1 BIDDING DOCUMENT EXPRESSION OF INTEREST (BID NO. EOI /PD&C/2016) FOR EMPANELMENT OF ELECTRICAL CONTRACTORS for one year, FOR SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF ELECTRICAL LINES UPTO 11 KV VOLTAGE LEVEL, DISTRIBUTION TRANSFORMERS AND ALL OTHER ALLIED Material required for erection of new electrical lines/ augmentation of existing lines and distribution transformers on turnkey basis under the JURISDICTION OF DHBVN VOLUME-II DATA REQUIREMENT SHEET (General & Technical Specifications) Chief Engineer /PD&C, DHBVN, Vidyut Sadan, Vidyut Nagar, HISAR Phone Fax No.: Superintending Engineer /P&D, DHBVN, Vidyut Sadan, Vidyut Nagar, HISAR Phone Vol.-II Page 1 of 19

2 1. Introduction 1.1. a) SCOPE: (Part-A, 11 KV Lines) Scope covers detailed survey, spotting location of poles, supply and erection of PCC poles in single pole support / double pole / 3 pole / 4 pole arrangement with complete 11 KV line material such as Disc Insulator, Pin Insulator with pins, Tension/ suspension fittings, Cross arms pole, top bracket, straight X arms, earthing material, guy sets with complete material with nuts and bolts, washers, pole clamps and other required lines accessories etc. ACSR conductor, fixing of insulator strings, stringing of conductor and earth wire, fixing of stays and testing and commissioning of erected transmission lines and any allied material required for completing the work, complete specifications have been placed in Volume-II under Scope (Part-II). b) SCOPE: (Part C Civil Works) The civil works for the plinths of Distribution T/Fs & fencing, foundation, of 11 KV equipment like G.O switches, PCC poles, tubular poles etc. will be done by the bidder Schedule of quantities The detailed description of various items/ equipment are indicated at Annexure under section VI (Vol.-I). The bill of quantity of major equipment are also indicated and wherever the quantities are not indicated, the bidder is required to compute the quantity. The bidder is also required to indicate the unit rate and total price of the items under a particular head in the bid proposal sheets, which may not be specifically mentioned but are essential for the execution of the contract Single Line Diagrams The single line diagram for 11 KV feeder be taken from concerned SE/OP Location of the Substation The location of the substation along with the nearest Railhead is indicated Meteorological data The meteorological data of the sub station is indicated However, for design purpose, ambient temperature should be considered as 50% Soil Data (Under the scope of DHBVN) Optional Spares The bidder shall identify and recommend the list of optional spare parts required together with their quantity to meet the specified performance for a period of three years. The item schedule and prices of these shall be given by bidder in the relevant schedule of BPS and shall not be considered for the Vol.-II Page 2 of 19

3 evaluation of the bid. The bidder must also indicate the basis for recommendation of optional spares. The bidder shall also recommendation their source of availability and technical particulars. The bidder may also suggest addition or deletion of spare items over this list. It will be the option of employer to buy the spares quoted by the bidder in this bid at the time of finalization of contract. The contractor shall advise the purchase about the required lead time for ordering of the spares and the minimum quantities required for order In addition to meeting the qualification requirement stipulated in section IFB, ITB Volume- IA the bidder of its own or his manufacturer or sub vendor/ fabricator shall also meet the qualifying requirement set forth for all the equipment in the relevant section of the technical specification, failing which the bid is liable to be rejected Special Tools and Tackles The bidder may include in his proposal the deployment of all such special tools and tackles required for erection, testing, Commissioning and maintenance of equipment. However, a list of all such devices offered by the bidder should be clearly indicated in his offer. In addition to this, the supplier shall also furnish a list of special tools and tackles for various equipment in a manner to be referred by the purchaser during the operation of these equipment. At the completion of job, the contractor will hand over a separate set of tools and tackles required for routine maintenance of substation equipment erected by him as a part of contract Facilities to be provided by the purchaser Purchaser shall make available the auxiliary power supplies on chargeable basis at a single point in the substation. The prevailing energy rates of the Slate shall be applicable. All further distribution from the same shall be made by the contractor. However, in case of failure of power due to any unavoidable circumstances, the contractor has to make necessary arrangements like diesel sets etc. so that progress of work is not affected and the purchaser, In no case shall be responsible, for any delay in completion of work because of non availability of power Purchaser shall make available water supply at single point for construction. All further distribution for the same shall be made by the Contractor. However in case of non availability of the water for Vol.-II Page 3 of 19

4 construction, the Contractor shall make his own arrangement, at his cost The purchaser shall in no case be responsible for any delay in works because of non availability of water. Vol.-II Page 4 of 19

5 SECTION VII-B Vol.-II Page 5 of 19

6 1. SECTION VII-B Drawings 1.1. All drawings submitted by the Contractor including those submitted at the time of Bid shall be with sufficient detail to indicate the type, size, arrangement, dimensions, material description, Bill of materials, weight of each component, break-u[p for packing and transportation, fixing arrangement required, the dimensions required for installation and any other information specifically requested in these specifications Each drawing submitted by the Contractor shall be clearly marked with the name of the Employer, the specification title, the specification number and the name of the project. All titles, notings, markings and writings on the drawing shall be in English. All the dimensions should be to the scale and in metric units The Contractor shall submit the necessary detailed route plan or other necessary construction drawings for approval to the Employer within 20 days of Letter of Intent The route plan drawings submitted by the Contractor shall be examined by the Employer as far as practicable within 20 days and shall be modified by the Contractor, if any modifications and/or corrections are required by the Employer. The Contractor shall incorporate such modifications and/or corrections and submit the final drawings for approval. Any delays arising out of failure by the Contractor to rectify the drawings in good time shall not alter the contract completion date The drawings submitted for approval to the Employer shall be in quadruplicate. One print of suet drawings shall be returned to the Contractor by the Employer marked approved/approved with corrections. The Contractor shall thereupon furnish the Employer additional prints as may be required along with one reproducible in original of the drawings after incorporating all corrections The work shall be performed by the Contractor strictly in accordance with these drawings and no deviation shall be permitted without the approval of the Employer, if so required All manufacturing, fabrication and erection work under the Scope of Vol.-II Page 6 of 19

7 Contractor, prior to the approval of the drawings shall be at the Contractor s risk. The Contractor may make any changes in the design which are necessary to conform to the provisions and intent of the Contract and such changes will again be subject to the approval by the Employer The approval of the documents and drawings by the Employer shall mean that the Employer is satisfied that: a) The Contractor has completed the part of the Works covered be the subject document (i.e., confirmation of progress of work). b) The work appears to comply with requirements of specifications. In no case the approval by the Employer of any document does imply compliance with all technical requirements, nor the absence of errors in such documents The following is the general list of the documents and drawings that are to be approved by the employer: a) Work Schedule (Master Network) Plan. b) Sag tensions calculation and sag template curve drawing. c) Pole spotting data. d) Detailed survey report and profile drawings showing ground clearance and pole locations. e) Pole earthing trawling. f) Pole accessories drawings like danger plate, number plate, phase plates etc. g) Pert Chart Design Improvements: The Employer or the Contractor may propose changes in the specification and if the parties agree upon any such changes and the cost implication, the specification shall be modified accordingly If any such agreement affects the price and schedule of completion, Design Co-ordination. the parties shall agree in writing as to the extent of any change in the price and schedule of completion before the Contractor proceeds with the change. Following such agreement, the provision thereof, shall be deemed to have been amended accordingly. The contractor shall be responsible for the selection and design of appropriate Vol.-II Page 7 of 19

8 material/item to provide the best coordinated performance of the entire system. The basic design requirements are detailed out in this specification. The design of various components, sub-assembly and assemblies shall be so done that it facilitates easy field assembly and maintenance Design Review Meetings The contractor will be called upon to attend design review meetings with the Employer and the consultants of the Employer during the period of contract. The Contractor shall attend such meetings at his own cost at Hisar or at mutually agreed venue as and when required. Such review meeting shall be held as & when required. 2. Packing 2.1. All the material shall be suitably protected, coated, covered of boxed and created to prevent or deterioration during transit, handling & storage at site till the time of erection. The Contractor shall be responsible for any loss or damage during transportation, handling and storage due to improper packing The contractor shall include and provide for securely protecting and packing the materials so as to avoid loss or damage during transport during transport by air, sea, rail and road All packing shall allow for easy removal and checking at site. Wherever necessary, proper arrangement for attaching slings for lifting shall be provided. All packages shall be clearly marked for with sign showing up & down on. 3. Progress Report Appropriate visual charts shall accompany the monthly progress report detailed out the progress achieved on all erection activities as compared to the schedules. The report shall also indicate the reasons for variance between the scheduled and actual progress and the action proposed for corrective measures wherever necessary. 4. Manpower Deployment Report 4.1. The Contractor shall submit to the employer on the first day of every month a manpower deployment schedule for each activity The Contractor shall also submit to the employer on the first day of every Vol.-II Page 8 of 19

9 month a manpower deployment report of the previous month detailing the No. of persons scheduled to have been employed and actually employed Tools, Tackle and Scaffolding The Contractor shall provide all the construction equipment, tools, tackle and scaffoldings required for construction, erection and commissioning of the power line covered under the contract. He shall submit a list of all such material of the employer before the commencement of work at site. These tools and tackle shall not be removed from the site without the written permission of the Employer First Aid and General Hygiene The Contractor shall provide necessary first aid & reasonable Hygiene facilities for all his employees, representatives and workmen working at the site Enough number of Contractor s personnel shall be trained in administering the first aid Security The Contractor shall have total responsibility for all requirement and materials in his custody, stored, loose, semi-assembled and or erected by him at site. The Contractor shall make suitable security arrangements including employment of security personnel to ensure the protection of all materials, equipment and works from theft, pilferage and any other damages and loss Materials Handling and Storage: All the supplies under the Contract as well as arriving at Site shall be promptly received, unloaded and transported and stored in the stores by the Contraction Contractor shall be responsible for examining all the shipment and notify the employer immediately of any damage, shortage, discrepancy etc for the purpose of Employer s information only. The Contactor shall submit to the Employer every week a report detailing all the receipts during the week. However, the Contactor shall be solely responsible for any shortage or damages in transit, handling and/ or in storage and erection at Site The Contractor shall maintain an accurate and exhaustive record detailing out the list of all items received by him for the purpose of Vol.-II Page 9 of 19

10 erection and keep such record open for the inspection of the Employer Each package shall be legibly marked by the Contractor/ Supplier at his expenses showing the details such as description and quantity of contents, the name of the consignee and address, the gross and net weight of the package, the name of the Contractor etc. 5. Erection Conditions 5.1. The following shall supplement the conditions already contained in the other parts of these specifications and documents and shall govern that portion of the work on this Contract to be performed at site Regulation of local Authorities and Statutes The Contractor shall comply with all the rules and regulations of local authorities during the performance of his field activities. He shall also comply with the Minimum Wages Act, 1948 and the payment of Wages Act (both of the Govt. of India) and the rules made there under in respect of any employee or workman employed or engaged by him or his Sub- Contractor All registration and statutory inspection fees, if any, in respect of his work pursuant to this Contract shall be to the account of the Contractor. However, any registration, statutory inspection fees lawfully payable under the provisions of the statutory law and its amendments from time to time during erection in respect of the 11 KV line, ultimately to be owned by the Employer shall be to the account of the Employer. Should any such inspection or registration need to be re-arranged due to the fault of the Contractor or his Sub-Contractor, the additional fees to such inspection and /or registration shall be borne by the Contractor Contractor s Field Operation The Contractor shall keep the Employer informed in advance regarding his field activity plans and schedules for carrying-out each part of the works. Any review of such plan or schedule or method of work by the Employer shall not relieve the Contractor of Vol.-II Page 10 of 19

11 any of his responsibilities towards the field activities. Such reviews shall also not be considered as an assumption of any risk by the Employer or any of his representatives and no claim of the Contractor will be entertained because of the failure or inefficiency of any such plan or schedule or method of work reviewed. The Contractor shall be solely responsible for the safety, adequacy and efficiency of tools and plants and his erection methods All the materials stored in the open or dusty location must be covered with suitable weather-proof and flameproof covering material as applicable The Contractor shall be responsible for making suitable indoor storage facilities at various locations to store all items /materials which require indoor storage. 6. Construction Management Time is the essence of the Contract and the Contractor shall be responsible for performance of his works in accordance with the specified construction schedule. If at any time, the Contractor is falling behind the schedule for reasons attributable to him, he shall take necessary action to make good for such delays by increasing his work force or by working overtime or otherwise to accelerate the progress of the work and to comply with schedule and shall communicate such actions in writing to the Employer, satisfying that his action will compensate for the delay. The Contractor shall not be allowed any extra compensation for such action. 7. Field Office Records The Contractor shall set up his site offices at different locations to facilitate smooth working. The site offices shall be manned by his supervisors/ other staff. The Contractor shall maintain at his Site office up-to-date copies of all drawings, specifications and other supplementary data complete with all the latest revisions thereto. The Contractor shall also maintain, in addition, the continuous record of all changes to the above Contract Documents, drawings, specifications, supplementary data etc. effected in the field and on completion of his total assignment under the Contract shall incorporate data to indicate as installed conditions of the material Vol.-II Page 11 of 19

12 supplied and erected under the contract. Such drawings and engineering data shall be submitted to the Employer in required number of copies. 8. Protection of Property and Contractor s Liability The Contractor will ensure provision of necessary safety equipment such as barriers, sign-boards, warning lights and alarms etc. to provide adequate protection to persons and property. The Contractor shall be responsible to give reasonable notice to the Employers and the Owners of public or private property and utilities when such property and utilities are likely to get damaged or injured during the performance of his works and shall make all necessary arrangements with such owners, related to removal and/or replacement or protection of such property and utilities. 9. Insurance The Contractor shall arrange & keep alive all the required insurance covers for his Employees/third parties as under: Workmen s Compensation Insurance: This insurance shall protect the Contractor against all claims applicable under the Workmen s Compensation Act, 1948 (Government of India). This policy shall also cover the Contractor against claims for injury, disability disease or death of his or his Sub-Contractor s employees, which for any reason are not covered under the Workmen s employees, which for any reason are not covered under the workmen s Compensation Act, The liabilities shall not be less than: Workmen s Compensation As per statutory Provisions Employee s Liability As per statutory Provisions 9.2. Comprehensive Automobile Insurance This insurance shall be in such a form to protect the Contractor against all claims for injuries, disability, disease and death to members of public including the Employer s men and damage to the property of others arising from the use of motor vehicles during on or off the site operations, irrespective of the ownership of such vehicles. The minimum liability covered shall be as herein indicated: Fatal Injury Rs. 1,00,000 each Rs. 2,00,000 each Vol.-II Page 12 of 19

13 Property Rs. 1,00,000 each In case the employer is made to pay such compensation, the Contractor will be liable to reimburse the Employer such amount even in addition to the compensation indicated above Comprehensive General Liability Insurance The insurance shall protect the Contractor against all claims arising from injuries, disabilities, disease or death of members of public or damage to property of others, due to any act or omission on the part of the Contractor, its agents, its employees, its representatives and Sub-Contractors or from riots, strikes and civil commotion The above are only illustrative list of insurance covers normally required and it will be the responsibility of the Contractor to maintain all necessary insurance coverage to the extent both in time and amount to take care of all its liabilities either direct of indirect, in pursuance of the Contact. 10. Protection of Measurements and Reference Points The Contractor shall ensure that any finds such as relics, antiques, coins, fossils, etc. which he may come across during the course of performance of his works either during excavation or elsewhere, are properly protect3ed and handed over to the Employees. Similarly, the Contractor shall ensure that the bench marks, reference points etc. which are marked either with the help of Employer shall or by the Employer shall not be disturbed in any way during the performance of its works. If, any work, is to be performed which disturbs such reference, the same shall be done only after these are transferred to other suitable locations under the direction of the Employer. The Contractor shall provide all necessary materials and assistance to such relocation of reference points etc. 11. Work and Safety Regulations The Contractor shall ensure safety of all the workmen, materials plant and equipment belonging to him or to the others, working at the Site. The Contractor shall also provide for all safety notices and safety equipment required by the relevant legislations and deemed necessary by the Employer. Vol.-II Page 13 of 19

14 11.2. The Contractor will notify, well in advance to the Employer, its intention to bring to the site any Container filled with liquid or gaseous fuel or explosive or petroleum substance or such chemicals which may involve hazards. The employer shall have the right to prescribe the conditions, under which such a container is to be stored, handled and used during the performance of the works and the Contractor shall strictly adhere to and comply with such instructions. The Employer shall also have the right, at his sole discretion, to inspect any such container or such construction plant/equipment for which materials in the container is required to be used and dif in his opinion, its use is not safe, he may forbid its use. No Claim due to such prohibition or towards additional safety provisions called for by him shall be entertained by the Employer. Further, any such decision of the Employer shall not, in any way, absolve the Contractor of his responsibilities under the Laws of land and in case use of such a Container or entry there of into the Site area is forbidden by the Employer, the Contractor shall use alternative methods with the approval of the Employer without any cost implication to the Employer or extension of work schedule Where it is necessary to provide and/or store petroleum products or petroleum mixtures and explosives, the Contractor shall be responsible for carrying out such provision and/or storage in accordance with the rules and regulations laid down in Petroleum Act, 1934, Explosives Act, 1948 or any other statuary acts in regard there of and amendments thereof, and petroleum and carbide of Calcium Manual published by the Chief Inspector of Explosives of India. All such storage shall have prior approval of the Employer. In case, any approval is necessary from the Chief Inspector (Explosives) or any statutory authorities, the Contractor shall be responsible for obtaining the same All equipment used in construction and erection by Contractor shall meet Indian/International Standards land where such standards do not exist, the Contractor shall ensure these too be absolutely safe. All equipment shall be strictly operated and maintained by the Contractor in accordance with manufacturer s operation manual and safety instructions and Vol.-II Page 14 of 19

15 as per any existing Guidelines/rules in this regard Periodical examinations and all tests for all lifting/hoisting equipment and tackle shall be carried-out in accordance with the relevant provisions of Factories Act Indian Electricity Supply Act and associated Laws/Rules in force from time to time. A register of such examinations and tests shall be properly maintained by the Contractor and will be promptly produced as land when desired by Employer or by the persons authorized by him The Contractor shall provide suitable safety equipment of prescribed standard to all employees and workmen according to the need as may be directed by the Employer who will also have the right to examine these safety equipment to determine their suitability, reliability, acceptability and adaptability The Contractor employing more than 250 workman whether temporary, casual, probationer, regular or permanent or on contract, shall employ at least one full time officer exclusively as safety officer to supervises safety aspects of the equipment and workman. The name and address of such Safety Officer of the Contractor will be promptly informed in writing to the Employer with a copy to the Safety Officer-Incharge before he starts work or immediately after any change of the incumbent is made during currency of the Contract In case any accident occurs during the construction/erection or other associated activities undertaken by the Contractor, thereby causing any minor or major or total injury to his employees due to any reason whatsoever, it shall be the responsibility of the Contractor to promptly inform the same to the Employer and also to all the authorities envisaged under the applicable laws The Employer shall have the right to stop the work, if in its opinion the work is being carried out in such a way as may cause accidents and endanger the safety of the persons and /or property. In such cases, the Contractor shall be informed in writing about the nature of the hazards and possible injury /accident and he shall remove shortcomings promptly. The Contractor after stopping the specific work, can if felt necessary, appeal against the order of stoppage of work to the Employer within 3 days of such Vol.-II Page 15 of 19

16 stoppage of work and the decision of the Employer in this respect shall be conclusive The Contractor shall not be entitled for any damages /compensation for stoppage of work due to safety reasons and the period of such stoppage of work will not be taken as an extension of time for completion of work and will not be the ground for waiver of any part of Contractor s liability for timely completion of the works The Contractor shall follow and comply with all safety rules, relevant provisions of applicable laws pertaining to the safety of workman, employees plant and equipment as may be prescribed from time to time without any demur, protest or contest or reservation. In case of any conflict between statutory requirement and safety rules referred above, the most stringent clause shall be applicable If the Contractor fails in providing safe working environment as per Safety Rules or continues the work even after being instructed to stop work by the Employer, the Contractor shall promptly pay to the Employer on demand, compensation at the rate of Rs. 5000/- per day or part thereof till the instructions are complied with and so certified by the Employer If the Contractor does not take all safety precautions and /or fails to comply with the safety Rules as prescribed by the Employer or as prescribed under the applicable law for the safety of the equipment, plant and personnel and the Contractor does not prevent hazardous conditions which may cause injury to his own employees or employees of other Contractors, or Employer or any other person at site or adjacent thereto, the Contractor shall be responsible for payment of compensation in the form of first hand relief as per the following schedule:- a) Fatal Injury or Rs. 1,00,000/- per Applicable for accident causing person: death/injury death b) Major injuries or accident causing25% or more Rs. 20,000/- per person: To any person whosoever Permanent disability The contractor, however, shall be responsible for full amount of Vol.-II Page 16 of 19

17 compensation admissible as per the law of land Permanent disability shall have the same meaning as indicated in Workmen s Compensation Act. The compensation mentioned above shall be in addition to the compensation payable to the workmen/ employees under the relevant provisions of the Workmen s Compensation Act and rules framed there under or any other applicable law as applicable from time to time. In case the Employer is made to pay any such compensation, the Contractor will be liable to reimburse the Employer such amount (s) even in addition to the compensation indicated above. 12. Code Requirements The erection requirements and procedures to be followed during the execution of the project shall be in accordance with the applicable Indian / International standards /regulations, as indicated in Technical Specifications, good engineering practice, the Drawings and other applicable Indian codes, laws and regulations. Vol.-II Page 17 of 19

18 SECTION VII-C (TECHNICAL SPECIFICATION OF EQUIPMENTS) The detailed specifications are available on the web site of Nigam i.e. The latest specification on the date of submission of bid will be applicable. Sr. No. DESCRIPTION 1. PCC POLES (200KG) W.L. (F.O.S-2.5) 8/9 METER LONG 2. Hard-Drawn Stranded Steel Cored Aluminum Conductor (ACSR- 80, 100 & 130mm2). 3. GI. WIRE 4. FOUR CORE & TWO CORE PVC INSULATED & PVC SHEATHED LT ARMOURED CABLES OUTDOORS TYPES DISTRIBUTION TRANSFORMERS OF 11 KV/ V 5. CLASS UPTO AND INCLUDING 100 KVA I.E (16KVA TO 100 KVA) WITH AND WITHOUT CSP (COMPLETELY SELF PROTECTED) FEATURES kv XLPE POWER CABLE (CROSS LINKED POLYTHELENE DRY / GAS CURED) 7. GSS WIRE OF 7/8 SWG 4 mm and 7/14 SWG (2.24mm) kv 400 A GO Switch. 9. PCC POLES (400 KG) W.L. (F.O.S.-2.5) 11 METER LONG KV NEUTRAL CURRENT TRANSFORMERS 11. PORCELAIN INSULATROS AND INSULATORS FITTINGS FOR 11 KV 12. OVERHEAD POWER LINES 11 KV CROSS LINKED POLY ETHYLENE INSULATED PVC SHEATED SINGLE CORE-630 mm2 POWER CABLE KV POTENTIAL TRANSFORMER MVAR Automatic Switched Capacitor Banks 15. GALVANISED STEEL BARBED WIRE KV VCB FOR 33 KV SUBSTATION KV C&R PANEL FOR 33 KV SUBSTATION KV CT FOR 33 KV SUBSTATION KV SWITCHGEAR PANEL VACUUM TYPE 20. NI-CD ALKALINE BATTERIES (PARTIAL RECOMBINATION TYPE) WITH CHARGERS FOR 33/11 KV AND 66/11 KV SUB-STATIONS MVA, 33/11 KV POWER TRANSFORMER Amendment in Technical Specification No. CSC- XXVII-RI/ DH/UH/P&D/ for 10MVA,33/11KV power Transformer Clause No 5.1 (viii) FITTINGS FOR 33KV LINE SUITABLE TO 0.1 SO. INCH ACSR DOG CONDUCTOR KV LIGHTNNG ARRESTERS (10 KA) KV LIGHTNING ARRESTER KV PIN INSULATOR AND INSULATOR PINS KV POST INSULATOR (PEDESTAL TYPE) FOR USE IN SUB STATION ONLY VOLTS L.T. SWITCH BOARDS Vol.-II Page 18 of 19

19 29. POWER CONDUCTOR FOR BUSBAR FOR 33 KV SUB STATIONS KV ISOLATORS AND ISOLATORS-CUM-EARTH SWITCH FOR 33 KV SUB STATIONS ONLY 31. BLACK HEXAGONAL M.S. NUTS & BOLTS 32. UN-ARMOURED COPPER CONTROL CABLE 33. HEAT SHRINKABLE / PUSH ON TYPETERMINATIONS FOR 11 KV XLPE CABLES 34. TECHNICAL REQUIREMENTS / PARAMETERS 35. TECHNICAL REQUIREMENTS / PARAMETERS FOR 33 KV TRANSMISSION LINE 36. BRIEF DETAILS / PARAMETERS FOR EARTHING MAT OF 33 KV SUB STATION 37. TECHNICAL REQUIREMENT / PARAMETERS FOR 11 KV LINES 38. LIST OF MANUFACTURERS/FIRMS EMPANELLED AS APPROVED VENDORS TO SUPPLY MATERIAL AGAINST TURNKEY WORKS 39. DRAWINGS Vol.-II Page 19 of 19

6 Date & Time Of Opening Of Tender Dt At Pm (If Possible) 7 Tender Fee (Non Refundable) Rs 1000/- 8 Time Limit One Year

6 Date & Time Of Opening Of Tender Dt At Pm (If Possible) 7 Tender Fee (Non Refundable) Rs 1000/- 8 Time Limit One Year DIVISION OFFICE, GANDHINAGAR. E TENDER NOTICE NO :- 4-2015-16 SR NO :- 5 PR No: - 249716 RFQ No: - 33935 Sr.No Particulars Description 1 Tender For Work contract for lying of under ground HT cable works

More information

SECTION - II. SPECIAL TERMS AND CONDITIONS (Transformer)

SECTION - II. SPECIAL TERMS AND CONDITIONS (Transformer) SECTION - II SPECIAL TERMS AND CONDITIONS (Transformer) 1. INTRODUCTION 1.1. The terms and conditions mentioned in this section are in addition to what are stated in Section I (General Conditions of Contract)

More information

Name of the work: AIR CONDITIONING WORKS TO BE CARRIED OUT AT OUR EXISTING BRANCHES IN THE REGION RO JAIPUR. SYNDICATEBANK:

Name of the work: AIR CONDITIONING WORKS TO BE CARRIED OUT AT OUR EXISTING BRANCHES IN THE REGION RO JAIPUR. SYNDICATEBANK: Name of the work: AIR CONDITIONING WORKS TO BE CARRIED OUT AT OUR EXISTING BRANCHES IN THE REGION RO JAIPUR. SYNDICATEBANK: SCHEDULE OF ITEMS FOR A.C. WORKS - EXISTING BRANCHES IN THE REGION RO JAIPUR

More information

Phone Office: /89 Maulana Azad Campus, Chelmsford Road New Delhi

Phone Office: /89 Maulana Azad Campus, Chelmsford Road New Delhi DETAILS FOR PUBLISHING BID Bid Ref. No.: MAEF/18-19/ELECTRICITY/01 Name of the Organization: MAULANA AZAD EDUCATION FOUNDATION Type of Organization: Under Aegis of Ministry of Minority Affairs Bid Title:

More information

FATIGUE TECHNOLOGY INC. PURCHASE ORDER TERMS AND CONDITIONS DATED JANUARY 4, 2006

FATIGUE TECHNOLOGY INC. PURCHASE ORDER TERMS AND CONDITIONS DATED JANUARY 4, 2006 FATIGUE TECHNOLOGY INC. PURCHASE ORDER TERMS AND CONDITIONS DATED JANUARY 4, 2006 1. CONTRACT. Fatigue Technology Inc. s, hereinafter called FTI, purchase order, or change order to a purchase order, collectively

More information

CONSTRUCTION OF 132/33 KV GIS SUB-STATION AT DINHATA, DISTRICT COOCHBEHAR. (Packge-38)

CONSTRUCTION OF 132/33 KV GIS SUB-STATION AT DINHATA, DISTRICT COOCHBEHAR. (Packge-38) DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED (A Govt of West Bengal Enterprise) CHIEF ENGINEER (PROCUREMENT), VIDYUT BHAVAN NOTICE INVITING TENDERS For CONSTRUCTION

More information

W-5 PROCUREMENT OF CIVIL WORKS UNDER SHOPPING PROCEDURES

W-5 PROCUREMENT OF CIVIL WORKS UNDER SHOPPING PROCEDURES W-5 PROCUREMENT OF CIVIL WORKS UNDER SHOPPING PROCEDURES INVITATION FOR QUOTATIONS FOR CONSTRUCTION OF CIVIL WORKS UNDER SHOPPING PROCEDURES To Dear Sirs, Sub : INVITATION FOR QUOTATIONS FOR CONSTRUCTION

More information

BANK OF INDIA, AHMEDABAD ZONE

BANK OF INDIA, AHMEDABAD ZONE BANK OF INDIA, AHMEDABAD ZONE TENDER FOR AIR CONDITIONING WORK FOR BANK OF INDIA AT VADTAL BRANCH, VADTAL. ISSUED TO :................ CLIENT ARCHITECT: CHIEF MANAGER WISTaaR Architects & Int. Designers

More information

Section VIII. Special Conditions of Contract

Section VIII. Special Conditions of Contract Section VIII. Special Conditions of Contract 8-1 Section VIII. Special Conditions of Contract The following Special Conditions of Contract (SCC) shall supplement the General Conditions of Contract (GCC).

More information

Corrigendum 2 to bid document no. REPL/CUGL/OLC/001/18

Corrigendum 2 to bid document no. REPL/CUGL/OLC/001/18 Corrigendum 2 to bid document no. 07.08.2018 Subject Bid Document No. : Supply of Online 1200 SCMH Engine Driven CNG Compressor Package : This has reference to the subject tender. The corrigendum to the

More information

State Bank Of India Administrative Office, Varanasi NOTICE

State Bank Of India Administrative Office, Varanasi NOTICE State Bank Of India Administrative Office, Varanasi NOTICE NAME OF BRANCH HIRING OF GENERATOR SETS Sealed tenders are hereby invited for hiring of...kva Gen Sets with CPCB compliant acoustic canopy to

More information

Tender No. AYCL/ED/SWG/14-16/Security Agency dated 24/10/2014. Appointment of Security Agency at. Electrical Division (Kolkata Operation)

Tender No. AYCL/ED/SWG/14-16/Security Agency dated 24/10/2014. Appointment of Security Agency at. Electrical Division (Kolkata Operation) ANDREW YULE AND COMPANY LIMITED (A GOVERNMENT OF INDIA ENTERPRISE) ELECTRICAL DIVISION SWITCHGEAR UNIT 14 MAYURBHANJ ROAD KOLKATA 700023 TELEPHONE: 24491601/24491770 FAX: 24491184 Tender No. AYCL/ED/SWG/14-16/Security

More information

Collective RFQ No.: 1408 Date:

Collective RFQ No.: 1408 Date: Collective RFQ No.: 1408 Date: 07.04.2015 technical details, supporting documents, drawings and technical & commercial deviations (if any), and price details duly signed and sealed on all pages. 6.2 Sealed

More information

Section I - NOTICE INVITING TENDER ABRIDGED NOTICE INVITING TENDER WBSETCL. (A Govt of West Bengal Enterprise)

Section I - NOTICE INVITING TENDER ABRIDGED NOTICE INVITING TENDER WBSETCL. (A Govt of West Bengal Enterprise) Section I - NOTICE INVITING TENDER ABRIDGED NOTICE INVITING TENDER WBSETCL (A Govt of West Bengal Enterprise) CHIEF ENGINEER (PROCUREMENT), VIDYUT BHAVAN NOTICE INVITING TENDERS For CONSTRUCTION OF 132/33

More information

A. Typical Cost Data Sheet for preparation of estimates on LABOUR CONTRACT

A. Typical Cost Data Sheet for preparation of estimates on LABOUR CONTRACT A. Typical Cost Data Sheet for preparation of estimates on LABOUR CONTRACT Amount (in Rs.) 1 Materials Cost 2 Labour Charges 3 Special Locality Allowance @..% on on Sl. 2 above (applicable for areas mentioned

More information

DIVISION OFFICE, GANDHINAGAR. TENDER NOTICE NO : SR NO :- 1 P R No: RFQ No:

DIVISION OFFICE, GANDHINAGAR. TENDER NOTICE NO : SR NO :- 1 P R No: RFQ No: DIVISION OFFICE, GANDHINAGAR. TENDER NOTICE NO :- 08-2018-19 SR NO :- 1 P R No: - 352316 RFQ No: - 48684 Sr.No Particulars Description 1 Tender For Tender of labour charges for making fabrications of HT

More information

GENERAL CONDITIONS of the CONTRACT

GENERAL CONDITIONS of the CONTRACT GENERAL CONDITIONS of the CONTRACT CONTENTS 1. Definitions 2. Intent and Interpretation of the Contract Documents 3. Contractor s Representation 4. Documents Furnished to Contractor 5. Ownership of Drawings

More information

AIA Document A201 TM 1997

AIA Document A201 TM 1997 AIA Document A201 TM 1997 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address): Project University of Maine at Farmington THE OWNER: (Name and address):

More information

496, Udyog Vihar, Phase-III, Gurgaon Phone:

496, Udyog Vihar, Phase-III, Gurgaon Phone: 496, Udyog Vihar, Phase-III, Gurgaon 122016 Phone: +91-124-2876431 THSTI/NIQ/33/14-15 20 th Aug, 2014 Notice Inviting Quotations On behalf of the Executive Director, THSTI, Gurgaon, Haryana, INDIA, sealed

More information

Chennai Metro Rail Limited (A Joint Venture of Govt. of India and Govt. of Tamil Nadu)

Chennai Metro Rail Limited (A Joint Venture of Govt. of India and Govt. of Tamil Nadu) Chennai Metro Rail Limited (A Joint Venture of Govt. of India and Govt. of Tamil Nadu) NIT.No: CMRL/RS/04/2017 Date: 17.07.2017 Sub: Invitation of sealed quotation for Supply, Installation, Testing & Commissioning

More information

Tender Schedule for the Work

Tender Schedule for the Work Tender Schedule for the Work Installation of 11/0.4 KVA 100 KV substation at Rangeilunda, Berhampur ODISHA STATE SEEDS CORPORATION LTD SANTARAPUR, BHUBANESWAR ODISHA STATE SEEDS CORPORATION LIMITED (A

More information

SYNDICATEBANK: DATA CABLING WORKS FOR AMRAVATI MAIN BRANCH (5120)

SYNDICATEBANK: DATA CABLING WORKS FOR AMRAVATI MAIN BRANCH (5120) NAME OF THE WORK:BRANCH TRANSFORMATION AS PER ANANYA GUIDLEINES: AMRAVATI MAIN BRANCH (5120): ELECTRICAL WORKS. SYNDICATEBANK: SCHEDULE OF ITEMS: DATA CABLING WORKS FOR AMRAVATI MAIN BRANCH (5120) No Specifications

More information

W-9 PROCUREMENT OF VERY SMALL WORKS UNDER NATIONAL COMPETITIVE BIDDING PROCEDURES

W-9 PROCUREMENT OF VERY SMALL WORKS UNDER NATIONAL COMPETITIVE BIDDING PROCEDURES W-9 PROCUREMENT OF VERY SMALL WORKS UNDER NATIONAL COMPETITIVE BIDDING PROCEDURES (For Works valued less than equivalent of $ 30,000 each. This document is drafted for construction of very small buildings

More information

CONSTRUCTION OF 220/132 KV GIS SUBSTATION AT EGRA, DISTRICT-PURBA MEDINIPUR (Package-25)

CONSTRUCTION OF 220/132 KV GIS SUBSTATION AT EGRA, DISTRICT-PURBA MEDINIPUR (Package-25) DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED (A Govt of West Bengal Enterprise) CHIEF ENGINEER (PROCUREMENT), VIDYUT BHAVAN NOTICE INVITING TENDERS For CONSTRUCTION

More information

र य गक स थ न प द र क र ल NATIONAL INSTITUTE OF TECHNOLOGY PUDUCHERRY Karaikal Tender Document

र य गक स थ न प द र क र ल NATIONAL INSTITUTE OF TECHNOLOGY PUDUCHERRY Karaikal Tender Document र य गक स थ न प द र क र ल 609 609 NATIONAL INSTITUTE OF TECHNOLOGY PUDUCHERRY Karaikal 609 609 Tender Document For Supply of 1.5 & 2 Ton Split Type Air Conditioners (ACs) at National Institute of Technology

More information

CORRIGENDUM. Tender. For. Self-Inflating Bag. NIT Issue Date : September 09, 2013.

CORRIGENDUM. Tender. For. Self-Inflating Bag. NIT Issue Date : September 09, 2013. Date: - 22/10/2013 CORRIGENDUM Tender For Self-Inflating Bag NIT Issue Date : September 09, 2013. Pre Bid Meeting held on : September 20, 2013 at 3:00 PM Initial Date of Submission : October 04, 2013 at

More information

No. 542-W-14/12/MH/2013 DT TENDER NOTICE

No. 542-W-14/12/MH/2013 DT TENDER NOTICE MODEL AND SUPER SPECIALITY HOSPITAL EMPLOYEES STATE INSURANCE CORPORATION ASRAMAM, KOLLAM, KERALA -691002 Website: www.esichsuperspecialitykollam.com Email: mh-ashramam@esic.nic.in Ph: 0474 2742833, 2766618(MS)

More information

PROPOSAL FORM ERECTION ALL RISKS/MARINE-CUM-ERECTION INSURANCE

PROPOSAL FORM ERECTION ALL RISKS/MARINE-CUM-ERECTION INSURANCE Bajaj Allianz General Insurance Company Limited Regd. Office & Head Office : GE Plaza, Airport Road, Yerawada, Pune - 411 006. CIN: U66010PN2000PLC015329 PROPOSAL FORM ERECTION ALL RISKS/MARINE-CUM-ERECTION

More information

AN ISO 9001 & ISO COMPANY TENDER DOCUMENT. NIT No.: NRO/CON/738/667 date : FOR

AN ISO 9001 & ISO COMPANY TENDER DOCUMENT. NIT No.: NRO/CON/738/667 date : FOR AN ISO 9001 & ISO 14001 COMPANY TENDER DOCUMENT NIT No.: NRO/CON/738/667 date : 12.10.2018 FOR Supply, Installation, Testing, Commissioning & Handing- over of Medical equipments (Group-7F) for Government

More information

TENDER DOCUMENT FOR PURCHASE OF GENERATOR (50KVA)

TENDER DOCUMENT FOR PURCHASE OF GENERATOR (50KVA) TENDER DOCUMENT FOR PURCHASE OF GENERATOR (50KVA) To be opened on October 21, 2014 at 2:00 PM in the Office of the Project Director, University of Haripur, Hattar Road Haripur. Name of the Company / Dealer

More information

(Name & address of the firm)

(Name & address of the firm) Issued to As per enclosed sheet. (Name & address of the firm)... PRASAR BHARATI (BROADCASTING CORPORATION OF INDIA) OFFICE OF THE CHIEF ENGINEER (EZ) AIR AND DOORDARSHAN GOLF GREEN, KOLKATA-700 095. AE/ADE/DDE/DE

More information

OFFICE OF THE SUPERIINTENDING ENGINEER ELECTRICITY DISTRIBUTION CIRCLE SHAHJAHANPUR TENDER SPECIFICATION NO. 208-EDC/SPN

OFFICE OF THE SUPERIINTENDING ENGINEER ELECTRICITY DISTRIBUTION CIRCLE SHAHJAHANPUR TENDER SPECIFICATION NO. 208-EDC/SPN OFFICE OF THE SUPERIINTENDING ENGINEER ELECTRICITY DISTRIBUTION CIRCLE SHAHJAHANPUR TENDER SPECIFICATION NO. 208-EDC/SPN 2015-2016 1- NAME AND FULL ADDRESS OF THE TENDERER 2- REFERENCE COST OF THE TENDER

More information

Vendor Development Policy Revision II (May 13)

Vendor Development Policy Revision II (May 13) Vendor Development Policy Revision II (May 13) I. Objective: I. During the conclave held by CBIP jointly with CEA & MOP at Delhi, a view was taken to develop new vendors considering the limited manufacturing

More information

(INTERNATIONAL COMPETITIVE BIDDING)

(INTERNATIONAL COMPETITIVE BIDDING) D B POWER (MADHYA PRADESH) LIMITED (DBP(MP)L) INVITAION FOR BIDS FOR COAL BASED 2 X 660 MW SUPER CRITICAL BOILER, TURBINE & GENERATOR PACKAGE WITH ASSOCIATED AUXILIAIRES (BTG) ALONGWITH SUPPLY OF MANDATORY

More information

BANK OF INDIA ZONAL OFFICE RAJASTHAN ZONE JAIPUR

BANK OF INDIA ZONAL OFFICE RAJASTHAN ZONE JAIPUR BANK OF INDIA ZONAL OFFICE RAJASTHAN ZONE JAIPUR QUOTATION FOR AIR-CONDITIONING WORK FOR BANK OF INDIA AT Sawaimadhopur BRANCH BIDDER/FIRMS NAME & ADDRESS:.... CLIENT ZONAL MANAGER Bank of India Zonal

More information

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED / HAND OPERATED GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED TRANSMISSION DIVISION - AMRELI TENDER NAME OF WORK : Supply of 72.5KV, 1250 AMP OIP condenser bushing suitable for EHV class transformer

More information

The work of Replacement of Suspension / Tension Insulators by Rubberize polymer Insulator on 220KV & 66 kv Lines

The work of Replacement of Suspension / Tension Insulators by Rubberize polymer Insulator on 220KV & 66 kv Lines GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED TRANSMISSION DIVISION, JETPUR-360375 TENDER No. TJ/11-12/09 The work of Replacement of Suspension / Tension Insulators by Rubberize polymer Insulator on

More information

AGREEMENT AND CONDITIONS OF SUB-CONTRACT (DOMESTIC)

AGREEMENT AND CONDITIONS OF SUB-CONTRACT (DOMESTIC) AGREEMENT AND CONDITIONS OF SUB-CONTRACT (DOMESTIC) FOR USE IN CONJUNCTION WITH THE FORMS OF MAIN CONTRACT FOR PUBLIC WORKS ISSUED BY THE OFFICE OF GOVERNMENT PROCUREMENT, DEPARTMENT OF PUBLIC EXPENDITURE

More information

SUPPLY, INSTALLATION, TESTING AND COMMISSIONING (SITC) OF SPLIT AIR CONDITIONERS ON BUYBACK BASIS

SUPPLY, INSTALLATION, TESTING AND COMMISSIONING (SITC) OF SPLIT AIR CONDITIONERS ON BUYBACK BASIS NOTICE INVITING TENDERS for SUPPLY, INSTALLATION, TESTING AND COMMISSIONING (SITC) OF SPLIT AIR CONDITIONERS ON BUYBACK BASIS 1. Institute for Development and Research in Banking Technology invites tenders

More information

SAFETY CUM INDEMNITY BOND (On Non-judicial Stamp paper of value not less than Rs )

SAFETY CUM INDEMNITY BOND (On Non-judicial Stamp paper of value not less than Rs ) SAFETY CUM INDEMNITY BOND (On Non-judicial Stamp paper of value not less than Rs. 100.00) KNOW ALL MEN BY THESE PRESENTS that we, by this SAFETY CUM INDEMNITY BOND Executed on this Day of 2013. I/We Having

More information

7/14/16. Hendry County Purchase Order Terms and Conditions

7/14/16. Hendry County Purchase Order Terms and Conditions Hendry County Purchase Order Terms and Conditions 1. Offer The order set forth in the Purchase Order is subject to cancellation by HENDRY COUNTY without notice if not accepted by VENDOR within fourteen

More information

SECTION V (VOLUME 1) SPECIAL CONDITIONS OF CONTRACT (SCC)

SECTION V (VOLUME 1) SPECIAL CONDITIONS OF CONTRACT (SCC) SECTION V (VOLUME 1) SPECIAL CONDITIONS OF CONTRACT (SCC) SCC percentage tender - 1 - Section-V-SCC SPECIAL CONDITIONS OF CONTRACT CONTENTS Cl. No. Description 1.0 Project description 2.0 Scope of Proposal

More information

Request for Proposal For Consultant for availing the Duty Credit scrip- under Foreign Trade Policy ( )

Request for Proposal For Consultant for availing the Duty Credit scrip- under Foreign Trade Policy ( ) Request for Proposal For Consultant for availing the Duty Credit scrip- under Foreign Trade Policy (2009-14) PREQUALIFICATION CUM TENDER NOTICE FOR CONSULTANT FOR AVAILING DUTY CREDIT SCRIP UNDER FOREIGN

More information

Last date of receipt of tender at Date : On Hrs Date of opening the tender at Date : On Hrs.

Last date of receipt of tender at Date : On Hrs Date of opening the tender at Date : On Hrs. Save Energy for Benefit of Self and Nation 1 PR NO 352388 RFQ NO 48544 ADVERTISED TENDER NOTICE NO. 07 /2018-19 TO, M/s Name of Work Erection of Earthing of earth terminal at consumer end of Bhabhar Sub

More information

Attachment 1 CITY OF SAN ANGELO, TEXAS OWNER S CONSTRUCTION GENERAL CONDITIONS. (Effective April 16, 2018)

Attachment 1 CITY OF SAN ANGELO, TEXAS OWNER S CONSTRUCTION GENERAL CONDITIONS. (Effective April 16, 2018) Attachment 1 CITY OF SAN ANGELO, TEXAS OWNER S CONSTRUCTION GENERAL CONDITIONS (Effective April 16, 2018) 1. Definitions 2. General Conditions 2.1. Architect/Engineer Administration of the Contract 2.2.

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Maharashtra Electricity Regulatory Commission (Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination of Compensation)

More information

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES AGREEMENT made by and between, hereinafter called the Owner, and SITESCOMMERCIAL, LLC 185 WIND CHIME COURT, SUITE

More information

Section 8 - Special Conditions of Contract

Section 8 - Special Conditions of Contract Page 1 of 26 The following Special Conditions of Contract (SCC) shall supplement the General Conditions of Contract (GCC). Whenever there is a conflict, the provisions herein shall prevail over those in

More information

ANNEX A Standard Special Conditions For The Salvation Army

ANNEX A Standard Special Conditions For The Salvation Army ANNEX A Standard Special Conditions For The Salvation Army TO BE ATTACHED TO AIA B101-2007 EDITION ABBREVIATED STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT 1. Contract Documents. This Annex supplements,

More information

Q&A Distribution equipment and materials

Q&A Distribution equipment and materials Q&A Distribution equipment and materials ITB-223/17 Establishing Long Term Agreement (LTA) in Two Lots for purchasing various capacities Transformers and Electricity supplies under Funding Facility for

More information

Section III Evaluation and Qualification Criteria (Revision 1)

Section III Evaluation and Qualification Criteria (Revision 1) Section III Evaluation and Qualification (Revision 1) Section III. Evaluation and Qualification This Section contains all the criteria that the Employer shall use to evaluate bids and qualify Bidders.

More information

TERMS AND CONDITIONS OF PURCHASE

TERMS AND CONDITIONS OF PURCHASE TERMS AND CONDITIONS OF PURCHASE This Order (as defined below) is the Company s offer to purchase the Goods (as defined below). Unless otherwise expressly agreed in writing these are the only conditions

More information

City Of Hammond Purchasing Department. Request for Pricing: RFP For Construction of Metal Building at 190 Maintenance Yard

City Of Hammond Purchasing Department. Request for Pricing: RFP For Construction of Metal Building at 190 Maintenance Yard 1 City Of Hammond Purchasing Department Request for Pricing: RFP 15-42 For Construction of Metal Building at 190 Maintenance Yard Proposals shall be faxed/emailed/hand delivered to the City Of Hammond,

More information

Sealed Bid, Traffic Signal Repair & Maintenance Bid # City of Rochester 31 Wakefield Street Rochester, NH Attn: Purchasing Agent

Sealed Bid, Traffic Signal Repair & Maintenance Bid # City of Rochester 31 Wakefield Street Rochester, NH Attn: Purchasing Agent INVITATION TO BID The City of Rochester, New Hampshire is accepting sealed bids for Traffic Signal Repair & Maintenance Bids must be submitted to the City at the address below in a sealed envelope plainly

More information

PR NO RFQ NO 41580

PR NO RFQ NO 41580 Save Energy for Benefit of Self and Nation ADVERTISED TENDER PR NO 304470 RFQ NO 41580 TO, M/s Name of Work : Labour for Erection of CI Plate/ coil type Earthing of earth terminal at consumer end of Jagudan

More information

IMPORTANT INFORMATION Invitation to Bid No. TS12-S-10 Kindly acknowledge important revisions to the terms and conditions under the bidding documents in details as follows: Volume I of IV 1. TC-SUB-01 Data

More information

Holt Public School District 5780 W. Holt Rd Holt MI

Holt Public School District 5780 W. Holt Rd Holt MI Holt Public School District 5780 W. Holt Rd Holt MI 48842-1197 1.1 is requesting bids to replace their existing Cisco VoIP and integrated voice messaging system with an updated Cisco solution including

More information

INGHAM COUNTY ROAD DEPARTMENT NOTICE TO BIDDERS CN/GTW RAILROAD. CON:TNB 1 of

INGHAM COUNTY ROAD DEPARTMENT NOTICE TO BIDDERS CN/GTW RAILROAD. CON:TNB 1 of INGHAM COUNTY ROAD DEPARTMENT NOTICE TO BIDDERS CN/GTW RAILROAD CON:TNB 1 of 1 08-28-15 The following information may be pertinent to the determination of construction methods and railroad protective insurance

More information

WORK IN OR ABOUT QR PROPERTY

WORK IN OR ABOUT QR PROPERTY SYSTEMS AND CAPABILITY TECHNICAL REQUIREMENT NO: MCE-SR-002 ISSUE: Revision E DATE: 22-12-2009 PAGE: 1 of 12 WORK IN OR ABOUT QR PROPERTY ISSUE DATE DESCRIPTION / REASON Initial 05.03.1997 Revision A 14.05.1997

More information

Invitation for Pre-Qualification of Bidders for 1X600 MT Mounded Pressurized Storage Vessel at Lucknow LPG Plant.

Invitation for Pre-Qualification of Bidders for 1X600 MT Mounded Pressurized Storage Vessel at Lucknow LPG Plant. Invitation for Pre-Qualification of Bidders for 1X600 MT Mounded Pressurized Storage Vessel at Lucknow LPG Plant. TENDER NO. : E&P:PQR:MSV/12-13/ 01 DATED 13-07-2012 Bharat Petroleum Corporation Ltd.,

More information

AIA Document A201 TM 1997

AIA Document A201 TM 1997 AIA Document A201 TM 1997 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address): A201 conversion Michigan State University East Lansing, MI THE OWNER:

More information

STATE OF VERMONT STANDARD FORM. GENERAL CONDITIONS FOR F P R DESIGN BUILD CONTRACTS (March 2017)

STATE OF VERMONT STANDARD FORM. GENERAL CONDITIONS FOR F P R DESIGN BUILD CONTRACTS (March 2017) STATE OF VERMONT STANDARD FORM GENERAL CONDITIONS FOR F P R DESIGN BUILD CONTRACTS (March 2017) The following general conditions are for use with DESIGN BUILD construction contracts with the State of Vermont,

More information

STANDARD TERMS AND CONDITIONS

STANDARD TERMS AND CONDITIONS STANDARD TERMS AND CONDITIONS 1. Parties to this Agreement 1. In these conditions ( these Conditions ) WPDT means Wilson Power And Distribution Technologies Pvt. Ltd. and Customer means the person entering

More information

TENDER NOTICE FOR OPERATION AND MAINTENANCE OF 11KV SUBSTATION AND ELECTRICAL EQUIPMENTS UNDER LOCAL HEAD OFFICE, THIRUVANANTHAPURAM

TENDER NOTICE FOR OPERATION AND MAINTENANCE OF 11KV SUBSTATION AND ELECTRICAL EQUIPMENTS UNDER LOCAL HEAD OFFICE, THIRUVANANTHAPURAM TENDER NOTICE FOR OPERATION AND MAINTENANCE OF 11KV SUBSTATION AND ELECTRICAL EQUIPMENTS UNDER LOCAL HEAD OFFICE, THIRUVANANTHAPURAM Name of work NIT No: 4/2018-19 EMD amount EMD to be enclosed with the

More information

Byte Paradigm General Conditions ( Design version)

Byte Paradigm General Conditions ( Design version) Byte Paradigm General Conditions ( Design version) Article I General 1. When these General Conditions for Delivery are part of tenders and agreements concerning the performance of deliveries and/or services

More information

COUNTRY SUPPLEMENT MALAYSIA TO BE READ IN CONJUNCTION WITH GLOBAL TERMS AND CONDITIONS OF PURCHASE

COUNTRY SUPPLEMENT MALAYSIA TO BE READ IN CONJUNCTION WITH GLOBAL TERMS AND CONDITIONS OF PURCHASE COUNTRY SUPPLEMENT MALAYSIA TO BE READ IN CONJUNCTION WITH GLOBAL TERMS AND CONDITIONS OF PURCHASE This Country Supplement is to be read with the Johnson Controls Global Terms and Conditions of Purchase

More information

Save Energy for Benefit of Self and Nation PR NO RFQ NO 48087

Save Energy for Benefit of Self and Nation PR NO RFQ NO 48087 Save Energy for Benefit of Self and Nation ADVERTISED TENDER 65/2018 PR NO 350970 RFQ NO 48087 TO, M/s Name of Work : Labour for Erection of CI Plate/ coil type Earthing of earth terminal at consumer end

More information

SUPPLIER - TERMS AND CONDITIONS Materials and Goods

SUPPLIER - TERMS AND CONDITIONS Materials and Goods SUPPLIER - TERMS AND CONDITIONS Materials and Goods 1. BINDING EFFECT; ACCEPTANCE. This purchase order and all subsequent purchase orders delivered by Buyer to Seller (each, an "order"), shall be governed

More information

IMPORTANT INFORMATION Invitation to Bid No. RTS2-S-17 Kindly acknowledge important revisions to the terms and conditions under the bidding documents in details as follows: 1. According to Article F-15.

More information

General Conditions of Purchase

General Conditions of Purchase I. Conclusion of Contract/Legal Form Requirements 1. Any legal relationship between the supplier and us is subject to the following terms and conditions. Conditions stipulated by the supplier as well as

More information

TENDER BOOKLET /// TECHNICAL BID /// Tender notice no:450/16/w,rfq

TENDER BOOKLET /// TECHNICAL BID /// Tender notice no:450/16/w,rfq TENDER BOOKLET /// TECHNICAL BID /// Tender notice no:450/16/w,rfq - 37641 Name of Work: Work of replacement of 2 nos. of 33 KV Bushings of BHEL Make, Single phase, 167 MVA, 400/200/33 KV interconnecting

More information

CONDITIONS OF BID PROPOSAL

CONDITIONS OF BID PROPOSAL Solid Glass 1452 N Batavia Street Orange, CA 92867 P 714.771.1245 F 714.771.1246 License # 806961 C-17 CONDITIONS OF BID PROPOSAL Time Limitation This bid proposal is valid for 30 days at which time it

More information

West Bengal Renewable Energy Development Agency. Draft General Terms & Conditions of the Tender

West Bengal Renewable Energy Development Agency. Draft General Terms & Conditions of the Tender West Bengal Renewable Energy Development Agency Draft General Terms & Conditions of the Tender (1) (a) The Tender shall be submitted in triplicate in 3 (three) separate Sealed Covers (COVER-I, II & III)

More information

DATED: DUE ON

DATED: DUE ON IMPORTANT: TENDERERS SHOULD READ THE TENDER PAPERS CAREFULLY; SUBMISSION OF TENDER SHALL MEAN THAT THE TENDERER HAS READ AND UNDERSTOOD ALL THE TERMS AND CONDITIONS OF THE TENDER AND AGREES AND BINDS HIMSELF/THEMSELVES

More information

APPLICABLE: Entire La. Service Area PAGE: 1 of 10 TERMS AND CONDITIONS

APPLICABLE: Entire La. Service Area PAGE: 1 of 10 TERMS AND CONDITIONS SECTION NO.: IV SECTION TITLE: Rules and Regulations GULF STATES UTILITIES CO. SHEET NO.: 1 Electric Service EFFECTIVE DATE: 3-1-91 Louisiana REVISION: 1 TERMS AND CONDITIONS APPLICABLE: Entire La. Service

More information

CONSUMER SERVICES GROUP APPLICATION FORM FOR NEW CONNECTION

CONSUMER SERVICES GROUP APPLICATION FORM FOR NEW CONNECTION BSES Rajdhani Power Limited CONSUMER SERVICES GROUP APPLICATION FORM FOR NEW CONNECTION (Please refer instructions overleaf to help us serve you better) FOR REGISTERING YOUR REQUEST/TO KNOW STATUS OF YOUR

More information

TENDER DOCUMENT. through SB Collect

TENDER DOCUMENT. through SB Collect Date 06.02.2019 TENDER DOCUMENT SBIIMS INVITING TENDER ON BEHALF OF SBI FOR HIRING OF SILENT DIESEL GENERATOR SETS WITH AMF PANEL TO BE INSTALLED FOR BRANCHES UNDER VARIOUS REGIONS IN RAJASTHAN End date

More information

म झग व ड क शप ब डस ल मट ड MAZAGON DOCK SHIPBUILDERS LIMITED

म झग व ड क शप ब डस ल मट ड MAZAGON DOCK SHIPBUILDERS LIMITED A10. BLANK GENERAL TERMS & CONDITIONS (GT&C) FOR ITEMS & SERVICES (EXCLUDING CIVIL WORKS) A20. SECURITY DEPOSIT. A21. The successful bidder shall submit a Security Deposit @ 5 % of the contract / order

More information

Proposed Air Conditioning Work of Bank of India Curchorem Branch BANK OF INDIA TENDER DOCUMENT FOR AIR CONDITIONING WORK OF BANK OF INDIA

Proposed Air Conditioning Work of Bank of India Curchorem Branch BANK OF INDIA TENDER DOCUMENT FOR AIR CONDITIONING WORK OF BANK OF INDIA BANK OF INDIA TENDER DOCUMENT FOR AIR CONDITIONING WORK OF BANK OF INDIA CURCHOREM BRANCH, CURCHOREM, GOA. TECHNICAL BID Part - I NOTICE INVITING TENDER & GENERAL CONDITIONS OF CONTRACT. OWNERS Bank of

More information

CONSTRUCTION AGREEMENT/CONTRACT

CONSTRUCTION AGREEMENT/CONTRACT Contract Number: Office Use Only 2233 Citygate Drive Columbus, Ohio 43219 614.418.7725 tel 614.418.7720 fax www.creativehousing.org CONSTRUCTION AGREEMENT/CONTRACT Between: For the Project: Creative Housing,

More information

BRIEF NOTICE INVITING BID

BRIEF NOTICE INVITING BID NLC TAMILNADU POWER LIMITED (NTPL) (A joint venture of Neyveli Lignite Corporation Limited and Tamilnadu Electricity Board ) Regd: Office, Neyveli House, 135, Periyar E.V.R. High Road, Chennai 600 010.

More information

TRANSMISSION CHARGING STATEMENT

TRANSMISSION CHARGING STATEMENT TRANSMISSION CHARGING STATEMENT 1 September 2016 1 September 2016 TABLE OF CONTENTS Page 1 Introduction... 1 2 General System Charges... 4 3 Site Specific Charges... 5 4 Connection Assets... 8 5 Least

More information

Conditions for the Carriage of Goods by Road

Conditions for the Carriage of Goods by Road Conditions for the Carriage of Goods by Road The Conditions set down the basis on which the Carrier will carry goods for the Customer (definitions of Carrier and Customer are given in Condition 1). The

More information

City of Charlevoix ADVERTISEMENT FOR BIDS. Tree Trimming

City of Charlevoix ADVERTISEMENT FOR BIDS. Tree Trimming City of Charlevoix ADVERTISEMENT FOR BIDS Tree Trimming The City of Charlevoix will accept sealed proposals for the removal and disposal of hazardous limbs, dead trees and stump grinding until 10:00 am

More information

Request for Proposal. Fabrication and Installation of Municipal Way-finding Signage Town of Orangeville. June 15, 2015

Request for Proposal. Fabrication and Installation of Municipal Way-finding Signage Town of Orangeville. June 15, 2015 Request for Proposal Fabrication and Installation of Municipal Way-finding Signage Town of Orangeville 1.0 Introduction and Background June 15, 2015 1.1 Fabrication and Installation of Municipal Way-finding

More information

IDBI BANK LTD. TENDER

IDBI BANK LTD. TENDER IDBI BANK LTD. TENDER (PART 1 & 2) NAME OF THE WORK Annual Maintenance Contract (AMC) for Electrical Installation at IDBI Tower, Mumbai. NAME OF THE TENDERER ADDRESS..... ISSUE OF TENDER May 22, 2015 LAST

More information

Purchase Order Terms and Conditions

Purchase Order Terms and Conditions Purchase Order Terms and Conditions 1. These terms and conditions together with the terms and conditions on the face of the Purchase Order, and any specifications, drawings, instructions or other written

More information

: TENDER SPECIFICATION NO: GETCO/TR-II/TL/220kV/S&E/2137

: TENDER SPECIFICATION NO: GETCO/TR-II/TL/220kV/S&E/2137 GUJARAT ENERGY TRANSMISSION CORPORATION Vidyut Bhavan, Race Course, VADODARA 390 007 TENDER SPECIFICATION FOR SUPPLY & ERECTION WORK OF 220kV D/C BECL - BOTAD 94.26 KM TRANSMISSION LINE ON TURNKEY BASIS

More information

Document A201 TM. General Conditions of the Contract for Construction

Document A201 TM. General Conditions of the Contract for Construction Document A201 TM 2007 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address) THE OWNER: (Name, legal status and address) THE ARCHITECT: (Name, legal

More information

SECTION 4 CONTRACT DATA

SECTION 4 CONTRACT DATA SECTION 4 CONTRACT DATA 75 CONTRACT DATA Items marked N/A shall not apply to this contract. The following documents are also part of the Contract The Schedule of other Contractors The Schedule of Key Personnel

More information

WATER CHAPTER 8 PIPE INSTALLATION SYSTEM SPECIFICATIONS JUNE 2016

WATER CHAPTER 8 PIPE INSTALLATION SYSTEM SPECIFICATIONS JUNE 2016 SECTION 6 ENGINEERING STANDARDS CHAPTER 8 PIPE INSTALLATION 6.1. GENERAL CONSTRUCTION STANDARDS The following is in addition to Denver Water Engineering Standards Chapter 8 - Pipe Installation. All excavations

More information

Document A107. Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope

Document A107. Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope TM Document A107 2007 Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope AGREEMENT made as of the in the year (In words, indicate day, month and year.) day of BETWEEN

More information

Specification No.: JPL/KWTL/A3 PROPOSAL

Specification No.: JPL/KWTL/A3 PROPOSAL Bidder's Name and Address: Bid Proposal Reference: Person to be contacted: Designation: PROPOSAL Page 1 of 6 Telephone No.: Fax: To JAYPEE POWERGRID LIMITED Regd Office- JA House, 63 Basant Lok, Vasant

More information

GENERAL CONDITIONS. of the CONTRACT FOR CONSTRUCTION. for the ARCHDIOCESE OF CHICAGO. for SOLE SOURCE CONTRACTS. (2004 Archdiocese Edition)

GENERAL CONDITIONS. of the CONTRACT FOR CONSTRUCTION. for the ARCHDIOCESE OF CHICAGO. for SOLE SOURCE CONTRACTS. (2004 Archdiocese Edition) Document #: 861154 GENERAL CONDITIONS of the CONTRACT FOR CONSTRUCTION for the ARCHDIOCESE OF CHICAGO for SOLE SOURCE CONTRACTS (2004 Archdiocese Edition) 86 Document #: 861161 TABLE OF CONTENTS ARTICLE

More information

INVITATION TO BID. Sealed Bid, Fire Sprinkler Service. Bid # City of Rochester 31 Wakefield Street Rochester, NH Attn: Purchasing Agent

INVITATION TO BID. Sealed Bid, Fire Sprinkler Service. Bid # City of Rochester 31 Wakefield Street Rochester, NH Attn: Purchasing Agent INVITATION TO BID The City of Rochester, New Hampshire is accepting sealed bids for Fire Sprinkler Service. Bids must be submitted in a sealed envelope plainly marked: Sealed Bid, Fire Sprinkler Service

More information

General Conditions for Construction GCC201. Contract Type: Document No. for the following PROJECT: (Name and location or address) EXAMPLE

General Conditions for Construction GCC201. Contract Type: Document No. for the following PROJECT: (Name and location or address) EXAMPLE Page 1 of 37 for the following PROJECT: (Name and location or address) EXAMPLE THE OWNER: (Name and address) Example, THE ARCHITECT: (Name and address) TABLE OF ARTICLES 1 GENERAL PROVISIONS 2 OWNER 3

More information

Purchase Order Terms and Conditions Commercial Contracts

Purchase Order Terms and Conditions Commercial Contracts 1. ACCEPTANCE: Purchase Order Terms and Conditions This purchase order represents Company's offer to purchase the goods or services ordered strictly in accordance with its stated terms and conditions.

More information

INVITATION FOR BID (IFB) (LOCAL COMPETETIVE BIDDING)

INVITATION FOR BID (IFB) (LOCAL COMPETETIVE BIDDING) INVITATION FOR BID (IFB) (LOCAL COMPETETIVE BIDDING) 1.0 The Maharashtra State Electricity Transmission Company Limited Mumbai, herein after referred to as the Owner (MSETCL) invites bids through SRM e-tendering

More information

Transmission Circle Office Nadiad E-TENDER NOTICE NO:- NTC/FEB-17/11

Transmission Circle Office Nadiad E-TENDER NOTICE NO:- NTC/FEB-17/11 Transmission Circle Office Nadiad E-TENDER NOTICE NO:- NTC/FEB-17/11 Subject: - Replacement Old AF type insulators with SRI insulator of various 220 & 132kv lines under hot/cold line conditions with Buy

More information

Sealed Bid, Tree Pruning and Removal Bid # City of Rochester 31 Wakefield Street Rochester, NH Attn: Purchasing Agent

Sealed Bid, Tree Pruning and Removal Bid # City of Rochester 31 Wakefield Street Rochester, NH Attn: Purchasing Agent INVITATION TO BID The City of Rochester, New Hampshire is accepting sealed bids for Tree Pruning & Removal Bids must be submitted to the City at the address below in a sealed envelope plainly marked as

More information