1 P1 ENVIRONMENTAL SERVICES DEPARTMENT PROPOSED SERVICE PLAN Mandate: Environmental Services (ENVS) provides leadership in environmental protection and sustainable service for the citizens of Red Deer and our Regional Partners in the areas of water treatment and distribution, collection and treatment of wastewater, collection and disposal of solid waste, collection of storm water runoff, and environmental initiatives. FTE 1 Table Year (proposed) # Budgeted FTE s Calculation of the number of FTE positions is for budgeted positions based on 2019 budget guidelines FTE (PFT) WWTP Lab Tech FAR; 1.93 FTE Green Cart Roll out FAR (Term); less 1.00 FTE Storm Water Position (OT); less 0.15 FTE for approved Personnel Information Update 3 The following are proposed through Funding Adjustment Requirements 1.00 FTE (OT) Stormwater Support person FAR less 1.00 FTE (OT) Stormwater FAR reversal 1.00 FTE (PFT) Water Distribution Operator FAR 1.00 FTE (OT) Corporate Environmental Sustainability Support Person (Grant FAR) 1.00 FTE (OT) Stormwater Utility Implementation FAR Less 0.5 FTE (OT) Green Cart Rollout FAR reversal 2. Department Priorities: 1. Environmental Master Plan Implementation The completion of the Environmental Master Plan (EMP) refresh is anticipated in early Once implementation priorities are established for the EMP, Environmental Services will work with other City Departments and stakeholders to see key priorities and action come to fruition. 2. Waste Management Master Plan Implementation The Cart collection program was launched in April 2018, starting with Green Carts. Single family households now receive automated weekly collection of food waste, pet waste and yard waste year round and the materials collected will be diverted for composting. Blue and Black Carts will be delivered to single family households in the spring of 2019 with collection starting at the beginning of May. At that time, every other week collection of Blue and Black Carts will be introduced, with Green Cart collection remaining weekly. 3. Stormwater Quality Improvements Based on the Stormwater Drainage Master Plan and the Storm Utility Feasibility Study, the establishment of a Storm Water Utility will help to address the needed repairs and maintenance to Red Deer s storm infrastructure. Currently Administration is compiling the implementation information including impact on customers. Should a Storm Water Utility be implemented a July 2021 launch in anticipated.

2 P2 Environmental Services The Storm Drainage Master Plan recommendations include: storm outfall rehabilitation, lift station improvements, storm sewer cleaning and inspection service level improvements. In alignment with these recommendations, a stormwater communications plan designed with the outcome to educate residents about these improvements will help to reduce the impacts from Stormwater drainage from the city of Red Deer to the Red Deer River. 4. Water Quality and Conservation Through implementation of the adopted Water Conservation, Efficiency and Productivity Plan (CEP), Environmental Services will provide leadership to the organization and the community regarding water conservation education, water efficiency programs, community engagement and planning focused on water conservation and protection of storm water quality. The City of Red Deer s Approval to Operate requires the City to look into options for the treatment and/or disposal of residuals from the WTP. The WTP Residuals Management Facility will be designed and constructed to remove residuals from the WTP waste stream before release into the Red Deer River. The Biosolids and Nutrient Recovery facility will allow for the removal and processing of the sludge produced by the WWTP Process as well as the recovery of nutrients - such as Phosphorous - from the wastewater stream prior to release into the Red Deer River. 5. Build the department s staffing and structure to establish a foundation that will: a. Maintain established service levels and continue to meet mandated requirements. b. Meet expectations for system reliability (after hours and emergency response). c. Adapt to changes in business processes which lead to efficiencies in delivering services. d. Take into account major upgrades and expansions to accommodate growth within Red Deer and the region. e. Monitor and address changes in Provincial policy direction as they impact core business. 3. Priority Categorizations: TITLE: Biosolids and Nutrient Recovery Facility Layer Cake & Description (please select one category) CHANGING ACCOMMODATING MAINTAINING Description: Currently the Wastewater Treatment Plant depends primarily on available farmland to dispose of the Plant s biosolids. A biosolids facility will allow the City to better manage the biosolids and reduce dependency on farmland Design of a facility to manage biosolids generated at the Wastewater Treatment Plant (WWTP)

3 P3 Environmental Services 2019 Begin construction of the components required for biosolids management 2020 Complete construction of the components required to address biosolids management TIMELINE: (quarter and year) Start: Q Complete: Q FAR, FARpital, or Capital related to this request Phosphorus Recovery/Biosolids Management project in Wastewater TITLE: Residuals Management Facility (RMF) Layer Cake & Description (please select one category) CHANGING ACCOMMODATING MAINTAINING Description: As part of the Water Treatment Plant upgrade required by the City s Water Works Approval License and Provincial regulations, the City is continuing with design and construction of a Residuals Management Facility. This facility further cleans the discharge water that goes back into the river. This project commenced in 2017 with construction completion planned for TIMELINE: (quarter and year) Start: Q Complete: Q FAR, FARpital, or Capital related to this request Capital funding for construction of the RMF was approved in 2007; WTP Operations Foreperson FAR TITLE: Waste Water Treatment Plant (WWTP) Phase 5 Layer Cake & Description (please select one category) CHANGING ACCOMMODATING MAINTAINING

4 P4 Environmental Services Description: In order to accommodate the wastewater flows from the North Red Deer Regional Wastewater Services Commission and the Sylvan Lake Wastewater Services Commissions as well as future growth for the City of Red Deer, a further capacity expansion is required. This phase of the WWTP will accommodate growth to the year The timeline is as follows: 2022 Design of the Phase #5 WWTP 2023/2024 Construction of Phase #5 including Primary and Secondary Clarifiers, Bioreactors and DAF building Construction Complete and facility operational TIMELINE: (quarter and year) Start: Q1, 2021 Complete: Q4, 2025 FAR, FARpital, or Capital related to this request TITLE: Storm Utility Implementation Layer Cake & Description (please select one category) CHANGING ACCOMMODATING MAINTAINING Description: Based on the Stormwater Drainage Master Plan and the Storm Utility Feasibility Study, the establishment of a Storm Water Utility will help to address the needed repairs and maintenance to Red Deer s stormwater infrastructure. Currently Administration is compiling the implementation information including impact on customers. Should a Storm Water Utility be implemented a July 2021 launch is anticipated Subject to Council approval, a storm utility program (i.e. rate design, credit systems, property assessments, procedures, etc.) will be developed with a Public Communication Plan 2020/2021 Completion of the program development, public communications and implementation of the billing processes TIMELINE: (quarter and year) Start: Q2, 2019 Complete: Q4, 2021 FAR, FARpital, or Capital related to this request

5 P5 Environmental Services TITLE: Environmental Master Plan Layer Cake & Description (please select one category) CHANGING ACCOMMODATING MAINTAINING Description: The Environmental Master Plan provides a guide to continue to reduce Red Deer s environmental footprint. The speed of implementation of various programs will relate to funding approvals. Setting aside funding may also create opportunities to leverage additional resources (e.g. where matching grants exist) or result in cost savings over time as more efficient use is made of resources (e.g. investment in energy conservation). TIMELINE: (quarter and year) Start: Q Complete: Q FAR, FARpital, or Capital related to this request Refreshed EMP Implementation FAR; Corporate Sustainability EMP FAR

6 P6 Environmental Services TITLE: Blue and Black Cart Collection Layer Cake & Description (please select one category) CHANGING ACCOMMODATING MAINTAINING Description: After a two year pilot of Green, Black and Blue carts, the City began its community wide roll out in The first phase was delivering the Green Carts to over 29,000 residential properties. The next phase commences in 2019 with the delivery of the Black and Blue carts City wide Blue and Black Cart roll out. Public spaces recycling pilot Three cart system fully implemented. Implement public spaces recycling Review regulatory options (e.g. mandatory recycling, disposal bans) as a mechanism to incent diversion. TIMELINE: (quarter and year) Start: Q Complete: Q FAR, FARpital, or Capital related to this request Cart Program Roll-Out FAR 4. Measures Please list the current measures you are using for the quarterly report to measure your current core service. If you would like to change these measures please identify those here. The benchmark project will be captured in a separate report. a. Water Utility: Water production efficiency: o operating cost divided by water production volume o 2018 Budget efficiency rate = $0.94 per m³ o 2019 Budget efficiency rate = $0.94 per m³ b. Wastewater Utility: Wastewater treatment efficiency: o operating cost divided by wastewater treatment volume o 2018 Budget efficiency rate = $0.81 per m³ o 2019 Budget efficiency rate = $0.81 per m³ c. Waste Management Utility: WMF operating efficiency:

7 P7 Environmental Services o operating cost divided by tonnes of waste landfilled and diverted o 2018 Budget efficiency rate = $51 per tonne o 2019 Budget efficiency rate = $51 per tonne Garbage and collection efficiency: o operating cost divided by tonnes of waste collected o 2018 Budget efficiency rate = $208 per tonne o 2019 Budget efficiency rate = $208 per tonne Recyclable collection efficiency: o operating cost divided by tonnes of recyclables collected o 2018 Budget efficiency rate = $500 per tonne o 2019 Budget efficiency rate = $500 per tonne

8 P8

9 P9 Environmental Services Department CHANGES IN BUDGET 2019 Budget Department Operating Budget Summary Total Council Approved Budget - 1,271,644 Total of All Reallocations (1,970) - Reallocated Budget (net $0 impact on City Budget) (1,970) 1,269,674 Budget Change to Base Prior Year Carry Forwards Reversals (330,120) - Subtotoal of Budget Changes to Base (330,120) 939,554 Changes within Submitted Budget Labour Reallocation/Adjustment (78,312) Internal Charges & Transfers Adjustment 568,506 Dept Changes within Submitted Budget (569,428) Subtotal of Dept. Changes within Submitted Budget (79,234) 860,320 EXPENDITURE 2017 Budget 2018 Budget 2019 Budget % Change Personnel 12,349,941 13,376,079 13,037, % Fees, maintenance & Services 16,430,116 18,278,189 17,047,188 (6.73%) Materials, Supplies & Utilities 5,674,968 5,742,394 5,782, % Other 24,333,981 25,728,057 25,728, % SUB-TOTAL 58,789,006 63,124,719 61,596,234 (2.42%) Internal Charges & Transfers 38,323,439 20,629,056 21,747, % TOTAL EXPENDITURE 97,112,445 83,753,774 83,343, % Revenue 95,807,406 82,483,097 82,483,115 - NET TAX LEVY 1,305,039 1,270, ,320 (32.29%) Percentage Change - (2.63%) (32.29%) - BUDGET FULL TIME EQUIVALENT

10

11 P11 Section: Storm Sewer System (Sec-335) Department: Environmental Services Department CHANGES IN BUDGET 2019 Budget Section Operating Budget Summary Total Council Approved Budget 1,063,023 Total of All Reallocations (1,875) Reallocated Budget (net $0 impact on City Budget) (1,875) 1,061,148 Budget Change to Base Prior Year Carry Forwards Reversals (260,000) Subtotoal of Budget Changes to Base (260,000) 801,148 Changes within Submitted Budget Labour Reallocation/Adjustment (1,504) Internal Charges & Transfers Adjustment - Subtotal of Dept. Changes within Submitted Budget (1,504) 799,645 EXPENDITURE 2017 Budget 2018 Budget 2019 Budget % Change Personnel 502, , , % Fees, maintenance & Services 199, ,641 55,591 (69.56%) Materials, Supplies & Utilities 61,003 74,788 37,482 (49.88%) Other 3,692,095 3,547,223 3,547,223 - SUB-TOTAL 4,455,123 4,203,735 3,951,535 (6.00%) Internal Charges & Transfers 662,388 (677,194) (684,994) 1.15% TOTAL EXPENDITURE 5,117,511 3,526,541 3,266,541 (4.85%) Revenue 4,079,445 2,466,896 2,466,896 - NET TAX LEVY 1,038,066 1,059, ,645 (24.54%) Percentage Change 2.08% (24.54%) BUDGET FULL TIME EQUIVALENT

12

13 P Budget Section Operating Budget Summary Section: Environmental Services Admin Section (Sec-381) Department: Environmental Services Department CHANGES IN BUDGET Total Council Approved Budget 208,615 Total of All Reallocations (95) Reallocated Budget (net $0 impact on City Budget) (95) 208,520 Budget Change to Base Prior Year Carry Forwards Reversals (70,120) Subtotoal of Budget Changes to Base (70,120) 138,399 Changes within Submitted Budget Labour Reallocation/Adjustment (59,989) Internal Charges & Transfers Adjustment - Dept Changes within Submitted Budget 866 Subtotal of Dept. Changes within Submitted Budget (59,123) 79,277 EXPENDITURE 2017 Budget 2018 Budget 2019 Budget % Change Personnel 312,053 1,585,909 1,476,270 (1.61%) Fees, maintenance & Services 1,019, , ,408 (35.21%) Materials, Supplies & Utilities 403, , , % Other 62,026 55,603 55,603 - SUB-TOTAL 1,797,299 2,945,851 2,522,503 (14.37%) Internal Charges & Transfers (1,530,325) (2,715,993) (2,443,226) (10.04%) TOTAL EXPENDITURE 266, ,858 79,277 (24.41%) Revenue NET TAX LEVY 266, ,858 79,277 (65.51%) Percentage Change (13.90%) (65.51%) BUDGET FULL TIME EQUIVALENT

14

15 P14A Section: Water Utility Section (Sec-390) Department: Environmental Services Department CHANGES IN BUDGET 2019 Budget Section Operating Budget Summary Council Approved Budget 2 Total of All Reallocations - Reallocated Budget (net $0 impact on City Budget) - 2 Budget Change to Base Subtotoal of Budget Changes to Base 2 Changes within Submitted Budget Labour Reallocation/Adjustment (15,004) Internal Charges & Transfers Adjustment (503,074) Total Dept Changes within Submitted Budget 503,300 Subtotal of Dept. Changes within Submitted Budget (14,778) (14,776) EXPENDITURE Personnel Fees, maintenance & Services Materials, Supplies & Utilities Other SUB-TOTAL Internal Charges & Transfers TOTAL EXPENDITURE Revenue NET TAX LEVY Percentage Change BUDGET FULL TIME EQUIVALENT 2017 Budget 2018 Budget 2019 Budget % Change 5,518,715 4,854,553 4,854, % 864,657 1,038,871 1,444, % 3,223,751 3,125,867 3,125,350 (0.02%) 8,081,599 8,703,783 8,703,783-17,688,722 17,723,074 18,128, % 16,734,009 11,810,672 11,405,755 (3.43%) 34,422,731 29,533,746 29,533,994 (1.14%) 34,422,732 29,548,753 29,548,770 - (1) (15,007) (14,776) (1.54%) (1.54%)

16

17 P14A Section: Wastewater Utility Section (Sec-415) Department: Environmental Services Department CHANGES IN BUDGET 2019 Budget Section Operating Budget Summary Council Approved Budget 1 Total of All Reallocations - Reallocated Budget (net $0 impact on City Budget) - 1 Budget Change to Base Subtotoal of Budget Changes to Base 1 Changes within Submitted Budget Labour Reallocation/Adjustment (1,825) Internal Charges & Transfers Adjustment 633,808 Total Dept Changes within Submitted Budget (635,809) Subtotal of Dept. Changes within Submitted Budget (3,826) (3,825) EXPENDITURE 2017 Budget 2018 Budget 2019 Budget % Change Personnel 5,022,126 5,366,081 5,368,061 (0.03%) Fees, maintenance & Services 1,945,062 2,484,960 1,614,085 (35.05%) Materials, Supplies & Utilities 1,923,969 2,087,190 2,156, % Other 10,704,708 10,881,803 10,881,803 - SUB-TOTAL 19,595,865 20,820,034 20,020,317 (3.84%) Internal Charges & Transfers 17,697,296 9,352,519 10,152, % TOTAL EXPENDITURE 37,293,161 30,172,553 30,172, % Revenue 37,293,161 30,176,375 30,176,375 - NET TAX LEVY - (3,822) (3,825) 0.08% Percentage Change 0.08% BUDGET FULL TIME EQUIVALENT

18 P14B

19 P14C Section: Waste Mgmt Utility Section (Sec-460) Department: Environmental Services Department CHANGES IN BUDGET 2019 Budget Section Operating Budget Summary Council Approved Budget 4 Total of All Reallocations - Reallocated Budget (net $0 impact on City Budget) - 4 Budget Change to Base Prior Year Carry Forwards Reversals 0 Subtotoal of Budget Changes to Base 0 4 Changes within Submitted Budget Labour Reallocation/Adjustment 9 Internal Charges & Transfers Adjustment 437,772 Dept Changes within Submitted Budget (437,785) Subtotal of Dept. Changes within Submitted Budget (4) 0 Total EXPENDITURE 2017 Budget 2018 Budget 2019 Budget % Change Personnel 994,422 1,170,453 1,027, % Fees, maintenance & Services 12,401,274 13,655,863 13,339,551 (2.32%) Materials, Supplies & Utilities 62,748 66,064 66,064 - Other 1,793,553 2,539,645 2,540, % SUB-TOTAL 15,251,997 17,432,025 16,973,641 (2.63%) Internal Charges & Transfers 4,760,071 2,859,052 3,317, % TOTAL EXPENDITURE 20,012,068 20,291,077 20,291, % Revenue 20,012,068 20,291,073 20,291,074 - NET TAX LEVY (105.35%) Percentage Change (105.35%) BUDGET FULL TIME EQUIVALENT

20 P14D

21 P15 THE CITY OF RED DEER BUDGET FUNDING ADJUSTMENT RECOMMENDATION BRO Item No. 45 Initiative Title: Stormwater Funding Department Name & Reference #: Environmental Services A. This FAR is required based on the following criteria: Maintain Service Levels B. This recommendation is related to: Maintenance and Modifications C. The financial impact of this recommendation is: $150,000 - D. Provide your business case: Brief Description including a rationale: A Stormwater Drainage Master Plan was completed in 2015 which identified additional work is needed to sustain a reliable stormwater drainage system. The City is exploring the establishment of a Stormwater Utility however in the interim the recommended funding will provide contracted services to improve service levels for prioritized projects. We need to fund some of the work on one-time basis to address the aging infrastructure For an expenditure (only) FAR please answer the following: What change will we realize as a result (outcome)? One-time funding was approved for 2 years, 2017 and This funding has ended. This request will ensure the stormwater work will continue. What other options did you consider to achieve the change? One option was, not proceeding with this request. However, that would decrease the amount of work being completed in stormwater system. Dedicated inspections would be decreased and response times to flooding will either be increased or overlooked as resources are dedicated to sanitary wastewater.

22 For a revenue FAR please answer the following: How you are increasing the revenue - increase in rates, increases in volumes, other mechanisms, or a combination. P16 If you are assuming a related expenditure please describe that briefly below. What other options did you consider to raise revenue without a related expenditure? E. Financial impact detail: Revenue Funding Reserve Funding - New Ongoing Reserve Funding - New One time (150,000) Request Funding (150,000) Revenue Subtotal Total Labour Costs 93, FTE One-time FTE Ongoing Fees, Maintenance and Services 20, Materials & Supplies 28, Other 7, Internal Charges Internal Transfers Financial Impact 150, Ongoing One-Time 150, F. City Manager Comments Recommended support. This FAR represents a continuation of the program to upgrade the stormwater system following recommendations in the Stormwater Drainage Master Plan.

23 P17 THE CITY OF RED DEER BUDGET FUNDING ADJUSTMENT RECOMMENDATION BRO Item No. 46 Initiative Title: Stormwater Detention Pond Maintenance Department Name & Reference #: Environmental Services A. This FAR is required based on the following criteria: Maintain Service Levels This financial impact of this recommendation is: $150,000 ongoing (maintenance) and $100,000 one-time funding (consultant) funded from Storm Pond deferred revenue B. This recommendation is related to: Maintenance and Modifications C. The financial impact of this recommendation is: $150,000 D. Provide your business case: Brief Description including a rationale: The City of Red Deer has approximately seventy stormwater pond areas which have never been cleaned. Stormwater pond maintenance requires r emov a l / pumping of the stormwater cleaning / dredging and eliminating invasive species (ex: goldfish). Stormwater ponds are designed to perform the following benefits: a. Control flooding by slowing surges and absorbing rainwater before it reaches waterways b. Filter pollutants Stormwater can contain: sediment nutrients bacteria trace metals oil and grease and pesticides/ herbicides. Proper maintenance allows the ponds to operate as intended. A consultant would be hired and a plan will be developed to assess all stormwater ponds. The work will be to cleaning two of the largest stormwater pond projects (Ackerman and Anders) in Additional ponds would be cleaned in future years based the Plan. For an expenditure (only) FAR please answer the following: What change will we realize as a result (outcome)? What other options did you consider to achieve the change? This is specialized maintenance work and options are limited. The ponds require cleaning.

24 For a revenue FAR please answer the following: How you are increasing the revenue - increase in rates, increases in volumes, other mechanisms, or a combination. P18 If you are assuming a related expenditure please describe that briefly below. What other options did you consider to raise revenue without a related expenditure? E. Financial impact detail: Revenue Funding Reserve Funding - New Ongoing Reserve Funding - New One time (150,000) Request Funding (150,000) Revenue Subtotal (100,000) Total Labour Costs FTE One-time FTE Ongoing Fees, Maintenance and Services 250, Materials & Supplies Other Internal Charges Internal Transfers Financial Impact 150, Ongoing One-Time 150, F. City Manager Comments Recommend support. This FAR represents the development of a more comprehensive plan for the maintenance of stormwater ponds throughout the City. It includes the maintenance of two of the largest stormwater ponds, which require cleaning.

25 P19 THE CITY OF RED DEER BUDGET FUNDING ADJUSTMENT RECOMMENDATION BRO Item No. 63 Initiative Title: Engineer in Training Department Name & Reference #: Environmental Services A. This FAR is required based on the following criteria: Maintain Service Levels B. This recommendation is related to: Changing Service C. The financial impact of this recommendation is: $0 - D. Provide your business case: Brief Description including a rationale: Based on current engineering consultant charge out rates it was determined that having the City of Red Deer Engineering Department complete the design would be the most cost effective approach. In order to facilitate this approach the City would need to be able to have an in house inspector available on demand to inspect the multiple linear projects. Environmental Services hired a temporary Engineer in Training to fulfill this role in Over the first two years of the position, The City has saved approximately $200,000 compared to hiring a consulting company to complete this work. This savings in budget has been applied to the projects to undertake additional capital construction work. Environmental Services is now requesting to continue with this position so that the City can continue addressing priority of projects and ensure that Environmental Services department is receiving capital projects of the highest quality. For an expenditure (only) FAR please answer the following: What change will we realize as a result (outcome)? Cost effective project management What other options did you consider to achieve the change? We could revert to hiring outside contractors, or see a decrease in annual work completed.

26 For a revenue FAR please answer the following: How you are increasing the revenue - increase in rates, increases in volumes, other mechanisms, or a combination. P20 If you are assuming a related expenditure please describe that briefly below. What other options did you consider to raise revenue without a related expenditure? E. Financial impact detail: Revenue Funding Reserve Funding - New Ongoing Reserve Funding - New One time Request Funding Revenue Subtotal Total Labour Costs 96, FTE One-time FTE Ongoing Fees, Maintenance and Services Materials & Supplies Other Internal Charges Internal Transfers (96,506) Financial Impact Ongoing One-Time F. City Manager Comments Recommend support. This FAR represents an Engineer-in-training position to assist in supervising capital projects. This represents a cost savings in terms of inspecting multiple linear projects throughout the City

27 P21 THE CITY OF RED DEER BUDGET FUNDING ADJUSTMENT RECOMMENDATION BRO Item No. 64 Initiative Title: Engineering Coop Students Department Name & Reference #: Environmental Services A. This FAR is required based on the following criteria: Maintain Service Levels B. This recommendation is related to: Changing Service C. The financial impact of this recommendation is: - D. Provide your business case: Brief Description including a rationale: Environmental Planning delivers a large number of projects for Environmental Services ranging from simple equipment rehabilitations to multimillion dollar treatment plant expansions. Generally each of the Environmental Planning Engineers has one large multimillion dollar project and roughly six to ten additional projects they are responsible for managing leaving a number of remaining projects requiring support or resulting in delays. The complexity of the multimillion dollar projects results in a significant amount of their attention on that project. Subsequently we are recommending the hiring of two engineering Co-op students on 8 month terms to provide project management support to the remaining projects. This initiative will also provide learning opportunities for engineering students and get them interested in employment opportunities with The City. It is more cost effective to hire Co-op Students to assist the Environmental Planning Engineers than it is to hire an additional Engineer fulltime. For an expenditure (only) FAR please answer the following: What change will we realize as a result (outcome)? What other options did you consider to achieve the change?

28 For a revenue FAR please answer the following: How you are increasing the revenue - increase in rates, increases in volumes, other mechanisms, or a combination. P22 If you are assuming a related expenditure please describe that briefly below. What other options did you consider to raise revenue without a related expenditure? E. Financial impact detail: Revenue Funding Reserve Funding - New Ongoing Reserve Funding - New One time Request Funding Revenue Subtotal Total Labour Costs 71, FTE One-time FTE Ongoing Fees, Maintenance and Services Materials & Supplies Other Internal Charges Internal Transfers (71,500) Financial Impact Ongoing One-Time F. City Manager Comments Recommend support. This FAR represents the hiring of two engineering co-op students to provide project management support.

29 P23 THE CITY OF RED DEER BUDGET FUNDING ADJUSTMENT RECOMMENDATION BRO Item No. 65 Initiative Title: Stormwater Utility Implementation Department Name & Reference #: Environmental Services A. This FAR is required based on the following criteria: Directed Service Level Increase B. This recommendation is related to: Changing Service C. The financial impact of this recommendation is: $380,000 D. Provide your business case: Brief Description including a rationale: In 2015 The Stormwater Utility Feasibility Study was prepared to determine the benefits and feasibility of moving to a utility system of funding operations maintenance and capital costs associated with the City's storm drainage system. The storm drainage system is currently funded from property taxes which bases its assessment on property value. Utility funding models similar to the water or wastewater utilities are generally based on the relative benefit that each user gets from the system and can therefore be seen to be more equitable. Another advantage of a utility based system is the ability to recognize/reward customers through credits or incentives for improving storm water quantity and/or quality characteristics at the source (i.e. within their property). This study will develop a proposed implementation plan and financial analysis for Council to consider in making a decision on a Storm Water Utility. For an expenditure (only) FAR please answer the following: What change will we realize as a result (outcome)? Council will have the necessary information to make a decision on Storm Water Utility. Utility funding models similar to the water and wastewater utilities are generally based on the relative benefit that each user gets from the system and can therefore be seen to be more equitable. Another advantage of a utility based system is the ability to recognize customers through credits or incentives for improving storm water quantity and/or quality characteristics at the source (i.e. within their property). What other options did you consider to achieve the change? Status quo

30 For a revenue FAR please answer the following: How you are increasing the revenue - increase in rates, increases in volumes, other mechanisms, or a combination. P24 If you are assuming a related expenditure please describe that briefly below. What other options did you consider to raise revenue without a related expenditure? E. Financial impact detail: Revenue Funding Reserve Funding - New Ongoing Reserve Funding - New One time (155,833) (190,000) (34,167) - Request Funding (155,833) (190,000) (34,167) - Revenue Subtotal Total Labour Costs 92, ,949 18,491 - FTE One-time FTE Ongoing Fees, Maintenance and Services 43,376 54,051 10,676 - Materials & Supplies Other Internal Charges 20,000 25,000 5,000 - Internal Transfers Financial Impact 155, ,000 34,167 - Ongoing One-Time 155, ,000 34,167 - F. City Manager Comments Recommend support. This FAR represents the work that is needed to be undertaken for council to make a final decision on whether to move towards a stormwater utility. Most large cities in Canada have either adopted or are moving towards this system, which is considered "best practice".

31 P25 THE CITY OF RED DEER BUDGET FUNDING ADJUSTMENT RECOMMENDATION BRO Item No. 113 Initiative Title: Implementation of the Refreshed Environmental Master Plan Department Name & Reference #: Environmental Services A. This FAR is required based on the following criteria: Directed Service Level Increase B. This recommendation is related to: Strategic and Sustainability Priorities C. The financial impact of this recommendation is: $80,000 D. Provide your business case: Brief Description including a rationale: In 2016 Council provided for a review of the EMP. The review looked at: the plan's metrics focus areas and actions. Following the completion of the EMP Refresh the next step is to implement the priority actions laid out in the plan and proactively address environment concerns. Depending on the final Plan's recommendations some of these actions will have associated implementation costs. The City of Red Deer has a long standing history of commitment to environmental action. The foundation for environmental leadership has been set with the EMP however to build on this base and to continue to move key priorities forward and to address new actions that were not envisioned 5 or 6 years ago; funding is required for implementation of the recently updated plan. As part of the process Council will have the ability to decide the priorities and timing of the recommended actions. The requested funds will be used to implement the priority actions from the refreshed Environmental Master Plan (EMP). These properties for implementation are determined on a regular basis. For an expenditure (only) FAR please answer the following: What change will we realize as a result (outcome)? The funding will mean the priority projects of the newly updated Environmental Master Plan will be implemented; resulting in continued environmental leadership and support of the Environmental Pillar of Red Deer's sustainability framework. What other options did you consider to achieve the change? Implementing the EMP priorities would be difficult.

32 P26 For a revenue FAR please answer the following: How you are increasing the revenue - increase in rates, increases in volumes, other mechanisms, or a combination. If you are assuming a related expenditure please describe that briefly below. What other options did you consider to raise revenue without a related expenditure? E. Financial impact detail: Revenue Funding Reserve Funding - New Ongoing Reserve Funding - New One time (80,000) Request Funding (80,000) Revenue Subtotal Total Labour Costs FTE One-time FTE Ongoing Fees, Maintenance and Services 80, Materials & Supplies Other Internal Charges Internal Transfers Financial Impact 80, Ongoing One-Time 80, F. City Manager Comments Recommended support. The implementation of the updated Environmental Master Plan (EMP). It is proposed that the use of these funds be conditional upon priority projects being identified and presented to Council for approval.

33 P27 THE CITY OF RED DEER BUDGET FUNDING ADJUSTMENT RECOMMENDATION BRO Item No. 114 Initiative Title: Water base budget changes Department Name & Reference #: Environmental Services A. This FAR is required based on the following criteria: Maintain Service Levels B. This recommendation is related to: Base Budget Items C. The financial impact of this recommendation is: $26,022 - D. Provide your business case: Brief Description including a rationale: Base budget changes include changes to the budget as required as a result of the 2019 budget guidelines. These changes affect items such as fleet, parks, water meter recoveries from Wastewater; investment income; other revenue; insurance; natural gas; electricity; support cost allocations; and debenture principal and interest. These changes are influenced by external factors outside of Environmental Services control such as union agreements, consumer price adjustments, etc. For an expenditure (only) FAR please answer the following: What change will we realize as a result (outcome)? The change will provide for more accurate budgets. What other options did you consider to achieve the change? Another option would be to not adjust the budget and report the variances.

34 For a revenue FAR please answer the following: How you are increasing the revenue - increase in rates, increases in volumes, other mechanisms, or a combination. P28 If you are assuming a related expenditure please describe that briefly below. What other options did you consider to raise revenue without a related expenditure? E. Financial impact detail: Revenue Funding (26,022) Reserve Funding - New Ongoing Reserve Funding - New One time Request Funding (26,022) Revenue Subtotal 215, Total Labour Costs FTE One-time FTE Ongoing Fees, Maintenance and Services 12, Materials & Supplies (217,124) Other (230,525) Internal Charges Internal Transfers 244, Financial Impact 26, Ongoing 26, One-Time F. City Manager Comments Recommended support. This FAR represents the components of the changes to the water utility base budget.

35 P29 THE CITY OF RED DEER BUDGET FUNDING ADJUSTMENT RECOMMENDATION BRO Item No. 115 Initiative Title: Water Personnel Provisions Department Name & Reference #: Environmental Services A. This FAR is required based on the following criteria: Contractual Obligations B. This recommendation is related to: Base Budget Items C. The financial impact of this recommendation is: $54,441 - D. Provide your business case: Brief Description including a rationale: To provide an estimated budget for compensation related cost changes such as contract settlements, position evaluations, market adjustments, and changes in benefit costs. The compensation related changes are due to primarily union and exempt contractual obligations. For an expenditure (only) FAR please answer the following: What change will we realize as a result (outcome)? Compensation related increases are required to help retain staff to create a stable and motivated/satisfied workforce. With less turnover there will be less recruitment and employee development related costs and organizational knowledge/memory is retained. What other options did you consider to achieve the change? None

36 For a revenue FAR please answer the following: How you are increasing the revenue - increase in rates, increases in volumes, other mechanisms, or a combination. P30 If you are assuming a related expenditure please describe that briefly below. What other options did you consider to raise revenue without a related expenditure? E. Financial impact detail: Revenue Funding (54,441) Reserve Funding - New Ongoing Reserve Funding - New One time Request Funding (54,441) Revenue Subtotal Total Labour Costs 54, FTE One-time FTE Ongoing Fees, Maintenance and Services Materials & Supplies Other Internal Charges Internal Transfers Financial Impact 54, Ongoing 54, One-Time F. City Manager Comments Recommended support. This FAR represents compensation related cost changes for the water utility.

37 P31 THE CITY OF RED DEER BUDGET FUNDING ADJUSTMENT RECOMMENDATION BRO Item No. 116 Initiative Title: Water Reserve Transfers Department Name & Reference #: Environmental Services A. This FAR is required based on the following criteria: Maintain Service Levels B. This recommendation is related to: Maintenance and Modifications C. The financial impact of this recommendation is: $1,042,552 - D. Provide your business case: Brief Description including a rationale: The financial impact of this recommendation is: $495,873 Water maintains a capital reserve and an operating reserve as detailed in the Utility policy for asset replacement; asset rehabilitation; acquisition of future assets; maintain operations; manage unplanned changes in operating expenditures and revenues; and mitigate the impact of significant changes in revenue requirements on customer rates for any particular year. The Utility is increasing the net amount of the transfer to the reserve due to an overall increase in surplus in the amount of $495,873 over the previous year in order to fund future capital. For an expenditure (only) FAR please answer the following: What change will we realize as a result (outcome)? What other options did you consider to achieve the change?

38 For a revenue FAR please answer the following: How you are increasing the revenue - increase in rates, increases in volumes, other mechanisms, or a combination. P32 If you are assuming a related expenditure please describe that briefly below. What other options did you consider to raise revenue without a related expenditure? E. Financial impact detail: Revenue Funding (1,042,552) Reserve Funding - New Ongoing 1,042, Reserve Funding - New One time Request Funding Revenue Subtotal Total Labour Costs FTE One-time FTE Ongoing Fees, Maintenance and Services Materials & Supplies Other Internal Charges Internal Transfers Financial Impact 1,042, Ongoing 1,042, One-Time F. City Manager Comments Recommended support. This FAR represents an increase to the net transfer to reserves for the water utility.

39 P33 THE CITY OF RED DEER BUDGET FUNDING ADJUSTMENT RECOMMENDATION BRO Item No. 117 Initiative Title: WTP Operation Foreperson Department Name & Reference #: Environmental Services A. This FAR is required based on the following criteria: Operating Impact of Capital B. This recommendation is related to: Maintenance and Modifications C. The financial impact of this recommendation is: $115,830 D. Provide your business case: Brief Description including a rationale: Construction will begin in the fall of 2018 on a new Residuals Management Facility (RMF). This $30M project includes the demolition of the former treatment plant and design and construction of the new RMF plant. This facility has been designed to treat the waste streams generated by the Water Treatment Plant (WTP) processes before being released back into the river. With this added infrastructure and operation an additional operation foreperson is required. The WTP is operated twenty-four (24) hours a day three hundred and sixty-five (365) days of the year This additional staffing request is required as part of the efforts to properly manage the facility ensure For an expenditure (only) FAR please answer the following: What change will we realize as a result (outcome)? The ability to operate, maintain and monitor the RMF without impacting the service levels of the WTP, reservoirs and pumping stations. This monitoring is part of our Provincial Approval to Operate. What other options did you consider to achieve the change? The new construction of the RMF is the result of Alberta Environment and Parks (AEP) requirements and a comprehensive review of all alternative options to treat these ongoing process waste streams. Maintaining

40 For a revenue FAR please answer the following: How you are increasing the revenue - increase in rates, increases in volumes, other mechanisms, or a combination. P34 If you are assuming a related expenditure please describe that briefly below. What other options did you consider to raise revenue without a related expenditure? E. Financial impact detail: Revenue Funding Reserve Funding - New Ongoing Reserve Funding - New One time Request Funding Revenue Subtotal Total Labour Costs - 85,221 28,409 - FTE One-time FTE Ongoing Fees, Maintenance and Services - 1, Materials & Supplies - 5, Other Internal Charges Internal Transfers - (92,421) (28,410) 115,631 Financial Impact - (1) 115,631 Ongoing - 0 (1) 115,631 One-Time F. City Manager Comments Recommended support. This FAR represents the approval of a new operation foreperson at the water treatment plant in 2020 as the new residuals management system begins operation. This new section of the plant will be under construction in 2019.

41 P35 THE CITY OF RED DEER BUDGET FUNDING ADJUSTMENT RECOMMENDATION BRO Item No. 119 Initiative Title: Water Regional Revenue Change Department Name & Reference #: Environmental Services A. This FAR is required based on the following criteria: Revenue B. This recommendation is related to: Accommodating Growth C. The financial impact of this recommendation is: $(108,321) - D. Provide your business case: Brief Description including a rationale: The City of Red Deer has become a regional water treatment provider. The North Red Deer Regional Water Services Commission has been in operations for a number of years as well as the Red Deer County South Hills development. Based on the projected 2019 volumes, supplied by the commission, the increase in revenue has been calculated to be $108,321. Regional water rates are recommended to increase by 2.25% to ensure all costs are included. The financial impact is an increase in revenue of $(108,321). For an expenditure (only) FAR please answer the following: What change will we realize as a result (outcome)? What other options did you consider to achieve the change? For a revenue FAR please answer the following: How you are increasing the revenue - increase in rates, increases in volumes, other mechanisms, or a combination.

42 Increase in rates, increases in volumes, other mechanisms, or a combination. We are raising the rates to all customers including the regional customers P36 If you are assuming a related expenditure please describe that briefly below. What other options did you consider to raise revenue without a related expenditure? E. Financial impact detail: Revenue Funding 108, Reserve Funding - New Ongoing Reserve Funding - New One time Request Funding 108, Revenue Subtotal (108,321) Total Labour Costs FTE One-time FTE Ongoing Fees, Maintenance and Services Materials & Supplies Other Internal Charges Internal Transfers Financial Impact (108,321) Ongoing (108,321) One-Time F. City Manager Comments Recommend support. This FAR represents revenue from 2.25% increase in rates from regional customers in order to ensure full cost recovery.

43 P37 THE CITY OF RED DEER BUDGET FUNDING ADJUSTMENT RECOMMENDATION BRO Item No. 120 Initiative Title: Water Growth Revenue Department Name & Reference #: Environmental Services A. This FAR is required based on the following criteria: Revenue B. This recommendation is related to: Accommodating Growth C. The financial impact of this recommendation is: $(312,377) - D. Provide your business case: Brief Description including a rationale: The City of Red Deer has become a regional water treatment provider. The North Red Deer Regional Water Services Commission has been in operations for a number of years as well as the Red Deer County South Hills development. Current usage modeling projects consistent in-city water consumption in 2018 but slightly higher regional water consumption. Based on the 2018 rates, this will result in a revenue increase of $312,377. For an expenditure (only) FAR please answer the following: What change will we realize as a result (outcome)? What other options did you consider to achieve the change?

44 For a revenue FAR please answer the following: How you are increasing the revenue - increase in rates, increases in volumes, other mechanisms, or a combination. P38 If you are assuming a related expenditure please describe that briefly below. What other options did you consider to raise revenue without a related expenditure? E. Financial impact detail: Revenue Funding 312, Reserve Funding - New Ongoing Reserve Funding - New One time Request Funding 312, Revenue Subtotal (236,451) Total Labour Costs FTE One-time FTE Ongoing Fees, Maintenance and Services Materials & Supplies Other Internal Charges (75,926) Internal Transfers Financial Impact (312,377) Ongoing (312,377) One-Time F. City Manager Comments Recommend support. This FAR represents increased revenue for water consumption after a projected decline in 2018.

45 P39 THE CITY OF RED DEER BUDGET FUNDING ADJUSTMENT RECOMMENDATION BRO Item No. 118 Initiative Title: Water meters - Drive by Readings Department Name & Reference #: Environmental Services A. This FAR is required based on the following criteria: Operating Impact of Capital B. This recommendation is related to: Changing Service C. The financial impact of this recommendation is: $(379,000) D. Provide your business case: Brief Description including a rationale: This initiative allows the City to gather water meter reads quickly and accurately while at the same time allowing the City employee to respond to read incorrectly as they occur thereby increasing efficiencies and reducing water bill adjustments in the future. In 2015 the City started the Automated Meter Reading (AMR) project which comprised of replacing all mechanical water meters within the city of Red Deer with AMR technology meters. This new technology allows the City to collect water consumption data by driving/walking around with a handheld or vehicle mounted device using radio waves to gather the data. The data is then uploaded electronically into the billing system verified by the Utilities department and billed to the customer monthly. The contractor spends 21 days (or every week day) per month collecting water meter data and each home/business is read once per month. There are approximately 30,000 residential meters and 1,700 commercial. Currently Environmental Services contracts out its meter reading work at an annual average cost of $504,000 (or $42,000 a month). Environmental Services proposes to eliminate the use an external contractor by 80% in 2019 and move the water meter reading work for all AMR installed meters in-house in the form of a new 1.0 FTE in Environmental Services. The total annual average cost for this is estimated to be $125,000 including equipment and software costs. In 2020 Environmental Services will eliminate the use of an external contractor completely and will be utilizing the new FTE. For an expenditure (only) FAR please answer the following: What change will we realize as a result (outcome)? This would realize a cost savings in 2019 of $278,000 ($403,000 meter reading contract savings less $125,000 in salary fleet and other costs) and an additional $101,000 (all meter reading contract savings) in 2020 for a total of $379,000 annually starting in In addition to the potential cost savings the following benefits could be achieved we will be able to respond billing and investigate discrepancies and meter failures. What other options did you consider to achieve the change? This would realize a cost savings in 2019 of $278,000 ($403,000 meter reading contract savings less $125,000 in salary fleet and other costs) and an additional $101,000 (all meter reading contract savings) in 2020 for a total of $379,000 annually starting in In addition to the potential cost savings the following benefits could be achieved we will be able to respond billing and investigate discrepancies and meter failures.

RE:EX Toronto Water CAPITAL BUDGET NOTES CONTENTS CONTACTS CAPITAL BUDGET AND PLAN OVERVIEW. Overview

RE:EX Toronto Water CAPITAL BUDGET NOTES CONTENTS CONTACTS CAPITAL BUDGET AND PLAN OVERVIEW. Overview RE:EX29.18 CAPITAL BUDGET NOTES CONTENTS Overview 1: Recommended 10-Year Capital Plan 5 2: Issues for Discussion 22 Appendices: 1. 2017 Performance 30 2. Recommended 10-Year Capital Plan Summary 32 Toronto

More information

DRAFT MULTI-YEAR Water and Wastewater & Treatment Budget December 17, ANNUAL UPDATE INVESTING IN OUR FUTURE. london.

DRAFT MULTI-YEAR Water and Wastewater & Treatment Budget December 17, ANNUAL UPDATE INVESTING IN OUR FUTURE. london. 6 MULTI-YEAR BUDGET FOR THE 2019 ANNUAL UPDATE INVESTING IN OUR FUTURE london.ca/budget DRAFT 2019 Water and Wastewater & Treatment Budget December 17, 2018 Table of Contents Recommendations... 1 WATER

More information

Information Technology Services PROPOSED SERVICE PLAN

Information Technology Services PROPOSED SERVICE PLAN P1 1. Mandate: Information Technology Services PROPOSED SERVICE PLAN 2019-2022 To provide information management, systems, and technology solutions through a balanced approach of leadership and partnership

More information

2019 Draft Rate Supported Operating Budget and 2019 Draft Capital Budget and Forecast

2019 Draft Rate Supported Operating Budget and 2019 Draft Capital Budget and Forecast 2019 Draft Rate Supported Operating Budget and 2019 Draft Capital Budget and Forecast Joint meeting of the Engineering and Public Works Committee (PW-3-2019) and Finance and Corporate Services Committee

More information

Solid Waste Management Services Capital Budget Analyst Notes. City Budget 2013

Solid Waste Management Services Capital Budget Analyst Notes. City Budget 2013 City Budget 2013 Solid Waste Management Services Capital Budget Analyst Notes The City of Toronto's budget is presented by program and service, in Analyst Note format. The City's Capital Budget funds major

More information

WATER, WASTEWATER, STORMWATER, AND MUNICIPAL SOLID WASTE COST OF SERVICE AND RATE DESIGN STUDY

WATER, WASTEWATER, STORMWATER, AND MUNICIPAL SOLID WASTE COST OF SERVICE AND RATE DESIGN STUDY REPORT January 2017 WATER, WASTEWATER, STORMWATER, AND MUNICIPAL SOLID WASTE COST OF SERVICE AND RATE DESIGN STUDY PREPARED BY: ECONOMICS STRATEGY STAKEHOLDERS SUSTAINABILITY www.newgenstrategies.net 3420

More information

Toronto Water Budget BU Recommended Operating Budget Recommended Capital Plan 2017 Recommended Water Rate

Toronto Water Budget BU Recommended Operating Budget Recommended Capital Plan 2017 Recommended Water Rate 2017 BU25.1 Toronto Water Budget 2017 Recommended Operating Budget 2017 2026 Recommended Capital Plan 2017 Recommended Water Rate Lou Di Gironimo, General Manager, Toronto Water Budget Committee, November

More information

2017 Mid-Year Financial Report

2017 Mid-Year Financial Report 2017 Mid-Year Financial Report BACKGROUND The mid-year report provides information regarding the City of Regina s (City) financial performance. This report provides a high level summary on how the City

More information

Environment and Climate Protection Committee. Tax Supported Programs

Environment and Climate Protection Committee. Tax Supported Programs Environment and Climate Protection Committee Tax Supported Programs Tabled November 8, 2017 Table of Contents Environment and Climate Protection Committe - Tax Supported Briefing Notes... 1 Infrastructure

More information

Solid Waste Management Services

Solid Waste Management Services CAPITAL PROGRAM SUMMARY Highlights Overview I: 1-Year Capital 5 II: 215 Capital Budget 17 III: Issues for Discussion 21 Solid Waste Management Services 215 224 CAPITAL BUDGET AND PLAN OVERVIEW Solid Waste

More information

City of Laramie Adjusted Budget FY - Wastewater Fund. 189 P age

City of Laramie Adjusted Budget FY - Wastewater Fund. 189 P age Wastewater Fund 189 P age Wastewater Fund The Water and Wastewater Funds are part of the Utility Fund, which is run as an enterprise fund, or businesstype activity. The Water and Wastewater Utilities are

More information

FINANCIAL PLAN WATER AND WASTEWATER LINES OF SERVICE

FINANCIAL PLAN WATER AND WASTEWATER LINES OF SERVICE UCS2018-0223 ATTACHMENT 1 FINANCIAL PLAN 2019-2022 WATER AND WASTEWATER LINES OF SERVICE 2018 MARCH 14 MAKING LIFE BETTER EVERY DAY UCS2018-0223 Financial Plan 2019-2022 - Water and Wastewater Lines of

More information

Finance and Treasury Department

Finance and Treasury Department Mission To provide financial governance, accountability and safeguard the City s assets while providing financial advice and strategy from both a department and corporate perspective Our Road Map Overview

More information

FY 2016 Proposed Budget Work Session

FY 2016 Proposed Budget Work Session Department of Environmental Services FY 2016 Proposed Budget Work Session Tuesday, March 24, 2:30 5:00 Agenda Tuesday, March 24, 2015 2:30 5:00 PM Related FAAC Report: DES Department / Topic Book pgs Web

More information

Overview. Highland Creek Wastewater Treatment Plant. R.C. Harris Water Treatment Plant

Overview. Highland Creek Wastewater Treatment Plant. R.C. Harris Water Treatment Plant Presentation to Budget Committee October 19, 2009 2010 Operating Budget 2010-20192019 Capital Budget 1 Overview Serves 3.1 million residents and businesses in Toronto, and portions of York and Peel Over

More information

City of Prince Albert YEAR STRATEGIC PLAN

City of Prince Albert YEAR STRATEGIC PLAN 5 City of Prince Albert YEAR STRATEGIC PLAN 2015-2020 City of Prince Albert Introduction Members of City Council, along with Senior Administration, attended a two-day Strategic Planning Session for the

More information

WATER and WASTEWATER & TREATMENT DRAFT October 30, 2017

WATER and WASTEWATER & TREATMENT DRAFT October 30, 2017 WATER and WASTEWATER & TREATMENT DRAFT October 30, 2017 TABLE OF CONTENTS Recommendations... 1 WATER 2018-2019 Multi-Year Summary - Water... 5 2016-2019 Water Operating Overview... 6 2016-2019 Water Staffing

More information

WATER and WASTEWATER & TREATMENT COUNCIL APPROVED December 12, 2017

WATER and WASTEWATER & TREATMENT COUNCIL APPROVED December 12, 2017 WATER and WASTEWATER & TREATMENT COUNCIL APPROVED December 12, 2017 TABLE OF CONTENTS Approval of 2018 Annual Update... 1 WATER 2018-2019 Multi-Year Summary - Water... 5 2016-2019 Water Operating Overview...

More information

Stormwater Financing Feasibility Study for. Wrightsville Borough, Pennsylvania

Stormwater Financing Feasibility Study for. Wrightsville Borough, Pennsylvania 2015 Stormwater Financing Feasibility Study for Wrightsville Borough, Pennsylvania Prepared for Wrightsville Borough, Pennsylvania Prepared by University of Maryland Environmental Finance Center for the

More information

TOWN OF ATIKOKAN WATER & WASTEWATER FINANCIAL PLAN. May 30, Atikokan Public Works Water & Wastewater Services

TOWN OF ATIKOKAN WATER & WASTEWATER FINANCIAL PLAN. May 30, Atikokan Public Works Water & Wastewater Services TOWN OF ATIKOKAN WATER & WASTEWATER FINANCIAL PLAN May 30, 2016 Atikokan Public Works Water & Wastewater Services WATER & WASTEWATER FINANCIAL PLAN TOWN OF ATIKOKAN Table of Contents 1.0 Introduction ----------------------------------------------------------

More information

Village of Oak Park, IL Department of Finance. Quarterly Finance and Performance Report 2016, 1st Quarter

Village of Oak Park, IL Department of Finance. Quarterly Finance and Performance Report 2016, 1st Quarter Village of Oak Park, IL Department of Finance Quarterly Finance and Performance Report 2016, 1st Quarter May, 2016 Table of Contents Section 1: Introduction... 3 Section 2: 1 st Quarter Financial Report

More information

STORMWATER MANAGEMENT FUND Department of Environmental Services

STORMWATER MANAGEMENT FUND Department of Environmental Services Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

Stormwater Utility Agency Overview

Stormwater Utility Agency Overview Stormwater Utility Agency Overview Agency Mission The mission of the Stormwater Utility is to provide stormwater management services to the City of Madison with an equitable rate structure. Agency Overview

More information

Stormwater Utility Agency Overview

Stormwater Utility Agency Overview Agency Overview Agency Mission The mission of the Stormwater Utility is to provide stormwater management services to the City of Madison with an equitable rate structure. Agency Overview The Stormwater

More information

Waste Management Services Audit September 29, 2011

Waste Management Services Audit September 29, 2011 Waste Management Services Audit September 29, 2011 The Office of the City Auditor conducted this project in accordance with the International Standards for the Professional Practice of Internal Auditing

More information

Issue. Background. Options and Recommendation

Issue. Background. Options and Recommendation Date: March 3, 2016 To: Public Works Commission Members From: Heather Buchanan, Support Systems Sr. Manager Subject: FY2017 O&M Budget Issue Public Works is proposing its FY 2017 operations and maintenance

More information

CORPORATE RISK 2017 ANNUAL REPORT

CORPORATE RISK 2017 ANNUAL REPORT CORPORATE RISK 07 ANNUAL REPORT The City of Saskatoon, like all municipal governments, faces many types of risk, including strategic, operational, financial and compliance risks. If not effectively managed,

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS Water & Sewer Utilities Optimization City of Wichita Public Works & Utilities May 14, 2015 PROJECT DEFINITION The City of Wichita is seeking proposals for assistance with the risk,

More information

Where are your taxes going?

Where are your taxes going? BUDGET HIGHLIGHTS Building for the Future The City s 2017 proposed Budget continues to build for the future, investing in community priorities essential to Regina s continued growth. The Budget goals were

More information

2009 BUDGET HIGHLIGHTS

2009 BUDGET HIGHLIGHTS 2009 BUDGET HIGHLIGHTS 2009 Staffing Staffing Complement and Dollars Total staff complement is 939 FTE - $55.8 million The draft 2009 Budget reflects a complement of 783.186 full-time equivalents and 155.901

More information

Infrastructure Services. Infrastructure Services

Infrastructure Services. Infrastructure Services Infrastructure Services Infrastructure Services Infrastructure Services Summary Part Time Hours Overtime Hours Crew Hours Revenues Options 353 346 (2.0) 0 346 (2.0) 56,413 54,972 (2.6) 1,371 56,343 (0.1)

More information

SIGNIFICANT BUDGET CHANGES

SIGNIFICANT BUDGET CHANGES Department of Environmental Services Our Mission: To build and maintain water delivery, sanitary sewer collection, and wastewater treatment systems that provide high-quality water and sewer services and

More information

2017 Budget In Brief June 2017

2017 Budget In Brief June 2017 2017 Budget In Brief June 2017 TABLE OF CONTENTS INTRODUCTION 201 7 BUDGET General Overview... 2-3 Financial Overview... 4-7 SUPPLEMENTARY INFORMATION Where the Money Comes From... 8 Where We Spend the

More information

Wastewater Treatment Project

Wastewater Treatment Project Wastewater Treatment Project Quarterly Report (Reporting Period: April, 2017 to June, 2017) September 05, 2017 Quarterly Report - Summary The Project is progressing as planned. Construction of the McLoughlin

More information

PUBLIC WORKS DEPARTMENT Departmental Summary FUND/ACTIVITY ACTUAL ADOPTED AMENDED ADOPTED General Fund: Revenue Administration

PUBLIC WORKS DEPARTMENT Departmental Summary FUND/ACTIVITY ACTUAL ADOPTED AMENDED ADOPTED General Fund: Revenue Administration Departmental Summary FUND/ACTIVITY ACTUAL ADOPTED AMENDED ADOPTED General Fund: Revenue Administration 494,751 453,181 494,253 501,667 Municipal Trash Collection 59,158 59,760 59,760 60,358 Total Revenues

More information

VILLAGE OF LIBERTYVILLE SPECIAL MEETING. Tuesday, March 6, 2018 Village Hall 118 W. Cook Avenue Libertyville, IL :00 p.m.

VILLAGE OF LIBERTYVILLE SPECIAL MEETING. Tuesday, March 6, 2018 Village Hall 118 W. Cook Avenue Libertyville, IL :00 p.m. VILLAGE OF LIBERTYVILLE SPECIAL MEETING Tuesday, March 6, 2018 Village Hall 118 W. Cook Avenue Libertyville, IL 60048 6:00 p.m. 1) Roll Call 2) Continued Discussion of Draft 2018/2019 Budget 3) Executive

More information

Village of Baltimore Water & Wastewater Analysis. July 2018

Village of Baltimore Water & Wastewater Analysis. July 2018 Village of Baltimore Water & Wastewater Analysis July 2018 Table of Contents Introductory Summary... 1 Data... 1 Water Treatment Plant (WTP)... 1 Production... 2 Costs & Debts... 2 Wastewater Treatment

More information

Drainage Services. AMPW - Drainage Services 2010 Operating Budget. Table of Contents

Drainage Services. AMPW - Drainage Services 2010 Operating Budget. Table of Contents Drainage Services AMPW - Drainage Services 2010 Operating Budget Table of Contents 1.0 Branch Overview 1 1.1 Branch Profile 1 1.2 Description of Operations 1 1.3 Major Services 2 1.4 Strategic Road Map

More information

Stormwater Business Plan & 2019 Budget

Stormwater Business Plan & 2019 Budget Stormwater 2019 2022 Business Plan & 2019 Budget Foreword Our Vision for the Future Mississauga will inspire the world as a dynamic and beautiful global city for creativity and innovation, with vibrant,

More information

Wastewater Utilities. FY Budget Presentation

Wastewater Utilities. FY Budget Presentation Utilities FY 2018-19 Budget Presentation 1 Volume Forecast Wastewater Customers by Class Fiscal Year Residential Commercial Wholesale Total Growth 2013 26,995 1.1% 3,091 0.8% 4 30,090 1.1% 2014 27,548

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MARCH 19, SOLID WASTE MANAGEMENT OPERATIONAL REVIEW STATUS UPDATE

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MARCH 19, SOLID WASTE MANAGEMENT OPERATIONAL REVIEW STATUS UPDATE Item 11, Report No. 9, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan on March 19, 2013. 11 SOLID WASTE MANAGEMENT OPERATIONAL REVIEW STATUS UPDATE

More information

Delivering on Our Commitments

Delivering on Our Commitments 2018 Business and Financial Plan Delivering on Our Commitments Mission Statement The Saskatchewan Assessment Management Agency develops, regulates and delivers a stable, cost-effective assessment system

More information

Operating Budget Overview 2019

Operating Budget Overview 2019 OPERATING BUDGET Operating Overview 2019 Introduction In planning for a vibrant, healthy and sustainable community, the Town of Halton Hills is committed to providing community leadership on issues of

More information

DATE: September 12, 2017 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration

DATE: September 12, 2017 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration DATE: September 12, 2017 REPORT NO. PW2017-061 TO: FROM: Chair and Members Committee of the Whole Operations and Administration E. (Beth) Goodger, General Manager Public Works Commission 1.0 TYPE OF REPORT

More information

Water Quality Improvement Act Purpose and Need For Legislation

Water Quality Improvement Act Purpose and Need For Legislation Water Quality Improvement Act Purpose and Need For Legislation Sec. 1 Short Title: Water Quality Improvement Act. Sec. 2. Sewer Overflow Control Grants: The capital costs that cities bear to address combined

More information

SIGNIFICANT BUDGET CHANGES

SIGNIFICANT BUDGET CHANGES Department of Environmental Services Our Mission: To build and maintain water delivery, sanitary sewer collection, and wastewater treatment systems that provide high-quality water and sewer services and

More information

BU25.1. Solid Waste Management Services Recommended Operating Budget and Capital Budget and Plan 2017 Recommended Solid Waste Rates

BU25.1. Solid Waste Management Services Recommended Operating Budget and Capital Budget and Plan 2017 Recommended Solid Waste Rates Solid Waste Management Services 2017 Recommended Operating Budget and 2017 2026 Capital Budget and Plan 2017 Recommended Solid Waste Rates BU25.1 2017 Rate-Supported Budget Launch November 4, 2016 Agenda

More information

Finance Committee Meeting

Finance Committee Meeting Finance Committee Meeting FY19 Strategic Business and Operating Plan and Preliminary Budget Review April 3, 2018 1 Finance Committee Meeting FY19 Strategic Business Operating Plan and Preliminary Budget

More information

Solid Waste Management Services

Solid Waste Management Services OPERATING PROGRAM SUMMARY Contents Overview I: 2015 2017 Service Overview and Plan 6 II: 2015 Budget by Service 21 III: Issues for Discussion 39 Solid Waste Management Services 2015 OPERATING BUDGET OVERVIEW

More information

Andrew Nazareth General Manager, Finance & Corporate Services Robert Gonzalez, P.Eng. General Manager, Engineering & Public Works

Andrew Nazareth General Manager, Finance & Corporate Services Robert Gonzalez, P.Eng. General Manager, Engineering & Public Works City of Richmond Report to Committee To: From: Re: General Purposes Committee Andrew Nazareth General Manager, Finance & Corporate Services Robert Gonzalez, P.Eng. General Manager, Engineering & Public

More information

Audit of Selected Stormwater Activity

Audit of Selected Stormwater Activity Audit of Selected Stormwater Activity Report #1302 December 12, 2012 Copies of this audit report #1302 may be obtained from the City Auditor s web site (http://www.talgov.com/auditing/auditreports.cfm),

More information

City of Madison 2018 Capital Improvement Plan Agency Request Summary

City of Madison 2018 Capital Improvement Plan Agency Request Summary City of Madison 2018 Capital Improvement Plan Agency Request Summary Agency : Agency Request by Project (All Funds) Project 2230 Broadway ## Citywide Flood Mitigation 350,000 875,000 550,000 575,000 675,000

More information

Water Consultancy. Montecito Sanitary District Wastewater Rate Study Report. Montecito Sanitary District

Water Consultancy. Montecito Sanitary District Wastewater Rate Study Report. Montecito Sanitary District 3585 Maple Street, Suite 250 Ventura, CA 93003 805-404-1467 Montecito Sanitary District Wastewater Rate Study Report March 2016 Montecito Sanitary District 1042 Monte Cristo Lane Santa Barbara CA 93108

More information

Environment & Infrastructure Services

Environment & Infrastructure Services Environment & Infrastructure Services 2017 Draft Operating Budget Budget Committee of the Whole 225 East Beaver Creek Road, Richmond Hill, ON L4B 3P4 T 905 771 8800 RichmondHill.ca TOWN OF RICHMOND HILL

More information

PUBLIC WORKS DEPARTMENT

PUBLIC WORKS DEPARTMENT Departmental Summary FUND/ACTIVITY ACTUAL ADOPTED AMENDED RECOMM. General Fund: Revenue Administration 494,646 501,667 501,035 508,551 Municipal Trash Collection 101,185 60,358 60,358 60,962 Total Revenues

More information

2017 Rate Supported Budgets - Solid Waste Management Services and Recommended 2017 Waste Rates

2017 Rate Supported Budgets - Solid Waste Management Services and Recommended 2017 Waste Rates EX20.23 REPORT FOR ACTION 2017 Rate Supported Budgets - Solid Waste Management Services and Recommended 2017 Waste Rates Date: November 15, 2016 To: Budget Committee, Executive Committee From: General

More information

Toronto Water Budget. Toronto Water Budget. Water. Recommended. Lou Di Gironimo General Managou Di Gironi. Budget Committee.

Toronto Water Budget. Toronto Water Budget. Water. Recommended. Lou Di Gironimo General Managou Di Gironi. Budget Committee. 2016 Toronto Water Budget Toronto Water Budget 2016 2016 Recommended Recommended Ope Opearting 2016 Recommned2016 Budget Operating 2016 2025 2016-2025 Budget Recommended rating Recommended Budget Capital

More information

City of Centerville BMP Pages Table of Contents. Minimum Control Measure 1. Public Education and Outreach

City of Centerville BMP Pages Table of Contents. Minimum Control Measure 1. Public Education and Outreach i City of Centerville s Table of Contents Minimum Control Measure 1. Public Education and Outreach Best Management Practice Page 1-1: Outreach Publications...1 1-2: 30-day Public Notice for Annual Storm

More information

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES DEPARTMENT OF ENVIRONMENTAL SERVICES Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

The following is a list of the City s Funds other than General Fund:

The following is a list of the City s Funds other than General Fund: City of San Mateo The following is a list of the City s Funds other than General Fund: Fund # Fund Name 20 Grants Fund (Police)* 21 Solid Waste Fund 22 H.O.M.E. Fund 23 Community Development Block Grant

More information

CITY OF TACOMA. Wastewater, Surface Water, and Solid Waste Cost of Service Rate Study December 31, 2016

CITY OF TACOMA. Wastewater, Surface Water, and Solid Waste Cost of Service Rate Study December 31, 2016 CITY OF TACOMA Wastewater, Surface Water, and Solid Waste Cost of Service Rate Study December 31, 2016 TABLE OF CONTENTS SECTION ES EXECUTIVE SUMMARY... 1 Background... 1 Objectives... 1 Rate Development

More information

Financial Plan Water and Wastewater Lines of Service

Financial Plan Water and Wastewater Lines of Service 2018 March 14 Page 1 of 7 EXECUTIVE SUMMARY The financial plan for The City of Calgary s (The City s) Water Treatment and Supply (Water) and Wastewater Collection and Treatment (Wastewater) lines of service

More information

2018 CAPITAL BUDGET CAPITAL PLAN

2018 CAPITAL BUDGET CAPITAL PLAN 2018 CAPITAL BUDGET 2019-2027 CAPITAL PLAN This is administrations recommended 2018 Capital Budget to Red Deer City Council. Final decisions will be made as a part of Councils review changes may occur.

More information

City of San Carlos Sewer Financial Plan & Rate Update

City of San Carlos Sewer Financial Plan & Rate Update City of San Carlos Sewer Financial Plan & Rate Update Revised 06/13/16 1889 Alcatraz Avenue Berkeley, CA 94703 Tel: 510 653 3399 www.bartlewells.com June 13, 2016 City of San Carlos Department of Public

More information

Town Hall Meeting Community Utilities of Indiana, Inc. Wednesday, Wednesday 29, :00PM - 8:00PM at Seasons Lakehouse 1048 N.

Town Hall Meeting Community Utilities of Indiana, Inc. Wednesday, Wednesday 29, :00PM - 8:00PM at Seasons Lakehouse 1048 N. Town Hall Meeting Community Utilities of Indiana, Inc. Wednesday, Wednesday 29, 2018 7:00PM - 8:00PM at Seasons Lakehouse 1048 N. Lakeshore Drive, Crown Point, Indiana Community Utilities of Indiana, Inc.

More information

Strategic Business Plan Department of Water Resources. Gwinnett County Department of Water Resources

Strategic Business Plan Department of Water Resources. Gwinnett County Department of Water Resources g w i n n e t t c o u n t y Strategic Business Plan Department of Water Resources Gwinnett County Department of Water Resources A Message from the Director The Department of Water Resources Strategic Business

More information

WATER AND WASTEWATER FUND REVENUES

WATER AND WASTEWATER FUND REVENUES WATER AND WASTEWATER FUND REVENUES Water revenues comprise $12.11 million, or 70.6% of total revenues of the fund, while wastewater (sewer) charges comprise $4.25 million, or 24.7% of total revenues. Water

More information

DEPARTMENT OF PUBLIC WORKS UTILITIES

DEPARTMENT OF PUBLIC WORKS UTILITIES DEPARTMENT OF PUBLIC WORKS UTILITIES Mission Statement: Public Works - Utilities is dedicated to providing water, wastewater, and environmental services to the citizens of Rio Rancho and other City Departments.

More information

Proposed 2015 Budget. Board Budget Workshop October 16, 2014

Proposed 2015 Budget. Board Budget Workshop October 16, 2014 Proposed 2015 Budget Board Budget Workshop October 16, 2014 10320532 Introduction 2015 Budget Process Budget process initiated in 2013 with further enhancements for developing 2015 Budget Development of

More information

City of Madison 2019 Operating Budget 296

City of Madison 2019 Operating Budget 296 City of Madison 2019 Operating Budget 296 City of Madison 2019 Operating Budget 297 Agency: Sewer Proposed Budget Cost to Continue Proposed Change Revenue -$38,331,199 -$40,684,110 -$2,352,911 Expenditures

More information

RATE STUDY. Town of Midland. HEMSON C o n s u l t i n g L t d.

RATE STUDY. Town of Midland. HEMSON C o n s u l t i n g L t d. WATER AND WASTEWATER RATE STUDY Town of Midland C o n s u l t i n g L t d. December 2010 TABLE OF CONTENTS EXECUTIVE SUMMARY.........1 I BACKGROUND AND STUDY OBJECTIVES.........9 ll ASSOCIATED LEGISLATION.........13

More information

Finance Committee Meeting

Finance Committee Meeting Finance Committee Meeting FY18 Strategic Business and Operating Plan and Preliminary Budget Review April 04, 2017 1 Finance Committee Meeting FY18 Strategic Business Operating Plan and Preliminary Budget

More information

DEFERRED MATTERS. CIVIC WORKS COMMITTEE (AS OF April 18, 2017)

DEFERRED MATTERS. CIVIC WORKS COMMITTEE (AS OF April 18, 2017) DEFERRED MATTERS CIVIC WORKS COMMITTEE (AS OF April 18, ) Item File Subject Request Date Requested/ Expected Reply Date 1. 13 On-street Municipal Parking Spaces for Boulevard Cafes in the Downtown Finalize

More information

Strategic Asset Management Policy

Strategic Asset Management Policy Strategic Asset Management Policy Submission Date: 2018-04-24 Approved by: Council Approval Date: 2018-04-24 Effective Date: 2018-04-24 Resolution Number: Enter policy number. Next Revision Due: Enter

More information

PUBLIC WORKS ADMINISTRATION / ENGINEERING

PUBLIC WORKS ADMINISTRATION / ENGINEERING PUBLIC WORKS ADMINISTRATION / ENGINEERING MISSION STATEMENT: The mission of the Public Works Department is to plan, design, build and maintain the public infrastructure in a manner that is consistent with

More information

CITY OF ALHAMBRA UTILITIES DEPARTMENT SEWER SYSTEM MAINTENANCE PROGRAM (SSMP)

CITY OF ALHAMBRA UTILITIES DEPARTMENT SEWER SYSTEM MAINTENANCE PROGRAM (SSMP) CITY OF ALHAMBRA UTILITIES DEPARTMENT SEWER SYSTEM MAINTENANCE PROGRAM (SSMP) APRIL 2009 Table of Contents INTRODUCTION... 3 SECTION I: GOALS... 3 SECTION II: ORGANIZATION... 4 SECTION III: LEGAL AUTHORITY...

More information

Overview Presentation January 9, /4/2017 1

Overview Presentation January 9, /4/2017 1 Overview Presentation January 9, 2017 1/4/2017 1 2017 Business Plan Process Budget Direction Report EMT Review Service Partners June and August 2016 October 2016 January 9, 2017 January 16, 2017 February

More information

STORMWATER MANAGEMENT FUND Department of Environmental Services

STORMWATER MANAGEMENT FUND Department of Environmental Services Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

The Corporation of the Municipality of Strathroy-Caradoc Consolidated Financial Statements For the year ended December 31, 2017

The Corporation of the Municipality of Strathroy-Caradoc Consolidated Financial Statements For the year ended December 31, 2017 The Corporation of the Municipality of Strathroy-Caradoc Consolidated Financial Statements For the year ended The Corporation of the Municipality of Strathroy-Caradoc Consolidated Financial Statements

More information

Water Resources Engineering Division Public Works City of Colorado Springs

Water Resources Engineering Division Public Works City of Colorado Springs Water Resources Engineering Division Public Works City of Colorado Springs Richard Mulledy, P.E. Division Manager City of Colorado Springs/Pueblo County IGA City of Colorado Springs/Pueblo County IGA $460

More information

Solid Waste Management Services

Solid Waste Management Services OPERATING PROGRAM SUMMARY Contents I: Overview 1 II: Council Approved Budget 4 III: 2014 Service Overview and Plan 6 IV: 2014 Operating Budget 18 V: Issues for Discussion 29 Appendices: Solid Waste Management

More information

Order No. 49/18 THE CITY OF THOMPSON WATER AND WASTEWATER UTILITY WATER AND WASTEWATER RATES. April 12, 2018

Order No. 49/18 THE CITY OF THOMPSON WATER AND WASTEWATER UTILITY WATER AND WASTEWATER RATES. April 12, 2018 THE CITY OF THOMPSON WATER AND WASTEWATER UTILITY WATER AND WASTEWATER RATES BEFORE: Irene A. Hamilton, Panel Chair Michael Watson, Member Room 400 330 Portage Avenue Winnipeg, MB R3C 0C4 www.pubmanitoba.ca

More information

Adopted. Operating Budget & Capital Improvements Plan. Adopted October 7, 2015

Adopted. Operating Budget & Capital Improvements Plan. Adopted October 7, 2015 Adopted 2016 Operating Budget & Capital Improvements Plan Adopted October 7, 2015 1 GFOA Award The Government Finance Officers Association of the United States and Canada (GFOA) presented a Distinguished

More information

2009 Draft Solid Waste Management Operating Budget and 2009 Draft Capital Budget and Forecast

2009 Draft Solid Waste Management Operating Budget and 2009 Draft Capital Budget and Forecast Treasurer s Report TO: Chair and Members Corporate and Emergency Services Committee Engineering and Public Works Committee FROM: Stephen Cairns, Commissioner of Finance and Corporate Services A.J. White,

More information

Committee of the Whole Agenda

Committee of the Whole Agenda 1 Committee of the Whole Agenda The agenda for the Freestanding Committee of the Whole (Corporate Administration & Finance Committee - Budget) meeting to be held in the Council Chambers of the Municipal

More information

Solid Waste & Recycling

Solid Waste & Recycling Solid Waste & Recycling The Solid Waste & Recycling Fund accounts for the activities of Chatham County's waste management, including the collection sites, hauling, and disposal costs. The Solid Waste &

More information

CITY OF LARAMIE FINANCIAL OUTLOOK. Malea Brown, Administrative Services Director

CITY OF LARAMIE FINANCIAL OUTLOOK. Malea Brown, Administrative Services Director CITY OF LARAMIE FINANCIAL OUTLOOK Malea Brown, Administrative Services Director Fiscal Year - GENERAL FUND 2 GENERAL FUND Organization Structure HUMAN RESOURCES PATROL POLICE LARC RECORDS DISPATCH ANIMAL

More information

Accomplishments for Administration

Accomplishments for Administration Today s Agenda A Look Back (FY 15-16) Budget Overview City Wide Outlook General Fund Public Utility Fund Beach Fund Port Commission Hotel Motel City Wide Debt What s Next? 2015-2016 Accomplishments for

More information

COUNTY ADMINISTRATOR PUBLIC WORKS

COUNTY ADMINISTRATOR PUBLIC WORKS COUNTY ADMINISTRATOR PUBLIC WORKS Public Works is comprised of several Departments/Divisions that develop, improve, and maintain the County s basic infrastructure needs related to transportation, storm

More information

Solid Waste Management Services

Solid Waste Management Services Contents OPERATING BUDGET NOTES Overview & Recommendations I: 2016 2018 Service Overview and Plan 6 II: 2016 Recommended Budget by Service 13 III: Issues for Discussion 29 Solid Waste Management Services

More information

The Corporation of Haldimand County. Consolidated Financial Statements

The Corporation of Haldimand County. Consolidated Financial Statements Consolidated Financial Statements December 31, 2016 Index to Consolidated Financial Statements December 31, 2016 Page INDEPENDENT AUDITORS' REPORT 2 CONSOLIDATED FINANCIAL STATEMENTS Management's Responsibility

More information

STORMWATER DISTRICT UTILITY FEASIBILITY STUDY York County, South Carolina

STORMWATER DISTRICT UTILITY FEASIBILITY STUDY York County, South Carolina STORMWATER DISTRICT UTILITY FEASIBILITY STUDY, South Carolina February 18, 2018 Table of Contents 1 Introduction... 2 2 Program Overview... 3 2.1 Current Program... 5 2.1.1 Regulatory Compliance... 5 2.1.2

More information

Capital Improvements

Capital Improvements Capital Improvements CAPITAL IMPROVEMENT ELEMENT GOAL 7-1: PROVIDE & MAINTAIN PUBLIC FACILITIES AND SERVICES Provide and maintain public facilities and services which protect and promote the public health,

More information

2018 BUDGET AND FINANCIAL PLAN

2018 BUDGET AND FINANCIAL PLAN Questionnaire 2018 BUDGET AND FINANCIAL PLAN January 1, 2018 - January 23, 2018 The Township of Langley is reviewing the Draft 2018 2022 Five-Year Financial Plan with emphasis on the 2018 Budget. Your

More information

Financial Planning Process at a Glance

Financial Planning Process at a Glance Financial Planning Process at a Glance The following schedule provides the dates for the Financial Plan process. July-September Budget preparation guidelines established. Department managers prepared and

More information

CORPORATION OF THE CITY OF CORNWALL CONSOLIDATED FINANCIAL STATEMENTS

CORPORATION OF THE CITY OF CORNWALL CONSOLIDATED FINANCIAL STATEMENTS CONSOLIDATED FINANCIAL STATEMENTS December 31, 2014 December 31, 2014 CONTENTS Page INDEPENDENT AUDITORS' REPORT 1 FINANCIAL STATEMENTS Consolidated Statement of Financial Position 2 Consolidated Statement

More information

Minutes Standing Policy Committee on Finance September 15, 2016 REPORTS

Minutes Standing Policy Committee on Finance September 15, 2016 REPORTS Minutes Standing Policy Committee on Finance September 15, 2016 REPORTS Item No. 16 Comprehensive Integrated Waste Management Strategy Reduce Reuse Recycle Repeat 4R Winnipeg Depots Financial Status Report

More information

2017 UTILITY RATE STUDY WORK SESSION #2: BACKGROUND, EDUCATIONAL/INFORMATIONAL

2017 UTILITY RATE STUDY WORK SESSION #2: BACKGROUND, EDUCATIONAL/INFORMATIONAL 2017 UTILITY RATE STUDY WORK SESSION #2: BACKGROUND, EDUCATIONAL/INFORMATIONAL Receive a presentation from Lewis Young Robertson & Burningham regarding the 2017 Utility Rate Study The purpose of the Council

More information

WATER POLLUTION CONTROL

WATER POLLUTION CONTROL WATER POLLUTION CONTROL WATER POLLUTION CONTROL NARRATIVE City of Warrensburg Water Pollution Control Division is under the supervision of the Public Works Department. The Administration budget includes

More information

Building Detail and Buy-in For Your Long-Term Multi-Asset Investment Plan

Building Detail and Buy-in For Your Long-Term Multi-Asset Investment Plan Building Detail and Buy-in For Your Long-Term Multi-Asset Investment Plan Michael E. Trickey, P.Eng., PE Senior Asset Management Consultant Urban Systems Limited 250-762-2517 mtrickey@urban-systems.com

More information