER 2766-MON(SF) LOAN AGREEMENT (Special Operations) (Higher Education Reform Project) between MONGOLIA and ASIAN DEVELOPMENT BANK DATED 9 SEPTEMBER 2011 LAS:MON 43007 LOAN AGREEMENT (Special Operations)

More information

PERIODIC FINANCING REQUEST. RE: Higher Education in the Pacific Investment Program: Periodic Financing Request #1

PERIODIC FINANCING REQUEST. RE: Higher Education in the Pacific Investment Program: Periodic Financing Request #1 PERIODIC FINANCING REQUEST Date: April 2012 To: Asian Development Bank 6 ADB Avenue Mandaluyong City, Metro Manila ATTENTION: Director General, Pacific Department Fax No. +632-632-6318 Sir: RE: Higher

More information

PROCUREMENT PLAN. Implementing Agency: N/A

PROCUREMENT PLAN. Implementing Agency: N/A PROCUREMENT PLAN Basic Data Project Name: Central Asia Regional Economic Cooperation Corridors 3 and 5 Enhancement Project Project : 46543-002 Approval : 0356 Country: Tajikistan Project Financing Amount:

More information

LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK LOAN NUMBER 2729-ARM LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA and ASIAN DEVELOPMENT BANK DATED 30 MAY 2011 ARM 42145 LOAN

More information

FINANCIAL MANAGEMENT ASSESSMENT EXECUTIVE SUMMARY

FINANCIAL MANAGEMENT ASSESSMENT EXECUTIVE SUMMARY Emergency Assistance Project (RRP BAN 52174-001) FINANCIAL ANAGEENT ASSESSENT EXECUTIVE SUARY I. Introduction 1. An updated financial management assessment (FA) has been conducted for the four implementing

More information

Socialist Republic of Viet Nam: Ho Chi Minh City Third Ring Road Technical Assistance Project

Socialist Republic of Viet Nam: Ho Chi Minh City Third Ring Road Technical Assistance Project Ho Chi Minh City Third Ring Road Technical Assistance Project (RRP VIE 43393-023) Project Administration Manual Project Number: 43393-023 Loan Number: TBD October 2014 Socialist Republic of Viet Nam: Ho

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE 8 Appendix 3 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The Government of the Republic of the Union of Myanmar has requested the Asian Development Bank (ADB) to provide a project preparatory

More information

LOAN AGREEMENT (Special Operations) (Climate Resilient Rice Commercialization Sector Development Project) between KINGDOM OF CAMBODIA.

LOAN AGREEMENT (Special Operations) (Climate Resilient Rice Commercialization Sector Development Project) between KINGDOM OF CAMBODIA. LOAN NUMBER 3007-CAM (SF) LOAN AGREEMENT (Special Operations) (Climate Resilient Rice Commercialization Sector Development Project) between KINGDOM OF CAMBODIA and ASIAN DEVELOPMENT BANK DATED 26 AUGUST

More information

Kyrgyz Republic: Central Asia Regional Economic Cooperation Corridor 3 (Bishkek Osh Road) Improvement Project, Phase 4

Kyrgyz Republic: Central Asia Regional Economic Cooperation Corridor 3 (Bishkek Osh Road) Improvement Project, Phase 4 Central Asia Regional Economic Cooperation Corridor 3 (Bishkek Osh Road) Improvement Project, Phase 4 (RRP KGZ 45169) Project Administration Manual Project Number: 45169 Loan and Grant Numbers: L3056;

More information

Project Administration Manual. India: Green Energy Corridor and Grid Strengthening Project. Project Numbers: October 2015

Project Administration Manual. India: Green Energy Corridor and Grid Strengthening Project. Project Numbers: October 2015 Green Energy Corridor and Grid Strengthening Project (RRP IND 44426) Project Administration Manual Project Numbers: 44426-016 October 2015 India: Green Energy Corridor and Grid Strengthening Project Contents

More information

Socialist Republic of Viet Nam: Sustainable Rural Infrastructure Development Project in Northern Mountain Provinces

Socialist Republic of Viet Nam: Sustainable Rural Infrastructure Development Project in Northern Mountain Provinces Sustainable Rural Infrastructure Development Project in Northern Mountain Provinces (RRP VIE 41461) Project Administration Manual Project Number: 41461 Loan and/or Grant Number(s): 30 September 2010 Socialist

More information

(l) "Qualified Subproject" means the installation of a solar home system under the SHS Program;

(l) Qualified Subproject means the installation of a solar home system under the SHS Program; 2 Section 1.02. Wherever used in this Loan Agreement, the several terms defined in the Loan Regulations have the respective meanings therein set forth unless modified herein or the context otherwise requires.

More information

Project Administration Manual. Project Number: November Cook Islands: Renewable Energy Sector Project

Project Administration Manual. Project Number: November Cook Islands: Renewable Energy Sector Project Project Administration Manual Project Number: 46453 November 2014 Cook Islands: Renewable Energy Sector Project Contents ABBREVIATIONS I. PROJECT DESCRIPTION 5 A. Impact and Outcome 5 B. Outputs 5 II.

More information

Uzbekistan: Small Business Finance Project

Uzbekistan: Small Business Finance Project Project Administration Manual Project Number: 42007-018 Loan Number: June 2016 Uzbekistan: Small Business Finance Project Important Note: This Project Administration Manual is an active document. It will

More information

LOAN AGREEMENT (Ordinary Operations) (Clean Energy Finance Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and

LOAN AGREEMENT (Ordinary Operations) (Clean Energy Finance Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and LOAN NUMBER 3186-IND LOAN AGREEMENT (Ordinary Operations) (Clean Energy Finance Investment Program Project 1) between ASIAN DEVELOPMENT BANK and INDIAN RENEWABLE ENERGY DEVELOPMENT AGENCY LIMITED DATED

More information

Project Administration Manual

Project Administration Manual Project Administration Manual Project Number: 46538-002 November 2016 Proposed Loan and Administration of Grant and Technical Assistance Grant Islamic Republic of Pakistan: Supporting Public Private Partnership

More information

PROJECT AGREEMENT. (Hebei Energy Efficiency Improvement and Emission Reduction Project) between ASIAN DEVELOPMENT BANK. and

PROJECT AGREEMENT. (Hebei Energy Efficiency Improvement and Emission Reduction Project) between ASIAN DEVELOPMENT BANK. and LOAN NUMBER 2835-PRC PROJECT AGREEMENT (Hebei Energy Efficiency Improvement and Emission Reduction Project) between ASIAN DEVELOPMENT BANK and HEBEI PROVINCIAL GOVERNMENT DATED 6 MARCH 2012 PRC 44012 PROJECT

More information

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan Technical Assistance Report Project Number: 46539 Regional Capacity Development Technical Assistance (R CDTA) August 2014 Improving the Financial Management Capacity of Executing Agencies in Afghanistan

More information

March Guidance on Using the Audited Project Financial Statements (APFS) Standard Review Checklist

March Guidance on Using the Audited Project Financial Statements (APFS) Standard Review Checklist March 2015 Guidance on Using the Audited Project Financial Statements (APFS) Standard Review Checklist Page 1 of 7 REVISED GUIDANCE ON USING THE APFS STANDARD REVIEW CHECKLIST Please note: The review checklist

More information

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT Himachal Pradesh Clean Energy Transmission Investment Program (RRP IND 43464) TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT A. INTRODUCTION 1. The

More information

Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project

Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project Technical Assistance Report Project Number: 51107-001 Transaction Technical Assistance (TRTA) October 2017 Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project This

More information

Proposed Grants and Administration of Grants Independent State of Samoa: Renewable Energy Development and Power Sector Rehabilitation Project

Proposed Grants and Administration of Grants Independent State of Samoa: Renewable Energy Development and Power Sector Rehabilitation Project Project Administration Manual Project Number: 46044 October 2013 Proposed Grants and Administration of Grants Independent State of Samoa: Renewable Energy Development and Power Sector Rehabilitation Project

More information

Project Administration Manual

Project Administration Manual Project Administration Manual Project Number: 31501 June 2011 Proposed Loan for Additional Financing Democratic Socialist Republic of Sri Lanka: Secondary Towns and Rural Community-Based Water Supply and

More information

PROJECT AGREEMENT. (Low-Carbon District Heating Project in Hohhot in Inner Mongolia Autonomous Region) between ASIAN DEVELOPMENT BANK.

PROJECT AGREEMENT. (Low-Carbon District Heating Project in Hohhot in Inner Mongolia Autonomous Region) between ASIAN DEVELOPMENT BANK. LOAN NUMBER 3218-PRC PROJECT AGREEMENT (Low-Carbon District Heating Project in Hohhot in Inner Mongolia Autonomous Region) between ASIAN DEVELOPMENT BANK and GOVERNMENT OF INNER MONGOLIA AUTONOMOUS REGION

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK . ASIAN DEVELOPMENT BANK TAR: BAN 35242 TECHNICAL ASSISTANCE TO THE PEOPLE S REPUBLIC OF BANGLADESH FOR PREPARING THE GAS SECTOR DEVELOPMENT PROJECT April 2004 CURRENCY EQUIVALENTS (as of 21 April 2004)

More information

Viet Nam: Ho Chi Minh City Long Thanh DauGiay Expressway Technical Assistance Project

Viet Nam: Ho Chi Minh City Long Thanh DauGiay Expressway Technical Assistance Project Validation Report Reference Number: PVR-360 Project Number: 40198 Loan Number: 2374 December 2014* Viet Nam: Ho Chi Minh CityLong ThanhDauGiay Expressway Technical Assistance Project Independent Evaluation

More information

Myanmar: Power Distribution Improvement Project

Myanmar: Power Distribution Improvement Project Power Distribution Improvement Project (RRP MYA 46390) Project Administration Manual Project Number: 46390 November 2013 Myanmar: Power Distribution Improvement Project Contents ABBREVIATIONS I. PROJECT

More information

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT CONFORMED COPY LOAN NUMBER 7971-BY Loan Agreement (Road Upgrading and Modernization Project) between REPUBLIC OF BELARUS and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated November 19, 2010

More information

CONTENTS. Page EXECUTIVE SUMMARY I. OVERVIEW 1 II. FINDINGS AND RECOMMENDATIONS 2 III. CONCLUDING REMARKS 19

CONTENTS. Page EXECUTIVE SUMMARY I. OVERVIEW 1 II. FINDINGS AND RECOMMENDATIONS 2 III. CONCLUDING REMARKS 19 CONTENTS Page EXECUTIVE SUMMARY i I. OVERVIEW 1 II. FINDINGS AND RECOMMENDATIONS 2 III. CONCLUDING REMARKS 19 CURRENCY EQUIVALENTS (as of 28 February 2016) Currency unit = Papua New Guinea Kina (PGK) 1

More information

Republic of Uzbekistan: Takhiatash Power Plant Efficiency Improvement Project

Republic of Uzbekistan: Takhiatash Power Plant Efficiency Improvement Project Project Administration Manual Project Number: 45306-001 Loan Number: 3141 January 2015 Republic of Uzbekistan: Takhiatash Power Plant Efficiency Improvement Project TABLE CONTENTS ABBREVIATIONS 1 I. PROJECT

More information

BHU: Second Green Power Development Project

BHU: Second Green Power Development Project Second Green Power Development Project (RRP BHU 44444) Project Administration Manual Project Number: 44444 Loan and/or Grant Number(s): {LXXXX&XXXX; GXXXX; TAXXXX} November 2014 BHU: Second Green Power

More information

OPERATIONS MANUAL BANK POLICIES (BP)

OPERATIONS MANUAL BANK POLICIES (BP) BANK POLICIES (BP) OM Section F1/BP Page 1 of 2 These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. SAFEGUARD POLICY STATEMENT 1. The Asian Development

More information

Project Administration Manual

Project Administration Manual Project Administration Manual Project Number: 48031-001 Loan Number: LXXXX 28 October 2014 Proposed Technical Assistance Loan for Islamic Republic of Pakistan: Public Sector Enterprise Reforms Project

More information

Republic of the Maldives: Preparing Business Strategy for Port Development

Republic of the Maldives: Preparing Business Strategy for Port Development Technical Assistance Report Project Number: 47283 Capacity Development Technical Assistance (CDTA) November 2013 Republic of the Maldives: Preparing Business Strategy for Port Development The views expressed

More information

Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project

Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project Technical Assistance Report Project Number: 51039-001 Transaction Technical Assistance (TRTA) September 2017 Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project

More information

LOAN AGREEMENT (Special Operations) (Greater Mekong Subregion Southern Coastal Corridor Project) between KINGDOM OF CAMBODIA. and

LOAN AGREEMENT (Special Operations) (Greater Mekong Subregion Southern Coastal Corridor Project) between KINGDOM OF CAMBODIA. and LOAN NUMBER 2373-CAM(SF) LOAN AGREEMENT (Special Operations) (Greater Mekong Subregion Southern Coastal Corridor Project) between KINGDOM OF CAMBODIA and ASIAN DEVELOPMENT BANK DATED 18 FEBRUARY 2008 LAS:CAM

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. OM Section H5/BP Page 1 of 4 BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction ADDITIONAL FINANCING 1. The

More information

Mongolia: Development of State Audit Capacity

Mongolia: Development of State Audit Capacity Technical Assistance Report Project Number: 47198-001 Capacity Development Technical Assistance (CDTA) November 2013 Mongolia: Development of State Audit Capacity The views expressed herein are those of

More information

People s Republic of Bangladesh: Natural Gas Infrastructure and Efficiency Improvement Project

People s Republic of Bangladesh: Natural Gas Infrastructure and Efficiency Improvement Project Natural Gas Infrastructure and Efficiency Improvement Project (RRP BAN 45203) Project Administration Manual Project Number: 45203-006 October 2016 People s Republic of Bangladesh: Natural Gas Infrastructure

More information

Development Credit Agreement

Development Credit Agreement Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 3909 YF Public Disclosure Authorized Development Credit Agreement (Transport Rehabilitation Project) Public Disclosure Authorized between SERBIA

More information

ATTACHED TECHNICAL ASSISTANCE

ATTACHED TECHNICAL ASSISTANCE Third Capital Market Development Program (RRP BAN 45253) ATTACHED TECHNICAL ASSISTANCE A. Introduction 1. The attached technical assistance (TA) of $700,000 will support implementation of the proposed

More information

Project Administration Memorandum. Democratic Socialist Republic of Sri Lanka: Eastern & North Central Provincial Road Project

Project Administration Memorandum. Democratic Socialist Republic of Sri Lanka: Eastern & North Central Provincial Road Project Project Administration Memorandum Project Number: 39619 Loan Number: 2546 December 2009 Democratic Socialist Republic of Sri Lanka: Eastern & North Central Provincial Road Project This Project administration

More information

IND: Accelerating Infrastructure Investment Facility in India

IND: Accelerating Infrastructure Investment Facility in India Accelerating Infrastructure Investment Facility in India (RRP IND 47083) Facility Administration Manual Project Number: 47083 August 2013 IND: Accelerating Infrastructure Investment Facility in India The

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI 6.07A Page 1 of 4 PROJECT COMPLETION REPORT FOR SOVEREIGN OPERATIONS 1 A. Objective and Scope 1. The main objective of a project completion report (PCR) 1 is to

More information

PROJECT AGREEMENT. (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF SINDH

PROJECT AGREEMENT. (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF SINDH LOAN NUMBER 2499-PAK (SF) PROJECT AGREEMENT (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK and PROVINCE OF SINDH NORTH SINDH URBAN SERVICES CORPORATION LIMITED DATED

More information

Updated Facility Administration Manual. Socialist Republic of Viet Nam: Greater Mekong Subregion Ben Luc Long Thanh Expressway Project

Updated Facility Administration Manual. Socialist Republic of Viet Nam: Greater Mekong Subregion Ben Luc Long Thanh Expressway Project Updated Facility Administration Manual Project Number: 41414 Loan Number: MFF 0053-VIE 23 March 2016 Socialist Republic of Viet Nam: Greater Mekong Subregion Ben Luc Long Thanh Expressway Project 1 Contents

More information

Cook Islands: Renewable Energy Sector Project

Cook Islands: Renewable Energy Sector Project Project Administration Manual Project Number: 46453 October 2017 Cook Islands: Renewable Energy Sector Project (including Additional Financing I and II) ABBREVIATIONS CONTENTS I. PROJECT DESCRIPTION 1

More information

LOAN AGREEMENT (Special Operations) (Municipal Services Development Project - Phase II) between GEORGIA. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Special Operations) (Municipal Services Development Project - Phase II) between GEORGIA. and ASIAN DEVELOPMENT BANK LOAN NUMBER 2534-GEO(SF) LOAN AGREEMENT (Special Operations) (Municipal Services Development Project - Phase II) between GEORGIA and ASIAN DEVELOPMENT BANK DATED 20 AUGUST 2009 LAS:GEO 43171 LOAN AGREEMENT

More information

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance Technical Assistance Report Project Number: 47287-001 Capacity Development Technical Assistance (CDTA) December 2013 Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved

More information

Islamic Republic of Pakistan National Motorway M-4 (Shorkot-Khanewal Section) Project

Islamic Republic of Pakistan National Motorway M-4 (Shorkot-Khanewal Section) Project PD 00001-PAK June 6, 2016 PROJECT DOCUMENT Islamic Republic of Pakistan National Motorway M-4 (Shorkot-Khanewal Section) Project This document has a restricted distribution and may be used by recipients

More information

Project Administration Manual

Project Administration Manual Project Administration Manual Project Number:50102 Loan and/or Grant Number(s): {LXXXX; GXXXX} July 2018 Kingdom of Cambodia: Second Urban Environmental Management in the Tonle Sap Basin Project ABBREVIATIONS

More information

Pakistan: MFF0009-PAK: Punjab Irrigated Agriculture Investment Program - Tranche 4

Pakistan: MFF0009-PAK: Punjab Irrigated Agriculture Investment Program - Tranche 4 Project Administration Manual Project Number: 37231-044 Loan Number: xxx November 2015 Pakistan: MFF0009-PAK: Punjab Irrigated Agriculture Investment Program - Tranche 4 ABBREVIATIONS Contents I. PROJECT

More information

New Development Bank Procurement Policy

New Development Bank Procurement Policy New Development Bank Procurement Policy Owner: Operations Division Version: 2015 V4 Revision Date: [10] March 2016 Procurement Policy All rights reserved. Any unauthorized use, duplication or disclosure

More information

LOAN AGREEMENT (Special Operations) (SASEC Information Highway Project- Bangladesh Component) between PEOPLE S REPUBLIC OF BANGLADESH.

LOAN AGREEMENT (Special Operations) (SASEC Information Highway Project- Bangladesh Component) between PEOPLE S REPUBLIC OF BANGLADESH. LOAN NUMBER 2397-BAN(SF) LOAN AGREEMENT (Special Operations) (SASEC Information Highway Project- Bangladesh Component) between PEOPLE S REPUBLIC OF BANGLADESH and ASIAN DEVELOPMENT BANK DATED 15 MARCH

More information

Bangladesh: Power System Expansion and Efficiency Improvement Investment Program

Bangladesh: Power System Expansion and Efficiency Improvement Investment Program Facility Administration Manual Power System Expansion and Efficiency Improvement Investment Program (RRP BAN 42378) Project Number: 42378-014 Loan Number: LXXXX October 2012 Bangladesh: Power System Expansion

More information

People s Republic of China: Inner Mongolia Road Development Project

People s Republic of China: Inner Mongolia Road Development Project Inner Mongolia Road Development Project (RRP PRC 43029) Project Administration Manual Project Number: 43029-013 May 2018 People s Republic of China: Inner Mongolia Road Development Project Contents ABBREVIATIONS

More information

LOAN AGREEMENT (Special Operations) (Third Financial Sector Program - Subprogram 3) between KINGDOM OF CAMBODIA. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Special Operations) (Third Financial Sector Program - Subprogram 3) between KINGDOM OF CAMBODIA. and ASIAN DEVELOPMENT BANK LOAN NUMBER 3185-CAM(SF) LOAN AGREEMENT (Special Operations) (Third Financial Sector Program - Subprogram 3) between KINGDOM OF CAMBODIA and ASIAN DEVELOPMENT BANK DATED 18 DECEMBER 2014 CAM 42305 LOAN

More information

People s Republic of Bangladesh: Updating the Road Master Plan

People s Republic of Bangladesh: Updating the Road Master Plan South Asia Subregional Economic Cooperation Dhaka Northwest Corridor Road Project, Phase 2 (RRP BAN 40540) Technical Assistance Report Project Number: 40540-016 Transaction Technical Assistance (TRTA)

More information

INDIA: Rajasthan State Highway Investment Program

INDIA: Rajasthan State Highway Investment Program Rajasthan State Highway Investment Program (RRP IND 49228) Facility Administration Manual Project Number: 49228-001 Loan Number: XXXX April 2017 INDIA: Rajasthan State Highway Investment Program ADB APFS

More information

LOAN AGREEMENT (Ordinary Operations) (National Motorway M-4 Gojra-Shorkot Section Project) between ISLAMIC REPUBLIC OF PAKISTAN.

LOAN AGREEMENT (Ordinary Operations) (National Motorway M-4 Gojra-Shorkot Section Project) between ISLAMIC REPUBLIC OF PAKISTAN. LOAN NUMBER 3300-PAK LOAN AGREEMENT (Ordinary Operations) (National Motorway M-4 Gojra-Shorkot Section Project) between ISLAMIC REPUBLIC OF PAKISTAN and ASIAN DEVELOPMENT BANK DATED 22 OCTOBER 2015 PAK

More information

Multitranche Financing Facility Azerbaijan: Water Supply and Sanitation Investment Program Project 2

Multitranche Financing Facility Azerbaijan: Water Supply and Sanitation Investment Program Project 2 Project Administration Manual Project Number: P42408-033 Loan No. 2842-AZE November 2017 Multitranche Financing Facility Azerbaijan: Water Supply and Sanitation Investment Program Project 2 2 CONTENTS

More information

Mongolia: Developing an Information System for Development Policy and Planning

Mongolia: Developing an Information System for Development Policy and Planning Technical Assistance Report Project Number: 51136-001 Knowledge and Support Technical Assistance (KSTA) September 2017 Mongolia: Developing an Information System for Development Policy and Planning This

More information

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time);

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time); 2 (f) GAP or Gender Action Plan means the gender action plan for the Project, including any update thereto, prepared and agreed between the Borrower and ADB and further set out in the PAM; (g) Goods means

More information

TERMS OF REFERENCES FOR CONSULTANTS I. OBJECTIVE AND PURPOSE OF THE ASSIGNMENT

TERMS OF REFERENCES FOR CONSULTANTS I. OBJECTIVE AND PURPOSE OF THE ASSIGNMENT 23 TERMS OF REFERENCES FOR CONSULTANTS I. OBJECTIVE AND PURPOSE OF THE ASSIGNMENT 1. The Asian Development Bank (ADB) is providing technical assistance to the Government of the Philippines (the government)

More information

India: Bihar State Highways Project

India: Bihar State Highways Project Completion Report Project Number: 41127-013 Loan Number: 2443 Technical Assistance Number: 7130 August 2018 India: Bihar State Highways Project This document is being disclosed to the public in accordance

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI 5.01 Page 1 of 2 EXECUTING AGENCY S PROJECT PROGRESS REPORT A. Introduction 1. Loan regulations and loan and project agreements require the borrower and executing

More information

Indonesia: Metropolitan Sanitation Management and Health Project

Indonesia: Metropolitan Sanitation Management and Health Project Metropolitan Sanitation Management and Health Project (RRP INO 39071-01) Project Administration Manual Project Number: 39071 Loan xxxx June 2010 Indonesia: Metropolitan Sanitation Management and Health

More information

Periodic Financing Request Report. People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4

Periodic Financing Request Report. People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4 Periodic Financing Request Report Project Number: 43332 December 2013 People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4 CURRENCY EQUIVALENTS

More information

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones Technical Assistance Report Project Number: 50004-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Study on Natural Resource Asset Appraisal and Management System

More information

Mongolia: Regional Road Development Project

Mongolia: Regional Road Development Project Validation Report Reference Number: PVR-481 Project Numbers: 35377-013 and 35377-023 Loan/Grant Numbers: 2087, 2621, and 0199 December 2016 Mongolia: Regional Road Development Project Independent Evaluation

More information