Welcome. Stephanie McGregor Director, Offshore Transmission

Size: px
Start display at page:

Download "Welcome. Stephanie McGregor Director, Offshore Transmission"

Transcription

1 Welcome Stephanie McGregor Director, Offshore Transmission Workshop on energy law: development of a European transmission grid integrating renewable energies Martin Crouch Director, Offshore Transmission, Ofgem Berlin, 22 January 2013

2 GB electricity transmission regime as an example Onshore Transmission RIIO: c. 22 billion allocated to upgrade and renew Britain s gas and electricity networks 3 Transmission Owners 8- year price controls with greater innovaeon Offshore Transmission CompeEEve ownership of transmission assets offshore MulEple Offshore Transmission Owners (OFTOs) Interconnec1on 4 exiseng interconnectors: to France, Netherlands, Ireland and Northern Ireland Developing contestable regulated regime Accommodates differences at the other end Image source: National Grid

3 Regulating transmission Aims Development of economic and efficient network Value for money for present and future consumers Ø outputs, innova1on and incen1ves Components of infrastructure applied to electricity transmission: Design Build Finance Operate System design Asset design Procure Need for Project manage Scope for compeeeon? coordinaeon Debt and equity Availability System operaeon 3

4 Aims of offshore tender regime Genera1on Enable offshore wind developments through a regime that: Meets generator s requirements for Emely grid conneceons Provides flexibility for future offshore generaeon needs Reduces generator overall transmission cost and capital need per MW Transmission Enable new parecipants to compete and bring innovaeon to this market Realise value for money for consumers Ensure fit for purpose assets are delivered on Eme Provide regulatory certainty Tender process that is rigorous, and maintains compeeeve tension Use or replicate exiseng licensing and industry governance wherever possible to maintain certainty for investors and consumers 3

5 What is an OFTO? Onshore TO Offshore Transmission Owner (OFTO) Generator Connection to onshore network Onshore Substation Offshore Platform 132 kv Cable 33 kv Inter Array Cables

6 Effective tendering of transmission assets Tender Round 1 (9 projects) o Investment appeete: 4 billion for 1.1 billion of assets in TR1 o Investment to date: c. 470 million (including Walney 2 September 2012) Tender Round 2 (4 projects) o 1.4billion of assets being tendered Future tenders o Up to 23 poteneal projects o PotenEal investment of up to 15 billion* o Incorporates Crown Estate Round 3 projects o Next round of tenders expected mid to late 2013 o MulEple OFTO opportuniees for many wind farm projects *up to 8bn by 2020

7 Offshore Transmission: competitive regime design Two op1ons for building transmission links Op1on 1: Generator Build - CompeEEon for Finance, Insurance, O&M Op1on 2: OFTO Build - CompeEEon for Asset design, ConstrucEon (Procurement and Project management), Finance, Insurance and O&M Revised tender regulaeons in early 2013 OFTO build model: start of tender OFTO build model: licence grant Generator build model: start of tender Generator build model: licence grant Connection offer Environmental impact assessment and consent planning Consent application Procurement Manufacture Construction Commissioning Connection offer Pre-construction (Including high level design) Procurement Construction Operation & Maintenance 12

8 Attracting new forms of investment TradiEonal funding source for onshore networks has been corporate rather than project specific This meant that investment, whilst effeceve, was also relaevely narrow The Offshore regime was designed to open up the market to a full range of funding sources Commercial lenders, European Investment Bank, pension funds and capital markets have all shown interest The regime has successfully: Created a new investment class and internaeonal interest Acracted varied funding sources, including infrastructure funds, asset builders, strategic players Enabled recycling of capital into future wind farm projects (c. 470m to date but expected to grow rapidly to over 1 billion within the next 12 months)

9 Further developments The Offshore Transmission Regime is well established We are looking at evolueonary changes to the regime - learning from past experiences - meeeng future challenges including coordinaeon The regime will conenue to: - provide value for money for consumers - be acraceve to investors Integrated transmission planning and regulation Joining up onshore, offshore and cross- border regulaeon Ensure delivery of economic and efficient overall network Further consultaeon this Spring

UK s Offshore Transmission Regime:

UK s Offshore Transmission Regime: UK s Offshore Transmission Regime: A case study for financing a low carbon future Stephanie McGregor Director Offshore Transmission June 2011 Today s presentation 1. Big picture 2. The OFTO 3. Making the

More information

The future of electricity transmission regulation

The future of electricity transmission regulation The future of electricity transmission regulation Energy Policy & Research Group Anthony Legg Director Economic & Financial Consulting FTI Consulting LLP Anthony.Legg@fticonsulting.com +44 (0) 775 3300

More information

Ireland s. Offshore Wind Resource. An Export Opportunity. Presentation to IWEA Conference Brian Britton Secretary NOW Ireland 22 nd March 2012

Ireland s. Offshore Wind Resource. An Export Opportunity. Presentation to IWEA Conference Brian Britton Secretary NOW Ireland 22 nd March 2012 Ireland s Offshore Wind Resource An Export Opportunity Presentation to IWEA Conference Brian Britton Secretary NOW Ireland 22 nd March 2012 1 Ireland s Offshore Opportunity Ireland has a number of opportunities

More information

P294 Addition of Offshore Transmission System and OTSUA to the definition of the Total System

P294 Addition of Offshore Transmission System and OTSUA to the definition of the Total System Stage 03: Assessment Report What stage is this document in the process? Addition of Offshore Transmission System and OTSUA to the definition of the Total System Amend the BSC definition of Total System

More information

Offshore electricity transmission: a new model for delivering infrastructure

Offshore electricity transmission: a new model for delivering infrastructure REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 22 SESSION 2012-13 22 JUNE 2012 Gas and Electricity Markets Authority Department of Energy and Climate Change Offshore electricity transmission: a new model

More information

TRANSMISe,,/ Blue Transmission Walney 2 Limited. Regulatory accounts 2017/18

TRANSMISe,,/ Blue Transmission Walney 2 Limited. Regulatory accounts 2017/18 TRANSMISe,,/ Blue Transmission Walney 2 Limited Regulatory accounts 2017/18 Contents Page 2 A description of these regulatory accounts 3 Strategic Report 23 Directors Report 25 Corporate governance statement

More information

Support regimes for offshore wind in Europe Florian Bauernfeind

Support regimes for offshore wind in Europe Florian Bauernfeind Winter Academy 2018 Trading, Sales and Financing in the European Energy Market and Industry Support regimes for offshore wind in Europe Florian Bauernfeind Vattenfall Agenda 1. Wind Power in Vattenfall

More information

Offshore Grid Development in Germany

Offshore Grid Development in Germany Offshore Grid Development in Germany Hamburg, 26 September 2017 Lukas Wienholt Federal Maritime and Hydrographic Agency Content of Presentation I. Current status of offshore wind energy in the German North

More information

First Offshore Windfarm Project in India (FOWPI) with EU-backing

First Offshore Windfarm Project in India (FOWPI) with EU-backing First Offshore Windfarm Project in India (FOWPI) with EU-backing Presentation at FOWPI Metocean Workshop 2 June 2017 Per Vølund, COWI 1 The Project is funded by The European Union Agenda 1. Offshore Wind

More information

TNUoS Tariffs in 10 minutes March 2018

TNUoS Tariffs in 10 minutes March 2018 TNUoS s in 10 minutes March 2018 An overview of TNUoS tariffs This information paper provides an overview of National Grid s Transmission Network Use of System (TNUoS) tariffs, applicable to transmission

More information

Paying for Investment: Perspectives of an energy infrastructure investor

Paying for Investment: Perspectives of an energy infrastructure investor Paying for Investment: Perspectives of an energy infrastructure investor Mathew Rose British Institute of Energy Economics. St John s College Oxford. 20 September 2012 Cautionary statement This presentation

More information

Five-Year Forecast Of TNUoS Tariffs For 2018/19 to 2022/23

Five-Year Forecast Of TNUoS Tariffs For 2018/19 to 2022/23 Five-Year Forecast Of TNUoS Tariffs For 2018/19 to 2022/23 November 2017 NGET: Forecast TNUoS tariffs for 2018/19 June 2017 1 Five-Year Forecast of TNUoS Tariffs for 2018/19 to 2022/23 This information

More information

SP Transmission successfully fast-tracked

SP Transmission successfully fast-tracked 2 RIIO-T1 Transmission Price Control January 2012 SP Transmission successfully fast-tracked SP Transmission is pleased to announce that it has reached agreement with the Government energy regulator Ofgem

More information

SSE Financial Results. Full year to 31 March 2015

SSE Financial Results. Full year to 31 March 2015 SSE Financial Results Full year to 31 March 2015 Lord Smith of Kelvin Chairman 2 SSE is a great company with fantastic people Lord Smith of Kelvin Dividend growth (p/share) 100 80 60 40 20 0 Capex ( bn)

More information

WoDS Transmission plc

WoDS Transmission plc Regulatory accounts 2016/17 WoDS Transmission plc TRANSMISS[bN WoDS J Contents Page 2 A description of these regulatory accounts 3 Strategic report 25 Directors report 27 Corporate governance statement

More information

CONNECTION OF OFFSHORE WIND ONSHORE -- Some Food for Thought to Aid the Discussion at the Post-Conference Workshop

CONNECTION OF OFFSHORE WIND ONSHORE -- Some Food for Thought to Aid the Discussion at the Post-Conference Workshop Deeper Water Offshore Wind Conference by GIC CONNECTION OF OFFSHORE WIND ONSHORE -- Some Food for Thought to Aid the Discussion at the Post-Conference Workshop Dr Chuan Zhang The Crown Estate, UK London,

More information

Review of Support Mechanisms and Policy Options for Offshore Wind. Prepared by the Center for Wind Energy at James Madison University.

Review of Support Mechanisms and Policy Options for Offshore Wind. Prepared by the Center for Wind Energy at James Madison University. Review of Support Mechanisms and Policy Options for Offshore Wind Prepared by the Center for Wind Energy at James Madison University August 2012 Denmark Denmark s long-term target is to achieve complete

More information

Candidates Survey February 2010 Q1 - Thinking about the energy sector, how strongly do you agree or disagree which of the following statements?

Candidates Survey February 2010 Q1 - Thinking about the energy sector, how strongly do you agree or disagree which of the following statements? Table 1/1 Britain should aim to have 15% of its energy from renewable sources by 2020 Agree strongly (2.0) 32 17 10 5 10 9 1 2 3 7 31-1 3 10 9 9 21 11 32% 22% 56% 71% 38% 56% 7% 13% 18% 54% 34% - 17% 27%

More information

Methodology for measuring the UK content of UK offshore wind farms

Methodology for measuring the UK content of UK offshore wind farms Methodology for measuring the UK content of UK offshore wind farms May 2015 Document history Revision Purpose and description Originated Checked Authorised Date 1 Final draft AER CLW BAV 22/1/15 BVG Associates

More information

A Scottish Hydro Electric Transmission plc project co-funded by the European Union under the European Energy Programme for Recovery (EEPR)

A Scottish Hydro Electric Transmission plc project co-funded by the European Union under the European Energy Programme for Recovery (EEPR) Offshore HVDC Hub project (2009 2012) A Scottish Hydro Electric Transmission plc project co-funded by the European Union under the European Energy Programme for Recovery (EEPR) Scottish Hydro Electric

More information

SSE Consolidated Segmental Statement (CSS) - year ending 31 March 2014

SSE Consolidated Segmental Statement (CSS) - year ending 31 March 2014 SSE Consolidated Segmental Statement (CSS) - year ending 31 March 2014 Generation Electricity Supply Gas Supply Aggregate Nondomestic Non- Supply Unit Domestic Domestic domestic Business 2014 2014 2014

More information

Offshore Wind in the UK January, 2010

Offshore Wind in the UK January, 2010 Offshore Wind in the UK January, 2010 EDPR s debut in offshore wind and UK market Selected in the UK Round 3 to develop 1.3 GW of wind offshore capacity Expanding in size in a new technology and a new

More information

OFFSHORE WIND REFERENCES

OFFSHORE WIND REFERENCES OFFSHORE WIND REFERENCES OFFSHORE WIND PROJECTS We helped to realise over 8 GW of offshore wind projects United Kingdom Galloper - 340 MW Sheringham Shoal - 315 MW The Netherlands Borssele 1&2-700 MW Borssele

More information

Submission by EDPR to The Scottish Parliament Devolution. (Further Powers Committee) on The Crown Estate and Offshore Wind

Submission by EDPR to The Scottish Parliament Devolution. (Further Powers Committee) on The Crown Estate and Offshore Wind Submission by EDPR to The Scottish Parliament Devolution (Further Powers Committee) on The Crown Estate and Offshore Wind 1. About EDP Renewables With headquarters in Madrid, EDPR s business consists of

More information

Further information on mid-year tariff changes following the September 2010 Customer Seminars

Further information on mid-year tariff changes following the September 2010 Customer Seminars Further information on mid-year tariff changes following the September 2010 Customer Seminars National Grid received a number of questions at the Customer Seminars on National Grid s proposal to update

More information

CUSC Section 15 (CMP192) User Commitment Methodology

CUSC Section 15 (CMP192) User Commitment Methodology CUSC Section 15 (CMP192) User Commitment Methodology Guidance and Implementation Document 1 May 2012 Version 1 1 1. Summary... 3 2. Purpose of the document...3 3. Background... 4 4. Attributable and Wider

More information

The voice of the energy industry. Brexit & the future EU-UK energy relationship

The voice of the energy industry. Brexit & the future EU-UK energy relationship The voice of the energy industry Brexit & the future EU-UK energy relationship February 2018 Executive Summary Energy UK was pleased to see the negotiations on the UK s departure from the European Union

More information

Offshore Wind and Development Opportunities in the South West Robert Thornhill Offshore Development Site Manager

Offshore Wind and Development Opportunities in the South West Robert Thornhill Offshore Development Site Manager Offshore Wind and Development Opportunities in the South West Robert Thornhill Offshore Development Site Manager Dan Towers 2004 Outline of presentation npower renewables (NRL) who we are? NRL s involvement

More information

TRANSMISSION CHARGING STATEMENT

TRANSMISSION CHARGING STATEMENT TRANSMISSION CHARGING STATEMENT 1 September 2016 1 September 2016 TABLE OF CONTENTS Page 1 Introduction... 1 2 General System Charges... 4 3 Site Specific Charges... 5 4 Connection Assets... 8 5 Least

More information

Offshore grid development

Offshore grid development Offshore grid development Jaarsma, Saskia TenneT at a glance Europe s first cross-border grid operator for electricity Top five grid operator in Europe International offshore division 23.000 km high-voltage

More information

Guidance and Implementation Document

Guidance and Implementation Document CUSC Section 15 (CMP192) User Commitment Methodology Guidance and Implementation Document February 2013 Version 0.1 1 1. Summary... 3 2. Purpose of the document... 3 3. Background... 4 4. Attributable

More information

UK Offshore Wind Market Study Final Report (Executive Summary) A report by Redpoint Energy Limited in association with GL Garrad Hassan

UK Offshore Wind Market Study Final Report (Executive Summary) A report by Redpoint Energy Limited in association with GL Garrad Hassan UK Offshore Wind Market Study Final Report (Executive Summary) A report by Redpoint Energy Limited in association with GL Garrad Hassan October 2012 1 Copyright This report has been prepared by Redpoint

More information

Beatrice Offshore Windfarm Limited project

Beatrice Offshore Windfarm Limited project Beatrice Offshore Windfarm Limited project Socio-economic impact report, July 2017 ± Map key 1 Beatrice wind farm Assessing socio-economic impacts 2 3 Subsea export cable corridor Export cable landfall

More information

CMP222 User Commitment for Non- Generation Users Volume 1

CMP222 User Commitment for Non- Generation Users Volume 1 Stage 06: Final CUSC Modification Report Connection and Use of System Code (CUSC) CMP222 User Commitment for Non- Generation Users Volume 1 This proposal seeks to introduce enduring User Commitment arrangements

More information

COMPARISION OF OFFSHORE REQUIREMENTS

COMPARISION OF OFFSHORE REQUIREMENTS Key to Table COMPARISION OF OFFSHORE REQUIREMENTS (Comparison based on GB Grid Code Issue 4 Revision 13 only and ENSTO - E RFG Internal Version dated 26 June 2012) (Note Does not include other Industry

More information

Analyst Call 2017 Eurogrid/ 50Hertz. 12 March 2018 Marco Nix, CFO

Analyst Call 2017 Eurogrid/ 50Hertz. 12 March 2018 Marco Nix, CFO Analyst Call 2017 Eurogrid/ 50Hertz 12 March 2018 Marco Nix, CFO Highlights 2017 Further progress in grid extension Stabilising costs for congestion management Huge export from 50Hertz area Decreasing

More information

CMP242 Charging arrangements for interlinked offshore transmission solutions connecting to a single onshore substation

CMP242 Charging arrangements for interlinked offshore transmission solutions connecting to a single onshore substation Stage 03: Workgroup Report Connection and Use of System Code (CUSC) CMP242 Charging arrangements for interlinked offshore transmission solutions connecting to a single onshore substation CMP242 aims to

More information

A Closer Examination of Wind Generation in Ireland

A Closer Examination of Wind Generation in Ireland Industry Insight June 2015 A Closer Examination of Wind Generation in Ireland How the changing market is making it hard for generators to forecast revenues With enviable wind resources, ambitious renewables

More information

Offshore Wind Cost Reduction: Findings of The Crown Estate and the Cost Reduction Taskforce

Offshore Wind Cost Reduction: Findings of The Crown Estate and the Cost Reduction Taskforce Offshore Wind Cost Reduction: Findings of The Crown Estate and the Cost Reduction Taskforce BIEE Parker Seminar 10 th October 2012 Richard Howard, Chief Economist richard.howard@thecrownestate.co.uk CONTENTS

More information

The North Seas Countries Offshore Grid Initiative

The North Seas Countries Offshore Grid Initiative The North Seas Countries Offshore Grid Initiative NSCOGI 2013/2014 progress report August 2014 1 Objectives of the North Seas Countries Offshore Grid Initiative In December 2012, Ministers of the North

More information

Introduction to the CFD. James Rushton Head of Commercial LCCC 1 December 2016

Introduction to the CFD. James Rushton Head of Commercial LCCC 1 December 2016 Introduction to the CFD James Rushton Head of Commercial LCCC 1 December 2016 Disclaimer This presentation (including all content, whether oral or in writing) has been prepared for the exclusive use and

More information

Half Year Results 2018/19. 8 November 2018

Half Year Results 2018/19. 8 November 2018 Half Year Results 2018/19 8 November 2018 Cautionary statement This presentation contains certain statements that are neither reported financial results nor other historical information. These statements

More information

TNUoS Forecasting Seminar. National Grid House, Warwick 23 November 2017

TNUoS Forecasting Seminar. National Grid House, Warwick 23 November 2017 TNUoS Forecasting Seminar National Grid House, Warwick 23 November 2017 0 Welcome Paul Wakeley Revenue Manager 1 Housekeeping 2 National Grid TNUoS Team Louise Schmitz Oversees the TNUoS and the CUSC Development

More information

UK Government Support Mechanisms for Offshore Wind - Is it working?

UK Government Support Mechanisms for Offshore Wind - Is it working? UK Government Support Mechanisms for Offshore Wind - Is it working? Presentation by Scott McCallum, Partner, Shepherd and Wedderburn LLP 22 nd September 2017 Agenda Available UK subsidy regime Contracts

More information

Elia Group FY2016 results. At the heart of the European Electricity grid

Elia Group FY2016 results. At the heart of the European Electricity grid Elia Group FY2016 results At the heart of the European Electricity grid Disclaimer - This presentation provides information about Elia and its activities and is provided for general information purposes

More information

SSE plc TRADING STATEMENT

SSE plc TRADING STATEMENT SSE plc TRADING STATEMENT SSE plc completed the first quarter of its financial year on 30 June 2016 and its Annual General Meeting is taking place today (21 July) in Perth. This trading statement provides

More information

User Commitment for Generator Focused Anticipatory Investment (GFAI)

User Commitment for Generator Focused Anticipatory Investment (GFAI) All Industry Parties Patrick Hynes Electricity Charging & Capacity Development Manager patrick.hynes@nationalgrid.com Direct tel.: 01926 656319 22 nd May 2015 Dear Colleagues, User Commitment for Generator

More information

National Grid Electricity Transmission plc Annual Report and Accounts 2015/16. Company number

National Grid Electricity Transmission plc Annual Report and Accounts 2015/16. Company number National Grid Electricity Transmission plc Annual Report and Accounts 2015/16 Company number 2366977 National Grid Electricity Transmission plc Annual Report and Accounts 2015/16 Contents Overview... 1

More information

Power Trading in the Coupled European Markets

Power Trading in the Coupled European Markets Power Trading in the Coupled European Markets Challenges for policy-makers February 2016-1 - Europe Economics is registered in England No. 3477100. Registered offices at Chancery House, 53-64 Chancery

More information

QUALITY CONTROL Prepared: D. Vree Reviewed: M. Müller Approved: F. Wester BACKGROUND MATERIAL...

QUALITY CONTROL Prepared: D. Vree Reviewed: M. Müller Approved: F. Wester BACKGROUND MATERIAL... POSITION PAPER STAKE HOLDER CONSULTATION PROCESS OFFSHORE GRID NL Type: Position paper Work stream Technical Topic: T.6 Protection Filename ONL 15-080-T6_Protection_PP_v1 Version 1 - release for Expert

More information

European Wind Investment European Wind Investment 2017 Project Finance and M&A

European Wind Investment European Wind Investment 2017 Project Finance and M&A European Wind Investment 2017 Project Finance and M&A Forward-thinking international law firm Advising clients in the world s most dynamic industries Taylor Wessing is a full-service international law

More information

Renewing Ireland's Energy European Investment Bank

Renewing Ireland's Energy European Investment Bank Renewing Ireland's Energy European Investment Bank IWEA Autumn Conference 2013 Galway Thursday 3 rd October 08/10/2013 1 The European Investment Bank (EIB) Long-term finance promoting European objectives

More information

Smart metering Implementation Programme

Smart metering Implementation Programme Smart metering Implementation Programme A consultation on a draft Statutory Instrument the Electricity and Gas (Prohibition of Communications Activities) Order 2012 10 February 2012 Department of Energy

More information

Osprey House, Tuesday 30 September 2014

Osprey House, Tuesday 30 September 2014 Osprey House, Tuesday 30 September 2014 Cautionary statement This presentation contains certain statements that are neither reported financial results nor other historical information. These statements

More information

Alan Duggan Department of Communications, Energy and Natural Resources By

Alan Duggan Department of Communications, Energy and Natural Resources By Alan Duggan Department of Communications, Energy and Natural Resources By e-mail Friday, 22 November 2013 Enterprise House, Kerry Technology Park, Listowel Road, Tralee, Co. Kerry TEL + 353 66 7129144

More information

Offshore transmission investments How to regulate these investments? Who should act?

Offshore transmission investments How to regulate these investments? Who should act? Offshore transmission investments How to regulate these investments? Who should act? North Seas Countries Offshore Grid Initiative (NSCOGI) Copenhagen, 18-19 April 2012 Leonardo Meeus (Florence School

More information

The Future of Offshore Wind Power Generation. Published:October 2011 No.Of Pages:136 Price:US $ Introduction

The Future of Offshore Wind Power Generation. Published:October 2011 No.Of Pages:136 Price:US $ Introduction The Future of Offshore Wind Power Generation Published:October 2011 No.Of Pages:136 Price:US $ 2875 Offshore wind power is one of the newest major sources of renewable electricity generation to be developed

More information

PRELIMINARY CERTIFICATION DECISION. GNI s GAS FOU CERTIFICATION APPLICATION

PRELIMINARY CERTIFICATION DECISION. GNI s GAS FOU CERTIFICATION APPLICATION PRELIMINARY CERTIFICATION DECISION GNI s GAS FOU CERTIFICATION APPLICATION 30 th November 2015 Table of Contents ACRONYMS... II EXECUTIVE SUMMARY... III 1.0 INTRODUCTION... 1 2.0 BACKGROUND TO GNI S CERTIFICATION

More information

STATEMENT ON SSE S APPROACH TO HEDGING 14 November 2018

STATEMENT ON SSE S APPROACH TO HEDGING 14 November 2018 STATEMENT ON SSE S APPROACH TO HEDGING 14 November 2018 INTRODUCTION SSE is working towards its vision of being a leading energy company in a low carbon world by focusing on core businesses of regulated

More information

Unlocking grid flexibility:

Unlocking grid flexibility: Jan Vorrink TenneT at a glance 2017 Europe's first cross-border grid operator 4,068 Employees EBIT 897 (EUR million) Assets 20.4 (EUR billion) Investments (2018-2028) 28 (EUR billion) Connected offshore

More information

Gunnar Groebler Head of Business Area Wind. Vattenfall Capital Markets Day, Solna, 19 September 2016

Gunnar Groebler Head of Business Area Wind. Vattenfall Capital Markets Day, Solna, 19 September 2016 Gunnar Groebler Head of Business Area Wind Vattenfall Capital Markets Day, Solna, 19 September 2016 FACTS AND FIGURES BA WIND Business Area Wind, which is responsible for Vattenfall s wind power operations,

More information

Electricity Market Reform

Electricity Market Reform Electricity Market Reform Jonathan Brearley, Director, Energy Markets and Networks, DECC 27 September 2012 Our objectives for the electricity market mirror those of the wider energy system Climate change:

More information

cc. Robert O Rourke Jo Aston Paul Bell Denis Kelly Robbie Ahern Michael Beggs Tony Hearne 1st April 2015 Dear Sir and Madam,

cc. Robert O Rourke Jo Aston Paul Bell Denis Kelly Robbie Ahern Michael Beggs Tony Hearne 1st April 2015 Dear Sir and Madam, Jenny Pyper Utility Regulator Queens House 14 Queen Street Belfast BT1 6ED Gareth Blaney Commission for Energy Regulation The Exchange Belgard Square North Tallaght Dublin 24 cc. Robert O Rourke Jo Aston

More information

Growth Beyond the Eurozone Confindustria Udine, Italy September 19, 2012

Growth Beyond the Eurozone Confindustria Udine, Italy September 19, 2012 Growth Beyond the Eurozone Confindustria Udine, Italy September 19, 2012 1 US-ITALY CROSSROADS Bou0que firm providing comprehensive turnkey management services for Italian enterprises seeking U.S. market

More information

No. 19. Offshore Wind Energy in Europe Fresh Wind for Insurers, Too? A Berkshire Hathaway Company. Topics No. 19

No. 19. Offshore Wind Energy in Europe Fresh Wind for Insurers, Too? A Berkshire Hathaway Company. Topics No. 19 No. 19 Topics No. 19 Offshore Wind Energy in Europe Fresh Wind for Insurers, Too? A Berkshire Hathaway Company 10 Offshore Wind Energy in Europe Fresh Wind for Insurers, Too? Oliver Stein Oliver Stein

More information

Offshore Wind New Leasing Stakeholder Engagement Event 15 th November OSW New Leasing Stakeholder Engagement

Offshore Wind New Leasing Stakeholder Engagement Event 15 th November OSW New Leasing Stakeholder Engagement Offshore Wind New Leasing Stakeholder Engagement Event 15 th November 2018 38255-TCE-PRS-002 20181115 OSW New Leasing Stakeholder Engagement Welcome This presentation is provided for information purposes

More information

Offshore wind finance 2016 update

Offshore wind finance 2016 update Offshore wind finance 2016 update Energy Talk London, 8 December 2016 Project finance forum for offshore wind farms Table of contents 1. Green Giraffe 2. Evolution of the equity market 3. Evolution of

More information

Electricity (Development of Small Power Projects) GN. No. 77 (contd.) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 18(5), 45 and 46))

Electricity (Development of Small Power Projects) GN. No. 77 (contd.) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 18(5), 45 and 46)) GOVERNMENT NOTICE NO. 77 published on 02/03/2018 THE ELECTRICITY ACT (CAP.131) RULES (Made under sections 18(5), 45 and 46)) THE ELECTRICITY (DEVELOPMENT OF SMALL POWER PROJECTS) RULES, 2018 1. Citation

More information

What next for UK auctions of renewable Contracts for Difference?

What next for UK auctions of renewable Contracts for Difference? What next for UK auctions of renewable Contracts for Difference? In February we saw the results of the first competitive auction for Contracts for Difference (CfDs), the primary support mechanism for incentivising

More information

Tariff for Virtual Reverse Flow Product at Moffat

Tariff for Virtual Reverse Flow Product at Moffat Tariff for Virtual Reverse Flow Product at Moffat DOCUMENT TYPE: REFERENCE: DATE PUBLISHED: FURTHER INFORMATION: Decision Paper CER/11/190 11 th November 2011 cjohnston@cer.ie The Commission for Energy

More information

Power Transmission - Transform to Win

Power Transmission - Transform to Win Power Transmission - Transform to Win Karlheinz Springer CEO Power Transmission Division Capital Market Day Siemens Energy Charlotte, December 11, 01 Siemens AG 01. All rights reserved. Safe Harbour Statement

More information

Connecting to life. Annual Report and Accounts 2014/15

Connecting to life. Annual Report and Accounts 2014/15 Connecting to life Annual Report and Accounts 2014/15 National Grid Annual Report and Accounts 2014/15, interactive PDF The functionality of this PDF is outlined below. Please note that tablet users will

More information

REG Interim Results Six months ending 31 December th February 2014

REG Interim Results Six months ending 31 December th February 2014 REG Interim Results Six months ending 31 December 2013 10 th February 2014 Andrew Whalley David Crockford Chief Executive Finance Director Introduction to REG REG is primarily a developer, owner and operator

More information

P344 Project TERRE implementation into GB market arrangements

P344 Project TERRE implementation into GB market arrangements Project TERRE implementation into GB market arrangements This Modification seeks to align the Balancing and Settlement Code (BSC) with the European Balancing Project TERRE (Trans European Replacement Reserves

More information

Offshore grid NL. Hollandse Kust (noord) & Hollandse Kust (west Alpha) General project introduction. 10 september 2018

Offshore grid NL. Hollandse Kust (noord) & Hollandse Kust (west Alpha) General project introduction. 10 september 2018 1 Offshore grid NL Hollandse Kust (noord) & Hollandse Kust (west Alpha) General project introduction 10 september 2018 Agenda 1. Offshore grid by TenneT 2. Hollandse Kust (noord) & Hollandse Kust (west

More information

UK Onshore Wind. Investment Fundamentals

UK Onshore Wind.   Investment Fundamentals UK Onshore Wind www.fimltd.co.uk Investment Fundamentals Wind is a proven asset class for both private and institutional direct investors. UK wind provides investors with a low risk investment. It is 100%

More information

Q&A OVERVIEW. Topic Question Answer Date Z (K-I).pdf. 18 enter/access the 66kV SWG, one accompaniment from TenneT is

Q&A OVERVIEW. Topic Question Answer Date Z (K-I).pdf. 18 enter/access the 66kV SWG, one accompaniment from TenneT is Q&A OVERVIEW 15 Root loci Referring to memo "Impedance loci harmonic impedance at 66 kv connection point, location 'Hollandse Kust Zuid' and quote: "The modelled 380 kv onshore grid for the year 2025 is

More information

Delivering Dividend Growth for the. Lord Smith of Kelvin

Delivering Dividend Growth for the. Lord Smith of Kelvin 2011 Full Year Results Delivering Dividend Growth for the Long Term Lord Smith of Kelvin The SSE Team Ian Marchant Lord Smith of Kelvin Gregor Alexander Chief Executive Officer Chairman Finance Director

More information

2017/18 Full Year Results Debt Investor Update 17 May Bring Energy to Life

2017/18 Full Year Results Debt Investor Update 17 May Bring Energy to Life 2017/18 Full Year Results Debt Investor Update 17 May 2018 Bring Energy to Life Cautionary statement This presentation contains certain statements that are neither reported financial results nor other

More information

ScottishPower Segmental Generation and Supply Statements for the year ended 31 December 2012

ScottishPower Segmental Generation and Supply Statements for the year ended 31 December 2012 ScottishPower Segmental Generation and Supply Statements for the year ended 31 December 2012 Required under Standard Condition 16B of Electricity Generation Licences and Standard Condition 19A of Electricity

More information

DRAFT STCP 18-1 Issue 004 Connection and Modification Application

DRAFT STCP 18-1 Issue 004 Connection and Modification Application STCP 18-1 Connection and Modification Application Draft Issue 004 - June 2014 DRAFT STCP 18-1 Issue 004 Connection and Modification Application STC Procedure Document Authorisation Party Name of Party

More information

9M 2017 results innogy SE 13 November 2017 Bernhard Günther CFO

9M 2017 results innogy SE 13 November 2017 Bernhard Günther CFO 9M 2017 results innogy SE 13 November 2017 Bernhard Günther CFO Notice This document contains forward-looking statements. These statements are based on the current views, expectations, assumptions and

More information

Introduc)on Economic Aims of the Government Achieve Full Employment: Achieve moderate Economic Growth: Control Government Finances:

Introduc)on Economic Aims of the Government Achieve Full Employment: Achieve moderate Economic Growth: Control Government Finances: Introduc)on The government have a huge role in developing the Irish economy, but this is a very general statement. In order to successfully assess any government s performance, we need to look in much

More information

Comments of Deepwater Wind, LLC July 26, 2018

Comments of Deepwater Wind, LLC July 26, 2018 STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES Docket No. QX18040466 In the Matter of Offshore Wind Renewable Energy Certificate (OREC) Funding Mechanism Comments of Deepwater Wind, LLC July 26, 2018 Deepwater

More information

SSE plc Q3 TRADING STATEMENT. SSE plc completed the third quarter of its financial year on 31 December This Trading Statement:

SSE plc Q3 TRADING STATEMENT. SSE plc completed the third quarter of its financial year on 31 December This Trading Statement: SSE plc Q3 TRADING STATEMENT SSE plc completed the third quarter of its financial year on 31 December 2018. This Trading Statement: reiterates SSE s intention to recommend a full-year dividend for 2018/19

More information

All Energy 2015 CfD: The New Normal?

All Energy 2015 CfD: The New Normal? All Energy 2015 CfD: The New Normal? Sarah-Jane McArthur, Associate 6 May 2015 Key Themes CfD 101 Reflections on allocation process Reflections on the auction outcome What next for the winners What next

More information

THE ROLE OF ENERGY COMPANIES IN THE ENERGY TRANSITION LATEST INSIGHTS IN COST REDUCTIONS

THE ROLE OF ENERGY COMPANIES IN THE ENERGY TRANSITION LATEST INSIGHTS IN COST REDUCTIONS THE ROLE OF ENERGY COMPANIES IN THE ENERGY TRANSITION LATEST INSIGHTS IN COST REDUCTIONS October 2016 EUFORES Copenhagen Martin Neubert Chief Strategy Officer DONG Energy Wind Power Green transformation

More information

Deutsch-Dänisch-Schwedisch-Norwegische Kooperation, EU-Policy Workshop on Offshore Wind Energy Dr. Joachim Kutscher PtJ

Deutsch-Dänisch-Schwedisch-Norwegische Kooperation, EU-Policy Workshop on Offshore Wind Energy Dr. Joachim Kutscher PtJ Deutsch-Dänisch-Schwedisch-Norwegische Kooperation, EU-Policy Workshop on Offshore Wind Energy 2009 Dr. Joachim Kutscher PtJ GDSN - Cooperation: Aim Formation of a most flexible network for cooperation

More information

Investor seminar: Re-defining RIIO. London, Tuesday 6 August 2013

Investor seminar: Re-defining RIIO. London, Tuesday 6 August 2013 Investor seminar: Re-defining RIIO London, Tuesday 6 August 2013 Cautionary statement This presentation contains certain statements that are neither reported financial results nor other historical information.

More information

SSE Financial Results. 6 months to 30 September 2017

SSE Financial Results. 6 months to 30 September 2017 SSE Financial Results 6 months to 30 September 207 Richard Gillingwater Chairman 2 The SSE Team Gregor Alexander Finance Director Alistair Phillips-Davies Chief Executive Richard Gillingwater Chairman

More information

Work package 2. Analysis of national MSP Instruments. Planning for Offshore RES in the North Sea Regional Workshop. Brussels, 16 March 2011

Work package 2. Analysis of national MSP Instruments. Planning for Offshore RES in the North Sea Regional Workshop. Brussels, 16 March 2011 Planning for Offshore RES in the North Sea Regional Workshop Brussels, 16 March 2011 Work package 2 Analysis of national MSP Instruments Andreas Wagner Stiftung OFFSHORE-WINDENERGIE German Offshore Wind

More information

SSE Financial Results. Full year to 31 March 2016

SSE Financial Results. Full year to 31 March 2016 SSE Financial Results Full year to 31 March 216 Richard Gillingwater Chairman 2 The SSE team 3 Safety comes first Total Recordable Injury Rate*.4.2.23.23 FY15 FY16 Total Recordable Injuries 15 1 5 118

More information

EnBW remains on course despite difficult conditions renewable energies experience large boost in earnings

EnBW remains on course despite difficult conditions renewable energies experience large boost in earnings 21 March 2016 Press release» EnBW remains on course despite difficult conditions renewable energies experience large boost in earnings 2015 financial year: adjusted EBITDA in line with expectations / renewable

More information

Cost Reduction Monitoring Framework

Cost Reduction Monitoring Framework Cost Reduction Monitoring Framework Quantitative Assessment Report 19 December 2016 Glossary CAPEX Capital expenditure CfD Contract for Difference CPI Consumer Price Inflation CRMF Cost Reduction Monitoring

More information

Disclaimer This financial report contains forward-looking statements about financial and operational matters. Because they relate to future events

Disclaimer This financial report contains forward-looking statements about financial and operational matters. Because they relate to future events i Disclaimer This financial report contains forward-looking statements about financial and operational matters. Because they relate to future events and are subject to future circumstances, these forward-looking

More information

North Seas Energy Clusters

North Seas Energy Clusters North Seas Energy Clusters Scoping paper INTRODUCTION The Political Declaration on energy cooperation between North Seas Countries, signed on 6 June 2016, set up a three-year work programme, based on voluntary

More information

BLUE TRANSMISSION WALNEY 2 LIMITED

BLUE TRANSMISSION WALNEY 2 LIMITED BLUE TRANSMISSION WALNEY 2 LIMITED 25 October 2012 Separation and Independence of the Transmission Business Compliance Statement Prepared pursuant to Amended Standard Condition E12 - C2 (Separation and

More information

Cross border participation in the capacity mechanism. Sharing the spoils...

Cross border participation in the capacity mechanism. Sharing the spoils... Cross border participation in the capacity mechanism Sharing the spoils... 5 June 2015 First GB capacity auction led to payments of 1billion for c50gw of capacity Outcome of first CM auction Main recipient

More information

ScottishPower Consolidated Segmental Statement for the year ended 31 December 2017

ScottishPower Consolidated Segmental Statement for the year ended 31 December 2017 ScottishPower Consolidated Segmental Statement for the year ended 31 December 2017 Required under Standard Condition 16B of Electricity Generation Licences and Standard Condition 19A of Electricity and

More information

Ventus 2 VCT plc. Strategy Note Executive Summary

Ventus 2 VCT plc. Strategy Note Executive Summary 1 Executive Summary This note summarises the outcome of a strategy review undertaken by the Board of Ventus 2 VCT plc (the Company ) over the past year during the period when the last of the Company s

More information