1 Minutes No. [27] Southwest Power Pool PROJECT COST WORKING GROUP MEETING August 13, 2013 Xcel (SPS) Office 600 South Tyler Street, Amarillo, TX MINUTES Agenda Item 1 Administrative Items a. Call to Order & Introductions Chair Terri Gallup (AEP) called the meeting to order at 9:00 am, welcomed those in attendance, and asked for introductions (Attachment 1 PCWG Attendance ). b. Staff Secretary Transition The Chair announced that Steve Purdy would be resigning as SPP Staff Secretary for the PCWG and that Cary Frizzell would be assuming the role, effective at the conclusion of the meeting. It was also announced that Jeff Stebbins was resigning from SPS, and would therefore have to also resign his post as Vice-Chair of the PCWG. c. Receipt of Proxies The Staff Secretary announced that no proxies had been received. d. Review of Agenda The Chair asked the PCWG for edits or additions to the agenda (Attachment 2 - PCWG Agenda ) and none were mentioned. e. Approval of Previous Meeting Minutes The Chair presented the minutes from the July 9 th meeting for review and asked for any additions or corrections. Tom Hestermann (Sunflower) moved and Peter Day (OGE) seconded that the minutes be approved as presented. The motion passed unanimously. Agenda Item 2 Review of Past Action Items The Staff Secretary led a review of the Action Item list (Attachment 3 - PCWG Action Items ). No additions or corrections were made. **The group decided to postpone Agenda Item 3 until members integral to the discussion were present** Agenda Item 4 FERC Order 1000 Update Cary Frizzell (SPP Staff) led the PCWG in a status update of SPP s compliance filing to FERC Order 1000 (Attachment 4- Order 1000 Regional Compliance Order). On July 18 th, FERC issued an order to SPP in response to its Order 1000 compliance filing. SPP must file a compliance filing to the new order by November 15, of 39

2 Minutes No. [27] The key decision in the new FERC order pertained to whether the Right of First Refusal (ROFR) provision would be allowed to continue for projects considered Byway projects in the Highway/Byway cost allocation methodology as defined in the SPP Open Access Transmission Tariff (OATT). Byway projects have a nominal operating voltage between 100 kv and 300 kv and a third of their costs are regionally funded while the remaining two-thirds are paid for by the host zone. FERC determined that ROFR should not be continued for Byway projects. However, an exemption to this provision was introduced in the order for projects determined to be needed for reliability issues within three years from the time of Notification to Construct (NTC) issuance. FERC accepted SPP s proposal to eliminate ROFR for projects considered Highway, or projects with a nominal operating voltage greater than 300 kv. SPP will petition FERC for a rehearing or clarification on other portions of the order, such as the consideration of state ROFR laws and the treatment of projects sourced from the Aggregate Study process. Staff will continue to provide updates to the PCWG as the compliance filing deadline approaches and the first stages of the Competitive Upgrade process begin. Agenda Item 3 MOPC Meeting Review The Chair provided the PCWG an overview of the discussions at the quarterly meeting of the Markets and Operations Policy Committee (MOPC) in July. The MOPC approved both Business Practice Revisions (BPRs) initiated by the PCWG titled BPR-035 PCWG Review of Legacy Projects and BPR-036 Definition of Applicable Project. In its discussion of BPR-035, the MOPC asked the PCWG to have a further discussion on the monitoring process of the Legacy Projects for costs that change over longer than the time frame of a quarter. Staff presented statistical analysis of the Legacy Projects that indicated how many have current cost estimates greater than 20% from the cost estimates indicated on their respective NTCs (Attachment 5 Legacy Project Analysis for MOPC Action Item 213). The PCWG membership suggested multiple ideas to increase the amount of scrutiny on the Legacy Project cost estimates. One suggestion was to keep the quarter-to-quarter evaluation, but decrease the bandwidth requirement from 20% to 10%. Another proposal was to move the Legacy Projects into the Standard process by allowing the designated Transmission Owners (TOs) to provide baseline cost estimates for those Legacy Projects not yet completed. Some supported this notion but felt that limiting the provision to only the Legacy Projects applicable to PCWG review would be adequate. Others expressed the desire to not apply a different process to projects based on classification to ensure fairness to all designated TOs with Legacy Projects. The PCWG asked Staff to update statistical analysis presented in a December of 2012 meeting that showed cost breakdowns of Legacy Projects. Staff will send the updated analysis to the PCWG membership as soon as it is available. The PCWG membership will use this information to discuss with their respective companies in preparation for a discussion of the topic at the September meeting. Agenda Item 5 Timelines for Cost Estimate Completion The Staff Secretary led the PCWG in a review of the current Aggregate Study process, focusing on the challenges that exist in providing ample time for Study Estimates to be developed by TOs (Attachment 6 Timelines for Cost Estimate Completion). Additionally, the Staff Secretary summarized the new study 2 of 39

3 Minutes No. [27] process proposed by stakeholders that incorporates improvements identified by the Aggregate Study Improvement Task Force. In the new proposed process, TOs would be given approximately 30 business days to complete Study Estimates for projects identified in the study. Some expressed concern that this would not constitute enough time to complete cost estimates expected to be within a ±30% bandwidth of the final cost, especially if the cost estimate requests occurred during a period that overlapped with the cost estimation time periods of any of the Integrated Transmission Planning (ITP) study processes. The PCWG asked the Staff Secretary to report back to the group in September the feedback he receives from presenting the new process and associated timelines to the Transmission Working Group (TWG). Agenda Item 6 Exclusion of Aggregate and DPA Studies from NTC-C Process The PCWG discussed the language in Business Practice 7060 that prohibited projects that originate out of the Aggregate and Delivery Point Addition (DPA) study processes from receiving a Notification to Construct with Conditions (NTC-C). It was noted that if the NTC-C process was modified to include the Aggregate and DPA Study processes, the amount of time give to the designated TOs would need to be defined like they are for the ITP study processes. The PCWG members agreed to discuss the issue with those who develop cost estimates at their respective companies in preparation for further discussion of the topic at the September meeting. Agenda Item 7 Other Items The Chair asked if there were any other items to discuss, and none were mentioned. Agenda Item 8 Summary of Action Items The Staff Secretary reviewed the new action items: 1. Staff will update statistical analysis presented in the December 2012 meeting that showed cost breakdowns of Legacy Projects and send the update to the PCWG membership as soon as it is available. 2. Staff will bring to the September meeting any feedback received from the TWG regarding the new Aggregate Study process proposal related to Study Estimate timelines. 3. Staff will send a reminder to those that have yet to sign the Non-Disclosure Agreement to do so. Agenda Item 9 Develop Agenda for Next Meeting 3 of 39

4 Minutes No. [27] The Staff Secretary mentioned the following list as potential agenda items for the next scheduled meeting in September: Legacy Project discussion regarding MOPC Action Item Timeframes for cost estimate completion Exclusion of NTC-C from Aggregate and DPA Study processes Election of Vice-Chair Agenda Item 10 Future Meeting Dates and Locations The PCWG decided to move the meeting in September from Tuesday the 10 th to Monday the 9 th, at 9:30 to 3:30. The group also decided to move the meeting from AECC s office in Little Rock, AR to AEP s office in Dallas, TX to accommodate the date change. The Staff Secretary also noted that locations and dates for meetings in 2014 will need to be discussed at the next meeting in September. The consensus of the PCWG was that the 2 nd Tuesday of each month was still a good meeting time for the group. Meeting adjourned at 2:30 pm. Respectfully Submitted, Steve Purdy Secretary Attachments Attachment 1 - PCWG Attendance Attachment 2 - PCWG Agenda Attachment 3 - PCWG Action Items Attachment 4 - Order 1000 Regional Compliance Order Attachment 5 - Legacy Project Analysis for MOPC Action Item 213 Attachment 6 - Timelines for Cost Estimate Completion 4 of 39

5 PCWG Attendance August 13, 2013 X=In Person P=Proxy T=Teleconference First Name Last Name Position Company Business Phone Attendance Terri Gallup Chair AEP (918) X Steve Purdy Secretary SPP (501) X Allen Ackland Member KCPL (816) T Scott Benortham Member Westar (785) X Brent Carr Member AECC (501) X Peter Day Member OGE (405) X Tom Hestermann Member Sunflower (785) X Larry Holloway Member KPP (316) X Leland Jacobson Member OPPD (402) T David Kimball Member NPPD (402) X Lloyd Kolb Member Golden Spread Electric Coop (806) X Tom Littleton Member OMPA (405) T Brian Slocum Member ITCGP (248) T Jeff Stebbins Member SPS (806) X John Krajewski Liaison Member NE Power Review Board (402) X Bruce Cude Guest SPS X Gerald Deaver Guest SPS T Jeff Ellis Guest AEP T Cary Frizzell Guest SPP T Noumvi Ghomsi Guest Missouri Public Service Commission T Bill Grant Guest SPS X Tony Green Guest SPP T Dan Jones Guest SPP T Thomas Maldonado Guest SPS X Debbie Prater Guest Oklahoma Corporation Commission X 5 of 39

6 Southwest Power Pool, Inc. PROJECT COST WORKING GROUP MEETING August 13, 2013 Xcel (SPS) Office 600 South Tyler Street, Amarillo, TX AGENDA 9:00 am 3:00 pm 1. Administrative Items... (5 min) a. Call to Order & Introductions... Terri Gallup b. Staff Secretary Transition... Terri Gallup c. Receipt of Proxies... Steve Purdy d. Review of Agenda*... Terri Gallup e. Approval of Previous Meeting Minutes*... Terri Gallup 2. Review of Past Action Items*... Steve Purdy (3 min) 3. MOPC Meeting Review... Terri Gallup (1 hr) a. Review of Legacy Project Monitoring (MOPC Action Item #213)* 4. FERC Order 1000 Update*... Staff (1.5 hrs) Lunch Break 5. Timelines for Cost Estimate Completion*... Staff (1 hr) 6. Exclusion of Transmission Service and DPA Studies from NTC-C Process*... Bruce Cude (1 hr) 7. Other Items... All 8. Summary of Action Items... Steve Purdy (2 min) 9. Develop agenda for next meeting... Terri Gallup (5 min) 10. Future Meeting Dates and Locations (Including 2014)... All (10 min) Sep 10 AECC Office, Little Rock Oct. 8 Airport Marriott, Kansas City Nov. 12 OMPA Office, Okla. City/Edmond Dec. 10 SPP Office, Little Rock * Background Materials Included Relationship-Based Member-Driven Independence Through Diversity Evolutionary vs. Revolutionary Reliability & Economics Inseparable 6 of 39

7 Southwest Power Pool, Inc. PROJECT COST WORKING GROUP Pending Action Items Status Report August 13, 2013 Action Item 13. As directed by MOPC at the January meeting, review and recommend any changes to the Quarterly Tracking Report process, including timing, data requested, format of data reporting, interaction with other project costrelated initiatives, etc. 63 The Chair will report to the TWG the decision of the PCWG to not modify the composition of SCERTs for projects meeting any criteria based on voltage level or cost estimate amount. 66 Staff will update the SCERT and the SCERT Data Dictionary to remove the requirements for escalation of costs within the Project s schedule. Staff will also review Business Practice 7060 to determine if changes are needed to document the removal of escalation for multi-year projects. 67 Staff will review the SCERTs of previously submitted baseline cost estimates to determine how many include costs for escalation in multi-year projects. 68 Staff will draft changes to the pertinent business practices that would allow SPP to reject a TO s commitment to an NTC if the corresponding cost estimate variance is substantial and an insufficient amount of supporting documentation is provided. Date Originated February 7, 2012 April 9, 2013 June 11, 2013 June 11, 2013 July 9, 2013 Status In Progress Complete Complete Complete In Progress Comments MOPC Action item complete. Ongoing project to identify improvements TWG Teleconference 7/24/ of 39

8 FERC Order on SPP Order 1000 Regional Compliance Filing August 2013 PCWG 8 of 39 1

9 SPP Regional Order 1000 Order - Dates Order issued by FERC on July 18, 2013 Commissioners Moeller and Clark partially dissented Petition for rehearing/clarification must be filed by Aug 18 SPP compliance filing to be filed by Nov 15, 2013 Conditionally accepted revisions to the OATT and Membership Agreement effective Mar 30, 2014 Prequalification Process starts April 2014 NTCs approved by the Board in January 2015 required to submit to competitive solicitation selection process 9 of 39 2

10 Order 1000 Mobile-Sierra Rejected argument that the ROFR provisions in the Membership Agreement are protected by Mobile- Sierra doctrine Found that the Membership Agreement does not the characteristics necessary to justify Mobile-Sierra protection Provisions of general applicability, not negotiated rate provisions Negotiated by parties interested in protection from competition FERC s reasons and rationale are nearly identical to 10 of 39 similar Mobile-Sierra claims invoked by other RTOs 3

11 Order 1000 Eliminate ROFR Accepted SPP elimination of federal ROFR for Highway projects Rejected SPP proposal to retain federal ROFR for Byway projects Confirmed that a transmission provider can not retain a federal ROFR for transmission if any of the costs of new facilities are allocated outside the provider s service territory Rejected SPP alternative request for a waiver regarding Byway facilities Must include Byway facilities as competitive upgrades 11 of 39 4

12 Order 1000 State ROFR Laws Rejected SPP language to eliminate projects from being considered competitive upgrades if project located in states with ROFR laws However, FERC stated that state laws may be considered at other points in the evaluation process Same language included in other RTO Order 1000 Orders 12 of 39 5

13 Order 1000 Multi-Owner Zones Approved proposal to treat cost allocation of new facilities in multi-owner zones the same way similar costs would be treated if allocated to a zone with a single TO In such cases the ROFR is retained Limited to the five existing multi-owner zones 13 of 39 6

14 Order 1000 Projects Needed for Public Policy Determined that SPP is partially compliant with requirement to consider transmission needed for public policy requirements Approved the definition of Public Policy Requirements proposed SPP directed to provide additional clarity regarding the process that will be used to consider transmission needed for public policy 14 of 39 7

15 Order 1000 Short Term Reliability Projects Conditionally accepted proposal to exempt projects needed in the short term to meet reliability needs Imposed 5 criteria that must be met for this exemption Limited to projects needed within 3 years Identify and post reliability violations explaining why needed Provide explanation to stakeholders with reason why not identified earlier Stakeholders should have opportunity to comment Post list of projects and file each January at FERC 15 of 39 8

16 Order 1000 Short Term Reliability Projects < 3 Years > 3 Years # of Upgrades Estimated Cost ($M) # of Upgrades Estimated Cost ($M) STEP 152 $ $212.0 Byway ( kv) Reliability Ag/DPA Studies ITPNT 60 $ $121.2 ITP10 0 $0.0 7 $109.8 Sub-Total 212 $1, $443.0 Ag Study 54 $ $70.5 DPA Study 16 $ $0.0 Sub-total 70 $ $70.5 Byway Total 282 $1, $513.5 STEP 6 $ $124.1 Highway (>300 kv) Reliability Ag/DPA Studies ITPNT 6 $ $3.5 ITP10 0 $ $1,164.6 Sub-Total 12 $ $1,292.2 Ag Study 1 $ $336.3 DPA Study 1 $ $0.0 Sub-Total 2 $ $336.3 Highway Total 14 $ $1, of 39 9

17 Order 1000 Cost Allocation SPP fully complies with all but one of the FERC regional cost allocation principles in Order 1000 SPP must modify the tariff to: Identify the consequences a facility selected in the regional planning process will have on other planning regions State whether SPP will bear the costs of any resulting upgrades in another planning region If SPP bears such costs how will they be allocated within SPP 17 of 39 10

18 Order 1000 Rights of Way Incumbent TOs will not be allowed to retain a ROFR for new transmission facilities built along the TO s existing right of way However, this situation could be considered during the planning process as part of the evaluation process 18 of 39 11

19 Order Rebuilds Proposal to retain ROFR for rebuilds of an existing facility found to be partially compliant SPP to revise tariff to include definition of rebuild that indicates its use in the planning process to distinguish between change to an existing facility and a new facility SPP must also clarify how projects will be classified that contain both upgrades to existing facilities and new facilities 19 of 39 12

20 Order 1000 Aggregate Study Projects Projects that result from the aggregate study process that receive Highway/Byway cost allocation should be considered competitive upgrades 20 of 39 13

21 Order 1000 Local Upgrades Ordered SPP to revise definition of competitive upgrades to clarify how a facility will be considered a local project To be classified a local project: It must be located entirely within the provider s retail service territory and It cannot be included in a regional transmission plan for purposes of cost allocation 21 of 39 14

22 Order 1000 Qualification and Evaluation Process Found SPP partially compliant with the transmission owner qualification requirement Applicant can demonstrate how it plans to meet NERC compliance SPP must either charge incumbents and nonincumbents the same application fee or explain the proposal to charge only non-incumbents in not discriminatory SPP must provide more justification regarding the points assigned to rate impact in the evaluation process 22 of 39 15

23 Next Steps? Issues to seek rehearing and/or clarification with FERC Mobile-Sierra Byway funding Removal of exemption on existing rights-of-way Treatment of Ag Study projects State ROFRs Treatment of Ag Study NTCs issued before Jan 2015 Working Groups to begin compliance process Includes cost allocation issue and state ROFRs 23 of 39 16

24 Legacy Project Analysis for MOPC Action Item 213 August 2013 PCWG 24 of 39 1

25 MOPC Action Item 213 PCWG to have a further discussion on the monitoring process of the Legacy Projects Procedure for costs that change over longer than the time frame of a quarter and bring back to MOPC in October. 25 of 39 2

26 Number of Legacy Projects Per Cost Estimate Amount % 16 Total Number of Legacy Projects = 93 % of Projects w/ Variance* > 20% = 46.2% 62.1% % Variance > 20% Variance < 20% < $5M $5M - $20M > $20M *Variance determined by comparing latest project cost estimate versus cost estimate indicated on NTC 26 of 39 3

27 Total Estimated Cost ($M) Per Cost Estimate Amount $2,500.0 $2,000.0 Total Estimated Cost of Legacy Projects = $2.64B % of Estimated Cost w/ Variance > 20% = 39.6% 38.2% $1,500.0 $1,000.0 Variance > 20% Variance < 20% $ % 36.7% $0.0 < $5M $5M - $20M > $20M 27 of 39 4

28 Number of Legacy Projects Per Voltage (kv) % % % % 6 Variance > 20% Variance < 20% % 13 75% of 39 5

29 Total Estimated Cost Per Voltage (kv) $2, % $2,000.0 $1,500.0 $1,000.0 Variance > 20% Variance < 20% $ % 83.6% 26.2% 92.86% 99.9% $ of 39 6

30 Number of Legacy Projects Per In-Service Year % % % Variance > 20% Variance < 20% % 13 20% % 0% of 39 7

31 Total Estimated Cost Per In-Service Year $1, % $1,400.0 $1,200.0 $1,000.0 $800.0 Variance > 20% Variance < 20% $600.0 $ % 33.6% 3.2% $200.0 $ % 9.1% 0% of 39 8

32 Timelines for Cost Estimate Completion (Aggregate Study) PCWG August 13, 2013 Steve Purdy Manager, Transmission Service Studies of 39

33 Aggregate Study Process (Current) YES Open Season (4 months) Facilities Study (60 days) Letter of Intent Response Period (15 days) Restudy Needed? Aggregate Study is an iterative process that continues until no customers withdraw. NO Write Service Agreement 33 of 39

34 Aggregate Facilities Study Stages Model Build 28 Models 7 Seasons: Years 1, 2, 5 Summer/Winter peak; Year 10 Summer peak 2 Cases: Base and Transfer 2 Scenarios: Projected Dispatch; Contractual Dispatch Contingency Scan Contingencies and Monitored Elements N-1 Facilities in SPP Flowgates for First-Tier areas and beyond Constraint Analysis Identify Upgrades Least-cost Solution Utilize expansion-plan upgrades where possible Cost Allocation Attachment J, Z1, and Z2 Allocate Upgrade Costs by Flow Impact, including Crediting Re-dispatch Calculation 34 of 39 3

35 Aggregate Facilities Study Iterations Current Process AFS-1 AFS-2 AFS-3 AFS-4?? Feedback on facility log posted with study report Informal data requests on specific upgrades Study Estimate (SCERT) Request 35 of 39 4

36 Current Study Queue As of July 30, 2013 Study Currently Active Iteration Due Date Requests Currently in Study MW Currently in Study Currently Posted Study Date Posted 2011-AG3 AFS-10 9/28/ AFS-9 7/15/ AG1 AFS-4 8/7/ AFS-3 4/5/ AG2 AFS-5 8/9/ AFS-4 3/4/ AG3 AFS-5 9/21/ AFS-4 7/8/ AG1 AFS-3 12/29/ AFS-2 6/17/ AG2 AFS-1 (LOI) 8/14/ AFS-1 7/30/ AG3 Open Season ends 9/30/2013 Total of 39 5

37 Number of Service Upgrades in 2011-AG Number of Service Upgrades Prior Study Completed between AFS-9 and AFS-10 AFS-1 AFS-2 AFS-3 AFS-4 AFS-5 AFS-6 AFS-7 AFS-8 AFS-9 AFS of 39 6

38 Overview of the Backlog Clearing Process Start Post AFS-4 and Tender ATSS Completion Agreement (ACA) Customer with thirdparty impacts may move to next study Customer Executes ACA Facilities Study Customers with requests that did not meet parameters may withdraw or must execute ACA amendment to remain NO Are New Completion Requirements Met? YES YES Did any customers withdraw? Accept all requests and Tender Service Agreements NO SPP Staff Action Customer Action Customer Does Not Execute ACA Request Withdrawn Collect Make-Whole Payments from Customer, if required Customer with Third-Party impacts postpones action Customer Does Not Confirm Service Stop Customer Confirms Service (and Executes Service Agreement) 38 of 39

39 Overview of the New Process 1. Customer defines maximum Example Dates acceptable directly-assigned upgrade cost & 3 rd party upgrade cost estimates 2. Customer defines acceptable deferred start date 3. Customer defines acceptable redispatch criteria 4. Execute study agmt. with obligation to take service. 5. Submit attestation for DR requests Day Days Process continues without customer intervention until all remaining requests are within the specified parameters Open Season Aggregate Facilities Study Agreement Aggregate Facilities Study Remove requests outside parameters from analysis Accept/Confirm all requests within parameters Tender Service Agreements Prohibit mutuallyexclusive requests Retract requests outside the parameters Post study results with cost estimates for all requests, including removed 39 of 39

Southwest Power Pool PROJECT COST WORKING GROUP MEETING December 2, 2015 ITC Great Plains Office 3500 SW Fairlawn Road, Topeka, KS MINUTES

Southwest Power Pool PROJECT COST WORKING GROUP MEETING December 2, 2015 ITC Great Plains Office 3500 SW Fairlawn Road, Topeka, KS MINUTES Minutes No. [56] Southwest Power Pool PROJECT COST WORKING GROUP MEETING December 2, 2015 ITC Great Plains Office 3500 SW Fairlawn Road, Topeka, KS 66614 MINUTES Agenda Item 1 Administrative Items a. Call

More information

Southwest Power Pool PROJECT COST WORKING GROUP MEETING June 7, 2017 AEP Offices, Dallas, TX M I N U T E S

Southwest Power Pool PROJECT COST WORKING GROUP MEETING June 7, 2017 AEP Offices, Dallas, TX M I N U T E S Minutes No. [66] Southwest Power Pool PROJECT COST WORKING GROUP MEETING June 7, 2017 AEP Offices, Dallas, TX M I N U T E S Agenda Item 1 Administrative Items a. Call to Order & Introductions Chair Tom

More information

PCTF. April 27 & 28, Tulsa, OK. Attendees

PCTF. April 27 & 28, Tulsa, OK. Attendees PCTF April 27 & 28, Tulsa, OK Attendees In Person 4/27: Bruce Cude, Xcel Energy Cary Frizzell, SPP Terri Gallup, AEP Thomas Hestermann, Sunflower Tom Littleton, OMPA Katherine Prewitt, SPP Mitchell Williams,

More information

FIRST QUARTERLY PROJECT TRACKING REPORT 2018 January 2018

FIRST QUARTERLY PROJECT TRACKING REPORT 2018 January 2018 FIRST QUARTERLY PROJECT TRACKING REPORT 2018 January 2018 CONTENTS Executive Summary... 3 NTC Project Summary... 5 NTC Issuance... 7 NTC Withdraw... 7 Completed Projects... 8 Project status summary...

More information

Southwest Power Pool FINANCE COMMITTEE MEETING July 17, 2015 Teleconference MINUTES

Southwest Power Pool FINANCE COMMITTEE MEETING July 17, 2015 Teleconference MINUTES Southwest Power Pool FINANCE COMMITTEE MEETING July 17, 2015 Teleconference MINUTES Administrative Items SPP Chair Harry Skilton called the meeting to order at 8:00 a.m. The following members of the Finance

More information

PROPOSAL FOR COST ESTIMATION REVIEW PROCESS FOR SPP TRANSMISSION

PROPOSAL FOR COST ESTIMATION REVIEW PROCESS FOR SPP TRANSMISSION PROPOSAL FOR COST ESTIMATION REVIEW PROCESS FOR SPP REGIONALLY FUNDED TRANSMISSION Presented on behalf of SPP s Transmission Owners SPP Strategic Planning Committee Meeting December 3, 2010 REGIONALLY

More information

Southwest Power Pool SEAMS STEERING COMMITTEE MEETING July 8, 2014 Conference Call MINUTES

Southwest Power Pool SEAMS STEERING COMMITTEE MEETING July 8, 2014 Conference Call MINUTES Southwest Power Pool SEAMS STEERING COMMITTEE MEETING July 8, 2014 Conference Call MINUTES Agenda Item 1 Administrative Items Seams Steering Committee (SSC) Chair Paul Malone, NPPD, called the meeting

More information

Project Cost Review Process. SPP Project Cost Working Group

Project Cost Review Process. SPP Project Cost Working Group Project Cost Review Process SPP Project Cost Working Group Revision History Date or Version Number Author Change Description Comments PCWG Initial Draft 6/28/2012 PCWG Sub-group Edited by sub-group 7/31/2012

More information

New Member Cost Allocation Review Process. Prepared by: COST ALLOCATION WORKING GROUP

New Member Cost Allocation Review Process. Prepared by: COST ALLOCATION WORKING GROUP New Member Cost Allocation Review Process Prepared by: COST ALLOCATION WORKING GROUP TABLE OF CONTENTS 1. HISTORY AND BACKGROUND... 1 2. PURPOSE / GOAL STATEMENT... 3 3. OVERVIEW OF PROCESS... 3 4. NEW

More information

153 FERC 61,249 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER REJECTING TARIFF REVISIONS. (Issued November 30, 2015)

153 FERC 61,249 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER REJECTING TARIFF REVISIONS. (Issued November 30, 2015) 153 FERC 61,249 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Norman C. Bay, Chairman; Cheryl A. LaFleur, Tony Clark, and Colette D. Honorable. Southwest Power Pool,

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) DIRECT TESTIMONY WILLIAM A. GRANT. on behalf of

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) DIRECT TESTIMONY WILLIAM A. GRANT. on behalf of BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF SOUTHWESTERN PUBLIC SERVICE COMPANY S APPLICATION FOR REVISION OF ITS RETAIL RATES UNDER ADVICE NOTICE NO., SOUTHWESTERN PUBLIC SERVICE

More information

Southwest Power Pool CREDIT PRACTICES WORKING GROUP November 17, 2016 Teleconference Minutes

Southwest Power Pool CREDIT PRACTICES WORKING GROUP November 17, 2016 Teleconference Minutes Southwest Power Pool CREDIT PRACTICES WORKING GROUP November 17, 2016 Teleconference Minutes Agenda Item 1 Call to Order Mark Holler called the meeting to order at 1:31 p.m. The following members were

More information

Regulatory Status Report

Regulatory Status Report FERC or State Jurisdiction: FERC AD10-13 Third-Party Provision of Ancillary Services; Accounting and Financial Reporting for New Electric Storage Technologies On July 18, 2013, FERC issued Order No. 784,

More information

Southwest Power Pool REGIONAL TARIFF WORKING GROUP February 3, 2005 DFW Airport Hyatt Dallas, TX 9:30 a.m. 4:00 p.m.

Southwest Power Pool REGIONAL TARIFF WORKING GROUP February 3, 2005 DFW Airport Hyatt Dallas, TX 9:30 a.m. 4:00 p.m. Southwest Power Pool REGIONAL TARIFF WORKING GROUP February 3, 2005 DFW Airport Hyatt Dallas, TX 9:30 a.m. 4:00 p.m. Agenda Item 1 Call to Order, Introductions and Receipt of Proxies Ricky Bittle (Chair)

More information

AGENDA. 1. Call to Order and Administrative Items... Mike Wise. 2. Review of SPC s Policy Decision (4-Step Process)... Paul Suskie

AGENDA. 1. Call to Order and Administrative Items... Mike Wise. 2. Review of SPC s Policy Decision (4-Step Process)... Paul Suskie Southwest Power Pool, Inc. STRATEGIC PLANNING COMMITTEE MEETING Friday, June 2, 2017 9:00 AM 3 PM AEP Office, 8 th Floor Renaissance Tower, Dallas, Texas AGENDA 1. Call to Order and Administrative Items...

More information

July 15, 2015 VIA ELECTRONIC FILING

July 15, 2015 VIA ELECTRONIC FILING July 15, 2015 VIA ELECTRONIC FILING The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20246 Re: Southwest Power Pool, Inc., Docket No.

More information

PROJECT COST TASK FORCE. June 2, 2011

PROJECT COST TASK FORCE. June 2, 2011 PROJECT COST TASK FORCE June 2, 2011 Table of Contents Introduction...3 RSC Motion 1...3 Problem Summary...3 RSC Motion 4...3 Problem Summary...3 Project Tracking Current Process...4 PCTF Recommendations...4

More information

Transmission System Expansion Cost Allocation Alternatives for Renewable Resources. Cost Allocation Working Group March 26, 2008 OG&E Ver 2 3/20/8

Transmission System Expansion Cost Allocation Alternatives for Renewable Resources. Cost Allocation Working Group March 26, 2008 OG&E Ver 2 3/20/8 Transmission System Expansion Cost Allocation Alternatives for Renewable Resources Cost Allocation Working Group March 26, 2008 OG&E Ver 2 3/20/8 Page 1 Why Page 2 Page 1 of 11 Basic Principles Wind generation

More information

Relationship-Based Member-Driven Independence Through Diversity Evolutionary vs. Revolutionary Reliability & Economics Inseparable

Relationship-Based Member-Driven Independence Through Diversity Evolutionary vs. Revolutionary Reliability & Economics Inseparable Southwest Power Pool, Inc. CORPORATE GOVERNANCE COMMITTEE MEETING December 7, 2011 Teleconference AGENDA 1:00 p.m. 3:00 p.m. CST 1. Call to Order and Administrative Items... Nick Brown 2. Vacancies...

More information

Southwest Power Pool CREDIT PRACTICES WORKING GROUP March 16, 2017 Teleconference Minutes

Southwest Power Pool CREDIT PRACTICES WORKING GROUP March 16, 2017 Teleconference Minutes Southwest Power Pool CREDIT PRACTICES WORKING GROUP March 16, 2017 Teleconference Minutes Agenda Item 1 Call to Order Terri Wendlandt called the meeting to order at 1:32p.m. The following members were

More information

151 FERC 61,045 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

151 FERC 61,045 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 151 FERC 61,045 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Norman C. Bay, Chairman; Philip D. Moeller, Cheryl A. LaFleur, Tony Clark, and Colette D. Honorable.

More information

Southwest Power Pool BUSINESS PRACTICES WORKING GROUP Conference Call/Web Cast April 21, SUMMARY OF ACTION ITEMS-

Southwest Power Pool BUSINESS PRACTICES WORKING GROUP Conference Call/Web Cast April 21, SUMMARY OF ACTION ITEMS- Southwest Power Pool BUSINESS PRACTICES WORKING GROUP Conference Call/Web Cast April 21, 2011 -SUMMARY OF ACTION ITEMS- # ACTION ITEMS ASSIGNED TO 1 SPP Staff will edit BPR001 and BPR002 to present to

More information

April 28, Southwest Power Pool, Inc., Docket No. ER11- Submission of Formula Rate Template

April 28, Southwest Power Pool, Inc., Docket No. ER11- Submission of Formula Rate Template Secretary Federal Energy Regulatory Commission 888 First Street NE Washington, DC 20426 Re: Southwest Power Pool, Inc., Docket No. ER11- Submission of Formula Rate Template Honorable Secretary Bose: Pursuant

More information

Southwest Power Pool REGIONAL TARIFF WORKING GROUP January 20, 2005 DFW Airport Hyatt Dallas, TX 9:30 a.m. 4:00 p.m.

Southwest Power Pool REGIONAL TARIFF WORKING GROUP January 20, 2005 DFW Airport Hyatt Dallas, TX 9:30 a.m. 4:00 p.m. Southwest Power Pool REGIONAL TARIFF WORKING GROUP January 20, 2005 DFW Airport Hyatt Dallas, TX 9:30 a.m. 4:00 p.m. Agenda Item 1 Call to Order, Introductions and Receipt of Proxies Ricky Bittle (Chair)

More information

Southwest Power Pool HUMAN RESOURCES COMMITTEE MEETING August 27 & 28, Southwest Power Pool Corporate Office Little Rock, Arkansas

Southwest Power Pool HUMAN RESOURCES COMMITTEE MEETING August 27 & 28, Southwest Power Pool Corporate Office Little Rock, Arkansas Southwest Power Pool HUMAN RESOURCES COMMITTEE MEETING Southwest Power Pool Corporate Office Little Rock, Arkansas Summary of Action Items 1. Approved minutes of the April 23, 2018 meeting. 2. Approved

More information

October 8, SPP Regional Cost Allocation Review Report

October 8, SPP Regional Cost Allocation Review Report Regional Cost Allocation Review October 8, 2013 SPP Regional Cost Allocation Review Report 1 Table of Contents EXECUTIVE SUMMARY...5 BACKGROUND...7 SECTION 1: OVERVIEW OF THE RARTF AND RCAR REVIEW...8

More information

Southwest Power Pool CREDIT PRACTICES WORKING GROUP September 24, 2015 In Person/Teleconference Minutes

Southwest Power Pool CREDIT PRACTICES WORKING GROUP September 24, 2015 In Person/Teleconference Minutes Southwest Power Pool CREDIT PRACTICES WORKING GROUP September 24, 2015 In Person/Teleconference Minutes Agenda Item 1 Administrative Items Mark Holler called the meeting to order at 9:00 a.m. Agenda Item

More information

MISO PJM IPSAC. December 2, Revised December 22, PJM IPSAC Meeting, December 2,

MISO PJM IPSAC. December 2, Revised December 22, PJM IPSAC Meeting, December 2, MISO PJM IPSAC December 2, 2016 Revised December 22, 2016 1 Agenda 2 TMEP Final JOA Language Recommended TMEPs Order No. 1000 Compliance Filing Generation Deactivation JOA Language PJM Proposal Window

More information

Southwest Power Pool REGIONAL STATE COMMITTEE. Teleconference. October 6, 2010 MINUTES

Southwest Power Pool REGIONAL STATE COMMITTEE. Teleconference. October 6, 2010 MINUTES Southwest Power Pool REGIONAL STATE COMMITTEE Teleconference October 6, 2010 MINUTES Administrative Items: The following members were in attendance: Bill Reid, proxy for Jeff Cloud, Oklahoma Corporation

More information

Southwest Power Pool FINANCE COMMITTEE MEETING April 5, 2016 Dallas, TX MINUTES

Southwest Power Pool FINANCE COMMITTEE MEETING April 5, 2016 Dallas, TX MINUTES Southwest Power Pool FINANCE COMMITTEE MEETING April 5, 2016 Dallas, TX MINUTES Administrative Items SPP Chair Harry Skilton called the meeting to order at 7:30 a.m. The following members of the Finance

More information

July 21, Southwest Power Pool, Inc., Docket No. ER Submission of Response to Request for Additional Information

July 21, Southwest Power Pool, Inc., Docket No. ER Submission of Response to Request for Additional Information July 21, 2016 VIA ELECTRONIC FILING Penny Murrell Director, Division of Electric Power Regulation-Central Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Southwest

More information

Southwest Power Pool FINANCE COMMITTEE MEETING April 1, 2014 DFW Hyatt Regency Dallas, TX. Summary of Action Items

Southwest Power Pool FINANCE COMMITTEE MEETING April 1, 2014 DFW Hyatt Regency Dallas, TX. Summary of Action Items Southwest Power Pool FINANCE COMMITTEE MEETING April 1, 2014 DFW Hyatt Regency Dallas, TX Summary of Action Items 1. Accepted 2013 financial statement audit report 2. Approved 2014 funding of pension plan

More information

October 29, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

October 29, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C., 46 October 9, 5 Re: Southwest Power Pool, Inc., Docket No. ER6- - Submission of Tariff

More information

History of Cost Allocation within MISO RECB TF. January 29, 2015

History of Cost Allocation within MISO RECB TF. January 29, 2015 History of Cost Allocation within MISO RECB TF January 29, 2015 Cost Allocation FERC Orders, Filings, and Rulings Cost allocation for MISO began with Order 2003 which instituted a pro forma Generator Interconnection

More information

MISO PJM IPSAC. August 26, PJM IPSAC Meeting, August 26,

MISO PJM IPSAC. August 26, PJM IPSAC Meeting, August 26, MISO PJM IPSAC August 26, 2016 1 Agenda 2 Targeted Market Efficiency Project (TMEP) Study TMEP Proposed JOA Language FERC EL13-88 Filings IPSAC Work Schedule 2 3 Targeted Market Efficiency Project Study

More information

FERC Order 1000: Planning for the Right of First Refusal and Planning for Public Policy Status & Implementation in New York

FERC Order 1000: Planning for the Right of First Refusal and Planning for Public Policy Status & Implementation in New York 1 FERC Order 1000: Planning for the Right of First Refusal and Planning for Public Policy Status & Implementation in New York Henry Chao Vice President - System and Resource Planning New York Independent

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Southwest Power Pool, Inc. ) Docket No. ER

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Southwest Power Pool, Inc. ) Docket No. ER UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Southwest Power Pool, Inc. ) Docket No. ER16- -000 PETITION OF SOUTHWEST POWER POOL, INC. FOR TARIFF WAIVER Pursuant to Rule 207(a)(5)

More information

UNITED STATES OF AMERICA BERFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BERFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BERFORE THE FEDERAL ENERGY REGULATORY COMMISSION Southwestern Public Service Company, ) v. ) Docket No. EL13-15-000 Southwest Power Pool, Inc. ) ) Southwestern Public Service Company,

More information

RR16 - Page 1 of

RR16 - Page 1 of DOCKET NO. APPLICATION OF SOUTHWESTERN PUBLIC SERVICE COMPANY FOR AUTHORITY TO CHANGE RATES PUBLIC UTILITY COMMISSION OF TEXAS DIRECT TESTIMONY of ARTHUR P. FREITAS on behalf of SOUTHWESTERN PUBLIC SERVICE

More information

Mountain West Transmission Group (MWTG) Introduction and Process

Mountain West Transmission Group (MWTG) Introduction and Process Mountain West Transmission Group (MWTG) Introduction and Process October 13 Denver, CO October 16 Little Rock, AR 2 Agenda Overview of SPP Overview of the MWTG Members SPP Process New Member Integration

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION SOUTHWESTERN PUBLIC SERVICE COMPANY S UNOPPOSED RESPONSE TO STAFF S COMMENTS

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION SOUTHWESTERN PUBLIC SERVICE COMPANY S UNOPPOSED RESPONSE TO STAFF S COMMENTS BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF SOUTHWESTERN ) PUBLIC SERVICE COMPANY S 2018 ) INTEGRATED RESOURCE PLAN FOR ) NEW MEXICO. ) CASE NO. 18-00215-UT ) SOUTHWESTERN PUBLIC

More information

Re: Analysis of NERC Standard Process Results, Fourth Quarter 2013 Docket Nos. RR , RR

Re: Analysis of NERC Standard Process Results, Fourth Quarter 2013 Docket Nos. RR , RR VIA ELECTRONIC FILING January 29, 2014 Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20426 Dear Ms. Bose: Re: Analysis of NERC Standard Process

More information

Costs and Revenue Offsets Item # Description

Costs and Revenue Offsets Item # Description Item # CUS-13 Costs and Description Total Cost Allocation - Total cost (PV of 40-year ATRR's ) are listed as $7,382M on ESWG slide 3. Could we get a breakdown (listing) of how this total was determined.

More information

February 23, 2015 VIA ELECTRONIC FILING

February 23, 2015 VIA ELECTRONIC FILING February 23, 2015 VIA ELECTRONIC FILING The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Southwest Power Pool, Inc., Docket

More information

Southwest Power Pool FINANCE COMMITTEE MEETING September 13, 2013 Teleconference. Summary of Action Items. Schedule of Follow-up Items

Southwest Power Pool FINANCE COMMITTEE MEETING September 13, 2013 Teleconference. Summary of Action Items. Schedule of Follow-up Items Southwest Power Pool FINANCE COMMITTEE MEETING September 13, 2013 Teleconference Summary of Action Items Schedule of Follow-up Items 1. Establish a scorecard for presentation to MOPC, SPC, and BOD indicating

More information

RSC Workshop on the Integration of WAPA, Basin, Heartland. April 4, 2014

RSC Workshop on the Integration of WAPA, Basin, Heartland. April 4, 2014 RSC Workshop on the Integration of WAPA, Basin, Heartland April 4, 2014 AGENDA I. Impact of IS Joining SPP II. Cost Allocation III. Potential Clarification to RSC Bylaws IV. SPP Bylaw and Membership Agreement

More information

Strategic Planning Committee Task Force Clean Power Plan Meeting No. 03 December 4, 2015

Strategic Planning Committee Task Force Clean Power Plan Meeting No. 03 December 4, 2015 Strategic Planning Committee Task Force Clean Power Plan Meeting No. 03 December 4, 2015 Southwest Power Pool SPCTF CLEAN POWER PLAN Friday, December 4, 2015 AEP Office, Dallas, Texas MINUTES Agenda Item

More information

Southwest Power Pool CREDIT PRACTICES WORKING GROUP December 12, 2013 Teleconference Minutes

Southwest Power Pool CREDIT PRACTICES WORKING GROUP December 12, 2013 Teleconference Minutes Southwest Power Pool CREDIT PRACTICES WORKING GROUP December 12, 2013 Teleconference Minutes Agenda Item 1 Call to Order Terri Wendlandt called the meeting to order at 1:35 p.m. The following members were

More information

SPP Staff Proposal on TO Zonal Placement. April 20, 2017

SPP Staff Proposal on TO Zonal Placement. April 20, 2017 SPP Staff Proposal on TO Zonal Placement April 20, 2017 Outline I. II. III. IV. V. VI. Background of the Staff s Proposal Paul Suskie Examples of New TO additions Carl Monroe SPC Motion & Updated Staff

More information

Memo to the MOPC and Board of Directors Highway-Byway Cost Allocation

Memo to the MOPC and Board of Directors Highway-Byway Cost Allocation Memo to the MOPC and Board of Directors Highway-Byway Cost Allocation SPP believes that the proposed Highway-Byway cost allocation methodology will promote new transmission construction by allocating:

More information

Transmission Planning and Cost Allocation

Transmission Planning and Cost Allocation Order No. 1000-A Transmission Planning and Cost Allocation Wednesday, June 27, 2012, 1:00 pm Eastern Panelists: Stephen M. Spina, Joseph W. Lowell, Levi McAllister www.morganlewis.com Overview Background

More information

April 6, 2018 VIA OVERNIGHT MAIL. Sheri Young, Secretary of the Board National Energy Board th Avenue SW Calgary, Alberta T2R 0A8

April 6, 2018 VIA OVERNIGHT MAIL. Sheri Young, Secretary of the Board National Energy Board th Avenue SW Calgary, Alberta T2R 0A8 !! April 6, 2018 VIA OVERNIGHT MAIL Sheri Young, Secretary of the Board National Energy Board 517 10 th Avenue SW Calgary, Alberta T2R 0A8 Re: North American Electric Reliability Corporation Dear Ms. Young:

More information

Southwest Power Pool, Inc. Policy Recommendation for the SPP Board of Directors and Members Committee. March 6, 2018 Mountain West Transmission Group

Southwest Power Pool, Inc. Policy Recommendation for the SPP Board of Directors and Members Committee. March 6, 2018 Mountain West Transmission Group Southwest Power Pool, Inc. Policy for the SPP Board of Directors and Members Committee Policy Area #1 DC Ties March 6, 2018 Mountain West Transmission Group SPP and MWTG anticipate that incorporating the

More information

SPP s Regional Review of SPP-MISO Coordinated System Plan Recommended Interregional Projects

SPP s Regional Review of SPP-MISO Coordinated System Plan Recommended Interregional Projects SPP s Regional Review of SPP-MISO Coordinated System Plan Recommended Interregional Projects January 4, 2016 SPP Interregional Relations Table of Contents Executive Summary... 2 Introduction... 5 Stakeholder

More information

SPP New Member Communication and Integration Process. Mountain West Transmission Group. Background Information October 2017

SPP New Member Communication and Integration Process. Mountain West Transmission Group. Background Information October 2017 1 SPP New Member Communication and Integration Process Mountain West Transmission Group Background Information October 2017 Contents Introduction... 2 1. Westside Tariff Design... 2 2. Operational Provisions...

More information

Regional Cost Allocation Review (RCAR II) July 11, 2016 SPP Regional Cost Allocation Review Report for RCAR II

Regional Cost Allocation Review (RCAR II) July 11, 2016 SPP Regional Cost Allocation Review Report for RCAR II Regional Cost Allocation Review (RCAR II) July 11, 2016 SPP Regional Cost Allocation Review Report for RCAR II 1 Table of Contents EXECUTIVE SUMMARY...5 BACKGROUND...7 SECTION 1: OVERVIEW OF THE RARTF

More information

PEAK RELIABILITY COORDINATOR FUNDING. Draft Final Proposal. May 28, 2015

PEAK RELIABILITY COORDINATOR FUNDING. Draft Final Proposal. May 28, 2015 PEAK RELIABILITY COORDINATOR FUNDING Draft Final Proposal May 28, 2015 2 Assessment of Peak Reliability Coordinator Charges Draft Final Proposal Table of Contents 1 Introduction... 3 2 Background... 3

More information

September 30, 2016 VIA ELECTRONIC FILING

September 30, 2016 VIA ELECTRONIC FILING September 30, 2016 VIA ELECTRONIC FILING The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20246 Re: Southwest Power Pool, Inc., Docket

More information

Southwestern Public Service Company Attachment O SPS Transmission Formula 2017 Projection Material Accounting Changes since January 1, 2016

Southwestern Public Service Company Attachment O SPS Transmission Formula 2017 Projection Material Accounting Changes since January 1, 2016 1 The Company has listed below any material changes that have taken effect since January 1, 2016. For additional information, please refer to the Southwestern Public Service Company FERC Form 1 for Q4

More information

FERC Order 890 APS Attachment E SRP Attachment K

FERC Order 890 APS Attachment E SRP Attachment K APS/SRP 2 nd Quarter Stakeholder FERC Order 890 APS Attachment E SRP Attachment K APS Deer Valley Facility Phoenix, Arizona June 14, 2018 9 AM -12 PM Agenda 1. Welcome, Introductions, and Stakeholder Meeting

More information

Cost Allocation Principles for Seams Transmission Expansion Projects

Cost Allocation Principles for Seams Transmission Expansion Projects Cost Allocation Principles for Seams Transmission Expansion Projects SPP s seams agreements currently contain requirements for SPP to develop coordinated system plans with its neighbors. The extent and

More information

Order No Transmission Planning and Cost Allocation

Order No Transmission Planning and Cost Allocation Order No. 1000 Transmission Planning and Cost Allocation Thursday, August 18, 2011, 1:00 pm Eastern Panelists: John D. McGrane, Floyd L. Norton, IV, Stephen M. Spina www.morganlewis.com Overview Order

More information

TRANSMISSION OWNER ZONAL PLACEMENT PROCESS

TRANSMISSION OWNER ZONAL PLACEMENT PROCESS TRANSMISSION OWNER ZONAL PLACEMENT PROCESS Published July 2017 CONTENTS Section 1: Introduction, Scope & Steps... 1 Subsection A: Introduction To Zonal Placement... 1 Subsection B: Scope... 1 Subsection

More information

Planning Commission. Regular Business Mee ng. January 22, Planning Commission Meeting 01/22/2019 Master Page 1 of 31

Planning Commission. Regular Business Mee ng. January 22, Planning Commission Meeting 01/22/2019 Master Page 1 of 31 Planning Commission Regular Business Mee ng January 22, 2019 01/22/2019 Master Page 1 of 31 Planning Commission Pre Mee ng January 22, 2019 01/22/2019 Master Page 2 of 31 Planning Commission Briefing Agenda

More information

BILLING CODE P. Department of Energy FEDERAL ENERGY REGULATORY COMMISSION

BILLING CODE P. Department of Energy FEDERAL ENERGY REGULATORY COMMISSION This document is scheduled to be published in the Federal Register on 02/06/2012 and available online at http://federalregister.gov/a/2012-02575, and on FDsys.gov BILLING CODE 6717-01-P Department of Energy

More information

Southwestern Public Service Company Attachment O SPS Transmission Formula Annual True-up for 2016 Material Accounting Changes since January 1, 2016

Southwestern Public Service Company Attachment O SPS Transmission Formula Annual True-up for 2016 Material Accounting Changes since January 1, 2016 1 The Company has listed below any material changes that have taken effect since January 1, 2016. For additional information, please refer to the Southwestern Public Service Company FERC Form 1 for Q4

More information

SPP PLANNING AND COST ALLOCATION OVERVIEW

SPP PLANNING AND COST ALLOCATION OVERVIEW Benefit/Cost Ratio Primer 101 for the Regional Allocation Review Task Force August 4, 2011 1 SPP PLANNING AND COST ALLOCATION OVERVIEW 2 1 Transmission = 10% Retail Electricity Rates Transmission enables

More information

EIPC Roll-Up Report & Scenarios

EIPC Roll-Up Report & Scenarios EIPC Roll-Up Report & Scenarios Zach Smith Director, Transmission Planning New York Independent System Operator IPTF/EGCWG/ESPWG Meeting January 6, 2014 2013 New York Independent System Operator, Inc.

More information

2011 Budget Initial Stakeholder Call

2011 Budget Initial Stakeholder Call 2011 Budget Initial Stakeholder Call Michael Epstein Director of Financial Planning June 23, 2010 Agenda TOPIC PRESENTER Introduction Steve Berberich Budget principles & strategic initiatives Steve Berberich

More information

1st Qua u r a ter e M e M e e t e in i g 2nd Qua u r a ter e M e M e e t e in i g

1st Qua u r a ter e M e M e e t e in i g 2nd Qua u r a ter e M e M e e t e in i g 2012 SERTP Welcome SERTP 2012 First RPSG Meeting & Interactive Training Session 1 2012 SERTP The SERTP process is a transmission planning process. Please contact the respective transmission provider for

More information

FERC Order 1000: Transmission Planning & Cost Allocation Framework for NYISO Compliance

FERC Order 1000: Transmission Planning & Cost Allocation Framework for NYISO Compliance FERC Order 1000: Transmission Planning & Cost Allocation Framework for NYISO Compliance by John P Buechler NYISO Executive Regulatory Policy Advisor Joint IPTF/ESPWG Meeting February 27, 2012 Albany, NY

More information

FERC Order 1000 Compliance Initiative. Straw Proposal (regional requirements), posted May 22, 2012

FERC Order 1000 Compliance Initiative. Straw Proposal (regional requirements), posted May 22, 2012 Stakeholder Comments Template FERC Order 1000 Compliance Initiative Straw Proposal (regional requirements), posted May 22, 2012 Please submit comments (in MS Word) to fo1k@caiso.com no later than the close

More information

RSC Regional. State Committee FOR THE SOUTHWEST POWER POOL

RSC Regional. State Committee FOR THE SOUTHWEST POWER POOL RSC Regional State Committee FOR THE SOUTHWEST POWER POOL April 28, 2014 TO PAST AND PRESENT RSC MEMBERS Congratulations on reaching this significant milestone! Your service has been invaluable to the

More information

CAWG MEETING July 25, 2007 Marriott Country Club Plaza Kansas City, MO 11:00 am 5:00 pm AGENDA

CAWG MEETING July 25, 2007 Marriott Country Club Plaza Kansas City, MO 11:00 am 5:00 pm AGENDA CAWG MEETING July 25, 2007 Marriott Country Club Plaza Kansas City, MO 11:00 am 5:00 pm AGENDA 1. Introductions 11:00-11:10 2. STEP Screen to Portfolio Transition 11:10 12:00 Discussion lead by Charles

More information

Regulatory Status Report

Regulatory Status Report FERC or State Jurisdiction: FERC AD10-12 AD12-12 Increasing Market and Planning Efficiency through Improved Software A technical conference was held on June 24-26, 2013 to discuss opportunities for increasing

More information

Regulatory Status Report

Regulatory Status Report FERC or State Jurisdiction: FERC 10-1227 SPP Filing of FERC Form 1 and 3-Q AD11-9 On November 25, 2014, SPP submitted its FERC Form 3-Q, Quarterly Financial Report, for the third quarter of 2014. Inquiry

More information

FORMULA RATE TASK FORCE CONFERENCE CALL TO DISCUSS GOLDEN SPREAD RECOMMENDATIONS

FORMULA RATE TASK FORCE CONFERENCE CALL TO DISCUSS GOLDEN SPREAD RECOMMENDATIONS FORMULA RATE TASK FORCE 12-15-05 CONFERENCE CALL TO DISCUSS GOLDEN SPREAD RECOMMENDATIONS PARTICIPATION: (v) Jay Toungate AEP (v) Bob Oakes Westar Alan Hientz SPP Formula Rate Consultant (v) Dave Grover

More information

PEAK RELIABILITY COORDINATOR FUNDING

PEAK RELIABILITY COORDINATOR FUNDING PEAK RELIABILITY COORDINATOR FUNDING Straw Proposal May 8, 2015 Assessment of 2 Peak Reliability Coordinator Charges Straw Proposal Table of Contents 1 Introduction... 3 2 Background... 3 3 Plan for Stakeholder

More information

RSC AGENDA. REGULAR MEETING* Monday, April 23, :00-5:00 p.m. The Skirvin Hilton Hotel Oklahoma City, OK

RSC AGENDA. REGULAR MEETING* Monday, April 23, :00-5:00 p.m. The Skirvin Hilton Hotel Oklahoma City, OK RSC AGENDA REGULAR MEETING* Monday, April 23, 2007 1:00-5:00 p.m. The Skirvin Hilton Hotel Oklahoma City, OK 1. CALL TO ORDER 2. PRELIMINARY MATTERS 3. UPDATES a. Declaration of a quorum b. Adoption of

More information

APS/SRP Stakeholder Meeting For Transmission Planning

APS/SRP Stakeholder Meeting For Transmission Planning APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 SRP Attachment K APS Attachment E SRP Facility Scottsdale, AZ December 15 th, 2017 9:00 11:00 A.M. Agenda 1. Welcome, Introductions,

More information

Regulatory Status Report

Regulatory Status Report FERC or State Jurisdiction: FERC EL13-88 EL16-91 Northern Indiana Public Service Company's ("NIPSCO") Complaint Against the Midcontinent Independent System Operator, Inc. ("MISO") and PJM Interconnection,

More information

FERC Order 1000: Transmission Planning & Cost Allocation NYISO Compliance Update

FERC Order 1000: Transmission Planning & Cost Allocation NYISO Compliance Update FERC Order 1000: Transmission Planning & Cost Allocation NYISO Compliance Update by John P. Buechler NYISO Executive Regulatory Policy Advisor NPCC Governmental/Regulatory Affairs Advisory Group November

More information

Southwest Power Pool SEAMS STEERING COMMITTEE MEETING February 5, 2015 AEP Office, Dallas, TX MINUTES

Southwest Power Pool SEAMS STEERING COMMITTEE MEETING February 5, 2015 AEP Office, Dallas, TX MINUTES Southwest Power Pool SEAMS STEERIN COMMITTEE MEETIN February 5, 2015 AEP Office, Dallas, T MINUTES Agenda Item 1 Administrative Items Seams Steering Committee (SSC) Chair Paul Malone, NPPD, called the

More information

Lower Voltage Interregional Economic Projects. RECBWG April 18, 2018

Lower Voltage Interregional Economic Projects. RECBWG April 18, 2018 Lower Voltage Interregional Economic Projects RECBWG April 18, 2018 Interregional Gaps & Inconsistencies 1. No tariff defined cost allocation for sub 345 kv economic projects with PJM 2. Economic projects

More information

Planning in a competitive market environment

Planning in a competitive market environment Planning in a competitive market environment The New York Story Rana Mukerji Senior Vice President - Market Structures New York Independent System Operator Harvard Electricity Policy Group 74 th Plenary

More information

Regulatory Status Report

Regulatory Status Report FERC or State Jurisdiction: FERC AD10-12 Increasing Market and Planning Efficiency through Improved Software On June 28, 2011, a Technical Conference was held to discuss opportunities for increasing real-time

More information

150 FERC 61,116 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

150 FERC 61,116 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 150 FERC 61,116 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Cheryl A. LaFleur, Chairman; Philip D. Moeller, Tony Clark, Norman C. Bay, and Colette D. Honorable.

More information

Agenda. Work Session: Budget. Work Session: Community Workforce Agreements

Agenda. Work Session: Budget. Work Session: Community Workforce Agreements Board Special Meeting Work Session: Budget; Community Workforce Agreements Wednesday, April 3, 2019, 4:30 7:30 p.m. Auditorium, John Stanford Center 2445 3 rd Avenue S, Seattle, WA 98134 Agenda Call to

More information

Southwest Power Pool s Balanced Portfolio Approach for Economic Upgrades

Southwest Power Pool s Balanced Portfolio Approach for Economic Upgrades Southwest Power Pool s Balanced Portfolio Approach for Economic Upgrades Presentation by Michael Proctor Chief Economist, Missouri PSC Harvard Electricity Policy Group Chicago, Illinois October 2, 2008

More information

40 th Annual EEI Finance Conference

40 th Annual EEI Finance Conference 40 th Annual EEI Finance Conference Hollywood, FL November 6-8, 2005 Forward-Looking Statements Disclosure The following presentation contains some forward-looking statements with respect to Westar Energy

More information

PJM SERTP Planning Process Overview

PJM SERTP Planning Process Overview PJM SERTP Planning Process Overview Order 1000 Biennial Regional Transmission Plan Review Meeting Presentation 1 of 2 May 8 th, 2018 Georgia Power Corporate Headquarters Atlanta, GA PJM SERTP Interregional

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) DIRECT TESTIMONY RUTH M. SAKYA. on behalf of.

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) DIRECT TESTIMONY RUTH M. SAKYA. on behalf of. BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF SOUTHWESTERN PUBLIC SERVICE COMPANY S INTERIM REPORT ON ITS PARTICIPATION IN THE SOUTHWEST POWER POOL REGIONAL TRANSMISSION ORGANIZATION,

More information

133 FERC 61,062 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability Corporation

133 FERC 61,062 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability Corporation 133 FERC 61,062 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, Philip D. Moeller, John R. Norris, and Cheryl A. LaFleur. North

More information

Interconnection Process Enhancements Initiative

Interconnection Process Enhancements Initiative Interconnection Process Enhancements Initiative Stakeholder Web Conference March 30, 2015 Agenda Time Topic Speaker 1:00-1:10 Introduction, Stakeholder Process Kristina Osborne 1:10-2:50 Issue Paper Topic

More information

September 8, 2017 VIA ELECTRONIC FILING

September 8, 2017 VIA ELECTRONIC FILING !! September 8, 2017 VIA ELECTRONIC FILING Kirsten Walli, Board Secretary Ontario Energy Board P.O Box 2319 2300 Yonge Street Toronto, Ontario, Canada M4P 1E4 Re: North American Electric Reliability Corporation

More information

How To Assure Returns For New Transmission Investment

How To Assure Returns For New Transmission Investment Portfolio Media. Inc. 860 Broadway, 6th Floor New York, NY 10003 www.law360.com Phone: +1 646 783 7100 Fax: +1 646 783 7161 customerservice@law360.com How To Assure Returns For New Transmission Investment

More information

California ISO Report. Regional Marginal Losses Surplus Allocation Impact Study

California ISO Report. Regional Marginal Losses Surplus Allocation Impact Study California ISO Report Regional Surplus Allocation Impact Study October 6, 2010 Regional Surplus Allocation Impact Study Table of Contents Executive Summary... 3 1 Issue and Background... 3 2 Study Framework...

More information

BAL-002-2(i) Disturbance Control Standard Contingency Reserve for Recovery from a Balancing Contingency Event

BAL-002-2(i) Disturbance Control Standard Contingency Reserve for Recovery from a Balancing Contingency Event Balancing A. Introduction 1. Title: Disturbance Control Standard Contingency Reserve for Recovery from a Balancing 2. Number: BAL-002-2(i) 3. Purpose: To ensure the Balancing Authority or Reserve Sharing

More information

130 FERC 61,185 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ADDRESSING COMPLIANCE FILING AND APPROVING IMPLEMENTATION PLAN

130 FERC 61,185 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ADDRESSING COMPLIANCE FILING AND APPROVING IMPLEMENTATION PLAN 130 FERC 61,185 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, Philip D. Moeller, and John R. Norris. Mandatory Reliability

More information

Illinois Power Agency. Ameren Illinois Company

Illinois Power Agency. Ameren Illinois Company REQUEST FOR PROPOSALS FOR STANDARD WHOLESALE ENERGY PRODUCTS Levitan & Associates, Inc. Procurement Administrator on behalf of Illinois Power Agency for ISSUE DATE: April 15, 2011 DUE DATE: May 5, 2011