Central State University March 25 th, 2010

Size: px
Start display at page:

Download "Central State University March 25 th, 2010"

Transcription

1 Central State University March 25 th, 2010 oster Connecticut College Cornell University Dartmouth College Davidson College Drew University Drexel University Duke University Duquesne University East Stro niversity Northwestern University Nova Southeastern University Oregon Institute of Technology Oregon State University Pace university Pacific Lutheran University of Massachusetts Amherst University of Massachusetts Boston University of Massachusetts Dartmouth University of Massachusetts Lowell University of Michigan Unive

2 Sightlines profile Common vocabulary, consistent methodology, credibility through benchmarking 260+ member campuses 100+ public and 130+ private institutions Developed a useful tool based on: Common vocabulary Consistent analytical methodology Credibility through benchmarking 2

3 A vocabulary for measurement The Return on Physical Assets ROPA SM The annual investment needed to insure buildings will properly perform and reach their useful life Keep Up Costs The accumulated backlog of repair and modernization needs and the definition of resource capacity to correct them. Catch Up Costs The effectiveness of the facilities operating budget, staffing, supervision, and energy management The measure of service process, the maintenance quality of space and systems, and the customers opinion of service delivery Annual Stewardship Asset Reinvestment Operating Effectiveness Service Asset Value Change Operations Success 3

4 Central State terms with Sightlines analysis The Return on Physical Assets ROPA SM Basic Renovations Planned Maintenance Gift Grants Bond funded projects Operating Budgets Staffing reports Utility Logs Work order production Campus Inspection Service Process Customer satisfaction survey Annual Stewardship Asset Reinvestment Operating Effectiveness Service Asset Value Change Operations Success 4

5 Changes since the qualification 1. Adjusted building construction dates 2. Accounting for Dayton Campus in Density Factor 3. Adjusted developed & maintained acreage 4. Broke down Custodial & Maintenance staffing by person by building 5. Confirmed supervisory positions 6. Added infrastructure premium to the Water Department and Power Plant operating costs 7. Accounting for additional planned/preventative maintenance contracts 5

6 What s Included? 20 E&G facilities; 764,039 GSF FY09 Breakdown of Space Descriptive text goes here Excluded 32% State Supported (E&G) Included 68% Non State Suported (AUX) 6

7 Comparison Institutions Institutions Cheyney University of Pennsylvania Clarion University of Pennsylvania East Stroudsburg University of Pennsylvania Eastern Oregon University Edinboro University of Pennsylvania Fitchburg State College Lock Haven University of Pennsylvania Mansfield University of Pennsylvania Plymouth State University Shawnee State University Slippery Rock University of Pennsylvania University of Massachusetts Dartmouth Wright State University Location Cheyney, PA Clarion, PA East Stroudsburg, PA La Grande, OR Edinboro, PA Fitchburg, MA Lock Haven, PA Mansfield, PA Plymouth, NH Portsmouth, OH Slippery Rock, PA North Dartmouth, MA Dayton, OH 7

8 Core issues for Central State University I. Complexity and age of campus present additional capital & operational demands. II. Scarce availability of Keep Up dollars has left CSU with a significant Catch Up investment need. III. Effective daily operations given the campus s age and limited operating resources. IV. Strong service process lacking complementary work order system. 8

9 Comparing CSU age profile with peers Significant portion of campus rebuilt after tornado of % 70% CSU Renovation Age vs. Peers 77% 60% % of Campus GSF 50% 40% 30% 46% 20% 10% 0% 22% 19% 9% 9% 9% 5% 0 to to to % CSU Renovation Age Peer Renovation Age A major renovation is designated as a project within a building in which the total cost is over 50% of the total replacement value of the building and affects all major systems within the building. 9

10 Defining the annual investment need Significant portion of campus in Catch Up mode Age Category < 10 Years Age Category Years Age Category Over 25 Years $/GSF $60 $55 $50 $45 $40 $35 $30 $25 $20 $15 $10 $5 $0 9% 9% 82% Years Annual Life Cycle Cash Flow Amortization of Life Cycle Expenses 10

11 Technical complexity rating FY09: 3.3/5.0 Database Average: 2.99 Complexity often has a direct correlation with energy consumption, maintenance staffing, and replacement values a higher complexity often results in higher consumption, replacement costs, stewardship targets and increased operational demand. 11

12 Campus density factor FY09: 242 Users/100,000 GSF Database Average:

13 ASSET VALUE CHANGE

14 Total capital spending vs. peers Limited investment in existing space 5 Year average is $0.4/GSF less than peers. This equates to $336K annually. CENS II New Space Project spending with CENS II 14

15 Total capital spending vs. peers Limited investment in existing space 5 Year average is $3.2/GSF less than peers. This equates to $2.4M annually on existing space. CENS II New Space Project spending with CENS II 15

16 Stewardship Investment Target Defining attainable goals to manage the rate of deferral $7 FY2009 FY09 Replacement Value = $239.1M $6 $ in Millions $5 $4 $3 $2 $1 $3.6 $2.9 Life cycle is discounted for the coordination of modernization and renovation. $1.3 $1.5 $0 Total Need Target Need $6.5M Life Cycle Model $2.8M Functional Obsolescence Envelope/Mech Space/Program Sightlines Recommendations 16

17 Stewardship need Setting goals to arrest the rate of asset deterioration $4.0 Annual Investment Target, and Actual Stewardship Expenditures $3.5 $3.0 $ in Millions $2.5 $2.0 $1.5 $1.0 $1.8M $1.4M $2.5M $0.5M $2.7M $0.5 $0.0 '05 '06 '07 '08 '09 Envelope/Mech Annual Investment Target Space/Program Five year total deferral to target is $8.9M 17

18 Total stewardship spending vs. peers 18

19 Total capital spending vs. peers Mold project skews spending profile CSU 5 Year Spending Mix 12% 43% 12% 11% 22% Peer 5 Year Spending Mix 7% 13% 28% 32% 20% Envelope Infrastructure Code Systems Space Project spending drops to 50 /GSF when mold remediation is removed. 19

20 The estimated backlog of need Total Dollars (Millions) $120 $100 $80 $60 $40 $20 $0 $108.6 Central State Backlog Estimates $76.3 $55.4 CSU Campus Priority Needs $26.3 IFP Backlog Estimation Deferral to Equilibrium Ohio State System Number Internal Priority Backlog Sightlines suggested backlog estimate of CSU s State Supported Space is $76.3M 20

21 OPERATIONS SUCCESS

22 Facilities operating budget Consistently operating with a lower budget than peers You are currently spending $1.60/GSF less than peers or $1.2M annually 22

23 Breaking down the facilities operating budget Daily Service $1.18/GSF or $0.9M annually 23

24 Energy cost Regional Peers Cincinnati State Technical &CC College of Wooster Columbus State CC Lorain County CC Owens State CC The University of Dayton University of Akron University of Cincinnati Xavier University Energy Rate Cost Avoidance = $290K in FY09 24

25 Energy consumption Fossil driving consumption increases In FY07 CSU rented a summer A/C unit and lost deregulated discount. 25

26 Maintenance operations Coverage ratio reflected in inspection score +2.5 FTEs Impression/General Repair Score Central State Peers Database Avg

27 Custodial operations Keeping pace despite limited resources +5.5 FTEs Cleanliness Score Central State Peers Database Avg

28 Grounds operations Coverage levels in line Grounds Score Central State Peers Database Avg

29 Service process Current work order system impacting score Service Process Index (%) The composite score of Sightlines Service Process analysis which includes an evaluation of the service department reporting structure, scheduling process, work order system capacity, and reporting capabilities. Opportunities for improvement Implement work order system with additional capabilities Utilize these additional tracking/reporting capabilities Communicate schedules/changes in schedules to customers Solicit feedback from customers 29

30 Concluding comments The impact of an aging, complex campus: CSU s campus is significantly older than its peers with the majority of space falling in the yr age category and is also one of the more technically complex. This drives operational needs and has created a large Catch Up need. Limited capital spending: With the new construction of CENS I and CENS II the investment into existing facilities has been minimal. Several large infusions of capital are imperative in order to renovate older facilities and aggressively attack the backlog. Defining the backlog: Determining an accurate view of the backlog of need on campus, enables the campus to prioritize future and much needed Catch Up investments. Effective, yet strained operations: Given the lean resources and high backlog operations have done a commendable job. While renewing the older facilities should be given the highest priority, stay aware of the shortfall in the operating staff. Additional resources will be required to keep pace with the changing campus. The value of service: In order for a planned maintenance program to gain traction and a capital investment program to get fed the right projects to release operating costs, a better work order system is needed. Implementation of the customer satisfaction survey will provide additional perspective on the service axis and offer other opportunities for improvement. 30

31 GLOSSARY AND COMMENTS

32 Sightlines ROPA SM benchmarking definitions Age profile terminology Age Categories Less than 10 Years the honeymoon period of a building in which very few life cycles are Descriptive due. Requires text goes little to here no investment and minimal operational effort Years a time period in which small components within a building begin to reach the end of their useful lives. Require more time and investment than buildings under 10 years old, but still operate as a new building Years Post World War II buildings. These buildings were generally not built with the same quality as those prior to or after this time period. Therefore, these buildings and their components often reach the end of their useful life more quickly, and place a great strain on facilities staff. Over 50 Years a time period in which most major components of a building reach the end of their useful lives. Require a significant amount of investment and operational effort. These buildings are often completely renovated to restore them to a working condition that is consistent with today s standards. 32

33 Sightlines ROPA SM benchmarking definitions Asset Value Change terminology Annual Stewardship Total Annual Stewardship (% of target) The sum of all recurring capital funding and planned or preventative maintenance expressed as a percent of the institution s individualized annual Descriptive text goes here investment target defined by Sightlines. If total annual stewardship as a % of target is low, the campus deferral rate will be correspondingly high. Stewardship Funding by Type (% of target) The sum of all recurring capital funding and planned/preventative maintenance expressed as a percent of the institution s individualized annual investment target defined by Sightlines, broken out between percent of envelope/mechanical target funding and percent of space/programming target funded. Asset Reinvestment Asset Reinvestment Backlog ($/GSF) The accumulated maintenance/repair, modernization and infrastructure needs on campus. The Asset Reinvestment Backlog is the sum of the annual investment requirements that the institution has not kept up with or has not addressed with onetime capital. Total Project Spending ($/GSF) The sum of all Annual Stewardship and Asset Reinvestment funds spent annually renovation, planned maintenance or improvement projects. The total project spending is broken out by project package (building envelope, building systems, infrastructure, space, and code) and does not include new construction or non facilities expenditures such as technology related projects, feasibility or design studies, academic equipment, etc. 33

34 Sightlines ROPA SM benchmarking definitions Operating budget terminology Facilities Operating Budget Total ($/GSF) The Facilities Operating Budget Total benchmark analyzes the amount budgeted each year to operate campus physical assets and the department Descriptive that maintains text goes them. here The budget is broken into three different categories: o Daily Service: Materials, labor costs, service contracts, office expense, etc. associated with the regular maintenance, cleaning and grounds keeping of the campus. o Planned Maintenance: Materials, labor costs, service contracts, etc. that enhance or extend the useful life of campus buildings and components. Some examples include changing belts and filters on HVAC equipment, elevator service contracts, sprinkler and fire alarm system testing/maintenance contracts, etc. o Utilities: The procurement of utility commodities, i.e. natural gas, oil, steam, electricity, water/sewer, etc. NOTE Utilities costs do not include institutionally held people costs, plant operations or service contracts of utility systems. 34

35 Sightlines ROPA SM benchmarking definitions Staffing terminology Staffing (GSF/FTE) The coverage ratio for staff, or the amount of space that each employee is responsible for covering. Utility workers, event set up, planned maintenance, construction Descriptive crews and text sold goes services hereare removed so as to only include full time equivalents performing daily service or annual stewardship in buildings. Supervision (FTE/Supervisor) The number of full time equivalents that report to each supervisor, or the number of staff for which each supervisor is responsible. Supervisors are defined as those that have direct line authority and can direct other workers. In some cases Sightlines treats individuals as partial supervisors to account for working foremen or lead tradesmen; a portion of their time will be captured as supervising and part will be captured as working. A high benchmark indicates lower levels of supervision, often resulting in less productivity or effectiveness within the department. Materials ($/FTE) The trades supplies used by each full time equivalent, or the amount of money that each maintenance worker has to do his/her job. This benchmark is directly influenced by Staffing. If the GSF/FTE is far above or below the average, the $/FTE may appear skewed, even if the total material dollars is appropriate for the campus. 35

36 Sightlines ROPA SM benchmarking definitions Campus inspection terminology Campus Inspection An independent judgment of campus appearance gained by an inspection of a representative sample of campus buildings and grounds. The inspection rates the following Descriptive categories text on goes a scale here of 1 5: ocleanliness An independent judgment of campus cleanliness gained by an inspection of a representative sample of campus buildings. Space is inspected to determine if it is free from dirt, debris, and stocked with the proper paper products in restrooms, etc. ogeneral Repair/Impression An independent judgment of campus general repair/impression gained by an inspection of a representative sample of campus buildings. Space is inspected to. oexterior Inspection An inspection to evaluate the condition of building envelopes/exteriors. This inspection includes exterior doorways, siding, pointing, roofs, windows, etc. ogrounds Inspection An evaluation of grounds appearance including plantings, turf, fixtures, roadways, and walkways. omechanical Spaces Inspection An evaluation of mechanical spaces within campus buildings. The inspection rates the general appearance of mechanical spaces, including cleanliness, labeling of pipes, lighting, drainage, appearance of equipment, etc. 36

37 QUESTIONS?

Sightlines, LLC University of Alaska System Presentation FY2012

Sightlines, LLC University of Alaska System Presentation FY2012 Sightlines, LLC University of Alaska System Presentation FY2012 Date: April 3, 2013 Presented by: Colin Sanders, Laura Vassilowitch & Sheena Salsberry University of Illinois at Urbana-Champaign The University

More information

Sightlines LLC FY2012 Facilities MB&A Presentation Middlesex Community College. Date: January 22, 2012 Presented by: Brendon Martin and Josh Vidro

Sightlines LLC FY2012 Facilities MB&A Presentation Middlesex Community College. Date: January 22, 2012 Presented by: Brendon Martin and Josh Vidro Sightlines LLC FY2012 Facilities MB&A Presentation Middlesex Community College Date: January 22, 2012 Presented by: Brendon Martin and Josh Vidro 1 Sightlines profile: 41 states, DC, Nova Scotia Common

More information

FY2013 ROPA Presentation. University of Alaska System

FY2013 ROPA Presentation. University of Alaska System FY2013 ROPA Presentation University of Alaska System A vocabulary for measurement The Return on Physical Assets ROPA SM Asset Value Change Operations Success The annual investment needed to ensure buildings

More information

Rhode Island School of Design

Rhode Island School of Design Rhode Island School of Design FY17 ROPA+ Final Presentation October 19, 217 University of Southern University of Southern Maine University of St. Thomas University of Tennessee, Knoxville University of

More information

Funding for Maintenance and Repair at UMKC. Faculty Senate November 4, 2014

Funding for Maintenance and Repair at UMKC. Faculty Senate November 4, 2014 Funding for Maintenance and Repair at UMKC Faculty Senate November 4, 2014 Changing the Conversation Space Understand how age profile drives capital and operational demands Capital Multiyear plans that

More information

Making the Case for Funding Deferred Maintenance Before it s Too Late

Making the Case for Funding Deferred Maintenance Before it s Too Late Making the Case for Funding Deferred Maintenance Before it s Too Late Jim Kadamus Vice President Sightlines Cuba Plain Assistant Vice President for Budget Planning and Development University of Missouri

More information

Developing the Capital Plan is only Half the Battle

Developing the Capital Plan is only Half the Battle Western Connecticut State University Western Oregon University Westfield State University Widener University Williams College Worcester Polytechnic Institute Worcester State University Xavier University

More information

Capital Maintenance. 2. Deferred Maintenance, May 18, 2009 <http://en.wikipedia.org/wiki/deferred_maintenance>

Capital Maintenance. 2. Deferred Maintenance, May 18, 2009 <http://en.wikipedia.org/wiki/deferred_maintenance> Capital Maintenance Capital Maintenance Capital maintenance has previously been known as deferred maintenance, the act of postponing maintenance in order to save money or avoid costs. 2 At NYU, the term

More information

Leveraging Facilities Intelligence & Lean to Create an Effective Preventive Maintenance Program

Leveraging Facilities Intelligence & Lean to Create an Effective Preventive Maintenance Program Leveraging Facilities Intelligence & Lean to Create an Effective Preventive Maintenance Program PAUL ARMAS BROWN UNIVERSITY JIM KADAMUS SIGHTLINES LISA TURTURRO HALEY & ALDRICH Brown University Facilities

More information

Update on Facilities Management s Repositioning Plan. January 17, 2018

Update on Facilities Management s Repositioning Plan. January 17, 2018 Update on Facilities Management s Repositioning Plan January 17, 2018 The Challenge: Reduce Operating Budgets by 5% Rather than react to budget uncertainty, Facilities Management proposed an alternate

More information

Deferred Maintenance and Renewal Program Briefing

Deferred Maintenance and Renewal Program Briefing Deferred Maintenance and Renewal Program Briefing Business and Finance December 2007 1 Briefing Overview Nature of the challenge How we compare Progress to date Remaining barriers What s next? 2 Context

More information

Backlog Reduction Plan

Backlog Reduction Plan 2003-2013 Executive Summary proposes to achieve reductions in our facilities maintenance backlog by documenting and completing backlog projects on a priority basis and by minimizing or eliminating future

More information

Campus Facilities Deficiencies Report December 2012

Campus Facilities Deficiencies Report December 2012 Campus Facilities Deficiencies Report December 2012 Deficiencies Deficiencies: Deferred maintenance is defined as maintenance work that has been deferred on a planned or unplanned basis to a future budget

More information

2018 State of Facilities in Higher Education. December 13, 2018

2018 State of Facilities in Higher Education. December 13, 2018 2018 State of Facilities in Higher Education December 13, 2018 Meet the Speakers Peter Reeves Regional Director Sightlines, a Gordian Company Pete Zuraw Vice President, Market Strategy & Development Sightlines,

More information

HOCKING COLLEGE Fee Pledge Request - $22,000,000 April, I. Project Overview

HOCKING COLLEGE Fee Pledge Request - $22,000,000 April, I. Project Overview I. Project Overview Hocking College is seeking approval to issue fixed rate general receipts bonds under the State s Credit Enhancement Program for two-year institutions for the following purposes: Purchase

More information

Tracking Expenses in Facilities

Tracking Expenses in Facilities Tracking Expenses in Facilities Requirements for Tracking Expenses when maintaining, building or improving a facility Minnesota State Colleges and Universities The Minnesota State Colleges and Universities

More information

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM 104 Office of the President TO MEMBERS OF THE COMMITTEE ON : For Meeting of ACTION ITEM AMENDMENT OF THE BUDGET FOR CAPITAL IMPROVEMENTS AND THE CAPITAL IMPROVEMENT PROGRAM AND APPROVAL OF EXTERNAL FINANCING

More information

Budget Update. Fiscal Year and

Budget Update. Fiscal Year and Budget Update Fiscal Year 2013-14 and 2014-015 PASSHE 2013/2014 E&G Appropria4on - Base and Performance Funding FY 2013/2014 Performance Funding System Wide: BU is 4 th out of 14 for E&G Base Appropriation

More information

Leveraging Facilities Intelligence & Lean to Create an Effective Preventive Maintenance Program

Leveraging Facilities Intelligence & Lean to Create an Effective Preventive Maintenance Program Leveraging Facilities Intelligence & Lean to Create an Effective Preventive Maintenance Program PAUL ARMAS BROWN UNIVERSITY JIM KADAMUS SIGHTLINES LISA TURTURRO HALEY & ALDRICH Brown University Facilities

More information

BEFORE THE ROOF CAVES IN II: APPA

BEFORE THE ROOF CAVES IN II: APPA BEFORE THE ROOF CAVES IN II: APPA PUBLISHED BY: RICK BIEDENWEG AND ROBERT HUTSON This article was originally published by APPA (www.appa.org) and was authored by Rick Biedenweg and Robert Hutson with assistance

More information

PROGRAM REVIEW FACILITIES PLANNING & SERVICES DIVISION

PROGRAM REVIEW FACILITIES PLANNING & SERVICES DIVISION 2013-14 PROGRAM REVIEW FACILITIES PLANNING & SERVICES DIVISION I. Division Purpose Plan, construct and maintain a safe, functional, clean and attractive physical environment for the users of El Camino

More information

FY & FY Budget Presentation

FY & FY Budget Presentation FY 2018-19 & FY 2019-20 Budget Presentation Juvenile Probation Commission Meeting February 14, 2018 Juvenile Probation Department City and County of San Francisco Mission Identify and respond to risks

More information

Facilities Management and Planning Organizational Review Phase II Update

Facilities Management and Planning Organizational Review Phase II Update MEMORANDUM Office of College Services DATE: September 3, 2013 TO: CC: FROM: SUBJECT: President Mary Spilde, Vice President Brian Kelly Facilities Management & Planning Organizational Review Team Jennifer

More information

University of Virginia Addressing the University s Deferred Maintenance Backlog

University of Virginia Addressing the University s Deferred Maintenance Backlog University of Virginia Addressing the University s Deferred Maintenance Backlog Introduction At its December 2004 meeting, the Buildings and Grounds Committee heard a presentation regarding the University

More information

Massachusetts School Building Authority DRAFT Maintenance and Capital Planning Record

Massachusetts School Building Authority DRAFT Maintenance and Capital Planning Record Massachusetts School Building Authority DRAFT enance and Capital Planning Record The enance and Capital Planning Record is one of the pre-requisite documents required during the application process that

More information

University of Virginia Status Report on the Plan to Address Deferred Maintenance

University of Virginia Status Report on the Plan to Address Deferred Maintenance Executive Summary University of Virginia Status Report on the Plan to Address Deferred Maintenance The University of Virginia s facilities portfolio includes 552 buildings and related infrastructure, encompassing

More information

UNIVERSITY of HOUSTON MANUAL OF ADMINISTRATIVE POLICIES AND PROCEDURES

UNIVERSITY of HOUSTON MANUAL OF ADMINISTRATIVE POLICIES AND PROCEDURES UNIVERSITY of HOUSTON MANUAL OF ADMINISTRATIVE POLICIES AND PROCEDURES SECTION: Facilities Number: 09.04.04 AREA: Facilities Management and Maintenance Information SUBJECT: Maintenance Project Evaluation

More information

Ballot Measures-N 7. Centralia Elementary School District, Building Strong Neighborhood Schools

Ballot Measures-N 7. Centralia Elementary School District, Building Strong Neighborhood Schools Section Ballot Measures-N N Centralia Elementary School District, Building Strong Neighborhood Schools To repair/modernize aging classrooms, science labs/school facilities to keep pace with technology,

More information

BERKELEY UNIFIED SCHOOL DISTRICT

BERKELEY UNIFIED SCHOOL DISTRICT BERKELEY UNIFIED SCHOOL DISTRICT TO: Javetta Cleveland and Neil Smith, Co-Superintendents FROM: Lew Jones, Director of Facilities DATE: June 26, 2013 SUBJECT: Approval of the 2013/14 Measure H Annual Plan

More information

The City of Owen Sound Asset Management Plan

The City of Owen Sound Asset Management Plan The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to

More information

University of Virginia Status Report on the Plan to Address Deferred Maintenance

University of Virginia Status Report on the Plan to Address Deferred Maintenance Executive Summary University of Virginia Status Report on the Plan to Address Deferred Maintenance The University of Virginia s facilities portfolio includes 540 buildings and related infrastructure, encompassing

More information

COMMUNITY COLLEGE DISTRICT OF JEFFERSON COUNTY, MISSOURI REQUEST FOR QUALIFICATIONS:

COMMUNITY COLLEGE DISTRICT OF JEFFERSON COUNTY, MISSOURI REQUEST FOR QUALIFICATIONS: COMMUNITY COLLEGE DISTRICT OF JEFFERSON COUNTY, MISSOURI REQUEST FOR QUALIFICATIONS: ARCHITECTURAL SERVICES FOR CHILD DEVELOPMENT CENTER RENOVATION RFQ #1711001 Due Date: December 7, 2017 Not Later Than

More information

Program: Facilities and Construction Management. Program Based Budget Page 117

Program: Facilities and Construction Management. Program Based Budget Page 117 Program: Facilities and Construction Management Program Based Budget 2014-2016 Page 117 Program: Facilities and Construction Management Vision: To develop and maintain town buildings that is safe, comfortable

More information

Use of State and District Construction Funds

Use of State and District Construction Funds 8 Use of State and District Construction Funds Through its long-range planning process, the district has met its facilities needs without issuing significant debt. To improve cost efficiency, however,

More information

UNC System Building Reserve Model Instructions

UNC System Building Reserve Model Instructions Instructions Introduction: These are instructions for filling out the two building reserve templates. One template is for new buildings - UNC System Building Reserve Model for New Buildings; and one template

More information

Samoset at Winnipesaukee Condominium Association. Estimated Financial Results for Operating & Reserve Budget for 2012

Samoset at Winnipesaukee Condominium Association. Estimated Financial Results for Operating & Reserve Budget for 2012 Samoset at Winnipesaukee Condominium Association Estimated Financial Results for 2011 Operating & Budget for 2012 11/15/2011 Final 2012 Budget File Prepared Nov 2011 1 Operating Annual Budget FY 2012 INCOME

More information

General Fund Revenues

General Fund Revenues Budget Overview General Fund Revenues $16.9 $4.0 $15.9 $54.5 Property Taxes Franchise & TLT State Rev Sharing Other Sources Total Revenues - $91.3 million Property Taxes 60% of total revenue Franchise

More information

Robert Shaw Theme Elementary

Robert Shaw Theme Elementary DeKalb County School District/Elementary Schools Robert Shaw Theme Elementary Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School

More information

FY Capital Improvement Program City of New Bedford, Massachusetts

FY Capital Improvement Program City of New Bedford, Massachusetts City of New Bedford, Massachusetts Background The Massachusetts Department of Revenue, credit agencies and the Government Accounting Standards Board recommend that localities develop a capital improvement

More information

WEST VALLEY-MISSION COMMUNITY COLLEGE DISTRICT ANNUAL FINANCIAL REPORT JUNE 30, 2010 AND 2009

WEST VALLEY-MISSION COMMUNITY COLLEGE DISTRICT ANNUAL FINANCIAL REPORT JUNE 30, 2010 AND 2009 WEST VALLEY-MISSION COMMUNITY COLLEGE DISTRICT ANNUAL FINANCIAL REPORT JUNE 30, 2010 AND 2009 TABLE OF CONTENTS JUNE 30, 2010 FINANCIAL SECTION Independent Auditors' Report 2 Management's Discussions and

More information

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016 DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition

More information

Summary of Capital Budget Request Tennessee Board of Regents. of the. September 21, 2017

Summary of Capital Budget Request Tennessee Board of Regents. of the. September 21, 2017 Summary of Capital Budget Request 2018-2019 of the Tennessee Board of Regents September 21, 2017 1 This is the Summary of the Capital Budget Request for Fiscal Year 2018-2019 for the Finance and Business

More information

The Real Meaning of Total Cost of Ownership (TCO)

The Real Meaning of Total Cost of Ownership (TCO) The Real Meaning of Total Cost of Ownership (TCO) Presented by David Patnaude Director of Plant and Sustainability Riverdale Country School Lawrence Eighmy Managing Principle 1 The Real Meaning of Total

More information

Prepared by the Office of the Treasurer

Prepared by the Office of the Treasurer Prepared by the Office of the Treasurer The Board s Role in Financial Oversight The Board of Trustees is tasked with financial oversight of the College. The Association of Governing Boards of Universities

More information

Program Allocation. Allocation of General Fund. FACILITIES MAINTENANCE Director: Bud J. Harris

Program Allocation. Allocation of General Fund. FACILITIES MAINTENANCE Director: Bud J. Harris Director: Bud J. Harris Mission: Facilities Maintenance maintains and repairs equipment and buildings belonging to Kitsap County. Key areas include electrical, plumbing, HVAC, building security systems,

More information

DeKalb Elementary School of the Arts at Terry Mills

DeKalb Elementary School of the Arts at Terry Mills DeKalb County School District/Elementary Schools DeKalb Elementary School of the Arts at Terry Mills Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School

More information

Rockville Science Center (P036600)

Rockville Science Center (P036600) Rockville Science Center (P036600) (AAGE15) Rockville Date Last Modified 2/26/14 N/A-PS Planning, Design and Supervision 6,492 6,477 15 0 0 0 0 0 0 0 0 Construction 56,300 56,272 28 0 0 0 0 0 0 0 0 6,598

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS FREQUENTLY ASKED QUESTIONS The SMART FAQS are provided to answer questions regarding the SMART Initiative and will be updated on an ongoing basis. On November 4, 2014, Broward County voters approved a

More information

Two-Year Program Facilities Management Capital Renewal & Deferred Maintenance

Two-Year Program Facilities Management Capital Renewal & Deferred Maintenance Two-Year Program Facilities Management Capital Renewal & Deferred Maintenance Table of Contents I. Program Mission Statement...3 II. Program Executive Summary...3 III. Primary Customers/Stakeholders...4

More information

Classified Staff Adequacy: Facility Maintenance and Operations

Classified Staff Adequacy: Facility Maintenance and Operations Slide 1 Classified Staff Adequacy: Facility Maintenance and Operations Gordon Beck, Director of School Facilities - OSPI Andrea Cobb, Research Analyst - OSPI Tom Kuehn, Regional Coordinator - OSPI Overview

More information

Capital Planning and Budget. University of Wisconsin System Administration. All Agency Projects Program

Capital Planning and Budget. University of Wisconsin System Administration. All Agency Projects Program University of Wisconsin System Administration All Agency Projects Program OVERVIEW All Agency Projects Program A targeted program addressing the maintenance, repair, renovation, and minor remodeling needs

More information

LOS ANGELES COMMUNITY COLLEGE DISTRICT PROPOSITION AA BOND CONSTRUCTION PROGRAM

LOS ANGELES COMMUNITY COLLEGE DISTRICT PROPOSITION AA BOND CONSTRUCTION PROGRAM Statement of Expenditures of Bond Proceeds and Unaudited Supplementary Schedule Year Ended June 30, 2017 (With Independent Auditors Report Thereon) Table of Contents Independent Auditors Report 1 Statement

More information

Louisiana State University System

Louisiana State University System August 25, 1994 Memorandum to: All Chancellors Subject: Construction, Modification, Maintenance, Care, and Operation of Sorority and Fraternity Houses Located on University Property PM-68 This Presidential

More information

2016 Budget Presentation. Presentation to Estimates Committee December 8, 2015

2016 Budget Presentation. Presentation to Estimates Committee December 8, 2015 2016 Budget Presentation Presentation to Estimates Committee December 8, 2015 2016 Capital Budget & 10-Year Forecast Summary of Plan by Commission Commission 10 Year 2016 Only Public Works $705M $63.4M

More information

Executive Summary Community Foundations Report FY2013

Executive Summary Community Foundations Report FY2013 Executive Summary Community Foundations Report FY2013 Demographic Profile The fifty Community Foundations participating in this year s Commonfund Benchmarks Study Community Foundations Report represent

More information

Questions from the Prince George s County Advocates for Better Schools

Questions from the Prince George s County Advocates for Better Schools P r i n c e G e o r g e s C o u n t y P u b l i c S c h o o l s 1 4 2 0 1 S c h o o l L a n e, U p p e r M a r l b o r o, M D 2 0 7 7 2 w w w. p g c p s. o r g Raymond H. Brown Chief Financial Officer

More information

PENNSYLVANIA STATE SYSTEM OF HIGHER EDUCATION COMMONWEALTH OF PENNSYLVANIA SINGLE AUDIT REPORTING PACKAGE. YEAR ENDED June 30, 2016

PENNSYLVANIA STATE SYSTEM OF HIGHER EDUCATION COMMONWEALTH OF PENNSYLVANIA SINGLE AUDIT REPORTING PACKAGE. YEAR ENDED June 30, 2016 PENNSYLVANIA STATE SYSTEM OF HIGHER EDUCATION COMMONWEALTH OF PENNSYLVANIA SINGLE AUDIT REPORTING PACKAGE YEAR ENDED June 30, 2016 SECTION I Financial Statements for the Year Ended June 30, 2016 SECTION

More information

William Bradley Bryant Center

William Bradley Bryant Center DeKalb County School District/Education Other William Bradley Bryant Center Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School

More information

Restoring the Dream: Renewing Pride and Stewardship of Place

Restoring the Dream: Renewing Pride and Stewardship of Place Strategic Plan Assessment Pathway 5 Restoring the Dream: Renewing Pride and Stewardship of Place November 8, 2017 Stewart Harvey, Executive Director, Facilities & Capital Management Services Pathway 5

More information

Springfield High School

Springfield High School 5.1 Springfield High School Springfield School District Delaware County - Pennsylvania Master Plan Presentation Town Hall Meeting 5 Project Cost Estimates/ Project Financing Strategy / Tax Impact February

More information

Pleasantdale Elementary

Pleasantdale Elementary DeKalb County School District/Elementary Schools Pleasantdale Elementary Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 5 School

More information

Capital Planning Program CPC Presentation

Capital Planning Program CPC Presentation Capital Planning Program CPC Presentation August 29, 2016 AGENDA 2 I. Overview II. 10-Year Capital Plan Update III. FRRM Data Improvement IV. Key Dates FY16-25 CAPITAL PLAN FUNDING LEVELS As adopted in

More information

Financial Statements and Uniform Guidance Supplementary Information Together with Report of Independent Certified Public Accountants

Financial Statements and Uniform Guidance Supplementary Information Together with Report of Independent Certified Public Accountants Financial Statements and Uniform Guidance Supplementary Information Together with Report of Independent Certified Public Accountants UNIVERSITY OF MASSACHUSETTS June 30, 2016 and 2015 UNIVERSITY OF MASSACHUSETTS

More information

Ronald E. McNair Discovery Learning Academy

Ronald E. McNair Discovery Learning Academy DeKalb County School District/Elementary Schools Ronald E. McNair Discovery Learning Academy Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive

More information

Ballot Measures-T Section

Ballot Measures-T Section T, Westminster School District Classroom Improvement Measure To upgrade aging schools and improve the quality of education with funding that cannot be taken by the State; provide heating, ventilation and

More information

CENTRAL STATE UNIVERSITY Wilberforce, Ohio. FINANCIAL STATEMENTS June 30, 2017 and 2016

CENTRAL STATE UNIVERSITY Wilberforce, Ohio. FINANCIAL STATEMENTS June 30, 2017 and 2016 Wilberforce, Ohio FINANCIAL STATEMENTS Wilberforce, Ohio FINANCIAL STATEMENTS CONTENTS INDEPENDENT AUDITOR S REPORT... 1 MANAGEMENT S DISCUSSION AND ANALYSIS (UNAUDITED)... 3 FINANCIAL STATEMENTS STATEMENTS

More information

Facilities Management Performance Assessment - Using APPA Facilities Performance Indicators

Facilities Management Performance Assessment - Using APPA Facilities Performance Indicators Facilities Management Performance Assessment - Using APPA Facilities Performance Indicators Duane G. Hickling APPA FPI Advisor January 27, 2016 dhickling@hicklingassociates.com Agenda Why use facilities

More information

REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES FOR DOUGLAS CITY HALL RENOVATIONS DOUGLAS, WYOMING

REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES FOR DOUGLAS CITY HALL RENOVATIONS DOUGLAS, WYOMING REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES FOR DOUGLAS CITY HALL RENOVATIONS DOUGLAS, WYOMING Request for Qualifications (RFQ) due: 3:00pm local time, August 17, 2018 Page 1 of 8 Section One Introduction

More information

Contents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure...

Contents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure... Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 6 Impartial Analysis... 7 Statement in Favor of Measure... 8 Ballot Measure EXHIBIT A HANFORD ELEMENTARY SCHOOLS REPAIR

More information

AVERAGE HOURLY INCREASES (Including Zero Increases) % 5.1% 3.8%

AVERAGE HOURLY INCREASES (Including Zero Increases) % 5.1% 3.8% CCQ Contractor Compensation Quarterly $23.77 is the average hourly rate for Foremen in 2007 Merit Shop Contractors 2007 Merit Shop contractors anticipate skilled craft hourly wage increases of 4.8% in

More information

UNIVERSITY of HOUSTON MANUAL OF ADMINISTRATIVE POLICIES AND PROCEDURES

UNIVERSITY of HOUSTON MANUAL OF ADMINISTRATIVE POLICIES AND PROCEDURES UNIVERSITY of HOUSTON MANUAL OF ADMINISTRATIVE POLICIES AND PROCEDURES SECTION: Facilities Number: 09.04.01 AREA: Facilities Renewal SUBJECT: Capital Facilities Life Cycle Renewal I. PURPOSE The purpose

More information

Facilities Development and Operations

Facilities Development and Operations Facilities Development and Operations Dashboard/Metrics Report California State University, East Bay July 1, 2016 to June 30, 2017 1 Who We Are: Vice President Administration & Finance Division Associate

More information

University of North Carolina Budget Reductions. The University of North Carolina May 7, Required Reversions

University of North Carolina Budget Reductions. The University of North Carolina May 7, Required Reversions University of North Carolina Budget Reductions BOG Policy Discussion May 7, 2009 2008-09 Required Reversions Overview of Budget Reversions for 2008-09 7% Hold Back ($168M) OSBM April Memo hiring i freeze

More information

Tangible Property Repair Regulations

Tangible Property Repair Regulations Tangible Property Repair Regulations Effective 2014 and modified February 2015 Presented by Charlotte Clark o 1329 South 800 East, Orem, UT 84097 // p 801.225.6900 // w squire.com What do the regulations

More information

6.0 INFRASTRUCTURE MAINTENANCE PROGRAM (IMP)

6.0 INFRASTRUCTURE MAINTENANCE PROGRAM (IMP) 6.0 INFRASTRUCTURE MAINTENANCE PROGRAM (IMP) Chapter 6.0 describes the purpose of the IMP and the roles, responsibilities, accountabilities, processes and policies associated with the delivery of the program.

More information

CAPITAL PROJECT PROCESS

CAPITAL PROJECT PROCESS CAPITAL PROJECT PROCESS May 2009 GETTING STARTED What is a project? A project is defined as all work (maintenance & repair or renovation) that requires 5,000 or more in time and materials and/or is sufficiently

More information

Real estate: draft capital master plan

Real estate: draft capital master plan SIXTIETH WORLD HEALTH ASSEMBLY A60/5 Provisional agenda item 11.3 1 May 2007 Real estate: draft capital master plan Report by the Director-General BACKGROUND 1. It has become increasingly difficult for

More information

Physical Plant. Five-Year Capital Budget Plan. State College Area School District November Page 1 of 15

Physical Plant. Five-Year Capital Budget Plan. State College Area School District November Page 1 of 15 Physical Plant Five-Year Capital Budget Plan State College Area School District November 2011 Page 1 of 15 Table of Contents Background and 2013 Projects Pages 3-5 Funding Level Pages 6-7 Existing Buildings

More information

Maintenance Matters. Building Envelope Maintenance and Renewals Planning. Building Envelope. Maintenance Bulletin

Maintenance Matters. Building Envelope Maintenance and Renewals Planning. Building Envelope. Maintenance Bulletin Maintenance Matters Building Envelope 7 Maintenance Bulletin No. The primary focus of this bulletin is on the importance of being proactive rather than reactive in the maintenance and care of buildings.

More information

Connecticut State University System (The System Office, Central Connecticut State University, Eastern Connecticut State University, Southern

Connecticut State University System (The System Office, Central Connecticut State University, Eastern Connecticut State University, Southern Connecticut State University System (The System Office, Central Connecticut State University, Eastern Connecticut State University, Southern Connecticut State University, Western Connecticut State University,

More information

SEPTA s State of Good Repair Funding Crisis

SEPTA s State of Good Repair Funding Crisis SEPTA s State of Good Repair Funding Crisis Jeffrey D. Knueppel, PE Deputy General Manager Laura J. Zale Senior Asset Management Analyst State of Good Repair Summit. March 27, 2013 The Southeastern Pennsylvania

More information

Program Performance Review

Program Performance Review Program Performance Review Facilities Maintenance Division of the Public Works and Transportation Department July 21, 2006 Report No. 06-18 Office of the County Auditor Evan A. Lukic, CPA County Auditor

More information

Where all students connect, learn, grow and succeed BUDGET May 7, 2018

Where all students connect, learn, grow and succeed BUDGET May 7, 2018 Where all students connect, learn, grow and succeed. 2018-19 BUDGET May 7, 2018 RICHARDSON ISD MISSION The mission of Richardson Independent School District is to ensure that ALL connect, learn, grow and

More information

Actual TOTAL $ 2,793,103 $ 3,115,212 $ 3,206,457 $ 3,296,810

Actual TOTAL $ 2,793,103 $ 3,115,212 $ 3,206,457 $ 3,296,810 REVENUE AND EXPENDITURE SUMMARY ITEM Revenues, Other Sources, and Fund Balance Sales/Charges for Services $ 2,773,135 $ 3,077,010 $ 3,191,580 $ 3,288,810 Miscellaneous Income 9,538 8,000 8,416 8,000 Investment

More information

DRAFT. Los Angeles Community College District

DRAFT. Los Angeles Community College District Los Angeles Community College District Statement of Expenditures of Bond Proceeds and Unaudited Supplementary Schedules for Propositions A, AA and J June 30, 2017 (With Independent Auditors Report Thereon)

More information

Deferred Maintenance Phase I Report

Deferred Maintenance Phase I Report Ohio University Deferred Maintenance Phase I Report A Case for Addressing Deferred Maintenance Needs at Ohio University Prepared by: University Planning and Implementation and Facilities Management Ohio

More information

Department Chair Online Resource Center Facility Maintenance or Facility Improvement? Taking a Responsible Approach

Department Chair Online Resource Center Facility Maintenance or Facility Improvement? Taking a Responsible Approach Department Chair Online Resource Center Facility Maintenance or Facility Improvement? Taking a Responsible Approach Richard Bettega, associate vice president for facilities, Lewis and Clark College. Facility

More information

SPECIFICATION NO. TxDOT DATED: DECEMBER 2016 Title: FACILITY MAINTENANCE AND REPAIR SERVICE

SPECIFICATION NO. TxDOT DATED: DECEMBER 2016 Title: FACILITY MAINTENANCE AND REPAIR SERVICE SPECIFICATION NO. TxDOT 910-00-00 DATED: DECEMBER 2016 Title: FACILITY MAINTENANCE AND REPAIR SERVICE PUBLICATION This specification is a product of the Texas Department of Transportation (TxDOT). This

More information

DeKalb County School District/High Schools Druid Hills High Final School Assessment Report May 19, 2016

DeKalb County School District/High Schools Druid Hills High Final School Assessment Report May 19, 2016 DeKalb County School District/High Schools Druid Hills High Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 5 School Condition Summary

More information

College Forum Budget Status March 17, 2009

College Forum Budget Status March 17, 2009 College Forum Budget Status March 17, 2009 Budget Horizon s The purpose of these college forums is to discuss Ventura College s three budget horizons: Immediate: Make mid-year reductions using one-time

More information

CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT TOTAL COST OF OWNERSHIP PLAN

CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT TOTAL COST OF OWNERSHIP PLAN CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT TOTAL COST OF OWNERSHIP PLAN FEBRUARY 21, 2017 CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT TOTAL COST OWNERSHIP TABLE OF CONTENTS SECTION 1- INTRODUCTION

More information

THE BUDGET AT NC STATE How big is the pie?

THE BUDGET AT NC STATE How big is the pie? THE BUDGET AT NC STATE How big is the pie? Randy Woodson, Chancellor Warwick A. Arden, Interim Provost and Executive Vice Chancellor Charlie Leffler, Vice Chancellor for Finance and Business NC State University

More information

1. Cash includes coin, currency, checks, money orders, and credit card transactions.

1. Cash includes coin, currency, checks, money orders, and credit card transactions. 1.0 Purpose BEREA COLLEGE Cash Handling Policy Document Document No. No. FIN032 FIN006 Revision Effective Date Date 3/2018 7/2008 Review Revision Date Date 3/2018 Next Pages Review Date 3/2019 1-3 Pages

More information

2017/18 Annual Budget Report. Charlie Faas VP Administration & Finance/CFO

2017/18 Annual Budget Report. Charlie Faas VP Administration & Finance/CFO 2017/18 Annual Budget Report Charlie Faas VP Administration & Finance/CFO Fiscal Year Budget Overview Increase in tuition and General Fund appropriation Tuition rate increase ($270, 4.9% increase) +240

More information

How to Use Tax Strategies to Offset Dealership Construction Costs Six-figure offsets are possible if you plan carefully

How to Use Tax Strategies to Offset Dealership Construction Costs Six-figure offsets are possible if you plan carefully How to Use Tax Strategies to Offset Dealership Construction Costs Six-figure offsets are possible if you plan carefully With Stephen Bedell, CPA of Crowe Horwath LLP Moderated by Mike Bowers, of DealersEdge

More information

THE STATE OF THE SYSTEM

THE STATE OF THE SYSTEM THE STATE OF THE SYSTEM Alamance-Burlington School System Dr. Lillie Cox, Superintendent March 2013 R E A C H Rigorous Instruction Engagement in 21 st Century Learning Opportunities Achievement in Support

More information

Chancellor s Message - Achievements

Chancellor s Message - Achievements Chancellor s Message - Achievements We have achieved significant educational and operational advances. To name a few: $41 million in savings from operations through the elimination of redundancies and

More information

Building Envelope. Maintenance Bulletin. Building Envelope Maintenance and Renewals Planning. Why Maintain?

Building Envelope. Maintenance Bulletin. Building Envelope Maintenance and Renewals Planning. Why Maintain? Maintenance Matters Building Envelope 7 Maintenance Bulletin No. While the gradual deterioration of building assets is inevitable, the speed at which this proceeds can be regulated. Building Envelope Maintenance

More information

FIXING RHODE ISLAND SCHOOL BUILDINGS. Office of General Treasurer Seth Magaziner

FIXING RHODE ISLAND SCHOOL BUILDINGS. Office of General Treasurer Seth Magaziner FIXING RHODE ISLAND SCHOOL BUILDINGS Office of General Treasurer Seth Magaziner 1 SCHOOLS OUR STUDENTS DESERVE All students deserve to go to schools that are warm, safe, dry and equipped for 21 st century

More information

Header Tile ATTACHMENT 2. City of Saskatoon

Header Tile ATTACHMENT 2. City of Saskatoon Header Tile ATTACHMENT 2 2 Building Better Infrastructure The Administration evaluates the condition of the City s assets in order to develop annual programs to maintain the assets at a minimum cost. Where

More information