Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Size: px
Start display at page:

Download "Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No."

Transcription

1 Report No. PID6809 Project Pakistan-Punjab Municipal Development (+) Fund Project Region Sector Project ID Borrower Implementing Agencies South Asia Urban PKPE55293 Government of Pakistan (GOP) Date PID Prepared August 11, 1998 Project Appraisal Date January 1, 1999 Project Board Date March 31, 1999 The (proposed) Punjab Municipal Development Fund Company The Local Government and Rural Development Department, The Province of Punjab, Civil Secretariat, Lahore. Tel: (92) The Planning & Development Board, The Province of Punjab, Civil Secretariat, Lahore Tel: (92) Background: The cities and towns of Punjab suffer from inadequate provision and poor operation and maintenance of basic urban infrastructure and services. The intermittent supply of water, even in major cities, for example, averages up to six hours per day at varying pressures. The treatment of sewerage is almost non-existent, resulting in raw or partially treated sewerage being discharged into drains and rivers. Drains generally serve the dual roles of carrying storm water as well as sewerage, posing severe environmental and health hazards. Solid waste management services in most urban areas are grossly inadequate; the rate of collection being less than 30w, resulting in drains becoming clogged with uncollected refuse. Formal solid waste disposal sites are rare, even in major cities. The municipal road networks are also inadequate and very poorly maintained. Meeting the pressing urban infrastructure needs of the province is constrained by a number of factors including: (i) inadequate local resource mobilization by urban local bodies (ULBs) due to inappropriate billing, poor tax collection, inability to raise user fees in line with inflation etc.; (ii) unpredictable and discretionary inter-governmental transfers; (iii) weak ULBs (their administrative, managerial, technical and financial capacities are low, and they do not have clear authority, responsibility and corresponding resources to provide urban services); (iv) lack of an efficient mechanism for allocating resources for urban infrastructure investments; and (v) lack of long-term financing for urban development. Project Objectives: The overall objective of the proposed project is to improve urban infrastructure services in the Province of Punjab. This will be achieved through: - mobilizing additional resources for urban infrastructure development; - developing an efficient mechanism for allocating resources for urban

2 infrastructure investments; and - strengthening the financial, administrative and managerial capacities of the ULBs Project Description: The project has two main components: (a) an Institutional Development Component; and (b) an Urban Investment Component. The project would further support up front urban sector reforms aimed at devolving greater authority, responsibilities and resources to local government. The proposed Bank loan/credit will be channeled through the Punjab Municipal Development Fund Company (PMDFC) -- a private company (limited by guarantee) to be established with an autonomous governance structure. This company would provide long-term-loans, capital grants, technical assistance and training to ULBs for urban infrastructure investments and institutional strengthening. The Institutional Development Component (US$25 million) would finance technical assistance (TA), training, studies and related equipment pertaining to: (a) building administrative, technical and financial capabilities of ULBs; (b) identifying, preparing and implementing sub-projects by the ULBs; (c) supporting the activities of the PMDFC during the initial period and (d) helping the provincial government with the implementation of urban sector reforms. The PMDFC would maintain a roster of eligible consulting firms which may be deployed by the ULBs. The Urban Investment Component (US$161 million) would provide long-term loans and capital grants for urban infrastructure projects sponsored by ULBs, Cantonment Boards, Water and Sanitation Agencies (WASAs) and Development Authorities (DAs) based on clear and transparent eligibility criteria. Subprojects eligible for financing would include basic infrastructure services such as water supply, sewerage, sanitation, solid waste management, urban roads, storm-water drains, street lighting, community centers, bus terminals amongst others. The Urban Investment Component would finance up to 90% of the capital cost of urban infrastructure projects sponsored by the ULBs. Such financing would comprise a mix of loans (at commercial rates) and grants in order to make debt-servicing affordable to the ULBs. The ULB concerned would be initially required to contribute the remaining 10% of the capital cost. The ULB share will be gradually increased to 20%. Sub-projects targeted at well-defined groups of the urban poor could receive up to 90% of the capital cost as a grant. The sponsoring ULB would provide the remaining 10%. Project Benefits: The proposed project would provide a number of direct and indirect benefits, including: (i) an improvement in the quality of life of the citizens in Punjab; (ii) an improvement in the capacity and the authority of ULBs to undertake, operate and maintain urban investments in a sustainable manner; (iii) an increase in the allocative efficiency of public expenditure; (iv) an improvement in the enabling environment for promoting investment in industrial and commercial activities; (v) an improvement in the urban environment and public health, particularly of the urban poor; and (vi) an impetus to driving municipalities to seek commercial sources of borrowing in the long-term. Project Risks: The proposed project could face the following risks: (i) the proposed reforms not being implemented by the Province of Punjab; (ii) political interference in PMDFC's decision-making; (iii) a deterioration of -2 -

3 political or economic conditions which will reduce the ULB's revenues in real terms; (iv) not enough ULBs qualifying for borrowing, and therefore, slow disbursement of the fund; and (v) the ULBs' inability to sustain good practices/services over time. These risks would be mitigated inter alia through: - making the implementation of several key reforms a condition for loan appraisal or negotiation, and making other critical reforms dated covenant conditions for disbursement; - ensuring an autonomous governance structure for the PMDFC with a significant proportion of non-political members; entrusting the PMDFC's subproject appraisal to a private fund management agency; establishing clearly defined, transparent eligibility criteria for ULBs and sub-projects; and putting in place effective financial and operational controls, procurement expertise and independent review arrangements; - increasing the ULBs' own-source revenues to buffer against a reduction in provincial transfers; - providing TA and training for capacity building of ULBs; - deciding the size of the Bank loan/credit based on a realistic assessment of the pipeline sub-projects and the ULBs' loan absorptive capacity; making project appraisal contingent on the PMDFC having appraised a sufficient pipeline of sub-projects; and - ensuring active community participation in project identification and implementation, which will put pressure on the ULBs to maintain/improve their services. Project Cost and Financing: The total cost of the project is expected to be US$186 million, of which the Bank would contribute about US$150 million (a blend of IBRD and IDA funds). The Province of Punjab is expected to contribute another US$20 million. The ULBs' contribution (by way of 10% of their subproject costs) would amount to about US$16 million. Project Implementation: The main project implementation agencies are as follows: (i) The PMDFC (the Urban Investment Component & Institutional Development Component); (ii) the ULBs (implementation of sub-projects under the Urban Investment Component); (iii) the Local Government and Rural Development Department of the Province of Punjab (project co-ordination and the implementation of urban sector reforms). The Project Advisory Team to the Province of Punjab will take the lead in co-ordinating the establishment the PMDFC, the appointment of its board/staff and contracting out its activities. Project Sustainability: The sustainability of this project would ultimately depend on: (a) the ability of the municipalities to improve their fiscal and financial strength and become creditworthy; and (b) the ability of the PMDFC to graduate to a sustainable financial intermediary. The Institutional Development Component is designed to improve the financial, managerial, technical and administrative capacities of the ULBs. Such assistance, coupled with the urban sector reforms sought by the project for devolving greater authority and resources to local government, are expected to strengthen the fiscal capacity of the ULBs, improve their ability to recover costs and generate surpluses, and enhance their creditworthiness. Furthermore, the participation of the communities in the identification and implementation of sub-projects is expected to put pressure on the municipalities to sustain their services. The project's support for establishing the PMDFC as a private company with an autonomous governance structure, entrusting the PMDFC's sub- - 3-

4 project appraisal to a private fund management agency, putting in place transparent eligibility criteria, and establishing intercept arrangements for ensuring loan recovery are important steps towards facilitating the PMDFC's graduation to a sustainable financial intermediary in the long-run. Lessons Learned from Previous Bank Operations: The Bank's global experience with municipal development funds and intermediaries has been mixed. Some of the key lessons learned and reflected in the proposed project's design are as follows: - the validity of any lending program depends on the creditworthiness of its borrowers, improving the creditworthiness of local government may necessitate up front major urban sector reforms for devolving greater authority, responsibilities and resources to local government; - the fund/intermediary should be operated on a commercial basis including: (i) professional management and staff; (ii) efficient loan appraisal and processing procedures based on clear and transparent eligibility criteria; (iii) sound loan disbursement and collection systems; and (iv) independent audits and supervision; any subsidies (grants) should be separated from loans; - there must be strong government commitment to the financial integrity of the fund/intermediary; there should not be any political interference affecting its lending and collection decisions; - reasonable debt-service limits should be imposed on the borrower (typically about 15t of a municipality's revenues); loan guarantees, particularly through intercept provisions, have been useful in reducing municipal loan arrears but should not obfuscate the need for prudent credit risk analysis and the due diligence of potential sub-projects; - any assistance to local governments should be "demand-driven"; a "topdown" approach should not be imposed; municipalities should also contribute to the equity of their sub-projects (usually about 10t of the sub-project cost); - there must be strong local ownership of sub-projects, with full participation of key stakeholders; - on-lending rates should be ideally set at market rates in order to encourage graduation to private sources of funding over time. Poverty Category: This project is not explicitly targeted to low-income groups per se. However, the project would offer significant benefits to the urban poor given its focus on improving basic urban services such as water supply and sanitation. In particular, about US$10 million under the Urban Investment Component would be set aside for providing grants for up to 90t of the capital cost of sub-projects targeted at clearly defined groups of citizens living in dire poverty. Environmental and Social Aspects: Given that the loans/grants from the PMDFC would be demand-driven, it is not possible to precisely predict at this point the specific sub-projects which will be financed through this project. However, the sub-projects will be in the sectors of water supply, sanitation, drainage, solid waste management, urban roads, bus terminals and other municipal infrastructure. While the project is being designed to realize overall environmental improvements in Punjab, some of the sub-projects could give rise to localized negative environmental impacts. Similarly, some subprojects could have negative social implications, particularly if they entail land acquisition. During project preparation, an environmental and social assessment framework will be developed in the form of an Environmental and - 4 -

5 Social Framework Report (ESFR) which will: (a) specify a screening criteria to assess the environmental and social impacts of different sub-projects; (b) set out the institutional process to be followed by the ULBs and the PMDFC; (c) prescribe a monitoring program to assess the implementation of sub-projects; and (d) identify human resources needs and skills required to manage and implement the framework. This framework will guide the preparation, appraisal, and implementation of sub-projects. This approach is being applied to other projects of this nature in the South Asia Region. Environment Category: B. Program Objective Categories: categories of the World Bank -- Sustainable Development (EN). This project falls under two program objective Economic Management (EA) and Environmentally Contact Point: The InfoShop The World Bank 1818 H Street, N.W. Washington, D.C Telephone No. (202) Fax No. (202) Note: This is information on an evolving project. Certain activities and/or components may not be included in the final project. Processed by the InfoShop week ending September 4,

6 Annex Because this is a Category B project, it may be required that the borrower prepare a separate EA report. If a separate EA report is required, once it is prepared and submitted to the Bank, in accordance with OP 4.01, Environmental Assessment, it will be filed as an annex to the Public Information Document (PID). If no separate EA report is required, the PID will not contain an EA annex; the findings and recommendations of the EA will be reflected in the body of the PID. -6-

Project Name Philippines-Local Government Finance & Development Project (LOGOFIND)

Project Name Philippines-Local Government Finance & Development Project (LOGOFIND) Public Disclosure Authorized Report No. PID4841 Project Name Philippines-Local Government Finance (@+)... & Development Project (LOGOFIND) Region East Asia and Pacific Region Sector UY - Other Urban Development

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Project Name Region Sector Project ID Borrower(s) Report No. PID5794 Lebanon-Municipal Infrastructure Project (@+) Middle East and North Africa Region Other Urban Development LBPE50544 Lebanese Republic

More information

Environmental Assessment

Environmental Assessment OP 4.01 January 1999 These policies were prepared for use by World Bank staff and are not necessarily a complete treatment of the subject. Environmental Assessment (Archived August 2004) Note: OP and BP

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Project Name Region Sector Project ID Borrower Beneficiaries Implementing Agency Report No. PID10910 India-Andhra Pradesh Economic Reform... Loan/Credit South Asia Poverty Reduction and Economic Management

More information

Kazakhstan-Leveraged Insurance Facility for Trade and Development (LIFTAD)

Kazakhstan-Leveraged Insurance Facility for Trade and Development (LIFTAD) Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Report No. PID8599 Kazakhstan-Leveraged Insurance Facility for Trade and Development (LIFTAD) Europe and Central Asia Private

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2168 Support for Strategic Local Development and Investment Project

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2168 Support for Strategic Local Development and Investment Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2168 Support

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Project Name Region Sector Project ID Borrower Report No. PID7363 Pakistan-Structural Adjustment Loan South Asia Banking, Power, Gas and Tax Administration PKPE59323 The Government of Pakistan Ministry

More information

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No. PID6725 Project Name Indonesia-Urban Poverty Project (+) Region Sector Project

More information

Table 1 the Road Network of Mozambique (in kilometers)

Table 1 the Road Network of Mozambique (in kilometers) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2867 Roads

More information

UPDATE. Financial Intermediary Lending and Environmental Assessment. Environmental Assessment

UPDATE. Financial Intermediary Lending and Environmental Assessment. Environmental Assessment Environmental Assessment S o u r c e b o o k UPDATE Environment Department June 2002 The World Bank Number 27 Financial Intermediary Lending and Environmental Assessment The World Bank supports economic

More information

MFF - Bihar Urban Development Investment Program (Facility Concept)

MFF - Bihar Urban Development Investment Program (Facility Concept) India: MFF - Bihar Urban Development Investment Program (Facility Concept) Project Name Project Number 41603-013 Country Project Status Project Type / Modality of Assistance Source of Funding / Amount

More information

Money Matters: Designing Effective CDD Disbursement Mechanisms

Money Matters: Designing Effective CDD Disbursement Mechanisms Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOCIAL DEVELOPMENT HOW TO SERIES vol. 4 February 2008 Money Matters: Designing Effective

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Project Name Region Sector Project ID Implementing Agency Report No. PIC908 West Bank and Gaza-Emergency Rehabilitation Project (& Middle East and North Africa Non-Sectoral XOPA34112 Date prepared May

More information

SERBIA AND MONTENEGRO-Montenegro Environmentally Sensitive Tourist Areas Project Region

SERBIA AND MONTENEGRO-Montenegro Environmentally Sensitive Tourist Areas Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Updated Project Information Document () Report No: AB131 Project Name SERBIA AND MONTENEGRO-Montenegro

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857. Project Name. Parent Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA9857 Project

More information

Nicaragua-Pension and Financial Market Reform Technical Assistance Credit

Nicaragua-Pension and Financial Market Reform Technical Assistance Credit Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category Report No. PID8081 Nicaragua-Pension and Financial Market (@) Reform Technical Assistance Credit Latin America

More information

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE November 16, 2016 Report No:

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE November 16, 2016 Report No: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE November 16, 2016 Report No: 111025

More information

Money Matters: Designing Effective CDD Disbursement Mechanisms

Money Matters: Designing Effective CDD Disbursement Mechanisms Money Matters: Designing Effective CDD Disbursement Mechanisms One of the key challenges associated with Community Driven Development (CDD) approaches is how to disburse funds to communities in an efficient

More information

1. Key development issues and rationale for Bank involvement

1. Key development issues and rationale for Bank involvement Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DRAFT PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5278 Project Name

More information

State Secretariat for Planning, Science and Technology (SEPLAN)

State Secretariat for Planning, Science and Technology (SEPLAN) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower Implementing Agency Report No. PID10306

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name. Wenchuan Earthquake Recovery Project Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name. Wenchuan Earthquake Recovery Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name Wenchuan

More information

CLIMATE INVESTMENT FUNDS

CLIMATE INVESTMENT FUNDS CLIMATE INVESTMENT FUNDS CTF/TFC.1/4 November 03, 2008 First Meeting of the CTF Trust Fund Committee Washington, D.C. November 17-18, 2008 CLEAN TECHNOLOGY FUND FINANCING PRODUCTS, TERMS, AND REVIEW PROCEDURES

More information

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Strengthening DAK Transfers To Local Governments Region

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Strengthening DAK Transfers To Local Governments Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Program Name

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/15/2010 1. Basic Project Data Original

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Report No. PID8369 Tanzania-Social Action Fund Project Africa Regional Office Social Funds & Social Assistance TZPE65372 GOT

More information

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized LOAN NUMBER 4753 -IN Public Disclosure Authorized Loan Agreement (Rural Roads Project) between Public Disclosure Authorized INDIA and INTERNATIONAL BANK FOR RECONSTRUCTION

More information

Central government administration (80%); Sub-national government administration (20%) Operation ID

Central government administration (80%); Sub-national government administration (20%) Operation ID Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE 31 March 2016 Report No.: AB7818 (The

More information

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE July 21, 2017 Report No.: MG Public Finance Sustainability and Investment II DPO

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE July 21, 2017 Report No.: MG Public Finance Sustainability and Investment II DPO Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE July 21, 2017 Report No.: 120763 Operation

More information

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER Responsible

More information

The Tamilnadu Urban Development Fund (TNUDF)

The Tamilnadu Urban Development Fund (TNUDF) The Tamilnadu Urban Development Fund (TNUDF) INTRODUCTION THE FUND OBJECTIVES LENDING POLICIES PERFORMANCE OF THE FUND ASSESSMENT OF PRIVATE FUNDING POLICY OPTIONS FOR GOVERNMENT 1 INTRODUCTION The Urban

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) Sector Performance, Problems, and Opportunities Improving Public Expenditure Quality Program, SP1 (RRP VIE 50051-001) SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT (PUBLIC EXPENDITURE AND FISCAL MANAGEMENT) 1 Sector Road Map 1. Sector Performance,

More information

Myanmar Development Policy Operation Region

Myanmar Development Policy Operation Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE March 6, 2017 Report No.: AB7879 (The

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second Additional Financing to Road Rehabilitation & Maintenance Project Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Second Additional Financing to Road Rehabilitation & Maintenance Project Region Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Second Additional Financing to Road Rehabilitation & Maintenance Project Region AFRICA Sector Roads and highways (100%) Project ID P120723

More information

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6188 Operation Name

More information

COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) APPRAISAL STAGE

COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS)

More information

PROJECT AGREEMENT. (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF SINDH

PROJECT AGREEMENT. (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF SINDH LOAN NUMBER 2499-PAK (SF) PROJECT AGREEMENT (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK and PROVINCE OF SINDH NORTH SINDH URBAN SERVICES CORPORATION LIMITED DATED

More information

September 30, 2015 (Revised document) CLEAN TECHNOLOGY FUND FINANCING PRODUCTS, TERMS, AND REVIEW PROCEDURES FOR PUBLIC SECTOR OPERATIONS

September 30, 2015 (Revised document) CLEAN TECHNOLOGY FUND FINANCING PRODUCTS, TERMS, AND REVIEW PROCEDURES FOR PUBLIC SECTOR OPERATIONS September 30, 2015 (Revised document) CLEAN TECHNOLOGY FUND FINANCING PRODUCTS, TERMS, AND REVIEW PROCEDURES FOR PUBLIC SECTOR OPERATIONS INTRODUCTION 1. Among the functions of the Clean Technology Fund

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/06/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

Governance for Improved Service Delivery Region. Program-for-Results Program ID. Republic of Kenya Implementing Agency

Governance for Improved Service Delivery Region. Program-for-Results Program ID. Republic of Kenya Implementing Agency Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.:PIDC0091373 (The

More information

India: Karnataka Urban Development and Coastal Environmental Management Project

India: Karnataka Urban Development and Coastal Environmental Management Project Validation Report Reference Number: PVR-334 Project Number: 30303 Loan Number: 1704 November 2014 India: Karnataka Urban Development and Coastal Environmental Management Project Independent Evaluation

More information

Cambodia: Rural Credit and Savings Project

Cambodia: Rural Credit and Savings Project Project Validation Report Reference Number: CAM 2008-06 Project Number: 30327 Loan Number: 1741 July 2008 Cambodia: Rural Credit and Savings Project Operations Evaluation Department ABBREVIATIONS ADB Asian

More information

WSSCC, Global Sanitation Fund (GSF)

WSSCC, Global Sanitation Fund (GSF) Annex I WSSCC, Global Sanitation Fund (GSF) Terms of Reference Country Programme Monitor (CPM) BURKINA FASO 1 Background The Water Supply and Sanitation Collaborative Council (WSSCC) was established in

More information

PROJECT INFORMATION DOCUMENT

PROJECT INFORMATION DOCUMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name: Region: Sector: Task Manager: Project ID Number: Borrower: Guarantor: Implementing

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB1710 Leader

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/10/2007 INTEGRATED SAFEGUARDS DATASHEET

More information

OFFICIAL LvG-K DOCUMENTS

OFFICIAL LvG-K DOCUMENTS Public Disclosure Authorized OFFICIAL LvG-K DOCUMENTS LOAN NUMBER 8677-TR Public Disclosure Authorized Loan Agreement (Sustainable Cities Project) Public Disclosure Authorized between ILLER BANKASI ANONIM

More information

Power Sector Reform: Second Development Policy Credit Region

Power Sector Reform: Second Development Policy Credit Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE April 2, 2015 Report No.: 99908 (The

More information

PROGRAM INFORMATION DOCUMENT (PID)

PROGRAM INFORMATION DOCUMENT (PID) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Operation Name PROGRAM INFORMATION DOCUMENT (PID) Appraisal STAGE September 25, 2015

More information

MATRIX OF STRATEGIC VISION AND ACTIONS TO SUPPORT SUSTAINABLE CITIES

MATRIX OF STRATEGIC VISION AND ACTIONS TO SUPPORT SUSTAINABLE CITIES Urban mission and overall strategy objectives: To promote sustainable cities and towns that fulfill the promise of development for their inhabitants in particular, by improving the lives of the poor and

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 24-Feb-2015

More information

PPP in Solid Waste Management. EIB Approach to support Circular Economy and to mitigate Climate Change

PPP in Solid Waste Management. EIB Approach to support Circular Economy and to mitigate Climate Change PPP in Solid Waste Management EIB Approach to support Circular Economy and to mitigate Climate Change European Investment Bank Dr. Patrick DORVIL Agenda The EIB: The EU Bank European PPP Expertise Centre

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL CREDIT

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL CREDIT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Sustainable Development Unit South Asia Region Document of The World Bank FOR OFFICIAL

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No. PID7125 Project Name Argentina-Special Structural Adjustment... Loan (SSAL)

More information

Fiscal Transparency and Public Contingent Liabilities

Fiscal Transparency and Public Contingent Liabilities Fiscal Transparency and Public Contingent Liabilities Lessons from Cross-Country Experiences Sudarshan Gooptu Lead Economist Poverty Reduction and Economic Management Sector Unit East Asia and Pacific

More information

International Bank for Reconstruction and Development

International Bank for Reconstruction and Development Information Statement International Bank for Reconstruction and Development 13AUG200501453077 The International Bank for Reconstruction and Development (IBRD) intends from time to time to issue its notes

More information

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) PRE-APPRAISAL STAGE Report No.:PIDC

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) PRE-APPRAISAL STAGE Report No.:PIDC Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) PRE-APPRAISAL STAGE Report No.:PIDC0071568

More information

Earth is our Business

Earth is our Business Earth is our Business changing the rules of the game POLLY HIGGINS SHEPHEARD-WALWYN (PUBLISHERS) LTD 2012 Polly Higgins Some rights reserved. [license_3.0] This work is licensed under a Creative Commons

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6515 Afghanistan New Market Development Project

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6515 Afghanistan New Market Development Project Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report.: AB6515 Afghanistan New Market Development Project Region SOUTH ASIA Sector General industry and trade sector (100%) Project ID P118053

More information

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE. MA-Second Capital Market Development and SME Finance DPL Region

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE. MA-Second Capital Market Development and SME Finance DPL Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB7824 March 8, 2016 Operation

More information

Fisheries & Food (SAGPyA)

Fisheries & Food (SAGPyA) Report No. PID7776 Project Name Argentina-Sustainable Fisheries (+) Management Project Region Sector Project ID Latin America and the Caribbean AF, SE ARLL57459 Estimated Project Cost: $6.5 million Expected

More information

Liberia Reconstruction Trust Fund Implementation Manual

Liberia Reconstruction Trust Fund Implementation Manual Liberia Reconstruction Trust Fund Implementation Manual Updated November 2009 2011-02-28 LRTF Implementation Manual 1 I. Background... 3 II. Coverage... 3 III. General Principles... 4 IV. Project Development

More information

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Second Disaster Risk Management Development Policy Loan with a CAT-DDO Region

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Second Disaster Risk Management Development Policy Loan with a CAT-DDO Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Operation Name Second Disaster

More information

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE September 30, 2017 Report No.:

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE September 30, 2017 Report No.: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE September 30, 2017 Report No.: 120338

More information

IBRD: ($m.) support the development of municipal infrastructure to provide quality local services.

IBRD: ($m.) support the development of municipal infrastructure to provide quality local services. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (ISDS) Section I Basic Information Date ISDS Prepared/Updated:

More information

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized o INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE te: This ISDS will be considered

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Project Name Region Sector Project ID Borrower Report No. PIC4620 Senegal-Urban Transport Reform and... Capacity Building Project Africa Urban Transport SNPA44383 Republic

More information

Environmental Funds. Main Categories and Characteristics of Environmental Funds

Environmental Funds. Main Categories and Characteristics of Environmental Funds Pollution Prevention and Abatement Handbook WORLD BANK GROUP Effective July 1998 Environmental Funds Environmental funds are increasingly popular environmental financing mechanisms in developing and transition

More information

Updated Project Information Document (PID) Report No: AB894

Updated Project Information Document (PID) Report No: AB894 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Theme Project Borrower(s) Implementing Agency(ies) Environment

More information

OFFMCAL. olrakdocuments,

OFFMCAL. olrakdocuments, Public Disclosure Authorized Th OFFMCAL. olrakdocuments, The World Bank 1818 H Strelft N.W. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOP Pll.I Vaiil.rdy6, D.C. 20433 Cable Address:

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Report No. PID10650 Nigeria-Community and Local Government Development... Project Africa Regional Office Decentralization

More information

Project Name. Region Sector

Project Name. Region Sector Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report

More information

The World Bank and Road Infrastructure Investment. October 8, Chanin Manopiniwes World Bank

The World Bank and Road Infrastructure Investment. October 8, Chanin Manopiniwes World Bank The World Bank and Road Infrastructure Investment October 8, 2013 Chanin Manopiniwes World Bank Outline 1. The Project Cycle 2. Roles of the World Bank in Road Infrastructure 3. Program for Result (P4R)

More information

THIRD TAMIL NADU URBAN DEVELOPMENT PROJECT. Report No: IN PROJECT APPRAISAL DOCUMENT ON A PROPOSED LOAN IN THE AMOUNT OF USD 300 MILLION

THIRD TAMIL NADU URBAN DEVELOPMENT PROJECT. Report No: IN PROJECT APPRAISAL DOCUMENT ON A PROPOSED LOAN IN THE AMOUNT OF USD 300 MILLION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT APPRAISAL DOCUMENT ON A PROPOSED

More information

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.:

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: 113653 Program

More information

Development Financing Agreement

Development Financing Agreement Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4042 - MAL GRANT NUMBER H148 - MAL Public Disclosure Authorized Development Financing Agreement Public Disclosure Authorized (Post Tsunami Recovery

More information

OFFICIAL DOCUMENTS. Loan Agreement

OFFICIAL DOCUMENTS. Loan Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS LOAN NUMBER 8796-IQ Public Disclosure Authorized Loan Agreement (Baghdad Water Supply and Sewerage Improvement Project) between REPUBLIC OF IRAQ Public Disclosure

More information

Bangladesh: Urban Governance and Infrastructure Improvement (Sector) Project

Bangladesh: Urban Governance and Infrastructure Improvement (Sector) Project f Validation Report Reference Number: PVR-370 Project Number: 29041 Loan Number: 1947 December 2014 Bangladesh: Urban Governance and Infrastructure Improvement (Sector) Project Independent Evaluation Department

More information

KANPUR City Development Plan (CDP)

KANPUR City Development Plan (CDP) Annexure-IV JNNURM AND METHODOLOGY FOR DEVELOPING CITY DEVELOPMENT PLAN BACKGROUND Urban population of India has increased from 23.34 percent in 1981 to 27.8 percent in 2001 (Census of India 1991, 2001).

More information

Initial Project Information Document (PID) Report No: AB484. INDONESIA - Domestic Gas Sector Restructuring Region. Project Name

Initial Project Information Document (PID) Report No: AB484. INDONESIA - Domestic Gas Sector Restructuring Region. Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Initial Project Information Document () Report No: AB484 Project Name INDONESIA - Domestic

More information

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE <October 4, 2013> Report No.: 86550

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE <October 4, 2013> Report No.: 86550 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Operation Name PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report

More information

Ebola Recovery and Reconstruction Trust Fund Grant Agreement

Ebola Recovery and Reconstruction Trust Fund Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS GRANT NUMBER: TFOA1023 Public Disclosure Authorized Ebola Recovery and Reconstruction Trust Fund Grant Agreement (LABOR-INTENSIVE PUBLIC WORKS TO MITIGATE

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA3619. Project Name. Parent Project Name. Region. Country.

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA3619. Project Name. Parent Project Name. Region. Country. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA3619 Project

More information

ANNEXURE-2 URBAN INSTITUTIONAL, FINANCIAL, REGULATORY, AND OPERATIONAL REFORM AGENDA

ANNEXURE-2 URBAN INSTITUTIONAL, FINANCIAL, REGULATORY, AND OPERATIONAL REFORM AGENDA ANNEXURE-2 URBAN INSTITUTIONAL, FINANCIAL, REGULATORY, AND OPERATIONAL REFORM AGENDA A Institutional Implement 74 th Constitutional Within six months of 1 st tranche approval develop and submit a plan

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s)

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Report No. PID6856 Project Name Romania-Cultural Heritage Project (+) [Learning and Innovation Loan] Region Sector Project ID Borrower Implementing Agency Environment Category Europe and Central Asia Environmentally

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/26/2009 INTEGRATED SAFEGUARDS DATASHEET

More information

Project Name Comoros-Health Project... (Previously Second Human Resources Project)

Project Name Comoros-Health Project... (Previously Second Human Resources Project) Report No. PID5951 Project Name Comoros-Health Project... (Previously Second Human Resources Project) Region Sector Project ID Borrower Implementing Agency Africa Basic Health KMPE52887 Government of Comoros

More information

Recommendation of the Council on Good Practices for Public Environmental Expenditure Management

Recommendation of the Council on Good Practices for Public Environmental Expenditure Management Recommendation of the Council on for Public Environmental Expenditure Management ENVIRONMENT 8 June 2006 - C(2006)84 THE COUNCIL, Having regard to Article 5 b) of the Convention on the Organisation for

More information

Ex post evaluation India

Ex post evaluation India Ex post evaluation India Sector: 24030 - Formal sector financial intermediaries Programme/Project: Urban infrastructure development Tamil Nadu - 2006 66 107* (interest subsidy), 2006 66 081** (bond issue)

More information

Financing Agreement OFFICIAL OCUMENTS. Public Disclosure Authorized CREDIT NUMBER 5152-UZ. Public Disclosure Authorized

Financing Agreement OFFICIAL OCUMENTS. Public Disclosure Authorized CREDIT NUMBER 5152-UZ. Public Disclosure Authorized Public Disclosure Authorized OFFICIAL OCUMENTS CREDIT NUMBER 5152-UZ Public Disclosure Authorized Financing Agreement (Additional Financing for the Second Rural Enterprise Support Project) between Public

More information

OFFICIAL DOCUMENTS. The World Bank. Public Disclosure Authorized. Public Disclosure Authorized

OFFICIAL DOCUMENTS. The World Bank. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized OFFICIAL DOCUMENTS The World Bank 1818 H Street N.W. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL

More information

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE. First Governance and Competitiveness Development Policy Operation (DPO1) Region

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE. First Governance and Competitiveness Development Policy Operation (DPO1) Region PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6864 Operation Name First Governance and Competitiveness Development Policy Operation (DPO1) Region AFRICA Sector Central government administration

More information

Report No.: ISDSA13978

Report No.: ISDSA13978 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 0 o Date ISDS Prepared/Updated: 29-Jul-2015 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:

More information

OFFICIAL -1 L(-L DOCUMENTS. Between. and

OFFICIAL -1 L(-L DOCUMENTS. Between. and Public Disclosure Authorized OFFICIAL -1 L(-L DOCUMENTS ADDENDUM No 2 TO ADMINISTRATION AGREEMENT Between Public Disclosure Authorized Public Disclosure Authorized the EUROPEAN UNION (represented by the

More information

Biennial Budget Section II: Process/Policies

Biennial Budget Section II: Process/Policies BUDGET POLICIES This section of the budget sets forth the objectives of the budget as a policy document together with a description of the basis of the policy. Policy Context of the Budget The City budget

More information

Environmental Assessment Framework and Guidelines: Experience from the Philippines

Environmental Assessment Framework and Guidelines: Experience from the Philippines Environmental Assessment Framework and Guidelines: Experience from the Philippines Presented by: Joe B. Tuyor Bishkek, Kyrgyz Republic March 26-28, 2008 Tbilisi, Georgia April 1-3, 2008 1 Outline of the

More information