1 Date: July 1, 2016 Corrigendum 2 uploaded on June 22, 2016 For Auction of s in the Captive Power Plant Sub-sector The following amendments are applicable to the Scheme dated June 22, 2016 for auction of s in the Captive Power Plant Sub-sector. Sl. 1. Clause 2. Clause As appearing in the Scheme dated June 22, 2016 (MTPA) = [ Energy (kcal per annum)] divided by [(10 9 ) multiplied by (the average gross calorific value of a particular grade of coal as specified in Annexure VII)] Energy (kcal per annum) = [ energy requirement Plant (calculated in kcal on the basis the norms set out in Annexure VII)] minus [(annual energy requirement Plant met any other existing coal linkage(s)(in kcal*)) plus (annual energy requirement Plant met any captive coal mine(s) (in kcal)) plus (annual energy requirement Plant met any allocation of coal linkage(s) pursuant to auction process of any lot conducted by CIL under this Scheme and/ or by SCCL (in kcal))] * requirement Plant (in kcal) met any other existing coal linkage(s) shall be calculated on the basis annual contracted quantity (MTPA) = [ Energy (kcal per annum)] divided by [(10 9 ) multiplied by (the gross calorific value of a particular grade of coal as specified in Annexure VII)] Energy (kcal per annum) = [ energy requirement Plant (calculated in kcal on the basis the norms set out in Annexure VII)] minus [(annual energy requirement Plant met any other existing coal linkage(s)(in kcal*)) plus (annual energy requirement Plant met any captive coal mine(s) (in kcal))** plus (annual energy requirement Plant met any allocation of coal linkage(s) pursuant to auction process of any lot conducted by CIL under this Scheme and/ or by SCCL (in kcal))**] * requirement Plant (in kcal) met any other existing coal linkage(s) shall be calculated on the basis annual contracted quantity Page 1 of 6

2 As appearing in the Scheme dated June 22, 2016 under the existing linkage(s) wherein such annual contacted quantity shall be deemed to be of grade of coal, irrespective of actual contracted grade. under the existing linkage(s) wherein such annual contacted quantity shall be deemed to be of grade of coal, irrespective of actual contracted grade. ** All the calculations above on the basis lower limits of that particular Grade s GCV range. 3. Clause Table under Illustration 1 Capacity of End Use Plant Capacity Utilisation Existing Quantity MW (A) 200 (B) 85% TPA (C) 4,200 Capacity of Plant Heat Rate Capacity Utilisation MW (A) 200 kcal/kwh (B) 2,500 (C) 85% Deemed Grade of Allocated Quantity of allocated for the End Use Plant from the Mine TPA (D) 66,667 Existing Quantity Deemed Grade of Allocated TPA (D) 4,200 Page 2 of 6

3 As appearing in the Scheme dated June 22, 2016 Grade of from Mine Average GCV of grade of coal Consumption Norm based on grade of the Plant (based on kcal/ kg Tonne/ MW per annum (E) 4,450 (F) 4,329 TPA (G = A*F) 8,65,800 Quantity of allocated for the Plant from the Mine Grade of from Mine GCV of grade of coal as per Appendix VII TPA (E) 66,667 kcal/ kg (F) 4,300 energy requirement of the Plant Kcal (H = G*E*1000) 38,52,81,00,00,000 Consumption Norm for grade Tonne/ MW per annum (G= B*24*365*C/F) 4,329 energy requirement of the Plant met existing coal linkage Kcal (I = C*E*1000) 18,69,00,00,000 Plant (based on TPA (H = A*G) 8,65,800 Page 3 of 6

4 As appearing in the Scheme dated June 22, 2016 energy requirement of the Plant met captive coal mine Kcal (J = D*E*1000) 2,96,66,81,50,000 energy requirement Plant Kcal (I = H*F*1000) 37,22,94,00,00,000 Energy Average GCV of G8 grade of coal Kcal (K = H-I-J) 35,37,45,18,50,000 kcal/kg (L) 4,900 TPA (M=K/(L*1000)) 7,21,929 MTPA (N=M/10 6 ) energy requirement Plant met existing coal linkage energy requirement Plant met captive coal mine Kcal (J= D*F*1000) 18,06,00,00,000 Kcal (K = E*F*1000) 2,86,66,81,00,000 Page 4 of 6

5 As appearing in the Scheme dated June 22, 2016 Energy Kcal (L = I-J-K) 34,18,21,19,00,000 GCV of G8 grade of coal as per Appendix VII kcal/kg (M) 4,900 TPA (N=L/(M*1000)) 6,97,594 MTPA (O=N/10 6 ) Clause Table under Illustration 2 (based on G8 Allocated Quantity in Lot with G8 grade TPA (A) 7,21,929 TPA (B) 20,000 (based on G8 Allocated Quantity in Lot with G8 grade TPA (A) 6,97,594 TPA (B) 20,000 Page 5 of 6

6 As appearing in the Scheme dated June 22, 2016 Available TPA (C=A-B) 7,01,929 Available TPA (C=A-B) 6,77,594 Average GCV of G8 grade of coal (D) 4,900 GCV of G8 grade of coal as per Appendix VII kcal/kg (D) 4,900 Average GCV of G9 grade of coal (E) 4,600 GCV of G9 grade of coal as per Appendix VII kcal/kg (E) 4,600 (based on G9 TPA (F=C*D/E) 7,47,707 (based on G9 TPA (F=C*D/E) 7,21,785 (based on G9 MTPA (G=F/10 6 ) (based on G9 MTPA (G=F/10 6 ) Page 6 of 6

Coal India Limited. Pre Bid Presentation

Coal India Limited. Pre Bid Presentation Coal India Limited Auction of Coal Linkages in the Sub-sectors of CPP (Phase IV of Tranche II) and Others (Phase III of Tranche II) Pre Bid Presentation This presentation is for ease of understanding of

More information

Corrigendum No. 2 to Standard Tender Document (Schedule III Coal Mines) (For iron and steel, cement and captive power plant sector)

Corrigendum No. 2 to Standard Tender Document (Schedule III Coal Mines) (For iron and steel, cement and captive power plant sector) Corrigendum 2 to Standard Tender (Schedule III Coal Mines) (For iron and steel, cement and captive power plant sector) Date: February 10, 2015 1. The amendments/ additions mentioned in a. Corrigendum to

More information

The Singareni Collieries Company Limited

The Singareni Collieries Company Limited The Singareni Collieries Company Limited Auction of Coal Linkages in the Sub-Sectors of Cement, CPP, and Sponge Iron (Phases I,II, and III respectively of Tranche II) Pre-Bid Presentation This presentation

More information

Auction of Coal Linkage for Non-Regulated Sector Tranche III

Auction of Coal Linkage for Non-Regulated Sector Tranche III Auction of Coal Linkage for Non-Regulated Sector Tranche III List of Frequently Asked s Captive Power Plant Sub-Sector Date: October 17, 2017 1. What are the various subsectors under nonregulated sector?

More information

Coal India Limited. Pre Bid Presentation

Coal India Limited. Pre Bid Presentation Coal India Limited Auction of Coal Linkages in the Cement Sub-Sector Tranche II Pre Bid Presentation This presentation is for ease of understanding of the Scheme by the Bidders. In case of any discrepancies

More information

The Singareni Collieries Company Limited

The Singareni Collieries Company Limited The Singareni Collieries Company Limited Auction of Coal Linkages in the Sub-Sectors of Sponge Iron (Phase III of Tranche I) and Others (Phase IV of Tranche I) Pre-Bid Presentation This presentation is

More information

The Singareni Collieries Company Limited (A Government Company) Auction of Coal Linkages for Non-Regulated Sector Tranche II

The Singareni Collieries Company Limited (A Government Company) Auction of Coal Linkages for Non-Regulated Sector Tranche II Date: January 13, 2016 The Singareni Collieries Company Limited (A Government Company) Auction of Coal Linkages for Non-Regulated Sector Tranche II List of Frequently Asked s Others sub-sector S. 1. What

More information

COAL INDIA LIMITED. Auction of Coal Linkage for Non-Regulated Sector Tranche II

COAL INDIA LIMITED. Auction of Coal Linkage for Non-Regulated Sector Tranche II Date: January 11, 2017 COAL INDIA LIMITED Auction of Coal Linkage for Non-Regulated Sector Tranche II List of Frequently Asked s - Sponge Iron Sub-Sector S. 1. What are the various sub-sectors under non-regulated

More information

COAL INDIA LIMITED. Auction of Coal Linkage of Coking Coal in the Steel sub-sector. Date: April 18, 2017

COAL INDIA LIMITED. Auction of Coal Linkage of Coking Coal in the Steel sub-sector. Date: April 18, 2017 Date: April 18, 2017 COAL INDIA LIMITED Auction of Coal Linkage of Coking Coal in the Steel sub-sector List of Frequently Asked s - Steel Sub-Sector S. 1. What are the various sub-sectors under non-regulated

More information

Coal India Limited. Auction of Coal Linkages to Power Producers/IPP(s) having already concluded long term PPAs under Clause B(ii) of SHAKTI Policy

Coal India Limited. Auction of Coal Linkages to Power Producers/IPP(s) having already concluded long term PPAs under Clause B(ii) of SHAKTI Policy Coal India Limited Auction of Coal Linkages to Power Producers/IPP(s) having already concluded long term PPAs under Clause B(ii) of SHAKTI Policy Pre Bid Presentation This presentation is for ease of understanding

More information

Coal India Limited. Auction of Coal Linkages in the Steel Sub-Sector Coking Coal Auction for Steel Sub-sector. Pre Bid Presentation

Coal India Limited. Auction of Coal Linkages in the Steel Sub-Sector Coking Coal Auction for Steel Sub-sector. Pre Bid Presentation Coal India Limited Auction of Coal Linkages in the Steel Sub-Sector Coking Coal Auction for Steel Sub-sector Pre Bid Presentation This presentation is for ease of understanding of the Scheme by the Bidders.

More information

Auction of Coal Mines for Production of Iron & Steel 5 th Tranche. SCOPE Complex, New Delhi April 24, 2017

Auction of Coal Mines for Production of Iron & Steel 5 th Tranche. SCOPE Complex, New Delhi April 24, 2017 Auction of Coal Mines for Production of Iron & Steel 5 th Tranche SCOPE Complex, New Delhi April 24, 2017 Background Apr 17 Sep 14 Cancellation of allocation of 204 coal blocks by Hon ble Supreme Court

More information

GMR Chhattisgarh Energy Limited

GMR Chhattisgarh Energy Limited Sr. GMR Chhattisgarh Energy Limited 1 RfS - Bid Informati on Sheet 2 RfS - 1.2.2 Ceiling tariff of Rs. 2.82/kWh 1.2.2: The Gross Station Heat Rate (SHR) quoted by Bidder has to be less than or equal to

More information

Knowledge Sharing Platform

Knowledge Sharing Platform To Knowledge Sharing Platform Topics for Discussion Highlight of Performance Coal Marketing in CIL Income tax provisions for Salaried Employee Organisational Structure Coal India Limited 8 Subsidiaries

More information

Coal India Limited. Auction of Coking Coal Linkages in the Others Sub-Sector- Coking Coal Auction. Pre Bid Presentation

Coal India Limited. Auction of Coking Coal Linkages in the Others Sub-Sector- Coking Coal Auction. Pre Bid Presentation Coal India Limited Auction of Coking Coal Linkages in the Others Sub-Sector- Coking Coal Auction Pre Bid Presentation This presentation is for ease of understanding of the Scheme by the Bidders. In case

More information

No.CBA / 1/2017-CBA2-Part(1) Government of India Ministry of Coal ORDER

No.CBA / 1/2017-CBA2-Part(1) Government of India Ministry of Coal ORDER No.CBA2-13011/ 1/2017-CBA2-Part(1) Government of India Ministry of Coal ORDER Shastri Bhawan, New Delhi, Dated the 11` gi February, 2018,2 Subject: Methodology for Auction of Coal Mines/Blocks for sale

More information

Auction of Schedule II Coal Mines

Auction of Schedule II Coal Mines Auction of Schedule II Coal Mines Queries & Responses To Standard Tender Document Dated December 27, 2014 Part V (Iron & Steel, Cement and Captive Power Sector specific queries) Nominated Authority Ministry

More information

COAL DISTRIBUTION AND MARKETING

COAL DISTRIBUTION AND MARKETING Chapter 7 COAL DISTRIBUTION AND MARKETING ANNUAL REPORT 2017-18 Ministry of Coal Coal Distribution and Marketing Coal Distribution and Marketing Allocation of coal to power, cement and steel plants. The

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Order on True-Up for FY 2014-15 & FY 2015-16, Business Plan, Aggregate Revenue Requirement and Tariff for Multi Year Tariff Period from FY 2016-17 to FY 2020-21 for Adhunik Power and Natural Resources

More information

[Insert Name]Coal Mine

[Insert Name]Coal Mine 5 TH TRANCHE OF AUCTION STANDARD TENDER DOCUMENT (AUCTION OF COAL MINES FOR IRON AND STEEL SECTOR) [Insert Name]Coal Mine Nominated Authority Ministry of Coal Government of India New Delhi April 10, 2017

More information

Summary of Tariff Petition for BECL 2 x 250 MW Lignite based Thermal Power Plant at Bhavnagar

Summary of Tariff Petition for BECL 2 x 250 MW Lignite based Thermal Power Plant at Bhavnagar Summary of Tariff Petition for BECL 2 x 250 MW Lignite based Thermal Power Plant at Bhavnagar In terms of sections 61, 62, 64 and 86 of the Electricity Act, 2003, the tariff for the generation and sale

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Order on approval of Business plan and determination of ARR for the control period to (including True up for 2015-16 ) for Tata Power Company Limited (TPCL) Ranchi 19 February 2018 to (including True up

More information

Coal Production, Marketing & Distribution

Coal Production, Marketing & Distribution Chapter-7 Coal Production, Marketing & Distribution 7.1 Coal Production 7.1.1 Coal India Ltd. and its subsidiaries are the major producer of coal. 299.52 Million Tonnes of coal was produced by Coal India

More information

Before the Karnataka Electricity Regulatory Commission, Bangalore. In the matter of Determination of Tariff in respect of Renewable Sources of Energy

Before the Karnataka Electricity Regulatory Commission, Bangalore. In the matter of Determination of Tariff in respect of Renewable Sources of Energy Before the Karnataka Electricity Regulatory Commission, Bangalore Dated 18 th January 2005 Present: 1. K.P. Pandey, Chairman 2. Sri H.S.Subramanya, Member 3. Sri S.D.Ukkali, Member In the matter of Determination

More information

e-auction Schedule Version Number : 1 Date of Hoisting : Apr 23, 2014 Catalog Name:- Spot e-auction of CCL-RAIL Dt: Qty offered 20RAKE

e-auction Schedule Version Number : 1 Date of Hoisting : Apr 23, 2014 Catalog Name:- Spot e-auction of CCL-RAIL Dt: Qty offered 20RAKE e-auction Schedule Seller : CCL Mode : RAIL Version Number : 1 Date of Hoisting : Apr 23, 2014 Catalog Name:- Spot e-auction of CCL-RAIL Dt:30.04.2014 Qty offered 20RAKE Lo t No 1 Source JARANGDIH -I W

More information

ASSAM ELECTRICITY REGULATORY COMMISSION

ASSAM ELECTRICITY REGULATORY COMMISSION ASSAM ELECTRICITY REGULATORY COMMISSION NOTIFICATION The 28th December, 2010 No. AERC.23/2010: In exercise of the powers conferred under Section 61(d), 62(4), 86(1)(b) sub-section (1) of section 181 and

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No. 1, 13th floor, Cuffe Parade, Mumbai 400 005. Tel. No. 022 22163964/ 65/ 69; Fax 022 22163976 E-mail: mercindia@merc.gov.in

More information

Uttar Pradesh Electricity Regulatory Commission

Uttar Pradesh Electricity Regulatory Commission Uttar Pradesh Electricity Regulatory Commission Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696 Dated: 22.3.2010 In exercise of powers conferred under section 181 read with section 9, 61, 86

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, Bittan Market, Bhopal MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No.16 of 2014 PRESENT: Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok Gupta, Member

More information

To [Name & Address of the Assured] Dear Mr./Ms.[ ] Subject: Letter of Assurance

To [Name & Address of the Assured] Dear Mr./Ms.[ ] Subject: Letter of Assurance To [Name & Address of the Assured] Dear Mr./Ms.[ ] Subject: Letter of Assurance Preamble In consideration of the request by [insert name of the applicant and address of the unit/plant] (hereinafter referred

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL under Coal Mines (Special Provisions) Second Ordinance, 2014 and Rules framed SMP No. 50 of 2015 DAILY ORDER (Date of Hearing: 24 th November, 2015)

More information

To [Name & Address of the Assured] Dear Mr./Ms.[ ] Subject: Letter of Assurance

To [Name & Address of the Assured] Dear Mr./Ms.[ ] Subject: Letter of Assurance To [Name & Address of the Assured] Dear Mr./Ms.[ ] Subject: Letter of Assurance Preamble In consideration of the request by [insert name of the applicant and address of the unit/plant] (hereinafter referred

More information

Report of the Comptroller and Auditor General of India on Public Sector Undertakings. for the year ended March 2015

Report of the Comptroller and Auditor General of India on Public Sector Undertakings. for the year ended March 2015 Report of the Comptroller and Auditor General of India on Public Sector Undertakings for the year ended March 2015 Government of Telangana Report No.5 of 2016 TABLE OF CONTENTS SUBJECT Reference to Paragraph(s)

More information

PTP_Intermediate_Syllabus 2012_Jun2014_Set 1

PTP_Intermediate_Syllabus 2012_Jun2014_Set 1 Paper 8: Cost Accounting & Financial Management Time Allowed: 3 Hours Full Marks: 100 Question.1 Section A-Cost Accounting (Answer Question No. 1 which is compulsory and any three from the rest in this

More information

Petition No 1234 of 2017

Petition No 1234 of 2017 No 1234 of 2017 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PRESENT: Hon ble Sri. S. K. Agarwal, Chairman Hon ble Sri. K. K. Sharma, Member IN THE MATTER OF: AND IN THE MATTER OF:

More information

Overview of the framework

Overview of the framework Overview of the framework To meet the infrastructure deficit, the Twelfth Five Year Plan envisages a renewed thrust on investment in infrastructure, particularly in the power sector. The additional thermal

More information

COAL PRODUCTION, MARKETING & DISTRIBUTION

COAL PRODUCTION, MARKETING & DISTRIBUTION Chapter - 7 COAL PRODUCTION, MARKETING & DISTRIBUTION 7.1 COAL PRODUCTION 7.1.1 The Coal production all over India during the period 1st January, 2013 to 31st March 2013 was 173.225 MT. During the period

More information

Prakash Industries Limited

Prakash Industries Limited Prakash Industries Limited People... Prosperity... Progress Q2 & H1 FY18 Result Presentation Disclaimer This presentation and the accompanying slides (the Presentation ), which have been prepared by Prakash

More information

Case No. 27 of In the matter of

Case No. 27 of In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION FOR THE YEAR CASE NO: TP 40 / IN RE THE TARIFF APPLICATION OF

ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION FOR THE YEAR CASE NO: TP 40 / IN RE THE TARIFF APPLICATION OF ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION FOR THE YEAR 2008-09 IN CASE NO: TP 40 / 08-09 IN RE THE TARIFF APPLICATION OF DPSC LIMITED FOR THE YEARS 2008-09, 2009-10 AND 2010-11 UNDER SECTION

More information

Compensatory Tariff Orders and Fine Balancing Act by CERC

Compensatory Tariff Orders and Fine Balancing Act by CERC CARE RESEARCH Compensatory Tariff Orders and Fine Balancing Act by CERC CERC has finally notified the long awaited Compensatory Tariff orders on imported coal based Tata and Adani Mundra projects. With

More information

INFORMATION NOTE ON SUPPORT REQUIREMENT FOR ENERGY GENERATION FROM LOCAL COAL

INFORMATION NOTE ON SUPPORT REQUIREMENT FOR ENERGY GENERATION FROM LOCAL COAL 1 T housand MW Why is electiricity from local coal important? 45 40 35 30 25 20 15 10 5 0 INFORMATION NOTE ON SUPPORT REQUIREMENT It provides base load electricity with security of supply and at lowest

More information

March 16, 2010 BUY HIGH RISK PRICE Rs TARGET Rs.300. APAT (Rs mn) Revenue (Rs mn)

March 16, 2010 BUY HIGH RISK PRICE Rs TARGET Rs.300. APAT (Rs mn) Revenue (Rs mn) ANALYST Ishpreet Batra +91 22 4093 5091 ishpreet.batra@sushilfinance.com Shreyas Bhukhanwala +91 22 4093 5096 shreyas.bhukanwala@sushilfinance.com SALES: Devang Shah +91 22 4093 6060/61 devang.shah@sushilfinance.com

More information

I N V O I C E S U M M A R Y

I N V O I C E S U M M A R Y I N V O I C E S U M M A R Y Send To: SE(RDPPC) Copy To: 220 KV substation Heerapura Ajmer Road Jaipur 302005 (On behalf of Aravali Power Company Pvt. Ltd.) Beneficiary: Bill Date 9-Mar-2017 Sl. No. Bill

More information

Case No.39 of 2012 IN THE MATTER OF. Shri V. P. Raja, Chairman Shri Vijay L. Sonavane, Member ORDER

Case No.39 of 2012 IN THE MATTER OF. Shri V. P. Raja, Chairman Shri Vijay L. Sonavane, Member ORDER Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail: mercindia@mercindia.org.in

More information

I N V O I C E S U M M A R Y

I N V O I C E S U M M A R Y I N V O I C E S U M M A R Y Send To: SE(RDPPC) Copy To: 220 KV substation Heerapura Ajmer Road Jaipur 302005 (On behalf of Aravali Power Company Pvt. Ltd.) Beneficiary: Bill Date 9-Mar-2017 Sl. No. Bill

More information

COMPREHENSIVE PERFORMANCE AWARD SCHEME FOR THERMAL POWER STATIONS

COMPREHENSIVE PERFORMANCE AWARD SCHEME FOR THERMAL POWER STATIONS Revision-3/August 2012 COMPREHENSIVE PERFORMANCE AWARD SCHEME FOR THERMAL POWER STATIONS YEAR 2016-17 - 1 - THERMAL POWER STATIONS PERFORMANCE AWARD SCHEME 1.0 PREAMBLE The incentive award scheme in force

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION Urja Bhawan, Shivaji Nagar, Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION Urja Bhawan, Shivaji Nagar, Bhopal MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION Urja Bhawan, Shivaji Nagar, Bhopal-462 016 (Email: secmperc@sancharnet.in) (Website : www.mperc.org) ORDER Dated : 29 th November 2002 Petition No. 99/2002

More information

A Bucket wheel excavator ANNUAL REPORT

A Bucket wheel excavator ANNUAL REPORT 6 A Bucket wheel excavator Chapter Coal and Lignite Production ANNUAL REPORT 48 Annual Report Ministry of Coal Coal and Lignite Production Coal Demand and Supply There has been a continuous increase in

More information

[Insert Name]Coal Mine

[Insert Name]Coal Mine STANDARD TENDER DOCUMENT (FOR IRON AND STEEL, CEMENT AND CAPTIVE POWER PLANT SECTOR) [Insert Name]Coal Mine Nominated Authority Ministry of Coal Government of India New Delhi Table of Contents 1 Definitions...

More information

Maharashtra State Power Generation Company Limited

Maharashtra State Power Generation Company Limited MSPGCL s Petition for True up of FY 2014-15, Provisional True up for FY 2015-16 and MYT Tariff Petition for the Period from FY 2016-17 to 2019-20 Maharashtra State Power Generation Company Limited Executive

More information

BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION AHMEDABAD. Petition No.1210/2012

BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION AHMEDABAD. Petition No.1210/2012 BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION AHMEDABAD In the Matter of: Petition No.1210/2012 Application under Article 13 (Change in Law) of the Power Purchase Agreement dated 02.02.2007 entered

More information

Limestone Mineral Auction

Limestone Mineral Auction Limestone Mineral Auction Queries & Responses To Tender Document (Notice Inviting Tender dated November 9, 2015) Part I Commissioner of Geology and Mining Industries & Mines Department Government of Gujarat

More information

Comments on proposed amendments in Electricity Rules (with respect to Captive Power Plants) issued by Ministry of Power on 22 nd May 2018

Comments on proposed amendments in Electricity Rules (with respect to Captive Power Plants) issued by Ministry of Power on 22 nd May 2018 Comments on proposed amendments in Electricity Rules (with respect to Captive Power Plants) issued by Ministry of Power on 22 nd May 2018 S No. Existing provision/ Draft amended proposed Modified proposed

More information

CASE No. 102 of In the matter of

CASE No. 102 of In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 SMP No. 50 of 2015 PRESENT: Dr. Dev Raj Birdi, Chairman A. B. Bajpai, Member Alok Gupta, Member

More information

Infomerics Valuation And Rating Pvt. Ltd. Press Release

Infomerics Valuation And Rating Pvt. Ltd. Press Release Press Release Instrument / Facility Non-Convertible Debentures (Proposed) Mangalam Cement Limited April 09, 2018 Amount (Rs. Crore) 250 Total 250 Details of Facilities are in Annexure 1 IVR AA- /Stable

More information

CASE NO. 196 OF In the matter of

CASE NO. 196 OF In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No. 1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022-22163964/65/69 Fax No. 022-22163976 Email: mercindia@merc.gov.in

More information

M O D I F I E D - M O D E L COAL SUPPLY AGREEMENT. BETWEEN [Name of the Subsidiary Company] AND

M O D I F I E D - M O D E L COAL SUPPLY AGREEMENT. BETWEEN [Name of the Subsidiary Company] AND M O D I F I E D - M O D E L COAL SUPPLY AGREEMENT BETWEEN [Name of the Subsidiary Company] AND [Name of the New State Electricity Board/ State GENCo through LOA Route* who has been allocated coal block(s)

More information

CASE No. 38 of Coram. Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member. Adani Power Maharashtra Ltd.

CASE No. 38 of Coram. Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member. Adani Power Maharashtra Ltd. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

C O N T E N T S. Chapter Title Page No. 1. Introduction True-up for FY Review for FY

C O N T E N T S. Chapter Title Page No. 1. Introduction True-up for FY Review for FY C O N T E N T S Chapter Title Page No. 1. Introduction 1-6 2. True-up for FY 2009-10 7-44 3. Review for FY 2010-11 45-81 4. Annual Revenue Requirement for FY 2011-12 83 125 5. Tariff Related Issues 127-130

More information

SECTOR UPDATE KEY HIGHLIGHTS: FY 2011 FINANCIAL RESULTS SITE PHOTOGRAPHS

SECTOR UPDATE KEY HIGHLIGHTS: FY 2011 FINANCIAL RESULTS SITE PHOTOGRAPHS FY 2011 SECTOR UPDATE KEY HIGHLIGHTS: FY 2011 FINANCIAL RESULTS PROJECT UPDATE STRATEGIC PRIORITIES SITE PHOTOGRAPHS 2 Capacity Build up (GW) Peak Demand/Supply (GW) FY 2011 India: World s 6 th largest

More information

Compensatory Tariff Orders...A Fine Balancing Act by CERC

Compensatory Tariff Orders...A Fine Balancing Act by CERC Impact Analysis: Compensatory Tariff Orders...A Fine Balancing Act by CERC March 11, 2014 CERC has finally notified the long awaited Compensatory Tariff orders on imported coal based Tata and Adani Mundra

More information

SIGNIFICANTLY IMPROVED PACKAGE OF COAL ASSETS IN INDONESIA

SIGNIFICANTLY IMPROVED PACKAGE OF COAL ASSETS IN INDONESIA 311 313 Hay Street SUBIACO WA 6008 P: + 61 8 9381 5819 F: + 61 8 9388 3701 ABN: 45 098 448 269 www.panasiacorp.com.au 7 April 2010 The Manager Company Announcements Platform Australian Securities Exchange

More information

For personal use only

For personal use only COAL FE RESOURCES LIMITED QUARTERLY REPORT For the period ended 30 June 2014 Highlights Appointment of Mr. Robert Swarbrick as the Managing Director of the company. Company will focus on acquiring deposits

More information

Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th floor, Cuffe Parade, Mumbai 400 005. Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail: mercindia@mercindia.org.in

More information

No. F.25/TERC/09/204 Dated, 11 th August 2011 TRIPURA ELECTRICITY REGULATORY COMMISSION NOTIFICATION

No. F.25/TERC/09/204 Dated, 11 th August 2011 TRIPURA ELECTRICITY REGULATORY COMMISSION NOTIFICATION No. F.25/TERC/09/204 Dated, 11 th August 2011 TRIPURA ELECTRICITY REGULATORY COMMISSION NOTIFICATION In exercise of the powers conferred under Section 61(d),62(4), 86(1)(b) sub-section (1) of section 181

More information

Hindustan Zinc Limited Results for the Second Quarter and Half Year Ended September 30, 2018

Hindustan Zinc Limited Results for the Second Quarter and Half Year Ended September 30, 2018 Hindustan Zinc Limited Results for the Second Quarter and Half Year Ended September 30, 2018 Record silver production of 172 MT; Board declares Special Interim dividend of 1000%; Ranks 1 st globally in

More information

GOLDEN ENERGY AND RESOURCES 2Q 2017 NET PROFIT SURGES TO US$19.1 MILLION

GOLDEN ENERGY AND RESOURCES 2Q 2017 NET PROFIT SURGES TO US$19.1 MILLION NEWS RELEASE GOLDEN ENERGY AND RESOURCES 2Q 2017 NET PROFIT SURGES TO US$19.1 MILLION - Revenue rose 54.9% to US$139.6 million boosted by broad-based growth in revenue contribution across business divisions

More information

Fuel and Power Purchase Price Adjust Formula Regulations DRAFT

Fuel and Power Purchase Price Adjust Formula Regulations DRAFT Fuel and Power Purchase Price Adjust Formula Regulations DRAFT 2011 No. F.25/TERC/09/ Dated, 30 th March 2011 TRIPURA ELECTRICITY REGULATORY COMMISSION NOTIFICATION In exercise of the powers conferred

More information

SCHEME FOR ISSUANCE OF LETTER OF ASSURANCES(LOA) UNDER NCDP FOR NON SLC(LT) CATEGORY CONSUMERS WITH LAPSED LINKAGES HAVING BIFR REFERRED STATUS.

SCHEME FOR ISSUANCE OF LETTER OF ASSURANCES(LOA) UNDER NCDP FOR NON SLC(LT) CATEGORY CONSUMERS WITH LAPSED LINKAGES HAVING BIFR REFERRED STATUS. SCHEME FOR ISSUANCE OF LETTER OF ASSURANCES(LOA) UNDER NCDP FOR NON SLC(LT) CATEGORY CONSUMERS WITH LAPSED LINKAGES HAVING BIFR REFERRED STATUS. General: As per the Government directives, a scheme is being

More information

Energy Q1 FY 2012 Lighting up the Future 1

Energy Q1 FY 2012 Lighting up the Future 1 Energy Q1 FY 2012 Lighting up the Future 1 SECTOR UPDATE KEY HIGHLIGHTS FINANCIAL RESULTS PROJECT UPDATE STRATEGIC PRIORITIES SITE PHOTOGRAPHS 2 Capacity Build up (GW) Peak Demand/Supply (GW) Q1 FY 12

More information

Q1 FY 2010 Net Sales at Rs. 2,541 million Operating profit stands at Rs. 336 million Net Profit stands at Rs. 101 million EPS at Rs. 0.

Q1 FY 2010 Net Sales at Rs. 2,541 million Operating profit stands at Rs. 336 million Net Profit stands at Rs. 101 million EPS at Rs. 0. Registered Office: 11, Ekamra Kanan, Nayapalli, Bhubaneswar 751 015, Orissa Corporate Office: VISA Steel Limited, Brooke House, 2nd Floor, 9 Shakespeare Sarani, Kolkata 700071 Q1 FY 2010 Net Sales at Rs.

More information

MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED (MSPGCL/MAHAGENCO)

MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED (MSPGCL/MAHAGENCO) MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED (MSPGCL/MAHAGENCO) PETITION FOR CAPITAL COST AND TARIFF DETERMINATION FOR FY 2012-13 TO FY 2015-16 INCLUDING TRUE UP FOR FY 2012-13 &FY 2013-14 OF BHUSAWAL

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI No. Dated 6 th December, 2013 DRAFT NOTIFICATION In exercise of powers conferred under section 178 of the Electricity Act, 2003 (36 of 2003) read with

More information

Postal Test Paper_P8_Intermediate_Syllabus 2016_Set 4 Paper 8- Cost Accounting

Postal Test Paper_P8_Intermediate_Syllabus 2016_Set 4 Paper 8- Cost Accounting Paper 8- Cost Accounting Academics Department, The Institute of Cost Accountants of India (Statutory Body under an Act of Parliament) Page 1 Paper 8 - Cost Accounting Full Marks :100 Time allowed: 3 hours

More information

Coal Swaps Daily Methodology Latest Update: August 2013

Coal Swaps Daily Methodology Latest Update: August 2013 Coal Swaps Daily Methodology Latest Update: August 2013 General Methodology 01 Spot Close Assessments 02 Indices 02 Assessment Window 02 ICIS Monthly Physical Coal Indices 02 Assessed Periods 03 Conversion

More information

The Bihar Gazette E X T R A O R D I N A R Y PUBLISHED BY AUTHORITY BIHAR ELECTRICITY REGULATORY COMMISSION, PATNA

The Bihar Gazette E X T R A O R D I N A R Y PUBLISHED BY AUTHORITY BIHAR ELECTRICITY REGULATORY COMMISSION, PATNA REGISTERED NO. PT-40 The Bihar Gazette E X T R A O R D I N A R Y PUBLISHED BY AUTHORITY 7 VAISHAKHA 1929 (S) (NO. PATNA 426) PATNA, FRIDAY 27TH APRIL 2007 BIHAR ELECTRICITY REGULATORY COMMISSION, PATNA

More information

Prakash Industries Limited

Prakash Industries Limited Prakash Industries Limited People... Prosperity... Progress Q1FY18 Result Presentation Disclaimer This presentation and the accompanying slides (the Presentation ), which have been prepared by Prakash

More information

M O D I F I E D - M O D E L COAL SUPPLY AGREEMENT. BETWEEN [Name of the Subsidiary Company] AND

M O D I F I E D - M O D E L COAL SUPPLY AGREEMENT. BETWEEN [Name of the Subsidiary Company] AND M O D I F I E D - M O D E L COAL SUPPLY AGREEMENT BETWEEN [Name of the Subsidiary Company] AND [Name of the New State Electricity Board/ State GENCo through LOA Route*] (*Also applicable against LOA issued

More information

state the objectives of variance analysis understand the linkage between individual variances and the difference between budgeted and actual profit

state the objectives of variance analysis understand the linkage between individual variances and the difference between budgeted and actual profit 1 INTRODUCTION In this lesson we explain the objective of analysis and provide a practical example of how the difference between budgeted and actual profit can be broken down into its constituent elements

More information

Subscribe to Coal India IPO

Subscribe to Coal India IPO Subscribe to Coal India IPO ETHICAL WEALTH CITY INVESTMENT SERVICE PVT LTD, 12/27, MADDOX STREET, CHOOLAI, CHENNAI-112 Page 1 Subscribe to Coal India IPO The biggest ever Initial Public Offer opens today

More information

MODEL COAL SUPPLY AGREEMENT FOR SUPPLY FROM CIL SOURCES TO GOVT./STATE POWER UTILITIES UNDER NCDP

MODEL COAL SUPPLY AGREEMENT FOR SUPPLY FROM CIL SOURCES TO GOVT./STATE POWER UTILITIES UNDER NCDP MODEL COAL SUPPLY AGREEMENT FOR SUPPLY FROM CIL SOURCES TO GOVT./STATE POWER UTILITIES UNDER NCDP [29/05/2009] Under the New Coal Distribution Policy (NCDP) issued by Government in October 2007, coal supply

More information

Government of India Ministry of Power PROPOSED COMPREHENSIVE AWARD SCHEME FOR POWER SECTOR ( ) Central Electricity Authority New Delhi

Government of India Ministry of Power PROPOSED COMPREHENSIVE AWARD SCHEME FOR POWER SECTOR ( ) Central Electricity Authority New Delhi Government of India Ministry of Power PROPOSED COMPREHENSIVE AWARD SCHEME FOR POWER SECTOR (2007-08) Central Electricity Authority New Delhi October, 2008 INDEX Sl. No. Contents Page No. Proposed Comprehensive

More information

TCS Provision at a Glance for FY

TCS Provision at a Glance for FY TCS Provision at a Glance for FY 2017-18 Who is Liable to Collect TCS As per Section 206C(1), Every Person being a seller of Goods of nature specified in table below shall, At the time of debiting to the

More information

TENDER DOCUMENT FOR PSDF SUPPORT TO STRANDED GAS BASED PLANTS (PHASE 1)

TENDER DOCUMENT FOR PSDF SUPPORT TO STRANDED GAS BASED PLANTS (PHASE 1) TENDER DOCUMENT FOR PSDF SUPPORT TO STRANDED GAS BASED PLANTS (PHASE 1) Tender Document No. 4/2/2015-Th-I (SGP) dated April 24, 2015 Nodal Authority Ministry of Power Government of India New Delhi 24 April

More information

MPERC TARIFF FILING FORMS UNIT -1 (TRUE UP PETITION) (For Financial Years: & )

MPERC TARIFF FILING FORMS UNIT -1 (TRUE UP PETITION) (For Financial Years: & ) MPERC TARIFF FILING FORMS UNIT -1 (TRUE UP PETITION) (For Financial Years: 2017-18 & 2018-19) FORM-TPS-1 SUMMARY SHEET Place Anuppur, Madhya Pradesh S. No. Particulars Remarks 2017-18 2018-19 (1) (2) (3)

More information

FORM A. [See rule 7 (2)(b) and 13(1)] ALLOTMENT ORDER IN CASE THE ALLOTTEE IS NOT THE PRIOR ALLOTTEE

FORM A. [See rule 7 (2)(b) and 13(1)] ALLOTMENT ORDER IN CASE THE ALLOTTEE IS NOT THE PRIOR ALLOTTEE FORM A [See rule 7 (2)(b) and 13(1)] ALLOTMENT ORDER IN CASE THE ALLOTTEE IS NOT THE PRIOR ALLOTTEE Office of the nominated authority constituted under section 6 of the Coal Mines (Special Provisions)

More information

DECEMBER 2014 QUARTERLY REPORT

DECEMBER 2014 QUARTERLY REPORT 30 January 2015 ASX Announcement DECEMBER 2014 QUARTERLY REPORT Paringa Resources Limited ( Paringa or Company ) (ASX:PNL) is pleased to present its quarterly report for the period ending 31 December 2014.

More information

Gujarat Mineral Development Corporation (GMDC) BID DOCUMENT FOR SELECTION OF MINE DEVELOPER AND OPERATOR (MDO) FOR DEVELOPMENT AND OPERATION OF THE

Gujarat Mineral Development Corporation (GMDC) BID DOCUMENT FOR SELECTION OF MINE DEVELOPER AND OPERATOR (MDO) FOR DEVELOPMENT AND OPERATION OF THE Gujarat Mineral Development Corporation (GMDC) BID DOCUMENT FOR SELECTION OF MINE DEVELOPER AND OPERATOR (MDO) FOR DEVELOPMENT AND OPERATION OF THE MORGA II COAL BLOCK e -Tender No.: MORGA II/2010-11 Cost

More information

Clarifications on the Queries of PRE-BID of Tender # CIL/C2D/Cart Explo & Accy/ /293 dated

Clarifications on the Queries of PRE-BID of Tender # CIL/C2D/Cart Explo & Accy/ /293 dated Clarifications on the Queries of PRE-BID of Tender # CIL/C2D/Cart Explo & Accy/2017-19/293 dated 14.02.2017 In consideration of the merits of the suggestions / representations received, before, during

More information

Integrated Single Electricity Market (I-SEM)

Integrated Single Electricity Market (I-SEM) Integrated Single Electricity Market (I-SEM) Balancing Market Principles Code of Practice SEM-17-049 11 th July 2017 COMPLEX BID OFFER DATA IN THE I-SEM BALANCING MARKET 1 I. INTRODUCTION 1. This Code

More information

For personal use only

For personal use only Kangaroo Resources Limited ABN: 38 120 284 040 ASX Code: KRL 29 December 2010 KANGAROO UNVEILS $277M TRANSACTION TO BECOME LEADING INDONESIAN COAL PRODUCER ACQUIRES WORLD-SCALE THERMAL COAL ASSET AND FORGES

More information

China Sourcing Update

China Sourcing Update Fung Business Intelligence China Sourcing Update February 28, 2018 Energy Costs 1. Crude prices rise and then retreat in January In line with the movement of global crude prices, China s crude prices trended

More information

Goods & Service Tax: Clarification required on various issues under Business Processes on GST. Date:

Goods & Service Tax: Clarification required on various issues under Business Processes on GST. Date: Goods & Service Tax: Clarification required on various issues under Business Processes on GST Date: 31-10-2015 GST-Export of Goods: Obtaining non-duty paid inputs & exporting Final Product without payment

More information

TENDER DOCUMENT FOR PSDF SUPPORT TO STRANDED GAS BASED PLANTS (PHASE II)

TENDER DOCUMENT FOR PSDF SUPPORT TO STRANDED GAS BASED PLANTS (PHASE II) TENDER DOCUMENT FOR PSDF SUPPORT TO STRANDED GAS BASED PLANTS (PHASE II) Tender Document No. 4/33/ 2015-Th-I (SGP)dated August 31, 2015 Nodal Authority Ministry of Power Government of India New Delhi 02

More information

Section - 206C, Income-tax Act,

Section - 206C, Income-tax Act, 1 of 8 29-Feb-16 2:27 PM Section - 206C, Income-tax Act, 1961-2015 57 [BB. Collection at source Profits and gains from the business of trading in alcoholic liquor, forest produce, scrap, etc. 58 59 206C.

More information

PRAKASH INDUSTRIES LIMITED

PRAKASH INDUSTRIES LIMITED PRAKASH INDUSTRIES LIMITED People Prosperity Progress INVESTOR PRESENTATION Q1 FY19 DISCLAIMER This presentation and the accompanying slides (the Presentation ), which have been prepared by Prakash Industries

More information

Before the. Case No. 115 of In the matter of

Before the. Case No. 115 of In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Email: mercindia@merc.gov.in Website: www.mercindia.org.in/ www.merc.gov.in

More information

COAL AND LIGNITE PROJECTS

COAL AND LIGNITE PROJECTS COAL AND LIGNITE PROJECTS Chapter-6 6. COAL PROJECTS APPRAISAL & MONITORING 6.. Onbeing conferred the Maharatna status, Coal India Limited (CIL) is now empowered to sanction/approve and implement all its

More information