1 Adopted Tentative Budget Final Public Hearing September 5, 2013
2 Presentation Outline Proposed Millage Budget Information Enrollment Projections vs. State Recalibration Proposed Employee Positions & History Operating Capital Unknowns for & Beyond Timeline Format of Budget Books Q&A 2
3 Brevard s Tax Roll Growth & Decline Fiscal Year Tax Roll % Change ,910,272, ,924,947, % ,316,371, % ,695,633, % ,087,435, % ,334,959, % ,060,244, % ,311,747, % ,927,287, % ,345,104, % ,725,460, % ,390,012, % ,812,038, % * 27,457,119, % ^ 28,725,623, % Source: Comprehensive Annual Financial Reports (CAFR), except for the following: * Adjusted Final Taxable Value as of March 15, 2013 ^ Certified Taxable Value by Property Appraiser on June 26,
4 Tax Roll History and Projections 45,000,000,000 40,000,000,000 35,000,000,000 30,000,000,000 25,000,000,000 20,000,000,000 15,000,000,000 10,000,000,000 Note: Numbers reflect those listed on slide 3 for years through Years through have been projected to reflect the first time the tax roll is expected to exceed the level. 4
5 History of School Board Millage Levy Fiscal Year Total Millage Difference % % % % % % % % % % % % % % % % Difference Since % Note: Each year the Board has levied the maximum allowed by law without voter referendum. 5
6 Proposed Millage Changes Required Local Effort (RLE) mills Millage required by the State to be levied If not, would receive no Federal, State, or Local dollars requirement of mills, plus Prior Period Funding Adjustment (year ) of mills mills generates $147,507, mills generates $248,189 RLE comprises 70% of the total proposed millage levy 6
7 Proposed Millage Changes Discretionary Millage mills Legislation mandated transfer of mills from Capital to Operating Legislation authorized to transfer mills from Capital to Operating optional Attempt of Legislature to hold total millage at same level, but used to fund the FEFP to balance the Operating Budget This budget assumes will still move mills from the Capital Projects Fund to the Operating Fund Currently subject to Compression by the State State guarantees average per FTE of $ State will provide Brevard $88.75 per FTE or $6,176,155 Without compression mills generates $20,627,295 7
8 Proposed Millage Changes Capital Outlay Millage mills Legislation mandated transfer of mills from Capital to Operating Legislation authorized to transfer mills from Capital to Operating optional Attempt of Legislature to hold total millage at same level, but used to fund the FEFP to balance the Operating Budget This budget assumes will still move mills from the Capital Projects Fund to the Operating Fund If millage not moved, Operating would lose approximately 1/3 (or $2.1 million) of the Discretionary Millage Compression from the State mills generates $41,364,897 8
9 What is a Mill? Definition of a mill related to a home s value: 1.00 Mill = $1 per $1,000 Examples of property taxes for a home with a Taxable Value = $100, Mill = $100 in property taxes Mills = $ in property taxes 9
10 Calculating Your Taxes Tax Formula: Taxable Value X Millage Rate X Example: Home Assessed Value $100,000 Less Homestead Exemption -25,000 Taxable Value of Home $75,000 Millage Rate = mills Property Taxes = 75,000 X X = $
11 Proposed Millage Operating - Required Local Effort - Local Discretionary - Critical Needs Capital Outlay Total Millage Actual Proposed Increase/ Decrease
12 Rolled-Back Rate Details The rolled-back rate is the new year property tax levy that would (after the value of new construction is deducted) produce the same amount of revenue as the previous year (but using this year s tax roll) Total Actual Millage Total Rolled-Back Rate Total Proposed Millage The Proposed Millage rate is: 2.43% lower than the Rolled-Back Rate 6.05% lower than the Actual Millage 12
13 Proposed Millage vs. Rolled-Back Operating - Required Local Effort - Local Discretionary Capital Outlay Total Millage Rolled-Back Proposed Increase/ Decrease
14 Sample Home Brevard Public Schools - By State Law - By Local Board - School Capital Outlay Total School Board Taxes Assessed Value Taxable Value Your Property Taxes Last Year Your Property Taxes This Year If No Change Your Property Taxes If Proposed Change Is Made $109,530 $111, % $84,530 $86, % 14
15 Sample Home (cont.) Total School Board Taxes - Taxable Value - Millage - Amount of Taxes* Your Property Taxes Last Year Your Property Taxes This Year If No Change Your Property Taxes If Proposed Change Is Made ,530 86,390 86, $ $27.27 * Amount of Taxes = Taxable Value X Millage X
16 Tax on Residential Home Scenario #1 Assumes no change in assessed valuation of $100,000 home Home Value $100,000 Less Homestead Exemption -25,000 Taxable Value of Home $75,000 Taxes Paid in $ Taxes Proposed for $ Tax Decrease for $
17 Tax on Residential Home Scenario #2 Assumes 1.7% ($1,700) increase in assessed valuation of $100,000 home Home Value $101,700 Less Homestead Exemption -25,000 Taxable Value of Home $76,700 Taxes Paid in $ Taxes Proposed for $ Tax Decrease for $
18 Tax on Residential Home Scenario #3 Assumes 10% ($10,000) increase in assessed valuation of $100,000 home Home Value $110,000 Less Homestead Exemption -25,000 Taxable Value of Home $85,000 Taxes Paid in $ Taxes Proposed for $ Tax Increase for $
19 Millage Decrease & Tax Roll Increase Operating Capital Total Millage Tax Roll Difference $27,457,119,387 $28,725,623,018 $1,268,503,631 Operating Capital Dollars Generated Dollars Generated from Millage and Tax Roll Difference $173,862,873 $168,382,708 -$5,480,165 $39,538,252 $41,364,897 $1,826,645 $213,401,125 $209,747,605 -$3,653,520 By law, additional dollars are calculated at 96% collection rate 19
20 Adopted Tentative Budget Amended Tentative Difference Dollars % Operating 536,384, ,252,108 5,867, Special Revenue 85,280, ,284,388 19,003, Debt Service 199,506,193 42,481, ,024, Capital Outlay 93,394,096 88,463,322-4,930, Enterprise Fund 8,407,530 8,355,276-52, Subtotal 922,973, ,837, ,136, Less Transfers 46,151,401 36,837,919-9,313, Total 876,821, ,999, ,822, Internal Service 87,999,508 88,535, ,
21 History Actual Total Revenue With and Without Fund Balance $1,400,000,000 $1,200,000,000 Actual Revenue With Fund Balance Actual Revenue Without Fund Balance $1,000,000,000 $800,000,000 $600,000,000 $400,000,000 $200,000,000 $ Note: increase was due to refinancing COP, but was offset by the equivalent amount of expenditures 21
22 Student Growth/Decline Year Membership Number Percent , , , ,912 1, ,216 1, , , , ,000-1, , , , , * 72, Note: six-day count number was 71,973 22
23 State s Recalibration Projected FTE District's Recalibrated Difference Request by State Dollars % ESE 111 Services 4, , ESE 112 Services 6, , ESE 113 Services 4, , Support Level Support Level Career Education 1, , Basic K-3 16, , Basic , , Basic , , ESOL 1, , Grand Total 70, ,
24 History of Change in Employee Positions Actual vs. Proposed Actual Proposed Change Positions Number Percent Classroom Teachers 4, , Instructional Support Instructional Assistants Support - School-Level 2, , Administrators - School-Level Support - District-Level Administrators - District-Level Total 9, , Membership 69,997 69, FTE 68, , , Notes: 1. Excludes Adult Education Teachers/Other 2. All numbers exclude charter schools 3. Proposed FTE result of State Recalibration 24
25 Head Start Employee Positions Positions Classroom Teachers Instructional Support Instructional Assistants Support - School-Level Administrators - School-Level Support - District-Level Administrators - District-Level Total
26 History of Change in Employee Positions Actual vs. Proposed Without Head Start Actual Proposed Change Positions Number Percent Classroom Teachers 4, , Instructional Support Instructional Assistants Support - School-Level 2, , Administrators - School-Level Support - District-Level Administrators - District-Level Total 9, , , Membership 72,215 68,409-3, FTE 70, , , Notes: 1. Excludes Adult Education Teachers/Other 2. All numbers exclude charter schools 3. Proposed FTE result of State Recalibration 26
27 Operating Budget Revenue Amended Tentative Difference Dollars % Federal 2,914,119 2,584, , State - FEFP 198,781, ,789,908 30,008, State - Categoricals/Other 91,784,718 91,880,649 95, Local - Property Taxes 175,202, ,382,707-6,819, Local - Other 6,531,075 6,256, , Total Revenue 475,213, ,893,797 22,680, Other Sources 1,321,429 1,299,035-22, Beginning Fund Balance 59,850,051 43,059,275-16,790, Grand Total 536,384, ,252,108 5,867,
28 Capital Projects Revenues Amended Proposed Difference Dollars % PECO-New Construction PECO - Maintenance Other-State 614, , , Local - Impact Fees 0 4,736,997 4,736,997 0 Local - Property Taxes/Other 40,075,458 41,786,354 1,710, Total Revenues 40,690,205 47,033,351 6,343, Other Sources 1,998, ,000-1,798, Beginning Fund Balance 50,704,909 41,229,971-9,474, Total 93,394,096 88,463,322-4,930,
29 Capital Projects Expenditures Project Amount Remodel/Renovation/Maintenance $3,171,457 Food Services Maintenance $200,000 Health and Safety Projects $250,000 Portable Relocation $150,000 Up to 10 School Buses $1,000,000 Refreshment of Technology $2,000,000 Repair at Failure $2,200,000 COP Payment $33,322,104 Other Various Capital Projects $4,939,790 Total Capital Projects Funded with New Dollars $47,233,351 Capital Projects/Debt Funded by Fund Balance $41,229,971 Grand Total $88,463,322 29
30 Unknowns for & Beyond State s Recalibration of FTE (already reduced 918 for ) Further Proration in Dollars by the State Student Enrollment in Future Years Future Recalibration by the State Future Changes in State Funding for Dual Enrollment, Virtual Education and Other FTE Generating Programs Future Increases in State Retirement (FRS) Future of Capital Funding: Growth in Tax Roll Receipt of Impact Fees Potential Tax Referendum 30
31 Timeline November 9 Facility Workshop (School Closures Announced) December 14 Submitted FTE (Student) Projections to State December 21 Budget Workshop Introduced Proposed Budget Cuts and Revenue Enhancements February Four (4) Community Forums March 12 Board Approves Proposed Budget Cuts and Revenue Enhancements May 3 Florida Legislative Session ended June 27 Board Approves Revised List of Proposed Budget Cuts and Revenue Enhancements 31
32 Timeline (cont.) June 27 Preliminary Budget Workshop July 27 Newspaper advertisement for 1st Public Hearing August 1 First Public Hearing Adopted Tentative Budget and Millage Third week of August Proposed Tax Notices mailed by Tax Collector to property owners, which also advertised the 2nd (Final) Public Hearing September 5 Final Public Budget Hearing to Adopt Final Budget and Millage, 5:30 p.m. at Educational Services Facility 32
33 Format of Budget Books Reminder that new salary object codes are being utilized in the Operating Budget (see page 15) All information has been updated Automated Labor updated for Actual Year-End Budget and Expenditures for Actual Fund Balance Information for Additional pages still provided for ARRA (Special Revenue Funds) to reflect Race to the Top dollars 33
34 Format of Budget Books Prior year being provided for comparison purposes : Adopted Budget (9/6/12) Amended Budget (as of 6/30/13) Actual Expenditures (as of 6/30/13) : Adopted Tentative Budget (9/5/13) Percent of total for each column has been included in the book for easy reference. Note: Budget books dating back to are available in the reference section of all Brevard public libraries. 34
35 Contact Information If you should require additional information, please contact: Judy Preston Associate Superintendent, Financial Services , ext. 600 Karen Strickland Director, Planning, Budgets, and Reporting , ext. 610 Jo Ann Clark Director, Accounting Services , ext. 660 District Website: 35
36 uestions nswers
37 Capital Budget Contingency Plan At the August 27, 2013 School Board Meeting, Staff was Requested to Provide a Contingency Plan in the event that the Impact Fees included in the Capital Projects Proposed Budget are not received from the County. 37
38 Capital Projects to be Funded Even Without Impact Fees Total of 46 Projects = $10,250,000 38
39 North Area CAMPUS DESCRIPTION OF WORK BUDGET CAPITAL PROJECTS TO BE FUNDED EVEN WITHOUT IMPACT FEES North Area 1 Jackson MS Replace Boiler 5,000 2 Jefferson MS Cafeteria HVAC Replacement 75,000 3 Jefferson MS CTSI 100% Outside Air Unit Replacement 320,000 4 Madison MS Mod. Bit. Roof Replacement 700 Wing 103,000 5 Oak Park ES Replace Air-Cooled Chillers 120,000 6 Pinewood ES Replace 3 DX units Bldg ,000 7 Stevenson ES Mod. Bit. Roof Replacement 680,000 8 Titusville HS Mod. Bit. Roof Replacement at Gymnasium 380,000 9 Tropical ES Replace R-11 Chiller 250, Tropical ES Cooling Tower Replacement 120,000 North Area Total $2,128,000 39
40 Central Area CAMPUS DESCRIPTION OF WORK BUDGET CAPITAL PROJECTS TO BE FUNDED EVEN WITHOUT IMPACT FEES Central Area 1 Croton ES Cooling Tower Replacement 94,000 2 DeLaura MS Phase 1 Chiller Plant & Piping 1,500,000 3 Golfview ES Cafeteria HVAC Replacement - Bldg ,000 4 Golfview ES Replace AHU Bldg 6 & 7 75,000 Golfview ES - Classroom Upgrades - 5 Phase 2 Painting/Cabinetry/HVAC/Courtyard 150,000 6 Holland ES Carpet Replacement w/tile (50,000SF/$7.50 sq. ft.) 430,000 7 Kennedy MS CTSI 100% Outside Air Unit Replacement 320,000 McLarty Stadium - 8 Rockledge HS Roofing & Restroom Improvements 85,000 9 Rockledge HS Mod. Bit. Roof Replacement - Phase 1 1,700, Sabal ES Cool Roof Coating 1,050, Satellite HS Repair Auditorium Entry Canopy 250, Cambridge ES Windows Cafeteria Building #2 10, Sea Park ES Metal Gazebo, Hard Court Roof 5,000 Central Area Total $5,769,000 40
41 South Area CAMPUS DESCRIPTION OF WORK BUDGET CAPITAL PROJECTS TO BE FUNDED EVEN WITHOUT IMPACT FEES South Area 1 Columbia ES Replace Water Source Heat Pumps 20,000 2 Gemini ES 3DI Classroom Addition HVAC Replacements & OA Ducts 100,000 3 Heritage HS Science Lab - Fan Wiring 1,000 4 Indialantic ES Spalling Sidewalk Canopies 5,000 5 Lockmar ES Bldg. 1 HVAC Unit Admin. 28,000 6 McAuliffe ES Replace Water Source Heat Pumps 20,000 7 Palm Bay ES. Mod. Bit. Roof Replacement NE Side 135,000 8 Palm Bay ES Electrical Panel Room ,000 9 Palm Bay ES Bldg. 9 (Law Academy) HVAC Upgrades 39, Southwest MS HVAC Unit Replacement in Cafe./Kitchen & Split DX Unit Bldg. 7, RM , Southwest MS HVAC Unit Replacement - Bldg. 700, RM , Turner ES - Phase 1 HVAC Unit Replacement - Bldg , Turner ES - Phase 2 HVAC Unit Replacement - Bldg. 200 & ,000 South Area Total $589,500 41
42 District-Wide CAMPUS DESCRIPTION OF WORK BUDGET CAPITAL PROJECTS TO BE FUNDED EVEN WITHOUT IMPACT FEES District-Wide 1 District-wide Building Automation System Upgrade - Ref. Maint. Priority List 120,000 2 District-wide Maintenance HVAC Replacement (CO&DS) 360,000 3 District-wide ADA 100,000 4 District-wide Building Code Deficiencies 149,000 5 District-wide Portable Relocations 150,000 6 District-wide Misc. Projects / Contingency 157,500 Melbourne Bus 7 Comp. Remove/Replace 1 Gasoline & 2 Diesel Tanks 400,000 8 Mid-South Maint. Building 2 Interior Floors & Walls 75,000 9 Satellite Bus Comp. Portables N141 & N184 2, Satellite Bus Comp. Remove/Replace 1 Gasoline & 1 Diesel Tanks 250,000 District-Wide Total $1,763,500 Grand Total of 46 Projects $10,250,000 42
43 Projects to be Cut if Impact Fees Not Received Total of 27 Cuts = $4,750,000 43
44 North Area CAMPUS DESCRIPTION OF WORK BUDGET LIST OF PROJECTS TO BE CUT IF IMPACT FEES NOT RECEIVED North Area 1 Audubon ES Replace Chilled Water AHU & OA DX Split System 200,000 2 Audubon ES Cooling Tower Replacement 80,000 3 Jackson MS Replace Band/Chorus HVAC Units 75,000 4 Madison MS Replace Band/Chorus HVAC Units 75,000 5 Oak Park ES Corridor/Fire Separation 40,000 6 Oak Park ES Replace 17 Magic Air Units Bldg. 200/500/600/700/800 75,000 7 Pinewood ES Corridor/Fire Separation 150,000 8 Roosevelt MS Cooling Tower Replacement 120,000 9 Tropical ES Repair of Exterior Wall Assembly Bldg ,000 North Area Total $905,000 44
45 Central Area CAMPUS DESCRIPTION OF WORK BUDGET LIST OF PROJECTS TO BE CUT IF IMPACT FEES NOT RECEIVED Central Area 1 Anderson ES Replace Chilled Water Air handling Units bldg. 2/3/5 125,000 2 Croton ES Corridor/Fire Separation 40,000 3 DeLaura MS Deficiencies noted in Fire Safety Evaluation 50,000 4 DeLaura MS Elevator Replacement 250,000 5 Johnson MS CTSI 100% Outside Air Unit Replacement 320,000 6 Rockledge HS Deficiencies noted in Fire Safety Evaluation 25,000 7 Rockledge HS Mod. Bit. Roof Replacement - Phase 2 700,000 8 Sabal ES Corridor/Fire Separation 30,000 9 Sabal ES Replace R-11 Chiller 250, Sabal ES Cooling Tower Replacement 120,000 Central Area Total $1,910,000 45
46 South Area and District-Wide CAMPUS DESCRIPTION OF WORK BUDGET LIST OF PROJECTS TO BE CUT IF IMPACT FEES NOT RECEIVED South Area 1 Discovery ES Replace Air-Cooled Chillers 150,000 2 Palm Bay ES Replace Air-Cooled Chillers 235,000 South Area Total $385,000 District-Wide 1 District-wide Custodial Equipment 200,000 2 District-wide Energy Conservation 250,000 3 District-wide Furniture Renewal 300,000 4 District-wide PO&M Building Improvements 200,000 5 District-wide ESF Improvements 350,000 6 District-wide Facilities Assessment 250,000 District-Wide Total $1,550,000 Grand Total of 27 Projects to be Cut $4,750,000 46
Proposed Tentative Budget. First Public Hearing
Proposed Tentative Budget First Public Hearing August 1, 2013 Presentation Outline Proposed Millage Budget Information Enrollment Projections Operating Capital Timeline Format of Budget Books Next Steps
More informationAdopted Tentative Budget
2011-12 Adopted Tentative Budget Final Public Hearing September 8, 2011 Tax Roll History Tax Roll % Increase 1999-2000 15,910,271,621-2000-01 16,924,946,890 6.38% 2001-02 18,291,203,593 8.07% 2002-03 19,695,633,660
More informationBudget Overview. Budget Workshop June 27, 2013
Budget Overview Budget Workshop June 27, 2013 Presentation Outline Budget Assumptions Funding Data State-Wide Brevard Enrollment Projections Possible Millage Budget Info Operating Capital Format of Budget
More informationPublic Hearing FY 2019 Tentative Budget July 31, 2018
Public Hearing FY 2019 Tentative Budget July 31, 2018 1 Agenda Presentation of proposed millage Presentation of proposed budget Superintendent s comments Public comments Board discussion Adoption of total
More informationDAYTONA BEACH CHAMBER OF COMMERCE
DAYTONA BEACH CHAMBER OF COMMERCE EDUCATION COMMITTEE MEETING AUGUST 13, 2014 MILLAGE LEVY COMPARISON FY10 Actual FY11 Actual FY12 Actual FY13 Actual FY14 Actual FY15 Actual TAXING AUTHORITY State Local
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationVOLUSIA COUNTY SCHOOL DISTRICT. DeLand Administrative Complex Board Room 9:00 am to 12:00 pm
VOLUSIA COUNTY SCHOOL DISTRICT DeLand Administrative Complex Board Room 9:00 am to 12:00 pm AGENDA Goal: Protect student instructional programs, services and activities and class size requirements from
More informationApril 8, Volusia County School Board DeLand Administrative Complex
April 8, 2015 Volusia County School Board DeLand Administrative Complex 1 2 3 4 5 Introductory Statement on Budget Goals and Process -- Mr. James T. Russell, Interim Superintendent Presentation on Academic
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More information$115,492 $2,963,834 $7,464,804 $7,856,304 $8,404,085 $26,804,519
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationENERGY CONSERVATION PLAN
2009-10 ENERGY CONSERVATION PLAN ATTACHMENT TO PRESENTATION AT SEPTEMBER 8, 2009 SCHOOL BOARD MEETING AGENDA ITEM #10 2009-10 ENERGY CONSERVATION PLAN EXECUTIVE SUMMARY History The Energy/Resource Conservation
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationBudget Workshop FY
Budget Workshop FY2016-2017 May 17, 2016 Agenda Introductory Statement on Budget Goals and Process -- Mr. James T. Russell, Superintendent Presentation on Academic Achievement Plan in Context of Budget
More informationFY 2016 Proposed Budget
FY 2016 Proposed Budget Budget Workshop July 22, 2015 Top-performing urban school district in Florida FY2016 Proposed Budget Adopted FY2015 Amended FY2015 (May 2015) Proposed FY2016 $ Increase/ (Decrease)
More informationSchool District of Volusia County. FY Recommended Budget September 13, 2011
School District of Volusia County FY2011-12 Recommended Budget September 13, 2011 Budget Calendar May 9 General Fund Budget Workshop May 9 School Staffing Distribution May 10 June 28 July 1 July 14 July
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationDeLand Administrative Center
DeLand Administrative Center September 11, 2012 1 Budget Calendar April 24 April 27 May 22 June 26 June 26 June 27 July 13 July 18 July 21 July 24 Sept. 11 General Fund Budget Workshop School Staffing
More informationDr. Karyn Gary - Superintendent. July 19, 2016
Dr. Karyn Gary - Superintendent July 19, 2016 School District of DeSoto County Approve the Tentative Millages and Budget for Advertisement Topics Millage and Rate Comparisons Non-Exempt Tax Values Florida
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationTentative Operating Budget
District School Board of Volusia County DeLand, Florida School Board Members Dr. Al Williams, Chairman Ms. Judy Conte, Vice Chairman 201213 Tentative Operating Budget Mr. Stan Schmidt Ms. Candace Lankford
More informationTotal Revenues $6,275,083 $2,394,299 $2,301,985 $2,481,307 $2,587,681 $16,040,355
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationTotal Revenues $27,158,867 $1,800,000 $2,400,000 $2,600,000 $3,600,000 $37,558,867
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationFinal Budget for FY September 8, 2015
Final Budget for FY2015-2016 September 8, 2015 Tax Increase Over Rolled-Back Rate The rolled-back rate of 7.0151 mills is the property tax levy that will, after the value of new construction is deducted,
More informationSCHOOL BOARD OF BREVARD COUNTY, FLORIDA BOARD AGENDA ITEM January 19, 2016
PURCHASING SOLICITATION SCHOOL BOARD OF BREVARD COUNTY, FLORIDA BOARD AGENDA ITEM January 19, 2016 Kitchen, Cafeteria & Lab Exhaust Equipment Inspection & (ITB) Invitation To Bid (ITN) Invitation To Negotiate
More informationSchool Board of Brevard County, Florida Internal Audit of Internal Accounts
School Board of Brevard County, Florida Internal Audit of Internal Accounts September 25, 2018 Prepared By: Internal Auditors TABLE OF CONTENTS Transmittal Letter... 1 Executive Summary:... 2-7 Schools
More information$4,701,440 $2,727,355 $2,596,419 $447,703 $11,216,598 $21,689,515
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationDISTRICT SCHOOL BOARD OF MONROE COUNTY
DISTRICT SCHOOL BOARD OF MONROE COUNTY *PRELIMINARY BUDGET* 2011 2012 Presented to: The School Board of Monroe County Mr. John Dick Chairperson, District 4 Mr. Andy Griffiths Vice-Chairperson, District
More informationBuilding and Site Sinking Fund Millage. Election Date: November 7th 2017
Building and Site Sinking Fund Millage Election Date: November 7th 2017 How do Districts Fund Facilities and Technology Needs? General Fund - Use current operating dollars. These are limited to the amount
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationLEE COUNTY SCHOOL DISTRICT S CAPITAL PLANNING PROCESS
LEE COUNTY SCHOOL DISTRICT S CAPITAL PLANNING PROCESS A Capital Projects Management Team has been established consisting of the Superintendent, the Chief Administrative Officer, the Chief Academic Officer,
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationREPORT TO SCHOOL BOARD
REPORT TO SCHOOL BOARD November 17, 2015 SCHOOL BOARD MEMBERS Misty Belford District 1 John Craig District 2 Amy Kneessy (Chair) District 3 Karen Henderson District 4 Andy Ziegler District 5 BPS SUPERINTENDENT
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationTotal Revenues $363,312 $426,353 $574,863 $690,185 $808,369 $2,863,082. Total Project Costs $0 $0 $0 $0 $0 $0
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More information$12,769,962 $15,919,892 $9,184,256 $9,491,206 $0 $47,365,316
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationSCHOOL BOARD OF PINELLAS COUNTY, FLORIDA. Public Hearing on. 2006/07 Millage Rates & District Budget
SCHOOL BOARD OF PINELLAS COUNTY, FLORIDA Public Hearing on 2006/07 Millage Rates & District Budget September 12, 2006 (7:00 p.m.) Conference Hall School Administration Building 301 4th Street SW, Largo,
More informationFY FINAL BUDGET VOLUSIA COUNTY SCHOOL BOARD DELAND ADMINISTRATIVE CENTER SEPTEMBER 10, 2013
FY 2013-14 FINAL BUDGET VOLUSIA COUNTY SCHOOL BOARD DELAND ADMINISTRATIVE CENTER SEPTEMBER 10, 2013 Feb. 26 & March 12, 2013 BUDGET CALENDAR Budget Workshops April 9, 2013* April 23, 2013* May 3, 2013
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationEstimated Revenue and transfers In Changes
Attachment A The School Board of Sarasota County, Florida Projected Results of Operations for the 2016-2017 Fiscal Year Based upon Results of Operations through December 31, 2016 Executive Summary The
More informationFirst Public Hearing Budget August 1, 2018
First Public Hearing Budget August 1, 2018 1 School Board Members Sally A. Harris, Chair Tamara P. Shamburger, Vice Chair Lynn Gray April Griffin Melissa Snively Cindy Stuart Susan L. Valdes 2 The education
More informationTENTATIVE BUDGET FISCAL YEAR JULY 24, 2018
TENTATIVE BUDGET FISCAL YEAR 2018-2019 JULY 24, 2018 Tax Increase Over Rolled-Back Rate The rolled-back rate of 6.0683 mills is the property tax levy that will, after the value of new construction is deducted,
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More information$12,893,799 $6,260,719 $6,074,226 $137,544 $0 $25,366,288
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationCapital Allocation Plan OCTOBER 24, 2017
Capital Allocation Plan OCTOBER 24, 2017 Capital Allocation Request Form Capital Allocation Committee Purpose evaluate each request on its individual merits Met in the Sunshine Weekly through out the month
More informationSchool Board of Volusia County June 26, 2012
School Board of Volusia County June 26, 2012 April 24 April 27 May 22 June 26 June 26 July 1 July 15 July 18 July 21 Budget Calendar General Fund Budget Workshop School Staffing Distribution Capital Budget
More informationPROPOSITION FARMINGTON SCHOOLS. April 8, 2014 Bond Issue
PROPOSITION FARMINGTON SCHOOLS April 8, 2014 Bond Issue PROPOSITION FARMINGTON SCHOOLS - BOND LANGUAGE Shall the Board of Education of the Farmington R-7 School District of St. Francois County, Missouri,
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationForm W-4 (2018) Future developments. For the latest information about any future developments related to Form W-4, such as legislation enacted after it was published, go to www.irs.gov/formw4. Purpose.
More informationSchool Board Members
July 29, 2014 1 School Board Members Carol W. Kurdell, Chair Susan L. Valdes, Vice Chair Doretha W. Edgecomb April Griffin Candy Olson Cindy Stuart Stacy R. White, Pharm.D. 2 The education of children
More informationTotal Revenues $2,305,895 ($122,050) ($119,269) ($93,522) $334,119 $2,305,173. Total Project Costs $2,305,000 $0 $0 $0 $0 $2,305,000
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationFinal Budget Fiscal Year SEPTEMBER 26, 2017
Final Budget Fiscal Year 2017-2018 SEPTEMBER 26, 2017 Tax Increase Over Rolled-Back Rate The rolled-back rate of 6.450 mills is the property tax levy that will, after the value of new construction is deducted,
More informationBond Amount: $18,470,000. Proposed I&S Tax Rate Increase: $.3180
Bond Amount: $18,470,000 Proposed I&S Tax Rate : $.3180 How was the EBISD 2017 Bond developed? The bond package was developed from K-12 academic needs identified by our fifty-member community facilities
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION 7KH
More informationTotal Revenues $45,750,000 $15,000,000 $27,000,000 $26,000,000 $5,600,000 $119,350,000
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationFINAL BUDGET FISCAL YEAR SEPTEMBER 11, 2018
FINAL BUDGET FISCAL YEAR 2018-2019 SEPTEMBER 11, 2018 Tax Increase Over Rolled-Back Rate The rolled-back rate of 6.0683 mills is the property tax levy that will, after the value of new construction is
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationBudget Workshop Fiscal Year June 13, 2017
Budget Workshop Fiscal Year 2017-2018 June 13, 2017 Agenda Budget Calendar Update on Special Legislative Session General Fund Preliminary Budget Reconciliation Board Member Discussion 2 Budget Calendar
More informationSchool board of Brevard County Viera, Fl. Comprehensive ANNUAL. Financial Report for the year ended June 30,
School board of Brevard County Viera, Fl Comprehensive ANNUAL Financial Report for the year ended June 30, 2016 www.brevardschools.org The School Board of Brevard County, Florida Viera, Florida Comprehensive
More informationFY 2016 Proposed Budget. Budget Advisory Committee July 13, 2015
FY 2016 Proposed Budget Budget Advisory Committee July 13, 2015 Budget Advisory Committee The purpose of the advisory committee is to make recommendations to the School Board regarding the School District's
More informationOasis Charter High School
Oasis Charter High School FY18 1st FEFP Calculation CHARTER PROJECTION Payments Remaining 24 Portion of Administrative fee to be charged Prior Year adjustments Amount paid to date Payment Amount Basic
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationGLOSSARY. Revenues are recorded when earned and expenses are recorded when the liability is incurred, regardless of the timing of related cash flows.
GLOSSARY A+ PLAN The A+ Plan assigns a grade each year to each public school in Florida. Grades are based on a number of variables including student scores on the Florida Comprehensive Assessment Test
More informationTentative Budget Fiscal Year
Seminole County Public Schools Tentative Budget Fiscal Year 2017-2018 The School Board of Seminole County Amy Lockhart, Chairman Tina Calderone Ed.D, Vice-Chairman Karen Almond, Member Jeffrey Bauer, Member
More informationSUMMARY OF REVENUES AND APPROPRATIONS GENERAL FUND
SUMMARY OF REVENUES AND APPROPRATIONS GENERAL FUND REVENUES FY 2011-12 FY 2012-13 FY 2013-14 ACTUAL PROJECTED TENTATIVE RESULTS RESULTS BUDGET FEDERAL $ 19,065,815 $ 16,829,410 $ 17,543,686 STATE: Florida
More informationPreliminary Budget Workshop General Fund For Fiscal Year Pennie Zuercher Chief Financial Officer Tuesday, June 13, 2017
Preliminary Budget Workshop General Fund For Fiscal Year 2017-18 Pennie Zuercher Chief Financial Officer Tuesday, June 13, 2017 What do we know? Conference report vetoed by the Governor 6/2/17 Special
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationChrista McAuliffe Charter Elementary
Christa McAuliffe Charter Elementary FY19 2nd FEFP Calculation CHARTER PROJECTION Payments Remaining 23 Portion of Administrative fee to be charged Prior Year adjustments Amount paid to date Payment Amount
More informationMEETING #10 AGENDA SCHOOL IMPACT FEE BENEFIT DISTRICT ADVISORY COMMITTEES
MEETING #10 AGENDA SCHOOL IMPACT FEE BENEFIT DISTRICT ADVISORY COMMITTEES Meeting Date: April 6, 2015 Meeting Time: 2:30 PM Meeting Location: Facilities Conference Room (804B) / ESF 1. Call to Order Steve
More informationFunding & Budgeting Overview May 2, 2012 Seminole County Public Schools
Funding & Budgeting Overview May 2, 2012 Seminole County Public Schools Funding Overview Where does the money come from? Types of Funds Operating Funds Capital Outlay Funds Federal Funds Operating Funds
More informationTotal Revenues $8,736,837 $4,574,443 $2,066,211 $2,198,858 $2,528,962 $20,105,311
INTRODUCTION 7KH
More informationTHE SCHOOL DISTRICT OF PALM BEACH COUNTY, FLORIDA
THE SCHOOL DISTRICT OF PALM BEACH COUNTY, FLORIDA EXECUTIVE SUMMARY OF THE 2016-2017 BUDGET (ALL FUNDS) SUBMITTED FOR TENTATIVE ADOPTION Robert M. Avossa, Ed.D., Superintendent July 27, 2016 THE SCHOOL
More informationPage Item 174 Overview 175 Revenue 177 Expenditures 178 Elementary School Allocation 180 Middle School Allocation 181 High School Allocation 182
Page Item 174 Overview 175 Revenue 177 Expenditures 178 Elementary School Allocation 180 Middle School Allocation 181 High School Allocation 182 Operational Services/Central Services/Axtell Park School
More informationUse of State and District Construction Funds
8 Use of State and District Construction Funds Through its long-range planning process, the district has met its facilities needs without issuing significant debt. To improve cost efficiency, however,
More informationBudget Workshop: Status of Budget Preparation
Budget Workshop: Status of Budget Preparation June 14, 2010 Our budget must reflect our values Alberto Carvalho # of Schools # of Students 33 5k 1920 YEAR # of Schools # of Students 33 5k 1920 51 15k
More informationSUMMARY OF REVENUES AND APPROPRIATIONS GENERAL FUND
SUMMARY OF REVENUES AND APPROPRIATIONS GENERAL FUND 2007-08 2008-09 2006-07 PROJECTED TENTATIVE ACTUAL RESULTS BUDGET REVENUES FEDERAL 18,340,106 14,693,391 5,484,142 STATE: Florida Education Finance Program
More informationLake County Schools. July 19, 2018 Budget Workshop Presentation
Lake County Schools July 19, 2018 Budget Workshop Presentation Truth in Millage (TRIM) The Truth in Millage (TRIM) process informs taxpayers and the public about the legislative process by which local
More informationClay County District Schools Tentative Budget Dr. Susan M. Legutko, Assistant Superintendent Business Affairs
Clay County District Schools 2018-2019 Tentative Budget Dr. Susan M. Legutko, Assistant Superintendent Business Affairs 1 Clay County District Schools 2018-2019 Tentative Budget BOARD MEMBERS Carol Studdard,
More informationJACKSON-MADISON COUNTY SCHOOL SYSTEM FUND #177 EDUCATION CAPITAL 5-YEAR PLAN (WORKING COPY)
Elementary & K-8 Campuses Alexander 6 8 Guttering replacement 2 $ 20,000 HVAC replacement 1 $ 800,000 Remove and replace old glass block windows 3 Total for Alexander $ - $ 20,000 $ 800,000 $ - $ - $ -
More informationTHE SCHOOL BOARD BREVARD COUNTY PROPERTY INSURANCE UPDATE. February 28, 2012
THE SCHOOL BOARD OF BREVARD COUNTY PROPERTY INSURANCE UPDATE February 28, 2012 World Wide Catastrophic Events Creating Turmoil in the Property Insurance Market 2011 Munich Re, estimated catastrophic losses
More informationMAJOR SOURCES OF REVENUE GENERAL FUND
MAJOR SOURCES OF REVENUE GENERAL FUND The District derives its operating income from a variety of federal, state and local sources. The major categories of these income sources for the general fund are
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationTHE SCHOOL BOARD OF ST. LUCIE COUNTY, FLORIDA Continuing Disclosure Information Certificates of Participation
THE SCHOOL BOARD OF ST. LUCIE COUNTY, FLORIDA Continuing Disclosure Information Certificates of Participation COP Series Original Par Amount Certificates of Participation, Series 2003A $34,805,000 Certificates
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationProgress Update Identified Needs & Capital Plan
Progress Update Identified Needs & Capital Plan May 29, 2012 Buena Park School District Facilities Assessment & Implementation Plan 0 Facilities Planning, Public Finance, Program Administration Summary
More informationBALTIMORE COUNTY PUBLIC SCHOOLS
Exhibit B BALTIMORE COUNTY PUBLIC SCHOOLS DATE: TO: FROM: SUBJECT: ORIGINATOR: RESOURCE PERSON(S): BOARD OF EDUCATION Dr. Joe A. Hairston, Superintendent PROPOSED FY 2008 STATE AND COUNTY CAPITAL BUDGET
More informationFixed Capital Outlay
Fixed Capital Outlay FIXED CAPITAL OUTLAY FINAL APPROPRIATIONS Issue Final Appropriations After Vetoes Maintenance, Repair, Renovation and Remodeling: Public Schools 50,000,000 State University System
More informationAPPENDIX Budget. Florida Charter Foundation / Franklin Academy Charter Application for Campus C
APPENDIX Budget Florida Charter Foundation / Franklin Academy 2013 Charter Application for Campus C 420 Budget Worksheet Planning, Program Design & Implementation Grant 3290 Total Revenue Allocation $
More informationTHREE-YEAR COMPARISON ALL FUNDS FY TENTATIVE BUDGET
THREE-YEAR COMPARISON ALL FUNDS FY 2011-12 TENTATIVE BUDGET INCREASE FY 2009-10 FY 2010-11 FY 2011-12 (DECREASE) ACTUAL PROJECTED TENTATIVE OVER RESULTS RESULTS BUDGET FY 2010-11 General Fund $ 2,638,024,332
More informationFinal Budget
Charlotte County Public Schools 2018-2019 Final Budget CHARLOTTE COUNTY PUBLIC SCHOOLS 1445 Education Way Port Charlotte, FL 33948 September 11, 2018 CCPS Table of Contents Introduction Section 1 Superintendent's
More informationCapital Projects Completed since 1988
Projects Completed since 1988 Project Cost FY1988 ICCB Building Illinois Repair & Renovation - Replace Carpet in Classroom Buildings, Library and Lobby of Admin $ 51,901.00 $ 51,901.00 $ 51,901.00 FY1990
More informationFY 2014/ /24 CAPITAL IMPROVEMENTS PROGRAM MAINTENANCE/REPLACEMENT PROJECTS DETAIL
Year 1 Project Revenue County Category FY 14/15 Total Offset Cost I 1 AGNOR HURT HVAC Design Chiller and Exhaust Fans replacement $30,000 $0 $30,000 I 2 AGNOR HURT HVAC Design replacement of 6 RTUs $35,000
More informationBarnesville Public Schools Proposed Building Program
August 1, 2018 Proposal for Submitted to: Commissioner Dr. Brenda Cassellius Minnesota Department of Education Barnesville Public Schools Proposed Building Program Barnesville Public School District Independent
More informationGLOSSARY. Revenues are recorded when earned and expenses are recorded when the liability is incurred, regardless of the timing of related cash flows.
GLOSSARY A+ PLAN The A+ Plan assigns a grade each year to each public school in Florida. Grades are based on a number of variables including student scores on the Florida Comprehensive Assessment Test
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More information