1 EXECUTIVE SUMMARY Preliminary Damage and Needs Assessment Disaster Overview 1. Pakistan experienced extraordinary rainfall in mid-july 2010, which continued until September The result was unprecedented floods affecting the entire length of the country. The floods have been assessed to be the worst since According to the National Disaster Management Authority (NDMA) the rains/floods have affected over 20 million people. Additionally, flash floods and landslides triggered by the rain caused severe damage to infrastructure in the affected areas. Entire villages have been washed away, urban centers have been flooded, homes have been destroyed, and thousands of acres of crops and agricultural lands have been damaged with major soil erosion happening in some areas. 2. The overall recovery and reconstruction cost associated with the floods is estimated at approximately US$ 8.74 billion to billion 1, which includes estimated costs for relief, early recovery, and medium- to long-term reconstruction (Table 1). Table-1: Overall Cost of the Flood 3. This report focuses on an assessment of damage and medium- to long-term reconstruction costs. It has a companion report entitled "Pakistan Floods Emergency Response Plan", which has been prepared by the United Nations. These two reports have been coordinated to ensure consistency and facilitate coordination. About the Damage and Needs Assessment Objective 4. In the wake of the floods, the Government of Pakistan requested ADB and WB to lead the Damage and Needs Assessment (DNA) and the One UN to lead the Early Recovery Needs Assessment in parallel. The DNA assesses the extent of the damage and the required needs for rehabilitation and reconstruction of the damaged assets and infrastructure; and restoration of livelihoods and economic productivity. 5. The objective of the DNA is: "To provide the strategic underpinnings for medium- to long-term postfloods reconstruction, recovery planning, prioritization, and programming" 6. This report represents a quantification and validation of physical damage and presents sector level 1 Overall costs are presented as a range since reconstruction cost has multiple options 2 Relief, Early Recovery and Relief/Early Recovery estimates are from UN's Pakistan Floods Emergency Response Plan 3 Reconstruction costs range from low to high cost options 13

2 Pakistan Floods 2010 recovery and reconstruction strategies in respect of public and private infrastructure, services, and livelihoods. The quantification of corresponding needs is then done with reference to these two points, i.e. damage and sector level reconstruction strategies. Scope 7. The DNA focuses on medium- to long-term reconstruction and provides the guiding principles for recovery. An assessment of the damage and reconstruction strategies for each sector are provided in the detailed sector assessments. 8. With respect to financial costs the DNA has been generated against three assessment categories: Direct Damage refers to the monetary value of the completely or partially destroyed assets, such as social, physical and economic infrastructure immediately following a disaster. Wherever possible, the direct damage for assets is assessed in "as was" condition, i.e. at their book values; Indirect Losses are income losses, and comprise both the change of flow of goods and services and other economic flows such as increased expenses, curtailed production and diminished revenue, which arise from the direct damage to production capacity and social and economic infrastructure; Reconstruction Costs measure the cost of rebuilding lost assets and restoring lost services. It is generally assessed as the replacement cost with a premium added for building back smarter. Sectors 9. The seventeen sectors covered in this DNA can be broken down into four categories: (i) cross-cutting; (ii) social infrastructure; (iii) physical infrastructure; (iv) economic sectors. Table-2: Breakdown of Sectors Methodology 10. ADB and WB DNA core teams coordinated the assessment with the Economic Affairs Division, Planning Commission and National Disaster Management Authority at the federal level, and with the provincial/state/fata Planning and Development Departments and Disaster Management Authorities (or equivalents). Data collection for the DNA focused on secondary data available through various sources that primarily include the relevant provincial and district government departments. Data from district and tehsil level was collected by the government and verified and validated by the DNA sector teams. Under the DNA methodology, all secondary data received was closely scrutinized through var- 14

3 ious analyses, including statistical tools, rationality and plausibility checks and damage analysis across sectors. The data received by the DNA sector teams were validated through a number of measures including: field damage inspection visits by sector teams; interviews with stakeholders; desk review; satellite imagery and GIS data comparisons; and other plausibility checks. Based on the above, analytical work was undertaken by sector teams for a comparative pre- and post-disaster assessment of the infrastructure and services affected. Coordination 11. The DNA team, led by the World Bank and the Asian Development Bank, were supported by the One UN, and also by bilateral donors. GFDRR provided financial support as well as technical experts for satellite image analysis, DNA framework development, trainings and so on. Report Overview 12. The report consists of preliminary sections that contextualize the disaster by describing the background to the 2010 floods as well as Pakistan's social and economic context. The report then introduces guiding principles for reconstruction and explains in greater detail the methodology used to conduct the assessment. Next, the macro-economic impact of the floods is presented followed by a summary of the damage and needs for each sector. The report also suggests governance and institutional arrangements for implementing the reconstruction program along with an overview of cross-cutting approaches that should be taken into consideration, including social and environmental aspects, and disaster risk management and climate change considerations. The detailed sector analyses can be found in the annexes to this report. Each sector analysis gives a breakdown of damage and needs for each province as well as outlining sector-specific strategies for reconstruction. Summary Table of Total Damage and Reconstruction Needs 13. This report presents estimates for: (i) direct damage and indirect losses, estimated at approximately PKR 855 billion; and (ii) the cost of reconstruction needs ranging from PKR 578 billion (base case option) to 758 billion (recommended option). 14. The direct damage caused by the floods is estimated at PKR 552 billion (US$ 6.5 billion) while indirect losses amount to PKR 303 billion (US$ 3.6 billion). The agriculture, livestock and fisheries sector suffered the highest damages, calculated at PKR 429 billion (US$ 5.0 billion). Table 3 provides the detailed breakdown of the damage costs. 15. Total reconstruction cost is provided across the range of three options with option one as the base case and option three as the recommended option. The reconstruction cost for the base case is estimated at PKR 578 billion (US$ 6.8 billion) while for the recommended option costs are estimated at PKR 758 billion (US$ 8.9 billion). Table 4 provides the detailed breakdown of the reconstruction costs. - Preliminary Damage and Needs Assessment 15

4 Pakistan Floods 2010 Table-3: Estimate of Total Damage Costs by Sector 16

5 Preliminary Damage and Needs Assessment Table-4: Estimate of Total Reconstruction Costs by Sector 17

6 Pakistan Floods 2010 Table 5 below provides the breakdown of aforementioned costs into "physical reconstruction and procurable items" and "soft components". Table-5: Breakdown of Total Reconstruction Costs by Category * Soft components are an integral part of physical reconstruction and both need to be implemented together 18

7 Preliminary Damage and Needs Assessment Notes: a/ Private Sector & Industries : Enterprise Development Fund, cash subsidies, business restoration facilitation b/ Financial Sector : Partial credit guarantees / risk sharing facilities; re-scheduling of existing loans with interest rate subsidies; and refinancing line for liquidity support c/ Social Protection & Livelihoods : Livelihood support grants to the severely affected households for a period of 6 months 16. A breakdown of estimated damage and reconstruction costs by province/region is presented in Table 6. Table-6: Estimated Damage and Reconstruction Costs by Province/Area A. BACKGROUND OF THE 2010 FLOODS Overview 17. Over the course of the monsoon season in July and August 2010, Pakistan experienced the worst floods recorded in its history. Heavy rainfall caused flash and riverine floods in the north and north-western regions of Pakistan (parts of Khyber Pakhtunhwa [KP], Gilgit Baltistan [GB], Balochistan, and Azad Jammu and Kashmir [AJK]) that combined to create a moving body of water equal in dimension to the land mass of the United Kingdom travelling southwards. 18. The high-intensity rainfall in KP generated unprecedented flood peaks in the Swat River. 4 These floods severely damaged the Amandara Headworks and washed away the Munda Headworks, both major irrigation structures. 5 The combined flow of the Swat and Kabul Rivers generated another unprecedented flood peak at Nowshera town, causing severe damage. The flood waters travelled downstream through the barrages in Punjab and Sindh until they reached the Arabian Sea downstream of Kotri Barrage. Extreme high floods were recorded at the Chasma and Taunsa Barrages, and a near historic flood peak was also recorded at the Kotri Barrage. 4 The one-day rainfall recorded in KP on 29 July varied from 21 to 280 mm; on 30 July, 274 mm of rain was recorded in Peshawar. 5 A flood peak of 270,000 ft 3 sec-1 was recorded at Amandara and 300,000 ft 3 sec-1 at Munda Headworks. 19

Developing a Disaster Insurance Framework for Pakistan

Developing a Disaster Insurance Framework for Pakistan Developing a Disaster Insurance Framework for Pakistan Fund Design Options RECURRING NATURAL HAZARDS ERODE RESILIENCE A NATIONAL DISASTER INSURANCE FUND TO SUPPORT VULNERABLE LOW-INCOME PEOPLE The people

More information

Independent Auditor s Report

Independent Auditor s Report International Federation of Red Cross and Red Crescent Societies (IFRC), Geneva Independent Auditor s Report On the IFRC s Financial Statements for the Pakistan Monsoon Floods Emergency Appeal (MDRPK006)

More information

2011 PAKISTAN FLOODS

2011 PAKISTAN FLOODS Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 84606 2011 PAKISTAN FLOODS Preliminary Damage and Needs Assessment 2011 PAKISTAN FLOODS

More information

SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) 1. Sector Performance, Problems, and Opportunities National Disaster Risk Management Fund (RRP PAK 50316) SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) A. Sector Road Map 1. Sector Performance, Problems, and Opportunities a. Performance

More information

Independent Auditor s Report

Independent Auditor s Report International Federation of Red Cross and Red Crescent Societies (IFRC), Geneva Independent Auditor s Report On the IFRC s Financial Statements for the Pakistan Monsoon Floods Emergency Appeal (MDRPK006)

More information

Planning, Budgeting and Financing

Planning, Budgeting and Financing English Version Planning, Budgeting and Financing Post-Disaster Recovery and Reconstruction Activities in Khammouane Province, Lao PDR Developed under the Khammouane Development Project (KDP), Implemented

More information

OFFICIAL -1 L(-L DOCUMENTS. Between. and

OFFICIAL -1 L(-L DOCUMENTS. Between. and Public Disclosure Authorized OFFICIAL -1 L(-L DOCUMENTS ADDENDUM No 2 TO ADMINISTRATION AGREEMENT Between Public Disclosure Authorized Public Disclosure Authorized the EUROPEAN UNION (represented by the

More information

OFFICIAL DOCUMENTS. The World Bank. Public Disclosure Authorized. Public Disclosure Authorized

OFFICIAL DOCUMENTS. The World Bank. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized OFFICIAL DOCUMENTS The World Bank 1818 H Street N.W. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL

More information

GDLN Seminar on Disaster Risk Management in East Asia and the Pacific series - Summary of April 1, 2010 Video Conference

GDLN Seminar on Disaster Risk Management in East Asia and the Pacific series - Summary of April 1, 2010 Video Conference GDLN Seminar on Disaster Risk Management in East Asia and the Pacific - 2010 series - Summary of April 1, 2010 Video Conference Conducting Post-disaster Damage and Needs Assessments (PDNAs) Speakers: Mr.

More information

How to Estimate Post-Disaster Recovery and Reconstruction Needs

How to Estimate Post-Disaster Recovery and Reconstruction Needs How to Estimate Post-Disaster Recovery and Reconstruction Needs Using the UN-ECLAC Methodology For Assessment of Damage, Losses and Needs J. Roberto Jovel Contents 1. Introduction 2. Conceptual Framework

More information

Earthquake 2005 Recovery and Reconstruction

Earthquake 2005 Recovery and Reconstruction Earthquake 2005 Recovery and Reconstruction 2 Earthquake 8 Oct 2005 Nine Districts 1. MANSHERA 2. BATAGRAM 3. SHANGLA 4. ABBOTTABAD 5. KOHISTAN Epicentre 6. MUZAFFARABAD 7. NELUM 8. BAGH 9. RAWALAKOT Depth:

More information

Close: 3 July 2017 STATE OF CITY FINANCES 2018 DANGA MUGHOGHO 20 JUNE Danga Mughogho State of City Finances

Close: 3 July 2017 STATE OF CITY FINANCES 2018 DANGA MUGHOGHO 20 JUNE Danga Mughogho State of City Finances STATE OF CITY FINANCES 2018 DANGA MUGHOGHO 20 JUNE 2017 Close: 3 July 2017 Page 1 of 6 Contents Close: 3 July 2017... 1 Contents... 2 Introduction... 3 Background... 3 Chapter Heading... 3 Chapter Background...

More information

Health Budget and Expenditure Analysis ( to ) Health Consolidated National (Federal) & Sub National (Provinces and Regions)

Health Budget and Expenditure Analysis ( to ) Health Consolidated National (Federal) & Sub National (Provinces and Regions) Health and Expenditure Analysis (2008 09 to 2012 13) Health Consolidated National (Federal) & Sub National (Provinces and Regions) Acknowledgement TRF acknowledges the cooperation and support of the Health

More information

Dr. Joseph A. Weinstock Asian Development Bank

Dr. Joseph A. Weinstock Asian Development Bank New Directions of Asian Development Bank in Reducing Disaster Risk Dr. Joseph A. Weinstock Asian Development Bank January 20, 2005 Kobe, Japan Global Disasters 1974 2003: People Affected Region Mean Annual

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA5305. Project Name. Parent Project Name. Region Country Sector(s) Theme(s)

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA5305. Project Name. Parent Project Name. Region Country Sector(s) Theme(s) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Parent Project Name Region Country Sector(s) Theme(s) Lending Instrument

More information

National Disaster Recovery Framework: Malawi

National Disaster Recovery Framework: Malawi International Recovery Forum 26 January, 2016 Kobe, Japan Stern Kita Principal Mitigation Officer, Department of Disaster Management Affairs, Office of the Vice President, Malawi COUNTRY PROFILE Population

More information

MDTF Financing Strategy: A Proposal

MDTF Financing Strategy: A Proposal MDTF Financing Strategy: A Proposal Introduction An important function of the Steering Committee (SC) of the Multi-Donor Trust Fund (MDTF) for Khyber Pakhtunkhwa, FATA and Balochistan is to endorse the

More information

SUSTAINABLE URBAN DEVELOPMENT AND SPECIAL ECONOMIC ZONES (SEZs): CONSIDERATIONS FOR CHINA PAKISTAN ECONOMIC CORRIDOR BY

SUSTAINABLE URBAN DEVELOPMENT AND SPECIAL ECONOMIC ZONES (SEZs): CONSIDERATIONS FOR CHINA PAKISTAN ECONOMIC CORRIDOR BY SUSTAINABLE URBAN DEVELOPMENT AND SPECIAL ECONOMIC ZONES (SEZs): CONSIDERATIONS FOR CHINA PAKISTAN ECONOMIC CORRIDOR BY Mr. Adnan Khan, Ms. Numra Asif, Dr. Saleem Janjua Background Industrialisation plays

More information

PRODUCTIVE SECTOR MANUFACTURING PDNA GUIDELINES VOLUME B

PRODUCTIVE SECTOR MANUFACTURING PDNA GUIDELINES VOLUME B PRODUCTIVE SECTOR MANUFACTURING PDNA GUIDELINES VOLUME B 2 MANUFACTURE CONTENTS n INTRODUCTION 4 n ASSESSMENT PROCESS 5 n PRE-DISASTER SITUATION 6 n FIELD VISITS FOR POST-DISASTER DATA COLLECTION 6 n ESTIMATING

More information

Bone Bolango, Indonesia

Bone Bolango, Indonesia Bone Bolango, Indonesia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical

More information

Padang Lawas, Indonesia

Padang Lawas, Indonesia Padang Lawas, Indonesia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical

More information

People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project

People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project Validation Report Reference Number: PVR-462 Project Number: 42496-013 Loan Number: 2508 December 2016 People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project Independent

More information

Patika, Pakistan. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (First Cycle)

Patika, Pakistan. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (First Cycle) Patika, Pakistan Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (First Cycle) Name of focal point: Habib Mughal Organization: UN-HABITAT - Pakistan Title/Position:

More information

Flood Risk Assessment Insuring An Emerging CAT

Flood Risk Assessment Insuring An Emerging CAT Flood Risk Assessment Insuring An Emerging CAT Vijay Manghnani Analytics and Exposure Officer Chartis Insurance Antitrust Notice The Casualty Actuarial Society is committed to adhering strictly to the

More information

Palu, Indonesia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )

Palu, Indonesia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( ) Palu, Indonesia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical

More information

Nutritionspecific. Nutritionsensitive. Total 2,001,928, ,011,649,

Nutritionspecific. Nutritionsensitive. Total 2,001,928, ,011,649, NUTRITION INVESTMENT SNAPSHOT: PAKISTAN INDONESIA SUMMARY TABLE Pakistan s budgetary structure is aggregated at the level. This means that each budget line item represents a. With this information, the

More information

Mournag, Tunisia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )

Mournag, Tunisia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( ) Mournag, Tunisia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Kamal Alelwy Organization: La ville de Mournag Title/Position:

More information

Impacts from the July 8, 2013 Storm Event on the City of Toronto

Impacts from the July 8, 2013 Storm Event on the City of Toronto STAFF REPORT ACTION REQUIRED Impacts from the July 8, 2013 Storm Event on the City of Toronto Date: September 10, 2013 To: From: Wards: Executive Committee City Manager All Reference Number: SUMMARY The

More information

Beirut, Lebanon. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )

Beirut, Lebanon. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( ) Beirut, Lebanon Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Bilal Hamad Organization: - Title/Position: - E-mail address:

More information

EAP DRM KnowledgeNotes Disaster Risk Management in East Asia and the Pacific

EAP DRM KnowledgeNotes Disaster Risk Management in East Asia and the Pacific Public Disclosure Authorized Public Disclosure Authorized Photos.com Public Disclosure Authorized Public Disclosure Authorized EAP DRM KnowledgeNotes Disaster Risk Management in East Asia and the Pacific

More information

Skardu, Pakistan. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (First Cycle)

Skardu, Pakistan. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (First Cycle) Skardu, Pakistan Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (First Cycle) Name of focal point: Habib Mughal Organization: UN-HABITAT - Pakistan Title/Position:

More information

Birgunj Sub metropolitan City, Nepal

Birgunj Sub metropolitan City, Nepal Birgunj Sub metropolitan City, Nepal Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: - - Organization: - Title/Position: -

More information

Pidie Jaya, Indonesia

Pidie Jaya, Indonesia Pidie Jaya, Indonesia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical

More information

A Comprehensive Report on Flood Relief Work Undertaken at Corbett By The Corbett Foundation

A Comprehensive Report on Flood Relief Work Undertaken at Corbett By The Corbett Foundation A Comprehensive Report on Flood Relief Work Undertaken at Corbett By The Corbett Foundation Report submitted to the Ten Dollar Club Flood Relief Work at Corbett Interim Relief Work This monsoon, the heavy

More information

Multi Donor Trust Fund For KP, FATA, & Balochistan

Multi Donor Trust Fund For KP, FATA, & Balochistan Multi Donor Trust Fund For KP, FATA, & Balochistan Multi-Donor Trust Fund for Khyber Pakhtunkhwa, Federally-Administered Tribal Areas & Balochistan OVERVIEW The overall objective of the MDTF is to support

More information

Pakistan s Citizens Damage Compensation Program (CDCP)

Pakistan s Citizens Damage Compensation Program (CDCP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Pakistan s Citizens Damage Compensation Program (CDCP) CASE STUDY June 2013 PAKISTAN

More information

Session 4 Status of Climate Finance in the Philippines

Session 4 Status of Climate Finance in the Philippines Session 4 Status of Climate Finance in the Philippines Workshop on Corruption Risks and Anti- Corruption Strategies in Climate Finance Manila, Philippines 25 to 27 May 2015 Summary of Day 1 2 Session objective

More information

Copyright 2017 United Nations Development Programme in Pakistan. The statistics used in this report were provided by the Government of Pakistan.

Copyright 2017 United Nations Development Programme in Pakistan. The statistics used in this report were provided by the Government of Pakistan. Copyright 2017 United Nations Development Programme in Pakistan The statistics used in this report were provided by the Government of Pakistan. www.pk.undp.org United Nations Development Programme Pakistan

More information

ODA and ODA Loans at a Glance

ODA and ODA Loans at a Glance ODA and ODA Loans at a Glance This chapter provides essential information on Japan s official development assistance (ODA) and ODA loans. What is ODA? Official development assistance (ODA) is the assistance

More information

SPECIFIC TERMS OF REFERENCE. EU contribution to 2012 Federal PEFA assessment in Pakistan

SPECIFIC TERMS OF REFERENCE. EU contribution to 2012 Federal PEFA assessment in Pakistan SPECIFIC TERMS OF REFERENCE EU contribution to 2012 Federal PEFA assessment in Pakistan FWC BENEFICIARIES 2009 - LOT 11: Macro economy, Statistics and Public finance management DCI-ASIE/2011/277245/1 1

More information

DRAFT REPORT. EN United in diversity EN 2014/2161(BUD)

DRAFT REPORT. EN United in diversity EN 2014/2161(BUD) EUROPEAN PARLIAMT 2014-2019 Committee on Budgets 22.10.2014 2014/2161(BUD) DRAFT REPORT on the proposal for a decision of the European Parliament and of the Council on the mobilisation of the European

More information

Sri Lanka: Preliminary Damage and Needs Assessment Page 25 of 29

Sri Lanka: Preliminary Damage and Needs Assessment Page 25 of 29 Sri Lanka: Preliminary Damage and Needs Assessment Page 25 of 29 F. IMMEDIATE AND MEDIUM TERM RECOVERY STRATEGY Implementation Approach 75. One of the main challenges of developing a comprehensive, as

More information

Loss and Damage Associated with Climate Change Impacts The (possible) role of Disaster Risk Financing and Insurance

Loss and Damage Associated with Climate Change Impacts The (possible) role of Disaster Risk Financing and Insurance UNFCC regional expert meeting on loss and damage August 27 29, 2012 Bangkok, Thailand Loss and Damage Associated with Climate Change Impacts The (possible) role of Disaster Risk Financing and Insurance

More information

MoPW. Directorate of Water Resources Ministry of Public Works

MoPW. Directorate of Water Resources Ministry of Public Works Good Governance for River Basin Management Institutional and Governmental Stakeholders Case of Progo Opak Serang River Basin Territory [INDONESIA] Madrid, 26 May 2010 Sugiyanto Director of Water Resources

More information

Response from the World Bank and ADB (dated 16 December 2016) to Mekong Watch s inquiries

Response from the World Bank and ADB (dated 16 December 2016) to Mekong Watch s inquiries Response from the World Bank and ADB (dated 16 December 2016) to Mekong Watch s inquiries (dated 5 & 23 August 2016) === RE: Request for your attention on the riverbank erosion in Lao PDR s Nam Theun 2

More information

Impact of Recent Flood Disaster in District Muzaffargarh and Role of Government/NGO s in the Rehabilitation of Flood Affecties

Impact of Recent Flood Disaster in District Muzaffargarh and Role of Government/NGO s in the Rehabilitation of Flood Affecties American-Eurasian J. Agric. & Environ. Sci., 15 (11): 2312-2318, 2015 ISSN 1818-6769 IDOSI Publications, 2015 DOI: 10.5829/idosi.aejaes.2015.15.11.12673 Impact of Recent Flood Disaster in District Muzaffargarh

More information

Binjai, Indonesia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )

Binjai, Indonesia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( ) Binjai, Indonesia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical

More information

BOSNIA AND HERZEGOVINA RECOVERY NEEDS ASSESSMENT

BOSNIA AND HERZEGOVINA RECOVERY NEEDS ASSESSMENT BOSNIA AND HERZEGOVINA RECOVERY NEEDS ASSESSMENT Floods 14 19 May EXECUTIVE SUMMARY The authorities of Bosnia and Herzegovina at all levels have conducted an assessment of the post disaster recovery needs

More information

Provincial Tax Reforms Challenges and Way Forward

Provincial Tax Reforms Challenges and Way Forward Provincial Tax Reforms Challenges and Way Forward 1 Background The transition to a devolved governance structure under the 18th Amendment was to be completed by 2015. However this transition and reforms

More information

with UNDP for the Union of the Comoros 25 June 2015 NDA Strengthening & Country Programming

with UNDP for the Union of the Comoros 25 June 2015 NDA Strengthening & Country Programming with UNDP for the Union of the Comoros 25 June 2015 NDA Strengthening & Country Programming PAGE 1 OF 12 Country (or region) Executive Summary (in one page) Union of the Comoros Submission Date 29/05/2015

More information

Disaster Risk Management in the Caribbean Case Study: Rapid Damage and Loss Assessment following the 2013 Disaster

Disaster Risk Management in the Caribbean Case Study: Rapid Damage and Loss Assessment following the 2013 Disaster Belize benefits from knowledge and experiences from the PPCR Disaster Risk Management in the Caribbean Case Study: Rapid Damage and Loss Assessment following the 2013 Disaster Photo Credit: http://gov.vc

More information

November 30, Mr. Matthias Weingart Director of Cooperation Swiss Development Cooperation Office Islamabad - Pakistan House #3, Street #3, F-6/3

November 30, Mr. Matthias Weingart Director of Cooperation Swiss Development Cooperation Office Islamabad - Pakistan House #3, Street #3, F-6/3 Public Disclosure Authorized OFFICIAL DOCUMENTS The World Bank 1818 H Street N.W. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL

More information

INVESTING IN DISASTER RESILIENCE: RISK TRANSFER THROUGH FLOOD INSURANCE IN SOUTH ASIA

INVESTING IN DISASTER RESILIENCE: RISK TRANSFER THROUGH FLOOD INSURANCE IN SOUTH ASIA INVESTING IN DISASTER RESILIENCE: RISK TRANSFER THROUGH FLOOD INSURANCE IN SOUTH ASIA GIRIRAJ AMARNATH International Water Management Institute (IWMI) Photo: World Bank Workshop on Addressing Disaster

More information

Proposal Report On Flood Hazard Mapping Project in Prey Veng Province

Proposal Report On Flood Hazard Mapping Project in Prey Veng Province Proposal Report On Flood Hazard Mapping Project in Prey Veng Province Prepared by CHUM Sphy. Department of Water Resources and Meteorology Prey Veng Province Cambodia FLOOD HAZARD MAPPING TRAINING COURSE

More information

Skardu, Pakistan. Local progress report on the implementation of the Hyogo Framework for Action (First Cycle)

Skardu, Pakistan. Local progress report on the implementation of the Hyogo Framework for Action (First Cycle) Skardu, Pakistan Local progress report on the implementation of the Hyogo Framework for Action (First Cycle) Name of focal point: Habib Mughal Organization: UN-HABITAT - Pakistan Title/Position: Manager

More information

Conditionality in the World Bank s Development Policy Lending. Background for IDA Consultations, July 2007

Conditionality in the World Bank s Development Policy Lending. Background for IDA Consultations, July 2007 Conditionality in the World Bank s Development Policy Lending Background for IDA Consultations, July 2007 2005 Conditionality Review In October 2004, the Development Committee (a ministerial advisory forum

More information

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized R E S T R I C T E D This report was prepared for use within the Bank. In making it available

More information

Flood Risk Valuation Flood Model Evaluation and Risk Pricing Evaluation

Flood Risk Valuation Flood Model Evaluation and Risk Pricing Evaluation Flood Risk Valuation Flood Model Evaluation and Risk Pricing Evaluation February 26, 2019 Joseph Becker Natural Hazards/Geosciences Group 203.229.8832 joseph.f.becker@guycarp.com GUY CARPENTER Macro forces

More information

Batam, Indonesia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )

Batam, Indonesia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( ) Batam, Indonesia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical

More information

Analysis of Federal, Provincial and District Budgets to

Analysis of Federal, Provincial and District Budgets to Analysis of Federal, Provincial and District Budgets 2010-11 to 2015-16 Public Financing of Education in Pakistan Analysis of Federal, Provincial and District Budgets 2010-11 to 2015-16 Public Financing

More information

TERMINOLOGY. What is Climate risk insurance? What is Disaster risk insurance?

TERMINOLOGY. What is Climate risk insurance? What is Disaster risk insurance? TERMINOLOGY What is Climate risk insurance? Climate risk insurance describes a suite of instruments for financial risk transfer that provides protection against risks arising from extreme weather events

More information

PRODUCTIVE SECTOR COMMERCE PDNA GUIDELINES VOLUME B

PRODUCTIVE SECTOR COMMERCE PDNA GUIDELINES VOLUME B PRODUCTIVE SECTOR COMMERCE PDNA GUIDELINES VOLUME B 2 COMMERCE CONTENTS n INTRODUCTION 2 n ASSESSMENT PROCESS 3 n PRE-DISASTER SITUATION 4 n FIELD VISITS FOR POST-DISASTER DATA COLLECTION 5 n ESTIMATION

More information

Disaster Risk Management

Disaster Risk Management Public Disclosure Authorized THE WORLD BANK & Climate Change Unit South Asia Sustainable Development Department Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report

More information

Disaster Management The

Disaster Management The Disaster Management The UKRAINIAN Agricultural AGRICULTURAL Dimension WEATHER Global Facility for RISK Disaster MANAGEMENT Recovery and Reduction Seminar Series February 20, 2007 WORLD BANK COMMODITY RISK

More information

Impacts of severe flood events in Central Viet Nam: Toward integrated flood risk management

Impacts of severe flood events in Central Viet Nam: Toward integrated flood risk management Impacts of severe flood events in Central Viet Nam: Toward integrated flood risk management Bui Duc Tinh, Tran Huu Tuan, Phong Tran College of Economics, Hue University Viet Nam 1. Research problem 2.

More information

Policy Implementation for Enhancing Community. Resilience in Malawi

Policy Implementation for Enhancing Community. Resilience in Malawi Volume 10 Issue 1 May 2014 Status of Policy Implementation for Enhancing Community Resilience in Malawi Policy Brief ECRP and DISCOVER Disclaimer This policy brief has been financed by United Kingdom (UK)

More information

Emergency Plan of Action (EPoA) Pakistan: Monsoon Floods 2014

Emergency Plan of Action (EPoA) Pakistan: Monsoon Floods 2014 Emergency Plan of Action (EPoA) Pakistan: Monsoon Floods 2014 DREF Operation MDRPK010 Glide n FL-2014-000122-PAK Date of issue: 22 September 2014 Date of disaster: 3 September 2014 Operation manager: Shesh

More information

Scope of Work For Conducting Baseline Assessment on Investment for Flood Resilience (including Disaster Risk Reduction and Climate Change Adaptation)

Scope of Work For Conducting Baseline Assessment on Investment for Flood Resilience (including Disaster Risk Reduction and Climate Change Adaptation) Scope of Work For Conducting Baseline Assessment on Investment for Flood Resilience (including Disaster Risk Reduction and Climate Change Adaptation) 1. Introduction Mercy Corps is an international, non-governmental

More information

PROJECT BUDGET REVISION FOR APPROVAL BY THE REGIONAL DIRECTOR

PROJECT BUDGET REVISION FOR APPROVAL BY THE REGIONAL DIRECTOR PROJECT BUDGET REVISION FOR APPROVAL BY THE REGIONAL DIRECTOR 5) To: Initials In Date Out Date Reason for Delay David Kaatrud, Regional Director 4) Through: Initials In Date Out Date Reason for Delay Peter

More information

MEETING OF THE SOUTHERN AFRICA REGION FLASH FLOOD GUIDANCE SYSTEM (SARFFGS) Country Presentation for Malawi 28TH OCTOBER, 2015.

MEETING OF THE SOUTHERN AFRICA REGION FLASH FLOOD GUIDANCE SYSTEM (SARFFGS) Country Presentation for Malawi 28TH OCTOBER, 2015. MEETING OF THE SOUTHERN AFRICA REGION FLASH FLOOD GUIDANCE SYSTEM (SARFFGS) Country Presentation for Malawi 28TH OCTOBER, 2015. Outline Introduction 2 DRM Institutional Structure Disasters and development

More information

Budget Strategy Paper (I) Fiscal Year

Budget Strategy Paper (I) Fiscal Year Fiscal Year 2018-19 Finance Department Government of Khyber Pakhtunkhwa Table of Contents 1) Overview of Budget Outturn Current FY 2017-18... 1 2) Economic Outlook... 3 3) Medium Term Fiscal Framework...

More information

AGRICULTURE AND FORESTRY SECTOR

AGRICULTURE AND FORESTRY SECTOR English Version Sectoral Damage, Loss and Needs Assessment (DaLNA) in Khammouane Province, Lao PDR AGRICULTURE AND FORESTRY SECTOR Developed under the Khammouane Development Project (KDP), Implemented

More information

Gross National Product of Pakistan (at current factor cost) (Rs. Million)

Gross National Product of Pakistan (at current factor cost) (Rs. Million) Gross National Product of Pakistan (at current factor cost) (Rs. Million) S. Sectors/Sub-sectors 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 No (F) (R) (P) A. Agricultural Sector

More information

Karlstad, Sweden. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )

Karlstad, Sweden. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( ) Karlstad, Sweden Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Mayor: Ulf Nyqvist Name of focal point: -Anna -Sjödin Organization: -Karlstad Municipality

More information

NATIONAL DISASTER RISK MANAGEMENT FUND (NDRMF) PAKISTAN

NATIONAL DISASTER RISK MANAGEMENT FUND (NDRMF) PAKISTAN NATIONAL DISASTER RISK MANAGEMENT FUND (NDRMF) PAKISTAN Lt Gen Nadeem Ahmad (R) CEO NDRMF Pakistan Asian Regional Forum on Disaster Risk Finance (Sep 25-26, 2018) ADB Headquarters, Manilla, Philippines

More information

Asian Development Bank Accountability Mechanism Compliance Review Panel

Asian Development Bank Accountability Mechanism Compliance Review Panel Asian Development Bank Accountability Mechanism Compliance Review Panel Terms of Reference for Monitoring under the Chashma Right Bank Irrigation Project (Stage III) Inspection Request I. Introduction

More information

Padang Lawas, Indonesia

Padang Lawas, Indonesia Padang Lawas, Indonesia Local progress report on the implementation of the Hyogo Framework for Action (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical Support

More information

SAFETY NET PROGRAMS IN PAKISTAN

SAFETY NET PROGRAMS IN PAKISTAN SAFETY NET PROGRAMS IN PAKISTAN Introduction of main Safety Net Programs Dynamics of Program Administraion Targeting, Payment, and Financing Mechanisms Institutional Model of Pakistan s National Flagship

More information

FLOOD HAZARD AND RISK MANAGEMENT UTILIZING HYDRAULIC MODELING AND GIS TECHNOLOGIES IN URBAN ENVIRONMENT

FLOOD HAZARD AND RISK MANAGEMENT UTILIZING HYDRAULIC MODELING AND GIS TECHNOLOGIES IN URBAN ENVIRONMENT Proceedings of the 14 th International Conference on Environmental Science and Technology Rhodes, Greece, 3-5 September 2015 FLOOD HAZARD AND RISK MANAGEMENT UTILIZING HYDRAULIC MODELING AND GIS TECHNOLOGIES

More information

Disaster Risk Management

Disaster Risk Management Disaster Risk Management Managing The Impacts of Extreme Weather and Climate Events Workshop on Climate Change and Disaster Risk Management in Planning and Investment Projects Session 8: Climate Change

More information

Information Sharing Event on Work Program for Loss and Damage

Information Sharing Event on Work Program for Loss and Damage Information Sharing Event on Work Program for Loss and Damage Contribution from the World Bank Kanta Kumari Rigaud Lead Adaptation & PPCR Coordinator World Bank June 7, 2011 Bonn World Bank Approach to

More information

Innovating to Reduce Risk

Innovating to Reduce Risk E X E C U T I V E S U M M A R Y Innovating to Reduce Risk This publication is driven by input provided by the disaster risk community. The Global Facility of Disaster Risk and Recovery facilitated the

More information

Palu, Indonesia. Local progress report on the implementation of the Hyogo Framework for Action ( )

Palu, Indonesia. Local progress report on the implementation of the Hyogo Framework for Action ( ) Palu, Indonesia Local progress report on the implementation of the Hyogo Framework for Action (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical Support Consultant

More information

Sendai Cooperation Initiative for Disaster Risk Reduction

Sendai Cooperation Initiative for Disaster Risk Reduction Sendai Cooperation Initiative for Disaster Risk Reduction March 14, 2015 Disasters are a threat to which human being has long been exposed. A disaster deprives people of their lives instantly and afflicts

More information

Country Practice Area(Lead) Additional Financing Pakistan Governance P130941,P130941,P152586

Country Practice Area(Lead) Additional Financing Pakistan Governance P130941,P130941,P152586 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020611 Public Disclosure Authorized Public Disclosure Authorized Project ID P126425 Project Name PK:

More information

Garfield County NHMP:

Garfield County NHMP: Garfield County NHMP: Introduction and Summary Hazard Identification and Risk Assessment DRAFT AUG2010 Risk assessments provide information about the geographic areas where the hazards may occur, the value

More information

in the EU A new EU legal context on the assessment and management of flood water.europa.eu Maria Brättemark, WFD Team, DG ENV.D.1, European Commission

in the EU A new EU legal context on the assessment and management of flood water.europa.eu Maria Brättemark, WFD Team, DG ENV.D.1, European Commission Setting the scene : Flood Risk Management in the EU A new EU legal context on the assessment and management of flood risks Maria Brättemark, WFD Team, DG ENV.D.1, European Commission water.europa.eu This

More information

Trade and Natural Disaster Response. Ricardo James, Charge d Affaires, Permanent Delegation of the Organization of Eastern Caribbean States (OECS)

Trade and Natural Disaster Response. Ricardo James, Charge d Affaires, Permanent Delegation of the Organization of Eastern Caribbean States (OECS) Trade and Natural Disaster Response Ricardo James, Charge d Affaires, Permanent Delegation of the Organization of Eastern Caribbean States (OECS) Natural Disaster Threats in the Caribbean Hurricanes and

More information

How to Explain and Use an Insurance Contract

How to Explain and Use an Insurance Contract How to Explain and Use an Insurance Contract Insurance contracts, in this case, are agreements between farmers and an insurance company. By signing the contract, the farmer agrees to pay a certain amount

More information

Flood Damage and Post-Flood Rehabilitation. Economic Performance in Q1/2012 and Outlook for 2012

Flood Damage and Post-Flood Rehabilitation. Economic Performance in Q1/2012 and Outlook for 2012 Presentation Outline 1 Flood Damage and Post-Flood Rehabilitation 2 Investment Plans of Strategic Committee for Reconstruction and Future Development 3 Economic Performance in Q1/2012 and Outlook for 2012

More information

Mekong River Commission

Mekong River Commission Mekong River Commission Office of the Secretariat in Phnom Penh (OSP) 576 National Road, # 2, Chak Angre Krom, P.O. Box 623, Phnom Penh, Cambodia Tel. (855-23) 425 353. Fax (855-23) 425 363 Office of the

More information

Islamic Republic of Pakistan: Update on Energy Sector Plan

Islamic Republic of Pakistan: Update on Energy Sector Plan Technical Assistance Report Project Number: 50081-001 Knowledge and Support Technical Assistance (KSTA) August 2017 Islamic Republic of Pakistan: Update on Energy Sector Plan This The views document expressed

More information

MACRO ECONOMIC IMPACT OF DISASTERS

MACRO ECONOMIC IMPACT OF DISASTERS CROSS-CUTTING SECTOR MACRO ECONOMIC IMPACT OF DISASTERS PDNA GUIDELINES VOLUME B CONTENTS n GENERAL COMMENTS 1 n MACROECONOMIC IMPACT ESTIMATION 2 GENERAL COMMENTS One of the main objectives of a post-disaster

More information

Republic of Mauritius. Official Statement for 2017 Global Platform. For Disaster Risk Reduction

Republic of Mauritius. Official Statement for 2017 Global Platform. For Disaster Risk Reduction Republic of Mauritius Official Statement for 2017 Global Platform For Disaster Risk Reduction Your Excellency the Prime Minister of the United Mexican States Your Excellency the Secretary General of the

More information

Barito Kuala, Indonesia

Barito Kuala, Indonesia Barito Kuala, Indonesia Local progress report on the implementation of the Hyogo Framework for Action (2013-2014) Name of focal point: Yusniar Nurdin Organization: BNPB Title/Position: Technical Support

More information

Rapid Response Fund Payment Request No. 05/2017

Rapid Response Fund Payment Request No. 05/2017 Rapid Response Fund Payment Request No. 05/2017 Funds Sent To: 1.Churches Action in Relief and Development (CARD) 2. Evangelical Lutheran Development Service (ELDS) Amount Sent: USD 118,239 Date: 22/02/2017

More information

Natural Disasters, Relief Aid, and Household Vulnerability in Pakistan: Evidence from a Pilot Survey in Khyber Pakhtunkhwa

Natural Disasters, Relief Aid, and Household Vulnerability in Pakistan: Evidence from a Pilot Survey in Khyber Pakhtunkhwa PRIMCED Discussion Paper Series, No. 12 Natural Disasters, Relief Aid, and Household Vulnerability in Pakistan: Evidence from a Pilot Survey in Khyber Pakhtunkhwa Takashi Kurosaki, Humayun Khan, Mir Kalan

More information

Adaptive Social Protection in Sri Lanka: Building Resilience to Disasters and Climate Change

Adaptive Social Protection in Sri Lanka: Building Resilience to Disasters and Climate Change Adaptive Social Protection in Sri Lanka: Building Resilience to Disasters and Climate Change Disaster Response and Relief in Sri Lanka Chaminda Pathiraja Director- National Disaster Relief Services Centre

More information

Mongolia The SCD-CPF Engagement meeting with development partners September 1 and 22, 2017

Mongolia The SCD-CPF Engagement meeting with development partners September 1 and 22, 2017 Mongolia The SCD-CPF Engagement meeting with development partners September 1 and, 17 This is a brief, informal summary of the issues raised during the meeting. If you were present and wish to make a correction

More information

Implementation of Water Framework and Flood Directive in Finland. Markku Maunula Finnish Environment Institute

Implementation of Water Framework and Flood Directive in Finland. Markku Maunula Finnish Environment Institute Implementation of Water Framework and Flood Directive in Finland Markku Maunula Finnish Environment Institute Finland is rich in freshwater About 11 % of surface is covered by water The number of lakes

More information