1 Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES14735 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN Public Disclosure Authorized OCTOBER 25, 2010 TO THE ADMINISTRACION NACIONAL DE ELECTRICIDAD (ANDE) WITH THE GUARANTEE OF THE REPUBLIC OF PARAGUAY FOR THE ENERGY SECTOR STRENGTHENING PROJECT Public Disclosure Authorized DECEMBER 10, 2015 ENERGY AND EXTRACTIVES GLOBAL PRACTICE LATIN AMERICA AND THE CARIBBEAN REGION This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization.
2 ABBREVIATIONS AND ACRONYMS ANDE DMS EMP EMS ESMF OMS PDO PIU SCADA SGIDE Administración Nacional de Electricidad. Demand Management System. A SCADA application that optimizes and manages the distribution systems (including events, alarm, time tagging, historical data records, control sequences) to monitor and operate the Medium Voltage (MV) grid. Increases overall grid reliability. Environmental Management Plan. Energy Management System. A SCADA application that optimizes and manages the transmission systems (including events, alarm, time tagging, historical data records, control sequences) to monitor and operate the High Voltage (HV) grid. Increase overall transmission grid reliability proactively minimizing blackouts. Environmental and Social Management Framework. Operations Management System. A SCADA application that optimizes and manages the restoration of power outages in distribution systems by reducing the duration and frequency of power outages. Project Development Objective. Project Implementation Unit. Supervisory Control And Data Acquisition. A software that provides real-time Supervisory Control and Data Acquisition of the power system components. Sistema de Gestión Integral de Distribución Eléctrica (Integrated Electrical Distribution Management System). An integral management system to optimize the technical, operational, administrative and commercial aspects of the Distribution System operation, maintenance and commercial cycle (regular metering, billing, and collection). Regional Vice President: Country Director: Senior Global Practice Director: Practice Manager/Manager: Task Team Leader: Jorge Familiar Jesko Hentschel Anita Marangoly George Antonio Alexandre Rodrigues Barbalho Sergio Gonzalez Coltrinari 2
3 PARAGUAY Energy Sector Strengthening Project CONTENTS A. SUMMARY 5 B. PROJECT STATUS 6 C. PROPOSED CHANGES 6 3
4 DATA SHEET Paraguay PY Energy Sector Strengthening Project (P114971) LATIN AMERICA AND CARIBBEAN Energy & Extractives Report No: RES14735 Basic Information Project ID: P Lending Instrument: Specific Investment Loan Regional Vice President: Jorge Familiar Calderon Original EA Category: Partial Assessment (B) Country Director: Jesko S. Hentschel Current EA Category: Partial Assessment (B) Senior Global Practice Director: Practice Manager/Manager: Team Leader(s): Anita Marangoly George Original Approval Date: Antonio Alexandre Rodrigues Barbalho Sergio Augusto Gonzalez Coltrinari Current Closing Date: 30-Nov Dec-2015 Borrower: Responsible Agency: ANDE ANDE Restructuring Type Form Type: Full Restructuring Paper Decision Authority: Country Director Approval Restructuring Level: Level 2 Financing ( as of 06-Nov-2015 ) Key Dates Project Ln/Cr/TF Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P IBRD Effective 30-Nov Feb Feb Dec Dec-2015 Disbursements (in Millions) Project Ln/Cr/TF Status Currency Original Revised Cancelle d Disburse d Undisbur sed % Disburse d P IBRD Effective USD
5 Policy Waivers Does the project depart from the CAS/CPF in content or in other significant respects? Yes [ ] No [ X ] Does the project require any policy waiver(s)? Yes [ ] No [ X ] A. Summary of Proposed Changes The main proposed changes are: (a) a 22-month extension (first extension) of the Closing Date of the project from December 31, 2015, to October 31, 2017 to enable timely completion of all ongoing activities and achievement of the PDO; (b) changes in investments in all three components and approval and completion of new proposed investments; (c) reallocation of loan proceeds; and (d) changes of some indicators in the results framework. Change in Implementing Agency Yes [ ] No [ X ] Change in Project's Development Objectives Yes [ ] No [ X ] Change in Results Framework Yes [ X ] No [ ] Change in Safeguard Policies Triggered Yes [ ] No [ X ] Change of EA category Yes [ ] No [ X ] Other Changes to Safeguards Yes [ X ] No [ ] Change in Legal Covenants Yes [ ] No [ X ] Change in Loan Closing Date(s) Yes [ X ] No [ ] Cancellations Proposed Yes [ ] No [ X ] Change to Financing Plan Yes [ ] No [ X ] Change in Disbursement Arrangements Yes [ ] No [ X ] Reallocation between Disbursement Categories Yes [ X ] No [ ] Change in Disbursement Estimates Yes [ X ] No [ ] Change to Components and Cost Yes [ X ] No [ ] Change in Institutional Arrangements Yes [ ] No [ X ] Change in Financial Management Yes [ ] No [ X ] Change in Procurement Yes [ ] No [ X ] Change in Implementation Schedule Yes [ X ] No [ ] Other Change(s) Yes [ ] No [ X ] Appraisal Summary Change in Economic and Financial Analysis Yes [ ] No [ X ] Appraisal Summary Change in Technical Analysis Yes [ ] No [ X ] Appraisal Summary Change in Social Analysis Yes [ ] No [ X ] Appraisal Summary Change in Environmental Analysis Yes [ ] No [ X ] Appraisal Summary Change in Risk Assessment Yes [ ] No [ X ] 5
6 B. Project Status The Loan was approved by the Bank on November 30, 2010 and became effective on February 9, 2012, with an original Closing Date of December 31, Implementation delays, including an effectiveness delay of about 15 months, have slowed down project implementation. The Project comprises 3 Components: Components 1 and 2 finance 11 investment packages and Component 3 supports Technical Assistance (TA) to strengthen sectoral capacity. Progress to date on the 11 investments originally included in the Loan is as follows: a) Investments 1 to 9 are currently under implementation, one of which (Reactive Power Compensator at the Guarambaré Substation) will be completed in December 2015.Factory testing has been completed for most of the equipment and delivery of tested equipment is already scheduled. All of the 24 transformers to be installed in 10 substations are scheduled for delivery by March 2016, while eight of them will be delivered ahead of schedule by the end of this year. b) Investment 10 (sub-component Construction of two new transmission substations at Barrio San Pedro and Minga Pora) is at bid evaluation stage with a bid opening ceremony on November 20, This investment is key to meeting the PDO. At the Bank request, this investment had been put on hold earlier since completion would end up being beyond the current Closing Date. c) Investment 11 (Sub-component 1.1 Purchase and installation of SCADA) will be scaled down from a SCADA-EMS-DMS-OMS-SGIDE system to a just the SCADA-EMS portion to optimize and manage the High Voltage (HV) transmission grid. The supervision mission of July 2015 noted significant progress in implementation, which allowed the upgrade of the Project Development Objective (PDO) and Implementation Progress (IP) ratings to Moderately Satisfactory. This is mainly due to the fact that while progress has been achieved and several contracts have been signed, ratings can improve only once the closing date has been extended, to allow for adequate time for completion of all activities, especially for sub-component 2.1 (construction of two new transmission substations), crucial to meeting the PDO. C. Proposed Changes Project Development Objectives Original PDO Development Objectives/Results To increase the quantity and quality of the provision of electricity services by the Borrower, while improving the Borrower s performance. Change in Project's Development Objectives Change in Results Framework The current indicators are difficult to track and measure because they measure overall system parameters (i.e. losses, service interruptions, energy transferred, etc.) in the country instead of the project related 6
7 investments. Therefore, a revision of the indicators is proposed to better reflect the expected outcomes of the project, including the new proposed investments, as well as actual progress towards the PDO. Out of the five PDO indicators, three are being replaced and two are being dropped. The ones being dropped are: (a) increased quality of service (improved voltage profile), and (b) Direct Project Beneficiaries. Out of five Intermediate Indicators, four are being replaced and one is being dropped. The updated indicators will be included in the Project Operations Manual. Other Changes to Safeguards Compliance The new proposed activities for the restructuring package represent a significant additional effort from ANDE for the original activities in terms of environmental management. The Borrower prepared a new Environmental Management Plan (EMP), to prevent and mitigate the potential impacts that these new activities might cause. The proposed new activities, if managed appropriately, are not expected to generate major adverse impacts. Some of the potential impacts are: (a) generation of residues from the packing of electrical equipment (wood, carton, plastic, etc.) and draining of oil tanks used in the transformers; (b) risks of accidents during transportation of the major electrical equipment (transformers, mobile substations, large truck, etc.) in urban areas; (c) risks of explosions and fires during installation, transportation, operation and storage of major equipment; (d) management of hazardous residues from maintenance activities (i.e. change of electrical/electronic spares, transformers, etc.). The EMP contains actions and measures to prevent and mitigate potential impacts and to improve ANDE's environmental management, including mitigation measures and protocols for the storing and handling of old transformers and other electrical residues. The EMP was published on Nov 20, 2015 on the Borrower s and the Bank s external websites. The changes in activities and new investments imply no land acquisition and no indigenous people issues. Change in Loan Closing Date(s) Financing The extension of the Closing Date from December 31, 2015, to October 31, 2017 will allow for the Project to complete all of the ongoing and planned activities, recovering the time lost with the initial effectiveness delay and the slow progress in implementation until recently. Ln/Cr/T F IBRD Status Reallocations Original Closing Date Current Closing Date Proposed Closing Date Previous Closing Date(s) Effective 31-Dec Dec Oct Dec-2015 The following table shows the reallocation of the Loan proceeds, needed to adjust the changes to components and costs that is presented in detail in the next section. Ln/Cr/TF Currency Current Category of Allocation Disbursement % 7
8 IBRD USD Disbursement Estimates Expenditure GO, CW, CS, Non-CS, TR for PART 1 GO, CW, CS, Non-CS, TR for PART 2 GO, CS, Non-CS, TR for PART 3 Premia for CAPS/COLLARS Change in Disbursement Estimates 8 (Type Total) Current Proposed Current Proposed 20,000,000 25,631, ,000,000 71,769, ,750,000 2,350, Designated Account FRONT END FEE 250, , Total: 100,000, ,000,000 A realignment of actual and estimates disbursements till the current Closing Date is needed and estimates for the proposed extension are presented in the following table. Fiscal Year Current (USD) Proposed (USD) Change to Components and Cost Total Components 1) Component 1 Modernizing the Borrower s Distribution Management System and Installing an advanced Metering System for Large Consumers. (IBRD US$20m). a) Sub-Component 1.1: Installation of a state-of-the art integrated distribution management system. It will not be possible to complete the full SCADA/EMS/DMS/OMS/SGIDE system even with an extension of 22 months. Instead, it is proposed to only undertake the SCADA/EMS portion with an
9 estimated budget of US$4.94 million to optimize and manage the High Voltage (HV) transmission grid. The balance from the original budget will be used to finance the following new investments: i) Supply and installation of SCADA/EMS for transmission US$ 4,942,153 ii) Supply and installation of fiber optic network US$ 7,690,000 iii) Supply and installation of active communication equipment US$ 6,235,000 iv) Supply and installation of wireless meshed network US$ 3,700,000 v) Supply and installation of digital carrier equipment US$ 928,000 b) Sub-Component 1.2: Installation of a 66kV advanced metering system. This is underway. No scope changes envisaged. 2) Component 2- Improving the Performance of the Transmission Network (IBRD US$77m). a) Sub-Component 2.1: Construction of two new substations. Bidding is underway. No scope changes anticipated to this component. b) Sub-Component 2.2: Extension of about 10 existing substations (transformers purchased and savings incurred as bid was lower than estimated budget). c) Sub-Component 2.3: Installation of Reactive Compensator at Guarambaré Substation. This is underway and completion expected by end of No changes to the scope. Savings incurred from the purchase of transformers under 2.2 will be used to finance new investments, as follows: i) Supply of 11 three-phase power transformers for additional 7 substations US$13,230,000 ii) Supply of mobile substation 66/23kV-30MVA US$ 2,500,000 iii) Purchase of 8x6 truck with modular trailer to transport power transformers US$ 1,900,000 iv) Purchase of mobile 23kv distribution center compact 23kv cells and SSAA US$ 1,600,740 3) Component 3-Strengthening Paraguay s Electricity Sector and the Borrower s Institutional Capacity (IBRD US$2.75m). a) Sub-component 3.1: Improvement of the performance of the electricity sector and in particular, the Borrower, through: (i) the carrying out of an independent institutional assessment of the legal framework, the organizational structure and operational procedures of the electric sector in Paraguay; (ii) the development of an action plan (acceptable to the Bank and to the MH); and (iii) the implementation of the key priorities established in the action plan, all in a manner acceptable to the Bank and to the MH. During the mission of July 2015, it was agreed that the three studies originally contemplated under subcomponent 3.1 were not relevant anymore. Those studies are replaced by a Technical Assistance for the analysis of ANDE's organizational structure and human resources, with an estimated cost of US$ 800,000. b) Sub-component 3.2: Institutional strengthening of the Borrower's capacity in investment and project planning and implementation, through, inter alia: (i) strategic advice to the Borrower's Presidency on managerial decisions that will enhance its performance; (ii) strategic support from international consultants with successful experience in the implementation of a distribution management system during the first three years of implementation of Part I of the Project; (iii) strengthening of the Borrower's environmental and social unit through provision of best practices 9
10 and methodologies, and capacity building to ensure oversight of transmission investments under Parts 1 and 2 of the Project; and (iv) strengthening of the Borrower's financial and asset management practices, its internal auditing unit, and provision of external auditors for the Project (underway). The item (i) strategic advice to the Borrower's Presidency on managerial decisions that will enhance its performance will be dropped as it is no longer relevant. This is the only change envisaged. Technical missions took place in May and July 2015, to carry out a technical assessment and feasibility of the new investments proposed by the Borrower, after which, critical investments needed which could be implemented under this Loan were identified. During the mission of July 2015, the technical team worked closely with the Borrower and carried out an assessment of the identified proposed new investments and a feasible implementation schedule within the anticipated 22-month extension. The proposed new investments will be financed from reallocation of funds between the components in the project and there will be no change in the current total Loan amount. The list of new proposed investments was agreed upon during the mission of July 2015 and is included in the revised Procurement Plan. An additional EMP has been prepared for improving safety, environmental and social management at the seven existing substation where the proposed new 11 transformers are to be installed. A budget was also agreed upon with the Borrower for the new proposed activities and funding will be provided by the Borrower. The original Components Cost breakdown under this Loan was the following: 1. Component 1. Modernizing the Borrower s Distribution Management System and Installing an Advanced Metering System for Large Consumers (US$ 25 million; IBRD US$ 20 million) 2. Component 2. Improving the Performance of the Transmission Network (US$ million; IBRD US$ 77 million) 3. Component 3. Strengthening Paraguay s Electricity Sector and the Borrower s Institutional Capacity(US$ 3.5 million; IBRD US$ 2.75 million) 4. The loan also finances the Front-End fee of $250,000. That is, the original "Project Total Cost" was US$125 million of which the IBRD Loan amount was US$100 million (inclusive of US$250,000 Front-End fee) and ANDE's counterpart funds totaled US$25 million. The total "Project Cost" has been reduced from US$125 million to US$ million, of which US$100 million correspond to the IBRD Loan amount (inclusive of US$250,000 Front-End Fees) and ANDE's counterpart funds decreased from US$25 million to US$8.78 million. The revised Components cost breakdown is the following: 1. Component 1. Modernizing the Borrower s Distribution Management System and Installing an Advanced Metering System for Large Consumers (US$28.40 million; IBRD US$25.63 million) 2. Component 2. Improving the Performance of the Transmission Network (US$77.89 million; IBRD US$71.77 million) 10
11 3. Component 3. Strengthening Paraguay s Electricity Sector and the Borrower s Institutional Capacity(US$ 2.49 million; IBRD US$ 2.35 million) 4. The loan finances the Front-End fee of $250,000. The following table presents the change of IBRD financing for each component, up to the total of US$99.75 million (exclusive of US$250,000 Front-End Fees). Current Component Name Component 1 - Modernizing ANDE's Distribution Management System and Installing an Advanced Metering System for Large Customers Component 2 - Improving the Performance of the Transmission Network Component 3 - Strengthening Paraguay's electricity Sector and the Borrower's Institutional Capacity Proposed Component Name Change in Implementation Schedule Component 1 - Modernizing ANDE's Distribution Management System and Installing an Advanced Metering System for Large Customers. Component 2 - Improving the Performance of the Transmission Network. Component 3 - Strengthening Paraguay's electricity Sector and the Borrower's Institutional Capacity. Current Cost (US$M) Proposed Cost (US$M) Action Revised Revised Revised Total: Other Change(s) As additional time is needed to complete ongoing and new activities, a proposed new implementation schedule acceptable to the Bank has been agreed upon during the mission of July
FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22644 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationDOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE
Public Disclosure Authorized DOCUMENT OF THE WORLD BANK REPORT NO.: RES30282 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized MEXICO
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INSTITUTIONS BUILDING TECHNICAL ASSISTANCE PROJECT (IBTAL)
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES18226 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE
Public Disclosure Authorized Document of The World Bank Public Disclosure Authorized RESTRUCTURING PAPER ON A Report No: RES19152 Public Disclosure Authorized Public Disclosure Authorized PROPOSED PROJECT
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT
Public Disclosure Authorized The World Bank REPORT NO.: RES30161 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE EGYPT NATIONAL RAILWAYS RESTRUCTURING PROJECT
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Transport Sector Unit Europe and Central Asia Region Document of The World Bank RESTRUCTURING
More informationThe World Bank Water and Sanitation in Tourist Areas (P054221)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF WATER AND SANITATION IN TOURIST AREAS APPROVED ON APRIL 2, 2009 TO THE
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A
Public Disclosure Authorized Document of The World Bank Document of The World Bank Public Disclosure Authorized FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No: RES22488 Public Disclosure Authorized
More informationDOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING HONDURAS AND NICARAGUA CATASTROPHE RISK INSURANCE PROJECT
Public Disclosure Authorized The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES24760 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES PROJECT
Public Disclosure Authorized REPORT NO.: RES33563 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF ACCESS TO LONGER TERM FINANCE FOR MICRO, SMALL AND MEDIUM ENTERPRISES
More informationThe World Bank Third Secondary and Local Roads Project (P148048)
Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THIRD SECONDARY AND LOCAL ROADS PROJECT APPROVED ON JULY 3, 2014 TO GEORGIA REPORT NO.:
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY ANALYSIS CAPACITY APPROVED ON APRIL 28, 2017
Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES31490 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO SERVICES (IDEA) PROJECT
Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES31045 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF BD IDENTIFICATION SYSTEM FOR ENHANCING ACCESS TO
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE PY Energy Sector Strengthening
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING OF THE SAFETY NET ADVANCEMENT PROJECT APPROVED JULY 5, 2011 GRENADA
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES12428 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES19910 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationFOR OFFICIAL USE ONLY
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL
More informationINFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 MINISTRY OF ECONOMY AND FINANCE, MEF,MINISTRY OF FINANCE AND ECONOMY
DOCUMENT OF THE WORLD BANK REPORT NO.: RES29941 RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 TO TRANSPORT & ICT
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RIO GRANDE DO SUL SWAP APPROVED ON MAY 1, 2012 STATE OF RIO GRANDE DO SUL, BRAZIL
Public Disclosure Authorized The World Bank REPORT NO.: RES29864 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF RIO GRANDE DO SUL SWAP APPROVED ON MAY 1, 2012 TO
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT PROJECT APPROVED ON JUNE 29, 2010
Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES24803 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF NIGERIA PUBLIC SECTOR GOVERNANCE REFORM AND DEVELOPMENT
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000)
Public Disclosure Authorized The World Bank REPORT NO.: RES29565 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MUNICIPAL SERVICES PROJECT LOAN 7885-TU
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Social, Urban Rural and Resilience (GSURR) Europe and Central Asia Region Document of
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No:
More informationThe World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LAND HUSBANDRY, WATER HARVESTING AND HILLSIDE IRRIGATION PROJECT APPROVED
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INCOME SUPPORT AND EMPLOYABILITY PROJECT LOAN 7811-SV
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES20444 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 104604 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationThe World Bank Indonesia Power Transmission Development Project (P117323)
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Energy & Extractives Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 7 ARCHIVED on 07-Jul-2015 ISR18557 Implementing Agencies:
More informationINTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE
. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDSPrepared/Updated: Date ISDS Approved/Disclosed I. BASIC INFORMATION 1. Basic
More informationSENEGAL: TRANSPORT & URBAN MOBILITY PROJECT APPROVED ON JUNE 1, 2010 COORDINATION DU PATMUR,MINISTERE DE L'ECONOMIE, DES FINANCES ET DU PLAN
Public Disclosure Authorized The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES30500 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SENEGAL: TRANSPORT &
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE KARNATAKA HEALTH SYSTEM DEVELOPMENT AND REFORM PROJECT
Public Disclosure Authorized Docume of The World Bank FOR OFFICIAL USE ONLY Report No: RES22733 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationThe World Bank Kabeli-A Hydro Electric Project (P122406)
Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF KABELI-A HYDRO ELECTRIC PROJECT APPROVED ON JULY 1, 2014 TO NEPAL REPORT NO.: RES32467
More informationThe World Bank Indonesia Power Transmission Development Project (P117323)
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2011 Seq No: 13 ARCHIVED on 28-Dec-2017 ISR30911 Implementing
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING SERBIA COMPETITIVENESS AND JOBS PROJECT (P152104) APPROVED ON SEPTEMBER 16, 2015
Public Disclosure Authorized The World Bank REPORT NO.: RES31629 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF SERBIA COMPETITIVENESS AND JOBS PROJECT APPROVED
More informationThe World Bank LK GPOBA - Access to Sanitation Project (P111161)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LK GPOBA - ACCESS TO SANITATION PROJECT APPROVED ON JUNE 8, 2011 TO DEMOCRATIC
More informationThe World Bank Industrial Waste Management and Cleanup Project (P122139)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INDUSTRIAL WASTE MANAGEMENT AND CLEANUP PROJECT APPROVED ON SEPTEMBER
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING VILLAGES PROJECT APPROVED ON JUNE 10, 2016
Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES31013 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING
More informationKey Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized The World Bank Power Recovery Project (P144029)
Public Disclosure Authorized EUROPE AND CENTRAL ASIA Albania Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 4 ARCHIVED on 06-May-2017 ISR27818 Implementing Agencies:
More informationThe World Bank NEITI Reporting Compliance (P162344)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF NEITI REPORTING COMPLIANCE APPROVED ON DECEMBER 7, 2016 TO FEDERAL MINISTRY
More informationImplementation Status & Results Brazil Second National Environmental Project - Phase II (P099469)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469) Operation Name: Second National
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES18411 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationThe World Bank SEE Catastrophe Risk Insurance Facility TA SECO (P156455)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SEE CATASTROPHE RISK INSURANCE FACILITY TA SECO APPROVED ON SEPTEMBER
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT )
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
Public Disclosure Authorized The World Bank REPORT NO.: RES30835 RESTRUCTURING PAPER Public Disclosure Authorized Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF REHABILITATION AND
More informationThe World Bank Sustainable Croatian Railways in Europe (P147499)
Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SUSTAINABLE CROATIAN RAILWAYS IN EUROPE APPROVED ON APRIL 30, 2015 TO HZ INFRASTRUCTURE,HZ
More informationImplementation Status & Results Chile Ministry of Public Works Institutional Strenghtening TAL (P102931)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Chile Ministry of Public Works Institutional Strenghtening TAL (P102931) Operation Name: Ministry
More informationThe World Bank. losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized. Public Disclosure Copy
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Lao People's Democratic Republic Lao PDR - Mainstreaming
More informationImplementation Status & Results India Assam State Roads Project (P096018)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results India Assam State Roads Project (P096018) Operation Name: Assam State Roads Project (P096018) Project Stage: Implementation
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TRANSPARENCY AND ACCOUNTABILITY CAPACITY BUILDING PROJECT (CREDIT NO.
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
More informationZambia Kafue Town - Muzuma - Victoria Falls Regional Transmission Line Reinforcement Project
Public Disclosure Authorized Zambia Kafue Town - Muzuma - Victoria Falls Regional Transmission Line Reinforcement Project (P124351) AFRICA Africa Energy and Mining Global Practice IBRD/IDA Specific Investment
More informationThe World Bank Social Assistance System Strengthening Project (P123960)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SOCIAL ASSISTANCE SYSTEM STRENGTHENING PROJECT APPROVED ON JANUARY 22,
More informationImplementation Status & Results Colombia Disaster Vulnerability Reduction First Phase APL (P082429)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase
More informationThe World Bank Indonesia Infrastructure Guarantee Fund Project (P118916)
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Finance & Markets Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 10 ARCHIVED on 24-Dec-2017 ISR31037 Implementing Agencies:
More informationRoad Sector Development Project (P149322)
Public Disclosure Authorized EUROPE AND CENTRAL ASIA Ukraine Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 6 ARCHIVED on 20-Jun-2018 ISR32806 Implementing
More informationImplementation Status & Results Africa Central African Backbone - APL4 - Gabon (P122776)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa Central African Backbone - APL4 - Gabon (P122776) Operation Name: Central African Backbone
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT APPROVED ON JULY 31, 2008
Public Disclosure Authorized RESTRUCTURING PAPER REPORT NO.: RES29620 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF BANGLADESH - SECONDARY EDUCATION QUALITY AND ACCESS IMPROVEMENT
More informationThe World Bank Malawi Strategic Program for Climate Resilience (P163245)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF MALAWI STRATEGIC PROGRAM FOR CLIMATE RESILIENCE APPROVED ON NOVEMBER
More informationThe World Bank Kabul Urban Transport Efficiency Improvement Project (P131864)
Public Disclosure Authorized SOUTH ASIA Afghanistan Transport & Digital Development Global Practice Recipient Executed Activities Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 09-Feb-2018
More informationTURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER Responsible
More informationPublic Disclosure Copy
Public Disclosure Authorized EUROPE AND CENTRAL ASIA Uzbekistan Water Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 11 ARCHIVED on 12-Jan-2018 ISR30620 Implementing Agencies: Republic
More informationImplementation Status & Results Brazil State Pension Reform II TAL (P089793)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil State Pension Reform II TAL (P089793) Operation Name: State Pension Reform II TAL (P089793)
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A
Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INDONESIA INFRASTRUCTURE FINANCE FACILITY PROJECT LOAN 7731-ID JUNE 24, 2009 TO THE REPUBLIC
More informationThe World Bank Disease Prevention and Control Project (P128442)
Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF DISEASE PREVENTION AND CONTROL PROJECT APPROVED ON MARCH 27, 2013 TO REPUBLIC OF ARMENIA
More informationResults-Based Rural Water Supply and Sanitation Under the National Target Program (P127435)
Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Water Global Practice Requesting Unit: EACVF Responsible Unit: GWA02 IBRD/IDA Program-for-Results Financing FY 2013 Team Leader(s): Lilian Pena
More informationImplementation Status & Results Croatia Revenue Administration Modernization Project (P102778)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Croatia Revenue Administration Modernization Project (P102778) Operation Name: Revenue Administration
More informationThe World Bank Second Karnataka State Highway Improvement (P107649)
Public Disclosure Authorized SOUTH ASIA India Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 10 ARCHIVED on 31-Jul-2015 ISR18834 Implementing Agencies: Karnataka Road
More informationFOR OFFICIAL USE ONLY
Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SAFE AND SUSTAINABLE TRANSPORT PROJECT LOAN December 10, 2009 IN THE INITIAL AMOUNT OF (US$ {150}
More informationL/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00
Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020366 Public Disclosure Authorized Public Disclosure Authorized Project ID P107666 Country Peru Project
More informationProject development objective/outcomes
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized THE SAINT VINCENT & THE GRENADINES HIV/AIDS PREVENTION AND CONTROL PROJECT PE-PO76799
More informationDocument of The World Bank RESTRUCTURING PAPER
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER Report No: 71429-IQ ON A PROPOSED PROJECT
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016
Public Disclosure Authorized The World Bank REPORT NO.: RES31986 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 24-Feb-2015
More informationImplementation Status & Results Kosovo Public Sector Modernization Project (P101614)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Kosovo Public Sector Modernization Project (P101614) Operation Name: Public Sector Modernization Project (P101614)
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011
Public Disclosure Authorized Document of The World Bank Report No: 65071-CM Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016
Public Disclosure Authorized The World Bank REPORT NO.: RES31608 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER
More informationImplementation Status & Results Chad Public Financial Management Capacity Building (P090265)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Chad Public Financial Management Capacity Building (P090265) Operation Name: Public Financial Management
More informationThe World Bank Kenya Infrastructure Finance/PPP project (P121019)
Public Disclosure Authorized AFRICA Kenya Financial Systems Practice Global Practice IBRD/IDA Adaptable Program Loan FY 2013 Seq No: 4 ARCHIVED on 22-Dec-2014 ISR17114 Implementing Agencies: Public Private
More informationImplementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Operation Name: AR Cordoba Road Infrastructure
More informationPublic Disclosure Copy
EAST ASIA AND PACIFIC Solomon Islands Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2009 Seq No: 14 ARCHIVED on 16-May-2018 ISR32246 Implementing Agencies: Ministry of Finance
More informationImplementation Status & Results Tajikistan Tax Administration (P127807)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Tajikistan Tax Administration (P127807) Operation Name: Tax Administration (P127807) Project Stage:
More informationDocument of. The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT
More informationThe World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INDIA: BIHAR INTEGRATED SOCIAL PROTECTION STRENGTHENING PROJECT APPROVED
More informationDocument of. The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A OF AN INTEGRATED HEALTH AND WATER MANAGEMENT PROJECT LOAN NUMBER IBRD-7951
Public Disclosure Authorized Document of The World Bank Public Disclosure Authorized FOR OFFICIAL USE ONLY Report No: RES22987 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED 2 ND PROJECT
More informationFinancing (In USD Million) Financing Source
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 06-Dec-2012 I. BASIC INFORMATION 1. Basic Project Data INTEGRATED
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 22-Apr-2015 Report No.: ISDSC8904 Date ISDS Approved/Disclosed: 27-Apr-2015 Public Disclosure Authorized
More informationDocument of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL FINANCING LOAN TO THE WITH THE GUARANTEE OF
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL
More informationL/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Mar ,450,000.00
Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021097 Public Disclosure Authorized Public Disclosure Authorized Project ID P111598 Country Tanzania
More informationPublic Disclosure Copy. Implementation Status & Results Report CO Rio Bogota Environmental Recuperation and Flood Control Project (P111479)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Colombia Water Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 12 ARCHIVED on 30-Jun-2017 ISR27693 Implementing Agencies: Corporacion
More informationPublic Disclosure Copy
Public Disclosure Authorized EUROPE AND CENTRAL ASIA Serbia Transport Global Practice IBRD/IDA Specific Investment Loan FY 2013 Seq No: 4 ARCHIVED on 24-Jun-2015 ISR17421 Implementing Agencies: Public
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SECOND STATE PENSION REFORM TECHNICAL ASSISTANCE LOAN PARSEP II. January 10, 2007 TO THE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: PROPOSED PROJECT RESTRUCTURING
More informationImplementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Operation Name: AR Cordoba Road Infrastructure
More informationPublic Disclosure Copy. Implementation Status & Results Report CAPE VERDE - Recovery and Reform of the Electricity Sector Project (P115464)
Public Disclosure Authorized AFRICA Cabo Verde Energy & Extractives Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 10 ARCHIVED on 23-Oct-2017 ISR29430 Implementing Agencies: Unidade
More informationImplementation Status & Results Brazil Sao Paulo Feeder Roads Project (P106663)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Brazil Sao Paulo Feeder Roads Project (P106663) Operation Name: Sao Paulo Feeder Roads Project (P106663) Project
More informationImplementation Status & Results Indonesia Local Government and Decentralization Project (P111577)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577) Operation Name: Local Government
More informationSaint Lucia Health System Strengthening Project (P166783)
LATIN AMERICA AND CARIBBEAN St. Lucia Health, Nutrition & Population Global Practice IBRD/IDA Investment Project Financing FY 2019 Seq No: 1 ARCHIVED on 26-Dec-2018 ISR35158 Implementing Agencies: Ministry
More informationImplementation Status & Results Haiti Strengthening the Management of Agriculture Public Services (GFRP) (P113623)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Haiti Strengthening the Management of Agriculture Public Services (GFRP) (P113623) Operation Name:
More informationPROJECT PREPARATION TECHNICAL ASSISTANCE
12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility
More informationIndia: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects
Technical Assistance Report Project Number: 51308-002 Transaction Technical Assistance Facility (F-TRTA) December 2017 India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects Distribution
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
More information