1 THE AUDITING OF TSUNAMI DISASTER RELIEF FUNDS IN ACEH AND NIAS BETWEEN Anwar Nasution Presentation at the International Public Sector Convention 2009, Sydney, March 2009
2 Disaster Profile The Indian Ocean Tsunami of December 26, 2004 was a global natural disaster and received quick global response; The disaster corresponds to the Black Swan terminology of Mr. Nassim Nicholas Taleb, 2008, The Black Swan, London: Penguin, with three characteristics: (i) it was a random event and therefore it was unpredictable; (ii) it carried huge global impacts around the Indian Ocean rim in Asia, the Middle East and Africa; (iii) it is retrospectively predictable: it happened due to a shift in the Indo-Australian tectonic plate. 2
3 Open door policy and the limited capacity of the government Given its limited capacity to face the disaster, the government adopted an open door policy: everybody was welcome to help, to bring and deliver their assistance; The government was unprepared to face the disaster due to the following reasons: (i) Government, social and economic infrastructures had been severely damaged in the Aceh Province as it had been in war for over 3 decades due to local rebellion; (ii) The tsunami further destroyed the already weakened infrastructures and killed a great number of local officials. 3
4 Two phases of response The response to the disaster is divided into two phases, namely: (i) The emergency phase between December 26, 2004 and April 30, Immediately after the tsunami had occurred, the Emergency Relief Agency (Bakornas PBP) was established to coordinate activities in this phase. The focus of its activities was on saving lives and providing services to evacuees, removing corpses, clearing debris and rebuilding basic infrastructure; (ii) Rehabilitation and Reconstruction phase from May 1, 2005 to June 30, The government issued a master plan for rehabilitation and reconstruction in 2004 and established BRR (the Rehabilitation and Reconstruction Agency for Nanggroe Aceh Darussalam and Nias) to coordinate activities during this period; The tsunami relief consisted of financial assistance and non monetary support, both from domestic sources as well as from 34 countries and regional and international organizations. Non-monetary support included services of volunteers, including military personnel, medical team and paramedics, floating hospitals, mother ships and war ships, aircraft and helicopters, mainly from the U.S., Australia and Singapore. The military operation during the emergency phase in Aceh and Nias was the biggest military operation for non-military purposes in the past half a century. 4
5 Financial assistance during the emergency phase Exhibit 7 indicates the size of the financial assistance to Aceh and Nias during the emergency phase from various sources Exhibit 7 : National Compilation Financial Report by Bakornas PB as of April 30, 2005 National budget (Total Actual Disbursements) Foreign Aid (1 US$ = 9,570.00) Total Via government donation centers (funds and goods) 1. Domestic Aid: a. Funds b. Goods Total Domestic Aid 2. Foreign Aid: a. Funds b. Goods Total Foreign Aid TOTAL 1,747,397,151, ,996, ,748,442,147, ,504,370, ,440,208, ,944,578, ,832,999, ,705,708,590, ,880,037,220, ,627,423,946, Source: BPK Audit Report 5
6 Financial assistance during the rehabilitation and reconstruction phase Exhibit 9 indicates the amount of financial assistance to Aceh and Nias during the rehabilitation and reconstruction phase. Exhibit 9. Breakdown of institutions and their contributions by donor category No Donor Category Consist of Amount in USD On-budget 1 Government of Indonesia State Budget/ APBN 3,209,031,720 2 Asian Development Bank 124,659,203 3 Multi Donor Trust Fund 121,652,076 4 KFW Germany 31,833,333 Off-budget 5 Foreign Governments Bilateral 1,069,696,423 6 Multilateral Organizations 436,701,561 7 NGOs International and local NGO, UN Agencies 1,688,216,684 8 Companies and communities 208,963,282 Total 6,890,754,282 6
7 Exhibit 10 indicates the flow of tsunami relief funds Flow of Tsunami-related Aid in Indonesia Donors Gov of Indonesia Foreign Govts. 3 Multilateral Organizations 4 5 NGOs Companies Communities Intermediate Agencies 1 2 Multi donor fund/ Multilateral org Companies NGOs Recipients/Implementers Central GOI Ministries BRR Gov. of Indonesia Aceh Local Gov. 26 NGOs 20 (Source: Indonesia Country Report- Intosai Task Force) Relief, Rehabilitation & Reconstruction Activities in Aceh and Nias 7
8 Auditing the tsunami relief funds BPK has the constitutional mandate to audit state finance in the three tiers of government in Indonesia: central, provincial and regency/municipality (Kabupaten/Kota). During the long period of former President Suharto s administration from 1966 to 1998, BPK was banned from auditing the gold mines of the regime, tax revenues, foreign aid and loans. The gold mines of the regime included Pertamina, the state oil company, and the oil sector, the central bank, state-owned banks, some other state-owned companies, as well as foreign aid and loans; BPK can only audit the tsunami relief funds channeled through the state budget as indicated in channels 1, 12, 21 to 26 of Exhibit 10. BPK has the authority to audit funds provided by foreign governments and multilateral organizations to the state budget (Channels 2 to 5). BPK has no mandate to audit funds channeled through the off state budget mechanism by the international community, NGOs and other private sector actors directly to the needy, as indicated in Channels 6, 7, 8 to 11, 15 to 19 and 20; Assistance from donor countries has been audited by their respective SAIs. Funds from international and national NGOs and private sector actors have been audited by their private auditors. Major international accounting firms, such as PriceWaterhouse&Coopers have provided voluntary audit services to audit tsunami relief funds. 8
9 BPK s Strategy BPK gradually improved its capacity to audit the relief funds both during emergency phase and beyond, by seeking advice and assistance from SAIs of other countries. Following the international conference attended by SAIs of donor countries, international organizations and tsunami-hit countries held in Jakarta on April 25-27, 2005, the INTOSAI-Tsunami Initiative Task Force was established to advise BPK on auditing the tsunami relief funds. At the time the tsunami had occurred in December 2004, the capacity of BPK was limited due to the following reasons: (i) BPK had had no prior experience in auditing such a major disaster; (ii) the absence of internal control system at the Ministry of Social Welfare, the National Disaster Management Agencies and local governments; (iii) BPK had had no representative office in Aceh. Traditionally, the province had been covered from Medan, the capital city of the neighboring province of North Sumatra; (iii) As mentioned earlier, during the administration of President Suharto, BPK had been banned from auditing foreign aid and loans; To conduct field audit, BPK opened a dedicated office in Aceh in early 2005; 9
10 Audit Approach and Methodology In collaboration with the SAI of France, BPK has audited projects of the UNICEF and NGOs from France in Aceh. Assisted by the Australian Audit Office (ANAO), BPK performs two types of audit, namely financial and performance audit. The latter includes analysis of risk, materiality, geography and environment aspects. Investigative audit has been conducted in some cases; Through BRR, BPK has been making use of data base provided by the international community such as the RAND system for tracking, accounting, reporting and monitoring of the committed relief funds. The system covers about 60 percent of the commitment, but no information is available on actual disbursed funds; With the help of ARK of The Netherlands, BPK has been using the information technology available at BRR such as GIS or satellite images, particularly for auditing housing projects. The GIS images, however, are being used only for first approximation, followed by field audit. 10
11 Audit Reports and Findings A number of audit reports have been produced by BPK between in relation to the tsunami in Aceh and Nias. These include (i) Accountability of funds management during the relief phase; (ii) Audit on national budget expenditures during the relief phase, (iii) a series of performance audits on infrastructure, health and other programs; (iv) Audit of the financial statements of BRR for the fiscal years of 2005, 2006 and 2007 and (v) Audit of the ADB ETESP consolidated financial statements for the fiscal years of 2005, 2006 and 2007; As expected, a number of weaknesses were found during the havoc emergency phase related to organizational structure, functions and authority, coordination, implementation, monitoring and the deficiency of accounting and reporting systems. Some of the material assistance provided by the donors, including medical kits and equipment, were useless as they did not match the actual needs on the ground; Planning and coordination by BRR and its accounting and monitoring systems during the rehabilitation and reconstruction phase have been considerably improved, and its financial reports have received unqualified opinion from the BPK. 11
Lessons on transparency and accountability of disasterrelated. Task Force on the Accountability for and Audit of Disaster-related Aid
Country report of Republic of Indonesia Lessons on transparency and accountability of disasterrelated aid Task Force on the Accountability for and Audit of Disaster-related Aid 4 September 2007 Tim INTOSAI
More informationAceh-Nias Reconstruction and Rehabilitation: Lessons Learned
THE BRR INSTITUTE Aceh-Nias Reconstruction and Rehabilitation: Lessons Learned Expert Group Meeting Tokyo, 31 May 2011 Said Faisal IMAGINE HALF A MILLION PEOPLE LIVED HERE BEFORE THE 30-FEET HIGH TSUNAMI
More informationAppendices lessons learned report Tsunami
Appendices lessons learned report Tsunami 10 November 2008 Netherlands Court of Audit, Lange Voorhout 8, P.O. Box 20015, 2500 EA The Hague, The Netherlands This document is copyright protected and contains
More informationQuestionnaire on Financial Schemes for Disaster Risk Reduction
Questionnaire on Financial Schemes for Disaster Risk Reduction 1 Objectives of Questionnaire Survey the current financial schemes related to disaster risk reduction in each country Review current approaches
More informationFeatured Session on the Launch of Post Disaster Needs Assessment and Disaster Recovery Framework: Indonesia s Perspective
Featured Session on the Launch of Post Disaster Needs Assessment and Disaster Recovery Framework: Indonesia s Perspective September 10, 2014 Washington, D.C. Dr. Suprayoga Hadi, Ministry of Disadvantaged
More informationLessons on accountability, transparency and audit of Tsunami-related aid. country report of the Netherlands
Lessons on accountability, transparency and audit of Tsunami-related aid country report of the Netherlands Lessons on transparency of and accountability for disasterrelated aid Task Force on the Accountability
More informationStatus of World Bank Assistance in the Reconstruction of Aceh and North Sumatra, Indonesia. Janelle Plummer, WSP-EAP Bill Paterson, EASTR
Status of World Bank Assistance in the Reconstruction of Aceh and North Sumatra, Indonesia Janelle Plummer, WSP-EAP Bill Paterson, EASTR 2 3 4 5 6 7 In Aceh The disaster was caused by a tsunami and an
More informationJapan s ODA and JICA. Chapter 1 Japan s ODA and an Overview of JICA Programs
Chapter 1 Japan s ODA and an Overview of JICA Programs Livestock farmers attending a lecture by a repatriate participant of JICA training programs held in Japan (Livestock husbandry training in Northern
More informationLESSONS LEARNED FROM ACEH NIAS RECONSTRUCTION : Relevant Lessons for FutureCity Initiative
PRESIDENT S DELIVERY UNIT DEVELOPMENT MONITORING AND OVERSIGHT LESSONS LEARNED FROM ACEH NIAS RECONSTRUCTION : Relevant Lessons for FutureCity Initiative INTERNATIONAL FORUM ON THE FUTURECITY INITIATIVE
More informationEAP DRM KnowledgeNotes Disaster Risk Management in East Asia and the Pacific
Public Disclosure Authorized Public Disclosure Authorized Photos.com Public Disclosure Authorized Public Disclosure Authorized EAP DRM KnowledgeNotes Disaster Risk Management in East Asia and the Pacific
More informationSustainable Livelihoods
Sustainable Livelihoods After Disaster Case: Post Earthquake 27 May 2006 in Yogyakarta and Central Java Dr. Suprayoga Hadi (suprayoga@bappenas.go.id) Director for Special Area and Disadvantaged Region,
More informationDelivering Results in Post-disaster Recovery through Effective Financial Management: The Case of Aceh and Nias
International Disaster and Risk Conference Davos, Switzerland 25-29 August 2008 Delivering Results in Post-disaster Recovery through Effective Financial Management: The Case of Aceh and Nias Amin Subekti
More informationSTAR Contribution to Indonesia PFM
State Accountability Revitalization (RRP INO 38354) STAR Contribution to Indonesia PFM Public financial management (PFM) includes all phases of the budget cycle, including the preparation of the budget,
More information11. Improving Vulnerable Urban Space in Postdisaster in Yogyakarta and Central Java, Indonesia: Participatory and Comprehensive Approach
11. Improving Vulnerable Urban Space in Postdisaster in Yogyakarta and Central Java, Indonesia: Participatory and Comprehensive Approach Suprayoga Hadi 11.1 Introduction 11.1.1 The Disaster The Earthquake
More informationunited Nations agencies
Chapter 5: Multilateral organizations and global health initiatives A variety of international organizations are involved in mobilizing resources from both public and private sources and using them to
More informationChapter 2. Non-core funding of multilaterals
2. NON-CORE FUNDING OF MULTILATERALS 45 Chapter 2 Non-core funding of multilaterals This chapter concludes that non-core funding can contribute to a wide range of complementary activities, although they
More informationUsing Data for Ex-Ante Preparedness. for Disaster Management
Using Data for Ex-Ante Preparedness for Disaster Management Tracking the 2004 Indian Ocean earthquake and tsunami reconstruction funds in Indonesia Jock McKeon PREM, Poverty Reduction Group, World Bank
More information3Chapter 3 Japan s ODA and an Overview of JICA Programs
3Chapter 3 Japan s ODA and an Overview of JICA Programs Japan s ODA and JICA Outline of Japan s ODA A variety of organizations and groups, including governments as well as international organizations,
More informationRoles & Challenges of Development Assistance in LDCs
Ministry of Finance International Economic Cooperation Coordination Division Roles & Challenges of Development Assistance in LDCs Ms. Anita Bhattarai Section officer, Ministry of Finance Government of
More informationDevelopment Assistance for HealTH
Chapter : Development Assistance for HealTH The foremost goal of this research is to estimate the total volume of health assistance from 199 to 7. In this chapter, we present our estimates of total health
More informationFinancing Mine Action in Vietnam
Financing Mine Action in Vietnam, Head: Strategic Management Slide 1 > Who decides? Priorities 1. National 2. Sub-national 3. Private sector 4. Development NGOs Decision-makers 1. Ministries via MPI >
More informationSector-wide Approaches (SWAps) in Education. An Overview. World Bank, Islamabad August 2007
Sector-wide Approaches (SWAps) in Education An Overview World Bank, Islamabad August 2007 What is a SWAp: definition A sector wide approach is an approach to support a country-led and owned program for
More informationCRS Report for Congress
CRS Report for Congress Received through the CRS Web Order Code RS22032 Updated May 23, 2005 Foreign Aid: Understanding Data Used to Compare Donors Summary Larry Nowels Specialist in Foreign Affairs Foreign
More informationPidie Jaya, Indonesia
Pidie Jaya, Indonesia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical
More informationGlobal ODA Trends. Topics
Global ODA Trends In "Transforming our world: the 2030 agenda for sustainable development," adopted by the UN General Assembly in September 2015, "ODA providers reaffirm their respective commitments, including
More informationPreliminary Damage and Loss Assessment
The 15th Meeting of The Consultative Group on Indonesia Jakarta, June 14, 2006 Yogyakarta and Central Java Natural Disaster A Joint Report from BAPPENAS, the Provincial and Local Governments of D.I.Yogyakarta,
More informationFAQs for Participating in the Second Monitoring Round of the GPEDC: Data Collection, Validation and Reporting
FAQs for Participating in the Second Monitoring Round of the GPEDC: Data Collection, Validation and Reporting This document presents frequently asked questions and answers on the second monitoring round
More informationBriefing note about EU Climate Finance
Briefing note about EU Climate Finance 11 December 2017 Jonas Appelt and Hans Peter Dejgaard INKA Consult List of content: Overall Findings and Conclusions:... 1 1. Introduction... 2 2. Climate Finance
More information20 th Meeting of the Programme Coordinating Board Geneva, Switzerland June 2007
15 May 2007 20 th Meeting of the Programme Coordinating Board Geneva, Switzerland 25-27 June 2007 Provisional agenda item 2: 2008-2009 Unified Budget and Workplan and Financial Report: Interim financial
More informationBusiness Activities. Individual Insurance Marketing. New Market Development
Business Activities Individual Insurance Marketing New Market Development In the area of product development, we made efforts to strengthen our product line-up, centering on the Life Account L.A. Double.
More informationQ&A of ODA and ODA Loans. This chapter provides essential information on Japan s official development assistance (ODA) and ODA loans.
5 Q&A of ODA and ODA Loans This chapter provides essential information on Japan s official development assistance (ODA) and ODA loans. 1. Japan s ODA Q.What is ODA? A. ODA is the assistance to developing
More informationDebt for Education Swaps
Debt for Education Swaps Working Group for Debt for Education Swaps Daniel Filmus Minister of Education, Science and Technology, República Argentina November 27, 2006 UNESCO, Paris Introduction More than
More informationTerms of Reference (ToR) Budget Tracking Officer, Line Ministry Budget Information System (LMBIS)
Annex I Terms of Reference (ToR) Budget Tracking Officer, Line Ministry Budget Information System (LMBIS) (Planning and Budget Management Division) 1. Position Description Post Title: Level: Project: Supervisor:
More informationGovernment of Indonesia
Government of Indonesia GOVERNMENT OF THE REPUBLIC OF INDONESIA, MINISTRY OF VILLAGE, DISADVANTAGED REGIONS DEVELOPMENT AND TRANSMIGRATION (KEMENDESA) & UNITED NATIONS CHILDREN S FUND (UNICEF) (January
More informationDEVELOPMENT AID AT A GLANCE
DEVELOPMENT AID AT A GLANCE STATISTICS BY REGION 5. EUROPE 6 edition 5.. ODA TO EUROPE - SUMMARY 5... Top ODA receipts by recipient USD million, net disbursements in 5... Trends in ODA Turkey % Ukraine
More informationIndonesia Aceh/Nias. Mini-Diagnostic Analysis of the Investment Climate
Public Disclosure Authorized 38793 Public Disclosure Authorized Public Disclosure Authorized Indonesia Aceh/Nias Mini-Diagnostic Analysis of the Investment Climate September 2005 Public Disclosure Authorized
More informationIndicator 6.a.1: Amount of water- and sanitation-related official development assistance that is part of a government-coordinated spending plan
Goal 6: Ensure availability and sustainable management of water and sanitation for all Target 6.a: By 2030, expand international cooperation and capacity-building support to developing countries in water-
More informationThe Tsunami: Impact, Responses, and Issues 14
The Tsunami: Impact, Responses, and Issues 14 Introduction 25. The tsunami that hit Sri Lanka on December 26, 2004 caused the worst devastation from a natural disaster in the country's history. While the
More informationImplementation Status & Results Indonesia Aceh Infrastructure Reconstruction Financing Facility (IRFF) (P101785)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Aceh Infrastructure Reconstruction Financing Facility (IRFF) (P101785) Operation Name:
More informationWORLD BANK RESPONSE TO THE TSUNAMI DISASTER
32154 WORLD BANK RESPONSE TO THE TSUNAMI DISASTER Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FEBRUARY 2, 2005 ABBREVIATIONS AND
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Infrastructure Reconstruction Financing Facility Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE 37732 Project Name Infrastructure
More informationPre-Feasibility Analysis, Project Pipelines and Institutional Support for Debt-for-Environment Swap (DFES) in the Kyrgyz Republic Preliminary Results
Joint Meeting of the EU Water Initiative s EECCA Working Group and the Environmental Finance and Water Networks 29 March 1 April 2005, Chisinau, Moldova Pre-Feasibility Analysis, Project Pipelines and
More informationMonitoring fund flows
Monitoring fund flows Workshop for Building Community Based Preparedness for and Responses to Natural Disasters, Bangkok Jock McKeon, World Bank Office Indonesia June 11 2008 Banda Aceh port (Malahayati)
More informationImplementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For (P125405)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For 2012-2015 (P125405) Operation
More informationINTERNATIONAL DISASTER RESPONSE LAWS, RULES & PRINCIPLES (IDRL)
INTERNATIONAL DISASTER RESPONSE LAWS, RULES & PRINCIPLES (IDRL) 9 January 27 The Federation s mission is to improve the lives of vulnerable people by mobilizing the power of humanity. It is the world s
More informationIndonesia: Earthquake and Tsunami Emergency Support Project
Validation Report Reference Number: PVR 237 Project Number: 39127 Grant Number: 0002-SF December 2012 Indonesia: Earthquake and Tsunami Emergency Support Project Independent Evaluation Department ABBREVIATIONS
More informationStatus of Iraq Reconstruction Funding
Status of Iraq Reconstruction Funding The cost of Iraq relief and reconstruction in the medium term has been estimated at $50-100 billion. As of September 30, 2004, approximately $55.1 billion had been
More informationMulti-Donor Trust Fund for Aceh and North Sumatra Grant Agreement
Public Disclosure Authorized CONFORMED COPY MDTF GRANT NUMBER TF055353 IND Public Disclosure Authorized Multi-Donor Trust Fund for Aceh and North Sumatra Grant Agreement Public Disclosure Authorized (Reconstruction
More informationFinancial information of. THE CANADIAN RED CROSS SOCIETY Asian Earthquake and Tsunami Fund Haiti Earthquake Fund
Financial information of THE CANADIAN RED CROSS SOCIETY March 31, 2013 and 2012 Deloitte LLP 800-100 Queen Street Ottawa ON K1P 5T8 Canada Tel: (613) 236 2442 Fax: (613) 236 2195 www.deloitte.ca Independent
More informationNote: Campbell Collaboration Systematic Review Title Registration Template version date: 24 February 2013
Title Registration for a Systematic Review: The Effectiveness and Efficiency of Cash-based Approaches in Protracted and Sudden Onset Emergencies: A Systematic Review Shannon Doocy and Hannah Tappis Submitted
More informationGlobal Monitoring Report: Findings on Progress since Monterrey
Global Monitoring Report: Findings on Progress since Monterrey Governance, institutions, and capacity A number of developing regions have made considerable progress toward regulatory reform, but Sub-Saharan
More informationSession 4 Status of Climate Finance in the Philippines
Session 4 Status of Climate Finance in the Philippines Workshop on Corruption Risks and Anti- Corruption Strategies in Climate Finance Manila, Philippines 25 to 27 May 2015 Summary of Day 1 2 Session objective
More informationODA and ODA Loans at a Glance
ODA and ODA Loans at a Glance This chapter provides essential information on Japan s official development assistance (ODA) and ODA loans. What is ODA? Official development assistance (ODA) is the assistance
More informationResources for Results III
1 Resources for Results III UN 25 February 2015 (Updated 7 April 2015) 2 Table of contents Introduction... 3 I. Status/Overview... 4 (A) Emergency response: for UN agencies and key CSOs... 5 (B) Emergency
More informationDr. Joseph A. Weinstock Asian Development Bank
New Directions of Asian Development Bank in Reducing Disaster Risk Dr. Joseph A. Weinstock Asian Development Bank January 20, 2005 Kobe, Japan Global Disasters 1974 2003: People Affected Region Mean Annual
More information"Rehabilitation and sustainable development of fisheries and aquaculture affected by the tsunami in Aceh Province, Indonesia" FINAL PROJECT EVALUATION
"Rehabilitation and sustainable development of fisheries and aquaculture affected by the tsunami in Aceh Province, Indonesia" (Project OSRO/INS/601/ARC) FINAL PROJECT EVALUATION 29 March 11 May 2010 Response
More informationCIVIL SOCIETY AID TRENDS 2015 Baobab Briefing No 3
JANUARY 215 CIVIL SOCIETY AID TRENDS 215 Baobab Briefing No 3 INTRODUCTION Major international civil society organisations (ICSOs) are increasingly taking a global perspective on the potential sources
More informationOverview of Progress of Maternal Health in Nepal: A Case Study
Overview of Progress of Maternal Health in Nepal: A Case Study Dr Babu Ram Marasini, MBBS,MPH Coordinator, Health Sector Reform Unit Ministry of Health & Population, Nepal Presented at 7 th Annual ODI-CAPE
More informationSri Lanka: Preliminary Damage and Needs Assessment Page 25 of 29
Sri Lanka: Preliminary Damage and Needs Assessment Page 25 of 29 F. IMMEDIATE AND MEDIUM TERM RECOVERY STRATEGY Implementation Approach 75. One of the main challenges of developing a comprehensive, as
More informationTRANSFORMING DISASTER EXPERIENCES INTO OPPORTUNITIES FOR REDUCING RISK
TRANSFORMING DISASTER EXPERIENCES INTO OPPORTUNITIES FOR REDUCING RISK GENEVE, 22 NOVEMBER 2005 HERU PRASETYO AGENCY FOR RECONSTRUCTION AND REHABILITATION FOR ACEH AND NIAS, INDONESIA 0 Aceh: A Society
More informationADB s Experiences in Disaster Management. Neil Britton Senior Disaster Risk Management Specialist Asian Development Bank 25 November 2007
ADB s Experiences in Disaster Management Neil Britton Senior Disaster Risk Management Specialist Asian Development Bank 25 November 2007 Presentation Format Asia s changing hazardscape and vulnerability
More informationGIS & Remote Sensing in auditing. Enhancing audit as a learning tool
GIS & Remote Sensing in auditing Enhancing audit as a learning tool 1 Presentation covers Netherlands Court of Audit Using GIS & Remote Sensing in auditing, examples: Tsunami Combating money laundering
More informationTax aspects of donor-financed projects
ITC/ATI Tax and Development conference, Berlin June 14-16, 2017 Tax aspects of donor-financed projects Jacques Sasseville Financing for Development Office Department of Economic and Social Affairs http://www.un.org/esa/ffd/
More informationLEGAL & GENERAL LIFE FIDELITY MULTI ASSET STRATEGIC FUND.
AN EQUITY FUND 31 JULY 2017 01 LEGAL & GENERAL LIFE FIDELITY MULTI ASSET STRATEGIC FUND. FUND FACTS Product(s) Portfolio Bond (IPS) Launch date 6 April 2011 Legal & General life fund size 14.6 million
More informationBone Bolango, Indonesia
Bone Bolango, Indonesia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical
More informationDevelopment Issues and ODA in the World Vol. 2
Development Issues and ODA in the World Vol. 2 November 155 & 16, 2007 Shunji Matsuoka,, Ph. D Professor at Graduate School of Asia Pacific Studies (GSAPS), Waseda University,, Tokyo, Japan 1 Contents
More informationClass: Class No.: 1. (a) In case of wars or natural disasters ( ) in LDCs, what materials do international organisations ( ) provide to
Tak Sun Secondary School F.3 Contemporary Studies Problem set 4 for remedial class 10-11 Topic: Rich and poor (Chapter 25) Name: Full mark: 35 marks Class: Class No.: Instruction: On top of finishing the
More information1) Background: two biggest channels for Canadian Official Development: CIDA and WB
CIDA and World Bank Programming in Microfinance 1) Background: two biggest channels for Canadian Official Development: CIDA and WB Canadians contribute to the social and economic welfare of the developing
More informationManaging Natural Disasters
Managing Natural Disasters Lucy Conger With research assistant from Cory Siskind, Inter-American Dialogue Prepared for the Colombian Government for the Sixth Summit of the Americas August 2011 Managing
More informationBuilding Community-Based Risk Management Responses to Natural Disasters
Building Community-Based Risk Management Responses to Natural Disasters Limiting Governance Risks: Fiduciary Requirements in Disaster Management CDD Projects Prepared by Douglas Graham & Pat Mc Kenzie
More informationIndia ASEAN Cooperation
Moving Forward with ASEAN-INDIA Connectivity it Financing and Supporting Mechanism: Views from Exim Bank November 27, 2013 Bangkok India ASEAN Cooperation ASEAN is the second-largest trade partner of India
More informationImplementation of the Sendai Framework in Australia. Julie Edwards Emergency Management Australia (EMA) Attorney-General s Department (AGD
Implementation of the Sendai Framework in Australia Julie Edwards Emergency Management Australia (EMA) Attorney-General s Department (AGD Sendai Framework Sendai terminology Disaster risk reduction Disaster
More informationIndonesia National Health Accounts 2016 Presented in INAHEA 5 th Conference Jakarta, 31 October 2 November 2018
Indonesia National Health Accounts 2016 Presented in INAHEA 5 th Conference Jakarta, 31 October 2 November 2018 Total Area (km 2 ) = 1,913,578.68 Number of Islands = 17,504 Indonesia in Brief Population
More informationDevelopment Partners Disbursement Report
Ministry of Finance Democratic Republic of Timor Leste Development Partners Disbursement Report Calendar Year 2009 National Directorate of Aid Effectiveness 1 Contents Overview... 3 Development Partners
More informationPROJECT APPRAISAL DOCUMENT ON A PROPOSED GRANT IN THE AMOUNT OF US $50 MILLION TO THE REPUBLIC OF INDONESIA FOR THE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank PROJECT APPRAISAL DOCUMENT ON A PROPOSED GRANT IN THE AMOUNT
More informationInsurTech: current trends and challenges
MGIMO University InsurTech: current trends and challenges Elena Nebolsina, PhD, Associate Professor Insurtech will lead to more change in the insurance industry in the next ten to fifteen years than it
More informationFriday, 4 June Distinguished Co-Chairs, Distinguished Delegates, Ladies and Gentlemen,
Statement by Nikhil Seth, Director, Office for ECOSOC Support and Coordination, UNDESA, at an informal meeting of the General Assembly on strengthening the system-wide funding architecture of UN operational
More informationDisaster budgeting of Banda Aceh s local government: Trends and analysis of post-tsunami Aceh 2004
IOP Conference Series: Earth and Environmental Science PAPER OPEN ACCESS Disaster budgeting of Banda Aceh s local government: Trends and analysis of post-tsunami Aceh 2004 To cite this article: R S Oktari
More information2010 DAC REPORT ON MULTILATERAL AID
2010 DAC REPORT ON MULTILATERAL AID EXECUTIVE SUMMARY This second DAC Report on Multilateral Aid covers recent trends in multilateral aid and total use (core and non-core) of the multilateral system, with
More informationNOTE BY THE DIRECTOR-GENERAL SUMMARY OF NOMINATIONS FOR EXTERNAL AUDITOR OF THE OPCW
OPCW Conference of the States Parties Tenth Session C-10/DG.8 7 11 November 2005 25 October 2005 Original: ENGLISH NOTE BY THE DIRECTOR-GENERAL SUMMARY OF NOMINATIONS FOR EXTERNAL AUDITOR OF THE OPCW 1.
More informationFinancing ASP Fiji s Case TC Winston in 2016
Financing ASP Fiji s Case TC Winston in 2016 Financial Tools and Approaches for Shock-responsive Safety Nets Rupeni Fatiaki Director of the Department of Social Welfare Ministry of Social Welfare, Women
More informationSendai Cooperation Initiative for Disaster Risk Reduction
Sendai Cooperation Initiative for Disaster Risk Reduction March 14, 2015 Disasters are a threat to which human being has long been exposed. A disaster deprives people of their lives instantly and afflicts
More informationTable-1: Overall Cost of the Flood
EXECUTIVE SUMMARY Preliminary Damage and Needs Assessment Disaster Overview 1. Pakistan experienced extraordinary rainfall in mid-july 2010, which continued until September 2010. The result was unprecedented
More informationCountry brief. Zimbabwe. Zimbabwe progress on development cooperation. Eleanor Maeresera Policy Officer responsible for Development Aid at AFRODAD
Country brief Zimbabwe Eleanor Maeresera Policy Officer responsible for Development Aid at AFRODAD Zimbabwe progress on development cooperation October 2014 Contacts: eleanor@afrodad.co.zw / eleanormaeresera@gmail.com
More informationPalu, Indonesia. Local progress report on the implementation of the Hyogo Framework for Action ( )
Palu, Indonesia Local progress report on the implementation of the Hyogo Framework for Action (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical Support Consultant
More informationPrinciples for the Design of the International Financing Facility for Education (IFFEd)
1 Principles for the Design of the International Financing Facility for Education (IFFEd) Introduction There is an urgent need for action to address the education and learning crisis confronting us. Analysis
More informationCOUNTRY PAPER - CAMBODIA
COUNTRY PAPER - CAMBODIA Khin Song 1 September 2009 1 Deputy Director General, National Institute of Statistics, Cambodia I. BACKGROUND Since 1979, Cambodia had adopted a decentralized statistical structure.
More informationAS A SHARE OF THE ECONOMY AND THE BUDGET, U.S. DEVELOPMENT AND HUMANITARIAN AID WOULD DROP TO POST-WWII LOWS IN 2002.
820 First Street, NE, Suite 510, Washington, DC 20002 Tel: 202-408-1080 Fax: 202-408-1056 center@cbpp.org http://www.cbpp.org June 18, 2001 AS A SHARE OF THE ECONOMY AND THE BUDGET, U.S. DEVELOPMENT AND
More informationStatement of the Asian Development Bank s Operations in 2017
February 208 Statement of the Asian Development Bank s Operations in 207 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 20. I. OVERVIEW OF OPERATIONS.
More informationPublic Financial Management (PFMx)
Public Financial Management (PFMx) Module 13 Management and Coordination of Donor Funding This training material is the property of the International Monetary Fund (IMF) and is intended for use in IMF
More informationPlanning, Budgeting and Financing
English Version Planning, Budgeting and Financing Post-Disaster Recovery and Reconstruction Activities in Khammouane Province, Lao PDR Developed under the Khammouane Development Project (KDP), Implemented
More informationFinancial information of. THE CANADIAN RED CROSS SOCIETY Asian Earthquake and Tsunami Fund Haiti Earthquake Fund
Financial information of THE CANADIAN RED CROSS SOCIETY March 31, 2012 Deloitte & Touche LLP 800-100 Queen Street Ottawa ON K1P 5T8 Canada Tel: (613) 236 2442 Fax: (613) 236 2195 www.deloitte.ca Independent
More informationEx-Post Project Evaluation 2011: Package IV -2. (Indonesia, Thailand, Mongol)
Ex-Post Project Evaluation 2011: Package IV -2 (Indonesia, Thailand, Mongol) December 2012 JAPAN INTERNATIONAL COOPERATION AGENCY FOUNDATION FOR ADVANCED STUDIES ON INTERNATIONAL DEVELOPMENT (FASID) EV
More informationSoutheast Asia Disaster Risk Insurance Facility
Southeast Asia Disaster Risk Insurance Facility PROTECT THE GREATEST HOME OF ALL: OUR COUNTRIES SEADRIF is a regional platform to provide ASEAN countries with financial solutions and technical advice to
More informationRussia's Multilateral Aid Practice. Anna Abalkina
Russia's Multilateral Aid Practice Anna Abalkina Russia as a multilateral donor Legal framework Old Concept of Russia's participation in international development assistance (2007) stated the importance
More informationSUPPORTING INFRASTRUCTURE DEVELOPMENT IN ASEAN ECONOMIES: THE ACCESS TO RISK MITIGATION INSTRUMENTS. Knut Gummert, OECD Southeast Asia Division
SUPPORTING INFRASTRUCTURE DEVELOPMENT IN ASEAN ECONOMIES: THE ACCESS TO RISK MITIGATION INSTRUMENTS Knut Gummert, OECD Southeast Asia Division UNESCAP EGM meeting 25 November 2015 Outline i. OECD projects
More informationRussia's Multilateral Aid
Russia's Multilateral Aid Bilateral and multilateral sources of development finance: evidence from Russia Anna Abalkina 31 October-1 November, Tokyo 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
More informationWEST BANK AND GAZA STRIP
WEST BANK AND GAZA STRIP SWA COLLABORATIVE BEHAVIOURS: COUNTRY PROFILES 2017 An introduction to the profiles In 2014, the Sanitation and Water for All (SWA) global partnership identified four Collaborative
More informationECHO.C - Resources, Partnerships and Operational Support C/2 - Budget, External Audit, Informatics VADEMECUM. Update April 2011
EUROPEAN COMMISSION DIRECTORATE-GENERAL HUMANITARIAN AID AND CIVIL PROTECTION - ECHO ECHO.C - Resources, Partnerships and Operational Support C/2 - Budget, External Audit, Informatics EDRIS 1 APPLICATION
More informationDonor Government Funding for Family Planning in 2016
REPORT Donor Government Funding for Family Planning in 2016 December 2017 Prepared by: Eric Lief Consultant and Adam Wexler and Jen Kates Kaiser Family Foundation Donor government funding for family planning
More information