1 Oldcastle Hamlet Sanitary Sewer Servicing 8 th Concession Road Sanitary Sewer Outlet Cost Recovery By-Law

2 Presentation Outline Background Project Cost Recovery Method Terminology North Talbot Road Sanitary Sewer Outlet 8 th Concession Road Sanitary Sewer Outlet Next Steps 8 th Concession Road Sanitary Sewer Outlet 2

3 Background Properties within the Oldcastle Hamlet were serviced by private on-site systems, some of which are inadequate, malfunctioning and have caused land and surface water pollution. Some existing septic systems cannot be upgraded or replaced to comply due to site constraints. The Municipality and MOE identified the need for proper treatment of wastewater within the Oldcastle Hamlet. 8 th Concession Road Sanitary Sewer Outlet 3

4 Background Studies o The W&WW Master Plan Update (2008) identified a preferred wastewater servicing strategy. o This was followed up with a Wastewater Servicing Study (2009) of Oldcastle Hamlet. o Two sanitary service areas created within the Oldcastle Hamlet Area: 1) North Talbot Road Outlet 2) 8 th Concession Road Outlet o A Preliminary Design Report (2017) was completed for the Oldcastle Hamlet Sanitary Servicing, 8 th Concession Road Outlet 8 th Concession Road Sanitary Sewer Outlet 4

5 Background Wastewater Servicing Strategy (2009) 8th Concession Road Sanitary Sewer Outlet 5

6 Background 8 th Concession Road Sanitary Sewer Outlet 6

7 Project Cost Recovery Method A project cost recovery method is required when funding a new major capital infrastructure where there is a new derived benefit to property owners. Full cost recovery from benefitting land owners. Mechanisms typically used include: o Local Improvement (Municipal Act, O.Reg. 586/06) For Projects initiated by property owners. o Development Charges Act For new infrastructure required as a result of a new development o Part XII By-Law (Municipal Act, s.391) For new infrastructure servicing existing development 8 th Concession Road Sanitary Sewer Outlet 7

8 Project Cost Recovery Method Part XII By-Law (Municipal Act, S.391) o S.391(1) provides the Municipality may impose fees or charges a) for services or activities provided or done by or on behalf of it; b) for costs payable by it for services or activities provided or done by or on behalf of any other municipality or local board; and c) for the use of its property including property under its control. o Charges not paid may be added to the tax roll. o Charges imposed are not appealable to the OMB on the grounds that the charges are unfair or unjust. 8 th Concession Road Sanitary Sewer Outlet 8

9 Terminology Sewer Main means the sewage collection system within the sanitary sewer outlet area. Main Charge means the charge for the capital cost of the sewer main. o Trunk means sanitary sewers greater than and equal to 375mm dia., pump stations and forcemains. o Local means sanitary sewers smaller than 375mm dia. Sewer Lateral means the pipe within the municipal road allowance that connects the sewer to a property. Lateral Charge means the charge for the installation of a sewer lateral. 8 th Concession Road Sanitary Sewer Outlet 9

10 North Talbot Road Sanitary Sewer Outlet 2011 Main & Lateral Charges (By-Law ) o Part XII By-Law - Identified service area for which the Main and Lateral Charges would be assessed against Amendment (By-Law ) o The Lateral Charges were revised to reflect updated construction costs for lateral service connections Amendment (By-Law ) o The service area was expanded to include 1 additional property on Outer Drive and 11 additional properties on County Road 11(Olympia Drive to Wolfe Drain). 8 th Concession Road Sanitary Sewer Outlet 10

11 North Talbot Road Sanitary Sewer Outlet Alternatives to calculate Main Charges were considered: o Properties Serviced (Each) Basis o Frontage Serviced (Each) Basis o Annual Water Consumption (Existing Customers) Basis o Gross Area (Properties) Serviced Basis The Gross Area Basis was the preferred method o Most equitable o Most controlled o Tender fluctuations are smoothed o All properties would benefit from grant funding 8 th Concession Road Sanitary Sewer Outlet 11

12 North Talbot Road Sanitary Sewer Outlet North Talbot Road Sanitary Sewer Outlet By Law Project Costs Part XII Area Charge Calculation Main Costs $ 7,815,113 Main Costs Lateral Costs $ 1,175,200 Total Acres Total $ 8,990,313 Total Hectares Cost/Acre $ 12,245 Cost/Hectare $ 30,267 Net Main Costs Gross Main Costs $ 7,815,113 Less Provincial/Federal Grants $ 3,166,667 Less DC Recoverable $ Net Main Costs $ 4,648,446 Lateral Costs (each) 150mm (6 inch), without inspection manhole $ 1, mm (6 inch), with inspection manhole $ 5, mm (8 inch), with inspection manhole $ 6, mm (10 inch), with inspection manhole $ 8,000 8 th Concession Road Sanitary Sewer Outlet 12

13 8th Concession Road Sanitary Sewer Outlet 8th Concession Road Sanitary Sewer Outlet 13

14 8 th Concession Road Sanitary Sewer Outlet 14

15 The 8 th Concession Road By-Law will be structured similar to the North Talbot Road By-Law. Part XII Main Charges based on Gross Area. Main Charges components consist of Trunk and Local to properly and fairly assess costs. Trunk (sewers 375mm dia. & Pump Stations) Local (sewers < 375mm dia.) Special Considerations o Frozen Areas, Existing Sanitary Service, DC Recoverable, Ability to sub-divide and install their own local sanitary sewers. 8 th Concession Road Sanitary Sewer Outlet 15

16 8th Concession Road Sanitary Sewer Outlet Summary of Project Costs Project Costs Part XII Area Charge Calculation Main Costs Main (Trunk) Trunk $ 59,783,834 Total Affected Acres Local $ 11,385,249 Total Affected Hectares Lateral Costs $ 2,199,701 Cost/Acre $ 13,063 Total $ 73,368,784 Cost/Hectare $ 32,280 Main (Local) Net Main Costs Total Affected Acres Gross Main Costs $ 71,169,083 Total Affected Hectares Less Provincial/Federal Grants $ 21,099,524 Cost/Acre $ 15,816 Less City of Windsor $ 11,506,381 Cost/Hectare $ 39,083 Less DC Recoverable $ 19,314,426 Less Benefit to Existing (other) $ 278,772 Net Main Costs $ 18,969,979 Trunk $ 7,584,730 Local $ 11,385,249 Lateral Costs (each) 150mm (6 inch), without inspection manhole $ 2, mm (6 inch), with inspection manhole $ 7, mm (8 inch), with inspection manhole $ 8, mm (10 inch), with inspection manhole $ 9,492 8 th Concession Road Sanitary Sewer Outlet 16

17 Summary of Total Project Costs TRUNK SEWERS Constructed Project Description Federal / Provincial Windsor Tecumseh Total % $ % $ % $ $ City of Windsor, Class EA for SSEL Sanitary 0.0% $ % $ 14, % $ 10, $ 25, City of Windsor, SSEL Phase 1A & 3 0.0% $ % $ 3,459, % $ 3,624, $ 7,084, City of Windsor, SSEL Phase 1B 0.0% $ % $ 1,682, % $ 1,763, $ 3,446, City of Windsor, SSEL Phase 2A & 2B % $ 3,605, % $ 880, % $ 922, $ 5,408, City of Windsor, SSEL Phase 4A % $ 2,352, % $ 923, % $ 252, $ 3,528, City of Windsor, SSEL Phase 4B & 4C % $ 4,933, % $ 1,937, % $ 529, $ 7,400, City of Windsor, SSEL Phase 4D % $ 3,327, % $ 1,270, % $ 393, $ 4,991, City of Windsor, SSEL Phase 5A & 5B % $ 2,581, % $ 809, % $ 481, $ 3,872, City of Windsor, SSEL Phase % $ 2,850, % $ 526, % $ 898, $ 4,276, Windsor SSEL Phase 6B / Tecumseh WW 11A % $ 1,447, % $ % $ 723, $ 2,170, th Concession Servicing Strategy 0.0% $ 0.0% $ 100.0% $ 60, $ 60, Tecumseh, WW 11B, 8th Concession to NTR 0.0% $ 0.0% $ 100.0% $ 2,256, $ 2,256, Tecumseh, WW 11C, Oldcastle Rd 0.0% $ 0.0% $ 100.0% $ 3,519, $ 3,519, Tecumseh, WW 11D, Greenway & McCord 0.0% $ 0.0% $ 100.0% $ 1,377, $ 1,377, Tecumseh, WW 11E, Blackacre PS1 0.0% $ 0.0% $ 100.0% $ 1,302, $ 1,302, Tecumseh, WW 11F, Blackacre & Outer 0.0% $ 0.0% $ 100.0% $ 1,689, $ 1,689, Tecumseh, WW 11G, Outer PS2 & Forcemain 0.0% $ 0.0% $ 100.0% $ 1,609, $ 1,609, Tecumseh, WW 11H, Oldcastle Road (South) 0.0% $ 0.0% $ 100.0% $ 1,209, $ 1,209, Tecumseh, WW 11I, NTR East of Oldcastle 0.0% $ 0.0% $ 100.0% $ 585, $ 585, Tecumseh, WW 11J, CR46 East of 8th Con 0.0% $ 0.0% $ 100.0% $ 1,310, $ 1,310, Tecumseh, WW 11K, N of CR46, E of 8th Con 0.0% $ 0.0% $ 100.0% $ 536, $ 536, Tecumseh, WW 11L, PS3 0.0% $ 0.0% $ 100.0% $ 708, $ 708, Tecumseh, WW 11M, CR46 East of 8th Con 0.0% $ 0.0% $ 100.0% $ 1,414, $ 1,414, SUMMARY TOTALS: 35.29% $ 21,099, % $ 11,506, % $ 27,177, $ 59,783, th Concession Road Sanitary Sewer Outlet 17

18 Further Breakdown of Town of Tecumseh Costs TRUNK SEWERS Constructed Project Description Tecumseh Benefit to Existing (Study Area) Benefit to Existing (Other Area) Development Charge $ % $ % $ % $ City of Windsor, Class EA for SSEL Sanitary $ 10, % $ 3, % $ 1, % $ 6, City of Windsor, SSEL Phase 1A & 3 $ 3,624, % $ 0.0% $ 100.0% $ 3,624, City of Windsor, SSEL Phase 1B $ 1,763, % $ 0.0% $ 100.0% $ 1,763, City of Windsor, SSEL Phase 2A & 2B $ 922, % $ 91, % $ 277, % $ 552, City of Windsor, SSEL Phase 4A $ 252, % $ 75, % $ 70.00% $ 176, City of Windsor, SSEL Phase 4B & 4C $ 529, % $ 158, % $ 70.00% $ 370, City of Windsor, SSEL Phase 4D $ 393, % $ 117, % $ 70.00% $ 275, City of Windsor, SSEL Phase 5A & 5B $ 481, % $ 144, % $ 70.00% $ 337, City of Windsor, SSEL Phase 6 $ 898, % $ 269, % $ 70.00% $ 629, Windsor SSEL Phase 6B / Tecumseh WW 11A $ 723, % $ 217, % $ 70.00% $ 506, th Concession Servicing Strategy $ 60, % $ 30, % $ 50.00% $ 30, Tecumseh, WW 11B, 8th Concession to NTR $ 2,256, % $ 744, % $ 67.02% $ 1,512, Tecumseh, WW 11C, Oldcastle Rd $ 3,519, % $ 1,775, % $ 49.55% $ 1,743, Tecumseh, WW 11D, Greenway & McCord $ 1,377, % $ 918, % $ 33.30% $ 458, Tecumseh, WW 11E, Blackacre PS1 $ 1,302, % $ 828, % $ 36.39% $ 473, Tecumseh, WW 11F, Blackacre & Outer $ 1,689, % $ 944, % $ 44.08% $ 744, Tecumseh, WW 11G, Outer PS2 & Forcemain $ 1,609, % $ 587, % $ 63.49% $ 1,021, Tecumseh, WW 11H, Oldcastle Road (South) $ 1,209, % $ 376, % $ 68.85% $ 832, Tecumseh, WW 11I, NTR East of Oldcastle $ 585, % $ 170, % $ 70.85% $ 414, Tecumseh, WW 11J, CR46 East of 8th Con $ 1,310, % $ 23, % $ 98.19% $ 1,286, Tecumseh, WW 11K, N of CR46, E of 8th Con $ 536, % $ 4, % $ 99.25% $ 532, Tecumseh, WW 11L, PS3 $ 708, % $ 6, % $ 99.14% $ 702, Tecumseh, WW 11M, CR46 East of 8th Con $ 1,414, % $ 95, % $ 93.22% $ 1,318, SUMMARY TOTALS: $ 27,177, % $ 7,584, % $ 278, % $ 19,314, th Concession Road Sanitary Sewer Outlet 18

19 Summary of Total Project Costs LOCAL SEWERS Project Description Tecumseh $ 8th Concession Servicing Strategy $ 60, Oldcastle Sanitary Class EA, Schedule B (2015) $ 82, Tecumseh L 1, CR46 & Webster Drive $ 942, Tecumseh L 2, Delduca, Ure, O'Neil, Hennin, etc. $ 2,897, Tecumseh L 3, Castlewood Court $ 336, Tecumseh L 4, Walker (N of Hwy3) & Hwy 3 $ 852, Tecumseh L 5, Blackacre Dr & Fasan Dr $ 1,697, Tecumseh L 6, Blackacre, Roscon, Outer $ 480, Tecumseh L 7, Walker (S of Hwy3) $ 558, Tecumseh L 8, Oldcastle Road (south) $ 273, Tecumseh L 9, Hwy3 (Walker to Oldcastle Rd) $ 547, Tecumseh L 10, North Talbot Road (East) $ 893, Tecumseh L 11, Howard Ave $ 1,763, TOTAL SUMMARY: $ 11,385, th Concession Road Sanitary Sewer Outlet 19

20 Cost Comparisons with North Talbot Road Sanitary Sewer Outlet North Talbot Road (2011 $) 8th Concession Road (2017 $) Project Costs Main Costs $ 7,815,113 $ Trunk $ $ 59,783,834 Local $ $ 11,385,249 Lateral Costs $ 1,175,200 $ 2,199,701 Total $ 8,990,313 $ 73,368,784 Net Main Costs Gross Main Costs $ 7,815,113 $ 71,169,083 Less Provincial/Federal Grants $ 3,166,667 $ 21,099,524 Less City of Windsor $ $ 11,506,381 Less DC Recoverable $ $ 19,314,426 Less Benefit to Existing (other) $ $ 278,772 Net Main Costs $ 4,648,446 $ 18,969,979 Trunk $ 7,584,730 Local $ 11,385,249 Assessed Area (Ha) Trunk Local 8 th Concession Road Sanitary Sewer Outlet 20

21 Comparisons with North Talbot Road Sanitary Sewer Outlet North Talbot Road 8th Concession Road Length (m) Length (m) Sanitary Sewer 200mm dia. 1,077 4, mm dia. 4,249 1, mm dia , mm dia , mm dia. 2, mm dia. 2,250 2, mm dia mm dia. 1, mm dia. 2, mm dia. 1, mm dia. 1, mm dia mm dia. 4, mm dia. 5,004 Total length of Sanitary Sewer 8,358 31,481 Forcemains Length (m) Length (m) Total length of Forcemains 1,245 Pump Stations Each Each Depths between m 3 Total Pump Stations 3 8 th Concession Road Sanitary Sewer Outlet 21

22 Main Differences between North Talbot Road & 8 th Concession Road Systems: o Length, Size and Depth of Sewers o Service Area Layout o Topography (i.e. pump stations and forcemains required) o Property and Easement Requirements o 2011 vs 2017 Construction Costs 8 th Concession Road Sanitary Sewer Outlet 22

23 Main Charge Trunk Sanitary Sewers Component o Assessed to Existing Developed Properties within the Study Area. o Includes Pumping Stations and Forcemains o Sewers equal to and larger than 375mm dia. ( mm) o Total Sewer Length of 22,876m (~ 23Km) o Net Costs of $7,584,730 o Affected Area: Hectares ( Acres) o $32,280/Hectare ($13,063/Acre) 8 th Concession Road Sanitary Sewer Outlet 23

24 8 th Concession Road Sanitary Sewer Outlet 24

25 8 th Concession Road Sanitary Sewer Outlet 25

26 Main Charge Trunk Sanitary Sewers Component o Special considerations given to properties that were not fully developed. 8 th Concession Road Sanitary Sewer Outlet 26

27 Main Charge Trunk Sanitary Sewers Component o Special considerations given to properties that cannot fully develop. 8 th Concession Road Sanitary Sewer Outlet 27

28 Main Charge Local Sanitary Sewers Component o Assessed to Existing Developed Properties and Properties unable to sub-divide and install their own Local Sanitary Sewers within the Study Area. o Should the Exempt Properties develop in the future without subdividing and installing their own Local Sanitary Sewers, they would then be subject to the Local Component of the Main Charge. o Sewers less than 375mm dia. ( mm) o Total Sewer Length of 8,605m (~ 8.6Km) o Net Costs of $11,385,249 o Affected Area: Hectares ( Acres) o $39,083/Hectare ($15,816/Acre) 8 th Concession Road Sanitary Sewer Outlet 28

29 8th Concession Road Sanitary Sewer Outlet 8th Concession Road Sanitary Sewer Outlet 29

30 8 th Concession Road Sanitary Sewer Outlet 30

31 Main Charge Local Sanitary Sewers Component o Special considerations given to properties that have the ability to sub-divide and install their own local sanitary sewers. 8 th Concession Road Sanitary Sewer Outlet 31

32 Residential Properties Special Consideration o Irregularities found in assessing residential properties based on Gross Area. o Main (Trunk & Local) Charges varied between $8,000 - $100,000/lot. o Residential properties do not have the same development opportunities/benefits as commercial or industrial lots once serviced. o It was decided to assess a per lot rate to those properties identified as residential in the Land Use Plan. 8 th Concession Road Sanitary Sewer Outlet 32

33 8 th Concession Road Sanitary Sewer Outlet 33

34 Residential Properties Special Consideration 8th Concession Road Sanitary Sewer Outlet Summary of Costs per Residential Lot Main (Trunk) Costs Residential Properties Total Residential Area (Ha) Main (Trunk) Costs ($) $ 1,433,907 No. of Affected Properties 93 No. of Future Severences 0 Main (Trunk) Charge ($/Lot) $ 15,418 Main (Local) Costs Residential Properties Total Residential Area (Ha) Main (Local) Costs ($) $ 2,173,600 No. of Affected Properties 103 No. of Future Severences 14 Main (Local) Charge ($/Lot) $ 18,578 8 th Concession Road Sanitary Sewer Outlet 34

35 Schedule of Assessments A detailed Schedule of Assessments will be available on the Town s website ( Timing of Assessments Assessments will be mailed out to those affected properties once the sanitary service connection has been provided to the property line (similar to the North Talbot Road Outlet). Assessments may be deferred for those parcels that are vacant and may be further subdivided in the future. 8 th Concession Road Sanitary Sewer Outlet 35

36 Next Steps Public Information Centre (PIC) o Not legislated requirement under Part XII o Detail property owner costs o Consider property owner concerns prior to by-law approval Report back to Council on the issues and questions raised at the PIC. By-Law presented to Council for approval. 8 th Concession Road Sanitary Sewer Outlet 36

37 37

Peters Township Sanitary Authority. Summary Report of Tapping Fee Calculation and Connection Charges

Peters Township Sanitary Authority. Summary Report of Tapping Fee Calculation and Connection Charges Peters Township Sanitary Authority Summary Report of Tapping Fee Calculation and Connection Charges June 30, 2008 Update No. 2 August 12, 2008 Summary Report Tapping Fee Calculation and Connection Charges

More information

Town of Rocky Mountain House: Offsite Levy Review

Town of Rocky Mountain House: Offsite Levy Review Town of Rocky Mountain House: Offsite Levy Review Version 6 October 25 th, 2016 Presented to: Todd Becker, CAO Town of Rocky Mountain House PO Box 1509 Rocky Mountain House AB T4T 1B2 (403) 845-2866 tbecker@rockymtnhouse.com

More information

TOWNSHIP OF WEST LINCOLN

TOWNSHIP OF WEST LINCOLN TOWNSHIP OF WEST LINCOLN April 18, 2016 dfa DFA Infrastructure International Inc. dfa DFA Infrastructure International Inc. 664-B Vine Street St. Catharines Ontario Canada L2M 7L8 Telephone: (905) 938-0965

More information

CITY OF WATERLOO Water & Sanitary Sewer Rate Design Study Final Report & Financial Plan No

CITY OF WATERLOO Water & Sanitary Sewer Rate Design Study Final Report & Financial Plan No CITY OF WATERLOO Water & Sanitary Sewer Rate Design Study Final Report & Financial Plan No. 112301 April 1st 2016 DFA Infrastructure International Inc. dfa DFA Infrastructure International Inc. 33 Raymond

More information

RATE INFORMATION. A. The rates adopted by the Authority will be in accordance with of the Code of Virginia, as amended.

RATE INFORMATION. A. The rates adopted by the Authority will be in accordance with of the Code of Virginia, as amended. Page 1 of 8 Section 1. PURPOSE The purpose of this policy to explain how the Bedford Regional Water Authority ( Authority ) implements the adopted Rates policy and to provide explanation for each of the

More information

Lehigh County Authority Capital Plan. Preliminary Plan: Board Presentation August 28, 2017

Lehigh County Authority Capital Plan. Preliminary Plan: Board Presentation August 28, 2017 Lehigh County Authority 2018-2022 Capital Plan Preliminary Plan: Board Presentation August 28, 2017 1 Project Prioritization Categories Project Category Regulatory New Cust CA/OS AM - Low AM - Med AM -

More information

Header Tile ATTACHMENT 2. City of Saskatoon

Header Tile ATTACHMENT 2. City of Saskatoon Header Tile ATTACHMENT 2 2 Building Better Infrastructure The Administration evaluates the condition of the City s assets in order to develop annual programs to maintain the assets at a minimum cost. Where

More information

GROWTH MANAGEMENT STRATEGY

GROWTH MANAGEMENT STRATEGY GROWTH MANAGEMENT STRATEGY THE COUNTY OF HALIBURTON May 21, 2014 TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 MEDIUM AND HIGH DENSITY HOUSING ALLOCATION... 2 2.1 Medium and High Option 1 Existing Distribution...

More information

MUNICIPALITY OF ARRAN-ELDERSLIE CHESLEY DRINKING WATER SYSTEM FINANCIAL PLAN

MUNICIPALITY OF ARRAN-ELDERSLIE CHESLEY DRINKING WATER SYSTEM FINANCIAL PLAN MUNICIPALITY OF ARRAN-ELDERSLIE CHESLEY DRINKING WATER SYSTEM FINANCIAL PLAN 15-013 GSS Engineering Consultants Ltd. Unit 104D 1010 9 th Avenue West Owen Sound ON N4K 5R7 519.372.4828 TABLE OF CONTENTS

More information

District of Clearwater Utility Rate Review

District of Clearwater Utility Rate Review District of Clearwater 2018 Utility Rate Review Janice Aver May 2018 Table of Contents BACKGROUND... 1 FULL COST OF SERVICE... 2 OPERATIONS... 3 CAPITAL... 5 RESERVES... 10 RATES... 12 RECOMMENDATIONS...

More information

RATE STUDY. Town of Midland. HEMSON C o n s u l t i n g L t d.

RATE STUDY. Town of Midland. HEMSON C o n s u l t i n g L t d. WATER AND WASTEWATER RATE STUDY Town of Midland C o n s u l t i n g L t d. December 2010 TABLE OF CONTENTS EXECUTIVE SUMMARY.........1 I BACKGROUND AND STUDY OBJECTIVES.........9 ll ASSOCIATED LEGISLATION.........13

More information

THE DISTRICT OF MUSKOKA ASSET MANAGEMENT PLAN FOR ROADS, BRIDGES, WATER AND WASTEWATER ASSETS

THE DISTRICT OF MUSKOKA ASSET MANAGEMENT PLAN FOR ROADS, BRIDGES, WATER AND WASTEWATER ASSETS THE DISTRICT OF MUSKOKA ASSET MANAGEMENT PLAN FOR ROADS, BRIDGES, WATER AND WASTEWATER ASSETS MAY 29, 2014 EXECUTIVE SUMMARY CONTENTS Page (i) 1. INTRODUCTION 1.1 Overview 1-1 1.2 Plan Development 1-1

More information

TOWN OF ATIKOKAN WATER & WASTEWATER FINANCIAL PLAN. May 30, Atikokan Public Works Water & Wastewater Services

TOWN OF ATIKOKAN WATER & WASTEWATER FINANCIAL PLAN. May 30, Atikokan Public Works Water & Wastewater Services TOWN OF ATIKOKAN WATER & WASTEWATER FINANCIAL PLAN May 30, 2016 Atikokan Public Works Water & Wastewater Services WATER & WASTEWATER FINANCIAL PLAN TOWN OF ATIKOKAN Table of Contents 1.0 Introduction ----------------------------------------------------------

More information

FINAL 2018 RATE SUPPORTED OPERATING BUDGET TABLE OF CONTENTS

FINAL 2018 RATE SUPPORTED OPERATING BUDGET TABLE OF CONTENTS FINAL RATE SUPPORTED OPERATING BUDGET TABLE OF CONTENTS Section 1 Final Rate Supported Operating Budget Water & Wastewater Summary PSAB Format...1 Water & Wastewater Summary...2 Water & Wastewater Administration...3

More information

Maurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 MEMORANDUM

Maurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 MEMORANDUM TO: FROM: Maurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 SUBJECT: - MEMORANDUM Introduction The (City) provides sewer sanitary collection services

More information

DRAFT MULTI-YEAR Water and Wastewater & Treatment Budget December 17, ANNUAL UPDATE INVESTING IN OUR FUTURE. london.

DRAFT MULTI-YEAR Water and Wastewater & Treatment Budget December 17, ANNUAL UPDATE INVESTING IN OUR FUTURE. london. 6 MULTI-YEAR BUDGET FOR THE 2019 ANNUAL UPDATE INVESTING IN OUR FUTURE london.ca/budget DRAFT 2019 Water and Wastewater & Treatment Budget December 17, 2018 Table of Contents Recommendations... 1 WATER

More information

Purpose To provide the completed prioritized 10-year capital plan for the Comox Valley sewerage service.

Purpose To provide the completed prioritized 10-year capital plan for the Comox Valley sewerage service. Staff report DATE: October 3, 2011 TO: Chair and Members Comox Valley Sewage Commission FILE: 5340-01 FROM: RE: Debra Oakman, CMA Chief Administrative Officer Sewerage service prioritized 10-year capital

More information

Chicopee River CSO Project Springfield Water & Sewer Commission. APWA Congress September 9, CSO Control Plan. CSO Control

Chicopee River CSO Project Springfield Water & Sewer Commission. APWA Congress September 9, CSO Control Plan. CSO Control Chicopee River CSO Project Springfield Water & Sewer Commission APWA Congress September 9, 2007 CSO Control Plan Typical Approach Different Thinking on Controlling Costs Case Example Springfield MA CSO

More information

PRINCE EDWARD COUNTY LONG TERM POPULATION, HOUSING AND EMPLOYMENT FORECAST AND CAPITAL NEEDS ASSESSMENT

PRINCE EDWARD COUNTY LONG TERM POPULATION, HOUSING AND EMPLOYMENT FORECAST AND CAPITAL NEEDS ASSESSMENT PRINCE EDWARD COUNTY LONG TERM POPULATION, HOUSING AND EMPLOYMENT FORECAST AND CAPITAL NEEDS ASSESSMENT JANUARY 14, 2013 CONTENTS Page 1. INTRODUCTION 1. 2. GROWTH FORECAST METHODOLOGY 1. 3. GROWTH DRIVERS

More information

Water & Sewer Budget Highlights

Water & Sewer Budget Highlights 2018-2022 Water & Sewer Budget Highlights PRESENTED BY CITY STAFF February 05, 2018 Council Meeting 2018 Water and Sewer Budgets: Background May 2017 Council approves utility rates for water and sewer

More information

Township of Georgian Bay Water & Sewer Capacity Allocation Strategy. MacTier. November, Jointly prepared by the

Township of Georgian Bay Water & Sewer Capacity Allocation Strategy. MacTier. November, Jointly prepared by the Appendix II Township of Georgian Bay 2008 Water & Sewer Capacity Allocation Strategy MacTier November, 2009 Jointly prepared by the Township of Georgian Bay and The District Municipality of Muskoka A.

More information

BY-LAW 1052/05 WATER AND SANITARY SEWER OFF-SITE LEVY BY-LAW STURGEON VALLEY AREA STURGEON COUNTY, ALBERTA

BY-LAW 1052/05 WATER AND SANITARY SEWER OFF-SITE LEVY BY-LAW STURGEON VALLEY AREA STURGEON COUNTY, ALBERTA BY-LAW 1052/05 WATER AND SANITARY SEWER OFF-SITE LEVY BY-LAW STURGEON VALLEY AREA STURGEON COUNTY, ALBERTA BEING A BYLAW OF STURGEON COUNTY FOR THE PURPOSE OF RECOVERING THE CAPITAL COSTS OF WATER AND

More information

TOWN OF MILTON LONG-TERM FISCAL IMPACT ASSESSMENT OF GROWTH Draft For Discussion Purposes

TOWN OF MILTON LONG-TERM FISCAL IMPACT ASSESSMENT OF GROWTH Draft For Discussion Purposes TOWN OF MILTON LONG-TERM FISCAL IMPACT ASSESSMENT OF GROWTH 2011-2021 Draft For Discussion Purposes DECEMBER 6, 2010 CONTENTS Page 1. INTRODUCTION 1.1 Background 1-1 2. FORECAST POPULATION, HOUSING, AND

More information

2018 Budget Public Budget Consultation Meeting November 16 th, 2017

2018 Budget Public Budget Consultation Meeting November 16 th, 2017 2018 Budget Public Budget Consultation Meeting November 16 th, 2017 2 1. 2018 Budget Process and Communications Plan 2. 2018 Proposed Capital Budget a. Funding Sources b. Expenditures c. Life Cycle Reserve

More information

WATER and WASTEWATER & TREATMENT COUNCIL APPROVED December 12, 2017

WATER and WASTEWATER & TREATMENT COUNCIL APPROVED December 12, 2017 WATER and WASTEWATER & TREATMENT COUNCIL APPROVED December 12, 2017 TABLE OF CONTENTS Approval of 2018 Annual Update... 1 WATER 2018-2019 Multi-Year Summary - Water... 5 2016-2019 Water Operating Overview...

More information

FINAL 2017 RATE SUPPORTED BUDGET TABLE OF CONTENTS

FINAL 2017 RATE SUPPORTED BUDGET TABLE OF CONTENTS FINAL RATE SUPPORTED BUDGET TABLE OF CONTENTS Final Operating Budget WATER & WASTEWATER SUMMARY PSAB Format... 1 WATER & WASTEWATER SUMMARY... 2 Water & Wastewater Administration Summary... 3 Water Operations

More information

Municipality of Trent Hills 2018 Water and Wastewater Budget Approved: December 19, 2017

Municipality of Trent Hills 2018 Water and Wastewater Budget Approved: December 19, 2017 1 Overview Municipality of Trent Hills The Municipality of Trent Hills has drinking water and sewage systems located in the communities of Campbellford, Hastings and Warkworth. These systems are considered

More information

Town of Boones Mill Water and Sewer Ordinance Rules and Regulations

Town of Boones Mill Water and Sewer Ordinance Rules and Regulations Town of Boones Mill Water and Sewer Ordinance Rules and Regulations SUPERVISION The Town of Boones Mill (Town) Water and Sewer Department shall be under the supervision of the Town Manager, who shall exercise

More information

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE PUBLIC WORKS AND UTILITIES DEPARTMENT NORTH PRIMARY SANITARY GRAVITY MAIN UPGRADE

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE PUBLIC WORKS AND UTILITIES DEPARTMENT NORTH PRIMARY SANITARY GRAVITY MAIN UPGRADE REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE PUBLIC WORKS AND UTILITIES DEPARTMENT ON NORTH PRIMARY SANITARY GRAVITY MAIN UPGRADE December 8, 2016 PURPOSE To seek Council s authorization to award

More information

City of Arroyo Grande Department of Public Works REQUEST FOR PROPOSAL WATER AND WASTEWATER RATE STUDY UPDATE

City of Arroyo Grande Department of Public Works REQUEST FOR PROPOSAL WATER AND WASTEWATER RATE STUDY UPDATE I. INTRODUCTION City of Arroyo Grande Department of Public Works REQUEST FOR PROPOSAL WATER AND WASTEWATER RATE STUDY UPDATE The City of Arroyo Grande, California (the City ) was incorporated as a general

More information

Pre-Amalgamated Tecumseh Area

Pre-Amalgamated Tecumseh Area Schedule "C" to By-law 2002-42 Schedule C to By-law 2002-2002 2002 2002 Grand 2002 Grand Municipal County Education Total Rate Not San. Sewer Total RTC RTQ Description Tax Rates Tax Rates Tax Rates Incl.

More information

NEW HAMPSHIRE CODE OF ADMINISTRATIVE RULES. Puc "Commission" means the New Hampshire public utilities commission.

NEW HAMPSHIRE CODE OF ADMINISTRATIVE RULES. Puc Commission means the New Hampshire public utilities commission. CHAPTER Puc 700 RULES FOR SEWER UTILITIES REVISION NOTE: Document #6475, effective 3-25-97, made extensive changes to the wording and numbering of rules in Chapter Puc 700. Document #6475 supersedes all

More information

THE CITY OF EDMONTON SANITARY SERVICING STRATEGY FUND 2012 ANNUAL REPORT

THE CITY OF EDMONTON SANITARY SERVICING STRATEGY FUND 2012 ANNUAL REPORT THE CITY OF EDMONTON SANITARY SERVICING STRATEGY FUND ANITARY ERVICING TRATEGY 2012 ANNUAL REPORT June 2013 Prepared by: City of Edmonton Financial Services and Utilities Department Drainage Services Branch

More information

Overview on Charges to Developers / SLPs 26 June 2018

Overview on Charges to Developers / SLPs 26 June 2018 Overview on Charges to Developers / SLPs 26 June 2018 Our agenda UU in the news Setting 2018/19 charges Feedback we incorporated How we set charges for 2018/19 Feedback we have since received Some focus

More information

REPORT. TO: Rob Adams FROM: Shawn Moyer DATE: March 6, 2019 REPORT: PU SUBJECT: 60% Design Stage RFP 2018-F18-04 Engineering for County Rd 12

REPORT. TO: Rob Adams FROM: Shawn Moyer DATE: March 6, 2019 REPORT: PU SUBJECT: 60% Design Stage RFP 2018-F18-04 Engineering for County Rd 12 REPORT TO: Rob Adams FROM: Shawn Moyer DATE: March 6, 2019 REPORT: PU.19.04 SUBJECT: 60% Design Stage RFP 2018-F18-04 Engineering for County Rd 12 RECOMMENDATION: That the report from the Director of Public

More information

Lehigh County Authority Capital Plan. Preliminary Plan Board Presentation August 22, 2016

Lehigh County Authority Capital Plan. Preliminary Plan Board Presentation August 22, 2016 Lehigh County Authority 2017-2021 Capital Plan Preliminary Plan Board Presentation August 22, 2016 1 Process Review / Approvals Capital Plan Annual Budget Funding / New Borrowing Project Authorizations

More information

RE:EX Toronto Water CAPITAL BUDGET NOTES CONTENTS CONTACTS CAPITAL BUDGET AND PLAN OVERVIEW. Overview

RE:EX Toronto Water CAPITAL BUDGET NOTES CONTENTS CONTACTS CAPITAL BUDGET AND PLAN OVERVIEW. Overview RE:EX29.18 CAPITAL BUDGET NOTES CONTENTS Overview 1: Recommended 10-Year Capital Plan 5 2: Issues for Discussion 22 Appendices: 1. 2017 Performance 30 2. Recommended 10-Year Capital Plan Summary 32 Toronto

More information

St. James Twp. Charlevoix Co. Michigan

St. James Twp. Charlevoix Co. Michigan SANITARY SEWER SYSTEM RATE STUDY December 12 BOARD Kathleen McNamara, Supervisor Alice Belfy, Clerk Diane McDonough, Treasurer Jeff Powers, Trustee Travis Martin, Trustee STAFF Darrell Butler, Public Works

More information

Nith Peninsula, Brant County Fiscal Impact Study

Nith Peninsula, Brant County Fiscal Impact Study Fiscal Impact Study October 25, 2017 Fiscal Impact Study Prepared for: Losani Homes Prepared by: 33 Yonge Street Toronto Ontario M5E 1G4 Phone: (416) 641 9500 Fax: (416) 641 9501 economics@altusgroup.com

More information

Where are your taxes going?

Where are your taxes going? BUDGET HIGHLIGHTS Building for the Future The City s 2017 proposed Budget continues to build for the future, investing in community priorities essential to Regina s continued growth. The Budget goals were

More information

M A N I T O B A ) Order No. 13/13 ) THE PUBLIC UTILITIES BOARD ACT ) February 4, 2013

M A N I T O B A ) Order No. 13/13 ) THE PUBLIC UTILITIES BOARD ACT ) February 4, 2013 M A N I T O B A ) Order No. 13/13 ) THE PUBLIC UTILITIES BOARD ACT ) BEFORE: Susan Proven, P.H.Ec., Acting Chair Marilyn Kapitany, B.Sc. (Hons.), M.Sc., Member RURAL MUNICIPALITY OF PEMBINA LOCAL URBAN

More information

Appendix A Financial Principles

Appendix A Financial Principles Appendix A Financial Principles 1) The continued use and development of a self sustaining sewer "utility" be confirmed, it being noted that a sewer system with its own revenue and expenses will best meet

More information

LAFCo 509 W. WEBER AVENUE SUITE 420 STOCKTON, CA 95203

LAFCo 509 W. WEBER AVENUE SUITE 420 STOCKTON, CA 95203 SAN JOAQUIN LOCAL AGENCY FORMATION COMMISSION AGENDA ITEM NO. 2 LAFCo 509 W. WEBER AVENUE SUITE 420 STOCKTON, CA 95203 REVISED EXECUTIVE OFFICER S REPORT March 10, 2016 TO: FROM: SUBJECT: LAFCo Commissioners

More information

CITY OF SAULT STE. MARIE 2016 DEVELOPMENT CHARGES BACKGROUND STUDY. Draft for Public Circulation and Comment

CITY OF SAULT STE. MARIE 2016 DEVELOPMENT CHARGES BACKGROUND STUDY. Draft for Public Circulation and Comment CITY OF SAULT STE. MARIE 2016 DEVELOPMENT CHARGES BACKGROUND STUDY Draft for Public Circulation and Comment JUNE 8, 2016 CONTENTS Page 1. INTRODUCTION 1.1 Purpose of this Document 1-1 1.2 Development Charges

More information

Municipal Levies- A Developers Perspective

Municipal Levies- A Developers Perspective Municipal Levies- A Developers Perspective Background Shelter is a basic necessity Serviced land is essential to shelter Cost of lot paid by homebuyer Increased costs =decreased affordability 2 Levy Definition

More information

Rood Engineering Inc.

Rood Engineering Inc. 1ST CONCESSION ROAD DRAIN EAST & 2ND CONCESSION ROAD DRAIN (Fulmer Estate Section 65) Geographic Township of Mersea MUNICIPALITY OF LEAMINGTON 111 Erie Street North Leamington, Ontario N8H 2Z9 519-326-5761

More information

Finance Committee Meeting

Finance Committee Meeting Finance Committee Meeting FY16 Strategic Business and Operating Plan and Preliminary Budget Review April 8, 2015 Finance Committee Meeting FY16 Strategic Business Operating Plan and Preliminary Budget

More information

TOWN OF INNISFIL STAFF REPORT

TOWN OF INNISFIL STAFF REPORT TOWN OF INNISFIL STAFF REPORT STAFF REPORT NO: DSR-092-15 DATE: 06 May 2015 TO: Mayor, Deputy Mayor and Members of Council FROM: Andy Campbell, Deputy CAO / Town Engineer SUBJECT: Municipal Services Corporation

More information

Report to: General Committee Date Report Authored: June 1, 2016

Report to: General Committee Date Report Authored: June 1, 2016 SUBJECT: Status of Capital Projects as of April 30, 2016 PREPARED BY: Andrea Tang Senior Manager, Financial Planning (Ext. 2433) Jemima Lee Senior Financial Analyst (Ext. 2963) RECOMMENDATION: 1) THAT

More information

City of Spruce Grove: Offsite Levy Review

City of Spruce Grove: Offsite Levy Review City of Spruce Grove: Offsite Levy Review Version 3 December 5 th, 2017 Prepared by: Greg Weiss, President 9670 95 Avenue Edmonton, AB T6C 2A4 (780) 428-4110 gweiss@corvusbusinessadvisors.com www.corvusbusinessadvisors.com

More information

Comox Valley Sewerage Service Cost Apportionment

Comox Valley Sewerage Service Cost Apportionment Comox Valley Sewerage Service Cost Apportionment Background Prior to 2003 apportionment of sewerage service costs was based on number of connections per participant In 2003 apportionment changed to measured

More information

BAPJ E User Rate Supported Operating Budgets. The City of. Introduction

BAPJ E User Rate Supported Operating Budgets. The City of. Introduction Introduction The User-rate supported budget includes water, wastewater and parking services. For all three services, recently completed or ongoing capital works have a significant influence on each service's

More information

Order No. 49/18 THE CITY OF THOMPSON WATER AND WASTEWATER UTILITY WATER AND WASTEWATER RATES. April 12, 2018

Order No. 49/18 THE CITY OF THOMPSON WATER AND WASTEWATER UTILITY WATER AND WASTEWATER RATES. April 12, 2018 THE CITY OF THOMPSON WATER AND WASTEWATER UTILITY WATER AND WASTEWATER RATES BEFORE: Irene A. Hamilton, Panel Chair Michael Watson, Member Room 400 330 Portage Avenue Winnipeg, MB R3C 0C4 www.pubmanitoba.ca

More information

PROPOSED 2019 RATE SUPPORTED OPERATING BUDGET TABLE OF CONTENTS

PROPOSED 2019 RATE SUPPORTED OPERATING BUDGET TABLE OF CONTENTS PROPOSED 2019 RATE SUPPORTED OPERATING BUDGET TABLE OF CONTENTS Section 1 Financial Services Report Financial Services Report...1 Section 2 General Information Norfolk County Council & Senior Staff...

More information

1. Tartan Land Corporation s application for an Early Servicing Agreement for Leitrim based on the terms attached in Annex D; and

1. Tartan Land Corporation s application for an Early Servicing Agreement for Leitrim based on the terms attached in Annex D; and 4. LEITRIM EARLY SERVICING AGREEMENT COMMITTEE RECOMMENDATIONS AS AMENDED That Council approve: 1. Tartan Land Corporation s application for an Early Servicing Agreement for Leitrim based on the terms

More information

2018 Operating Budget Schedule "A" Description Revenues Expenses 2018 Budget

2018 Operating Budget Schedule A Description Revenues Expenses 2018 Budget 2018 Operating Budget Schedule "A" Description Revenues Expenses 2018 Budget Revenue from Taxation $ (8,896,874) $ - $ (8,896,874) Payments in Lieu of Taxation (123,000) - (123,000) OMPF Funding (1,275,100)

More information

Actual Cost Actual Cost HST

Actual Cost Actual Cost HST s & Charges Department Water % Est # Units 2013 Actual Water Main Taps 20mm to 50mm 58 $ 369.87 $ 375.42 Exempt 1.5% Inflation 100mm & larger 57 $ 689.77 $ 700.12 Exempt 1.5% Inflation Standby time for

More information

VOLUME 2 - RULES AND REGULATIONS. Part B - Schedule of Rates, Fees and Other Charges. Table of Contents. 1. Definitions... 1

VOLUME 2 - RULES AND REGULATIONS. Part B - Schedule of Rates, Fees and Other Charges. Table of Contents. 1. Definitions... 1 VOLUME 2 - RULES AND REGULATIONS Part B - Schedule of Rates, Fees and Other Charges Table of Contents 1. Definitions... 1 1.1 Applicant... 1 1.2 Availability... 1 1.3 Availability Fees... 1 1.4 Availability

More information

Notice of a public hearing

Notice of a public hearing Notice of a public hearing Dear Benicia Resident and/or Business Owner, You are receiving a revised Notice of a Public Hearing to increase the water and sewer rates and add water meter replacement fees.

More information

Waterfront Revitalization Initiative

Waterfront Revitalization Initiative CAPITAL BUDGET NOTES Waterfront Revitalization Initiative 2018 2027 CAPITAL BUDGET AND PLAN OVERVIEW The revitalization of Toronto's Waterfront is a 25 to 30 year project, in coordination with the three

More information

CORPORATION OF THE TOWNSHIP OF ADELAIDE METCALFE. Financial Statements. December 31, 2016

CORPORATION OF THE TOWNSHIP OF ADELAIDE METCALFE. Financial Statements. December 31, 2016 CORPORATION OF THE TOWNSHIP OF ADELAIDE METCALFE Financial Statements December 31, 2016 Financial Statements Table of Contents PAGE Independent Auditors' Report 1 Statement of Financial Position 2 Statement

More information

CORPORATION OF THE TOWNSHIP OF ADELAIDE METCALFE. Financial Statements. December 31, 2015

CORPORATION OF THE TOWNSHIP OF ADELAIDE METCALFE. Financial Statements. December 31, 2015 CORPORATION OF THE TOWNSHIP OF ADELAIDE METCALFE Financial Statements December 31, 2015 Financial Statements Table of Contents PAGE Independent Auditors' Report 1 Statement of Financial Position 2 Statement

More information

Appendix A - Water Modelling Technical Memorandum

Appendix A - Water Modelling Technical Memorandum Appendix A - Water Modelling Technical Memorandum 75 International Blvd., Suite 304 Toronto, Ontario M9W 6L9 Phone: 416.703.0667 Fax: 416.703.2501 www.blueplan.ca Memorandum Organization: The Town of Caledon

More information

Civic Works Committee Report

Civic Works Committee Report Civic Works Committee Report 11th Meeting of the Civic Works Committee July 17, 2018 PRESENT: Councillors V. Ridley, T. Park, P. Hubert, P. Squire ABSENT: H. Usher, Mayor M. Brown ALSO PRESENT: Councillors

More information

LIBERTY UTILITIES (ENTRADA DEL ORO SEWER) CORP.

LIBERTY UTILITIES (ENTRADA DEL ORO SEWER) CORP. DOCKET NO. SW-04316A-16-0078, et al. Sheet No. i 1 TABLE OF CONTENTS Pan One Statement of No. l 1. Rates 11. Taxes and Assessments...Sheet No. 2 111. Additional Charges No. 3. n. Permitted Sheet No. 4

More information

PUBLIC ANNOUNCEMENT REQUEST FOR QUALIFICATIONS

PUBLIC ANNOUNCEMENT REQUEST FOR QUALIFICATIONS PUBLIC ANNOUNCEMENT REQUEST FOR QUALIFICATIONS of the Morrow Roachester & Morrow-Cozaddale Sewer Improvement Areas, Warren County Sewer District April, 2019 Warren County is accepting sealed statement

More information

PRELIMINARY OPINION OF PROBABLE CONSTRUCTION COSTS

PRELIMINARY OPINION OF PROBABLE CONSTRUCTION COSTS ACCU MOLD SYSTEM 8-Aug-07 REVISED: 5-Dec-07 6" SDR-35 Laterals 10 EA x $1,000.00 = $10,000.00 8" SDR-35 1000 L.F. x $75.00 = $75,000.00 Manholes (6-8" Depth) 4 EA x $2,500.00 = $10,000.00 Manhole Core

More information

HACKBERRY HIDDEN COVE PUBLIC IMPROVEMENT DISTRICT NO. 2 SERVICE AND ASSESSMENT PLAN (UTILITY IMPROVEMENTS)

HACKBERRY HIDDEN COVE PUBLIC IMPROVEMENT DISTRICT NO. 2 SERVICE AND ASSESSMENT PLAN (UTILITY IMPROVEMENTS) HACKBERRY HIDDEN COVE PUBLIC IMPROVEMENT DISTRICT NO. 2 SERVICE AND ASSESSMENT PLAN (UTILITY IMPROVEMENTS) SEPTEMBER 15, 2009 HACKBERRY HIDDEN COVE PUBLIC IMPROVEMENT DISTRICT NO. 2 SERVICE AND ASSESSMENT

More information

WATER and WASTEWATER & TREATMENT DRAFT October 30, 2017

WATER and WASTEWATER & TREATMENT DRAFT October 30, 2017 WATER and WASTEWATER & TREATMENT DRAFT October 30, 2017 TABLE OF CONTENTS Recommendations... 1 WATER 2018-2019 Multi-Year Summary - Water... 5 2016-2019 Water Operating Overview... 6 2016-2019 Water Staffing

More information

CITY OF ALHAMBRA UTILITIES DEPARTMENT SEWER SYSTEM MAINTENANCE PROGRAM (SSMP)

CITY OF ALHAMBRA UTILITIES DEPARTMENT SEWER SYSTEM MAINTENANCE PROGRAM (SSMP) CITY OF ALHAMBRA UTILITIES DEPARTMENT SEWER SYSTEM MAINTENANCE PROGRAM (SSMP) APRIL 2009 Table of Contents INTRODUCTION... 3 SECTION I: GOALS... 3 SECTION II: ORGANIZATION... 4 SECTION III: LEGAL AUTHORITY...

More information

STORMWATER MANAGEMENT FUND Department of Environmental Services

STORMWATER MANAGEMENT FUND Department of Environmental Services Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

M A N I T O B A ) Order No. 83/12 ) THE PUBLIC UTILITIES BOARD ACT ) July 9, 2012

M A N I T O B A ) Order No. 83/12 ) THE PUBLIC UTILITIES BOARD ACT ) July 9, 2012 M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) July 9, 2012 BEFORE: Susan Proven, P.H.Ec, Acting Chair Monica Girouard, CGA, Member Raymond Lafond, CA, Member RURAL MUNICIPALITY OF DE SALABERRY ST.

More information

DEVELOPER CHARGING ARRANGEMENTS

DEVELOPER CHARGING ARRANGEMENTS DEVELOPER CHARGING ARRANGEMENTS 2018-2019 2 A1. This document sets out the Developer Charging Arrangements made by Anglian Water Services Limited under various provisions within the Water Industry Act

More information

Introduction to Development Charges (DCs)

Introduction to Development Charges (DCs) Introduction to Development Charges (DCs) Strategic Priorities and Policy Committee April 13 th, 2015 1 Agenda What are Development Charges & what do they pay for? DC rate setting process Payment of DCs

More information

Frequently Asked Questions (FAQs) About Chatham Borough s Water and Sewer Revenue Systems

Frequently Asked Questions (FAQs) About Chatham Borough s Water and Sewer Revenue Systems Frequently Asked Questions (FAQs) About Chatham Borough s Water and Sewer Revenue Systems 1) How much revenue does Chatham Borough need to collect to operate and maintain its water and sewer systems? A:

More information

Baltimore Gas and Electric Company Gas Extensions

Baltimore Gas and Electric Company Gas Extensions Baltimore Gas and Electric Company Gas 15 8. Extensions 8.1 General 8.11 General Statement Regarding Extensions: The Company extends its gas lines in accordance with the general practice described in these

More information

Municipality of Bluewater Draft Budget

Municipality of Bluewater Draft Budget Municipality of Bluewater - 2010 Draft Budget 1 Draft 2010 Budget Bluewater Municipal Council has approved a draft 2010 budget of $5,551,702, a 4.66% overall increase which protects the current levels

More information

Haist St Arena Lands Financial Update. Presented by: Teresa Quinlin, MBA, CPA, CA February 11, 2019

Haist St Arena Lands Financial Update. Presented by: Teresa Quinlin, MBA, CPA, CA February 11, 2019 Haist St Arena Lands Financial Update Presented by: Teresa Quinlin, MBA, CPA, CA February 11, 2019 February 11, 2019 1. Haist St Arena Property Photos 2. Financial reasons why the Town needs to sell the

More information

FINANCIAL PLAN WATER AND WASTEWATER LINES OF SERVICE

FINANCIAL PLAN WATER AND WASTEWATER LINES OF SERVICE UCS2018-0223 ATTACHMENT 1 FINANCIAL PLAN 2019-2022 WATER AND WASTEWATER LINES OF SERVICE 2018 MARCH 14 MAKING LIFE BETTER EVERY DAY UCS2018-0223 Financial Plan 2019-2022 - Water and Wastewater Lines of

More information

Sewer Rate Study July 2016

Sewer Rate Study July 2016 July 2016 Prepared By The Finance Division TABLE OF CONTENTS SECTION 1: EXECUTIVE SUMMARY... 1 1.1 Background... 1 1.2 Purpose... 1 1.3 Current Sewer Rates... 1 1.4 Five Year Financial Projection... 1

More information

SEWER DISTRICT EXTENSION REPORT. South & Center Chautauqua Lake Sewer Districts Chautauqua County, New York

SEWER DISTRICT EXTENSION REPORT. South & Center Chautauqua Lake Sewer Districts Chautauqua County, New York SEWER DISTRICT EXTENSION REPORT Sewer Extension through the Hamlet of Stow for the West Side of Chautauqua Lake South & Center Chautauqua Lake Sewer Districts Chautauqua County, New York September 2017

More information

CRESTVIEW WATER AND SANITATION DISTRICT FINANCIAL STATEMENTS DECEMBER 31, 2014

CRESTVIEW WATER AND SANITATION DISTRICT FINANCIAL STATEMENTS DECEMBER 31, 2014 CRESTVIEW WATER AND SANITATION DISTRICT FINANCIAL STATEMENTS DECEMBER 31, 2014 CONTENTS Independent Auditors Report 2-3 Management s Discussion and Analysis 4-7 BASIC FINANCIAL STATEMENTS Statements of

More information

General Business Rules and Regulations

General Business Rules and Regulations General Business Rules and Regulations GENERAL BUSINESS POLICIES The Western Virginia Water Authority (Authority) rates, fees, and penalties referred to in this document are reflected in the Approved Rates

More information

Finance Committee Meeting

Finance Committee Meeting Finance Committee Meeting FY18 Strategic Business and Operating Plan and Preliminary Budget Review April 04, 2017 1 Finance Committee Meeting FY18 Strategic Business Operating Plan and Preliminary Budget

More information

STEGE SANITARY DISTRICT FINANCIAL PLAN AND RATE REVIEW

STEGE SANITARY DISTRICT FINANCIAL PLAN AND RATE REVIEW STEGE SANITARY DISTRICT FINANCIAL PLAN AND RATE REVIEW June 2014 BARTLE WELLS ASSOCIATES Independent Public Finance Advisors 1889 Alcatraz Avenue Berkeley CA 94703 Tel. 510/653-3399 TABLE OF CONTENTS

More information

CORPORATION OF THE TOWN OF ST. MARYS CONSOLIDATED FINANCIAL STATEMENTS DECEMBER 31, 2011

CORPORATION OF THE TOWN OF ST. MARYS CONSOLIDATED FINANCIAL STATEMENTS DECEMBER 31, 2011 CORPORATION OF THE TOWN OF ST. MARYS CONSOLIDATED FINANCIAL STATEMENTS DECEMBER 31, 2011 INDEPENDENT AUDITORS' REPORT To the Members of Council, Inhabitants and Ratepayers of the Corporation of the Town

More information

Wastewater Rate Study. Villa Park, Illinois

Wastewater Rate Study. Villa Park, Illinois Wastewater Rate Study Villa Park, Illinois June 2013 Executive Summary General The Village of Villa Park s Wastewater Utility is responsible for operation and maintenance of the Village s separate sanitary

More information

DEVELOPMENT CHARGES BACKGROUND STUDY

DEVELOPMENT CHARGES BACKGROUND STUDY DEVELOPMENT CHARGES BACKGROUND STUDY Town of Innisfil C o n s u l t i n g L t d. July 19, 2018 TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 I PURPOSE OF THE DEVELOPMENT CHARGES BACKGROUND STUDY... 6 A. INTRODUCTION

More information

Progressive Planning for Financially Robust Water Systems

Progressive Planning for Financially Robust Water Systems Canadian Water Network: Blue Cities 2017 Progressive Planning for Financially Robust Water Systems May 17, 2017 CITY OF ATLANTA Kasim Reed, Mayor Kishia L. Powell, Commissioner 5/25/2017 1 Discussion I.

More information

WATER POLLUTION CONTROL AUTHORITY TOWN OF SOUTH WINDSOR REGULAR MEETING AGENDA 7:00 P.M. SPRENKEL ROOM MAY 5, 2015

WATER POLLUTION CONTROL AUTHORITY TOWN OF SOUTH WINDSOR REGULAR MEETING AGENDA 7:00 P.M. SPRENKEL ROOM MAY 5, 2015 MEMBERS OF THE WPCA THAT ARE UNABLE TO ATTEND THIS MEETING, PLEASE CALL ETHER DIAZ, (860) 644-2511, EXT. 243, ON OR BEFORE 4:30 P.M. ON THE DAY OF THE MEETING WATER POLLUTION CONTROL AUTHORITY AGENDA 7:00

More information

TOWN OF COLLINGWOOD ASSET MANAGEMENT PLAN

TOWN OF COLLINGWOOD ASSET MANAGEMENT PLAN TOWN OF COLLINGWOOD ASSET MANAGEMENT PLAN JUNE 24, 2014 EXECUTIVE SUMMARY CONTENTS Page (i) 1. INTRODUCTION 1.1 Overview 1-1 1.2 Plan Development 1-1 1.3 Maintaining the Asset Management Plan 1-2 1.4

More information

M A N I T O B A ) Order No. 36/10 ) THE PUBLIC UTILITIES BOARD ACT ) April 12, 2010 TOWN OF MINNEDOSA INTERIM WATER AND SEWER RATES

M A N I T O B A ) Order No. 36/10 ) THE PUBLIC UTILITIES BOARD ACT ) April 12, 2010 TOWN OF MINNEDOSA INTERIM WATER AND SEWER RATES M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) BEFORE: Graham Lane, CA, Chairman Monica Girouard, CGA, Member TOWN OF MINNEDOSA INTERIM WATER AND SEWER RATES Page 2 of 11 Executive Summary By this

More information

M A N I T O B A ) Order No. 100/10 ) THE PUBLIC UTILITIES BOARD ACT ) October 6, 2010 MUNICIPALITY OF KILLARNEY TURTLE MOUNTAIN WATER AND SEWER RATES

M A N I T O B A ) Order No. 100/10 ) THE PUBLIC UTILITIES BOARD ACT ) October 6, 2010 MUNICIPALITY OF KILLARNEY TURTLE MOUNTAIN WATER AND SEWER RATES M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) October 6, 2010 BEFORE: Graham Lane, CA, Chairman Susan Proven, P.H.Ec., Member MUNICIPALITY OF KILLARNEY TURTLE MOUNTAIN WATER AND SEWER RATES Page

More information

Region of Peel. BMO Canadian Fixed Income Conference. May 1 & 2, Spring

Region of Peel. BMO Canadian Fixed Income Conference. May 1 & 2, Spring Region of Peel BMO Canadian Fixed Income Conference May 1 & 2, 2018 Spring 2018 1 Meet the Region of Peel Table of Contents Who we are 2 Economy 5 Finances 14 Debt Issuance.. 27 Spring 2018 Who we are

More information

CALL FOR TENDER - MUNICIPALITY OF THE DISTRICT OF CLARE LITTLE BROOK, N.S.

CALL FOR TENDER - MUNICIPALITY OF THE DISTRICT OF CLARE LITTLE BROOK, N.S. - MUNICIPALITY OF THE DISTRICT OF CLARE LITTLE BROOK, N.S. NAME OF TENDER: REPLACE WASTEWATER TREATMENT PLANT OUTFALL PIPE LOCATION OF WORK: Wastewater Treatment Plant Meteghan 8425 Hwy 1, Meteghan, NS

More information

Order No. 105/17. September 29, BEFORE: Shawn McCutcheon, Member, Panel Chair Carol Hainsworth, C.B.A, Member Susan Nemec, FCPA, FCA, Member

Order No. 105/17. September 29, BEFORE: Shawn McCutcheon, Member, Panel Chair Carol Hainsworth, C.B.A, Member Susan Nemec, FCPA, FCA, Member MUNICIPALITY OF PEMBINA LOCAL URBAN DISTRICT OF DARLINGFORD WASTEWATER RATES January 1, 2018 and 2019 & 2015 DEFICIT RECOVERY BEFORE: Shawn McCutcheon, Member, Panel Chair Carol Hainsworth, C.B.A, Member

More information

SMALL BUSINESS SEPTIC SYSTEM REHABILITATION AND REPLACEMENT PROGRAM RULES (ARTICLE 13)

SMALL BUSINESS SEPTIC SYSTEM REHABILITATION AND REPLACEMENT PROGRAM RULES (ARTICLE 13) SMALL BUSINESS SEPTIC SYSTEM REHABILITATION AND REPLACEMENT PROGRAM RULES (ARTICLE 13) Catskill Watershed Corporation PO Box 569 Margaretville, NY 12455 (845) 586-1400 Approved by the Board of Directors

More information

Subject: City of St. Louis Park Beltline Boulevard Station Redevelopment Area Comprehensive Plan Amendment, Review File No.

Subject: City of St. Louis Park Beltline Boulevard Station Redevelopment Area Comprehensive Plan Amendment, Review File No. Committee Report Business Item No. 2017-54 Community Development Committee For the Metropolitan Council meeting of March 8, 2017 Subject: City of St. Louis Park Beltline Boulevard Station Redevelopment

More information

RESOLUTION ADOPTING AN EXCESS CAP A CITY CREDIT POLICY FOR WATER AND SEWERFACILTIIES

RESOLUTION ADOPTING AN EXCESS CAP A CITY CREDIT POLICY FOR WATER AND SEWERFACILTIIES RESOLUTION ADOPTING AN EXCESS CAP A CITY CREDIT POLICY FOR WATER AND SEWERFACILTIIES WHEREAS, it is desirable to institute a policy to provide a credit (payment) to individuals who extend the Orange Water

More information

The Municipality of Callander. Callander Drinking Water System. Financial Plan #

The Municipality of Callander. Callander Drinking Water System. Financial Plan # The Municipality of Callander Callander Drinking Water System #187-301 January 4, 2012 Municipality of Callander Callander Drinking Water System Page i Table of Contents 1. INTRODUCTION... 1 1.1 LEGISLATIVE

More information