1 Page 1 of 16 CITY OF PORT TOWNSEND PLANNING COMMISSION S RECOMMENDED DOCKET 2016 GMA Periodic Update Comprehensive Plan/Development s Compliance Review & Update Program The document represents the City s determinations for review/update revisions that will fulfill the first major milestone of the 2016 Update requirements of GMA (RCW36.70A.130). This following matrix will be utilized in concert with the Comprehensive Plan and Development Checklist to review and revise the City s Comprehensive Plan and Development s. The schedule for accomplishing the update is dictated by the Planning Commission and City Council Hearing schedule. The 2016 Update is partially funded with State funds made available through the State Department of Commerce. The following GMA required Elements of the Comprehensive Plan were reviewed: Land Use Housing Capital Facilities and Utilities Element Transportation Also reviewed for compliance: Development s Critical Areas (not recommended for docketing at this time) Other Plan Elements not required by GMA - Economic Development FINDINGS 1) Since the Comprehensive Plan mandated by GMA was adopted in 1996, amendments have been made on an annual basis both for local needs and to maintain Plan consistency with legislative amendments to GMA and for internal consistency among its elements. In addition, the City updates its Capital Improvement Program annually to enhance the applicability of the Comprehensive Plan capital facilities funding. Development regulations have been updated on an asneed basis Planning Commission s Recommended Docket (Rev. 10/22/15)

2 Page 2 of 16 2) Although this work plan includes house-keeping, and locally suggested optional amendments and anticipates their completion in 2016, these updates will be placed on a separate track(s) if it is determined that additional time is needed to adequately address public input. Given limited resources, revisions to the Critical Areas Ordinance (CAO) necessary to comply with the BAS requirements of GMA are slated for a subsequent phase (anticipated 2017). 3) Amendments included herein present a matter appropriately addressed through the comprehensive plan - The Director compiled a broad range of suggested amendments during the public participation process. Those that would require an amendment to the Comprehensive Plan and development regulations were compiled into a preliminary docket. As anticipated, the number and complexity of suggested amendments exceeds capacity. After a duly noticed public hearing, Planning Commission recommended those suggested amendments that warranted inclusion on the 2016 docket. 4) The proposed amendments can be reasonably reviewed within the available resources and time frame - The substantive work effort will largely be undertaken and completed by Development Services Department and Public Works Department staffs and a project team including representatives from other City departments and the Planning Commission. Public Works Department staff will be needed to complete required updates to the Transportation and Capital Facilities & Utilities Elements of the Plan. Given limited resources, the Planning Commission and Director recommend that the City proceed as follows: process amendments to the Comprehensive Plan, zoning code and subdivision code (Titles 17 and 18 respectfully) process amendments (both mandatory and optional) to the critical areas ordinance (Chapter 19.05) 5) The proposed amendments address significantly changed conditions or respond to an expressed desire by the community since the last time the pertinent comprehensive plan map or text was amended and thus warrant review in the current year In applying this criteria, the Planning Commission relied heavily upon the Changed Circumstances memorandum (June 24, 2015), Planning Commission Assessment (September 24, 2015) and input received during the extensive public participation process throughout the spring, summer and fall of 2015 (as more fully described in the Planning Commission Assessment). 6) The proposed amendments are consistent with policy implementation in the county-wide planning policies, the Growth Management Act, other state or federal law, and the Washington Administrative Code Planning Commission s Recommended Docket (Rev. 10/22/15)

3 Page 3 of 16 Planning Commission s Recommended Docket In order to comply with the City s requirement to periodically update its Comprehensive Plan and associated development regulations by June 2016, the Commission recommends that the City incorporate the following updates to the Port Townsend Comprehensive Plan and development regulations to address compliance with the GMA and to update the plan, to respond to changed circumstances and public input. Items on the docket are categorized as follows: Mandated amendments necessary to comply with the GMA Optional amendments including Housekeeping revisions Ongoing amendments Council had previously slated for the 2016 Update Suggested Amendments Throughout the Mandated Plan 1. A consistent population projection throughout the plan which should be consistent with the Office of Financial Management forecast for the county or the county s sub county allocation of that forecast. RCW , WAC (f) Throughout the Suggested Plan 2. Plan for Transition and community resilience. Incorporate community resiliency concepts throughout the plan, beginning with any new policies adopted during the 2016 update. Consider resiliency recommendations included in public comment letters including but not limited to the recommendations of Local 20/20 Climate Change Preparation Group (Comment 17) Planning Commission s Recommended Docket (Rev. 10/22/15)

4 Page 4 of 16 Throughout the House keeping Plan 3. Update to reflect current conditions: delete/revise outdated narrative, goals and policies (e.g., specific improvements/acquisition/tasks that have since been accomplished; update agency names/acronyms; Port Hadlock/Irondale UGA). 4. Update Tables, Figures and Maps as necessary to reflect changed /TJ circumstances/clarification Introduction House keeping 5. Update to reflect existing conditions and current planning process 6. Update Profile of Port Townsend 7. Revise/add assumptions (per Planning Commission assessment Assumption 3, 12, and 9/18/14 meeting) Population growth, economic outlook 8. Uncertainty of Assumptions add climate change & climate refugees; natural disasters (PC Assessment 9/24/15) Land Use Mandated Element 9. A consistent population projection must be used throughout the Plan, which should be consistent with the Office of Financial Management (OFM) forecast for the Jefferson County, and County s sub county allocation of that forecast. 10. A process to ensure public participation in the comprehensive planning process. The comprehensive plan public participation process, detailed in Land Use Element Goal 15 and Policies requires critical review and revision to ensure its conformance with RCW 36.70A.130 (2), as amended, as well Planning Commission s Recommended Docket (Rev. 10/22/15) Goal 15 and Policies

5 Page 5 of and PTMC. Presently, the municipal code appears to more faithfully reflect the statutory requirements than the Plan. Modify the Plan policies to better align with the statutory requirements, differentiating between annual amendments, periodic updates, and emergency amendments. See also, RCW 36.70A.020 (11) and WAC (3). RCW 36.70A.020 (11),.035, and.140; WAC (3) The process should address annual amendments [RCW 36.70A.130(2), Amended in 2006], emergency amendments [RCW 36.70A.130(2)(b)]; Adopt a specialized periodic update process. Ensure plan amendment processes are well publicized. 11. Land Use Element Policies 2.8 and 16.7 require critical review and assessment to ensure that they provide sufficient guidance to ensure that both regulatory and administrative actions taken by the City do not result in unconstitutional takings of private property. Include specific policy guidance that outlines the analysis the City will conduct to avoid both facial (prospective) and as applied (retrospective) takings. See RCWs 36.70A.020(6) and 36.70A.370, as well as Attorney General s Advisory Memorandum: Avoiding Unconstitutional Takings of Private Property (2006). Policies 2.8 and Update to reflect GMA periodic update cycle (previously 7 years) Policy Planning Commission s Recommended Docket (Rev. 10/22/15)

6 Page 6 of 16 Land Use Element House Keeping 13. Update to reflect current conditions (e.g., City purchase of 80 acre DNR land) 14. Delete Table IV I: Land Use Designations Suggested Uses, Densities & Building Heights (per the footnote, this table is intended only to provide information and guidance in the preparation of revisions to the Zoning Code) which was revised in Land Use Element Ongoing Howard Street Corridor Policy Table IV I: Land Use Designations Suggested Uses, Densities & Building Heights 15. Based on the Economic Feasibility Study (Hovee: 2015) consider revisions to Land Use Policy 10.9 to reflect the working vision statement for the Howard Street corridor. Consider contracting with a land use consultant to formulate a subarea plan to implement the recommendations of the Economic Feasibility Study. 16. Review description of C II and C II/MU based on the Economic Feasibility Study (Hovee: 2015). Is city wide market too limiting? 17. Consider broadening the definition of CI MU mixed use to include not just one category of use in a building structure (as vertical mixed use), but also applicable to structures used for single use with adjoining buildings on the same or different parcels for other complementary uses (as horizontal mixed use) (Hovee: 2015) Policy 10.9 Definitions of C II and C II/MU (Corollary amendments to Zoning) Definition of CI MU (Corollary amendments to Zoning) LB LB LB Planning Commission s Recommended Docket (Rev. 10/22/15)

7 Page 7 of 16 Comprehensive Revisions 18. Consider single story in mixed use Policy 12.6 (Corollary amendments to Zoning) 19. Existing C II/MU definition cater to a local or City wide market may be a barrier consider broadening/clarifying (Hovee Study/Howard Street) Land Use & Zoning Ongoing Map 20. Howard Street Corridor Description: Consider amending the land use classification/zoning based on the recommendations of the Economic Feasibility Study (Hovee: 2015), effecting lands generally located between SR 20 to the south, Discovery Road to the North and northeast, Howard Street to the west. Consider contracting with a land use consultant to formulate a subarea plan to implement the recommendations of the Economic Feasibility Study. Land Use Element Suggested 21. Revise Policy 4.11 to be more inclusive of other entities when collaborating on park and recreational facility needs. Consider Parks, Recreation and Tree Advisory Board (PRTAB)proposed language in Comment letter #18. Housing Element Mandated 22. An updated inventory and analysis of existing and projected housing needs over the planning period. The anticipated population for the year 2036 (11,805) is lower than was forecast in the current Plan for 2024 (13,329). Accordingly, an updated inventory and analysis would be expected to reflect lower C II/MU description in Comprehensive Plan and DR Policy 4.11 Provide updated Inventory in Appendices Replace existing inventory narrative within the element with a brief overview of updated LB LB LB/ Planning Commission s Recommended Docket (Rev. 10/22/15)

8 Page 8 of 16 aggregate housing demand than the current Plan. Because of this lower overall housing demand, a simplified inventory format would appear justified. See RCW 36.70A.070(2)(a) and WAC (2)(b) and (c). Inventory to reflect both the Housing Action Plan and OlyCAP s Ten Year Plan to End Homelessness; changed agencies/advisory groups (HAPN to the Shelter to Housing Partnership; Jefferson Housing Authority to Peninsula Housing Authority; Community Action Council to Habitat for Humanity) 23. If enacting or expanding an affordable housing program under RCW 36.70A.540: identification of land use designations within a geographic area where increased residential development will assist in achieving local growth management and housing policies. RCW 36.70A.540, New in WAC Include provisions for temporary encampments for the homeless pursuant to RCW (WICA) Housing Element House Keeping Housing Element Suggested 25. Consider adding re examine parking requirements to the list of affordable housing strategies. inventory. Preparation of a revised inventory has been identified as a necessary component of the 2016 Update. Goal 2, Policy 2.2. Note both the Plan policies and development regulations should be reviewed, and if necessary, amended, to conform to RCW 36.70A Planning Commission s Recommended Docket (Rev. 10/22/15)

9 Page 9 of Provide more flexibility in housing types while preserving neighborhood character. Set the framework for future amendments to the zoning code. Transportation Mandated Element 27. An updated inventory of air, water, and ground transportation facilities and services, including transit routes, state owned transportation facilities, and general aviation airports is required. See RCW 36.70A.070(6)(a)(iii)(A) and WAC (2)(c). (See: Map 21, Peninsula Regional Transportation Plan, Washington State Ferries Long Range Plan, current Washington Department of Transportation (WSDOT) SR19/SR20 corridor study; Jefferson Transit. Also consider Jefferson County s Quimper Peninsula Transportation Study dated January 2012 (while technically outside of the City of Port Townsend, this study was developed in conjunction with the WSDOT SR 19/SR 20 study and identifies gateway strategies in the vicinity of the Jefferson County and City of Port Townsend boundary.) 28. New or revised policy language should be contemplated that specifies actions that will be employed by the City to bring locally owned transportation facilities and services to established levels of service (LOS). This requirement is a consequence of amendments to RCW 36.70A.070(6)(a)(iii)(D) in The guidance provided in Transportation Element policies 8.1 through 8.8 arguably may suffice; however, critical review and evaluation Planning Commission s Recommended Docket (Rev. 10/22/15) Policy 2.2 Use updated Inventory from the 2009 Transportation Plan Replace existing inventory narrative within the element with a brief overview of updated inventory. Preparation of a revised inventory has been identified as a necessary component of the 2016 Update. Level of Service (LOS) Standards & Concurrency Management narrative on pp. VI 6 VI 7 of the TE, and TE Goal 8 and Policies ; and /TJ

10 Page 10 of 16 against the revised statutory language is necessary. See RCW 36.70A.070(6)(a)(iii)(D) and WAC Adopt Level of Service (LOS) standards for arterials and transit routes (RCW 36.70A.070(6)(a)(iii)(B)). 29. An updated forecast of traffic (through at least 2026) must be prepared, including the land use assumptions used in estimating travel. See RCW 36.70A.070(6)(a)(i), RCW 36.70A.070(6)(a)(iii)(E) WAC (2)(f). 30. An updated projection of state and local system needs to meet current and future demand is required. See RCW RCW 36.70A.070(6)(a)(iii)(F) WAC (2)(f) 31. An updated analysis of future funding capabilities, to judge needs against probable funding resources is necessary. See RCW 36.70A.070(6)(a)(iv)(A) WAC (2)(k)(iv) CF&UE Concurrency narrative on pp. VII 3 Goal 3, Policies Goal 4, Policies The 2009 Transportation Functional Plan provided a traffic forecast to This updated traffic forecast should be used to update the Transportation Element as part of the 2016 Plan review process. TE section entitled Policy Direction for Future Transportation Needs, pp. VI 3 through VI 5. Goal 10, Policies ; CF&UE pp Identified needs should be reevaluated against probable funding resources as part of the 2016 Plan Update Planning Commission s Recommended Docket (Rev. 10/22/15)

11 Page 11 of a. An updated multi year financing plan must be prepared, based on the needs identified in the Plan, the relevant parts of which serve as the basis for the 6 year street, road or transit program. See RCW 36.70A.070(6)(a)(iv)(B) and RCW WAC (2)(k)(ii) 33. An updated description of intergovernmental coordination efforts should be incorporated, including an assessment of the impacts of the transportation and land use assumptions on the transportation systems of adjacent jurisdictions and how they are consistent with the regional transportation plan. See RCW 36.70A.070(6)(a)(v); WAC (2)(a)(iv) Replace outdated Table VI I: Capacity Related Improvements; CFE narrative & CFE Tables which set forth the initial six (6) year financing plan for transportation improvements; a new financing plan should be prepared as part of the 2016 Plan. Narrative, Goal 2, Policies Further review of this section of the TE is necessary to confirm its consistency with RCW 36.70A.070(6)(a)(v). Transportation House keeping Element 34. Update terminology/definitions per WSDOT Design Manual (2011) Transportation Suggested Element 35. Review existing parking policy consider parking pricing policies in commercial districts and explore the feasibility of paid parking as a means to fund nonmotorized transportation/transit.(see comment letter #22) Transportation Policy Planning Commission s Recommended Docket (Rev. 10/22/15)

12 Page 12 of 16 Capital Facilities & Mandated Utilities An updated inventory of existing capital facilities owned by public entities must be completed. For example, the inventory should be updated to reflect changes in the ownership of facilities since 2005 (Kah Tai Lagoon Nature Park, City Dock, Union Wharf, etc.). See RCW 36.70A.070(3)(a) and WAC (a). Fire Station to EJFR Broadband*NOAA NET and PUD fibersystem City PUD water facility transfers PUD as electric utility provider Internet Providers: WAVE, Century Link Numerous Cellular providers PTTV, RCM, EJFR Water Treatment; DNR 80 acres 36. A forecast of needed capital facilities is required, based upon the projected population at the end of the planning period and adopted levels of service (LOS). As was the case with the housing inventory, the anticipated population projection would be expected to decrease the demand and need for expanded capital facilities. See RCW 36.70A.070(3)(b) and WAC (b) Planning Commission s Recommended Docket (Rev. 10/22/15) The integrated Draft Plan/EIS from 1996 included this inventory; make corollary amendments to the Comprehensive Plan element as needed; preparation of a revised inventory has been identified as a necessary component of the 2016 Update. A Capital Facilities Plan Support Document was included as an appendix to the Integrated Draft Plan/EIS from This document requires revision as part of the 2016 Update process. Adopted LOS: See Table VII 4 in the CF&UE, p. VII 28. Future needs: See pp. VII /TJ

13 Page 13 of Proposed locations and capacities of expanded or new capital facilities. RCW 36.70A.070(3)(c) and WAC (3)(C) 38. A six year funding plan identifying sources of public money to finance planned capital facilities is necessary. Because the City does this on an annual basis as part of its budget process, this requirement should not add to staff s baseline workload. See RCW 36.70A.070(3)(d), 36.70A.120 and WAC through VII 72 of the CF&UE. See pp. VII 22 through VII 72 of the CF&UE. See pp. VII 22 through VII 72 of the CF&UE. Capital Facilities & House Keeping Utilities Element 39. Place legacy text Capital Improvements page VII 22 through VII page VII 22 through VII 72 ST 72 in an Appendix and provide updates. 40. Delete reference to 50 year planning horizon ST 41. Water System Master Plan ST 42. Consistent with the GMA and PTMC Revise from annual Policy 6.2 ST reassessment to Reassess Comprehensive plan as per the schedule provided in RCW 36.70A.130 or more frequently as may be directed by council Economic Development Element Mandated None Planning Commission s Recommended Docket (Rev. 10/22/15)

14 Page 14 of 16 Economic House Keeping Development Element 43. Update to reflect current higher educational opportunities (delete reference to Magnet Center as funding is no longer available) 44. Update intro to reflect Mandated however postponed until state funding is available Economic Ongoing Development Element 45. Howard Update measuring our success to reflect Howard Street Street Economic goals 46. Howard Review small scale clean' industry and cottage based industries Street is it too confining in respect to encouraging local companies to grow (Hovee: 2015) Economic Suggested Development Element Planning Commission s Recommended Docket (Rev. 10/22/15) 47. Consider promoting local food production as an economic strategy. Appendices Mandated 48. Provide updated inventory information in supporting documentation. Identify outdated appendices. Either eliminate/move to supporting documentation. Title 17 Zoning Mandated 49. Except for residential zoning districts, the tables of permitted, CF&UE 31.5 encourages LB LB

15 Page 15 of 16 conditional and prohibited uses set forth in Title 17 PTMC ( , , and ) must be amended to specifically permit electric vehicle battery charging stations in all areas outside designated critical areas. See RCW 36.70A.695. Title 17 Zoning Ongoing 50. Howard Street See Land Use Element section above make corollary revisions in the Zoning Code Title 17 Zoning Suggested 51. To support resiliency in the local food system, define commercial kitchens and food hubs ; consider allowing these uses in the Commercial/ Mixed Use/ Light Manufacturing zoning districts. these stations; however, the zoning code requires amendment to specifically permit such stations within the areas specified by RCW 36.70A.695. **Historic district? Require design review? LB 52. Define conference center LB Title 18 Land Mandated Division 53. The timelines for approval and disapproval of preliminary plats in RCW 36.70A.140 have been amended in the wake of the 2008 recession, providing more time to obtain final plat approvals. Sections and PTMC must be reviewed and amended to ensure conformance with the statute, as revised. Preliminary plat approvals are now valid for seven (7) years if the date of preliminary approval is on or before December 31, 2014, Further review needed: PTMC sections and These provisions require further review to ensure conformance with the statute as revised Planning Commission s Recommended Docket (Rev. 10/22/15)

16 Page 16 of 16 five (5) years if preliminary approval is issued on or after January 1, 2015, and nine (9) years if outside the shoreline jurisdiction and preliminary approval was obtained on or before December 31, Planning Commission s Recommended Docket (Rev. 10/22/15)

This page intentionally blank. Capital Facilities Chapter Relationship to Vision. Capital Facilities Chapter Concepts

This page intentionally blank. Capital Facilities Chapter Relationship to Vision. Capital Facilities Chapter Concepts This page intentionally blank. Capital Facilities Chapter Relationship to Vision Vision County Government. County government that is accountable and accessible; encourages citizen participation; seeks

More information

Updated Planning Commission Work Program ( )

Updated Planning Commission Work Program ( ) Updated Planning Commission Work Program (2017-2019) The Planning Commission Work Program contains projects and planning activities that are slated for completion in or substantial progress during the

More information

Proposed Planning Commission Work Program ( )

Proposed Planning Commission Work Program ( ) Proposed Planning Commission Work Program (2017-2019) The Planning Commission Work Program contains projects and planning activities that are slated for completion in or substantial progress during the

More information

CHAPTER 11. CAPITAL FACILITIES PLAN ELEMENT

CHAPTER 11. CAPITAL FACILITIES PLAN ELEMENT CHAPTER 11. CAPITAL FACILITIES PLAN ELEMENT 11.1 INTRODUCTION A is one of eight elements required by the Growth Management Act (GMA) to be included in Yakima County s comprehensive plan. The reason for

More information

County-wide Planning Policies

County-wide Planning Policies Kittitas County County-wide Planning Policies Last amended on April 16, 2013 Ordinance No. 2013-005 KITTITAS COUNTY - COUNTY-WIDE PLANNING POLICIES PREAMBLE TO THE COUNTY-WIDE PLANNING POLICIES These Planning

More information

Puyallup Shoreline Master Program FINAL, JAN

Puyallup Shoreline Master Program FINAL, JAN CHAPTER 1 INTRODUCTION A. PURPOSE AND INTENT 1. The purposes of this Shoreline Master Program are: a. To guide the future development of shorelines in the City of Puyallup in a positive, effective, and

More information

2020 Annual Amendment to the Comprehensive Plan and Land Use Regulatory Code. Monday, April 1, 2019, at 5:00 p.m.

2020 Annual Amendment to the Comprehensive Plan and Land Use Regulatory Code. Monday, April 1, 2019, at 5:00 p.m. APPLICATION PACKET 2020 Annual Amendment to the Comprehensive Plan and Land Use Regulatory Code Application Deadline: Monday, April 1, 2019, at 5:00 p.m. Application Fee: $1,400 Submittal Requirements:

More information

Planning Commission. Regular Business Mee ng. January 22, Planning Commission Meeting 01/22/2019 Master Page 1 of 31

Planning Commission. Regular Business Mee ng. January 22, Planning Commission Meeting 01/22/2019 Master Page 1 of 31 Planning Commission Regular Business Mee ng January 22, 2019 01/22/2019 Master Page 1 of 31 Planning Commission Pre Mee ng January 22, 2019 01/22/2019 Master Page 2 of 31 Planning Commission Briefing Agenda

More information

Minimum Elements of a Local Comprehensive Plan

Minimum Elements of a Local Comprehensive Plan Minimum Elements of a Local Comprehensive Plan Background OKI is an association of local governments, business organizations and community groups serving more than 180 cities, villages, and townships in

More information

Chapter 1: Introduction

Chapter 1: Introduction Chapter 1: Introduction CHAPTER 1: INTRODUCTION A VISION FOR PLANNING The city will integrate the Growth Management Act (GMA), defined in Chapter 36.70A of the Revised Code of Washington (RCW), as an essential

More information

Planning Commission WORKSHOP: General Plan Implementation Program - Task 2 Refining the General Plan Implementation Checklist.

Planning Commission WORKSHOP: General Plan Implementation Program - Task 2 Refining the General Plan Implementation Checklist. 6.1 MARIPOSA COUNTY Commission 209-966-5151 MEETING: October 6, 2017 TO: FROM: The Mariposa County Commission Sarah Williams, Director RE: General Plan Implementation Program - Workshop 1 WORKSHOP: General

More information

CITY OF PALM DESERT COMPREHENSIVE GENERAL PLAN

CITY OF PALM DESERT COMPREHENSIVE GENERAL PLAN Comprehensive General Plan/Administration and Implementation CITY OF PALM DESERT COMPREHENSIVE GENERAL PLAN CHAPTER II ADMINISTRATION AND IMPLEMENTATION This Chapter of the General Plan addresses the administration

More information

PLANNING AND ZONING COMMISSION COMMUNICATION

PLANNING AND ZONING COMMISSION COMMUNICATION PLANNING AND ZONING COMMISSION COMMUNICATION City of Longmont, Colorado Project Title: Meeting Date: April 25, 2018 Land Development Code and Official Zoning Map Update Staff Planner: Brien Schumacher,

More information

CAPITAL IMPROVEMENTS ELEMENT GOALS, OBJECTIVES AND POLICIES. Goal 1: [CI] (EFF. 7/16/90)

CAPITAL IMPROVEMENTS ELEMENT GOALS, OBJECTIVES AND POLICIES. Goal 1: [CI] (EFF. 7/16/90) CAPITAL IMPROVEMENTS ELEMENT GOALS, OBJECTIVES AND POLICIES Goal 1: [CI] (EFF. 7/16/90) To use sound fiscal policies to provide adequate public facilities concurrent with, or prior to development in order

More information

Executive Summary 1/3/2018

Executive Summary 1/3/2018 Executive Summary 1/3/2018 EXECUTIVE SUMMARY This comprehensive plan was prepared by the City of Langley in accordance with Section 36.70A.070 of the Growth Management Act (GMA). The plan guides future

More information

Chapter CONCURRENCY

Chapter CONCURRENCY Chapter 14.28 CONCURRENCY Sections: 14.28.010 Purpose. 14.28.020 Development exempt from project concurrency review. 14.28.030 Concurrency facilities and services. 14.28.040 Project concurrency review.

More information

Chapter 4 Capital Facilities 2 3

Chapter 4 Capital Facilities 2 3 Draft March 0 0 Chapter Four Capital Facilities Introduction Capital facilities as defined here, and for purposes of the plan, include facilities owned by Whatcom County and other public entities. Capital

More information

Date of Issue: January 27, 2017 Closing Date & Time: 4:00 PM, March 3, 2017

Date of Issue: January 27, 2017 Closing Date & Time: 4:00 PM, March 3, 2017 Request for Qualifications For Planning Services: Gee Creek Plateau Sub Area Plan City of Ridgefield, Washington Date of Issue: January 27, 2017 Closing Date & Time: 4:00 PM, March 3, 2017 Project Overview:

More information

City Services Appendix

City Services Appendix Technical vices 1.0 Introduction... 1 1.1 The Capital Facilities Plan... 1 1.2 Utilities Plan... 2 1.3 Key Principles Guiding Bremerton s Capital Investments... 3 1.4 Capital Facilities and Utilities Addressed

More information

MEMORANDUM. Attachment 4 CITY COUNCIL DAN BUCKSHI, CITY MANAGER DATE: JANUARY 15, 2019

MEMORANDUM. Attachment 4 CITY COUNCIL DAN BUCKSHI, CITY MANAGER DATE: JANUARY 15, 2019 Attachment 4 MEMORANDUM TO: FROM: CITY COUNCIL DAN BUCKSHI, CITY MANAGER DATE: JANUARY 15, 2019 SUBJECT: MAJOR ACTIVITIES UPDATE FOR CITY COUNCIL RETREAT ON FEBRUARY 26, 2019 In addition to the original

More information

Introduction P O L I C Y D O C U M E N T P A R T 1

Introduction P O L I C Y D O C U M E N T P A R T 1 P O L I C Y D O C U M E N T P A R T 1 Introduction The 2035 General Plan for San Joaquin County presents a vision for the County's future and a strategy to make that vision a reality. The Plan is the result

More information

2013 ANNUAL AMENDMENT

2013 ANNUAL AMENDMENT 2013 ANNUAL AMENDMENT TO THE COMPREHENSIVE PLAN AND LAND USE REGULATORY CODE ASSESSMENT REPORT EXHIBIT B: ASSESSMENT OF APPLICATIONS July 24, 2012 Assessment of the applications was conducted using the

More information

CITY OF RAMSEY PRELIMINARY WORK PLAN FOR: 2040 COMPREHENSIVE PLAN UPDATE (DETAILED WORK PLANS TO BE DEVELOPED IN FUTURE STEPS)

CITY OF RAMSEY PRELIMINARY WORK PLAN FOR: 2040 COMPREHENSIVE PLAN UPDATE (DETAILED WORK PLANS TO BE DEVELOPED IN FUTURE STEPS) CITY OF RAMSEY PRELIMINARY WORK PLAN FOR: 2040 COMPREHENSIVE PLAN UPDATE (DETAILED WORK PLANS TO BE DEVELOPED IN FUTURE STEPS) PURPOSE: The intent of this document is to BEGIN discussions on developing

More information

6 MONTH PLANNING CALENDAR July January 2019

6 MONTH PLANNING CALENDAR July January 2019 6 MONTH PLANNING CALENDAR July January 2019 Revised: 6/28/2018 3:22 PM CALENDAR SUBJECT TO FREQUENT CHANGES Call City Clerk s Office for up-to-date information (970) 416-2774 Council Meetings begin at

More information

Chapter 4 Capital Facilities 2 3

Chapter 4 Capital Facilities 2 3 January, 0 0 0 0 Chapter Four Capital Facilities Introduction Capital facilities as defined here, and for purposes of the plan, include facilities owned by Whatcom County and other public entities. Capital

More information

CAPITAL IMPROVEMENTS ELEMENT

CAPITAL IMPROVEMENTS ELEMENT GOALS, OBJECTIVES AND POLICIES Goal 1.0.0. To annually adopt and utilize a 5-Year Capital Improvements Program and Annual Capital Budget to coordinate the timing and to prioritize the construction and

More information

ACTION STRATEGIES. Aurora Places is the guidebook

ACTION STRATEGIES. Aurora Places is the guidebook ACTION STRATEGIES Aurora Places is the guidebook for growth and development throughout city for the next 20 years. It outlines specific recommendations to successfully use the plan on a daily basis. This

More information

Planning Process---Requirement 201.6(b): An open public involvement process is essential to the development of an effective plan.

Planning Process---Requirement 201.6(b): An open public involvement process is essential to the development of an effective plan. Section 3 Capability Identification Requirements Planning Process---Requirement 201.6(b): An open public involvement process is essential to the development of an effective plan. Documentation of the Planning

More information

FINAL DRAFT CONSISTENCY REVIEW AND RECOMMENDATIONS REPORT

FINAL DRAFT CONSISTENCY REVIEW AND RECOMMENDATIONS REPORT CHRIS CHRISTIE Governor KIM GUADAGNO Lt. Governor State of New Jersey Highlands Water Protection and Planning Council 100 North Road (Route 513) Chester, New Jersey 07930-2322 (908) 879-6737 (908) 879-4205

More information

REPORT TO THE CITY COUNCIL rd Avenue NE, Woodinville, WA

REPORT TO THE CITY COUNCIL rd Avenue NE, Woodinville, WA To: From: By: Subject: CITY OF WOODINVILLE, WA REPORT TO THE CITY COUNCIL 17301 133rd Avenue NE, Woodinville, WA 98072 WWW.CLWOODINVILLE.WA.US Honorable City Council Richard A. Leahy, City Manager 6 David

More information

INTRODUCTION INTRODUCTION 1

INTRODUCTION INTRODUCTION 1 INTRODUCTION The provides a blueprint for the future growth and development of the City in the coming decade. The Comprehensive Plan is long-range in scope and represents a comprehensive update of the

More information

Planning Commission 101:

Planning Commission 101: : The Nuts and Bolts of Planning March 6, 2019 Panelists» David Early, AICP, Senior Advisor, PlaceWorks» Marc Roberts, City Manager, City of Livermore» Bill Anderson, Director of City and Regional Planning,

More information

Introduction and Participation Horizon 2030 Comprehensive Plan (Prepared 2010)

Introduction and Participation Horizon 2030 Comprehensive Plan (Prepared 2010) HORIZON 2030 : UTILIZING THE VISION TO UPDATE THE COMPREHENSIVE PLAN Plan Purpose: Achieving a New Community Planning Vision for the City of West Melbourne The City of West Melbourne Horizon 2030 Comprehensive

More information

SNOHOMISH COUNTY COUNCIL SNOHOMISH COUNTY, WASHINGTON AMENDED ORDINANCE NO

SNOHOMISH COUNTY COUNCIL SNOHOMISH COUNTY, WASHINGTON AMENDED ORDINANCE NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 ADOPTED: 11/21/17 EFFECTIVE: SNOHOMISH COUNTY COUNCIL SNOHOMISH

More information

ORDINANCE NO

ORDINANCE NO ORDINAE NO. 12 094 Introduced by: Mr. Reda, Mr. Tackett Date of introduction: September 4, 2012 TO REVISE CHAPTER 40 OF THE NEW CASTLE COUNTY CODE (ALSO KNOWN AS THE UNIFIED DEVELOPMENT CODE OR UDC ) REGARDING

More information

AREA STRUCTURE PLAN PROCESS

AREA STRUCTURE PLAN PROCESS AREA STRUCTURE PLAN PROCESS Planning and Development Information Guide CITY OF CAMROSE 5204-50 AVENUE CAMROSE ALBERTA T4V 0SB WWW.CAMROSE.CA P a g e 1 Table of Contents 1.0 Introduction... 2 2.0 What is

More information

Road Map to Washington s Future. Phase I: Pre-Assessment Report

Road Map to Washington s Future. Phase I: Pre-Assessment Report Road Map to Washington s Future Phase I: Pre-Assessment Report August 1, 2017 The William D. Ruckelshaus Center is a neutral resource for collaborative problem solving in the State of Washington and the

More information

City of Seattle COMPREHENSIVE PLAN AMENDMENT APPLICATION

City of Seattle COMPREHENSIVE PLAN AMENDMENT APPLICATION City of Seattle COMPREHENSIVE PLAN AMENDMENT APPLICATION Use this application to propose a change in the policies, future land use map, appendices, or other components of the adopted City of Seattle Comprehensive

More information

CITY OF WINCHESTER KENTUCKY/PLANNING & COMMUNITY DEVELOPMENT REQUEST FOR PROPOSAL COMPREHENSIVE PLAN UPDATE

CITY OF WINCHESTER KENTUCKY/PLANNING & COMMUNITY DEVELOPMENT REQUEST FOR PROPOSAL COMPREHENSIVE PLAN UPDATE CITY OF WINCHESTER KENTUCKY/PLANNING & COMMUNITY DEVELOPMENT REQUEST FOR PROPOSAL COMPREHENSIVE PLAN UPDATE OCTOBER 3, 2016 TABLE OF CONTENTS SUMMARY..2 PROPOSAL GUIDELINES AND REQUIREMENTS... 3 TIMELINE

More information

1. I N T R O D U C T I O N

1. I N T R O D U C T I O N INTRODUCTION The Chico 2030 General Plan is a statement of community priorities to guide public decisionmaking. It provides a comprehensive, long-range, and internally consistent policy framework for the

More information

Public Works and Development Services

Public Works and Development Services City of Commerce Capital Improvement Program Prioritization Policy Public Works and Development Services SOP 101 Version No. 1.0 Effective 05/19/15 Purpose The City of Commerce s (City) Capital Improvement

More information

Urban Growth Area Review City of Bellingham Preliminary UGA Growth Allocation Proposal

Urban Growth Area Review City of Bellingham Preliminary UGA Growth Allocation Proposal Bellingham Growth Allocation Proposal December 3, 2013 Urban Growth Area Review City of Bellingham Preliminary UGA Growth Allocation Proposal December 3, 2013 I. Introduction Growth Management Act (GMA)

More information

6 MONTH PLANNING CALENDAR May November 2018

6 MONTH PLANNING CALENDAR May November 2018 6 MONTH PLANNING CALENDAR May November 2018 Revised: 5/10/2018 2:59 PM CALENDAR SUBJECT TO FREQUENT CHANGES Call City Clerk s Office for up-to-date information (970) 416-2774 Council Meetings begin at

More information

Capital Facilities Planning Put Your Money Where Your Mouth Is

Capital Facilities Planning Put Your Money Where Your Mouth Is Capital Facilities Planning Put Your Money Where Your Mouth Is Speakers Joyce Phillips, AICP, Senior Planner, WA State Dept. of Commerce, Growth Management Lynn Kohn, Regional Services Coordinator, WA

More information

Council Communication February 21, 2017, Business Meeting

Council Communication February 21, 2017, Business Meeting Council Communication February 21, 2017, Business Meeting Second Reading of an ordinance amending the Flood Plain Corridor Lands Map FROM: Bill Molnar, Director of Community Development, bill.molnar@ashland.or.us

More information

Plan Implementation AICP Exam Review

Plan Implementation AICP Exam Review Plan Implementation AICP Exam Review GPA Fall Conference October 9, 2013 Gary A. Cornell, FAICP Outline of AICP Exam Content Visioning and goal setting Quantitative and qualitative research methods Collecting,

More information

Cancelled. Final Action

Cancelled. Final Action RESOLUTION NO. R2018-16 Baseline Budget and Schedule for the Lynnwood Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 05/10/2018 05/24/2018 Cancelled

More information

STAFF REPORT SAUSALITO CITY COUNCIL

STAFF REPORT SAUSALITO CITY COUNCIL STAFF REPORT SAUSALITO CITY COUNCIL AGENDA TITLE: Annual Review of City Council Priority Calendar Step One: Reviewing the Projects RECOMMENDED MOTION: Move to approve the items to be Considered for the

More information

POLICY STATEMENT: ESTABLISHING STATUTORY DISTRICTS IN DENVER

POLICY STATEMENT: ESTABLISHING STATUTORY DISTRICTS IN DENVER CITY AND COUNTY OF DENVER Department of Public Works Infrastructure Planning & Programming, Dept. 509 POLICY STATEMENT: ESTABLISHING STATUTORY DISTRICTS IN DENVER The magnitude of local and regional infrastructure

More information

BOISE BENCH AREA URBAN RENEWAL DISTRICT

BOISE BENCH AREA URBAN RENEWAL DISTRICT BOISE BENCH AREA URBAN RENEWAL DISTRICT Discussion Draft Prepared by CCDC 3/17/2016 DOCUMENT DELIVERABLES REQUIRED 1. Bench Area Master Plan 2. Bench Area Eligibility Study 3. Bench Area Specific Plan

More information

Pennsylvania Municipalities Planning Code. Recent amendments Beginning with Acts 67 & 68 of 2000 First Edition, January 2003

Pennsylvania Municipalities Planning Code. Recent amendments Beginning with Acts 67 & 68 of 2000 First Edition, January 2003 Pennsylvania Municipalities Planning Code Recent amendments Beginning with Acts 67 & 68 of 2000 First Edition, January 2003 Section Nature of change Description Amendatory act ARTICLE I General Provisions

More information

Traffic Impact Analysis Guidelines Methodology

Traffic Impact Analysis Guidelines Methodology York County Government Traffic Impact Analysis Guidelines Methodology Implementation Guide for Section 154.037 Traffic Impact Analysis of the York County Code of Ordinances 11/1/2017 TABLE OF CONTENTS

More information

CAPITAL IMPROVEMENTS ELEMENT

CAPITAL IMPROVEMENTS ELEMENT Goals, Objectives and Policies CAPITAL IMPROVEMENTS ELEMENT GOAL 9.1.: USE SOUND FISCAL POLICIES TO PROVIDE ADEQUATE PUBLIC FACILITIES TO ALL RESIDENTS WITHIN THE CITY. FISCAL POLICIES MUST PROTECT INVESTMENTS

More information

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: SEPTEMBER 11, 2006 CMR: 346:06

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: SEPTEMBER 11, 2006 CMR: 346:06 21a TO: HONORABLE CITY COUNCIL FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: SEPTEMBER 11, 2006 CMR: 346:06 SUBJECT: 901 SAN ANTONIO ROAD [06PLN-00031, 06PLN-00050]: REQUEST BY

More information

INTRODUCTION. Introduction Page 1 of 5. G:\Comp\Adopted Comprehensive Plans\15. Cylce 16-2 and 16-3\Elements not changed\_d. Introduction.

INTRODUCTION. Introduction Page 1 of 5. G:\Comp\Adopted Comprehensive Plans\15. Cylce 16-2 and 16-3\Elements not changed\_d. Introduction. INTRODUCTION Page 1 of 5 G:\Comp\Adopted Comprehensive Plans\15. Cylce 16-2 and 16-3\Elements not changed\_d..doc INTRODUCTION In 1985 the State Legislature passed Florida's Growth Management Act. Officially

More information

1 INTRODUCTION 1.1 PURPOSE

1 INTRODUCTION 1.1 PURPOSE 1 INTRODUCTION 1.1 PURPOSE The County of Mariposa Board of Supervisors proposes to adopt the Mariposa County General Plan. This General Plan will replace the County s current General Plan, which was prepared

More information

1. Approve and accept the Comprehensive Park Design for the Orange County Great Park.

1. Approve and accept the Comprehensive Park Design for the Orange County Great Park. REQUEST FOR CITY COUNCIL ACTION COUNCIL MEETING DATE: TITLE: O~GE COUNTY GREAT PARK COMP~ PARK DESIGN City~ RECOMMENDED ACTION: 1. Approve and accept the Comprehensive Park Design for the Orange County

More information

Case No.: N/A Staff Phone #: (805) Environmental Document: N/A 1.0 REQUEST

Case No.: N/A Staff Phone #: (805) Environmental Document: N/A 1.0 REQUEST SANTA BARBARA COUNTY MONTECITO PLANNING COMMISSION Staff Report/Work Program for FY 2014-2015 Long Range Planning Division Planning and Development Department Hearing Date: February 19, 2014 Staff Report

More information

SFY 2018 (July 1, 2017 to June 30, 2018) Annual Report

SFY 2018 (July 1, 2017 to June 30, 2018) Annual Report SFY 2018 (July 1, 2017 to June 30, 2018) Annual Report Thurston Regional Planning Council UNIFIED PLANNING WORK PROGRAM Annual Report for second year of TRPC s UPWP State Fiscal Years 2017-2018 (July 1,

More information

6 MONTH PLANNING CALENDAR September April 2019

6 MONTH PLANNING CALENDAR September April 2019 6 MONTH PLANNING CALENDAR September April 2019 Revised: 10/4/2018 11:44 AM CALENDAR SUBJECT TO FREQUENT CHANGES Call City Clerk s Office for up-to-date information (970) 416-2774 Council Meetings begin

More information

Chapter 4 Capital Facilities 2 3

Chapter 4 Capital Facilities 2 3 July, 0 0 0 Chapter Four Capital Facilities Introduction Capital facilities as defined here, and for purposes of the plan, include facilities owned by Whatcom County and other public entities. Capital

More information

Schedule of Fees & Escrow Charges

Schedule of Fees & Escrow Charges PLANNING COMMISSION FEES (effective 6/8/10) Site Plan Review Filing Fees... $ 400.00 a) $1,000 (less than 50 acres, 150 units or 200,000 bldg sq ft) Site Plan Review for Attached or Multi-Family Housing

More information

TABLE OF CONTENTS LIST OF TABLES

TABLE OF CONTENTS LIST OF TABLES TABLE OF CONTENTS A. GOALS, OBJECTIVES, AND POLICIES... 3 B. SUMMARY... 17 LIST OF TABLES Table IX 1: City of Winter Springs Five-Year Schedule of Capital Improvements (SCI) FY 2013/14-2017/18... 11 Table

More information

Agenda Item B.8 CONSENT CALENDAR Meeting Date: May 19, 2015

Agenda Item B.8 CONSENT CALENDAR Meeting Date: May 19, 2015 Agenda Item B.8 CONSENT CALENDAR Meeting Date: May 19, 2015 TO: FROM: CONTACT: SUBJECT: Mayor and Councilmembers Jennifer Carman, Planning and Environmental Review Director Anne Wells, Advance Planning

More information

CENTRAL SOMA PLAN & IMPLEMENTATION STRATEGY

CENTRAL SOMA PLAN & IMPLEMENTATION STRATEGY http://centralsoma.sfplanning.org CENTRAL SOMA PLAN & IMPLEMENTATION STRATEGY Adoption Hearing Planning Commission May 10, 2018 1 TODAY S ACTIONS 1. Certification of the Final EIR 2. Adoption of CEQA Findings

More information

Vision, Mission, Values and Critical Success Factors

Vision, Mission, Values and Critical Success Factors Approved Budget Vision, Mission, Values and Critical Success Factors The City of Tallahassee, through workshops, surveys and commission retreats has developed the following vision, mission, and target

More information

6 MONTH PLANNING CALENDAR July January 2019

6 MONTH PLANNING CALENDAR July January 2019 6 MONTH PLANNING CALENDAR July January 2019 Revised: 7/19/2018 2:09 PM CALENDAR SUBJECT TO FREQUENT CHANGES Call City Clerk s Office for up-to-date information (970) 416-2774 Council Meetings begin at

More information

City of Tacoma Planning Commission

City of Tacoma Planning Commission City of Tacoma Planning Commission Stephen Wamback, Chair Anna Petersen, Vice-Chair Chris Beale Carolyn Edmonds Jeff McInnis Brett Santhuff Andrew Strobel Dorian Waller Jeremy Woolley MINUTES (Approved

More information

Village Plan Commission Ordinances

Village Plan Commission Ordinances Village Plan Commission Ordinances Following are three examples of Village Plan Commission ordinances that create and establish plan commissions. Sample 1 is the longest and most thorough ordinance of

More information

CITY OF PITT MEADOWS

CITY OF PITT MEADOWS RECOMMENDATIONS: THAT Council: CITY OF PITT MEADOWS COUNCIL IN COMMITTEE REPORT To: Chief Administrative Officer File No: From: Acting Director of Bylaw/Policy No: 2635- Operations and 2013 Development

More information

City of Georgetown 2030 Comprehensive Plan. Chapter 4. - Plan Administration

City of Georgetown 2030 Comprehensive Plan. Chapter 4. - Plan Administration Chapter 4. - Plan Administration 3.90 Chapter 4. - Plan Administration 4. Plan Administration OVERVIEW While the City of Georgetown 2030 Comprehensive Plan is fundamentally a policy document, the goals,

More information

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT COMBINED MONTHLY AND QUARTERLY PROGRESS REPORT FOR QUARTER ENDING JUNE 30, 2014 GEORGE MASSEY TUNNEL MONTHLY STATUS REPORT SEPTEMBER 2017 FOREWORD TO MONTHLY STATUS REPORT On September 6, 2017, the Minister

More information

PLANNING DEPARTMENT ADMINISTRATION

PLANNING DEPARTMENT ADMINISTRATION PLANNING DEPARTMENT ADMINISTRATION Long-Range Planning Zoning and Land Development Land Use and Design Community Improvement and Transportation Rezoning and Development Regulations Development Review Transit

More information

Town of Tyrone Planning Commission Meeting Minutes Thursday June 22, :00 PM

Town of Tyrone Planning Commission Meeting Minutes Thursday June 22, :00 PM Town of Tyrone Planning Commission Meeting Minutes Thursday June 22, 2017 7:00 PM Present: Chairman Wil James Vice-Chairman Jeff Duncan Commission Member Carl Schouw Commission Member David Nebergall Commission

More information

City of Manassas, Virginia Planning Commission Meeting AGENDA. Work Session

City of Manassas, Virginia Planning Commission Meeting AGENDA. Work Session City of Manassas, Virginia Planning Commission Meeting AGENDA Work Session 9027 Center Street Manassas, VA 20110 Second Floor Conference Room Wednesday, May 02, 2018 Call to Order - 6:30 p.m. Roll Call

More information

Proposed Amendment to Rules Governing Data Service Organizations, Minnesota Rules chapter 2705

Proposed Amendment to Rules Governing Data Service Organizations, Minnesota Rules chapter 2705 This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/sonar/sonar.asp Minnesota Department

More information

1. identifies the required capacity of capital improvements to serve existing and future development based on level-of-service (LOS) standards;

1. identifies the required capacity of capital improvements to serve existing and future development based on level-of-service (LOS) standards; DIVISION 4.200 CAPITAL IMPROVEMENTS ELEMENT SECTION 4.201 INTRODUCTION The purpose of the Capital Improvements Element (CIE) is to tie the capital improvement needs identified in the other elements to

More information

UNOFFICIAL COPY OF HOUSE BILL Read and Examined by Proofreaders:

UNOFFICIAL COPY OF HOUSE BILL Read and Examined by Proofreaders: UNOFFICIAL COPY OF HOUSE BILL 1141 L6 (6lr1312) ENROLLED BILL -- Environmental Matters/Education, Health, and Environmental Affairs -- Introduced by Delegates McIntosh, Bobo, Bronrott, Cane, V. Clagett,

More information

Glossary Candidate Roadway Project Evaluation Form Project Scoring Sheet... 17

Glossary Candidate Roadway Project Evaluation Form Project Scoring Sheet... 17 Kitsap County Public Works Transportation Project Evaluation System 2017 Table of Contents Introduction... 1 Four-Tier system... 4 Tier 1 - Transportation Improvement Program (TIP)... 4 Tier 2 Prioritized

More information

DRAFT 2040 COMPREHENSIVE PLAN UPDATE

DRAFT 2040 COMPREHENSIVE PLAN UPDATE DRAFT 2040 COMPREHENSIVE PLAN UPDATE PLANNING COMMISSION PUBLIC HEARING TUESDAY, MAY 22, 2018 05/22/2018 DRAFT 2040 COMPREHENSIVE PLAN UDPATE - PUBLIC HEARING 1 What is a Comprehensive Plan? Framework

More information

Nassau County 2030 Comprehensive Plan. Capital Improvements Element (CI) Goals, Objectives and Policies. Goal

Nassau County 2030 Comprehensive Plan. Capital Improvements Element (CI) Goals, Objectives and Policies. Goal (CI) Goal Based on the premise that existing taxpayers should not have to bear the financial burden of growth-related infrastructure needs, Ensure the orderly and efficient provision of infrastructure

More information

REGIONAL EVALUATION FRAMEWORK 1.0 INTRODUCTION 2.0 PURPOSE 3.0 DEFINITIONS. Edmonton Metropolitan Region Planning Toolkit

REGIONAL EVALUATION FRAMEWORK 1.0 INTRODUCTION 2.0 PURPOSE 3.0 DEFINITIONS. Edmonton Metropolitan Region Planning Toolkit Edmonton Metropolitan Region Planning Toolkit Re-imagine. Plan. Build. Edmonton Metropolitan Region Growth Plan 1.0 INTRODUCTION On October 26, 2017, the Government of Alberta approved the Edmonton Metropolitan

More information

Planning and Growth Management Committee

Planning and Growth Management Committee Agenda Regular Planning and Growth Management Committee Meeting No. 20 Contact Merle MacDonald, Committee Administrator Meeting Date Thursday, November 13, 2008 Phone 416-392-7340 Start Time 9:30 AM E-mail

More information

ADMINISTRATIVE ANALYST (Class Code 1590) TASK LIST

ADMINISTRATIVE ANALYST (Class Code 1590) TASK LIST ADMINISTRATIVE ANALYST (Class Code 1590) TASK LIST A. General Administration 1. Writes narrative material such as letters, memos, and reports on various personnel, budgetary, contractual, grant, and policy

More information

[Business and Tax Regulations, Planning Codes - Central South of Market Housing Sustainability District]

[Business and Tax Regulations, Planning Codes - Central South of Market Housing Sustainability District] FILE NO. ORDINANCE NO. 1 [Business and Tax Regulations, Planning Codes - Central South of Market Housing Sustainability District] Ordinance amending the Business and Tax Regulations and Planning Codes

More information

University Link LRT Extension

University Link LRT Extension (November 2007) The Central Puget Sound Regional Transit Authority, commonly known as Sound Transit, is proposing to implement an extension of the Central Link light rail transit (LRT) Initial Segment

More information

Section II: Overview of the Annual Growth Policy 1. Background

Section II: Overview of the Annual Growth Policy 1. Background Section II Page 1 Section II: Overview of the Annual Growth Policy 1 Background The Montgomery County Council adopted the Adequate Public Facilities Ordinance (APFO) in 1973 as part of the Montgomery County

More information

FINAL CONSISTENCY REVIEW AND RECOMMENDATIONS REPORT

FINAL CONSISTENCY REVIEW AND RECOMMENDATIONS REPORT CHRIS CHRISTIE Governor KIM GUADAGNO Lt. Governor State of New Jersey Highlands Water Protection and Planning Council 100 North Road (Route 513) Chester, New Jersey 07930-2322 (908) 879-6737 (908) 879-4205

More information

Planning Commission Application Summary

Planning Commission Application Summary Planning Commission Application Summary Project Name: Galena Park Place Zone Change Address: 538 W. Fox Chase Dr. Current Zoning: CC Hearing Date: April 28, 2016 Background This rezone fixes a zoning discrepancy

More information

Chapter VIII. General Plan Implementation A. INTRODUCTION B. SUBMITTAL AND APPROVAL OF SUBSEQUENT PROJECTS C. SPHERE OF INFLUENCE

Chapter VIII. General Plan Implementation A. INTRODUCTION B. SUBMITTAL AND APPROVAL OF SUBSEQUENT PROJECTS C. SPHERE OF INFLUENCE Chapter VIII General Plan Implementation A. INTRODUCTION This chapter presents a variety of tools available to the (City) to help build the physical city envisioned in Chapter III. While the Modesto provides

More information

PLEASANT GROVE, UTAH TRANSPORTATION IMPACT FEE FACILITIES PLAN AND ANALYSIS

PLEASANT GROVE, UTAH TRANSPORTATION IMPACT FEE FACILITIES PLAN AND ANALYSIS PLEASANT GROVE, UTAH TRANSPORTATION IMPACT FEE FACILITIES PLAN AND OCTOBER 2012 PREPARED BY: LEWIS YOUNG ROBERTSON & BURNINGHAM IMPACT FEE CERTIFICATION Impact Fee Facilities Plan (IFFP) Certification

More information

IMPLEMENTATION A. INTRODUCTION C H A P T E R

IMPLEMENTATION A. INTRODUCTION C H A P T E R C H A P T E R 11 IMPLEMENTATION A. INTRODUCTION This chapter addresses implementation of the General Plan. The Plan s seven elements include 206 individual actions. 1 Many are already underway or are on-going.

More information

Fiscal Annexation Analysis. FINAL REPORT: January 14, 2009

Fiscal Annexation Analysis. FINAL REPORT: January 14, 2009 Fiscal Annexation Analysis FINAL REPORT: January 14, 2009 120 Lakeside Avenue Suite 200 Seattle, Washington 98122 P (206) 324-8760 www.berkandassociates.com Helping Communities and Organizations Create

More information

Georgetown Planning Department Plan Annual Update: Background

Georgetown Planning Department Plan Annual Update: Background 2030 Plan Annual Update: 2013 Background The 2030 Comprehensive Plan was unanimously adopted by City Council on February 26, 2008. The Plan was an update from Georgetown s 1988 Century Plan. One of the

More information

Kelly Howsley Glover, Long Range Planner Wasco County Planning Commission. Wasco County Planning Department

Kelly Howsley Glover, Long Range Planner Wasco County Planning Commission. Wasco County Planning Department STAFF REPORT PLALEG-16-08-001 Amendments to the Wasco County Comprehensive Plan Request: Prepared by: Prepared for: Applicant: Staff Recommendation: Amend the Wasco County Comprehensive Plan 1. Change

More information

Report to: Development Services Committee Date: June 26, 2017

Report to: Development Services Committee Date: June 26, 2017 SUBJECT: New Provincial Plans Release of the 2017 Growth Plan, Greenbelt Plan and Oak Ridges Moraine Conservation Plan PREPARED BY: Policy and Research, Planning and Urban Design REVIEWED BY: Marg Wouters,

More information

General Discussion A&E Services Consultants

General Discussion A&E Services Consultants WSDOT Local Agency Guidelines M 36-63.01 Chapter 31 Chapter 31 General Discussion To be eligible for reimbursement of Federal Highway Administration (FHWA) funds for payments to a consultant, the procedures

More information

ST/SGB/2018/3 1 June United Nations

ST/SGB/2018/3 1 June United Nations 1 June 2018 United Nations Regulations and Rules Governing Programme Planning, the Programme Aspects of the Budget, the Monitoring of Implementation and the Methods of Evaluation Secretary-General s bulletin

More information

natural resources, and functional street system. Both are proposed to be updated through the periodic review process.

natural resources, and functional street system. Both are proposed to be updated through the periodic review process. natural resources, and functional street system. Both are proposed to be updated through the periodic review process. On May 20, 2008, the City received a letter from the Oregon Department of Land Conservation

More information

Updating LCP Implementation Plan (IP) Procedures

Updating LCP Implementation Plan (IP) Procedures STATE OF CALIFORNIA NATURAL RESOURCES AGENCY ARNOLD SCHWARZENEGGER, GOVERNOR CALIFORNIA COASTAL COMMISSION 45 FREMONT, SUITE 2000 SAN FRANCISCO, CA 94105-2219 VOICE (415) 904-5200 FAX (415) 904-5400 TDD

More information