1 District of Clearwater 2018 Utility Rate Review Janice Aver May 2018

2 Table of Contents BACKGROUND... 1 FULL COST OF SERVICE... 2 OPERATIONS... 3 CAPITAL... 5 RESERVES RATES RECOMMENDATIONS APPENDICES... 19

3 Background The District of Clearwater is committed to improving their asset management practices in an ongoing manner and to further this goal, undertook this review to determine the full cost of service for both water and sewer operation and to recommend what the required rates are to fully fund these services on a sustainable basis. The objective was to review and recommend new rates for water and sewer services based on the following: Full cost recovery of system operating costs Full cost of capital infrastructure requirements Reserve contributions required for long term maintenance and replacement of all related assets To complete the analysis, a long term financial model that covers 20 years was developed based on the structure of the existing 2018 Financial Plan. The model was built based on the goal of creating rates that will accomplish full cost recovery of all operating and capital infrastructure requirements. The review looked at existing rate structures and customer types to evaluate the effect of the various rates considered. In undertaking this review consideration was also given to recent grants applications and past studies the District has completed, including studies to determine the overall financial requirements and risk assessment of the infrastructure of water and sewer assets that are critical to the provision of clean water and disposal of wastewater. The reports referenced in preparing this report are: 1. Strategic Priorities Fund Capacity Building Grant Application, District of Clearwater Infrastructure Master Plan, Urban Systems, March Risk Assessment of Buried Linear Infrastructure, True, December 2017 The major consideration that came out of these documents included: 1. Ensure Utility rates capture full costs Urban Systems 2. Continue to regularly inspect the condition of existing sewer assets True Consulting 3. Improve Water Asset inventory and assessment True Consulting and District Grant application

4 The recommendations are also influenced by the fact that the District recently acquired funding to undertake an Asset Management Investment Plan for Water and Sewer which will further inform and improve the financial management of Water and Sewer Services and ensure their long term sustainability. Full Cost of Service To completely understand and calculate the full cost of service, model the following items need to be considered and included in this model: Expenditures Current usage or consumption of services Growth in the community Administration and Operations costs Allocations from other departments New Infrastructure requirements o Planning and subdivision o Development Cost Charges o Development Connection Fees o Non-growth amounts Existing Infrastructure requirements o Replacement schedules o Replacement funding o Operation and Maintenance Non-Rate Revenues Allocations to other departments Fees and Charges Grants and Contributions Other revenue sources The total of expenditures less the total non-rate revenue will provide the amount of revenue required from user rates. See Revenue Requirement, Table 2. 2

5 Operations Expenditures The water and sewer operation and maintenance costs included in the financial model are based on the Districts 2018 budget. The following cost factors were used to create the 20-year model. Electricity expenses were increased annually by 5% All other operating expenses were increased annually by 2% Total water operating expenditures for water in 2018 is $447,000, and projected to increase to $726,000by Total sewer operating expenditures budgeted in 2018 are $182,000, and are projected increase to $207,000 by Sewer expenditures do not increase by much as the current debt will be eliminated by The model does not consider any new debt Table 1: Operating and Maintenance Costs Operating and Maintenance Costs Budget Forecast Water 447, , ,000 Sewer 182, , ,000 Revenue The water and sewer revenue amounts included in the forecast are based on the Districts 2018 budget. The revenue sources were broken into two types, other revenue and user fee revenue. The other revenue sources were used to establish the net revenue requirement funded from water and sewer user rates. Sources of other revenue includes: 3 The forecast for revenue requirements from user fee revenue is $807,000 for water and $242,000 for sewer by 2038 All other revenue was increased annually at 2% to account for inflation

6 There is no forecast for future growth in the District in this review, however future Infrastructure Investment Plans should include forecasts. Option #5 for Water considers borrowing to fund capital program. The revenue increase appears less in sewer due to debt that is retired before Table 2: Rate Revenue Requirement Rate Revenue Requirement Budget Forecast Water 303, , ,000 Sewer 127, , ,000 Table 2a: Rate Revenue Requirement with Borrowing Water only Rate Revenue Requirement - With Borrowing Budget Forecast Water 303, ,000 1,352,000 4

7 Capital Capital Infrastructure The asset information in the review came from the Infrastructure Master Plan - Urban Systems 2013, and the recent Risk Assessment of Buried Linear Infrastructure True Consulting Total length of water assets is 41.5km. The risk assessment of water assets is based on material and age as no condition information was available at time of study. Total length of sewer assets is 7.6km. The risk assessment of sewer assets is based on a combination of condition, material and age. Condition was available for only part of the system. The water assets risk for the entire system is estimated at 30% of assets are at high to very high risk, and 70% at medium to very low risk. The sewer assets risk for the entire system is estimated at 20% of assets being at high to very high risk, and 80% at medium to very low risk. The first water and sewer assets where installed in the 1970 s and have a useful life, of anywhere from 50 years to 100 years depending on material used. Replacement value of water assets is approximately $14,700,000 based on the 2013 Infrastructure Master Plan. Replacement value of sewer assets is approximately $2,300,000 based on the 2013 Infrastructure Master Plan. New or Growth Related Capital This information comes from District staff on future projects related to new capital and/or expansion of the existing systems. Addition of new assets or upgrades to existing systems have not been included in the amounts required for transfers to reserves in the 2013 Infrastructure Master Plan. These amounts will increase the overall cost of replacement of the assets and therefore the required annual contributions to the reserves. The sewer system is projected to be upgraded and expanded to include the Dutch Lake area for an estimated cost of $3,110,000. 5

8 The water system is projected to be upgraded to include a Universal Water Meter Program at an estimated cost of $2,500,000. Water Capital Projects Table 3: Water Capital Projects PROJECT NAME Location From To Year AMOUNT Russell Creek Intake - Replace Screens and Intake 2018 $100,000 Replace PRV Clearwater Station Road at Swanson Road 2019 $120,000 New 250 mm MOld Hwy 5 Camp Two Rd. Ex. 250 mm Main on Old Hwy $459,000 New PRV Clearwater Village Road at Norfolk 2021 $200,000 New 250 mm MSunshine Valley Rd $198,000 Water Main Replacement Allowance 2029 $410,560 Water Main Replacement Allowance 2030 $410,560 New ReservoirCamp Two Rd $900,000 New 300 mm WCamp Two RdHwy 5 New Reservoir 2030 $712,500 Water Main Replacement Allowance 2031 $410,560 New 300 mm MOld Hwy 5 Well No.1 Hwy $675,000 Water Main Replacement Allowance 2032 $666,267 New 250 mm MPark Dr. Hwy 5 Norfolk Rd $1,044,000 Russell Creek Booster Station - Replace Pumps 2032 $25,000 Russell Creek Intake - Replace Pumps 2032 $30,000 Water Main Replacement Allowance 2033 $666,267 Water Main Replacement Allowance 2034 $749,887 Water Main Replacement Allowance 2035 $749,887 New 300 mm MWest of ClearwEden Rd. Archibald Rd $145,000 Water Main Replacement Allowance 2036 $362,336 Water Main Replacement Allowance 2037 $362,336 Russell Creek Intake - Replace Chlorination System 2037 $25,000 Russell Creek Intake - Replace Electrical & Controls 2037 $95,000 Russell Creek Booster Station - Replace Electrical & Controls 2037 $110,000 Water Main Replacement Allowance 2038 $412,359 Water Main Replacement Allowance 2039 $164,844 Water Main Replacement Allowance 2040 $164,844 Archibald Reservoir - Replace Electrical & Controls 2040 $30,000 New PRV Lodge Dr (incl. Piping to Grizzly Heights) 2040 $300,000 Universal Water Meter Program $2,500,000 Water Main Replacement Allowance 2041 $81,224 Water Main Replacement Allowance 2042 $81,224 $13,361,656 * source: Infrastruture Master Plan, Urban Systems

9 Sewer Capital Projects Table 4: Sewer Capital Projects That policy be set to direct what a reasonable amount of total capital reserve should be based on current asset state and condition. That policy be set to direct what a reasonable amount of total capital reserve should be based on current asset state and condition. Sewer Project Description Year Amount Sewer Main Replacement Allowance 2029 $63,585 Hospital Pump Station - Replace Pumps 2030 $15,000 Sewer Main Replacement Allowance 2030 $63,585 WWTP - Upgrade Cell #2 to Complete Mix Tank + add more RI Basins 2030 $11,850 SCADA Upgrades - Eden Road Lift Station 2018 $158,620 SCADA Upgrades - Clearview Egram Homes Lift Station estimate 2019 $175,000 Upgrades - Expansion to Dutch Lake Area TBD $3,110,000 Sewer Main Replacement Allowance 2031 $63,585 Sewer Main Replacement Allowance 2032 $63,585 Sewer Main Replacement Allowance 2033 $63,585 Sewer Main Replacement Allowance 2034 $63,585 Sewer Main Replacement Allowance 2035 $82,004 Eden Road Pump Station - Replace Pumps 2035 $15,000 Sewer Main Replacement Allowance 2036 $18,418 Sewer Main Replacement Allowance 2037 $18,418 Sewer Main Replacement Allowance 2038 $18,418 Sewer Main Replacement Allowance 2039 $18,418 Sewer Main Replacement Allowance 2040 $18,418 Sewer Main Replacement Allowance 2041 $18,418 $4,059,495 * source: Infrastruture Master Plan, Urban Systems 2013 Development Cost Charges Development Cost Charges are intended to facilitate development by providing a method to finance capital projects related to roads, drainage, sewers, water and parkland. In 2015 the District adopted a Development Cost Charge Bylaw to provide funding to water and sewer projects which are specifically related to new development. Those projects related to specific area will receive a portion of funding from new homes and other development. The following table shows the calculation and total amount of revenue to be collected through DCC s. 7

10 Table 5: Water and Sewer DCC Projects Water DCC Projects Total DCC Total Estimated Design Cost per Population Benefit to New Cost Population Capita Increase Development Water supply well #1 replacement $ 2,863, $ $ 283, mm from well#1 to Hwy 5 $ 900, $ $ 89, mm from Hwy 5 to Eden Rd. $ 460, $ $ 45, mm from Eden Rd. to Archibald Rd. $ 580, $ $ 57,446 Total $ 4,803,000 $ 475,713 Municipal Assist Factor 1% $ 4,757 DCC Recoverable $ 470,956 Less CEC Reserves $ 39,222 $ 431,734 New Percent Sewer DCC Projects Development Aportioned to Total Estimated Total Capacity New Benefit to New Cost Capacity required Development Development New headworks/screening facility $ 483, % $ 45,400 Standby power $ 105, % $ 33,500 Convert cell 1 and add R1 capacity $ 1,015, % $ 206,000 Total $ 1,603,000 $ 284,900 Municipal Assist Factor 1% $ 2,849 DCC Recoverable $ 282,051 Less CEC Reserves $ 34,308 $ 247,743 * source: Development Cost Charge - Bylaw 127 Technical Appendix, True Consulting 2014 The existing DCC bylaw was completed in early 2015 and should be reviewed to determined if new projects can be partially funded through this option. Capital Maintenance This information comes from the District s current 2018 budget and makes no assumption that the amounts are sufficient to maintain assets in adequate operating condition over time. Once the Infrastructure Investment Plan is completed that information can be used to help set optimum levels of maintenance to keep assets in the best operating condition over their useful life. These amounts are currently funded through annual revenue. The risk of not providing adequate maintenance is that assets may fail or not last for their full useful life, requiring earlier than anticipated replacement or even increased costs to maintain. 8

11 9 Annual maintenance and small equipment for water assets in 2018 budget is $122,000, this has been forecast at 2% increase annually to account for inflation. Annual maintenance and small equipment for sewer assets in 2018 budget is $30,000, this has been forecast to increase at 2% per year to account for inflation

12 Reserves The forecast for reserves requirements is taken from information contained in the 2013 Infrastructure Master Plan. The twenty year (20) forecast will reduce the annual effect of rate increases. 10 The requirement for water asset capital reserve contribution was calculated at $260,000 annually (as identified in the Infrastructure Master Plan, Urban System 2013) The requirement for sewer asset capital reserve was calculated at $50,000 annually (as identified in the Infrastructure Master Plan, Urban System 2013) As the state and condition of assets change over time, and as new assets are added or the expansion of systems occur, the amounts required to fund a long term financial model will have to be modified accordingly. Even though the current risk assessment shows that annual requirements may be less than originally calculated, no change was made based on this information. Further information is required before a reasonable calculation could be made. Some of the information that is needed to update required reserve contributions will include: Current state and conditional of all water and sewer assets. Growth estimates which will inform required system upgrades and additions to existing assets. Confirmation of all existing asset inventory. Based on the current twenty (20) year forecast the reserve funds for both water and sewer will not receive sufficient transfer to keep pace with the projects planned. The options are to borrow, apply for grants and/or increase transfers to reserves. Table 6: Projected Reserve Balances Projected Capital Reserve Balances Budget Forecast Water 590, ,000 (8,522,000) Sewer 163, ,000 1,387,000 The alternate scenario would be to borrow the funds to complete the capital projects:

13 Table 7: Projected Reserve Fund Balance with Borrowing Projected Capital Reserve Balances - with Borrowing Budget Forecast Water 590, ,000 1,634,000 While this option will fund capital projects it does add additional cost for debt payment: Table 8: Projected Borrowing Projected Total Borrowing Total Debt Incurred Annual 2019 to 2038 Water 426,000 8,520,000 The annual costs of repaying this debt would need to be recovered through user fee revenue which would further increase the revenue requirement: Table 9: Rate Revenue requirement with Borrowing Rate Revenue Requirement - With Borrowing Budget Forecast Water 303, ,000 1,352,000 These debt costs would substantially increase the rate for water user rates, while sewer user rates are not affected as there is no requirement to borrow long term funds. This is due to the size of the sewer capital program compared to water capital program which is far more substantial. 11

14 Rates The existing rate structure for the District takes two forms 1) a flat rate parcel tax that was implemented to help cover costs of Capital reinvestment and 2) a user rate fee intended to cover costs of operations, maintenance and repair of capital infrastructure. These fees and charges are set by bylaw and must be set in relation to the cost of providing the services. The current rates do not fully fund the long term financial requirements of the water and sewer utilities. This means that Property taxes and other revenue sources could in fact be subsidizing the water and sewer services. To be more transparent and ensure the long tern financial sustainability of these services rates must be set to cover 100% of the cost of managing these utilities. It is easier to justify increases in user fees which are set to recover costs than it is to justify why property taxes may increase. The proposed rate structure ensures the District will over time begin to recover all costs related to water and sewer utilities on an annual basis, including a provision to set aside reserves for asset repair and replacement. Recommended Rate Increase That the first step in moving toward a full cost recovery rate structure is to begin increasing rates on an incremental basis. The recommended model considers an initial rate increase of 5% per year for Water and 10% for Sewer until further information is available. To help keep rate increases more stable in the years going forward it is recommended that a Rate Stabilization Reserve be created. Any surplus or short fall created in any year would go to a new rate stabilization reserve. Other Rates Options Considered Other Options included as follows: Option 1: (recommended) Increase rates for water by 5% per year and for sewer by 10% per year, and increase contributions to reserve to optimal levels over twenty (20) years. Pro s 12

15 13 Con s Moves to full cost of operating costs gradually over a twenty-year period. Rate increase is less of an impact in first year than other options and the increase remains constant over the twenty years. Does not address funding for Capital Program for Water and minimal amounts for Sewer. Only able to slowly increase contributions to reserves which brings more risks as funds may not be available when assets need repair or assets fail as they are not repaired. Option 2: Increase rates for water by 8% per year and for sewer by 5% per year. Increase annual contributions to reserve to optimal levels over ten (10) years, $260,000 for water and $50,000 for sewer. Pro s Con s Moves to full cost of operating costs gradually over a ten-year period. Rate increase is lower than other options in years 11 through 20. Provides capital funding sooner than other options. Rate increase is more of an impact than option #1 in first ten years Option 3: Increase 2019 rates for water by 75%, then 2% annually and for 2019 sewer rates by 50% and then 1% per year. Increase annual contributions to reserve to optimal levels over twenty (20) years, $260,000 for water and $50,000 for sewer. Pro s Con s Option 4: Status Quo, no increase to rates or to reserve contributions. Pro s There is no increase in current rates.

16 Con s This option is unsustainable as it does not cover costs of operating or funds for capital requirements. Option 5: (Water Only) Increase rates for water by 9% per year to cover full cost of operating and the cost to borrow for capital program. Pro s Con s Moves to full cost of operating costs gradually over a twenty-year period. Includes borrowing which provides Funds for capital program. Only able to slowly increase contributions to reserves which brings more risk as funds may not be available when assets need repair or assets fail as they are not repaired. Rate increase is more per year than other options. Table 9: Water Rate Option Summary Water Rate Options Option #1 Option #2 Option #3 Option #4 Option #5 Increase reserve Increase reserve Increase reserve Status Quo Increase reserve contribution over contribution over Contribution Now contribution 20 years 10 years over 20 years Increase rates gradually till full cost achieved Increase rates gradually till full cost achieved Increase rates in first year to cover full cost No Increases Increase rates gradually till full cost achieved and borrow for capital program First year rate increase 5% 8% 75% 0% 9% Year 2 to 10 increase 5% 8% 2% 0% 9% Year 11 to 20 increase 5% 2% 2% 0% 9% Operating reserve balance $ 745,000 $ 679,000 $ 640,000 $ (2,180,000) $ 431,000 (unfunded operating) Capital reserve balance $ (8,522,000) $ (7,222,000) $ (6,052,000) $ (11,251,893) $ 1,634,000 (unfunded capital) 14

17 Table 10: Sewer Rate Option Summary Sewer Forecast Options Option #1 Option #2 Option #3 Option #4 Increase reserve Increase reserve Increase reserve Status Quo contribution over contribution over contribution Now 20 years 10 years Increase rates gradually till full cost achieved Increase rates gradually till full cost achieved Increase rates in first year to cover full cost No Increases First year rate increase 10% 5% 50% 0% Annaul Rate Increase 10% 5% 1% 0% Year 11 to 20 Annual Increase 5% 2% 1% 0% Operating reserve balance $ 301,000 $ 244,000 $ 426,000 $ (544,000) (unfunded operating) Capital reserve balance $ 1,387,000 $ 348,000 $ 450,000 $ (549,000) (unfunded capital) New Rate Structure A further option to consider is whereby the District could consider revamping its existing rate structure and consider other models. These other models could include a combination of the following: Metered system Combination flat rate and metered rate Flat rate for capital maintenance and replacement and separate flat rate for usage These are valid and operational models which exist in other communities, however this decision should be delayed until further information is made available through the Asset Management Infrastructure Investment plan. 15

18 Recommended Water Rates Table 11: Option #1 The recommended user rates are forecast to increase by 5% as noted in the table below: Rate Schedule RESIDENTIAL Existing Rates New Rates Rate Increase Impact Monthly Quarterly Monthly Quarterly Annual Monthly Quarterly Annual A Single Family Dwelling Additional self contained dwelling sharing one connection B Duplex, apartment, mobile home or other multiple dwelling per unit C Senior citizen home - per unit INSTITUTIONAL A Place of Worship B School, per Classroom C Public Hall D Hospital, per bed COMMERCIAL A Restaurant B Coffee Shop or drive In C Beauty Parlour D Super market, meat market or bakery E Medical, dental or veterinary Offices F Beer parlour, neighbourhood pub G Liquor lounge H Medical, hotel living quarters Motel, hotel per unit I Laundromat, per washer J Car wash per bay K Pet grooming facility L Garage, service station up to two bays additional bay per bay O Commercial enterprise not otherwise sepecified M Commercial enterprise attached to a residential connected dwelling N Commercial enterprise, sharing with another commercial enterprise P CNR Station SEASONAL Campground with site tap facilities A per site B Sports field, or school grounds per acre

19 Recommended Sewer Rates Table 12: Option #1 - The proposed user rates is to increase by 10% as noted in the table below: RESIDENTIAL Existing Rates New Rates Rate Increase Impact Monthly Quarterly Monthly Quarterly Annual Monthly Quarterly Annual A Single Family Dwelling Additional self contained dwelling sharing one connection B Duplex, apartment, mobile home or other multiple dwelling per unit C Senior citizen home - per unit INSTITUTIONAL A Place of Worship B School, per Classroom C Public Hall D Hospital, per bed COMMERCIAL A Restaurant B Coffee Shop or drive In C Beauty Parlour D Super market, meat market or bakery E Medical, dental or veterinary Offices F Beer parlour, neighbourhood pub G Liquor lounge H Medical, hotel living quarters Motel, hotel per unit I Laundromat, per washer J Car wash per bay K Pet grooming facility L Garage, service station up to two bays additional bay per bay O Commercial enterprise not otherwise sepecified M Commercial enterprise attached to a residential connected dwelling N Commercial enterprise, sharing with another commercial enterprise P CNR Station SEASONAL Campground with site tap facilities A per site B Sports field, or school grounds per acre

20 Recommendations That Council adopt a policy that outlines an incremental basis of moving to a full cost recovery model for setting rates for water and sewer. That the District budget be reviewed to ensure that 100% of costs related to water and sewer services are included in costs. That policy be set to direct what a reasonable amount of total operating reserve should be based on budgeted annual operating expenses. That policy be set to direct what a reasonable amount of total capital reserve should be based on current asset state and condition, and That annual transfers to reserves be set to fully fund future requirements for asset replacement and asset additions. That the District develop a Rate Stabilization Fund by policy or bylaw to assist in providing funding through incremental rate increases required in future years. That a further review of rates be done after the completion of the Asset Management Infrastructure Investment Plan. 18

21 Appendices Appendix A Water Forecasts for Rate Options Water Forecast Option # FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST Operating Expenditure Administrative Salaries and Wages 184, , , , , , , , , , ,318 General Expenses 22,646 23,099 23,561 24,032 24,513 25,003 25,503 26,013 26,533 27,064 32,991 Contracted Services 37,485 38,235 38,999 39,779 40,575 41,386 42,214 43,058 43,920 44,798 54,609 Materials 4,590 4,682 4,775 4,871 4,968 5,068 5,169 5,272 5,378 5,485 6,687 Vehicle Overhead 61,692 62,925 64,184 65,468 66,777 68,113 69,475 70,864 72,282 73,727 89,873 Operations Sample Testing 13,770 14,045 14,326 14,613 14,905 15,203 15,507 15,817 16,134 16,456 20,060 Works Equipment 3,743 3,818 3,895 3,973 4,052 4,133 4,216 4,300 4,386 4,474 5,453 Reservoir 1,847 1,909 1,973 2,040 2,109 2,181 2,257 2,335 2,417 2,502 3,575 Treatment 21,888 22,432 22,991 23,568 24,162 24,774 25,404 26,054 26,724 27,415 35,662 Pump House Booster Station 73,388 76,674 80,118 83,726 87,506 91,468 95,619 99, , , ,802 Distribution and Connections 19,890 20,288 20,694 21,107 21,530 21,960 22,399 22,847 23,304 23,770 28,976 Hydrants 5,610 5,722 5,837 5,953 6,072 6,194 6,318 6,444 6,573 6,704 8,173 Other and Debt 6, Total Operating Expenses 457, , , , , , , , , , ,179 Capital Expenditures Infrastruture Reinvestment 120, , , , ,359 Capital Program 95,120 95,120 95,120 95,120 95,120 95,120 95,120 95,120 95,120 95,120 95,120 Infrastruture replacement reserves Current Additional 13,000 26,000 39,000 52,000 65,000 78,000 91, , , , ,000 Transfer from reserve (for capital) (215,120) (554,120) (295,120) (95,120) (95,120) (95,120) (95,120) (293,120) (95,120) (95,120) (507,479) Borrowing Grants/Contributions Net Capital Expenses 13,000 26,000 39,000 52,000 65,000 78,000 91, , , , ,000 Total Annual Expenditures 470, , , , , , , , , , ,179 Non Rate Revenues Parcel Taxes 101, , , , , , , , , , ,555 Connections 1,000 1,050 1,103 1,158 1,216 1,276 1,340 1,407 1,477 1,551 2,527 Penalties 4,725 4,961 5,209 5,470 5,743 6,030 6,332 6,649 6,981 7,330 11,940 Return on Investment 1,050 1,103 1,158 1,216 1,276 1,340 1,407 1,477 1,551 1,629 2,653 Grants and Miscellaneous 5,775 6,064 6,367 6,685 7,020 7,371 7,739 8,126 8,532 8,959 14,593 Reserves and Surplus Total Non Rate revenue 113, , , , , , , , , , ,268 RATE REVENUE REQUIREMENT 356, , , , , , , , , , ,911 Rate Increase 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% Revenue from User fees 357, , , , , , , , , , ,121 Short Fall/(Excess) (144) (3,645) (831) 1,299 2,708 3,356 3,202 2, (2,523) (95,210) Transfer (to)fr operating reserve (144) (3,645) (831) 1,299 2,708 3,356 3,202 2, (2,523) (95,210) Water Operating Reserve Opening Balance 322, , , , , , , , , , ,848 Transfer In (Out) 144 3, (1,299) (2,708) (3,356) (3,202) (2,202) (310) 2,523 95,210 Closing Balance 323, , , , , , , , , , ,058 Water Capital Reserve Opening Balance 590, ,880 (140,240) (396,359) (439,479) (469,599) (486,719) (490,838) (679,958) (658,078) (8,274,414) Transfers In/(Out) (202,120) (528,120) (256,120) (43,120) (30,120) (17,120) (4,120) (189,120) 21,880 34,880 (247,479) Closing Balance 387,880 (140,240) (396,359) (439,479) (469,599) (486,719) (490,838) (679,958) (658,078) (623,198) (8,521,893) 19

22 Water Forecast Option # FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST Operating Expenditure Administrative Salaries and Wages 184, , , , , , , , , , ,318 General Expenses 22,646 23,099 23,561 24,032 24,513 25,003 25,503 26,013 26,533 27,064 32,991 Contracted Services 37,485 38,235 38,999 39,779 40,575 41,386 42,214 43,058 43,920 44,798 54,609 Materials 4,590 4,682 4,775 4,871 4,968 5,068 5,169 5,272 5,378 5,485 6,687 Vehicle Overhead 61,692 62,925 64,184 65,468 66,777 68,113 69,475 70,864 72,282 73,727 89,873 Operations Sample Testing 13,770 14,045 14,326 14,613 14,905 15,203 15,507 15,817 16,134 16,456 20,060 Works Equipment 3,743 3,818 3,895 3,973 4,052 4,133 4,216 4,300 4,386 4,474 5,453 Reservoir 1,847 1,909 1,973 2,040 2,109 2,181 2,257 2,335 2,417 2,502 3,575 Treatment 21,888 22,432 22,991 23,568 24,162 24,774 25,404 26,054 26,724 27,415 35,662 Pump House Booster Station 73,388 76,674 80,118 83,726 87,506 91,468 95,619 99, , , ,802 Distribution and Connections 19,890 20,288 20,694 21,107 21,530 21,960 22,399 22,847 23,304 23,770 28,976 Hydrants 5,610 5,722 5,837 5,953 6,072 6,194 6,318 6,444 6,573 6,704 8,173 Other and Debt 6, Total Operating Expenses 457, , , , , , , , , , ,179 Capital Expenditures Infrastruture Reinvestment 120, , , , ,359 Capital Program 95,120 95,120 95,120 95,120 95,120 95,120 95,120 95,120 95,120 95,120 95,120 Infrastruture replacement reserves Current Additional 26,000 52,000 78, , , , , , , , ,000 Transfer from reserve (for capital) (215,120) (554,120) (295,120) (95,120) (95,120) (95,120) (95,120) (293,120) (95,120) (95,120) (507,479) Borrowing Grants/Contributions Net Capital Expenses 26,000 52,000 78, , , , , , , , ,000 Total Annual Expenditures 483, , , , , , , , , , ,179 Non Rate Revenues Parcel Taxes 101, , , , , , , , , , ,555 Connections 1,000 1,075 1,156 1,242 1,335 1,436 1,543 1,659 1,783 1,917 2,337 Penalties 4,838 5,200 5,590 6,010 6,460 6,945 7,466 8,026 8,628 9,275 11,306 Return on Investment 1,075 1,156 1,242 1,335 1,436 1,543 1,659 1,783 1,917 2,061 2,512 Grants and Miscellaneous 5,913 6,356 6,833 7,345 7,896 8,488 9,125 9,809 10,545 11,336 13,818 Reserves and Surplus Total Non Rate revenue 114, , , , , , , , , , ,528 RATE REVENUE REQUIREMENT 369, , , , , , , , , , ,651 Rate Increase 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 2% Revenue from User fees 365, , , , , , , , , , ,211 Short Fall/(Excess) 4,081 3,683 8,396 11,107 11,657 9,872 5,565 (1,464) (11,431) (24,569) (45,560) Transfer (to)fr operating reserve 4,081 3,683 8,396 11,107 11,657 9,872 5,565 (1,464) (11,431) (24,569) (45,560) Water Operating Reserve Opening Balance 322, , , , , , , , , , ,280 Transfer In (Out) (4,081) (3,683) (8,396) (11,107) (11,657) (9,872) (5,565) 1,464 11,431 24,569 45,560 Closing Balance 318, , , , , , , , , , ,840 Water Capital Reserve Opening Balance 590, ,880 (101,240) (318,359) (309,479) (274,599) (213,719) (126,838) (211,958) (73,078) (6,974,414) Transfers In/Out (189,120) (502,120) (217,120) 8,880 34,880 60,880 86,880 (85,120) 138, ,880 (247,479) Closing Balance 400,880 (101,240) (318,359) (309,479) (274,599) (213,719) (126,838) (211,958) (73,078) 91,803 (7,221,893) 20

23 Water Forecast Option # FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST Operating Expenditure Administrative Salaries and Wages 184, , , , , , , , , , ,318 General Expenses 22,646 23,099 23,561 24,032 24,513 25,003 25,503 26,013 26,533 27,064 32,991 Contracted Services 37,485 38,235 38,999 39,779 40,575 41,386 42,214 43,058 43,920 44,798 54,609 Materials 4,590 4,682 4,775 4,871 4,968 5,068 5,169 5,272 5,378 5,485 6,687 Vehicle Overhead 61,692 62,925 64,184 65,468 66,777 68,113 69,475 70,864 72,282 73,727 89,873 Operations Sample Testing 13,770 14,045 14,326 14,613 14,905 15,203 15,507 15,817 16,134 16,456 20,060 Works Equipment 3,743 3,818 3,895 3,973 4,052 4,133 4,216 4,300 4,386 4,474 5,453 Reservoir 1,847 1,909 1,973 2,040 2,109 2,181 2,257 2,335 2,417 2,502 3,575 Treatment 21,888 22,432 22,991 23,568 24,162 24,774 25,404 26,054 26,724 27,415 35,662 Pump House Booster Station 73,388 76,674 80,118 83,726 87,506 91,468 95,619 99, , , ,802 Distribution and Connections 19,890 20,288 20,694 21,107 21,530 21,960 22,399 22,847 23,304 23,770 28,976 Hydrants 5,610 5,722 5,837 5,953 6,072 6,194 6,318 6,444 6,573 6,704 8,173 Other and Debt 6, Total Operating Expenses 457, , , , , , , , , , ,179 Capital Expenditures Infrastruture Reinvestment 120, , , , ,359 Capital Program 95,120 95,120 95,120 95,120 95,120 95,120 95,120 95,120 95,120 95,120 95,120 Infrastruture replacement reserves Current Additional 260, , , , , , , , , , ,000 Transfer from reserve (for capital) (215,120) (554,120) (295,120) (95,120) (95,120) (95,120) (95,120) (293,120) (95,120) (95,120) (507,479) Borrowing Grants/Contributions Net Capital Expenses 260, , , , , , , , , , ,000 Total Annual Expenditures 717, , , , , , , , , , ,179 Non Rate Revenues Parcel Taxes 101, , , , , , , , , , ,555 Connections 1,000 1,020 1,035 1,053 1,072 1,091 1,110 1,129 1,149 1,169 1,390 Penalties 7,875 8,033 8,153 8,296 8,441 8,589 8,739 8,892 9,047 9,206 10,950 Return on Investment 1,750 1,785 1,812 1,843 1,876 1,909 1,942 1,976 2,011 2,046 2,433 Grants and Miscellaneous 9,625 9,818 9,965 10,139 10,317 10,497 10,681 10,868 11,058 11,251 13,383 Reserves and Surplus Total Non Rate revenue 121, , , , , , , , , , ,711 RATE REVENUE REQUIREMENT 596, , , , , , , , , , ,468 Rate Increase 75% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% Revenue from User fees 595, , , , , , , , , , ,310 Short Fall/(Excess) 1,156 (9,172) (9,371) (11,016) (12,559) (13,992) (15,306) (16,492) (17,542) (18,445) (16,842) Transfer (to)fr operating reserve 1,156 (9,172) (9,371) (11,016) (12,559) (13,992) (15,306) (16,492) (17,542) (18,445) (16,842) Water Operating Reserve Opening Balance 322, , , , , , , , , , ,566 Transfer In (Out) (1,156) 9,172 9,371 11,016 12,559 13,992 15,306 16,492 17,542 18,445 16,842 Closing Balance 321, , , , , , , , , , ,408 Water Capital Reserve Opening Balance 590, , , , , , , , ,042 1,096,922 (5,804,414) Transfers In/Out 44,880 (294,120) (35,120) 164, , , ,880 (33,120) 164, ,880 (247,479) Closing Balance 634, , , , , , , ,042 1,096,922 1,261,803 (6,051,893) 21

24 Water Forecast Option # FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST Operating Expenditure Administrative Salaries and Wages 184, , , , , , , , , , ,318 General Expenses 22,646 23,099 23,561 24,032 24,513 25,003 25,503 26,013 26,533 27,064 32,991 Contracted Services 37,485 38,235 38,999 39,779 40,575 41,386 42,214 43,058 43,920 44,798 54,609 Materials 4,590 4,682 4,775 4,871 4,968 5,068 5,169 5,272 5,378 5,485 6,687 Vehicle Overhead 61,692 62,925 64,184 65,468 66,777 68,113 69,475 70,864 72,282 73,727 89,873 Operations Sample Testing 13,770 14,045 14,326 14,613 14,905 15,203 15,507 15,817 16,134 16,456 20,060 Works Equipment 3,743 3,818 3,895 3,973 4,052 4,133 4,216 4,300 4,386 4,474 5,453 Reservoir 1,847 1,909 1,973 2,040 2,109 2,181 2,257 2,335 2,417 2,502 3,575 Treatment 21,888 22,432 22,991 23,568 24,162 24,774 25,404 26,054 26,724 27,415 35,662 Pump House Booster Station 73,388 76,674 80,118 83,726 87,506 91,468 95,619 99, , , ,802 Distribution and Connections 19,890 20,288 20,694 21,107 21,530 21,960 22,399 22,847 23,304 23,770 28,976 Hydrants 5,610 5,722 5,837 5,953 6,072 6,194 6,318 6,444 6,573 6,704 8,173 Other and Debt 6, Total Operating Expenses 457, , , , , , , , , , ,179 Capital Expenditures Infrastruture Reinvestment 120, , , , ,359 Capital Program 95,120 95,120 95,120 95,120 95,120 95,120 95,120 95,120 95,120 95,120 95,120 Infrastruture replacement reserves Current Additional Transfer from reserve (for capital) (215,120) (554,120) (295,120) (95,120) (95,120) (95,120) (95,120) (293,120) (95,120) (95,120) (507,479) Borrowing Grants/Contributions Net Capital Expenses Total Annual Expenditures 457, , , , , , , , , , ,179 Non Rate Revenues Parcel Taxes 99,300 99,300 99,300 99,300 99,300 99,300 99,300 99,300 99,300 99,300 99,300 Connections 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 Penalties 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 Return on Investment 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 Grants and Miscellaneous 5,500 5,500 5,500 5,500 5,500 5,500 5,500 5,500 5,500 5,500 5,500 Reserves and Surplus Total Non Rate revenue 111, , , , , , , , , , ,300 RATE REVENUE REQUIREMENT 346, , , , , , , , , , ,879 Rate Increase 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% Revenue from User fees 340, , , , , , , , , , ,000 Short Fall/(Excess) 6,392 10,394 21,675 33,284 45,233 57,534 70,199 83,242 96, , ,879 Transfer (to)fr operating reserve 6,392 10,394 21,675 33,284 45,233 57,534 70,199 83,242 96, , , Water Operating Reserve Opening Balance 322, , , , , , ,441 78,242 (5,000) (101,676) (1,904,570) Transfer In (Out) (6,392) (10,394) (21,675) (33,284) (45,233) (57,534) (70,199) (83,242) (96,676) (110,517) (274,879) Closing Balance 316, , , , , ,441 78,242 (5,000) (101,676) (212,193) (2,179,449) Water Capital Reserve Opening Balance 590, ,880 (179,240) (474,359) (569,479) (664,599) (759,719) (854,838) (1,147,958) (1,243,078) (10,744,414) Transfers In/Out (215,120) (554,120) (295,120) (95,120) (95,120) (95,120) (95,120) (293,120) (95,120) (95,120) (507,479) Closing Balance 374,880 (179,240) (474,359) (569,479) (664,599) (759,719) (854,838) (1,147,958) (1,243,078) (1,338,198) (11,251,893) 22

25 Water Forecast Option # FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST Operating Expenditure Administrative Salaries and Wages 184, , , , , , , , , , ,318 General Expenses 22,646 23,099 23,561 24,032 24,513 25,003 25,503 26,013 26,533 27,064 32,991 Contracted Services 37,485 38,235 38,999 39,779 40,575 41,386 42,214 43,058 43,920 44,798 54,609 Materials 4,590 4,682 4,775 4,871 4,968 5,068 5,169 5,272 5,378 5,485 6,687 Vehicle Overhead 61,692 62,925 64,184 65,468 66,777 68,113 69,475 70,864 72,282 73,727 89,873 Operations Sample Testing 13,770 14,045 14,326 14,613 14,905 15,203 15,507 15,817 16,134 16,456 20,060 Works Equipment 3,743 3,818 3,895 3,973 4,052 4,133 4,216 4,300 4,386 4,474 5,453 Reservoir 1,847 1,909 1,973 2,040 2,109 2,181 2,257 2,335 2,417 2,502 3,575 Treatment 21,888 22,432 22,991 23,568 24,162 24,774 25,404 26,054 26,724 27,415 35,662 Pump House Booster Station 73,388 76,674 80,118 83,726 87,506 91,468 95,619 99, , , ,802 Distribution and Connections 19,890 20,288 20,694 21,107 21,530 21,960 22,399 22,847 23,304 23,770 28,976 Hydrants 5,610 5,722 5,837 5,953 6,072 6,194 6,318 6,444 6,573 6,704 8,173 Other and Debt 29,000 58,000 87, , , , , , , , ,000 Total Operating Expenses 479, , , , , , , , , ,817 1,306,179 Capital Expenditures Infrastruture Reinvestment 120, , , , ,359 Capital Program 95,120 95,120 95,120 95,120 95,120 95,120 95,120 95,120 95,120 95,120 95,120 Infrastruture replacement reserves Current Additional 13,000 26,000 39,000 52,000 65,000 78,000 91, , , , ,000 Transfer from reserve (for capital) (215,120) (554,120) (295,120) (95,120) (95,120) (95,120) (95,120) (293,120) (95,120) (95,120) (507,479) Borrowing (426,000) (426,000) (426,000) (426,000) (426,000) (426,000) (426,000) (426,000) (426,000) (426,000) (426,000) Grants/Contributions Transfer to reserve for Capital 426, , , , , , , , , , ,000 Net Capital Expenses 13,000 26,000 39,000 52,000 65,000 78,000 91, , , , ,000 Total Annual Expenditures 492, , , , , , , , , ,817 1,566,179 Non Rate Revenues Parcel Taxes 101, , , , , , , , , , ,555 Connections 1,000 1,090 1,188 1,295 1,412 1,539 1,677 1,828 1,993 2,172 5,142 Penalties 4,905 5,346 5,828 6,352 6,924 7,547 8,226 8,967 9,774 10,653 25,220 Return on Investment 1,090 1,188 1,295 1,412 1,539 1,677 1,828 1,993 2,172 2,367 5,604 Grants and Miscellaneous 5,995 6,535 7,123 7,764 8,462 9,224 10,054 10,959 11,945 13,021 30,824 Reserves and Surplus Total Non Rate revenue 114, , , , , , , , , , ,345 RATE REVENUE REQUIREMENT 378, , , , , , , , , ,557 1,351,834 Rate Increase 9% 9% 9% 9% 9% 9% 9% 9% 9% 9% 9% Revenue from User fees 370, , , , , , , , , ,904 1,905,500 Short Fall/(Excess) 7,854 24,269 37,854 48,339 55,429 58,805 58,116 52,979 42,976 27,654 (553,665) Transfer (to)fr operating reserve 7,854 24,269 37,854 48,339 55,429 58,805 58,116 52,979 42,976 27,654 (553,665) Water Operating Reserve Opening Balance 322, , , , , ,208 90,403 32,287 (20,692) (63,668) 431,199 Transfer In (Out) (7,854) (24,269) (37,854) (48,339) (55,429) (58,805) (58,116) (52,979) (42,976) (27,654) 553,665 Transfer to Capital (553,665) Closing Balance 315, , , , ,208 90,403 32,287 (20,692) (63,668) (91,322) 431,199 Water Capital Reserve Opening Balance 590, , , ,641 1,264,521 1,660,401 2,069,282 2,491,162 2,728,042 3,175, ,728 Transfer from operating reserve 553,665 Transfers In/(Out) (202,120) (528,120) (256,120) (43,120) (30,120) (17,120) (4,120) (189,120) 21,880 34,880 (247,479) Borrowing 426, , , , , , , , , , ,000 Closing Balance 813, , ,641 1,264,521 1,660,401 2,069,282 2,491,162 2,728,042 3,175,922 3,636,803 1,633,915 23

26 Appendix B Sewer Forecasts for Rate Options Sewer Forecast Option # BUDGET FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST FORECAST Operating Expenditure Administrative Salaries and Wages 59,825 61,022 62,242 63,487 64,757 66,052 67,373 68,721 70,095 71,497 72,927 88,897 General Expenses 10,785 11,001 11,221 11,445 11,674 11,908 12,146 12,389 12,636 12,889 13,147 16,026 Contracted Services 11,400 11,628 11,861 12,098 12,340 12,587 12,838 13,095 13,357 13,624 13,897 16,940 Materials 3,250 3,315 3,381 3,449 3,518 3,588 3,660 3,733 3,808 3,884 3,962 4,829 Vehicle Overhead 15,573 15,884 16,202 16,526 16,857 17,194 17,538 17,888 18,246 18,611 18,983 23,141 Operations Sewer Sampling 2,000 2,040 2,081 2,122 2,165 2,208 2,252 2,297 2,343 2,390 2,438 2,972 External Equipment Rental 1,670 1,703 1,737 1,772 1,808 1,844 1,881 1,918 1,957 1,996 2,036 2,482 Treatment 10,600 11,064 11,550 12,059 12,592 13,150 13,734 14,347 14,988 15,660 16,365 25,557 Lift Stations 8,700 8,925 9,157 9,396 9,643 9,898 10,161 10,433 10,713 11,003 11,302 14,912 Distribution and Connection 9,000 9,180 9,364 9,551 9,742 9,937 10,135 10,338 10,545 10,756 10,971 13,374 Debt Servicing 48,750 68,093 68,093 19,343 19, Total Expenses 181, , , , , , , , , , , ,129 Capital Expenditures Infrastruture Reinvestment 107,570 18,418 Capital Program 7,570 7,570 7,570 7,570 7,570 7,570 7,570 7,570 7,570 7,570 7,570 Infrastruture replacement reserves - 2,500 5,000 7,500 10,000 12,500 15,000 17,500 20,000 22,500 25,000 50,000 Transfer from reserve (for capital) - (7,570) (7,570) (7,570) (7,570) (7,570) (7,570) (7,570) (7,570) (7,570) (7,570) (25,988) Grants 100,000 Net Capital Expenses 7,570 2,500 5,000 7,500 10,000 12,500 15,000 17,500 20,000 22,500 25,000 50,000 Total Annual Expenditures 189, , , , , , , , , , , ,129 Non Rate Revenues Parcel Taxes 9,920 10,118 10,321 10,527 10,738 10,952 11,172 11,395 11,623 11,855 12,092 14,741 Connections Penalties 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 Transfer from reserve 50,203 Return on Investment 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 Total Non Rate revenue 62,123 12,118 12,321 12,527 12,738 12,952 13,172 13,395 13,623 13,855 14,092 16,741 RATE REVENUE REQUIREMENT 127, , , , , , , , , , , ,389 Rate Increase 10% 10% 10% 10% 10% 5% 5% 5% 5% 5% 5% Revenue from User fees 127, , , , , , , , , , , ,213 Short Fall/(Excess) 54,537 45,898 (12,815) (24,241) (56,622) (61,214) (66,235) (71,708) (77,658) (84,110) (182,824) (Borrow)/Repay (54,537) (45,898) 12,815 24,241 56,622 61,214 66,235 71,708 77,658 84,110 Transfer to operating reserve 182, Sewer Operating Reserve Opening Balance 81,391 31,188 (23,349) (69,247) (56,432) (32,191) 24,431 85, , , , ,247 Transfer In (54,537) (45,898) 12,815 24,241 56,622 61,214 66,235 71,708 77,658 84, ,824 Transfer to Capital 50,203 (84,110) (182,824) Closing Balance 31,188 (23,349) (69,247) (56,432) (32,191) 24,431 85, , , , , ,247 Sewer capital reserve Opening Balance 163, , , , , , , , , ,385 1,180,544 Transfers In/(Out) (5,070) (2,570) (70) 2,430 4,930 7,430 9,930 12,430 14,930 17,430 24,012 Transfer from Operating reserve , ,824 Closing Balance 157, , , , , , , , , ,925 1,387,381 24

PARKVILLE WATER DISTRICT

PARKVILLE WATER DISTRICT PARKVILLE WATER DISTRICT WATER RATE STUDY DECEMBER 2017 RPI Consulting LLC Durango, Colorado TABLE OF CONTENTS Table of Contents 2 Summary of Findings 3 Water Rate Analysis 6 Usage patterns and existing

More information

NORTH HUNTINGDON TOWNSHIP MUNICIPAL AUTHORITY

NORTH HUNTINGDON TOWNSHIP MUNICIPAL AUTHORITY NORTH HUNTINGDON TOWNSHIP MUNICIPAL AUTHORITY T a p p i n g F e e C a l c u l a t i o n A p r i l 2 0 1 8 5 1 7 3 C A M P B E L L S R U N R O A D P I T T S B U R G H, P A 1 5 2 0 5-9 7 3 3 Table of Contents

More information

Actual Cost Actual Cost HST

Actual Cost Actual Cost HST s & Charges Department Water % Est # Units 2013 Actual Water Main Taps 20mm to 50mm 58 $ 369.87 $ 375.42 Exempt 1.5% Inflation 100mm & larger 57 $ 689.77 $ 700.12 Exempt 1.5% Inflation Standby time for

More information

Water Service Asset Management Plan

Water Service Asset Management Plan Water Service Asset Management Plan November 2016 Joel Shaw, P.Eng. 1435 Water Street Kelowna, BC V1Y 1J4 TEL (250) 469-8739 jshaw@kelowna.ca kelowna.ca Document Control Rev No Date Revision Details Author

More information

RATE STUDY. Town of Midland. HEMSON C o n s u l t i n g L t d.

RATE STUDY. Town of Midland. HEMSON C o n s u l t i n g L t d. WATER AND WASTEWATER RATE STUDY Town of Midland C o n s u l t i n g L t d. December 2010 TABLE OF CONTENTS EXECUTIVE SUMMARY.........1 I BACKGROUND AND STUDY OBJECTIVES.........9 ll ASSOCIATED LEGISLATION.........13

More information

WATER AND WASTEWATER FUND REVENUES

WATER AND WASTEWATER FUND REVENUES WATER AND WASTEWATER FUND REVENUES Water revenues comprise $12.11 million, or 70.6% of total revenues of the fund, while wastewater (sewer) charges comprise $4.25 million, or 24.7% of total revenues. Water

More information

RATE INFORMATION. A. The rates adopted by the Authority will be in accordance with of the Code of Virginia, as amended.

RATE INFORMATION. A. The rates adopted by the Authority will be in accordance with of the Code of Virginia, as amended. Page 1 of 8 Section 1. PURPOSE The purpose of this policy to explain how the Bedford Regional Water Authority ( Authority ) implements the adopted Rates policy and to provide explanation for each of the

More information

Committee of the Whole Agenda

Committee of the Whole Agenda 1 Committee of the Whole Agenda The agenda for the Freestanding Committee of the Whole (Corporate Administration & Finance Committee - Budget) meeting to be held in the Council Chambers of the Municipal

More information

MUNICIPALITY OF ARRAN-ELDERSLIE CHESLEY DRINKING WATER SYSTEM FINANCIAL PLAN

MUNICIPALITY OF ARRAN-ELDERSLIE CHESLEY DRINKING WATER SYSTEM FINANCIAL PLAN MUNICIPALITY OF ARRAN-ELDERSLIE CHESLEY DRINKING WATER SYSTEM FINANCIAL PLAN 15-013 GSS Engineering Consultants Ltd. Unit 104D 1010 9 th Avenue West Owen Sound ON N4K 5R7 519.372.4828 TABLE OF CONTENTS

More information

Town of Rocky Mountain House: Offsite Levy Review

Town of Rocky Mountain House: Offsite Levy Review Town of Rocky Mountain House: Offsite Levy Review Version 6 October 25 th, 2016 Presented to: Todd Becker, CAO Town of Rocky Mountain House PO Box 1509 Rocky Mountain House AB T4T 1B2 (403) 845-2866 tbecker@rockymtnhouse.com

More information

The Nation Municipality Drinking Water System. Financial Plan Number &

The Nation Municipality Drinking Water System. Financial Plan Number & The Nation Municipality Financial Plan Number 179-101 & 179-102 January 25 th, 2016 Table of Contents Executive Summary... 3 1. Introduction... 4 1.1 Legislative requirements... 4 1.2 Recent Accounting

More information

West Valley Sanitation District FINANCIAL PLAN & RATE STUDY. January 2018

West Valley Sanitation District FINANCIAL PLAN & RATE STUDY. January 2018 West Valley Sanitation District FINANCIAL PLAN & RATE STUDY January 2018 BARTLE WELLS ASSOCIATES Independent Public Finance Consultants 1889 Alcatraz Avenue Berkeley, California 94703 www.bartlewells.com

More information

CHAPTER 1 WATER REGULATIONS; RATES

CHAPTER 1 WATER REGULATIONS; RATES CHAPTER 1 WATER REGULATIONS; RATES SECTION: 6-1- 1: Purpose 6-1- 2: Service Rates 6-1- 3: New Service Connections 6-1- 4: Construction Standards 6-1- 5: Inactive Accounts 6-1- 6: Billing 6-1- 7: Advance

More information

City of Keizer Fees and Charges for Services As of July 2017

City of Keizer Fees and Charges for Services As of July 2017 General Administration Liquor Licenses/Permits Original Application $ 100.00 Change of ownership, location, privilege $ 75.00 Renewal and temporary applications $ 35.00 Special license applications $ 35.00

More information

CITY OF FRUITLAND FISCAL YEAR BUDGET

CITY OF FRUITLAND FISCAL YEAR BUDGET CITY OF FRUITLAND FISCAL YEAR 2018 2019 BUDGET June 12, 2018 CITY OF FRUITLAND, MD UTILITIES DEPARTMENT BUDGET FISCAL YEAR 2019 FISCAL YEAR 2018 FISCAL YEAR 2017 SANITATION WATER SEWER SANITATION WATER

More information

SLC COMMERCIAL 2488 SE Willoughby Blvd, Stuart, FL

SLC COMMERCIAL 2488 SE Willoughby Blvd, Stuart, FL 32.96 +/- Acres Vacant Land - US Hwy 1 Frontage Property Description: Located just north of the new 850 unit residential Grand Harbor development, this property is beautifully treed with majestic oaks

More information

Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee. Residential Water

Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee. Residential Water Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee Residential Water $10.82 Minimum Bill 1,501 gallons through 8,000 gallons $ 2.86 per 1,000 gallons 8,001 gallons through

More information

CITY OF THOUSAND OAKS

CITY OF THOUSAND OAKS CITY OF THOUSAND OAKS 2018 Wastewater Financial Plan Update Final Report / June 23, 2017 445 S. Figueroa Street Suite #2270 Los Angeles, CA 90071 Phone 213.262.9300 Fax 213.262.9303 www.raftelis.com June

More information

Cost Accounting for Rate & Fee Setting: Calculating Defensible Rates and Charges

Cost Accounting for Rate & Fee Setting: Calculating Defensible Rates and Charges Cost Accounting for Rate & Fee Setting: Calculating Defensible Rates and Charges UNC School of Government EFC 2017 Water & Wastewater Finance Workshop February 28 March 1, 2017 The William & Ida Friday

More information

City of San Carlos Sewer Financial Plan & Rate Update

City of San Carlos Sewer Financial Plan & Rate Update City of San Carlos Sewer Financial Plan & Rate Update Revised 06/13/16 1889 Alcatraz Avenue Berkeley, CA 94703 Tel: 510 653 3399 www.bartlewells.com June 13, 2016 City of San Carlos Department of Public

More information

DISTRICT OF TOFINO SPECIAL COUNCIL MEETING. Council Chamber, Municipal Office May 5, 2015 at 10:00 AM AGENDA

DISTRICT OF TOFINO SPECIAL COUNCIL MEETING. Council Chamber, Municipal Office May 5, 2015 at 10:00 AM AGENDA DISTRICT OF TOFINO SPECIAL COUNCIL MEETING Council Chamber, Municipal Office May 5, 2015 at 10:00 AM AGENDA Page 1. CALL MEETING TO ORDER 2. ADOPTION OF AGENDA 3. DELEGATIONS 4. REPORTS 2-27 4.1 2015-2019

More information

City of Riverbank. Water Rate Study FINAL 6/18/2015

City of Riverbank. Water Rate Study FINAL 6/18/2015 Water Rate Study FINAL 6/18/2015 Bartle Wells Associates Independent Public Finance Consultants 1889 Alcatraz Avenue Berkeley, California 94703 www.bartlewells.com Tel: 510-653-3399 June 18, 2015 6707

More information

Rates and Fees for New Connections (Developer Fees)

Rates and Fees for New Connections (Developer Fees) Rates and Fees for New Connections (Developer Fees) Table V: New Connection (Developer) Rates and Fees Effective Date 1/1/2019 1/1/2020 1/1/2021 A. Plan Review Fees Per Linear Foot (LF) - Water $0.65 $0.65

More information

City of Port Orchard Water & Sewer Financial Gap Analysis Final Report November 20, 2015

City of Port Orchard Water & Sewer Financial Gap Analysis Final Report November 20, 2015 City of Port Orchard Water & Sewer Financial Gap Analysis Final Report November 20, 2015 Summary In 2016, the City s Comprehensive Plan is required to be updated and financially constrained, pursuant to

More information

CITY OF WATERLOO Water & Sanitary Sewer Rate Design Study Final Report & Financial Plan No

CITY OF WATERLOO Water & Sanitary Sewer Rate Design Study Final Report & Financial Plan No CITY OF WATERLOO Water & Sanitary Sewer Rate Design Study Final Report & Financial Plan No. 112301 April 1st 2016 DFA Infrastructure International Inc. dfa DFA Infrastructure International Inc. 33 Raymond

More information

Toronto Water Budget BU Recommended Operating Budget Recommended Capital Plan 2017 Recommended Water Rate

Toronto Water Budget BU Recommended Operating Budget Recommended Capital Plan 2017 Recommended Water Rate 2017 BU25.1 Toronto Water Budget 2017 Recommended Operating Budget 2017 2026 Recommended Capital Plan 2017 Recommended Water Rate Lou Di Gironimo, General Manager, Toronto Water Budget Committee, November

More information

CITY OF CHARLES TOWN, a municipal utility WATER

CITY OF CHARLES TOWN, a municipal utility WATER P.S.C. W. Va. No. 13 Canceling P.S.C. W. Va. No. 12 CITY OF CHARLES TOWN, a municipal utility OF CHARLES TOWN, WEST VIRGINIA RATES, RULES AND REGULATIONS FOR FURNISHING WATER at Charles Town, Ranson and

More information

SACRAMENTO COUNTY WATER AGENCY ORDINANCE NO. WAO- AN ORDINANCE AMENDING TITLE 3 OF THE SACRAMENTO COUNTY WATER AGENCY CODE

SACRAMENTO COUNTY WATER AGENCY ORDINANCE NO. WAO- AN ORDINANCE AMENDING TITLE 3 OF THE SACRAMENTO COUNTY WATER AGENCY CODE SACRAMENTO COUNTY WATER AGENCY ORDINANCE NO. WAO- AN ORDINANCE AMENDING OF THE SACRAMENTO COUNTY WATER AGENCY CODE The Board of Directors of the Sacramento County Water Agency ordains as follows: SECTION

More information

Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee. Residential Water

Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee. Residential Water Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee Residential Water $11.14 Minimum Bill 1,501 gallons through 8,000 gallons $ 2.95 per 1,000 gallons 8,001 gallons through

More information

presents: PLANNING FOR THE FUTURE INFORMATIONAL OVERVIEW DETAILS PROVIDED BY:

presents: PLANNING FOR THE FUTURE INFORMATIONAL OVERVIEW   DETAILS PROVIDED BY: presents: PLANNING FOR THE FUTURE INFORMATIONAL OVERVIEW www.springcreekud.org DETAILS PROVIDED BY: SPRING CREEK UTILITY DISTRICT Development & Infrastructure About Spring Creek Utility District Spring

More information

REGIONAL DISTRICT OF CENTRAL OKANAGAN 2018 PROGRAM BUDGET AND FIVE YEAR FINANCIAL PLAN CONTENTS

REGIONAL DISTRICT OF CENTRAL OKANAGAN 2018 PROGRAM BUDGET AND FIVE YEAR FINANCIAL PLAN CONTENTS 2018 PROGRAM BUDGET AND 2018-2022 FIVE YEAR FINANCIAL PLAN CONTENTS ENGINEERING SERVICES -- David Komaike ENGINEERING SERVICES (Lime Green Pages) 004 -- Engineering Services 1 047 -- Mosquito Control --

More information

DISTRICT OF CLEARWATER. A bylaw to Regulate and License Business

DISTRICT OF CLEARWATER. A bylaw to Regulate and License Business DISTRICT OF CLEARWATER BYLAW NO. 124, 2014 A bylaw to Regulate and License Business WHEREAS the Community Charter permits a Council to regulate the carrying on of business within the municipality; NOW

More information

Asset Management Plan Contract No. ES-13-2

Asset Management Plan Contract No. ES-13-2 Asset Management Plan Contract No. ES-13-2 Prepared For: Prepared By: Robinson Consultants Inc. In association with BMA Management Inc. Our Project No. 13030 November 2013 Acknowledgements Robinson Consultants

More information

Water and Sewer Utility Rate Studies

Water and Sewer Utility Rate Studies Final Report Water and Sewer Utility Rate Studies July 2012 Prepared by: HDR Engineering, Inc. July 27, 2012 Mr. Mark Brannigan Director of Utilities 591 Martin Street Lakeport, CA 95453 Subject: Comprehensive

More information

SAWS Guide to Development 2008 revision B

SAWS Guide to Development 2008 revision B SAWS Guide to Development 2008 revision B This document is an abbreviated description of the SAWS review process. It is designed as an easy to follow guide for developers and their consulting engineering

More information

THE DISTRICT OF MUSKOKA ASSET MANAGEMENT PLAN FOR ROADS, BRIDGES, WATER AND WASTEWATER ASSETS

THE DISTRICT OF MUSKOKA ASSET MANAGEMENT PLAN FOR ROADS, BRIDGES, WATER AND WASTEWATER ASSETS THE DISTRICT OF MUSKOKA ASSET MANAGEMENT PLAN FOR ROADS, BRIDGES, WATER AND WASTEWATER ASSETS MAY 29, 2014 EXECUTIVE SUMMARY CONTENTS Page (i) 1. INTRODUCTION 1.1 Overview 1-1 1.2 Plan Development 1-1

More information

VOLUME 2 - RULES AND REGULATIONS. Part B - Schedule of Rates, Fees and Other Charges. Table of Contents. 1. Definitions... 1

VOLUME 2 - RULES AND REGULATIONS. Part B - Schedule of Rates, Fees and Other Charges. Table of Contents. 1. Definitions... 1 VOLUME 2 - RULES AND REGULATIONS Part B - Schedule of Rates, Fees and Other Charges Table of Contents 1. Definitions... 1 1.1 Applicant... 1 1.2 Availability... 1 1.3 Availability Fees... 1 1.4 Availability

More information

FOR SALE. For More Information:

FOR SALE. For More Information: FOR SALE 67th Street 3415 67th Place, Vero Beach, FL 32967 PARCEL ID #: 32391000000100000009.1 LOCATION: Great location on the corner of US 1 and Quay Dock Rd with approximately 54 feet of US 1 frontage.

More information

VILLAGE OF LIBERTYVILLE SPECIAL MEETING. Tuesday, March 6, 2018 Village Hall 118 W. Cook Avenue Libertyville, IL :00 p.m.

VILLAGE OF LIBERTYVILLE SPECIAL MEETING. Tuesday, March 6, 2018 Village Hall 118 W. Cook Avenue Libertyville, IL :00 p.m. VILLAGE OF LIBERTYVILLE SPECIAL MEETING Tuesday, March 6, 2018 Village Hall 118 W. Cook Avenue Libertyville, IL 60048 6:00 p.m. 1) Roll Call 2) Continued Discussion of Draft 2018/2019 Budget 3) Executive

More information

The Municipality of Callander. Callander Drinking Water System. Financial Plan #

The Municipality of Callander. Callander Drinking Water System. Financial Plan # The Municipality of Callander Callander Drinking Water System #187-301 January 4, 2012 Municipality of Callander Callander Drinking Water System Page i Table of Contents 1. INTRODUCTION... 1 1.1 LEGISLATIVE

More information

UTILITY RATE STUDY. Public Hearing

UTILITY RATE STUDY. Public Hearing UTILITY RATE STUDY Public Hearing. Public January 23, 2018 Resources Management Group, Inc. Utility, Rate, Financial, and Management Consultants Rate Guiding Principles Recognized Revenues Should Be Sufficient

More information

Maurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 MEMORANDUM

Maurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 MEMORANDUM TO: FROM: Maurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 SUBJECT: - MEMORANDUM Introduction The (City) provides sewer sanitary collection services

More information

Order No. 49/18 THE CITY OF THOMPSON WATER AND WASTEWATER UTILITY WATER AND WASTEWATER RATES. April 12, 2018

Order No. 49/18 THE CITY OF THOMPSON WATER AND WASTEWATER UTILITY WATER AND WASTEWATER RATES. April 12, 2018 THE CITY OF THOMPSON WATER AND WASTEWATER UTILITY WATER AND WASTEWATER RATES BEFORE: Irene A. Hamilton, Panel Chair Michael Watson, Member Room 400 330 Portage Avenue Winnipeg, MB R3C 0C4 www.pubmanitoba.ca

More information

SUMMERLAND SANITARY DISTRICT

SUMMERLAND SANITARY DISTRICT SUMMERLAND SANITARY DISTRICT Financial Plan and Rate Study December 6, 2017 445 S. Figueroa Street Suite #2270 Los Angeles, CA 90071 Phone 213.262.9300 Fax 213.262.9303 www.raftelis.com December 6, 2017

More information

County of Prince Edward. Water and Wastewater Rate and Study and Connection Charges Update

County of Prince Edward. Water and Wastewater Rate and Study and Connection Charges Update County of Prince Edward Water and Wastewater Rate and Study and Connection Charges Update December 16, 2015 Contents Page 1. Introduction... 1-1 1.1 Background... 1-1 1.2 Update Study Process... 1-5 1.3

More information

Lorie Tinfow, City Manager, City of Pacifica Lorenzo Hines Jr., Assistant City Manager, City of Pacifica

Lorie Tinfow, City Manager, City of Pacifica Lorenzo Hines Jr., Assistant City Manager, City of Pacifica DATE: March 7, 2017 TO: FROM: SUBJECT: Lorie Tinfow, City Manager, Lorenzo Hines Jr., Assistant City Manager, Douglas Dove, President Michael DeGroot, Financial Analyst Abigail Seaman, Financial Analyst

More information

City of Garland. Fee List (2015) Zoning Change or Specific Use Provision Applications

City of Garland. Fee List (2015) Zoning Change or Specific Use Provision Applications Planning Department Collects the following fees: City of Garland Fee List (2015) Zoning Change or Specific Use Provision Applications Type of Application Fee Planned Development (PD) Zoning (New or revised

More information

8 th Concession Road Sanitary Sewer Outlet

8 th Concession Road Sanitary Sewer Outlet Oldcastle Hamlet Sanitary Sewer Servicing 8 th Concession Road Sanitary Sewer Outlet Cost Recovery By-Law Presentation Outline Background Project Cost Recovery Method Terminology North Talbot Road Sanitary

More information

The Utilities Fund is broken into two categories: a Capacity Expansion Fund and an Operating Fund.

The Utilities Fund is broken into two categories: a Capacity Expansion Fund and an Operating Fund. Attachment 1 O16-19 BACKGROUND REPORT The Utilities Fund is an enterprise fund. An enterprise fund establishes a separate accounting financial reporting mechanism for municipal services for which a fee

More information

Accomplishments for Administration

Accomplishments for Administration Today s Agenda A Look Back (FY 15-16) Budget Overview City Wide Outlook General Fund Public Utility Fund Beach Fund Port Commission Hotel Motel City Wide Debt What s Next? 2015-2016 Accomplishments for

More information

City of Riverbank. Sewer Rate Study June 18, 2015 FINAL

City of Riverbank. Sewer Rate Study June 18, 2015 FINAL Sewer Rate Study June 18, 2015 Bartle Wells Associates Independent Public Finance Consultants 1889 Alcatraz Avenue Berkeley, California 94703 www.bartlewells.com Tel: 510-653-3399 FINAL Historical & Current

More information

2030 Infrastructure Plan Introduction

2030 Infrastructure Plan Introduction 2 nd Draft February 25, 2016 Infrastructure Plan Introduction 1.0 INTRODUCTION The Infrastructure Plan covers the City s infrastructure investment needs for the next 15 years (2016-) and was developed

More information

Asset Management Investment Plan

Asset Management Investment Plan Asset Management Plan Prepared for the City of Kimberley 304-1353 Ellis Street Kelowna, BC, V1Y 1Z9 T: 250.762.2517 F: 250.763.5266 June 2016 File: 1162.0014.01 A s s e t M a n a g e m e n t I n v e s

More information

MAINE REVENUE SERVICES SALES, FUEL & SPECIAL TAX DIVISION INSTRUCTIONAL BULLETIN NO. 13

MAINE REVENUE SERVICES SALES, FUEL & SPECIAL TAX DIVISION INSTRUCTIONAL BULLETIN NO. 13 MAINE REVENUE SERVICES SALES, FUEL & SPECIAL TAX DIVISION INSTRUCTIONAL BULLETIN NO. 13 SALES OF FUEL AND UTILITIES (Coal, Oil, and Wood; Electricity; Gas, Water) This bulletin is intended solely as advice

More information

Cedar River Water and Sewer District FEE AND CHARGE SCHEDULE AMENDED January 21, 2014

Cedar River Water and Sewer District FEE AND CHARGE SCHEDULE AMENDED January 21, 2014 Cedar River Water and Sewer District FEE AND CHARGE SCHEDULE AMENDED January 21, 2014 I. FLAT FEES Certificate of Availability Fee - New (W & S each) Residential - Single family residence $70.00 Commercial

More information

City of Prince Albert YEAR STRATEGIC PLAN

City of Prince Albert YEAR STRATEGIC PLAN 5 City of Prince Albert YEAR STRATEGIC PLAN 2015-2020 City of Prince Albert Introduction Members of City Council, along with Senior Administration, attended a two-day Strategic Planning Session for the

More information

Total 6,266,792 11,331,983 29,867,049 20,087,396 12,652,829 10,847,455 9,655,552 7,193,173 14,515,849 8,603,923

Total 6,266,792 11,331,983 29,867,049 20,087,396 12,652,829 10,847,455 9,655,552 7,193,173 14,515,849 8,603,923 Airport Funds Charges for Goods/Services 6,266,792 11,331,983 29,867,049 20,087,396 12,652,829 10,847,455 9,655,552 7,193,173 14,515,849 8,603,923 Fund Transfers - - - - - - - - - - Total 6,266,792 11,331,983

More information

DOMESTIC SERVICE CHARGE:

DOMESTIC SERVICE CHARGE: PART 5 CHARGES 51 SERVICE CHARGE: 51.2 GENERAL PROVISIONS: 51.1.1 DOMESTIC For all metered service connections located within or outside the boundaries of the District, a bimonthly charge for domestic

More information

MD OF GREENVIEW NO. 16

MD OF GREENVIEW NO. 16 FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2015 INDEPENDENT AUDITORS' REPORT To the Reeve and Council of MD of Greenview No. 16 We have audited the accompanying financial statements of MD of

More information

Schedule A Page 1 of 8

Schedule A Page 1 of 8 PART A RESIDENTIAL AND RELATED USES A-1. A single detached dwelling for one (1) family and not more than one (1) such dwelling. A-2. Multiple dwellings consisting of two (2) or more dwelling units. (apartments)

More information

Q Internal Financial Report (Unaudited)

Q Internal Financial Report (Unaudited) Q3 2013 Internal Financial Report (Unaudited) Index Financial Commentary... 1 Summary of All City Funds... 7 Second Quarter Year-to-Date Actuals by Fund compared to Current Budget and Prior Year: General

More information

CLASSES OF PERMITS AND FEES PAYABLE. Item Class of Permit Reference Fee Payable 1. Building Permit 6(3) See Part C

CLASSES OF PERMITS AND FEES PAYABLE. Item Class of Permit Reference Fee Payable 1. Building Permit 6(3) See Part C CLASSES OF PERMITS AND FEES PAYABLE Item Class of Permit Reference Fee Payable 1. Building Permit 6(3) See Part C 2. Demolition Permit 6(4) All Occupancies - $0.11 for each square metres of floor area

More information

BOYNTON BEACH UTILITIES CONVERSION PROJECT 1/15/2017 1

BOYNTON BEACH UTILITIES CONVERSION PROJECT 1/15/2017 1 1/15/2017 1 INTRODUCTION WHY THE SECOND PRESENTATION AND VOTE? PROJECT BACKGROUND AND ORGANIZATION PROJECT TEAM AND DUTIES SCOPE OF PROJECT MAJOR POINTS OF THE PURCHASE AGREEMENT IMPACT TO THE TBE MAINTENANCE

More information

Frequently Asked Questions

Frequently Asked Questions Welcome to the Shady Cove Municipal Water System Frequently Asked Questions Date Released: 7/6/12 The purpose of this document is to provide a list of frequently ask questions (FAQ s) relating to the proposed

More information

CITY OF PENTICTON UTILITY RATE REVIEW

CITY OF PENTICTON UTILITY RATE REVIEW PROPOSAL TITLE CITY OF PENTICTON UTILITY RATE REVIEW Submitted to: City of Penticton Prepared by: InterGroup Consultants Ltd. 500-280 Smith Street Winnipeg, MB R3C 1K2 November 2015 Executive Summary

More information

M A N I T O B A ) Order No. 100/10 ) THE PUBLIC UTILITIES BOARD ACT ) October 6, 2010 MUNICIPALITY OF KILLARNEY TURTLE MOUNTAIN WATER AND SEWER RATES

M A N I T O B A ) Order No. 100/10 ) THE PUBLIC UTILITIES BOARD ACT ) October 6, 2010 MUNICIPALITY OF KILLARNEY TURTLE MOUNTAIN WATER AND SEWER RATES M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) October 6, 2010 BEFORE: Graham Lane, CA, Chairman Susan Proven, P.H.Ec., Member MUNICIPALITY OF KILLARNEY TURTLE MOUNTAIN WATER AND SEWER RATES Page

More information

Operating Budget and Capital Improvement Program for Fiscal Year 2018

Operating Budget and Capital Improvement Program for Fiscal Year 2018 12770 Second Street, Yucaipa, California 92399 Operating Budget and Capital Improvement Program for Fiscal Year July 1, to June 30, Adopted June 20, Fiscal Year Table of Contents CHAPTER ONE Table of Contents...

More information

SOUTH WALTON UTILITY COMPANY, INC. 369 Miramar Beach Drive Miramar Beach, FL Telephone: (850) Fax (850)

SOUTH WALTON UTILITY COMPANY, INC. 369 Miramar Beach Drive Miramar Beach, FL Telephone: (850) Fax (850) SOUTH WALTON UTILITY COMPANY, INC. 369 Miramar Beach Drive Miramar Beach, FL 32550 Telephone: (850) 837-2988 Fax (850) 837-7648 FEE SCHEDULE Fees and charges for water and sewer services provided by South

More information

TOWN OF ATIKOKAN WATER & WASTEWATER FINANCIAL PLAN. May 30, Atikokan Public Works Water & Wastewater Services

TOWN OF ATIKOKAN WATER & WASTEWATER FINANCIAL PLAN. May 30, Atikokan Public Works Water & Wastewater Services TOWN OF ATIKOKAN WATER & WASTEWATER FINANCIAL PLAN May 30, 2016 Atikokan Public Works Water & Wastewater Services WATER & WASTEWATER FINANCIAL PLAN TOWN OF ATIKOKAN Table of Contents 1.0 Introduction ----------------------------------------------------------

More information

Utilities - Water and Sewer Funds

Utilities - Water and Sewer Funds Utilities - Water and Sewer Funds Summary of Expenditures by Fund: Water Funds: Actual Adopted Amended Adopted Amended Estimated Proposed Water Administration $ 158,511 $ 199,100 $ 199,100 $ 198,400 (0.4)

More information

LONDON GROVE TOWNSHIP MUNICIPAL AUTHORITY RESOLUTION NO

LONDON GROVE TOWNSHIP MUNICIPAL AUTHORITY RESOLUTION NO LONDON GROVE TOWNSHIP MUNICIPAL AUTHORITY RESOLUTION NO 2019-02 A RESOLUTION OF THE AUTHORITY BOARD ESTABLISHING WASTERWATER SYSTEM TAPPING FEES IN ACCORDANCE WITH ACT 57 OF 2003 WHEREAS, London Grove

More information

Notice of a public hearing

Notice of a public hearing Notice of a public hearing Dear Benicia Resident and/or Business Owner, You are receiving a revised Notice of a Public Hearing to increase the water and sewer rates and add water meter replacement fees.

More information

MUNICIPALITY OF ARRAN-ELDERSLIE TARA DRINKING WATER SYSTEM FINANCIAL PLAN

MUNICIPALITY OF ARRAN-ELDERSLIE TARA DRINKING WATER SYSTEM FINANCIAL PLAN MUNICIPALITY OF ARRAN-ELDERSLIE TARA DRINKING WATER SYSTEM FINANCIAL PLAN 15-013 GSS Engineering Consultants Ltd. Unit 104D 1010 9 th Avenue West Owen Sound ON N4K 5R7 519.372.4828 TABLE OF CONTENTS EXECUTIVE

More information

DEPARTMENT OF PUBLIC WORKS UTILITIES

DEPARTMENT OF PUBLIC WORKS UTILITIES DEPARTMENT OF PUBLIC WORKS UTILITIES Mission Statement: Public Works - Utilities is dedicated to providing water, wastewater, and environmental services to the citizens of Rio Rancho and other City Departments.

More information

Wastewater Rate Study. Villa Park, Illinois

Wastewater Rate Study. Villa Park, Illinois Wastewater Rate Study Villa Park, Illinois June 2013 Executive Summary General The Village of Villa Park s Wastewater Utility is responsible for operation and maintenance of the Village s separate sanitary

More information

BODEGA BAY PUBLIC UTILITY DISTRICT Water and Wastewater Rate Study

BODEGA BAY PUBLIC UTILITY DISTRICT Water and Wastewater Rate Study BODEGA BAY PUBLIC UTILITY DISTRICT Water and Wastewater Rate Study FINAL REPORT March 22, 2018 BARTLE WELLS ASSOCIATES Independent Public Finance Advisors 1889 Alcatraz Avenue Berkeley, CA 94703-2714 Tel.

More information

M A N I T O B A ) Order No. 83/12 ) THE PUBLIC UTILITIES BOARD ACT ) July 9, 2012

M A N I T O B A ) Order No. 83/12 ) THE PUBLIC UTILITIES BOARD ACT ) July 9, 2012 M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) July 9, 2012 BEFORE: Susan Proven, P.H.Ec, Acting Chair Monica Girouard, CGA, Member Raymond Lafond, CA, Member RURAL MUNICIPALITY OF DE SALABERRY ST.

More information

ROCK RIVER WATER RECLAMATION DISTRICT ROCKFORD, ILLINOIS FINANCIAL STATEMENTS AND INDEPENDENT AUDITOR S REPORT. For the Year Ended April 30, 2016

ROCK RIVER WATER RECLAMATION DISTRICT ROCKFORD, ILLINOIS FINANCIAL STATEMENTS AND INDEPENDENT AUDITOR S REPORT. For the Year Ended April 30, 2016 FINANCIAL STATEMENTS AND INDEPENDENT AUDITOR S REPORT For the Year Ended April 30, 2016 TABLE OF CONTENTS Page(s) INDEPENDENT AUDITOR S REPORT... 1-3 GENERAL PURPOSE EXTERNAL FINANCIAL STATEMENTS Management

More information

Title 6 WATER AND SEWER FEES AND CHARGES

Title 6 WATER AND SEWER FEES AND CHARGES Title 6 WATER AND SEWER FEES AND CHARGES Chapter 6.04 - GENERAL PROVISIONS Chapter 6.08 - WATER SERVICE CHARGES Chapter 6.12 - SEWER SERVICE CHARGES Chapter 6.16 - OTHER FEES AND CHARGES Chapter 6.04 GENERAL

More information

PUBLIC MEETING DOCUMENTATION 2011 BUDGETS AND RATES

PUBLIC MEETING DOCUMENTATION 2011 BUDGETS AND RATES PUBLIC MEETING DOCUMENTATION 2011 BUDGETS AND RATES December 9, 2010 @ 6:00 p.m. Board Room Peterborough Utilities Office 1867 Ashburnham Drive NOTICE OF SPECIAL MEETING PETERBOROUGH UTILITIES COMMISSION

More information

FY18 SCHEDULE OF USER FEES October 1, 2017 September 30, UTILITIES - RECLAIMED WATER Adopted

FY18 SCHEDULE OF USER FEES October 1, 2017 September 30, UTILITIES - RECLAIMED WATER Adopted UTILITIES - RECLAIMED WATER I. New Service Connection Fees for Systems on Existing Mains A. Unmetered Service 1. Service connection - unmetered service 1" $790 2. Service connection - unmetered service

More information

Water & Sewer Budget Highlights

Water & Sewer Budget Highlights 2018-2022 Water & Sewer Budget Highlights PRESENTED BY CITY STAFF February 05, 2018 Council Meeting 2018 Water and Sewer Budgets: Background May 2017 Council approves utility rates for water and sewer

More information

TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009

TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009 TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009 EXECUTIVE SUMMARY The functions and duties of the Oro Valley Water Utility Commission include reviewing and developing

More information

2017 ENTERPRISE ASSET MANAGEMENT PLAN

2017 ENTERPRISE ASSET MANAGEMENT PLAN Corporate Asset Management 2017 ENTERPRISE ASSET MANAGEMENT PLAN Investments in Peel s Infrastructure We are all asset managers! Executive Summary The Region s infrastructure is a public investment with

More information

Village of Baltimore Water & Wastewater Analysis. July 2018

Village of Baltimore Water & Wastewater Analysis. July 2018 Village of Baltimore Water & Wastewater Analysis July 2018 Table of Contents Introductory Summary... 1 Data... 1 Water Treatment Plant (WTP)... 1 Production... 2 Costs & Debts... 2 Wastewater Treatment

More information

Strategic Growth in the Rangeview Area Structure Plan

Strategic Growth in the Rangeview Area Structure Plan 2018 March 22 Page 1 of 8 EXECUTIVE SUMMARY Administration has received and reviewed an Outline Plan/Land Use (OP/LU) application within the Rangeview Area Structure Plan (ASP). The developer of these

More information

M A N I T O B A ) Order No. 142/06 ) THE PUBLIC UTILITIES BOARD ACT ) October 24, 2006

M A N I T O B A ) Order No. 142/06 ) THE PUBLIC UTILITIES BOARD ACT ) October 24, 2006 M A N I T O B A ) Order No. 142/06 ) THE PUBLIC UTILITIES BOARD ACT ) October 24, 2006 BEFORE: Graham Lane, C.A., Chairman Susan Proven, P.H.Ec., Member Monica Girouard, C.G.A., Member THE RURAL MUNICIPALITY

More information

DEVELOPMENT CHARGES BACKGROUND STUDY

DEVELOPMENT CHARGES BACKGROUND STUDY DEVELOPMENT CHARGES BACKGROUND STUDY Town of Innisfil C o n s u l t i n g L t d. July 19, 2018 TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 I PURPOSE OF THE DEVELOPMENT CHARGES BACKGROUND STUDY... 6 A. INTRODUCTION

More information

Development Charges. Someone Has to Pay, But Who?

Development Charges. Someone Has to Pay, But Who? Development Charges Someone Has to Pay, But Who? Lynda Cooke Urban Systems Joel Short Urban Systems Kathy Dietrich City of Calgary Shanie Leugner City of Regina Kim Sare City of Regina WORKSHOP OVERVIEW

More information

WATER AND SEWER RATE STUDY

WATER AND SEWER RATE STUDY FINAL WATER AND SEWER RATE STUDY B&V PROJECT NO. 179322.0100 PREPARED FOR City of Lynwood, CA JANUARY 11, 2017 Black & Veatch Holding Company 2011. All rights reserved. City of Lynwood, CA WATER AND SEWER

More information

CITY OF RIVIERA BEACH, FLORIDA UTILITY SPECIAL DISTRICT S SYSTEMS AND OPERATIONS FOR FISCAL YEAR ENDING SEPTEMBER 30, 2010.

CITY OF RIVIERA BEACH, FLORIDA UTILITY SPECIAL DISTRICT S SYSTEMS AND OPERATIONS FOR FISCAL YEAR ENDING SEPTEMBER 30, 2010. UTILITY SPECIAL DISTRICT S SYSTEMS AND OPERATIONS FOR FISCAL YEAR ENDING SEPTEMBER 30, 2010 Overview The service area of the Utility District s Water System includes the entire City of Riviera Beach (approximately

More information

Lehigh County Authority Capital Plan. Preliminary Plan: Board Presentation August 28, 2017

Lehigh County Authority Capital Plan. Preliminary Plan: Board Presentation August 28, 2017 Lehigh County Authority 2018-2022 Capital Plan Preliminary Plan: Board Presentation August 28, 2017 1 Project Prioritization Categories Project Category Regulatory New Cust CA/OS AM - Low AM - Med AM -

More information

JEFFERSON WATER AND SEWER DISTRICT DEPOSIT, FEE AND CHARGE SCHEDULE (Includes Rate Adjustments Effective January 1, 2019)

JEFFERSON WATER AND SEWER DISTRICT DEPOSIT, FEE AND CHARGE SCHEDULE (Includes Rate Adjustments Effective January 1, 2019) JEFFERSON WATER AND SEWER DISTRICT DEPOSIT, FEE AND CHARGE SCHEDULE (Includes Rate Adjustments Effective January 1, 2019) The deposits, fees and charges as set herein shall be paid as provided in the Jefferson

More information

D E F I N I T I O N S

D E F I N I T I O N S D E F I N I T I O N S Actuals vs. Budget/Estimate This document includes analyses of department appropriations and funds based on variances between the 2017-2018 actual revenues/expenditures and either

More information

City of Arroyo Grande Department of Public Works REQUEST FOR PROPOSAL WATER AND WASTEWATER RATE STUDY UPDATE

City of Arroyo Grande Department of Public Works REQUEST FOR PROPOSAL WATER AND WASTEWATER RATE STUDY UPDATE I. INTRODUCTION City of Arroyo Grande Department of Public Works REQUEST FOR PROPOSAL WATER AND WASTEWATER RATE STUDY UPDATE The City of Arroyo Grande, California (the City ) was incorporated as a general

More information

Fiscal Year Budget Proposal

Fiscal Year Budget Proposal Fiscal Year 20182019 Budget Proposal Board of Directors March 27, 2018 RIVANNA WATER & SEWER AUTHORITY FY 2019 Proposed Budget Table of Contents Budget Highlights Prepared: March 6, 2018 Adopted: Draft

More information

RATE & FEE SCHEDULE AMENDED July 1, 2018

RATE & FEE SCHEDULE AMENDED July 1, 2018 RATE & FEE SCHEDULE AMENDED July 1, 2018 I. FLAT FEES & CHARGES Certificate of Availability Fee - New (Water & Sewer Each) Residential - Single Family Residence $70.00 Commercial & Short Plats $200.00

More information

Charges. Retail. Charge (water) & Builder. Account Activation Fee. Meter Size. Meter Fee. Water Sewer. Total $7.485 $4.99 $9.98 $9.

Charges. Retail. Charge (water) & Builder. Account Activation Fee. Meter Size. Meter Fee. Water Sewer. Total $7.485 $4.99 $9.98 $9. Residential Accounts Rates & Fees Calendar Year Meter Size ¾ 1 1 ½ Initial Charges (Single-Family Residential Accounts) Account Activation Fee Total 3 Base Charge New Construction or Irrigation (water)

More information

APPENDIX A. Effective January 1, WATER AND SEWER TAP FEES - SINGLE FAMILY RESIDENTIAL TAP FEE

APPENDIX A. Effective January 1, WATER AND SEWER TAP FEES - SINGLE FAMILY RESIDENTIAL TAP FEE APPENDIX A Effective January 1, 2018 SECTION 1: WATER AND SEWER TAP FEES 1.1 WATER AND SEWER TAP FEES - SINGLE FAMILY RESIDENTIAL TAP FEE Type of Development for water and sewer tap(s) Single Family detached

More information

Strategic PLAN

Strategic PLAN Strategic PLAN - D MC Staff Legend Chief Administrative Officer Human Resources Information Services Policing Deputy Chief Administrative Officer Finance Administrative and Protective Services Fire Services

More information