1 Review of Support Mechanisms and Policy Options for Offshore Wind Prepared by the Center for Wind Energy at James Madison University August 2012

2 Denmark Denmark s long-term target is to achieve complete independence from fossil energy sources. Denmark s target from the EU is for a 30% share of renewable energies in gross domestic energy consumption by Suitable areas for onshore wind projects are becoming more difficult to identify and so Denmark is counting more and more on the development of offshore wind projects to reach its national and European climate objectives. Priority areas for the development of offshore wind projects in Denmark were identified in 2007, with plans to install up to 4.6 GW by Since then, developers have been able to participate in tenders, organized by Danish Energy Energistryreisen (ENS), for licenses to operate within these priority areas. Alternatively, developers may propose their own projects outside of the priority areas. ENS is responsible for approving offshore wind projects. Project implementation is dependent on Planning permission Building permit Operating license and an environmental impact assessment The TSO Energinet.dk is responsible for the costs of connecting offshore wind projects to the grid. Projects that have undergone successful tender processes are Horns Rev 2 (209 MW), Rodsand 2 (207 MW) and Anholt (400 MW). Along with a license, the successful bidder received planning permission, a building permit and an operating license for 25 years. The EIA is carried out by Energinet.dk. Projects are awarded to the bidder offering the lowest price per kwh. For Horns Rev 2 and Rodsand 2, the FIT was limited to energy production equivalent to 50,000 full load hours, at rates of 6.94 ct/kwh and 8.43 ct/kwh respectively. For Anholt, the only bidder Dong Energy offered a FIT of around 14 ct/kwh for the first 20,000 TWh produced, and was awarded the license in June Developers that propose their own projects are responsible for obtaining the required approvals and conducting and EIA. For these projects, a bonus of 1.3 ct/kwh is applied for 20 years, in addition to the market electricity price. Germany According to a report by the Federal Ministry for the Environment on the expansion of renewable energy, the intention is to install offshore wind capacities of 10 GW by 2020, and 23 GW by 2030 (22). The majority of planned offshore wind projects in Germany are located in the Exclusive Economic Zone (EEZ) and must be approved by the Bundesamt fur Seeschifffahrt und Hydrographie (BSH). Offshore wind projects within 12 nautical miles of the shore are approved by the ministries in the relevant Federal states. Regulations governing development plans for EEZs in the North Sea and Baltic Sea came

3 into force in September and December 2009 respectively. These plans define priority areas for offshore wind generation. The Infrastructure Planning Acceleration Act came into effect in December 2006, requiring German TSOs to connect offshore wind projects to the grid where construction of wind farms began before 31 December Connection costs are shared among all TSOs in Germany. Until 2009, there were significant issues getting TSOs and banks to commit to offshore wind projects. TSOs made grid connection commitments contingent on secured financing. Banks, meanwhile, would not approve lending without such commitments being in place. In 2009, the Federal Network Agency published its position paper on grid connection obligations. The project paper specifies the criteria for project developers to obtain (un)conditional grid connection commitments. The main objective of the position paper is to ensure the timely connection of offshore wind projects to the grid. Project developers must meet the following criteria 1. Required approvals or promise of such approvals by the responsible authority 2. Feasible construction schedule 3. Geotechnical site survey report 4. Procurement contracts for the wind turbine generators and a. Secured financing or b. (pre)contracts for the procurement of key components If the TSO has evidence that criteria 1, 2 and 3 or 1, 2 and 4 are met by the closing dates of either 1 March of 1 September in the respective year, a conditional grid connection commitment must be submitted within two months. The TSO must start a tender process for grid connection immediately and commission the grid connection within 30 months. With proof that all four criteria are satisfied by the closing dates, the TSO must award binding contracts for the grid connection within two months. Despite the increased transparency created by this policy, the connection to the grid continues to pose significant investment hurdles for offshore wind developers. Furthermore, given the high number of connections that will be required in 2012 and 2013, short-term supply bottlenecks are expected, which could result in delays to grid connections even if all deadlines and criteria are met. If the TSO is not at fault, developers have no claim for damage compensation. Both developers and lenders face significant investment risk. The promotions of renewable energies in Germany is based on FITs since the first EEG in In January 2009, FITs for offshore wind increased from 9.1 ct/kwh to 13.0 ct/kwh, for an initial period of 12 years. A further 2 ct/kwh applies during this period for turbines that enter operation before January , called a sprinter tariff, designed to accelerate the implementation of Germany s first offshore wind projects.

4 France On December , the French government published its new multi-year program for investment in electricity generation capacity. (24) The French government aims to expand installed wind power capacity to 25 GW by 2020 (6 GW offshore). In France, the promotion of renewable energies is based on the 2000 electricity law. This sets out the basis for FITs and for tendering. The responsibilities for connecting offshore wind projects to the grid rests with the TSO. There is an initial period of 10 years with a FIT of 13.0 ct/kwh for all offshore wind projects, and a subsequent 10 year period in which the applicable FIT is calculated according to the measured wind yield in the initial FIT period. (3.0 ct/kwh for more than 3,900 full load hours to 13.0 ct/kwh for less than 2,800 full load hours) By tendering licenses, the French governments seek to actively influence investments in offshore wind development. The first licenses were put out to tender in 2005, which saw one offshore wind license awarded (Cote d Albatre). A FIT of 10 ct/kwh, for a period of 20 years was set for this project, but a low FIT by international standards and a cumbersome approval process, the project is still on hold. The French government hopes to streamline and simplify the approval process with the new Grenelle II environmental legislative. (28) United Kingdom In 2009, the British government formulated a renewable energy strategy to achieve its long-term climate change objectives, which stipulates an increase in renewable energies as a share of electricity consumption to 30% by Expansion in offshore wind capacity is expected to be the main contributor to achieving this objective. The British government awarded development licenses totaling 32 GW (for a total of 49 GW overall) as part of a tendering round in January 2010 and has therefore set the stage for large scale deployment.

5 The Crown Estate owns most of the foreshore and all of the seabed up to 12 nautical miles and awards lease agreements for offshore wind projects in these areas. The Energy Act of 2004 gave the Crown Estate the right to award leases for areas in the Renewable Energy Zone (REZ), which is nearly identical to the Exclusive Economic Zone. In 2001 and 2003, the Crown Estate conducted two tenders, Round 1 and Round 2, for offshore wind project development licenses. In Round 1, developers were free to propose their own sites, whereas in Round 2, the Crown Estate defined development zones. The Crown Estate qualified 18 projects in Round 1 and 15 projects in Round 2. Once a development license has been awarded, developers must obtain a number of approvals before a lease agreement can be concluded (31). In Round 1, several projects were never given a lease agreement. In Round 2, development zones were defined based on strategic environmental reviews by the Crown Estate, and the risk of non-approval was reduced. The same system was used for the Round 3 tender process. In June 2009, the UK introduced a new tendering procedure for the construction and operation of grid connections for offshore wind projects. Now, companies authorized by the Office of Gas and Electricity Markets (Ofgem), can apply for a construction and operation license for offshore wind project grid connections. The operator license for a grid connection is initially limited to a term of 20 years. Ofgem sets the network tariffs based on a cost estimate. One of the main purposes of the tender procedure is to promote competition and, consequently, the implementation of cost-effective grid connections. Offshore wind developers are also freed from the investment costs associated with building the grid connection. At the same time, OFTO can engage in bilateral negotiations with the project developer to reduce investment risk by providing guarantees. The UK support mechanism is based on quotas, called headroom for a share of renewable energies in electricity consumption since Electricity suppliers must prove their compliance with these quotas with Renewable Obligation Certificates (ROCs). For 2010/2011 time period, the ROCs equated to approximately 11% of total electricity consumption. Since the introduction of the Renewable Obligation Order (RO) in 2002, one ROC/MWh was granted for all renewable energy technologies. ROC banding was introduced on April 1, 2009, meaning that ROC/MWhs were granted according to the technology s level of maturity and expansion potential. Offshore wind was placed in the post-demonstration category, and the number of ROCs increased from 1.0 to 1.5 per MWh. This amendment to the RO was reviewed shortly after, due to objections from developers that offshore wind was no longer commercially viable due to increased costs and difficulties in obtaining finance. The British government approved amendments to the RO, effective April 1, Increase to 2 ROCs/MWh for projects which obtain full accreditation between April and March Extension of the RO term from 2027 to 2037, to a maximum subsidy period of 20 years

6 Increase in quotas for the share of renewable energy in electricity consumption, from 8 to 10 percent. Removal of 20% upper limit for energy that falls under the RO subsidy In addition to RO support, offshore wind project operators benefit from tax relief in the form of levy exemption certificates (LECs). These certificates grant an exemption from the climate change levy (CCL) on electricity, coal and gas. The UK continues to offer the most attractive conditions for investment in offshore wind projects, even though revenues are dependent on market prices and therefore carry price fluctuation risks. Market risk is contained by setting quotas for the share of renewable energy in electricity consumption. Moreover, developers emphasized the British government s straightforward and flexible attitude to dealing with potential or actual stumbling blocks. Ireland The approval procedure for offshore wind projects is the same as for onshore wind projects. The only exception being that an additional approval is required from the Ministry for Agriculture, Fishery, and Food - a so-called foreshore lease agreement for the economic use of coastal seas. Requirements include Planning permission from the regulatory authority of the energy market Grid connection commitment from the TSO Building permit and operating license from the regulatory authority of the energy market Foreshore lease agreement Offshore wind projects with other renewable technologies do not have priority rights for grid connections. While the TSO EirGrid is responsible for constructing and operating the connection, developers are responsible for obtaining the approval and for the costs associated with construction and operation. Ireland introduced a FIT system called REFIT in 2006 and added a tariff for offshore wind in Under REFIT, power purchase agreements (PPAs) between power plant operators, based on renewable energy sources, and utilities are subsidized. For an offshore wind project, the REFIT is designed to enable the operator to achieve revenues of 14 ct/kwh and take into account the terms of the PPA as well as market prices. Netherlands The Dutch TSO, TenneT TSO B.V., is responsible for building and operating offshore wind project connections. However, current law also prescribes that the costs for the construction and operation of such connections is the responsibility of the offshore wind project operator. The old tariff system, the MEP program, was allowed to expire in August 2006 and was replaced with the SDE program in April SDE pays a bonus for a time period of 15 years. An adjustment is made to

7 account for the difference between the SDE tariff and market prices. The Dutch Ministry for the Economy defines the tariff and adjustment on an annual basis. The SDE program started to apply to offshore wind projects since January After obtaining a construction permit, project developers apply to the authority in charge Noordzeeloket to participate in the SDE program. The first round of bids started in January The responsible authority, SenterNovem, requested bidders to apply for SDE participation on the basis of a minimum tariff per kwh (15-year term). Taking into account varying distances to the shore and water depths for offshore wind projects, the authority stated that it would consider the most competitive bidders, up to a maximum subsidy of EUR 5.3 billion. Twelve applications, totaling 3.2 GW of planned capacity, were admitted for the first SDE bid two Bard Group projects with a planned total capacity of 600 MW were selected to participate in the SDE program. No information about the applicable tariff has been disclosed. Two months from the announcement, successful applicants must provide bank guarantees of EUR 20 million per project as security. Sweden In addition to obtaining a building permit for the offshore wind project, developers also require a permit to build and operate connection to the grid. The TSO, Svenska Kraftnat, passes on connection costs to project developers by way of fees for using the grid. Sweden s support mechanism for renewable energies is based on quotas, and was set out in a 2003 law of electricity certificates. For every year until 2030, energy suppliers are required to provide evidence that they meet their specified quotas for renewable energies in electricity consumption. They use certificates 1, issued by the TSO, which can be traded within Sweden and can only lapse once offset against a quota obligation. The price of a certificate in July 2010 was around 2.4 ct/kwh, producing an overall tariff of 6.76 ct/kwh, which is low by international standards. The expansion of offshore wind is also supported by a government subsidy program, which has a EUR 350 million budget. The government energy agency acts as the approving authority for these subsidies, which are for research and development projects related to wind power. They focus on environmental protection measures, procurement of technology and developments prior to market introduction. Assessment of general conditions The support mechanisms used to promote offshore wind differ considerably by country. In general, support mechanisms can be divided into tender-based systems (Denmark, Netherlands), market-priced based systems (UK, Sweden) and fixed FIT systems (Belgium, Germany, France, Ireland). In addition to the support mechanism itself, the general framework, most notably provisions for grid connections or existing infrastructure, such as ports, are also significant for project developers. 1 Each certificate corresponds to one MWh

8 Resources for the development of offshore wind projects are limited, in particular with regards to financing. All the EU countries systems reviewed above show that there is a push to expand offshore wind through the private sector, where national support mechanisms provide genuine competition for investment. There are advantages and disadvantages to all systems. For example, the FIT tender-based process implemented by Denmark has shown limited value for the comprehensive development of offshore wind. Tenders for new offshore wind power capacity are limited in Denmark to a few select individual projects (Stop-and-Go policy). Other projects are not commercially viable due to low FIT applied to them. This means that despite an extensive project pipeline, it is not possible to achieve the dynamic growth experienced in the UK. Moreover, since cost pressures are transferred to the developer, the tender process is not competitive in the context of a Europe-wide competition. In general, fixed FIT systems offer offshore wind developers a higher degree of investment security, but the success of the fixed FIT is dependent on the level of subsidy and other framework conditions. Measured by the expansion of the offshore wind sector, none of the countries with a fixed FIT can be classed as successful. Following extensive adjustments to the EEG, Germany has successfully entered the market, albeit with considerable delay. Yet despite completion of the Alpha Ventus test site and the two offshore wind projects under construction, future market development remains uncertain. Significantly higher cost expectations reduces the profitability of offshore wind projects, and the provision for connections to the grid is another significant hurdle despite efforts to relieve the burden on project developers. Finally, there is the risk of a supply bottleneck for which developers would not be entitled compensation. Offshore wind developers are therefore demanding that the German government develops a grid expansion plan to ensure that the four offshore wind project clusters in the North Sea receive grid connections in time. The UK continues to offer the most attractive conditions for investment in offshore wind projects, even though revenues are dependent on market prices and contain price fluctuation risks. Moreover, the British government s willingness and flexibility to remove obstacles helps to maintain the speed of implementation and makes the UK an attractive investment destination for wind projects Market Survey A KPMG 2010 market survey of the European offshore wind markets confirmed that the UK offers the best conditions for offshore wind project development, followed by Germany, Belgium and the Netherlands. These four countries are well placed to achieve their expansion targets. An unfavourable assessment of expected returns puts the expansion plans for offshore wind in Ireland, Denmark, France and Sweden into question.

9 Germany received the highest approval ratings for its willingness to provide support to offshore wind, followed by the UK following the recent amendments to the EEG and RO respectively. The Netherlands have also made considerable gains in this regard, whilst market participants are losing confidence in France and Spain. The results of this market survey and an analysis of offshore wind farm development across Europe show that good support mechanisms for offshore as well as political support to finance projects and remove barriers shows dividends when it comes to project approval and development. While the offshore wind industry has flourished in the UK, the industry is non-existent in France, and is slowing down in Denmark.

Support regimes for offshore wind in Europe Florian Bauernfeind

Support regimes for offshore wind in Europe Florian Bauernfeind Winter Academy 2018 Trading, Sales and Financing in the European Energy Market and Industry Support regimes for offshore wind in Europe Florian Bauernfeind Vattenfall Agenda 1. Wind Power in Vattenfall

More information

Work package 2. Analysis of national MSP Instruments. Planning for Offshore RES in the North Sea Regional Workshop. Brussels, 16 March 2011

Work package 2. Analysis of national MSP Instruments. Planning for Offshore RES in the North Sea Regional Workshop. Brussels, 16 March 2011 Planning for Offshore RES in the North Sea Regional Workshop Brussels, 16 March 2011 Work package 2 Analysis of national MSP Instruments Andreas Wagner Stiftung OFFSHORE-WINDENERGIE German Offshore Wind

More information

Global Offshore Wind Market

Global Offshore Wind Market Global Offshore Wind Market Presented at: Wind Shipping and Logistics Conference Presented by Bruce Hamilton Navigant Copenhagen, Denmark March 12, 2015 2015 Navigant Consulting, Inc. D I S P U T E S &

More information

Energiewende. Drivers and Enablers for German Offshore Wind. Dr. Martin Schöpe

Energiewende. Drivers and Enablers for German Offshore Wind. Dr. Martin Schöpe Energiewende Drivers and Enablers for German Offshore Wind Dr. Martin Schöpe BMWi Head of Unit IIA1 International Cooperation on Energy Hamburg, 25 September 2018 18-09-24 Referent 1 Source: Ecofys 2018

More information

The development of offshore wind - The case of Denmark

The development of offshore wind - The case of Denmark 9 February 2017 The development of offshore wind - The case of Denmark Camilla Holbech, Deputy Manager Danish Wind Industry Association Zooming in on the Danish wind industry More than 30,000 employees

More information

Wind policy in Germany removing the bottlenecks for a continuing success story. Dania Röpke, Policy Advisor German Wind Energy Association

Wind policy in Germany removing the bottlenecks for a continuing success story. Dania Röpke, Policy Advisor German Wind Energy Association Wind policy in Germany removing the bottlenecks for a continuing success story Dania Röpke, Policy Advisor German Wind Energy Association 2011 03 16 Agenda The target: contrasting the government s and

More information

Offshore Wind in the UK January, 2010

Offshore Wind in the UK January, 2010 Offshore Wind in the UK January, 2010 EDPR s debut in offshore wind and UK market Selected in the UK Round 3 to develop 1.3 GW of wind offshore capacity Expanding in size in a new technology and a new

More information

Offshore Wind Energy in Germany and Europe: Status Quo and Market Outlook. Andreas Wagner, Managing Director German Offshore Wind Energy Foundation

Offshore Wind Energy in Germany and Europe: Status Quo and Market Outlook. Andreas Wagner, Managing Director German Offshore Wind Energy Foundation Offshore Wind Energy in Germany and Europe: Status Quo and Market Outlook Andreas Wagner, Managing Director German Offshore Wind Energy Foundation Agenda 1. German Offshore Wind Energy Foundation - Who

More information

Offshore Grid Development in Germany

Offshore Grid Development in Germany Offshore Grid Development in Germany Hamburg, 26 September 2017 Lukas Wienholt Federal Maritime and Hydrographic Agency Content of Presentation I. Current status of offshore wind energy in the German North

More information

BETTER EUROPEAN STAKEHOLDER WORKSHOP. Results from the EC project RES Support Schemes and Cooperation Mechanisms in Europe

BETTER EUROPEAN STAKEHOLDER WORKSHOP. Results from the EC project RES Support Schemes and Cooperation Mechanisms in Europe BETTER EUROPEAN STAKEHOLDER WORKSHOP Results from the EC project RES Support Schemes and Cooperation Mechanisms in Europe Malte Gephart 08/10/2014 Content Project overview Current status of Cooperation

More information

Offshore transmission investments How to regulate these investments? Who should act?

Offshore transmission investments How to regulate these investments? Who should act? Offshore transmission investments How to regulate these investments? Who should act? North Seas Countries Offshore Grid Initiative (NSCOGI) Copenhagen, 18-19 April 2012 Leonardo Meeus (Florence School

More information

Analysis on the furthering of competition in relation to the establishment. wind farms in Denmark.

Analysis on the furthering of competition in relation to the establishment. wind farms in Denmark. Analysis on the furthering of competition in relation to the establishment of large offshore wind farms in Denmark. Summary The Ministry of Climate and Energy April 28th 2011 1 Contents 1. Summary... 3

More information

5th Annual Renwable Energy Finance in Practice 21 October Support Tendering - François van Leeuw CEO of Parkwind

5th Annual Renwable Energy Finance in Practice 21 October Support Tendering - François van Leeuw CEO of Parkwind 5th Annual Renwable Energy Finance in Practice 21 October 2016 - Support Tendering - François van Leeuw CEO of Parkwind AGENDA 1. Introduction to Parkwind 1. Corporate Overview 2. Shareholders structure

More information

Stormy Weathers in the European Wind Power sector how to keep the pace?

Stormy Weathers in the European Wind Power sector how to keep the pace? allocate International Management and Executive Search Consultants Stormy Weathers in the European Wind Power sector how to keep the pace? Dr. Jörg Fabri allocate International, Managing Partner Presentation

More information

Offshore Wind and Development Opportunities in the South West Robert Thornhill Offshore Development Site Manager

Offshore Wind and Development Opportunities in the South West Robert Thornhill Offshore Development Site Manager Offshore Wind and Development Opportunities in the South West Robert Thornhill Offshore Development Site Manager Dan Towers 2004 Outline of presentation npower renewables (NRL) who we are? NRL s involvement

More information

The 2030 Energy & Climate Package for the EU: the challenges that lie ahead The utilities view

The 2030 Energy & Climate Package for the EU: the challenges that lie ahead The utilities view The 2030 Energy & Climate Package for the EU: the challenges that lie ahead The utilities view Dr. Hans Bünting CEO, RWE Innogy GmbH Brussels, 3 rd December 2014 RWE Innogy 04/12/2014 PAGE 1 New targets:

More information

Support mechanisms for RES-e

Support mechanisms for RES-e Support mechanisms for RES-e Regional ECREEE Training Workshop on National Renewable Energy Policy and Incentive Schemes Praia, 9-11 April 2012 Sofía Martínez International Relations Department Table of

More information

Analyst Call 2017 Eurogrid/ 50Hertz. 12 March 2018 Marco Nix, CFO

Analyst Call 2017 Eurogrid/ 50Hertz. 12 March 2018 Marco Nix, CFO Analyst Call 2017 Eurogrid/ 50Hertz 12 March 2018 Marco Nix, CFO Highlights 2017 Further progress in grid extension Stabilising costs for congestion management Huge export from 50Hertz area Decreasing

More information

Power Trading in the Coupled European Markets

Power Trading in the Coupled European Markets Power Trading in the Coupled European Markets Challenges for policy-makers February 2016-1 - Europe Economics is registered in England No. 3477100. Registered offices at Chancery House, 53-64 Chancery

More information

THE MONITORING REPORT FROM 16 MARCH 2018 ON THE IMPLEMENTATION OF THE JOINT DECLARATION

THE MONITORING REPORT FROM 16 MARCH 2018 ON THE IMPLEMENTATION OF THE JOINT DECLARATION Opinion on THE MONITORING REPORT FROM 16 MARCH 2018 ON THE IMPLEMENTATION OF THE JOINT DECLARATION IN JULY 2017 THE FEDERAL MINISTRY OF ECONOMIC AFFAIRS AND ENERGY OF THE FEDERAL REPUBLIC OF GERMANY AND

More information

RENEWABLE ELECTRICTY SUPPORT IN THE EU WHAT LESSONS CAN BE LEARNED?

RENEWABLE ELECTRICTY SUPPORT IN THE EU WHAT LESSONS CAN BE LEARNED? RENEWABLE ELECTRICTY SUPPORT IN THE EU WHAT LESSONS CAN BE LEARNED? 16 th Global Conference on Environmental Taxation University of Technology Sydney, 24 th September 2015 Claudia Kettner & Daniela Kletzan-Slamanig

More information

CRITIQUE THE OFFSHORE WIND INDUSTRY, IRELAND S OPPORTUNITY BRIAN BRITTON, NOW IRELAND MAY 2017

CRITIQUE THE OFFSHORE WIND INDUSTRY, IRELAND S OPPORTUNITY BRIAN BRITTON, NOW IRELAND MAY 2017 CRITIQUE THE OFFSHORE WIND INDUSTRY, IRELAND S OPPORTUNITY BRIAN BRITTON, NOW IRELAND MAY 2017 Slide Index Slide 2: Ireland s Problem - Offshore Wind the Solution Slide 3: Energy is now Centre Stage -

More information

Some practical aspects in the implementation of tenders: The Danish example for offshore wind

Some practical aspects in the implementation of tenders: The Danish example for offshore wind Some practical aspects in the implementation of tenders: The Danish example for offshore wind Lena Kitzing, PhD candidate, Energy Systems Analysis 10 th IFIC Workshop, Brussels 24 October 2013 Practical

More information

No. 19. Offshore Wind Energy in Europe Fresh Wind for Insurers, Too? A Berkshire Hathaway Company. Topics No. 19

No. 19. Offshore Wind Energy in Europe Fresh Wind for Insurers, Too? A Berkshire Hathaway Company. Topics No. 19 No. 19 Topics No. 19 Offshore Wind Energy in Europe Fresh Wind for Insurers, Too? A Berkshire Hathaway Company 10 Offshore Wind Energy in Europe Fresh Wind for Insurers, Too? Oliver Stein Oliver Stein

More information

Proposed National Offshore Wind Energy Policy

Proposed National Offshore Wind Energy Policy FOWIND Capacity Building Workshop (12 September, 2014) Proposed National Offshore Wind Energy Policy J.P. Singh, Director Ministry of New & Renewable Energy 1 Global Status & Technology Over 7 GW Global

More information

North Seas Energy Clusters

North Seas Energy Clusters North Seas Energy Clusters Scoping paper INTRODUCTION The Political Declaration on energy cooperation between North Seas Countries, signed on 6 June 2016, set up a three-year work programme, based on voluntary

More information

Where does the money come from? Financing challenges for a Meshed Offshore Grid

Where does the money come from? Financing challenges for a Meshed Offshore Grid Where does the money come from? Financing challenges for a Meshed Offshore Grid Presentation at Baltic InteGrid Seminar, 15-05-2018, Bremerhaven Alexandra Armeni, Deutsche WindGuard Contents 1. The principle

More information

CGN INAUGURAL GREEN BOND ISSUANCE

CGN INAUGURAL GREEN BOND ISSUANCE CGN INAUGURAL GREEN BOND ISSUANCE Table of Contents 1. Independent Limited Assurance Statement 1 Appendix: Green Bond Management Statement 3 2. Green Bond Framework 6 Page 1 of 13 Page 2 of 13 Appendix

More information

Electricity (Development of Small Power Projects) GN. No. 77 (contd.) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 18(5), 45 and 46))

Electricity (Development of Small Power Projects) GN. No. 77 (contd.) THE ELECTRICITY ACT (CAP.131) RULES. (Made under sections 18(5), 45 and 46)) GOVERNMENT NOTICE NO. 77 published on 02/03/2018 THE ELECTRICITY ACT (CAP.131) RULES (Made under sections 18(5), 45 and 46)) THE ELECTRICITY (DEVELOPMENT OF SMALL POWER PROJECTS) RULES, 2018 1. Citation

More information

Gas, oil and coal prices were subsidised by 3.63bn in 2010 Or were they? Wind power still gets lower public subsidies than fossil fuel tax breaks

Gas, oil and coal prices were subsidised by 3.63bn in 2010 Or were they? Wind power still gets lower public subsidies than fossil fuel tax breaks INTRODUCTION On 27 th February 2012, the UK national daily newspaper The Guardian published an article 1 headed Wind power still gets lower public subsidies than fossil fuel tax breaks Financial support

More information

Submission by EDPR to The Scottish Parliament Devolution. (Further Powers Committee) on The Crown Estate and Offshore Wind

Submission by EDPR to The Scottish Parliament Devolution. (Further Powers Committee) on The Crown Estate and Offshore Wind Submission by EDPR to The Scottish Parliament Devolution (Further Powers Committee) on The Crown Estate and Offshore Wind 1. About EDP Renewables With headquarters in Madrid, EDPR s business consists of

More information

First Offshore Windfarm Project in India (FOWPI) with EU-backing

First Offshore Windfarm Project in India (FOWPI) with EU-backing First Offshore Windfarm Project in India (FOWPI) with EU-backing Presentation at FOWPI Metocean Workshop 2 June 2017 Per Vølund, COWI 1 The Project is funded by The European Union Agenda 1. Offshore Wind

More information

Skills gap in offshore RES: challenges for Intelligent Energy Europe Programme

Skills gap in offshore RES: challenges for Intelligent Energy Europe Programme Skills gap in offshore RES: challenges for Intelligent Energy Europe Programme Dana Dutianu, Project Officer, Executive Agency for Competitiveness and Innovation EACI Brussels, 04 October 2010 IEE: TURNING

More information

Show me the Money. Rabobank International. Marc Schmitz Rabobank December 20 th 2011

Show me the Money. Rabobank International. Marc Schmitz Rabobank December 20 th 2011 Show me the Money Rabobank International Marc Schmitz Rabobank December 20 th 2011 -How viable is the offshore wind sector? The history of onshore and offshore wind Onshore wind Started in 1985 with first

More information

CORPI Klaipeda University;

CORPI Klaipeda University; Stakeholder Workshop on Offshore Energy and MSP in the Baltic Sea 12-13 November 2013, Hotel Meridien Vilnius, Lithuania Hosted by Federal Maritime and Hydrographic Agency (BSH) Author of the report: Bettina

More information

CRITIQUE OF OFFSHORE WIND ENERGY

CRITIQUE OF OFFSHORE WIND ENERGY CRITIQUE OF OFFSHORE WIND ENERGY POLICIES OF THE DENMARK AND NETHERLANDS WHAT ARE THE LESSONS FOR INDIA 2/21/2017 @ Dr. Tarun Dhingra, UPES 1 Tarun Dhingra Sr. Associate Professor & Assistant Dean (Research)

More information

Gunnar Groebler Head of Business Area Wind. Vattenfall Capital Markets Day, Solna, 19 September 2016

Gunnar Groebler Head of Business Area Wind. Vattenfall Capital Markets Day, Solna, 19 September 2016 Gunnar Groebler Head of Business Area Wind Vattenfall Capital Markets Day, Solna, 19 September 2016 FACTS AND FIGURES BA WIND Business Area Wind, which is responsible for Vattenfall s wind power operations,

More information

PNE WIND AG OFFSHORE PROJECT ATLANTIS I SOLD. FIRST BERLIN Equity Research. Good start to PRICE TARGET P N

PNE WIND AG OFFSHORE PROJECT ATLANTIS I SOLD. FIRST BERLIN Equity Research. Good start to PRICE TARGET P N FIRST BERLIN Equity Research PNE WIND AG RATING Germany / Cleantech Good start to Primary exchange: Frankfurt PRICE TARGET 3.00 Bloomberg: PNE3 GR the new year Return Potential 43.8% ISIN: DE000A0JBPG2

More information

Conditions for tender of aid for electricity generated by onshore wind turbines, open door offshore wind turbines, and solar PV installations

Conditions for tender of aid for electricity generated by onshore wind turbines, open door offshore wind turbines, and solar PV installations Conditions for tender of aid for electricity generated by onshore wind turbines, open door offshore wind turbines, and solar PV installations December 2017 1 1. THE CONTRACTING AUTHORITY... 4 2. REGULATION

More information

Questions and Answers The Ministerial Order for permitting offshore wind energy Hollandse Kust (zuid) Wind Farm Sites I and II

Questions and Answers The Ministerial Order for permitting offshore wind energy Hollandse Kust (zuid) Wind Farm Sites I and II Questions and Answers The Ministerial Order for permitting offshore wind energy Hollandse Kust (zuid) Wind Farm Sites I and II Hollandse Kust (zuid) Wind Farm Zone Sites I and II Version 17 Please note:

More information

European Wind Investment European Wind Investment 2017 Project Finance and M&A

European Wind Investment European Wind Investment 2017 Project Finance and M&A European Wind Investment 2017 Project Finance and M&A Forward-thinking international law firm Advising clients in the world s most dynamic industries Taylor Wessing is a full-service international law

More information

UK Offshore Wind Market Study Final Report (Executive Summary) A report by Redpoint Energy Limited in association with GL Garrad Hassan

UK Offshore Wind Market Study Final Report (Executive Summary) A report by Redpoint Energy Limited in association with GL Garrad Hassan UK Offshore Wind Market Study Final Report (Executive Summary) A report by Redpoint Energy Limited in association with GL Garrad Hassan October 2012 1 Copyright This report has been prepared by Redpoint

More information

Questions and answers

Questions and answers Questions and answers Here you can find answers to questions the DEA receives continually. The questions are divided into different categories. Even though some of the questions may be relevant for more

More information

INVESTMENT AID IN EUROPE MARCH 2014 POLICY UPDATE

INVESTMENT AID IN EUROPE MARCH 2014 POLICY UPDATE INVESTMENT AID IN EUROPE MARCH 2014 POLICY UPDATE H I C K E Y & A S S O C I AT E S SITE SELECTION, INCENTIVES AND WORKFORCE SOLUTIONS INTRODUCTION As the world recovers from the economic downturn, businesses

More information

ANCILLARY SERVICES TO BE DELIVERED IN DENMARK TENDER CONDITIONS

ANCILLARY SERVICES TO BE DELIVERED IN DENMARK TENDER CONDITIONS Ancillary services to be delivered in Denmark. Tender conditions 1/49 Energinet.dk Tonne Kjærsvej 65 DK-7000 Fredericia +45 70 10 22 44 info@energinet.dk VAT no. 28 98 06 71 Date: 30. august 2017 Author:

More information

SAWEA submission to the public hearing relating to the NERSA review of the REFIT tariffs. By: Johan van den Berg, CEO.

SAWEA submission to the public hearing relating to the NERSA review of the REFIT tariffs. By: Johan van den Berg, CEO. SAWEA submission to the public hearing relating to the NERSA review of the REFIT tariffs By: Johan van den Berg, CEO Date: May 2011 Overview 1. Who we are and our vision 2. Some history of our engagement

More information

Kerstin Rath Senior Trade Adviser UKTI Berlin 23 May 2013

Kerstin Rath Senior Trade Adviser UKTI Berlin 23 May 2013 Kerstin Rath Senior Trade Adviser UKTI Berlin 23 May 2013 1 UKTI Germanywe are 2 Trade Opportunities Germany Offshore 3 Germany is on your doorstep 4th largest economy in the world one of the most densely

More information

Baltic Sea offshore - A cost-effective solution for the Baltic Sea. wpd Offshore Stockholm Charlotte Bergqvist

Baltic Sea offshore - A cost-effective solution for the Baltic Sea. wpd Offshore Stockholm Charlotte Bergqvist Baltic Sea offshore - A cost-effective solution for the Baltic Sea wpd Offshore Stockholm Charlotte Bergqvist Disposition of presentation 1. wpd short facts 2. Offshore market outlook 3. Baltic offshore

More information

Discussion Area CURRENT MARKET REGIME. FIT CFD s PPA. COMPARISON OF FIT CFD v ROC BACK STOP PPA S

Discussion Area CURRENT MARKET REGIME. FIT CFD s PPA. COMPARISON OF FIT CFD v ROC BACK STOP PPA S PPA s under FIT-CfD Discussion Area CURRENT MARKET REGIME FIT CFD s PPA COMPARISON OF FIT CFD v ROC BACK STOP PPA S CURRENT MARKET REGIME Current PPA Market PPA Revenue are generated via 5 core components;

More information

Understanding Electricity & Gas Prices in Ireland 1 ST SEMESTER (JANUARY JUNE) 2009

Understanding Electricity & Gas Prices in Ireland 1 ST SEMESTER (JANUARY JUNE) 2009 Understanding Electricity & Gas Prices in Ireland 1 ST SEMESTER (JANUARY JUNE) 2009 Understanding Electricity & Gas Prices in Ireland 1 st Semester (January June) 2009 Report prepared by Martin Howley,

More information

Government Response to the Environmental Audit Committee's Report on the Energy Intensive Industries Compensation Scheme

Government Response to the Environmental Audit Committee's Report on the Energy Intensive Industries Compensation Scheme Government Response to the Environmental Audit Committee's Report on the Energy Intensive Industries Compensation Scheme Presented to Parliament by the Secretary of State for Business, Innovation and Skills

More information

Docket No. QX In the Matter of Offshore Wind Renewable Energy Certificate (OREC) Funding Mechanism

Docket No. QX In the Matter of Offshore Wind Renewable Energy Certificate (OREC) Funding Mechanism May 18, 2018 Aida Camacho-Welch Secretary of the Board Board of Public Utilities 44 South Clinton Avenue, 3rd Floor, Suite 314 Post Office Box 350 Trenton, New Jersey 08625-0350 Re: Docket No. QX18040466

More information

Second quarter Vestas Wind Systems A/S. Copenhagen, 18 August Classification: Public

Second quarter Vestas Wind Systems A/S. Copenhagen, 18 August Classification: Public Second quarter Vestas Wind Systems A/S Copenhagen, 18 August Disclaimer and cautionary statement This presentation contains forward-looking statements concerning Vestas' financial condition, results of

More information

1. Foreword Main developments in the gas and electricity market The electricity market Wholesale...

1. Foreword Main developments in the gas and electricity market The electricity market Wholesale... NATIONAL REPORT DENMARK STATUS FOR 2016 2017 Contents 1. Foreword... 3 2. Main developments in the gas and electricity market... 4 2.1 The electricity market... 4 2.1.1 Wholesale... 4 2.1.2 Retail... 4

More information

Questions and Answers The Ministerial Order for permitting offshore wind energy Hollandse Kust (zuid) Wind Farm Sites I and II

Questions and Answers The Ministerial Order for permitting offshore wind energy Hollandse Kust (zuid) Wind Farm Sites I and II Questions and Answers The Ministerial Order for permitting offshore wind energy Hollandse Kust (zuid) Wind Farm Sites I and II Hollandse Kust (zuid) Wind Farm Zone Sites I and II Final verion Please note:

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a COUNCIL REGULATION

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a COUNCIL REGULATION COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 27.06.2002 COM(2002) 307 final 2002/0135 (CNS) Proposal for a COUNCIL REGULATION amending Regulation (EEC) No 3950/92 establishing an additional levy in

More information

MAIN FEATURES OF THE NEW FINNISH SUPPORT SCHEME FOR RENEWABLE ENERGY

MAIN FEATURES OF THE NEW FINNISH SUPPORT SCHEME FOR RENEWABLE ENERGY MAIN FEATURES OF THE NEW FINNISH SUPPORT SCHEME FOR RENEWABLE ENERGY On 9 November 2017 the Finnish Government published a government bill on a new scheme for renewable energy 175/2017 vp ( the Government

More information

THE NEW EUROPEAN COMMISSION PROPOSAL ON COMMERCIAL FUEL DUTY

THE NEW EUROPEAN COMMISSION PROPOSAL ON COMMERCIAL FUEL DUTY CLTM/B3627/DVI Brussels, 6 April 2007 THE NEW EUROPEAN COMMISSION PROPOSAL ON COMMERCIAL FUEL DUTY Overview of the new Commission proposal for amening Council Directive 2003/96 concerning commercial diesel

More information

UK Onshore Wind. Investment Fundamentals

UK Onshore Wind.   Investment Fundamentals UK Onshore Wind www.fimltd.co.uk Investment Fundamentals Wind is a proven asset class for both private and institutional direct investors. UK wind provides investors with a low risk investment. It is 100%

More information

Auction s Definition Citizen s Project Curse or Blessing for Community Wind Entities?

Auction s Definition Citizen s Project Curse or Blessing for Community Wind Entities? Auction s Definition Citizen s Project Curse or Blessing for Community Wind Entities? Fabian Tenk Community Wind Officer WWEA Fabian Tenk Coimbatore, 14.06.2017 21 June 2015 Content Objective and scope

More information

Ireland s. Offshore Wind Resource. An Export Opportunity. Presentation to IWEA Conference Brian Britton Secretary NOW Ireland 22 nd March 2012

Ireland s. Offshore Wind Resource. An Export Opportunity. Presentation to IWEA Conference Brian Britton Secretary NOW Ireland 22 nd March 2012 Ireland s Offshore Wind Resource An Export Opportunity Presentation to IWEA Conference Brian Britton Secretary NOW Ireland 22 nd March 2012 1 Ireland s Offshore Opportunity Ireland has a number of opportunities

More information

Ventus 2 VCT plc. Strategy Note Executive Summary

Ventus 2 VCT plc. Strategy Note Executive Summary 1 Executive Summary This note summarises the outcome of a strategy review undertaken by the Board of Ventus 2 VCT plc (the Company ) over the past year during the period when the last of the Company s

More information

WG5/6 Sub-Working. EU Emissions Trading Scheme - Auctioning Proceeds

WG5/6 Sub-Working. EU Emissions Trading Scheme - Auctioning Proceeds WG5/6 Sub-Working EU Emissions Trading Scheme - Auctioning Proceeds Introduction of Paper Under the current EU Emissions Trading Directive, Member States are required to submit a National Allocation Plan

More information

International Wind Energy Development

International Wind Energy Development International Wind Energy Development Thornton Bank II, Belgium, the first commercial 6MW+ turbine installed offshore C-Power N.V., photographer Tom D Haenens. Offshore Report 2013 Published by BTM Consult

More information

Auctions for Renewable Energy Support

Auctions for Renewable Energy Support Auctions for Renewable Energy Support Jan Kreiss Takon GmbH Strommarkttreffen, Rapperswil 14. November 2018 Agenda 1. What are Auctions for Renewable Energy Support? Motivation 2. Where are such Auctions

More information

Offshore grid development

Offshore grid development Offshore grid development Jaarsma, Saskia TenneT at a glance Europe s first cross-border grid operator for electricity Top five grid operator in Europe International offshore division 23.000 km high-voltage

More information

Cooperation under the RES Directive

Cooperation under the RES Directive Cooperation under the RES Directive Case study on a joint project: An offshore wind park in the North Sea (cooperation between the Netherlands, Belgium, UK, and Luxembourg) Cooperation under the RES Directive

More information

The significance of a meshed offshore grid in the North Sea from an energy-economic perspective - The German experience Andreas Wagner

The significance of a meshed offshore grid in the North Sea from an energy-economic perspective - The German experience Andreas Wagner The significance of a meshed offshore grid in the North Sea from an energy-economic perspective - The German experience Andreas Wagner Managing Director Stiftung OFFSHORE-WINDENERGIE German Offshore Wind

More information

Offshore Wind Cost Reduction: Findings of The Crown Estate and the Cost Reduction Taskforce

Offshore Wind Cost Reduction: Findings of The Crown Estate and the Cost Reduction Taskforce Offshore Wind Cost Reduction: Findings of The Crown Estate and the Cost Reduction Taskforce BIEE Parker Seminar 10 th October 2012 Richard Howard, Chief Economist richard.howard@thecrownestate.co.uk CONTENTS

More information

Grid Investments from a Nordic Perspective

Grid Investments from a Nordic Perspective Grid Investments from a Nordic Perspective NordREG recommendations 1 Background and task As one of the challenges for the further development of the Nordic electricity market has in the last few years

More information

Offshore Wind. Investing in the future of energy. Offshore Wind. North American Liquids Pipelines. U.S. Transmission. Natural Gas Utilities

Offshore Wind. Investing in the future of energy. Offshore Wind. North American Liquids Pipelines. U.S. Transmission. Natural Gas Utilities Offshore Vern Yu Executive VP & Chief Development Officer Offshore Investing in the future of energy North American Liquids Pipelines U.S. Transmission Natural Gas Utilities Canadian Transmission & Midstream

More information

SSE Consolidated Segmental Statement (CSS) - year ending 31 March 2014

SSE Consolidated Segmental Statement (CSS) - year ending 31 March 2014 SSE Consolidated Segmental Statement (CSS) - year ending 31 March 2014 Generation Electricity Supply Gas Supply Aggregate Nondomestic Non- Supply Unit Domestic Domestic domestic Business 2014 2014 2014

More information

CYPRUS ENERGY REGULATORY AUTHORITY

CYPRUS ENERGY REGULATORY AUTHORITY CYPRUS ENERGY REGULATORY AUTHORITY METHODOLOGY AND CRITERIA FOR THE EVALUATION OF INVESTMENTS IN ELECTRICITY AND GAS INFRASTRUCTURE PROJECTS (ARTICLE 13(6) OF REGULATION (EU) No. 347/2013) 2015 WWW. C

More information

The role of the Crown Estate in the development of offshore windfarms

The role of the Crown Estate in the development of offshore windfarms The role of the Crown Estate in the development of offshore windfarms N JACOBSON The Crown Estate, London, UK SYNOPSIS The paper describes the role of the Crown Estate in a proposed NFFO based procedure

More information

Report on Proposed principles for Common Balance Management

Report on Proposed principles for Common Balance Management Report on Proposed principles for Common Balance Management 2007-11-16 1 Contents 1. INTRODUCTION AND BACKGROUND...3 2. COMMON COST ALLOCATION...3 3. FEE STRUCTURE... 4 4. NEW MODEL FOR ENCOMPASSING TWO

More information

Electricity market in the. Simon-Erik Ollus Baltic Energy Forum, Vilnius 20 November 2014

Electricity market in the. Simon-Erik Ollus Baltic Energy Forum, Vilnius 20 November 2014 Electricity market in the Baltic Sea area today Simon-Erik Ollus Baltic Energy Forum, Vilnius 20 November 2014 Disclaimer This presentation does not constitute an invitation to underwrite, subscribe for,

More information

FULL YEAR 2018 Vestas Wind Systems A/S

FULL YEAR 2018 Vestas Wind Systems A/S FULL YEAR Vestas Wind Systems A/S Copenhagen, 7 February 2019 DISCLAIMER AND CAUTIONARY STATEMENT This document contains forward-looking statements concerning Vestas financial condition, results of operations

More information

Prepared by Nordenergi WG Taxes and Levies:

Prepared by Nordenergi WG Taxes and Levies: Nordic Tax Report 2013 electricity sector Prepared by Nordenergi WG Taxes and Levies: Anders Espensen, Dansk Energi Antti Kohopää, Finnish Energy Industries Inge Pierre, Svensk Energi Ingvar Solberg, Energi

More information

The Future of Offshore Wind Power Generation. Published:October 2011 No.Of Pages:136 Price:US $ Introduction

The Future of Offshore Wind Power Generation. Published:October 2011 No.Of Pages:136 Price:US $ Introduction The Future of Offshore Wind Power Generation Published:October 2011 No.Of Pages:136 Price:US $ 2875 Offshore wind power is one of the newest major sources of renewable electricity generation to be developed

More information

Third quarter Vestas Wind Systems A/S. Copenhagen, 7 November 2018

Third quarter Vestas Wind Systems A/S. Copenhagen, 7 November 2018 Third quarter Vestas Wind Systems A/S Copenhagen, 7 November Disclaimer and cautionary statement This document contains forward-looking statements concerning Vestas financial condition, results of operations

More information

Implementation of Auctions for Renewable Energy Support in the Netherlands and Denmark: A cooperation case study Report D7.1-NL/DK, March 2016

Implementation of Auctions for Renewable Energy Support in the Netherlands and Denmark: A cooperation case study Report D7.1-NL/DK, March 2016 Downloaded from orbit.dtu.dk on: Oct 08, 2018 Implementation of Auctions for Renewable Energy Support in the Netherlands and Denmark: A cooperation case study Report D7.1-NL/DK, March 2016 Gephart, Malte;

More information

New offshore wind leasing for Scotland. Discussion Document

New offshore wind leasing for Scotland. Discussion Document New offshore wind leasing for Scotland Discussion Document May 2018 Contents 1. Foreword 3 2. Introduction and context 4 3. Aim of leasing process and purpose of this Discussion Document 6 4. Leasing explained

More information

German Wind and Solar from FiT to tender.

German Wind and Solar from FiT to tender. German Wind and Solar from FiT to tender. Contents Roadmap to EEG 2016 EEG 2014 vs. Draft EEG 2016 General principles Direct marketing How does it work? FiT or tenders applicable? Framework for specific

More information

Renewable Energy Auctions: Lessons from Germany, the UK, and the Netherlands. Dominik Huebler Principal

Renewable Energy Auctions: Lessons from Germany, the UK, and the Netherlands. Dominik Huebler Principal Renewable Energy Auctions: Lessons from Germany, the UK, and the Netherlands Dominik Huebler Principal Strommarkttreffen Berlin, 4 May 2018 Plenty of variation in recent offshore wind auction results Delivery

More information

MASSACHUSETTS OFFSHORE WIND ENERGY AREA LEASE OPPORTUNITIES

MASSACHUSETTS OFFSHORE WIND ENERGY AREA LEASE OPPORTUNITIES MASSACHUSETTS OFFSHORE WIND ENERGY AREA LEASE OPPORTUNITIES May 1, 017 www.poweradvisoryllc.com To: From: Clients and Colleagues John Dalton, President & Carson Robers, Consultant, Power Advisory LLC On

More information

5 Killer Apps of Offshore Wind Prosperity

5 Killer Apps of Offshore Wind Prosperity Southeast Coastal Wind Conference, 11 th September 2013 GL Garrad Hassan A Decade of Offshore Wind Experience Huge Potential How do we get there? 10 GW by 2020? 54 GW by 2030? 5 GW installed * * Inspired

More information

Proposal for a COUNCIL IMPLEMENTING DECISION

Proposal for a COUNCIL IMPLEMENTING DECISION EUROPEAN COMMISSION Brussels, 13.5.2015 COM(2015) 203 final 2015/0106 (NLE) Proposal for a COUNCIL IMPLEMENTING DECISION authorising Denmark to apply, in accordance with Article 19 of Directive 2003/96/EC,

More information

Feed in Tariff Guidelines

Feed in Tariff Guidelines COMMON MARKET FOR EASTERN AND SOUTHERN AFRICA Feed in Tariff Guidelines Zambia Lusaka August 7 to 11 2017 Feed in tariff Guidelines I. Objectives of the Feed In Tariff Guideline II. Feed In Tariffs Policy

More information

Contract length analysis for Feed-in Tariff with Contracts for Difference. Summary of onshore and offshore wind analysis

Contract length analysis for Feed-in Tariff with Contracts for Difference. Summary of onshore and offshore wind analysis Contract length analysis for Feed-in Tariff with Contracts for Difference Summary of onshore and offshore wind analysis August 2013 Contract length analysis for Feed-in Tariff with Contracts for Difference

More information

How to structure a power purchase agreement on a market without feed-in-tariff. Sten Lillienau

How to structure a power purchase agreement on a market without feed-in-tariff. Sten Lillienau How to structure a power purchase agreement on a market without feed-in-tariff Sten Lillienau Neas Energy in brief Nordics 2000MW Wind Neas Energy is an independent energy asset management company that

More information

OFFSHORE WIND REFERENCES

OFFSHORE WIND REFERENCES OFFSHORE WIND REFERENCES OFFSHORE WIND PROJECTS We helped to realise over 8 GW of offshore wind projects United Kingdom Galloper - 340 MW Sheringham Shoal - 315 MW The Netherlands Borssele 1&2-700 MW Borssele

More information

Environmental taxes in Country Specific Recommendations for Denmark

Environmental taxes in Country Specific Recommendations for Denmark European Semester 2015 Environmental taxes in Country Specific Recommendations for Denmark During the last years, environmental taxes have not been the focus in EU Commission s country specific recommendations

More information

EUROPEAN RENEWABLE ELECTRICITY CERTIFICATES

EUROPEAN RENEWABLE ELECTRICITY CERTIFICATES EUROPEAN RENEWABLE ELECTRICITY CERTIFICATES Long term outlook 16 August 2011 / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /

More information

innogy confirms strategy and outlook for 2018

innogy confirms strategy and outlook for 2018 innogy confirms strategy and outlook for 2018 Strategy for value-added growth rigorously pursued Capital expenditure in operational business further increased Business performance in first half of year

More information

Offshore electricity transmission: a new model for delivering infrastructure

Offshore electricity transmission: a new model for delivering infrastructure REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 22 SESSION 2012-13 22 JUNE 2012 Gas and Electricity Markets Authority Department of Energy and Climate Change Offshore electricity transmission: a new model

More information

Choosing Appropriate Incentives to Deploy Renewable Energy

Choosing Appropriate Incentives to Deploy Renewable Energy Choosing Appropriate Incentives to Deploy Renewable Energy Workshop, World Bank Headquarters Global Head of Climate Change Investment Research Climate Change Advisors http://www.dbcca.com/research January

More information

STATISTICS IN FOCUS Economy and finance

STATISTICS IN FOCUS Economy and finance STATISTICS IN FOCUS Economy and finance 1997 U 28 ISSN 1024-4298 TAXES AND SOCIAL CONTRIBUTIONS IN THE EUROPEAN UNION -First results for - As in previous years, this issue -of 'Statistics in Focus' presents

More information

Viridian Group Investments Limited

Viridian Group Investments Limited Viridian Group Investments Limited Annual Report and Accounts For the year ended 31 March 2013 Viridian Group Investments Limited Annual Report and Accounts - 2013 1 CONTENTS Page Group Financial Highlights

More information

Comments of Deepwater Wind, LLC July 26, 2018

Comments of Deepwater Wind, LLC July 26, 2018 STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES Docket No. QX18040466 In the Matter of Offshore Wind Renewable Energy Certificate (OREC) Funding Mechanism Comments of Deepwater Wind, LLC July 26, 2018 Deepwater