Park Maintenance Management Plan

Size: px
Start display at page:

Download "Park Maintenance Management Plan"

Transcription

1 COSUMNES COMMUNITY SERVICES DISTRICT Park Maintenance Management Plan Fiscal Year 2016/17

2 This page intentionally left blank

3 Table of Contents Section 1 Introduction... 1 Section 2 Cosumnes Community Services District Background... 2 Cosumnes Community Services District Boundaries... 2 Assets... 3 Funding and Budgets for Landscape and Lighting Assessment Districts... 4 Funding... 4 Annual Budget... 4 Operations... 4 Section 3 - Asset Life Cycle Plan... 6 Section 4 Capital Improvement Plan Costs... 7 Section 5 Benefit Zone Summaries... 8 Section 6 - Challenges Section 7 Plan Improvement and Monitoring Appendix Appendix A Routine Maintenance Frequencies Appendix B Park System Appendix C Asset Life Cycle Plan Appendix D Unfunded Asset Life Cycle Plan BENEFIT ZONE 3 and Appendix E Playground Renewal Timeline Appendix F Deferred Projects Guide Appendix G PMMP Summary Budgets... 65

4 Park Maintenance Management Plan 1 Section 1 Introduction The Park Maintenance Management Plan (PMMP) was instituted beginning in 2014 as a comprehensive budget and planning tool to ensure the longevity of assets in the Cosumnes Community Services District (CSD) Park System as well as the safety of participants utilizing the assets. The PMMP is updated annually to guide the responsible and sustainable management of assets. The CSD Park System assets represent a major investment. Not only do Parks and Recreation assets and facilities provide a means of maintaining a healthy lifestyle, they also provide an important focal point for social interaction and help strengthen the community fabric. The CSD maintains all parks and recreation assets and facilities within the City of Elk Grove boundaries and the larger boundaries of the CSD. As of July 2016, this includes 94 parks totaling 703 acres, plus all trails and streetscapes totaling 340 acres. The CSD Park System includes active and passive assets for all age groups in the community. These assets have a replacement value of more than $163M. The PMMP is intended for use as an educational tool for use by the CSD Board, staff, and interested community members. The PMMP incorporates the following sections: Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7 Introduction CSD Background Boundaries Assets Funding Operations Asset Life Cycle Plan Benefit Zone Summaries Challenges Plan Improvement and Monitoring Appendix

5 Park Maintenance Management Plan 2 Section 2 Cosumnes Community Services District Background Cosumnes Community Services District Boundaries The Cosumnes Community Services District is 157 square miles with a population of over 183,000 people. Provision of park maintenance services is accomplished within Landscape and Lighting (L&L) Benefit Assessment Districts known as Benefit Zones (BENEFIT ZONE). Thirteen BENEFIT ZONE s are shown on the map below. Four additional BENEFIT ZONE s (not shown on the map) are assessment districts which overlay some of the BENEFIT ZONE s. BENEFIT ZONE 14 - Camden Park overlays BENEFIT ZONE 2 Camden and BENEFIT ZONE 9A Waterman/Park Village 9 (north portion) BENEFIT ZONE 15 - Vista Creek overlays a portion of BENEFIT ZONE 3 Elk Grove/West Vineyard BENEFIT ZONE 16 - Fallbrook overlays BENEFIT ZONE 9B Waterman/Park Village (central portion) BENEFIT ZONE 18 Hampton Village Improvement District overlays the Hampton Village neighborhood in BENEFIT ZONE 9C (south portion) These overlays add revenue to offset expense increases. Map 1 CSD Landscape and Lighting Benefit Zones

6 Park Maintenance Management Plan 3 Section 2 Cosumnes Community Services District Background (continued) Assets Since 1985 when the CSD was formed, the Park System has grown to include 94 parks, miles of streetscapes, trails, and hundreds of assets. Developer fees were instituted to fund initial park development. Developers normally included the fee as a one-time cost within the price of each new home. The Developers also agreed to a separate Landscape and Lighting assessment as a means of providing ongoing maintenance funding for Park System assets. CSD parks total 703 acres. Before 2007, all parks were owned and maintained by the CSD. In 2007, the CSD and City of Elk Grove entered into a Memo of Understanding (MOU) to jointly own future parks, with maintenance funding provided by the City and maintenance operations provided by the CSD. In 2015, the MOU was amended to reflect CSD assuming ownership of all current and future Laguna Ridge and Southeast Planning Area Parks. To date, seven parks in Laguna Ridge meet this criterion. In 2016, the park inventory includes: 46 local parks of 1-3 acres 37 neighborhood parks of 3-10 acres 9 community parks of acres Bartholomew Sports Park (46 acres) Elk Grove Regional Park (121 acres) Typical assets include sport fields, sport courts, playgrounds and fitness areas, pools and spray grounds, walks and paths, and picnic shelters. A full list of parks and assets is located in Appendix B in the document entitled PARK SYSTEM. Streetscapes and trails are another large asset category. These areas, totaling 340 acres, consist mainly of landscaping with walks or paths. Streetscapes are an important part of the Park System as they are the most visible throughout the district. It is important that these streetscapes as well as the trails are well maintained as many time their appearance or lack of, forms people s opinions about the community. It is our duty to keep high standards to ensure public perception of our community remains high and that people continue to take pride in the community we serve. CSD valuation for assets in parks, trails and streetscapes assets is $78.3M. This does not include the Urban Forest of 45,456 trees, which is valued at $84.M. Taken together; the 2016 value of CSD Park System assets exceeds $162,600, All assets have a limited life span. Regular asset renewal is needed to ensure both usability and safety for park system users. The Park Maintenance Management Plan (PMMP) was created as a budgeting and management tool to manage asset renewal effectively. 1 Certain assets are maintained by the CSD Recreation Division. These include 7 community/recreation centers and Emerald Lakes Golf Course. Neither asset values nor asset renewal costs is included in the Park Maintenance Management Plan (PMMP). These figures are as of June 30, 2016, and do not include the seven Laguna Ridge Parks most recently dedicated to the CSD.

7 Park Maintenance Management Plan 4 Section 2 Cosumnes Community Services Background (continued) Funding and Budgets for Landscape and Lighting Assessment Districts Funding The CSD uses Landscape and Lighting (L&L) Benefit Assessment Districts to fund landscape maintenance as allowed by the 1972 Landscape and Lighting Act. L&L assessments provide a stable, ongoing funding source for landscape maintenance. This allows the CSD to direct all General Fund dollars to Fire, Recreation, and Administration activities. Other important details for L&L assessments: 1) The CSD has 18 assessments based on geographic boundaries 2) Assessments are collected annually from property owners 3) Assessments are based on the benefit the property derives from park amenities, streetscapes and trails 4) Assessments cannot increase beyond the Consumer Price Index without property owner approval 5) Assessment funds must be used within the benefit zone where collected, except for District Wide expenditures 2 Annual Budget The CSD prepares annual budgets for each L&L assessment district identifying revenues and expenditures. Any excess funds are set aside in reserves for future use in the Asset Life Cycle Plan (ALCP) or for Capital Improvement Projects (CIP). As part of the PMMP, staff created a 10-year budget for operational revenues and expenditures. Key assumptions in the PMMP budget are based on historical averages. 1) All revenues estimated to increase 1% annually (3% annually for the overlays) 2) All expenditures estimated to increase 3% annually Operations The CSD maintains assets in the CSD Park System using both staff and contractors. Through many years of research and experience, the CSD has determined it is most cost effective to combine staff and contractors to accomplish landscape maintenance work. The CSD Park Operations employs 24 full-time staff and numerous part-time staff to complete irrigation and park inspections, pool and sprayground maintenance, graffiti abatement, trash removal and asset repairs. A detailed list of maintenance activities are described in ROUTINE MAINTENANCE FREQUENCIES in Appendix A. Contractors are employed for routine tasks such as mowing, edging, pest control, irrigation repairs, wood fiber installation, and tree pruning. Contractors also complete specialized work such as pump repairs, removal of aquatic weeds in Camden Lake, resurfacing sport courts, sidewalk repairs and seal coating of rubberized playground surfaces. 2 District Wide expenditures include Bartholomew Sports Park, Camden Creek Greenbelt, Elk Grove Regional Park, and costs allocated across multiple benefit zones (e.g., staffing).

8 Park Maintenance Management Plan 5 Section 3 - Asset Life Cycle Plan The Asset Life Cycle Plan (ALCP) is one part of the budget and planning portion of the Park Maintenance Management Plan (PMMP). Capital Improvement Plan (CIP) costs represent the other part. ALCP costs are for scheduled asset maintenance, while CIP costs are one-time expenditures to install an asset. See Section 4 for details on CIP costs. Staff completed asset life cycle projects in past years as time and resources allowed. With competing demands in the ever-expanding CSD Park System, asset life cycle upkeep has not kept pace with needs. The ALCP has been instituted to ensure assets are effectively maintained on a regular schedule. The ALCP identifies 541 funded projects for completion in the next 5 years. This is similar to the amount identified in the first version of the PMMP in The ASSET LIFE CYCLE PLAN is located in Appendix C. It describes each project within each benefit zone, the project budget, and the planned year of work. ALCP projects include these characteristics: 1) Planned maintenance to extend use or increase the life span of an asset; 2) Asset renewal or replacement when useful life has been reached; 3) The project normally requires a bid process with CSD Board of Directors (Board) approval due to higher costs and/or complexity. Maintenance projects, by comparison, include these characteristics: 1) Minor or stop-gap repairs; 2) Routine inspections and work to ensure asset safety and aesthetics; 3) Work is often, but not always, unplanned. The ALCP is ten-year glance. Detailed expenditures are identified for years 1-5 (2016/17 to 2020/21) to verify funding availability and resources to accomplish the work. For years 6-10 (2021/22 to 2025/26), funding is based on the running average in the previous 5 years, plus scheduled playground renewals and replacement of synthetic turf at Bartholomew Sports Park. Playground renewals represent the largest expense in the ALCP, averaging $365,000 for design, equipment, construction management, and installation. Fortunately, playgrounds are built to last 25 years with minor upkeep. However, at the end of 25 years, the play value has diminished and the playground is ready for renewal. To help staff manage playground renewals, a PLAYGROUND RENEWAL TIMELINE for the next 35 years is kept and is used for planning purposes (Appendix E). Certain ALCP expenditures occur at punctuated intervals. Examples include: well rehabilitation estimated every 20 years, or replacement of the Bartholomew Sports Park synthetic turf every 10 years. Like playground renewals, these major expenditures require reserve funds to be built up over time. To assist with identifying costs, a DEFERRED PROJECTS GUIDE is included in Appendix F. The following tables summarize the ALCP for the next 5 years. Refer to Section 5 Benefit Zone Summaries, to see the ALCP in each Benefit Zone.

9 Park Maintenance Management Plan 6 Section 3 Asset Life Cycle Plan (Continued) Table 1 ALCP Overview 5 Years 2016/17 to 2020/21 Projects Value ALCP Projects - Identified 495 $35,057,328 ALCP Projects funded 442 $26,460,773 The ALCP includes 495 projects. Not all projects are funded. Funding for the ALCP is not sufficient in BENEFIT ZONE 3 Elk Grove West Vineyard, and BENEFIT ZONE 6 Central, to proceed with 64 projects totaling $8.6M. This count includes $4.6M for two development sites. These projects will be delayed indefinitely. 3 The funded ALCP includes 442 projects totaling $26.2M to be completed in the next 5 years. The number of projects and value is expected to increase as park system assets expand and age. Table 2 ALCP Funded Workload Allocation FY 2016/17 to FY 2020/21 Project Count Project Value Project Examples Contractor + CIP 313 $ 25,577,533 Playground renewal, sports court resurface, seal parking lot, sidewalk repairs Ballfield mix install, field renovation, In house 129 $ 883,220 Decomposed Granite (DG) resurface Grand Total 442 $ 26,460,773 The most cost-effective workload allocation uses a combination of in house staff and contractors to complete projects. Table 3 ALCP Categories Project Type FY 2015/16 Actual FY 2016/17 Approved FY 2016/17 to FY 2020/21 Completed Project Count Value 2015/16 Project Count Value 2016/17 Project Count Projected Value Fixtures 34 $ 156, $ 346, $ 9,722,590 Landscape/ Irrigation 21 $ 297, $ 765, $ 5,753,013 Parking/Roads 3 $ 45, $ 164, $ 369,443 Playground 20 $ 820,532 4 $ 632, $ 5,219,924 Sport Court 6 $ 22, $ 124, $ 361,475 Sport Field 13 $ 85, $ 128, $ 249,500 Walks/Paths 10 $ 49, $ 719, $ 1,784,828 Grand Total 107 $ 1,478, $ 2,881, $ 26,460,773 3 Unfunded projects are addressed in Section 6 Challenges. See Appendix D for UNFUNDED ASSET LIFE CYCLE PLAN BZ 3 and 6

10 Park Maintenance Management Plan 7 ALCP projects fall into seven categories. Playground renewal and Landscape projects represent over 27% of the total. Section 4 Capital Improvement Plan Costs Portions of certain L&L Assessment Reserves are designated for capital improvement projects (CIP), which are normally new assets or facilities. Because some improvements are still years away, the amount shown is a placeholder. These improvements require design work and a detailed budget before presentation to the Board for approval to proceed.

11 Park Maintenance Management Plan 8 Section 5 Benefit Zone Summaries The Park Maintenance Management Plan (PMMP) is a complete budget and planning tool for managing CSD Park System assets. The following pages describe the PMMP for each Benefit Zone (BENEFIT ZONE). The PMMP allows the user to quickly understand the following details: 1) Assets Includes the number of parks, acres, and types of parks. High-use assets are what the public uses and value the most. This data allows CSD staff to focus more effort on keeping these assets safe and usable. 2) Map Describes the BENEFIT ZONE boundaries and park locations. 3) Budget Describes assessment health: a. Strong /Sustainable Adequate funds for operating costs, ALCP costs, and CIP costs. b. Average/Likely Sustainable Adequate funds for operating costs, and some level of funding for ALCP and/or CIP costs. c. Poor/Not Sustainable Inadequate funds for operating costs and most ALCP/CIP costs. The PMMP budget is designed to show all relevant costs: annual operating costs, ALCP costs, and CIP costs. All three costs must be combined to accurately determine the long term health of the L&L assessment. The combined budget for the next 5 years is shown for each BENEFIT ZONE. To see the following 5 years, refer to the PMMP SUMMARY BUDGETS located in Appendix G. 4) ALCP Identifies project category, count, and value. Focus areas and challenges are listed for completing the ALCP within the BENEFIT ZONE. Table 4 on the next page is a one-page BENEFIT ZONE Summary. This snapshot provides the same information found on individual BENEFIT ZONE Summary pages. It is presented here in one chart to assist the user in quickly determining BENEFIT ZONE funding, budget health, ALCP costs, and CIP Costs. The snapshot shows most BENEFIT ZONE s have strong funding, a sustainable budget, a plan to accomplish the ALCP, and funding for CIP projects. If the PMMP is implemented effectively, there is a bright future ahead. Conversely, there are 2 BENEFIT ZONEs that are underfunded and the budgets are not sustainable: 1) BENEFIT ZONE 3 Elk Grove/West Vineyard 4 2) BENEFIT ZONE 6 Central Elk Grove The challenges facing these zones are discussed in Section 6 - Challenges. 4 Vista Creek is the one area in Benefit Zone 3 which is sustainable, based on passage of the Benefit Zone 15 Vista Creek Assessment in 2009.

12 Park Maintenance Management Plan 9 Table 4 BENEFIT ZONE Snapshot Benefit Zone FY Assessment Rate Assessment Funding Health Budget Sustainability ALCP Costs (No CIP) Capital Improvement Plan (CIP) Costs % of All Costs Funded Laguna $253 Strong Sustainable $1,000,263 $3,901, % 2 - Camden $274 Strong Sustainable $43, % 3 EG/West Vineyard $126 Poor Not Sustainable $88,244 $6,167,164 0% 4 - West Laguna $251 Strong Sustainable $454,338 $934, % Likely 5 - Lakeside $245 Average Sustainable $352,180 $69, % 6 - Central Elk Grove $85 Poor Not Sustainable $654,747 $1,686,400 0% 7 - Southwest Ag $0 NA NA NA 0 NA 8 Other Rural $85 Strong Sustainable $90, % 9 - Waterman/Park Village $152 Strong Sustainable $166,100 $1,338, % 10 Auto Mall $99 Strong Sustainable 0 0 NA 11 - East Elk Grove $424 Strong Sustainable $365,800 $4,242, % Likely 12 Laguna Stonelake $248 Average Sustainable $727, % 13 - East Franklin $344 Strong Sustainable $1,553,800 $7,773, % from all District Wide Benefit Zones Strong Sustainable $3,410,967 $38, % Overlay Districts Funds distributed to other Benefit Zones 14 - Camden Park $141 Strong Sustainable NA $0 NA 15 - Vista Creek Park $188 Strong Sustainable NA $0 NA 16 Fallbrook/Park Lane/Britschgi Park $154 Strong Sustainable NA $0 NA 18 Hampton Village Improvement District $133/$136 Strong Sustainable NA $0 NA 5 Includes operating, ALCP, and CIP costs

13 Park Maintenance Management Plan 10 Benefit Zone 1 Laguna Summary FY 2016/17 Assets Laguna Benefit Zone (BENEFIT ZONE) is large with 23 parks totaling 149 acres. It has more parks and park acres than any other benefit zone in the CSD. Laguna BENEFIT ZONE is fully built out with no additional parks planned. Laguna BENEFIT ZONE includes 8 local parks, 12 neighborhood parks, and 3 community parks. In addition, there are 99 acres of streetscapes and trails, also the largest amount in the CSD. Many parks are linked by either offstreet trails or on-street bike lanes. Laguna BENEFIT ZONE is known for its wide variety of parks with many high-use assets. These assets require regular renewal to ensure asset longevity. Asset Snapshot Count Park Count 23 Park Acres 149 ac. Corridor/Trail Acres 99 ac. High-Use Assets Diamond Fields 10 Multi-use Fields 16 Sport Courts 20 Playgrounds/Fitness 28 Spraygrounds 0 Dog Parks 1 Restrooms 5 Total High-Use Assets 80

14 Park Maintenance Management Plan 11 Benefit Zone 1 Laguna Summary FY 2016/17 Budget Laguna Benefit Zone (BENEFIT ZONE) funds for maintenance and improvements come from the annual Landscape and Lighting (L&L) assessment paid by property owners and cell tower revenue. The budget is designed to be self-supporting and not require use of General Fund dollars from property taxes. The Laguna BENEFIT ZONE L&L assessment is funded at a strong level. The budget snapshot (right) verifies the budget is sustainable into the foreseeable future. Adequate revenue is generated for all operating costs and reserves exist to fund the Asset Life Cycle Plan (ALCP). Reserves in Laguna BENEFIT ZONE will increase to $5.1 million in 10 years. This increase is necessary to offset large expenses in the ALCP in upcoming years, particularly for playground renewals. ALCP Laguna BENEFIT ZONE has 83 identified ALCP projects scheduled in the next five years totaling $4.9M. Nine playground renewals account for 62% all ALCP costs. The challenge will be effective ALCP management to ensure completion according to established timelines. Budget Snapshot L&L Assessment per home $253 Annual Revenue (FY 16/17) $3,9852,636 Reserves Actual July 2016 $3,318,382 In 5 Years July 2021 $3,090,069 In 10 Years July 2026 $5,168,164 Asset Life Cycle Plan (ALCP) Renewal Summary - Next 5 Years Category Projects Value Fixtures 20 $181,950 Landscape 16 $988,013 Parking/Roads 2 $45,000 Playgrounds 13 $3,037,000 Sport Courts 13 $151,000 Sport Fields 10 $105,000 Walks/Paths 9 $393,500 5 Year Total 83 $4,901,463

15 Park Maintenance Management Plan 12 Benefit Zone 2 - Camden Summary FY 2016/17 Assets Camden Benefit Zone (BENEFIT ZONE) is small with 2 neighborhood parks (Underwood and Camden Park Greenbelt) totaling 13 acres, plus 7 acres of streetscapes. Camden is fully built out with no additional parks planned. Camden Creek Greenbelt, along Camden Lake, is located in the Camden BENEFIT ZONE but identified as a District Wide facility. This distinction means costs for Camden Creek Greenbelt are shared by all CSD residents, rather than being placed solely on Camden BENEFIT ZONE residents. Camden BENEFIT ZONE is known for its open spaces and trails connecting the parks. Camden BENEFIT ZONE does not have traditional high-use assets such as playgrounds. However, the infrastructure includes a well and many walkways, which require regular funding to ensure asset longevity. Asset Snapshot Count Park Count 2 Park Acres 13 ac. Corridor/Trail Acres 7 ac. High-Use Assets Diamond Fields 0 Multi-use Fields 1 Sport Courts 0 Playgrounds 0 Spraygrounds 0 Dog Parks 0 Restrooms 0 Total High-Use Assets 1

16 Park Maintenance Management Plan 13 Benefit Zone 2 Camden Summary FY 2016/17 Budget Camden Benefit Zone (BENEFIT ZONE) funds for maintenance and improvements come from the annual Landscape and Lighting (L&L) assessment paid by property owners. The budget is designed to be self-supporting and not require use of General Fund dollars from property taxes. The Camden BENEFIT ZONE L&L assessment is funded at a strong level due to resident approval of the 2009 Camden Park L&L Assessment overlay. Prior to passage of the new assessment, expenses were greater than revenues. See BENEFIT ZONE 14 for supplemental budget information. The budget snapshot (right) along with the overlay zone verifies the budget is sustainable into the foreseeable future. Adequate revenue is generated for all operating costs and reserves exist to fund the Asset Life Cycle Plan (ALCP). ALCP Camden BENEFIT ZONE has 11 identified ALCP projects scheduled in the next five years totaling $43,000. Budget Snapshot L&L Assessment per home 1A $274 Annual Revenue (FY 16/17) $233,462 Reserves Actual July 2016 $74,100 In 5 Years July 2021 $83,542 In 10 Years July 2026 $3,260 Asset Life Cycle Plan (ALCP) Renewal Summary - Next 5 Years Category Projects Value Fixtures 1 $3,000 Landscape 5 $5,000 Parking/Roads 0 $0 Playgrounds 0 $0 Sport Courts 0 $0 Sport Fields 0 $0 Walks/Paths 5 $35,000 5 Year Total 11 $43,000 1A Includes BZ 2 Camden assessment of $274, plus BZ 14 Camden Park overlay of $141.

17 Park Maintenance Management Plan 14 Benefit Zone 3 Elk Grove/West Vineyard Summary FY 2016/17 Assets Elk Grove/West Vineyard Benefit Zone (BENEFIT ZONE) is a large benefit zone with 11 parks totaling 59 acres. It has the third most parks and park acres in the CSD. Elk Grove West/Vineyard includes 8 local parks, 1 neighborhood park, and 2 community parks. There are 18 acres of streetscapes and trails. Elk Grove/West Vineyard BENEFIT ZONE includes Rau Park and Jones Park, both with high-use assets for youth and adult sports. Elk Grove/West Vineyard BENEFIT ZONE includes a high amount of playgrounds, which require substantial funding for renewal. It is reasonable to predict that playgrounds and other assets will become unusable due to aging in the next few years. Unless new revenue is identified to renew the assets, these will require removal to prevent liability exposure. Asset Snapshot Count Park Count 11 Park Acres 59 ac. Corridor/Trail Acres 18 ac. High-Use Assets Diamond Fields 6 Multi-use Fields 3 Sport Courts 5 Playgrounds 12 Spraygrounds 0 Dog Parks 0 Restrooms 3 Total High-Use Assets 29

18 Park Maintenance Management Plan 15 Benefit Zone 3 Elk Grove/West Vineyard Summary- FY 2016/17 Budget Elk Grove/West Vineyard Benefit Zone (BENEFIT ZONE) funds for maintenance and improvements come from the annual Landscape and Lighting (L&L) assessment paid by property owners and cell tower revenues. The budget is designed to be self-supporting and not require use of General Fund dollars from property taxes. The Elk Grove/West Vineyard BENEFIT ZONE L&L assessment is funded at a poor level. 6 The budget snapshot (right) verifies the budget is not sustainable. Revenue does not cover operating costs and reserves are required to balance the budget. At the current pace, reserves will be depleted within 3 years. The Board of Directors recently directed staff to move forward with a Funding Plan that may result with an assessment vote to increase assessments. If a Ballot Measure were successful, additional revenue beginning in the 2018/19 fiscal year would bring this zone back in alignment and back to a sustainable state. Asset Life Cycle Plan (ALCP) Elk Grove/West Vineyard BENEFIT ZONE has 19 identified ALCP projects totaling $6,255,408. All projects are on hold until new funding is identified. Budget Snapshot L&L Assessment per home $126 Annual Revenue (FY 16/17) $885,559 Reserves Actual July 2016 $270,625 In 5 Years July 2021 ($120,713) In 10 Years July 2026 ($1,066,793) Asset Life Cycle Plan (ALCP) Renewal Summary - Next 5 Years Category Projects Value Fixtures 7 9,000 Landscape 1 57,200 Parking/Roads 4 36,300 Playgrounds 0 $0 Sport Courts 4 $22,400 Sport Fields 0 $0 Walks/Paths 4 $20,500 5 Year Total 21 $6,255,408 6 The only exception is Vista Creek, where residents approved an overlay assessment providing strong funding. See Benefit Zone 15 Vista Creek for details.

19 Park Maintenance Management Plan 16 Benefit Zone 4 West Laguna Summary FY 2016/17 Assets West Laguna Benefit Zone (BENEFIT ZONE) is medium in size with 7 parks totaling 39 acres. West Laguna BENEFIT ZONE is fully built out with no additional parks planned. The man-made lake is privately owned and maintained by the Laguna West Homeowners Association. West Laguna BENEFIT ZONE includes 2 local parks and 5 neighborhood parks. In addition, there are 23 acres of streetscapes and trails. Many parks are linked by either offstreet walks/paths or on-street bike lanes. West Laguna BENEFIT ZONE abounds in open space and trails. Existing assets require regular renewal to ensure asset longevity. As parks mature, asset renewal will need to be scheduled at an increasing pace. Asset Snapshot Count Park Count 7 Park Acres 39 ac. Corridor/Trail Acres 23 ac. High-Use Assets Diamond Fields 0 Multi-use Fields 6 Sport Courts 2 Playgrounds 7 Spraygrounds 0 Dog Parks 0 Restrooms 0 Total High-Use Assets 13

20 Park Maintenance Management Plan 17 Benefit Zone 4 West Laguna Summary FY 2016/17 Budget West Laguna Benefit Zone (BENEFIT ZONE) funds for maintenance and improvements come from the annual Landscape and Lighting (L&L) assessment paid by property owners. The budget is designed to be self-supporting and not require use of General Fund dollars from property taxes. The West Laguna BENEFIT ZONE L&L assessment is funded at a strong level. The budget snapshot (right) verifies the budget is sustainable into the foreseeable future. Adequate revenue is generated for all operating costs and reserves exist to fund the Asset Life Cycle Plan (ALCP). Reserves in West Laguna BENEFIT ZONE will grow moderately over for the next 10 years and beyond. This increase is necessary to offset 4 playground renewals between 2023 and 2029 in the ALCP. ALCP West Laguna BENEFIT ZONE has 36 identified ALCP projects scheduled in the next five years totaling $1,388,338. Two focus areas are walk/path repairs for liability reduction, and landscaping improvements to enhance the community aesthetic and sustain property value. The challenge will be effective ALCP management to ensure completion according to established timelines. Budget Snapshot L&L Assessment per home $251 Annual Revenue (FY 16/17) $851,546 Reserves Actual July 2016 $849,113 In 5 Years July 2021 $836,095 In 10 Years July 2026 $387,567 Asset Life Cycle Plan (ALCP) Renewal Summary - Next 5 Years Category Projects Value Fixtures 10 $20,710 Landscape 4 $40,000 Parking/Roads 0 $0 Playgrounds 2 $934,000 Sport Courts 3 $16,300 Sport Fields 1 $3,000 Walks/Paths 16 $374,328 5 Year Total 36 $1,388,338

21 Park Maintenance Management Plan 18 Benefit Zone 5 Lakeside Summary FY 2016/17 Assets Lakeside Benefit Zone (BENEFIT ZONE) is small in size with 3 parks totaling 24 acres. Lakeside is fully built out with no additional parks planned. The man-made lake is privately owned and maintained by Lakeside Community Owners Association. Lakeside BENEFIT ZONE includes 2 local parks, Caterino and Perez, plus Johnson Community Park, which includes most high-use assets. In addition, there are 14 acres of streetscapes and trails. Lakeside BENEFOT ZONE offers a wide variety of experiences in 3 parks. Existing assets require regular renewal to ensure asset longevity. Asset Snapshot Count Park Count 3 Park Acres 24 ac. Corridor/Trail Acres 14 ac. High-Use Assets Diamond Fields 3 Multi-use Fields 1 Sport Courts 2 Playgrounds 3 Spraygrounds 0 Dog Parks 0 Restrooms 1 Total High-Use Assets 10

22 Park Maintenance Management Plan 19 Benefit Zone 5 Lakeside Summary FY 2016/17 Budget Lakeside Benefit Zone (BENEFIT ZONE) funds for maintenance and improvements come from the annual Landscape and Lighting (L&L) assessment paid by property owners. The budget is designed to be self-supporting and not require use of General Fund dollars from property taxes. The Lakeside BENEFOT ZONE L&L assessment is funded at an average level. The budget snapshot (right) verifies the budget is likely sustainable into the foreseeable future therefore we have this zone on watch. Revenue is currently adequate for all operating costs however we will have to watch the reserves and choose the only the most necessary projects to fund from the Asset Life Cycle Plan (ALCP) moving into the future. Reserves appear to be diminishing over the next ten years however; this is due to 3 playground renewals between 2022 and 2030 scheduled in the ALCP. ALCP Lakeside BENEFIT ZONE has 29 identified ALCP projects scheduled in the next five years totaling $421,180. Two focus areas are walk/path repairs for liability reduction, and landscaping improvements to enhance the community aesthetic and sustain property value. The challenge will be effective ALCP management to ensure completion according to established timelines. Budget Snapshot L&L Assessment per home $245 Annual Revenue (FY 16/17) $625,776 Reserves Actual July 2016 $819,515 In 5 Years July 2021 $689,842 In 10 Years July 2026 $222,293 Asset Life Cycle Plan (ALCP) Renewal Summary - Next 5 Years Category Projects Value Fixtures 7 $35,090 Landscape 9 $185,000 Parking/Roads 1 $10,000 Playgrounds 0 $0 Sport Courts 1 $14,000 Sport Fields 5 $31,000 Walks/Paths 6 $146,090 5 Year Total 29 $421,180

23 Park Maintenance Management Plan 20 Benefit Zone 6 Central Summary FY 2016/17 Assets Central Elk Grove BENEFIT ZONE is a small benefit zone with 8 parks totaling 16 acres. Central Elk Grove BENEFIT ZONE is fully built out with no additional parks planned. Central Elk Grove BENEFOT ZONE includes 8 local parks. Elk Grove Regional Park is located in Central Elk Grove but considered a District Wide facility, which is accounted for in the District Wide Benefit Zone. There is less than 1 acre of streetscapes in this BENEFIT ZONE. It is reasonable to predict that playgrounds and other assets will become unusable due to aging in the next few years. Unless new revenue is identified to replace the assets, these will require removal to prevent liability exposure. Asset Snapshot Count Park Count 8 Park Acres 16 ac. Corridor/Trail Acres 0.4 ac. High-Use Assets Diamond Fields 0 Multi-use Fields 0 Sport Courts 1 Playgrounds/ Fitness 7 Spraygrounds 0 Dog Parks 0 Restrooms 0 Total High-Use Assets 8

24 Park Maintenance Management Plan 21 Benefit Zone 6 Central Summary FY 2016/17 Budget Central Elk Grove Benefit Zone (BENEFIT ZONE) funds for maintenance and improvements come from the annual Landscape and Lighting (L&L) assessment paid by property owners. The budget is designed to be self-supporting and not require use of General Fund dollars from property taxes. The Central Elk Grove BENEFIT ZONE L&L assessment is funded at a poor level. The budget snapshot (right) verifies the budget is not sustainable. Adequate revenue is generated to fund operating costs for the next 3 years before funds are depleted. Reserves in the Central Elk Grove BENEFOT ZONE are not sufficient and should be preserved to fund operating costs beyond year 3. The poor funding dilemma was recognized in After an education campaign, BENEFIT ZONE residents were asked to approve a $79 annual assessment overlay. This failed with 75% of ballots cast against the increase. The Board of Directors recently directed staff to move forward with a Funding Plan that may result with an assessment vote to increase assessments. If a Ballot Measure is successful, additional revenue beginning in the 2018/19 fiscal year would bring this zone back in alignment and back to a sustainable state. Budget Snapshot L&L Assessment per home $85 Annual Revenue (FY 16/17) $606,522 Reserves Actual July 2016 $74,441 In 5 Years July 2021 ($73,148) In 10 Years July 2026 ($579,200) Asset Life Cycle Plan (ALCP) Renewal Summary - Next 5 Years Category Projects Value Fixtures 8 $10,500 Landscape 3 $20,367 Parking/Roads 1 $3,400 Playgrounds 8 $2, Sport Courts 1 $3,530 Sport Fields 0 $0 Walks/Paths 8 $16,950 5 Year Total 29 $2,341,147 Asset Life Cycle Plan (ALCP) Central Elk Grove BENEFIT ZONE has 28 identified ALCP projects totaling $2,341,147. All projects are on hold until new funding is identified.

25 Park Maintenance Management Plan 22 Benefit Zone 8 Other Rural Summary FY 2016/17 Assets Other Rural Benefit Zone (BENEFIT ZONE) is large in geographic size, but currently has few assets. Other Rural BENEFIT ZONE encompasses the rural homes east of Waterman Road and Bradshaw Road and Laguna Ridge, also known as Madeira. Other Rural BENEFIT ZONE was created for property owners to contribute to the cost of District Wide facilities when they do not have a nexus benefit of local or neighborhood parks nearby. In the Laguna Ridge area, the City of Elk Grove instituted a Community Facilities District (CFD) fee to fund the park and streetscape construction and maintenance. The CFD is separate from the Other Rural BENEFIT ZONE fee. Other Rural Benefit Zone includes 0.8 acres of streetscapes on Bond Road. Laguna Ridge parks are not included in Other Rural Benefit Zone since these are funded through the City Park Fee Program and CFD. Asset Snapshot Count Park Count 0 Park Acres 0 ac. Corridor/Trail Acres 0.8 ac. High-Use Assets Diamond Fields 0 Multi-use Fields 0 Sport Courts 0 Playgrounds 0 Spraygrounds 0 Dog Parks 0 Restrooms 0 Total High-Use Assets 0

26 Park Maintenance Management Plan 23 Benefit Zone 8 Other Rural Summary FY 2016/17 Budget Other Rural Benefit Zone (BENEFIT ZONE) funds for maintenance and improvements come from the annual Landscape and Lighting (L&L) assessment paid by property owners. The budget is designed to be self-supporting and not require use of General Fund dollars from property taxes. The Other Rural BENEFIT ZONE L&L assessment is funded at a strong level. The budget snapshot (right) verifies the budget is sustainable into the foreseeable future. Adequate revenue is generated for all operating costs and reserves exist to fund the Asset Life Cycle Plan (ALCP). The majority of funds generated in the Other Rural BENEFIT ZONE are transferred to the District Wide budget to offset costs for three District Wide facilities: Bartholomew Sports Park, Camden Creek Greenbelt, and Elk Grove Regional Park, plus other District Wide costs such as staffing. Funding in this BENEFIT ZONE may be used to supplement City funded activities in Laguna Ridge, most notably the future City Aquatic facility. ALCP Other Rural has 2 identified ALCP projects scheduled in the next five years totaling $90,000. Budget Snapshot L&L Assessment per home $85 Annual Revenue (FY 16/17) $795,225 Reserves Actual July 2016 $1,176,662 In 5 Years July 2021 $2,930,427 In 10 Years July 2026 $4,689,052 Asset Life Cycle Plan (ALCP) Renewal Summary - Next 5 Years Category Projects Value Fixtures 0 $0 Landscape 1 $50,000 Parking/Roads 0 $0 Playgrounds 0 $0 Sport Courts 0 $0 Sport Fields 0 $0 Walks/Paths 1 $40,000 5 Year Total 2 $90,000

27 Park Maintenance Management Plan 24 Benefit Zone 9 Waterman/Park Village Summary FY 2016/17 Assets Waterman/Park Village Benefit Zone (BENEFIT ZONE) consists of 3 geographic areas with 4 parks totaling 21 acres and 64 acres of streetscapes and trails. As parks mature, asset renewal will need to be scheduled at an increasing pace. Waterman/Park Village Benefit Zone is fully built out with no additional parks planned. Assets are located in one of the 3 areas described below: Area 9A of Waterman/Park Village BENEFIT ZONE is southwest of Sheldon Road and Elk Grove Florin Road. Area 9B of Waterman/Park Village BENEFIT ZONE is southwest of Bond Road and Waterman Road. Area 9C of Waterman/Park Village BENEFIT ZONE is northeast of East Stockton Boulevard and Hampton Oak Drive. Asset Snapshot Count Park Count 4 Park Acres 21 ac. Corridor/Trail Acres 64 ac. High-Use Assets Diamond Fields 3 Multi-use Fields 0 Sport Courts 6 Playgrounds 5 Spraygrounds 0 Dog Parks 0 Restrooms 1 Total High-Use Assets 15

28 Park Maintenance Management Plan 25 Benefit Zone 9 - Waterman/Park Village Summary FY 2016/17 Budget Waterman/Park Village Benefit Zone (BENEFIT ZONE) funds for maintenance and improvements come from the annual Landscape and Lighting (L&L) assessments paid by property owners and cell tower revenues. The budget is designed to be self-supporting and not require use of General Fund dollars from property taxes. The Waterman/Park Village BENEFIT ZONE L&L assessment of $152 annually applies in area 9A, 9B, and 9C. In 2009, property owners were notified this funding level is poor and given the option to approve new assessment overlays. Area 9A and 9B property owners did, resulting in strong funding with sustainable reserves. Reserves are collected in Benefit Zone 14 Camden Park for Area 9A and in Benefit Zone 16 Fallbrook for Area 9B. Property owners in 9C originally rejected the overlay assessment, but in the Spring of 2016 voted for and approved a new assessment (Benefit Zone 18) overlay bringing Area 9C to a strong funding level with a sustainable reserve after repayment of the McConnell Park Renovation project. Additional reserves for Area 9C are shown in the overlay zone 18. Asset Life Cycle Plan (ALCP) Waterman/Park Village BENEFIT ZONE has 26 identified ALCP projects scheduled in the next five years totaling $1,504,100. Budget Snapshot L&L Assessment per home $152 Annual Revenue (FY 16/17) $329,582 Reserves Actual July 2016 $27,165 In 5 Years July 2021 $53,378 In 10 Years July 2026 $39,451 Asset Life Cycle Plan (ALCP) Renewal Summary - Next 5 Years Category Projects Value Fixtures 2 $58,000 Landscape 4 $620,000 Parking/Roads 1 $2,800 Playgrounds 2 $728,000 Sport Courts 5 $38,200 Sport Fields 5 $15,000 Walks/Paths 7 $42,100 5 Year Total 26 $1,504,100

29 Park Maintenance Management Plan 26 Benefit Zone 11 East Elk Grove Summary FY 2016/17 Assets East Elk Grove Benefit Zone (BENEFIT ZONE) is medium in size with 9 parks totaling 41 acres. East Elk Grove BENEFIT ZONE continues to build out with future plans for Wright Park Phase 2, Derr- Okamoto Phase 2, and an eventual community center in this BENEFIT ZONE. Many parks are linked by either off-street trails or on-street bike lanes. East Elk Grove BENEFIT ZONE is known for its wide variety of parks with many high-use assets. These assets require regular renewal to ensure asset longevity. Asset Snapshot Count Park Count 9 Park Acres 41 ac. Corridor/Trail Acres 16 ac. High-Use Assets Diamond Fields 2 Multi-use Fields 3 Sport Courts 5 Playgrounds/Fitness 14 Spraygrounds 2 Dog Parks 0 Restrooms 2 Total High-Use Assets 24

30 Park Maintenance Management Plan 27 Benefit Zone 11 East Elk Grove Summary FY 2016/17 Budget East Elk Grove Benefit Zone (BENEFIT ZONE) funds for maintenance and improvements come from the annual Landscape and Lighting (L&L) assessment paid by property owners. The budget is designed to be selfsupporting and not require use of General Fund dollars from property taxes. The East Elk Grove BENEFIT ZONE L&L assessment is funded at a strong level. The budget snapshot (right) verifies the budget is sustainable into the foreseeable future. Adequate revenue is generated for all operating costs and reserves exist to fund the Asset Life Cycle Plan (ALCP). Reserves in East Elk Grove BENEFIT ZONE will increase to $6 million in 10 years, even after funding CIP park development of $4.1M. Budget Snapshot L&L Assessment per home $424 Annual Revenue (FY 16/17) $1,842,373 Reserves Actual July 2016 $4,453,240 In 5 Years July 2021 $3,806,842 In 10 Years July 2026 $6,172,479 Asset Life Cycle Plan (ALCP) Renewal Summary - Next 5 Years Category Projects Value Fixtures 6 $3,367,000 Landscape 12 $989,500 Parking/Roads 2 $10,300 Playgrounds 4 $20,000 ALCP East Elk Grove BENEFIT ZONE has 51 identified ALCP projects scheduled in the next five years totaling $4,608,600. Sport Courts 4 $30,800 Sport Fields 15 $45,000 Walks/Paths 8 $146,000 5 Year Total 51 $4,608,600

31 Park Maintenance Management Plan 28 Benefit Zone 12 Laguna Stonelake Summary FY 2016/17 Assets Laguna Stonelake Benefit Zone (BENEFIT ZONE) is small in size with 3 parks totaling 27 acres. This BENEFIT ZONE is fully built out with no additional parks planned. The Laguna Stonelake BENEFIT ZONE parks are lined by off-street walks/paths and on-street bike lanes. The Laguna Stonelake BENEFIT ZONE offers a wide variety of experiences in 3 parks. Existing assets require regular renewal to ensure asset longevity. Asset Snapshot Count Park Count 3 Park Acres 27 ac. Corridor/Trail Acres 8 ac. High-Use Assets Diamond Fields 2 Multi-use Fields 1 Sport Courts 3 Playgrounds 3 Spraygrounds 1 Dog Parks 0 Restrooms 1 Total High-Use Assets 11

32 Park Maintenance Management Plan 29 Benefit Zone 12 Laguna Stonelake Summary FY 2016/17 Budget Laguna Stonelake Benefit Zone (BENEFIT ZONE) funds for maintenance and improvements come from the annual Landscape and Lighting (L&L) assessment paid by property owners and cell tower revenues. The budget is designed to be self-supporting and not require use of General Fund dollars from property taxes. The Laguna Stonelake BENEFIT ZONE L&L assessment is funded at an average level. The budget snapshot (right) verifies the budget is likely sustainable into the foreseeable future, therefore we have this zone on watch. Revenue is currently adequate for all operating costs however; we will have to watch the reserves and choose the only the most necessary projects to fund from the Asset Life Cycle Plan (ALCP) moving into the future. Budget Snapshot L&L Assessment per home $248 Annual Revenue (FY 16/17) $522,828 Reserves1 Actual July 2016 $690,837 In 5 Years July 2021 $198,967 In 10 Years July 2026 $103,564 Asset Life Cycle Plan (ALCP) Renewal Summary - Next 5 Years Category Projects Value Fixtures 3 $6,720 Landscape 20 $621,000 ALCP Laguna Stonelake BENEFIT ZONE has 36 identified ALCP projects scheduled in the next five years totaling $727,725. The challenge will be effective ALCP management to ensure completion according to established timelines. Parking/Roads 1 $20,000 Playgrounds 0 $0 Sport Courts 2 $27,675 Sport Fields 3 $9,000 Walks/Paths 7 $43,330 5 Year Total 36 $727,725

33 Park Maintenance Management Plan 30 Benefit Zone 13 East Franklin Summary FY 2016/17 Assets East Franklin Benefit Zone (BENEFIT ZONE) is large in size with 15 parks totaling 103 acres. It has the second-most parks and park acres in the CSD, just behind the Laguna BENEFIT ZONE. East Franklin BENEFIT ZONE is almost built out, with plans remaining for a community center at Morse Park and construction of the 5 acre George Park. East Franklin BENEFIT ZONE includes 7 local parks, 7 neighborhood parks, and 1 community park. Bartholomew Sports Park is located in East Franklin but considered a District Wide facility, which is accounted for in the District Wide Benefit Zone. There are 51 acres of streetscapes and trails. Many parks in this benefit zone are linked by either off-street trails or on-street bike lanes. East Franklin BENEFIT ZONE is known for its wide variety of parks with many high-use assets. These assets require regular renewal to ensure asset longevity. Asset Snapshot Count Park Count 15 Park Acres 103 ac. Corridor/Trail Acres 51 ac. High-Use Assets Diamond Fields 9 Multi-use Fields 4 Sport Courts 12 Playgrounds/Fitness 34 Spraygrounds 4 Dog Parks 1 Restrooms 6 Total High-Use Assets 57

34 Park Maintenance Management Plan 31 Benefit Zone 13 East Franklin Summary FY 2016/17 Budget East Franklin Benefit Zone (BENEFIT ZONE) funds for maintenance and improvements come from the annual Landscape and Lighting (L&L) assessment paid by property owners and cell tower revenues. The budget is designed to be self-supporting and not require use of General Fund dollars from property taxes. The East Franklin BENEFIT ZONE L&L assessment is funded at a strong level. The budget snapshot (right) verifies the budget is sustainable into the foreseeable future. Adequate revenue is generated for all operating costs and reserves exist to fund projects within the Asset Life Cycle Plan (ALCP). ACLP East Franklin BENEFIT ZONE has 93 identified ALCP projects scheduled in the next five years totaling $9.3M, with funding designated for a wide variety of projects to renew assets and extend their life cycle. The challenge will be effective ALCP management to ensure completion according to established timelines. Budget Snapshot L&L Assessment per home $344 Annual Revenue (FY 16/17) $3,423,464 Reserves Actual July 2016 $12,754,878 In 5 Years July 2021 $8,587,490 In 10 Years July 2026 $10,672,722 Asset Life Cycle Plan (ALCP) Renewal Summary - Next 5 Years Category Projects Value Fixtures 7 $6,024,120 Landscape 12 $1,986,000 Parking/Roads 6 $47,300 Playgrounds 3 $469,000 Sport Courts 7 $53,500 Sport Fields 44 $254,000 Walks/Paths 14 $493,000 5 Year Total 93 $9,326,920

35 Park Maintenance Management Plan 32 District Wide Benefit Zone Summary FY 2016/17 Assets The District Wide Benefit Zone (BENEFIT ZONE) is large in size with 3 parks totaling 149 acres. This includes Bartholomew Sports Park, Camden Creek Greenbelt, and Elk Grove Regional Park. These 3 parks are packed with many high-use assets and used by the public on a continual basis. These assets require regular renewal to ensure asset longevity. Expenses in the 3 parks in the District Wide BENEFIT ZONE are shared by all residents, rather than being places solely on the BENFIT ZONE where the park is geographically located. Each of the BENEFIT ZONES (not including overlay zones) carry the financial responsibility of these parks proportionally based on several different allocation processes (acreage, amenity and EDU). Budget Annual funding for maintenance and improvements comes from cell tower revenues and then proportionately from all other BENEFIT ZONE s. The budget is self-supporting and does not require use of General Fund dollars from property taxes. The District Wide BENEFIT ZONE is funded at a strong level. The budget is sustainable into the foreseeable future with funds for all operating costs and the Asset Life Cycle Plan (ALCP). Additional reserve funds are available for emergency use. Asset Snapshot Asset Life Cycle Plan (ALCP) Renewal Summary - Next 5 Years Count Park Count 3 Park Acres High-Use Assets 149 ac. Diamond Fields 15 Multi-use Fields 7 Sport Courts 6 Playgrounds 2 Spraygrounds 0 Dog Parks 1 Restrooms 7 Total High-Use Assets 38 Category Projects Value Fixtures 3 $26,000 Landscape 12 $268,500 Parking/Roads 20 $234,043 Playgrounds 3 $31,924 ALCP District Wide BENEFIT ZONE has 73 identified ALCP projects scheduled in the next five years totaling $3.4M, with funding designated for a wide variety of projects to renew assets and extend their life cycle. Sport Courts 1 $ 30,000 Sport Fields 21 $2,787,500 Walks/Paths 14 $71,480 5 Year Total 73 $3,449,447 The challenge will be effective ALCP management to ensure completion according to established timelines.

36 Park Maintenance Management Plan 33 Benefit Zone 14 Camden Park Summary FY 2016/17 Overview - Camden Park Benefit Zone (BENEFIT ZONE) is an assessment overlay of the BENEFIT ZONE 2 Camden Lighting and Landscape (L&L) assessment south of Whitehouse Creek and the BENEFIT ZONE 9 Waterman/Park Village, Area 9A, assessment north of Whitehouse. The Camden Park BENEFIT ZONE assessment was approved in 2009 to ensure sufficient funds were available for maintenance, water, and renewal projects in BENEFIT ZONE 2 Camden and BENEFIT ZONE 9 Waterman/Park Village, Area 9A. Other than minor costs for the annual engineering report, all revenues are available for use in BENEFIT ZONE 2 Camden and BENEFIT ZONE 9 Waterman/Park Village, Area 9A. Budget The Camden Park BENEFIT ZONE L&L assessment is funded at a strong level. The budget snapshot (right) verifies the budget is sustainable into the foreseeable future. Adequate revenue is generated for all operating costs and reserves to fund the Asset Life Cycle Plan (ALCP) within the BENEFIT ZONES this overlay supports. Reserves in Camden Park BENEFIT ZONE will grow moderately over for the next 10 years and beyond. All reserves will be used to fund ALCP projects in BENEFIT ZONE 2 Camden and BENEFIT ZONE 9A. ALCP No assets are attributed to the Camden Park BENEFIT ZONE. Instead, the assets are identified in BENEFIT ZONE 2 Camden and BENEFIT ZONE 9 Waterman/Park Village, Area 9A. Budget Snapshot L&L Assessment per home $141 Annual Revenue (FY 16/17) $149,681 Reserves Actual July 2016 $167,563 In 5 Years July 2021 $155,482 In 10 Years July 2026 $359,966

37 Park Maintenance Management Plan 34 Benefit Zone 15 Vista Creek Park Summary FY 2016/17 Overview Vista Creek Park Benefit Zone (BENEFIT ZONE) is an assessment overlay of the area surrounding Jordan Family Park in BENEFIT ZONE 3 Elk Grove West Vineyard. The Vista Creek Park BENEFIT ZONE Lighting and Landscape (L&L) assessment was approved in 2009 ensuring sufficient funds for maintenance, water, and renewal projects in this overlay area. Other than minor costs for the annual engineering report, all revenues are available for use in BENEFIT ZONE 3 Elk Grove/West Vineyard, Vista Creek Park. Budget The Vista Creek Park BENEFIT ZONE L&L assessment is funded at a strong level. The budget snapshot (right) verifies the budget is sustainable into the foreseeable future. Adequate revenue is generated for all operating costs and reserves to fund the Asset Life Cycle Plan (ALCP) within the BENEFIT ZONE this overlay supports. Reserves in Vista Creek Park BENEFIT ZONE will grow moderately over for the next 10 years and beyond. All reserves will be used to fund ALCP projects in BENEFIT ZONE 3 Elk Grove West Vineyard, Vista Creek specifically for Jordan Family Park. Over $13,000 is generated annually for ALCP projects. ALCP No assets are attributed to the Vista Creek Park BENEFIT ZONE. Instead, the assets are identified in BENEFIT ZONE 3 Elk Grove/West Vineyard. Budget Snapshot L&L Assessment per home $188 Annual Revenue (FY 16/17) $22,623 Reserves Actual July 2016 $83,922 In 5 Years July 2021 $169,356 In 10 Years July 2026 $269,675

38 Park Maintenance Management Plan 35 Benefit Zone 16 Fallbrook/Park Lane/Britschgi Park Summary FY 2016/17 Overview Fallbrook/Park Lane/Britschgi Park Benefit Zone (BENEFIT ZONE) is an assessment overlay of BENEFIT ZONE 9 Waterman/Park Village, Area 9B. The Fallbrook Lighting and Landscape (L&L) assessment was approved in 2009 to ensure sufficient funds were available for maintenance, water, and renewal projects in BENEFIT ZONE 9 Waterman/Park Village, Area 9B. Other than minor costs for the annual engineering report, all revenues are available for use BENEFIT ZONE 9 Waterman/Park Village, Area 9B. Budget The Fallbrook/Park Lane/Britschgi Park BENEFIT ZONE L&L assessment is funded at a strong level. The budget snapshot (right) verifies the budget is sustainable into the foreseeable future. Adequate revenue is generated for all operating costs and reserves to fund the Asset Life Cycle Plan (ALCP) within the BENEFIT ZONE this overlay supports. Reserves in Fallbrook/Park Lane/Britschgi Park BENEFIT ZONE will grow moderately over for the next 10 years and beyond. All reserves will be used to fund ALCP projects in BENEFIT ZONE 9 Waterman/Park Village, Area 9B. Reserves do appear to drop, but that is in correlation with a playground replacement at Hill Park. ALCP No assets are attributed to the Fallbrook/Park Lane/Britschgi Park BENEFIT ZONE. Instead, the assets are identified in BENEFIT ZONE 9 Waterman/Park Village, Area 9B. Budget Snapshot L&L Assessment per home $154 Annual Revenue (FY 16/17) $137,658 Reserves Actual July 2016 $429,063 In 5 Years July 2021 $136,917 In 10 Years July 2026 $19,570

39 Park Maintenance Management Plan 36 Benefit Zone 18 Hampton Village Improvement District Summary FY 2016/17 Overview Hampton Village Improvement District Benefit Zone (BENEFIT ZONE) is an assessment overlay of the Hampton Village area surrounding Jennie McConnell Park in BENEFIT ZONE 9 Waterman/Park Village, Area 9C. The Hampton Villag Improvememnt District BENEFIT ZONE Lighting and Landscape (L&L) assessment was approved in 2016 ensuring sufficient funds for maintenance, water, and renewal projects in this overlay area. Other than minor costs for the annual engineering report, all revenues are available for use in BENEFIT ZONE 9 Waterman/Park Village, Area 9C. Budget The Hampton Village Improvement District L&L assessment is funded at a strong level. The budget snapshot (right) verifies the budget is sustainable into the foreseeable future. Adequate revenue is generated for all operating costs and reserves to fund the Asset Life Cycle Plan (ALCP) within the BENEFIT ZONES this overlay supports. Reserves in Hampton Village Improvement District BENEFIT ZONE will immediately be used to fund the park improvements, playground replacement and streetscape replacement. As such this zone will be repaying a loan over the next 20 year. ALCP No assets are attributed to the Hampton Village Improvement District BENEFIT ZON. Instead, the assets are identified in BENEFIT ZONE 9 Waterman/ Park Village, Area 9C. Budget Snapshot L&L Assessment per home (A) $133 L&L Assessment per home (B) $136 Annual Revenue (FY 16/17) $71,002 Reserves Actual July 2016 $0 In 5 Years July 2021 $122,235 In 10 Years July 2026 $248,970

40 Park Maintenance Management Plan 37 Section 6 - Challenges The PMMP will face a number of challenges on the path to successful implementation. The challenges and recommendations are provided in this section. Challenge #1: Unsustainable Assessment Funding in Benefit Zones 3, and 6 Description: There are two BENEFIT ZONE s where funding is poor and the budget is not sustainable: 1) BENEFIT ZONE 3 Elk Grove West Vineyard - $123 assessment 2) BENEFIT ZONE 6 Central Elk Grove - $83 assessment Action Plan: Generally speaking, the minimum assessment increase needed in these BENEFIT ZONEs is $80 to $125 annually. 7 Unsustainability is due to a 1) low assessments that do not generate enough revenue to offset expenses, and 2) expense uncertainty. Contractor landscape maintenance costs and utilities (water and electrical) account for 25% of the annual L&L budget. Contractor landscape maintenance costs are predicted to increase in 2018 when the landscape contract renews, but the increase is uncertain at this time. Rate increases are anticipated from Sacramento County Water Agency, Elk Grove Water District, and SMUD in the coming years. Even minor increases will significantly impact the unsustainable zones. The poor funding issue was recognized in Substantial staff time and money was spent on education, but property owners voted down assessment increases by a large margin. Time for action will be necessary in the next few years. The PMMP shows that both Benefit Zones 3 and 6, all reserves will be exhausted and expenses exceeding revenues starting FY Staff have presented the Board with a Funding Plan. Task one and two are currently underway and are scheduled to be complete by the fall of At that time if the Board believes a ballot process will be successful, more resources will be committed to begin the ballot processes. If an assessment ballot were successful, increase to revenue would be realized in the 2018/19 fiscal year. Challenge #2: Description: Succession Planning The next few years will bring many retirements to the Park Operations Division at key positions. It will be important that not only do we capture the institutional knowledge of staff, but to make sure we mentor and prepare our staff to move up in the ranks if that is the path they so choose. This means not only preparing them for the technical work, but to make sure they would be prepared for supervisory roles, as well as training staff on the every changing technological platform. Our division strives to be more tech. friendly by utilizing a medley of web-based applications from our tree inventory to our daily dispatch system. The following are what we will be striving to focus on 7 Factors affecting the increase include how many Equivalent Dwelling Units (EDU s) are included in the assessment, the asset count, and age of assets.

41 Park Maintenance Management Plan 38 Action Plan: In order to mitigate the loss of institutional knowledge, we will strive for the following best practices for succession planning: 1) Cross train - We recognize that not all of our employees have the same needs when it comes to their careers. We will be trying to allow employees to cross train within our Division and provide the opportunity to work alongside someone in a different Division to gain other perspectives about our organization as a whole. We recognize that by providing opportunities for cross training we help facilitate vertical moves not only horizontal moves within the Division. This could ultimately lead to employees being more vested, but can lead to longevity with the District. 2) Make transparency a priority. Effective succession planning and career development flourishes when employees have access to information, and feel included in decision making. We currently hold quarterly meeting where we reflect back on past months, and help spread awareness of what is on the horizon. We continue to disseminate information out to crews when appropriate. Challenge #3: Description: Action Plan: Challenge #4: Description: Rising Construction Costs As the county and the Sacramento area are slowly come out of a recession, we are seeing an increase in construction costs, as well as an overall increase to services. The CSDs Lighting and Landscaping assessments are tied to the Consumer Price Index, which is not keeping up with the rising costs. Thus overall costs are rising faster than revenues. In order to compensate, there are a few steps staff can take: 1) Group projects together. If we can group projects together we may be able to take advantage of the economy of scale and get better pricing instead of bidding one park site out at a time. 2) Scale back - This plan identifies project and funding and allows us to make necessary changes as needed. It may be necessary for staff to be less aggressive in our project list. The result of this could mean that projects are deferred longer and assets are replaced on a longer cycle. 3) Staff were very successful in changing the specifications on the most recent Parks Maintenance contract which resulted in significant savings. Staff will once again look at the Streetscape Maintenance contract that is coming up for bid and many any necessary changes they see fit that could potentially save the district money Examples of such changes include pruning styles and frequency of fertilization applications. Decentralized Maintenance Facilities Coordination of activities, scheduling of staff and equipment are a current challange. Because maintenance activities are not scheduled out of one location, overlapping use of the same equipment is scheduled, and on occasion duplication of services. Multiple maintenance locations create a Division within a Division. This is not conducive to team building. All three current maintenance facility locations are at maximum capacity thus no room for growth which is an inevitable in our growing community.

42 Park Maintenance Management Plan 39 Action Plan: In order to more efficiently run the Park Operations Division we propose the next maintenance facility be built large enough to encompass our current staff and operational needs as well as future staff growth. 1) We are actively searching for the ideal location. Staff will not only research build to suit locations but also existing facilities that would meet the Division needs, and be centrally located to serve all areas of the District s service boundaries.

43 Park Maintenance Management Plan 40 Section 7 Plan Improvement and Monitoring The PMMP must be updated annually to be an effective budget and planning tool. Staff intends to produce an annual PMMP update, which will inform the annual budget process. This rendition of the ALCP does not include pool and sprayground projects. Nor does it include costs for City-funded assets in Laguna Ridge. Staff is developing this information for inclusion in the FY 2017/18 PMMP. With the first two years of PMMP implementation complete, it continues to be critical to monitor progress with implementation ACLP scheduling and completion.

44 Park Maintenance Management Plan 41 Appendix A B Routine Maintenance Frequencies Park System C Asset Life Cycle Plan D Unfunded Asset Life Cycle Plan BENEFIT ZONE 3 and 6 E F G Playground Renewal Timeline Deferred Projects Guide PMMP Summary Budgets

45 Park Maintenance Management Plan 42 Appendix A Routine Maintenance Frequencies The Parks Maintenance Division is responsible for maintaining a wide variety of assets throughout the parks, trails, and streetscapes within the boundaries of the District. Maintenance tasks are performed by both in-house and contractual staff. Maintenance responsibilities are divided into the following categories: Landscape Maintenance Turf Areas A. Mow height and frequency 1 ½ to 2 ½ inches. Weekly in growing season; every 2 weeks in dormant season. B. Edging Occurs at every mowing. Vacuum or blow. C. Clippings Mulching preferred. Remove if excessive. Vacuum or blow. D. Trimming No line trimmers around trees; 18 clearance of turf from tree trunk, chemical vegetation removal. E. Aeration One time annually, to occur one month prior to Spring fertilization. F. Turf Fertilization Two times annually. G. Weed Control 85 to 90 percent weed free (broadleaf and clover). H. Whitehouse Creek Trail Mow- Every other week between March and October. I. Playgrounds/Sand Volleyball Court/Horseshoe Pits Policed weekly, raked on service days. J. Litter Control weekly Shrubs and Trees A. Pruning using ISA methods and trained staff. B. Shrub pruning - consistent to ISA standards, no individual box or balled forms. Carpet/Hybrid T Roses (3 times annually) and Hybrid T heavy winter pruning (1 time annually). C. Tree pruning Shape trees as needed to maintain 96 high clearance; remove dead/damaged branches immediately. Young tree pruning - none unless directed by CSD staff. D. Stakes and ties Inspect/service per service schedule. E. Weed control Areas kept weed and litter free at all times per service schedule. F. Cut back old or dead growth as needed. Groundcover A. Groundcover Edged once per month. All cuttings removed. B. Ornamental grasses and monocots Pruned at end of growth season. C. Dead and damaged plant material identified and removed. D. Bio Swales - Shrubs pruned to eliminate encroachment on walks; trim groundcover by request up to 2 times annually. E. Hard Fescue Cut back twice annually. F. Weed control Weed and litter free at all times per service schedule. Bark Areas A. Weed control Weed and litter free at all times per service schedule. Decomposed Granite A. Weed control Weed and litter free at all times per service schedule.

46 Park Maintenance Management Plan 43 Sport Fields A. Ball field mix Weed and litter free at all times per service schedule. B. Edging Concurrent with mow schedule. Hardscapes A. Ballfields: bleachers and hardscapes - blown and debris free per service schedule B. Tennis and Futsal Courts - blown and debris free per service schedule C. Walkways and Paths - blown and debris free per service schedule Irrigation System Checks/Repairs A. Irrigation checks twice per month B. Repairs required repairs documented during inspection, repaired within 2 working days Urban Forest Management Plan The multi-faceted Urban Forest Management Plan provides for the maintenance and upkeep of over 45,000 trees within the District s inventory. Major program areas and desired outcomes are as follows: A. Computerization the Urban Forest Management Plan is a web-based program, maintained by others, fully accessible by District staff, and provides the following components: tree inventory, ordering and tracking work, maintenance scheduling, and budget projections. B. Cyclical Pruning all trees will be pruned every 5 years. The cycle will be extended in areas where funding cannot support a 5 year pruning cycle. Pruning must be in accordance with International Society of Arborist (ISA) standards. C. Planting new and replacement trees shall be planted where practical and sustainable. D. Tree palette tree varieties with known issues shall not be planted. In areas where unacceptable tree varieties were planted, reforestation using a more appropriate variety shall be considered. Sidewalk Inspection and Repair A. Sidewalks on District property or within District easement areas are the responsibility of the District to maintain. District staff will insect 25% of its sidewalk areas per year. When the District is notified by the City, public, or staff of a safety related sidewalk issue, Park Operations staff will: i. Inspect the area within 24 hours of notice ii. When lifts are greater than.25, temporary repair will be made using an asphalt product or angle cut. When lifts are greater than.75 then a determination is made to remove and replace. iii. Barricade the sidewalk, if no temporary repair is possible iv. Designate as immediate repair or defer to next repair cycle v. All activities involving sidewalk inspections and/or repairs shall be documented within the District s GIS based sidewalk inspection system. Records shall be retained per the District s record retention procedure.

47 Park Maintenance Management Plan 44 Aquatic Facilities Park Operations staff visit the Barbara Morse Wackford Aquatic Center (BMWCAC) and the Jerry Fox Swim Center (JFSC) daily, and perform the duties as outlined here: Location: Wackford Aquatic Complex PEAK SEASON OFF PEAK (Feb. 1 - Sept. 30) (Oct. 1 - Jan. 31) Task Frequency Task Frequency Deep Xtreme (aka Competition) Adventure Bay (aka Recreation) Pool Readings 2 times daily (6:30 am & 2:30pm) Pool Readings 1 time daily (7am) Backwash 2 times per week Backwash 1 time weekly Clean Traps 3 times per week (Mon, Wed, Fri) Clean Traps 1 every other week Detailed Pool Readings Every 2 weeks Detailed Pool Readings 1 time monthly Pulsar Cleaning Every 2 weeks Pulsar Cleaning 1 time monthly Pool Readings 2 times daily (6:30 am & 2:30pm) Pool Readings 1 time daily (7am) Backwash 1 time daily (6am) Backwash 1 time weekly Clean Traps 3 times per week (Mon, Wed, Fri) Clean Traps 1 every other week Detailed Pool Readings Every 2 weeks Detailed Pool Readings 1 time monthly Pulsar Cleaning Every 2 weeks Pulsar Cleaning 1 time monthly Pool Readings 2 times daily (6:30 am & 2:30pm) Pool Readings 1 time daily (7am) Island (aka Play) Backwash 2 times weekly Backwash 1 time weekly Clean Traps 1 time per week (Fri) Clean Traps 1 every other week Detailed Pool Readings Every 2 weeks Detailed Pool Readings 1 time monthly Pulsar Cleaning Every 2 weeks Pulsar Cleaning 1 time monthly

48 Park Maintenance Management Plan 45 Location: Jerry Fox Swim Center PEAK SEASON OFF PEAK (Feb. 1 - Sept. 30) (Oct. 1 - Jan. 31) TASK FREQUENCY TASK FREQUENCY Pool readings 2 times daily (7a & 2p) Pool readings Once daily (8am) Backwash 2 times weekly Backwash As needed Clean trap & deck baskets 1 time daily Clean trap & deck baskets 2 times weekly, until covered. Then none. Detailed pool readings Every 2 weeks Detailed pool readings Once a month Pulsar cleaning Every 2 weeks Pulsar cleaning Once a month Spraygrounds The District maintains 8 spraygrounds, that are operated from May 1 st to Sept. 30 th8, with two distinctively different modes of operation drain-to-waste and recirculating. There are 6 drain-to-waste spraygrounds where the water run-off generated is drained into the City sewer system. These systems require a daily operational test and daily drain cleaning. Periodic repairs are performed as needed and a yearly winterization process is done to protect the system from freezing during the winter months. The 2 spraygrounds with recirculating systems are maintained similar to a swimming pool. Water runoff is drained into large underground tanks where it is treated and re-used. Recirculating spraygrounds require a minimum of two staff visits per day. 8 Dates are modified during drought conditions.

REQUEST FOR WRITTEN BIDS

REQUEST FOR WRITTEN BIDS Parks & Recreation Department 9355 E, Stockton Blvd., Suite 185 Elk Grove, CA 95624 REQUEST FOR WRITTEN BIDS TO: ALL PROSPECTIVE CONTRACTORS DATE: December 14, 2017 AMENDED 1/4/18 Bid Manager: Pamela Dawson,

More information

COSUMNES COMMUNITY SERVICES DISTRICT

COSUMNES COMMUNITY SERVICES DISTRICT COSUMNES COMMUNITY SERVICES DISTRICT STATE OF CALIFORNIA The is the Local Government Provider of Fire & Emergency Services and Parks & Recreation Services COMPREHENSIVE ANNUAL FINANCIAL REPORT FOR THE

More information

Lakeside Park Financial Review MAY 1, 2018

Lakeside Park Financial Review MAY 1, 2018 Lakeside Park Financial Review MAY 1, 2018 Utility System Sustainability Issues: Aging infrastructure / costly emergency repairs / inefficient spending of resources / dramatic drop in sale volume Developed

More information

Parks and Recreation. FY Budget Presentation

Parks and Recreation. FY Budget Presentation Parks and Recreation Budget Presentation Parks and Recreation Budget Emphasis The mission of Parks and Recreation is to unite and grow lives by preserving parks and encouraging play. 36 Parks 27 Playgrounds

More information

This page intentionally left blank

This page intentionally left blank 197 This page intentionally left blank 198 Capital Improvement Program PROCEDURE Each year the Capital Improvement Program (CIP) is prepared from project requests submitted by the various departments.

More information

POLICY TOPIC PAPER 1.0: SPECIFIC PLANS AND SPECIAL PLANNING AREAS

POLICY TOPIC PAPER 1.0: SPECIFIC PLANS AND SPECIAL PLANNING AREAS POLICY TOPIC PAPER 1.0: SPECIFIC PLANS AND SPECIAL PLANNING AREAS BACKGROUND The City uses a number of tools to guide and manage development. In addition to the General Plan, there are a number of Specific

More information

Concord s Historic Beebe House

Concord s Historic Beebe House Concord s Historic Beebe House The Beebe House was built circa 1870 as the residence of Benjamin and Fannie Beebe and their children. It was originally located about a quarter of a mile west of the town

More information

FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary

FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary The adopted FY 2017 FY 2021 CIP is $235.8 million (including prior year expenditures) and is $28 million higher than the previous CIP

More information

BERKELEY UNIFIED SCHOOL DISTRICT

BERKELEY UNIFIED SCHOOL DISTRICT BERKELEY UNIFIED SCHOOL DISTRICT TO: Javetta Cleveland and Neil Smith, Co-Superintendents FROM: Lew Jones, Director of Facilities DATE: June 26, 2013 SUBJECT: Approval of the 2013/14 Measure H Annual Plan

More information

Parks & Recreation. Mission Statement. Mandates. Expenditure Budget: $35,570,456. Community Development Expenditure Budget: $162,905,334

Parks & Recreation. Mission Statement. Mandates. Expenditure Budget: $35,570,456. Community Development Expenditure Budget: $162,905,334 Mission Statement The Department of Parks & Recreation enriches our diverse community s quality of life through citizendriven recreational experiences, offered in an environmentally and fiscally responsible

More information

Philip A. Ginsburg, General Manager Dawn Kamalanathan, Planning and Capital Program Director

Philip A. Ginsburg, General Manager Dawn Kamalanathan, Planning and Capital Program Director Date: June 1, 2016 To: Through: From: Subject: Recreation and Park Commission Capital Committee Philip A. Ginsburg, General Manager Dawn Kamalanathan, Planning and Capital Program Director Dan Mauer, Project

More information

Capital Improvement Program Fund

Capital Improvement Program Fund Capital Improvement Program Fund The Capital Improvement Program Fund provides funding for streets, public buildings (both governmental and school facilities), land, and other capital assets. Capital Improvement

More information

P ARISH OF EAST B ATON ROUGE, L OUISIANA BREC S TRATEGIC P LAN

P ARISH OF EAST B ATON ROUGE, L OUISIANA BREC S TRATEGIC P LAN CHAPTER 12 IMPLEMENTATION PLAN INTRODUCTION The final outcome of the planning process is the implementation of the recommendations which have been made. Some recommendations do not cost the department,

More information

Replacement Reserve Study Report

Replacement Reserve Study Report Replacement Reserve Study Report for Landscaping and Lighting Assessment District (Zone 1: La Vigne) For the Napa County, California August 6, 2012 (Revised March 5, 2014) Page i August 6, 2012 (revised

More information

RECREATION AND PARKS

RECREATION AND PARKS RECREATION AND PARKS Description The Division of Recreation and Parks offers a variety of quality programs and facilities to meet the leisure needs of the residents of Henrico County. To accomplish these

More information

Policy CIE The following are the minimum acceptable LOS standards to be utilized in planning for capital improvement needs:

Policy CIE The following are the minimum acceptable LOS standards to be utilized in planning for capital improvement needs: Vision Statement: Provide high quality public facilities that meet and exceed the minimum level of service standards. Goals, Objectives and Policies: Goal CIE-1. The City shall provide for facilities and

More information

An Evaluation of the Performance Measurement Process of The City of Austin

An Evaluation of the Performance Measurement Process of The City of Austin To: Mayor Steve Adler From: Mike Hebert and Linda Bailey Cc: City Council Members April 22, 2016 Summary An Evaluation of the Performance Measurement Process of The City of Austin Recently, the City Council

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Sample Condominium Association Laguna Hills, California Version 1 March 31, 2004 23201 Mill Creek Drive, Suite 100 Laguna Hills, California 92653 Phone (949) 474-9800 Facsimile

More information

Debt Service Funds

Debt Service Funds Debt Service Funds & Debt Schedules 327 The City issues general obligation bonds, certificates of obligation, combination tax and revenue certificates of obligation and tax notes to provide for the acquisition

More information

PARKS, RECREATION AND WATERFRONT DEPARTMENT FACILITIES ASSESSMENT AND FUNDING OPTIONS

PARKS, RECREATION AND WATERFRONT DEPARTMENT FACILITIES ASSESSMENT AND FUNDING OPTIONS PARKS, RECREATION AND WATERFRONT DEPARTMENT FACILITIES ASSESSMENT AND FUNDING OPTIONS Worksession February 11, 2014 1 INTRODUCTION/ OVERVIEW Parks Tax Structural Deficit Capital Improvement Program Projected

More information

2014 COMMON AREA GROUNDS MAINTENANCE AGREEMENT Neighborhood Association

2014 COMMON AREA GROUNDS MAINTENANCE AGREEMENT Neighborhood Association 2014 COMMON AREA GROUNDS MAINTENANCE AGREEMENT Neighborhood Association This agreement is made by and between (Contractor) and the Neighborhood Association (Neighborhood) for the calendar year January

More information

The foundation of the Elk Grove General Plan is the Vision Statement, contained in the Preface to this General Plan

The foundation of the Elk Grove General Plan is the Vision Statement, contained in the Preface to this General Plan General Plan Goals The Goals, Policies, Action Items/ Implementation steps in this General Plan are organized as shown below. Each of the items in descending order provides more detail specific information

More information

Building Better Parks: An Asset Management Plan for Parks

Building Better Parks: An Asset Management Plan for Parks Header Title Attachment 1 Building Better Parks: An Asset Management Plan for Parks 2 JULY 2016 INTRODUCTION The s (City) parks inventory is composed of a variety of asset sub-classes that include but

More information

City of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016

City of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016 City of Des Moines Citizen Engagement Capital Improvement Program November 29, 2016 Goals of Citizen Engagement Goal Focus on service levels Department definitions of adequate service and opportunities

More information

UNINCORPORATED CAPITAL

UNINCORPORATED CAPITAL UNINCORPORATED CAPITAL The total funding to be appropriated for the unincorporated capital program in FY13 is $13,665,000. This reflects funds committed to drainage, pavement, sidewalk, and other infrastructure

More information

VILLAGE AT LAKE CHELAN

VILLAGE AT LAKE CHELAN VILLAGE AT LAKE CHELAN Manson, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued October, 2018 Next Update: Level 3 by October,

More information

PUBLIC WORKS DEPARTMENT PUBLIC WORKS ADMINISTRATION & ENGINEERING STREETS MAINTENANCE PARKS MAINTENANCE GOVERNMENT BUILDINGS

PUBLIC WORKS DEPARTMENT PUBLIC WORKS ADMINISTRATION & ENGINEERING STREETS MAINTENANCE PARKS MAINTENANCE GOVERNMENT BUILDINGS PUBLIC WORKS DEPARTMENT PUBLIC WORKS ADMINISTRATION & ENGINEERING STREETS MAINTENANCE PARKS MAINTENANCE GOVERNMENT BUILDINGS 180 PUBLIC WORKS ADMINISTRATION & ENGINEERING General Fund Department 4301 DEPARTMENT

More information

May 24, 2016 Our File: /63238/2 Doc#: V1

May 24, 2016 Our File: /63238/2 Doc#: V1 CoQuitlam For Council Our File: 12-6100-20/63238/2 Doc#: 2276781.V1 To: From: Subject: For: City Manager General Manager Parks, Recreation & Culture Services Hartley Grass Field Replacement and Mountainview

More information

City of Pacifica General Fund Budget

City of Pacifica General Fund Budget City of Pacifica 2017-18 General Fund Budget General Government Lorenzo Hines Jr. City Manager s Office May 2, 2017 City of Pacifica 1 General Government 2017-18 DRAFT Budget Mission We strive to manage

More information

2017 Budget & Capital Improvement Plan AUGUST 29, 2017

2017 Budget & Capital Improvement Plan AUGUST 29, 2017 2017 Budget & Capital Improvement Plan AUGUST 29, 2017 FY 2017 Budget Calendar May June July August September October November December Financial Forecast & Public Safety Staffing Priorities, Programs,

More information

City of Rancho Cucamonga

City of Rancho Cucamonga City of Rancho Cucamonga Fiscal Year 2018/19 Proposed Budgets Budget Study Session June 7, 2018 Transition to the 21 st Century Are we in the midst of a long recovery or getting closer to the next downturn?

More information

DEBT SERVICE FUNDS & DEBT SCHEDULES

DEBT SERVICE FUNDS & DEBT SCHEDULES DEBT SERVICE FUNDS & DEBT SCHEDULES INTEGRITY INNOVATION ACCOUNTABILITY COMMITMENT TO EXCELLENCE TEAMWORK This section provides a summary of the annual principal and interest payments for all outstanding

More information

Fiscal Year Final Budget

Fiscal Year Final Budget Fiscal Year 2017-18 Final Budget TABLE OF CONTENTS TABLE OF CONTENTS Introduction Board of Directors 2 Executive Staff 2 Demographics 3 Jurisdiction Profile 7 District Vision, Mission, Goals 11 Economic

More information

Develop and implement the City s capital construction programs for parks, trails and other associated infrastructure

Develop and implement the City s capital construction programs for parks, trails and other associated infrastructure Parks and Recreation The Parks and Recreation department provides inclusive, safe and enjoyable recreation, sport and passive recreation opportunities for all community members. The department strives

More information

PROPOSED TEN-YEAR CAPITAL IMPROVEMENT PLAN

PROPOSED TEN-YEAR CAPITAL IMPROVEMENT PLAN 2017/2018 YEAR 1 ESTIMATED FUND BALANCE 7/1/17 $ 1,795,000 $ - $ 209,000 $ 117,861 $ (333,878) $ (240,844) $ 642,513 $ (113,143) EXPECTED REVENUE ACTIVITY $ 1,014,000 $ 33,473 $ 49,500 $ - $ - $ - $ -

More information

Debt Service FunDS & Debt ScheDuleS

Debt Service FunDS & Debt ScheDuleS Debt Service Funds & Debt Schedules The City issues general obligation bonds, certificates of obligation, combination tax and revenue certificates of obligation and tax notes to provide for the acquisition

More information

2010 ADOPTED BUDGET IN BRIEF

2010 ADOPTED BUDGET IN BRIEF 2010 ADOPTED BUDGET IN BRIEF 2010 Total Expenditures $29,054,040 (excluding transfers) General $23,891,701 Recreation Center $2,360,597 Open Space $1,485,287 Capital Investment Program $1,350,000 Conservation

More information

TABLE OF CONTENTS. FY 2016/17 Final Budgets CSD Combined 19 Administrative Services Department 22 Fire Department 31 Parks & Recreation Department 50

TABLE OF CONTENTS. FY 2016/17 Final Budgets CSD Combined 19 Administrative Services Department 22 Fire Department 31 Parks & Recreation Department 50 TABLE OF CONTENTS TABLE OF CONTENTS Introduction Board of Directors 2 Executive Staff 2 Demographics 3 Jurisdiction Profile 7 District Organizational Chart 9 District Awards and Recognitions 10 District

More information

FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary

FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary The adopted FY 2016 FY 2020 CIP is $205.3 million (including prior year expenditures) and is $2.9 million lower than the previous CIP

More information

CITIZEN S POPULAR ANNUAL FINANCIAL REPORT

CITIZEN S POPULAR ANNUAL FINANCIAL REPORT Clearfield City 1 CITIZEN S POPULAR ANNUAL FINANCIAL REPORT A Summary Financial Report of the 2013 Fiscal Year (July 1, 2012 through June 30, 2013) 2 Clearfield City Purpose Statement The intent of the

More information

City of Penticton: Financial Plan Reporting Structure

City of Penticton: Financial Plan Reporting Structure City of Penticton: Financial Plan Reporting Structure General Utilities General Government Transportation Services Recreation and Culture Environmental Health Services Public Health and Safety Protective

More information

Dallas Public Improvement Districts (PIDs) Overview and Update

Dallas Public Improvement Districts (PIDs) Overview and Update Dallas Public Improvement Districts (PIDs) Overview and Update Dallas PID Overview - Purpose Review PID governance, operating parameters, management and reporting. Provide the Economic Development Committee

More information

STATUS OF LIMITED TERM STAFF POSITIONS

STATUS OF LIMITED TERM STAFF POSITIONS STAFF REPORT MEETING DATE: March 13, 2018 TO: FROM: SUBJECT: City Council Michael Antwine II, Assistant City Manager Tony Clark, Finance Manager STATUS OF LIMITED TERM STAFF POSITIONS 922 Machin Avenue

More information

The Ranches HOA. Level II Reserve Study. Report Period 1/01/08 12/31/08

The Ranches HOA. Level II Reserve Study. Report Period 1/01/08 12/31/08 The Ranches HOA Level II Reserve Study Report Period 1/01/08 12/31/08 Client Reference Number.... 10329 Property Type..... Single Family Homes Number of Units.......... 1,750 Fiscal Year End......... December

More information

REATA PARK AND EVENT CENTER

REATA PARK AND EVENT CENTER REATA PARK AND EVENT CENTER Consideration of the Security/Operations and Maintenance Plan for the Reata Park and Event Center and an Extension to the Memorandum of Understanding with the San Juan Capistrano

More information

PARK AND RECREATION DEPARTMENT

PARK AND RECREATION DEPARTMENT Departmental Summary FUND/ACTIVITY ACTUAL ADOPTED AMENDED RECOMM. : Revenue Management Services 154,277 157,619 155,619 159,845 Park Improvements Planning 199,318 401,000 61,051 63,453 Cemetery 1,264,295

More information

OUR NEIGHBORS IN WOODLAND SPRINGS YOUR NEIGHBORHOOD ASSOCIATION BOARD

OUR NEIGHBORS IN WOODLAND SPRINGS YOUR NEIGHBORHOOD ASSOCIATION BOARD TO: FROM: OUR NEIGHBORS IN WOODLAND SPRINGS YOUR NEIGHBORHOOD ASSOCIATION BOARD This mailing will help you prepare for the 2015 Annual Members Meeting of the association, which will be held at 9:00 a.m.

More information

Fiscal Responsibility to Further Invest in the Future. Executive Committee Department of Finance May 4, 2017

Fiscal Responsibility to Further Invest in the Future. Executive Committee Department of Finance May 4, 2017 Fiscal Responsibility to Further Invest in the Future Executive Committee Department of Finance May 4, 2017 1 Asset Inventory Denver s Assets Parks and Recreation $1.8B Transportation $4.7B Buildings $1.9B

More information

Dallas Public Improvement Districts (PID) Overview and Update

Dallas Public Improvement Districts (PID) Overview and Update Dallas Public Improvement Districts (PID) Overview and Update Economic Committee September 6, 2011 1 Dallas PID Overview - Purpose Review PID governance, operating parameters, management and reporting.

More information

2017 Survey Results. 55. Would you be interested in participating in any type of marathon/triathlon in The Villages?

2017 Survey Results. 55. Would you be interested in participating in any type of marathon/triathlon in The Villages? 46. To what extent does The Villages Recreation Department make a difference in you health or the health of members of your household? Makes no difference 963 12% Makes little difference 1117 14% Helps

More information

State of the City Report August 2015

State of the City Report August 2015 State of the City Report August 2015 Lindon City: An Optimistic Future The state of Lindon City is strong! We have emerged from the recession as a vibrant city that is positioned for success and prosperity.

More information

Public Works and Development Services

Public Works and Development Services City of Commerce Capital Improvement Program Prioritization Policy Public Works and Development Services SOP 101 Version No. 1.0 Effective 05/19/15 Purpose The City of Commerce s (City) Capital Improvement

More information

P AR K S AN D RECRE AT I O N

P AR K S AN D RECRE AT I O N P AR K S AN D RECRE AT I O N A D M I N I S T R A T I O N ( 5 2 0 1 ) OVERALL GOAL Provide overall direction and coordination for the Parks and Recreation Department, including but not limited to; implementation

More information

IMPLEMENTATION A. INTRODUCTION C H A P T E R

IMPLEMENTATION A. INTRODUCTION C H A P T E R C H A P T E R 11 IMPLEMENTATION A. INTRODUCTION This chapter addresses implementation of the General Plan. The Plan s seven elements include 206 individual actions. 1 Many are already underway or are on-going.

More information

WORK SESSION ITEM City Council

WORK SESSION ITEM City Council DATE: STAFF: January 22, 2019 Ginny Sawyer, Policy and Project Manager WORK SESSION ITEM City Council SUBJECT FOR DISCUSSION Keep Fort Collins Great Sunset. EXECUTIVE SUMMARY The purpose of this work session

More information

2018 Budgeted Amount: 400,000 GL Account Number: Responsible Department: City Council. Potential Grant Funds Identified. Small Ongoing Revenue Source

2018 Budgeted Amount: 400,000 GL Account Number: Responsible Department: City Council. Potential Grant Funds Identified. Small Ongoing Revenue Source City of Golden Capital Plan 20192028 Project Detail Sheet 2018 Budgeted Amount: 400,000 GL Account Number: Completed by: Steve Glueck Responsible Department: City Council Department Head Review: Steve

More information

Accept the report on the status of the development of the proposed citywide Softball facility.

Accept the report on the status of the development of the proposed citywide Softball facility. COUNCIL AGENDA: 6/21/16 ITEM: CITY OF SANjOSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR AND CITY COUNCIL SUBJECT: BOND-FUNDED SOFTBALL PROJECT UPDATE Approved ' rvr\s~ L_ Memorandum FROM: Angel Rios,

More information

COMPREHENSIVE ANNUAL FINANCIAL REPORT FISCAL YEAR ENDED JUNE 30, 2018

COMPREHENSIVE ANNUAL FINANCIAL REPORT FISCAL YEAR ENDED JUNE 30, 2018 COMPREHENSIVE ANNUAL FINANCIAL REPORT FISCAL YEAR ENDED JUNE 30, 2018 Cosumnes Community Services District 9355 E. Stockton Boulevard, Suite 185, Elk Grove, California 95624 Phone: (916) 405-7150 Fax:

More information

CAPITAL IMPROVEMENT PLAN

CAPITAL IMPROVEMENT PLAN CAPITAL IMPROVEMENT PLAN Algoma Township 1 P a g e Table of Contents Title Page 1 Table of Contents 2 Chapter 1 Executive Summary Overview 3 The Capital Improvement Plan 3 Organization 4 Project Prioritization

More information

FLINT HILL MANOR FLINT HILL MANOR. Replacement Reserve Study. Oakton, Virginia. Property Management: Flint Hill Manor Townhouse Association

FLINT HILL MANOR FLINT HILL MANOR. Replacement Reserve Study. Oakton, Virginia. Property Management: Flint Hill Manor Townhouse Association Replacement Reserve Study REPLACEMENT RESERVE STUDY Oakton, Virginia Property Management: Flint Hill Manor Townhouse Association Jamie Critchfield Vice President Email: tommie0200@aol.com Consultant: RICHARD

More information

OPERATIONS AND MAINTENANCE IMPLEMENTATION EAST OF THE RIVER PARK MASTER PL AN

OPERATIONS AND MAINTENANCE IMPLEMENTATION EAST OF THE RIVER PARK MASTER PL AN INTRODUCTION PLANNING PROCESS SERVICE AREA VISION PARK PLANS OPERATIONS AND MAINTENANCE IMPLEMENTATION 6 IMPLEMENTATION EAST OF THE RIVER PARK MASTER PL AN 291 IMPLEMENTATION Implementation of planned

More information

Infrastructure and Capital Projects Planning and Funding

Infrastructure and Capital Projects Planning and Funding Infrastructure and Capital Projects Planning and Funding September 6, 2018 Preview of FY 2020 2024 CIP process Why are we here? Overview Current Assets Overview and Highlights of Adopted FY 2019 2023 CIP

More information

COUNTY ADMINISTRATOR PUBLIC WORKS

COUNTY ADMINISTRATOR PUBLIC WORKS COUNTY ADMINISTRATOR PUBLIC WORKS Public Works is comprised of several Departments/Divisions that develop, improve, and maintain the County s basic infrastructure needs related to transportation, storm

More information

FY 2018 FY 2022 Capital Improvement Program (CIP) Executive Summary

FY 2018 FY 2022 Capital Improvement Program (CIP) Executive Summary FY 2018 FY 2022 Capital Improvement Program (CIP) Executive Summary The adopted FY 2018 FY 2022 CIP is $138 million (including prior year expenditures) and is $100 million lower than the previous CIP due

More information

CIP. PUBLIC WORKS DEPARTMENT Timm Borden, Director

CIP. PUBLIC WORKS DEPARTMENT Timm Borden, Director PUBLIC WORKS DEPARTMENT Timm Borden, Director CITY HALL 10300 TORRE AVENUE ~ CUPERTINO, CA 95014-3266 (408) 777-3354 ~ FAX (408) 777-3333 CIP 2015-2016 Budget report of the Capital Improvement Program

More information

General Plan Goals. Vision. More Detail. More Detail. More Detail. More Detail

General Plan Goals. Vision. More Detail. More Detail. More Detail. More Detail GOALS The, Policies, and Action Items/ Implementation steps in this General Plan are organized as shown below. Each of the items in descending order provides more detail and specific information about

More information

DEPARTMENT OF PARKS AND RECREATION BUDGET REVIEW OCTOBER 1, BUDGET

DEPARTMENT OF PARKS AND RECREATION BUDGET REVIEW OCTOBER 1, BUDGET DEPARTMENT OF PARKS AND RECREATION BUDGET REVIEW OCTOBER 1, 2013 2014 BUDGET DPR Strategic Overview Citywide Vision: We will deliver a world-class city where everyone matters As stewards of Denver s legacy,

More information

City of Vacaville FY 2017/2018 CIP Budget, General Plan Consistency and CEQA Review Parks and Recreation

City of Vacaville FY 2017/2018 CIP Budget, General Plan Consistency and CEQA Review Parks and Recreation Parks and Recreation Park & Recreation Housing 14160 Grant Total Fund Balance $3,916,598 $3,916,598 Prior Budget Commitments ($2,770,788) ($2,770,788) Other Budget Commitments ($126,482) ($126,482) Other

More information

MAINTENANCE DEPARTMENT

MAINTENANCE DEPARTMENT MAINTENANCE DEPARTMENT E-78 City of Mercer Island 2007-2008 Budget Department: Maintenance The Maintenance Department consists of the following functions: 1) administration, 2) capital projects engineering,

More information

City of Pittsburg Five Year Capital Improvements Plan

City of Pittsburg Five Year Capital Improvements Plan General Fund Roadways Roadways account for forty three percent of the plan total and are the largest category at over $26.8 million. Planned improvements include annual street resurfacing, Silverback Way,

More information

Reserves & Reserve Funds Business Plan & 2016 Budget

Reserves & Reserve Funds Business Plan & 2016 Budget Reserves & Reserve Funds 2018 Business Plan & Budget Table of Contents Executive Summary of Reserves and Reserve Funds... 3 Overview... 4 Forecast Changes... 6 Operating Reserves and Reserve Funds... 7

More information

a) The City Manager has established a Roster for the provision of consulting services for a range of Assignments (REOI # ).

a) The City Manager has established a Roster for the provision of consulting services for a range of Assignments (REOI # ). October 3, 2011 1. Background City of Toronto Service Efficiency Study Program: Parks, Forestry & Recreation (PF&R) Statement of Work for External Management Consultants Roster Assignment #9144-11-7001-Cat2MC13-11

More information

Projects Receiving New Funding by. Funding Source and Project Number

Projects Receiving New Funding by. Funding Source and Project Number 20172022 Approved Capital Improvement Program s Receiving New Funding by Funding Source and Number 1001 GENERAL FUND A04000100 A07000300 A07000400 CITY CLER AUTOMATION IT EQUIPMENT REPLACEMENT CITYWIDE

More information

Concord Station Community Development District

Concord Station Community Development District Concord Station Community Development District concordstationcdd.com Adopted Budget for Fiscal Year 2018/2019 Presented by: Rizzetta & Company, Inc. 5844 Old Pasco Road, Suite 100 Pasco, Florida 33544

More information

Long Lake Ranch Community Development District

Long Lake Ranch Community Development District Long Lake Ranch Community Development District Budget Proposal Packet for Fiscal Year 2016/2017 Presented by: Rizzetta & Company, Inc. Wesley Chapel Office 5844 Old Pasco Rd.; Suite 100 Wesley Chapel,

More information

West-Side Parks, Landscaping, and Lighting Districts. City Council Workshop February 18, 2015

West-Side Parks, Landscaping, and Lighting Districts. City Council Workshop February 18, 2015 West-Side Parks, Landscaping, and Lighting Districts City Council Workshop February 18, 2015 Workshop Agenda and Goals Review the challenges and public information efforts in the West-Side Districts to

More information

PARK AND RECREATION IMPACT FEE ANALYSIS (IFA) MANTUA, UT JUNE 2018 DRAFT

PARK AND RECREATION IMPACT FEE ANALYSIS (IFA) MANTUA, UT JUNE 2018 DRAFT PARK AND RECREATION IMPACT FEE ANALYSIS (IFA) MANTUA, UT JUNE 2018 TABLE OF CONTENTS IMPACT FEE CERTIFICATION... 3 DEFINITIONS... 4 SECTION 1: EXECUTIVE SUMMARY... 5 SECTION 2: GENERAL IMPACT FEE METHODOLOGY...

More information

PUBLIC WORKS CIP SUPPORT

PUBLIC WORKS CIP SUPPORT PUBLIC WORKS Public Works is comprised of several Departments/Divisions that develop, improve, and maintain the County s basic infrastructure needs related to transportation, storm water management, and

More information

Closing the Gap: Investing in Neighborhood Parks

Closing the Gap: Investing in Neighborhood Parks Superintendent s Recommendations for Closing the Gap January 6 Recommendations presented and Board discussion of recommendations January 20 Board Action on recommendations By February 1 Formal communication

More information

CHAPTER 4 1 Transportation Financial Analysis

CHAPTER 4 1 Transportation Financial Analysis CHAPTER 4 1 Transportation Financial Analysis COMPASS commissioned a financial analysis, finalized in 2012, to support the CIM 2040 update. The analysis, Financial Forecast for the Funding of Transportation

More information

SERVICE DELIVERY & GOVERNMENTAL TRANSPARENCY Infrastructure & Operational Enhancements

SERVICE DELIVERY & GOVERNMENTAL TRANSPARENCY Infrastructure & Operational Enhancements SERVICE DELIVERY & GOVERNMENTAL TRANSPARENCY Infrastructure & Operational Enhancements To improve service delivery, the Proposed Budget continues a focus on improvements in: Core infrastructure Vital services

More information

ECIA 2019 BUDGET December, 3, 2018

ECIA 2019 BUDGET December, 3, 2018 INCOME 4100 - GENERAL ASSESSMENTS $1,456,350 2774 Homes @ $525.00 $1,456,350 Assesments $1,456,350 $1,456,350 RECOVERY INCOME 0 405 405 4230 - COMMUNITY CENTER RENTALS 8,000 8,316 Based on repeat yearly

More information

City of Falls Church

City of Falls Church 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Meeting Date: 10-8-14 (Work Session) City of Falls Church Title: ORDINANCE TO AMEND ORDINANCE 1918 AND ORDINANCE 1919, REGARDING

More information

FIVE-YEAR IMPLEMENTATION PLAN FOR THE SPRINGS REDEVELOPMENT PROJECT For the Period July 1, 2009 June 30, 2014

FIVE-YEAR IMPLEMENTATION PLAN FOR THE SPRINGS REDEVELOPMENT PROJECT For the Period July 1, 2009 June 30, 2014 FIVE-YEAR IMPLEMENTATION PLAN FOR THE SPRINGS REDEVELOPMENT PROJECT For the Period July 1, 2009 June 30, 2014 I. INTRODUCTION A. Background The Sonoma County Board of Supervisors (the Board of Supervisors

More information

Brooklyn Bridge Park Financial Plan

Brooklyn Bridge Park Financial Plan Brooklyn Bridge Park Financial Plan A. BACKGROUND B. CONSTRUCTION BUDGET COSTS BY ELEMENT C. MAINTENANCE AND OPERATIONS BUDGET D. DEVELOPMENT REVENUE BUDGET JANUARY 29, 2009 1 BACKGROUND BACKGROUND AND

More information

Special City Commission Meeting. September 20, 2011

Special City Commission Meeting. September 20, 2011 Special City Commission Meeting September 20, 2011 1 Agenda Staff Presentation Ordinance 2011-120: User Fees Ordinance 2011-124: Fines, Liens, and Administrative Costs Resolution 2011-038: Establish an

More information

AGENDA STATUS OF CURRENT YEAR BUDGET FY 19 CURRENT PROJECTIONS REVIEW FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM REVIEW CITY COUNCIL WORK PLAN

AGENDA STATUS OF CURRENT YEAR BUDGET FY 19 CURRENT PROJECTIONS REVIEW FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM REVIEW CITY COUNCIL WORK PLAN AGENDA STATUS OF CURRENT YEAR BUDGET FY 19 CURRENT PROJECTIONS FOCUS ON COSTS CALPERS UPDATE REVIEW FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM REVIEW CITY COUNCIL WORK PLAN ANSWER QUESTIONS ABOUT DEPARTMENT

More information

CITY OF SACRAMENTO CALIFORNIA. April 27, 2012

CITY OF SACRAMENTO CALIFORNIA. April 27, 2012 OFFICE OF THE CITY MANAGER CALIFORNIA April 27, 2012 CITY HALL 5 th FLOOR 915 I STREET SACRAMENTO, CA 95814-2684 PH 916-808-5704 FAX 916-808-7618 Honorable Mayor and City Council Sacramento, California

More information

INVITATION TO BID Lawn and Landscape Maintenance Services Town of Palm Beach Shores

INVITATION TO BID Lawn and Landscape Maintenance Services Town of Palm Beach Shores INVITATION TO BID Lawn and Landscape Maintenance Services Town of Palm Beach Shores The Town of Palm Beach Shores desires to engage the services of an individual or business entity to provide lawn and

More information

CITY OF GLENDALE, CALIFORNIA REPORT TO THE:

CITY OF GLENDALE, CALIFORNIA REPORT TO THE: CITY OF GLENDALE, CALIFORNIA REPORT TO THE: Joint D City Council ~ Housing Authority D Successor Agency D Oversight Board D April 1, 2014 AGENDA ITEM Report: Fremont Park Tennis Court Lighting and Resurfacing

More information

IMPLEMENTATION SECTION CONTENTS: IMPLEMENTATION ACCOUNTABILITY COST ESTIMATES USING THIS DOCUMENT AMENDING THIS PLAN

IMPLEMENTATION SECTION CONTENTS: IMPLEMENTATION ACCOUNTABILITY COST ESTIMATES USING THIS DOCUMENT AMENDING THIS PLAN IMPLEMENTATION SECTION CONTENTS: IMPLEMENTATION ACCOUNTABILITY COST ESTIMATES USING THIS DOCUMENT AMENDING THIS PLAN IMPLEMENTATION Implementation of planned park improvements is a critical aspect of planning.

More information

FOUNTAIN HILLS COMMUNITY ASSOCIATION FISCAL YEAR 2017 BUDGET NOTES May 6, 2016 GENERAL ASSOCIATION BUDGET

FOUNTAIN HILLS COMMUNITY ASSOCIATION FISCAL YEAR 2017 BUDGET NOTES May 6, 2016 GENERAL ASSOCIATION BUDGET FOUNTAIN HILLS COMMUNITY ASSOCIATION FISCAL YEAR 2017 BUDGET NOTES May 6, 2016 GENERAL ASSOCIATION BUDGET I. INCOME 1. Assessment Income The total income generated from the monthly assessment charged to

More information

City of Manassas, Virginia Planning Commission Meeting AGENDA. Work Session

City of Manassas, Virginia Planning Commission Meeting AGENDA. Work Session City of Manassas, Virginia Planning Commission Meeting AGENDA Work Session 9027 Center Street Manassas, VA 20110 Second Floor Conference Room Wednesday, May 02, 2018 Call to Order - 6:30 p.m. Roll Call

More information

CAPITAL IMPROVEMENT PROGRAM K-1

CAPITAL IMPROVEMENT PROGRAM K-1 Fund # begins with a Fund Type Fund Type Description/Restrictions 1 General The City's principal operating fund, which is supported by taxes and fees and which, generally, has no restrictions on its use.

More information

IMPLEMENTATION SECTION CONTENTS: IMPLEMENTATION ACCOUNTABILITY COST ESTIMATES USING THIS DOCUMENT AMENDING THIS PLAN

IMPLEMENTATION SECTION CONTENTS: IMPLEMENTATION ACCOUNTABILITY COST ESTIMATES USING THIS DOCUMENT AMENDING THIS PLAN IMPLEMENTATION SECTION CONTENTS: IMPLEMENTATION ACCOUNTABILITY COST ESTIMATES USING THIS DOCUMENT AMENDING THIS PLAN IMPLEMENTATION Implementation of planned park improvements is a critical aspect of planning.

More information

CAPITAL IMPROVEMENT PROGRAM K-1

CAPITAL IMPROVEMENT PROGRAM K-1 Fund # begins with a Fund Type Fund Type Description/Restrictions 1 General The City's principal operating fund, which is supported by taxes and fees and which, generally, has no restrictions on its use.

More information

PLANO TOMORROW COMPREHENSIVE PLAN ANNUAL REPORT

PLANO TOMORROW COMPREHENSIVE PLAN ANNUAL REPORT PLANO TOMORROW COMPREHENSIVE PLAN ANNUAL REPORT TWENTY SIXTEEN OCTOBER 12, 2015 - OCTOBER 12, 2016 Planning for Excellence Silver Level Recognition Comprehensive Plan Standards for Sustaining Places Program

More information

NOTICE OF ELECTION 2021 $10,000, $10,000, $10,000, $10,000,000

NOTICE OF ELECTION 2021 $10,000, $10,000, $10,000, $10,000,000 NOTICE OF ELECTION TO THE QUALIFIED VOTERS OF DEKALB COUNTY, GEORGIA NOTICE IS HEREBY GIVEN that on the 7 th day of November, 2017, an election will be held at the regular polling places in all of the

More information

REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO OF THE CITY OF SAN JACINTO

REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO OF THE CITY OF SAN JACINTO REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO. 2003-1 OF THE CITY OF SAN JACINTO December 11, 2003 REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO. 2003-1 CITY OF SAN JACINTO Prepared for CITY OF SAN

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION. Prepared for: MEADOWWOOD HOMEOWNER S ASSOCIATION

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION. Prepared for: MEADOWWOOD HOMEOWNER S ASSOCIATION RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: MEADOWWOOD HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 Site Inspection:

More information