Updated Project Information Document (PID) Other rural development (P); Participation and civic engagement (P) Project

Size: px
Start display at page:

Download "Updated Project Information Document (PID) Other rural development (P); Participation and civic engagement (P) Project"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Updated Project Information Document () Project Name BRAZIL - BR Maranhao Integrated: Rural Development Region Latin America and Caribbean Region Sector General agriculture, fishing and forestry sector (100%) Theme Other rural development (P); Participation and civic engagement (P) Project P Borrower(s) STATE OF MARANHÃO Implementing Agency(ies) GEPLAN/NEPE Address: Rua do Giz, Centro, São Luis, MA Contact Person: Dr. Antônio Gualhardo Alvarez Prazeres Tel: Fax: nepe@nepe.ma.gov.br Environment Category B (Partial Assessment) Date Prepared November 5, 2003 Auth Appr/Negs Date November 7, 2003 Bank Approval Date March 16, Country and Sector Background Report No: AB432 Rural Poverty and Social Exclusion: Brazil is characterized by extreme levels of income disparity, with poverty rates much higher than in other countries at a similar level of per-capita GDP. The Northeast region accounts for only 20 percent of Brazil s land area, yet is home to 30 percent of its total population and to 49% of all Brazilians living on less than US$1 per day. Within Brazil, Maranhão is the second poorest state, has the second lowest HDI, and is the country s most rural state. Rural areas of Maranhão show serious deficits in terms of minimal access to basic services: 84 percent without piped water, 80 percent without sanitation, and 53 percent without electricity. As discussed below, social indicators are also well below national averages. Notwithstanding these deficits relative to the rest of Brazil, Maranhão has actually experienced one of the strongest rates of improvement over the past decade. The HDI for Maranhão rose from in 1991 to in 2000, although this is still well below the national average of The State s strategy for addressing rural poverty explicitly links interventions through the PPA to the desired increase in the HDI. It will target investments which have the greatest potential to raise the HDI, paying particular attention to the poorest municipalities and to the rural space generally. Municipal Councils established under the predecessor RPAP project in Maranhão (Ln BR) will play an expanded role in investment prioritization and allocation decisions. The State government further proposes to introduce agreements with municipal governments (contratos de adesão) whereby each party commits to performance indicators relating to the expenditure program outlined in the PPA and the HDI objective. The State Management Unit for Planning and Budget (GEPLAN) has been tasked with integrating, monitoring and evaluating state, municipal and federal expenditures directed toward poverty reduction in Maranhão, using a results-based management information system (SIARI) which it will strengthen and integrate with existing control systems. Low Education and Health Attainments. In order to achieve its HDI goal, Maranhão needs to pay special attention to improving its extremely poor education and health indicators, and this, in turn, will require integrated action among social sector, infrastructure and income generation programs. The average educational attainment for the State is only 2.8 years the second lowest in Brazil and significantly below the Northeast average of about four years. Many school districts, especially in the rural interior, have no access to education beyond grade four and in those cases children s only recourse is to move or permanently drop out. Adult illiteracy is twice the national average.

2 2 The State strategy for addressing these challenges involves (a) increasing access and quality in the first four grades of basic education, (b) raising literacy levels by closely linking literacy programs with productive activities to maintain motivation of youths and adults to participate, and (c) reducing infant and maternal mortality. Although social subprojects were eligible for support under the RPAP, communities tended to prioritize other kinds of investments. Over the next few years, the State will make a major effort to inform Municipal Councils and communities and motivate them to participate in several programs with proven effectiveness, including Vamos Ler (Let s Read), PRONERA, and Escola Ativa (Active School, modeled on Colombia s Escuela Nueva program). At the same time, they will also be encouraged to identify any interventions in other sectors which may also be crtical for achieving education and health objectives, such as rural electrification, water supply, local transport, etc. Environmental Sustainability. Maranhão faces a number of important environmental issues, the solutions to which will play a crticial role in underpinning the long-term sustainability of the State s development efforts. Among the most pressing: improper treatment of liquid and solid wastes, high rates of deforestation, inadequate agricultural and livestock technologies, occupation of protected areas and legal reserves, and watershed degradation. As in the case of the social sectors, addressing these problems will require an integrated approach, at both state and local levels, and often across sectors. An important part of the State s strategy will be to work with local communities and Municipal Councils to sensitize them to the causes and impacts of environmental problems, encourage them to identify the key issues in their respective geographic locations and seek financing to address them (e.g., production and planting of native mudas for reforestation, including species with good commercial marketing prospects, forestation or reforestation of areas of particular value to the community, development of opportunities to sell environmental services, establishment of demonstration units for environmentally sustainable agricultural technologies, development of efficient fuelwood alternatives). The State will also pilot coordinated action across municipalities/communities to address common sub-regional environmental problems (eg., micro-basin management in the Vale de Magu). Integration of Policies and Investments. The State Government of Maranhão seeks to unite its investment program under a common results-based framework aimed at reducing poverty by raising the HDI, and to upgrade its management capacity to plan, integrate, monitor and evaluate its efforts towards achieving that goal. Effective integration of development efforts has both spatial and cross-sectoral dimensions. The State s strategy includes the recent adoption of a new state government structure at the level of its 18 regions. GEPLAN is developing a computerized system to integrate planning and budgeting functions (SEPOC). Also within GEPLAN, an existing system tracks the planning and execution of government programs at the municipal level (SISPCA). A new institute has been established (IEASE) to help strengthen the links between statistical data collection and analysis and policy formulation. A further information system is planned (SIARI) to track links between execution of programs and their impact on the state s overall HDI goals. Finally, the State plans to develop individual performance agreements with municipalities, indicating the spending programs on which the two levels of government will collaborate and setting specific performance targets; impact will be measured through SIARI. Sustained cross-sectoral dialogue among the various State Management Units and with local and municipal actors will be vital to build consensus on the merits of pursuing an integrated approach to poverty reduction. Decentralization: Since ratification of the Brazilian Federal Constitution of 1988, there has been a trend towards increasing decentralization of fiscal resources, public investment, priority-setting and program implementation, from the Federal Government to the state, municipal and local levels. The current State administration in Maranhão has adopted the new governmental structure referred to above. It also intends to strengthen local and municipal capacity to participate effectively in priority-setting, decision-making over resource allocations and program/project implementation and maintenance. At present, there are 216 Municipal Councils developed under the RPAP (in all municipalities except São Luis, the State capital), but there are also other councils PRONAF, DLIS, etc. present in many of these municipalities. The State plans to consolidate these entities under a unified Municipal Council for Integrated Development (CMDI), whose mandate would include all the principal challenges to improving the HDI at municipal level. The composition of the CMDI may vary among municipalities, provided the majority are representatives from community associations and other organized civil society, following the procedures established under the RPAP. State and municipal governments will play a vital role in the functioning of the CMDI, in terms of logistical support and partnering in the execution of project activities.

3 3 2. Objectives Background: In 2001, the most recent year for which household data exist, Maranhão was Brazil s second poorest state on a per capita income basis. Using a poverty line of about a dollar a day, nearly 60 percent of Maranhenses are living in poverty. Maranhão also has the second lowest Human Development Index (HDI), The Human Development Index (HDI) is a summary measure of three dimensions of the human development concept: living a long and healthy life, being educated and having a decent standard of living. It combines measures of life expectancy, school enrollment, literacy and income. There are strong links between the HDI and the Millennium Development Goals (MDGs). The three dimensions of human development captured in the HDI are very similar to goals 1-7 of the MDGs. a combined measure of income and equality, educational and health indicators, among all of Brazil s states. The lag in education is particularly severe, with the average educational attainment (2.8 years) well below that of both the country and neighboring Northeast states. Finally, Maranhao is Brazil s most rural state, and it is in the rural space where HDIs are the lowest. The State s needs in terms of socio-economic infrastructure and services, and institutional capacity, are commensurate with these indicative statistics. The State Government of Maranhão has set a goal of increasing its HDI from (in 2000) to by the year 2007, and this provides the unifying theme for its multi-year investment plan (PPA ). Although ambitious, this goal is feasible based on the State s track record over the past decade. Since the 1990s Maranhão has had a series of competent State Governments, and social indicators have increased faster than in most Northeast states. The State has launched an innovative, decentralized form of government, dividing itself into 18 regional management units, and has been very active in attempting to change the culture of Brazil s state and local governments away from clientelism and patronage, toward responsible service delivery to the population. The proposed project seeks to support the State Government in its effort to reduce poverty by increasing its HDI, using a community-driven development (CDD) approach that has already proven successful in Maranhão under the Bank-financed Rural Poverty Alleviation Program (RPAP, Ln BR). While building on the institutional foundations of the RPAP, the proposed project will significantly improve on the experience by: strengthening the cross-sectoral integration, monitoring, evaluation and results-based management of development efforts within Maranhão at the state, municipal and local levels; better aligning the State s public expenditures with the PPA development priorities, while improving the effectiveness and targeting of expenditures; introducing performance agreements between the State Government and municipalities, with special emphasis on targets for improving the various components of the HDI, and encouraging subproject identification and selection by beneficiaries according to the criterion of impact on municipal HDIs; providing significantly more emphasis on education, health, culture, natural resource management and environmental sustainability than under the RPAP; taking advantage of opportunities to achieve stronger results through coordinated action than may be possible with isolated community subprojects, including piloting regional subprojects (involving several municipalities) to address environmental issues, and supporting productive subprojects which tackle critical gaps within a broader concept of local supply chains (arranjos produtivos locais); and leveraging the skills and institutional arrangements developed under the RPAP project at the local and municipal levels to improve also the relevance, efficiency, targeting and outcomes of non-project investments in rural areas of Maranhão. Project development objective:

4 4 The proposed project will help Maranhão to achieve the goal of reducing poverty by increasing its HDI from to by the year 2007, through: (a) strengthening the results-based management capacity at the State level for planning, cross-sectoral integration, monitoring and evaluation of public policies and investments under Maranhão s PPA; (b) supporting cross-sectoral integration of development actions at the municipal and local levels through the design and implementation of integrated municipal development plans and the introduction of State-municipal performance agreements; (c) financing demand-driven community investments for income-generation, health and sanitation, education, culture, the environment and other investments impacting the HDI; and (d) strengthening municipal governance through the participation of community associations and municipal councils in decisions that are directly related to improvements in the living conditions of the rural poor. 3. Rationale for Bank's Involvement For nearly three decades, the Bank has partnered with the Northeast States to address rural poverty through a variety of programs and projects. Under the predecessor project (RPAP-MA, Ln BR), using a CDD approach some 187,000 families benefited from more than 4,000 community investment subprojects. Bank participation will ensure that international best-practice in CDD (both in Brazil and elsewhere) is incorporated into project design and that sound international quality standards of monitoring, evaluation and impact assessment are applied. An especially important feature of Bank value-added under the proposed project will be its ability to facilitate closer local integration on the part of project Municipal Councils with the wide spectrum of programs aimed at rural poverty reduction. The Bank is well-positioned to help forge these linkages, not only because of its direct role in financing the RPAP and developing the Municipal Council mechanism, but also because of its involvement in other important sectoral programs relevant to rural poverty reduction (e.g., irrigation, agricultural research, land reform, education, rural health, environmental sustainability) and the many opportunities for policy dialogue and consensus building in the context of its fairly active program of collaborative research and analytical work on poverty and rural development issues in Brazil. The Bank will also provide technical value-added in the development of results-based management methods within the State Government through the Horizontal Component of the project, strengthening the planning, coordination, monitoring and evaluation of the Government s investment program. Finally, the Bank will undertake, as part of its strategic updating of all work in Northeast Brazil, a yearly review of how the implementation of the Bank s Northeast program is contributing to integrate broader issues of poverty reduction in the region. 4. Description The total project cost is US$40 million, of which the Bank will finance US$30 million; the State of Maranhão, US$6.4 million; and beneficiary communities, US$3.6 million, in cash or in-kind. Component 1 Community Subprojects (US$36 million or 90% of total project cost) will support community matching grants for approximately 1,700 small-scale socio-economic infrastructure, education, health, culture, productive, environmental and other investments aimed at raising HDIs. All 216 municipalities in Maranhão (other than Saõ Luis) will be covered by this component, because of the importance of encouraging cross-sectoral integration throughout the State, getting all municipalities to focus on the HDIs, and strengthening local and municipal institutional arrangements. However about 60% of total component cost will be concentrated in the 80 municipalities with the lowest HDIs. Component 2 - Institutional Development (US$2 million) will finance technical assistance and training to increase the capacity of implementing entities including the CMDIs, community associations, GEAGRO and GEPLAN. Component 3 - Horizontal Integration (US$1 million) will finance technical assistance to strengthen the results-based management capacity of the State Government to plan, integrate, monitor and evaluate public policies and investments for poverty reduction, and to improve the alignment of public expenditures with the State s development priorities. Component 4 - Project Administration, Supervision, Monitoring and Evaluation (US$1 million) will finance

5 5 costs (excluding salaries) of project administration and coordination, including supervision, monitoring and impact evaluation. 5. Financing Source (Total ( US$m)) BORROWER ($10.00) IBRD ($30.00) Total Project Cost: $ Implementation Implementation period: Four years Executing Entities: Community Associations are groups of rural citizens with a common interest who organize into legally-constituted civil associations. They identify, prepare, implement, supervise, operate and maintain their subprojects, assisted both by technical specialists whom they contract directly and by technical assistance and training made available by project Municipal Councils and the State Technical Unit. Once subprojects are approved for financing, Community Associations can access a share of the costs for design and implementation assistance. Municipal Councils (CMDIs) include representatives of beneficiaries and civil society, as well as local government. A majority of voting CMDI members (at least 60%) would represent potential beneficiary communities while the remaining 40% representation would be from other organized civil society (e.g., STR, ONGs), and public sector entities. CMDIs are the key organization for targeting of benefits and allocating project resources; they also provide a critical link to local government and have the potential to engage in other non-project activities. The CMDIs play a fundamental role in mobilizing communities and promoting their participation in local decision-making. During regularly scheduled and widely publicized meetings that the public is encouraged to attend, the CMDIs receive, prioritize and approve subproject proposals from the Community Associations, within the ceiling of an indicative resource envelope received from NEPE, and in line with their Municipal Plan for Integrated Development (PMDI). The State Technical Unit. The Núcleo Estadual de Projetos Especiais (NEPE), within the State Management Unit of Agriculture and Rural Development (GEAGRO), will function as the State Technical Unit (STU), responsible for overall project coordination, with the support of GEAGRO s 18 regional units (Casas de Agricultura Familiar CAFs). NEPE will gradually delegate supervision of community associations and subprojects to the CMDIs and concentrate on oversight of the Municipal Councils themselves, as well as general project coordination and promotion. The latter duties include continuous execution of information campaigns, project reporting, impact evaluation, Management Information System (MIS) updating, and design and provision of tailored training modules for CMDIs and Community Associations on key project issues. The State Management Unit for Planning, Budget and Management (GEPLAN) will, through Component 3 of the project, promote the integration of public policies and investments oriented toward poverty reduction, monitor the activities associated with these policies including, inter alia, the subproject investments financed under Component 1 and evaluate the outcomes and impacts as they relate to an increase in Maranhão s HDI. Subproject Cycle: A statewide information campaign will increase public awareness about the project, and Municipal Councils and community associations will receive explanations about the situation of their municipality with respect to the HDI and its various components, to help them in considering sub-project alternatives and understanding the HDI criterion which will be used in the selection process. Community associations determine their local investment priorities, based on their own choices and information provided concerning the State s HDI objective and the proirities under the PPA, and will prepare subproject proposals for investment financing.

6 6 Subproject proposals from community associations are submitted to the respective CMDI, where they are prioritized and approved, based on indicative municipal resource envelopes, their expected contribution toward improvement of HDI-M, and their compatibility with the Municipal Plan for Integrated Development (PMDI). The STU technically evaluates approved subprojects and confirms compliance with subproject technical, social and environmental guidelines established in the Operational Manual before releasing funds. Subproject agreements are signed between NEPE and community associations. These agreements spell out the terms and conditions for the funding, execution, ownership, operation and maintenance of the approved subprojects. Resources for subproject implementation are then transferred directly from the project to the community association s bank account. Community associations contract goods, works and technical assistance for subproject execution, bear responsibility for operation and maintenance of all investments, and may request technical assistance to develop operation and maintenance arrangements for subproject investments. Project Oversight: GEPLAN is responsible for project oversight and the Secretary of GEPLAN represents the Borrower vis-à-vis the Bank. The Secretary delegates day-to-day execution of Component 1, 2 and 4 to NEPE, which is housed within GEAGRO and will operate as the STU. Component 3 (Horizontal Integration) will be executed by GEPLAN. Project Coordination: NEPE, supported by the 18 regional CAFs, will (a) review community subproject proposals for compliance with project guidelines and eligibility criteria in the Project Operational Manual; (b) assess the degree of community participation in identifying, preparing and executing subprojects and quality of technical assistance; (c) supervise the project Municipal Councils to ensure they adequately manage quality of subproject implementation and provide sufficient training support to communities; (d) implement introductory training and technical assistance programs for all project Municipal Councils and community associations with approved subprojects (including training on subproject implementation, contracting, O&M and financial management); (e) monitor and apply performance incentives to reward efficiency, transparency and inclusiveness of community associations and project Municipal Councils, and to penalize poor performance/misappropriation (e.g., legal action for fund misallocation); (f) monitor performance through the project MIS and periodically report progress; (g) prepare annual implementation, physical performance reviews, and impact evaluation studies; and (h) submit project yearly operating plans (POAs) to the Bank for approval. For the most common types of subprojects, NEPE would develop standardized designs and cost indicators for use by community associations to ensure reasonable quality and costing for subproject implementation. Departures from these standard designs would have to be fully justified in the subproject proposal, as would proposed investments which fall outside the range of standardized costs. Finally, NEPE will a conduct statewide information campaign to continuously disseminate information about the project and its guidelines to all potential beneficiary communities, thereby increasing awareness, transparency and participation in the program. The preparation of a proposal for the statewide information campaign, satisfactory to the Bank, would be a condition of loan effectiveness. GEPLAN will coordinate Component 3 of the project (Horizontal Integration) and will (a) monitor the specific contribution of the subprojects financed under the project to the goal of increasing Maranhão s HDI, (b) assure that the activities under the proposed project are consistent with the overall strategy of the State, regarding progress toward improvements in HDI, and (c) maintain detailed information concerning investment programs at the Federal, State and Municipal levels. Project operational procedures: The project will be implemented according to detailed procedures defined in its Project Operational Manual. This Manual will be based on that used for the predecessor project (RPAP-MA, Ln BR), and is being revised and updated to reflect lessons learned during its implementation and for consistency with the state s mobilizing goal of achieving an increase in the HDI by 2007 and the integrated nature of the proposed project. A user-friendly synthesis of this document will also be available to project Municipal Councils and community associations. The adoption by the State of the Project Operational Manual, in a form

7 7 satisfactory to the Bank, would be a condition of loan effectiveness. Monitoring arrangements: Monitoring of project implementation will rely on a database of subproject information from the project MIS operated and maintained by NEPE. This database will be integrated with statewide information systems (SEPOC, SISPCA, SIARI) to facilitate monitoring by GEPLAN of the overall PPA and impact assessment of the project and broader State development efforts. The database is currently organized in three general levels: (a) a subproject information module contains pertinent physical and financial information for each subproject; (b) a financial management module, from which Statements of Expenditure (SOEs) and Financial Statements in FMR format are generated; and (c) a project management module, from which all project reports are generated. The database includes community profiles, which will also aid in evaluating project impact. The Institutional Development component will be monitored through tracking of training events, workshops and achievement of POAs by the project Municipal Councils. The Horizontal Integration component will be monitored by GEPLAN via indicators which link both project and non-project expenditures to reduction in poverty in the rural space and statewide, measured by improvement in the HDI. The Bank s Recife Office will monitor project performance indicators through the online MIS, and with inputs from the State, review monthly disbursement summaries and supervise subproject implementation progress on a sample basis in the field. The establishment and operation of a revised MIS, acceptable to the Bank, would be a condition of loan effectiveness. Impact assessment. Project-financed evaluation studies will assess the impact of the subprojects and provide feedback to improve project operations. These studies will include: (a) annual physical performance reviews to assess the quality and sustainability of common types of financed subprojects, including reviews of community-based procurement; (b) a mid-term evaluation/implementation review, to include consultations on project performance and impact as perceived by its beneficiaries; (c) assessment of the activities under the Horizontal Integration component on achieving cross-sectoral integration of public policies and investments to reduce poverty ; and (d) a rigorous and comprehensive evaluation of the impact of the project in raising Maranhão s HDI. The impact evaluation will use repeated surveys of project beneficiaries, non-beneficiary households, and beneficiaries of similar projects with centralized delivery mechanisms to assess (i) poverty targeting of beneficiaries relative to the income distribution of the population at large; (ii) household welfare; (iii) social capital formation at the community level; (iv) improved governance at the municipal level; (v) cost-effectiveness of infrastructure investments compared with traditional delivery mechanisms, and (vi) cost-benefit of productive investments. In addition, community leaders and municipal leaders will be surveyed for the analysis of social capital and governance impacts. The first baseline field survey will be conducted within six months of project effectiveness. A survey update, to be contracted at the same time as the baseline study, will be conducted two years later, followed by further survey updates after four and six years, depending on interim results.presentation of Terms of Reference for the project baseline study and for the overall evaluation framework, both acceptable to the Bank, would be a condition of loan effectiveness. Accounting, financial reporting and auditing arrangements: The financial management systems to be used by NEPE were reviewed by a Bank financial management specialist during project preparation for compliance with OP/BP The Guidelines of Fiduciary Management for Community Driven Development Projects (CDD Guidelines) were taken into consideration where applicable. Based on this review, the financial management arrangements were considered satisfactory, indicating that the project complies with the Bank's minimum financial management requirements. The final format of the Financial Monitoring Reports FMR -- and their periodicity will be agreed by negotiations. Under the new project, NEPE will implement an action plan within the first six months of project implementation (agreed with the Bank, and attached in the financial management assessment report, Annex 6B) to allow FMR reporting, and to adjust project accounting and reporting procedures to fully comply with Bank requirements. According to arrangements for Bank-financed projects in Brazil, the annual financial audit of the project accounts for the period January 1 to December 31 of the year will be carried out by an Independent Auditor acceptable to the Bank. The audit report will be submitted to the Bank no later than June 30 in the year following that for which the project accounts are audited. The year-end FMR will also serve as the Financial Statement of the Project, on which the independent auditors will express their opinion. The annual audit will also include a separate opinion on the eligibility of expenditures disbursed on the basis of SOEs, as well as on the Special Account, compliance with all financial covenants and a Management Letter on internal controls and

8 8 recommendations. 7. Sustainability Institutional sustainability: Both the R-NRDP and the RPAP indicate that, by delegating greater responsibility and influence to local-level organizations and municipal governments, the proposed project can successfully support decentralized resource allocation and social capital creation in rural Maranhão. The new project will link the project councils to local municipal planning and budgeting processes and programs, as well as alternative credit and financial services. The sustainability of NEPE is quite strong, given the experience that its core technical team already brings to rural development activities and its broad involvement in other State and Federal supported programs, and because of the technical and administrative capacity and autonomy with which it has been formally established as the State Technical Unit for the project. The project s horizontal component will also contribute to the long-term institutional sustainability of project interventions by supporting the Maranhão s efforts to introduce results-based management and integration of development efforts and State and municipal levels. Financial sustainability: Financial analysis and field investigation confirm the sustainability of the investment subprojects funded by the R-NRDP and RPAP programs. A sample of over 8,000 community subprojects in those Northeast States which executed RPAP projects as of 1995 (under the R-NRDP) and 1997/98 (under RPAP) was reviewed in Eighty-nine percent of these subprojects were fully operational. Analysis of productive subprojects revealed that cost recovery through user fees by beneficiary associations was adequate to cover both operation and maintenance and replacement of the original investment long before the end of its useful economic life. The preparation mission observed that the investments carried out under the RPAP in Maranhão continued to be operated and managed in a satisfactory manner by the beneficiary communities with their own contributions, and continued satisfying community needs. Physical sustainability: Beneficiary participation at all stages of the subproject cycle, together with significant levels of community counterpart contribution, help to ensure subprojects are maintained. Further, the democratic process intrinsic to FUMAC ensures better selection and prioritization of subprojects by beneficiaries, enhancing long-term sustainability. The proposed project requires the establishment of community-funded O&M plans and subproject maintenance would be monitored by Municipal Councils and NEPE during implementation. Performance incentives for proper O&M are included in project design. 8. Lessons learned from past operations in the country/sector Decentralization of fiscal and investment decision-making and implementation from federal to state and local governments and to community organizations, improves program administration and outcomes. Experience in Northeast Brazil shows that decentralized CDD approaches can reduce bureaucracy and eliminate administrative bottleneck,s and reinforce accountability for project outcomes by placing decision-making near beneficiaries. The project will further what has already been achieved under the RPAP, delegating additional duties to Municipal Councils and utilizing STU central and regional offices to promote more responsive and local-level monitoring, data collection, coordination, and supervision. Participation by beneficiaries under the RPAP in the selection, financing, execution, and O&M of subprojects in Northeast Brazil has helped to ensure that investments meet genuine community needs, generate cost savings, and increase community ownership, thus improving sustainability of investments. This methodology will be extended under the new project to both project and non-project investments critical to achieving Maranhão s HDI objectives. Poverty targeting mechanisms that are simple, verifiable and based on objective criteria, can foster transparency and minimize political interference in project resource allocation. Poverty targeting mechanisms under the RPAP have been effective to date in reaching the poorest rural populations in the Northeast. About 84 percent of the program s beneficiary population are comprised of small farmers and rural laborers living in remote, low density areas with acute deficiencies in access to basic infrastructure and services. A significant additional population resides in rural areas directly adjacent to the urban periphery of municipal centers. Experience with project

9 9 Municipal Councils demonstrates that communities themselves are the best-positioned and informed to target effectively. Under the new project, broad targeting will be undertaken (a) at the municipal level, by prioritizing subproject resources according to poverty indices (i.e., municipal HDIs) and (b) at the community level, by the Municipal Councils themselves, which will be encouraged and technically assisted to undertake a poverty ranking of the communities in their municipalities and to use this in prioritizing subproject proposals. Intensive supervision of CDD projects has been found to be an indispensable determinant of success and sustainability. It needs to be reinforced at all levels and involve local entities closest to the communities, particularly Municipal Councils and NGOs. Under the new project, supervision responsibilities will be increasingly devolved to Municipal Councils, which will be supported with training and technical assistance. Measures will also be taken to provide computers and information technology to the Councils to allow them to receive and exchange information through the Internet and to modernize management. A user-friendly monitoring and evaluation system facilitates the subproject evaluation process, provides feedback and necessary information to improve targeting and efficiency, and is an essential management and planning tool. The project MIS will be enhanced to more effectively link physical implementation data with financial information on the project, and will be integrated with State information systems to facilitate overall monitoring and evaluation of the PPA. A comprehensive impact evaluation component will also be introduced to measure income, welfare and social capital gains. Dissemination of best practices, such as experiences with NGOs in Rio Grande do Norte, EMATERCE in Ceará, social inclusion in Maranhão and FUMAC Councils in Bahia and Sergipe can hasten learning and reward innovation. Under the new project, exchanges among states, municipalities and communities will be expanded further using more frequent regional training seminars, and workshops and videoconferencing, where available. Standardization of subproject documents, technical designs and unit costs simplifies subproject preparation and evaluation, improves the quality of subprojects, facilitates the procurement process, prevents over-design and enables participation by poorer communities. The existing database of standard designs will be reviewed at appraisal and technically updated and expanded where necessary. Environmental protection criteria: Proactive attention to natural resource management and sustainability issues is essential in the environmentally fragile Northeast. The project will offer an expanded option of environmental subprojects which community associations can propose, as well as piloting of regional or territorial subprojects which may cut across several municipalities (eg. watershed management). Demonstration projects will also be undertaken in selected regions throughout the state to stimulate interest in the adoption of sustainable resource management technologies and techniques. Municipal Councils will serve as focal points for channeling information from the State and NGOs (e.g., AMAVIDA) on environmental issues relevant to the specific municipality. The re-designed and enhanced environmental checklist developed under RPAP will be used to improve the criteria and procedures, and their application for evaluating environmental impact of subprojects. An environmental specialist at NEPE will provide additional technical assistance on environmental matters and training to increase environmental awareness of Municipal Councils and community groups. Partnerships will be fostered with State and municipal environmental agencies and NGOs to develop a culture of environmental awareness in the communities and Councils through training and education. Technical assistance enhances the ability of community associations and Municipal Councils to identify, prepare and implement subprojects, thereby augmenting their capacity to compete for investment funds. Technical assistance needs to be targeted to weaker municipalities to improve their planning, management and financial capacity to participate in the project. Locating and/or developing sources of technical assistance in rural areas requires significant attention and needs to be monitored at the local level. Under the new project, attention will be placed on training at the community level. To this effect, funds will be made available for the appointment of technical advisors to be recruited by each Municipal Council. These advisors will be responsible for managing and coordinating local technical and training needs. Increasing efforts will also be placed on deeper involvement of civil society (e.g., NGOs and other civil and church groups) - particularly with respect to increasing the flow of

10 10 information, mobilizing the poorest groups and supporting training activities at the community level. A system of checks and balances, clearly-defined and well-disseminated, is essential to ensure proper use of funds and sound targeting of resources. Guidelines for performance incentives and penalties will be detailed in the Project Operational Manual. Incentives may include increasing Councils indicative budget envelopes, increasing the number of investments or investment volume permitted to a community association, or incentives for environmental or technologically innovative investments. Penalties would attach to cases of mis-management and diversion of funds and include removal from eligibility to participate, reduced availability of funds, and/or judicial action. As important as penalties per se is the free and transparent flow of information. Municipal Councils include participation of local civil society (e.g., NGOs, Rural Workers Union, the Church), representatives of public ministries and municipal officials, and their meetings are publicly announced and open to broad participation. Project-financed computers in the Councils will enable Council decisions to be publicized on their own and on NEPE s webpages. All of the above are designed to institutionalize transparency. Productive subprojects should be subjected to rigorous selection, preparation, technical assistance and supervision criteria. Under the new project, a one-shot matching grant will be provided to eligible productive investments that (a) provide services for a large number of community members; (b) whose collective use is regulated by strict operational guidelines (regulamento de uso); (c) for which O & M is assured by charging adequate user fees to both association members and non-members; (d) meet the criterion of impact on HDI; and (e) include technical assistance to ensure the sustainability of the investment. Revised procedures for productive subprojects are outlined in the Project Operational Manual, as are arrangements to facilitate access to formal credit by eligible communities (Annex 2). Efforts will also be taken to expand the participation of communities in the ongoing Fair Trade initiative (Comércio Ético e Solidário). 9. Environment Aspects (including any public consultation) Issues : The preparation of the EMP was based on a series of meetings with current and former personnel from the State Management Unit for the Environment (GEMA), extensive discussions with NEPE staff, the analysis of technical documents regarding the environment in Maranhão, and field visits to potential beneficiary communities. The proposed project has been assigned a "B" environmental classification. An Integrated Safeguard Data Sheet has been prepared and will be reviewed by the LCSES Quality Assurance Team prior to appraisal. Environmental Checklists incorporated into the Project Operational Manual under the predecessor project RPAP have been adapted and updated for the proposed project, for use in subproject preparation by potential beneficiary community associations. These checklists would be completed by community associations to identify potentially adverse environmental impacts from subproject investments and methods to mitigate them. The EMP reviewed a representative sample of RPAP subprojects and concluded that, due to their small scale, adverse environmental impact would be negligible. In the few cases where subproject investments could generate a localized negative impact, these would be detected in the Environmental Checklist and actions taken to address such impacts and thereby minimize the need for environmental licensing. The project will also promote improved management of the environment by financing subproject investments in natural resource management and environmental recuperation, as well as advocating the adoption of technologies by small-scale producers which also seek to minimize environmental impact. As stated earlier, the Municipal Councils will serve as conduits for information-sharing (from both the State and NGOs) on environmental issues of interest to the municipality and region. 10. List of factual technical documents:

11 Contact Point: Task Manager Luis O. Coirolo The World Bank 1818 H Street, NW Washington D.C Telephone: Fax: 12. For information on other project related documents contact: The InfoShop The World Bank 1818 H Street, NW Washington, D.C Telephone: (202) Fax: (202) Web: Note: This is information on an evolving project. Certain components may not be necessarily included in the final project.

State Secretariat for Planning, Science and Technology (SEPLAN)

State Secretariat for Planning, Science and Technology (SEPLAN) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower Implementing Agency Report No. PID10306

More information

ONA PROPOSED LOAN TO THE STATE OF BAHIA FORA. June 4, 2001

ONA PROPOSED LOAN TO THE STATE OF BAHIA FORA. June 4, 2001 Document of The World Bank Report No: 21337-BR PROJECT APPRAISAL DOCUMENT ONA PROPOSED LOAN IN THE AMOUNT OF US$54.35 MILLION TO THE STATE OF BAHIA FORA RURAL POVERTY REDUCTION PROJECT (BRAZIL RURAL POVERTY

More information

PROJECT APPRAISAL DOCUMENT ONA PROPOSED LOAN IN THE AMOUNT OF US$30.1 MILLION TO THE STATE OF PERNAMBUCO FOR A RURAL POVERTY REDUCTION PROJECT

PROJECT APPRAISAL DOCUMENT ONA PROPOSED LOAN IN THE AMOUNT OF US$30.1 MILLION TO THE STATE OF PERNAMBUCO FOR A RURAL POVERTY REDUCTION PROJECT Public Disclosure Authorized Document of The World Bank Public Disclosure Authorized PROJECT APPRAISAL DOCUMENT ONA PROPOSED LOAN Report No: 21433-BR Public Disclosure Authorized IN THE AMOUNT OF US$30.1

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT APPRAISAL DOCUMENT ON A PROPOSED

More information

Guiding Principles for Project Design

Guiding Principles for Project Design Strengthening Operational Skills in Community Driven Development April 15-19, 2002 Washington, D.C. Guiding Principles for Project Design Community-Based Development in Northeast Brazil Luis Coirolo World

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/15/2010 1. Basic Project Data Original

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Report No. PID8369 Tanzania-Social Action Fund Project Africa Regional Office Social Funds & Social Assistance TZPE65372 GOT

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB1710 Leader

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Project Name Region Sector Project ID Borrower(s) Report No. PID5794 Lebanon-Municipal Infrastructure Project (@+) Middle East and North Africa Region Other Urban Development LBPE50544 Lebanese Republic

More information

Government of Peru Peru. PROVIAS Departamental Peru

Government of Peru Peru. PROVIAS Departamental Peru Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category Safeguard Classification PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB827 Regional Transport

More information

PROJECT INFORMATION DOCUMENT

PROJECT INFORMATION DOCUMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name: Region: Sector: Task Manager: Project ID Number: Borrower: Guarantor: Implementing

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2890 TIR - Transport Infrastructure Rehabilitation Project Region EUROPE AND CENTRAL ASIA Sector Roads and highways (70%);Railways

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social Welfare and Development Reform

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social Welfare and Development Reform Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1 Country Partnership Strategy: Cambodia, 2014 2018 Sector Road Map SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1 1. Sector Performance, Problems, and Opportunities 1. Lagging public sector management

More information

Actual Project Name : Rural Poverty Reduction Project - Rio Grande Do Norte (US$M. Project Costs (US$M US$M):

Actual Project Name : Rural Poverty Reduction Project - Rio Grande Do Norte (US$M. Project Costs (US$M US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number : ICRR13678 1. Project Data: Date Posted : 04/29/2013 Public Disclosure Authorized Public Disclosure Authorized Country:

More information

TECHNICAL GUIDANCE FOR INVOLVING NON-STATE ACTORS IN THE COUNTRY PROGRAMMING FRAMEWORK (CPF)

TECHNICAL GUIDANCE FOR INVOLVING NON-STATE ACTORS IN THE COUNTRY PROGRAMMING FRAMEWORK (CPF) TECHNICAL GUIDANCE FOR INVOLVING NON-STATE ACTORS IN THE COUNTRY PROGRAMMING FRAMEWORK (CPF) TECHNICAL GUIDANCE FOR INVOLVING NON-STATE ACTORS IN THE COUNTRY PROGRAMMING FRAMEWORK (CPF) Office for Partnerships,

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Project Name Region Sector Project ID Borrower Beneficiaries Implementing Agency Report No. PID10910 India-Andhra Pradesh Economic Reform... Loan/Credit South Asia Poverty Reduction and Economic Management

More information

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower Name Implementing Agency Environment Category Date PID Prepared Estimated Date of Approval Initiation Note Review Decision

More information

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS EUROPEAN COMMISSION Brussels, 13.10.2011 COM(2011) 638 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE

More information

Mauritania s Poverty Reduction Strategy Paper (PRSP) was adopted in. Mauritania. History and Context

Mauritania s Poverty Reduction Strategy Paper (PRSP) was adopted in. Mauritania. History and Context 8 Mauritania ACRONYM AND ABBREVIATION PRLP Programme Regional de Lutte contre la Pauvreté (Regional Program for Poverty Reduction) History and Context Mauritania s Poverty Reduction Strategy Paper (PRSP)

More information

ANNEX 15 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument

ANNEX 15 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument ANNEX 15 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument Action Fiche for EU- Brazil Sector Dialogues Support Facility 1. IDENTIFICATION Title

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Productive Initiatives For Solidarity Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Productive Initiatives For Solidarity Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5534 Project Name Productive

More information

Project Name. Region Sector

Project Name. Region Sector Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report

More information

Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening. (1st January 31st March 2013) First-Quarter Report

Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening. (1st January 31st March 2013) First-Quarter Report Building a Nation: Sint Maarten National Development Plan and Institutional Strengthening (1st January 31st March 2013) First-Quarter Report Contents 1. BACKGROUND OF PROJECT... 3 2. PROJECT OVERVIEW...

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2560 Project Name. Bahia Integrated Water Management Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2560 Project Name. Bahia Integrated Water Management Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2560 Project Name Bahia

More information

SERBIA AND MONTENEGRO-Montenegro Environmentally Sensitive Tourist Areas Project Region

SERBIA AND MONTENEGRO-Montenegro Environmentally Sensitive Tourist Areas Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Updated Project Information Document () Report No: AB131 Project Name SERBIA AND MONTENEGRO-Montenegro

More information

Updated Project Information Document (PID) Report No: AB894

Updated Project Information Document (PID) Report No: AB894 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Theme Project Borrower(s) Implementing Agency(ies) Environment

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category

More information

FIDUCIARY ARRANGEMENTS FOR SECTORWIDE APPROACHES (SWAPS)

FIDUCIARY ARRANGEMENTS FOR SECTORWIDE APPROACHES (SWAPS) FIDUCIARY ARRANGEMENTS FOR SECTORWIDE APPROACHES (SWAPS) OPERATIONS POLICY AND COUNTRY SERVICES APRIL 2, 2002 FIDUCIARY ARRANGEMENTS FOR SECTORWIDE APPROACHES (SWAPS) CONTENTS Page I. Introduction..1 II.

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020665 Public Disclosure Authorized Public Disclosure Authorized Project ID P117440 Country El Salvador

More information

Project Name Philippines-Local Government Finance & Development Project (LOGOFIND)

Project Name Philippines-Local Government Finance & Development Project (LOGOFIND) Public Disclosure Authorized Report No. PID4841 Project Name Philippines-Local Government Finance (@+)... & Development Project (LOGOFIND) Region East Asia and Pacific Region Sector UY - Other Urban Development

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 18-Sep-2013

More information

Governance for Improved Service Delivery Region. Program-for-Results Program ID. Republic of Kenya Implementing Agency

Governance for Improved Service Delivery Region. Program-for-Results Program ID. Republic of Kenya Implementing Agency Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.:PIDC0091373 (The

More information

METRICS FOR IMPLEMENTING COUNTRY OWNERSHIP

METRICS FOR IMPLEMENTING COUNTRY OWNERSHIP METRICS FOR IMPLEMENTING COUNTRY OWNERSHIP The 2014 policy paper of the Modernizing Foreign Assistance Network (MFAN), The Way Forward, outlines two powerful and mutually reinforcing pillars of aid reform

More information

Annex 1. Action Fiche for Solomon Islands

Annex 1. Action Fiche for Solomon Islands Annex 1 Action Fiche for Solomon Islands 1. IDENTIFICATION Title/Number FED/2012/023-802 Second Solomon Islands Technical Cooperation Facility (TCF II) Total cost EUR 1,157,000 Aid method / Method of implementation

More information

Nicaragua-Pension and Financial Market Reform Technical Assistance Credit

Nicaragua-Pension and Financial Market Reform Technical Assistance Credit Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category Report No. PID8081 Nicaragua-Pension and Financial Market (@) Reform Technical Assistance Credit Latin America

More information

SUBSECTOR ASSESSMENT (SUMMARY): COMMUNITY-DRIVEN DEVELOPMENT

SUBSECTOR ASSESSMENT (SUMMARY): COMMUNITY-DRIVEN DEVELOPMENT Country Operations Business Plan: Philippines, 2014 2016 SUBSECTOR ASSESSMENT (SUMMARY): COMMUNITY-DRIVEN DEVELOPMENT A. Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Sector performance.

More information

Internal Audit of the Republic of Albania Country Office January Office of Internal Audit and Investigations (OIAI) Report 2017/24

Internal Audit of the Republic of Albania Country Office January Office of Internal Audit and Investigations (OIAI) Report 2017/24 Internal Audit of the Republic of Albania Country Office January 2018 Office of Internal Audit and Investigations (OIAI) Report 2017/24 Internal Audit of the Albania Country Office (2017/24) 2 Summary

More information

MATRIX OF STRATEGIC VISION AND ACTIONS TO SUPPORT SUSTAINABLE CITIES

MATRIX OF STRATEGIC VISION AND ACTIONS TO SUPPORT SUSTAINABLE CITIES Urban mission and overall strategy objectives: To promote sustainable cities and towns that fulfill the promise of development for their inhabitants in particular, by improving the lives of the poor and

More information

Recommendation of the Council on Good Practices for Public Environmental Expenditure Management

Recommendation of the Council on Good Practices for Public Environmental Expenditure Management Recommendation of the Council on for Public Environmental Expenditure Management ENVIRONMENT 8 June 2006 - C(2006)84 THE COUNCIL, Having regard to Article 5 b) of the Convention on the Organisation for

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6515 Afghanistan New Market Development Project

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6515 Afghanistan New Market Development Project Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report.: AB6515 Afghanistan New Market Development Project Region SOUTH ASIA Sector General industry and trade sector (100%) Project ID P118053

More information

Suggested elements for the post-2015 framework for disaster risk reduction

Suggested elements for the post-2015 framework for disaster risk reduction United Nations General Assembly Distr.: General 16 June 2014 A/CONF.224/PC(I)/6 Original: English Third United Nations World Conference on Disaster Risk Reduction Preparatory Committee First session Geneva,

More information

Job Description and Requirements Programme Manager State-building and Governance Job no in the EU Delegation to the Republic of Yemen

Job Description and Requirements Programme Manager State-building and Governance Job no in the EU Delegation to the Republic of Yemen JOB PROFILE 17/08/2013 Job Description and Requirements Programme Manager State-building and Governance Job no. 127004 in the EU Delegation to the Republic of Yemen Job Type: Contract Agent Function Group

More information

METHODOLOGICAL GUIDELINES FOR CONDUCTING SECTORAL ANALYSIS IN WATER SUPPLY AND SANITATION

METHODOLOGICAL GUIDELINES FOR CONDUCTING SECTORAL ANALYSIS IN WATER SUPPLY AND SANITATION Pan American Health Organization World Health Organization Basic Sanitation Program Division of Health and Environment METHODOLOGICAL GUIDELINES FOR CONDUCTING SECTORAL ANALYSIS IN WATER SUPPLY AND SANITATION

More information

ONE WASH NATIONAL PROGRAMME (OWNP)

ONE WASH NATIONAL PROGRAMME (OWNP) ONE WASH NATIONAL PROGRAMME (OWNP) ONE Plan ONE Budget ONE Report planning with linked strategic and annual WASH plans at each level budgeting re ecting all WASH-related investments and expenditures financial

More information

Actual Project Name : Rural Poverty Reduction Project - Pernambuco Country: Brazil. Project Costs (US$M US$M):

Actual Project Name : Rural Poverty Reduction Project - Pernambuco Country: Brazil. Project Costs (US$M US$M): Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 04/29/2013 Report Number : ICRR13525 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Table 1 the Road Network of Mozambique (in kilometers)

Table 1 the Road Network of Mozambique (in kilometers) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2867 Roads

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3376 Project Name Jamaica

More information

GEF-7 REPLENISHMENT POLICY RECOMMENDATIONS (PREPARED BY THE SECRETARIAT)

GEF-7 REPLENISHMENT POLICY RECOMMENDATIONS (PREPARED BY THE SECRETARIAT) Fourth Meeting for the Seventh Replenishment of the GEF Trust Fund April 25, 2018 Stockholm, Sweden GEF/R.7/18 April 2, 2018 GEF-7 REPLENISHMENT POLICY RECOMMENDATIONS (PREPARED BY THE SECRETARIAT) TABLE

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Project Name Region Sector Project ID Borrower Report No. PIC2827 Latvia-Welfare Reform Project (@) Europe and Central Asia Social Sector Adjustment LVPA35807 Republic of Latvia

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4152 Second Madhya Pradesh District Poverty Initiatives Project Project Name

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4152 Second Madhya Pradesh District Poverty Initiatives Project Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4152 Second Madhya Pradesh

More information

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Strengthening DAK Transfers To Local Governments Region

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Strengthening DAK Transfers To Local Governments Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Program Name

More information

Armenia: Infrastructure Sustainability Support Program

Armenia: Infrastructure Sustainability Support Program Technical Assistance Report Project Number: 46220 Policy and Advisory Technical Assistance (PATA) December 2012 Armenia: Infrastructure Sustainability Support Program The views expressed herein are those

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5681 STRENGTHENING HEALTH ACTIVITY FOR THE RURAL POOR PROJECT Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5681 STRENGTHENING HEALTH ACTIVITY FOR THE RURAL POOR PROJECT Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5681 STRENGTHENING

More information

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones Technical Assistance Report Project Number: 50004-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Study on Natural Resource Asset Appraisal and Management System

More information

Statement by the IMF Managing Director on The Role of the Fund in Low-Income Countries October 2, 2008

Statement by the IMF Managing Director on The Role of the Fund in Low-Income Countries October 2, 2008 Statement by the IMF Managing Director on The Role of the Fund in Low-Income Countries October 2, 2008 1. Progress in recent years but challenges remain. In my first year as Managing Director, I have been

More information

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE ON A LOAN IN THE AMOUNT OF US$32.8 MILLION TO THE REPUBLIC OF GUATEMALA

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE ON A LOAN IN THE AMOUNT OF US$32.8 MILLION TO THE REPUBLIC OF GUATEMALA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT COMPLETION NOTE ON A LOAN IN

More information

COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) APPRAISAL STAGE

COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS)

More information

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE <October 4, 2013> Report No.: 86550

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE <October 4, 2013> Report No.: 86550 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Operation Name PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report

More information

G20 Emerging Economies St. Petersburg Structural Reform Commitments: An Assessment

G20 Emerging Economies St. Petersburg Structural Reform Commitments: An Assessment G20 Emerging Economies St. Petersburg Structural Reform Commitments: An Assessment September 2013 lights This assessment covers the new structural reform commitments made by the emerging economy members

More information

Challenges Of The Indirect Management Of Eu Funds In Albania

Challenges Of The Indirect Management Of Eu Funds In Albania Challenges Of The Indirect Management Of Eu Funds In Albania Neritan Totozani, Msc Central Financing & Contracting Unit, Ministry of Finance, Albania doi: 10.19044/esj.2016.v12n7p170 URL:http://dx.doi.org/10.19044/esj.2016.v12n7p170

More information

Myanmar Development Policy Operation Region

Myanmar Development Policy Operation Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE March 6, 2017 Report No.: AB7879 (The

More information

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution.

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution. ANNEX ICELAND NATIONAL PROGRAMME 2012 1 IDENTIFICATION Beneficiary Iceland CRIS decision number 2012/023-648 Year 2012 EU contribution 11,997,400 EUR Implementing Authority European Commission Final date

More information

Loan Agreement. (Additional Financing for the Rural Poverty Reduction Project - Rio Grande do Norte) between

Loan Agreement. (Additional Financing for the Rural Poverty Reduction Project - Rio Grande do Norte) between Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 7489-BR Public Disclosure Authorized Loan Agreement (Additional Financing for the Rural Poverty Reduction Project - Rio Grande do Norte) Public Disclosure

More information

Information note. Revitalization of the Palestinian Fund for Employment and Social Protection

Information note. Revitalization of the Palestinian Fund for Employment and Social Protection INTERNATIONAL LABOUR ORGANIZATION REGIONAL OFFICE FOR ARAB STATES Information note Revitalization of the Palestinian Fund for Employment and Social Protection Implementing Partners: Ministry of Labour,

More information

Colombia s National System for Evaluation of Management and Results

Colombia s National System for Evaluation of Management and Results Colombia s National System for Evaluation of Management and Results Country Presenter: Manuel Fernando Castro Director of Public Policy, Department of National Planning (DNP) Introduction I WILL FIRST

More information

EUROPEAN PARLIAMENT Committee on Regional Development

EUROPEAN PARLIAMENT Committee on Regional Development EUROPEAN PARLIAMT 2009-2014 Committee on Regional Development 27.11.2012 MANDATE 1 for opening inter-institutional negotiations adopted by the Committee on Regional Development at its meeting on 11 July

More information

OFFICIAL DOCUMENTS. The World Bank. Public Disclosure Authorized. Public Disclosure Authorized

OFFICIAL DOCUMENTS. The World Bank. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized OFFICIAL DOCUMENTS The World Bank 1818 H Street N.W. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/27/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE July 21, 2017 Report No.: MG Public Finance Sustainability and Investment II DPO

PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE July 21, 2017 Report No.: MG Public Finance Sustainability and Investment II DPO Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE July 21, 2017 Report No.: 120763 Operation

More information

Actual Project Name : Rural Poverty Alleviation - Paraiba Country: Brazil US$M): Project Costs (US$M

Actual Project Name : Rural Poverty Alleviation - Paraiba Country: Brazil US$M): Project Costs (US$M Public Disclosure Authorized IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 06/28/2007 Report Number : ICRR12652 Public Disclosure Authorized Public Disclosure Authorized PROJ

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 16-Mar-2012

More information

Democratic Socialist Republic of Sri Lanka. Smallholder Agribusiness Partnerships (SAP) Programme. Negotiated financing agreement

Democratic Socialist Republic of Sri Lanka. Smallholder Agribusiness Partnerships (SAP) Programme. Negotiated financing agreement Document: EB 2017/120/R.13/Sup.1 Agenda: 9(b)(iii) Date: 8 April 2017 Distribution: Public Original: English E Democratic Socialist Republic of Sri Lanka Smallholder Agribusiness Partnerships (SAP) Programme

More information

Introduction. The Assessment consists of: Evaluation questions that assess best practices. A rating system to rank your board s current practices.

Introduction. The Assessment consists of: Evaluation questions that assess best practices. A rating system to rank your board s current practices. ESG / Sustainability Governance Assessment: A Roadmap to Build a Sustainable Board By Coro Strandberg President, Strandberg Consulting www.corostrandberg.com November 2017 Introduction This is a tool for

More information

Integrated Safeguards Data Sheet Identification / Concept Stage (ISDS)

Integrated Safeguards Data Sheet Identification / Concept Stage (ISDS) Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet Identification / Concept Stage (ISDS) Concept Stage Date ISDS Prepared/Updated:

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Report No. PID6809 Project Pakistan-Punjab Municipal Development (+) Fund Project Region Sector Project ID Borrower Implementing Agencies South Asia Urban PKPE55293 Government of Pakistan (GOP) Date PID

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 14-Jul-2014

More information

Private Fundraising: 2013 workplan and proposed budget

Private Fundraising: 2013 workplan and proposed budget Distr.: General E/ICEF/2013/AB/L.1 3 December 2012 Original: English For action United Nations Children s Fund Executive Board First regular session 2013 5-8 February 2013 Item 12 of the provisional agenda*

More information

Issues Paper on Completing the Economic and Monetary Union

Issues Paper on Completing the Economic and Monetary Union Issues Paper on Completing the Economic and Monetary Union by European Council September 12, 2012 ISSUES PAPER ON COMPLETING THE ECONOMIC AND MONETARY UNION Introduction The European Council of 29 June

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE GUINEA: EDUCATION FOR

More information

OFFICIAL -1 L(-L DOCUMENTS. Between. and

OFFICIAL -1 L(-L DOCUMENTS. Between. and Public Disclosure Authorized OFFICIAL -1 L(-L DOCUMENTS ADDENDUM No 2 TO ADMINISTRATION AGREEMENT Between Public Disclosure Authorized Public Disclosure Authorized the EUROPEAN UNION (represented by the

More information

UPDATE. Financial Intermediary Lending and Environmental Assessment. Environmental Assessment

UPDATE. Financial Intermediary Lending and Environmental Assessment. Environmental Assessment Environmental Assessment S o u r c e b o o k UPDATE Environment Department June 2002 The World Bank Number 27 Financial Intermediary Lending and Environmental Assessment The World Bank supports economic

More information

The World Bank and Brazil. What is the World Bank Group? Project Cycle. Information Sources. Procurement

The World Bank and Brazil. What is the World Bank Group? Project Cycle. Information Sources. Procurement What is the World Bank Group? The World Bank and Brazil Project Cycle Procurement Information Sources Children at Risk Foundation! Formed by 187 countries, functions as a cooperative! One of the pillars

More information

Brazil. Poverty profile. Country profile. Country profile. November

Brazil. Poverty profile. Country profile.   Country profile. November Brazil Country profile Country profile 16 November www.devinit.org/pi This country profile is produced by Development Initiatives to support the National Dialogue on the 3 Agenda for Sustainable Development.

More information

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection Technical Assistance Report Project Number: 47042-001 Policy and Advisory Technical Assistance (PATA) October 2013 People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

More information

Internal Audit of the Lao People s Democratic Republic Country Office

Internal Audit of the Lao People s Democratic Republic Country Office Internal Audit of the Lao People s Democratic Republic Country Office March 2013 Office of Internal Audit and Investigations (OIAI) Report 2013/04 Audit of the Lao People s Democratic Republic Country

More information

MEMO. Why a European promotion policy for agricultural products?

MEMO. Why a European promotion policy for agricultural products? EUROPEAN COMMISSION MEMO Brussels, 21 November 2013 Questions & Answers: Reform of the policy on information and promotion measures for agricultural products on the internal market and in third countries:

More information

Sector-wide Health System and Social Development Support Project Region

Sector-wide Health System and Social Development Support Project Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1473 Country Mali Prpoject ID P093689 Project Name Sector-wide Health System and Social Development Support Project Region AFRICA Sector Health

More information

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) TF-A Jun ,000,000.00

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) TF-A Jun ,000,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020814 Public Disclosure Authorized Public Disclosure Authorized Operation ID P156865 Country West Bank

More information

Introduction. The Assessment consists of: A checklist of best, good and leading practices A rating system to rank your company s current practices.

Introduction. The Assessment consists of: A checklist of best, good and leading practices A rating system to rank your company s current practices. ESG / CSR / Sustainability Governance and Management Assessment By Coro Strandberg President, Strandberg Consulting www.corostrandberg.com September 2017 Introduction This ESG / CSR / Sustainability Governance

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4270 Health Transformation and Social Security Reform Project.

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4270 Health Transformation and Social Security Reform Project. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4270 Health

More information

GUIDELINES FOR STRATEGIES IN SWEDISH DEVELOPMENT COOPERATION AND HUMANITARIAN ASSISTANCE

GUIDELINES FOR STRATEGIES IN SWEDISH DEVELOPMENT COOPERATION AND HUMANITARIAN ASSISTANCE GUIDELINES FOR STRATEGIES IN SWEDISH DEVELOPMENT COOPERATION AND HUMANITARIAN ASSISTANCE Annex to Government Decision 21 December 2017 (UD2017/21053/IU) Guidelines for strategies in Swedish development

More information

ANNEX. CRIS number: 2014/37442 Total estimated cost: EUR 5M. DAC-code Sector Public sector policy and administrative management

ANNEX. CRIS number: 2014/37442 Total estimated cost: EUR 5M. DAC-code Sector Public sector policy and administrative management ANNEX Action Document for 11 th EDF EU-TL Co-operation Support Facility (CSF) 1. IDENTIFICATION Title/Number Total cost 11 th EDF EU-TL Co-operation Support Facility (CSF) CRIS number: 2014/37442 Total

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/10/2007 INTEGRATED SAFEGUARDS DATASHEET

More information

2015 Development Policy Financing Retrospective: Preliminary Findings

2015 Development Policy Financing Retrospective: Preliminary Findings 2015 Development Policy Financing Retrospective: Preliminary Findings Purpose of this Consultation Meeting on the DPF Retrospective The 2015 Retrospective will focus on the Bank s experience with Development

More information

Project Name KIAT GURU: KINERJA DAN AKUNTABILITAS GURU - IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY

Project Name KIAT GURU: KINERJA DAN AKUNTABILITAS GURU - IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC56822

More information

AFRICA. Investment Project Financing P Federal Ministry of Finance

AFRICA. Investment Project Financing P Federal Ministry of Finance Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA24330 Project Name

More information

Report No.: ISDSA13978

Report No.: ISDSA13978 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 0 o Date ISDS Prepared/Updated: 29-Jul-2015 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Report No. PID10650 Nigeria-Community and Local Government Development... Project Africa Regional Office Decentralization

More information