1 Community Coordination Meeting Sagadahoc County, Maine Risk MAP Study April 2, 2014
2 Agenda Welcome and Introductions Project Timeline Flood Hazard Analysis Recap Flood Risk Products Action: Hazard Mitigation & Flood Insurance PPP - Public Review and Appeal Period PPP - Effect on Existing Letters of Map Change PPP - Community Adoption Process Questions 2
3 Risk MAP Study Timeline Activities Project Timeline Products Discovery Meeting March 2012 Work Map Meeting August 2013 Preliminary January 31, 2014 CCO Meeting April 2, 2014 Projected Effective July 2015 Projected LFD* January 2015 *LFD scheduled in January due to the Town Meeting requirement 3
4 CONVERSION TO DIGITAL MAPS 4
5 Digital FIRM (DFIRM) Base + Topography + Flood Data = Digital FIRM 5
6 Zone Designation Changes OLD ZONE A1 through A30 V1 through V30 B C NEW ZONE AE VE X X 6
7 Datum Conversion Previous FIRM referenced to NGVD Datum Conversion to NAVD88 Required by FEMA for new DFIRMs Process described in Appendix B of FEMA s Guidelines and Specifications 7
8 Conversion Factor The previous effective study was referenced to the NGVD Datum All new studies are referenced to the NAVD 88 (North American Vertical Datum of 1988) The conversion factor from NGVD 29 to NAVD 88 is -0.7 feet. For Androscoggin River, the conversion factor from NGVD 29 to NAVD 88 is -0.6 feet, to match the datum conversion factor of the adjacent,cumberland County. 8
9 Paneling Scheme Existing Paneling System(town-wide format) 9
10 New Paneling Scheme New Paneling System (county-wide format based on USGS quadrangles) 10
11 COASTAL FLOOD HAZARD ANALYSIS 11
12 Coastal Analysis Source STARR performed new coastal flood hazard analysis Communities impacted: City of Bath Towns Arrowsic, Georgetown, Phippsburg, Topsham, West Bath 12
13 LiDAR Coverage 2-foot contour data Contours generated from LiDAR acquired from MEGIS LiDAR flown in 2011 and 2012 Sagadahoc County, ME 13
14 Stillwater Elevations Wave Modeling Transect Analysis Floodplain mapping 14
15 Field Reconnaissance 15
16 Stillwater Elevations (Open Coast) 2012 New England Tidal Profile 16
17 Stillwater Elevations (Sheltered Areas) 2 Dimensional Hydraulic Model (RMA2) 17
18 Wave Model Model Inputs: Buoy Data Bathymetry Water Levels STWAVE Model Model Outputs: Wave Height Wave Period Wave Directions 18
19 Transect Analysis 19
20 th Ave NE Shoreline, WA Transect Analysis Wave Runup Reference: 20
21 Transect Analysis Overland Wave Propagation 21
22 Detailed Study Primary Frontal Dunes a continuous or nearly continuous mound or ridge of sand with relatively steep seaward and landward slopes immediately landward and adjacent to the beach and subject to erosion and overtopping from high tides and waves during major coastal storms. 22
23 Limit of Moderate Wave Action LiMWA Areas subject to wave heights greater than 1.5 feet Defines Coastal A Zone Recommendation of building to V zone standards 23
24 FEMA Coastal Outreach Website 24
25 Non-Coastal Analysis Source STARR performed new flood hazard analyses for all approximate (Zone A) non-coastal flooding sources STARR redelineated all detailed (Zone AE) noncoastal flooding sources Communities impacted: Towns of Bowdoin, Bowdoinham, Richmond, Woolwich 25
26 FLOOD RISK PRODUCTS 26
27 Flood Risk Products - Background These products are intended to help communities better understand and communicate flood risk All of these products are GIS based 27
28 Flood Risk Products - Background The following flood risk products are currently in production for this study Flood Risk Assessment Depth Grids Coastal Hazard Identification maps Flood Risk Report 28
29 Flood Risk Assessment Annualized flood losses are displayed on the Census Block Data Aimed at depicting general flood loss areas 29
30 Depth Grids Displays depth of flooding at a given location Flooding depths vary within 1%- annual-chance floodplain 30
31 Coastal Hazard Identification 31
32 Flood Risk Report Flood Risk Report Components Introduction Flood Risk Analysis Flood Risk Analysis Results Actions to Reduce Flood Risk Acronyms and Definitions Additional Resources Data Used to Develop Flood Risk Products 32
33 ACTION: HAZARD MITIGATION AND FLOOD INSURANCE 33
34 Mitigation Actions Address specific existing assets (e.g., elevate critical facility, enlarge a culvert, acquisition of floodprone properties, floodproof properties) Address future risks (e.g., update building codes) Based on local capabilities Build on current strengths, ongoing efforts (add-on to stormwater management regulations) Coordinate with Federal programs (e.g., NFIP, CRS) Encourage property owners to purchase flood insurance 34
35 Mitigation Action Categories STRUCTURAL /NON- STRUCTURAL PROJECTS Detention Drainage Acquisition Elevation PLANNING MECHANISMS Zoning Building Codes Ordinances Open Space Plan EDUCATION & OUTREACH Public Awareness Outreach Educational programs NATURAL RESOURCE PROTECTION Stream and wetland restoration Erosion control Retrofits 35
36 Driving Action Through HMA Grants Hazard Mitigation Assistance (HMA)includes both post-disaster and pre-disaster grants HMGP is a post-disaster grant program. PDM and FMA are available annually subject to Congressional appropriations. Mitigation Plan Requirement Local/State Cost Share States Manage Programs and Set Funding Priorities State Hazard Mitigation Officer (SHMO) is contact These grants share the common goal of reducing risk to life and property due to natural hazards 36
37 Mitigation Grants/Programs: OFAs 37
38 Driving Action Through the CRS Rewards NFIP communities taking additional actions to reduce risk Most flood insurance policies can receive discounted rates (In New England generally ranging from 5%-15%) To be eligible FEMA must determine that the community is in full compliance with the NFIP If you are interested in joining, FEMA can provide assistance For additional information please contact: Chris Markesich, FEMA Region 1 CRS Coordinator christopher.markesich@fema.dhs.gov (617)
39 Action Tracker New mitigation tool Houses communityidentified mitigation actions Actions can be edited by community officials We will input your community s action into the Action Tracker and send you a report and a link - A tool for communities to support future mitigation planning efforts 39
40 Meet the Action Form 40
41 POST-PRELIMINARY PROCESSING (PPP) 41
42 Post-Preliminary Phase Timeline Typical Post Preliminary Phase takes approximately 20 months to complete January 31, 2014 April 2, 2014 Est. June 20, days Est. June 27, 2014 Review and Appeal Period 90 days Est. September 25, 2014 Est. January 2015* 6 months Compliance Period *LFD scheduled in January due to the Town Meeting requirement Est. July
43 Community Review Public Review and Expanded Appeal Period (EAP) Process Begin reviewing now! Outreach to your community members Templates available! Statutory 90-day Appeal Period: Publication in Federal Register Letter to Community Official Newspaper publication, and Maps and data available online! 43
44 Website 44
45 Expanded Appeal Period (EAP) Process The Facts New process detailed in Procedure Memorandum issued to the public by FEMA on December 1, 2011 What s the same? An appeal must be based on data that shows the flood hazard information is scientifically or technically incorrect What s different? Anything that may have an impact on flood insurance requirements will now be given the same 90-day appeal period! 45
46 Expanded Appeal Period (EAP) Process Appeals versus Comments under the new EAP process Appeals : Areas showing new or revised Base Flood Elevations (BFEs) or Zone AO depths Areas showing new or revised Special Flood Hazard Area (SFHA) boundaries (including both increases and decreases in the extent of the SFHA) Areas where there is a change in SFHA zone designation Areas showing new or revised regulatory floodway boundaries (including both increases and decreases in the extent of the regulatory floodway) 46
47 Expanded Appeal Period (EAP) Process Appeals versus Comments under the new EAP process Comments: Corporate limit revisions Road name errors and revisions Flooding source name errors and revisions Base map errors Other possible omissions or potential improvements to the mapping 47
48 MYTHS! The Expanded Appeal Period (EAP) means I have more time to submit an appeal. NO The 90- day appeal/comment period is my only chance to change FEMA s maps? NO What are my other options? Letter of Map Amendments (LOMA): A request to FEMA for removal of individual properties or structures from the SFHA Letter of Map Revisions (LOMR): A request to FEMA to modify an effective Flood Insurance Rate Map (FIRM), or Flood Boundary and Floodway Map (FBFM), or both. Results in the modification of the floodway, BFEs, or the Special Flood Hazard Area (SFHA). 48
49 Post-Preliminary Processing Summary of Map Actions (SOMA) Background Letters of Map Change (LOMCs) are legally binding changes to the map Summary of Map Actions is an assessment of all existing LOMCs compared with the new FEMA maps 49
50 Summary of Map Actions Category 1: shown on the new DFIRM panel Category 2: NOT shown on the new DFIRM panel due to scale limitations (revalidated after the new DFIRMs become effective) 50
51 Summary of Map Actions (continued) Category 3: superseded, and no longer valid, due to revised flood hazards Category 4: property owner must request this be re-determined 51
52 Post-Preliminary Processing Revalidation of Letters of Map Change (LOMCs) The Summary of Map Actions (SOMA) is used to generate a Revalidation Letter The Revalidation Letter is issued to the community Community officials are encouraged to disseminate this information. 52
53 Post-Preliminary Processing Revalidation Letter Distribution Community FEMA Regional Office State NFIP Coordinator LOMC Compendium NOT to Homeowners or Developers IS available through Map Service Center: 53
54 Post-Preliminary Processing The compliance and map adoption period begins at the date the Letter of Final Determination is sent, and ends at the effective date. During this period, community officials review, and if appropriate, revise the community s floodplain ordinances to ensure they are compliant with NFIP regulations. To avoid suspension from the NFIP, the community must adopt a compliant floodplain management ordinance. Communities should contact their State NFIP Coordinator's Office for model language and any questions regarding higher standards. Once the State has reviewed the ordinance and the community has adopted it, the ordinance must be approved by FEMA before close of business on the effective date. Do not wait until the last day to adopt your ordinance! 54
55 Points of Contact STARR Contact Brian Lee, Project Manager, STARR FEMA Contacts Kerry Bogdan, Project Manager and Senior Engineer, FEMA Region I Kerry.Bogdan@fema.dhs.gov Marilyn Hilliard, Planning, FEMA Region I Marilyn.Hilliard@fema.dhs.gov Bob Desaulniers, Regional Insurance Specialist Robert.Desaulniers@fema.dhs.gov STARR Regional Service Center Alex Sirotek, RSC Lead, STARR Alex.Sirotek@starr-team.com National Flood Insurance Program iservice Team Tom Young, Manager Region I New England tyoung@nfip-iservice.com Maine Department of Agriculture, Conservation and Forestry, Floodplain Management Program Contact Sue Baker, State NFIP Coordinator, Sue.Baker@maine.gov Please send all comments/protests/appeals to: Brian Lee, Stantec, 6110 Frost Pl, Laurel, MD Please copy: Kerry Bogdan, FEMA Region 1, 99 High Street, 6 th Floor, Boston, MA Alex Sirotek, STARR, 99 High Street, 3 rd Floor, Boston, MA Sue Baker, Maine Floodplain Management Program Dept. of Agriculture, Conservation & Forestry, 93 SHS, 17 Elkins Lane, Augusta, ME
56 Questions?
57 WEB LINKS Preliminary Data Effective Data (including Future Effective) msc.fema.gov Coastal Outreach Material Mitigation Action Tracker fema.starr-team.com Multi-Hazard Planning Website Mitigation Ideas National Flood Insurance Program Flood Insurance Reform Act 57
Community Coordination Meeting. York County, Maine. Risk MAP Study
Community Coordination Meeting York County, Maine Risk MAP Study January 9, 2014 Agenda Welcome and Introductions Project Timeline Flood Hazard Analysis Recap (Digital Conversion, Riverine and Coastal)
More informationPhysical Map Revisions as a Result of Updated Coastal Flood Hazards
Physical Map Revisions as a Result of Updated Coastal Flood Hazards Agenda Coastal Flood Hazard Analysis Recap Public Review and Appeal Period Effect on Existing Letters of Map Change Insurance Questions
More informationMiddlesex County Timeline
Community Coordination Meeting for Middlesex County, Connecticut Risk MAP Study November 9, 2011 Agenda Welcome and Introductions Project Timeline Coastal Flood Hazard Analysis Recap Public Review and
More informationUpdates to Maine Coastal Flood Insurance Rate Maps (FIRM s): What a Local Official Should Know. Presented by: Steve Johnson, P.E.
Updates to Maine Coastal Flood Insurance Rate Maps (FIRM s): What a Local Official Should Know Presented by: Steve Johnson, P.E. Town Engineer October 4, 2018 Introduction Federal Emergency Management
More informationMartin County, Florida Consultation Coordination Officer (CCO) Meeting. March 22, 2018 Stuart, Florida
Martin County, Florida Consultation Coordination Officer (CCO) Meeting March 22, 2018 Stuart, Florida Agenda Introductions Coastal Flood Risk Study Review Data Collected Storm Surge Modeling Overland Wave
More informationNassau County, Florida Consultation Coordination Officer (CCO) Meeting. February 24, 2016 Fernandina Beach, Florida
Nassau County, Florida Consultation Coordination Officer (CCO) Meeting February 24, 2016 Fernandina Beach, Florida Agenda Introductions Coastal Study Update Study Process and Timeline Flood Insurance Implications
More informationErie County Flood Risk Review Meeting. January 18, 2018
Erie County Flood Risk Review Meeting January 18, 2018 Agenda The value of updated flood maps for your community Review updated flood-risk data and important next steps in the Risk MAP process Increasing
More informationOTTAWA COUNTY AND SANDUSKY COUNTY COMMUNITY CONSULTATION OFFICERS (CCO) MEETING December 7, 2017
OTTAWA COUNTY AND SANDUSKY COUNTY COMMUNITY CONSULTATION OFFICERS (CCO) MEETING December 7, 2017 TODAY S AGENDA The Value of Updated Flood Maps for Your Community Reviewing the Updated Flood Risk Data
More informationNational Flood Insurance Program. Jennifer Gilbert, CFM, ANFI New Hampshire NFIP State Coordinator
National Flood Insurance Program Jennifer Gilbert, CFM, ANFI New Hampshire NFIP State Coordinator What is the National Flood Insurance Program? Created by Congress in 1968 Participating Communities voluntarily
More informationSt. Johns County, Florida Consultation Coordination Officer (CCO) Meeting. August 31, 2016 St. Augustine, Florida
St. Johns County, Florida Consultation Coordination Officer (CCO) Meeting August 31, 2016 St. Augustine, Florida Agenda Introductions Coastal Study Update Study Process and Timeline Flood Insurance Implications
More informationIntroduction to the National Flood Insurance Program: A Guide for Coastal Property Owners MAINE BEACHES CONFERENCE 2017
Introduction to the National Flood Insurance Program: A Guide for Coastal Property Owners MAINE BEACHES CONFERENCE 2017 SUE BAKER, CFM STATE NFIP COORDINATOR MAINE DEPT OF AGRICULTURE, CONSERVATION & FORESTRY
More informationDuval County, Florida Consultation Coordination Officer (CCO) Meeting. January 25, 2017 Jacksonville, Florida
Duval County, Florida Consultation Coordination Officer (CCO) Meeting January 25, 2017 Jacksonville, Florida Agenda Introductions Coastal Study Update Study Process and Timeline Flood Insurance Implications
More informationBullitt County, Kentucky Preliminary DFIRM Community Open House. October 8, 2014 Shepherdsville, Kentucky
Bullitt County, Kentucky Preliminary DFIRM Community Open House October 8, 2014 Shepherdsville, Kentucky Meeting Agenda Introductions Overview of Preliminary DFIRMs Overview of Map Appeal Process Questions
More informationPreliminary DFIRM Community Coordination (PDCC) Meeting Gilchrist & Levy Counties, FL. April 30, 2015
Preliminary DFIRM Community Coordination (PDCC) Meeting Gilchrist & Levy Counties, FL April 30, 2015 Agenda 1. Introductions 2. Study Process and Timeline 3. Overview of Preliminary Products 4. Overview
More informationWAYNE COUNTY COMMUNITY CONSULTATION OFFICERS (CCO) MEETING. February 27, 2019
WAYNE COUNTY COMMUNITY CONSULTATION OFFICERS (CCO) MEETING February 27, 2019 TODAY S AGENDA Review the Updated Flood Risk Data for Your County Next Steps in the Map Adoption Process Understanding Flood
More informationTaylor County, Florida Community Coordination and Outreach (CCO) Meeting
Taylor County, Florida Community Coordination and Outreach (CCO) Meeting Suwannee River Water Management District April 26, 2017 11:00AM to 12:00PM Taylor County Administration Building, 201 E. Green Street,
More informationCumberland County, NJ. Risk MAP Project Status Update April 22, 2013
Cumberland County, NJ Risk MAP Project Status Update April 22, 2013 Agenda Project Team Milestones Risk MAP Overview Study Scope overview Regulatory products Non-regulatory products Proposed Schedule Risk
More informationJAXGIS FEMA Flood Hazard Mapping -- Frequently Asked Questions
Flood Hazard Zone Designations Summary Zones starting with the letter 'A' (for instance, Zone A, Zone AE, Zone AH, Zone AO) denote a Special Flood Hazard Area, which can also be thought of as the 100-year
More informationHerkimer County, New York Flood Hazard Mapping Status Report for Property Owners
Herkimer County, New York Flood Hazard Mapping Status Report for Property Owners Herkimer County, New York Flood Hazard Mapping Status Report for Property Owners FLOOD INSURANCE Who Should Purchase Flood
More information9/20/2016. Orange County Preliminary FIRM / Consultation Coordination Officer (CCO) Meeting
Orange County Preliminary FIRM / Consultation Coordination Officer (CCO) Meeting Open Pacific Coast Study September 21 and 22, 2016 1 Welcome and Introductions Preliminary FIRM / CCO Meeting Orange County
More informationDurham County Preliminary Flood Hazard Data Public Meeting. July 28, 2016
Durham County Preliminary Flood Hazard Data Public Meeting July 28, 2016 Why Are We Here New flood hazard data has been released as Preliminary for Durham County Statutory Due Process for review/comments
More informationCameron County, TX. Consultation Coordination Officer (CCO) Meeting. Please sign in (sheet at front of the room) Meeting will begin at 9:00
Cameron County, TX Consultation Coordination Officer (CCO) Meeting Please sign in (sheet at front of the room) Meeting will begin at 9:00 July 29, 2015 Lisa Jennings FEMA Region 6 Roles & Responsibilities
More informationFederal Emergency Management Agency
Page 1 of 4 Issue Date: April 11, 2013 Case No.: DETERMINATION DOCUMENT COMMUNITY AND REVISION INFORMATION PROJECT DESCRIPTION BASIS OF REQUEST Town Of Stratford Fairfield County Connecticut NO PROJECT
More informationN.C. Floodplain Mapping Program
N.C. Floodplain Mapping Program Current Status and Update April 23, 2018 NCFMP Program Objectives Purpose: Develop, Maintain, and Disseminate current, accurate, digital flood hazard data for all of NC,
More informationSkagit County Flood Insurance Study Update. Ryan Ike, CFM FEMA Region 10
Skagit County Flood Insurance Study Update Ryan Ike, CFM FEMA Region 10 Skagit County Flood Insurance Study Process Overview Process, Schedule, & Deliverables Base Flood Elevations, Modeling, & Levees
More informationASFPM Partnerships for Statewide Mitigation Actions. Alicia Williams GIS and HMP Section Manager, Amec Foster Wheeler June 2016
ASFPM Partnerships for Statewide Mitigation Actions Alicia Williams GIS and HMP Section Manager, Amec Foster Wheeler June 2016 Summary The Concept Leveraging Existing Data and Partnerships to reduce risk
More informationDealing With Unnumbered A Zones in Maine Floodplain Management
Dealing With Unnumbered A Zones in Maine Floodplain Management The following is a list of acceptable methods that the State Floodplain Management Coordinator and the Federal Emergency Management Agency
More informationFOR LOCAL GOVERNMENTS
FLOOD MAP OUTREACH PLANNING GUIDEBOOK FOR LOCAL GOVERNMENTS Version 1.1 Georgia Department of Natural Resources March 2010 Dear Community Official: Georgia s Department of Natural Resources (DNR) has partnered
More informationFederal Emergency Management Agency
Page 1 of 4 Issue Date: February 14, 2013 Effective Date: June 28, 2013 DETERMINATION DOCUMENT COMMUNITY AND REVISION INFORMATION City of Sunny Isles Beach Miami-Dade County Florida PROJECT DESCRIPTION
More informationLOCAL OFFICIALS MEETING Lake Wausau Physical Map Revision MARATHON COUNTY, WISCONSIN FEBRUARY 9, 2017
LOCAL OFFICIALS MEETING Lake Wausau Physical Map Revision MARATHON COUNTY, WISCONSIN FEBRUARY 9, 2017 Welcome & Introduction Michelle Staff Floodplain Management Policy Coordinator, WDNR Michelle.Staff@Wisconsin.gov
More informationFlood Map Revisions. Town of Nags Head Public Information and Input Session. December 14, 2016, 6 pm
Flood Map Revisions Town of Nags Head Public Information and Input Session December 14, 2016, 6 pm Flood Map Revisions New preliminary flood maps released for Dare County June 30, 2016 www.nagsheadnc.gov/floodmaps
More informationKevin Wagner Maryland Department of the Environment
Kevin Wagner Maryland Department of the Environment Topics Overview of the National Flood Insurance Program (NFIP) Mapping Regulations Insurance Mitigation Community Rating System (CRS) Questions Know
More informationKing County, WA DFIRM Update and Seclusion Process. Webinar June 14, 2016
King County, WA DFIRM Update and Seclusion Process Webinar June 14, 2016 Agenda King County DFIRM Study History What is/has been done Process for moving forward Seclusion Seclusion mapping process Seclusion
More informationFederal Emergency Management Agency
Page 1 of 5 Issue Date: April 2, 2015 DETERMINATION DOCUMENT COMMUNITY AND REVISION INFORMATION PROJECT DESCRIPTION BASIS OF REQUEST Ventura County California NO PROJECT UPDATE COMMUNITY (Unincorporated
More informationEnough about me! Topics Covered
About Me Worked in land surveying since 1997 Employed by the City of Orlando since 2006 City of Orlando City Surveyor since February 2015 Certified Floodplain Manager since 2015 Florida Licensed Surveyor,
More informationFederal Emergency Management Agency
Page 1 of 6 Issue Date: September 27, 2010 Effective Date: February 14, 2011 Follows Conditional Case No.: 08-08-0873R DETERMINATION DOCUMENT COMMUNITY AND REVISION INFORMATION PROJECT DESCRIPTION BASIS
More informationFederal Emergency Management Agency
Page 1 of 4 Issue Date: October 2, 2017 Effective Date: October 2, 2017 Case No.: 17-09-2731P LOMR-APP Federal Emergency Management Agency Washington, D.C. 20472 LETTER OF MAP REVISION DETERMINATION DOCUMENT
More informationFederal Emergency Management Agency
Page 1 of 5 Issue Date: October 16, 2014 Effective Date: March 2, 2015 Case No.: 14-09-2279P LOMR-APP Federal Emergency Management Agency Washington, D.C. 20472 LETTER OF MAP REVISION DETERMINATION DOCUMENT
More informationFlood Risk Review (FRR) Meeting. Cumberland County, Pennsylvania Carlisle, Pennsylvania December 5, 2016
Flood Risk Review (FRR) Meeting Cumberland County, Pennsylvania Carlisle, Pennsylvania December 5, 2016 Why are we here today? The Flood Insurance Study (FIS) report and Flood Insurance Rate Maps (FIRMs)
More informationFloodplain Management 101. Mississippi Emergency Management Agency Floodplain Management Bureau
Floodplain Management 101 Mississippi Emergency Management Agency Floodplain Management Bureau Stafford Act The Stafford Disaster Relief and Emergency Assistance Act (Stafford Act) (Public Law 100-707)
More informationCommunity Officials Meeting. Plumas and Sierra County Physical Map Revision
Community Officials Meeting Plumas and Sierra County Physical Map Revision March 6, 2014 Agenda Introductions/Sign In Project Scope Sierra Valley Flood Study (Plumas and Sierra Counties) North Yuba River
More informationBest Practices. for Incorporating Building Science Guidance into Community Risk MAP Implementation November 2012
Best Practices for Incorporating Building Science Guidance into Community Risk MAP Implementation November 2012 Federal Emergency Management Agency Department of Homeland Security 500 C Street, SW Washington,
More informationAbington Township Public Meeting
Abington Township Public Meeting Flood Insurance Rate Map Update March 23, 2016 1 Meeting Agenda and Format Provide residents/property owners of Abington Township with information about the map update,
More informationUsing GISWeb to Determine Your Property s Flood Zone
Using GISWeb to Determine Your Property s Flood Zone 1. In a new browser window, go to http://www.co.santacruz.ca.us/departments/geographicinformationsystemsgis.aspx 2. Click on GISWeb - GIS Mapping Application
More informationCRISP COUNTY, GEORGIA AND INCORPORATED AREAS
CRISP COUNTY, GEORGIA AND INCORPORATED AREAS Community Name Community Number ARABI, CITY OF 130514 CORDELE, CITY OF 130214 CRISP COUNTY (UNINCORPORATED AREAS) 130504 Crisp County EFFECTIVE: SEPTEMBER 25,
More informationBucks County, PA Flood Risk Review Meeting. November 2014
Bucks County, PA Flood Risk Review Meeting November 2014 Agenda for Today Risk MAP Program overview Overview of non-regulatory Flood Risk Products and datasets Discuss mitigation action Technical overview
More informationMichael Taylor, PE, CFM Project Manager, AECOM August 25, 2015
Promoting FEMA s Flood Risk Products in the Lower Levisa Watershed Michael Taylor, PE, CFM Project Manager, AECOM August 25, 2015 Agenda Study Background Flood Risk Product Overview AOMI and Mitigation
More informationDoor County Floodplain Program Informational Meeting
Door County Floodplain Program Informational Meeting Door County Land Use Services Department Wisconsin Department of Natural Resources January 15, 2018 Floodplain = Land affected by flood event with a
More informationQuestions about the National Flood Insurance Program
Questions about the National Flood Insurance Program Federal Emergency Management Agency (FEMA) Questions and Answers What is the National Flood Insurance Program (NFIP)? The NFIP is a Federal program
More informationFederal Emergency Management Agency
Page 1 of 5 Issue Date: October 28, 2009 Follows Conditional Case No.: 08-08-0612R DETERMINATION DOCUMENT COMMUNITY AND REVISION INFORMATION PROJECT DESCRIPTION BASIS OF REQUEST COMMUNITY Lincoln County
More informationNFIP Overview Elevation Certificate Flood Insurance Rate Maps. By: Maureen O Shea, AICP, CFM State NFIP Coordinator
NFIP Overview Elevation Certificate Flood Insurance Rate Maps By: Maureen O Shea, AICP, CFM State NFIP Coordinator Example of a flood failure Example of a flood failure Purposes of the NFIP Identify &
More informationFederal Emergency Management Agency
Page 1 of 6 Issue Date: May 13 2016 Case No.: Follows Conditional Case No.: 14-05-0595R DETERMINATION DOCUMENT COMMUNITY AND REVISION INFORMATION PROECT DESCRIPTION BASIS OF REQUEST COMMUNITY Village of
More informationFederal Emergency Management Agency
Page 1 of 4 Issue Date: April 29, 2011 DETERMINATION DOCUMENT COMMUNITY COMMUNITY AND REVISION INFORMATION City of Simi Valley Ventura County California PROJECT DESCRIPTION NO PROJECT BASIS OF REQUEST
More informationBUTTS COUNTY, GEORGIA AND INCORPORATED AREAS
BUTTS COUNTY, GEORGIA AND INCORPORATED AREAS Butts County Community Name Community Number BUTTS COUNTY (UNICORPORATED AREAS) 130518 FLOVILLA, CITY OF 130283 JACKSON, CITY OF 130222 JENKINSBURG, TOWN OF
More informationPinellas County Flood Map Information Service & Real Estate Disclosure Program Training January 26, 2017 COMMON FLOODPLAIN ACRONYMS
FEMA ASFPM BFE CAV Pinellas County Flood Map Information Service & Real Estate Disclosure Program Training COMMON FLOODPLAIN ACRONYMS Federal Emergency Management Agency Association of State Floodplain
More informationFEMA Region IX May 30-31, 2017
Ventura County Preliminary Flood Maps FEMA Region IX May 30-31, 2017 National Flood Insurance Program U.S. Congress established the NFIP with the passage of the National Flood Insurance Act of 1968: 1.
More informationNFIP Mapping Issues. Wendy Lathrop, PLS, CFM. Cadastral Consulting, LLC
NFIP Mapping Issues Cadastral Consulting, LLC NFIP Basic Objectives: Reduce the exposure to flood damages through the use of minimum standards for the placement and design of structures located in flood
More informationCalhoun County Flood Insurance Study Update
Calhoun County Flood Insurance Study Update Larry Voice FEMA Region VI September 18, 2009 AGENDA Introduction Study Overview and Status Update Levees Post-Preliminary Process Outreach Moving Forward 2
More informationAGENDA PLANNING ADVISORY BOARD SUBCOMMITTEE INDUSTRIAL STANDARDS FOR CONSTRUCTION WITHIN A FLOODPLAIN THURSDAY, AUGUST 25, :00-5:00 P.M.
AGENDA PLANNING ADVISORY BOARD SUBCOMMITTEE INDUSTRIAL STANDARDS FOR CONSTRUCTION WITHIN A FLOODPLAIN THURSDAY, AUGUST 25, 2016 3:00-5:00 P.M. CITY COMMISSION CHAMBERS 204 ASH STREET FERNANDINA BEACH,
More informationFederal Emergency Management Agency
Page 1 of 5 Issue Date: July 27, 2012 Effective Date: December 10, 2012 Case No.: 11-06-4512P Follows Conditional Case No.: 06-06-B789R LOMR-APP Federal Emergency Management Agency Washington, D.C. 20472
More informationLocation: Tampa, Florida March 6, 2013
Discovery Meeting: West Florida Coastal Study Location: Tampa, Florida March 6, 2013 Agenda Introductions Why we are here Outline Risk MAP products and datasets Discovery Overview: Project scoping and
More informationFederal Emergency Management Agency
Page 1 of 4 Issue Date: April 26, 2013 DETERMINATION DOCUMENT COMMUNITY AND REVISION INFORMATION PROJECT DESCRIPTION BASIS OF REQUEST City of Coppell Dallas County Texas FILL HYDRAULIC ANALYSIS NEW TOPOGRAPHIC
More informationFloodplain Management 101: UNIT II. Maps & Flood Insurance Studies
Floodplain Management 101: UNIT II Maps & Flood Insurance Studies Who is ASFPM? ASFPM stands for the Association of State Floodplain Managers A national organization of floodplain management professionals
More informationADVISORY BASE FLOOD ELEVATIONS (ABFEs)
The Department of Homeland Security s Federal Emergency Management Agency is committed to helping communities that were impacted by Hurricanes Katrina and Rita rebuild safer and stronger. Following catastrophic
More informationMaryland Model Floodplain Management Ordinance (May, 2014) MODEL NOTES
Maryland Model Floodplain Management Ordinance (May, 2014) MODEL NOTES The model floodplain management ordinance that most Maryland communities have used as the basis for their regulations since the early
More informationASSUMPTION PARISH, LOUISIANA AND INCORPORATED AREAS
VOLUME 1 of 1 ASSUMPTION PARISH, LOUISIANA AND INCORPORATED AREAS COMMUNITY NAME ASSUMPTION PARISH UNINCORPORATED AREAS COMMUNITY NUMBER 220017 NAPOLEONVILLE, TOWN OF 220018 REVISED PRELIMINARY November
More informationConsultation Coordination Officer (CCO) Meeting
Consultation Coordination Officer (CCO) Meeting Middle Brazos Lake Whitney Physical Map Revision Hill and McLennan Counties FEMA Region 6 Agenda National Flood Insurance Program Purpose of the Meeting
More informationFederal Emergency Management Agency
Page 1 of 4 Issue Date: September 7, 2012 Effective Date: January 22, 2013 DETERMINATION DOCUMENT COMMUNITY COMMUNITY AND REVISION INFORMATION City of Lubbock Lubbock County Texas PROJECT DESCRIPTION CHANNELIZATION
More informationLake Erie. June 10 & 11, 2014
Discovery Meeting: Lake Erie FEMA REGION II June 10 & 11, 2014 Lake Erie Contributing Watersheds eds Introductions and Who s Here Project Team FEMA Region II RAMPP Local Stakeholders Invited Local Community
More informationFLOOD INSURANCE. Introduction
FLOOD INSURANCE Introduction The purpose of this course is to provide a comprehensive description of the NFIP for insurance producers who are seeking continuing education credits. It provides an overview
More informationKentucky Risk MAP It s not Map Mod II
Kentucky Risk MAP It s not Map Mod II Risk Mapping Assessment and Planning Carey Johnson Kentucky Division of Water carey.johnson@ky.gov What is Risk MAP? Risk Mapping, Assessment, and Planning (Risk MAP)
More informationFederal Emergency Management Agency
Page 1 of 6 Issue Date: October 24, 2012 Effective Date: March 7, 2013 Case No.: LOMR-APP DETERMINATION DOCUMENT COMMUNITY AND REVISION INFORMATION PROJECT DESCRIPTION BASIS OF REQUEST City of Lubbock
More informationFEMA Mapping Update Meeting: Contra Costa County. March 11, 2015
FEMA Mapping Update Meeting: Contra Costa County March 11, 2015 Welcome and Introductions Mapping Update Meeting Contra Costa County Contra Costa County Riverine Physical Map Revision (PMR) San Francisco
More informationRequirements for Construction on Properties in the Special Flood Hazard Area (SFHA)
Requirements for Construction on Properties in the Special Flood Hazard Area (SFHA) Rev 010915 The website for the IDNR to request the EFARA (Electronic Floodplain Analysis/Regulatory Assessment is found
More informationAdapting Maine s coastal communities to sea level rise and storm surge (2015 State of the Bay Presentation)
University of Southern Maine USM Digital Commons Presentations Casco Bay Estuary Partnership (CBEP) 2015 Adapting Maine s coastal communities to sea level rise and storm surge (2015 State of the Bay Presentation)
More informationCITY OF PLANTATION ENGINEERING DEPARTMENT INTEROFFICE MEMORANDUM NO
CITY OF PLANTATION ENGINEERING DEPARTMENT INTEROFFICE MEMORANDUM NO. 2013-003 DATE: October 22, 2012 TO: Mayor and Members of City Council FROM: Brett W. Butler, PE, CFM City Engineer SUBJECT: CRS Program
More informationRichSmith_slate-FEMA_320x240.wmv.
Nebraska DNR s role in the making of FEMA s Digital Flood Insurance Rate Maps Becky Groshens (grow-hands) & Shelley Schindler Important Terms: FIRM: Flood Insurance Rate Map FIS: Flood Insurance Study
More informationHazard Mitigation Grants. Technical Assistance Session Middlesex County, NJ December 7, 2011
Hazard Mitigation Grants Technical Assistance Session Middlesex County, NJ December 7, 2011 Outline Purpose of Hazard Mitigation Hazard Mitigation Projects Hazard Mitigation Assistance Grant Programs Using
More informationPreliminary Work Map Release
Coastal Mapping in New Jersey Preliminary Work Map Release Monmouth County, New Jersey June 14, 2013 Agenda Introduction and Purpose of Briefing Hurricane Sandy Advisory Base Flood Elevations Transitioning
More informationFederal Emergency Management Agency
Page 1 of 3 COMMUNITY AND MAP PANEL INFORMATION COMMUNITY CITY OF MARGATE CITY, ATLANTIC COUNTY, NEW JERSEY LEGAL PROPERTY DESCRIPTION A parcel of land, as described in Deed recorded in Book 4826, page
More informationFederal Emergency Management Agency
Page 1 of 4 Issue Date: August 1, 2012 Effective Date: December 13, 2012 Case No.: 12-06-0595P LOMR-APP Washington, D.C. 20472 LETTER OF MAP REVISION DETERMINATION DOCUMENT COMMUNITY AND REVISION INFORMATION
More informationUnderstanding and Using NFIP Data
Understanding and Using NFIP Data The understanding of those who provide information and of those who have to act responsibly in using that information is often very much misunderstood. Old Proverb Overview
More informationFLOOD STUDY Atlantic County, NJ. FEMA REGION II July 12, :00
FLOOD STUDY Atlantic County, NJ FEMA REGION II July 12, 2011 14:00 Agenda Introductions FEMA Strategic Plan & Risk Mapping, Assessment, and Planning (Risk MAP) Goals Risk MAP Program Overview Meeting Objectives
More informationThe New Maryland Model Floodplain Management Ordinance
Department of the Environment The New Maryland Model Floodplain Management Ordinance MAFSM Conference October 21, 2010 Kevin G. Wagner Agenda Brief history/background What s driving new ordinances Introduction
More informationFederal Emergency Management Agency
age 1 of 4 Issue Date: April 16, 2013 Effective Date: August 30, 2013 DETERMINATION DOCUMENT COMMUNITY AND REVISION INFORMATION ROJECT DESCRITION BASIS OF REQUEST City of Naples Collier County Florida
More informationDelaware Bay / River Coastal Flood Risk Study. FEMA REGION II and III September 19, 2012
Delaware Bay / River Coastal Flood Risk Study FEMA REGION II and III September 19, 2012 Agenda Risk MAP Program Overview Risk MAP Non-Regulatory Products & Datasets Region II New Jersey Coastal Flood Study
More informationNorthern Alameda County Consultation Coordination Officer (CCO) Meeting
MEETING TITLE: DATE AND TIME: Northern Alameda County Consultation Coordination Officer (CCO) Meeting May 27, 2015, 1:30 to 3:30 p.m. LOCATION: 950 West Mall Square, Room 201 Alameda, CA ATTENDEES: Eric
More informationFederal Emergency Management Agency
Page 1 of 5 Issue Date: June 21, 2013 Follows Conditional Case No.: 04-06-A148R DETERMINATION DOCUMENT COMMUNITY COMMUNITY AND REVISION INFORMATION City of Irving Dallas County Texas FILL PROJECT DESCRIPTION
More informationDiscovery Meeting: Lake Ontario. FEMA REGION II November 12-14, 2013 and November 19-21, 2013 Lake Ontario Contributing Watersheds
Discovery Meeting: Lake Ontario FEMA REGION II November 12-14, 2013 and November 19-21, 2013 Lake Ontario Contributing Watersheds Introductions and Who s Here Project Team FEMA Region II Dewberry New York
More informationMEIGS COUNTY UNINCORPORATED AREAS
VOLUME 1 MEIGS COUNTY, OHIO AND INCORPORATED AREAS COMMUNITY NAME COMMUNITY NUMBER MEIGS COUNTY UNINCORPORATED AREAS 390387 MIDDLEPORT, VILLAGE OF 390388 POMEROY, VILLAGE OF 390389 RACINE, VILLAGE OF 390390
More informationTable 1: Federal, State and Local Government Rules applicable to LOMRs/CLOMRS submittal
MnDNR LOMC Guide This document has been prepared by the Minnesota Department of Natural Resources floodplain staff and is intended to provide assistance with LOMR/CLOMR submittals. This information is
More informationNational Capitol Region HAZUS User Group Call
Listen to the recording here to follow along with the presentation: http://www.freeconferencecalling.com/recordings/recording.aspx?fileid=l AF3494_04252013070630062_1154707&bridge=697620&email=&account
More informationCOLLIER COUNTY FLOODPLAIN MANAGEMENT
COLLIER COUNTY FLOODPLAIN MANAGEMENT FREQUENTLY ASKED QUESTIONS The following information is based on common questions from the public. If you have a specific question or need further information, please
More informationGlossary. Frequently Used Terms for Levees
Glossary Frequently Used Terms for Levees The terms listed below will regularly be encountered by FEMA mapping partners, stakeholders, and users that are actively involved in the Flood Map Modernization
More informationUse of FEMA Non regulatory Flood Risk Products in Planning
Use of FEMA Non regulatory Flood Risk Products in Planning Georgia Association of Floodplain Managers Annual Conference March 24, 2016 What are the Non regulatory Flood Risk products? Go beyond the basic
More informationOrange County Flood Insurance Study Update
Orange County Flood Insurance Study Update Larry Voice FEMA Region VI August 26, 2009 AGENDA Introduction Study Overview and Status Update Levees Post-Preliminary Process Outreach Moving Forward 2 Introduction
More informationFederal Emergency Management Agency
Page 1 of 4 Issue Date: November 16 2016 Effective Date: March 31 2017 Case No: 16-06-2056P LOMR-APP Follows Conditional Case No: 10-06-3320R Federal Emergency Management Agency Washington DC 20472 LETTER
More information10526 Bermuda Isle Dr. Tampa, FL 33647
Flood Analysis Memo Property Address 10526 Bermuda Isle Dr. In Partnership with: ** This property is NOT within a high-risk flood zone ** 10526 Bermuda Isle Dr. BFE = 35 ft This property is located in
More informationMONROE COUNTY, GEORGIA
MONROE COUNTY, GEORGIA AND INCORPORATED AREAS Monroe County Community Name Community Number *CULLODEN, CITY OF 130543 FORSYTH, CITY OF 130359 MONROE COUNTY 130138 (UNINCORPORATED AREAS) *No Flood Hazard
More information10526 Bermuda Isle Dr. Tampa, FL 33647
Flood Analysis Memo Property Address In Partnership with: ** This property is NOT within a high-risk flood zone ** This property is located in a FEMA low-risk zone designated as Zone X - an area of minimal
More information