Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Size: px
Start display at page:

Download "Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No."

Transcription

1 Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No E PRELIMINARY STATEMENT Sheet 1 Safety and Reliability Investment Incentive Mechanism (SRIIM) 1. Purpose The Safety and Reliability Investment Incentive Mechanism (SRIIM) shall determine the difference between: (1) actual (recorded) safety and reliability-related capital additions; and (2) the authorized level of safety and reliability-related capital additions in Decision (D.) Additionally, the SRIIM will track the staffing target. If by the end of 2017, SCE has fully implemented its safety and reliability-related capital spending and maintained a staffing target greater than or equal to the 2012 year-end levels 2,225 SRIIM Employee Target positions, no customer refunds shall be required. If an overcollection in revenue requirement is determined from (1) the authorized reliability-related capital additions being greater than recorded adjusted capital additions or (2) from a net short fall in the SRIIM Employee Target, the associated revenue requirement shall be refunded to customers. 2. Definitions a. SRIIM Capital Additions For purposes of recording entries in the SRIIM, Capital Additions shall be defined as Gross Capital Additions plus associated Cost of Removal. b. Authorized SRIIM Safety and Reliability-Related Capital Expenditures and Capital Additions The SRIIM Safety and Reliability-Related Capital Expenditures are the capitalrelated costs specifically identified in preserving long-term electric service reliability for customers. Table A shows the amounts adopted by D for each of the relevant categories. (D) Table A - Authorized SRIIM Expenditures 1/ Nominal $ Worst Circuit Rehabilitation 104, , ,484 Underground Cable Life 26,892 27,430 27,979 CIC Replacement 75,452 76,961 78,500 Underground Switch 9,625 9,818 10,014 Underground Structure Replacement 57,750 58,905 60,083 Circuit Breaker Replacements 24,375 24,863 25,360 Substation Transformer Replacement 48,328 49,294 50,280 Total SRIIM Expenditures 346, , ,700 1/ 2016 and 2017 expenditures are escalated annually by 2% per the Post Test Year mechanism adopted in D Advice 3314-E R.O Nichols Date Filed Nov 25, 2015 Decision Senior Vice President Effective Jan 1, C12

2 Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No E PRELIMINARY STATEMENT Sheet 2 Safety and Reliability Investment Incentive Mechanism (SRIIM) 2. Definitions The associated authorized capital additions including cost of removal are shown in Table B. (D) Table B - Authorized SRIIM Capital Additions 2/ Nominal $ Total SRIIM Capital Additions 366, , ,258 2/ 2016 and 2017 additions are escalated annually by 2% per the Post Test Year mechanism adopted in D The capital expenditures identified in Table A and the associated cumulative capital additions forecast to be added to plant-in-service by December 31, 2017 (plus associated cost of removal) are subject to SRIIM. c. Authorized SRIIM High Priority Exception Expenditures and Capital Additions The High Priority Capital Expenditures are expenditures identified as affecting the SRIIM categories above (section 2.b). The High Priority capital additions are used to adjust the recorded SRIIM Capital Additions. The authorized SRIIM High Priority Capital Expenditures and associated Capital Additions amounts reflect expenditures adopted in D , including cost of removal, and are shown in Tables C and D. (D) Table C - Authorized High Priority Expenditures 3/ Nominal $ Claims 25,810 26,327 26,853 Customer Growth 303, , ,231 Storms 46,492 47,421 48,370 Total High Priority Expenditures 376, , ,454 3/ 2016 and 2017 expenditures are escalated annually by 2% per the Post Test Year mechanism adopted in D Advice 3314-E R.O Nichols Date Filed Nov 25, 2015 Decision Senior Vice President Effective Jan 1, C14

3 Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No E PRELIMINARY STATEMENT Sheet 3 Safety and Reliability Investment Incentive Mechanism (SRIIM) 2. Definitions Table D - Authorized High Priority Capital Additions 4/ Nominal $ Total High Priority Capital Additions 259, , ,484 4/ 2016 and 2017 additions are escalated annually by 2% per the Post Test Year mechanism adopted in D d. Recorded SRIIM Capital Additions Adjustment The difference between the authorized High Priority exception Capital Additions and recorded High Priority categories Capital Additions can be used to offset underspending the SRIIM Capital Additions. Overspending in High Priority categories can offset underspending in SRIIM categories if two conditions are true. (1) Overspending in High Priority categories exceeds 10% of the adopted forecast for those categories (2) SCE s rate of return on rate base for the period does not exceed the authorized rate of return That is, if recorded High Priority Capital Additions exceed amounts authorized by the Commission and subject to satisfying Conditions 1 and 2 described above (Section 2.d.), the SRIIM capital target would be adjusted by this amount. However, pursuant to D , the first 10% of the overspending on High Priority categories cannot be used to offset underspending in the core SRIIM categories. e. Adjusted Recorded SRIIM Capital Additions Adjusted recorded SRIIM Capital Additions shall be the sum of the Recorded SRIIM Capital Additions (section 2a) and the Recorded SRIIM Capital Additions Adjustment (section 2d). (L) 3C8

4 Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No E PRELIMINARY STATEMENT Sheet 4 Safety and Reliability Investment Incentive Mechanism (SRIIM) 2. Definitions f. Cumulative Shortfall (1) The Capital Additions Cumulative Shortfall (if any) is the difference between the Authorized SRIIM capital additions (including associated cost of removal) and the Adjusted Recorded SRIIM Capital Additions from January 1, 2015 through December 31, If there is a cumulative shortfall at the end of SRIIM, SCE shall return to customers the accumulated capital-related revenue requirement plus interest. (2) The SRIIM Employee Target Shortfall (if any) is the result of the net shortfall in SRIIM job categories from the 2012 year-end headcount level of 2,225 employees through December 31, If there is a cumulative shortfall at the end of SRIIM, SCE shall return to customers the O&M related revenue requirement plus interest. If an employee shortfall develops in the fourth quarter of 2017, SCE will have the first quarter of 2018 to address the shortfall. (L) (L) 4C10

5 Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No E PRELIMINARY STATEMENT Sheet 5 (L) Safety and Reliability Investment Incentive Mechanism (SRIIM) 2. Definitions g. SRIIM Employee Target (1) The SRIIM Employee Target is set to equal the 2012 year-end headcount of 2,225 employees for the combined SRIIM job categories. The SRIIM SCE Employee Target shall be calculated as the difference between the number of SCE Employees working in the SRIIM job categories in December 2017 and the number of SCE Employees working in the SRIIM job categories in December (2) The SRIIM Job Categories shall include the following Distribution: E-Crew, Lineman, Sr. Cable Splicer, Apprentice Lineman, Groundman A, Groundman; Transmission: Lineman, Groundman A, Apprentice Lineman; Senior Patrolman; Troubleman; System Operator; Substation Operator; Electrician: Substation, Apprentice Substation; Technician: Test, Test Supervision working in these job classifications. 5C11

6 Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No E PRELIMINARY STATEMENT Sheet 6 (L) Safety and Reliability Investment Incentive Mechanism (SRIIM) 2. Definitions h. SRIIM Employee Target Shortfall Calculations (1) Net Shortfall is less than 50 If SCE s net shortfall in the SRIIM Employee Target positions is less than 50, SCE will return $20,000 per position under 50 to customers. (2) Net Shortfall is greater than 50 If SCE s net shortfall in the SRIIM Employee Target positions is greater than 50, SCE will return an additional amount of $1,000,000, plus $80,000 for each position greater than 50, to customers. 6C11

7 Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No E PRELIMINARY STATEMENT Sheet 7 (L) Safety and Reliability Investment Incentive Mechanism (SRIIM) 2. Definitions i. Interest Rate The Interest Rate shall be the most recent annual interest rate on three month Financial or Non-financial Commercial Paper rate (prime, three months) published monthly in the Federal Reserve Statistical Release H.15, whichever is available on the first day of the month. j. CPUC Jurisdictional Factor The distribution O&M-related CPUC jurisdictional factor reflected in D is percent. k. Revenue Requirement Multiplier The Revenue Requirement Multiplier shall reflect SCE s most current Commissionauthorized factors that are used in calculating a capital-related revenue requirement including depreciation rates, rate of return on rate base, and income tax rates. For 2015, the annual Revenue Requirement Multiplier shall be set at 16.27%. l. Effective Date The effective date of SRIIM is January 1, Determining a Capital Related SRIIM Base Revenue Requirement Reduction Amount If a calculation of SRIIM Capital Additions base revenue requirement reduction amount is necessary, that is if a Capital Additions cumulative shortfall exists, the base revenue requirement reduction amount shall be determined as follows: a. The recorded adjusted SRIIM Capital Additions cumulative shortfall shall be allocated to each month during the period January 1, 2015 through December 31, 2017 evenly after it has been CPUC jurisdictionalized by applying the applicable distribution capital-related CPUC Jurisdictional Factor; b. A monthly revenue requirement balance shall be determined for each month during the period January 1, 2015 through December 31, 2017 by multiplying the monthly cumulative difference between the authorized and the adjusted recorded SRIIM Capital Additions by the applicable monthly Revenue Requirement Multiplier; If SCE s recorded Capital Additions exceed authorized levels, SCE shall not recover from customers any additional base revenue requirement associated with its recorded Capital Additions; c. Monthly interest shall be added by applying the Interest Rate to the average of the beginning and ending monthly revenue requirement balances; d. The Distribution-related revenue requirement shall be credited to the Distribution Sub-account of the BRRBA to be returned to customers. 7C10

8 Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No E PRELIMINARY STATEMENT Sheet 8 (L) Safety and Reliability Investment Incentive Mechanism (SRIIM) 4. Determining SRIIM Employee Target Related Revenue Reduction Amount If a calculation of the SRIIM Employee Target positions reduction is necessary, that is the SRIIM Employee Target cumulative shortfall exists, the reduction amount shall be determined as follows: a. If SRIIM Employee Target net shortfall in positions is less than 50, multiply the shortfall by $20,000. b. If SRIIM Employee Target net shortfall in positions is greater than 50, multiply the difference between 50 and the amount greater than 50 by $80,000, plus $1,000,000. c. The amount determined in (a) or (b) above shall be allocated each month during the period January 1, 2015 through December 31, 2017 evenly. d. The monthly revenue requirement amount shall be CPUC jurisdictionalized by applying the distribution O&M CPUC jurisdictional factor. e. Monthly interest shall be added by applying the Interest Rate to the average of the beginning and ending monthly revenue requirement balances; 5. SRIIM Report By April 2018, SCE shall submit an advice letter to the Commission that reports SCE s adjusted recorded SRIIM capital additions for calendar years 2015 through 2017 and includes support for the calculation of a base revenue requirement reduction amount (if any). The advice letter will include all necessary information and supporting workpapers for the Commission to review and approve SCE s post test year SRIIM Capital Additions rate recovery. The advice letter will also include the recorded number of SRIIM Employee Target positions for calendar years 2015 through 2017 and shall include the SRIIM SCE Employee Target and include support for the calculation of a reduction amount (if any). If an employee shortfall develops in the fourth quarter of 2017, SCE will have the first quarter of 2018 to address the shortfall. SCE will inform the Commission by letter if it intends to utilize the timing modification. SCE will also include all necessary information and supporting workpapers for the Commission to review and approve. 8C10

PRELIMINARY STATEMENT Sheet 1. J. Pole Loading and Deteriorated Pole Programs Balancing Account

PRELIMINARY STATEMENT Sheet 1. J. Pole Loading and Deteriorated Pole Programs Balancing Account Southern California Edison Revised Cal. PUC Sheet No. 60654-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 57949-E PRELIMINARY STATEMENT Sheet 1 J. Pole Loading and Deteriorated

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 51720-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 44454-E PRELIMINARY STATEMENT Sheet 1 CALIFORNIA ALTERNATE RATES FOR ENERGY

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 60626-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 58142-E PRELIMINARY STATEMENT Sheet 1 CC. Statewide Marketing, Education

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 60626-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 58142-E PRELIMINARY STATEMENT Sheet 1 CC. Statewide Marketing, Education

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 61132-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 53957-E Sheet 1 Rule 15 Refundable/Discount Option Estimate Extension

More information

RE: Southern California Edison Company s Formula Transmission Rate Annual Update Filing in Docket No. ER (TO11)

RE: Southern California Edison Company s Formula Transmission Rate Annual Update Filing in Docket No. ER (TO11) James A. Cuillier Director FERC Rates & Regulation Ms. Kimberly D. Bose, Secretary 888 First Street, N.E. Washington, DC 20426 RE: Southern California Edison Company s Formula Transmission Rate Annual

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 62766-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 53907-E Sheet 1 DIRECT ACCESS CUSTOMER RELOCATION DECLARATION (To be inserted

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 49319-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 46179-E PRELIMINARY STATEMENT Sheet 1 1. Purpose The purpose of the Public

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 59483-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 51843-E APPLICABILITY Schedule RES-BCT Sheet 1 This Schedule is optional

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 64087-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 62826-E PRELIMINARY STATEMENT Sheet 1 Y. Demand Response Program Balancing

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 60721-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 53887-E Schedule FC-NEM Sheet 1 APPLICABILITY Applicable to Bundled Service

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 58812-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 55706-E Sheet 1 NET ENERGY METERING Form 14-935 (To be inserted by utility)

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 66505-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 65449-E Schedule LS-3 Sheet 1 APPLICABILITY Applicable to metered service

More information

2018 General Rate Case

2018 General Rate Case Application No.: A.16-09- Exhibit No.: SCE-0, Vol. 08 Witnesses: J. R. Goizueta M. Flores A (U 338-E) 018 General Rate Case Transmission & Distribution (T&D) Volume 8 - Infrastructure Replacement Before

More information

RE: Southern California Edison Company s Formula Transmission Rate Annual Update Filing in Docket No. ER (TO11)

RE: Southern California Edison Company s Formula Transmission Rate Annual Update Filing in Docket No. ER (TO11) Jeffrey L. Nelson Director FERC Rates & Market Integration Ms. Kimberly D. Bose, Secretary 888 First Street, N.E. Washington, DC 20426 RE: Southern California Edison Company s Formula Transmission Rate

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 28658-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 27754-E INCREMENTAL SALES RATE AGREEMENT (To be inserted by utility) Issued

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 34721-E Rosemead, California Cancelling Revised Cal. PUC Sheet No. 34487-E* 31479-E Schedule D-APS-E Sheet 1 APPLICABILITY Applicable to domestic service

More information

PRELIMINARY STATEMENT Sheet 1. NNN. Transportation Electrification Portfolio Balancing Account (TEPBA)

PRELIMINARY STATEMENT Sheet 1. NNN. Transportation Electrification Portfolio Balancing Account (TEPBA) Southern California Edison Revised Cal. PUC Sheet No. 64055-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 63233-E PRELIMINARY STATEMENT Sheet 1 NNN. Transportation Electrification

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 31867-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 23018-E Rule 20 Sheet 1 A. SCE will, at its expense, replace its existing

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No E

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No E Southern California Edison Revised Cal. PUC Sheet No. 35321-E Rosemead, California Cancelling Revised Cal. PUC Sheet No. 35307-E PRELIMINARY STATEMENT Sheet 1 ELECTRIC DISTRIBUTION REVENUE ADJUSTMENT BALANCING

More information

Schedule GTSR-GR Sheet 1 GREEN TARIFF SHARED RENEWABLES GREEN RATE

Schedule GTSR-GR Sheet 1 GREEN TARIFF SHARED RENEWABLES GREEN RATE Southern California Edison Revised Cal. PUC Sheet No. 59547-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 56750-E Schedule GTSR-GR Sheet 1 APPLICABILITY This Schedule is applicable

More information

Schedule GTSR-CR Sheet 1 GREEN TARIFF SHARED RENEWABLES COMMUNITY RENEWABLES

Schedule GTSR-CR Sheet 1 GREEN TARIFF SHARED RENEWABLES COMMUNITY RENEWABLES Southern California Edison Revised Cal. PUC Sheet No. 59541-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 56740-E Schedule GTSR-CR Sheet 1 APPLICABILITY This Schedule is applicable

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 58914-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 57616-E Schedule CPP Sheet 1 APPLICABILITY This Schedule is optional for

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 59484-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 52461-E RATES (continued) Schedule RES-BCT Sheet 2 All costs associated

More information

APPENDIX IX ATTACHMENT 1 FORMULA RATE PROTOCOLS

APPENDIX IX ATTACHMENT 1 FORMULA RATE PROTOCOLS APPENDIX IX ATTACHMENT 1 FORMULA RATE PROTOCOLS 1. INTRODUCTION SCE shall calculate its Base Transmission Revenue Requirement ( Base TRR ), as defined in Section 3.6 of the main definitions section of

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 57616-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 53885-E Schedule CPP Sheet 1 APPLICABILITY This Schedule is optional for

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 56089-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 56203-E PRELIMINARY STATEMENT Sheet 2 N. MEMORANDUM ACCOUNTS 2. Definitions.

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 64436-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 63592-E Sheet 1 OPTIONAL BINDING MANDATORY CURTAILMENT AGREEMENT BETWEEN

More information

PRELIMINARY STATEMENT Sheet 2

PRELIMINARY STATEMENT Sheet 2 Southern California Edison Revised Cal. PUC Sheet No. 30251-E Rosemead, California Cancelling Revised Cal. PUC Sheet No. 28274-E PRELIMINARY STATEMENT Sheet 2 N. MEMORANDUM ACCOUNTS 2. Definitions. d.

More information

RE: Revision to Southern California Edison Company s Formula Transmission Rate Annual Update in Docket No. ER (Amended TO8)

RE: Revision to Southern California Edison Company s Formula Transmission Rate Annual Update in Docket No. ER (Amended TO8) Regulation James A. Cuillier Director FERC Rates & Regulation Ms. Kimberly D. Bose, Secretary 888 First Street, N.E. Washington, DC 20426 RE: Revision to Southern California Edison Company s Formula Transmission

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Original Cal. PUC Sheet No E

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Original Cal. PUC Sheet No E Southern California Edison Revised Cal. PUC Sheet No. 27771-E Rosemead, California Cancelling Original Cal. PUC Sheet No. 23089-E Form (To be inserted by utility) Issued by (To be inserted by Cal. PUC)

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 64409-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 58722-E Schedule NEM Sheet 1 APPLICABILITY Applicable to Eligible Customer-Generators

More information

December 14, Modifications to Regulatory Mechanisms Established in Accordance with Decision and Decision

December 14, Modifications to Regulatory Mechanisms Established in Accordance with Decision and Decision Akbar Jazayeri Director of Revenue and Tariffs December 14, 2005 ADVICE 1940-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Modifications to Regulatory Mechanisms

More information

Schedule NEM-V Sheet 1 VIRTUAL NET ENERGY METERING FOR MULTI-TENANT AND MULTI-METER PROPERTIES

Schedule NEM-V Sheet 1 VIRTUAL NET ENERGY METERING FOR MULTI-TENANT AND MULTI-METER PROPERTIES Southern California Edison Revised Cal. PUC Sheet No. 55676-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 54511-E* APPLICABILITY Schedule NEM-V Sheet 1 Applicable to Qualified

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 34727-E Rosemead, California Cancelling Revised Cal. PUC Sheet No. 34492-E 34493-E* Schedule DM Sheet 1 APPLICABILITY Applicable to domestic service

More information

2018 General Rate Case. Transmission & Distribution (T&D) Volume 3 R System Planning

2018 General Rate Case. Transmission & Distribution (T&D) Volume 3 R System Planning Application No.: Exhibit No.: Witnesses: A.1-0- A SCE-0, Vol. 0 R A E. Takayesu (U -E) 01 General Rate Case rd Errata ERRATA Transmission & Distribution (T&D) Volume R System Planning Before the Public

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No E

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No E Southern California Edison Revised Cal. PUC Sheet No. 29205-E Rosemead, California Cancelling Revised Cal. PUC Sheet No. 23729-E Schedule DM Sheet 1 APPLICABILITY Applicable to domestic service including

More information

Exhibit A Affidavit of Alan Varvis

Exhibit A Affidavit of Alan Varvis Affidavit of Alan Varvis Page 1 of 9 UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Southern California Edison Company ) Docket No. ER16- -000 AFFIDAVIT OF ALAN VARVIS FOR SOUTHERN

More information

Rule 22 Sheet 1 DIRECT ACCESS

Rule 22 Sheet 1 DIRECT ACCESS Southern California Edison Revised Cal. PUC Sheet No. 46949-E** Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 40020-E Rule 22 Sheet 1 The following terms and conditions apply to

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 62808-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 61326-E APPLICABILITY Schedule D-CARE Sheet 1 Applicable to domestic service

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 61411-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 53858-E Schedule TOU-BIP Sheet 1 APPLICABILITY This Schedule is optional

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 62812-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 62650-E Schedule TOU-D-T Sheet 1 APPLICABILITY Applicable as an option

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 59895-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 57290-E GENERATING FACILITY INTERCONNECTION AGREEMENT (Non-Exporting)

More information

November 29, RE: Southern California Edison Company s Formula Transmission Rate Annual Update Filing in Docket No. ER (TO2019)

November 29, RE: Southern California Edison Company s Formula Transmission Rate Annual Update Filing in Docket No. ER (TO2019) Jeffrey L. Nelson Director FERC Rates & Market Integration Ms. Kimberly D. Bose, Secretary 888 First Street, N.E. Washington, DC 20426 RE: Southern California Edison Company s Formula Transmission Rate

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No E*

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No E* Southern California Edison Revised Cal. PUC Sheet No. 28371-E Rosemead, California Cancelling Revised Cal. PUC Sheet No. 26736-E* Schedule PE Sheet 1 APPLICABILITY Applicable to all SCE Bundled Service

More information

EDISON An EDISON INTERNATIONAL Company

EDISON An EDISON INTERNATIONAL Company SOUTHERN CALIFORNIA EDISON An EDISON INTERNATIONAL Company (U 338-E) 2015 General Rate Case APPLICATION Workpapers Transmission & Distribution Customer Driven Programs and Distribution Construction SCE-03

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 62914-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 60975-E RATES Schedule TOU-BIP Sheet 5 Excess Energy Charges: For both

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 59107-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 57595-E Schedule TOU-GS-3 Sheet 1 APPLICABILITY Applicable to single-

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 58755-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 55676-E APPLICABILITY Schedule NEM-V Sheet 1 Applicable to Qualified Customers

More information

Akbar Jazayeri Vice President, Regulatory Operations Southern California Edison Company P O Box 800 Rosemead, CA 91770

Akbar Jazayeri Vice President, Regulatory Operations Southern California Edison Company P O Box 800 Rosemead, CA 91770 STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr. Governor February 1, 2012 Advice Letter 2677-E Akbar Jazayeri Vice President, Regulatory Operations Southern

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 62813-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 61336-E Schedule TOU-DPP Sheet 1 APPLICABILITY This Schedule is available

More information

Workpapers. Transmission & Distribution Grid Operations SCE-03 Volume General Rate Case APPLICATION. An EDISON INTERNATIONAL Company

Workpapers. Transmission & Distribution Grid Operations SCE-03 Volume General Rate Case APPLICATION. An EDISON INTERNATIONAL Company An EDISON INTERNATIONAL Company (U 338-E) 215 General Rate Case APPLICATION Workpapers Transmission & Distribution Grid Operations SCE-3 Volume 7 N ovem ber 213 1 Workpaper - Southern California Edison

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 57517-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 55662-E Schedule NEM Sheet 1 APPLICABILITY Applicable to Eligible Customer-Generators

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 64404-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 58701-E Schedule MASH-VNM Sheet 1 APPLICABILITY Applicable to Qualified

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 54897-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 53225-E Schedule CBP Sheet 1 APPLICABILITY The Capacity Bidding Program

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 59898-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 57292-E Sheet 1 GENERATING FACILITY INTERCONNECTION AGREEMENT (3 RD PARTY

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 62547-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 57088-E APPLICABILITY Schedule CCA-INFO Sheet 1 Applicable to Community

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 63153-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 62809-E Schedule D-FERA Sheet 1 APPLICABILITY Applicable to domestic service

More information

Southern California Edison Revised Cal. PUC Sheet No G Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No G Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 1772-G Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 1712-G Rule 11 Sheet 1 A. Past Due Bills. When bills are rendered monthly

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 62425-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 57044-E Schedule DBP Sheet 1 APPLICABILITY This Schedule is optional for

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 63032-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 62343-E Schedule WTR Sheet 1 APPLICABILITY Applicable to single-phase

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) )

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Application of Southern California Edison Company (U 338-E for Authority to, Among Other Things, Increase its Authorized Revenues for Electric

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 63147-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 62808-E APPLICABILITY Schedule D-CARE Sheet 1 Applicable to domestic service

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 57626-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 46689-E Schedule TMDL Sheet 1 APPLICABILITY This Schedule is applicable

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 53895-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 50436-E Schedule SLRP Sheet 1 APPLICABILITY This Schedule is optional

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 62633-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 61381-E PRELIMINARY STATEMENT Sheet 2 N. MEMORANDUM ACCOUNTS 2. Definitions.

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 21344-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 18069-E PRELIMINARY STATEMENT Sheet 1 N. MEMORANDUM ACCOUNTS 1. Purpose.

More information

FOR IMMEDIATE RELEASE Media relations contact: Charles Coleman, (626) Investor relations contact: Scott Cunningham, (626)

FOR IMMEDIATE RELEASE Media relations contact: Charles Coleman, (626) Investor relations contact: Scott Cunningham, (626) NEWS FOR IMMEDIATE RELEASE Media relations contact: Charles Coleman, (626) 302-7982 Investor relations contact: Scott Cunningham, (626) 302-2540 Edison International Reports Second Quarter 2016 Results;

More information

October 26, 2017 Advice Letter 3665-E

October 26, 2017 Advice Letter 3665-E STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr., Governor October 26, 2017 Advice Letter 3665-E Russell G. Worden Director, Regulatory Operations Southern

More information

CITY OF DANA POINT. FINANCIAL REVIEW COMMITTEE Agenda Report

CITY OF DANA POINT. FINANCIAL REVIEW COMMITTEE Agenda Report 01/23/18 Page 1 Item #3B CITY OF DANA POINT FINANCIAL REVIEW COMMITTEE Agenda Report DATE: JANUARY 23, 2018 TO: FROM: FINANCIAL REVIEW COMMITTEE MIKE KILLEBREW, ASSISTANT CITY MANAGER SUBJECT: UTILITY

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 64407-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 43778-E Schedule NMDL Sheet 1 APPLICABILITY This Schedule is applicable

More information

January 31, 2003 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

January 31, 2003 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Akbar Jazayeri Director of Revenue and Tariffs January 31, 2003 ADVICE 1682-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Year 2003 Refund Plan For December

More information

Schedule NEM-ST Sheet 1 NET ENERGY METERING SUCCESSOR TARIFF

Schedule NEM-ST Sheet 1 NET ENERGY METERING SUCCESSOR TARIFF Southern California Edison Revised Cal. PUC Sheet No. 60463-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 58728-E Schedule NEM-ST Sheet 1 APPLICABILITY This Schedule is applicable

More information

June 8, 2001 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Restatement of the Transition Cost Balancing Account

June 8, 2001 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Restatement of the Transition Cost Balancing Account Akbar Jazayeri Director of Revenue and Tariffs June 8, 2001 ADVICE 1535-E-A (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Restatement of the Transition Cost

More information

Advice Letters 3072-E and 3072-E-A

Advice Letters 3072-E and 3072-E-A STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr., Governor August 19, 2014 Advice Letters 3072-E and 3072-E-A Megan Scott-Kakures Vice President, Regulatory

More information

SUBJECT: Modification of the Distribution Resources Plan Memorandum Account Pursuant to Decision

SUBJECT: Modification of the Distribution Resources Plan Memorandum Account Pursuant to Decision STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 April 13, 2018 Advice Letter 3764-E Russell G. Worden Director, State Regulatory

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 52806-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 51618-E Rule 22.1 Sheet 1 The following terms and conditions apply to

More information

Schedule NEM-ST Sheet 1 NET ENERGY METERING SUCCESSOR TARIFF

Schedule NEM-ST Sheet 1 NET ENERGY METERING SUCCESSOR TARIFF Southern California Edison Revised Cal. PUC Sheet No. 60463-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 58728-E Schedule NEM-ST Sheet 1 APPLICABILITY This Schedule is applicable

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 65881-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 64401-E Schedule CPP Sheet 1 APPLICABILITY This Schedule is optional for

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 58865-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 55179-E Rule 26 Sheet 1 A. APPLICABILITY The following rules apply to:

More information

Schedule NEM-V-ST Sheet 1 VIRTUAL NET METERING FOR MULTI-TENANT AND MULTI-METER PROPERTIES SUCCESSOR TARIFF

Schedule NEM-V-ST Sheet 1 VIRTUAL NET METERING FOR MULTI-TENANT AND MULTI-METER PROPERTIES SUCCESSOR TARIFF Southern California Edison Revised Cal. PUC Sheet No. 60503-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 58758-E Schedule NEM-V-ST Sheet 1 APPLICABILITY This Schedule is applicable

More information

August 16, Attachment 1 to the Formula Rate is the Formula Protocols, and Attachment 2 is the Formula Spreadsheet. 2

August 16, Attachment 1 to the Formula Rate is the Formula Protocols, and Attachment 2 is the Formula Spreadsheet. 2 Karen Koyano Principle Manager FERC Rates and Compliance Ms. Kimberly D. Bose, Secretary 888 First Street, N.E. Washington, DC 20426 Dear Ms. Bose: Pursuant to Section 205 of the Federal Power Act and

More information

February 6, RE: Southern California Edison 2006 General Rate Case, A , et al.

February 6, RE: Southern California Edison 2006 General Rate Case, A , et al. Frank A. McNulty Senior Attorney mcnultfa@sce.com February 6, 2005 Docket Clerk California Public Utilities Commission 505 Van Ness Avenue San Francisco, California 94102 RE: Southern California Edison

More information

SUBJECT: Establishment of the Distribution Resources Plan Demonstration Balancing Account (DRPDBA) Pursuant to Decision

SUBJECT: Establishment of the Distribution Resources Plan Demonstration Balancing Account (DRPDBA) Pursuant to Decision STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 June 2, 2017 Advice Letter 3579-E Russell G. Worden Director, State Regulatory

More information

2015 General Rate Case

2015 General Rate Case Application No.: Exhibit No.: Witnesses: A.13-11-003 SCE-73 T. Cameron R. Fisher G. Henry C. Hu M. Marelli D. Snow P. Wong (U 338-E) 2015 General Rate Case PUBLIC VERSION Update Testimony Before the Public

More information

SUBJECT: Establishment of the Transportation Electrification Portfolio Balancing Account Pursuant to D

SUBJECT: Establishment of the Transportation Electrification Portfolio Balancing Account Pursuant to D STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 February 26, 2018 Advice Letter 3734-E Russell G. Worden Director, State Regulatory

More information

December 11, 2006 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

December 11, 2006 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Akbar Jazayeri Vice President, Revenue and Tariffs December 11, 2006 ADVICE 2072-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Revision to the Base Revenue

More information

Russell G. Worden Director, Regulatory Operations Southern California Edison Company 8631 Rush Street Rosemead, CA 91770

Russell G. Worden Director, Regulatory Operations Southern California Edison Company 8631 Rush Street Rosemead, CA 91770 ;STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr., Governor November 13, 2015 Advice Letter 3219-E and 3219-E-A Russell G. Worden Director, Regulatory Operations

More information

November 14, 2005 ADVICE 1929-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

November 14, 2005 ADVICE 1929-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Akbar Jazayeri Director of Revenue and Tariffs November 14, 2005 ADVICE 1929-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Disconnection Notice, Past Due Utility

More information

QUARTERLY FINANCIAL REPORT December 31, 2017

QUARTERLY FINANCIAL REPORT December 31, 2017 California Independent System Operator QUARTERLY FINANCIAL REPORT December 31, 2017 Preliminary and Unaudited 250 Outcropping Way Folsom, CA 95630 (916) 351-4000 CALIFORNIA INDEPENDENT SYSTEM OPERATOR

More information

CITY OF ANAHEIM ELECTRIC UTILITY FUND. Financial Statements. June 30, 2017 and (With Independent Auditors Report Thereon)

CITY OF ANAHEIM ELECTRIC UTILITY FUND. Financial Statements. June 30, 2017 and (With Independent Auditors Report Thereon) Financial Statements (With Independent Auditors Report Thereon) Table of Contents Independent Auditors Report 1 Management s Discussion and Analysis (Unaudited) 3 Financial Statements: Page Statement of

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 61411-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 53858-E Schedule TOU-BIP Sheet 1 APPLICABILITY This Schedule is optional

More information

LIBERTY UTILITIES (CALPECO ELECTRIC) LLC SOUTH LAKE TAHOE, CALIFORNIA 2nd Revised CPUC Sheet No. 224 Canceling 1 st Revised CPUC Sheet No.

LIBERTY UTILITIES (CALPECO ELECTRIC) LLC SOUTH LAKE TAHOE, CALIFORNIA 2nd Revised CPUC Sheet No. 224 Canceling 1 st Revised CPUC Sheet No. SOUTH LAKE TAHOE, CALIFORNIA 2nd Revised CPUC Sheet No. 224 Canceling 1 st Revised CPUC Sheet No. 224 A. Applicability Under the provisions of this rule Utility shall make extensions and alterations of

More information

September 1, Southern California Edison Company/ Docket No. ER

September 1, Southern California Edison Company/ Docket No. ER Anna J. Valdberg Senior Attorney anna.valdberg@sce.com September 1, 2011 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Re: Southern California

More information

September 22, Advice Letter 3033-E

September 22, Advice Letter 3033-E STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 Edmund G. Brown Jr., Governor September 22, 2014 Advice Letter 3033-E Megan Scott-Kakures Vice President,

More information

November 22, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Implementation of the Energy Resource Recovery Account

November 22, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Implementation of the Energy Resource Recovery Account Akbar Jazayeri Director of Revenue and Tariffs November 22, 2002 ADVICE 1665-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Implementation of the Energy Resource

More information

PRELIMINARY STATEMENT Sheet 1

PRELIMINARY STATEMENT Sheet 1 Southern California Edison Original Cal. PUC Sheet No. 18853-E Rosemead, California Cancelling Cal. PUC Sheet No. PRELIMINARY STATEMENT Sheet 1 V. Hazardous Substance Cleanup Cost Recovery Mechanism. 1.

More information

2018 General Rate Case Rebuttal Testimony

2018 General Rate Case Rebuttal Testimony Application No.: A.16-09-001 Exhibit No.: SCE-18, Vol. 08 Witnesses: M. Flores J. Goizueta (U 338-E) 2018 General Rate Case Rebuttal Testimony Transmission & Distribution (T&D) Volume 8 - Infrastructure

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 53906-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 45879-E Sheet 1 CUSTOMER PHYSICAL ASSURANCE AGREEMENT FORM 14-749 (To

More information

SUBJECT: Establishment of Demand Response Load Shift Working Group Memorandum Account in Compliance with Decision

SUBJECT: Establishment of Demand Response Load Shift Working Group Memorandum Account in Compliance with Decision STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 February 23, 2018 Advice Letter 3729-E Russell G. Worden Director, State Regulatory

More information