TABLE 1 BICYCLE AND PEDESTRIAN PROGRAM Measure B Revenues and Expenditures

Size: px
Start display at page:

Download "TABLE 1 BICYCLE AND PEDESTRIAN PROGRAM Measure B Revenues and Expenditures"

Transcription

1 Alameda CTC Programs Annual Compliance Report Reporting Year TABLE BICYCLE AND PEDESTRIAN PROGRAM Measure B Revenues and DATE : 2/9/203 (revised 2/2/4) Column A Column B Column C Column D Column E Column F Column G Column H Column I Column J Starting MB Balance FY 2 Passthrough + Interest FY 23 MB Fund Balance MB Passthrough Fund Revenue 3,500 52,064 Ending MB Balance FY 23 MB Passthrough Fund Other MB Other MB Local Streets and Roads FY 23 Discretionary Grant Fund Fund MB Passthrough Fund Interest (Must match Table 2: Column L) Ending MB Passthrough Fund Balance (Must match Table 2: Column M) (Must match Table 2: Column N) Other MB 54 24,02 4,606 from Table : 24,02 from Table 2: 24,02 0 VERIFICATION CHECK: Values to the bottom right are automatically drawn from Table and Table 2 (corresponding expenditures fund totals) to ensure accurate reporting. These numbers must match each other. Measure B Passthrough Funds FY 23 MB Passthrough Revenues and Other Measure B Funds FY 23 NonMeasure B Funds FY 23 List the specific types of nonmeasure B Funding.* NonMB Funding Source NonMB (Should match Table 2: Column O) Column Descriptions MB Balance: Value must match the local agency's audit report figure for the ending MB balance reported in FY 2. MB Passthrough Revenue: Value is the actual MB revenues for FY 23. MB Passthrough Interest: Value is the MB Passthrough Interest earned on unspent funds during FY 23. MB : Value must match the agency audit report figure AND total sum of MB passthrough expenditures calculated on Table 2: Column L. Other Measure B Discretionary Grant Fund This includes Measure B Bicycle/Pedestrian grant expenditures. Dollar figures entered into Table must match with Table 2 Column M AND the value listed in the agency's audit report. Other Measure B: Local Streets & Roads This includes expenditures from Local Streets and Roads passthrough funds used for Bicycle/Pedestrian projects. Dollar figures entered into Table must match with Table 2 Column N AND the value listed in the agency's audit report. Do not include Measure B Capital Expenses. NOTES ) The numbers on Table must be consistent with your Audited Financial Statements. 2) The expenditures inputted in Table must match expenditures calculated on Table 2. Additional Information: Use the Box Below to clarify revenues and expenditures. The received 2,772 in Measure B Grants reimbursement for the Albany Pedestrian Master Plan and Update to the Albany Bicycle Master Plan (A09002). VERIFICATION CHECK: Values to the bottom right are automatically drawn from Table and Table 2 (Column O) to ensure accurate reporting. These numbers must match each other. NonMB: NonMB Table : NonMB Table 2: 859,965 NonMeasure B Funding includes any nonmeasure B funding sources such as state, federal, or local funding.

2 This Page Intentionally Left Blank.

3 Alameda CTC Programs Annual Compliance Report Reporting Year TABLE 2 BICYCLE AND PEDESTRIAN PROGRAM Measure B and Accomplishments (FY 2023) No. Local ID Number Status Column A Column B Column C Column D Column E Column F Column G Column H Column I Column J Column K* Column L** Column M** Column N** Column O Column P Column Q Column R Column S Category (Dropdown Menu) DATE: 2/9/203 (revised 2/2/4) Phase (Dropdown Menu) Description Type (Dropdown Menu) Name Description Benefits (describe project's benefit to the implementation area) Status (at the end of FY 23) (Dropdown Menu) Quantity Completed in FY 23 Units for Quantity (Dropdown Menu) Deliverables FY 23 Description (other details about unit or quantity) Estimated Completed Quantity Funded by Measure B FY 23 (auto calculates) MB Passthrough Bike/Ped Other MB Bike/Ped Countywide Discretionary Fund Other MB Bike/Ped Local Streets and Roads Fund NonMB Funding (federal & state grants, city/local funds, etc.) Cost in FY 23 (L+M+N+O= P) (auto calculates) Enter the Contract amount if 50K or more of this was for an Individual Contract Did the Governing Board Approve this? (Dropdown Menu) Approvals and Plans Is this in a Countywide Bicycle or Pedestrian Plan, if so which one? (Dropdown Menu) N/A Bicycle Construction Bike Parking Bike Racks Citywide Install bicycle parking at schools, parks, public buildings, and along the commercial district (San Pablo Avenue and Solano Avenue). In the 2023 fiscal year, the City installed 4 bike racks in the commercial district (8 bicycle parking spaces), a 2 P93 Bike and Ped PS&E Bikeways (nonclass I) Buchanan Marin BikewayPhase III Design intersection improvements at San Pablo/Marin intersection. Design the extension of the bicycle lanes from Cornell Avenue to San Pablo Avenue. Provide bike parking to encourage the use of bicycles as mode of transportation within the City. The construction of I and II of the Buchanan Bikeway, which was finalized in November 203, shortened the existing gap between the Ohlone Greenway and the Bay Trail. Phase III of the project started design process in June 203, Construction is slated for 205. Measure B pass through funds are being used to match two competititve grants for this project: A 66,00 BTA grant and Measure B grant in the amount of 536,000. Continuing/Ongoing Initiated in FY 23 6 Bike Parking Spaces Other (describe in Column J) City installed 4 bike racks with capacity to park two bicycles each along its commercial district and four bike lockers for 8 bikes (2 bikes per locker) at City Hall. This project is in PS&E Phase and the design process in expected to run through FY 203/ ,587 5,587 No Both Plans,34 6,56 7,470 00,000 Ped Plan 3 Q48 Bike and Ped Completion/Closeout Master Plan Albany Active Transportation Plan Develop the first Pedestrian Master Plan and Update the Bicycle Master Plan for the The Albany ATP recomends 27 bicycle and pedestrian projects that when implemented would make the City a better place to bike and walk encouraging its residents and visitors to engage in active modes of transportation ClosedOut in FY 23 Other (describe in Column J) The actual plan along with the environmental work was completed in June 20, but final materials, final invoicing, and presentation of the plan to the BPAC meeting in September 202 extended into the 202/3 fiscal year to October 30, ,29 2,29 42,000 Both Plans 4 P87 Bike and Ped Scoping, Feasibility, Planning Master Plan Complete Streets Concept Design for San Pablo Avenue and Buchanan Street consists on development concept plans for safety improvements along San Pablo Avenue and Buchanan Streets in a way that accommodates the needs of all users of the roadways. Improved safety for Continuing/Ongoing pedestrians, cyclists, children, seniors, people with disabilities, transit riders, and motorists. Increased use of alternative modes of transportation, improved public health and greater sense of community and place. Other (describe in Column J) 50% of the Plan was completed in FY2/3. About 32% percent of the expenses were funded by pass through Measure B. Column M does not accept percentages, therefore, I cannot key in this figure , ,07 4,559 75,900 Both Plans 5 P64 Pedestrian Construction Pedestrian Crossing Improvements Marin Santa Fe Safe Routes to School Intersection improvements The project consists of installing bulbouts at the four legs of the interseciton of Marin and Santa Fe Avenues. Install a new traffic signal with count down head and a blank out NRTOR restriction during school hours. Install speed humps adjacent to Marin Elementary School on Santa Fe Avenue and solar speed feedback signs on Marin Avenue along the school approach. Improved safety for children and other pedestrains crossign Marin and Santa Fe Avenues. ClosedOut in FY 23 Intersections 0.0,383 86, , ,67 Ped Plan 6 G84 Bike and Ped Operations Staffing Safe Routes to School Program Coordinator and Educational Program The City obtained a federal grant to fund a SRTS Coordinator position for three years and to continue funding its SR2S program in the three Elementary Schools and the Middle School. Encouragement, and education for increasing the walk and bike mode of transportation to and from schools. Cooridnate with school staff and parents for the improvement of pedestrain and bicyclits safety around schools. Continuing/Ongoing Other (describe in Column J) Years ,735 26,792 85,000 Both Plans 7 #DIV/0! 8 #DIV/0! 9 #DIV/0! 0 #DIV/0! #DIV/0! 2 #DIV/0! 3 #DIV/0! 4 #DIV/0! 5 #DIV/0! 6 #DIV/0! 7 #DIV/0! 8 #DIV/0! 9 #DIV/0!

4 No. Local ID Number Alameda CTC Programs Annual Compliance Report Reporting Year Status Column A Column B Column C Column D Column E Column F Column G Column H Column I Column J Column K* Column L** Column M** Column N** Column O Column P Column Q Column R Column S Category (Dropdown Menu) Phase (Dropdown Menu) Description Type (Dropdown Menu) Name Description Benefits (describe project's benefit to the implementation area) Status (at the end of FY 23) (Dropdown Menu) Quantity Completed in FY 23 Units for Quantity (Dropdown Menu) Deliverables FY 23 Description (other details about unit or quantity) Estimated Completed Quantity Funded by Measure B FY 23 (auto calculates) MB Passthrough Bike/Ped Other MB Bike/Ped Countywide Discretionary Fund Other MB Bike/Ped Local Streets and Roads Fund NonMB Funding (federal & state grants, city/local funds, etc.) Cost in FY 23 (L+M+N+O= P) (auto calculates) Enter the Contract amount if 50K or more of this was for an Individual Contract Did the Governing Board Approve this? (Dropdown Menu) Approvals and Plans Is this in a Countywide Bicycle or Pedestrian Plan, if so which one? (Dropdown Menu) 20 #DIV/0! 2 #DIV/0! 22 #DIV/0! 23 #DIV/0! 24 #DIV/0! 25 #DIV/0! Note: Definitions for each dropdown menu appear as Comments (scroll over the column title or in the Review mode, choose "Show All Comments"). The document is set up to print Comments at the end. TOTALS: 24, , , ,067 Additional Information: Use the Box Below to clarify expenses or to provide additional information. * Column K: ( Measure B Dollars Spent X Quantity) / Cost = Measure BFunded Quantity ** Columns LN: The dollar figures inputted must be consistent with your agency's Audited Financial Statements. Pull Down Menu Options Bicycle Scoping, Feasibility, Planning Bike Parking Planning in FY 23 Bike Parking Spaces Bike Plan Bike and Ped Environmental Bikeways (nonclass I) Initiated in FY 23 Intersections No Ped Plan Pedestrian PS&E Bridges and Tunnels Continuing/Ongoing Lane Miles Both Plans RightofWay Education and Promotion ClosedOut in FY 23 Linear Feet Neither Plan Construction Master Plan Number of People/Passengers Maintenance Multiuse Paths (Class I) Number of Oneway Unduplicated Trips Operations Pedestrian Crossing Improvements Square Feet Completion/Closeout Safety Improvements Vehicles Purchased Other Sidewalks and Ramps Other (describe in Column J) Signage Signals Staffing Traffic Calming Other (describe in Column E)

5 Alameda CTC Programs Annual Compliance Report Reporting Year TABLE 3 BICYCLE AND PEDESTRIAN PROGRAM Measure B s and Fund Reserves DATE : 2/9/203 (revised 2/2/4) Directions There are FOUR Sections on this worksheet to be completed by the local agency. ) In the EVEN Numbered Boxes, enter the FY 23 and Reserve Activities, and the Actual that occurred in FY 23. 2) In the ODD Numbered Boxes, allocate the FY 34 Measure B Funds Available (Box, in Green) to these four sections designated for FY 34. AUTO CALCULATED REFERENCE TABLES Auto Box Provides a Summary of Measure B Funds Available in FY 34. The total in the GREEN box is the amount to be allocated to the FY 34 through FY 67 s and Fund Reserves (ODD numbered boxes). Auto Box 2 Provides a tracking summary comparison of Measure B FY 23 and Actual. Auto Box 3 Measure B Summary for FY 34 through FY 67 using the available Measure B funds available (GREEN box). BOX BOX 2 Measure B Available in FY 34 Measure B FY 23 vs. Actual FY 23 Measure B Ending Passthrough Balance (From Table : Column E) 4,606 FY 23 Reported FY 23 Actual FY 23 Amount % FY 34 FY 45 FY 56 FY 67 TOTAL 68% MB s 69,578 69,578 #DIV/0! MB Capital Reserve Max. Allocation % Sponsor Allocated Max. % Allowed 46% 50% 0% 0% Reported FY 2/3 Balances MB s 59,47 9,02 40,459 FY 2/3 Balance 40,459 MB Capital Reserve FY 2/3 Capital Reserve Balance Committed in FY 36 Window 68% MB Operational Reserve 23,633 23,633 25,803 FY 3/45/6 Capital Reserve (original) Committed in FY 36 Window MB Undesignated Reserve 5,6 FY 2/3 Operational Reserve Balance TOTAL MEASURE B 93,2 93,2 Any unspent FY 23 Measure B Capital Fund Reserve Amount will require a FY 2/3 Undesignated Reserve Balance request to reallocate the funds to outer years of the FY 23 through FY 56 FY 2/3 Actual vs ed Revenue Variance,47 Reserve Window (Blue lines). Remaining (rollover) Measure B Balance 4,606 Matches Measure B Ending Passthrough Balance above? subtract FY 36 reserve window commitments Must equal to FY 34 Measure B Funds Available (Green Box, Box ). FY 34 Uncommitted rollover amount 4,606 Remaining Measure B subtract FY 36 reserve commitment NOTE: FY 34 Measure B ed Passthrough Revenue 5,605 Alameda CTC may request additional information to determine recipient's compliance with the Reserve and Timely Use of Fund Policies. FY 34 Measure B Funds Available 93,2 Allocate Amount to FY 34 through FY 67 Reserve Window (ODD Numbered Boxes). This amount should equal the total in Box 3. BOX 3 Measure B FY 34 Funding Allocation Summary SECTION : Measure B s (unreserved funds) Box 4 FY 23 MEASURE B PLANNED PROJECTS (unreserved funds) Box 5 FY 34 MEASURE B PLANNED PROJECTS (unreserved funds) Local ID Number P64 P87 P93 Q48 G Name Phase Local ID Number Actual Amount Reason for positive or negative balance? FY 23 FY 23 FY 23 Construction 46,602,383 35,29 The project was completed under budget. Marin Santa Fe Traffic Signal and P87 Pedestrian Improvements 46,602,383 35,29 Albany Complete Streets San Pablo Ave. and Buchanan Street Corridors Buchanan Marin BikewayPhase III Active Transportation Plan Safe Routes to School Program Coordinator and Educational Program Bike racks and signage Citywide TRACKING FY 23 (Prior Year's) PLAN Name Phase s FY 34 Completion/Closeout 9,328 Albany Complete Streets San Pablo Ave. and Buchanan Street Corridors 9,328 Scoping, Feasibility, Planning 2,869 3,54 9,328 The remaining balance for this project was PS&E 20,000 spent at the beginning of FY 3/4 and it will be Buchanan Marin BikewayPhase 2 P93 reflected in next year's compliance report. III 2,869 3,54 9,328 20,000 This project had not been assigned pass Other 6,750 Safe Routes to School Program PS&E,34 (,34) through Measure B funds at the time of last 3 G84 Coordinator and Educational year's compliance report. Program,34 (,34) 6,750 This project was reported in last year's PS&E 20,000 Marin Curtis Safe Routes to Completion/Closeout 2,29 (2,29) Compliance Report. A small amount of funds Construction 3,500 4 P90 School Pedestrian was processed after the 2/3 fiscal year was Improvements 2,29 (2,29) closed. 33,500 This project had not been assigned pass Operations 58 (58) through Measure B funds at the time of last 5 year's compliance report. 58 (58) Council has approved the Climate Action Plan Construction 587 (587) and the Albany Active Transportation Plan that 6 include the implmentation of bike parking 587 (587) citywide Governing Body Approved? ( or No) Describe the 's Status is closing out in February 204. City Council approved the Concept Plan at its 2/6/203 meeting. The project is in PS&E phase. This project will be implemented along with a Rule 20 Utility Undergrounding project and it is slated for construction in 206. Plans are at 35% level now. The Albany CIP assigned 42,540 of pass through Measure B funds to match design and construction grants. For the purposes of this report, it is estimated that 0,000 of the fully allocated amount will be spent in Measure B fundsn will be used to pay the Manager salary portion for this project for the current and the next school year (ending in school year 205) for a total of 3,500 for the two school years. is in PS&E phase. Construction is scheduled for the summer of 204. It is anticipated that a portion fo the pass through funds allocated for construction would be expensed in the Fiscal Year 4/5. TOTAL FY 23 PLANNED VS ACTUAL EXPENDITURES 59,47 9,02 40,459 68% TOTAL FY 34 PLANNED PROJECTS 69,578 5 of 23

6 Tracking Tracking Alameda CTC Programs Annual Compliance Report Reporting Year TABLE 3 BICYCLE AND PEDESTRIAN PROGRAM Measure B s and Fund Reserves DATE : 2/9/203 (revised 2/2/4) Directions There are FOUR Sections on this worksheet to be completed by the local agency. ) In the EVEN Numbered Boxes, enter the FY 23 and Reserve Activities, and the Actual that occurred in FY 23. 2) In the ODD Numbered Boxes, allocate the FY 34 Measure B Funds Available (Box, in Green) to these four sections designated for FY 34. SECTION 2: Measure B Capital Fund Reserve BOX 6 Capital Fund Reserves FY 23 vs Actual BOX 7 Capital Fund Reserves FY 34 through FY 67 Capital Reserve Local ID Number Name FY 23 (PRIOR YEAR'S) PLAN Original and Revised Plans Phase Actual Original New By Phase, Amount FY 36 Window FY 47 Window Original FY 36 + FY 47 FY 23 FY 23 FY 23 FY 34 FY 45 FY 56 FY 67 Window Actual (Revised) Plan New FY 47 Window Actual (Revised) Plan New FY 47 Window New Phase Line New Phase Line Cost FY 36 Plan YEARLY TOTALS FY 47 Plan Per Fiscal Year Describe the Status ) If requesting an adjustment, explain how and why the FY 23 Capital Reserve Plan was adjusted. Provide a explanation on any unspent funds and its reallocation. 2) Specify Measure B adjustments to FY 36 Window and usage of FY 47 revenue. 2 Actual (Revised) Plan New FY 47 Window Actual (Revised) Plan New FY 47 Window New Phase Line New Phase Line Cost FY 36 Plan YEARLY TOTALS FY 47 Plan Per Fiscal Year Fiscal Year FY 23 through FY 56 Window s FY 23 vs Actual Expenses TOTAL CAPITAL FUND RESERVE #DIV/0! Fiscal Year FY 34 through FY 67 Window s 6 of 23

7 Alameda CTC Programs Annual Compliance Report Reporting Year TABLE 3 BICYCLE AND PEDESTRIAN PROGRAM Measure B s and Fund Reserves DATE : 2/9/203 (revised 2/2/4) Directions There are FOUR Sections on this worksheet to be completed by the local agency. ) In the EVEN Numbered Boxes, enter the FY 23 and Reserve Activities, and the Actual that occurred in FY 23. 2) In the ODD Numbered Boxes, allocate the FY 34 Measure B Funds Available (Box, in Green) to these four sections designated for FY 34. SECTION 3: Measure B Operation Reserve 2 Box 8 FY 23 MEASURE B OPERATION RESERVE Phase Op Reserve FY 23 Construction 5,000 5,000 5,000 5,000 TRACKING FY 23 (Prior Year's) PLAN Actual FY 23 Amount FY 23 Reason for positive or negative balance? There was additional need to provide bike parking at City Hall. Funds were used to pay for a concrete pad to install four bicycle lockers at Construction 5, Bike racks and signage Citywide City Hall. 5,000 Construction 8,633 2 P4 Misc. Transportation s 8, Local ID Number Name Bike Racks and Signage Citywide Local ID Number Name Box 9 FY 34 MEASURE B OPERATION RESERVE Phase s FY 34 Governing Body Approved? ( or No) Describe the 's Status Council has approved the Climate Action Plan and the Albany Active Transportation Plan that include the implmentation of bike parking citywide. This line item was included in the CIP that was approved in the summer of 203. Every year there is a need to install signage, conduct transportation studies, or install additional traffic calming. These funds have been used for this purpose. TOTAL OPERATION FUND RESERVE 5,000 5,000 0% TOTAL FY 34 OPERATION FUND RESERVE 23,633 SECTION 4: Measure B Undesignated Reserve Box 0 FY 23 MEASURE B UNDESIGNATED RESERVE TRACKING FY 23 (Prior Year's) PLAN Box FY 34 MEASURE B UNDESIGNATED RESERVE Undesignated Funds (Up to 0% of the annual year's revenue) Undesignated FY 23 Actual FY 23 Amount FY 23 Identify projects where undesignated funds were used. Undesignated Funds (Up to 0% of the annual year's revenue) Undesignated FY 34 Identify Potential Funding usage. TOTAL FY 23 UNDESIGNATED RESERVE #DIV/0! TOTAL FY 34 UNDESIGNATED RESERVE 7 of 23

8 This Page Intentionally Left Blank.

9 Alameda CTC Programs Annual Compliance Report Reporting Year TABLE LOCAL STREETS AND ROADS PROGRAM Measure B Revenues and DATE : 2/9/203 (revised 2/2/4) Column A Column B Column C Column D Column E Column F Column G Column H Column I Starting MB Balance MB Passthrough Revenues and FY 2 Ending MB Balance List the specific types of nonmeasure B Funding including FY 2 MB Passthrough Fund Passthrough + Interest MB Fund Balance FY 23 MB Passthrough Fund Revenues FY 23 MB Passthrough Fund Interest (Should match Table 2: Column L) Ending MB Passthrough Fund Balance Other MB (Should match Table 2: Column M) Other MB NonMB Funding Source NonMB (Should match Table 2: Column N) 379, ,508 37,660 Vehicle Registration Fee Fund** from Table : 8,508 from Table 2: 8,508 VERIFICATION CHECK: Values to the bottom right are automatically drawn from Table and Table 2 (corresponding expenditures fund totals) to ensure accurate reporting. These numbers must match each other. Measure B Passthrough Funds FY 23 Other Measure B NonMeasure B Funds FY 23 Column Descriptions MB Balance: Value must match the local agency's audit report figure for the ending MB balance reported in FY 2. MB Passthrough Revenue: Value is the actual MB revenues for FY 23. MB Passthrough Interest: Value is the MB Passthrough Interest earned on unspent funds during FY 23. MB : Value must match the agency audit report figure AND total sum of MB passthrough expenditures calculated on Table 2: Column L. Other MB : Value must match the agency audit report figure AND other Measure B expenditures calculated on Table 2: Column M. Do not include Measure B Capital Expenses. NOTES ) The numbers on Table must be consistent with your Audited Financial Statements. 2) The expenditures inputted in Table must match expenditures calculated on Table 2. Additional Information: Use the Box Below to clarify revenues and expenditures. VERIFICATION CHECK: Values to the bottom right are automatically drawn from Table and Table 2 (Sum of Column N and Column O) to ensure accurate reporting. Table 's nonmeasure B expenditures values must match the sum of Table 2's nonmeasure B expenditures. NonMB: NonMB Table : NonMB Table 2: * NonMeasure B Funding includes any nonmeasure B funding sources such as state, federal, or local funding. **Report Vehicle Registration Fee (VRF) revenues and expenditures for Local Streets and Roads in this section. Inputted VRF values must match reported VRF expenditures in the VRF Local Streets and Road Compliance Reporting Form (completed separately) i.e.table 2 (Column N).

10 This Page Intentionally Left Blank.

11 Alameda CTC Programs Annual Compliance Report Reporting Year TABLE 2 LOCAL STREETS AND ROADS PROGRAM Measure B and Accomplishments (FY 2023) No. Local ID Number (Dropdown Menu) DATE: 2/9/203 (revised 2/2/4) Status Column A Column B Column C Column D Column E Column F Column G Column H Column I Column J Column K* Column L** Column M** Column N*** Column O Column P Column Q Column R Estimated NonMB NonMB Status Units for Completed Funding Did the Governing Benefits Funding Enter the Contract (at the end of Quantity Category Phase Type Quantity Description Quantity MB Passthrough LSR (federal & state (L+M+N+0=P) Other MB LSR Board Approve this (describe project's benefit Cost in FY 23 amount if 50K or more Name FY 23) Completed in (other details about Description to the implementation Funded by? Vehicle Registration of this was for (Dropdown FY 23 (Dropdown unit or quantity) (Dropdown Menu) (Dropdown Menu) area) Measure B grants, city/local Fee Menu) Menu) FY 23 funds, etc.) (auto calculates) an Individual Contract (Dropdown Menu) N/A Other Other Other (describe in Column E) Description Alameda County Membership fees Annual fees The membership fees allowed the City to participate in the Transportation Commission and work together with other jurisdictions for the improvement of transportation in Alameda County. Continuing or Ongoing Other (describe in Column J) Annual membership Council approved with Measure B/VRF Agreement. Approvals (auto calculates).0 8,508 8,508 2 #DIV/0! 3 #DIV/0! 4 #DIV/0! 5 #DIV/0! 6 #DIV/0! 7 #DIV/0! 8 #DIV/0! 9 #DIV/0! 0 #DIV/0! #DIV/0! 2 #DIV/0! 3 #DIV/0! 4 #DIV/0! 5 #DIV/0! 6 #DIV/0! 7 #DIV/0! 8 #DIV/0! 9 #DIV/0! 20 #DIV/0! 2 #DIV/0! 22 #DIV/0! 23 #DIV/0! 24 #DIV/0! 25 #DIV/0! Note: Definitions for each dropdown menu appear as Comments (scroll over the column title or in the Review mode, choose "Show All Comments"). The document is set up to print Comments at the end. Deliverables FY 23 TOTALS: 8,508 8,508 Additional Information: Use the Box Below to clarify expenses or to provide additional information. No in FY 2/3 * Column K: ( Measure Dollars Spent X Quantity) / Cost = MBFunded Quantity ** Columns LN: The dollar figures inputted must be consistent with your agency's Audited Financial Statements. *** Column N: The dollar figures inputted must be consistent with your agency's Audited Financial Statements. Pull Down Menu Options Bike/Ped Scoping, Feasibility, Planning Bike Parking Planning in FY 23 Bike Parking Spaces Mass Transit Environmental Bikeways and Multiuse Paths Initiated in FY 23 Intersections No Paratransit PS&E Bridges and Tunnels Continuing or Ongoing Lane Miles Streets and Roads RightofWay Education and Promotion Closed Out in FY 23 Linear Feet Other Construction Equipment and New Vehicles Number of People/Passengers Maintenance Operations Number of OneWay Unduplicated Trips Operations Pedestrian Crossing Improvements Square Feet Completion/Closeout Sidewalks and Ramps Vehicles Purchased Other Signage Other (describe in Column J) Signals Staffing Street Resurfacing and Maintenance Traffic Calming Welfare to Work Operations Other (describe in Column E)

12 Alameda CTC Programs Annual Compliance Report Reporting Year Cell: C Comment: Category: Bicycle: Bicycle project. Bike/Pedestrian: Bicycle and pedestrian project. Pedestrian: Pedestrian project. Cell: D Comment: Phase: Scoping, Feasibility, Planning: Early capital project phases, such as project scoping, feasibility studies, and planning. Environmental: Preparation of environmental documents, such as those related to the California Environmental Quality Act (CEQA) or the National Environmental Policy Act (NEPA). RightofWay: Preparing documentation needed to secure or dispose of property rights for project. Plans, Specifications and Engineering (PS&E): Development of the preliminary engineering and engineering estimates. Construction: Construction of a new capital project, Maintenance: Maintenance, repairs, renovation, or upgrade of existing facility or infrastructure. Operations: Operations such as transit, which may include routine maintenance and procurement, or lease of vehicles/equipment; intelligent transportation systems; or corridor system management. Completion/Closeout: Inspection/project acceptance, final invoicing, final reporting, and processes for closing out project. Other: Use if none of the above apply, and define the project phase by selecting Type (Column C) and describe the phase under Description (Column E). Cell: E Comment: Type: Bike Parking: Bike racks and lockers, bike shelters, attended bike parking facilities, and bike parking infrastructure. Bikeways (nonclass I): Bike lanes (Class II), bike boulevards, side paths, bike routes (Class III), atgrade bike crossings. Includes bikeway maintenance. Bridges and Tunnels: Bicyclepedestrian crossings above or below grade. Education and Promotion: Marketing, education, information, outreach, promotional campaigns, and programs. Master Plan: Bicycle and/or pedestrian master plan development. Multiuse Paths (Class I): Pathways (Class I) for bicyclists, pedestrians, and other nonmotorized modes. Includes maintenance of multiuse paths. Pedestrian Crossing Improvements: Atgrade pedestrian crossing improvements such as crosswalks, roadway/geometric changes, or reconfiguration specifically benefiting pedestrians. Safety Improvements: Infrastructure improvements for bicyclists and pedestrians not covered by other project types on the list. Sidewalks and Ramps: New sidewalks, sidewalk maintenance, curb ramps, stairs/ramps for pedestrian and Americans with Disabilities Act access. Signage: Warning, regulatory, way finding, or informational signage. Includes signage maintenance. Signals: New traffic signals or crossing signals for pedestrians and/or bicyclist, signal upgrades, countdown signals, audible signals, and video detection. Staffing: Salary and benefits for staff to support projects, programs, or services. Traffic Calming: Infrastructure primarily aimed at slowing down motor vehicle traffic. Other: Use if none of the Types apply or for projects that consist of multiple types of improvements. Describe the type under Description (Column E). Cell: I Comment: Status: Choose project status on June 30, 203: Planning in FY 2/3, Initiated in FY 2/3, Continuing or Ongoing, or Closed Out in FY 2/3. Cell: J Comment: Quantity Complete includes itemizations such as square feet, lane miles, linear feet, etc. Cell: K Comment: Units for Quantity: Select from the dropdown menu and add any details about the unit or quantity in Column J. Lane Miles: Measurement to describe length of roadway, street improvements, and bicycle facilities. Linear Feet: Measurement to describe sidewalk and pedestrian facilities improvement lengths. Square Feet: Measurement to describe building, floor plan specifications, landscaping, etc. Cell: M Comment: Completed Quantity funded by MB FY 23: This column autocalculates based on the following. ( Measure Dollars Spent X Quantity) / Cost = MBFunded Quantity

13 Alameda CTC Programs Annual Compliance Report Reporting Year TABLE 3 LOCAL STREETS AND ROADS PROGRAM Measure B s and Fund Reserves DATE : 2/9/203 (revised 2/2/4) Directions There are FOUR Sections on this worksheet to be completed by the local agency. ) In the EVEN Numbered Boxes, enter the FY 23 and Reserve Activities, and the Actual that occurred in FY 23. 2) In the ODD Numbered Boxes, allocate the FY 34 Measure B Funds Available (Box, in Green) to these four sections designated for FY 34. AUTO CALCULATED REFERENCE TABLES Auto Box Provides a Summary of Measure B Funds Available in FY 34. The total in the GREEN box is the amount to be allocated to the FY 34 through FY 67 s and Fund Reserves (ODD numbered boxes). Auto Box 2 Provides a tracking summary comparison of Measure B FY 23 and Actual. Auto Box 3 Measure B Summary for FY 34 through FY 67 using the available Measure B funds available (GREEN box). FY 23 Measure B Ending Passthrough Balance (From Table : Column E) BOX BOX 2 Measure B Available in FY 34 Measure B FY 23 vs. Actual 37,660 FY 23 Reported MB s 368, ,27 MB Capital Reserve FY 23 Actual FY 23 Amount Measure B FY 34 Funding Allocation Summary % FY 34 FY 45 FY 56 FY 67 TOTAL Reported FY 2/3 Balances 8, ,27 98% MB s 559, ,880 FY 2/3 Balance #DIV/0! MB Capital Reserve Max. Allocation % Sponsor Allocated Max. % Allowed FY 2/3 Capital Reserve Balance Committed in FY 36 Window 98% MB Operational Reserve 80,000 80,000 84,0 49% 50% FY 3/45/6 Capital Reserve (original) Committed in FY 36 Window MB Undesignated Reserve 36,822 0% 0% FY 2/3 Operational Reserve Balance TOTAL MEASURE B 739, ,880 Any unspent FY 23 Measure B Capital Fund Reserve Amount will require FY 2/3 Undesignated Reserve Balance a request to reallocate the funds to outer years of the FY 23 through FY FY 2/3 Actual vs ed Revenue Variance, Reserve Window (Blue lines). Remaining (rollover) Measure B Balance 37,660 Matches Measure B Ending Passthrough Balance above? subtract FY 36 reserve window commitments Must equal to FY 34 Measure B Funds Available (Green Box, Box ). FY 34 Uncommitted rollover amount 37,660 Remaining Measure B subtract FY 36 reserve commitment NOTE: FY 34 Measure B ed Passthrough Revenue 368,220 Alameda CTC may request additional information to determine recipient's compliance with the Reserve and Timely Use of Fund Policies. FY 34 Measure B Funds Available 739,880 Allocate Amount to FY 34 through FY 67 Reserve Window (ODD Numbered Boxes). This amount should equal the total in Box 3. BOX 3 0 SECTION : Measure B s (unreserved funds) Box 4 FY 23 MEASURE B PLANNED PROJECTS (unreserved funds) Box 5 FY 34 MEASURE B PLANNED PROJECTS (unreserved funds) Local ID Number Name Phase S20 and T02 Street Maintenance FY 23 Actual FY 23 TRACKING FY 23 (Prior Year's) PLAN Amount FY 23 Reason for positive or negative balance? Local ID Number Name Phase s FY 34 Maintenance 368, ,779 In FY 202/3, the City hired a new Public Works PS&E 46,77 Director/City Engineer. New management decided to use pass through Measure B funds for pavement Construction 254,655 rehabilitation projects and to create a new sidewalk program for the City. Therefore, no expenditures in FY 2/3, but these fund balances will allow for the Albany Pavement Rehabilitation TBD implementation of larger, locally beneficial projects in FY 3/4 as shown in the adjacent BOX 5. Governing Body Approved? ( or No) No Describe the 's Status The project is part of the City Pavement Program preapared through a PTAP grant from MTC. The Pavement Program was finalized in April 202. The City just issued a RFP for design services. Proposals are expected on January 6, 204. Council will approve entering into contract for design services with the selected consulting firm. Council action is expected in February, N/A Alameda County Transportation Commission membership 368, ,779 40,372 Other 8,508 (8,508) Alameda CTC annual membership fees Maintenance 50,000 2 P42 Albany Sidewalk Program No 8,508 (8,508) 50,000 Construction 00,000 Buchanan Bikeway Phase I and 3 S42 II Signal adjustments and pavement potholing 00,000 Alameda County Transportation Other 8,508 4 Commission membership 8, The City exhausted its funds for the existing sidewalk program which consisted on reimbursing up to 50% of sidewalk repair costs to residential property owners. The Public Works Department proposed a new sidewalk program that entails identifying the worst sidewalk locations throughout the Ctiy, hiring a concrete contractor to repair the sidewalk and then bill the property owner for his/her portion of the work. Council has not approved this project yet, but it is scheduled to be presented to Council early in 204. Measure B LSR and proposed to be used for the new sidewalk program./ Additional adjustments are needed for the signal at the intersection of Marin Avenue and San Pablo Avenue. These include the addtion of a No Right Turn on Red Blank out sign and installation of bike loop detectors. Pavement potholing will be done westbound on Buchanan Street at the concrete/asphalt joint and at the intersection of Buchahan and Pierce Street. Alameda CTC annual membership fees TOTAL FY 23 PLANNED VS ACTUAL EXPENDITURES 368,779 8, ,27 98% TOTAL FY 34 PLANNED PROJECTS 559,880 2 of 23

14 Tracking Tracking Tracking Alameda CTC Programs Annual Compliance Report Reporting Year TABLE 3 LOCAL STREETS AND ROADS PROGRAM Measure B s and Fund Reserves DATE : 2/9/203 (revised 2/2/4) Directions There are FOUR Sections on this worksheet to be completed by the local agency. ) In the EVEN Numbered Boxes, enter the FY 23 and Reserve Activities, and the Actual that occurred in FY 23. 2) In the ODD Numbered Boxes, allocate the FY 34 Measure B Funds Available (Box, in Green) to these four sections designated for FY 34. SECTION 2: Measure B Capital Fund Reserve BOX 6 Capital Fund Reserves FY 23 vs Actual BOX 7 Capital Fund Reserves FY 34 through FY 67 Capital Reserve Local ID Number FY 23 (PRIOR YEAR'S) PLAN Name Original and Revised Plans Phase Actual Original New By Phase, Amount FY 36 Window FY 47 Window Original FY 36 + FY 47 FY 23 FY 23 FY 23 FY 34 FY 45 FY 56 FY 67 Window Actual (Revised) Plan New FY 47 Window New Phase Line New Phase Line Cost FY 36 Plan YEARLY TOTALS FY 47 Plan Per Fiscal Year Describe the Status ) If requesting an adjustment, explain how and why the FY 23 Capital Reserve Plan was adjusted. Provide a explanation on any unspent funds and its reallocation. 2) Specify Measure B adjustments to FY 36 Window and usage of FY 47 revenue. 2 Actual (Revised) Plan Construction New FY 47 Window Construction New Phase Line New Phase Line Cost FY 36 Plan YEARLY TOTALS FY 47 Plan Per Fiscal Year 3 Actual (Revised) Plan New FY 47 Window Actual (Revised) Plan New FY 47 Window New Phase Line New Phase Line Cost FY 36 Plan YEARLY TOTALS FY 47 Plan Per Fiscal Year Fiscal Year FY 23 through FY 56 Window s FY 23 vs Actual Expenses TOTAL CAPITAL FUND RESERVE #DIV/0! Fiscal Year FY 34 through FY 67 Window s 3 of 23

15 Alameda CTC Programs Annual Compliance Report Reporting Year TABLE 3 LOCAL STREETS AND ROADS PROGRAM Measure B s and Fund Reserves DATE : 2/9/203 (revised 2/2/4) Directions There are FOUR Sections on this worksheet to be completed by the local agency. ) In the EVEN Numbered Boxes, enter the FY 23 and Reserve Activities, and the Actual that occurred in FY 23. 2) In the ODD Numbered Boxes, allocate the FY 34 Measure B Funds Available (Box, in Green) to these four sections designated for FY 34. SECTION 3: Measure B Operation Reserve 2 0 Box 8 FY 23 MEASURE B OPERATION RESERVE Local ID Number Name Phase Op Reserve FY 23 Actual FY 23 TRACKING FY 23 (Prior Year's) PLAN Amount FY 23 Reason for positive or negative balance? Local ID Number Name Phase Box 9 FY 34 MEASURE B OPERATION RESERVE s FY 34 PS&E Operations N/A LS&R Operations Reserve Maintenance 80, Governing Body Approved? ( or No) Describe the 's Status This reserve is established for unanticipated expenses, or fluctuations in revenues. TOTAL OPERATION FUND RESERVE #DIV/0! TOTAL FY 34 OPERATIONS FUND RESERVE 80,000 SECTION 4: Measure B Undesignated Reserve Box 0 FY 23 MEASURE B UNDESIGNATED RESERVE TRACKING FY 23 (Prior Year's) PLAN Box FY 34 MEASURE B UNDESIGNATED RESERVE Undesignated Funds (Up to 0% of the annual year's revenue) Undesignated FY 23 Actual FY 23 Amount FY 23 Identify projects where undesignated funds were used. Undesignated Funds (Up to 0% of the annual year's revenue) Undesignated FY 34 Identify Potential Funding usage. TOTAL FY 23 UNDESIGNATED RESERVE #DIV/0! TOTAL FY 34 UNDESIGNATED RESERVE 4 of 23

16 This Page Intentionally Left Blank.

17 Alameda CTC Programs Annual Compliance Report Reporting Year TABLE PARATRANSIT PROGRAM Measure B Revenues and DATE : 2/8/203 (revised 2/2/4) Column A Column B Column C Column D Column E Column F Column G Column H Column I Column K Column L Column O Measure B Passthrough Funds FY 23 Other Measure B NonMeasure B Funds FY 23 Starting MB Balance MB Passthrough Revenues and FY 2 Ending MB Balance List the specific types of nonmeasure B Funding FY 2 Passthrough + Interest MB Fund Balance FY 23 MB Passthrough Fund Revenues FY 23 MB Passthrough Fund Interest MB Passthrough Fund (Should match Table 2: Column L) Ending MB Passthrough Fund Balance Other MB Expenditure MSL Fund (Should match Table 2: Column M) Other MB Expenditure Paratransit Gap Grant (Should match Table 2: Column N) Other MB Expenditure Stabilization Fund (Should match Table 2: Column O) Other MB Expenditure Local Streets and Roads (Should match Table 2: Column P) Other MB NonMB Funding Source,354 30,288 26,095 5,547 0,90 0,90 Fares** from Table : 26,095 0,90 from Table 2: 26,095 0,900 VERIFICATION CHECK: Values to the bottom right are automatically drawn from Table and Table 2 (corresponding expenditures fund totals) to ensure accurate reporting. These numbers must match each other. Column Descriptions MB Balance: Value must match the agency audit report figure for the ending MB balance reported in FY 2. MB Passthrough Revenue: Value is the actual MB revenues for FY 23. MB Passthrough Interest: Value is the MB Passthrough Interest earned on unspent funds during FY 23. MB : Value must match the agency audit report figure AND total sum of MB passthrough expenditures calculated on Table 2: Column L. Other Measure B: Minimum Service Level Fund The Minimum Service Level expenditure figured entered into Table must match with Table 2 Column M AND the value listed in the agency's audit report. Other Measure B: Paratransit Gap Grant Fund The Paratransit Gap Grant expenditure figured entered into Table must match with Table 2 Column N AND the value listed in the agency's audit report. Other Measure B: Stabilization Fund The Stabilization Fund expenditure figured entered into Table must match with Table 2 Column O AND the value listed in the agency's audit report. Other Measure B: Local Streets & Roads The Measure B Local Streets and Roads includes expenditures from Local and Streets and Roads passthrough funds used for Paratransit activities. The Local Streets and Roads expenditure figured entered into Table must match with Table 2 Column P AND the value listed in the agency's audit report. Do not include Measure B Capital expenses. NOTE: ) The numbers on Table must be consistent with your Audited Financial Statements. 2) The expenditures inputted in Table must match expenditures calculated on Table 2. VERIFICATION CHECK: Values to the bottom right are automatically drawn from Table and Table 2 (sum of column Q and R) to ensure accurate reporting. Table 's nonmeasure B expenditures values must match the sum of Table 2's nonmeasure B expenditures. NonMB: NonMB Table : NonMB Table 2: Additional Information: Use the Box Below to clarify revenues and expenditures. Additional Revenue: Fare revenue: 260 yearly registration fee collected for the shopping trip program. Misc revenue: reimbursement for repairs from third party insurance. Gap Revenue: 6,528.2 Column A: The FY /2 Audit accounted included nonmeasure B related revenues in the statement in the amount of 4,09. Therefore the passthrough starting balance is actually,354 as noted as the ending balance in the FY /2 Compliance Report. * NonMeasure B Funding includes any nonmeasure B funding sources such as state, federal, or local funding. **Report Fare revenues and expenditures in this section. Inputted Fare expenditures must match reported Fare expenditures from Table 2 (Column R).

18 This Page Intentionally Left Blank.

19 Alameda CTC Programs Annual Compliance Report Reporting Year TABLE 2 PARATRANSIT PROGRAM Measure B and Accomplishments (FY 2023) DATE: 2/8/203 (revised 2/2/4) No. Local ID Number Status Column A Column B Column C Column D Column E Column F Column G Column H Column I Column J Column K* Column L** Column M** Column N** Column O** Column P** Column Q Column R Column S Column T Category Dropdown Menu /Program Phase Dropdown Menu Description Type Dropdown Menu Service/Program/ Name Description Benefits/ Needs This Service Meets (describe project's benefit to the implementation area e.g. medical, grocery, recreation, regional trips, etc.) Status (at the end of FY 23) Dropdown Menu Quantity Completed in FY 23 (numerical value only) Quantity Type Description Dropdown Menu Deliverables Description (other details about unit or quantity) Estimated Completed Quantity Funded by Measure B FY 23 (auto calculates) MB Passthrough Paratransit Other MB Paratransit MSL Fund Other MB Paratransit Paratransit Gap Grant Fund FY 23 Other MB Paratransit Stabilization Fund Other MB Paratransit Local Streets and Roads Fund NonMB Funding (federal & state grants, city/local funds, etc.) NonMB Fares (cash fares, scrip/voucher purchases, fares retained by vendors or paid by thirdparty sponsors) Cost in FY 23 (L+M+N+O+P+Q+R=S ) (auto calculates) Enter the Contract amount if 50K or more of this was for an Individual Contract N/A Senior and Disabled Services Operations Same Day/Taxi Program Taxi Subsidy Program Taxi subsidy programs of 70% up to 20 which ever is least for Albany residents age 80+ or EBP ceritfied residents age 8+ provides rides for any purpose 24 hours/day & 7 days a week Continuing or Ongoing 454 Trips (oneway) ,970 4,970 2 N/A Senior and Disabled Services Operations Group Trips Shopping Trips Using the Albany Senior Center Community Shuttle, provide accessible doortodoor service to nearby grocery stores, malls. Must be age 60+ and Albany residents to be picked up at home. Basic Needs trips. Shopping trips are provided 2 Monday mornings a month (Hilltop Mall, Thrift Town & Dollar Store) and on Thursday (El Cerrito Plaza and Ranch 99)& Friday (safeway & target)mornings weekly. No trip limit. Continuing or Ongoing,96 Trips (oneway),96.0 2,876 3,052 5,928 3 N/A Senior and Disabled Services Operations Group Trips Day trips, walking trips and senior center trips Using the Albany Senior Center Community Shuttle, provide free accessible transportation for recreational and walking group trips throughout the Bay Area. 6 trip sper month usually on Tuesdays and Wednesdays. Eligibility age 50+ Recreational and fitness group trips provides opportunitiese for social interaction with peers, physical exercises and lifelong learning in a safe and friendly environment. Continuing or Ongoing 3,088 Trips (oneway) 3, ,469 7,848 5,37 4 N/A Senior and Disabled Services 5 N/A Senior and Disabled Services 6 N/A Senior and Disabled Services Operations Meal Delivery Meals on Wheels Meals on Wheels. Use the senior center van to deliver meals Operations Operations Management/Overhe ad/staffing Customer Service and Outreach Program administration for the paratransit programs. Program administration for the paratransit programs. Program administration for the paratransit programs. Program administration for the paratransit programs. meal delivery 4 days per week to homebound seniors Administration for the paratransit programs provide coordination and delivery of services. Administration for the paratransit programs provide coordination and delivery of services. Continuing or Ongoing Continuing or Ongoing Other (describe in Column J) Other (describe in Column J) Administration for the paratransit programs provide coordination and delivery of services. Administration for the paratransit programs provide coordination and delivery of services ,608 5, ,865 4,865 7 #DIV/0! 8 #DIV/0! 9 #DIV/0! 0 #DIV/0! #DIV/0! 2 #DIV/0! 3 #DIV/0! 4 #DIV/0! 5 #DIV/0! 6 #DIV/0! 7 #DIV/0! 8 #DIV/0! 9 #DIV/0! 20 #DIV/0! 2 #DIV/0! 22 #DIV/0! 23 #DIV/0! 24 #DIV/0! 25 #DIV/0! Note: Definitions for each dropdown menu appear as Comments (scroll over the column title or in the Review mode, choose "Show All Comments"). The document is set up to print Comments at the end. TOTALS: 26,095 0,900 36,995 * Column K: ( Measure Dollars Spent X Quantity) / Cost = MBFunded Quantity ** Columns LR: The dollar figures inputted must be consistent with your agency's Audited Financial Statements. Column A Category Note: Disabled Services: Services primarily created for mobility for people with disabilities. Meals on Wheels: Delivery of meals. Senior & Disabled Services: Transportation services for seniors and people with disabilities. Senior Services: Services primarily created for senior mobility. Other: Use Other if none of the above apply, and define other by selecting Type (Column C) and providing Description (Column E). Column J Note: If trip services were provided, describe the type and estimated quantities of the trips which were delivered such as passenger trips, sameday trips, taxitrips, liftassisted, group trips, etc. Additional Information: Use the Box Below to clarify expenses or to provide additional information. Pull Down Menu Options Disabled Services Scoping, Feasibility, Planning ADAmandated Services Planning in FY 23 Consumers Trained Meals on Wheels Environmental Capital Expenditure/Purchase Initiated in FY 23 Contacts Made (outreach program only) Senior and Disabled Ser PS&E Citybased DoortoDoor Continuing or Ongoing Meals Delivered Senior Services RightofWay Customer Service and Outreach Closed Out in FY 23 Trips (oneway) Other Construction Group Trips Scholarships Provided Maintenance Management/Overhead/Staffing Other (describe in Column J) Operations Meal Delivery Completion/Closeout Mobility Management/Travel Training Other Same Day/Taxi Program Scholarship/Subsidized Fare Shuttle or Fixedroute Trips Volunteer Driver Program Other (describe in Column E)

20 Alameda CTC Programs Annual Compliance Report Reporting Year Cell: C2 Comment: Category: Disabled Services: Services primarily created for mobility for people with disabilities. Meals on Wheels: Delivery of meals. Senior & Disabled Services: Transportation services for seniors and people with disabilities. Senior Services: Services primarily created for senior mobility. Other: Use Other if none of the above apply, and define other by selecting Type (Column C) and providing Description (Column E). Cell: D2 Comment: Phase: Scoping, Feasibility, Planning: Early capital project phases, such as project scoping, feasibility studies, and planning. Environmental: Preparation of environmental documents, such as those related to the California Environmental Quality Act (CEQA) or the National Environmental Policy Act (NEPA). RightofWay: Preparing documentation needed to secure or dispose of property rights for project. Plans, Specifications and Engineering (PS&E): Development of the preliminary engineering and engineering estimates. Construction: Construction of a new capital project, Maintenance: Maintenance, repairs, renovation, or upgrade of existing facility or infrastructure. Operations: Operations such as transit, which may include routine maintenance and procurement, or lease of vehicles/equipment; intelligent transportation systems; or corridor system management. Completion/Closeout: Inspection/project acceptance, final invoicing, final reporting, and processes for closing out project. Other: Use if none of the above apply, and define the project phase by selecting Type (Column C) and describe the phase under Description (Column E). Cell: E2 Comment: Type: ADAmandated Services: Includes mandated public transportation service for people unable to independently use the fixed route bus service. Capital Expenditure or Purchase: Expenditure or purchase of equipment, vehicles, or facilities. Citybased DoortoDoor: Prescheduled, accessible, doortodoor service provided by the city. Provides similar level of service to mandated ADA services; designed to fill gaps not met by ADAmandated providers and/or relieve ADAmandated providers of some trips. Customer Service and Outreach: Staffing and benefits for customer service as well as costs associated with marketing, education, outreach, and promotional campaigns and programs. Group Trips: Oneway passenger trips considered group trips. Includes vehicle operation and contracts. See Individual Demandresponse Trips. Management/Overhead/Staffing: Staffing and benefits to manage programs, projects, and services. Meal Delivery: Costs associated with vehicle operation, scheduling, dispatching, vehicle maintenance, and supervision for the purpose of delivering meals, whether provided inhouse, through contracts, via taxicab, or by grantees. Mobility Management/Travel Training: Covers a wide range of activities, such as travel training, trip planning, and brokerage. Does not include provision of trips. This is considered "nontrip provision". Same Day/Taxi Program: Provides a same day, curbtocurb service intended for situations when consumers cannot make their trip on a prescheduled basis; allows eligible consumers to use taxis at a reduced fare. Scholarship/Subsidized Fare Program: Program to subsidize any services for customers who are lowincome and can demonstrate finance need. Shuttle or Fixedroute Trips: Shuttle or fixedroute bus service, for example. Includes vehicle operation and contracts. Volunteer Driver Program: Prescheduled, doorthroughdoor services that are generally not accessible; rely on volunteers to drive eligible consumers for critical trip needs, such as medical trips. May also have an escort component. Other: Use if none of the above apply. Describe the Type under Description (Column E). Cell: I2 Comment: Status: Choose project status on June 30, 203: Planning in FY 2/3, Initiated in FY 2/3, Continuing or Ongoing, or Closed Out in FY 2/3. Cell: J2 Comment: Quantity Completed includes itemizations such as the total number of oneway passenger trips, consumers trained, meals delivered, tickets purchased, etc. Cell: K2 Comment: Quantity Type Description: Consumers Trained: Individuals who received travel trainings related to mobility management/travel training programs. Contacts Made: Individuals contacted during public outreach events related to mobility management/travel training programs. Meals Delivered: Number of meals delivered to individuals. Scholarships Provided: Number of scholarship/scrip vouchers distributed. Trips: Any type of oneway trip, including taxi, same day service, passenger trips, accessibility trips, etc. Other: If Trip Type is not applicable to your program, choose Other and provide a description in Column K. Cell: M2 Comment: Completed Quantity funded by MB FY 23: This column autocalculates based on the following. ( Measure Dollars Spent X Quantity) / Cost = MBFunded Quantity

TABLE 1 BICYCLE AND PEDESTRIAN PROGRAM Measure B Revenues and Expenditures

TABLE 1 BICYCLE AND PEDESTRIAN PROGRAM Measure B Revenues and Expenditures Alameda CTC Programs Annual Compliance Report 00 Reporting Year TABLE BICYCLE AND PEDESTRIAN PROGRAM Measure B Revenues and DATE : Revised /0/ Column A Column B Column C Column D Column E Column F Column

More information

Measure B Expenditures Across All Programs FY Report Card

Measure B Expenditures Across All Programs FY Report Card Measure B Across All Programs FY 1314 Report Card AC Transit FY 1314 Planned Projects Program Planned FY 1314 Actual FY 1314 Unspent Amount FY 1314 Unspent Percentage Mass Transit 19,715,268 18,188,651

More information

Column A Column B Column C Column D Column E Column F Column G Column H Column I Column J Column K Column L Column M Column N

Column A Column B Column C Column D Column E Column F Column G Column H Column I Column J Column K Column L Column M Column N Alameda CTC Programs Annual Compliance Report 20112012 Reporting Year Table 1: Measure B Revenues and BICYCLE AND PEDESTRIAN AGENCY NAME : City of Albany 12/19/2012 Column A Column B Column C Column D

More information

TABLE 1 BICYCLE AND PEDESTRIAN PROGRAM Measure B Revenues and Expenditures

TABLE 1 BICYCLE AND PEDESTRIAN PROGRAM Measure B Revenues and Expenditures Alameda CTC Programs Annual Compliance Report 20122013 Reporting Year TABLE 1 BICYCLE AND PEDESTRIAN PROGRAM Measure B Revenues and DATE : 12/11/2013 Column A Column B Column C Column D Column E Column

More information

Measure B Expenditures Across All Programs FY Report Card

Measure B Expenditures Across All Programs FY Report Card Measure B Across All Programs Report Card Altamont Commuter Express Projects Program Actual Mass Transit 2,820,948 2,824,169 (3,221) Totals: 2,820,948 2,824,169 (3,221) Capital Fund Reserve (FY 1316 Capital

More information

Measure B Expenditures Across All Programs FY Report Card

Measure B Expenditures Across All Programs FY Report Card Measure B Across All Programs FY 1314 Report Card FY 1314 s Program FY 1314 FY 1314 Amount FY 1314 Percentage Bicycle and Pedestrian 171,457 175,819 (4,362) Local Streets and Roads (Local Transportation)

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: City of Albany Date: 12/18/2017 Primary Point of Contact Name: Aleida Andrino-Chavez

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 20172018 AGENCY CONTACT INFORMATION Agency Name: City of Alameda Date: 11/29/2018 Primary Point of Contact Name: Scott Wikstrom

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 20172018 AGENCY CONTACT INFORMATION Agency Name: City of Fremont Date: 12/21/2018 Primary Point of Contact Name: Tish Saini

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 217218 AGENCY CONTACT INFORMATION Agency Name: City of San Leandro Date: 12/14/218 Primary Point of Contact Name: Norite

More information

Alameda County Public Works Agency

Alameda County Public Works Agency MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: Alameda County Public Works Agency Date: 12/22/2017 Primary Point of Contact

More information

Alameda CTC Mass Transit Program Implementation Guidelines

Alameda CTC Mass Transit Program Implementation Guidelines Section 1. Purpose Alameda County Transportation Commission Implementation Guidelines for the Mass Transit Program Funded through Measure B, Measure BB, and Vehicle Registration Fees A. To delineate eligible

More information

End-of-Year Program Compliance Reporting Forms

End-of-Year Program Compliance Reporting Forms MEASURE B End-of-Year Program Compliance Reporting Forms Reporting Period July 1, 2011 through June 30, 2012 End of the Year Compliance Report FY 11-12 Measure B Program End-of-Year Program Compliance

More information

FY19 Budget - Discussion. April 2018

FY19 Budget - Discussion. April 2018 FY19 Budget - Discussion April 2018 FY19 Proposed Budget: $6.6 Billion General Planning & Programs 3% Identify regional mobility needs and solutions Debt Service 6% Obligations from current and past projects

More information

RECEIVE A REPORT AND APPROVE PROPOSED PUBLIC ENGAGEMENT POLICIES AND PRACTICES FOR THE PUBLIC

RECEIVE A REPORT AND APPROVE PROPOSED PUBLIC ENGAGEMENT POLICIES AND PRACTICES FOR THE PUBLIC J-17 STAFF REPORT MEETING DATE: October 24, 2017 TO: City Council FROM: Russ Thompson, Public Works Director PRESENTER: Russ Thompson, Public Works Director SUBJECT: RECEIVE A REPORT AND APPROVE PROPOSED

More information

Office of the City Manager CONSENT CALENDAR May 19, 2009

Office of the City Manager CONSENT CALENDAR May 19, 2009 Office of the City Manager CONSENT CALENDAR May 19, 2009 To: From: Honorable Mayor and Members of the City Council Phil Kamlarz, City Manager Submitted by: Jane Micallef, Acting Housing Director Subject:

More information

End-of-Year Program Compliance Reporting Forms

End-of-Year Program Compliance Reporting Forms MEASURE B End-of-Year Program Compliance Reporting Forms Reporting Period July 1, 2011 through June 30, 2012 End of the Year Compliance Report FY 11-12 Measure B Program End-of-Year Program Compliance

More information

PPC RESOLUTION NO RESOLUTION ALLOCATING $510,526 IN PROP K FUNDS, WITH CONDITIONS, TO

PPC RESOLUTION NO RESOLUTION ALLOCATING $510,526 IN PROP K FUNDS, WITH CONDITIONS, TO PPC041613 RESOLUTION NO. 13-47 RESOLUTION ALLOCATING $510,526 IN PROP K FUNDS, WITH CONDITIONS, TO THE SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY FOR FIVE REQUESTS AND $831,100 IN PROP K FUNDS, WITH

More information

This Page Intentionally Left Blank.

This Page Intentionally Left Blank. This Page Intentionally Left Blank. End- of-the Year Program Compliance Report FY 13-14 Page 2 MASS TRANSIT PROGRAM Compliance Report Summary Fiscal Year 2013-14 1. Did your agency receive Measure B Mass

More information

Analysis of the Alameda County Transportation Expenditure Plan Prepared by Alameda County Transportation Commission

Analysis of the Alameda County Transportation Expenditure Plan Prepared by Alameda County Transportation Commission Analysis of the Alameda County Transportation Expenditure Plan Prepared by Alameda County Transportation Commission Discussion: In 1986, voters approved Measure B, a 1/2 cent sales tax, to fund transportation

More information

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY TRANSPORTATION DEVELOPMENT ACT ARTICLE 3 BICYCLE AND PEDESTRIAN FUNDS

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY TRANSPORTATION DEVELOPMENT ACT ARTICLE 3 BICYCLE AND PEDESTRIAN FUNDS LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY TRANSPORTATION DEVELOPMENT ACT ARTICLE 3 BICYCLE AND PEDESTRIAN FUNDS FISCAL YEAR 2018-2019 FUNDING AND ALLOCATION GUIDELINES CLAIMING TDA ARTICLE

More information

QUALITY TRANSPORTATION SUMMARY

QUALITY TRANSPORTATION SUMMARY QUALITY TRANSPORTATION SUMMARY Quality Transportation Overview... 126 Department of Transportation... 127 Traffic Field Operations... 129 Winston-Salem Transit Authority... 131 Quality Transportation Non-Departmental...

More information

FY17 Budget Discussion

FY17 Budget Discussion FY17 Budget Discussion Metro is Everywhere Metro is a lot more than buses and trains. Anyone who has boarded a bus or a train, driven on the freeway, used the toll roads, stopped at a traffic signal, or

More information

Chapter 6: Financial Resources

Chapter 6: Financial Resources Chapter 6: Financial Resources Introduction This chapter presents the project cost estimates, revenue assumptions and projected revenues for the Lake~Sumter MPO. The analysis reflects a multi-modal transportation

More information

TRANSPORTATION CAPITAL PROGRAM

TRANSPORTATION CAPITAL PROGRAM TRANSPORTATION CAPITAL PROGRAM The transportation capital program for fiscal year 2016 through fiscal year 2020 consists of a variety of transportation construction and maintenance capital projects primarily

More information

SFMTA Board Presentation January 16, 2018

SFMTA Board Presentation January 16, 2018 SFMTA Board Presentation January 16, 2018 About the SFMTA VISION San Francisco: great city, excellent transportation choices. Our Strategic Plan: Goal 1: Create a safer transportation experience for everyone.

More information

IMPLEMENTATION A. INTRODUCTION C H A P T E R

IMPLEMENTATION A. INTRODUCTION C H A P T E R C H A P T E R 11 IMPLEMENTATION A. INTRODUCTION This chapter addresses implementation of the General Plan. The Plan s seven elements include 206 individual actions. 1 Many are already underway or are on-going.

More information

City of Piedmont COUNCIL AGENDA REPORT

City of Piedmont COUNCIL AGENDA REPORT City of Piedmont COUNCIL AGENDA REPORT DATE: May 2, 2016 TO: FROM: Mayor and Council Paul Benoit, City Administrator SUBJECT: Approval of a Resolution to enter a Master Programs Funding Agreement and Transportation

More information

IMPLEMENTATION PLAN INTRODUCTION PROJECT PACKAGES

IMPLEMENTATION PLAN INTRODUCTION PROJECT PACKAGES INTRODUCTION The Implementation Plan is intended to provide the City of Berkeley a framework to define the future steps for the West Berkeley Circulation Master Plan (WBCMP). Since the objective of the

More information

QUALITY TRANSPORTATION SUMMARY

QUALITY TRANSPORTATION SUMMARY SUMMARY Transportation systems influence virtually every aspect of community life. They are the means for moving people, goods, and services throughout the community, and they play a significant role in

More information

CITY OF ALAMEDA, CALIFORNIA ALAMEDA COUNTY TRANSPORTATION COMMISSION MEASURE B PROGRAM FINANCIAL STATEMENTS FOR THE YEAR ENDED JUNE 30, 2018

CITY OF ALAMEDA, CALIFORNIA ALAMEDA COUNTY TRANSPORTATION COMMISSION MEASURE B PROGRAM FINANCIAL STATEMENTS FOR THE YEAR ENDED JUNE 30, 2018 CITY OF ALAMEDA, CALIFORNIA ALAMEDA COUNTY TRANSPORTATION COMMISSION MEASURE B PROGRAM FINANCIAL STATEMENTS FOR THE YEAR ENDED JUNE 30, 2018 This Page Left Intentionally Blank CITY OF ALAMEDA ALAMEDA COUNTY

More information

SB 83 Additional Vehicle Registration Fee Expenditure Plan (July 15, 2010)

SB 83 Additional Vehicle Registration Fee Expenditure Plan (July 15, 2010) 1. INTRODUCTION A. SUMMARY In late October, the Governor signed into law SB 83 (Hancock), which authorizes congestion management agencies (CMAs) to impose an annual vehicle registration fee increase of

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 11 DIVISION: Communications BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Presentation and discussion regarding the Fiscal Year (FY) 2013 SFMTA

More information

Federal Assistance 13% Charges for Services 5% Appropriated Fund Balance.5% Other 3% Administration 6% Building Maintenance 3% Other 2%

Federal Assistance 13% Charges for Services 5% Appropriated Fund Balance.5% Other 3% Administration 6% Building Maintenance 3% Other 2% TRANSIT FUND The Transit Fund is used to account for the operations of the Town s public transit system. Federal Assistance 13% Transit Revenues State Assistance 12% Charges for Services 5% Appropriated

More information

INVESTING STRATEGICALLY

INVESTING STRATEGICALLY 11 INVESTING STRATEGICALLY Federal transportation legislation (Fixing America s Surface Transportation Act FAST Act) requires that the 2040 RTP be based on a financial plan that demonstrates how the program

More information

Capital Investment Program (CIP) About CIP

Capital Investment Program (CIP) About CIP Capital Investment Program (CIP) About CIP The Capital Investment Program (CIP) is a multi-year program aimed at upgrading and expanding City facilities, buildings, grounds, streets, parks and roads. The

More information

Capital Improvement Projects

Capital Improvement Projects Capital Improvement Projects This section highlights the Capital Improvement Program (CIP) projects proposed for FY 2017-2018. Capital projects are designed to enhance the City s infrastructure, extend

More information

FY Capital Improvement Plan. Presented For Public Input and Review City Council Meeting September 21, 2015

FY Capital Improvement Plan. Presented For Public Input and Review City Council Meeting September 21, 2015 FY 2016 2020 Capital Improvement Plan Presented For Public Input and Review City Council Meeting September 21, 2015 Presented For City Council Adoption October 5, 2015 This page left blank intentionally

More information

Pleasanton Bus Rapid Transit Corridor Enhancement Project On-Call Task Order for Project Design and Engineering

Pleasanton Bus Rapid Transit Corridor Enhancement Project On-Call Task Order for Project Design and Engineering SUBJECT: FROM: Pleasanton Bus Rapid Transit Corridor Enhancement Project On-Call Task Order for Project Design and Engineering Jennifer Yeamans, Senior Grants, Project Management & Contract Specialist

More information

CITY OF ALAMEDA, CALIFORNIA ALAMEDA COUNTY TRANSPORTATION COMMISSION MEASURE BB PROGRAM FINANCIAL STATEMENTS FOR THE YEAR ENDED JUNE 30, 2018

CITY OF ALAMEDA, CALIFORNIA ALAMEDA COUNTY TRANSPORTATION COMMISSION MEASURE BB PROGRAM FINANCIAL STATEMENTS FOR THE YEAR ENDED JUNE 30, 2018 CITY OF ALAMEDA, CALIFORNIA ALAMEDA COUNTY TRANSPORTATION COMMISSION MEASURE BB PROGRAM FINANCIAL STATEMENTS FOR THE YEAR ENDED JUNE 30, 2018 This Page Left Intentionally Blank CITY OF ALAMEDA, CALIFORNIA

More information

Rule #1: Procedure for Distribution of Revenues for Transportation Services for Seniors and the Disabled

Rule #1: Procedure for Distribution of Revenues for Transportation Services for Seniors and the Disabled BOARD POLICY NO. 031 TransNet ORDINANCE AND EXPENDITURE PLAN RULES The following rules have been adopted and amended by the SANDAG Board of Directors in its role as the San Diego County Regional Transportation

More information

Public Works and Development Services

Public Works and Development Services City of Commerce Capital Improvement Program Prioritization Policy Public Works and Development Services SOP 101 Version No. 1.0 Effective 05/19/15 Purpose The City of Commerce s (City) Capital Improvement

More information

Memorandum. Date: February 21, 2018 To: From: Subject:

Memorandum. Date: February 21, 2018 To: From: Subject: Agenda Item 6 Memorandum Date: February 21, 2018 To: From: Subject: Transportation Authority Board Anna LaForte Deputy Director for Policy and Programming 3/13/2018 Board Meeting: Allocation of $8,795,721

More information

Solano County Transit

Solano County Transit AGENDA ITEM 13 - REVISED BOARD MEETING DATE: APRIL 18, 2013 Solano County Transit TO: BOARD OF DIRECTORS PRESENTER: KRISTINA BOTSFORD, BUDGET & ACCOUNTING MANAGER MONA BABAUTA, EXECUTIVE DIRECTOR SUBJECT:

More information

Transportation Disadvantaged Trip & Equipment Grant Application Form

Transportation Disadvantaged Trip & Equipment Grant Application Form Legal Name Federal Employer Identification Number Transportation Disadvantaged Trip & Equipment Grant Application Form Broward County Board of County Commissioners d/b/a/ Broward County Mass Transit Administration

More information

Transportation Disadvantaged Trip & Equipment Grant Application Form

Transportation Disadvantaged Trip & Equipment Grant Application Form Legal Name Federal Employer Identification Number Transportation Disadvantaged Trip & Equipment Grant Application Form Broward County Board of County Commissioners d/b/a/ Broward County Mass Transit Administration

More information

Parking Services and Transportation Planning

Parking Services and Transportation Planning Prepared for the Board of Governors April 10, 2014 Table of Contents PARKING SERVICES AND TRANSPORTATION PLANNING... 1 Background:... 2 Transportation Demand Management (TDM)... 2 Safety Initiatives:...

More information

San Francisco Paratransit

San Francisco Paratransit San Francisco Paratransit Addendum #1 SF Paratransit Van Services: SFMTA/DAAS Group Van, & DAAS Shopping Shuttle No. 16-493-001 October 28, 2016 Proposal Submission Deadline: Wednesday, November 9, 2016

More information

Transportation Authority of Marin Citizens Oversight Committee

Transportation Authority of Marin Citizens Oversight Committee DATE: January 25, 2018 TO: FROM: SUBJECT: Transportation Authority of Marin Citizens Oversight Committee Dianne Steinhauser, Executive Director Li Zhang, Chief Financial Officer Review and Acceptance of

More information

GUIDELINES. Proposition A and Proposition C LOCAL RETURN

GUIDELINES. Proposition A and Proposition C LOCAL RETURN GUIDELINES Proposition A and Proposition C LOCAL RETURN PROPOSITION A AND PROPOSITION C DISTRIBUTION Discretionary (Includes for Projects 40% 25% Local Return (allocation to Jurisdictions Based Population)

More information

Transportation Funding

Transportation Funding Transportation Funding TABLE OF CONTENTS Introduction... 3 Background... 3 Current Transportation Funding... 4 Funding Sources... 4 Expenditures... 5 Case Studies... 6 Washington, D.C... 6 Chicago... 8

More information

TIGER IV. Benefit Cost Analysis. Minot International Airport Access Road. Minot, ND

TIGER IV. Benefit Cost Analysis. Minot International Airport Access Road. Minot, ND Appendix A TIGER IV Benefit Cost Analysis Minot International Airport Access Road Minot, ND Table of Contents Summary and Findings... 3 Net Economic Impacts to North Dakota... 4 Project Matrix... Error!

More information

Christopher Blunk, Deputy Director Public Works/City Engineer. PRESENTER: Christopher Blunk, Deputy Director Public Works/City Engineer

Christopher Blunk, Deputy Director Public Works/City Engineer. PRESENTER: Christopher Blunk, Deputy Director Public Works/City Engineer STAFF REPORT MEETING DATE: April 10, 2018 TO: FROM: City Council Christopher Blunk, Deputy Director Public Works/City Engineer PRESENTER: Christopher Blunk, Deputy Director Public Works/City Engineer 922

More information

Implementation Project Development and Review 255

Implementation Project Development and Review 255 Introduction 248 Implementation Principles 249 Public Agency Fiduciary Responsibilities 250 Project Development and Review Process 252 Project Development and Review 255 Maintenance 23 Implementation Implementation

More information

10-Year Capital Highway Investment Plan DRAFT

10-Year Capital Highway Investment Plan DRAFT This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp 10-Year Capital Highway

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 11 DIVISION: Chief of Staff BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Resolution urging the Board of Supervisors to place the $500 million Transportation

More information

Instruction Manual. For the. National Park Service. Alternative Transportation Systems. Financial Proforma

Instruction Manual. For the. National Park Service. Alternative Transportation Systems. Financial Proforma Instruction Manual For the National Park Service Alternative Transportation Systems Financial Proforma 2007 This Instruction Manual provides step-by-step guidance on completing the National Park Service

More information

PUBLIC WORKS - ENGINEERING

PUBLIC WORKS - ENGINEERING PUBLIC WORKS - ENGINEERING 4 DIVISIONS: CAPITAL IMPROVEMENT PROGRAM (CIP) TRAFFIC ENGINEERING DEVELOPMENT ENGINEERING SEWER & STORM DRAIN ENGINEERING 18 FTE s, 2 Hourly s In FY 14/15 Expended approximately

More information

Introduction Project Overview How Express Lanes Work 101 Managed Lane Financial Forecast Performance Comparison Ownership Considerations Transit

Introduction Project Overview How Express Lanes Work 101 Managed Lane Financial Forecast Performance Comparison Ownership Considerations Transit Joint Board Ownership Workshop November 16, 2018 1 Introduction Project Overview How Express Lanes Work 101 Managed Lane Financial Forecast Performance Comparison Ownership Considerations Transit Equity

More information

Balancing the Transportation Needs of a Growing City

Balancing the Transportation Needs of a Growing City Balancing the Transportation Needs of a Growing City FY 2019 and FY 2020 Operating Budget SFMTA Board Meeting Ed Reiskin, Director of Transportation March 6, 2018 1 Guiding Principles: FY 2013-2018 Vision:

More information

Transportation Authority of Marin: 2018 Transportation Revenue Measure Feasibility Survey

Transportation Authority of Marin: 2018 Transportation Revenue Measure Feasibility Survey Transportation Authority of Marin: 2018 Transportation Revenue Measure Feasibility Survey Page 1 Overview and Research Objectives The Transportation Authority of Marin commissioned Godbe Research to conduct

More information

Governor s FY 2019 Revised, FY 2020 and Capital Budget Recommendations House Finance Committee April 9, 2019

Governor s FY 2019 Revised, FY 2020 and Capital Budget Recommendations House Finance Committee April 9, 2019 Governor s FY 2019 Revised, FY 2020 and Capital Budget Recommendations House Finance Committee April 9, 2019 Quasi-public agency Established in 1964 Responsible: Fixed route bus service and Americans with

More information

METRO. Metro Funding. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington. Neighborhood(s):

METRO. Metro Funding. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington. Neighborhood(s): METRO METRO METRO 2017 2026 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed to provide mass transit

More information

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET CITY OF PLACERVILLE ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET 2014/2015 CAPITAL IMPROVEMENT PROGRAM POLICY Each year the City faces the challenge of meeting infrastructure and equipment needs with limited

More information

Capital Improvement Program Fund

Capital Improvement Program Fund Capital Improvement Program Fund The Capital Improvement Program Fund provides funding for streets, public buildings (both governmental and school facilities), land, and other capital assets. Capital Improvement

More information

Draft SFMTA Strategic Plan 11/14/2011, San Francisco California

Draft SFMTA Strategic Plan 11/14/2011, San Francisco California Draft SFMTA Strategic Plan 11/14/2011, San Francisco California Agenda Development of the Strategic Plan. Draft FY2013-FY2018 Strategic Plan. o Vision. o Mission. o Goals. o Objectives with Indicators

More information

Chapter 5: Cost and Revenues Assumptions

Chapter 5: Cost and Revenues Assumptions Chapter 5: Cost and Revenues Assumptions Chapter 5: Cost and Revenues Assumptions INTRODUCTION This chapter documents the assumptions that were used to develop unit costs and revenue estimates for the

More information

Rural Transportation Forum, Walkerton, ON

Rural Transportation Forum, Walkerton, ON Rural Transportation Forum, Walkerton, ON Dennis Kar, Dillon Consulting Limited June 16 th, 2014 R u r a l Tr a n s p o r t a t i o n Fo r u m 2 Illustrate different types of coordinated transportation

More information

Addendum to Environmental Impact Report

Addendum to Environmental Impact Report Lead Agency: Staff Contact: Addendum to Environmental Impact Report Addendum Date: Case No.: 2011.0558E Project Title:, EIR: 2011.0558E, certified March 27, 2014 Project Sponsor: Sean Kennedy, San Francisco

More information

2017 TRANSIT DEVELOPMENT PLAN PROGRESS REPORT

2017 TRANSIT DEVELOPMENT PLAN PROGRESS REPORT LAKE COUNTY TRANSIT DIVISION P.O. Box 7800, Tavares, Florida 32778 2440 U.S. Highway 441/27, Fruitland Park, Florida 34731 Telephone: 352.323.5733; Facsimile: 352.323.5755 www.ridelakexpress.com 2017 TRANSIT

More information

VALLEY METRO RPTA FY18 Budget EXECUTIVE SUMMARY

VALLEY METRO RPTA FY18 Budget EXECUTIVE SUMMARY VALLEY METRO RPTA FY18 Budget EXECUTIVE SUMMARY FY18 ADOPTED ANNUAL OPERATING AND CAPITAL BUDGET Valley Metro Regional Public Transportation Authority (RPTA) provides public transportation services for

More information

City of Santa Monica Annual Financial Report of its

City of Santa Monica Annual Financial Report of its Annual Financial Report of its Proposition A Local Return Fund Proposition C Local Return Fund Measure R Local Return Fund Transportation Development Act Article 3 Fund As of and for the Years Ended June

More information

SAN FRANCISCO PLANNING DEPARTMENT

SAN FRANCISCO PLANNING DEPARTMENT REMARKS Addendum #2 to Environmental Impact Report Addendum Date: June 11, 2015 Case No.: 2011.0558E Project Title: Transit Effectiveness Project, Modified TTRP.5 Moderate Alternative, McAllister Street

More information

Measure R Local Return Guidelines

Measure R Local Return Guidelines Measure R Local Return Guidelines 10-0311cmc 2009 lacmta MEASURE R LOCAL RETURN - TABLE OF CONTENTS A. POLICY...2 I. PROGRAM SUMMARY...2 II. MEASURE R USES AND CONDITIONS FOR PROJECT ELIGIBILITY...2 1.

More information

Governor s FY 2018 Revised, FY 2019 and Capital Budget Recommendations House Finance Committee April 12, 2018

Governor s FY 2018 Revised, FY 2019 and Capital Budget Recommendations House Finance Committee April 12, 2018 Governor s FY 2018 Revised, FY 2019 and Capital Budget Recommendations House Finance Committee April 12, 2018 Quasi-public agency Established in 1964 Responsible: Fixed route bus service and Americans

More information

City of Saratoga Springs

City of Saratoga Springs City of Saratoga Springs Proposed Capital Program 2019 2024 Submitted by Mayor Meg Kelly and the 2019 Capital Program Committee Office of the Mayor City Hall 474 Broadway, Saratoga Springs, NY 12866 518.587.3550

More information

City of Portsmouth Portsmouth, New Hampshire Department of Public Works

City of Portsmouth Portsmouth, New Hampshire Department of Public Works RFP# 10-07 City of Portsmouth Portsmouth, New Hampshire Department of Public Works MARKET STREET BICYCLE AND PEDESTRIAN PATH BETWEEN MICHAEL SUCCI DRIVE AND THE NH PORT AUTHORITY REQUEST FOR PROPOSAL Sealed

More information

Okaloosa-Walton 2035 Long Range Transportation Plan Amendment

Okaloosa-Walton 2035 Long Range Transportation Plan Amendment Okaloosa-Walton 2035 Long Range Transportation Plan Amendment Adopted August 22, 2013 This report was financed in part by the U.S. Department of Transportation, Federal Highway Administration, the Florida

More information

1 (b) Reconstruct and rehabilitate state highways to better maintain 2 them and prevent and avoid costly future repairs; 3 (c) Support local

1 (b) Reconstruct and rehabilitate state highways to better maintain 2 them and prevent and avoid costly future repairs; 3 (c) Support local 1 (b) Reconstruct and rehabilitate state highways to better maintain 2 them and prevent and avoid costly future repairs; 3 (c) Support local government efforts to fund local transportation 4 projects that

More information

SALEM-KEIZER TRANSIT 555 Court St. NE Suite 5230 Salem, OR

SALEM-KEIZER TRANSIT 555 Court St. NE Suite 5230 Salem, OR SALEM-KEIZER TRANSIT 555 Court St. NE Suite 5230 Salem, OR 97301-3980 503-588-2424 Fax 503-566-3933 www.cherriots.org May 15, 2014 To: From: Subject: Salem Area Mass Transit District Budget Committee Allan

More information

San Francisco County Transportation Authority Prop K/Prop AA Allocation Request Form. Current Prop AA Request:

San Francisco County Transportation Authority Prop K/Prop AA Allocation Request Form. Current Prop AA Request: FY of Allocation Action: 2016/17 San Francisco County Transportation Authority Project Name: Grant Recipient: Department of Public Works EXPENDITURE PLAN INFORMATION Prop K EP category: Traffic Calming:

More information

RE: Citizens Advisory Committee September 12, 2012

RE: Citizens Advisory Committee September 12, 2012 09.07.12 RE: Citizens Advisory Committee September 12, 2012 Citizens Advisory Committee Anna LaForte Deputy Director for Policy and Programming Maria Lombardo Chief Deputy Director for Policy and Programming

More information

DRAFT PROPOSED BUDGET THE GOOD, THE BAD AND THE UGLY (Part 2) City of Chico May 2, 2017

DRAFT PROPOSED BUDGET THE GOOD, THE BAD AND THE UGLY (Part 2) City of Chico May 2, 2017 DRAFT PROPOSED BUDGET 2017 18 THE GOOD, THE BAD AND THE UGLY (Part 2) City of Chico May 2, 2017 DRAFT PROPOSED BUDGET 2017 18 SCHEDULE May 2 nd Round #2 Community Development Public Works May 16 th Questions

More information

ORANGE COUNTY TRANSPORTATION AUTHORITY. Orange County Transportation Authority's Fiscal Year Budget Workshop. PowerPoint

ORANGE COUNTY TRANSPORTATION AUTHORITY. Orange County Transportation Authority's Fiscal Year Budget Workshop. PowerPoint ORANGE COUNTY TRANSPORTATION AUTHORITY Orange County Transportation Authority's Fiscal Year 2013-14 Budget Workshop PowerPoint Budget Workshop Fiscal Year 2013-14 Board of Directors Meeting May 13, 2013

More information

Memorandum. Date: RE: Plans and Programs Committee

Memorandum. Date: RE: Plans and Programs Committee Memorandum Date: 07.08.10 RE: Plans and Programs Committee July 13, 2010 To: From: Through: Subject: Plans and Programs Committee: Commissioners Campos (Chair), Chu (Vice Chair), Chiu, Avalos, Dufty and

More information

Review and Release the Draft TAM FY Annual Budget for Public Comment (Action) - Agenda Item No. 8

Review and Release the Draft TAM FY Annual Budget for Public Comment (Action) - Agenda Item No. 8 DATE: May 14, 2018 TO: FROM: SUBJECT: Transportation Authority of Marin Board of Commissioners Dianne Steinhauser, Executive Director Li Zhang, Chief Financial Officer Review and Release the Draft TAM

More information

Metrolinx Rapid Transit Program Allocation of the Public Realm Amount

Metrolinx Rapid Transit Program Allocation of the Public Realm Amount STAFF REPORT ACTION REQUIRED Metrolinx Rapid Transit Program Allocation of the Public Realm Amount Date: April 4, 2014 To: From: Wards: Reference Number: Executive Committee Deputy City Manager, Cluster

More information

May 31, 2016 Financial Report

May 31, 2016 Financial Report 2016 May 31, 2016 Financial Report Capital Metropolitan Transportation Authority 7/13/2016 Table of Contents SUMMARY REPORTS Budgetary Performance - Revenue 2 - Sales Tax Revenue 6 - Operating Expenses

More information

Arlington County, Virginia

Arlington County, Virginia Arlington County, Virginia METRO METRO 2015 2024 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed

More information

FY17 FY16 Valley Metro RPTA Sources of Funds FY17 vs FY16

FY17 FY16 Valley Metro RPTA Sources of Funds FY17 vs FY16 FY17 ADOPTED ANNUAL OPERATING AND CAPITAL BUDGET Valley Metro Regional Public Transportation Authority (RPTA) provides public transportation services for Maricopa County located in the metro Phoenix, Arizona.

More information

Memorandum. Date: RE: Plans and Programs Committee

Memorandum. Date: RE: Plans and Programs Committee Memorandum Date: 11.09.09 RE: Plans and Programs Committee November 17, 2009 To: From: Through: Subject: Plans and Programs Committee: Commissioners Chu (Chair), Campos (Vice Chair), Chiu, Elsbernd, Maxwell

More information

SFMTA 2013 Revenue Bond Board of Directors

SFMTA 2013 Revenue Bond Board of Directors SFMTA Municipal Transportation Agency Image: Market and Geary Streets, circa 1920s, Muni Centennial logo SFMTA 2013 Revenue Bond Board of Directors 09 03 2013 SAN FRANCISCO, CALIFORNIA Background In 2007,

More information

Final Report June 1, 2012 San Francisco Municipal Transportation Agency (SFMTA) 2012 Budget Balancing Panel

Final Report June 1, 2012 San Francisco Municipal Transportation Agency (SFMTA) 2012 Budget Balancing Panel Panel Deliverables Final Report June 1, 2012 1. Develop a priority list of recommendations to address the balancing of the FY 2013 and FY 2014 Operating Budget. 2. Developed a priority list of recommendations

More information

Governor s FY 2017 Revised, FY 2018 and Capital Budget Recommendations House Finance Committee April 12, 2017

Governor s FY 2017 Revised, FY 2018 and Capital Budget Recommendations House Finance Committee April 12, 2017 Governor s FY 2017 Revised, FY 2018 and Capital Budget Recommendations House Finance Committee April 12, 2017 Quasi-public agency Established in 1964 Responsible: Fixed route bus service and Americans

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 10.12 SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY DIVISION: Finance and Information Technology BRIEF : Amend Transportation Code, Division II, Sections 302 and 303

More information

PROPOSED FY 2015 & 2016 OPERATING BUDGET & CAPITAL BUDGET PROPOSED FY CAPITAL IMPROVEMENT PROGRAM (CIP)

PROPOSED FY 2015 & 2016 OPERATING BUDGET & CAPITAL BUDGET PROPOSED FY CAPITAL IMPROVEMENT PROGRAM (CIP) PROPOSED FY 2015 & 2016 OPERATING BUDGET & CAPITAL BUDGET PROPOSED FY 2015 2019 CAPITAL IMPROVEMENT PROGRAM (CIP) February 4, 2014 SFMTA Board of Directors Workshop 1 PROPOSED FY 2015 & 2016 OPERATING

More information

CIP. PUBLIC WORKS DEPARTMENT Timm Borden, Director

CIP. PUBLIC WORKS DEPARTMENT Timm Borden, Director PUBLIC WORKS DEPARTMENT Timm Borden, Director CITY HALL 10300 TORRE AVENUE ~ CUPERTINO, CA 95014-3266 (408) 777-3354 ~ FAX (408) 777-3333 CIP 2015-2016 Budget report of the Capital Improvement Program

More information

Transit Development Plan And 2013 Annual Report. Asotin County PTBA

Transit Development Plan And 2013 Annual Report. Asotin County PTBA Transit Development Plan 2014-2019 And 2013 Annual Report Asotin County PTBA Date of Public Hearing: September 10, 2014 Table of Contents Section I: Organization... 3 Section II: Physical Plant... 4 Section

More information

SAMPLE BALLOT NOT FOR OFFICIAL USE

SAMPLE BALLOT NOT FOR OFFICIAL USE 3 in 1! Bike Lanes for Safety and Convenience! $ 117,000 Increase striping and marking of bicycle lanes and routes along selected streets. LOCATIONS: Various locations throughout Vallejo determined by

More information

Parking Cash Out. Transportation Solutions Workshop Series April 19, 2017

Parking Cash Out. Transportation Solutions Workshop Series April 19, 2017 Parking Cash Out Transportation Solutions Workshop Series April 19, 2017 Workshop Series Sponsors Welcome from the Chamber of Commerce Grand Rapids is Changing New Approach to Transportation Workshop Agenda

More information