RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING VILLAGES PROJECT APPROVED ON JUNE 10, 2016
|
|
- Austen Palmer
- 5 years ago
- Views:
Transcription
1 Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES31013 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING VILLAGES PROJECT APPROVED ON JUNE 10, 2016 TO SAVE THE CHILDREN INTERNATIONAL Public Disclosure Authorized EDUCATION EAST ASIA AND PACIFIC Public Disclosure Authorized Regional Vice President: Country Director: Senior Global Practice Director: Practice Manager/Manager: Task Team Leader: Victoria Kwakwa Ellen A. Goldstein Jaime Saavedra Chanduvi Harry Anthony Patrinos Tsuyoshi Fukao
2 ABBREVIATIONS AND ACRONYMS CB ECCD HB ISR PDO SCI Community-based Early Childhood Care and Development Home-based Implementation Status Report Project Development Objective Save the Children International
3 BASIC DATA Product Information Project ID P Original EA Category Partial Assessment (B) Approval Date 10-Jun-2016 Financing Instrument Investment Project Financing Current EA Category Partial Assessment (B) Current Closing Date 10-Jun-2019 Organizations Borrower Save the Children International Responsible Agency Project Development Objective (PDO) Original PDO The PDO is to improve access to quality Early Childhood Care and Development (ECCD) services through community and home-basedprograms for 0 to 5-year-olds, particularly for those from disadvantaged background, in the targeted areas. Summary Status of Financing TF Approval Signing Effectiveness Closing Net Commitment Disbursed Undisbursed TF-A May Jun Jun Jun Policy Waiver(s) Does this restructuring trigger the need for any policy waiver(s)? No
4 I. PROJECT STATUS AND RATIONALE FOR RESTRUCTURING A. Summary of Project Status 1. The Early Childhood Care and Development (ECCD) for Floating Villages Project (hereinafter referred to as the Project) supports the Government of Cambodia, through Save the Children International (SCI) as an implementing agency, to improve access to quality ECCD services through community-based (CB) and home-based (HB) ECCD programs. To this end, the Project supports: (i) the construction of onshore and floating CB ECCD centers; (ii) establishment of HB ECCD programs; (iii) building capacity of CB ECCD center facilitators as well as government officials for improving CB ECCD services; (iv) training to core mothers and parent group leaders for conducting HB ECCD programs; and (v) maternal literacy program for promoting ECCD activities. The baseline and endline studies are included to assess the output and outcome results and indicators agreed in the project results framework. 2. The Project is half way through its short three-year implementation period. Its design is ambitious and innovative and reasonable progress has been made to-date. The project is now entering a crucial stage, with a range of important activities to be implemented within tight time constraints. Initial delays of approximately one year were due to the pilot nature of the construction (onshore and floating centers). More time was required for SCI to get qualified staff on board, especially in the areas of center designs, and construction of both onshore and floating centers. The design of the onshore center was approved by the Bank in February The design of the floating center was submitted to and approved by the Bank in December 2017 and the technical specifications finalized in March Thus far, one onshore ECCD center has been completed in March Three other onshore centers are being constructed and scheduled to finish in June For construction of floating ECCD centers, the bid announcement has taken place in mid April The bid opening will be carried out in mid May Despite the construction delays of the CB centers, SCI is to be complimented on implementing a series of training activities relating to the soft components. All project personnel are now on board and have received appropriate training, including training on safeguards to SCI engineers, staff and contractors, training on procurement and contract management as well as training on financial management. Training sessions for CB-ECCD volunteer teachers has been completed. While waiting for the construction to complete, trained facilitators use existing infrastructure or available spaces in the villages to organize CB ECCD classes such as community centers, primary schools and pagodas. These volunteer teachers will also be able to support the HB ECCD activities. For HB ECCD, parenting sessions are ongoing, with increasing numbers of participating parents. Parental literacy program has been successfully completed for 198 parents (the project has achieved the target of 150 parents). As of April 30, 2018, project cumulative disbursement stands at per cent of the total grant amount. 4. In terms of achieving the PDO, the most recent ISR rating is Moderately Unsatisfactory (MU). CB ECCD program enrollment and classroom environment have made little progress, as most of the CB ECCD centers are under construction, resulting in the slow progress of these two PDO indicators. On the other hand, HB ECCD program has been implemented on schedule and the PDO indicator on HB ECCD program enrollment is on track. Regarding the intermediate results, one intermediate indicator regarding the community-based ECCD center construction shows little progress, while a second indicator regarding parent s literacy class has been achieved and a third indicator related to parent s participation in the home-based ECCD program is on track. The fourth and last intermediate indicator the number of communes that address ECCD services in their official annual plans is expected to be met during the final year of implementation. 4
5 B. Rationale for Restructuring 5. The project mid-term review was conducted during November 20 December 1, Its key findings highlighted that the project is at a critical stage of implementing activities within the tight remaining timeframe due to the accumulated delays from the civil works component. Although the other components have been progressing relatively well, adjustment and alignment of targets and indicators as well as reallocation of funds were suggested to ensure that the PDO will be met during the remaining implementation period. The main adjustment will be the number of children enrolled in the CB ECCD programs as well as HB ECCD programs, the project s PDO level indicators, which will be reduced due to the following reasons. 6.First, findings from the project baseline study indicates that the number of children in the target areas who would participate in the ECCD programs has reduced due to the two main reasons: (i) children from floating communities migrate with their families to find jobs on the main land or in the neighboring country; and (ii) behaviors in reproductive health have changed, resulting in low new birth rate for the target age children of the project. The study shows that there is a decline of about 7 per cent per year in the population of age 0-6 children in target villages. Migration also causes the total number of parents who would participate in the project s HB ECCD program to reduce. 7.Second, the number of children enrolled in CB ECCD programs will be reduced due to the decreased number of CB ECCD centers to be constructed (from originally 18 to 11 centers) caused by the construction cost escalation. Two main reasons have contributed to such cost escalation: (i) the design has been significantly improved to ensure stability, safety and provision of quality learning environment; and (ii) the cost of materials has increased significantly due to inflation and limited availability in the domestic market. 8.In light of the above, SCI has requested that the project be restructured within the following parameters of PDO indicators as well as an intermediate indicator: (i) reduce the number of children enrolled in CB ECCD program from the original target of 1,200 children to 770 children (PDO Indicator); (ii) reduce the number of children enrolled in HB ECCD program from 12,183 children to 10,070 children (PDO Indicator); (iii) reduce the number of CB ECCD centers to be constructed using the project funds from 18 to 11 centers (Intermediate Indicator), (iv) reduce the number of parents participating in HB ECCD program from 10,153 to 8,483 persons, and (iv) reallocate the funds to cover the increased construction cost of the CB ECCD centers. The restructuring, which is in response to the local context changes, will allow the project to achieve its PDO and related indicators. Concerted efforts both by SCI and WB task teams will be made to ensure that the project implementation will be closely monitored and accelerated within the remaining project timeframe. II. DESCRIPTION OF PROPOSED CHANGES C. Results Framework and Monitoring 9.PDO Level Results Indicators (a) Indicator One: Number of children enrolled in CB ECCD grogram financed by the project The proposed change for this indicator is to reduce the end target to 770 children due to (i) the reduction of beneficiary children in the target areas, and (ii) the reduction of the number of CB ECCD centers to be constructed. 5
6 (b) Indicator Two: Number of children enrolled in HB ECCD program financed by the project The proposed change for this indicator is to reduce the end target to 10,070 children due to the reduction of beneficiary children in the target areas. 10. Intermediate Results Indicator (c) Intermediate Result Indicator One: Number of ECCD centers with health corners constructed The number of CB ECCD centers to be constructed is scaled down from 18 centers (9 onshore and 9 floating) to 11 centers (4 onshore and 7 floating) due to the cost escalation. (d) Intermediate Result Indicator Two: Number of parents participating in HB ECCD program The proposed change for this indicator is to reduce the end target to 8,483 parents due to the lower number of new parent groups participating in the project in Year 3. The reason for the lower number of parent groups is due to migration. D. Reallocation between Disbursement Categories 11. Due to the construction cost escalation, funds are proposed to be reallocated across disbursement categories to reflect the additional construction costs as follows: Original Proposed Reallocation Category Amount ($) % Amount ($) % Consultants Services 557, , Incremental Operating Costs 418, , Goods 159, , Works 600, , Training and Workshops 1,052, ,015, ,790, ,790, III. SUMMARY OF CHANGES Changed Change in Results Framework Not Changed Reallocation between Disbursement Categories Change in Disbursement Estimates Change in Implementing Agency Change in Project's Development Objectives 6
7 PDO_IND_TABLE The World Bank Change in Components and Cost Change in Loan Closing Date(s) Cancellations Proposed Additional Financing Proposed Change in Disbursements Arrangements Change in Overall Risk Rating Change in Safeguard Policies Triggered Change of EA category Change in Legal Covenants Change in Institutional Arrangements Change in Financial Management Change in Procurement Change in Implementation Schedule Other Change(s) IV. DETAILED CHANGE(S) OPS_DETAILEDCHANGES_RESULTS_TABLE RESULTS FRAMEWORK Project Development Objective Indicators Number of children enrolled in Community-based ECCD program financed by the project Value Revised Date 10-Jun Jan May-2019 Number of children enrolled in Home-based ECCD program financed by the project Value Revised 7
8 Date 11-Jul Jan May-2019 Percentage of Community Based ECCD program rated as level 5 overall on the adjusted Early Childhood Environmental Rating Scale throuhg classroom observation Unit of Measure: Percentage Value No Change Date 11-Jul Jan May-2019 Intermediate Indicators IO_IND_TABLE Number of ECCD centers with health corners constructed Value Revised Date 10-Jun Jan May-2018 Number of parents participating in HB ECCD program Value Revised Date 11-Jul Jan May-2019 Number of parents/mothers who participated and completed maternal literacy programs Value No Change Date 11-Jul Jan May-2019 Number of communes that address ECCD services in their official annual plans of commune council 8
9 Value No Change Date 11-Jul Sep May-2019 OPS_DETAILEDCHANGES_REALLOCATION _TABLE REALLOCATION BETWEEN DISBURSEMENT CATEGORIES Current Allocation Actuals + Committed Proposed Allocation Financing % (Type Total) Current Proposed TF-A Currency: USD ilap Category Sequence No: 1 Current Expenditure Category: TFA CONS SERV 557, , , ilap Category Sequence No: 2 Current Expenditure Category: TFA GOODS 159, , , ilap Category Sequence No: 3 Current Expenditure Category: TFA WORKS 600, , , ilap Category Sequence No: 4 Current Expenditure Category: TFA TRAINING & WS 1,052, , ,015, ilap Category Sequence No: 5 Current Expenditure Category: TFA OPERATING COSTS 418, , , Total 2,790, ,178, ,790, OPS_DETAILEDCHANGES_DISBURSEMENT_TABLE DISBURSEMENT ESTIMATES Change in Disbursement Estimates Yes 9
10 Year Current Proposed , ,000, , ,000, , , ,430,
DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE
Public Disclosure Authorized DOCUMENT OF THE WORLD BANK REPORT NO.: RES30282 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized MEXICO
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO SERVICES (IDEA) PROJECT
Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES31045 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY ANALYSIS CAPACITY APPROVED ON APRIL 28, 2017
Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES31490 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY
More informationThe World Bank LK GPOBA - Access to Sanitation Project (P111161)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LK GPOBA - ACCESS TO SANITATION PROJECT APPROVED ON JUNE 8, 2011 TO DEMOCRATIC
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016
Public Disclosure Authorized The World Bank REPORT NO.: RES31608 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016
Public Disclosure Authorized The World Bank REPORT NO.: RES31986 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT APPROVED ON JULY 31, 2008
Public Disclosure Authorized RESTRUCTURING PAPER REPORT NO.: RES29620 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT
More informationThe World Bank Social Assistance System Strengthening Project (P123960)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SOCIAL ASSISTANCE SYSTEM STRENGTHENING PROJECT APPROVED ON JANUARY 22,
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000)
Public Disclosure Authorized The World Bank REPORT NO.: RES29565 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
Public Disclosure Authorized The World Bank REPORT NO.: RES30835 RESTRUCTURING PAPER Public Disclosure Authorized Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF REHABILITATION AND
More informationDOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT
Public Disclosure Authorized The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES24760 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationThe World Bank Third Secondary and Local Roads Project (P148048)
Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THIRD SECONDARY AND LOCAL ROADS PROJECT APPROVED ON JULY 3, 2014 TO GEORGIA REPORT NO.:
More informationThe World Bank NEITI Reporting Compliance (P162344)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF NEITI REPORTING COMPLIANCE APPROVED ON DECEMBER 7, 2016 TO FEDERAL MINISTRY
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 104604 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT PROJECT APPROVED ON JUNE 29, 2010
Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES24803 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT
More informationThe World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LAND HUSBANDRY, WATER HARVESTING AND HILLSIDE IRRIGATION PROJECT APPROVED
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT
Public Disclosure Authorized The World Bank REPORT NO.: RES30161 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE
More informationThe World Bank Kabeli-A Hydro Electric Project (P122406)
Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF KABELI-A HYDRO ELECTRIC PROJECT APPROVED ON JULY 1, 2014 TO NEPAL REPORT NO.: RES32467
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Transport Sector Unit Europe and Central Asia Region Document of The World Bank RESTRUCTURING
More informationThe World Bank Water and Sanitation in Tourist Areas (P054221)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF WATER AND SANITATION IN TOURIST AREAS APPROVED ON APRIL 2, 2009 TO THE
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A
Public Disclosure Authorized Document of The World Bank Document of The World Bank Public Disclosure Authorized FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No: RES22488 Public Disclosure Authorized
More informationThe World Bank Disease Prevention and Control Project (P128442)
Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF DISEASE PREVENTION AND CONTROL PROJECT APPROVED ON MARCH 27, 2013 TO REPUBLIC OF ARMENIA
More informationThe World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SEE CATASTROPHE RISK INSURANCE FACILITY TA SECO APPROVED ON SEPTEMBER
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PROVINCIAL AND RURAL INFRASTRUCTURE PROJECT (CREDIT 3822-KH)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Sustainable Development Department Southeast Asia Country Management Unit East Asia and
More informationImplementation Status & Results Azerbaijan Corporate and Public Sector Accountivility Project (P099924)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Azerbaijan Corporate and Public Sector Accountivility
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GOVERNMENT S CENTRAL PUBLIC ADMINISTRATION REFORM (CPAR) PROJECT
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Project No: 105602 PROPOSED PROJECT
More informationPublic Disclosure Copy
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Specific Investment Loan FY 2013 Seq No: 9 ARCHIVED on 22-Jun-2017
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22644 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No:
More informationImplementation Status & Results Ukraine Public Finance Modernization Project (P090389)
Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Ukraine Public Finance Modernization Project (P090389)
More informationDocument of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES19910 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationImplementation Status & Results Brazil Second National Environmental Project - Phase II (P099469)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469) Operation Name: Second National
More informationPublic Disclosure Copy
EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global Practice Recipient Executed Activities Technical Assistance Loan FY 2013 Seq No: 4 ARCHIVED on 28-Dec-2015 ISR21722
More informationImplementation Status & Results Sri Lanka Public Sector Capacity Building (P097329)
Public Disclosure Authorized Public Disclosure Authorized @ The World Bank Implementation Status & Results Sri Lanka Public Sector Capacity Building (P97329) Report No: ISR553 o o Operation Name: Public
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING OF THE SAFETY NET ADVANCEMENT PROJECT APPROVED JULY 5, 2011 GRENADA
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES12428 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING
More informationThe World Bank Malawi Strategic Program for Climate Resilience (P163245)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MALAWI STRATEGIC PROGRAM FOR CLIMATE RESILIENCE APPROVED ON NOVEMBER
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT )
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
More informationSENEGAL: TRANSPORT & URBAN MOBILITY PROJECT APPROVED ON JUNE 1, 2010 COORDINATION DU PATMUR,MINISTERE DE L'ECONOMIE, DES FINANCES ET DU PLAN
Public Disclosure Authorized The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES30500 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SENEGAL: TRANSPORT &
More informationImplementation Status & Results India Assam State Roads Project (P096018)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results India Assam State Roads Project (P096018) Operation Name: Assam State Roads Project (P096018) Project Stage: Implementation
More informationDocument of The World Bank RESTRUCTURING PAPER
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER Report No: 71429-IQ ON A PROPOSED PROJECT
More informationPublic Disclosure Copy
EAST ASIA AND PACIFIC China Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2011 Seq No: 12 ARCHIVED on 27-Nov-2017 ISR28052 Implementing Agencies: Ministry of Fiance, Shandong
More informationDebt Management Strengthening Programme at Ministry of Finance, Government of Pakistan (P161451)
SOUTH ASIA Pakistan Macroeconomics, Trade and Investment Global Practice Recipient Executed Activities Investment Project Financing FY 2017 Seq No: 2 ARCHIVED on 27-Jun-2018 ISR33129 Implementing Agencies:
More informationMozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)
AFRICA Mozambique Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2007 Seq No: 22 APPROVED ISR29261 Implementing Agencies: Key Dates Key Project Dates Bank Approval Date:23-May-2007
More informationThe World Bank Indonesia Power Transmission Development Project (P117323)
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Energy & Extractives Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 7 ARCHIVED on 07-Jul-2015 ISR18557 Implementing Agencies:
More informationImplementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207) Operation Name: Transport Rehabilitation
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report
Public Disclosure Authorized Public Disclosure Copy AFRICA Ghana Environment & Natural Resources Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 7 ARCHIVED on 10-Aug-2015 ISR18623 Implementing
More informationKey Dates. Global Development Objectives. Components. Overall Ratings
Public Disclosure Authorized AFRICA Cameroon Environment & Natural Resources Global Practice Global Environment Project Specific Investment Loan FY 2012 Seq No: 10 ARCHIVED on 19-Apr-2017 ISR27535 Implementing
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES PROJECT
Public Disclosure Authorized REPORT NO.: RES33563 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES18411 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationThe World Bank Sustainable Croatian Railways in Europe (P147499)
Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SUSTAINABLE CROATIAN RAILWAYS IN EUROPE APPROVED ON APRIL 30, 2015 TO HZ INFRASTRUCTURE,HZ
More informationINFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 MINISTRY OF ECONOMY AND FINANCE, MEF,MINISTRY OF FINANCE AND ECONOMY
DOCUMENT OF THE WORLD BANK REPORT NO.: RES29941 RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 TO TRANSPORT & ICT
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE KARNATAKA HEALTH SYSTEM DEVELOPMENT AND REFORM PROJECT
Public Disclosure Authorized Docume of The World Bank FOR OFFICIAL USE ONLY Report No: RES22733 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationThe World Bank. losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized. Public Disclosure Copy
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Lao People's Democratic Republic Lao PDR - Mainstreaming
More informationPNG - Small and Medium Enterprise Access to Finance Project (P120707)
EAST ASIA AND PACIFIC Papua New Guinea Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2011 Seq No: 14 ARCHIVED on 13-Dec-2018 ISR34953 Implementing Agencies:
More informationThe World Bank Indonesia Infrastructure Guarantee Fund Project (P118916)
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Finance & Markets Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 10 ARCHIVED on 24-Dec-2017 ISR31037 Implementing Agencies:
More informationThe World Bank Mozambique - Artisanal Fisheries and Climate Change (P149992)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MOZAMBIQUE - ARTISANAL FISHERIES AND CLIMATE CHANGE APPROVED ON MARCH
More informationImplementation Status & Results Burkina Faso Local Government Support Project (P120517)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Burkina Faso Local Government Support Project (P120517) Operation Name: Local Government Support
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
More informationResults-Based Rural Water Supply and Sanitation Under the National Target Program (P127435)
Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Water Global Practice Requesting Unit: EACVF Responsible Unit: GWA02 IBRD/IDA Program-for-Results Financing FY 2013 Team Leader(s): Lilian Pena
More informationThe World Bank Kabul Urban Transport Efficiency Improvement Project (P131864)
Public Disclosure Authorized SOUTH ASIA Afghanistan Transport & Digital Development Global Practice Recipient Executed Activities Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 09-Feb-2018
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES14735 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR
More informationBangladesh Insurance Sector Development Project (P156823)
SOUTH ASIA Bangladesh Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 4 ARCHIVED on 11-Oct-2018 ISR34079 Implementing Agencies: PEOPLE'S REPUBLIC
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report
Public Disclosure Authorized Public Disclosure Copy EAST ASIA AND PACIFIC China Energy & Extractives Global Practice IBRD/IDA Financial Intermediary Loan FY 2008 Seq No: 11 ARCHIVED on 16-Dec-2015 ISR21909
More informationImplementation Status & Results Philippines National Program Support for Tax Administration Reform. (P101964)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Philippines National Program Support for Tax Administration Reform. (P101964) Operation Name: National
More informationPublic Disclosure Copy
Public Disclosure Authorized EUROPE AND CENTRAL ASIA Uzbekistan Water Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 11 ARCHIVED on 12-Jan-2018 ISR30620 Implementing Agencies: Republic
More informationPublic Disclosure Copy
Public Disclosure Authorized EUROPE AND CENTRAL ASIA Armenia Energy & Extractives Global Practice Recipient Executed Activities Investment Project Financing FY 2015 Seq No: 1 ARCHIVED on 24-Sep-2015 ISR20717
More informationMicroSmall&Medium Enterprise and Large Enterprise Supply Chain Finance (P157691)
EUROPE AND CENTRAL ASIA Turkey Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 6 ARCHIVED on 26-Nov-2018 ISR34378 Implementing Agencies: Türkiye
More informationINTEGRATED COASTAL ZONE MANAGEMENT APPROVED ON JUNE 15, 2010 THE REPUBLIC OF INDIA
The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES30277 RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INTEGRATED COASTAL ZONE MANAGEMENT APPROVED ON JUNE 15, 2010 TO ENVIRONMENT & NATURAL
More informationPublic Disclosure Copy
Public Disclosure Authorized AFRICA Burkina Faso Social Protection & Labor Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 10 ARCHIVED on 23-Dec-2017 ISR29874 Implementing Agencies:
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT
More informationPublic Disclosure Copy
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Peru Social Protection Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 7 ARCHIVED on 04-Feb-2015 ISR17689 Implementing Agencies:
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INSTITUTIONS BUILDING TECHNICAL ASSISTANCE PROJECT (IBTAL)
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES18226 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationTR Third Access to Finance for SMEs (SME III) (P130864)
EUROPE AND CENTRAL ASIA Turkey Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 9 ARCHIVED on 17-Oct-2018 ISR34297 Implementing Agencies: T.
More informationSTATUS OF PROJECTS IN EXECUTION FY09 SOPE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized STATUS OF PROJECTS IN EXECUTION FY09 SOPE COUNTRY: GUINEA Operations Policy and Country
More informationPublic Disclosure Copy
Public Disclosure Authorized EUROPE AND CENTRAL ASIA Poland Water Global Practice IBRD/IDA Investment Project Financing FY 2007 Seq No: 20 ARCHIVED on 07-Dec-2017 ISR30355 Implementing Agencies: Republic
More informationRoad Sector Development Project (P149322)
Public Disclosure Authorized EUROPE AND CENTRAL ASIA Ukraine Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 6 ARCHIVED on 20-Jun-2018 ISR32806 Implementing
More informationThe World Bank NP: Strengthening the Office of the Auditor General (P127040)
Public Disclosure Authorized SOUTH ASIA Nepal Financial Management Global Practice Recipient Executed Activities Specific Investment Loan FY 2012 Seq No: 3 ARCHIVED on 20-Feb-2015 ISR18017 Implementing
More informationThe World Bank CG Rep. Skills Development for Employability Project (P128628)
Public Disclosure Authorized AFRICA Congo, Republic of Education Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 17-Jun-2017 ISR27973 Implementing Agencies: Ministry
More informationThe World Bank Indonesia Power Transmission Development Project (P117323)
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2011 Seq No: 13 ARCHIVED on 28-Dec-2017 ISR30911 Implementing
More informationImplementation Status & Results Croatia Revenue Administration Modernization Project (P102778)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Croatia Revenue Administration Modernization Project (P102778) Operation Name: Revenue Administration
More informationPublic Disclosure Copy. Implementation Status & Results Report Uganda Reproductive, Maternal and Child Health Services Improvement Project (P155186)
Public Disclosure Authorized AFRICA Uganda Health, Nutrition & Population Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 3 ARCHIVED on 20-Dec-2017 ISR30454 Implementing Agencies:
More informationSOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR (CAREC 1B & 6B) (P099270)
Public Disclosure Authorized SOUTH-WEST ROADS: WESTERN EUROPE-WESTERN CHINA INTERNATIONAL TRANSIT CORRIDOR EUROPE AND CENTRAL ASIA Kazakhstan Transport & ICT Global Practice IBRD/IDA Specific Investment
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions
Public Disclosure Authorized Public Disclosure Copy AFRICA South Sudan Health, Nutrition & Population Global Practice Special Financing Emergency Recovery Loan FY 2012 Seq No: 7 ARCHIVED on 23-Dec-2015
More informationPublic Disclosure Copy
Public Disclosure Authorized AFRICA Congo, Republic of Social Protection & Labor Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 4 ARCHIVED on 07-Jan-2016 ISR22324 Implementing Agencies:
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A
Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INDONESIA INFRASTRUCTURE FINANCE FACILITY PROJECT LOAN 7731-ID JUNE 24, 2009 TO THE REPUBLIC
More informationPublic Disclosure Copy. Implementation Status & Results Report CO Rio Bogota Environmental Recuperation and Flood Control Project (P111479)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Colombia Water Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 12 ARCHIVED on 30-Jun-2017 ISR27693 Implementing Agencies: Corporacion
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized
Public Disclosure Authorized Public Disclosure Copy AFRICA Ethiopia Social Protection & Labor Global Practice IBRD/IDA Sector Investment and Maintenance Loan FY 2013 Seq No: 12 ARCHIVED on 09-Oct-2015
More informationPublic Disclosure Copy
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Social Protection & Labor Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 14 ARCHIVED on 16-Jun-2016 ISR23892 Implementing
More informationPublic Disclosure Copy
LATIN AMERICA AND CARIBBEAN Honduras Energy & Extractives Global Practice Recipient Executed Activities Technical Assistance Loan FY 2014 Seq No: 1 ARCHIVED on 16-Oct-2015 ISR20092 Implementing Agencies:
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INCOME SUPPORT AND EMPLOYABILITY PROJECT LOAN 7811-SV
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES20444 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure
More informationPublic Disclosure Copy. Implementation Status & Results Report Transparency and Accountability in Mongolian Education (TAME) (P150842)
EAST ASIA AND PACIFIC Mongolia Education Global Practice Recipient Executed Activities Investment Project Financing FY 2015 Seq No: 6 ARCHIVED on 08-Dec-2017 ISR30515 Implementing Agencies: Globe International
More informationThe World Bank Kenya Cash Transfer for Orphans and Vulnerable Children (P111545)
Public Disclosure Authorized AFRICA Kenya Social Protection & Labor Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 17 ARCHIVED on 21-Jun-2017 ISR28380 Implementing Agencies: Ministry
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING SERBIA COMPETITIVENESS AND JOBS PROJECT (P152104) APPROVED ON SEPTEMBER 16, 2015
Public Disclosure Authorized The World Bank REPORT NO.: RES31629 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF SERBIA COMPETITIVENESS AND JOBS PROJECT APPROVED
More informationThe World Bank Industrial Waste Management and Cleanup Project (P122139)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INDUSTRIAL WASTE MANAGEMENT AND CLEANUP PROJECT APPROVED ON SEPTEMBER
More informationImplementation Status & Results Samoa SAMOA HEALTH SECTOR MANAGEMENT PROGRAM SUPPORT PROJECT (P086313)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Samoa SAMOA HEALTH SECTOR MANAGEMENT PROGRAM SUPPORT PROJECT (P086313) Operation Name: SAMOA HEALTH
More informationThe World Bank. Ghana: Energy Development and Access Project (P074191) Key Dates. Project Development Objectives. Components
Public Disclosure Authorized Public Disclosure Copy AFRICA Ghana Energy & Extractives Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 17 ARCHIVED on 29-Jun-2017 ISR28824 Implementing
More informationImplementation Status & Results Indonesia Project for Indonesian Tax Administration Reform (PINTAR) (P100740)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Project for Indonesian Tax Administration Reform (PINTAR) (P100740) Operation Name: Project
More informationImplementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810) Operation
More informationNigeria - Program to Support Saving One Million Lives (P146583)
Public Disclosure Authorized AFRICA Nigeria Health, Nutrition & Population Global Practice Requesting Unit: AFCW2 Responsible Unit: GHN07 IBRD/IDA Program-for-Results FY 2015 Team Leader(s): Benjamin P.
More information