INO 2012 Assessment (AMDAL) System Capacity Development for Social Safeguard Preparation and

Size: px
Start display at page:

Download "INO 2012 Assessment (AMDAL) System Capacity Development for Social Safeguard Preparation and"

Transcription

1 PORTFOLIO ANALYSIS Table 1: Strengthening and Use of Country Safeguard Systems Technical Assistance s TA Title DMC Cost Year 6285 Strengthening Country Safeguard Systems REG 1,568,000 a 2005 Report on a Suggested Methodology for Assessing Country Safeguard REG 2011 System Preliminary Country Safeguards Review: India: Environment Safeguard IND 2011 Preliminary Country Safeguards Review: Kyrgyz Republic: Environment KGZ 2011 Safeguard Preliminary Country Safeguards Review: People s Republic of China: PRC 2011 Environment Safeguard Preliminary Country Safeguards Review: Philippines: Indigenous PHI 2011 Peoples 7566 Strengthening and Use of Country Safeguard Systems REG 9,000,000 b 2010 Strengthening Environmental Impact Assessment System and its BAN 2012 Implementation Practices Preparation of Draft Sub Decree on Informal Settlers CAM 2011 Strengthening Capacity of Indonesia s Environment Impact INO 2012 Assessment (AMDAL) System Capacity Development for Social Safeguard Preparation and INO 2012 Implementation in Water Resource Management and Energy in Indonesia Strengthening Community Consultation and Grievance Redress KAZ 2013 Mechanism in the Committee on Road Strengthening Capacity for Strategic Environment Assessment KGZ 2013 Strengthening WREA Capacity to Implement Lao Resettlement Policies LAO 2010 Reform of Legal and Regulatory Framework for Involuntary MON 2010 Resettlement (Phase I) Reform of Legal and Regulatory Framework for Involuntary MON 2011 Resettlement (Phase II) Improving Legal and Regulatory Framework for Environmental Impact MON 2011 Assessment Capacity Building for Implementing Environment and Social MYA 2012 Safeguards in Myanmar Institutional Strengthening and Capacity Development for the MYA 2014 Ministry of Construction on Environment and Social Safeguards Strengthening Involuntary Resettlement Safeguard Systems in Nepal NEP 2012 Environmental Training for Civil Servants in Pakistan PAK 2012 Enhancing the Philippine Environmental Impact Statement (EIS) PHI 2011 System Improvement Initiatives Country Safeguard Review PNG 2011 Developing Resettlement Safeguards Capacity in the Transport Sector TIM 2012 in Timor-Leste Strengthening the Regulatory Framework for EIA in Timor-Leste TIM 2012 ESMS Capacity-Building for Private Sector Financial Intermediaries REG 2010 Supporting and Strengthening National-Level Capacity for a Country SRI 2010 Involuntary Resettlement Safeguard System Strengthening Implementation Capacity for EIA in Vanuatu VAN 2014 Amending the 2003 Land Law and Its Implementing Decrees VIE 2010 Capacity Development for the Implementation of the New VIE 2011 Environment Decree Mainstreaming Biodiversity Considerations into Country VIE 2014 Environmental Safeguard System EIA Clearinghouse and Capacity Strengthening through Twinning SRI, LAO

2 TA Title DMC Cost Year 7038 Enhancing the Legal and Administrative Framework for Land INO 800, Strengthening Enforcement of Environmental Laws and Regulations PRC 300, Mainstreaming Land Acquisition and Resettlement Safeguards in the REG 5,000, Central and West Asia Region 7474 Strengthening of Judicial Capacity to Adjudicate Upon Environmental REG 225, Laws and Regulations 7548 Improving the Implementation of Environmental Safeguards in REG 1,550, Central and West Asia 7735 Building Capacity for Environmental Prosecution, Adjudication, REG 2,705, Dispute Resolution, Compliance, and Enforcement in Asia 8210 Preparation of Regulations and Capacity Development Plan for MON 200, Involuntary Resettlement 8217 Strengthening Country Safeguard Systems in the Transport Sector SOL 600, Improving the implementation of safeguard policy applications in REG 225, selected South Asia Developing Member Countries 8309 Capacity Building for Enhanced Safeguards Management PAK 550, Strengthening Safeguards Capacity in the Urban Sector in Kiribati KIR 220, Aligning Asian Development Bank and Country Systems for Improved INO 1,500, Performance 8569 Improving Safeguard Policy Applications in South Asia Developing REG 1,500, Member Countries 8663 Sustainable Environmental Management of s in Central and REG 1,500, West Asia Total 27,443,000 BAN = Bangladesh, CAM = Cambodia, PRC = People s Republic of China, CSS = country safeguard systems, IND = India, INO = Indonesia, KAZ = Kazakhstan, KGZ = Kyrgyz Republic, LAO = Lao PDR, MON = Mongolia, MYA = Myanmar, NEP = Nepal, PAK = Pakistan, PHI = Philippines, PNG = Papua New Guinea, SOL = Solomon Islands, SRI = Sri Lanka, TA = technical assistance, TIM = Timor-Leste, VIE = Viet Nam. a Initial approval in 2005 was for $800,000. Supplementary financing was approved for $170,000 in 2007 and $598,000 in b Initial approval in 2010 was for $5 million. Supplementary financing was approved for $3 million and $1 million in 2011 and 2013, respectively. Source: ADB website on country safeguards systems, and project data sheets. Table 2: Financial Intermediary s Approved with Safeguard FI Categorization ( ) Loan Public/ Safeguards Category Amount No. DMC Name Pre-SPS SPS Private ENV IR IP ($ million) 2404 IND MFF-India Infrastructure x Public FI B A Financing Facility / BAN Public-Private Infrastructure x Public FI A A Development Facility 2509 IND MFF-India Infrastructure x Public FI B B Financing Facility PHI Credit for Better Health Care x Public FI C A INO Indonesian Infrastructure Financing x Public FI A A Facility Company 2549 BAN Small and Medium Sized Enterprise x Public FI C C Development 2586 IND MFF-Second India Infrastructure x Public FI B B Financing Facility - Tranche PRC MFF-Guangdong Energy Efficiency x Public FI C C and Environment Improvement Investment Program - Tranche IND Micro, Small and Medium Enterprise Development x Public FI C C

3 Loan Public/ Safeguards Category Amount No. DMC Name Pre-SPS SPS Private ENV IR IP ($ million) 2634 UZB Second Small and Microfinance x Public FI FI FI Development 2660 IND MFF-National Capital Region Urban x Public FI FI FI Infrastructure Financing Facility - Tranche PNG Microfinance Expansion x Public FI C B KAZ MFF: Small and Medium Enterprise x Public FI FI FI Investment Program - Tranche IND MFF-Second India Infrastructure x Public FI FI FI Financing Facility Tranche PRC Energy Efficiency and Emission x Public FI FI FI Reduction in Shandong Province 2773 PRC MFF-Guangdong Energy Efficiency x Public FI C C and Environment Improvement Investment Program - Tranche UZB Housing for Integrated Rural x Public FI FI FI Development Investment Program - Tranche REG ASEAN Infrastructure Fund x Public FI FI FI IND MFF - Second India Infrastructure x Public FI FI FI Financing Facility - Tranche PRC Hebei Energy Efficiency Improvement x Public FI FI FI and Emission Reduction 2865/ BAN Financing Brick Kiln Efficiency x Public FI FI FI Improvement 2867 MLD Inclusive Micro, Small, and Medium- x Public FI FI FI 6.00 Sized Enterprise Development 2922/ ARM Women's Entrepreneurship Support x Public FI FI FI Sector Development Program (SF) 7200 PRC Credite Orienwise Group Limited x Private FI C C KAZ Guarantee and Loan JSC x Private FI C C Kazkommertsbank 7250 MLD Secured Loan Republic of the x Private FI C C 4.50 Maldives South Asian SME Leasing Facility 7251 SRI Secured Loan Rep. of Sri Lanka x Private FI C C South Asian SME Leasing Facility 7255 KAZ Senior Loan to Bank Centercredit x Private FI C C PAK JS Private Equity Fund I x Private FI B/C C AZE Debt Financing to Bank of Baku x Private FI C C MON Loan to Khan Bank x Private FI C C GEO Senior Loan to Joint Stock x Private C C C Commercial Bank of Georgia 7264 REG Micro and Small Enterprise x Private FI C C Financing Facility 7266 AZE Subordinated Loan to International x Private FI C C Bank of Azerbaijan (IBA) 7267 AZE Subordinated Loan to Bank x Private FI C C Respublika Open Joint Stock Company 7269 / SRI Loan to Commercial Leasing x Private FI C C Company Limited 7274 MLD Equity Investment and Loan to the Housing Development Finance Corporation x Private FI C C

4 Loan Public/ Safeguards Category Amount No. DMC Name Pre-SPS SPS Private ENV IR IP ($ million) 7282 INO Loan to Bank Mandiri (PERSERO) x Private FI C C VIE Loan to Saigon Thuong Tin Bank x Private FI C C (SACOMBANK) 7298 INO Equity Investment in Indonesian x Private FI A A Infrastructure Financing Facility Company 7299 REG Islamic Infrastructure Fund (CIMB) x Private FI B/C C GEO Bank Republic Joint Stock Company x Private FI C C REG Credit Guarantee and Investment x Private FI FI FI Facility 7312 REG ASEAN China Investment Fund II x Private FI C C / GEO Bank of Georgia x Private FI FI FI REG Asia Water Fund x Private FI FI FI / REG Clean Energy Funds - Renewable x Private FI FI FI Energy Asia Fund 7322/ INO Housing Finance Program x Private FI FI FI REG Shorecap II Limited x Private FI FI FI REG MFI Risk Participation Facility x Private FI FI FI / INO Indonesia Eximbank x Private FI FI FI IND Solar Power Generation x Private FI FI FI / REG Climate Ventures Capital Funds x Private FI FI FI REG Sino-Green Climate Investment Fund x Private FI FI FI / ARM SME Finance Program x Private FI FI FI / 7345/ 7346/ 2810/ 2811/ 2812/ REG Aureos Southeast Asia Fund II x Private FI FI FI / BAN Industrial Energy Efficiency Finance x Private FI FI FI Program 7350 / KGZ Senior Unsecured Loan in Kyrgyz x Private FI FI FI Investment and Credit Bank Small and Medium-Sized Enterprise Finance 7352 REG Customized Fund Investment Group x Private FI FI FI / IND Renewable Energy and Energy x Private FI FI FI Efficiency s 7355 / PRC Microfinance Wholesale Lending x Private FI FI FI Facility 7357 PHI Philippine Investment Alliance for x Private FI FI FI Infrastructure Fund 7359 / SRI Housing Finance x Private FI FI FI IND Credit Enhancement of Bonds x Private FI FI FI UZB Equity Investments in Ipak Yuli Bank x Private FI FI FI / REG Supply Chain Finance Program x Private FI FI FI Total , ARM = Armenia, AZE = Azerbaijan, BAN = Bangladesh, PRC = People s Republic of China, DMC = developing member country, ENV = environment, FI = financial intermediary, GEO = Georgia, IND = India, INO = Indonesia, IP = Indigenous Peoples, IR = 4

5 involuntary resettlement, KAZ = Kazakhstan, KGZ = Kyrgyz Republic, MFF = multitranche financing facility, MLD = Maldives, MON = Mongolia, PAK = Pakistan, PHI = Philippines, REG = regional, SRI = Sri Lanka, UZB = Uzbekistan, VIE = Viet Nam. Note: Some FI projects did not get a safeguard FI categorization; some obtained a safeguards category C; a few were classified as environmental safeguard category A or B. Source: Loan and Grant Financial Information Services (LFIS). Table 3: Profile of the 66 Financial Intermediary s Approved, Item Description Pre-SPS % of Total Approved SPS % of Total Approved Categorization s categorized FI for environment and C for social safeguards s categorized FI for environment and A/B for social safeguards s categorized FI for both environment and social safeguards Total Sector Public sector Private sector Total Type Equity projects (including MFFs and sector loans) Investment projects (including MFFs and sector loans) Loans Other types (guarantee projects) Total Safeguards With EMS/ESMS at approval a Document With ESSF at approval With neither EMS/ESMS nor ESSF at approval (indicated as category C) With neither EMS/ESMS nor ESSF due to other reasons (cancelled, no counterparty, awaiting documents, breach of contract, etc.) Total Modality MFFs/sector loans implemented by FIs s implemented by FIs Total Infrastructure Infrastructure oriented Orientation Non-infrastructure oriented Total Total Amount ($ million) Total Amount, Public and Private ($ million) Percentage to Total ADB Portfolio, Public and Private With EMS/ESMS Without EMS/ESMS 190 1,784 With ESSF With Safeguards Documents 1,664 1,714 Total FIs 1,854 3,498 Public Sector 989 1,624 FI MFF/Sector Loan Private Sector 866 1,874 FI 866 1,726 MFF/Sector Loan Total ADB Portfolio 32,540 37,915 % FIs to Total ADB Portfolio 6 9 Total ADB Public 29,993 32,704 % Public FIs to Total ADB Public 3 5 Total ADB Private 2,546 5,210 % Private FIs to Total ADB Private

6 EMS = environmental management system, ESMS = environmental and social management system, ESSF = environmental and social safeguards framework, FI = financial intermediary, MFF = multitranche financing facility, SPS = Safeguard Policy Statement. a Loans 2516 and 7298 were counted as only one project in the detailed safeguard requirements assessment. Source: This study, and Regional and Sustainable Development Department, Environment and Safeguards Division (RSES) database and ADB Data Sheets. A. By Safeguards Area Summary of ADB s Approved, Table 4: Summary of Safeguards Classification of s, Classification/ Category No. % No. % No. % No. % No. % No. % No. % ENV A B C FI Total IR A B B/C C FI Total IP A B C FI Total ENV = environment, FI = financial intermediary, IR = involuntary resettlement, IP = Indigenous Peoples. Source: Regional and Sustainable Development Department, Environment and Safeguards Division (RSES) database. Table 5: Re-categorization of Safeguards Classification of s, Re-categorization ENV IR IP Total Upgrade C to B Upgrade B to A Re-categorized C to FI Downgrade A to B Downgrade B to C Downgrade A to C ENV = environment, FI = financial intermediary, IR = involuntary resettlement, IP = Indigenous Peoples. Source: This study from Regional and Sustainable Development Department, Environment and Safeguards Division (RSES) database. 6

7 a) Environment Figure 1: Safeguards Classification by Lending Volume Pre- and Post-SPS Adoption 100% 80% 60% 40% 20% 0% Pre-SPS Post-SPS A B C FI b) Involuntary Resettlement 100% % 60% 40% 20% 0% Pre-SPS Post-SPS A B C FI c) Indigenous Peoples 100% % 60% 40% 20% 0% Pre-SPS Post-SPS A B C FI FI = financial intermediary, SPS = Safeguard Policy Statement. Source: This study based on data from Regional and Sustainable Development Department, Environment and Safeguards Division (RSES). 7

8 B. By Sector Table 6: Environmental Safeguards Classification of s by Sector, Sector and Category No. % No. % No. % No. % No. % No. % No. % ANR 5 6% 8 9% 6 6% 12 10% 12 11% 13 11% 11 10% A 0% 2 25% 1 17% 2 17% 3 25% 3 23% 3 27% B 5 100% 5 63% 5 83% 10 83% 9 75% 10 77% 7 64% C 0% 1 13% 0% 0% 0% 0% 0% FI 0% 0% 0% 0% 0% 0% 1 9% Education 3 3% 2 2% 2 2% 1 1% 4 4% 6 5% 6 6% A 0% 0% 0% 0% 0% 0% 0% B 0% 0% 0% 0% 2 50% 1 17% 6 100% C 3 100% 2 100% 2 100% 1 100% 2 50% 5 83% 0% FI 0% 0% 0% 0% 0% 0% 0% Energy 10 12% 18 20% 19 20% 24 21% 26 24% 22 19% 27 25% A 2 20% 4 22% 4 21% 6 25% 6 23% 3 14% 6 22% B 8 80% 10 56% 10 53% 16 67% 13 50% 17 77% 17 63% C 0% 0% 0% 1 4% 1 4% 1 5% 2 7% FI 0% 4 22% 5 26% 1 4% 6 23% 1 5% 2 7% Finance 21 24% 5 6% 5 5% 17 15% 5 5% 12 11% 11 10% A 0% 0% 0% 0% 0% 0% 0% B 0% 0% 0% 0% 0% 0% 0% C 6 29% 2 40% 2 40% 6 35% 1 20% 3 25% 5 45% FI 15 71% 3 60% 3 60% 11 65% 4 80% 9 75% 6 55% HSP 1 1% 3 3% 2 2% 2 2% 1 1% 4 4% 3 3% A 0% 0% 0% 0% 0% 0% 0% B 0% 2 67% 0% 0% 1 100% 3 75% 1 33% C 1 100% 1 33% 1 50% 2 100% 0% 1 25% 2 67% FI 0% 0% 1 50% 0% 0% 0% 0% Industry and Trade 2 2% 3 3% 2 2% 0% 0% 5 4% 4 4% A 1 50% 0% 0% 0% 0% B 0% 1 33% 2 100% 0% 0% C 0% 2 67% 0% 3 60% 2 50% FI 1 50% 0% 0% 2 40% 2 50% Multisector 11 13% 15 17% 11 12% 11 10% 13 12% A 2 18% 5 33% 3 27% 0% 3 23% B 6 55% 5 33% 3 27% 4 36% 5 38% C 2 18% 3 20% 3 27% 4 36% 2 15% FI 1 9% 2 13% 2 18% 3 27% 3 23% PSM 6 7% 10 11% 14 15% 9 8% 4 4% 11 10% 3 3% A 0% 0% 0% 0% 0% 0% 0% B 0% 0% 0% 0% 0% 0% 0% C 6 100% % % 9 100% 4 100% % 3 100% FI 0% 0% 0% 0% 0% 0% 0% Transport and ICT 21 24% 19 21% 23 24% 27 23% 28 26% 25 22% 23 22% A 10 48% 5 26% 6 26% 7 26% 6 21% 7 28% 7 30% B 8 38% 10 53% 11 48% 18 67% 21 75% 16 64% 12 52% C 2 10% 3 16% 4 17% 2 7% 1 4% 2 8% 3 13% FI 1 5% 1 5% 2 9% 0% 0% 0% 1 4% WOMIS 6 7% 6 7% 10 11% 12 10% 15 14% 15 13% 18 17% A 2 33% 0% 1 10% 3 25% 0% 2 13% 0% B 2 33% 4 67% 9 90% 8 67% % 13 87% % C 1 17% 2 33% 0% 1 8% 0% 0% 0% FI 1 17% 0% 0% 0% 0% 0% 0% 8

9 Sector and Category No. % No. % No. % No. % No. % No. % No. % Not classified 0% 0% 1 1% A 0% B 1 100% C 0% FI 0% Total % % % % % % % ANR = agriculture and natural resources, HSP =health and social protection, ICT = information and communications technology, PSM = public sector management, WOMIS = water supply and other municipal infrastructure and services. Source: Regional and Sustainable Development Department, Environment and Safeguards Division (RSES) database. Table 7: Involuntary Resettlement Safeguards Classification of s by Sector, Sector and Category No. % No. % No. % No. % No. % No. % No. % ANR 5 6% 8 9% 6 6% 12 10% 12 11% 13 11% 11 10% A 0% 2 25% 2 33% 2 17% 5 42% 6 46% 2 18% B 1 20% 4 50% 2 33% 5 42% 3 25% 4 31% 4 36% C 4 80% 2 25% 2 33% 5 42% 4 33% 3 23% 4 36% FI 0% 0% 0% 1 9% Education 3 3% 2 2% 2 2% 1 1% 4 4% 6 5% 6 6% A 0% 0% 0% 0% 1 25% 0% 0% B 1 33% 0% 0% 0% 1 25% 1 17% 2 33% C 2 67% 2 100% 2 100% 1 100% 2 50% 5 83% 4 67% FI 0% 0% 0% 0% Energy 10 12% 18 20% 19 20% 24 21% 26 24% 22 19% 27 25% A 4 40% 2 11% 3 16% 3 13% 4 15% 2 9% 5 19% B 4 40% 9 50% 9 47% 9 38% 13 50% 9 41% 13 48% C 2 20% 7 39% 7 37% 11 46% 3 12% 10 45% 7 26% FI 1 4% 6 23% 1 5% 2 7% Finance 21 24% 5 6% 5 5% 17 15% 5 5% 12 11% 11 10% A 0% 0% 1 20% 0% 0% 0% 0% B 0% 0% 1 20% 0% 0% 0% 0% B/C 1 5% 0% 0% C 20 95% 5 100% 3 60% 8 47% 1 20% 3 25% 5 45% FI 9 53% 4 80% 9 75% 6 55% HSP 1 1% 3 3% 2 2% 2 2% 1 1% 4 4% 3 3% A 0% 1 33% 0% 0% 0% 0% 0% B 0% 0% 0% 0% 0% 0% 0% C 1 100% 2 67% 2 100% 2 100% 1 100% 4 100% 3 100% FI 0% 0% 0% 0% Industry and Trade 2 2% 3 3% 2 2% 0% 0% 5 4% 4 4% A 0% 1 33% 1 50% 0% 0% B 0% 0% 0% 0% 1 25% C 2 100% 2 67% 1 50% 3 60% 1 25% FI 2 40% 2 50% Multisector 11 13% 15 17% 11 12% 11 10% 13 12% 0% A 2 18% 7 47% 4 36% 0% 5 38% B 5 45% 4 27% 3 27% 2 18% 1 8% C 4 36% 4 27% 4 36% 6 55% 4 31% FI 3 27% 3 23% PSM 6 7% 10 11% 14 15% 9 8% 4 4% 11 10% 3 3% A 0% 0% 0% 0% 0% 0% 0% B 0% 0% 0% 0% 0% 0% 0% C 6 100% % % 9 100% 4 100% % 3 100% FI 0% 0% 0% 0% 9

10 Sector and Category No. % No. % No. % No. % No. % No. % No. % Transport and ICT 21 24% 19 21% 23 24% 27 23% 28 26% 25 22% 23 22% A 11 52% 6 32% 9 39% 9 33% 9 32% 12 48% 9 39% B 2 10% 4 21% 2 9% 9 33% 7 25% 9 36% 7 30% C 8 38% 9 47% 12 52% 9 33% 12 43% 4 16% 6 26% FI 0% 0% 0% 1 4% WOMIS 6 7% 6 7% 10 11% 12 10% 15 14% 15 13% 18 17% A 2 33% 2 33% 1 10% 3 25% 1 7% 5 33% 5 28% B 3 50% 3 50% 7 70% 7 58% 12 80% 10 67% 10 56% C 1 17% 1 17% 2 20% 2 17% 2 13% 0% 3 17% FI 0% 0% 0% 0% 0% 0% 0% Not classified 0% 0% 1 1% A 0% B 0% C 1 100% FI 0% Total % % % % % % % ANR = agriculture and natural resources, HSP =health and social protection, ICT = information and communications technology, PSM = public sector management, WOMIS = water supply and other municipal infrastructure and services. Source: Regional and Sustainable Development Department, Environment and Safeguards Division (RSES) database. Table 8: Indigenous Peoples Safeguards Classification of s by Sector, Sector and Category No. % No. % No. % No. % No. % No. % No. % ANR 5 6% 8 9% 6 6% 12 10% 12 11% 13 11% 11 10% A 0% 1 13% 1 17% 0% 4 33% 1 8% 0% B 2 40% 4 50% 3 50% 5 42% 3 25% 4 31% 4 36% C 3 60% 3 38% 2 33% 7 58% 5 42% 8 62% 6 55% FI 0% 0% 0% 0% 0% 0% 1 9% Education 3 3% 2 2% 2 2% 1 1% 4 4% 6 5% 6 6% A 0% 0% 0% 0% 0% 0% 1 17% B 3 100% 1 50% 2 100% 1 100% 2 50% 3 50% 3 50% C 0% 1 50% 0% 0% 2 50% 3 50% 2 33% FI 0% 0% 0% 0% 0% 0% 0% Energy 10 12% 18 20% 19 20% 24 21% 26 24% 22 19% 27 25% A 0% 3 17% 2 11% 0% 1 4% 0% 2 7% B 4 40% 4 22% 8 42% 1 4% 0% 1 5% 2 7% C 6 60% 11 61% 9 47% 22 92% 19 73% 20 91% 21 78% FI 0% 0% 0% 1 4% 6 23% 1 5% 2 7% Finance 21 24% 5 6% 5 5% 17 15% 5 5% 12 11% 11 10% A 0% 0% 1 20% 0% 0% 0% 0% B 0% 0% 1 20% 0% 0% 0% 0% C % 5 100% 3 60% 8 47% 1 20% 3 25% 5 45% FI 0% 0% 0% 9 53% 4 80% 9 75% 6 55% HSP 1 1% 3 3% 2 2% 2 2% 1 1% 4 4% 3 3% A 0% 1 33% 1 50% 0% 0% 0% 0% B 0% 0% 0% 1 50% 0% 1 25% 1 33% C 1 100% 2 67% 1 50% 1 50% 1 100% 3 75% 2 67% FI 0% 0% 0% 0% 0% 0% 0% Industry and Trade 2 2% 3 3% 2 2% 0% 0% 5 4% 4 4% A 0% 1 33% 0% 0% 0% B 0% 0% 2 100% 0% 0% C 2 100% 2 67% 0% 3 60% 2 50% FI 0% 0% 0% 2 40% 2 50% 10

11 Sector and Category No. % No. % No. % No. % No. % No. % No. % Multisector 11 13% 15 17% 11 12% 11 10% 13 12% 0% 0% A 1 9% 2 13% 1 9% 0% 0% B 5 45% 3 20% 3 27% 2 18% 2 15% C 5 45% 10 67% 7 64% 6 55% 8 62% FI 0% 0% 0% 3 27% 3 23% PSM 6 7% 10 11% 14 15% 9 8% 4 4% 11 10% 3 3% A 0% 0% 0% 0% 0% 0% 0% B 0% 0% 0% 0% 0% 0% 0% C 6 100% % % 9 100% 4 100% % 3 100% FI 0% 0% 0% 0% 0% 0% 0% Transport and ICT 21 24% 19 21% 23 24% 27 23% 28 26% 25 22% 23 22% A 5 24% 1 5% 1 4% 1 4% 1 4% 0% 2 9% B 4 19% 6 32% 3 13% 4 15% 4 14% 1 4% 2 9% C 12 57% 12 63% 19 83% 22 81% 23 82% 24 96% 18 78% FI 0% 0% 0% 0% 0% 0% 1 4% WOMIS 6 7% 6 7% 10 11% 12 10% 15 14% 15 13% 18 17% A 0% 0% 1 10% 1 8% 0% 0% 0% B 1 17% 0% 2 20% 3 25% 2 13% 1 7% 3 17% C 5 83% 6 100% 7 70% 8 67% 13 87% 14 93% 15 83% FI 0% 0% 0% 0% 0% 0% 0% Not classified 0% 0% 1 1% A 0% B 0% C 1 100% FI 0% Total % % % % % % % ANR = agriculture and natural resources, HSP =health and social protection, ICT = information and communications technology, PSM = public sector management, WOMIS = water supply and other municipal infrastructure and services. Source: Regional and Sustainable Development Department, Environment and Safeguards Division (RSES) database. 11

12 C. By Operational Department Figure 2: Safeguards Classification by Operations Department Pre- and Post-SPS Adoption a) Environment 100% 4% 10% 6% 5% 4% 6% 11% 18% 13% 7% 5% 2% 32% 12% 23% 9% 80% 20% 40% 22% 59% 48% 52% 60% 41% 3% 59% 73% 74% 40% 49% 69% 73% 14% 44% 55% 43% 35% 43% 20% 18% 15% 19% 9% 9% 14% 10% 11% 0% 8% 7% Central and West East Asia Pacific Private Sector South Asia Southeast Asia A B C FI b) Involuntary Resettlement 100% 0% 0% 10% 5% 4% 0% 0% 6% 0% 2% 26% 80% 34% 36% 38% 43% 26% 33% 46% 66% 11% 68% 62% 53% 60% 16% 43% 40% 37% 42% 55% 32% 63% 17% 45% 50% 19% 25% 20% 30% 18% 17% 25% 25% 14% 19% 20% 0% 9% 2% 6% Central and West East Asia Pacific Private Sector South Asia Southeast Asia A B C FI c) Indigenous Peoples 100% 80% 60% 40% 20% 0% 10% 5% 4% 6% 2% 38% 51% 63% 64% 67% 87% 68% 67% 86% 88% 76% 90% 59% 20% 42% 17% 18% 36% 27% 11% 17% 2% 9% 8% 11% 15% 2% 3% 7% 16% 3% 4% Central and West East Asia Pacific Private Sector South Asia Southeast Asia A B C FI FI = financial intermediary, SPS = Safeguard Policy Statement. Source: This study based on data from Regional and Sustainable Development Department, Environment and Safeguards Division (RSES). 12

13 Safeguards Category Environment Table 9: Number of s by Safeguards Risk Category in and , by Department CWRD EARD PARD PSOD SARD SERD No. % No. % No. % No. % No. % No. % No. % No. % No. % No. % No. % No. % A B C FI Involuntary Resettlement A B C FI Indigenous Peoples A B C FI Total: CWRD = Central and West Asia Department, EARD = East Asia Department, FI = financial intermediary, PARD = Pacific Department, PSOD = Private Sector Operations Department, SARD = South Asia Department, SERD = Southeast Asia Department. Source: Regional and Sustainable Development Department, Environment and Safeguards Division (RSES). 13

14 D. By Financing Modality a) Environment Figure 3: Safeguards Classification by Financing Modality Pre- and Post-SPS Adoption 100% 80% 60% 40% 20% 0% 2% 3% 14% 12% 11% 10% 2% 7% 2% 5% 38% 33% 35% 59% 52% 59% 3% 65% 69% 96% 80% 92% 98% 23% 37% 11% 44% 32% 20% 28% 23% 38% 26% 15% 7% 15% 4% 13% 8% 4% 4% MFF NS -- Private Program Sector Other b) Involuntary Resettlement A B C FI 100% 3% 10% 2% 8% 40% 30% 28% 27% 80% 27% 37% 31% 66% 63% 60% 18% 36% 39% 96% 44% 38% 98% 60% 92% 38% 40% 41% 22% 20% 31% 33% 32% 18% 27% 19% 2% 2% 7% 13% 15% 0% 2% 0% 0% 4% MFF NS -- Private Program Sector Other A B C FI c) Indigenous Peoples 100% 80% 60% 40% 20% 0% 3% 10% 2% 37% 31% 60% 50% 53% 58% 73% 70% 84% 81% 96% 95% 58% 29% 41% 60% 27% 42% 19% 19% 11% 8% 11% 20% 5% 9% 0% 5% 3% 2% 8% 2% 2% 11% 4% MFF NS -- Private Program Sector Other A B C FI FI = financial intermediary, MFF = multitranche financing facility, NS = nonsovereign, SPS = Safeguard Policy Statement. Source: This study based on data from Regional and Sustainable Development Department, Environment and Safeguards Division (RSES). 14

15 Safeguards Category Environment Table 10: Number of s by Safeguards Risk Category in and , by Financing Modality MFF NS Private Program Sector Other No. % No. % No. % No. % No. % No. % No. % No. % No. % No. % No. % No. % A B C FI Involuntary Resettlement A B C FI Indigenous Peoples A B C FI Total: FI = financial intermediary, MFF = multitranche financing facility, NS = nonsovereign. Source: Regional and Sustainable Development Department, Environment and Safeguards Division (RSES). 15

16 Table 11: ADB s Approved in with Safeguards Classification Year Dept DMC No. No. Name Loan Type Sector Amount ENV IR IP 2010 EARD PRC Tianjin Integrated Gasification Combined Cycle Power Plant Energy A C C 2010 SARD IND Micro, Small, and Medium Enterprise Development - Credit Line/NS- Finance 50.0 FI C C Public (DFI) 2010 SARD SRI North East Community Restoration and Development II - Supplementary T and ICT A A B 2010 SERD INO Java-Bali Electricity Distribution Performance Improvement Energy 50.0 C C C 2010 EARD MON Regional Road Development - Supplementary T and ICT 8.0 B C C 2010 SARD SRI Fiscal Management Efficiency (formerly Fiscal Management Reform PSM 50.0 C C C Program II) 2010 PARD SAM Economic Recovery Support Program (Subprogram 1) Program Multisector 16.0 C C C 2010 SARD SRI Conflict-Affected Region Emergency ANR 66.1 B C C 2010 EARD PRC Second Heilongjiang Road Network Development MFF-Subproject WOMIS B B C 2010 EARD PRC Integrated Renewable Biomass Energy Development Sector (formerly Rural Finance 50.0 FI FI FI Energy and Ecosystem 2010 CWRD UZB MFF - Water Supply and Sanitation Services Investment Program - Tranche 2 MFF-Subproject T and ICT A B C 2010 CWRD UZB Second Small and Microfinance Development ANR B A C 2010 CWRD UZB MFF - Central Asia Regional Economic Cooperation Corridor 2 Road Investment MFF-Subproject WOMIS B B B Program SERD VIE Strengthening Water Management and Irrigation Systems Rehabilitation Program Finance 60.4 C C C 2010 SARD IND MFF - North Karnataka Urban Sector Investment Program - Tranche 2 Program HSP C C C 2010 SARD NEP Rural Finance Sector Development Cluster Program (Subprogram 2) Program Finance C C C 2010 CWRD PAK Punjab Millennium Development Goals Program - Subprogram 2 Sovereign Energy A C C Guarantee 2010 CWRD PAK Sindh Growth and Rural Revitalization Program - Subprogram 2 WOMIS A A C 2010 CWRD AZE Janub Gas-Fired Power Plant WOMIS A A A 2010 EARD PRC Wuhan Urban Environmental Improvement ANR 40.0 B C B 2010 EARD PRC Chongqing Urban-Rural Infrastructure Development Demonstration WOMIS 60.0 B B B 2010 SARD BAN Second Crop Diversification SAL Multisector B B C 2010 SARD NEP Secondary Towns Integrated Urban Environmental Improvement WOMIS 35.0 B B C 2010 SARD IND MFF - Rural Roads Sector II Investment Program - Tranche 5 MFF-Subproject T and ICT 85.0 B C C 2010 SERD INO Metropolitan Sanitation Management and Health T and ICT 10.0 B B C 2010 CWRD GEO MFF - Sustainable Urban Transport Investment Program - Tranche 1 WOMIS A A B 2010 SARD NEP Kathmandu Sustainable Urban Transport Energy B B C 2010 EARD PRC Guangxi Southwestern Cities Development Program PSM 9.5 C C C 2010 EARD PRC Inner Mongolia Autonomous Region Environment Improvement (Phase II) MFF-Subproject Multisector 78.0 FI FI FI 2010 PARD RMI Public Sector Program - Subprogram 1 Energy B A C 2010 SARD IND MFF - National Capital Region Urban Infrastructure Financing Facility -Tranche 1 Multisector C C B 2010 SARD BAN Bangladesh-India Electrical Grid Interconnection T and ICT B A C 2010 SERD PHI Social Protection Support Program Multisector C C C 2010 SARD IND Bihar State Highways II (formerly Bihar State Roads II) Program Finance C C C 2010 CWRD GEO Social Services Delivery Program PSM 25.0 C C C 2010 SERD THA Capital Market Development Program ANR 29.8 B B C 2010 SERD BAN Strengthening Governance Management SAL Multisector 48.5 B C C 2010 CWRD KGZ CAREC Regional Road Corridor Improvement (Supplementary) MFF-Subproject ANR 67.6 B C C 16

17 Year Dept DMC No. No. Name Loan Type Sector Amount ENV IR IP 2010 CWRD KGZ Emergency Assistance for Recovery and Reconstruction T and ICT 35.0 B B B 2010 SARD IND MFF - Agribusiness Infrastructure Development Investment Program - Tranche 1 Energy 16.7 B B C 2010 SERD CAM Rural Roads Improvement Program PSM 10.0 C C C 2010 CWRD KGZ Power Sector Improvement (formerly Transmission and Distribution Program PSM 10.0 C C C Metering ) (formerly Transmission and Distribution Metering ) 2010 SERD CAM Public Financial Management for Rural Development Program - Subprogram 2 MFF-Subproject WOMIS 43.4 B C C (Subprogram 2) 2010 SERD CAM Promoting Economic Diversification Program (Subprogram 2) MFF-Subproject Energy 89.7 B B C 2010 SARD IND Infrastructure Development Investment Program for Tourism - Tranche 1 MFF-Subproject ANR 51.6 A C C 2010 SARD IND MFF - Assam Power Sector Enhancement Investment Program - Tranche 2 Program PSM 40.0 C C C 2010 SARD IND MFF - Sustainable Coastal Protection and Management Investment Program - Tranche 1 Energy B B C 2010 SERD VIE Second Small and Medium-Sized Enterprises Development Program - Subprogram I MFF-Subproject ANR 56.9 A A B 2010 SARD IND Bihar Power System Improvement T and ICT 24.5 B B B 2010 SARD IND MFF - Assam Integrated Flood and Riverbank Erosion Risk Management Finance 13.0 FI FI FI Investment Program - Tranche SARD NEP Subregional Transport Enhancement MFF-Subproject Energy A A C 2010 PARD PNG Microfinance Expansion TA Loan T and ICT 23.0 C C C 2010 SARD IND MFF - Himachal Pradesh Clean Energy Development Investment Program-Tranche 3 MFF-Subproject Multisector FI FI FI 2010 SARD BAN Subregional Transport Preparatory Facility ANR 40.0 B C C 2010 CWRD KAZ MFF - Small and Medium Enterprise Investment Program - Tranche 1 Sector Multisector B B C 2010 EARD PRC Jiangxi Sustainable Forest Ecosystem Development ANR 60.0 B B B 2010 SARD BAN City Region Development T and ICT A A A 2010 SARD BAN Sustainable Rural Infrastructure Improvement HSP 27.0 C C B 2010 CWRD KAZ MFF: CAREC Transport Corridor 1 (Zhambyl Oblast Section) [Western Europe- T and ICT 75.0 B B B Western People's Republic of China International Transit Corridor] Investment Program - Tranche SERD VIE Second Greater Mekong Subregion Regional Communicable Diseases Control T and ICT B A C 2010 EARD PRC Risk Mitigation and Strengthening of Endangered Reservoir in Shandong Province Program Finance 10.0 C C C 2010 SERD VIE Second Northern GMS Transport Network Improvement Program Finance 60.0 C C C 2010 SARD IND Karnataka State Highway Improvement Program PSM C C C 2010 SERD CAM Financial Sector Development Program (Cluster 2, Subprogram 4) Program Finance C C C 2010 SERD VIE Financial Sector Program III - Subprogram II MFF-Subproject T and ICT A A C 2010 SERD INO Infrastructure Reform Sector Development Program (Subprogram 3) MFF-Subproject Multisector FI FI FI 2010 EARD PRC Yunnan Integrated Road Network Development T and ICT 12.0 B B C 2010 SERD PHI Financial Market Regulation and Intermediation Program, Subprogram II T and ICT 45.0 B C C 2010 CWRD GEO Road Corridor Investment Program - 2 ANR 30.0 B B B 2010 SARD IND Second India Infrastructure Tranche Financing Facility - Tranche 2 Program PSM C C C 2010 PARD KIR Road Rehabilitation MFF-Subproject T and ICT C C C 2010 EARD MON Regional Logistics MFF-Subproject WOMIS 63.0 B B C 2010 SERD REG GMS-VIE Biodiversity Conservation Corridor MFF-Subproject Energy B C C 2010 SERD INO Sixth Development Policy Support Program MFF-Subproject Energy B B C 2010 EARD PRC Railway Energy Efficiency and Safety Enhancement Investment Program-Tranche 2 MFF-Subproject T and ICT B B C 17

18 Year Dept DMC No. No. Name Loan Type Sector Amount ENV IR IP 2010 SARD IND MFF - Rajasthan Urban Sector Development Investment Program (Tranche 3) MFF-Subproject T and ICT A A C 2010 CWRD PAK MFF - Renewable Energy Development Sector Investment Program PFR2 MFF-Subproject T and ICT A A C 2010 CWRD PAK MFF Power Distribution Enhancement (Tranche 2) MFF-Subproject T and ICT 40.0 B B C 2010 CWRD KAZ MFF - CAREC Corridor 2 (Mangystau Oblast Sections) Investment Program - MFF-Subproject Energy 69.0 B B C Tranche CWRD ARM North-South Road Corridor Investment Program - 2 Multisector 12.8 B C C 2010 SERD VIE GMS Ben Luc-Long Thanh Expressway (MFF $650 m) - PFR 1 MFF-Subproject T and ICT B C C 2010 SERD VIE Ho Chi Minh City Urban Mass Rapid Transit Line 2 Investment Program - PFR 1 MFF-Subproject T and ICT B C C 2010 SARD IND MFF- Madhya Pradesh Power Sector Investment Program (Tranche 6) T and ICT 23.0 B C C 2010 PSOD GEO Bank Republic Joint Stock Company NS-Private Finance 20.0 FI C C 2010 PSOD AFG Sungas Liquefied Petroleum Gas NS-Private Energy 8.0 B C C 2010 PSOD ARM Zvartnots Airport Expansion (Phase 2) NS-Private T and ICT 40.0 B A C 2010 PSOD REG Credit Guarantee and Investment Facility NS-Private Finance FI FI FI 2010 PSOD REG ASEAN China Investment Fund II NS-Private Finance 25.0 FI FI FI 2010 PSOD REG Asia Water Fund NS-Private Finance 20.0 FI FI FI 2010 PSOD REG Shorecap II Limited NS-Private Finance 10.0 FI FI FI 2010 PSOD GEO Port of Poti NS-Private T and ICT 18.0 B C C 2010 PSOD REG MFI Risk Participation Facility NS-Private Finance FI FI FI 2010 PSOD PAK Uch II - Power Private Limited NS-Private Energy A C C 2010 SERD VIE /2614 SOE Reform and Corporate Governance Facilitation Program - 1 MFF-Subproject PSM C C C 2010 SARD BAN /2623 Natural Gas Access Improvement (formerly Clean Fuel Development Energy B A C ) 2010 CWRD UZB /2630 Talimarjan Power (formerly CASAREM-Talimarjan Energy Development Energy A C C ) (formerly CASAREM-Talimarjan Energy Development ) 2010 SARD SRI /2640 Northern Road Connectivity T and ICT B B C 2010 SERD VIE /2643 Health Human Resources Sector Development Program SDP Multisector 60.0 C C B Program/ 2010 SERD VIE /2653 Skills Enhancement Education 70.0 C C B 2010 SERD CAM /2673 Water Resources Management Sector Development Program (Program) SDP ANR 30.0 B B C Program/ 2010 SERD VIE /2683 Sustainable Rural Infrastructure Development in Northern Mountain ANR B B B Provinces 2010 PARD PAL /2692 Water Sector Improvement Program Program WOMIS 16.0 C C C 2010 SARD BAN /2702 Padma Multipurpose Bridge T and ICT A A C 2010 SARD SRI /2711 Jaffna and Kilinochchi Water Supply and Sanitation WOMIS 90.0 B B C 2010 PARD PNG /2714 Town Electrification Investment Program, Tranche 1 MFF-Subproject Energy 57.3 B B B 2010 PSOD PRC /2627 Songhua River Basin Water Pollution Control and Management Private NS-Private WOMIS B B C Sector Facility 2010 PSOD THA /2628 Solar Power NS-Private Energy 70.0 B C C 2010 PSOD AZE /2637 Garadagh Cement Expansion and Energy Efficiency Improvement NS-Private Energy 27.0 A C C 2010 PSOD THA /2678 Bangchak Solar NS-Private Energy B C C 2010 PSOD GEO /2690 Bank of Georgia NS-Private Finance 50.0 FI FI FI 2010 PSOD PRC /2693 Municipal Natural Gas Infrastructure Development 2 NS-Private Energy B B C 2010 PSOD PRC /2698 Jilin Wind Power NS-Private Energy B B C 18

19 Year Dept DMC No. No. Name Loan Type Sector Amount ENV IR IP 2010 PSOD PAK /2704 Zorlu Enerji Power NS-Private Energy 36.8 B C C 2010 PSOD REG /7321 Clean Energy Funds - Renewable Energy Asia Fund NS-Private Energy 40.0 FI FI FI 2010 PSOD INO /2712 Housing Finance Program NS-Private Finance FI FI FI 2011 CWRD KAZ CAREC Transport Corridor I (Zhambyl Oblast Section) [Western Europe-Western T and ICT 4.7 B B C People's Republic of China International Transit Corridor] Investment Program - Tranche SARD IND Madhya Pradesh State Roads III MFF-Subproject T and ICT B B C 2011 CWRD TKM North-South Railway T and ICT 95.0 A B C 2011 EARD PRC Qinghai Rural Water Resources Management MFF-Subproject WOMIS B B C 2011 PARD COO Avatiu Port Development (Supplementary) MFF-Subproject T and ICT B A C 2011 SERD INO Indonesia Eximbank T and ICT B C C 2011 SERD VIE Ha Noi Metro Rail System (Line 3: Nhon-Ha Noi Station Section) ANR 60.0 B A A 2011 EARD PRC Forestry and Ecological Restoration in Three Northwest Provinces NS-Public Finance FI FI FI 2011 CWRD UZB Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program T and ICT A A C - Tranche SERD VIE Phuoc Hoa Water Resources (Supplementary) ANR B C A 2011 SARD IND Bangalore Metro Rail Transit System NS-Private T and ICT 40.0 B C C 2011 CWRD GEO Urban Services Improvement Investment Program - Tranche 1 MFF-Subproject T and ICT B B C 2011 CWRD ARM Sustainable Urban Development Investment Program - Tranche 1 ANR 60.0 A A B 2011 SERD VIE Water Sector Investment Program - Tranche 1 NS-Public T and ICT B C C 2011 CWRD KGZ CAREC Corridor 1 (Biskek-Torugart Road) - 3 MFF-Subproject WOMIS 80.0 B B C 2011 SARD BAN Khulna Water Supply MFF-Subproject T and ICT 48.6 B A C 2011 EARD PRC Xinjiang Altay Urban Infrastructure and Environment Improvement NS-Private WOMIS B B C 2011 EARD PRC Gansu Tianshui Urban Infrastructure Development MFF-Subproject WOMIS B B C 2011 SARD BAN Third Primary Education Development T and ICT 55.0 A C C 2011 SARD BAN Second Chittagong Hill Tracts Rural Development WOMIS 75.0 B A C 2011 SARD IND Madhya Pradesh Energy Efficiency Improvement Investment Program - Tranche 1 Multisector A A B 2011 EARD PRC Railway Energy Efficiency and Safety Enhancement Investment Program-Tranche 3 Multisector A A C 2011 EARD MON Higher Education Reform Education B B B 2011 SARD SRI Additional Financing National Highways Sector NS-Private Energy A C C 2011 SERD INO Urban Sanitation and Rural Infrastructure Support to the PNPM Mandiri ANR 55.0 B A A 2011 SARD BAN Power System Efficiency Improvement MFF-Subproject Energy B B C 2011 SARD IND North Eastern State Roads Investment Program -Tranche 1 MFF-Subproject T and ICT C C C 2011 EARD PRC Shandong Energy Efficiency and Emission Reduction Education 20.0 C C C 2011 CWRD UZB Second Central Asia Regional Economic Cooperation Corridor 2 Road Investment T and ICT 85.0 B A C Program - Tranche EARD PRC Guangdong Energy Efficiency and Environment Improvement Investment Multisector B C C Program - Tranche CWRD UZB Housing for Integrated Rural Development Investment Program - Tranche 1 Energy A B C 2011 SARD NEP Kathmandu Valley Water Supply Improvement MFF-Subproject T and ICT 74.8 B A B 2011 SERD LAO Secondary Education Sector Development Program Energy FI FI FI 2011 SARD IND Gujarat Solar Power Transmission MFF-Subproject T and ICT B C C 2011 CWRD UZB Advanced Electricity Metering MFF-Subproject Energy 42.9 FI FI FI 2011 SERD LAO Additional Financing Nam Ngum River Basin Development Sector NS-Private Energy A B C 19

20 Year Dept DMC No. No. Name Loan Type Sector Amount ENV IR IP 2011 CWRD UZB Central Asia Regional Economic Cooperation Corridor 6 (Marakand-Karshi) MFF-Subproject Multisector FI FI FI Railway Electrification 2011 SERD REG ASEAN Infrastructure Fund WOMIS 80.0 B B C 2011 PARD PNG Rural Primary Health Services Delivery (SF) Program Education 10.0 C C B 2011 SERD INO Second Local Government Finance and Governance Reform Program - Energy B B C Subprogram SERD VIE Transport Connections in Northern Mountainous Provinces (SF) Energy C C C 2011 SARD SRI Local Government Enhancement Sector (SF) Sector ANR 5.0 B B B 2011 SERD LAO Second Private Sector and SME Development Program - Subprogram 1 (SF) T and ICT B C C 2011 SARD IND Railway Sector Investment Program - Tranche 1 Equity Multisector FI FI FI 2011 SARD IND Himachal Pradesh Clean Energy Transmission Investment Program - Tranche 1 HSP 20.0 B C C 2011 PARD KIR South Tarawa Sanitation Improvement Sector (SF) Program PSM C C C 2011 SARD NEP Decentralized Rural Infrastructure and Livelihood - Additional Financing (SF) T and ICT 80.0 B B A 2011 SARD IND Uttarakhand Urban Sector Development Investment Program - Tranche 2 Sector WOMIS 59.0 B B B 2011 SARD IND Assam Power Sector Enhancement Investment Program-Tranche 3 Program PSM 5.0 C C C 2011 PARD SAM Economic Recovery Support Program (Subprogram 2) (SF) NS-Private Energy 97.0 A A C 2011 EARD PRC Xi'an Urban Road Network Improvement MFF-Subproject T and ICT B A C 2011 SERD INO Low-Carbon and Resilient Development Program MFF-Subproject Energy B B C 2011 SARD IND Assam Urban Infrastructure Investment - Tranche 1 WOMIS 7.6 B B C 2011 CWRD GEO Urban Services Improvement Investment Program - Tranche 2 ANR 18.0 B B B 2011 SARD NEP Electricity Transmission Expansion and Supply Improvement MFF-Subproject WOMIS B B C 2011 SERD LAO Smallholder Development - Additional Financing (SF) NS-Private Energy 48.0 B B C 2011 SERD VIE O Mon IV Combined Cycle Power Plant MFF-Subproject Energy 50.0 B B C 2011 SERD CAM Third Financial Sector Program - Subprogram 1 (SF) Program Multisector 10.8 C C C 2011 SARD BHU Urban Infrastructure T and ICT A A C 2011 SERD INO Regional Roads Development Policy-based Multisector C C C lending 2011 PARD VAN Interisland Shipping Support (SF) MFF-Subproject Multisector 81.0 B B C 2011 EARD PRC Guangxi Beibu Gulf Cities Development MFF-Subproject WOMIS 40.0 B C C 2011 SARD IND Second India Infrastructure Financing Facility - Tranche 3 Energy 56.0 B B C 2011 SARD IND National Power Grid Development Investment Program - Tranche 3 ANR 5.0 B C C 2011 CWRD KAZ Central Asia Regional Economic Cooperation Corridor 1 (Taraz Bypass) Energy A A C 2011 CWRD UZB Water Supply and Sanitation Services Investment Program - Tranche 3 Program Finance 15.0 C C C 2011 SERD VIE Comprehensive Socioeconomic Urban Development in Viet Tri, Hung Yen, Multisector 19.9 B C C and Dong Dang 2011 SERD VIE Support for the Implementation of the Poverty Reduction Program V - T and ICT B A B Subprogram 3 (SF) 2011 SERD VIE Development of the Northern Chu and Southern Ma Rivers Irrigation System T and ICT 10.8 B C C (SF) 2011 EARD PRC Hai River Estuary Area Pollution Control and Ecosystem Rehabilitation Multisector A A C 2011 SARD IND Madhya Pradesh Energy Efficiency Improvement Investment Program - Tranche 2 MFF-Subproject Multisector FI FI FI 2011 CWRD AZE Road Network Development Program - Tranche 3 MFF-Subproject Energy 76.0 B B C 2011 PARD VAN Port Vila Urban Development (SF) MFF-Subproject WOMIS 58.0 B B C 2011 SARD IND Infrastructure Development Investment Program for Tourism - Tranche 2 Multisector 70.0 B A B 20

The Role of Fiscal Policy to Achieve Inclusive Growth in Asia

The Role of Fiscal Policy to Achieve Inclusive Growth in Asia The Role of Fiscal Policy to Achieve Inclusive Growth in Asia Valerie Mercer-Blackman Economic Research and Regional Cooperation Department, Asian Development Bank TOKYO FISCAL FORUM, June 6, 2017 Presentation

More information

2015 Annual Portfolio Performance Report

2015 Annual Portfolio Performance Report April 2016 2015 Annual Portfolio Performance Report This is a redacted version of the document that excludes information that is subject to exceptions to disclosure set forth in ADB's Public Communications

More information

GENDER EQUALITY AND WOMEN S EMPOWERMENT OPERATIONAL PLAN ( ) 2016 PERFORMANCE SUMMARY

GENDER EQUALITY AND WOMEN S EMPOWERMENT OPERATIONAL PLAN ( ) 2016 PERFORMANCE SUMMARY GENDER EQUALITY AND WOMEN S EMPOWERMENT OPERATIONAL PLAN (2013 2020) 2016 PERFORMANCE SUMMARY April 2017 Sustainable Development and Climate Change Department ABBREVIATIONS ADB ADF CPS CWRD DMC DMF EARD

More information

NONSOVEREIGN OPERATION PROJECTS

NONSOVEREIGN OPERATION PROJECTS State-Owned Enterprise Engagement and Reform, Linked Document 5 NOVEREIGN OPERATION PROJECTS People s Republic of China (PRC) 1 Equity FIN 7219 * * Equity FIN 7240 Loan ENE 7244 2 Loan TRA 7270 3 Loan

More information

2016 Annual Portfolio Performance Report

2016 Annual Portfolio Performance Report May 2017 2016 Annual Portfolio Performance Report This is a redacted version of the document that excludes information that is subject to exceptions to disclosure set forth in ADB's Public Communications

More information

2014 Annual Portfolio Performance Report

2014 Annual Portfolio Performance Report April 2015 2014 Annual Portfolio Performance Report This is a redacted version of the document that excludes information that is subject to exceptions to disclosure set forth in ADB's Public Communications

More information

Organization of Presentation

Organization of Presentation Meeting Infrastructure Needs for a Shared Prosperity: Key Challenges and Policy Implications Guntur Sugiyarto*) Economic Research and Regional Department, ADB Central Asia Think Tank Development Forum

More information

ADB INDIA PORTFOLIO,

ADB INDIA PORTFOLIO, CAPE India, Supplementary Linked Document 1 ADB INDIA PORTFOLIO, 2007 2015 Table 1: Sovereign Loans Loan No. Project Name Amount ($ million) PCR (PVR) Agriculture, Natural Resources, and Rural Development

More information

Multitranche Financing Facility Annual Report 2017

Multitranche Financing Facility Annual Report 2017 May 2018 Multitranche Financing Facility Annual Report 2017 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. ABBREVIATIONS ADB Asian Development

More information

Statement of the Asian Development Bank s Operations in 2017

Statement of the Asian Development Bank s Operations in 2017 February 208 Statement of the Asian Development Bank s Operations in 207 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 20. I. OVERVIEW OF OPERATIONS.

More information

Infrastructure Financing Challenges in Southeast Asia

Infrastructure Financing Challenges in Southeast Asia Infrastructure Financing Challenges in Southeast Asia Alfredo Perdiguero Director, Regional Cooperation and Coordination Division Southeast Asia Department Asian Development Bank Policy Dialogue on Infrastructure

More information

INFRASTRUCTURE NEEDS

INFRASTRUCTURE NEEDS INFRASTRUCTURE NEEDS Key messages Developing Asia needs $26 trillion (in 2015 prices), or $1.7 trillion per year, for infrastructure investment in 2016-2030 Without climate change mitigation and adaptation,

More information

2017 Annual Portfolio Performance Report

2017 Annual Portfolio Performance Report April 2018 2017 Annual Portfolio Performance Report This is a redacted version of the document that excludes information that is subject to exceptions to disclosure set forth in ADB's Public Communications

More information

Financing for Sustainable Urbanization

Financing for Sustainable Urbanization Place Date here Financing for Sustainable Urbanization Rana Hasan* Asian Development Bank The 4th Asian Think Tank Development Forum New Delhi, India October 27 2016 This presentation has benefited from

More information

ADB BRIEFS NO. 22 KEY POINTS MAY Sri W. Handayani 1 Asian Development Bank 2

ADB BRIEFS NO. 22 KEY POINTS MAY Sri W. Handayani 1 Asian Development Bank 2 NO. 22 MAY 2014 ADB BRIEFS KEY POINTS The poor receive less social insurance benefits than the nonpoor. The quantity of social assistance benefits for poor and nonpoor is similar. Effective social assistance

More information

Money, Finance, and Prices

Money, Finance, and Prices 118 III. Money, Finance, and Prices Snapshot Inflation, as measured by the consumer price index (CPI), exceeded 5.0% in 13 of 47 regional economies in 2017. In 2017, the money supply expanded on an annual

More information

Contracts Awarded in April 2009

Contracts Awarded in April 2009 Contracts Awarded in April 2009 : 0089-BHU Micro, Small, And Medium-Sized Enterprise : Development Project Executing Agency : Ministry of Finance : Small & Medium Scale Enterprises : Bhutan Contract Description

More information

Financing the MDG Gaps in the Asia-Pacific

Financing the MDG Gaps in the Asia-Pacific Financing the MDG Gaps in the Asia-Pacific Dr. Nagesh Kumar Chief Economist, ESCAP And Director, ESCAP Subregional Office for South and South-West Asia, New Delhi 1 2 Outline Closing the poverty gap: interactions

More information

RCI as Driver of Inclusive Growth

RCI as Driver of Inclusive Growth RCI as Driver of Inclusive Growth 19 July 2013 Alfredo Perdiguero Principal Economist Thailand Resident Mission Southeast Asia Department Asian Development Bank Disclaimer: In preparing any country program

More information

Asia-Pacific Countries with Special Needs Development Report Investing in Infrastructure for an Inclusive and Sustainable Future

Asia-Pacific Countries with Special Needs Development Report Investing in Infrastructure for an Inclusive and Sustainable Future Asia-Pacific Countries with Special Needs Development Report 2017 Investing in Infrastructure for an Inclusive and Sustainable Future Manila, 30 August 2017 Countries with special needs Countries with

More information

Project Number: {April 2017} Establishment of the Canadian Climate Fund for the Private Sector in Asia II

Project Number: {April 2017} Establishment of the Canadian Climate Fund for the Private Sector in Asia II Project Number: 26194 {April 2017} Establishment of the Canadian Climate Fund for the Private Sector in Asia II CURRENCY EQUIVALENTS (as of 24 March 2017) Currency Unit Canadian Dollar (CAD) CAD1.00 =

More information

Progress of Regional Integration and Connectivity

Progress of Regional Integration and Connectivity 2015/FDM2/002 Session: 1 Progress of Regional Integration and Connectivity Purpose: Information Submitted by: Asian Development Bank Finance and Central Bank Deputies Meeting Cebu, Philippines 10 September

More information

01 Regional Outlook, Linkages, and Vulnerabilities

01 Regional Outlook, Linkages, and Vulnerabilities 1 Regional Outlook, Linkages, and Vulnerabilities 2 Asian Economic Integration Report 217 Regional Outlook, Linkages, and Vulnerabilities Regional Outlook, Integration, and Challenges Developing Asia s

More information

MEETING ASIA S INFRASTRUCTURE NEEDS HIGHLIGHTS ASIAN DEVELOPMENT BANK

MEETING ASIA S INFRASTRUCTURE NEEDS HIGHLIGHTS ASIAN DEVELOPMENT BANK MEETING ASIA S INFRASTRUCTURE NEEDS HIGHLIGHTS ASIAN DEVELOPMENT BANK MEETING ASIA S INFRASTRUCTURE NEEDS HIGHLIGHTS ASIAN DEVELOPMENT BANK Creative Commons Attribution 3.0 IGO license (CC BY 3.0 IGO)

More information

Contracts Awarded in July 2011

Contracts Awarded in July 2011 Contracts Awarded in July 2011 : 0089-BHU Micro, Small, And Medium-Sized Enterprise : Development Project Executing Agency : Ministry of Finance : Irrigation, Drainage, and Flood Protection : Reimbursement

More information

Achievements and Challenges

Achievements and Challenges LDCs Graduation in Asia-Pacific: Achievements and Challenges Ministerial Meeting of Asia-Pacific Least Developed Countries on Graduation and Post 2015 Development Agenda Kathmandu, Nepal 16-18 December

More information

Financing Sustainable Infrastructure In Asia. Fei Yu Deputy Representative Asian Development Bank North American Representative Office

Financing Sustainable Infrastructure In Asia. Fei Yu Deputy Representative Asian Development Bank North American Representative Office Financing Sustainable Infrastructure In Asia Fei Yu Deputy Representative Asian Development Bank North American Representative Office Agenda The Asia Scene The sustainable infrastructure gap The current

More information

Policy Paper. June Mainstreaming the Multitranche Financing Facility

Policy Paper. June Mainstreaming the Multitranche Financing Facility Policy Paper June 2008 Mainstreaming the Multitranche Financing Facility ABBREVIATIONS ADB Asian Development Bank ADF Asian Development Fund CPS country partnership strategy DMC developing member country

More information

Asia-Pacific Countries with Special Needs Development Report Investing in infrastructure for an inclusive and sustainable future

Asia-Pacific Countries with Special Needs Development Report Investing in infrastructure for an inclusive and sustainable future Asia-Pacific Countries with Special Needs Development Report 2017 Investing in infrastructure for an inclusive and sustainable future Tbilisi, 8 May 2017 Introduction Countries with special needs (CSN)

More information

Survey launch in 37 locations

Survey launch in 37 locations ECONOMIC AND SOCIAL SURVEY OF ASIA AND THE PACIFIC 213 Forward-looking Macroeconomic Policies for Inclusive and Sustainable Development 1 Survey launch in 37 locations 2 28 Locations in Asia-Pacific New

More information

Asian Development Outlook 2017 Update

Asian Development Outlook 2017 Update Asian Development Outlook 217 Update Sustaining Development Through Public Private Partnership Yasuyuki Sawada Chief Economist Asian Development Bank EMBARGOED UNTIL 9:3 AM Manila/Hong Kong, China/Singapore

More information

Regional update: trends and issues in Asian development cooperation

Regional update: trends and issues in Asian development cooperation Regional update: trends and issues in Asian development cooperation Yasuyuki Sawada Chief Economist and Director General Economic Research and Regional Cooperation Department Asian Development Bank Australasian

More information

Session 1 : Economic Integration in Asia: Recent trends Session 2 : Winners and losers in economic integration: Discussion

Session 1 : Economic Integration in Asia: Recent trends Session 2 : Winners and losers in economic integration: Discussion Session 1 : 09.00-10.30 Economic Integration in Asia: Recent trends Session 2 : 11.00-12.00 Winners and losers in economic integration: Discussion Session 3 : 12.30-14.00 The Impact of Economic Integration

More information

Goods and Works: Grants Contracts Awarded in September 2013

Goods and Works: Grants Contracts Awarded in September 2013 Goods and Works: Grants Contracts Awarded in September 2013 Name of Supplier : Khulna Mukti Seba Sangstha (Kmss) Address of Supplier : 36 Sher-E Bangla Road, Khulna 9100 Bangladesh Contract Description

More information

Consulting Services: Loans Contracts Awarded in July 2015

Consulting Services: Loans Contracts Awarded in July 2015 Consulting Services: Loans Contracts Awarded in July 2015 LOAN NO. : 2878-BAN(SF) Project Name : Urban Primary Health Care Services Delivery Project Executing Agency : Local Govt Div, Min of Local Govt.

More information

Agenda 3. The research framework for compiling and analyzing income support scheme

Agenda 3. The research framework for compiling and analyzing income support scheme 2011 Expert Meeting Agenda 3. The research framework for compiling and analyzing income support scheme Yun Suk-myung Seoul 1 June 2011 Methodology Data & Information to be Compiled & Analyzed 2 Ⅰ. Methodology

More information

MDG 8: Develop a Global Partnership for Development

MDG 8: Develop a Global Partnership for Development 182 Key Indicators for Asia and the Pacific 2015 MDG 8: Develop a Global Partnership for Development Millennium Development Goal (MDG) 8 has six targets. The first three and last are the focus of this

More information

Annual Report on the 2016 Country Performance Assessment Exercise

Annual Report on the 2016 Country Performance Assessment Exercise December 2016 Annual Report on the 2016 Country Performance Assessment Exercise This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. ABBREVIATIONS

More information

2017 Case Studies: Infrastructure

2017 Case Studies: Infrastructure 2017 Case Studies: Infrastructure REG: ASEAN Distributed Power (Phase 1 and Phase 2) Engineers inspecting a wind turbine installation Client: B. Grimm Power Public Company Limited (B. Grimm) ADB Assistance:

More information

Team Leader: Henrike Feig, Lead Evaluation Specialist (Financial Sector Operations) ( Contact:

Team Leader: Henrike Feig, Lead Evaluation Specialist (Financial Sector Operations) (  Contact: Asian Development Bank. 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2163; evaluation@adb.org; www.adb.org/evaluation Evaluation Approach Special Evaluation

More information

Country Operations Business Plan. Nepal August 2018

Country Operations Business Plan. Nepal August 2018 Country Operations Business Plan August 2018 Nepal 2019 2021 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 3 August

More information

ADB Economics Working Paper Series. Macroeconomic Uncertainties, Oil Subsidies, and Fiscal Sustainability in Asia

ADB Economics Working Paper Series. Macroeconomic Uncertainties, Oil Subsidies, and Fiscal Sustainability in Asia ADB Economics Working Paper Series Macroeconomic Uncertainties, Oil Subsidies, and Fiscal Sustainability in Asia Shikha Jha, Pilipinas Quising, and Shiela Camingue No. 150 March 2009 ADB Economics Working

More information

Country Operations Business Plan. Cambodia September 2016

Country Operations Business Plan. Cambodia September 2016 Country Operations Business Plan September 2016 Cambodia 2017 2019 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of

More information

ASIAN DEVELOPMENT BANK SST: OTH

ASIAN DEVELOPMENT BANK SST: OTH ASIAN DEVELOPMENT BANK SST: OTH 2003-09 SPECIAL EVALUATION STUDY OF THE ASIAN DEVELOPMENT FUND VI VII OPERATIONS March 2003 ABBREVIATIONS ADB Asian Development Bank ADF Asian Development Fund CAP country

More information

Session 7 Review of 10 PBL Operations Bruno Carrasco South Asia Regional Department

Session 7 Review of 10 PBL Operations Bruno Carrasco South Asia Regional Department Session 7 Review of 10 PBL Operations Bruno Carrasco South Asia Regional Department Introductory Course on Economic Analysis of Policy-Based Lending Operations 7 June 2007 Outline I. Motivation/Objective

More information

Asia-Pacific: Sustainable Development Financing Outreach. Asia-Pacific: Landscape & State of Sustainable Financing

Asia-Pacific: Sustainable Development Financing Outreach. Asia-Pacific: Landscape & State of Sustainable Financing Asia-Pacific: Sustainable Development Financing Outreach Asia-Pacific: Landscape & State of Sustainable Financing Dr. Shamshad Akhtar, United Nations Under-Secretary-General & ESCAP Executive Secretary

More information

Country Operations Business Plan. Georgia September 2018

Country Operations Business Plan. Georgia September 2018 Country Operations Business Plan September 2018 Georgia 2019 2021 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of

More information

The 2015 Social Protection Indicator Results for Asia Sri Wening Handayani ADB Principal Social Development Specialist

The 2015 Social Protection Indicator Results for Asia Sri Wening Handayani ADB Principal Social Development Specialist The 2015 Social Protection Indicator Results for Asia Sri Wening Handayani ADB Principal Social Development Specialist The views expressed in this presentation are those of the author and do not necessarily

More information

Financing Infrastructure in Asia and the Pacific

Financing Infrastructure in Asia and the Pacific Financing Infrastructure in Asia and the Pacific Building Bridges III S. Samuel Tumiwa Deputy Representative North America Representative Office November 2015 1 What Does All This Mean Re-emergence of

More information

SUMMARY OF INSPECTION PANEL CASES October 15, 2012

SUMMARY OF INSPECTION PANEL CASES October 15, 2012 SUMMARY OF INSPECTION PANEL CASES October 15, 2012 REQUEST REQUEST RECEIVED REQUEST REGISTERED INSPECTION PANEL RECOMMENDATION AND ITS APPROVAL BY THE BOARD PANEL S ACTIVITY POLICIES AND PROCEDURES RAISED

More information

ADB Economics Working Paper Series. Poverty Impact of the Economic Slowdown in Developing Asia: Some Scenarios

ADB Economics Working Paper Series. Poverty Impact of the Economic Slowdown in Developing Asia: Some Scenarios ADB Economics Working Paper Series Poverty Impact of the Economic Slowdown in Developing Asia: Some Scenarios Rana Hasan, Maria Rhoda Magsombol, and J. Salcedo Cain No. 153 April 2009 ADB Economics Working

More information

MDG 8: Develop a Global Partnership for Development

MDG 8: Develop a Global Partnership for Development 124 Key Indicators for Asia and the Pacific 2014 MDG 8: Develop a Global Partnership for Development Millennium Development Goal (MDG) 8 has six targets. The first three are the focus of this section.

More information

Country Operations Business Plan. August Bangladesh

Country Operations Business Plan. August Bangladesh Country Operations Business Plan August 2007 Bangladesh 2008 2010 CURRENCY EQUIVALENTS (as of 5 August 2007) Currency Unit taka (Tk) Tk1.00 = $0.015 $1.00 = Tk68.5 ABBREVIATIONS ADB Asian Development Bank

More information

Recycling Regional Savings for Closing Asia-Pacific s Infrastructure Gaps

Recycling Regional Savings for Closing Asia-Pacific s Infrastructure Gaps Recycling Regional Savings for Closing Asia-Pacific s Infrastructure Gaps Presentation at the Conference on Global Cooperation for Sustainable Growth and Development: Views from G20 Countries ICRIER, New

More information

Third Working Meeting of the Technical Advisory Group (TAG) on Population and Social Statistics

Third Working Meeting of the Technical Advisory Group (TAG) on Population and Social Statistics Third Working Meeting of the Technical Advisory Group (TAG) on Population and Social Statistics Framework of Inclusive Growth Indicators (FIGI) Kaushal Joshi Senior Statistician, Research Division, Economics

More information

Country Operations Business Plan. Kazakhstan September 2017

Country Operations Business Plan. Kazakhstan September 2017 Country Operations Business Plan September 2017 Kazakhstan 2018 2020 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as

More information

Asian Development Outlook 2016: Asia s Potential Growth

Asian Development Outlook 2016: Asia s Potential Growth Asian Development Outlook 2016: Asia s Potential Growth Juzhong Zhuang Deputy Chief Economist Asian Development Bank Presentation at The views expressed in this document are those of the author and do

More information

ADB Support for BEZ: TAs and Investments for BEZ in PRC and Viet Nam

ADB Support for BEZ: TAs and Investments for BEZ in PRC and Viet Nam ADB Support for BEZ: TAs and Investments for BEZ in PRC and Viet Nam Ha Noi 28 June 2017 Outline of Presentation Part I ADB RCI Strategy and GMS overview Part II BEZ Experiences: History and Lessons Part

More information

Regional integration in Asia:

Regional integration in Asia: Regional integration in Asia: Trends and Issues Cyn-Young Park Director Economic Research and Regional Cooperation Department Asian Development Bank ADB-ASIAN THINK TANK DEVELOPMENT FORUM 2017: Financing

More information

Jong-Wha Lee. Chief Economist Economics and Research Department Asian Development Bank. Washington, DC April 19, 2010

Jong-Wha Lee. Chief Economist Economics and Research Department Asian Development Bank. Washington, DC April 19, 2010 Asian Development Outlook 2010 Macroeconomic Policy Challenges Jong-Wha Lee Chief Economist Economics and Research Department Asian Development Bank Washington, DC April 19, 2010 Outline 1. Economic prospects

More information

Country Operations Business Plan. Armenia October 2015

Country Operations Business Plan. Armenia October 2015 Country Operations Business Plan October 2015 Armenia 2016 2018 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 31

More information

Country Operations Business Plan. Bangladesh October 2015

Country Operations Business Plan. Bangladesh October 2015 Country Operations Business Plan October 2015 Bangladesh 2016 2018 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of

More information

Developing Asia s Short-Run Economic Outlook and Main Risks

Developing Asia s Short-Run Economic Outlook and Main Risks Developing Asia s Short-Run Economic Outlook and Main Risks Dr. Donghyun Park, Asian Development Bank Workshop on Bond Market Development in Emerging East Asia Raffles Hotel Le Royal Phnom Penh, Cambodia,

More information

ASIAN DEVELOPMENT FUND (ADF) ADF X MIDTERM REVIEW MEETING. Development Effectiveness of Regional Cooperation and Integration Initiatives

ASIAN DEVELOPMENT FUND (ADF) ADF X MIDTERM REVIEW MEETING. Development Effectiveness of Regional Cooperation and Integration Initiatives ASIAN DEVELOPMENT FUND (ADF) ADF X MIDTERM REVIEW MEETING Development Effectiveness of Regional Cooperation and Integration Initiatives October 2010 ABBREVIATIONS ADB Asian Development Bank ADBI Asian

More information

Piloting Results-Based Lending for Programs. Asian Development Bank 2014

Piloting Results-Based Lending for Programs. Asian Development Bank 2014 Piloting Results-Based Lending for Programs Asian Development Bank 2014 Outline 1. Why RBL 2. Defining RBL 3. Defining and Assessing Programs 4. Questions 2 Supporting Development Effectiveness Measurable

More information

Fiscal policy for inclusive growth in Asia

Fiscal policy for inclusive growth in Asia Fiscal policy for inclusive growth in Asia Dr. Donghyun Park, Principal Economist Economics and Research Department, Asian Development Bank PRI-IMF-ADBI Tokyo Fiscal Forum on Fiscal Policy toward Long-Term

More information

FOLLOW-UP TO RECENTLY COMPLETED MAJOR EVALUATION REPORTS

FOLLOW-UP TO RECENTLY COMPLETED MAJOR EVALUATION REPORTS FOLLOW-UP TO RECENTLY COMPLETED MAJOR EVALUATION REPORTS 1. While the recommendations of Asian Development Bank (ADB) country program evaluations generally get addressed in some form in a new Country Partnership

More information

Country Operations Business Plan. Kazakhstan September 2018

Country Operations Business Plan. Kazakhstan September 2018 Country Operations Business Plan September 2018 Kazakhstan 2019 2021 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as

More information

Country Operations Business Plan. Myanmar September 2015

Country Operations Business Plan. Myanmar September 2015 Country Operations Business Plan September 2015 Myanmar 2016 2018 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of

More information

THE SOCIAL PROTECTION INDICATOR. Assessing Results for Asia ASIAN DEVELOPMENT BANK

THE SOCIAL PROTECTION INDICATOR. Assessing Results for Asia ASIAN DEVELOPMENT BANK THE SOCIAL PROTECTION INDICATOR Assessing Results for Asia ASIAN DEVELOPMENT BANK THE SOCIAL PROTECTION INDICATOR Assessing Results for Asia ASIAN DEVELOPMENT BANK Creative Commons Attribution 3.0 IGO

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 49267-001 October 2016 Proposed Equity Investment VI (Vietnam Investments) Fund III, L.P. (Regional) This is an abbreviated

More information

3Foreign Direct Investment

3Foreign Direct Investment 3Foreign Direct Investment 42 Asian Economic Integration Report 218 Trends and Patterns of Foreign Direct Investment in Asia Despite a downturn in global investment, foreign direct investment in Asia both

More information

Goods and Works: Grants Contracts Awarded in February 2014

Goods and Works: Grants Contracts Awarded in February 2014 Goods and Works: Grants Contracts Awarded in February 2014 : 0232-LAO : Second GMS Regional Communicable Diseases Control Project - Lao Executing Agency : Ministry of Health Name of Supplier : Maxcare

More information

Goods and Works: Grants Contracts Awarded in May 2013

Goods and Works: Grants Contracts Awarded in May 2013 Goods and Works: Grants Contracts Awarded in May 2013 : 0173-LAO : HEALTH SECTOR DEVELOPMENT PROGRAM - GRANT Executing Agency : Ministry of Health Name of Supplier : VIENGPHONXAY CONSTRUCTION SOLE CO.

More information

ASIA-PACIFIC HIGH-LEVEL CONSULTATION ON FINANCING FOR DEVELOPMENT April 2015 Jakarta. Chair s summary

ASIA-PACIFIC HIGH-LEVEL CONSULTATION ON FINANCING FOR DEVELOPMENT April 2015 Jakarta. Chair s summary ASIA-PACIFIC HIGH-LEVEL CONSULTATION ON FINANCING FOR DEVELOPMENT 29-30 April 2015 Jakarta Chair s summary 1. The Asia-Pacific High-level Consultation on Financing for Development was held from 29 to 30

More information

The Role of Non-state Actors in Social Cohesion: The ADB SP Plan

The Role of Non-state Actors in Social Cohesion: The ADB SP Plan The Role of Non-state Actors in Social Cohesion: The ADB SP Plan Maria Socorro G. Bautista ADB The views expressed herein are those of the author and do not necessarily reflect the views or policies of

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Lanka Project Number: 46265 September 2013 Proposed Administration of Grant Socialist Republic of Viet Nam: Energy Efficiency for Ho

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN])

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN]) CAREC Corridors 1 and 6 Connector Road (Aktobe Makat) Reconstruction Project (RRP KAZ 48424) SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN]) 1. Sector Performance, Problems, and Opportunities

More information

Contracts Awarded for Loan Projects (Consulting Services)

Contracts Awarded for Loan Projects (Consulting Services) Contracts Awarded for Loan Projects (Consulting Services) December 2011 Cambodia : 2670-CAM(SF) : Rural Roads Improvement Project : Ministry of Rural Development : SBK Research and Development Co. Ltd.

More information

Country Operations Business Plan. Timor-Leste March 2017

Country Operations Business Plan. Timor-Leste March 2017 Country Operations Business Plan March 2017 Timor-Leste 2017 2019 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS The currency

More information

UNFCCC Expert Meeting on Loss and Damage from Climate Change

UNFCCC Expert Meeting on Loss and Damage from Climate Change UNFCCC Expert Meeting on Loss and Damage from Climate Change Asia Regional Workshop Bangkok, Thailand 27 29 August 2012 Session 4 Approaches to Address Loss and Damage at National Level Charles Rodgers

More information

Economic Prospects: East Asia and South Asia

Economic Prospects: East Asia and South Asia Economic Prospects: East Asia and South Asia Daniel Jeongdae Lee, UN ESCAP UN DESA EGM on the World Economy 2 October 216, Toronto Main messages Steady high growth >> quality of growth (jobs, poverty,

More information

2017 Annual Review of Salary and Benefits for International Staff, National Staff, and Administrative Staff

2017 Annual Review of Salary and Benefits for International Staff, National Staff, and Administrative Staff November 2017 2017 Annual Review of Salary and Benefits for International Staff,, and Distribution of this document is restricted until it has been approved by the Board of Directors. Following such approval,

More information

POPULATION AGING AND THE POSSIBILITY OF A MIDDLE-INCOME TRAP IN ASIA

POPULATION AGING AND THE POSSIBILITY OF A MIDDLE-INCOME TRAP IN ASIA POPULATION AGING AND THE POSSIBILITY OF A MIDDLE-INCOME TRAP IN ASIA Joonkyung Ha and Sang-Hyop Lee NO. 536 February 2018 adb economics working paper series ADB Economics Working Paper Series Population

More information

Financing for Development in Asia and the Pacific: Opportunities and Challenges

Financing for Development in Asia and the Pacific: Opportunities and Challenges Financing for Development in Asia and the Pacific: Opportunities and Challenges Dr. Shamshad Akhtar, Under-Secretary-General of the United Nations & Executive Secretary of The Economic and Social Commission

More information

Table 1 Baseline GDP growth (%)

Table 1 Baseline GDP growth (%) ASIAN DEVELOPMENT Outlook Supplement December Firming industrial economies to support Asia s outlook z Developing Asia is set to benefit as further signs emerge of growth momentum in the advanced economies.

More information

Public-Private Partnership Monitor Key Trends and Findings

Public-Private Partnership Monitor Key Trends and Findings Office of Public Private Partnership Public-Private Partnership Monitor Key Trends and Findings 23 November 2017 PPP Monitor Benefits and Key Findings PPP Monitor The PPP Monitor tracks the development

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 42180-016 February 2017 Proposed Multitranche Financing Facility and Technical Assistance Grant People s Republic of

More information

Contracts Awarded in March 2011

Contracts Awarded in March 2011 Contracts Awarded in March 2011 : 0002-INO : Earthquake and Tsunami Emergency Support Executing Agency : Asian Development Bank : Multisector : Indonesia Small Community Works Contracts for Construction

More information

Environmental Assessment and Review Framework. Mongolia: Western Regional Road Corridor Investment Program

Environmental Assessment and Review Framework. Mongolia: Western Regional Road Corridor Investment Program Western Regional Road Corridor Investment Program (RRP MON 41193) Environmental Assessment and Review Framework September 2011 Mongolia: Western Regional Road Corridor Investment Program Prepared by the

More information

Strengthening public finance in North and Central Asia. An overview

Strengthening public finance in North and Central Asia. An overview Strengthening public finance in North and Central Asia An overview Public finance is the financing backbone for sustainable development and infrastructure investment The financing demand for the implementation

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT

SECTOR ASSESSMENT (SUMMARY): TRANSPORT SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Myanmar is the largest country in the Greater Mekong Subregion (GMS) with a total land area

More information

Country Operations Business Plan. Afghanistan November 2017

Country Operations Business Plan. Afghanistan November 2017 Country Operations Business Plan November 2017 Afghanistan 2018 2020 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. 1 CURRENCY EQUIVALENTS (as

More information

Country Operations Business Plan. Bhutan Asian Development Bank. September 2017

Country Operations Business Plan. Bhutan Asian Development Bank. September 2017 Country Operations Business Plan September 2017 Bhutan 2018 2020 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. Asian Development Bank CURRENCY

More information

Flood Damage and Post-Flood Rehabilitation. Economic Performance in Q1/2012 and Outlook for 2012

Flood Damage and Post-Flood Rehabilitation. Economic Performance in Q1/2012 and Outlook for 2012 Presentation Outline 1 Flood Damage and Post-Flood Rehabilitation 2 Investment Plans of Strategic Committee for Reconstruction and Future Development 3 Economic Performance in Q1/2012 and Outlook for 2012

More information

REPORT TO THE FATF PLENARY February 2008

REPORT TO THE FATF PLENARY February 2008 REPORT TO THE FATF PLENARY February 2008 Ongoing Technical Assistance and Plans 1. Background ADB continues to provide assistance to a number of its developing member countries (DMCs) to enhance their

More information

Annual MFF Progress Report. Revised Closing Date. Facility Summary

Annual MFF Progress Report. Revised Closing Date. Facility Summary Annual MFF Progress Report 37049013 For the meaning of each item, please refer to the MFF Annual Report Definitions Table. FACILITY UPDATE Project Title Multitranche Financing Facility - Integrated Citarum

More information

The G20 Mexico Summit 2012 Key Issues for Asia-Pacific

The G20 Mexico Summit 2012 Key Issues for Asia-Pacific The G20 Mexico Summit 2012 Key Issues for Asia-Pacific Third ESCAP High-Level Consultation Bangkok, 23 May 2012 Dr. Nagesh Kumar Chief Economist, UN-ESCAP And Director, ESCAP SRO-SSWA 1 Outline Reviving

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Country Partnership Strategy: Viet Nam, 2012 2015 SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Investment in the transport sector in Viet

More information

SME Finance and Green Finance by ADB

SME Finance and Green Finance by ADB SME Finance and Green Finance by ADB Biao Huang Private Sector Operations Department Asian Development Bank Overview Financial Sector Development and Environment are two core areas of operations under

More information